The statute authorizing approval for both studies is R.I. Gen. Laws (b) which reads as follows:

Similar documents
Re: Docket No R.I. Office of Energy Resources Response to the Commission s Set of Data Requests Dated June 30, 2016

RE: Docket Proposed FY 2019 Electric Infrastructure, Safety, Reliability Plan Responses to Record Requests

STATE OF RHODE ISLAND AND PROVIDENCE PLANTATIONS PUBLIC UTILITIES COMMISSION

STATE OF RHODE ISLAND AND PROVIDENCE PLANTATIONS PUBLIC UTILITIES COMMISSION REPORT AND ORDER

STATE OF RHODE ISLAND AND PROVIDENCE PLANTATIONS DIVISION OF PUBLIC UTILITIES AND CARRIERS 89 JEFFERSON BOULEVARD WARWICK, RHODE ISLAND 02888

Enclosed please find ten (10) copies of National Grid s Post-Hearing Memorandum in the abovecaptioned

JOSEPH A. KEOUGH JR.* JEROME V. SWEENEY III* SEAN P. KEOUGH* STACI L. KOLB JEROME V. SWEENEY II OF COUNSEL

KEEGAN WERLIN LLP. ATTORNEYS AT LAW 99 HIGH STREET, Suite 2900 BOSTON, MASSACHUSETTS 02110

Docket 4651 Arrearage Management Adjustment Factor Filing

October 1, 2015 VIA HAND DELIVERY & ELECTRONIC MAIL

Amended Solicitation Plan for the Purchase and Sale of Connecticut. Class I Renewable Energy Credits. from Low and Zero Emission Projects

The following words and terms shall have the following meanings when used in this Tariff:

Electri Safety, Revised. Related. Submitted. by: Submitted to:

September 18, 2018 BY HAND DELIVERY AND ELECTRONIC MAIL

REQUEST FOR PROPOSALS FOR LONG-TERM CONTRACTS FOR RENEWABLE ENERGY PROJECTS

SREC II-BASED SOLAR FINANCING PROGRAM ROUND 6 CONSOLIDATED BID APPLICATION Due no later than April 17, 2017 by 5:00 PM

H 7991 SUBSTITUTE A ======== LC005162/SUB A/4 ======== S T A T E O F R H O D E I S L A N D

Docket Electric Retail Rates Filing Compliance Filing

STATE OF RHODE ISLAND AND PROVIDENCE PLANTATIONS PUBLIC UTILITIES COMMISSION

THE NARRAGANSETT ELECTRIC COMPANY RENEWABLE ENERGY GROWTH PROGRAM FOR NON-RESIDENTIAL CUSTOMERS

The Narragansett Electric Company d/b/a National Grid Tariff Advice Filing to Amend R.I.P.U.C. No Docket No.

Benjamin C. Riggs, Jr. 15D Harrington Street Newport, RI Tel. 401/ Fax

STATE OF RHODE ISLAND AND PROVIDENCE PLANTATIONS PUBLIC UTILITIES COMMISSION

Docket Distribution Adjustment Charge ( DAC ) Responses to Record Requests

The Rhode Island Energy Efficiency and Resource Management Council

January 17, National Grid Renewable Energy Standard Procurement Plan Docket No. 3765

RE: Docket No Distribution Adjustment Charge Filing 2010 Supplemental Response to Division 1-5 and 1-6 Responses to Division Data Requests Set 3

Rhode Island Renewable Energy Standard. Instructions for completing Table One and Documenting Information (Revised 5/15/2015)

RIPUC No Sheet 1 THE NARRAGANSETT ELECTRIC COMPANY RENEWABLE ENERGY GROWTH PROGRAM COST RECOVERY PROVISION

Luly E. Massaro, Commission Clerk March 21, 2019 Public Utilities Commission 89 Jefferson Blvd. Warwick, RI 02888

S 0876 S T A T E O F R H O D E I S L A N D

RI Commercial PV Financing Julian Dash Principal Clean Economy Development, LLC

Interconnection Standards Solar Policy Survey January 2017

September 21, 2017 VIA HAND DELIVERY & ELECTRONIC MAIL

TITLE 815 DIVISION OF PUBLIC UTILITIES AND CARRIERS

January 3, Ms. Kimberly D. Bose, Secretary Federal Energy Regulatory Commission 888 First Street, N.E. Washington, D.C.

Docket No Twenty-First Set of Data Requests of the Division of Public Utilities and Carriers to National Grid February 2, 2018

Docket No Twenty-First Set of Data Requests of the Division of Public Utilities and Carriers to National Grid February 2, 2018

Feed-in Tariff Policy Design: Innovations, Lessons Learned and Future Direction

THE NARRAGANSETT ELECTRIC COMPANY RENEWABLE ENERGY GROWTH PROGRAM COST RECOVERY PROVISION

A. These rules and regulations are promulgated pursuant to the authority conferred by R.I. Gen. Laws

September 9,2015. Ms. Luly E. Massaro, Commission Clerk Rhode Island Public Utilities Commission 89 Jefferson Boulevard Warwick, RI 02888

STATE OF RHODE ISLAND AND PROVIDENCE PLANTATIONS PUBLIC UTILITIES COMMISSION REPORT AND ORDER

Docket 4610 Electric Environmental Response Fund Request to Propose an Addition to the List of Sites

October 22, 2007 VIA HAND DELIVERY & ELECTRONIC MAIL

STATE OF RHODE ISLAND AND PROVIDENCE PLANTATIONS PUBLIC UTILITIES COMMISSION

RE: Docket National Grid s Proposed FY 2016 Electric Infrastructure, Safety, and Reliability Plan Responses to Record Requests

RE: Docket 3859 Distribution Adjustment Clause Filing 2007

Restoring the Balance in the Regulatory Compact. Marion S. Gold Commissioner 2018 NASUCA Annual Meeting November 12, 2018

STATE OF RHODE ISLAND AND PROVIDENCE PLANTATIONS PUBLIC UTILITIES COMMISSION

Docket Revenue Decoupling Mechanism Proposal Responses to Division Data Requests 1-19

JOSEPH A. KEOUGH JR.* JEROME V. SWEENEY III* SEAN P. KEOUGH* STACI L. KOLB JEROME V. SWEENEY II OF COUNSEL

Before the Rhode Island Public Utilities Commission

EXHIBIT "B" CRITERIA AND BILLING FOR EXTRA SERVICES

NINTH AMENDMENT A G R E E M E N T. Between BROWARD COUNTY. and THE WEITZ COMPANY, LLC. for

REQUEST FOR PROPOSALS FOR LONG-TERM CONTRACTS FOR CLEAN ENERGY PROJECTS

Short Form Instructions

Exhibit A Simplified Process Interconnection Application

October 20, VIA ELECTRONIC FILING-

PSE&G Solar Loan III Program General Q&A

Application for Interconnection and Net Metering Level 1

August 1, Ms. Kimberly D. Bose, Secretary Federal Energy Regulatory Commission 888 First Street, N.E. Washington, D.C

POLICY NO I. INTRODUCTION

CORDELIA FIRE PROTECTION DISTRICT FACILITY RENTAL CONTRACT

04/16/2014- AMENDED AND REPORTED OUT TO THE FLOOR 04/04/14-AMENDED AND REPORTED OUT TO THE COMMITTEE ON RULES AND JUDICIARY 09/13/13-NO ACTION TAKEN

Proposal Concerning Modification to Smart Grid Small Generator Interconnection Procedures Appended to LIPA s Tariff for Electric Service

February 20, National Grid Renewable Energy Standard Procurement Plan Docket No. 3765

Superseding REVISED Sheet No. 38 REVISED SHEET NO. 38 Effective March 20, 2008 Effective February 6, 2014 RULE NO. 18. Net Energy Metering

THE NARRAGANSETT ELECTRIC COMPANY ARREARAGE MANAGEMENT PROGRAM PROVISION

RE Growth Enrollment and Tariff Overview

PART 7 Rules and Regulations for Certification as a Qualified Business Entity or a Certified Venture Capital Partnership

The Commonwealth of Massachusetts

Standard Form of Agreement between Owner and Designer

Advice Letters 2311-E and 2311-E-A

FIRST AMENDMENT TO PORT EVERGLADES PASSENGER CRUISE TERMINAL AND BERTH USER AGREEMENT BETWEEN BROWARD COUNTY AND ROYAL CARIBBEAN CRUISES LTD.

YANKEE GAS SERVICES COMPANY, DBA EVERSOURCE ENERGY. DISTRIBUTED GENERATION (DG) DELIVERY REBATE Page 1 of 8

BANKING REGULATION 8 CHECK CASHERS. This regulation is promulgated pursuant to the authority granted in R.I. Gen. Laws

Contract Oversight Report CA City of Belle Glade Torry Island Observation Tower Contract Management Review March 28, 2019

MASSACHUSETTS OFFSHORE WIND ENERGY AREA LEASE OPPORTUNITIES

Customer s Name: Address: Contact Person: Telephone Number: Service Point Address: (Name and Address) Signature

Please Refer to Attached Sample Form

Smart Grid Small Generator Interconnection Procedures For Distributed Generators Less than 10 MW Connected in Parallel with LIPA s Radial

November 12, 2015 SPECIFIED STATE AGENCIES AND ELECTRIC DISTRIBUTION COMPANIES IN CONNECTICUT, MASSACHUSETTS AND RHODE ISLAND

STANDARD CONTRACT FOR SOLAR*REWARDS COMMUNITY

COMMONWEALTH OF PENNSYLVANIA PENNSYLVANIA PUBLIC UTILITY COMMISSION P.O. BOX 3265, HARRISBURG, PA March 1, 2012

ENTERGY LOUISIANA, LLC STANDARD INTERCONNECTION AGREEMENT FOR NET METERING FACILITIES

CITY AND COUNTY OF SAN FRANCISCO AIRPORT COMMISSION

New York State Public Service Commission

Precise Adjustments, Inc.

Request for Public Comment and Status of Proceeding to Investigate Approaches to Mitigate Solar Development Volatility

FLORIDA DEPARTMENT OF INSURANCE

PENNSYLVANIA PUBLIC UTILITY COMMISSION. Formal Complaint. Your name, mailing address, telephone number and utility account number:

BEFORE THE PUBLIC SERVICE COMMISSION OF MARYLAND. * COMAR * Administrative Docket RM17 Competitive Electric Supply * * * * * * * * *

Your Retirement Benefits

NARRAGANSETT BAY COMMISSION ONE SERVICE ROAD. PROVIDENCE, RI 02905

FEED-IN TARIFF CONTRACT (FIT CONTRACT)

STATE UNIVERSITIES RETIREMENT SYSTEM OF ILLINOIS

Dear Ms. Lawrence and Members of the Board of Commissioners:

DEFAULT SERVICE IN PENNSYLVANIA. David B. MacGregor, Esquire Anthony D. Kanagy, Esquire Post & Schell, P.C.

Rhode Island Commerce Corporation. Rebuild Rhode Island Tax Credit Economic Impact Analysis

Transcription:

STATE OF RHODE ISLAND AND PROVIDENCE PLANTATIONS Department of Administration DIVISION OF LEGAL SERVICES Tel: (0) -0 One Capitol Hill, th Floor Fax: (0) - Providence, RI 00-0 November, 0 VIA U.S. MAIL & EMAIL Luly E. Massaro Public Utilities Commission Jefferson Blvd. Warwick, Rhode Island 0 Re: Docket No. 0 - The Office of Energy Resources (OER) - Budget Requests to Perform Ceiling Price Services or Studies for the Renewable Energy Growth Program (Request Date //0) Dear Ms. Massaro: In accordance with R.I. Gen. Laws -.-(b), the Rhode Island Office of Energy Resources ( OER ), in consultation with the Rhode Island Distributed- Generation Board ( DG Board ), is requesting approval from the Public Utilities Commission ( PUC ) to perform ceiling price studies for the 00 Renewable Energy ( RE ) Growth Program year and to conduct solar quality assurance field case studies during the 0 RE Growth Program year. OER and the DG Board are respectfully requesting approval from the PUC to receive Eighty Five Thousand Dollars ($,000.00) representing the anticipated costs for the ceiling price studies and One Hundred Forty Five Thousand Five Hundred Seventy Five Dollars ($,.00) representing the anticipated cost for the solar quality assurance studies. The statute authorizing approval for both studies is R.I. Gen. Laws -.-(b) which reads as follows: The office, in consultation with the board, shall be authorized to hire, or to request the electric-distribution company to hire, the services of qualified consultants to perform ceiling price studies subject to commission approval that shall be granted or denied within sixty (0) days of receipt of such request from the office. The cost of such studies shall be recoverable through the rate-reconciliation provisions of the electric-distribution company set forth in -.-, subject to commission approval. In addition, the office, in consultation with the board, may request the commission to approve other costs incurred by the board, office, or the electric-distribution company to utilize consultants for annual programmatic services or to perform any other studies and reports, subject to the review and approval of the commission, that shall be granted or denied within one hundred twenty (0) days of receipt of such request from the

Transmittal Letter - Page of office, and that shall be recoverable through the same reconciliation provisions. Emphasis Added. For additional information relating to this filing please see the attached Exhibit A which provides background information in a question and answer format. Sincerely, If you have any questions or concerns, please do not hesitate to contact me. Andrew S. Marcaccio Deputy Chief of Legal Services Enclosures cc: Kenneth Payne, Chairperson, Distributed Generation Board Christopher Kearns, Office of Energy Resources

Exhibit A - Page of The Office of Energy Resources (OER) - Budget : Requests to Perform Ceiling Price Services or Studies : Docket 0 for the Renewable Energy Growth Program : (Request Date --0) : Exhibit A Background Information Prepared by Rhode Island Office of Energy Resources Staff November, 0

Exhibit A - Page of 0 DG Board Approval Q. Did the Rhode Island Distributed-Generation Board ( DG Board ) approve the requested funding amounts relating to the Renewable Energy ( RE ) Growth Program? A. Yes. On October, 0, the DG Board directed the Rhode Island Office of Energy Resources ( OER ) to submit a budgetary request to the Rhode Island Public Utilities Commission ( PUC ) in the amount of Eighty Five Thousand Dollars ($,000.00) to perform ceiling prices studies for the 00 RE Growth Program year. In addition, the DG Board directed OER to submit a budgetary request to the PUC in the amount of One Hundred Forty Thousand Five Hundred Seventy Five Dollars ($0,.00) to conduct solar quality assurance field case studies for the 0 RE Growth Program year. Ceiling Price Studies Q. How does the amount requested by the DG Board and OER to perform the ceiling price studies for the 00 RE Growth program year compare with prior years? A. Please see Table below. RE Growth Program Year Table Historical Funding s for Ceiling Price Studies OER / DG Board Request Date Requested PUC Order No. PUC Approved Actual Spent 00 //0 $,000 N/A N/A N/A 0 //0 $,000 0 $,000 $,.00 0 //0 $,000 $,000 $,000.00 0 //0 $,000 $,000 $,000.00 0 //0 $,000 0 $,000 $,0.00 0 //0 $,000 $,000 $,. As of October, 0 The amount in excess of $,000 was not recovered through rate-reconciliation.

Exhibit A - Page of 0 0 Q. The DG Board and OER are requesting an additional $,000 as compared to last year s budgetary request for celling price studies. Why? A. OER and the Rhode Island Division of Public Utilities and Carriers ( DPUC ) are interested in examining possible location-based incentives to be factored into ceiling prices for future RE Growth program years, potentially beginning with the 00 RE Growth Program year. To understand the potential value in location-based ceiling prices, the additional funds would be utilized to cover the costs of a brief analysis to be conducted by the consultant who will be conducting the ceiling price studies. The analyses would examine best practices in other jurisdictions and offer possible incremental steps toward adopting granular location-based prices. OER, the DPUC, National Grid, and the DG Board would examine any potential opportunities for location-based incentives with the consultant during the spring and summer of the 0 calendar year while developing the ceiling prices for the 00 RE Growth Program year. Q. Who will be the consultant to perform the ceiling price studies for the 00 RE Growth Program year? A. Sustainable Energy Advantage, LLC ( SEA ). Q. Was SEA selected through a competitive solicitation process? A. Yes, the Rhode Island Division of Purchases ( Purchases ), on behalf of OER and the DG Board, issued a request for proposals, solicitation number, entitled Renewable Energy Growth Program -- 00-0 Ceiling Prices Development (the RFP ). The RFP was issued on February, 0 and solicited services of a qualified consultant to conduct ceiling price studies for the 00-0 RE Growth Program years. SEA was the selected consultant.

Exhibit A - Page of 0 0 Q. In the order approving funding for the ceiling price studies for the 0 RE Growth Program year (Order No. 0), the PUC included a footnote that the consultant s 0 invoices had not included an hourly rate or number of hours billed and that OER explained the consultant agreement in effect for the 0-0 program years had established a lump sum fixed-fee price agreement for ceiling price studies. The footnote also provided that OER would seek a provision requiring an hourly rate breakdown through the upcoming RFP for ceiling price services. Does the consultant agreement for ceiling price studies for the 00-0 program years require the consultant to include an hourly services breakdown in its invoices? A. Yes. Q. Does the consultant agreement include a budgetary cap to perform the ceiling price studies for the 00 RE Growth Program year? A. Yes. The cap is $,0. Q. Why is the requested amount attributable to the ceiling price studies above the budgetary cap? A. As has been the case for prior requests, the requested amount serves as a do-not-exceed amount and only the actual amount utilized will be recovered through ratepayers. The additional funds provide OER and the DG Board with the ability to adjust in response to market conditions or enacted federal legislation and such adjustments could be beyond the scope of the consultant agreement. For example, in December 0, the federal renewable tax credits were extended which required the proposed ceiling prices to be updated. In 0, the Trump Administration imposed tariffs on imported solar panels, which required adjustments to the 0 ceiling prices in January 0. If there are no unexpected expenses

Exhibit A - Page of 0 0 and the funds aren t needed, then OER will not request payment from National Grid for the unused budget. Q. Does the requested budget for ceiling price services help achieve some of the goals relating to PUC Docket 00? A. Yes, the annual ceiling price design, which has been approved annually by the PUC since 0, achieves some of Docket 00 objectives by developing cost effective renewable energy ceiling prices for the technology categories; diversifying of the state s energy mix with a variety and scale of distributed generation resources; and assisting the state s climate change objectives upon the installation of systems with the associated ceiling prices through or 0 year tariffs. Q. Will the DG Board and OER utilize the consultant s ceiling price studies to provide recommendations to the PUC for the 00 RE Growth Program year? A. Yes. The DG Board and OER anticipate filing ceiling price recommendations for the 00 RE Growth Program year in the fall of 0. See PUC Docket for an example of how the recommendations were filed for the 0 RE Growth Program year. Solar Quality Assurance Case Studies Q. How does the amount requested by the DG Board and OER to perform the solar quality assurance studies during the 0 RE Growth program year (the 0 QA Study ) compare with prior years? A. See Table [starting on next page].

Exhibit A - Page of Table Historical Funding s for QA Studies QA Study 0 QA Study 0 QA Study 0 QA Study OER / DG Board Request Date Requested PUC Order No. PUC Approved Actual Spent //0 $0, N/A N/A N/A N/A Date Report Issued //0 $,000 0 $,000 $,. // //0 $,000 0 $,000 $0,0 /0/0 0 Q. Who will be the consultant to perform the quality assurance studies for the 0 RE Growth Program year? A. The Cadmus Group Inc. ( Cadmus ). Q. Was Cadmus selected through a competitive solicitation process? A. Yes, the Rhode Island Division of Purchases ( Purchases ), on behalf of OER, issued a request for proposals, solicitation number 0, entitled Solar Quality Assurance Inspection Study and Report (the QA RFP ). The QA RFP was issued on August, 0 and solicited services of a qualified consultant to conduct quality assurance studies to cover installations that occurred in 0 and 0 provided that the DG Board has the express right to retain the selected consultant to perform additional solar quality assurance inspections and reports for additional years. The DG Board has exercised its right to retain the consultant for the 0 QA Study and anticipates doing so for the requested 0 study. Q. When the DG Board and OER procured Cadmus for the 0 QA Study, what was the negotiated fee? As of October, 0. Pursuant to consultant agreement, the price of the 0 QA Study is $,.

Exhibit A - Page of 0 0 A. Pursuant to consultant agreement as amended, the negotiated fee for the 0 QA Study is $, which is lower than the $,000 do-not-exceed amount that was requested by the DG Board and OER for that report. Q. Is the requested budget for the 0 QA Study the same as for the 0 QA Study? A. No. The requested budget for the 0 QA Study of $0, is greater than what the 0 actual cost will be for the 0 QA Study. OER negotiated with Cadmus to keep the budget as close to the budget for the 0 QA Study, despite the addition of two () new tasks. The expected cost for all nine () tasks listed below is $0, which is $, more than the negotiated price contained within the consultant agreement. Q. Why is the requested budget for the 0 QA Report $, more than the negotiated price for the 0 QA Report? A. The budget was increased for the two new additional tasks. See Task and Task below. Q. What are the objectives of the requested 0 Solar Quality Assurance Study? A. The quality assurance studies will assist OER and the DG Board in ensuring solar PV installations that occur as part of the RE Growth Program are safe and trustworthy. For additional information, please see VI of the Report and Recommendations of the Rhode Island Distributed Generation Board on 0 Renewable Energy Growth Classes, Ceiling Prices, and Capacity Targets dated October, 0 that was filed by the DG Board an OER in PUC Docket No.. Q. What tasks will be performed by the consultant through the requested 0 Solar Quality Assurance Study? A. There are nine () tasks outlined for the 0 work Cadmus will perform. They include: Task Project planning

Exhibit A - Page of 0 0 Task. Small scale inspections Task. Medium scale solar inspections Task. Large solar inspections Task - Wind Turbine inspections Task Customer survey Cadmus will conduct a survey of RE Growth customers, as was previously done for the 0 report. The survey will be web based and program participants will have the opportunity to win a gift card for completing the survey. Task Draft report Task Final report Task Presentations Task RE Growth Minimum Technical Requirements ( MTR ) new to 0. Cadmus, in coordination with OER and National Grid, will develop Minimum Technical Requirements for solar PV projects. The document, which will be posted on the National Grid RE Growth website, will focus on installation best practices that are mandated by both the National Electric Code as well as the RE Growth Program, such as interconnection and metering requirements. Appended to the MTR will be basic electrical diagrams of approved interconnection types and arrangements. Task Training for new installers and self-installers new to 0. The DG Board has directed OER to move forward with additional quality assurance measures for 0. One such measure is to create a webinar style training that will be mandatory for new RE Growth Program participants and self-installers. The training will need to be completed prior to applying for interconnection. OER, in coordination with Cadmus and National Grid, will develop this training which applicants would access via the

Exhibit A - Page of 0 National Grid interconnection portal. It would be approximately one () hour in length and will discuss the RE Growth Minimum Technical Requirements, the unique interconnection requirements of the RE Growth Program, and common installation violations. Q. In the order approving funding for the 0 QA Study (Order No. 0), the PUC directed OER to provide the PUC with an implementation plan for each 0 QA Study recommendation that it adopts. Has OER developed such an implementation plan for the 0 QA Study? A. Yes. Q. Will OER develop an implementation plan for all of the 0 QA Study recommendations that are adopted? A. Yes Q. Does the requested budget for quality assurance studies help achieve some of the goals relating to PUC Docket 00? A. Yes, the results of the quality assurance study will help the state identify and address safety concerns. This will help advance the goal of providing safe, clean, and affordable energy. Q. Will the PUC receive a presentation from OER and the consultant when the 0 studies and report is complete? A. Yes, we anticipate that a meeting will be scheduled at the PUC office in Q 0.