Barneveld School District Community Survey Results. Spring 2017

Similar documents
School District of Horicon Community Survey Results. Fall 2017

Lake Mills Area School District Community Survey Results. Spring 2018

Beaver Dam Unified School District Community Survey Results. Spring 2016

Freedom Area School District Community Survey Results. Fall 2018

Burlington Area School District Community Survey Results. Winter 2016

West Bend School District Community Survey Results. Spring 2018

Muskego Norway Schools Community Survey Results. Fall 2015

Marathon School District Community Survey Results. Spring 2018

76% The comprehensive solution put forward by the Community Steering Committee addresses a wide variety of needs at the high school:

School District of West De Pere Community Survey Results. Fall 2017

Sheboygan Area School District Community Survey Results. Spring 2016

School District of Somerset Community Survey Results. Fall 2015

Oakfield School District Community Survey Results. Fall 2018

Public Presentation Capital Bond November 27, 2017

Gillett School District Community Survey Results. Spring 2018

PROPOSITION FARMINGTON SCHOOLS. April 8, 2014 Bond Issue

Tomah Area School District Community Survey Results. Spring 2015

Ballot Measures-T Section

DISTRICT HISTORY Referendum ($585,000) Purchase of 10 Acres / Football Field Original junior high building (present old section of MS)

CH-UH Board of Education Meeting. June 27, 2017

Bond Amount: $18,470,000. Proposed I&S Tax Rate Increase: $.3180

Welcome. Dr. Buck Gilcrease Alvin ISD Superintendent. David Becker Paul Ingamells CAC Co-Chairs

School District of Manawa Community Survey Results. Winter

Hayfield Community Schools Bond Referendum. Vote Monday, September 11, Our Schools Our Communities Our Future

2017 Bond Program Summary

APPENDIX A FULL TEXT OF BOND MEASURE

HUENEME ELEMENTARY SCHOOL DISTRICT IMPARTIAL ANALYSIS BY COUNTY COUNSEL* BOND MEASURE T

Contents Ballot Measure... 2 Full Text Ballot Proposition... 3 Tax Rate Statement... 7 Impartial Analysis... 8 Statement in Favor of Measure...

Page Item 174 Overview 175 Revenue 177 Expenditures 178 Elementary School Allocation 180 Middle School Allocation 181 High School Allocation 182

REQUEST FOR PROPOSALS CONSTRUCTION MANAGER AS CONSTRUCTOR

FREQUENTLY ASKED QUESTIONS

Contents. Ballot Measure Full Text Ballot Proposition Tax Rate Statement Impartial Analysis Statement in Favor of Measure...

FY 2014/ /24 CAPITAL IMPROVEMENTS PROGRAM MAINTENANCE/REPLACEMENT PROJECTS DETAIL

Action Item. Sid Albaugh, Assistant Superintendent Business Services. Consideration of Approval of 2018 Measure A - Facilities Project List

CIP FY2015 FY2019 Requests SCH-1, SCH-2 and SCH-5

Understanding the Costs: Frequently Asked Questions

Capital Projects Fund. Board Work Session August 9, 2007

POJOAQUE VALLEY SCHOOL DISTRICT October 12, 2016

Barnesville Public Schools Proposed Building Program

MUROC JOINT UNIFIED SCHOOL DISTRICT KERN COUNTY NORTH EDWARDS, CALIFORNIA

Progress Update Identified Needs & Capital Plan

October 4, 2007 Page 1 of 8

INTRODUCTION. Summary of revenue/expenditures available for new construction and remodeling projects only. CERTIFICATION

Ballot Measures-N 7. Centralia Elementary School District, Building Strong Neighborhood Schools

LAKE CENTRAL SCHOOL CORPORATION USE OF SCHOOL FACILITIES

I. PROJECT DESCRIPTION

INTRODUCTION. Summary of revenue/expenditures available for new construction and remodeling projects only. CERTIFICATION

SEQUOIA UNION HIGH SCHOOL DISTRICT PROPOSITION 39/MEASURE J BOND AUDIT REPORT. August 31, 2016 * * *

SPACE UTILIZATION STUDY ANALYSIS November 5, 2013

Barnesville Public Schools Proposed Building Program

ARENA SPONSORSHIP OPPORTUNITIES

Fort Wayne Community Schools. Capital Projects Planning March 15, 2011

Performance Audit on 2008 and 2013 SPLOST Revenues For the Fiscal Year ended June 30, 2012

Baldwinsville Central School District. Capital Project Proposal November 9, 2015 Board of Education Meeting

OXNARD SCHOOL DISTRICT IMPARTIAL ANALYSIS BY COUNTY COUNSEL* BOND MEASURE R OXNARD SCHOOL DISTRICT TAX RATE STATEMENT BOND MEASURE R

SOMIS UNION SCHOOL DISTRICT IMPARTIAL ANALYSIS BY COUNTY COUNSEL* BOND MEASURE S SOMIS UNION SCHOOL DISTRICT TAX RATE STATEMENT BOND MEASURE S

LAKE CENTRAL SCHOOL CORPORATION USE OF SCHOOL FACILITIES

City School District of Albany Five Year Facilities Plan 3/14/2019

Local ballot measure: B. Redding School District Bond Measure

School Referendum Results School Amount Type of Debt Description Arrowhead UHS Failed

REQUEST FOR USE OF SCHOOL FACILITIES. Depew Union Free School District Depew, NY (716)

Page Item 165 Overview 167 Revenue 168 Expenditures 169 Elementary School Allocation 171 Middle School Allocation 173 High School Allocation 175

SCHOOL BUDGET NEWS. Elmira City School District. May School District Annual Budget Vote and School Board Election May 17, 2016

JACKSON-MADISON COUNTY SCHOOL SYSTEM FUND #177 EDUCATION CAPITAL 5-YEAR PLAN (WORKING COPY)

Tumwater University School District Budget Myths Bond Project Update. February 2016 Mel Murray, Director of Capital Projects John Bash, Superintendent

Facilities Update Construction Progress

Sheboygan Falls School District Facilities Public Taskforce - Project Report March 29th' 2011

Santa Barbara Community College District Measure V Bond Construction Fund Financial Statements and Agreed-Upon Procedures Year Ended June 30, 2013

Pennsbury School District School Board Policy

Capital Projects Completed since 1988

BERKELEY UNIFIED SCHOOL DISTRICT Berkeley, California. MEASURE I GENERAL OBLIGATION BONDS PERFORMANCE AUDIT June 30, 2013

Wissahickon School District Ambler, PA FINANCE COMMITTEE AGENDA. February 21, :30 pm Administration Building Board Room

ALAMEDA COUNTY REGISTRAR OF VOTERS LIST OF LOCAL MEASURES November 6, 2012 GENERAL ELECTION MEASURE I

FREQUENTLY ASKED QUESTIONS (FAQs)

APPLICATION FOR COMMUNITY USE OF SCHOOL FACILITIES

Facility Requested: Date Entry time: Exit time:

APPLICATION FOR COMMUNITY USE OF SCHOOL FACILITIES

Facility and Financial Overview. Brandywine Heights Area School District

Oak Park and River Forest High School Five-Year Facilities Plan and Referendum Overview and Frequently Asked Questions

KIMBERLY AREA SCHOOL DISTRICT

Interest Earned through 6/30/2018 2,013, , ,029, ,454, (3,443,911.91) 29, ,500, ,540,322.

2017 Citizen Satisfaction Survey Final Report

USER AGREEMENT THE NAPERVILLE COMMUNITY CONCERT CENTER

2016 Bond Steering Committee Meeting

CANDIA SCHOOL DISTRICT COMMUNITY USE OF SCHOOL FACILITIES

To facilitate readability, the Comprehensive Annual Financial Report is presented in three sections as described below:

Richland School District

Santa Barbara Community College District Measure V Bond Construction Fund Financial Statements and Agreed-Upon Procedures Year Ended June 30, 2015

DESERT COMMUNITY COLLEGE DISTRICT PROPOSITION 39, GENERAL OBLIGATION BONDS (MEASURE B, MARCH 2004) PERFORMANCE AUDIT JUNE 30, 2008

N A V E S I N K C O U N T R Y C L U B

BELLS INDEPENDENT SCHOOL DISTRICT

Ss. Francis & John Strategic Planning Committee

BANNING UNIFIED SCHOOL DISTRICT BUILDING FUND GENERAL OBLIGATION BONDS (MEASURE R) FINANCIAL AND PERFORMANCE AUDITS MARCH 31, 2017

2019 Capital Projects Plan

North Attleborough Public Schools Facilities Use Agreement

GEORGE MASON UNIVERSITY BOARD OF VISITORS. BOARD OF VISITORS SPECIAL MEETING April 11, 2018 Merten Hall, Fairfax Campus 1:30 3:00 p.m.

St. Andrews United Church Facilities Rental Guidelines November 28, 2018

Resolution Adopting Da Vinci Schools Facilities and Grounds Use Policy

Ridgeway Primary School Lettings Policy and Agreement

Montville Township Public Schools

Transcription:

Barneveld School District Community Survey Results Spring 2017

Survey Summary The survey was conducted in late May/early June of 2017. Residents within the District were mailed a paper survey. Each survey included a unique survey access code for those who preferred to take the survey online. Total responses = 313 (92 paper) Participation rate = 20%

Respondent Information

What is your age? 30% 25% 29% 26% 20% 17% 15% 13% 14% 10% 5% 0% 1% 18-25 26-35 36-45 46-55 56-64 65+

Do you live in the Barneveld School District? 16% 84% Yes No

In which city/township do you reside? 50% 47% 45% 40% 35% 36% 30% 25% 20% 15% 10% 7% 6% 5% 2% 1% 1% 0% Village of Barneveld Town of Brigham Other Town of Ridgeway Town of Moscow Town of Blue Mounds Town of Arena

Are you an employee of the Barneveld School District? 15% 85% Yes No

Do you have children attending the Barneveld School District? 51% 49% Yes No

If you have school-aged children, what school(s) do they attend? 60% 52% 50% 40% 30% 37% 34% 20% 10% 0% 9% 6% 1% 1% 0%

Overall, how do you feel the quality of the Barneveld School District is affecting your home value? 50% 46% 45% 40% 37% 35% 30% 25% 20% 15% 13% 10% 5% 4% 0% Positive impact Little to no impact Negative impact Do not own a home in the District

How would you like to receive information regarding the Barneveld School District? Email 23% 88% Barneveld Shopper 58% 79% School mailings 44% 50% School newsletters 23% 40% District/school website Text message Facebook/social media PowerSchool Parent Access Attend meetings 0% 0% 3% 21% 30% 13% 23% 20% 20% 40% Non-Parents (Non-Staff) Parents (Non-Staff) Dodgeville Chronicle 20% 30% School Board meetings 4% 16% Television/cable 6% 4% Radio 2% 12% Other 1% 0% 0% 25% 50% 75% 100%

Striving Toward Excellence

Item How well are we doing in each of the following areas? Great (4), Good (3), Fair (2), Poor (1) Staff Parents (Non-Staff) Non-Parents (Non-Staff) Building pride in our community 3.53 3.40 3.39 Delivering a high-quality educational experience 3.46 3.02 3.04 Providing a welcoming and safe learning environment 3.34 3.01 3.01 Using technology to enhance the learning experience 3.57 3.16 3.01 Maintaining school facilities 2.35 2.81 2.92 Making decisions in the best interest of students 3.13 2.88 2.91 Keeping the public informed 3.17 2.82 2.82 Preparing students for life after high school 3.22 2.88 2.81 Hiring and retaining high-quality staff 3.18 2.72 2.80 Spending tax dollars wisely 3.30 2.80 2.80 Meeting the needs of all students 3.00 2.72 2.56

Overall, how satisfied are you with the Barneveld School District? (All Respondents) 60% 54% 50% 40% 30% 25% 20% 15% 10% 5% 1% 0% Very satisfied Satisfied Not satisfied Very unsatisfied No opinion

Facility Background

A recent Facilities Assessment, conducted by HSR Associates, found that many of the Barneveld school building s systems, including plumbing, heating and electrical, are original and require extensive work or replacement. In addition, the study found: Part of the school does not meet Americans with Disabilities Act (ADA) requirements. The school s multiple ramps and extended corridors limit accessibility and do not allow for efficient use of space nor effective flow of students. Safety and security concerns over the location of the main entrance and office. The kitchen, cafeteria, music and gym spaces are undersized for the student population. There are moisture and air quality concerns within the school. Educationally, the school lacks the flexible learning and collaboration spaces. The School Board believes this is a good time for the District to consider our options because interest rates are historically low. If the public chooses to address these needs, the primary way to obtain funding is through a referendum.

Renovate or Build New Sections of Barneveld school are over 100 years old. The older sections of the school are more expensive to heat and maintain. Various floor levels are connected by ramps, creating accessibility challenges. The most recent addition that provided a multi-purpose room and technical education area is already more than 20 years old. The Citizens Facility Committee considered renovating the oldest portion of the school, but the project was found to be too expensive and would not have properly addressed the educational needs. The committee recommends tearing down the oldest portion of the school and rebuilding a two-story elementary wing as well as the cafeteria, kitchen, music and art rooms and main office.

Would you support a plan to tear down the oldest portion of the school and rebuild a two-story elementary school wing, music and art rooms, cafeteria, kitchen and main office? (Residents Only) 90% 80% 70% 60% 50% 40% 30% 20% 10% 0% 70% 84% 79% 58% 10% 0% 4% 18% 20% 16% 17% Yes No Not sure/need more information All Residents Staff Parents (Non-Staff) Non-Parents (Non-Staff) 24%

Base Plan

The Citizens Facility Committee has reviewed the facility assessment, toured the school and listened to the educational needs of the District. The committee acknowledges that it may not be realistic to complete all of the needed updates at one time. Therefore, they have identified a Base Plan as the first phase of our school improvement plan. The Base Plan addresses most of the fundamental issues with the current facility and positions the District well for the future. The image below is the Base Plan concept recommended by the Citizens Facility Committee. The plan will: Replace the Elementary School, Music and Art Rooms and Cafeteria 1A. Tear down the oldest portions of the school, which includes the elementary school, music rooms, kitchen and cafeteria. 1B. Build a two-story elementary addition and music and art rooms. Improve Safety and Security/Rebuild Cafeteria/Commons and Kitchen 1C. Rebuild the front entrance to create a secure entry to better control student and visitor access. Renovate the cafeteria/commons to allow for better flow of students and a space that can be utilized for large group instruction, community meetings and small group collaboration. Update the kitchen to improve work flow and replace equipment that has exceeded its service life. Heating, Ventilation, Plumbing, Electrical Upgrades and Restroom Improvements 1D. Replace/repair the heating and ventilation and plumbing and electrical systems that have exceeded their service life. Address air quality and moisture concerns. Parking 1E. Expand parking and improve traffic flow around school as well as move bus barn away from parking area. The total cost for the Base Plan is $12.9 million.

Would you support a $12.9 million referendum for the Base Plan? This would represent an estimated tax increase of $213 ($18 per month) for each $100,000 of property value for each of the next 25 years. Assumes a 25-year borrowing period, interest rates ranging from 3.25% to 4.75% and a 2% annual valuation growth. All Residents Definitely yes Probably yes 38% 36% 74% Yes Undecided 9% Probably no Definitely no 7% 10% 17% No 0% 15% 30% 45% 60% 75%

Would you support a $12.9 million referendum for the Base Plan? This would represent an estimated tax increase of $213 ($18 per month) for each $100,000 of property value for each of the next 25 years. Assumes a 25-year borrowing period, interest rates ranging from 3.25% to 4.75% and a 2% annual valuation growth. Staff Residents Definitely yes Probably yes 38% 52% 90% Yes Undecided 10% Probably no Definitely no 0% 0% 0% No 0% 15% 30% 45% 60% 75%

Would you support a $12.9 million referendum for the Base Plan? This would represent an estimated tax increase of $213 ($18 per month) for each $100,000 of property value for each of the next 25 years. Assumes a 25-year borrowing period, interest rates ranging from 3.25% to 4.75% and a 2% annual valuation growth. Parent Residents (Non-Staff) Definitely yes Probably yes 33% 46% 79% Yes Undecided 9% Probably no Definitely no 3% 9% 12% No 0% 15% 30% 45% 60% 75%

Would you support a $12.9 million referendum for the Base Plan? This would represent an estimated tax increase of $213 ($18 per month) for each $100,000 of property value for each of the next 25 years. Assumes a 25-year borrowing period, interest rates ranging from 3.25% to 4.75% and a 2% annual valuation growth. Non-Parent Residents Definitely yes Probably yes 29% 36% 65% Yes Undecided 9% Probably no 6% 26% No Definitely no 20% 0% 15% 30% 45% 60% 75%

Additional Projects

Renovate and Expand Gym Space 2A. Additional gym space could be created by converting the existing multi-purpose space and industrial arts area into a two-court gym that can also serve as a competition gym with seating for 800 with the ability to add additional seating in the future. This would: Provide more space for physical education Increase space for school and community use, especially in the winter months Expand space for large events, youth programs and Fair Day Provide sufficient space to host indoor conference and WIAA events that generate revenue Provide needed practice space for school teams during late afternoon and evening hours Be the primary competition gym The locker rooms would also be updated to address Americans with Disabilities Act (ADA) requirements. Technical Education/Industrial Arts/STEM Expansion 2B. A new Technical Education/Industrial Arts wing would then be added where the previous elementary classrooms existed. The new space would allow the District to incorporate the latest technology and equipment and better respond to the growing demand for skilled trades and professionals in manufacturing, engineering and design in our region. Staff/Event Parking 2C. Expand parking to accommodate staff and special events. The total cost for these additional projects is $3.4 million.

Would you support a $16.3 million referendum for the Base Plan with the addition of a gym expansion, technical education/industrial arts/stem expansion and additional parking? This would represent an estimated tax increase of $280 ($23 per month) for each $100,000 of property value for each of the next 25 years. All Residents Definitely yes Probably yes 27% 31% 58% Yes Undecided 14% Probably no Definitely no 11% 17% 28% No 0% 15% 30% 45% 60% 75%

Would you support a $16.3 million referendum for the Base Plan with the addition of a gym expansion, technical education/industrial arts/stem expansion and additional parking? This would represent an estimated tax increase of $280 ($23 per month) for each $100,000 of property value for each of the next 25 years. Staff Residents Definitely yes Probably yes 29% 43% 72% Yes Undecided 14% Probably no Definitely no 0% 14% 14% No 0% 15% 30% 45% 60% 75%

Would you support a $16.3 million referendum for the Base Plan with the addition of a gym expansion, technical education/industrial arts/stem expansion and additional parking? This would represent an estimated tax increase of $280 ($23 per month) for each $100,000 of property value for each of the next 25 years. Parent Residents (Non-Staff) Definitely yes Probably yes 31% 38% 69% Yes Undecided 11% Probably no Definitely no 11% 9% 20% No 0% 15% 30% 45% 60% 75%

Would you support a $16.3 million referendum for the Base Plan with the addition of a gym expansion, technical education/industrial arts/stem expansion and additional parking? This would represent an estimated tax increase of $280 ($23 per month) for each $100,000 of property value for each of the next 25 years. Non-Parent Residents (Non-Staff) Definitely yes Probably yes 20% 22% 42% Yes Undecided 17% Probably no 12% 41% No Definitely no 29% 0% 15% 30% 45% 60% 75%

Performance Space 3A. The District does not have a dedicated space for plays, musicals, recitals, concerts, large group activities or community presentations. The District explored building an auditorium but found it too expensive at this time. Instead, a smaller rehearsal and performance space could be added to the existing main gym that would include lighting, sound and new ADA-compliant bleachers. A moveable wall would allow for athletic practices and rehearsals to occur at the same time, thus reducing scheduling conflicts. The total cost for this additional project is $2.6 million.

Would you support an $18.9 million referendum for the Base Plan with the addition of a gym expansion, technical education/industrial arts/stem expansion and additional parking AND the addition of performance space in the gym? This would represent an estimated tax increase of $327 ($27 per month) for each $100,000 of property value for each of the next 25 years. All Residents Definitely yes 21% Probably yes 25% 46% Yes Undecided 15% Probably no Definitely no 17% 22% 39% No 0% 15% 30% 45% 60% 75%

Would you support an $18.9 million referendum for the Base Plan with the addition of a gym expansion, technical education/industrial arts/stem expansion and additional parking AND the addition of performance space in the gym? This would represent an estimated tax increase of $327 ($27 per month) for each $100,000 of property value for each of the next 25 years. Staff Residents Definitely yes 29% Probably yes 19% 48% Yes Undecided 19% Probably no Definitely no 9% 24% 33% No 0% 15% 30% 45% 60% 75%

Would you support an $18.9 million referendum for the Base Plan with the addition of a gym expansion, technical education/industrial arts/stem expansion and additional parking AND the addition of performance space in the gym? This would represent an estimated tax increase of $327 ($27 per month) for each $100,000 of property value for each of the next 25 years. Parent Residents (Non-Staff) Definitely yes 25% 57% Yes Probably yes 32% Undecided 14% Probably no Definitely no 15% 14% 29% No 0% 15% 30% 45% 60% 75%

Would you support an $18.9 million referendum for the Base Plan with the addition of a gym expansion, technical education/industrial arts/stem expansion and additional parking AND the addition of performance space in the gym? This would represent an estimated tax increase of $327 ($27 per month) for each $100,000 of property value for each of the next 25 years. Non-Parent Residents (Non-Staff) Definitely yes 16% Probably yes 18% 34% Yes Undecided 16% Probably no Definitely no 18% 32% 50% No 0% 15% 30% 45% 60% 75%

Project Timing/Election Date

There is not a regularly scheduled election this fall. The District could schedule a special election for voters to consider a referendum this fall vs. in the spring of 2018. There could be an estimated cost of $6,000 to the District to hold this special election. However, if successful, the District could start construction in the spring of 2018 and secure interest rates at a lower level, assuming they continue to rise as forecasted. Given this background information, would you support the District holding a facilities referendum in the fall of 2017? (Residents Only) 75% 65% 86% 73% 60% 52% 45% 34% 30% 22% 15% 9% 13% 13% 14% 5% 14% 0% Yes No Undecided All Residents Staff Parents (Non-Staff) Non-Parents (Non-Staff)

Thank you!