Project Appraisal and Selection

Similar documents
PRINCIPLES OF FINANCIAL APPRAISAL

Winners and Losers in Argentina s Water Sector Reform Cost Benefit Analysis a tool to estimate the distributional impact of water sector reform

6 Calculating the Net Benefits to the Referent Group

Benefit-Cost Analysis: Introduction and Overview

Project Economic and Financial Appraisal & Risk Analysis: A focus on GCF Funding Proposal

OVERVIEW OF ECONOMIC ANALYSIS IN ADB OPERATIONS

Feasibility study. Lecture 4. 7/15/2014 Dr. Joshua Onono

Adaptation Assessment: Economic Analysis of Adaptation Measures

Introduction to the Toolkit Financial Models

BY A.R MANICKAM DEPUTY GENERAL MANAGER UNION BANK OF INDIA

PROJECT CRITERIA: ECONOMIC VIABILITY AND PROJECT ALTERNATIVES

ARTICLE ON PROJECT FINANCING

Project Finance An Overview

Equitable Financial Evaluation Method for Public-Private Partnership Projects *

Public Investment Management. gy = (I/Y)/k. Harrod Domar Growth Model. Role of Investment in Economic Growth. Savings, Investment and Growth

Sample Questions for Chapters 10 & 11

Draft Environmental Impact Statement. Appendix G Economic Analysis Report

Monetary Valuation of UK Continental Shelf Oil & Gas Reserves

Benefit Cost Analysis and Public Sector Economics

Economic Analysis Concepts

Chapter# Feasibility Study, Project Proposal and Project Appraisal

GUIDELINES FOR ECONOMIC ANALYSIS OF PROJECTS

Organization Strategy and Project Selection The McGraw-Hill Companies, All Rights Reserved

111. PROFILE ON THE PRODUCTION OF AGGREGATES

Project Finance & Techniques. CA Amit Godse CA Yashesh Shroff

Principles of Financial Feasibility ARCH 738: REAL ESTATE PROJECT MANAGEMENT. Morgan State University

FINANCIAL ANALYSIS. Table 1: Project Outputs Output Subcomponents Type of Analysis Enshi Wastewater Enshi Hongmiao WWTP Enshi Dashaba WWTP

Review of Financial Analysis Terms

Draft PPP Policy Outline

Capital Budgeting CFA Exam Level-I Corporate Finance Module Dr. Bulent Aybar

Chapter Five. Scale, Timing, Length, and Interdependencies in Project Selection

What are Banks looking for during credit appraisal WE EMPOWER MSME

Water in the Green Economy in Practice Session 3: Sustainable Financing. Maria Angelica Sotomayor Senior Economist World Bank

COST-BENEFIT ANALYSIS Economics 437 / Economics 837 Spring 2014

CA. Sonali Jagath Prasad ACA, ACMA, CGMA, B.Com.

The New Programming Period Working Document No. 4

Introduction to RELCOST. Carolyn Roos, Ph.D. Northwest CHP Technical Assistance Partnerships Washington State University Energy Program

Session 1.2 Scope of Project Economic Analysis. Introductory Course on Economic Analysis of Investment Projects 29 June 2009

1of 23. Learning Objectives

Lecture in Energy Economics: Life Cycle Cost Analysis for Bankable Projects in Sustainable Energy

ACCA. Paper F9. Financial Management. December 2014 to June Interim Assessment Answers

Vladimir Ramirez Soberanis Unidad de Inversiones SHCP October 21, 2010

The following box outlines the basic steps in economic analysis. The last

Improving public investment efficiency for infrastructure development

Overview. Overview. Chapter 19 9/24/2015. Centre Point: Reversion Sale Price

CMA Part 2. Financial Decision Making

Prioritization of Climate Change Adaptation Options. The Role of Cost-Benefit Analysis

Before discussing capital expenditure decision methods, we may understand following three points:

T o o l k i t f o r P u b l i c - P r i v a t e P a r t n e r s h i p s i n r o a d s & H i g h w a y s. Advantages of PPP

CHAPTER 12 APPENDIX Valuing Some More Real Options

Financing Energy Efficiency Projects for SMEs

ECONOMICS 2008 MAY/JUNE

Financial Modeling Fundamentals Module 01 Overview and Core Concepts Quiz Questions

Session 1.2 Discounting and Project Alternatives. Introductory Course on Economic Analysis of Investment Projects

Aircraft Finance: Leasing & Financial Evaluation

Fall, 2007 Environmental Economics Phil Graves st. 1 Midterm, A EC3545 U. of Colorado

VOLTA RIVER AUTHORITY

To extract relevant information for determining the success or failure of a project. To determine the expected costs and benefits of the project.

AGEC 604 Natural Resource Economics

Understanding Business Borrowers $150 COURSE DESCRIPTIONS

Chapter 6. The Standard Trade Model

Paper P1 Performance Operations Russian Diploma Post Exam Guide November 2012 Exam. General Comments

Project Finance Modelling

Working together in 2017 and beyond

Cost-benefit analysis in the context of EU Cohesion funding - tools, methodology and available support

Problems and Prospects of Public Private Partnership in Bangladesh

The Capital Expenditure Decision

CHAPTER 15 INVESTMENT, TIME, AND CAPITAL MARKETS

Chapter 5. The Standard Trade Model. Slides prepared by Thomas Bishop

Discussion Questions

New Development Bank. Policy on Financial Management and Financial Analysis, and Economic Analysis of Projects

Overview. Overview. Chapter 19 2/25/2016. Centre Point Office Building. Centre Point: Reversion Sale Price

Economics Training Series Introductory Course. Benefit Estimation

Preparation of the cost-benefit analysis

The Benefits of a Carbon Tax Swedish experiences and a focus on developing countries

Planning & Economic Analysis I

Value for Money Analysis: Choosing the Best Project Delivery Method. Ken L. Smith, PE, CVS -HDR Engineering, Inc.

METHODOLOGY For Risk Assessment and Management of PPP Projects

FINANCE & ACCOUNTING FEASIBILITY STUDIES: PREPARATION, ANALYSIS AND EVALUATION NON-TECHNICAL & CERTIFIED TRAINING COURSE

Auditing Public Sector Projects and Programs. Speaker : Sanjay Vani The World Bank Washington DC

Tariffs and Tariff Design Promoting Access to the Poor

Financial Modelling for Project Finance

Water Resource Economics C H A P T E R E E V A L U A T I O N O F W A T E R D E V E L O P M E N T P R O J E C T S

VANUATU NATIONAL INFRASTRUCTURE MASTERPLAN. Terms of Reference for Consultants

Overview of cogeneration project development

INVITATION TO TENDER: CONSULTANCY SERVICES TO DEVELOP A FINANCIAL MODEL FOR THE LESOTHO-BOTSWANA WATER TRANSFER SCHEME (LBWTS)

Chapter 14 Solutions Solution 14.1

Cost-Benefit Analysis of the Effects of Federal Government Regulation for Organic Products Produced in Canada or Imported

Real Options. Katharina Lewellen Finance Theory II April 28, 2003

Chapter 8. Preview. Instruments of trade policy. The Instruments of Trade Policy

The Economics of Innovation Procurement

Engagement of Financial Advisory Services for the Soapberry Wastewater. Terms of Reference

ECONOMIC AND FINANCIAL ANALYSIS

Life Cycle Analysis Money... and More

Risk of Hydro Power Sector in Nepal. Mahesh Guragain, FCA Chairman, NepalRe (

Fiscal Policy and Financial Support Schemes for Clean Energy Mini Grids (CEMG)

Module 4 Preparing Agricultural Financial Statements: The Balance Sheet. Module Outline

Impact Assessment (IA)

Sensitivity Analysis: A Technique for Investigating the Impact of Changes in Project Variables

Stat 476 Life Contingencies II. Profit Testing

Transcription:

Project Appraisal and Selection Project Appraisal Objectives Dr. DNS Dhakal Duke University Leadership for Results Program for Mid-Level Officers in the Nepalese Civil Service Kathmandu, Nepal 2 September 2 October 205 To direct resources to the best possible uses To justify decisions in a transparent manner To think about alternatives that might be more efficient Serves as a management tool for decision making and monitoring Allows the government to forecast better multiyear budgets 2 Objectives (cont.) To formulate projects for Central and Subnational levels, Donors and Bank funding To develop models for negotiation with contractors, service providers, different agencies in government For assessing cost recovery, subsidy level and for regulation in some cases Objectives (Contd.) To examine projects/programs from the point of view of various stakeholders (owner, sponsoring department, banks and other funding agencies, affected parties, and the entire economy) To assess the likely sources and magnitude of risks and redesign the project/program to reduce risks and satisfy the requirements of various stakeholders 3 4

Projects and Programs Project Related set of investments plus their operation to produce specific set of services or products Factory to produce textiles Airport plus feeder transport for air transportation services Dam plus irrigation canals plus hydro plant Program Related set of activities requiring series or set of projects Education program schools, teacher training facilities Rural development rural roads, small irrigation, village industries, rural electrification Programs contain projects which contain capital and current expenditures (operations and maintenance) 5 Scope of Project/Program Appraisal In a nutshell, project appraisal and program evaluation is not only about accepting or rejecting a project/program; it is more of a management tool for decision making in a transparent manner, monitoring and successful implementation of projects and programs thereby to maximize the benefits of public sector investments KEY ISSUE: How can Nepal ensure that government revenues will generate the maximum social and economic benefits to the Nepali people. Integrated Appraisal/Evaluation The three main components are: Financial Analysis Economic Analysis Distributive (Stakeholder) With Risk Analysis 7 Financial Analysis Financial analysis to see if a particular project or program is financially viable and, if not, what is the burden on the budget - both initial and recurrent Examine alternative sources and costs of financing Assess the value of a project (firm) that could serve as the base value for privatization of a public sector company 8

Economic Analysis Stakeholder and Risk Analysis Economic analysis to answer the question: does the proposal make sense from the point of view the economy (society)? For public sector projects/programs this could be the basis for yes-no decision Assess the costs and benefits of externalities (pollution, deforestation, health etc.) Economic prices indicate the right level of user fees Stakeholder or distributive analysis asks the question who gains and who loses and is relevant for the politics or the sustainability Special attention may be paid to projects/ programs if they meet some basic needs Risk analysis allows assessment of risk and its management through redesigning, changing ownership or participation and contracting 9 0 3 Stage Approach for Analysis. Financial Appraisal 4 2 DIFFERENT PROJECTS Project Design (Different products, prices, location, scale, timing, ownership, regulatory framework, etc.) Core building block for financing project Usually focus is on suppliers of equity capital (owners) and debt capital (bankers, etc), but includes government tax or budget financing for pure public project 2. Economic Appraisal Ultimate basis for public decision making aggregate benefits to economy 3. Risk and Distributive Appraisal RISK ANALYSIS Sensitivity Scenario Monte Carlo Cost of Risk Risk Allocation and Reduction 3 Spreadsheet Models FINANCIAL ANALYSIS Owners Debt Holders Government in Various Roles ECONOMIC ANALYSIS DISTRIBUTIVE ANALYSIS ECONOMIC PRICES AND EXTERNALITIES General Framework National parameters Output and Input Prices Regulation Markets Critical to project design: - Identify winners and losers - Incentives of participants to undertake and sustain project distribution of benefits and risks COST-BENEFIT or COST-EFFECTIVENESS from different perspectives ENVIRONMENTAL and SOCIAL EXTERNALITIES

Stages in Project Development and Analysis Objectives of Project Appraisal () Idea Definition Stage Prefeasibility Study 2 Feasibility Study 3 Project Design Development Stages 0 or No Decision Key: Stop Bad Projects Quickly Project / Programme Implementation 4 5 Post Evaluation Choose projects that increase national wealth: NPV>0. Investment needs to generate a surplus to support growth Stop bad project and programs ( white elephants ) with NPV<0 Costs of stopping/correcting are high Overpriced incomplete, not operational (corruption? Incompetence?) Non-self-financing public projects (budget financed projects) do not have a direct test of actual financial success. Costs covered by taxes, not sales revenues. Failure often non-transparent. Undertake Selection & Implementation in a Staged Approach 3 4 Objectives of Project Appraisal (2) Develop potentially good projects and programs precisely and concisely (feasibility study). Capital budgeting is more than yes/no? Design alternatives, including build/lease/buy, scale, timing, technology, financing mechanisms, risk sharing contracts, etc Prevent good projects from being rejected or destroyed either initially or during implementation Examine projects from various Stakeholders point of view (owner, sponsoring department, banks and other funding agencies, affected parties, the entire economy) Objectives of Project Appraisal (3) Identify winners and losers; supporters and opposition (eg, pro-poor programs and policies; multiple funders (banks, CG/LG, donors) Assess likely sources and magnitude of risks and redesign to reduce risks and satisfy requirements of various stakeholders Develop models for negotiation with contractors, private partners, service providers, government agencies in a transparent and accountable way 5 6

Objectives of Project Appraisal (4) Assess cost recovery, subsidy level and for regulating prices Enable better forecasting of multiyear budgets by identifying operating and maintenance (O&M) requirements and help avoid taking up projects without adequate provision for O&M; hence essential for effective MTEF 7 Simple vs. Complex Projects Investment projects can be simple or complex Simple Investment: single capital purchase; single benefit stream similar to simple financial asset such as a term deposit Purchase farmland to rent to tenant farmers Purchase motor vehicle to operate as a taxi Complex Investment: Complex investment and operating phases over many years with multiple revenue and expenditure items; requires detailed investment & operating plan Agricultural processing plant, mine, manufacturing facility, public utility, waste disposal facility Public sector projects and programs (health, education) generally complex 8 B t -C t Simple investment in farmland (+) Complex Investment Years Discount rate or opportunity cost of funds = 0% Annual rental receipts from land = 00 Present value (PV) of expected gross benefits = 00/0% =,000 Cost of land = 850 Net present value (NPV) or PV of expected net benefits = 50 9 Benefits Less Costs (-) 0 2 3 4 5 6 7 8 9 0 2 3 4 5 Initial Investment Period Operating Stage Year of Project Life 20

Components of Project Cash Flows A. Investment Plan Reconciles technical construction plans with the financing plan and manpower availability B. Operating Plan Reconciles demand (market) module with costs for operation of project C. Treatment of prices levels over project time horizon Cash flows capture complex pattern of all revenues and costs over life of project; discounting future flows allows consolidation into a point of time for decision making Changes in real prices, inflation and exchange rate are relevant D. Cash flow vs. profit and loss account 2 Key Variable in Cash Flow Statement Opportunity Cost All resources used in a project should be charged as the project cost since public or private investor is forgoing value that could be earned in alternative uses (concept of opportunity cost ) Not all cash flows are actual flows of cash through an account. If existing resources are used, opportunity cost (forgone cash flows ) should be charged to the investment for using these resources Existing land, building and machinery Time of owner-manager of business 22 Generic Cash Flow Model Example: Cash Flow for Water Project Receipt: Sales Change in Account Receivable Subsidy Liquidation Value Expenditures: Capital Recurrent Change in Account Payable Change in Cash Balance Corporate Taxes Net Cash Flow 23 Water Connection Project, Financial Analysis Year PV @2% DR 0 2 3 9 0 Revenues Price Quantity 00.00 00.00 00.00 00.00 00.00 Sales 565.0 0 00.00 00.00 00.00 00.00 00.00 Liquidation Value 6.0 0 - - - - 500.00 Subsidy 500.0 500 - - - - - Total Revenues,226.0,226.0 500 00.00 00.00 00.00 00.00 600.00 Expenditures Recurrent/unit 0 0.5 0.5 0.5 0.5 0.5 Total Recurrent 282.5 0 50.00 50.00 50.00 50.00 50.00 Capital,000.0 000 - - - - - Import Tariff - 0 Total Expenditures,282.5,282.5 000 50.00 50.00 50.00 50.00 50.00 Net Cash Flow (56.50) (56.50) -500 50.00 50.00 50.00 50.00 550.00 NPV @ 0% $0 Owners NPV @ 2% (56.50) Owners 24

Construction of Cash Flows Stages of Analysis Different Points of View Analyses of Investment Decisions From Different Viewpoints Type of Analysis Decision Making Criteria Choose Project if NPV is positive Viewpoint: Banker (Total Investment) Financial (I) Economic (II) No/ Stakeholder (III) Basic Needs (IV) No Choice of Scale and Timing Chose Scale & Time to start to maximize NPV Owner Government Budget Office Country No No/ No No No Fine Tuning the Model Incorporate price changes due to inflation, foreign exchange or any other reasons 25 26 Analyses of Investment Decisions from Different Viewpoints Note: Exchange premium=0%;receipts & Equipment 00% tradeable; Tradeable Operating cost =00 Analysis Viewpoints: Year: Receipts Operating Cost Equipment Operating Subsidy Taxes Loan Interest Environ. Externality Opp. Cost of Land Net Resource Flow Banker s (Total Investment) (A) 0-000 -030 Financial 400-40 950 50-00 30 0-000 500-530 Owner (B) 400-40 950 50-00 -500-50 580 Economic Country (C) 0-00 440-50 045-90 5 Financial Govt. Budget (D) 0-00 -00 40-0 95-50 00-75 27 Project Selection Criteria Using Discount Rate and Net Present Value (NPV) Discount Rate: Recognizes time value of money Funds when invested yield a return Future consumption worth less than present consumption Net Present Value: Value addition over and above the Opportunity Cost NPV = (B o -C o )/(+r) o +(B -C )/(+r) +..+(B n -C n )/(+r) n Use NPV Criteria for Project Selection 28

Other Criteria for Project Evaluation. Net Present Value (NPV) 2. Internal Rate of Return (IRR) 3. Benefit Cost Ratio (B/C Ratio)* 4. Payback Period* 5. Annual Debt Service Coverage Ratio (ADSCR) 6. Debt Service Capacity Ratio (DSCR) or Loan Life Ratio (LLR) 7. Cost Effectiveness Analysis Project-Program Life Cycle A. Idea and Project Definition B. Pre-Feasibility Study C. Feasibility Study D. Detailed Design E. Project Implementation F. Project Post Evaluation, Audit, Impact Evaluation Why should a project evaluation be done in stages? 29 30 A. Idea and Project Definition Key questions a. Where is the demand? What factors are typically important to justifying new investments in a sector? b. Is this project consistent with the country s strategy? c. Why not involve the private sector? d. What depth of analysis is required or justified to take an investment decision? 3 From Idea to Feasibility Study. Identify or forecast demand for project/program output 2. A pre-feasibility study uses known information to see whether it makes sense to proceed to a detailed feasibility study 3. Feasibility and final detailed blue prints and design contain: Market or demand analysis Technical or engineering analysis Organization, ownership, human resources and capital financing Financial analysis including all internalized risks and environmental costs Economic analysis including all external benefits and costs including costs of risk and external environmental benefits or costs 4. Stakeholder analysis - who wins and who loses 32

From Idea to Feasibility Study (2) Key questions: a. Does project satisfy some existing or expected excess demand? b. Is project financially and economically feasible? c. Can winners compensate the losers? Is target population capturing benefits? d. What are the sources of risk, and how to reduce risk? Financial Analysis Construct cash flow profile of project/program using market prices: both revenue stream and expenditure stream (cost of investment and operating/maintenance costs); this yields net cash flow Ascertain sources and costs of financing: cost of funds serves as discount rate for making sense of the net cash flow Using discounting, calculate the net present value (NPV): present value of revenues minus present values of costs 33 Use NPV as project selection criterion and for choosing from a menu of projects/programs 34 Financial Analysis (2) Annual net cash flow indicates burden on budget Financial analysis from alternative points of view: What are minimum cash flow requirements for each of stakeholders; What can be adjusted to satisfy all of them? Self-Financing vs Non-Self-Financial Project Financial cash flows are starting point for capital budgeting, but are not enough. Focus on analyzing economic costs and benefits (costbenefit analysis) or financial costs & revenues plus economic externalities Need to recognize that there are two types of projects: Self-financing or commercial projects Non-self-financing or budget supported project 35 36

Two Types of Projects Self-financing or commercial projects where user charges or revenues from services covers financial costs (eg, regulated electricity, water utility, PPP arrangement for toll road or ports). Key issue: financial viability of project. Non-self-financing or budget supported project: no direct financial benefits, and only benefit is social benefit e.g. health and education when government charges token or no fees; increased productivity, savings from controlling diseases (SARS, HIV-AIDs), cost savings of replacing self supply (water, energy), time and operating cost savings from an improved road or, more generally, people s willingness to pay for public service. Economic Analyses Examines project using whole country as accounting entity based on new services produced and resources consumed. Transfers between persons net out. Evaluation of externalities (subsidies, taxes, consumer and producer surplus, environmental impacts, etc. What is the expected value of economic net benefits? Key issue: financial analysis to ensure costs can be absorbed by future budgets, otherwise no external benefits. 37 38 Financial vs Economic Appraisal Economic (shadow) prices estimated from financial prices and market distortions (taxes, subsidies, controlled prices, foreign exchange premium) Evaluation of externalities including environmental impacts Stakeholder /Distributive Analysis Income, cost, and fiscal impacts on various stakeholders (Distributive Appraisal) -- disaggregation of overall economic costs and benefits Basis of political analysis and possible compensation of losers Basic Needs: Impact of project on achieving basic needs objectives 39 40

Risk Analysis Risk Analysis for Projects Identify risk variables and monitor them throughout project s life Risk variables are modeled using probability distributions rather than deterministic values Using Monte Carlo simulation, find probability of making losses, the range of maximum profits and losses, and the probability of ending up with negative cash flows during project s life and the effects of risk sharing or allocation mechanisms on distribution of the value of the project. Re-design project to allocate or spread risks to reduce the Monte Carlo costs of risk if necessary and decide if project should be Simulation accepted 44 4 Completed Model Risk Analysis Sensitivity Analysis Scenario Analysis Net Present Value (NPV): Key Criteria for Project Selection Financial Perspective NPV (+) NPV(-) Economic Perspective NPV(-) NPV(+) REJECT or REDESIGN REJECT or REGULATE or TAX to reduce net economic cost (typically, negative pollution externality or subsided or protected private sector project) ACCEPT if GOVERNMENT or DONOR FINANCE AVAILABLE AND BUDGETED (typical public infrastructure or social project) ACCEPT as PRIVATE SECTOR or COMMERCIALIZE or PRIVATIZE or PRIVATE PARTNER (such as BOOT) Revenue financed projects Self financed projects While NPV (net present value) from Economic Perspective gives aggregate estimate of net benefits to all stakeholders, often also key to disaggregate economic perspective from Distributive Perspective to identify major winners and losers amongst stakeholders 43 Summary Thoughts Project planning and investment appraisal are critical to STOP BAD PROJECTS QUICKLY, while ensuring good stream of projects All projects should be evaluated from financial, economic and distribution perspective, while accounting for risk. Linking projects to the capital and recurrent budgets are critical for realization of benefits. Focus on entire public investment management (PIM) cycle 44