Flood Risk Reduction Program

Similar documents
Stormwater Management Utility Fee Reduction Credit Application

STORMWATER MANAGEMENT FUND Department of Environmental Services

Stormwater Utility Report #2 April 5, 2016

Volusia County Floodplain Management Plan 2012

Nassau County 2030 Comprehensive Plan. Capital Improvements Element (CI) Goals, Objectives and Policies. Goal

8.2 Adoption of the Cook County Stormwater Management Plan

STORMWATER MANAGEMENT FUND DEPARTMENT OF ENVIRONMENTAL SERVICES

FREQUENTLY ASKED QUESTION ABOUT FLOODPLAINS Michigan Department of Environmental Quality

STORMWATER MANAGEMENT FUND Department of Environmental Services

Justification for Floodplain Regulatory Standards in Illinois

BACKGROUND ANNUAL PROGRESS REPORT DEVELOPMENT ADOPTION OF THE H-GAC HAZARD MITIGATION PLAN/UPDATES MISSION STATEMENT

Water Resources Engineering Division Public Works City of Colorado Springs

Sugar Hill Stormwater Utility Credit Technical Manual

STORMWATER MANAGEMENT FUND DEPARTMENT OF ENVIRONMENTAL SERVICES

Priority Ranking. Timeframe. Faribault County Blue Earth, Bricelyn, Delavan, Easton, Elmore, Frost, Kiester, Minnesota Lake, Walters, Wells, Winnebago

Stormwater Utility Fund Delivery of Services

STORMWATER MANAGEMENT FUND Department of Environmental Services

Simsbury. Challenges Capitol Region Natural Hazards Mitigation Plan Update - Page 356

City of Galesburg Stormwater Utility Credits and Incentives Policy

Proposed FY Storm Drainage Management Fund Budget. Presented to the Dallas City Council August 19, 2009

Frequently Asked Questions Oxbow / Hickson / Bakke Ring Levee Option

CAPABILITY ASSESSMENT

DRAFT. Stormwater Management Program Credit Policy and Appeals Process Manual Policies & Procedures LOWER ALLEN TOWNSHIP STORMWATER AUTHORITY

Floodplain Management Legal Issues. Making the Case for a No Adverse Impact Approach

Public Outreach Strategy

PUBLIC WORKS CIP SUPPORT

Priority Ranking. Timeframe. Faribault County Blue Earth, Bricelyn, Delavan, Easton, Elmore, Frost, Kiester, Minnesota Lake, Walters, Wells, Winnebago

East Hartford. Challenges

Priority Ranking. Timeframe. Faribault County Blue Earth, Bricelyn, Delavan, Easton, Elmore, Frost, Kiester, Minnesota Lake, Walters, Wells, Winnebago

STORMWATER UTILITY FEE CREDIT MANUAL

9.31 Village of Smyrna

Mitigation Action Plan Alamance County

Finance Committee Meeting

NAPA COUNTY FLOOD CONTROL AND WATER CONSERVATION DISTRICT Board Agenda Letter

2018 FMA Annual Conference in Reno, NV:

9.2 ALBURTIS BOROUGH. This section presents the jurisdictional annex for Alburtis Borough. A. HAZARD MITIGATION PLAN POINT OF CONTACT

presents: PLANNING FOR THE FUTURE INFORMATIONAL OVERVIEW DETAILS PROVIDED BY:

Federal Emergency Management Agency

Green Stormwater. Flood Risk Reduction. Infrastructure for. June Presented by: Kari Mackenbach, CFM ms consultants Lynn Mayo, PE, CFM AECOM

VILLAGE OF GLENVIEW BOARD OF TRUSTEES MEETING August 2, 2011 M I N U T E S

HAZARD MITIGATION PLAN POINT OF CONTACT MUNICIPAL PROFILE

Statement of Policy. Milwaukee Metropolitan Sewerage District s Private Property Inflow and Infiltration Reduction Program.

FEMA FLOOD MAPS Public Works Department Stormwater Management Division March 6, 2018

Planning Process---Requirement 201.6(b): An open public involvement process is essential to the development of an effective plan.

Community Development Department

9.35 VILLAGE OF TULLY

PUBLIC WORKS DEPARTMENT

Urban Flooding in Illinois The Changing Face of Floods

Planning Process---Requirement 201.6(b): An open public involvement process is essential to the development of an effective plan.

Tookany Creek Watershed Flood Damage Reduction Feasibility Study Data Collection Checklist General Information Requirements

CAPITAL IMPROVEMENTS ELEMENT

MINUTES OF THE SPECIAL MEETING OF THE BOARD OF TRUSTEES OF THE VILLAGE OF GRAYSLAKE HELD MARCH 24, 2018

9.10 HEIDELBERG TOWNSHIP

City of Centerville BMP Pages Table of Contents. Minimum Control Measure 1. Public Education and Outreach

Town of Little Elm, Texas

SECTION V THE LOCAL MITIGATION STRATEGY BLUEPRINT

ANNEX B: TOWN OF BLUE RIVER

Village of Glenview Plan Commission

Stormwater Management Fee Policy Options and Recommendations

Winnetka Village Council STUDY SESSION Village Hall 510 Green Bay Road Tuesday, December 13, :00 PM AGENDA. 2) Water Rate Study...

CITY OF ALHAMBRA UTILITIES DEPARTMENT SEWER SYSTEM MAINTENANCE PROGRAM (SSMP)

Stormwater Utilities 101: Getting Started on Financing your Stormwater Management Plan

Floodplain Management 101. Mississippi Emergency Management Agency Floodplain Management Bureau

City of Sea Isle City Department of Construction and Zoning Physical Location: 4501 Park Road (rear entrance)

HAZARD MITIGATION PLAN POINT OF CONTACT MUNICIPAL PROFILE

Public Works and Development Services

PUBLIC WORKS DEPARTMENT Departmental Summary FUND/ACTIVITY ACTUAL ADOPTED AMENDED ADOPTED General Fund: Revenue Administration

Stormwater Needs Assessment

City of Des Moines. Budget Workshop. December 7, 2015

LOWER PASSAIC RIVER COMMUNITY ADVISORY GROUP

CAPITAL IMPROVEMENTS ELEMENT GOALS, OBJECTIVES AND POLICIES. Goal 1: [CI] (EFF. 7/16/90)

More Legal Quick Takes: SLR, Law & Flooding

Challenges. Estimated Damages from 100-Year Flood

Stormwater Management Program

ASFPM Partnerships for Statewide Mitigation Actions. Alicia Williams GIS and HMP Section Manager, Amec Foster Wheeler June 2016

Floodplain Development Permit Application

Chapter 6 - Floodplains

9.46 NAZARETH BOROUGH

Public Meeting Impact of Hurricane Irma on Central Beach

Repetitive Loss Area Revisit # 6 Walter Road Area Jefferson Parish

Stronger Storm Water Standards Will Reduce Flood Risks and Cut Costs

Lake County Stormwater Utility Fee

TOWNSHIP OF UPPER ST. CLAIR LONG-TERM PLAN

A Quick Guide to Defining and Funding Your Municipal Stormwater Program Merrimack Valley Stormwater Collaborative

City of Kinston. Stormwater Utility Credit Manual

Stormwater Business Plan & 2019 Budget

TOWN OF CENTREVILLE, MARYLAND. Financial Statements Together with Report of Independent Public Accountants

IMPLEMENTATION A. INTRODUCTION C H A P T E R

Wastewater Rate Study. Villa Park, Illinois

City of Prince Albert YEAR STRATEGIC PLAN

Chicopee River CSO Project Springfield Water & Sewer Commission. APWA Congress September 9, CSO Control Plan. CSO Control

City of Madison 2018 Capital Improvement Plan Agency Request Summary

Exhibit A. City of Roswell Stormwater Utility. Stormwater Utility Credit Manual. December 27, 2010

King County Flood Control District 2015 Work Program

Community Rating System. National Flood Insurance Program

This survey is expected to take approximately 20 minutes and must be completed in one session.

REAL ESTATE FLOOD DISCLOSURE PROGRAM & FLOOD MAP INFORMATION SERVICES

Mitigation Strategies

Existing Strategies. Challenges

Program for Public Information for Flood Awareness

Transcription:

Village of Glenview July 2012 Update Flood Risk Reduction Program Executive Summary The Flood Risk Reduction Program is a comprehensive approach to solving the flooding and drainage problems that the Village has been experiencing for a number of years. After substantial rain events in August 2007 and September 2008, which greatly impacted the entire community, the Village President and Board of Trustees appointed a 16-member Storm Water Task Force of residents who worked with staff and consultants to develop a storm water master plan. In August 2010, a storm water master plan, the Flood Risk Reduction Program, was approved, which outlined a multipronged approach for the Village to reduce the impacts of flooding where feasible and cost-effective. In response, the Village Board committed more than $7 million to begin implementation of the Flood Risk Reduction Program. This booklet provides an update on program accomplishments and the Village s plan for moving forward. The Program The Flood Risk Reduction Program is comprised of several key components. First and foremost it establishes the goals and fundamental principles of the Village Storm Water Management Program. It identified areas prone to problematic flooding and categorized these areas in 4 tiers based on the severity of flooding. These levels considered and weighted the ramifications associated with the severity of flooding based on impacts to public health and to private and public infrastructure. Elements of the program not only include capital infrastructure improvements, but also operational, regulatory, funding and public involvement efforts, as indicated below:

Five Fundamental Principles 1. Efforts to address flooding should include actions that will lead to quick visible results when feasible. 2. Take action to reduce the rate and volume of discharges to receiving sewers and streams. 3. Solutions should strive to have no significant negative impact on flooding of downstream areas. 4. Solutions should include public, private, local and regional efforts. 5. Costs to address all identified problems are very large; prioritization of efforts will be required. Benefits to the Community Proper storm water management not only provides benefits to those residents who are located in flood-prone areas but also those living adjacent to or near these areas. Reduction in problematic flooding benefits the community and improves the quality of life in the following ways: Enhances public health and safety by ensuring that routes used by emergency vehicles are not impacted by street flooding. Enhances community livability by improving public and private living space. Improves local character and maintains Village competitiveness. Helps maintain property values throughout the Village.»» Improves water quality to receiving wetlands and streams. 2 Village of Glenview Flood Risk Reduction Program 2012 Update

Program Accomplishments Operations and Maintenance - 2011 The past year has been busy for the Public Works Department. Check out their statistics! Public Works 2011 Statistics 420,600 feet of sanitary sewer cleaned 92% of entire system 1,860 sanitary manholes cleaned 52% of entire system Over 40,000 feet of storm sewer cleaned > 4% of entire system Over 2,000 storm sewer grate and structures cleaned >13% of entire system»» Debris removal: 320 tons from street sweeping 116 cubic yards from storm sewers Glenview Inlet Maintenance Program Capital Maintenance 2011 Statistics $1,200,000 of storm and sanitary capital maintenance Over 18,000 feet (3.5 miles) of sanitary sewer lining Over 2,500 feet (0.5 miles) of storm sewer lining Capital Improvement Program - 2010 to 2012 The Village is committed to evaluating opportunities for the installation of in-line detention in conjunction with future roadway projects. This effort is focused on increasing storm water detention and runoff management capacity throughout the Village. The following projects aligned with the Village s Capital Improvement Program and have been completed to date: Completed in 2010: Pfingsten Road Completed in 2011: Indian Road and Beverly Lane Indian Road (South of Glenview Road) Hunter Road (orth of Glenview Road) 100% Village Stormwater Detention Goal Dec 2012 Jan 2010 42.2% 40% Inline Detention (270,000 Gallons) Completion of these projects has provided 270,000 gallons (36,150 cubic feet) of detention storage benefitting approximately 273 parcels at a cost of $650,000. Flood Risk Reduction Program 2012 Update Village of Glenview 3

Where detention is not possible, the Village has implemented storm sewer and storm inlet improvement projects to increase conveyance and capacity within the public storm sewer system. In 2011 the Village installed over 2,180 linear feet of storm sewer benefitting about 163 parcels. The following areas have benefitted from the completion of these projects: Storm Sewer Conveyance Improvements Mary Kay Lane and Pebbleford Lane Fontana Drive and Bel Air Drive Shermer Road and Robincrest Road West Lake Avenue and Lehigh Avenue Pine Street Total Cost for Storm Sewer Improvements = $413,000 In 2011, the Village installed 11 storm sewer inlets benefitting about 46 parcels. The following areas have benefited from the completion of these projects: Storm Inlet Capacity Improvements orwich Court Barry Lane and La Fontaine Drive Knight Street Total Cost for Inlet Improvements = $23,600 Regional Projects Regional projects will continue to be a source of significant potential for the reduction of flooding risks to the residents of Glenview. The Village has been proactive in pursuing opprotunities with the Metropolitan Reclamation District of Greater Chicago (MWRDGC) for flood mitigation along the West and Middle Forks of the orth Branch of the Chicago River (BCR). MWRDGC is currently evaluating projects along the West Fork that will ultimately provide benefits to the Village of Glenview. Once a project is selected along the West Fork for implementation, the MWRDGC plans to further evaluate project opportunities along the Middle Fork. Regulatory Modifications During the SWTF process, several regulatory (permitting) standards were hightlighted for review and possible revision. The Village has successfully completed two of the items slated for review in the FRRP: The Village pursued certification with the ational Flood Insurance Program (FIP) Community Rating System (CRS) and achieved a CLASS 6 Rating from the Federal Emergency Management Agency (FEMA). (October 2011) Property Owners in the 100-year floodplain will receive a 20% discount on their annual flood insurance. Property Owners in the 500-year floodplain will receive a 10% discount on their annual flood insurance. A potential savings of about $34,000 per year! Infill Ordinance Amendment (June 2011) Expanded grading as-built and neighbor notification requirements.»» Provides additional tools to assist staff to proactively handle drainage problems 4 Village of Glenview Flood Risk Reduction Program 2012 Update

Cost-Sharing Programs As part of the FRRP, the implementation of the cost-sharing programs encourages the completion of beneficial local projects. Three of the programs, Rain Garden and Rain Barrel Program, Over-Head Sanitary Sewer Service Conversion and Holistic Drainage Inspections recommended by the SWTF have been successfully implemented. 152 Rain Barrels provided to residents (2010-2012) Cost Sharing Program umber of Approved Permits Resident Reimbursement Cost Sharing Rain Garden 37 $28,947 50/50 up to $1,000 Over-Head Sanitary Sewer Service Conversion 16 $81,923 50/50 up to $7,500 Holistic Drainage Inspections 40 $16,000 50/50 up to $400 TOTAL 93 $126,870 Rain Garden Program * As of July 2012 Funding Mechanisms Funding support is necessary to implement many of the recommendations presented in the FRRP. Village staff has been successful in securing funding from these following sources: Source Funding Village Board Quick-Win Projects $7,100,000 Illinois Green Infrastructure Grant (IGIG) Waukegan Road Rain Garden $7,114 Department of Commerce and Economic Opportunity (DCEO) Grants Bel Air and Clavey Inline Detention Improvements $100,000 Flick Park Drainage Improvement $50,000 East of Harms Sanitary System Improvements $200,000 The Village has completed and submitted a FEMA PDM Grant Application for the Dawes-Henley-Harlem Drainage Improvements in December of 2011. The estimated cost of the project is $1.25 Million with a 25% local match from the Village of about $350,000. The Village entered into contract with AMEC to perform a stormwater utility feasibility analysis study on October 25, 2011. Flood Risk Reduction Program 2012 Update Village of Glenview 5

A Plan for Moving Forward The Village of Glenview makes difficult decisions in prioritizing, funding and implementing specific flood risk reduction capital projects. There are numerous factors that can impact the decision to move forward on a project. The flow chart below assists Village Staff in their decision making process. Annual Capital Project Review Project Opportunity Does project address critical need? Can project reduce flood risk? Proceed Without Project Defer project for future implementation Is project consistent with Village strategy? Revise Project Is project costeffective? Is funding available? Implement 6 Village of Glenview Flood Risk Reduction Program 2012 Update

For a project to move forward, it needs to at least answer yes to the following four questions: Is there an opportunity for inclusion with other projects or is it critical? Is it consistent with Village Strategy? Is it cost-effective? Is there funding available? A Storm Water Snapshot This pie chart provides a snapshot of the storm water project needs throughout the Village. It also shows the significant progress the Village has made in completing stormwater projects amounting up to $6.8 Million. However, this chart also shows that there is still work to be Future done. There are about $49 Million Implementation worth of cost-effective projects, $59.6M both that are and are not river sensitive, awaiting an opportunity for implementation and funding. The remaining $59.6 Million are projects that have been identified for future implementation but further work needs to be completed to develop more cost effective projects. Completed $6.8M Stormwater Project eeds, Total Cost ($M) Cost-Effective, ot River Sensitive $32.5M Cost-Effective and River Sensitive $16.5M Flood Risk Reduction Program 2012 Update Village of Glenview 7

Detailed Action Plan for 2012 and 2013 OPERATIOS AD MAITEACE Implement a regular sewer cleaning and major ditch maintenance program. CAPITAL IMPROVEMET PROGRAM - Ongoing Construction Projects avy Bypass Storm Sewer Phase 1 completed in April 2012 Phase 2 under design Opportunity: Conveyance Cost to Village: $2 Million Bel-Air and Clayey in line detention Opportunity: Detention Cost to Village: $320,000 Forest Drive in line detention Opportunity: Detention Cost to Village: $150,000 Waukegan Road (River Drive) Rain Garden Opportunity: Water Quality Cost to Village: $4,316 (after IGIG Grant) REGIOAL PROJECTS CAPITAL IMPROVEMET PROGRAM - Ongoing Design Projects Park District Coordination Flick Park Opportunity: Detention (0.6 ac-ft) Cost to Village: TBD ($50,000) Grant Glenview Park Golf Club Opportunity: TBD Cost to Village: TBD Harrison/Ronald/Glendale Opportunity: Conveyance + Detention Cost to Village: $4.2 Million Bellwood Quick Win Opportunity: Conveyance + Detention Cost to Village: TBD Central/Glenwood (orthfield Township Coordination) Opportunity: Detention (6.9 ac-ft) Cost to Village: $400,000 orthfield Woods Opportunity: Detention Cost to Village: TBD Village-wide Detention over next 20-60 years Opportunity: In line Detention Cost to Village: $306,700-920,000 annually, plus additional needs/opportunities 2014 and Beyond Opportunity: Cost Beneficial Projects Cost to Village: $49 Million Continue to monitor MWRDGC progress on the planning and development of flood control projects along the West and Middle Forks of the orth Branch of the Chicago River. CAPITAL IMPROVEMET PROGRAM - SWAMP Improvement Area The Village s Storm Water Area Management Program (SWAMP) has been very successful with the following 3 SWAMP areas moving into the design phase. Glenayre SWAMP Cost to Village: $1.6 Million Maple SWAMP Cost to Village: $99,200 Long Valley SWAMP Cost to Village: $200,000 REGULATOR MODIFICATIOS MWRDGC Countywide Ordinance - Coordinate with MWRDGC staff and review/revise Village stormwater management policies and requirements as necessary. COST SHARIG PROGRAMS FOR 2012 AD 2013 Continue partnership with MWRDGC to support the Village s Rain Barrel Program that promotes the purchase and installation of rain barrels by Village Residents. Continue management of the Village s Holistic Private Flooding Inspections Program using $10,000 budgeted annually for 2012 and 2013. Continue management of the Village s Rain Garden Grant Program using $10,000 budgeted annually for 2012 and 2013. 8 Village of Glenview Flood Risk Reduction Program 2012 Update

Funding Mechanisms All-encompassing Municipal Storm Water Program The chart below shows budgeted funding versus the funding recommended in the Flood Risk Reduction Program. With over $3 million of total recommended annual needs, and just over $1 million made available through various sources, a short- and long-term plan to establish ongoing revenues to fund and implement the Flood Risk Reduction Program is needed. Public Works Village Stormwater eeds Actual Recommended Difference PW Operations & Maintenance - Current $381,061 $381,06 $0 PW Operations & Maintenance - Recommended (regular sewer cleaning program and major ditch maintenance) Capital Projects 0 $375,000 ($375,000) CIP Standards for Capital Maintenance - Current $800,000 $1,599,584 ($799,584) Flood Risk Reduction Program Projects - Recommended (cost beneficial local projects Village-wide [60-year cycle] and one-time area opportunities) 0 $960,000 ($960,000) TOTAL ($2,134,584) otes: Current actual costs paid by corporate fund. The Village Board will host more workshops in the coming year that will discuss possible funding sources or possible implementation of a stormwater utility to help generate revenue for stormwater projects. Flood Risk Reduction Program 2012 Update Village of Glenview 9