FY 2014/ /24 CAPITAL IMPROVEMENTS PROGRAM MAINTENANCE/REPLACEMENT PROJECTS DETAIL

Similar documents
FY 2014/ /24 CAPITAL IMPROVEMENTS PROGRAM MAINTENANCE/REPLACEMENT PROJECTS DETAIL DRAFT

CIP FY2015 FY2019 Requests SCH-1, SCH-2 and SCH-5

Capital Projects Fund. Board Work Session August 9, 2007

(TOTAL MANASSAS CITY PUBLIC SCHOOLS PROJECTS DOLLARS IN THOUSANDS I

Hayfield Community Schools Bond Referendum. Vote Monday, September 11, Our Schools Our Communities Our Future

Capital Projects Completed since 1988

City School District of Albany Five Year Facilities Plan 3/14/2019

Page Item 174 Overview 175 Revenue 177 Expenditures 178 Elementary School Allocation 180 Middle School Allocation 181 High School Allocation 182

Physical Plant. Five-Year Capital Budget Plan. State College Area School District November Page 1 of 15

Burlington Area School District Community Survey Results. Winter 2016

Action Item. Sid Albaugh, Assistant Superintendent Business Services. Consideration of Approval of 2018 Measure A - Facilities Project List

FY 2017 Stockton University Expenditure Report as of May 31, 2017

PROPOSITION FARMINGTON SCHOOLS. April 8, 2014 Bond Issue

Progress Update Identified Needs & Capital Plan

Fort Wayne Community Schools. Capital Projects Planning March 15, 2011

INTRODUCTION. Summary of revenue/expenditures available for new construction and remodeling projects only. CERTIFICATION

CH-UH Board of Education Meeting. June 27, 2017

West Bend School District Community Survey Results. Spring 2018

Reserve Analysis Report

Building and Site Sinking Fund Millage. Election Date: November 7th 2017

2019 Capital Projects Plan

School District of Horicon Community Survey Results. Fall 2017

JACKSON-MADISON COUNTY SCHOOL SYSTEM FUND #177 EDUCATION CAPITAL 5-YEAR PLAN (WORKING COPY)

Public Presentation Capital Bond November 27, 2017

FY 2018 Stockton University Operational & Capital Report as of May 31, 2018

2015/2016 Donations, Miscellaneous Revenue and Donated Property Report

Budget Committee Meeting. February 8, 2018

Listing of Events Fort McMurray Roman Catholic Seperate School District Fr. M. Beauregard School

Subject: Capital Reserve Expenditure Guidelines. *incl. former OCHAP/CSHP Peel Access to Housing (PATH)

JERICHO SCHOOL DISTRICT BUDGET

INTRODUCTION. Summary of revenue/expenditures available for new construction and remodeling projects only. CERTIFICATION

COUNTY BUILDINGS & CAPITAL CONSTRUCTION

2017 Bond Program Summary

Two Ballot Proposals. August 8, 2017

UNION COUNTY PUBLIC SCHOOLS

PERMANENT IMPROVEMENT LEVY

This workbook is designed as a supplement to the 2018 Department memo labeled "Capital Projects Plan Template and Notices for Budget Year 2019.

WHAT IS A RESERVE STUDY AND WHY ARE THEY IMPORTANT?

7th Draft Projected Adopted Proposed. Summary

Contents. Ballot Measure Full Text Ballot Proposition Tax Rate Statement Impartial Analysis Statement in Favor of Measure...

Proposed Final Budget Presentation (May 14, 2018) SELINSGROVE AREA SCHOOL DISTRICT

SECTION 6: CAPITAL IMPROVEMENT DETAIL

Interest Earned through 6/30/2018 2,013, , ,029, ,454, (3,443,911.91) 29, ,500, ,540,322.

POJOAQUE VALLEY SCHOOL DISTRICT October 12, 2016

Springfield High School

Page Item 165 Overview 167 Revenue 168 Expenditures 169 Elementary School Allocation 171 Middle School Allocation 173 High School Allocation 175

FY17 FMD Capital Budget

5 Year Capital Projects Plan INITIAL DISCUSSION JANUARY 7, 2014

CMP Strategy Project Listing by Cluster (Includes Technology and SIPs. Does not include SB9-08 M&O projects)

Muskego Norway Schools Community Survey Results. Fall 2015

Facilities Planning & Construction Report nd Quarter Ending December 31, 2017

Weston Public Schools PROPOSED BUDGET OF EXPENDITURES

Barneveld School District Community Survey Results. Spring 2017

INTRODUCTION. Summary of revenue/expenditures available for new construction and remodeling projects only. CERTIFICATION

Abilene Independent School District Bond Oversight Committee. Meeting Agenda

NOTICE TO TAXPAYERS. The Notice to Taxpayers is available online at or by calling (888)

Sagamore Hills Elementary

DISTRICT HISTORY Referendum ($585,000) Purchase of 10 Acres / Football Field Original junior high building (present old section of MS)

Cecil County Public Schools Board of Education Proposed Budget

BERKELEY UNIFIED SCHOOL DISTRICT

Capital Improvement Budgeting

Governing Board Bond Update. Measure G Bond Program. for. Solano Community College District

Board of Trustees Proposition Summary Table of Contents

APPLICATION FOR COMMUNITY USE OF SCHOOL FACILITIES

Stone Mountain Middle

CAPITAL IMPROVEMENT PROGRAM

Educational & Performing Arts Center: Downriver Campus

BALTIMORE COUNTY PUBLIC SCHOOLS

REQUEST FOR PROPOSALS CONSTRUCTION MANAGER AS CONSTRUCTOR

Our Focus: Your Future

MUROC JOINT UNIFIED SCHOOL DISTRICT KERN COUNTY NORTH EDWARDS, CALIFORNIA

OVERSIGHT OF MEASURE C SPENDING THE CITIZENS OVERSIGHT COMMITTEE

Lake Mills Area School District Community Survey Results. Spring 2018

Resurrection Lutheran Church. Replacement Reserve Report FY November 2018

Beaver Dam Unified School District Community Survey Results. Spring 2016

Pleasantdale Elementary

Page Item 153 Overview 154 Revenues 156 Expenditures 157 Elementary School Allocation 158 Middle School Allocation 159 High School Allocation 160

Budget Newsletter. Rush-Henrietta. In This Issue District Budget Proposal. Central School District May 2007

Upper St. Clair School District

Oakfield School District Community Survey Results. Fall 2018

SOMIS UNION SCHOOL DISTRICT IMPARTIAL ANALYSIS BY COUNTY COUNSEL* BOND MEASURE S SOMIS UNION SCHOOL DISTRICT TAX RATE STATEMENT BOND MEASURE S

Motion by: Second by: Vote: VI. Action Items A. Resolution Approving Long Term Facility Maintenance Revenue Ten Year Plan Ms.

Washingtonville Central School District Building Condition Survey Five Year Plan

Anderson Creek Primary

Central Michigan University Capital Budget

Contents Ballot Measure... 2 Full Text Ballot Proposition... 3 Tax Rate Statement... 7 Impartial Analysis... 8 Statement in Favor of Measure...

Wissahickon School District Ambler, PA FINANCE COMMITTEE AGENDA. February 21, :30 pm Administration Building Board Room

SAMPLE CONDO RESERVE STUDY for fiscal year 2012

Measure RR Bond Budget by Project. Measure RR BAN Measure RR BAN Interest Measure RR Series AB Measure RR Series AB Interest

GENERAL CAPITAL PROGRAM

DeKalb County School District/Elementary Schools Dunwoody Elementary Final School Assessment Report May 19, 2016

Summary of Capital Budget Request Tennessee Board of Regents. of the. September 21, 2017

Capital Improvement Program Fund

Harnett Central High

Public Schools of Petoskey ANNUAL BUDGET Fiscal Year Final

Capital Maintenance. 2. Deferred Maintenance, May 18, 2009 <

Barnesville Public Schools Proposed Building Program

Priority #1 Request for Construction FY Priority #2 Anticipated Request for Planning FY 2019

Stockton University FY 2019 Operational and Capital Report as of January 31, 2019

Total Revenues $27,158,867 $1,800,000 $2,400,000 $2,600,000 $3,600,000 $37,558,867

Transcription:

Year 1 Project Revenue County Category FY 14/15 Total Offset Cost I 1 AGNOR HURT HVAC Design Chiller and Exhaust Fans replacement $30,000 $0 $30,000 I 2 AGNOR HURT HVAC Design replacement of 6 RTUs $35,000 $0 $35,000 I 3 ALBEMARLE HIGH HVAC Design Ph1 3 Boilers, Chiller, and DDC controls $72,000 $0 $72,000 I 4 ALBEMARLE HIGH HVAC Design Phase II Replace Auditorium Air Handling Unit and New DDC Controls $20,000 $0 $20,000 I 5 ALBEMARLE HIGH SCHOOL Main Gym Floor Replacement $346,000 $0 $346,000 I 6 ALBEMARLE HIGH SCHOOL Exterior Door Replacement $40,000 $0 $40,000 I 7 BURLEY Design Fieldhouse Restroom Facility Repairs $7,000 $0 $7,000 I 8 BURLEY Boilers Replacement $200,000 $0 $200,000 I 9 CALE Boiler Replacement $150,000 $0 $150,000 I 10 CALE Parking Lot Expansion add 25 spaces $131,500 $0 $131,500 I 11 CATEC Maintenance Projects $210,000 $105,000 $105,000 I 12 CROZET Boiler and Chiller Replacement $375,000 $0 $375,000? 13 GREER Field Upgrade and Sound Berm $125,000 $0 $125,000 I 14 HOLLYMEAD Boilers Replacement $150,000 $0 $150,000 I 15 MONTICELLO HIGH SCHOOL Track Resurfacing $150,000 $0 $150,000 I 16 MURRAY ELEMENTARY HVAC Design 1991 Addition $56,000 $0 $56,000 I 17 SCOTTSVILLE HVAC Upgrades / Replacement in the 1979 Addition $475,000 $0 $475,000 I 18 STONE ROBINSON ROOF Replacement of Gym Addition Roof $286,650 $0 $286,650 I 19 STONE ROBINSON Phase II Replace 26 Unit Ventilators, 2 Boilers, 12 pumps, 4 AHU's, and New DCC Controls $600,000 $0 $600,000 I 20 WESTERN ALBEMARLE HIGH Design B Building Classrooms Replace AC 9, Ductwork, VAV's and Controls $40,000 $0 $40,000 I 21 YANCEY Roof Replacement for Main Building and 1990 Addition $412,051 $0 $412,051 I 22 VMF Vehicle Lifts Replacement Design and Construction $150,796 $0 $150,796 I 23 ADA Building and Grounds Modifications $30,000 $0 $30,000 I 24 CHILD NUTRITION SERVICES Equipment Replacement $50,000 $0 $50,000 I 25 ELECTRICAL PANEL UPGRADES at various schools $20,000 $0 $20,000 II 26 ENERGY CONSERVATION AND LIGHTING UPGRADES $120,000 $0 $120,000 I 27 FLOORING REPLACEMENT (Tile, Carpet and Asbestos Removal and Installation) $150,000 $0 $150,000 I 28 GENERATOR REPLACEMENT Broadus Wood Elementary $40,000 $0 $40,000 I 29 LOCKER and CASEWORK REFURBISHMENT /REMOVAL $75,000 $0 $75,000 II 30 KITCHEN AIR CONDITIONING DESIGN & INSTALLATION (add location) $150,000 $0 $150,000 III 31 MEDIA CENTER UPGRADES $90,000 $0 $90,000 I 32 MINOR CAPITAL IMPROVEMENTS $400,000 $0 $400,000 I 33 PARKING LOT PAVING AND SEALING $200,000 $0 $200,000 I 34 PLAYGROUND EQUIPMENT & ATHLETIC IMPROVMENTS $125,000 $0 $125,000 I 35 RESTROOM UPGRADES VARIOUS $50,000 $0 $50,000 I 36 ROOF REPAIRS $50,000 $0 $50,000 I 37 STORMWATER FACILITIES MAINTENANCE $30,000 $0 $30,000 I 38 TELEPHONE SYSTEM REPLACMENT Various Schools (VOIP) $50,000 $0 $50,000 Total $5,691,997 $105,000 $5,586,997 04/16/2013 Page 1 of 10

Year 2 Project Revenue County Category FY 15/16 Total Offset Cost I 1 AGNOR HURT Chiller and Exhaust Fans Replacement $300,000 $0 $300,000 I 2 AGNOR HURT Replacement of 6 HVAC RTUs $400,000 $0 $400,000 I 3 AGNOR HURT Roof Design Main Building $40,200 $0 $40,200 I 4 ALBEMARLE HIGH HVAC design Phase III Foreign LW & 92 wing's Chillers, AHUs and Controls $60,500 $0 $60,500 I 5 ALBEMARLE HIGH HVAC Phase I 3 Boilers, Chiller and DDC controls $714,000 $0 $714,000 I 6 ALBEMARLE HIGH Phase II Replace Auditorium Air Handling Unit & New DDC Controls $100,000 $0 $100,000 7 ALBEMARLE HIGH Landscaping & Site Circulation Improvements $100,000 $0 $100,000 I 8 BURLEY Fieldhouse Restroom Facility Repairs $60,000 $0 $60,000 I 9 BURLEY Gym Partition Replacement with Curtain $30,000 $0 $30,000 I 10 BROADUS WOOD HVAC Design Cooling Tower Replacement $10,000 $0 $10,000 I 11 CALE HVAC Design Replacement of 6 RTUs Serving Old Classroom Sections $35,000 $0 $35,000 I 12 CATEC Maintenance Projects $315,000 $157,500 $157,500 I 13 HOLLYMEAD HVAC Design Chiller and Exhaust Fan Replacement $30,000 $0 $30,000 I 15 MURRAY ELEMENTARY HVAC Replacement Phase I 1991 Addition $600,000 $0 $600,000 I 16 MURRAY ELEMENTARY HVAC Design Phase II Original Building $60,000 $0 $60,000 I 17 MURRAY ELEMENTARY Roof Design 1991 Addition $25,000 $0 $25,000 I 18 SUTHERLAND HVAC Design Replace 3 Boilers and a Hot Water Heater $15,000 $0 $15,000 I 19 WALTON EXTERIOR DOOR REPLACEMENT $40,000 $0 $40,000 I 20 WESTERN Albemarle High HVAC Replacement in B Building Classrooms, Replace AC 9, Ductwork, VAV's and Controls $450,000 $0 $450,000 I 21 VMF VEHICLE LIFT REPLACEMENT $149,693 $0 $149,693 I 22 VMF Roof Design $28,000 $0 $28,000 23 WESTERN ALBEMARLE HIGH SCHOOL: Locker room HVAC Replacement $100,000 $0 $100,000 I 24 ADA Building and Grounds Modifications $30,000 $0 $30,000 I 25 CHILD NUTRITION SERVICES Equipment Replacement $0 $0 $0 I 26 ELECTRICAL PANEL UPGRADES at various schools $20,000 $0 $20,000 II 27 ENERGY CONSERVATION AND LIGHTING UPGRADES $120,000 $0 $120,000 I 28 FLOORING REPLACEMENT (Tile, Carpet and Asbestos Removal and Installation) $150,000 $0 $150,000 I 29 LOCKER and CASEWORK REFURBISHMENT /REMOVAL $75,000 $0 $75,000 II 30 KITCHEN AIR CONDITIONING DESIGN & INSTALLATION $0 $0 $0 III 31 MEDIA CENTER UPGRADES $90,000 $0 $90,000 I 32 MINOR CAPITAL IMPROVEMENTS $400,000 $0 $400,000 I 33 PARKING LOT PAVING AND SEALING $200,000 $0 $200,000 I 34 PLAYGROUND EQUIPMENT & ATHLETIC IMPROVMENTS $125,000 $0 $125,000 I 35 RESTROOM UPGRADES VARIOUS $50,000 $0 $50,000 I 36 ROOF REPAIRS $50,000 $0 $50,000 I 37 STORMWATER FACILITIES MAINTENANCE $30,000 $0 $30,000 I 38 TELEPHONE SYSTEM REPLACMENT Various Schools (VOIP) $50,000 $0 $50,000 Total $5,052,393 $157,500 $4,894,893 04/16/2013 Page 2 of 10

Year 3 Project Revenue County Category FY 16/17 Total Offset Cost I 1 AGNOR HURT Roof Replacement on Main Building $669,900 $0 $669,900 I 2 ALBEMARLE HIGH HVAC Design Phase IV Replace 34 unit ventilators, add outside air system for classrooms served by Unit Ventilators, New DDC controls $112,000 $0 $112,000 I 3 ALBEMARLE HIGH HVAC Phase III Foreign LW & 92 wing's Chillers, AHUs and controls $650,000 $0 $650,000 I 4 ALBEMARLE HIGH Design Traffic Flow Upgrades $20,000 $0 $20,000 I 5 BROADUS WOOD HVAC Replace Cooling Tower $100,000 $0 $100,000 I 6 BURLEY Roof Design Main Building and Auditorium $48,000 $0 $48,000 I 7 CALE Replacement of 6 RTUs Serving Old Classroom Sections $400,000 $0 $400,000 I 8 CATEC Maintenance Projects $178,000 $89,000 $89,000 I 9 CROZET HVAC Design Replace 8 RTUs $30,000 $0 $30,000 I 10 HOLLYMEAD Chiller and Exhaust Fan Replacement $300,000 $0 $300,000 11 HOLLYMEAD Student Entrance Canopy $100,000 I 12 MONTICELLO HIGH SCHOOL Design Chiller Replacement $10,000 $0 $10,000 I 13 MURRAY HIGH HVAC Design Replace Boilers $8,000 $0 $8,000 I 14 MURRAY ELEMENTARY HVAC Replacement of Original Building Phase II $600,000 $0 $600,000 I 15 MURRAY ELEMENTARY Roof Replacement 1991 Addition $350,000 $0 $350,000 I 16 SUTHERLAND Replace 3 Boilers and a Hot Water Heater $150,000 $0 $150,000 II 17 VMF Roof Replacement $280,000 $0 $280,000 I 18 ADA Building and Grounds Modifications $30,000 $0 $30,000 I 19 CHILD NUTRITION SERVICES Equipment Replacement $50,000 $0 $50,000 I 20 ELECTRICAL PANEL UPGRADES at various schools $20,000 $0 $20,000 I 21 ELECTRICAL SWITCHGEAR Design Replacement at Brownsville and Woodbrook $16,000 $0 $16,000 II 22 ENERGY CONSERVATION AND LIGHTING UPGRADES $120,000 $0 $120,000 I 23 FLOORING REPLACEMENT (Tile, Carpet and Asbestos Removal and Installation) $150,000 $0 $150,000 I 24 LOCKER and CASEWORK REFURBISHMENT /REMOVAL $75,000 $0 $75,000 II 25 KITCHEN AIR CONDITIONING DESIGN & INSTALLATION $150,000 $0 $150,000 III 26 MEDIA CENTER UPGRADES $90,000 $0 $90,000 I 27 MINOR CAPITAL IMPROVEMENTS $400,000 $0 $400,000 I 28 PARKING LOT PAVING AND SEALING $200,000 $0 $200,000 I 29 PLAYGROUND EQUIPMENT & ATHLETIC IMPROVMENTS $125,000 $0 $125,000 I 30 RESTROOM UPGRADES VARIOUS $50,000 $0 $50,000 I 31 ROOF REPAIRS $50,000 $0 $50,000 I 32 STORMWATER FACILITIES MAINTENANCE $30,000 $0 $30,000 I 33 TELEPHONE SYSTEM REPLACMENT Various Schools (VOIP) $50,000 $0 $50,000 Total $5,611,900 $89,000 $5,422,900 04/16/2013 Page 3 of 10

Year 4 Project Revenue County Category FY 17/18 Total Offset Cost I 1 ALBEMARLE HIGH Traffic Flow Upgrade Student Drop off $250,000 $0 $250,000 I 2 ALBEMARLE HIGH Phase IV Replace 34 unit ventilators, add outside air system for classrooms served by Unit Ventilators, New DDC controls $1,120,000 $0 $1,120,000 I 3 ALBEMARLE HIGH SCHOOL Design Cafeteria Expansion $36,500 $0 $36,500 I 4 BURLEY HVAC Design Replace Chiller and AHUs serving Ground floor, First Floor and Cafeteria $52,500 $0 $52,500 I 5 BURLEY Roof Replacement Main Building and Auditorium $541,800 $0 $541,800 I 6 BURLEY CHILLER REPLACEMENT $150,000 $0 $150,000 I 7 CATEC Maintenance Projects $60,000 $30,000 $30,000 I 8 CROZET HVAC Replace 8 RTUs $300,000 $0 $300,000 I 9 HENLEY. Roof Design Original Building $95,000 $0 $95,000 I 10 HENLEY Roof Design Replacement for 1996 Addition $15,200 $0 $15,200 I 11 JOUETT Roof Design Original Building $95,000 $0 $95,000 I 12 JOUETT Roof Design 2003 Addition $50,700 $0 $50,700 I 13 MONTICELLO HIGH SCHOOL Chiller Replacement $190,000 $0 $190,000 I 14 MURRAY HIGH HVAC Replace Boilers $80,000 $0 $80,000 I 15 STONY POINT HVAC Design Replacement of Chiller $15,000 $0 $15,000 I 16 STONY POINT Roof Design 97 Addition $25,000 $0 $25,000 I 17 STONY POINT Design Roof Replacement on Original Building $15,000 $0 $15,000 I 18 SUTHERLAND HVAC Design Replacement of Chiller $20,000 $0 $20,000 I 19 Walton HVAC UPGRADES Design 44 VAV box replacement $10,000 $0 $10,000 I 20 ADA Building and Grounds Modifications $30,000 $0 $30,000 I 21 CHILD NUTRITION SERVICES Equipment Replacement $50,000 $0 $50,000 I 22 ELECTRICAL PANEL UPGRADES at various schools $20,000 $0 $20,000 I 23 ELECTRICAL SWITCHGEAR Replacement at Brownsville and Woodbrook $160,000 $0 $160,000 I 24 ELECTRICAL SWITCHGEAR Design Replacement at WAHS and HENLEY $20,000 $0 $20,000 I 25 ENERGY CONSERVATION AND LIGHTING UPGRADES $120,000 $0 $120,000 II 26 FLOORING REPLACEMENT (Tile, Carpet and Asbestos Removal and Installation) $150,000 $0 $150,000 I 27 KITCHEN AIR CONDITIONING DESIGN & INSTALLATION $150,000 $0 $150,000 I 28 LOCKER and CASEWORK REFURBISHMENT /REMOVAL $75,000 $0 $75,000 II 29 MEDIA CENTER UPGRADES $90,000 $0 $90,000 III 30 MINOR CAPITAL IMPROVEMENTS $900,000 $0 $900,000 I 31 PARKING LOT PAVING AND SEALING $200,000 $0 $200,000 I 32 PLAYGROUND EQUIPMENT & ATHLETIC IMPROVMENTS $125,000 $0 $125,000 I 33 RESTROOM UPGRADES VARIOUS $50,000 $0 $50,000 I 34 ROOF REPAIRS $50,000 $0 $50,000 I 35 STORMWATER FACILITIES MAINTENANCE $30,000 $0 $30,000 I 36 TELEPHONE SYSTEM REPLACMENT Various Schools (VOIP) $50,000 $0 $50,000 I 37 TRACK RESURFACING at AHS and WAHS $100,000 $0 $100,000 I 38 WOODEN GYM FLOOR REPLACEMENT BWE, SCO, STR, WDB and MWL $350,000 $0 $350,000 Total $5,841,700 $30,000 $5,811,700 04/16/2013 Page 4 of 10

Year 5 Project Revenue County Category FY 18/19 Total Offset Cost I 1 ALBEMARLE HIGH SCHOOL Cafeteria Expansion $310,300 $0 $310,300 I 2 ALBEMARLE HIGH SCHOOL Roof Design 1993 Addition $20,000 $0 $20,000 I 3 BAKER BUTLER GYM CEILING REPAINTING $40,000 $0 $40,000 I 4 BROADUS WOOD Roof Design 1993 Addition $15,000 $0 $15,000 I 5 BROWNSVILLE HVAC Design Replace Cafeteria RTUs $15,000 $0 $15,000 I 6 BUILDING SERVICES HVAC/BOILER REPLACMENT $75,000 $0 $75,000 I 7 BURLEY Replace AHUs serving Ground floor, First Floor and Cafeteria $525,000 $0 $525,000 I 8 CATEC Maintenance Projects $320,000 $160,000 $160,000 I 9 HENLEY. Roof Replacement Original Building $997,500 $0 $997,500 I 10 HENLEY Roof Replacement 1996 Addition $159,600 $0 $159,600 I 11 JOUETT Roof Replacement Original Building $997,500 $0 $997,500 I 12 JOUETT Roof Replacement 2003 Addition $432,600 $0 $432,600 I 13 MONTICELLO HIGH HVAC design Replacement of Hot Water heater $8,000 $0 $8,000 I 14 MONTICELLO HIGH SCHOOL Student Parking Lot Lights $50,000 $0 $50,000 I 15 IVY CREEK HVAC Design Replace Boiler $8,000 $0 $8,000 I 16 SCOTTSVILLE Roof Design Replace Round Library Roof $4,000 $0 $4,000 I 17 STONY POINT HVAC Chiller Replacement $150,000 $0 $150,000 I 18 STONY POINT Roof replacement 1997 Addition $250,000 $0 $250,000 I 19 STONY POINT Roof Replacement Original Building $150,000 $0 $150,000 I 20 SUTHERLAND HVAC Chiller Replacement $200,000 $0 $200,000 I 21 WALTON HVAC Upgrades 44 VAV box replacement $150,000 $0 $150,000 I 22 WOODBROOK HVAC Design Replace Office and Cafeteria AHUs $20,000 $0 $20,000 I 23 VMF VEHICLE LIFT REPLACEMENT $46,735 $0 $46,735 I 24 ADA Building and Grounds Modifications $30,000 $0 $30,000 I 25 CHILD NUTRITION SERVICES Equipment Replacement $50,000 $0 $50,000 I 26 ELECTRICAL SWITCHGEAR Design Replacement at Walton $16,000 $0 $16,000 I 27 ELECTRICAL SWITCHGEAR Replacement at WAHS and HENLEY $165,000 $0 $165,000 I 28 ELEVATOR REPLACEMENT (WAHS/AHS) $300,000 $0 $300,000 II 29 ENERGY CONSERVATION AND LIGHTING UPGRADES $120,000 $0 $120,000 I 30 FLOORING REPLACEMENT (Tile, Carpet and Asbestos Removal and Installation) $150,000 $0 $150,000 I 31 LOCKER and CASEWORK REFURBISHMENT /REMOVAL $75,000 $0 $75,000 II 32 KITCHEN AIR CONDITIONING DESIGN & INSTALLATION $150,000 $0 $150,000 III 33 MEDIA CENTER UPGRADES $90,000 $0 $90,000 I 34 MINOR CAPITAL IMPROVEMENTS $545,000 $0 $545,000 I 35 PARKING LOT PAVING AND SEALING $200,000 $0 $200,000 I 36 PLAYGROUND EQUIPMENT & ATHLETIC IMPROVMENTS $125,000 $0 $125,000 I 37 RESTROOM UPGRADES VARIOUS $50,000 $0 $50,000 I 38 ROOF REPAIRS $50,000 $0 $50,000 I 39 STORMWATER FACILITIES MAINTENANCE $30,000 $0 $30,000 I 40 TELEPHONE SYSTEM REPLACMENT Various Schools (VOIP) $50,000 $0 $50,000 Total $6,809,935 $160,000 $6,649,935 04/16/2013 Page 5 of 10

Year 6 Project Revenue County Category FY 19/20 Total Offset Cost I 1 ALBEMARLE HIGH SCHOOL Roof Replacement 1993 Addition $200,000 $0 $200,000 I 2 BROWNSVILLE Replace Cafeteria RTUs $150,000 $0 $150,000 I 3 BROADUS WOOD Roof Replacement 1993 Addition $100,000 $0 $100,000 I 4 CATEC Maintenance Projects $60,000 $30,000 $30,000 I 5 MONTICELLO HIGH Replacement of Hot Water heater $80,000 $0 $80,000 I 6 IVY CREEK Replace Boiler $80,000 $0 $80,000 I 7 SCOTTSVILLE Roof Replace Round Library roof $32,550 $0 $32,550 I 8 STONE ROBINSON Roof Design Main Building and 1999 Addition $40,000 $0 $40,000 I 9 WESTERN ALBEMARLE HIGH SCHOOL Roof Design Main Building $62,500 $0 $62,500 I 10 WOODBROOK HVAC REPLACE Office and Cafeteria RTUs $200,000 $0 $200,000 I 11 VMF VEHICLE LIFT REPLACEMENT $48,137 $0 $48,137 I 12 ADA Building and Grounds Modifications $30,000 $0 $30,000 I 13 CHILD NUTRITION SERVICES Equipment Replacement $50,000 $0 $50,000 I 14 ELECTRICAL SWITCHGEAR REPLACEMENT at Walton $85,000 $0 $85,000 II 15 ENERGY CONSERVATION AND LIGHTING UPGRADES $120,000 $0 $120,000 I 16 FLOORING REPLACEMENT (Tile, Carpet and Asbestos Removal and Installation) $150,000 $0 $150,000 I 17 LOCKER and CASEWORK REFURBISHMENT /REMOVAL $75,000 $0 $75,000 I 18 HVAC IMPROVEMENTS AT VARIOUS SCHOOLS $1,000,000 $0 $1,000,000 II 19 KITCHEN AIR CONDITIONING DESIGN & INSTALLATION $150,000 $0 $150,000 III 20 MEDIA CENTER UPGRADES $90,000 $0 $90,000 I 21 MINOR CAPITAL IMPROVEMENTS $1,600,000 $0 $1,600,000 I 22 PARKING LOT PAVING AND SEALING $200,000 $0 $200,000 I 23 PLAYGROUND EQUIPMENT & ATHLETIC IMPROVMENTS $125,000 $0 $125,000 I 24 RESTROOM UPGRADES VARIOUS $50,000 $0 $50,000 I 25 ROOF REPAIRS Design and Construction $1,200,000 $0 $1,200,000 I 26 STORMWATER FACILITIES MAINTENANCE $30,000 $0 $30,000 I 27 TELEPHONE SYSTEM REPLACMENT Various Schools (VOIP) $50,000 $0 $50,000? 28 WINDOW Replacement $150,000 $0 $150,000 Total $5,858,187 $30,000 $5,978,187 04/16/2013 Page 6 of 10

Year 7 Project Revenue County Category FY 20/21 Total Offset Cost I 1 CATEC Maintenance Projects $100,000 $50,000 $50,000 I 2 MURRAY ELEMENTAY Roof Design Main Building $60,000 $0 $60,000 I 3 STONE ROBINSON Roof Replacement Main Building and 1999 Addition $564,900 $0 $564,900 I 4 WESTERN ALBEMARLE HIGH SCHOOL Roof Design Main Building $1,250,110 $0 $1,250,110 I 5 VMF VEHICLE LIFT REPLACEMENT $49,581 $0 $49,581 I 6 ADA Building and Grounds Modifications $30,000 $0 $30,000 I 7 CHILD NUTRITION SERVICES Equipment Replacement $50,000 $0 $50,000 II 8 ENERGY CONSERVATION AND LIGHTING UPGRADES $120,000 $0 $120,000 I 9 FLOORING REPLACEMENT (Tile, Carpet and Asbestos Removal and Installation) $150,000 $0 $150,000 I 10 LOCKER and CASEWORK REFURBISHMENT /REMOVAL $75,000 $0 $75,000 I 11 HVAC IMPROVEMENTS AT VARIOUS SCHOOLS $1,000,000 $0 $1,000,000 II 12 KITCHEN AIR CONDITIONING DESIGN & INSTALLATION $150,000 $0 $150,000 III 13 MEDIA CENTER UPGRADES $90,000 $0 $90,000 I 14 MINOR CAPITAL IMPROVEMENTS $1,600,000 $0 $1,600,000 I 15 PARKING LOT PAVING AND SEALING $200,000 $0 $200,000 I 16 PLAYGROUND EQUIPMENT & ATHLETIC IMPROVMENTS $125,000 $0 $125,000 I 17 RESTROOM UPGRADES VARIOUS $50,000 $0 $50,000 I 18 ROOF REPAIRS Design and Construction $250,000 $0 $250,000 I 19 STORMWATER FACILITIES MAINTENANCE $30,000 $0 $30,000 I 20 TELEPHONE SYSTEM REPLACMENT Various Schools (VOIP) $50,000 $0 $50,000? 21 WINDOW Replacement $150,000 $0 $150,000 Total $5,994,591 $50,000 $5,944,591 04/16/2013 Page 7 of 10

Year 8 Project Revenue County Category FY 21 /22 Total Offset Cost I 1 CATEC Maintenance Projects $100,000 $50,000 $50,000 I 2 MURRAY ELEMENTAY Roof Replacement Main Building $600,000 $0 $600,000 I 3 VMF VEHICLE LIFT REPLACEMENT $16,934 $0 $16,934 I 4 ADA Building and Grounds Modifications $30,000 $0 $30,000 I 5 CHILD NUTRITION SERVICES Equipment Replacement $50,000 $0 $50,000 II 6 ENERGY CONSERVATION AND LIGHTING UPGRADES $120,000 $0 $120,000 I 7 FLOORING REPLACEMENT (Tile, Carpet and Asbestos Removal and Installation) $150,000 $0 $150,000 I 8 HVAC IMPROVEMENTS AT VARIOUS SCHOOLS $1,200,000 $0 $1,200,000 I 9 KITCHEN AIR CONDITIONING DESIGN & INSTALLATION $150,000 $0 $150,000 II 10 LOCKER and CASEWORK REFURBISHMENT /REMOVAL $75,000 $0 $75,000 III 11 MEDIA CENTER UPGRADES $90,000 $0 $90,000 I 12 MINOR CAPITAL IMPROVEMENTS $1,600,000 $0 $1,600,000 I 13 PARKING LOT PAVING AND SEALING $200,000 $0 $200,000 I 14 PLAYGROUND EQUIPMENT & ATHLETIC IMPROVMENTS $125,000 $0 $125,000 I 15 RESTROOM UPGRADES VARIOUS $50,000 $0 $50,000 I 16 ROOF REPAIRS Design and Construction $1,200,000 $0 $1,200,000 I 17 STORMWATER FACILITIES MAINTENANCE $30,000 $0 $30,000 I 18 TELEPHONE SYSTEM REPLACMENT Various Schools (VOIP) $50,000 $0 $50,000? 19 WINDOW Replacement $150,000 $0 $150,000 Total $5,836,934 $50,000 $5,786,934 04/16/2013 Page 8 of 10

Year 9 Project Revenue County Category FY 22 /23 Total Offset Cost I 1 CATEC Maintenance Projects $100,000 $50,000 $50,000 I 2 BURLEY 3RD FLOOR HVAC AND ANNEXT $250,000 $0 $250,000 I 3 MURRAY ELEMENTAY Roof Replacement Main Building $600,000 $0 $600,000 I 4 VMF VEHICLE LIFT REPLACEMENT $16,934 $0 $16,934 I 5 ADA Building and Grounds Modifications $30,000 $0 $30,000 I 6 CHILD NUTRITION SERVICES Equipment Replacement $50,000 $0 $50,000 II 7 ENERGY CONSERVATION AND LIGHTING UPGRADES $120,000 $0 $120,000 I 8 FLOORING REPLACEMENT (Tile, Carpet and Asbestos Removal and Installation) $150,000 $0 $150,000 I 9 HVAC IMPROVEMENTS AT VARIOUS SCHOOLS $1,200,000 $0 $1,200,000 I 10 KITCHEN AIR CONDITIONING DESIGN & INSTALLATION $150,000 $0 $150,000 II 11 LOCKER and CASEWORK REFURBISHMENT /REMOVAL $75,000 $0 $75,000 III 12 MEDIA CENTER UPGRADES $90,000 $0 $90,000 I 13 MINOR CAPITAL IMPROVEMENTS $1,600,000 $0 $1,600,000 I 14 PARKING LOT PAVING AND SEALING $200,000 $0 $200,000 I 15 PLAYGROUND EQUIPMENT & ATHLETIC IMPROVMENTS $125,000 $0 $125,000 I 16 RESTROOM UPGRADES VARIOUS $50,000 $0 $50,000 I 17 ROOF REPAIRS Design and Construction $1,200,000 $0 $1,200,000 I 18 STORMWATER FACILITIES MAINTENANCE $30,000 $0 $30,000 I 19 SYNTHETIC TURF FIELD REPLACEMENT WAHS/AHS/MHS $900,000 $0 $900,000 I 20 TELEPHONE SYSTEM REPLACMENT Various Schools (VOIP) $50,000 $0 $50,000 I 21 TRACK RESURFACING at AHS and WAHS $100,000 $0 $100,000? 22 WINDOW Replacement $150,000 $0 $150,000 Total $7,086,934 $50,000 $7,036,934 04/16/2013 Page 9 of 10

Year 10 Project Revenue County Category FY 23 /24 Total Offset Cost I 1 CATEC Maintenance Projects $100,000 $50,000 $50,000 I 2 BURLEY 3RD FLOOR HVAC AND ANNEXT $250,000 $0 $250,000 I 3 MURRAY ELEMENTAY Roof Replacement Main Building $600,000 $0 $600,000 I 4 VMF VEHICLE LIFT REPLACEMENT $16,934 $0 $16,934 I 5 ADA Building and Grounds Modifications $30,000 $0 $30,000 I 6 CHILD NUTRITION SERVICES Equipment Replacement $50,000 $0 $50,000 II 7 ENERGY CONSERVATION AND LIGHTING UPGRADES $120,000 $0 $120,000 I 8 FLOORING REPLACEMENT (Tile, Carpet and Asbestos Removal and Installation) $150,000 $0 $150,000 I 9 HVAC IMPROVEMENTS AT VARIOUS SCHOOLS $1,200,000 $0 $1,200,000 I 10 KITCHEN AIR CONDITIONING DESIGN & INSTALLATION $150,000 $0 $150,000 II 11 LOCKER and CASEWORK REFURBISHMENT /REMOVAL $75,000 $0 $75,000 III 12 MEDIA CENTER UPGRADES $90,000 $0 $90,000 I 13 MINOR CAPITAL IMPROVEMENTS $1,600,000 $0 $1,600,000 I 14 PARKING LOT PAVING AND SEALING $200,000 $0 $200,000 I 15 PLAYGROUND EQUIPMENT & ATHLETIC IMPROVMENTS $125,000 $0 $125,000 I 16 RESTROOM UPGRADES VARIOUS $50,000 $0 $50,000 I 17 ROOF REPAIRS Design and Construction $1,200,000 $0 $1,200,000 I 18 STORMWATER FACILITIES MAINTENANCE $30,000 $0 $30,000 I 19 SYNTHETIC TURF FIELD REPLACEMENT WAHS/AHS/MHS $900,000 $0 $900,000 I 20 TELEPHONE SYSTEM REPLACMENT Various Schools (VOIP) $50,000 $0 $50,000 I 21 TRACK RESURFACING at AHS and WAHS $100,000 $0 $100,000? 22 WINDOW Replacement $150,000 $0 $150,000 Total $7,086,934 $50,000 $7,036,934 04/16/2013 Page 10 of 10