OVERHEAD COST IN CONSTRUCTION INDUSTRY

Similar documents
International Journal of Modern Engineering and Research Technology

Journal of Internet Banking and Commerce

THE AVAILABILITY OF COMPONENTS ACCOUNTING RESPONSIBILITY IN INDUSTRIAL COMPANIES IN AQABA CITY

Comment Does the economics of moral hazard need to be revisited? A comment on the paper by John Nyman

Balanced Scorecard. * Author's address: J. J. Appl. Sci., Vol.11, No. 2 (2008)

SUMMARY OF BORROWER SURVEY DATA

CASH FLOWS OF INVESTMENT PROJECTS A MANAGERIAL APPROACH

Formalizing a Debt Management Strategy

Fairness and Incentive Contracting Based on the Performance Budget: Testing Experiment on Referent Cognition Theory

THE OPEN UNIVERSITY OF TANZANIA FACULTY OF BUSINESS MANAGEMENT FINANCIAL AND MANAGERIAL ACCOUNTING MODULE OUTLINE

Analysis of PPP Project Risk

Cash Flow and the Consistency Principle in Working Capital Management Calculations

COST MANAGEMENT TECHNIQUES PRACTICES BY BUILDING CONTRACTORS NETWORK IN TAMILNADU

Management of cash in Public sector Enterprises - A case study of ECIL, Hyderabad

PERFORMANCE APPRAISAL OF HPCL THROUGH FREE CASH FLOW

The Extent to Which Contracting Companies in Kuwait Comply with International Accounting Standards from the Point of View of the Internal Auditors

Study of Cost Control Techniques Used in Construction Industry and Their Impact to Minimize Cost Overrun

The Influence of Managers Characteristics on Risk Management Practices in Public Listed Companies (PLCs) Of Malaysia

A STATISTICAL MODEL OF ORGANIZATIONAL PERFORMANCE USING FACTOR ANALYSIS - A CASE OF A BANK IN GHANA. P. O. Box 256. Takoradi, Western Region, Ghana

CHAPTER-8 SUMMARY, FINDINGS & SUGGESTIONS

Week 2 Quantitative Analysis of Financial Markets Hypothesis Testing and Confidence Intervals

Manpower, Sultanate of Oman.

Market Research for Business and Public Policy Decisions in Consumer Lending

ATTITUDE OF RETAIL INVESTORS TOWARDS SHARE MARKET AND SHARE BROKING COMPANIES AN EMPIRICAL STUDY IN MADURAI CITY TAMILNADU

Economic Growth Centre Working Paper Series

FINANCIAL AND SOCIAL COSTS OF CONSTRUCTION ACCIDENTS

A Study on Investors Perception Towards Lic (With Special Reference To Lic, Machilipatnam)

OPENING RANGE BREAKOUT STOCK TRADING ALGORITHMIC MODEL

Interest Rate Risk in a Negative Yielding World

The Impact of Project Type on Risk Timing and Frequency

A Study of Non-Performing Assets and its Impact on Banking Sector

Developing a Bankruptcy Prediction Model for Sustainable Operation of General Contractor in Korea

BINARY LINEAR PROGRAMMING AND SIMULATION FOR CAPITAL BUDGEETING

BFO Theory Principles and New Opportunities for Company Value and Risk Management

Chapter 3. Introduction to Risk Management. After studying this chapter, the student has to able to answer the following questions:

DIVIDEND CONTROVERSY: A THEORETICAL APPROACH

Curriculum Vitae SCOTT F. RICHARD. 565 Fairview Road February 2011 Coatesville, PA (610) home (610) mobile Citizen of USA

MOTIVATIONS AND FACTORS INFLUENCING THE DECISION OF ONLINE TRADING

Study on Measurement and Management of Cash Flow Efficiency of Tata Steel Limited (Standalone Company)

A MATRIX APPROACH TO SUPPORT DEPARTMENT RECIPROCAL COST ALLOCATIONS

Radovan Jelašić: Macroeconomic policy and export sector

A Study on Investors Attitude towards Mutual Funds as an Investment Option

Empirical Study on Investment Pattern towards Health Insurance at Salem district, Tamilnadu.

Spotting Passive Investment Trends: The EDHEC European ETF Survey

4apg. S third parties; APG Asset Management. European Commission. Attn. Mr. Michel Barnier

Indian Accounting Standards (Ind.-As): An Overview

CYPRUS MAIL Q&A. Dr. Kirill Zimarin, RCB Bank CEO

Should Households Establish Emergency Funds?

MULTI-PARTY RISK MANAGEMENT PROCESS (MRMP) FOR A CONSTRUCTION PROJECT FINANCED BY AN INTERNATIONAL LENDER

Child maintenance 2012 scheme: early progress

Measuring and Utilizing Corporate Risk Tolerance to Improve Investment Decision Making

Effect of Change Management Practices on the Performance of Road Construction Projects in Rwanda A Case Study of Horizon Construction Company Limited

Budgeting and Budgetary Control System: A study on Selected Indian Companies

An Analytical Over View of Performance of Bank of Punjab during the Period

Calculating a Consistent Terminal Value in Multistage Valuation Models

Risk Analysis and Strategic Evaluation of Procurement Process in Construction

FACTORS AFFECTING STOCK EXCHANGE INVESTMENT IN KURDISTAN

Dual Income Polarization by Age Groups in Korea:

Section 2: Focus Group Participant Questionnaire and Discussion Responses Concerning Wyo-Care Accounts by: Mark Harris, Ph.D.

FAQ: Role of Finance and Ratios

Impact of Liquidity Rules on Shareholders Returns in Jordan Islamic Bank

A STUDY ON FACTORS MOTIVATING THE INVESTMENT DECISION OF MUTUAL FUND INVESTORS IN MADURAI CITY

Influencing Dynamics of Safety in Mutual Fund Investments An Emperical Overview

Exit Strategies for Stocks and Futures

International Journal of Advance Engineering and Research Development

ASSESSMENT AND FACTORS OF RISK IN AN IPO S Jyoti Shukla *1

UNIT 5 COST OF CAPITAL

SELECTION BIAS REDUCTION IN CREDIT SCORING MODELS

Hong Kong s Fiscal Issues

Sunset Company: Risk Analysis For Capital Budgeting Using Simulation And Binary Linear Programming Dennis F. Togo, University of New Mexico

Return on Software. Maximizing the Return on Your Software Investment. Steve Tockey.

FINANCE 305. Financial Markets, Institutions, and Economic Activity Fall 2010

Fengyi Lin National Taipei University of Technology

PSYCHOLOGY OF FOREX TRADING EBOOK 05. GFtrade Inc

Evaluation of Construction Risks Impact on Construction Project Manager s

Maximizing Operations Processes of a Potential World Class University Using Mathematical Model

An Analysis of Construction Overhead Expenses During the Great Recession

Financial Management Bachelors of Business Administration Study Notes & Tutorial Questions Chapter 3: Capital Structure

REVALUATION OF PLANT, PROPERTY, AND EQUIPMENT: SIMILARITIES AND DIFFERENCES BETWEEN IASC AND ASC (PHILIPPINES) STANDARDS

RESEARCH REPORT. Rural. Privatization of Municipal Services in Illinois

INTER-ORGANIZATIONAL COOPERATIVE INNOVATION OF PROJECT-BASED SUPPLY CHAINS UNDER CONSIDERATION OF MONITORING SIGNALS

The Kelly Criterion. How To Manage Your Money When You Have an Edge

A Theory of Optimized Resource Allocation from Systems Perspectives

PRODUCTIVITY ANALYSIS OF INDIAN COMMERCIAL BANKS: A COMPARATIVE STUDY OF PUBLIC PRIVATE AND FOREIGN SECTOR BANKS R. K. UPPAL 1 & RUPANI 2

Leading Factors Contributing to the Generation of Claims in Indian Construction Industry-Consultant s Perception

LINK BETWEEN CORPORATE STRATEGY AND BANKRUPTCY RISK: A STUDY OF SELECT LARGE INDIAN FIRMS

Research Article Portfolio Optimization of Equity Mutual Funds Malaysian Case Study

Establishment of Risk Evaluation Index System for Third Party Payment in Internet Finance

It is December 15, Phillip Groth, CFO, and Carver Smith, Controller, both

Risk Management Practices in the Conventional Banks Working in Peshawar

Should You Cash Out Your 401(k) or IRA Early?

PERFORMANCE OF IDBI BANK WITH REFERENCE TO NON PERFORMING ASSETS

Risk Assessment in Construction of Highway Project

THE PATH TO PROFIT: SELECT THE RIGHT CLIENTS AND THE RIGHT PROJECTS

your future Know your risk tolerance FIN2-9

Change Orders and Consensus Contracts

Benefits of the Contract Method to County Highway Programs

Mixed Scanning Approach to Budgetary Decision Making: A Review

Absolute Alpha by Beta Manipulations

Will Abenomics Save the Japanese Economy? Kim, Sang Keun

Transcription:

International Journal of Industrial Engineering & Technology (IJIET) ISSN(P): 2277-4769; ISSN(E): 2278-9456 Vol. 4, Issue 2, Apr 2014, 1-6 TJPRC Pvt. Ltd. OVERHEAD COST IN CONSTRUCTION INDUSTRY SWATI S PATIL & P. P. BHANGALE Department of Civil Engineering, SSGBCOET, Bhusawal, Maharashtra, India ABSTRACT Nowadays, the construction industry is becoming highly competitive which causes general contractors to bid with a very small margin of profit. At the same time, overhead costs are always increasing and never go down of its own. Overhead costs are extremely important in construction estimation. Neglecting overhead has forced some contractors out of business, because these cost constitute a significant portion of the total construction cost. Hence it is important to control overhead cost. Construction projects become complicated and fragmented so that many specialty contractors are involved. In such changed environments, a general contractor s overhead costs are increasing comparable to direct costs. In addition to an increase of volume, activities consisting of overhead costs play an important role in coordinating different participants who include different specialty contractors and client. The paper discusses the actual definition of overhead cost, contractor awareness about overhead cost, percentage of OH costs, changes in overhead cost, causes of increased overhead cost in construction industry, contractors perception about overhead cost, control of overhead cost. KEYWORDS: Market Economy, Construction, contractor awareness, Expanding Business INTRODUCTION OH costs are those charges which cannot be attributed exclusively to a single product or service, or the summary of expenses that benefit more than one cost objective. A third definition is that OH costs are those costs which are not a component of the actual construction work but are incurred by the contractor to support the work. At all times, high efficiency and total cost management are fundamental to success in any free market economy, which has been the case in India since the start of the five year development plans thirty years ago. However, the issue becomes extremely important with the emergence of a global economy and the free trade agreements that are expected to be implemented in the near future. Under these conditions, contractors will be compelled to trim out the fact that has accumulated during more comfortable times and find ways of reducing OH burden no billable costs. In the light of this discussion, the importance of studying OH costs cannot be under-estimated. Taylor (1994) indicated that in the competitive environment of today s construction industry, the difference of a single percentage point can be the difference between winning and losing a bid, making a profit, or bankruptcy. Under such an environment, the logical way to remain competitive is to attempt to control and decrease costs, without jeopardizing the quality of provided services. The objective of this report is to evaluate the overhead costs practices of construction companies. Several aspects will be examined that include contractor awareness, percentage of company OH costs to annual construction volume

2 Swati S Patil & P. P. Bhangale OVERHEAD COST There are, however, two types of OH costs in construction Company OH costs and Project OH costs. Company OH cost,is also called general and administrative OH, includes all costs incurred by the construction firm in maintaining the firm in business and supporting the production process, but are not directly related to a specific project. Company OH costs differ significantly from time to time but vary from 8 to 15% of the total construction volume. Project OH cost is also called job site overhead or general condition are It is the cost specific to a project, but not specific to a trade or work item. Project OH costs comprise the contractor's expenses in managing the project at the job site. Causes of Increased Overhead Costs Delayed payments: This factor affects company OH in two ways. First, it forces a contractor to look for external financial support which means additional company OH costs. Second, delayed payments affect the bid/no bid decision. When contractors decide not to bid because of delayed payments, the rate and the effect of company OH become larger even if its magnitude remains the same. Its effect becomes damaging because the no bid decision implies fewer projects which means company OH costs are not distributed among sufficient projects. Lack of New Project If there are not enough new projects, then the level of competition among contractors becomes seriously sharp, which not only reduces profit margin but also makes contractors delay the issue of recovering company OH costs hoping for another chance to recover them. Again, this cause may not lead to a direct increase in company OH costs but it makes existing OH costs more damaging to the company. Nevertheless, lack of new projects may directly lead to an increase in company OH costs because lack of projects strongly affects the decision of down-sizing and its accompanied costs. One important example in this situation is the financial loss accompanying a contractor's decision to liquidate his assets such as equipment, camps, or workshops. Cost Inflation Contractors think that inflation is the third cause for increased company OH costs. Company OH consumes many different types of commodities and services which in general transfers overall inflation rate to company expenses. Government Regulation Government regulations came as the fourth reason for increased company OH costs. Increased costs to recruit manpower from abroad and work legal in the Kingdom have affected company OH costs as many contractors consider such costs a company OH cost. Firm's Growth Company's strategy regarding expanding to new working horizons or even shrinking to a smaller size company has significant accompanying costs. Expanding construction activities may involve recruiting more manpower, expanding head office, buying more equipment, or negotiating loan. On the other hand, down-sizing involves getting rid of surplus manpower, reducing or changing head office, or liquidating equipment and batching plants which usually takes place in bad times leading to high company OH costs.

Overhead Cost in Construction Industry 3 Client Related Requirements It is true that most company OH costs are not related directly to project requirements and thus are not related to client requirements. However, there are instances where a project needs certain equipment or other costly items which cannot be exclusively recovered by including their costs in the project at hand. Such costs are treated as a company OH cost. The result of the survey regarding this point sets it in the sixth positions a reason for increased company OH costs. Increased Spending on Marketing It is normal for construction firms to look for new clients because only a limited number of clients will be continuously involved in building projects. Also, during recession many contractors will put their full efforts into finding new markets which involves extra spending. Increased spending on marketing came in the seventh and last place among factors leading to increased company OH costs. Wrong Management Decisions It is considered that the inter-organization mistakes are also a source for increased OH costs. Wide spectrums of examples are inefficiency in managing company head office and improperly expanding business. Controlling OH Costs Controlling overhead costs should always be an important management concern. Contractors can control OH costs through some traditional common sense measures that significantly reduce OH costs because these measures are easy to practice on a day-by-day level without special arrangements. Following Are Some of These Measures Contractors need to be better informed about OH costs through short courses, seminars, professional and scientific societies. Contractors should be aware of the benefits of reduced company OH costs to their organization and to the construction industry. Less OH means more efficient organization. Contractors should, practically speaking, plan to maintain optimal levels of company OH costs, thus reaching two objectives at the same time: to eliminate unneeded spending and to be able to secure or increase the firm s market share in accordance with its strategic objectives. Contractors are recommended to establish cost control plans to help reduce company OH costs. Such plans should contain cost objectives, implementation steps, monitoring, and corrective actions. Maintaining sound safety programs helps reduce insurance costs. Customer satisfaction helps in maintaining good reputation, which helps in obtaining loans and other financial services at lower costs. Applying the right combination of resources, which allows maximum utilization of company head office manpower Increasing cost awareness among their employees, setting group cost targets with incentive plans and subsequently share the success with employees to motivate their interest in cost saving strategies. Maintaining customer satisfaction via a good reputation, this helps in obtaining loans and other financial services at lower costs.

4 Swati S Patil & P. P. Bhangale Applying the combination of resources, this allows maximum utilization of head office manpower. Contractors and project owners should try to resolve the problem of delayed payments in order to reduce financing costs. Contractors should implement cost control measures on supervision costs, equipment costs, temporary constructions, and financing costs as these items constitute the major project OH costs. Project owners should minimize OH related requirements in their contract documents so that project OH costs can be reduced. This would be of reciprocal benefit to project owners. Research Methodology Data needed for this research was collected via a questionnaires that was developed based on a through review of the related literature to reflect the existing level of OH cost and how contractors deal with them DATAANALYSIS AND DISCUSSIONS OH Cost The main purpose of this question is to examine the level of contractors' awareness regarding the basic meaning of the OH cost. Results show that 64 % of the contractor did not properly define OH costs and mentioned examples of OH costs. Another23% of the defined OH cost with a reasonably accurate definition by stating that OH cost is not part of the actual construction production cost but is an indirect cost. Only 13 % of the contractor has properly define the OH cost, which can be sensed in their definition especially by stating that OH cost is an indirect construction cost which cannot be attributed to a single cause (project or activity)and also by stating that there are two types of OH cost which are company and project OH costs. Types of OH Costs It is seen that majority of contractor with about 87% differentiate company OH and project OH costs. However, the remaining percentage considers all OH costs alike. Percentage of OH Costs It was stated in the literature that the total OH costs do not usually exceed 15% of the annual construction volume in the India. However, the results show that only 48% of the contractors have 15% OH costs or less. The remaining 52% have a higher percentage, indicating that OH costs present a serious challenge. The calculated overall percentage is 16.83. Contractors' Perception Regarding OH Costs The majority of contactors put in plain words the following: Current rate of OH costs is not acceptable. Uncontrolled OH costs can badly affect the performance. OH costs were not important in the past. OH costs can be monitored and controlled.

Overhead Cost in Construction Industry 5 These results indicate that the majority of contractors are not satisfied with OH cost and they are facing problems in managing them. This should encourage contractors to investigate the issue in an effort to reduce the negative effect of OH cost. Changes in OH Costs Results on whether contractors believe that OH has increased or decreased lately are shown in Table 1. It is clear that the majority of contractors think that company OH costs have increased during the past years. Table 1 TREND FREQ. PERCENT Increased 47 77 Decreased 08 13.2 Didn t Change 06 9.8 Reasons for Increased OH Costs Knowing the major sources of high company OH costs helps in concentrating efforts towards specific causes. Seven potential causes were identified from the literature and a pilot study, and evaluated as shown in Table 2. In evaluating these factors it should be noted that some causes of increased company OH costs are inter-related, which makes it difficult to evaluate them individually. Looking at results, causes of increased company OH costs can be arranged in their order of effectiveness as follows: Table 3: Table 2: Reasons for Increased Company OH Costs Controlling Company OH Cost Reason for Increased Co. OH Costs 5 4 3 2 1 A) Lack of new projects (recession) 27 44% 15 25% 06 10% 07 11% 06 10% B) Cost inflation 14 23% 19 32% 13 21% 10 16% 05 08% C) Delayed payments 24 39% 18 30% 11 18% 06 10% 02 03% D) Government regulation 10 16% 19 31% 20 34% 05 08% 07 11% E) Increased marketing cost 17 28% 06 10% 17 28% 11 18% 10 16% F) Client related reasons 19 31% 10 16% 12 20% 05 08% 15 25% G) Firm s growth 23 37% 04 07% 16 26% 03 05% 15 25% H) Other (internal mistakes) 00 0% 08 42% 06 32% 05 26% 00 00% 5 = strongly agree, 4 = Agree, 3 = Neutral, 2 = Disagree, 1= strongly disagree This question asks contractors to specify efforts taken to reduce or control OH costs. Results are summarized in Table 3: Rate of Applying Steps to Reduce OH Costs Efforts to Reduce OH Costs Frequency Percent A) No efforts are Exerted 14 23 B) Steps are taken To reduce co. OH 47 77 Results in Table 3 indicate that 77 percent of the contractors do apply a cost control plan for co. OH costs. In the second part of this question contractors were asked to explain their cost control plans. Answers can be divided into two groups. First, the majority of contractors (87 percent) explained their cost control plans as an instantaneous decision aimed at cutting OH costs which came as a reaction to high OH rates. Such actions cannot be called a cost control plan as they are not part of a comprehensive understanding of the issue.

6 Swati S Patil & P. P. Bhangale CONCLUSIONS The unstable construction market makes it difficult for contractors to decide on the optimum level of OH costs that enables contractors to win and administer large projects and at the same time does not financially drain the company. Causes of increased overhead costs include delayed payments, lack of new projects, cost of inflation and government regulations. Factors affecting company OH costs include the following: automobile and equipment costs, head-office expenses, labor related costs and financing costs. Results of the survey show that average overhead cost is slightly higher than the ratio reported in the literature. REFERENCES 1. Cokins, G. (1996). Activity-based cost management making it work: a manager's guide to implementing and sustaining an effective ABC system, Irwin Professional Publishing, 2. Burr Ridge, IL. Holland, N. and Hobson, D. (1999). Indirect cost categorization and allocation by construction contractors. Journal of Architectural Engineering, ASCE, 5(2) 49-56. 3. Horngren, C.Y., Foster, G. and Datar, S. M. (1999). Cost Accounting, 10th edition, Prentice Hall, Upper Saddle River, NJ, 906pp. 4. Johnson, T. and Kaplan, R. (1987). Rise and fall of Management Accounting. Management Accounting, IMA, January, 22-30. 5. Kim, Y. and Ballard, G. (2001). Activity-Based Costing and its Application to Lean Construction, Proceedings of the 9th Annual Conference of the International Group for Lean Construction, Singapore. 6. Miller, J. A. (1996). Implementing activity-based management in daily operations, John Wiley & Sons, New York, NY.