If you are unsure of which sections to complete, please contact us on

Similar documents
PREQUALIFICATION QUESTIONNAIRE

MAJ Developments (UK) Ltd CONTRACTORS PRE-QUALIFICATION QUESTIONNAIRE (PQQ)

APPROVED (SUB)-CONTRACTOR APPLICATION

Appendix 4 :Contractors Health and Safety Questionnaire (Form CCHSQ1) 1. DETAILS OF CONTRACTOR / SUB-CONTRACTOR Name of Company:

Subcontractor Approval Form

HR Records that are needed:

Sub-Contractor Pre-Qualification Questionnaire

PQQ Supplier Pre-Qualification Questionnaire

3/15/2018» sitrep March 2018 NASC

APPENDIX F PRE-TENDER QUESTIONNAIRE

Contractor Information

This document is meant to be a starting point for any company wanting to implement the safety passport scheme for their contractors on site.

Driving at Work Policy

Contractors Induction Booklet. Contractor s Name:

Contractor Pre-qualification Questionnaire

Application Form. For Continued Inclusion on the Estates Department Approved List of Contractors

SUPPLIER EVALUATION QUESTIONNAIRE

TARMAC TRADING LIMITED LABOUR ONLY CONDITIONS OF SUB-CONTRACT- TS2

Drivers Notice of Due Process Rights and Authorization

WORK INTEGRATED LEARNING (WIL) PROGRAM STUDENT PLACEMENT AGREEMENT. This agreement is made on the day of 20..

Health and Safety Policy

ITW LTD T/A AVERY WEIGH-TRONIX SAFETY, HEALTH AND ENVIRONMENTAL INFORMATION

HULCHER CONTRACTOR SAFETY MANAGEMENT PROCESS

CONTROL OF SUBSTANCES HAZARDOUS TO HEALTH

Career Break Policy. Remuneration Committee 27 February months. Review date: Page 1 of 12

JPG (Trade Unions) March Specialist Advice (if required) n/a. THCCGHR2 Sickness absence Policy. THCCGHR3 Equality and Diversity Strategy

Construction Industry Scheme (CIS)

Career Break Policy. Date Issued: 1 st January 2014 Date to be reviewed:

HUMAN RESOURCES POLICY CAREER BREAK

WASTE & RECYCLING LIABILITY

Health and Safety. Version 5. Category: Corporate. Latest Review Date: December Review Frequency: Annual. Owner: Company Secretary

CONTRACTOR PRE-QUALIFICATION FORM

PROHSP8 SQA Unit Code H8WH 04. Develop, implement and review reactive monitoring systems for health and safety. Overview

Career Break Policy Date Impact Assessed: Version No: No of pages: Date of Issue: Date of next review: Distribution: Published:

Health & Safety Policy

Career Break Policy. Policy ID. HR36 Version v1.0 Owner

NEW CASTLE COUNTY Purchasing Division New Castle County Government Center 87 Read s Way New Castle, DE (302)

RISK ASSESSMENT POLICY

A Safety, Environmental and Labour rights Guide for Suppliers to British Airways

INCOME PROTECTION CLAIMS

INFORMATION YOU WILL NEED TO PROVIDE AT STAGE 2 INCLUDES: CONTACT DETAILS FOR PRIMARY, SECONDARY, ACCOUNTS PAYABLE, ACHILLES ADMINISTRATION

CAREER BREAK POLICY. HR Business Partner, Hayley Moorhouse Accountable Manager(s) Staff Intranet. Version No

Health and Safety Procedure: Risk Assessment. 1. Introduction

Filleigh Village Hall

Introduction to Working with the Public Sector Module 1 - Getting Started

Alcumus Health and safety assessment standards

Business Package Proposal Form INSURANCE

Career Break Policy. Page 1

Our lawful basis for processing. Processing is necessary. Processing is necessary for compliance with. legal obligation.

Relocation and Removal Expenses Policy

Control of Contractors Policy

An Introduction to Business Regulations when Starting Up

BROCKWOOD PARK SCHOOL & INWOODS SMALL SCHOOL

Modern Apprenticeship Programme Specification Published 29 March 2019

KRAIBURG. Code of Conduct

Risk assessment Policy and Procedures

1.8 Organisation details. Name

Application Form. Please list/describe your services (Brochures can be attached to this Form)

WASTE & RECYCLING LIABILITY

PROHSP6 Control health and safety risks

Last Name First Name Middle Initial. City State Zip

NEW CASTLE COUNTY Purchasing Division New Castle County Government Center 87 Read s Way New Castle, DE (302)

1.8 Organisation details. Name

Retirement Options. Personal Pension. Claim Form. To be completed by your Financial Advisor. Your Personal Details.

Kidderminster College: Newcastle College: Newcastle Sixth Form College West Lancashire College: Rathbone Training: Group Services:

TRUCKING & CONSTRUCTION DIVISIONS

Proposal Form. Tradesmen. Commercial Division

DRIVER S EMPLOYMENT APPLICATION

A UNIQUE AND COMPREHENSIVE INSURANCE SCHEME FOR THE ELECTRICAL INDUSTRY

Risk Assessment Policy (Trust, Summer, Senior and Prep School & EYFS)

WRITTEN AGREEMENT FOR OCCUPATIONAL HEALTH AND SAFETY

REQUEST FOR PROPOSAL for Legal Services for the HIGH PLAINS LIBRARY DISTRICT Greeley, CO

Work Method and OH&S Statement

Drought Communities Programme. Request for Pricing. RFP Title

1.8 Organisation details. Name

Bradfield College. Information and Records Retention Policy

Information and Records Retention Policy

Supplier Code of Conduct

Wilkins Safety Group

EEA(QP): guidance notes

CONTRACTORS & SERVICE PROVIDERS PRE-QUALIFICATION QUESTIONNAIRE

Risk Assessment Policy

Asbestos Survey Services

COMPANY POLICY FOR HEALTH AND SAFETY

Risk Assessment Policy

Application for Ill-health Retirement Benefits

Equality Act Briefing Note Q & A

WorkSafe Victoria inspectors

WORKING WITH CONTRACTORS POLICY AND PROCEDURE

Choosing your Retirement options

An Introduction to Business Regulations when Starting Up

RINEHART OIL, INC. Employment Application Petroleum Transportation Driver

Terms of Reference Annex: Green Deal

To Ecclesiastical Insurance Office plc, Beaufort House, Brunswick Road, Gloucester GL1 1JZ

Contractor Safety Management Element November 2018

NHS Rotherham Clinical Commissioning Group

City of Becker Employment Application

COMMERCIAL GENERAL LIABILITY INSURANCE APPLICATION FORM

EL PASO COUNTY COMMUNITY COLLEGE DISTRICT POST OFFICE BOX EL PASO, TEXAS GENERAL CONDITIONS OF CONTRACT

RISK ASSESSMENTS (GENERAL) POLICY AND GUIDANCE

Transcription:

Lintonville Parkway, Ashington, rthumberland NE63 9JZ Arch Business Trading Name: Application Completed by: Approval (circle as appropriate): (Refer to section 11 for full details) APPROVED REJECTED Instructions Thank you for completing this questionnaire. The information it contains will be held in confidence by Arch and used to determine your suitability for the provision of services to Arch Construction, Arch Estates, or where applicable, both. te that we will only use the information contained within this submission in our evaluation process and when completing the document you should assume we have no prior knowledge of your organisation. All applicants should state the business name and the person completing the questionnaire on page 1, plus sections 1 to 5. Applicants to Arch Estates only should complete sections 6. Applicants to Arch Construction only should complete sections 7. All applicants should complete section 8 and the declaration in section 9. If you are unsure of which sections to complete, please contact us on 01670 528400. Please complete this document as fully as possible, and continue on a separate sheet where needed. Please also enclose copies of all relevant supporting information; these should not be submitted separately. Guidance notes are shown in blue. Data Protection Statement We will not share this information with third parties. In the event your submission is approved, we reserve the right to contact you periodically (and every 3 years as a minimum) to update all or part of this information. Your approved applications will be retained on file for 6 years and then destroyed. In the event your submission is rejected, your submission will be retained on file for 6 months and then destroyed. Page 1 of 18

Lintonville Parkway, Ashington, rthumberland NE63 9JZ 1. Business Overview 1.1 Company Structure (tick one) Sole Trader Partnership Limited Company Additional information: For Sole Trader and Partnership, please add the name of the principal(s) in the box below. Please state you company number in the box below and attach your certificate of incorporation. 1.2 Contact Details Legal name of Company: Trading name (if different): Principal business activity: Registered office address: Trading address (if different): Telephone number: Email address: Website: 1.3 Business Information Date commenced trading: UTR: VAT Registration number*: NI number: (*please attach a copy of your VAT certificate) Page 2 of 18

Lintonville Parkway, Ashington, rthumberland NE63 9JZ 1.4 HMRC Construction Industry Scheme Does your activity fall within the scope of the HMRC Construction Industry Scheme? 1.5 Holding Company (complete if applicable, or leave blank) Company Name: Company registration number: 1.6 Related Parties Declaration Is there any party who significantly influences the decisions of your business that is related to a similarly influential party within Arch? Please tick below as applicable. If yes please add their name here: 1.7 Type of Work Applied For (please tick one and add a brief description) Labour, Plant & Materials Labour & Plant ONLY Labour ONLY, incl. small tools Labour, Plant & Materials with Design Description: Labour & Plant ONLY with Design Labour Agency 1.6 Number of Employees Page 3 of 18

Lintonville Parkway, Ashington, rthumberland NE63 9JZ 1.7 Contact Details within your business Department Name and position Telephone Email Quotations Order placement Order progress Finance Please note that Arch require a named contact for all items specified above, but in the event of a sole trader or partnership, this can be the same named person. Page 4 of 18

Lintonville Parkway, Ashington, rthumberland NE63 9JZ 2.0 Finance 2.1 Bank Details Do you use a factoring company? Please tick one. Please enter their details below Please enter your details below Bank Name: Bank Address: Bank Account Name: Account Number: Sort Code: Swift BIC Code: IBAN: 2.2 Turnover Annual Turnover (for last 3 years) Year: Year: Year: Page 5 of 18

Lintonville Parkway, Ashington, rthumberland NE63 9JZ 3. Insurance and Legal 3.1 Insurance Cover Please provide details of your insurance in the table below. te that if you are applying for design work, you must include details of professional indemnity insurance below. (Please attach an original copy of your certificate(s) or broker confirmation) Employer Liability Limit of Indemnity Renewal Date insurance (please tick) Public Liability Contractors All Risk Professional Indemnity Other 3.2 Legal and contractual matters Has your organisation been sued or prosecuted within the last 5 years in respect of a project involving design, construction, or services provided by the organisation? Has your organisation been involved in such a project that has been abandoned? Has your organisation had a contract terminated in the last 5 years? Has your organisation or any individual employed by your company been prosecuted or received an improvement/prohibition notice for any breach of health and safety legislation within the past 3 years? (If you have answered YES to any of the above, please provide details on a separate sheet) Page 6 of 18

Lintonville Parkway, Ashington, rthumberland NE63 9JZ 4.0 Health and Safety 4.1 Health and Safety Policy Does your organisation have a Health and Safety Policy? Tick one. (If you have answered YES, please attach a copy with your submission) 4.2 Person responsible for Health and Safety Please give details of the Competent Person (as defined in the Management of Health & Safety at Work Regulations 1999) in your organisation, or state where this is an external body. Name: Position: Contact : Email: Further details: 4.3 Accidents Please complete the following for the last three years Fatal Accidents ** Major Injuries ** Over 3 day accidents Dangerous occurrences Reportable Diseases Year: Year: Year: ** The Reporting of Injuries, Diseases and Dangerous Occurrences Regulations 1995 (RIDDOR) require accidents involving the self-employed and members of the public in these categories to be reported by employers, therefore these should be shown, but as a separate total from employee accidents. Page 7 of 18

Lintonville Parkway, Ashington, rthumberland NE63 9JZ 4.4 Contractors Does your business use sub-contractors? Tick one 4.5 Risk Assessments and Method Statements Does your business use method statements and risk assessments, as per current Health and Safety regulations? Tick one (If you have answered YES, please attach a copy of a generic risk assessment and method statement appropriate to the type of work applied for.) 4.6 Manual Handling Does your business comply with current Manual Handling Regulations? Tick one (If you have answered YES, please attach a copy of a recent manual handling risk assessment.) 4.7 Control of Substances Hazardous to Health (COSHH) Does your business comply with current COSHH Regulations? Tick one (If you have answered YES, please attach a copy of a typical assessment.) 4.8 Communication Please state how health and safety procedures, policies and updates are communicated within your business. Page 8 of 18

Lintonville Parkway, Ashington, rthumberland NE63 9JZ 5.0 Quality and Environmental 5.1 Quality Systems Does your management system have an external accreditation, please tick as appropriate below Standard Certification Documentation ISO 9001: ISO 14001: ISO 18001: Other: (Please attach copies of any relevant accreditation certificates from external bodies) 5.2 Environmental Policy Does your organisation have an Environmental Policy please tick as applicable Is a senior manager in your organisation responsible for environmental matters? If, please state their name and position: Does your organisation provide environmentally sound products as standard? 5.3 Waste Does your organisation have a waste management plan? Page 9 of 18

Lintonville Parkway, Ashington, rthumberland NE63 9JZ 6.0 Arch Estate Applications Only Complete this section if you are applying to work within the Arch Homes portfolio and / or the Arch Commercial Property portfolio (including workspace). 6.1 Recruitment Please provide more information on your staff recruitment techniques. Tick yes or no for each area stated. Application form Interview References Disclosure and Barring Checks (DBS) Other measures used to ensure safe recruitment and staff retention 6.2 Equality and Diversity Does your organisation comply with its legal obligations relating to the following? Tick yes or no for each area stated. Race Sexual Orientation Disability Age Religion or belief Gender Human Rights Page 10 of 18

Lintonville Parkway, Ashington, rthumberland NE63 9JZ In the last three years has any finding of unlawful discrimination been made against your organisation by any court or industrial or employment tribunal? Tick one. In the last 3 years has your organisation been the subject of a formal investigation on the grounds of alleged unlawful discrimination by, for example, the Commission for Racil Equality (CRE), Disability Rights Commission (DRC), Equal Opportunities Commission (EOC) or Equality and Human Rights Commission (EHRC). Tick one. 6.3 Arch Estate Contractor Code of Conduct The Arch Estate Contractor Code of Conduct has been received, reviewed and acknowledged. Page 11 of 18

Lintonville Parkway, Ashington, rthumberland NE63 9JZ 7.0 Arch Construction applications only Only complete if you are applying to be an approved supplier to our Construction sites for Arch Developments and Ascent Homes. If you are only interested in work within the Arch Homes or commercial property portfolio you do not need to complete this section. 7.1 Vehicles Under the requirements of the Goods Vehicle (Licensing of Operators) Act 1995 you are required to hold an operator s licence for ALL vehicles complying with the following criteria: Any vehicle with a gross plated weight exceeding 3500Kg which is for carrying goods in connection with any trade or business or available for hire or reward. Any unplated vehicle with an unladen weight in excess of 1525 Kg. Do you own or operate ANY vehicles that comply with the above criteria? Tick one. 7.2 Drivers All drivers issued with appropriate Personal Protective Equipment PPE for delivering to Construction sites. Tick one. All drivers have received training on safe working at heights and prevention of falls (especially flatbed lorry deliveries). Tick one. All drivers have been advised that reversing of vehicles on site is prohibited unless a trained Banksman is present. Tick one. Page 12 of 18

Lintonville Parkway, Ashington, rthumberland NE63 9JZ 7.3 Additional Health and Safety Information Please give details of membership of any safety groups or other professional bodies in the box below. Please give the name of any personnel who possess formal safety qualifications in the box below. If successful in working with Arch Construction, what Health and Safety training has been, or would be given to supervisors and operatives? Please state details in box below. 7.4 Asbestos Does your business deal with asbestos removal / disposal? Tick one (If YES, please attach a copy of your Asbestos Licence) Page 13 of 18

Lintonville Parkway, Ashington, rthumberland NE63 9JZ 7.5 Arch Construction Safety Guidelines for Sub-contractors (S-G-002). Document S-G-002 has been received, reviewed and acknowledged. All operatives must hold a current CSCS card and or other recognised accredited Health and Safety Qualification such as IOSH, Site NEBOSH, 11RSM and CIEH. All operatives must be trained and qualified to undertake the tasks requested of them. Confirm all employees / your contractors are trained for an approved scheme appropriate to their occupation and will have a valid card as proof of such. te it is a mandatory requirement for Arch Construction sites that employees and Contractors carry a valid card. (If YES, please attach a copy of CSCS card and all other approved schemes) Page 14 of 18

Lintonville Parkway, Ashington, rthumberland NE63 9JZ 8.0 Client References Please provide details of companies to whom you have provided similar services in the last year. Name and Address Contact Name: Telephone : Email address: Name and Address Contact Name: Telephone : Email address: Name and Address Contact Name: Telephone : Email address: Page 15 of 18

Lintonville Parkway, Ashington, rthumberland NE63 9JZ 9.0 Declaration I confirm that to the best of my knowledge the information provided within this submission is current and correct. I accept the conditions and undertakings requested within this questionnaire and to: Provide adequate control of health, safety and welfare risks arising from our work activities which may affect employees of others. Consult with our employees on matters affecting health and safety. Provide and maintain safe plant and equipment. Ensure safe handling or use of substances. Provide information, instruction and supervision of employees. Ensure all employees are fit and competent to do their tasks, and give them adequate training. Prevent accidents and cases of work related ill health. Maintain safe and healthy working conditions. Ensure sufficient funds are available to implement this declaration; and Review and revise this declaration as necessary at regular intervals and not exceeding 12 months. I understand that false information in any aspect of this submission could result in the rejection of the application. This undertaking should be signed by a Partner, Director or authorised representative on behalf of the Organisation. Signature Print Name Position Date Page 16 of 18

Lintonville Parkway, Ashington, rthumberland NE63 9JZ 10. Submission Checklist: Please use the list below to check you have included all information and documents required for this submission. Please also ensure you have signed and dated the declaration. If marked with an M note the information is mandatory. Information from section 6 is required only if you are applying to work with Arch Construction. Documents required with your submission Section Description Ref. 1.1 Certificate of incorporation (if Limited) 1.2 VAT Certificate (if VAT registered) 1.2 CIS Registration Letter M 3.1 Certificate of Employer Liability Insurance M 3.1 Certificate of Public Liability Insurance M 3.1 Certificate of Professional Indemnity Insurance 3.2 Details of any litigation, prosecution, abandonment or cancelled contracts, if applicable 4.1 Health and Safety Policy 4.5 Copy of a Method Statement and Risk Assessment M 4.6 Manual Handling Risk Assessment 4.7 Example of COSHH Risk Assessment 5.1 Copies of external accreditation certificates if applicable CONSTRUCTION ONLY 7.1 Copy of Goods Vehicle Operator s Licence M 7.4 Copy of Asbestos Licence M 7.5 Copy of CSCS Card and other approved schemes M 7.5 Signed copy of the Safety Guidelines for Sub-Contractors S-G-002 M 11. Approval Sheet (to be completed by Arch) Page 17 of 18

Lintonville Parkway, Ashington, rthumberland NE63 9JZ Audited Accounts checked? Credit Check reviewed / approved by Finance Director? Insurances checked? Insurers on the Arch Construction approved list? Documentation complete? NA Comments **Approval (circle as appropriate): APPROVED REJECTED ** Print Name and Signature: ** Print Name and Signature: ** Transfer application status information to front cover. Page 18 of 18