MEDIA RELEASE OCEANAGOLD UPDATES DIDIPIO NI TECHNICAL REPORT

Similar documents
MEDIA RELEASE OCEANAGOLD ANNOUNCES UPDATED RESOURCE & RESERVE STATEMENT

MEDIA RELEASE. OCEANAGOLD HAILE OPTIMISATION STUDY DELIVERS ENHANCED VALUE (All financial figures in US Dollars unless otherwise stated)

MEDIA RELEASE OCEANAGOLD ACHIEVES RECORD ANNUAL GOLD PRODUCTION AND ACHIEVES 2017 GUIDANCE FOR SIXTH CONSECUTIVE YEAR

MEDIA RELEASE. OCEANAGOLD REPORTS THIRD QUARTER 2017 RESULTS; DECLARES DIVIDEND (All financial figures in US Dollars unless otherwise stated)

For personal use only

MEDIA RELEASE OCEANAGOLD TO ACQUIRE ROMARCO CREATING THE LOWEST COST GOLD PRODUCER GLOBALLY

MEDIA RELEASE OCEANAGOLD FOURTH QUARTER AND FULL YEAR 2013 PRODUCTION REPORT

MEDIA RELEASE OCEANAGOLD ACHIEVES CONSOLIDATED GUIDANCE FOR SEVENTH CONSECUTIVE YEAR

MEDIA RELEASE OCEANAGOLD ANNOUNCES 2019 PRODUCTION AND COST GUIDANCE

MEDIA RELEASE OCEANAGOLD REPORTS THIRD QUARTER 2016 OPERATIONAL AND FINANCIAL RESULTS

MEDIA RELEASE OCEANAGOLD REPORTS FULL YEAR 2018 FINANCIALS

MEDIA RELEASE OCEANAGOLD ANNOUNCES ROBUST FINANCIAL RESULTS; DECLARES DIVIDEND

MEDIA RELEASE OCEANAGOLD ANNOUNCES RECORD NET PROFIT AND REVENUE; DECLARES DIVIDEND

2017 Results Presentation

Q Results Presentation

October 8, pleased to pursuant to. diversified

THE IMPORTANCE OF ESG PERFORMANCE FOR MINING 2018 MINES & MONEY LONDON. Mick Wilkes President & CEO. November 28, 2018

MEDIA RELEASE OCEANAGOLD ANNOUNCES FIRST QUARTER FINANCIAL AND OPERATIONAL RESULTS

2011 Full Year Results Conference Call Presentation February 17, 2012

Detour Gold Reports Fourth Quarter and Full-Year 2014 Results and Year-end 2014 Mineral Reserve and Resource Estimates

Skouries Update March 2018

Detour Gold Reports Third Quarter 2018 Results

Third Quarter 2014 Results

March 2016 Prospectors & Developers Conference Toronto, Canada

Acacia Mining plc (formerly African Barrick Gold plc) LSE: ACA. ( Acacia or the Company ) Approval of Gokona Underground project at North Mara

West African Resources awards underground mining contract for M1 South to Byrnecut

Stock Symbol: AEM (NYSE and TSX) For further information: Investor Relations (416)

2015 Diggers & Dealers Mick Wilkes

Turquoise Hill files 2016 Oyu Tolgoi Technical Report

2017 DENVER GOLD FORUM

SAS REPORTS STRONG 2015 FIRST QUARTER RESULTS

NEWS RELEASE GREAT PANTHER SILVER REPORTS POSITIVE PRELIMINARY ECONOMIC ASSESSMENT FOR THE CORICANCHA MINE

CANADA S INTERMEDIATE GOLD PRODUCER

HBM. Creating Sustainable Value through High Quality Long Life Deposits

SANDSTORM GOLD ROYALTIES RELEASES HOD MADEN PFS AND INCREASES PRODUCTION GUIDANCE

For Immediate Release Date: July 4, 2017 # ORVANA PROVIDES UPDATE ON DON MARIO OPERATION; ANNOUNCES US$11.3 MILLION DEBT FINANCING

Company Announcements Office. PNG Chamber of Mines and Petroleum Mining Seminar Wafi-Golpu Joint Venture

December Developing Copper, Zinc and Gold Deposits on the Asmara Project, Eritrea. November 2010

Detour Gold Announces 2016 Operating Results and 2017 Guidance

Detour Gold Achieves Production and Cost Guidance for 2017 and Provides 2018 Guidance

NEWS RELEASE FOR IMMEDIATE RELEASE

SAS REPORTS 2013 THIRD QUARTER RESULTS, WITH A SIXTH CONSECUTIVE QUARTER OF POSITIVE CASH FLOW FROM OPERATIONS

Northgate Minerals Reports Second Quarter Results

OTCQX:CROCF. February. completed % U 3 O 8 Cut Off Grade. contained. repetitions. significant the aim of. Gold retains

For further information: Investor Relations (416)

Spanish Mountain Gold Announces Results of New PEA for the First Zone

September 2014 Quarterly Results

WESDOME ANNOUNCES FOURTH QUARTER AND FULL YEAR 2016 FINANCIAL RESULTS AND RESERVE AND RESOURCE UPDATE

News Release. B2Gold Corp. Announces Positive Results from the Preliminary Economic Assessment for the Gramalote Project in Colombia

Media Announcement (For Immediate Release)

June 2014 Quarterly Results. Sandeep Biswas Managing Director & Chief Executive Officer

Detour Gold Reports First Quarter 2018 Results and Provides Update on Mine Plan Assessment with Guidance Revisions for 2018

NEWS RELEASE K92 MINING INC. K92 Mining Discovers High Grade Extension of Kora Deposit in First Completed Exploration Hole

Orezone Announces Positive Preliminary Economic Assessment

MCEWEN MINING ANNOUNCES RECORD RESOURCE ESTIMATE AT THE SAN JOSÉ MINE IN ARGENTINA

September 2013 Quarterly Results. Greg Robinson Managing Director and Chief Executive Officer

Press Release 31 January 2018

TSX.V:ORG Page 1 of 7. Orca Gold Inc West Georgia St. Vancouver, B.C., V6C 3E8, Canada Tel: Fax: HIGHLIGHTS

GROWTH THROUGH CASH FLOW. Q Results 3 August 2017

Kişladağ Update March 2018

PRESS RELEASE TSX NYSE: RIC

MCEWEN MINING ANNOUNCES UPDATED RESERVE & RESOURCE ESTIMATE AT THE SAN JOSÉ MINE IN ARGENTINA

ASANKO GOLD REPORTS Q4 AND FULL YEAR 2017 RESULTS, PROVIDES 2018 GUIDANCE AND A 5-YEAR OUTLOOK

LSE:ACA. Acacia Mining plc. Unearthing Africa s Potential

Dalradian Resources Reports Positive Preliminary Economic Assessment for the Curraghinalt Gold Project in Northern Ireland

CANADA S INTERMEDIATE GOLD PRODUCER

LEAGOLD FILES UPDATED TECHNICAL REPORT FOR LOS FILOS GOLD MINE, INCREASING RESERVES BY 59% TO 2.7 MILLION OUNCES GOLD

Detour Gold Updates Life of Mine Plan for Detour Lake

Operational Outlook & Update Conference Call November 29, 2018

Golden Star Announces Wassa Mine Feasibility Study Results

June 2013 Quarterly Results. Greg Robinson Managing Director and Chief Executive Officer

Eldorado Gold Reports Results of Technical Studies

KINROSS GOLD CORPORATION Q Results Conference Call & Webcast

For personal use only

NOT FOR DISSEMINATION IN THE UNITED STATES OF AMERICA

McEWEN MINING REPORTS 2015 FIRST QUARTER OPERATING & FINANCIAL RESULTS

Atico Reports Consolidated Financial Results for the Second Quarter of (All amounts expressed in US dollars, unless otherwise stated)

The Turnaround Continues. Value Over Volume

2008 PRODUCTION FORECAST HIGHLIGHTS

LionGold s Bolivia Gold Project delivers a 40% increase in its Mineral Resource estimate to now contain a total of 1.79 million ounces of gold

Morila our company maker in a post mining legacy. Chiaka Berthe

Detour Gold Reports Second Quarter 2018 Results and Reaffirms Guidance for 2018

Northgate Announces Increase in Gold Reserves at its Stawell Gold Mine

NEWS RELEASE 03/2018 Symbol: TSX-V: PRB Shares Issued: 93,914,742

OSISKO UPDATES CANADIAN MALARTIC MINE PLAN

SEMAFO: Positive Mana PFS and Reserve Additions at Mana and Boungou. 5-Year Average Target of 413,000 Ounces of Annual Production, AISC $696

Q Conference Call November 2, 2012 HBM

SUITE WEST HASTINGS STREET VANCOUVER, BC V6C 2W2 CANADA TEL: FAX: November 12, 2009

PRESS RELEASE. Banro Files NI Technical Report on Namoya Project, Democratic Republic of the Congo

CROCODILE GOLD INTERSECTS GRAMS PER TONNE GOLD OVER 2.52 METERS BELOW THE PROSPECT DEPOSIT AT UNION REEFS PROJECT

FNV. Forward-Looking Statements

November 28, 2018 News Release Release #

Allied Nevada Announces Improved Mine Plan and Economics for Hycroft Mill Expansion With 77% IRR and $2.7 Billion NPV

SECOND QUARTER 2018 RESULTS. August 10, 2018

Rambler Updates Reserves at its Producing Canadian Copper & Gold Mine Demonstrating a Profitable 20 Year Mine Life

Rambler Reports Financial Results Quarter Ended June 30, 2018

Teranga Gold Files Updated Technical Report for Sabodala

All amounts are in US dollars, unless otherwise indicated.

CROCODILE GOLD OBTAINS APPROVAL TO PROCEED AT ITS INTERNATIONAL MINE

For personal use only

Transcription:

MEDIA RELEASE 30 October 2014 OCEANAGOLD UPDATES DIDIPIO NI 43-101 TECHNICAL REPORT (All figures in US Dollars unless otherwise stated) (MELBOURNE) OceanaGold Corporation (TSX/ASX/NZX: OGC) (the Company ) is pleased to announce the completion of the updated technical report for the Didipio operation, prepared in accordance with Canadian National Instrument 43-101 Standards of Disclosure for Mineral Projects ( Technical Report ). The release of the updated Technical Report follows the announcement on the preliminary results of the Didipio Optimisation Study dated tember 12, 2014 ( Optimisation Study ). It includes an updated Resource and Reserve statement, optimised mine plans and enhanced economics. Please also refer to JORC Table 1 released concurrently with the Technical Report for information relating to the estimates of Ore Reserves and Mineral Resources at the Didipio operation. Key Outcomes Earlier access to high grade ore from the underground and completion of open pit mining in 2017 resulting in improved production and cash flow profiles over life of mine. Enhanced Didipio operation economics with forecast operating cash flow after tax and capital expenditure of $944 million over the life of mine based on long term metal prices of $1,300/oz gold and $3.20/lb copper. Reduced waste movement of 67 million tonnes from the previous open pit mine plan resulting in a cost savings of $215 million over the mine life of the open pit. Underground unit mining costs estimated to be $26.45 per tonne mined; an improvement on the original estimates of $33.50 per tonne mined. Increased total Proven and Probable mineral reserves by 3.35 million tonnes of ore, 180,300 ounces of gold and 8,480 tonnes of copper after depletion to tember 30, 2014. Total Measured and Indicated Resources after depletion of 58.6 million tonnes of ore, 2.08 million ounces of gold and 250 thousand tonnes of copper. Mick Wilkes, Managing Director and CEO said, With the update to the Technical Report now complete and delivering very positive results, we continue to effectively execute on our strategy to maximise value from our existing assets. Moreover, we have further demonstrated the robust operational and economic attributes of this very high quality asset. As previously reported, the underground operation at Didipio will be brought forward by one year with development of the underground portal and surface facilities scheduled to commence in the first quarter of 2015. First underground ore mined is expected in late 2017, two years earlier than originally planned. 1

Under the revised mine plan, the open pit mining operations is now expected to be completed at the end of 2017 at which point, the underground feed and open pit stockpiles will maintain the mill capacity (Figure 1). Figure 1 Process Plant Feed Profile Through the information gathered from nearly two years of mining operations, extensive geotechnical drilling and analysis and Whittle modelling, the Company has redesigned the open pit to match the geometry of the ore body, improve the ramp layout and lift the interface (crown pillar) between the open pit and underground by 80 metres. The Company has also extended the depth of the underground by an additional 110 metres to 2,070mRL. An Inferred Resource target has been assessed as being economically viable, however it requires improved geological confidence. The potential to extend the underground depth by an additional 60 metres to 2,010mRL exists should the Company be successful in converting this Inferred Resource into the Indicated category (Figure 2). A larger underground will now support mining in two domains thus increasing the underground mining rate from 1.2 Mtpa to a target rate of 1.6 Mtpa. Figure 2 Underground Mine Design Cross Section 2

Factoring in the optimised design and mining depletion from the first nine months of 2014, the Company has updated the mineral reserves and resources for Didipio. Tables 1 and 2 below illustrate the updated mineral reserves for Didipio and the variances from the ember 31, 2013 mineral reserve statement. The cut-off grades of 0.52 g/t AuEq for the open pit and 1.3 g/t AuEq for the underground are based on metal prices of $1,250/oz gold and $3.20/lb copper. Table 1 Updated Mineral Reserves 1 Reserve Area Reserve Class Tonnes Gold Grade Copper Grade Contained Gold Contained Copper Mt g/t % Moz kt Open Pit Underground Stockpiles Proven 6.65 1.77 0.54 0.38 35.7 Probable 15.44 0.61 0.42 0.30 64.8 Proven 2.25 2.48 0.47 0.18 10.5 Probable 13.67 1.76 0.43 0.77 58.1 Proven 10.99 0.40 0.43 0.14 47.4 Probable 0.00 0.00 0.00 0.00 0.00 Total Proven 19.89 1.10 0.47 0.70 93.6 Total Probable 29.11 1.13 0.44 1.77 216.5 Table 2 Mineral Reserves Variance 1 Ore Tonnes Gold Grade Contained Gold Copper Grade Contained Copper Mt Mt g/t g/t Moz Moz % % kt kt Open Pit 22.10 32.32 0.96 1.02 0.68 1.06 0.45 0.46 100.5 147.3 Underground 15.92 5.91 1.86 2.25 0.95 0.43 0.43 0.45 68.6 26.6 Stockpiles 10.99 7.42 0.40 0.43 0.14 0.10 0.43 0.46 47.4 34.1 Total 49.00 45.65 1.13 1.09 1.77 1.59 0.44 0.46 216.5 208 Notes: 1. Refer to the updated Didipio Technical Report located at www.oceanagold.com for full Resource and Reserve Statement. 2. Open pit resources does not include stockpiles inventory. Tables 3 and 4 below present and compare the updated Didipio mineral resources within the ember 31, 2013 resource statement. The cut-off grades of 0.47 g/t AuEq (above 2,460mRL) for the open pit and 1.12 g/t AuEq for the underground resource are based on metal prices of $1,450/oz gold and $3.80/lb copper. 3

Table 3 Updated Mineral Resources (Open Pit) 1,2 Tonnes Gold Grade Contained Gold Copper Grade Contained Copper Mt Mt g/t g/t Moz Moz % % kt kt Measured 6.06 10.58 1.81 1.85 0.35 0.63 0.55 0.55 33.1 58.2 Indicated 21.91 35.36 0.59 0.66 0.42 0.75 0.36 0.36 79.1 127.3 Measured & Indicated 27.96 45.94 0.86 0.93 0.77 1.38 0.40 0.40 112.2 185.5 Inferred 9.8 12.9 0.40 0.40 0.10 0.17 0.20 0.20 19.6 26.0 Table 4 Updated Mineral Resources (Underground) 1 Tonnes Gold Grade Contained Gold Copper Grade Contained Copper Mt Mt g/t g/t Moz Moz % % kt kt Measured 2.57 2.50 0.21 0.48 12.3 Indicated 17.10 7.67 1.74 2.36 0.96 0.58 0.46 0.51 78.5 39.1 Measured & Indicated 19.67 7.67 1.84 2.36 1.17 0.58 0.46 0.51 90.8 39.1 Inferred 6.39 1.80 1.30 1.60 0.30 0.09 0.40 0.40 23.4 7.0 Notes: 1. Refer to the updated Didipio Technical Report located at www.oceanagold.com for full Resource and Reserve Statement. 2. Open pit resources does not include stockpiles inventory. The pre-production capital cost for the underground development has been estimated to be $116 million (including purchase of mobile equipment) over a three year period with the bulk of the capital expenditure taking place in 2016 and 2017. The total life of mine sustaining capital costs for the underground is estimated to be $75 million. The changes to the mine design and revised mine plan whereby high grade ore feed is brought forward by two years has significantly improved the Didipio production schedule and operating cash flow profile than in the original plan (Figure 3). The smaller open pit design has resulted in 67 million tonnes of waste eliminated from the previous mine plan, which translates into a cost savings for open pit mining of $215 million from 2018 to 2020. The higher underground production rate has reduced the unit underground mining costs. With these changes, the Didipio operation s economics have been significantly improved. Using a gold price assumption of $1,300/oz, copper price assumption of $3.20/lb, the Company forecasts an after tax and capital expenditure cash flow of $944 million over the life of mine. 4

Figure 3 Didipio After-Tax Cash Flow Profile Mr. Wilkes added, The Company is preparing for construction of the underground portal scheduled to commence in the first quarter of 2015. In addition to developing access to the underground mine, this will also allow us to explore for new resources at depth beneath the existing ore body. The cost associated with the development is fully financed through the strong free cash flow generation of the business. The Technical Report has been filed on SEDAR at www.sedar.com and can also be located on the Company s website at www.oceanagold.com. Qualified Persons The Technical Report was prepared under the supervision of Michael Holmes, Simon Griffiths and Jonathan Moore. Messrs Holmes, Griffiths and Moore are members and Chartered Professionals with the AusIMM. Each is a qualified person for the purposes of the National Instrument 43-101 Standards of Disclosure for Mineral Projects of the Canadian Securities Administrators ( NI 43-101 ). Mr Holmes is a fulltime employee of the Company, whilst Messrs Griffiths and Moore are full-time employees of the Company s subsidiary, OceanaGold (New Zealand) Limited. All such persons are qualified persons for the purposes of NI 43-101 and have sufficient experience relevant to the style of mineralisation and type of deposit under consideration and to the activity which they are undertaking to qualify as a Competent Person. The qualified persons have reviewed the information and data contained in this press release and have approved it for dissemination. - ENDS - 5

For further information please contact: Investor Relations Toronto Sam Pazuki Tel: +1 416 915 3123 Media Relations Melbourne Andrea Atell Tel: +61(3) 9656 5300 info@oceanagold.com www.oceanagold.com Twitter: @OceanaGold About OceanaGold OceanaGold Corporation is a significant multinational gold and copper producer with over 24 years of operating sustainably in New Zealand and more recently the Philippines. Its flagship operation is the Didipio Mine located in the northern Philippines which commenced commercial production on April 1, 2013 and has a current mine life to 2029. In New Zealand on the South Island, OceanaGold operates the country s largest gold operation at the Macraes Goldfield and the Reefton Gold Mine on the west coast. OceanaGold has an unwavering commitment to the environment and to the host communities in which it operates it. In 2014, the Company expects to produce 275,000 to 305,000 ounces of gold from the combined New Zealand and Philippine operations and 21,000 to 24,000 tonnes of copper from the Philippine operations. OceanaGold is listed on the Toronto, Australian and New Zealand stock exchanges under the symbol OGC. Technical Disclosure The Company s disclosure of Mineral Reserve and Mineral Resource information is governed by NI 43-101 under the guidelines set out in the Canadian Institute of Mining, Metallurgy and Petroleum (the CIM ) Standards on Mineral Resources and Mineral Reserves, adopted by the CIM Council, as may be amended from time to time by the CIM ( CIM Standards ). The disclosure of Mineral Reserve and Mineral Resource information is also based on the reporting requirements of the Australiasian Code for the Reporting of Mineral Resources and Ore Reserves of ember 2012 (the JORC Code ). CIM definitions of the terms Mineral Reserve, Proven Mineral Reserve, Probable Mineral Reserve, Mineral Resource, Measured Mineral Resource, Indicated Mineral Resource and Inferred Mineral Resource, are substantially similar to the JORC Code corresponding definitions of the terms ore reserve, proved ore reserve, probable ore reserve, Mineral Resource, Measured Mineral Resource, Indicated Mineral Resource and Inferred Mineral Resource, respectively. Estimates of Mineral Resources and Mineral Reserves prepared in accordance with the JORC Code would not be materially different if prepared in accordance with the CIM definitions applicable under NI 43-101. There can be no assurance that those portions of such Mineral Resources that are not Mineral Reserves will ultimately be converted into Mineral Reserves. Mineral Resources are not Mineral Reserves and do not have demonstrated economic viability. All Mineral Reserves are within the Mineral Resource. 6

Cautionary Statement for Public Release Certain information contained in this public release may be deemed forward-looking within the meaning of applicable securities laws. Forward-looking statements and information relate to future performance and reflect the Company s expectations regarding the future growth, results of operations, business prospects and opportunities of OceanaGold Corporation and its related subsidiaries. Any statements that express or involve discussions with respect to predictions, expectations, beliefs, plans, projections, objectives, assumptions or future events or performance (often, but not always, using words or phrases such as "expects" or "does not expect", "is expected", "anticipates" or "does not anticipate", "plans", "estimates" or "intends", or stating that certain actions, events or results "may", "could", "would", "might" or "will" be taken, occur or be achieved) are not statements of historical fact and may be forward-looking statements. Forward-looking statements are subject to a variety of risks and uncertainties which could cause actual events or results to differ materially from those expressed in the forward-looking statements and information. They include, among others, the accuracy of mineral reserve and resource estimates and related assumptions, inherent operating risks and those risk factors identified in the Company s most recent Annual Information Form prepared and filed with securities regulators which is available on SEDAR at www.sedar.com under the Company s name. There are no assurances the Company can fulfil forwardlooking statements and information. Such forward-looking statements and information are only predictions based on current information available to management as of the date that such predictions are made; actual events or results may differ materially as a result of risks facing the Company, some of which are beyond the Company's control. Although the Company believes that any forward-looking statements and information contained in this press release is based on reasonable assumptions, readers cannot be assured that actual outcomes or results will be consistent with such statements. Accordingly, readers should not place undue reliance on forward-looking statements and information. The Company expressly disclaims any intention or obligation to update or revise any forward-looking statements and information, whether as a result of new information, events or otherwise, except as required by applicable securities laws. The information contained in this release is not investment or financial product advice. NOT FOR DISSEMINATION OR DISTRIBUTION IN THE UNITED STATES AND NOT FOR DISTRIBUTION TO US NEWSWIRE SERVICES. 7