Actual Cost Actual Cost HST

Similar documents
FINAL 2017 RATE SUPPORTED BUDGET TABLE OF CONTENTS

FINAL 2018 RATE SUPPORTED OPERATING BUDGET TABLE OF CONTENTS

CHAPTER XI. WATER & SEWER ARTICLE A. WATER CONNECTION FEES. New Water Connection Fees. Inside City Limits

FY18 SCHEDULE OF USER FEES October 1, 2017 September 30, UTILITIES - RECLAIMED WATER Adopted

City of St. Albans Water and Wastewater Rates and Fees Summary

AMADOR WATER AGENCY SCHEDULE OF MISCELLANEOUS FEES AND CHARGES

Town of Derry, NH Water Rates and Fees

North Pecos Water & Sanitation District. Rates, Charges, Fees and Penalties Effective January 1, 2015

PROPOSED 2019 RATE SUPPORTED OPERATING BUDGET TABLE OF CONTENTS

City of Keizer Fees and Charges for Services As of July 2017

BOPU RESOLUTION NO

APPENDIX A. Effective January 1, WATER AND SEWER TAP FEES - SINGLE FAMILY RESIDENTIAL TAP FEE

Cedar River Water and Sewer District FEE AND CHARGE SCHEDULE AMENDED January 21, 2014

Rate Schedule. Fiscal Year-2018 (July 1, 2017 June 30, 2018) P.O. Box 5911 Virginia Beach, Virginia

CITY OF TITUSVILLE ORDINANCE. Sec Schedule of water and sewer charges

District of Clearwater Utility Rate Review

Town of Chocowinity Budget vs. Actual For the Date Ending December 29, 2017 Account Description Budgeted Amount Amount Received Remaining Percentage U

M A N I T O B A ) Order No. 136/10 ) THE PUBLIC UTILITIES BOARD ACT ) December 22, 2010

SOUTH WALTON UTILITY COMPANY, INC. 369 Miramar Beach Drive Miramar Beach, FL Telephone: (850) Fax (850)

SECTION G. RATES AND SERVICE FEES

GENERAL ADMINISTRATION AND CORPORATE SERVICES (Administration/Corporate/Finance Departments)

WATER AND WASTEWATER FUND REVENUES

South Australian Water Corporation Fees and Charges Schedule Rates and Sales

Rate Schedule. Fiscal Year-2015 (July 1, 2014 June 30, 2015) Amended July 22, 2014 Amended August 26, 2014

LEHIGH COUNTY AUTHORITY SCHEDULE OF WATER RATES AND CHARGES

SUFFOLK COUNTY WATER AUTHORITY RULES & REGULATIONS SECTION 7 GENERAL RULES

Schedule of Water and Sewer Rates of First Utility District of Knox County, Tennessee. Residential Water

1. Schedule of Commodity Rates & February 1, 2019 Quarterly Service Charge

SIGNIFICANT BUDGET CHANGES

Public Utility District Act to provide potable water and sewer collection service to lands within the District; and,

Fee Schedule. Effective January 1, Administrative Services/All Departments: COPYING OF RECORDS

Municipality of Trent Hills 2018 Water and Wastewater Budget Approved: December 19, 2017

WATER, WASTEWATER, AND RECLAIMED WATER RATE STUDY Public Meeting to Review Study Results. January 5, 2016

CITY OF SONOMA 2017 FEE SCHEDULE INDEX EFFECTIVE FEBRUARY 13, 2017

RESOLUTION NO A RESOLUTION OF THE CITY OF NEWPORT REVOKING ALL PRIOR FEE RESOLUTIONS AND ADOPTING A NEW FEE SCHEDULE.

Order No. 49/18 THE CITY OF THOMPSON WATER AND WASTEWATER UTILITY WATER AND WASTEWATER RATES. April 12, 2018

M A N I T O B A ) Order No.17/14 ) THE PUBLIC UTILITIES BOARD ACT ) February 6, 2014

General Fund FY2016 Final Budget

VOLUME 2 - RULES AND REGULATIONS. Part B - Schedule of Rates, Fees and Other Charges. Table of Contents. 1. Definitions... 1

INSPECTION SERVICES DIVISION FEE SCHEDULE

Title 6 WATER AND SEWER FEES AND CHARGES

YEAR BUDGET

Toronto Water Budget BU Recommended Operating Budget Recommended Capital Plan 2017 Recommended Water Rate

THIS BUDGET WILL RAISE MORE TOTAL PROPERTY TAXES THAN LAST YEAR S BUDGET BY $227,677 or 2.51%, AND OF THAT AMOUNT, $104,038 IS TAX REVENUE TO BE

LAS CRUCES UTILITIES Sheet No. W Revision Approval Date: July 14, 2016 Effective Billing Date: October 1, 2010 LCUB Resolution No.

RATE & FEE SCHEDULE AMENDED July 1, 2018

Charges. Retail. Charge (water) & Builder. Account Activation Fee. Meter Size. Meter Fee. Water Sewer. Total $7.485 $4.99 $9.98 $9.

CITY OF GREATER SUDBURY

FY CURRENT REVENUE BUDGET MONTHLY ESTIMATED CASH INFLOW COMPARED TO ACTUAL RECEIPTS (CUMULATIVE) TOTAL (Excludes Reclamation Reimbursements)

TOWN OF LANTANA ADOPTED FEES AND CHARGES SCHEDULE (R ) EFFECTIVE JULY 10, 2017 UNLESS OTHERWISE SPECIFIED

FEE SCHEDULES. Class "B" Fermented Malt $ per year

General Fund. General Fund Revenues Final Budget

RESOLUTION

Schedule of Water and Sewer Rates of First Utility District of Knox County, Tennessee. Residential Water

3.1. Construction Meter Additional Charges for Temporary Meters OTHER FEES, CHARGES, AND DEPOSITS CAPACITY FEES...

Section 575 Public Utilities Department Fees

UTILITY RATE STUDY. Public Hearing

City of Riverbank. Water Rate Study FINAL 6/18/2015

SUMMARY OF SERVICES BY STRATEGIC PRIORITY

ADMINISTRATIVE POLICY AND PROCEDURES MANUAL FOR UTILITY BILLING AND COLLECTIONS

RULES, REGULATIONS AND RATES GOVERNING THE DISTRIBUTION OF WATER SOUTH HEIGHTS BOROUGH AND HOPEWELL TOWNSHIP BEAVER COUNTY, PENNSYLVANIA AND

OPERATING POLICY MANUAL

& Fees. Rates. Charge (water) Rate. Meter Size. Total. Water Sewer ¾ 1 1 ½ $9.84 $4.92 $9.84 $7.38 $60 $7.98. Footnotes. base fee in addition

FY BUDGETED CURRENT REVENUE MONTHLY ESTIMATED CASH INFLOW COMPARED TO ACTUAL RECEIPTS (CUMULATIVE) TOTAL (Excludes Reclamation Reimbursements)

ORANGE WATER AND SEWER AUTHORITY SCHEDULE OF RATES, FEES, AND CHARGES APPLICABLE TO ALL BILLINGS AND SERVICES ON AND AFTER OCTOBER 1, 2017

WATERWORKS BYLAW BYLAW NO

FY2018 General Fund Budget

TOWN OF ORO VALLEY WATER UTILITY COMMISSION WATER RATES ANALYSIS REPORT OCTOBER 7, 2009

BOARD OF WATER AND SEWER COMMISSIONERS OF THE CITY OF MOBILE PUBLIC NOTICE

JEFFERSON WATER AND SEWER DISTRICT DEPOSIT, FEE AND CHARGE SCHEDULE (Includes Rate Adjustments Effective January 1, 2019)

TARIFF. Issued: August 19, 2016 Effective: September 1, 2016 ISSUED BY: Arturo Gabaldon, President Community Water Company of Green Valley

RESOLUTION CONNECTION CHARGES, PLANT INVESTMENT FEES, AND UTILITY RATES FOR WATER AND SEWER SERVICE

RATE AND FEE SCHEDULE FOR 2018

2018 SEWER PERMIT APPLICATION updated 1/4/18

(REVISED) NOTICE OF PUBLIC MEETING

CITY OF SOLVANG FEES, CHARGES, AND FINES

M A N I T O B A ) Order No. 83/12 ) THE PUBLIC UTILITIES BOARD ACT ) July 9, 2012

TAUSSIG. Annual Report Fiscal Year City of Irvine Community Facilities District No (Great Park) & Associates, Inc.

City of Winder Title: Water Service Policy Date Issued: 5/2012 Policy: 500

JAMESTOWN S KLALLAM TRIBE TRIBAL CODE TITLE 10 UTILITIES CODE

UTILITY SERVICES CUSTOMER INFORMATION PACKET

INDIAN HILLS UTILITY OPERATING COMPANY, INC. CUSTOMER RIGHTS AND RESPONSIBILITIES

2019 PROPOSED BUDGET ACCOUNT 2019

Municipal Budget. City of Seagraves. This budget includes a proposed tax rate of Tel Hill

Albemarle County Service Authority FY 2005 Budget

Falcon Highlands Metropolitan District Financial Statement Variances March 31, 2018

M A N I T O B A ) Order No. 43/02 ) THE PUBLIC UTILITIES BOARD ACT ) March 13, 2002

Falcon Highlands Metropolitan District Financial Statement Variances April 30, 2018

Asset Management Plan - Introduction

Utility Enterprise Fund Water/Wastewater

CITY OF SAGINAW 2016/2017 PROPOSED BUDGET

TOWNSHIP OF WEST LINCOLN

The Three Planning Windows of Asset Management John Murray City of Hamilton May 9 th, 2012 CNAM - Montreal. Hamilton Asset Management Plan

GOFORTH SPECIAL UTILITY DISTRICT RATE ORDER AND SERVICE POLICIES

TOWNSHIP OF RUSSELL ASSET MANAGEMENT PLAN WATER / WASTEWATER JUNE WSP 100 Commerce Valley Drive West Thornhill, ON L3T 0A1

TAUSSIG. Annual Report Fiscal Year City of Irvine Community Facilities District No (Great Park) & Associates, Inc.

DOMESTIC SERVICE CHARGE:

M A N I T O B A ) Order No. 100/10 ) THE PUBLIC UTILITIES BOARD ACT ) October 6, 2010 MUNICIPALITY OF KILLARNEY TURTLE MOUNTAIN WATER AND SEWER RATES

Charges schemes. New connections and developer services charges scheme 2019/2020 Page 1 of 64

SIGNIFICANT BUDGET CHANGES

Transcription:

s & Charges Department Water % Est # Units 2013 Actual Water Main Taps 20mm to 50mm 58 $ 369.87 $ 375.42 Exempt 1.5% Inflation 100mm & larger 57 $ 689.77 $ 700.12 Exempt 1.5% Inflation Standby time for Watermain Taps 2 Bacterial Tests - After 30 days by System Operations Actual Cost Actual Cost HST Fire hydrant relocation $ 6,859.37 $ 6,962.26 Exempt 1.5% Inflation Fire hydrant relocation investigation $ 340.00 $ 345.00 HST 1.5% Inflation Standby time for Fire Hydrant Relocation Tenant Water Service Water deposit (minimum) $ 100.00 $ 100.00 Exempt 0.0% Bulk Water - Perm. Sites Coin /.25 m3 $ 0.50 $ 0.50 Exempt 0.0% Bulk Water - Perm. Sites Invoice / m3 $ 2.11 $ 2.20 Exempt 4.3% Rate increase Bulk Water Rates - Mobile Stations / m3 285,496 $ 2.11 $ 2.20 Exempt 4.3% Rate increase Bulk Water Rates - Hydrant Meter Rental / m3 $ 2.11 $ 2.20 Exempt 4.3% Rate increase Thaw water service on private property Actual Cost Actual Cost Exempt Water Service Reg/Aft Hrs Reg/Aft Hrs Shut off $159.96 / $272.28 $162.36 / $276.36 Exempt 1.5% Inflation Turn on 350 / 70 $159.96 / $272.28 $162.36 / $276.36 Exempt 1.5% Inflation On/off same day $159.96 / $272.28 $162.36 / $276.36 Exempt 1.5% Inflation Water service cleaning $ 215.56 $ 218.79 Exempt 1.5% Inflation Testing and Inspection Report (per consultant report/per device/annually) 5,800 $ 50.00 $ 50.00 HST 0.0% Backflow Prevention/Cross-Connection Initial Survey (Hazard review) 500 $ 100.00 $ 100.00 HST 0.0% D174

Water % Est # Units 2013 Actual Water Meter Installations by Region 20mm 2,800 $ 371.50 $ 371.50 Exempt 0.0% 25mm 65 $ 380.13 $ 380.13 Exempt 0.0% Water Meter Purchase, Seal and Connect by Region only 40mm 40 $ 609.00 $ 609.00 Exempt 0.0% 50mm 25 $ 807.70 $ 807.70 Exempt 0.0% 75mm 12 $ 1,466.09 $ 1,466.09 Exempt 0.0% 100mm 4 $ 2,541.65 $ 2,541.65 Exempt 0.0% 150mm (turbine vs compound) $ 4,710.92 $ 4,710.92 Exempt 0.0% 200mm $ 7,085.05 $ 7,085.05 Exempt 0.0% 250mm $ 9,461.31 $ 9,461.31 Exempt 0.0% Note: Cost of meter includes construction water Frozen water meter repair (15 mm - 25 mm inclusive) 35 $ 331.42 $ 331.42 Exempt 0.0% Frozen water meter repair (40 mm and larger) Actual Cost Actual Cost Exempt Water Meter Calibration Testing 15mm to 25mm Actual Cost Actual Cost HST 40mm to 250mm Actual Cost Actual Cost HST Hydrant meter rental (monthly charge) $ 588.84 $ 597.67 Exempt 1.5% Inflation Hydrant Meter relocation during rental period $ 419.78 $ 426.08 Exempt 1.5% Inflation Hydrant meter replacement (if lost by lessee) Actual Cost Actual Cost HST Penalty for failure to respond to meter maintenance requests Water Meter Deposit $ 166.77 $ 169.27 Exempt 1.5% Inflation 1 Water Meter $ 500.00 $ 500.00 Exempt 0.0% 2-20 Water Meters ($ each) $ 200.00 $ 200.00 Exempt 0.0% 21-50 Water Meters ($ each) $ 150.00 $ 150.00 Exempt 0.0% 51 & Up Water Meters ($ each) $ 100.00 $ 100.00 Exempt 0.0% D175

Wastewater / Regional Storm Lateral Disconnect By Region - no maintenance hole removal @ property line by region Wastewater Est # Units 2013 Actual % $ 4,521.12 $ 4,588.94 Exempt 1.5% Inflation Wastewater / Regional Storm main taps (all sizes) 45 $ 561.56 $ 569.98 Exempt 1.5% Inflation Standby time for Wastewater / Regional Storm Main Taps Wastewater / Regional Storm lateral TV inspection 71 $ 265.47 $ 269.00 HST 1.3% Inflation Standby time for Wastewater / Regional Storm TV Inspection Wastewater lateral blockage clearing on private property 163 $ 329.10 $ 334.04 Exempt 1.5% Inflation Septic tank disposal (per 500 gal) 16,434 $ 12.02 $ 12.20 Exempt 1.5% Inflation Sewer Discharge Abatement Application 5 $ 900.00 $ 913.50 HST 1.5% Inflation Sewer Discharge Agreement / 1000 m3 2,442 $ 390.21 $ 396.06 Exempt 1.5% Inflation Residential audit 3 $ 43.09 $ 43.74 Exempt 1.5% Inflation Commercial/industrial institutional audit 29 $ 149.78 $ 152.03 Exempt 1.5% Inflation Compliance program application annual fee (inspection) 28 $ 1,945.69 $ 1,974.88 HST 1.5% Inflation Sampling and Analysis 47 $ 389.14 $ 394.98 HST 1.5% Inflation Sampling& Analysis each Additional Lab analysis $170.18 or actual cost $172.73 or actual cost HST 1.5% Inflation D176

Water Permits 20 mm or 25 mm Water Service Inspection Public side 40 mm or 50 mm Water Service Inspection - includes (2) bacterial tests and (1) swabbing Public side 100 mm or larger Water service inspection - includes (2) bacterial and (1) pressure tests Public side Inspect disconnection of old domestic water service 15mm to 50mm Inspect disconnection of old water service 100mm and larger Standby time for Watermain Disconnect Standby time for Water Service inspection Water & Wastewater Permits Est # Units 2013 Actual % 138 $ 399.43 $ 405.00 HST 1.4% Inflation 15 $ 1,244.47 $ 1,263.00 HST 1.5% Inflation 60 $ 1,541.89 $ 1,565.00 HST 1.5% Inflation 35 $ 265.47 $ 269.00 HST 1.3% Inflation 20 $ 1,425.93 $ 1,447.00 HST 1.5% Inflation Meter Chamber Inspection 1 $ 265.47 $ 269.00 HST 1.3% Inflation Standby time for Meter Chamber inspection Pressure Test 60 $ 369.37 $ 375.00 HST 1.5% Inflation Bacterial Test 200 $ 319.98 $ 325.00 HST 1.6% Inflation Swabbing Test 120 $ 206.16 $ 209.00 HST 1.4% Inflation Standby time for each or combination of: Bacterial/Pressure Test/Swabbing Fire hydrant relocation inspection 0 $ 1,425.93 $ 1,447.00 HST 1.5% Inflation Residential Permit Application - Water Application includes: Plan Review Records Research Permits Cost Estimate Permit Issuance 120 $ 177.00 $ 179.66 Exempt 1.5% Inflation D177

Commercial/Industrial/Institutional Permit Application - Water Application includes: Plan Review Records Research Permit Cost Estimate Permit Issuance Wastewater Permits Wastewater / Regional Storm lateral inspection-includes all sizes Wastewater / Regional Storm maintenance hole inspection Standby time for Wastewater / Regional Storm inspection Wastewater / Regional Storm Lateral Disconnect Inspection - including maintenance hole removal at property line (by owner) Standby time for Wastewatermain / Regional Storm Disconnect / Manhole removal Residential Permit Application - Wastewater Application includes: Plan Review Records Research Permits Cost Estimate Permit Issuance Industrial/Commercial/Institutional Permit Application - Wastewater Application includes: Plan Review Records Research Permit Cost Estimate Permit Issuance Water & Wastewater Permits Est # Units 2013 Actual % 175 $ 265.47 $ 269.45 Exempt 1.5% Inflation 160 $ 753.37 $ 765.00 HST 1.5% Inflation 26 $ 177.00 $ 180.00 HST 1.7% Inflation 25 $ 620.62 $ 630.00 HST 1.5% Inflation 80 $ 177.00 $ 179.66 Exempt 1.5% Inflation 115 $ 265.47 $ 269.45 Exempt 1.5% Inflation D178

Business & Technical Services % Est # Units 2013 Actual Water and Wastewater Linear Design Standard 2 $ 48.40 $ 49.13 HST 1.5% Inflation Subscription for Water and Wastewater Linear Design Standard (3 yr subscription & 2 $ 30.18 $ 30.63 HST 1.5% Inflation updates) Water and Wastewater Facilities Design Manual and Consultants procedure Manual - 2 $ 60.53 $ 61.44 HST 1.5% Inflation Facilities Guide for Facility Project Delivery 2 $ 24.14 $ 24.50 HST 1.5% Inflation Uniform Traffic Signal Specifications (incl. CD) 2 $ 66.56 $ 67.56 HST 1.5% Inflation Guide for Production Engineering Contract Documents (CAD Standards Manual with CD) 2 $ 48.40 $ 49.13 1.5% Inflation Tender Documents inclusive of Contract Documents & Specifications (non-refundable): Large drawings 50 sheets $ 167.66 $ 170.17 HST 1.5% Inflation Large drawings < 50 sheets $ 83.76 $ 85.02 HST 1.5% Inflation Each additional sets of drawings: Large drawings 50 sheets $ 111.78 $ 113.46 HST 1.5% Inflation Large drawings < 50 sheets $ 55.83 $ 56.67 HST 1.5% Inflation 11 x 17 drawings package $ 27.92 $ 28.34 HST 1.5% Inflation Each Additional Contract Document & Specification set $ 27.92 $ 28.34 HST 1.5% Inflation Halton Urban Structure Plan 0 $ 46.72 $ 47.42 HST 1.5% Inflation Sustainable Halton Miscellaneous Documentation 0 $ 113.45 $ 115.15 HST 1.5% Inflation Miscellaneous Environmental Assessments and Studies for Water & Wastewater Infrastructure 0 $ 85.06 $ 86.34 HST 1.5% Inflation Transportation Studies, Master Plan & Miscellaneous Documents Halton Water & Wastewater Master Plan Review (2002) South Halton Water & Wastewater Master Plan Update (2008) Halton Water & Wastewater Master Plan Review (2011) 0 $ 56.73 $ 57.58 HST 1.5% Inflation 0 $ 350.59 $ 355.85 HST 1.5% Inflation 0 $ 170.18 $ 172.73 HST 1.5% Inflation 0 $ 350.59 $ 355.85 HST 1.5% Inflation D179

Business & Technical Services Est # Units 2013 Actual % Aerial Photos (24 x36) 400 $ 12.07 $ 12.25 HST 1.5% Inflation Digital Orthophotography- 1km x1km 3 $ 60.53 $ 61.44 HST 1.5% Inflation Digital Terrain Model 1km x 1km 4 $ 60.53 $ 61.44 HST 1.5% Inflation License for GIS Vector files Water or Wastewater for Single Asset Layer 0 $ 113.45 $ 115.15 HST 1.5% Inflation License for GIS Vector files Water or Wastewater for Additional Asset Layers (per 0 $ 56.73 $ 57.58 HST 1.5% Inflation each additional layer) Print of As Constructed" Plan and Profile Sheet 50 $ 12.07 $ 12.25 HST 1.5% Inflation Large drawings Print of As Constructed" Plan and Profile Sheet $ 3.58 $ 3.63 HST 1.5% Inflation 11" x 17" Water and Sewer Operating Maps 10 $ 12.07 $ 12.25 HST 1.5% Inflation Time @ Time @ All Custom Maps( including aerial $46.60 hr + $47.30 hr + 3 photography) - HST 1.5% Inflation Time @ Shop Rate $3.75 / lin ft $3.81 / lin ft D180

Water and Wastewater 2013 Actual /2013 % Connection Charges - Water Residential Water Lateral Actual Actual N/A Non-Residential Water Lateral Actual Actual N/A Residential Water Connection / SDE: $3,738.89 $ 3,753.85 N/A 0.4% index per By-law 152-12 Non-Residential Water Connection / sq.ft.: Connection Charges - Wastewater Residential Wastewater Lateral Actual Actual N/A Non-Residential Wastewater Lateral Actual Actual N/A Residential Wastewater Connection / SDE: $ 1.32 $ 1.33 N/A 0.4% index per By-law 152-12 $ 4,341.37 $ 4,358.74 N/A 0.4% index per By-law 152-12 Non-Residential Wastewater Connection / $ 1.75 $ 1.76 N/A 0.4% index per By-law 152-12 sq.ft.: * fee exclusive of applicable taxes D181

Regional Municipality of Halton Water Rates Monthly Service Charges Residential Commercial / Industrial Meter Size 20 mm or less $ 24.63 $ 24.63 25 mm $ 42.89 $ 79.71 40 mm $ 76.28 $ 130.88 50 mm $ 177.69 $ 286.29 75 mm $ 323.57 $ 510.33 100 mm $ 560.32 $ 872.63 150 mm $ 1,437.68 $ 2,217.34 200 mm $ 2,315.03 $ 3,562.26 250 mm $ 2,850.23 $ 4,450.52 Monthly Usage Charge (per cubic meter) From To 0m 3-25m 3 First 25m 3 at $ 2.0248 $ 2.0248 26m 3-45m 3 Next 20m 3 at $ 2.1693 $ 2.1693 46m 3-60m 3 Next 15m 3 at $ 2.3354 $ 2.3354 61m 3-460m 3 Next 400m 3 at $ 1.1614 $ 2.2401 Greater than 460m 3 Balance at $ 0.9461 $ 2.0248 D182