SOLUTIONS 913,

Similar documents
SOLUTIONS. Solution. The liabilities are deterministic and their value in one year will be $ = $3.542 billion dollars.

Mathematics of Finance Final Preparation December 19. To be thoroughly prepared for the final exam, you should

B6302 Sample Placement Exam Academic Year

Mathematics of Time Value

B6302 B7302 Sample Placement Exam Answer Sheet (answers are indicated in bold)

Portfolio Management

The exam will be closed book and notes; only the following calculators will be permitted: TI-30X IIS, TI-30X IIB, TI-30Xa.

Solutions to Further Problems. Risk Management and Financial Institutions

Derivatives Questions Question 1 Explain carefully the difference between hedging, speculation, and arbitrage.

EXAMINATION II: Fixed Income Valuation and Analysis. Derivatives Valuation and Analysis. Portfolio Management

John Hull, Risk Management and Financial Institutions, 4th Edition

Financial Markets & Risk

Interest Rate Markets

The University of Nottingham

2. Futures and Forward Markets 2.1. Institutions

FIN FINANCIAL INSTRUMENTS SPRING 2008

Final Exam. 5. (21 points) Short Questions. Parts (i)-(v) are multiple choice: in each case, only one answer is correct.

SAMPLE FINAL QUESTIONS. William L. Silber

Final Exam. 5. (24 points) Multiple choice questions: in each case, only one answer is correct.

Market risk measurement in practice

Homework. Due Monday 11/2/2009 at beginning of class Chapter 6: 2 Additional Homework: Download data for

NATIONAL UNIVERSITY OF SINGAPORE DEPARTMENT OF MATHEMATICS SEMESTER 2 EXAMINATION Investment Instruments: Theory and Computation

Futures and Forward Markets

Financial Risk Measurement/Management

Financial Derivatives Section 1

Random Variables and Applications OPRE 6301

Forward and Futures Contracts

Final Exam. Indications


Financial Risk Measurement/Management

INTEREST RATE FORWARDS AND FUTURES

Jaime Frade Dr. Niu Interest rate modeling

Consumption- Savings, Portfolio Choice, and Asset Pricing

UNIVERSITY OF TORONTO Joseph L. Rotman School of Management. RSM332 FINAL EXAMINATION Geoffrey/Wang SOLUTIONS. (1 + r m ) r m

Valuing Stock Options: The Black-Scholes-Merton Model. Chapter 13

Answer choice A in Problem 26, Practice Examination 8, should be 2.

Math 441 Mathematics of Finance Fall Midterm October 24, 2006

Port(A,B) is a combination of two stocks, A and B, with standard deviations A and B. A,B = correlation (A,B) = 0.

Sample Final Exam Fall Some Useful Formulas

LECTURE NOTES 3 ARIEL M. VIALE

, U.S.A. URL:

Midterm Review. P resent value = P V =

November Course 8V

M339W/M389W Financial Mathematics for Actuarial Applications University of Texas at Austin In-Term Exam I Instructor: Milica Čudina

When we model expected returns, we implicitly model expected prices

Mean-Variance Portfolio Theory

Paper 2.6 Fixed Income Dealing

Appendix A Financial Calculations

1 Asset Pricing: Replicating portfolios

SOCIETY OF ACTUARIES FINANCIAL MATHEMATICS. EXAM FM SAMPLE SOLUTIONS Financial Economics

Solution to Problem Set 2

Show that the column rank and the row rank of A are both equal to 3.

Overview of Concepts and Notation

Actuarial Society of India

Notes on: J. David Cummins, Allocation of Capital in the Insurance Industry Risk Management and Insurance Review, 3, 2000, pp

CHAPTER 10 SOME LESSONS FROM CAPITAL MARKET HISTORY

RISKMETRICS. Dr Philip Symes

MFE8825 Quantitative Management of Bond Portfolios

Derivatives Options on Bonds and Interest Rates. Professor André Farber Solvay Business School Université Libre de Bruxelles

FINA 695 Assignment 1 Simon Foucher

Financial Markets and Products

Final Examination. ACTU 363- Actuarial Mathematics Lab (1) (10/ H, Time 3H) (5 pages)

Derivatives Revisions 3 Questions. Hedging Strategies Using Futures

CHAPTER 14 BOND PORTFOLIOS

Optimizing Portfolios

More Actuarial tutorial at 1. An insurance company earned a simple rate of interest of 8% over the last calendar year

MORNING SESSION. Date: Wednesday, April 30, 2014 Time: 8:30 a.m. 11:45 a.m. INSTRUCTIONS TO CANDIDATES

Random Variables and Probability Distributions

PAPER 2 : STRATEGIC FINANCIAL MANAGEMENT

SOCIETY OF ACTUARIES Advanced Topics in General Insurance. Exam GIADV. Date: Thursday, May 1, 2014 Time: 2:00 p.m. 4:15 p.m.

Lecture 2. Agenda: Basic descriptions for derivatives. 1. Standard derivatives Forward Futures Options

On the Use of Stock Index Returns from Economic Scenario Generators in ERM Modeling

For each of the questions 1-6, check one of the response alternatives A, B, C, D, E with a cross in the table below:

MFE8812 Bond Portfolio Management

ECON FINANCIAL ECONOMICS

Corporate Finance, Module 21: Option Valuation. Practice Problems. (The attached PDF file has better formatting.) Updated: July 7, 2005

FINAL EXAMINATION GROUP - III (SYLLABUS 2016)

INSTITUTE OF ACTUARIES OF INDIA

The Multistep Binomial Model

Super-replicating portfolios

INSTITUTE OF ACTUARIES OF INDIA

University of North Carolina at Charlotte Mathematical Finance Program Comprehensive Exam. Spring, 2015

CREDIT RATINGS. Rating Agencies: Moody s and S&P Creditworthiness of corporate bonds

Lecture 8 Foundations of Finance

Exercise Session #1 Suggested Solutions

ERM (Part 1) Measurement and Modeling of Depedencies in Economic Capital. PAK Study Manual

Market Risk VaR: Model- Building Approach. Chapter 15

Analytical Problem Set

EXAMINATION II: Fixed Income Valuation and Analysis. Derivatives Valuation and Analysis. Portfolio Management

Credit Risk in Banking

Business Statistics 41000: Probability 3

SOLVENCY, CAPITAL ALLOCATION, AND FAIR RATE OF RETURN IN INSURANCE

Econ 424/CFRM 462 Portfolio Risk Budgeting

ELEMENTS OF MATRIX MATHEMATICS

DISCLAIMER. The Institute of Chartered Accountants of India

( 0) ,...,S N ,S 2 ( 0)... S N S 2. N and a portfolio is created that way, the value of the portfolio at time 0 is: (0) N S N ( 1, ) +...

May 2012 Course MLC Examination, Problem No. 1 For a 2-year select and ultimate mortality model, you are given:

Hedging and Regression. Hedging and Regression

Calculating EAR and continuous compounding: Find the EAR in each of the cases below.

The Term Structure and Interest Rate Dynamics Cross-Reference to CFA Institute Assigned Topic Review #35

Transcription:

Illinois State University, Mathematics 483, Fall 2014 Test No. 3, Tuesday, December 2, 2014 SOLUTIONS 1. Spring 2013 Casualty Actuarial Society Course 9 Examination, Problem No. 7 Given the following information on a currency swap: The swap has a remaining life of 15 months. The swap involves exchanging interest at 9% on 20 million British pounds for interest at 5% on $30 million at the end of each year. Principal amounts will be exchanged when the swap term expires. The term structure of interest rates in both the United Kingdom and the United States is currently flat and if the swap were negotiated today, the interest rates exchanged would be 6% in British pounds and 4% in dollars. The current exchange rate (dollars per British pound) is 1.65. All interest rates are quoted with annual compounding. Viewing the swap as a portfolio of forward contracts, calculate the current value of the swap to the party paying British pounds, such value calculated in British pounds. There are two payment times remaining on the swap: 3 months from now and 15 months from now. In 3 months, the party paying British pounds will need to pay 9% on 20 million British pounds, or 1.8 million pounds, and will receive 5% on $30 million, or $1.5 million. This is equivalent to a forward contract for purchase of $1.5 million in three months by paying 1.8 million pounds for it. Remember that we are doing calculations in pounds. Current forward price (in pounds) for purchase of $1.5 million in 3 months is (in pounds) 12 $1,500,000 1.06 3 913,430.37. 1.65 12 1.04 Spot price in pounds Accumulated with interest in British pounds 3 Contract price without dollar interest income, i.e., "ex-dividend" Instead, 1.8 million pounds will be paid. This amounts to 913,430.37 1,800,000.00 = 886,569.63 pounds in three months, and in present value 886,569.63 3 873,749.38 pounds. 12 1.06 In 15 months, the party paying pounds will pay 1.8 million pounds plus 20 million principal, and receive $1.5 million plus $30 million principal, effectively purchasing $31.5 million for 21.8 million pounds. Current forward price for $31.5 million is

12 $31,500,000 1.06 15 19,550,923.10 pounds. 1.65 12 1.04 Spot price in pounds Accumulated with interest in British pounds 15 Contract price without dollar interest income, i.e., "ex-dividend" Instead, 21.8 million pounds will be paid. The value of such transaction is 19,550,923.10 21,800,000.00 = 2,249,076.90 pounds in 15 months, and in today s money, this is 2,249,076.90 15 2,091,086.40 pounds. 12 1.06 Total value, in pounds, to the party paying British pounds, is ( 873,749.38) + ( 2,091,086.40) = 2,964,834.80. The problem specifically asks for the value in British pounds, but if you are interested in the value in U.S. dollars, that value is calculated by multiplying the above by 1.65, and it equals approximately 4,891,977.40. 2. You are given that the duration of a standard five-year discrete decreasing annuity immediate (paying 5 at time 1, 4 at time 2, 3 at time 3, 2 at time 4, and 1 at time 6), ( ) 5, is 35 whose present value is Da, while the duration of a standard five-year discrete 15 increasing annuity immediate (paying 1 at time 1, 2 at time 2, 3 at time 3, 4 at time 4 and ( ) 5, is 55 5 at time 5), whose present value is Ia. The interest rate is i. Given that 15 information, find the duration of a standard level five-year annuity immediate (paying 1 a times 1, 2, 3, 4 and 5), whose present value is a 5. With zero interest rate Macaulay duration (and duration, as well) of a standard decreasing annuity is 1 5+ 2 4 + 3 3+ 4 2 + 5 1 = 35 5+ 4 + 3+ 2 +1 15. and Macaulay duration (as well as duration) of increasing annuity is 1 1+ 2 2 + 3 3+ 4 4 + 5 5 = 55 1+ 2 + 3+ 4 + 5 15. Therefore, the interest rate is 0, and the Macaulay duration (as well as duration) of a unit five year annuity immediate is 1 1+1 2 +1 3+1 4 +1 5 = ( Ia) 5 i=0% 1+ 2 + 3+ 4 + 5 = = 3. 5 a 5 i=0% 5

3. You are the investment actuary of an insurance firm, which is subject to new regulatory requirements in Freedonia. Your company has 10 million freebies (currency of Freedonia) worth of assets, half of which is invested in stocks and half in bonds. You are given that the one year effective rate of return on stocks follows the normal distribution with mean 0.10 and standard deviation 0.20, while the one year effective rate of return on bonds follows the normal distribution with mean 0.05 and standard deviation 0.02. The new regulation requires you to find the 1-st percentile of the joint distribution of the value of your asset portfolio of stocks and bonds assuming that the joint distribution is formed by applying the Gaussian copula to the distributions of stocks and bonds value at the end of the period. That 1-st percentile is the maximum amount of premium that the company is allowed to collect from business sold next year, if it ever exceeds it, it must stop sales for the year. The correlation of stocks and bonds returns is 0.25. Find that crucial first percentile. You should know immediately that applying the Gaussian copula to two normal distributions will result in a joint bivariate normal distribution, with the prescribed correlation parameter. The value of stocks in the portfolio at year end will have normal distribution with mean 5 million times 1.10, i.e., 5.5 million, and standard deviation of 5 million times 0.20, i.e., 1 million. The value of bonds in the portfolio at year end will have normal distribution with mean 5 million times 1.05, i.e., 5.25 million, and standard deviation of 5 million times 0.02, i.e., 0.1 million. Since the joint distribution is bivariate normal, their sum (i.e., the whole portfolio) will have a normal distribution with mean 5.5 + 5.25 = 10.75 million and standard deviation 1 2 + 0.1 2 + 2 0.25 1 0.1 = 1.06. Since the 99-th percentile of the standard normal distribution is approximately 2.33 (from the table), the 1-st percentile sought is 10.75 2.33 1.0.6 = 8.2802. 4. You are given the following with respect to a one-period securities market model: (i) The time 0 prices of the three securities in the market are S( 0) = [ 0.8 6 1]. (ii) The time 1 payoffs of the three securities are described in the matrix: 1 14 0 S( 1) = 1 6 0. 1 7 5 Find the risk neutral probabilities of the three states of the future, or show that the riskneutral probabilities do not exist. Let us write [ ψ 1 ψ 2 ψ 3 ]

for the state price vector, if one exists. We see that 1 1 0 0 1 = 1 0 + 1 1 + 1 0 1 0 0 1 so that 0.8 = 1 ψ 1 + 1 ψ 2 + 1 ψ 3. Similarly, 6 = 14 ψ 1 + 6 ψ 2 + 7 ψ 3, and 1 = 0 ψ 1 + 0 ψ 2 + 5 ψ 3. Thus we must have ψ 1 + ψ 2 + ψ 3 = 0.8, 14ψ 1 + 6ψ 2 + 7ψ 3 = 6, 5ψ 3 = 1. Therefore ψ 3 = 0.2, and ψ 1 + ψ 2 + 0.2 = 0.8, 14ψ 1 + 6ψ 2 + 1.4 = 6. Consequently, ψ 2 = 0.6 ψ 1, so that 14ψ 1 + 6 0.6 ψ 1 ψ 1 = 0.125, ψ 2 = 0.475. We get [ ψ 1 ψ 2 ψ 3 ] = [ 0.125 0.475 0.2] = 1 19 1 8 40 5. Note that the risk-free interest rate is determined from the relationship 0.8 ( 1 + i) = 1, so that 1+ i = 1 0.8 = 1.25, and i = 25%. The risk-neutral probabilities are q 1 = ψ 1 ( 1 + i) = 1 8 5 4 = 5 32, q 2 = ψ 2 ( 1 + i) = 19 40 5 4 = 19 32, q 3 = ψ 3 ( 1 + i) = 1 5 5 4 = 1 4 = 8 32. ( ) + 1.4 = 6, and we get 5. Consider a position consisting of $1,000,000 investment in asset X and $1,000,000 investment in asset Y. Assume that the daily volatilities of both assets are 0.1% and that the correlation coefficient between their returns is 0.30. What is the 5-day 99% Value at Risk for this portfolio, assuming a parametric model with zero expected return? The 99-th percentile of the standard normal distribution is 2.326. The standard deviation of the daily dollar change in the value of each asset is $1,000. The variance of the portfolio s daily change, using the formula:

Var( U +V ) = Var( U ) + Var( V ) + 2ρ U,V σ U σ V is: 1000 2 +1000 2 + 2 0.3 1000 1000 = 2,600,000. The standard deviation of the portfolio s daily change in value is the square root of 2,600,000, i.e., $1,612.45. The standard deviation of the five-day change in the portfolio value is: $1,612.45 5 = $3,605.55. The 99-th percentile of the standard normal distribution is 2.326. Therefore (assuming zero mean), the five-day 99% Value at Risk is: 2.326 $3,605.55 $8386.51. 6. Regulated Insurance is a company domiciled in Freedonia, a country that implemented a risk-based capital requirement system for regulation of its insurance companies. Riskbased capital requirement is the amount equal to the 95-th percentile of random amount of the loss that the company experiences in one year. The company has liabilities of 1,000,000 freebies (the currency of Freedonia) in life annuities reserves, and assets of $1,200,000 freebies, invested 40% in stocks and 60% in bonds. The liabilities of the company will increase by 2% over the next year. The effective annual rate of return on bonds follows a normal distribution with mean 4% and standard deviation of 2%, while the effective annual rate of return on stocks follows a normal distribution with mean 9% and standard deviation of 12%. The correlation of returns of stocks and bonds is 0.6, and the joint distribution of those returns is bivariate normal. Find the ratio of the capital held by Regulated Insurance to the capital required by regulation in Freedonia. The 95-th percentile of the standard normal distribution is 1.645. The capital held by Regulated Insurance is equal to the excess of its assets over its liabilities, i.e., 1,200,000 1,000,000 = 200,000 freebies. Let X be the random rate of return of stocks, and Y be the random rate of return on bonds. The loss of Regulated Insurance in one year is 0.02 1000000 X 0.4 1200000 Y 0.6 1200000 = = 20000 480000X 720000Y. This is a normal random variable with mean E( 20000 480000X 720000Y ) = 20000 480000E( X) 720000E( Y ) = = 20000 480000 0.09 720000 0.04 = 20000 43200 28800 = 52000, and variance Var 30000 480000X 720000Y ( ) = = Var( 480000X + 720000Y ) = = Var( 480000X) + Var( 720000Y ) + 2ρ X,Y Var( 480000X) Var( 720000Y ) = = 480000 2 0.12 2 + 720000 2 0.02 2 + 2 0.6 480000 0.12 720000 0.02 = = 3317760000 + 207360000 + 995328000 = = 4520448000. The 95-th percentile of the distribution of the loss is

52000 +1.645 4520448000 58600.3856. The ratio sought is 200000 58600.3856 3.41294683. 7. You are in investment manager and you purchase a catastrophe bond, which pays oneyear LIBOR plus 2.5% every year in which Truerisk Catastrophe Index of insured losses is below $3 billion. However, if Truerisk Catastrophe Index of insured losses exceeds $3 billion, the payment is reduced by ten basis point for each billion dollars of losses in excess of $3 billion, and if that reduction results in a negative value, bondholders s principal is appropriately reduced (e.g., payment of negative 1% means that principal is reduced by that 1%). If the current one-year LIBOR is 0.25%, what level of Truerisk Catastrophe Index of insured losses would result in payment to bondholder dropping to zero? With LIBOR at 0.25%, non-reduced payment is 2.5% + 0.25% = 2.75%. The difference between 0% and 2.75% is 275 basis points, so the Truerisk Catastrophe Index would have to exceed $3 billion by $27.5 billion, and reach the level of $30.5 billion. 8. In the country of Softwareland, there are now only two securities traded: risk-free government bond earning 5% a year, and the stock of the only corporation in that nation: Megasoft, currently trading at 100, and in a year possibly trading at one of these three prices: 90, 105 and 120. You are the Minister of Finance for that nation, and propose to complete the market in Softwareland by adding a third security, paying 1 when Megasoft trades below 100, and 0 otherwise. Will adding that security make the market complete? If the security is issued, it will only be issue if it completes the market, and it will be issued by the government through an initial public offering of 1 billion units of that security with 5% of proceeds paid to brokers marketing the security, and the rest collected by the Treasury of the government of Softwareland. Estimate the proceeds to the Treasury if the security is issued. The current market is 1.05 90 S( 0) = [ 1 100], S( 1) = 1.05 105. 1.05 120 It is, clearly incomplete. Let us see how it looks with respect to being arbitrage-free. If the state price vector ψ 1 ψ 2 ψ 3 exists then it must satisfy the equations: 1.05ψ 1 +1.05ψ 2 +1.05ψ 3 = 1, 90ψ 1 +105ψ 2 +120ψ 3 = 100.

Hence ψ 3 = 1.05 1 ψ 1 ψ 2 = 20 21 ψ 1 ψ 2 and or 0.9ψ 1 +1.05ψ 2 + 12 10 20 21 ψ 1 ψ 2 = 1, 8 7 1 = 1.2ψ +1.2ψ 0.9ψ 1.05ψ, 1 2 1 2 ψ 2 = 20 21 2ψ. 1 If the asset proposed is added to the market, its price must be ψ 1, and we get the market as follows: ( ) = 1 100 ψ 1 S 0, S 1 ( ) 1.05 90 1 = 1.05 105 0 1.05 120 0 The matrix S(1) is of rank 3 because its determinant is 1 1.05 120 105 ( ) = 15.75. The conditions that must be satisfied by the parameters ψ 1, ψ 2, and ψ 3 are ψ 1 > 0, ψ 2 = 20 21 2ψ 1 > 0, ψ 3 = 20 21 ψ 1 ψ 2 = 20 21 ψ 1 20 21 2ψ 1 =ψ 1 > 0. This means that 0 <ψ 1 < 10 21. We can choose any number between 0 and 10 10 for the price of the new security, with 21 21 being the unobtainable maximum. With 1 billion units issues, the total proceeds will be 10 1 billion 476,190,476. 21 But the Treasury will receive only 95% of these proceeds, or 0.95 10 1 billion 452,380,952. 21. 9. You are in charge of hedging the property-casualty loss exposure at your company using the Property Claims Service spreads, which consist of a long call of lower exercise price, and short call of a higher exercise price. The premium for the spreads is quoted in points, and each point is worth $200. Suppose that you are given that the 200/250 spread provides protection for the underlying index values at the rate of $100 000 000 per point, and the spread acts like a long 200 points call combined with short 250 points call, with

the actual payment equal to number of points times $200. You have bought 500 contracts, and the index settled at $25 billion. What is the payoff to your company? $25 billion corresponds to $25000000000 = 250 points. $100000000 You have a 200 call, which is now worth 50 points, or 50 times $200 = $10000, and you are short a 250 call, which expires worthless. Thus your payoff is $10000 per contract, or $5000000 for 500 contracts. 10. The market price of a security is $50. Assume that Capital Asset Pricing Model holds. The expected rate of return of this security is 14%. The risk-free rate is 6%, and the market risk premium (over the risk-free rate) is 8.50%. What will be the market price of the security if the covariance of its returns with the market doubles, while no other parameters are changed? Assume that the security is a perpetuity of a constant dividend. Basic CAPM formula is E r where ( ) ( ) r f = β E( r M ) r f ( ) β = Cov r,r M Var( r M ). When the covariance doubles, beta doubles. We need to find the original beta first. It must satisfy 14% 6% = β ( 8.50% ) so that β = 80 85 = 16 17. After beta doubles, β = 32 17. Therefore, new rate of return is r new = 6% + 32 ( 17 8.50% ) = 22%. What is the dividend D of this security? At 14% expected rate, perpetuity of D is worth D $50, and this must equal so that D = $7. At 22% expected return, perpetuity of $7 0.14, is worth $31.82.

11. You are the investment actuary for a life insurance company. Your company has of a bond portfolio with the value of $3 billion dollars. The portfolio is invested only in two securities: a 3-year bond with annual coupons of 5% and a 10-year zero coupon bond, with 27.981823% invested in the first security, and the rest in the second security. The continuously compounded risk-free interest rate is 4%. Calculate the 99% 10 day Value at Risk (VaR) of this portfolio, assuming a standard parametric model, and using only duration of the portfolio, and given that the annual yield volatility is 0.5% (yield volatility defined here as the standard deviation of Δy, where y is the yield). Assume 252 days in a year for the calculation, i.e., only use trading days, and you can also assume that the 99-th percentile of the standard normal distribution is 2.33. The Macaulay duration of the zero coupon bond is its maturity, i.e. 10 years. The coupon paying bond has a Macaulay duration of 0.05e 0.04 + 2 0.05e 2 0.04 + 3 1.05e 3 0.04 2.86129686. 0.05e 0.04 + 0.05e 2 0.04 +1.05e 3 0.04 Using the allocations given, this produces the portfolio Macaulay duration of 0.27981823 2.86129686 + ( 1 0.27981823) 10 8.00246072, and duration of approximately 8.00246072, 7.68867975. e 0.04 The daily volatility of yield is 0.005 and the daily volatility of the portfolio is therefore 252 estimated as σ P = D P σ y 7.68867975 3,000,000,000 0.005 252 7265119.48. Since the 99-th percentile of the standard normal distribution is 2.33, the 10-day 99% Value at Risk is estimated as 2.33 10 σ P 2.33 10 7265119.48 53530177.30, or approximately 535.30 million (that s about 1.78% of the portfolio). 12. You are given the following with respect to an option-free bond portfolio worth ten million dollars and held by the insurance company in which you work as an investment actuary: The value of the bond portfolio using the current interest rate of 2% is 800,000, The value of the bond portfolio using the current interest rate plus 20 basis points is 788,000, The value of the bond portfolio using the current interest rate minus 20 basis points is 813,000. You are also given that your company s only liability is a single payment of 800,000 three years from now, with the present value of 753,857.87. Calculate the convexity of your company s surplus.

The convexity estimate for the asset portfolio is C P( i Δi) 2P( i) + P( i + Δi) = P( i) ( Δi) 2 813,000 2 800,000 + 788,000 1 = = 800,000 0.002 2 0.0032 = 312.5. On the other hand, the liability has convexity of t( t +1) ( 1+ i) = 3 4 2 1.02 2 11.5340254. Therefore, the convexity of your company s portfolio is estimated as 800,000 800,000 753,857.87 312.5 753,857.87 11.5340254 5229.60192. 800,000 753,857.87