SOUTHWEST LIGHT RAIL TRANSIT PROJECT (METRO GREEN LINE EXTENSION) Section 106 Memorandum of Agreement

Similar documents
SOUTHWEST LIGHT RAIL TRANSIT PROJECT (METRO GREEN LINE EXTENSION) Section 106 Memorandum of Agreement. Quarterly Report No. 4 (March 1 May 31, 2017)

SOUTHWEST LIGHT RAIL TRANSIT PROJECT (METRO GREEN LINE EXTENSION) Section 106 Memorandum of Agreement

METRO BLUE LINE EXTENSION LIGHT RAIL TRANSIT PROJECT Section 106 Memorandum of Agreement. Quarterly Report No. 1 (August 24 November 30, 2016)

Metropolitan Council. May 30, 2018

Joint Report of the Transportation and Management Committees For the Special Metropolitan Council meeting of May 30, 2018

Corridor Management Committee. May 6, 2015

Executive Change Control Board. January 15, 2016

Guideway Status Report

SOUND TRANSIT RESOLUTION NO. R99-14

CHAPTER 2 BACKGROUND. Update of Previous Planning Work. Plan Development Process. Public Involvement and Review Process

Washington County Housing and Redevelopment Authority. GROW Fund POLICY AND APPLICATIONS

Environmental Analysis, Chapter 4 Consequences, and Mitigation

10-Year Capital Highway Investment Plan DRAFT

Disclaimer. This online document has been formatted for two-sided printing.

2. APPROVAL OF MINUTES

Metropolitan Council 2013 Operating Budget and Capital Program

Disclaimer. This online document has been formatted for two-sided printing.

Transportation Committee

Transportation Committee Meeting date: October 23, 2017 For the Metropolitan Council meeting of November 8, 2017

Meeting of the Southwest Corridor Management Committee September 11, 2013

Management Committee Meeting date: October 25, 2017 For the Metropolitan Council meeting of November 8, 2017

Disclaimer. This online document has been formatted for two-sided printing.

INTERGOVERNMENTAL AGREEMENT BETWEEN METRO AND WASHINGTON COUNTY FOR THE SOUTHWEST CORRIDOR PLAN

Amend the 2010 Authorized Capital Program (multi-year authorization) by adding spending authority as follows:

Cancelled. Final Action

Contents. Appendix. Cost Model Structure. Tables

CENTRAL COORIDOR LIGHT RAIL TRANSIT (GREEN LINE) CONSTRUCTION CHANGE ORDER REVIEW PROGRAM EVALUATION AND AUDIT

Subject: City of St. Louis Park Beltline Boulevard Station Redevelopment Area Comprehensive Plan Amendment, Review File No.

Executive Change Control Board. August 3, 2016

REQUEST FOR PROPOSALS INVESTMENT MANAGEMENT SERVICES Alameda Corridor Transportation Authority

Loan Agreement DMIUMTS OFFICIAL LOAN NUMBER 8131-CN PEOPLE'S REPUBLIC OF CHINA INTERNATIONAL BANK FOR RECONSTRUCTION AND DEVELOPMENT

Debt. Summary of Policy. utilized in, lead and senior manager roles when appropriate

TEX Rail Fort Worth, Texas Project Development (Rating Assigned November 2012)

ACTION TRANSMITTAL No

Fixed Guideway Transit Overview

NOW, THEREFORE, the Government and the Non-Federal Sponsor agree as follows: ARTICLE I -DEFINITIONS AND GENERAL PROVISIONS

Docket No. CP

Intergovernmental Agreement Between Illinois Department of Transportation, DMATS Metropolitan Planning Organization and JULE Transit Provider

Management Committee Meeting date: March 8, 2017 For the Metropolitan Council meeting of March 22, 2017

RESOLUTION NO. R Baseline Budget and Schedule, and Approve Gates 5 and 6 for the East Link Extension

Capital Cost Estimation Methodology

Metrolinx-City of Toronto-Toronto Transit Commission Master Agreement for Light Rail Transit Projects

A Qualification Based Selection method will be used to review proposals submitted in response to this RFP.

Chairman Smedberg and the VRE Operations Board

Executive Change Control Board. March 30, 2016

Board of Directors Meeting Monday March 26, :30 p.m.

Transportation Planning

End-of-Session Update

University Link LRT Extension

Transportation Committee

One Gateway PI; Metropolitan Transportation Authority Los Angeles, CA goulr-~y,~...-.

FY2020 Budget Outlook

Approved by the Roanoke Valley-Alleghany Regional Commission April 25, 2013

City of Excelsior 2018 Budget Presentation. December 4, 2017 City Council Meeting

Request for Proposal

Appendix E: Revenues and Cost Estimates

RESOLUTION NO. R Tacoma Link Expansion Baseline Budget, Schedule, Phase Gate 5, and Project Naming

ELEMENTS FOR A MINES AND MINERALS DEVELOPMENT BILL CENTRE FOR ENVIRONMENTAL POLICY AND ADVOCACY

TEXAS TRANSPORTATION COMMISSION

THE TAX INCREMENT FINANCE AUTHORITY ACT Act 450 of The People of the State of Michigan enact:

MAJOR BUSINESS TERMS FOR THE TRANSFORM 66 P3 PROJECT IN THE COMMONWEALTH OF VIRGINIA DBFOM DELIVERY METHOD

Wilder Research Information. Insight. Impact. Executive summary. Summary of key findings

SUBJECT: APPROVAL OF FISCAL CAPITAL IMPROVEMENT PROGRAM

SOUND TRANSIT STAFF REPORT MOTION NO. M Select a draft Sounder fare structure change and fare increase for public review and comment

TEXAS TRANSPORTATION COMMISSION

The Future Scenarios

Disclaimer. This online document has been formatted for two-sided printing.

[Bank Name] Mitigation Bank CA BEI template_pdt FINAL Draft dot

Transportation Finance Overview. Presentation Contents

TEXAS TRANSPORTATION COMMISSION

DRAFT REQUEST FOR QUALIFICATIONS RELATING TO THE TRANSFORM 66 P3 PROJECT UNDER THE VIRGINIA PUBLIC-PRIVATE TRANSPORTATION ACT OF 1995 (AS AMENDED)

INVESTING STRATEGICALLY

National Historic Preservation Act Section 106 and Programmatic Agreement Overview. February 17 th and 19 th, 2015

COMMUTER RAIL DIVISION OF THE REGIONAL TRANSPORTATION AUTHORITY AND THE NORTHEAST ILLINOIS REGIONAL COMMUTER RAILROAD CORPORATION

SAN FRANCISCO PLANNING DEPARTMENT

RECOMMENDATION PAPER FOR THE DULLES CORRDOR COMMITTEE

10 Financial Analysis

The DRAFT Bus and Rail Investment Plan in Orange County

10-Year Capital Highway Investment Plan DRAFT

Chapter 4: Regional Transportation Finance

Financial Practices and Reporting Review Committee. Committee Meeting July 15, 2011

BOARD OF SUPERVISORS TRANSPORTATION/LAND USE COMMITTEE INFORMATION ITEM. Dulles Corridor Metrorail Phase 2 Update

Transportation Committee Meeting date: July 24, 2017 For the Metropolitan Council meeting of July 26, 2017

PUBLIC UTILITY COMMISSION OF OREGON STAFF REPORT PUBLIC MEETING DATE: November 21, 2017

AGENDA. City of Tacoma Planning Commission

Hotel Property Investments Limited. Responsible Entity Compliance Committee Charter

ADDENDUM TO SECTION 4.7 COUNTY OF SANTA CLARA INTEREST RATE SWAP POLICY (SWAP POLICY)

Management Committee Meeting date: April 11, 2018 For the Metropolitan Council meeting of April 25, 2018

That the Metropolitan Council authorize the amendment of the 2013 Unified Capital Program as indicated and in accordance with the attached tables.

8.0 FINANCIAL ANALYSIS

COMMUTER RAIL DIVISION OF THE REGIONAL TRANSPORTATION AUTHORITY AND THE NORTHEAST ILLINOIS REGIONAL COMMUTER RAILROAD CORPORATION

Regional Transit System: Return on Investment Assessment. October 2012

Transportation Committee Meeting date: January 23, 2017 For the Metropolitan Council meeting of February 8, 2017

Sports Stadium Funding: A Summary of Actions by the 2006 Legislature

ENVIRONMENTAL ASSESSMENT ACT SECTION 9 NOTICE OF APPROVAL TO PROCEED WITH THE UNDERTAKING

A G E N D A. FasTracks Monitoring Committee. Tuesday, February 3, 2015 Rooms R, T, & D 5:30 PM Conference Dial-in # Conference ID: 15120

MOTION NO. M Sole-Source Contract Amendment for Operational Reporting Technology Tools

Receive and file capital works report CW providing an update on the Burloak grade separation.

Mid - City Industrial

SETON HALL UNIVERSITY CONTRACT REVIEW CHECKLIST

Transcription:

SOUTHWEST LIGHT RAIL TRANSIT PROJECT (METRO GREEN LINE EXTENSION) Section 106 Memorandum of Agreement Quarterly Report No. 6 (September 1 November 30, 2017)

Prepared by: Minnesota Department of Transportation 395 John Ireland Boulevard Saint Paul, Minnesota 55155-1899 On behalf of: Federal Transit Administration Region V 200 West Adams Street, Suite 320 Chicago, IL 60606 and Metropolitan Council Southwest LRT Project Office 6465 Wayzata Boulevard, Suite 500 St. Louis Park, MN 55426 December 2017

Introduction The Southwest Light Rail Transit (LRT) (METRO Green Line Extension) Project (Project) is an approximately 14.5-mile long extension of the METRO Green Line (Central Corridor LRT). The line includes 16 new stations (including Town Center which is deferred for construction at a later date) and will operate from downtown Minneapolis through the communities of St. Louis Park, Hopkins, Minnetonka, and Eden Prairie, passing in close proximity to Edina. The project also includes an operations and maintenance facility in Hopkins, approximately 2,500 additional park-and-ride spaces, accommodations for passenger drop off, bicycle and pedestrian access, and new or restructured local bus routes connecting stations to nearby destinations The Project sponsor, the Metropolitan Council, may receive funding from the Federal Transit Administration (FTA) and permits from the United States Army Corps of Engineers (USACE) to construct the Project. Therefore, the Project is a federal undertaking and must comply with Section 306108 (previously Section 106 and hereinafter referred to as Section 106) of the National Historic Preservation Act of 1966, as amended (54 United States Code 306108) and its implementing regulations, 36 Code of Federal Regulations (CFR) Part 800 et. seq. In accordance with 36 CRF Part 800.2(a)(2), the USACE has recognized FTA as the lead federal agency responsible for fulfilling their collective responsibilities for the Project under Section 106. Pursuant to 36 CFR Part 800 et. seq., FTA, with assistance from the Minnesota Department of Transportation Cultural Resources Unit, consulted with the Minnesota Historic Preservation Office and other interested parties to define an Area of Potential Effect (APE), conduct surveys to identify and evaluate historic properties within the APE for the National Register of Historic Places, assess effects of the Project on historic properties, and resolve adverse effects. The measures FTA agreed to implement as part of the Project to avoid, minimize, and mitigate adverse effects on historic properties are documented in the Memorandum of Agreement between the Federal Transit Administration and the Minnesota Historic Preservation Office Regarding the Southwest Light Rail Transit (METRO Green Line Extension) Project, Hennepin County, Minnesota (MOA), which was executed on June 21, 2016. This quarterly summary report was prepared to meet the reporting requirements of MOA Stipulation X.A. It provides an itemized listing of all measures required to implement the terms of the MOA, identifies actions FTA has taken during the reporting period to implement those measures, and includes a timetable of activities proposed for implementation within the following reporting period. It also identifies any problems or unexpected issues encountered during the reporting period, any proposed scheduling changes, any disputes and objections submitted or resolved as part of FTA s efforts to carry out the terms of the MOA, and any changes recommended in implementation of the MOA.

Acronyms and Abbreviations The following is a list of commonly used acronyms and abbreviations that may be found in the reporting table found in the Implementation Efforts section of this report. APE BNSF Council CRU FTA HPC LRT MnDOT MnHPO MOA OMF Project Q1 SCADA SOI TPSS WPA Area of Potential Effect Burlington Northern Santa Fe Railway Metropolitan Council Cultural Resources Unit Federal Transit Administration Heritage Preservation Commission Light Rail Transit Minnesota Department of Transportation Minnesota Historic Preservation Office Memorandum of Agreement Operations and Maintenance Facility Southwest Light Rail Transit/METRO Green Line Extension Quarter of the year, in this example, the First Quarter Supervisory Control and Data Acquisition Secretary of the Interior Traction Power Substation(s) Works Progress Administration ii

Implementation Efforts This is quarterly report No. 6 prepared under the terms of the Project MOA and covers the reporting period from September 1, 2017, through November 30, 2017. MOA Action Item Implementation Schedule Implementation Status Stipulation I. Project Design Development Design Review - SOI s Standards for the Treatment of Historic Properties On-going through completion of the 100% Plans, anticipated schedule: Q3 2016- Q2 2017 On-going, also see Stipulations II, VI and VII Design Review Non-SOI s Standards for the Treatment of Historic Properties Stipulation II. Pre-Construction Design Review On-going through completion of the 100% Plans, anticipated schedule: Q3 2016- Q2 2017 On-going, also see Stipulation II Review of 90% Plans Q3 2016 Completed August 2016 Review of 100% Plans To be completed prior to the start of Project construction, but will be completed in stages as 100% Plans for different Project construction packages are completed, anticipated schedule: Q4 2016-Q2 2018 Civil: anticipated Q4 2016-Q1 2017 o Addenda: anticipated Q3 2017-Q2 2018 Systems and Tunnel Facilities: anticipated Q1 2017-Q2 2018 OMF: anticipated Q1 2017-Q2 2018 SCADA: anticipated Q1 2017-Q2 2018 Kenilworth Corridor Landscape: anticipated Q4 2017-Q2 2018 WPA Walls: anticipated Q1-Q2 2017, also see Stipulation VII In process. Civil 100% Plans: Completed February 2017. WPA Walls: Completed April 2017. Also see Stipulation VII. Review of the Systems and Tunnel Facilities, OMF Plans, and SCADA: In process. Kenilworth Corridor Landscape: In process. MnDOT CRU continued to review Addenda Items to the Civil 100% Plans. Civil Addenda were reviewed to determine potential for changes that would result in a change of effect to a historic property and adherence to SOI s Standards. o MnDOT CRU found that 3 items met the requirements of the MOA and that no further review under Section 106 was required. o MnDOT CRU identified 1 Addenda Item for minor adjustments to a driveway and several stalls in a surface parking lot that will require a slight revision of the Project s APE. FTA is in the process of revising the APE to account for this design change and the other design modifications identified during the previous reporting period that require revisions to the APE. FTA anticipates submitting the revisions to MnHPO during the next reporting period. If FTA, with assistance from MnDOT CRU, identifies 3

MOA Action Item Implementation Schedule Implementation Status any historic properties in these areas, FTA will consult with MnHPO as appropriate per Stipulations II and III to consider effects on these properties. o On August 13, 2017, the Council notified FTA of the tentative agreement it reached with BNSF to construct a portion of the Project on BNSF right-ofway. The agreement requires design changes and additional infrastructure along portions of the Project that are within and in the vicinity of historic properties and which must be designed in accordance with the SOI s Standards for the Treatment of Historic Properties per MOA Stipulation I.A. MnDOT CRU completed its review of the proposed design modifications on October 4, 2017, and found that the proposed Project modifications would have an adverse effect on the St. Paul, Minneapolis & Manitoba Railroad / Great Northern Railway Historic District. FTA adopted MnDOT CRU s findings and determined that the proposed design modifications would result in an adverse effect to a historic property. FTA submitted its findings to MnHPO and MOA concurring parties for review on November 7, 2017. See Stipulation III for process to resolve the adverse effect. Comment on FTA s findings are due on December 7, 2017. MnDOT CRU will continue to review any additional addenda during the next reporting period and issue findings. When MnDOT CRU has completed its review of all addenda, FTA will review them and issue its determination. FTA will then notify MnHPO and other consulting parties and will consult as appropriate. Stipulation III. Resolution of Additional Adverse Effects St. Paul, Minneapolis & Manitoba Railroad/ Great Northern Railway Historic District Stipulation IV. Construction Protection Plan As needed during duration of MOA implementation (Q2 2016-Q2 2026) Q4 2017-Q1 2018 In process. On November 7, 2017, FTA notified MnHPO and MOA consulting parties that proposed Project design modifications would result in an adverse effect on the St. Paul, Minneapolis & Manitoba Railroad / Great Northern Railway Historic District. A consultation meeting was held with consulting parties on November 28, 2017, to gain input on how to resolve the adverse effect. FTA will use the input received to prepare a Draft Mitigation Plan. FTA will submit the Draft Mitigation Plan to consulting parties for review by December 22, 2017. 4

MOA Action Item Implementation Schedule Implementation Status Construction Protection Plan Vibration Management and Remediation Monitoring Reporting o Pre-Construction Survey Reporting o Post-Construction Survey Reporting Stipulation V. Archaeological Sites 21HE0436 and 21HE 0437 Phase III Data Recovery Interpretation of Archaeological Sites To be completed prior to the start of Project construction, anticipated schedule: Q3 2016-Q3 2017 To be completed prior to the start of Project construction, anticipated schedule: Q2-Q3 2017 On-going during Project construction, to be completed in the quarter following completion of Project construction, anticipated timeframe: Q3 2017-2020 To be completed prior to the start of Project construction in the vicinity of Sites 21HE0436 and 21HE0437, anticipated schedule: Q2-Q4 2017 Completed April 2017. Anticipated to begin during next reporting period. o Draft Interpretative Plan Q2-Q3 2016 Completed May 2016 o Final Interpretative Plan o Installation of Interpretation at Royalston Station o Website to Interpret Sites 21HE0436 and 21HE 0437 Stipulation VI. Chicago, Milwaukee, St. Paul & Pacific Railroad Depot Design measures to avoid adverse effect: relocate crossover tracks in front of depot To be completed after completion of Phase III Data Recovery, anticipated schedule: Q3 2017-Q1 2018 To be installed after the Final Interpretative Plan is approved and finished before Project construction is completed, anticipated timeframe: Q2 2018-2020 To be developed after the Final Interpretative Plan is approved and completed prior to initiation of revenue service operations, anticipated timeframe: Q1 2018-2021 In development, on hold. MnHPO provided comments on the draft interpretative plan on May 27, 2016. The City of Minneapolis and Minneapolis HPC provided comments on June 10, 2016. To the extent feasible, the Council will incorporate these comments into the final interpretative plan. Work on final interpretative plan will resume after completion of Phase III Data Recovery. 5

MOA Action Item Implementation Schedule Implementation Status 3,420 west and shift noise wall in front of depot 240 west o Incorporate design revisions into 90% Plans Q2-Q3 2016 Completed August 2016 o Consult on revised design prior to completion of 100% Plans o Incorporate design revisions into 100% Plans To be completed prior to the final 100% Plans, anticipated schedule: Q3 2016-Q1 2017, also see Stipulation II for timeline of completion of 100% Plans for different Project construction packages To be completed prior to the final 100% Plans, anticipated schedule: Q3 2016-Q2 2017, also see above and Stipulation II for timeline of completion of 100% Plans for different Project construction packages Completed October 2016 In process. See above, below and Stipulation II. Review of revised design See Stipulation II In process. Changes are reflected in the Civil 100% Plans reviewed by MnDOT CRU and FTA. Review of 100% Systems Plans is in process. Also see above and Stipulation II. Stipulation VII. Grand Rounds Historic District Kenilworth Lagoon Noise Mitigation o Incorporate design into Project Plans To be completed prior to the start of Project construction: Q3 2016-Q1 2017 Completed February 2017 o Construct noise mitigation To be completed prior to the completion of Project construction, anticipated timeframe: Q3 2017-2020 Additional design consultation prior to completion of the 100% Plans Q3 2016-Q2 2017 Completed June 2017 Kenilworth Lagoon WPA Rustic Style Retaining Walls o Construction plans o Deconstruction and reconstruction of wall portion under the Project s Kenilworth Crossing and rehabilitation of wall portions beyond the crossing To be completed prior to the start of any Project construction in the vicinity of the WPA walls, anticipated schedule: Q3 2016-Q2 2017, also see Stipulation II To be completed prior to the completion of Project construction, anticipated timeframe: Q3 2017-2020 Completed April 2017. Also see Stipulation II. 6

MOA Action Item Implementation Schedule Implementation Status Plans for the Grand Rounds Historic District: Canal System o Preservation Plan o Treatments Plan Stipulation VIII. Hopkins Commercial Historic District National Register of Historic Places Nomination Public Education Stipulation IX. Standards Carry out work pursuant to the MOA in accordance with the SOI s Standards for Archaeology and Historic Preservation FTA oversight to ensure that all activities carried out pursuant to the MOA are done by, or under the direct supervision of, historic preservation professionals who meet the SOI s Professional Qualifications Standards Stipulation X. Monitoring and Reporting Quarterly MOA Implementation Summary Report Stipulation XI. Coordination with Other Federal Reviews To be completed prior to initiation of revenue service operations, anticipated timeframe: 2019-2021 To be completed prior to initiation of revenue service operations, anticipated timeframe: 2019-2021 Work on nomination to be initiated within 6 months of MOA execution and completed prior to initiation of revenue service operations, anticipated timeframe: Q4 2016-2018 To be completed prior to initiation of revenue service operations, anticipated timeframe: 2018-2019 Duration of MOA implementation, anticipated timeframe: Q2 2016-Q2 2026, or earlier if all MOA measures implemented Duration of MOA implementation, anticipated timeframe: Q2 2016-Q2 2026, or earlier if all MOA measures implemented Every 3 months following MOA execution until it expires or is terminated, anticipated schedule: Q3 2016-Q2 2026, or earlier if all MOA measures implemented As needed for the duration of MOA implementation, anticipated timeframe: Q2 2016-Q2 2026, or earlier if all MOA measures implemented In development. Research work needed to prepare the nomination is ongoing and will continue during the next reporting period. On-going On-going On-going. Quarterly summary report for previous reporting period submitted to MnHPO on September 13, 2017. Next quarterly report to be prepared and submitted at end of next reporting period. On-going, as needed, no activity during reporting period 7

MOA Action Item Implementation Schedule Implementation Status Stipulation XII. Review Process During Construction Plan for Unexpected Discoveries Project Modifications Historic Properties Discovered or Unexpected Affected as a Result of Project Construction Stipulation XIII. Dispute Resolution Stipulation XIV. Duration, Amendments, and Termination To be developed and included as part of the Construction Protection Plan, anticipated schedule: Q3 2016-Q3 2017 After the completion of the 100% Plans, through the completion of Project construction, anticipated timeframe: Q2 2017-2020 As needed during Project construction, anticipated timeframe: Q3 2016-Q2 2026, or earlier if all MOA measures implemented As needed during duration of MOA implementation, anticipated timeframe: Q2 2016-Q2 2026, or earlier if all MOA measures implemented As needed during duration of MOA implementation, anticipated timeframe: Q2 2016-Q2 2026, or earlier if all MOA measures implemented Completed April 2017. See Construction Protection Plan bullet under Stipulation IV On-going, as needed, no activity during reporting period On-going, as needed, no activity during reporting period 8