ASEAN-ROK Cooperation Fund (AKCF) Manual

Similar documents
ENHANCED INTEGRATED FRAMEWORK (EIF) GUIDANCE NOTE ON EIF SUSTAINABILTIY SUPPORT PHASE PROCESS

ADMINISTRATIVE MANUAL FOR PROJECT IMPLEMENTATION

TERMS OF REFERENCE CONSULTANT FOR THE DEVELOPMENT OF MONITORING AND EVALUATION MECHANISM FOR THE ASEAN LABOUR MINISTERS WORK PROGRAMME

TERMS OF REFERENCE CONSULTANT FOR THE DEVELOPMENT OF MONITORING AND EVALUATION MECHANISM FOR THE ASEAN LABOUR MINISTERS WORK PROGRAMME

III. modus operandi of Tier 2

Terms of Reference (ToR)

UN-Habitat Policy For Implementing Partners. UN-Habitat. Policy For. Partners

Bilateral Guideline. EEA and Norwegian Financial Mechanisms

Annex 1. Action Fiche for Solomon Islands

South Sudan Common Humanitarian Fund Allocation Process Guidelines

Assignment Name: Workshop on EU Budget Support for civil servants of Macedonia Section 1. Introductory Information

Terms of Reference. External monitoring mission for the Project Mid-Term Review

Guidelines for the United Nations Trust Fund for Human Security

Regulation on the implementation of the European Economic Area (EEA) Financial Mechanism

MEMORANDUM OF UNDERSTANDING ON THE IMPLEMENTATION OF THE NORWEGIAN FINANCIAL MECHANISM between THE KINGDOM OF NORWAY,

Annex 2 Template for MoU Norwegian Financial Mechanism

PEFA Handbook. Volume I: The PEFA Assessment Process Planning, Managing and Using PEFA

2 nd INDEPENDENT EXTERNAL EVALUATION of the EUROPEAN UNION AGENCY FOR FUNDAMENTAL RIGHTS (FRA)

Annex 2 Template for MoU Norwegian Financial Mechanism

Arrangements for the revision of the terms of reference for the Peacebuilding Fund

TERMS OF REFERENCE FOR INDIVIDUAL CONTRACTORS

AFGHANISTAN ALLOCATION GUIDELINES 22 JANUARY 2014

REPORT 2016/081 INTERNAL AUDIT DIVISION

ADMINISTRATION REQUIRIMENTS

The Global Fund. Financial Management Handbook for Grant Implementers. December 2017 Geneva, Switzerland

ANNEX. CRIS number: 2014/37442 Total estimated cost: EUR 5M. DAC-code Sector Public sector policy and administrative management

Guideline for strengthened bilateral relations. EEA and Norway Grants

FRAMEWORK AND WORK PROGRAM FOR GEF S MONITORING, EVALUATION AND DISSEMINATION ACTIVITIES

NCF 7 Project Implementation Manual

JORDAN. Terms of Reference

UNICEF Moldova. Terms of Reference

Annex 1 Citizen s summary 1

Terms of Reference for the Fund Operator The EEA and Norway Grants Global Fund for Regional Cooperation EEA and Norwegian Financial Mechanisms

TERMS OF REFERENCE Final evaluation consultant AUP Project, Kayin State, Myanmar

Assignment Name: Workshop on EU Budget Support for civil servants from Montenegro, Trainer 1

MANUAL OF PROCEDURES FOR DISBURSEMENT OF FUNDS TO PARTICIPATING PARTNERS

Brief Introduction. To Completing the Logframe Matrix

Institute for Global Environmental Strategies IGES Regional Centre

TERMS OF REFERENCE FOR INDIVIDUAL CONSULTANT

صندوق تطوير وا قراض البلديات Muncipal Development & Lending Fund MDLF CAPACITY BUILDING

SURVEY GUIDANCE CONTENTS Survey on Monitoring the Paris Declaration Fourth High Level Forum on Aid Effectiveness

Contents. Ulkoministeriö Utrikesministeriet Ministry for Foreign Affairs of Finland

Introduction. Mr. President,

Progress report on implementation of the recommendations of the Board of Auditors on the UNICEF accounts for the biennium

Handbook. CEWARN Rapid Response Fund (RRF)

United Nations Development Programme

Cross Border Co-operation between Bulgaria & Romania Multi-annual Programme Project Fiche for Programme Support

The United Republic of Tanzania Ministry of Finance. Memorandum of Understanding. Between. The Government of the United Republic of Tanzania

Report on the activities of the Independent Integrity Unit

ANNEX 1 MODALITY FOR TARIFF REDUCTION AND ELIMINATION FOR TARIFF LINES PLACED IN THE NORMAL TRACK

Annex 2 Template for MoU EEA Financial Mechanism

Financing Agreement. (Uganda Public Service Performance Enhancement Project) between THE REPUBLIC OF UGANDA. and

Programmatic approach to funding proposals

The tasks of the Managing Authority under IPARD II. Multi-country workshop, 13 November 2015 Tirana

2011 SURVEY ON MONITORING THE PARIS DECLARATION

with the Ministry of Finance and Planning for the United Republic of Tanzania 08 November 2015 NDA Strengthening & Country Programming

MEMORANDUM OF UNDERSTANDING ON THE IMPLEMENTATION OF THE EEA FINANCIAL MECHANISM between ICELAND, THE PRINCIPALITY OF LIECHTENSTEIN,

Office of the Auditor General of Norway. Handbook for the Office of the Auditor General s Development Cooperation

GOVERNMENT OF SIERRA LEONE

Initial Structure and Staffing of the Secretariat

Joint Partnership Arrangement

United Nations Environment Programme

South Sudan Common Humanitarian Fund (South Sudan CHF) Terms of Reference (TOR)

Open Call for Consulting Services Consultant for Mapping of funding opportunities for Roma integration measures, policies and programs

Operating Guidelines

REPUBLIC OF ZAMBIA. Ministry of National Development Planning

Terms of Reference for the Mid-term Evaluation of the Implementation of UN-Habitat s Strategic Plan,

Fund for Gender Equality Monitoring and Evaluation Framework Executive Summary

REPORT 2016/012 INTERNAL AUDIT DIVISION

Project Monitoring and Reporting Workshop for Interreg programmes

Terms of Reference for Financial Audit of Implementing Partners. UNICEF Nigeria Country Office Expenditures

EEA Financial Mechanism Memorandum of Understanding Hungary MEMORANDUM OF UNDERSTANDING ON THE IMPLEMENTATION OF THE EEA FINANCIAL MECHANISM.

Additional Modalities that Further Enhance Direct Access: Terms of Reference for a Pilot Phase

FREQUENTLY ASKED QUESTIONS 4 (from the information session for shortlisted applicants on 21 May 2013) Guidelines for Applicants Section 1.3.

EN 1 EN. Annex. Sector Policy Support Programme: Sector budget support (centralised management) DAC-code Sector Trade related adjustments

MEMORANDUM OF UNDERSTANDING ON THE IMPLEMENTATION OF THE EEA FINANCIAL MECHANISM between ICELAND, THE PRINCIPALITY OF LIECHTENSTEIN,

REPORT 2014/070 INTERNAL AUDIT DIVISION. Audit of civil affairs activities in the. United Nations Stabilization Mission in Haiti

Introduction Chapter 1, Page 1 of 9 1. INTRODUCTION

European Commission Directorate General for Development and Cooperation - EuropeAid

UNDP Initiation Plan to programme the project preparation grant received from the GEF. (otherwise called GEF PPG)

Call for Proposals from NGOs INSTRUCTIONS FOR PROPOSERS - NGO to implement MSS through Playback Theater Reference: LBN/CO/CFP/199/18

Report on the activities of the Co-Chairs

United Nations Environment Programme

Submission by the Pacific Islands Forum Secretariat, Suva, Fiji. To the UNFCCC Standing Committee on Finance

INDONESIA-MALAYSIA-THAILAND GROWTH TRIANGLE PROJECT MANUAL

1. Preamble. 2. Principles and objectives

Factsheet N 6 Project implementation: delivering project outputs, achieving project objectives and bringing about the desired change

United Nations Environment Programme

United Nations Environment Programme

Annex 1: The One UN Programme in Ethiopia

COMMUNICATION AND VISIBILITY GUIDE. FOR EU-FUNDED PROJECTS IMPLEMENTED by International Organizations in Cape Verde.

Proposal to adopt International Public Sector Accounting Standards (IPSAS) by the Agency

REPORT 2015/041 INTERNAL AUDIT DIVISION. Audit of the United Nations Mine Action Service of the Department of Peacekeeping Operations

Public Disclosure Authorized OFFICIAL~ DOCUMENTS (

Mongolia: Development of State Audit Capacity

REPORT OF THE TWELVE MEETING OF ASEAN EXPERT GROUP ON FOOD SAFETY (12 TH AEGFS) 20 22OCTOBER 2015 YOGYAKARTA, INDONESIA

General principles and indicative list of eligible costs covered under GCF fees and project management costs

IPA National Programme 2009 Part II - Bosnia and Herzegovina Fiche 3 Preparation for IPA components III and IV

GUIDANCE NOTE Introduction

Multi-Donor Trust Fund for the Malawi Public Finance and Economic Management Reform Program Grant Agreement

Transcription:

ASEAN-ROK Cooperation Fund (AKCF) Manual Working Draft Prepared by ASEAN-ROK Programme Management Team (AKPMT) 1 P a g e

Table of Contents 1. Introduction: How to use this Manual 1.1 Objective 1.2 Target Audience 1.3 Contents of the Manual 2. Overview of AKCF 2.1 Background 2.2 Framework 2.3 AKCF Logo 2.4 ASEAN-ROK Programme Management Team (AKPMT) 3. Application for AKCF 3.1. Eligibility 3.2. Proposal Formulation 3.3. Appraisal and Approval 3.4. Implementation 3.5. Monitoring and Evaluation 3.6. Completion and Reporting Appendix 1: ASEAN-ROK Plan of Action 2016-2020 Appendix 2: New Framework for AKCF 2017-2020 Appendix 3: AKCF Pro-forma Cost Appendix 4: Q & A on AKCF Pro-forma Cost Appendix 5: AKCF Project Concept Note Template Appendix 6: Full Project Proposal Template Appendix 7: Disbursement Letter Template 2 P a g e

List of Abbreviations AEC AFRP AKCF AKPMT AMS ASEAN ASCC APSC CLMV CPR DO DP ASEAN Economic Community ASEC Financial Rules and Procedure ASEAN Korea Cooperation Fund ASEAN-ROK Programme Management Team ASEAN Member States Association of South East Asian Nations ASEAN Socio Cultural Community ASEAN Political Security Community Cambodia, Laos, Myanmar, Vietnam Committee of Permanent Representative Desk Officer Dialogue Partner ERD1 External Relation Division 1 FBD FOCF GAAP IA IAI IFRS IPSAS M&E MOFA PCR ROK Finance and Budget Division Future Oriented Cooperation Fund Generally Accepted Accounting Principles Implementing Agency Initiative for ASEAN Integration International Financial Reporting Standards International Public Sector Accounting Standards Monitoring & Evaluation Ministry of Foreign Affairs Project Completion Report Republic of Korea 3 P a g e

SCF ToR UN USD Special Cooperation Fund Terms of Reference United Nations United States Dollar Chapter 1. Introduction: How to use this Manual 1.1. Objectives The purpose of the AKCF Manual is to provide general information on operational rules and practices that are applicable to the ASEAN-ROK Cooperation Fund (AKCF) with the overall aim to maximize the effective utilization of the AKCF. The main objective can be split up in two: 1) Improve Transparency & Accountability through ensuring better communication & information flow between various actors dealing with the AKCF. This includes ensuring that the AKCF Manual is supplemented with a compliance of the Handbook Proposal for ASEAN Cooperation Projects 1. 2) Increase Ownership by ensuring proper interventions for each stages of the AKCF project management cycle, and advise proponents/implementing Agencies (IAs) to adhere to the AKCF regulations. 1.2. Target Audience All actors involved in the AKCF management. This manual serves as a reference guide for existing proponents and Implementing Agencies (IAs) of the AKCF and as an introduction to the AKCF management for new arrivals. Some of the procedures suggested will need to be carried out by IAs and their project managers. 1.3 Contents of the Manual Chapter 1 : Introduction Provides an overview of the handbook and its target users Chapter 2: Overview of AKCF Provides background information on the 1 http://asean.org/storage/2012/05/handbook-on-proposal-development-for-asean-cooperation- Projects-Final.pdf 4 P a g e

establishment of AKCF and AKPMT Adopted on 18/12/2017 Chapter 3: Application for AKCF Sets out the AKCF Eligibility Rules and provide procedures for all phases of the AKCF project management cycle. Chapter 2. Overview of AKCF 2.1 Background Following the establishment of sectoral dialogue relations between ASEAN and the ROK in 1989, the Korean government launched the ASEAN-ROK Special Cooperation Fund (SCF) in 1990 with an aim to enhance people to people exchanges. In 1996, the ASEAN-ROK Future-Oriented Cooperation Fund (FOCF) was further launched in order to implement cooperation projects outlined in the ASEAN-ROK Plan of Action. In 2015, SCF and FOCF were merged into AKCF with an annual contribution of 7 million US dollars. The total scale of contribution would be 88 million USD by the end of 2017. 5 P a g e Figure 1. The Expansion of AKCF (1999-curent) From 1990 to 1991, the ROK contributed USD 1 million per year to the AKCF (after the establishment of the ASEAN-ROK sectoral dialogue partnership in 1989). From 1992 to 2004, the ROK increased its contribution to USD 2 million per year (after the establishment of a full dialogue partnership between ASEAN and the ROK in 1991). From 2005 to 2009, the ROK increased its contribution to USD 3 million per year (after the 15 th anniversary of the dialogue partnership in 2004). From 2010 to 2014, the ROK increased its contribution to USD 5 million per year (after the 20 th anniversary of the dialogue partnership in 2009). Since 2015, the ROK has increased its contribution to USD 7 million per year (after the 25 th

anniversary of the dialogue partnership in 2014). 2.2. Framework According to the Terms of Reference (ToR) of the AKCF adopted in 2015, AKCF shall provide funding for the implementation of cooperation projects initiated by ASEAN Member States (AMS) and the ROK under the Programme-based Approach of the ASEAN-ROK Cooperation Framework that should be reviewed and approved by ASEAN and the ROK every five years in accordance with the ASEAN-ROK Plan of Action. The Framework is comprised of priority sectors, goals, and targets of the AKCF Cooperation projects. The First Framework, New Framework for the ASEAN-ROK Cooperation Fund (AKF) 2017-2020, was adopted by ASEAN and the ROK in February, 2017 (Please refer to Appendix 2). The overall goal of the Framework is to contribute to the realization of the ASEAN Vision 2025 outlined in ASEAN s Political-Security, Economic, and Socio-Cultural Community Blueprints, in accordance with the selected priorities laid out in the ASEAN- ROK Plan of Action (2016-2020) (Please refer to Appendix 1). The sectors of i) education, ii) environment and iii) culture are considered as the focal areas for the next four years (2017-2020) as they are areas in which the ASEAN-ROK Cooperation Fund has a comparative advantage and made great progress. In addition, for a cross-sectoral approach, the AKCF shall support policy dialogue programmes initiated by ASEAN-related agencies, think-tanks, UN agencies, international organizations, and other Dialogue Partners (DPs) of ASEAN are expected to create a conducive environment for the AKCF Framework. 6 P a g e

Figure 2. AKCF Framework 2017-2020 7 P a g e

2.3 AKCF Logo The AKCF logo was created with a view to enhancing the visibility of the AKCF to the wider audience and beneficiaries. When carrying out AKCF-supported projects, the AKCF logo should be used by AKCF supported projects in all soft and hard copy of project documents, project reports, publications, meeting materials and other kinds of promotional materials to indicate support from AKCF. The AKCF logo is available for download on the AKCF website 2. The logo can also be shared through e-mail by AKPMT upon request. Figure 3. the AKCF logo 2.4 ASEAN-ROK Programme management Team (AKPMT) The ASEAN-ROK Programme Management Team (AKPMT) was established at the end of 2016 under the funding of AKCF. For efficient utilization of overall AKCF, the AKPMT works closely with the ASEC and the relevant DOs in the transparent use of project fund under AKCF particularly in reviewing proposals, tracking the appraisal and approval process and monitoring of the project implementation. The roles of the AKPMT include but not limited to: 1) To be a contact point for general enquiries from proponents 2) To assist in formulating and reviewing the concept note and project proposal 3) To maintain close coordination among the proponents, DOs of the ASEC and the MOFA ROK 4) To monitor the progress in AKCF supported projects and keep track on the approval process by updating AKCF Project Matrix 5) To receive and evaluate progress report for multi-year projects. 2 http://www.aseanrokfund.com/eng/sub_01/sub_03.asp. 8 P a g e

Chapter 3: Application for AKCF 3.1. Eligibility Projects eligible for application should meet the following qualifications: 1) The project should enhance the cooperative relationship between ASEAN and the ROK Please refer to the ASEAN-ROK Plan of Action to Implement the Joint Declaration on Strategic Partnership for Peace and Prosperity (2016-2020) (Appendix 1). 2) The project should be in line with the action lines laid out in the blueprints of the APSC, the ASCC, and the AEC so as to achieve the ASEAN Vision 2025 Please refer to the blueprints of the three ASEAN communities and the ASEAN Vision 2025 as well as sectoral bodies Work Plans, Master Plan on ASEAN Connectivity 2025, and Initiative for ASEAN Integration (IAI) Work Plan III. 3) The project should be in line with the ASEAN-ROK Cooperation Fund Framework (2017-2020) Please refer to the New Framework for AKCF 2017-2020 (Appendix 2). 4) The project should generally engage all ASEAN Member States (AMS) as well as the ROK. However, for the IAI Work Plan III project, only CLMV countries can be the beneficiaries of the AKCF funded projects. In terms of the IAI accredited Project, only 2 countries from CLMV countries are allowed to be the main beneficiaries. The followings are the eligibility requirements of proponents and Implementing Agency (IA) for AKCF-supported projects. 1) Eligible entities: i. ASEAN: ASEC, ASEAN Intergovernmental Organization, Ministries, Governmentaffiliated Organizations, Non-profit Organizations and Universities whose proposals have been endorsed or jointly proposed by a relevant ministry; and ii. ROK: Ministries, Government-affiliated Organizations, Public Associations and Foundations, Non-profit Organizations and Universities whose proposals have been endorsed or jointly proposed by a relevant ministry; and iii. International Organizations, subject to prior endorsement by the Ministry of Foreign Affairs of ROK and AMS. 2) Non-eligible entities: 9 P a g e

i. Individuals or for Profit Organizations; 3. 2. Proposal Formulation AKPMT Consultation and Review in Proposal Formulation The proponents are highly suggested to have consultation with the AKPMT on the proposal prior to the ASEC Project Appraisal and Approval Process to facilitate smooth approval of the proposal. The prior consultation with the AKPMT covers, but not limited to, the review of: 1) The budget proposal, which includes clarification on budget calculations based on the proper unit costs specified in the AKCF Pro-forma Cost (such as administrative support, per diem, travel expenses, as well as acceptable costing of the budget items included); 2) The ASEAN Cooperation Project Proposal format, which includes relevant annexes such as budget, indicative work plan, and ToR if applicable; and 3) Contents, which include, but not limited to, completeness of the information required for a proposal. In this regard, proponents are requested to follow the below-mentioned practices and engage in sufficient consultation with the AKPMT before the official proposal submission. Preparation of Concept Note 1) Before preparing the full ASEAN Project Proposal, the proponents are encouraged to prepare a Concept Note in AKCF format to be submitted through ASEC DO and/or AKPMT. The proponents are suggested to have an initial consultation with AKPMT and seek the preliminary view of ROK, and sectoral bodies. 2) A Concept Note may include, but not limited to, the following points in at least 2-3 pages; i) Project title, ii) Project Description, iii) Background and iv) Indicative budget. The template for the AKCF Concept Note is in Appendix 5. It is highly recommended for the proponents to articulate the rationales for applying AKCF as well as how to ensure the ROK participation in the project activities. 10 P a g e Proposal Formulation 1) Project proposals should be submitted in electronic copies. Project proposals must be submitted to the ASEC at least 83 working days (or approximately 4

months and 1 week) for single sector projects, and 96 working days (or approximately 4 months and 3 weeks) for cross-sectoral projects prior to implementation. 2) Application for AKCF supported project should include: i) ASEAN Cooperation Project Proposal, ii) Annex 1. Budget Proposal. iii) Annex 2. Indicative Work Plan and iv) Annex 3. Notation on Additional Supporting Documents (where applicable) such as the ToR of IA. (See the Appendices the above-mentioned templates 3 ). Incomplete submission will not be processed to the next step in the appraisal and approval process. 3) It is essential that proponents develop a project proposal following the guidelines provided in the Handbook on Proposal Development for ASEAN Cooperation Projects published by ASEC. 4) The proponents should make sure that the proposed project is not a replication of existing or past projects supported by AKCF, other Ministries of ROK or any other donor organizations. The proponents are suggested to further consult the AKPMT or DOs if it has further enquiries related to project proposal formulation. 5) The proposal should clearly mention that the support of ROK will be highlighted during the implementation by using AKCF logo in relevant documents and publications, also participation of Korean organizations/officials in relevant events. 6) The proposal should state that unspent balance and/or any interest earned from the fund should be returned to the AKCF account within 90 days of the project implemented. 7) For the multi-year project proposal, it should include a paragraph on the submission of Annual Financial Interim Report, Annual Interim Report and Project Completion Report. The annual reports shall be submitted within 30 days of every end of ASEC fiscal year 4 while Project Completion Report (PCR) and Final Financial Report are within 60 days of the project implemented. 8) Each budget item in the budget proposal (Annex 1 of the full Project Proposal) should follow the AKCF Pro-forma Cost (Please refer to Appendix 3.) Other costs that are not stated in the Pro-forma Cost should be consulted with MOFA ROK through AKPMT. 3 The ASEAN Cooperation Project Proposal Format and templates are also available from ASEAN National Secretariats, External Relations Division 1 of ASEC, ASEC s official website (http://www.asean.org/resources/asean-project-template) and AKMPT s website (http://www.aseanrokfund.org). 4 AKCF-supported projects follow the ASEAN Secretariat (ASEC) s fiscal year, which is from January to December. 11 P a g e

9) In case the proponents differ from IA, the proponents are requested to annex the Terms of Reference (TOR) of IA to the ASEAN Cooperation Project Proposal, including sub-contractor information as well as detailed allocation of budget where applicable. The proponents are also expected to select a qualified IA in accordance with their own rules and regulations. Otherwise, the ASEC Financial Rules and Procedures (AFRP) shall be applied. Moreover, where applicable, the proponent/ia is expected to select a qualified sub-contractor in accordance with their own rules and regulations. The proponent/ia is requested to provide justification of the selection or explanation of selection method in the proposal. 10) Proposals for multi-year project with the total budget of USD 1,000,000 and above are encouraged to conduct external audit at the end of the project. Relevant cost should be included in the budget plan. 3.3. Appraisal and Approval Proponents should follow the following procedure, beginning with the submission of a concept paper to the completion of the project. Figure 4. Flow Chart of the Process 3.4. Implementation 12 P a g e After a project proposal is approved, the project will follow the following process from the fund disbursement to the completion. The process of project implementation

through project completion under AKCF is as follows: 1) The project is approved by ASEAN and ROK. 2) DO informs the proponents of the approval of the project. 3) Once a project is approved, DO sends Disbursement Letter to the fund recipient within 5 working days of approval. The fund recipient is requested to return Disbursement Letter with the counter-signature as well as the bank account information for the disbursement of approved project to the DO. 4) The fund will be disbursed in tranches. ASEC disburses initial disbursement of the approved budget to the designated bank account of the fund recipient [Project commencement date]. The proponents should submit the First Tranche Financial Report for the next tranche (if applicable) with financial summary and supporting documents. For multi-year projects, the proponents will also submit Annual Interim Report and Annual Financial Interim Report (as of 31 December) within days after end of ASEC fiscal year (January December). 5) IA conducts the project activities according to the Indicative Work Plan, which is an integral part of the approved proposal. The final project activity mentioned in the Indicative Work Plan is conducted [Project implemented date] 3.5. Monitoring and Evaluation 13 P a g e IA assumes a primary responsibility for monitoring the progress of project activities and reporting it to ASEAN and/or the ROK through the proponents based on the management arrangements and monitoring methods as indicated in the approval proposal. The monitoring by IA should capture tangible outputs, which should be reported in annual interim report as well as the PCR. Items to monitor and report include but not limited to: 1) The number and types of participants who benefited from each activity 2) Key results from each activity such as workshops, studies and reports 3) Progress of activities in light of project objectives and expected outputs stated in the proposal; and 4) Necessary follow-up actions if any. To capture the outputs, various monitoring methods can be used e.g. surveys/questionnaires, reviews, interviews, site visits, focus group interviews. As part of monitoring, IA is encouraged to coordinate closely with DOs of the ASEC and the AKPMT. If substantial changes such as budget and timeframe are made in

implementation, especially in the Indicative Work Plan, IA is required to inform the DO, through the proponents, so that the DO can inform the Mission of ROK through AKPMT accordingly. The monitoring report, if any, should be shared with the relevant ASEAN Body through ASEC DO as well as the AKPMT for review and retention. With regard to any M&E related concerns, the IAs are invited to consult directly with the AKPMT. The AKPMT can provide technical assistance, advice and guidance and clarify procedures to assist IA at the earliest stages for project development (from the concept note to the full project proposal). The AKPMT shall carry out field monitoring under the budget of the project, if needed. If the project is not in line with the approved project and operation method, the proponents shall be imposed disadvantages in carrying out future projects. 3.6. Completion and Reporting Within 60 days after the project implemented, the proponents are requested to submit a Project Completion Report (PCR) and Final Financial Report together with financial summary and the remaining financial supporting documents to ERD1 of ASEC. The proponents are requested to prepare two sets of reports since the original reports are requested to submit to the ASEAN Secretariat and the copy version is submitted to AKPMT. The project completion and financial reports shall follow ASEAN Template which can be downloaded at www.asean.org. 5 In case where proponents have not submitted these two reports for project completion, funding for the next project will be withheld until the pending report is settled. Financial Report Verification by Finance and Budget Division (FBD) of ASEC FBD of ASEC verifies the financial supporting documents and informs the proponent/ia, through DOs of ASEC, of the amount of final disbursement from ASEC or unspent balance and/or any interest earned from the project fund to be refunded to ASEC. Any findings during the verification process should be followed up and settled (i.e. lack of supporting documents, miscalculation of expenditure, deviation from the approved budget proposal, etc.) by FBD through DOs of ASEC. Once all the follow up actions have been taken and settled, FBD will inform DOs and ERD1 of ASEC and AKPMT, by which the verification is considered completed. If the deviations from the approved budget proposal have been found during verification process, the proponents may be requested to refund the amount paid for 5 http://asean.org/resource/asean-project-templates/ 14 P a g e

the unapproved/overspent budget items and it shall be impose disadvantages for the proponents in carrying out future projects. Refund of Unspent Balance and Accrued Interest The unexpended balance of any project and activities under the funded project shall be returned to the ASEAN-ROK Cooperation Fund account through FBD of the ASEAN Secretariat within sixty (60) days after the completion of the project. Appendix 1: ASEAN-ROK Plan of Action 2016-2020 Appendix 2: New Framework for AKCF 2017-2020 Appendix 3: AKCF Pro-forma Cost Appendix 4: Q & A on AKCF Pro-forma Cost Appendix 5: AKCF Project Concept Note Template Appendix 6: Full Project Proposal Template Appendix 7: Disbursement Letter Template 15 P a g e