St. Asaph Flood Risk Management Scheme Case Study: The problem and task

Similar documents
St. Asaph Flood Risk Management Scheme Case Study The Solution

Good Practice Guide. GPG 101 Document Owner: Steve Cook. Page 1 of 7.

Good Practice Guide. Technical guidance: Flood risk activity definitions October GPG 220 Document Owner: Flood Risk Strategy.

Flood Risk Management: Modelling blockage and breach scenarios February 2015

Problem Overview. Key Flood extent for present day 1% (or 1 in 100) chance flood event. Dinas Powys. Barry Industrial Area.

Frequently Asked Questions

FLOODING INFORMATION SHEET YOUR QUESTIONS ANSWERED

River Lugg Internal Drainage Board. Policy Statement on Flood Protection and Water Level Management

Creetown (Potentially Vulnerable Area 14/17) Local Plan District Local authority Main catchment Dumfries and Galloway Solway Moneypool Burn Council Ba

Abstraction Charges Scheme 2017/18

Alyth (Potentially Vulnerable Area 08/04) Local Plan District Local authority Main catchment Tay Perth and Kinross Council Alyth Burn (River Tay) Back

Hillfoots Villages (Potentially Vulnerable Area 09/04) Local Plan District Forth Local authority Clackmannanshire Council, Stirling Council Main catch

Oban (Potentially Vulnerable Area 01/31) Local authority Main catchment Argyll and Bute Council Knapdale coastal Background This Potentially Vulnerabl

Clyde catchment - Motherwell to Lesmahagow (Potentially Vulnerable Area 11/17/2) Local Plan District Clyde and Loch Lomond Local authority North Lanar

Arbroath (Potentially Vulnerable Area 07/07) Local Plan District Local authority Main catchment Tay Estuary and Montrose Basin Angus Council Brothock

CHAPTER 10 FLOOD RISK

RIVER LUGG INTERNAL DRAINAGE BOARD. Statement on Water Level and Flood Risk Management

Strategic Environmental Assessment

Ellon (Potentially Vulnerable Area 06/12) Local Plan District North East Local authority Aberdeenshire Council Main catchment River Ythan, Buchan coas

Isle of Arran (Potentially Vulnerable Area 12/08) Local Plan District Local authority Main catchment Brodick to Kilmory Ayrshire North Ayrshire Counci

Newton Stewart (Potentially Vulnerable Area 14/12) Local Plan District Local authority Main catchment Dumfries and Galloway Solway River Cree Council

Elgin (Potentially Vulnerable Area 05/05) Local Planning District Local authority Main catchment Findhorn, Nairn and Speyside The Moray Council River

Consider the risks to your own business as well as to your operations

Guildford Borough Level 1 Strategic Flood Risk Assessment Summary Report. January 2016

Dornoch (Potentially Vulnerable Area 01/07) Local Plan District Highland and Argyll Local authority The Highland Council Main catchment Dornoch coasta

Flood Investigation Report

Derwent Catchment Flood Management Plan. Summary Report December managing flood risk

THE RIVER STOUR (KENT) INTERNAL DRAINAGE BOARD. Policy Statement on Water Level and Flood Risk Management

Fort William (Potentially Vulnerable Area 01/25) Local authority Main catchment The Highland Council Appin coastal Background This Potentially Vulnera

Managing flood risk on the Severn Estuary Gloucestershire. January 2011

Aberfeldy and Pitlochry (Potentially Vulnerable Area 08/03) Local Plan District Local authority Main catchment Tay Perth and Kinross Council River Tay

Joint Lincolnshire Flood Risk and Drainage Management Strategy: Draft v.6.0:consultation Draft, : Annexes A-F

Flood Risk Management Strategy. Shetland

Glossary. Annual Average Damages (AAD) Benefit cost ratio (BCR)

Appendix 4 Candidate Projects for Local Choices

Glasgow City centre (Potentially Vulnerable Area 11/16) Local Plan District Local authority Main catchment Clyde and Loch Lomond Glasgow City Council

FLOOD SOLUTIONS Residence

BRITISH COLUMBIA DAM SAFETY REGULATION 44/2000

STRATEGIC FLOOD RISK ASSESSMENT

Broad-Scale Assessment of Urban Flood Risk Mark G. E. Adamson 1

Unique ID: (from PFRA database) Location: Nenagh, Co. Tipperary. Stage 1: Desktop Review

Stirling (Cornton and Causewayhead) (Potentially Vulnerable Area 09/05) Local Plan District Forth Local authority Clackmannanshire Council, Stirling C

Unique ID: (from PFRA database) Location: Bridgetown, Co. Clare. Stage 1: Desktop Review

Solway Local Plan District 1 Flood risk management in Scotland 1.1 What is a Flood Risk Management Strategy? Flood Risk Management Strategies have bee

Kirkwall (Potentially Vulnerable Area 03/05) Local Plan District Local authority Main catchment Orkney Orkney Islands Council Orkney coastal Backgroun

Planning and Flood Risk

Dunblane and Bridge of Allan (Potentially Vulnerable Area 09/03) Local Plan District Local authority Main catchment Forth Stirling Council Allan Water

Clyde south - Port Glasgow to Inchinnan (Potentially Vulnerable Area 11/09) Local Plan District Clyde and Loch Lomond Local authority Inverclyde Counc

LOW. Overall Flood risk. Flood considerations. Specimen Address, Specimen Town. Rivers and the Sea Low page 4. Historic Flood.

Inverurie and Kintore (Potentially Vulnerable Area 06/13) Local Plan District Local authority Main catchment North East Aberdeenshire Council River Do

Shropshire Local Flood Risk Management Strategy. Summary for Consultation. July 2014

The AIR Inland Flood Model for Great Britian

Protocol for the maintenance of flood and coastal risk management assets (England only) Version 4, 27/01/2014 UNCLASSIFIED

Caol and Inverlochy (Potentially Vulnerable Area 01/24) Local Plan District Highland and Argyll Local authority The Highland Council Main catchment Fo

Castle Douglas (Potentially Vulnerable Area 14/11) Local Plan District Local authority Main catchment Dumfries and Galloway Solway River Dee (Solway)

FREQUENTLY ASKED QUESTION ABOUT FLOODPLAINS Michigan Department of Environmental Quality

Chapter 5 Floodplain Management

Dee River Basin District Consultation on the draft Flood Risk Management Plan

Stirling (Raploch and Riverside) (Potentially Vulnerable Area 09/07) Local Plan District Local authority Main catchment Forth Stirling Council Stirlin

Environment Agency pre-application advice incorporating Local Flood Risk Standing Advice from East Lindsey District Council

Turriff (Potentially Vulnerable Area 06/07) Local Plan District Local authority Main catchment North East Aberdeenshire Council River Deveron Backgrou

Resilience to Flooding of Grid and Primary Substations

CODE OF PRACTICE FOR WORKS AFFECTING THE CANAL & RIVER TRUST

Flood Risk Assessment for Planning

Managing flood risk on the Severn Estuary South Gloucestershire to Hinkley Point, Somerset. January 2011

Kelso (Potentially Vulnerable Area 13/09) Local Plan District Local authority Main catchment Tweed Scottish Borders Council River Tweed Background Thi

Lowestoft. Summary 2016 FLOOD RISK MANAGEMENT. Mike Page

Strategic Flood Risk Assessment

Document Control Sheet

The approach to managing natural hazards in this Plan is to: set out a clear regional framework for natural hazard management

Annex 1: Glossary. Annual Average Damages (AAD) Benefit cost ratio (BCR) Candidate Potentially Vulnerable Area (PVAc)

Britannia Village Flood Control Project

Nairn Central (Potentially Vulnerable Area 01/18) Local authority Main catchment The Highland Council Moray coastal Background This Potentially Vulner

Chelmsford City Council. Level 1 and Level 2 Strategic Flood Risk Assessment. Final Report

Lowestoft Flood Risk Management Project

Review of preliminary flood risk assessments (Flood Risk Regulations 2009): guidance for lead local flood authorities in England

FOR TO THE GAELTACHT LOCAL AREA PLAN MARCH 2013

STATUTORY INSTRUMENTS. S.I. No. 122 of EUROPEAN COMMUNITIES (ASSESSMENT AND MANAGEMENT OF FLOOD RISKS) REGULATIONS 2010.

ARUN DISTRICT COUNCIL POLICY STATEMENT ON FLOOD AND COASTAL DEFENCE. 12 January 2004

The London to Fishguard Trunk Road (East of Magor to Castleton) Order 201-

Chapter Flood Consequences

Luncarty, Stanley, Bankfoot, Dunkeld and Birnam (Potentially Vulnerable Area 08/08) Local Plan District Local authority Main catchment Tay Perth and K

Strategic Flood Risk Assessment. SFRA Report

Saturday, 14 April 2012

RESERVOIR LEGISLATION IN WALES

RESOLUTION - APPROVING FINAL FISCAL YEAR BUDGET

M 328 DEPOSITED. October 13, /2017 B.C.REG.

Flood Risk Management Planning in Scotland: Arrangements for February 2012

Sample Site, Sample Street, Sample Town

Flood and Coastal Risk Management - A Risk Based. David Rooke Head of Flood & Coastal Risk Management 20 March 2009

Explanatory Memorandum to The Reservoirs Act 1975 (Exemptions, Appeals and Inspections) (Wales) Regulations 2015

CYNGOR SIR POWYS COUNTY COUNCIL. CABINET EXECUTIVE 18 th September Flood Risk Management Plan (FRMP)

ECONOMIC, SOCIAL AND ENVIRONMENTAL ASSESSMENT OF NEIGHBOURHOOD PLANS

Strategic Flood Risk Assessment

Please find attached your: FCI Flood Commercial <0.25Ha

Forres (Potentially Vulnerable Area 05/06) Local Planning District Local authority Main catchment Findhorn, Nairn and Speyside The Moray Council Moray

Conon Bridge and Muir of Ord (Potentially Vulnerable Area 01/16) Local authority Main catchment The Highland Council River Conon Background This Poten

Flood Risk Assessment Appendix 1 to Strategic Environmental Assessment Screening of Amendment No. 1 to Ferrybank/Belview Local Area Plan

Barry Island and Docks (2)

Draft River Hull Flood Risk Management Strategy. May River Hull Flood Risk Management Strategy Report

Transcription:

St. Asaph Flood Risk Management Scheme Case Study: The problem and task

Introduction This case study can be used in conjunction with the St Asaph November 2012 Floods Data Report which can be found on the Education, Learning and Skills pages of NRW s website. The solution to the problem and task can also be found on these pages. www.naturalresourceswales.gov.uk Natural Resources Wales (NRW) has a duty under the Environment Act Wales 2016 to apply the principles of sustainable management of natural resources (SMNR) through it s work. Figure 1 - The Environment Act 2016 sustainable management of our natural resources (SMNR) principles www.naturalresourceswales.gov.uk Education, Learning and Skills Page 2 of 17

St.Asaph Awarded city status as part of the Queen's Diamond Jubilee celebrations in 2012, St Asaph is a small city in North Wales, situated in the Vale of Clwyd between Denbigh and the coastal resort of Rhyl. It is home to the smallest Cathedral in Britain and has a population of just under 3,500 according to the 2011 census. It is located on the lower reaches of the River Elwy. The River Elwy The River Elwy, a tributary of the River Clwyd comes into existence in the village of Llangernyw (South-west of St.Asaph) as three rivers converge to form the Elwy Afon Gallen, Afon Collen and the Afon Cleddwen - see Figure 2. From Llangernyw the Elwy flows easterly to Llanfair Talhairn where another tributary, Afon Aled joins the Elwy. After passing through Bont-Newydd, the Elwy turns northwards and flows through St.Asaph. Flowing directly through the city, the Elwy is a medium sized river with a catchment area of around 250km 2 when it reaches St. Asaph. There is also a small tributary of the Elwy known as the Glascoed Stream, which discharges into the Elwy on the left bank. It runs adjacent to Glascoed Road at the southern end of the city, draining an area of 3km 2. The Elwy has its confluence with the River Clwyd 1.8km downstream of St Asaph see Figure 3. Afon Elwy Figure 2 map showing the Rivers Gallen, Collen and Cledwen converging at Llangernyw to form the River Elwy www.naturalresourceswales.gov.uk Education, Learning and Skills Page 3 of 17

Figure 3 Map showing the confluence of the River Clwyd and Elwy The River Clwyd The River Clwyd has it s source in Clocaenog Forest (west of Ruthin). The river flows south until it reaches the village of Melin y Wig where it veers north-eastwards until it reaches the town of Ruthin. Flowing through rich agricultural land known as the Vale of Clwyd, the River Clywedog joins the Clwyd at Rhewl. The Clwyd meanders gently meanders north to St.Asaph where just north of the city, the two rivers conjoin. The Afon Elwy discharges to the Clywd 1.8km downstream of St. Asaph and the ground levels fall from around 10m above Ordanance Datum (OD) to between 6 7m Ordanance Datum. At the confluence of the Elwy and Clwyd, the river becomes tidal and enters a narrow estuary. The river channel was straightened at Rhuddlan by King Edward 1 st to enable his supply barges to reach his castle at Rhuddlan. The engineered, straightened channel runs for three miles before meeting the Irish Sea at Rhyl. History of flooding at St.Asaph Flood risk to the city comes predominantly from raised water levels in the Elwy overtopping the city s flood defences. Historically there are entries in the Chronolgy of British Hydrological Events that indicate likely flooding in the vicinity of the city in 1871, 1882 and 1896. During the 20 th century, flooding was reported during 1913, 1964 and 1965. This prompted construction of the original defences through the city in the 1960 s. These defences were raised again during 1975. The defences withstood all flood events until the 27 th November 2012. www.naturalresourceswales.gov.uk Education, Learning and Skills Page 4 of 17

Figure 4 - Images from the 1964/1965 St.Asaph floods www.naturalresourceswales.gov.uk Education, Learning and Skills Page 5 of 17

November 2012 Floods The flooding in November 2012 occurred when prolonged, intense rainfall fell over the catchment. During the early hours of Tuesday the 27th November 2012, the defences were overwhelmed when the Elwy rose 3 metres above its normal level. 322 homes, 32 businesses and 70 caravans within the city were flooded. A flood depth of 0.8 metres was recorded and the floods resulted in one tragic fatality. Figure 5. demonstrates the breadth of flooding experienced by St.Asaph. Figure 5 photo demonstrating the breadth of flooding at St.Asaph Figure 6 map showing the November 2012 flood extent www.naturalresourceswales.gov.uk Education, Learning and Skills Page 6 of 17

Initial reports from site stated that flooding began to occur downstream of the A55 with water spilling into the Spring Gardens area - see Figure 6. This area was then cut off as upstream sections flooded. Out of bank water was fast flowing and all areas affected were quickly inundated. Standard of Protection (SoP) A flood defence standard of protection provides an indicative level of risk to a specific area from flooding from the sea or a river. Flood defences are built to reduce the risk of flooding from the sea or a river. The standard of protection they offer is usually described in terms of the likelihood of a flood event happening from overtopping of those defences. For example, a flood defence could be described as providing a 1 in 100 year standard of protection. This means that the defence could overtop if subjected to an event which has a probability of less than 1% in any given year. It is however worth noting that defences can fail by other means (eg breach) which is why it is so important to have appropriate inspection and maintenance regimes in place. Figure 7 explains different the Standard of Protection concept further. Standard of Protection (SoP) 1 in 1,000 annual event probability % Likelihood of flooding happening 0.1% chance of flooding in any given year, very low probability 1 in 200 annual event probability 1 in 100 annual event probability 1 in 50 annual event probability 1 in 20 annual event probability 0.5% chance of flooding in any given year, low probability 1% chance of flooding in any given year, medium probability 2% chance of flooding in any given year, medium probability 5% chance of flooding in any given year, high probability Figure 7 The Standard of Protection model explained These figures do not take account of the possible impacts of climate change and consequent changes in the future probability of flooding. Neither do they consider the impact of flooding. Flood risk assessment combines the probability and the potential consequences of flooding from all sources including from rivers and the sea, directly from rainfall on the ground surface and rising groundwater, overwhelmed sewers and drainage systems, and from reservoirs, canals and lakes and other artificial sources. UK Government Planning Practice Guidance 2 www.naturalresourceswales.gov.uk Education, Learning and Skills Page 7 of 17

For example, a defence might have a 1 in 20 annual event probability (high probability) of flooding at a given location but the impact will be negligible as only fields with livestock will be affected. Or a defence may have a 1 in 1,000 annual event probability (low probability) of flooding at a given location but if a flood was to happen the impact would be high as hundreds of homes and commercial properties would be damaged. Therefore when assessing flood risk, both the probability and the potential impact of a flood need to taken into consideration. St. Asaph s Standard of Protection (SoP) The November 2012 flood was estimated to have been between a 1 in 100 (1%) and 1 in 200 (0.5%) annual probability event. Flood damage Overtopping of the defences during November 2012 caused severe flood damage throughout the city. Damage Applicable to St. Asaph Notes Property damage residential Evacuation costs Indirect costs (health) Vehicle damage Non-residential Electricity and gas x No critical infrastructure in St. Asaph Water and waste water x Existing sewage works too small to be included in the assessment Roads Flood damages from connection between A525 and A55 Railways x No railways at risk in St. Asaph Telecommunications x No critical infrastructure at risk in St.Asaph Schools 4 schools in St. Asaph Hospitals X No hospitals at risk in St. Asaph Emergency services Recreation X Risk to recreation deemed negligible Agriculture x No agricultural land at risk in St. Asaph although there are fields at risk both upstream and downstream of the city. Environment x Risk to life Figure 8 List of the potential sources of flood damages 1 together with whether they were applicable for St. Aspah www.naturalresourceswales.gov.uk Education, Learning and Skills Page 8 of 17

It was concluded in the St Asaph Flood Risk Management Scheme Project Appraisal Report that a scheme was required to reduce both the present day risk of flooding in St Asaph and to allow for it to be managed for the effects of future climate change. Flood Risk Modelling Flood risk modelling showed: The existing defences would be overtopped by a 1 in 50 (2%) annual event probability flood. Flood risk modelling highlighted that there were around 430 properties in St Asaph at risk from a flood with a 1 in 200 (0.5%) annual event probability. This includes 293 homes and 136 businesses, together with locally important highway infrastructure. Sections of the exisiting defence were identified as being in poor condition and require strengthening. Private gardens had encroached over parts of the defence, limiting access to maintain it. Large flows in the River Elwy could cause flooding in the River Clwyd at Rhuddlan The Clwyd is tidally influenced and can give rise to tidal flooding at the confluence with the River Elwy. St Asaph is too far upstream for there to be a tidal influence on flood levels in the city. Reservoir and canals can present a flood risk as a result of dam or embankment failure. These risks are very low as a result of regular maintenance and inspection. All large reservoirs must be inspected regularly and supervised by the Reservoir Panel Engineers under the 1975 Reservoirs Act. Reservoir flood maps on the NRW website show a worst case scenario and indicate that St Asaph is at risk of flooding resulting from a failure of either Llyn Aled or Llyn Aled Isaf. These two reservoirs lie some 30km upstream of St Asaph. There are no canals is this area and therefore no risk of flooding from a canal embankment failure. Climate change is predicted to increase the frequency with which severe floods occur in St Asaph. Future climate change would both significantly reduce the standard of protection provided by the existing defences and increase the number of properties at risk from flooding. Figure 9 An otter sculpture in the park during the 2012 floods. Figure 10 view along the A525 during the 2012 floods Photos taken by Alun Williams www.naturalresourceswales.gov.uk Education, Learning and Skills Page 9 of 17

Current approach to flood risk management Measures to manage the probability of flood risk The existing defences were operated and maintained by Natural Resources Wales and provided protection against flooding with a 1 in 50 (2%) annual event probability. NRW did not own any of the land on which the defences were built; existing landowners include private residential, commercial and public holdings. Work undertaken by NRW includes: Operation of temporary defences by Spring Gardens Bridge and removal of mesh fence panels from the bridge during a flood warning. Mowing and repairs to the existing defences. Routine vegetation clearance and blockage removal from the channel. Were this work to be discontinued: The condition of the existing defences would deteriorate, leading to eventual breach and failure over a period of around 15 years. Blockages of Spring Gardens and St. Asaph Old Bridge would occur which would hamper the flow of water within the river channel. Measures to manage the consequences of flood risk In the event of a flood warning, NRW would deploy temporary defences in the vicinity of Spring Gardens and remove mesh panels from Spring Gardens Bridge to reduce the risk of overtopping and blockage respectively. This raises the standard of flood protection to a 1 in 75 annual event probability in this location. NRW provides a flood warning service for the city - residents and businesses have to register for this service. A Community Flood Plan exists, which is implemented by the St Asaph Flood Action Group to manage the consequences of flooding. The St Asaph Flood Partnership Group was established in the aftermath of the November 2012 event and consists of representatives from NRW, Denbighshire County Council, St Asaph City Council, Welsh Water, other professional partners and members of the local community. The network includes local flood wardens to promote flood awareness and manage the consequences of flooding through the city. The network is maintained by the North Wales Flood Incident Management team to aid information passage during a flood event. www.naturalresourceswales.gov.uk Education, Learning and Skills Page 10 of 17

Considerations for the new flood risk management scheme A study area for the Flood Risk Management Scheme was identifited to ensure that all properties and land which could be affected by the scheme to reduce the flood risk could be considered. The full study area for the St Asaph Flood Risk Management Scheme spread along the River Elwy from properties at Wigfair Isaf in the south to Rhuddlan in the north - see Figure 11. Figure 11 St Asaph Flood Risk Management Scheme Study Area www.naturalresourceswales.gov.uk Education, Learning and Skills Page 11 of 17

Biodiversity A total of 21 habitats were found to be present within the Study Area. Of note for their biodiversity value were: 6 ponds within 250 metres of the scheme which all apprear to be potentially suitable for Great Crested Newts. All trees with ivy were considered to offer roosting habitat for individual bats as day roosts. A number of trees were identified as having high bat roost potential. The habitats within the study area were considered to be of high value to breeding birds and likely to support a diverse range of birds. A number of otter spraints were found throughout the survey area confirming that otters pass through the area. The River Elwy itself is likely to support an array of fish species including salmon, sea trout, eel and lamprey. Invasive Species Himalayan Balsam was present within the study area and had to be removed before work on the Flood Risk Management Scheme could commence. Designations There were no designated sites of international or national conservation importance in the study area. There were three Local Wildlife Sites (LWS) located between 200-700m from the study area however these had no effect on the options considered. There was a Site of Special Scientific Interest (Coedydd ac Ogofau Elwy a Meirchion SSSI) located 3km upstream from the study area. Liverpool Bay Special Protection Area (SPA) is located 7km downstream from the study area. Special Protection Areas are special sites designated under the EU Birds Directive to protect rare, vulnerable and migratory birds. Constraints The study area contained the St Asaph Conservation Area and over 50 listed buildings in and around the city, notably, St Asaph Old Bridge see Figure 12. The bridge crosses the Elwy within the scheme area and is an important landmark within the city being Grade 2 Listed and a Scheduled Ancient Monument. Existing flood defences are connected to the bridge. Works connecting to or affecting the setting of the bridge required Listed Building Consent to proceed. All trees within the Conservation Area were protected and required permission from the Local Planning Authority for their removal. Consultees: www.naturalresourceswales.gov.uk Education, Learning and Skills Page 12 of 17

Figure 12 - St. Asaph Old Bridge A Grade 2 listed building and Scheduled Ancient Monument Public consultation events have been held in St Asaph in February 2013, July 2013, December 2014, February 2016 and October 2016 in order to update the community on the developments of both short and longer term improvements. These events have been attended by people from across the Elwy catchment. Further updates have been provided through newsletters, articles in the local journal and a dedicated page on the NRW website. www.naturalresourceswales.gov.uk Education, Learning and Skills Page 13 of 17

Options considered for the St. Asaph Flood Risk Management Scheme The following options were considered as part of the St Asaph Flood Risk Management Scheme. Option 1 - existing defences abandoned leading to failure Option 2 - existing defences to be maintained to their current condition Option 3 - all in channel and bankside vegetation to be removed along the Elwy from St Asaph to its confluence with the River Clwyd to improve the flow of water within the river channel Option 4 - existing defences raised, new defences built and Spring Gardens Bridge replaced Option 5 - upstream storage together with improvements to the flood defence through the city where required Task A scheme is required to reduce both the present risk of flooding in St Asaph and allow for it to managed for the effects of future climate change. What would you do if you worked for NRW? Study the facts and the options and decide on the benefits and the constraints of each option. Place them in order of merit and explain why you chose your first option over the other options. Consider who you would need to consult and involve? www.naturalresourceswales.gov.uk Education, Learning and Skills Page 14 of 17

References 1 - UK Government Planning Practice Guidance http://planningguidance.communities.gov.uk/blog/guidance/flood-risk-and-coastalchange/planning-and-flood-risk/what-is-flood-risk/ 2 - Flood and Coastal Erosion Risk Management Handbook and Data for Economic Appraisal 2016 Bibliography 1. Natural Resources Wales, Project Appraisal Report, St. Asaph Flood Risk Management Scheme, August 2015 2. A Galliford Try, Black & Veatch Joint Venture, St. Asaph Flood Risk Management Scheme Preliminary Ecological Appraisal Report 3. Natural Resources Wales, St. Asaph Flood Risk Management Scheme, Envirnonmental Assessment Summary 4. Black & Veatch, St. Asaph Flood Risk Management Scheme Flood Consequence Assessment Report, August 2016 This document will be reviewed on an annual basis. Acknowledgements NRW would like to thank the following: Charlotte Lang Carwyn Hughes Tim Owen Marianne Jones Rob Green Eirian Gilford Staff yr adran cyfieithu Angharad Harris Snowdonia National Park / Geography Association www.naturalresourceswales.gov.uk Education, Learning and Skills Page 15 of 17

The accompanying Solution document for this case study can be found on the Education, Learning and Skills pages of NRW s website. You may also wish to refer to the St. Asaph November 2012 Floods Data Report which can also be found on these pages. Published in April 2017 Review due in April 2018 Authored by NRW Education, Learning & Skills If you have any queries or questions regarding this document please contact: education@naturalresourceswales.gov.uk Published by: Natural Resources Wales Cambria House 29 Newport Road Cardiff CF24 0TP 0300 065 3000 (Mon-Fri, 8am - 6pm) enquiries@naturalresourceswales.gov.uk www.naturalresourceswales.gov.uk Natural Resources Wales All rights reserved. This document may be reproduced with prior permission of Natural Resources Wales. www.naturalresourceswales.gov.uk Education, Learning and Skills Page 16 of 17