The Office of the Scottish Information Commissioner. Publication Scheme Approval Process Internal Guidance
|
|
- Christopher Washington
- 5 years ago
- Views:
Transcription
1 The Office of the Scottish Information Commissioner Publication Scheme Approval Process Internal Guidance
2 CONTENTS Sections 1 INTRODUCTION APPROVING PUBLICATION SCHEMES A SUMMARY TIMETABLE RESPONSIBILITY FOR SECTORS PUBLICATION SCHEME APPROVAL PROCESS - flowcharts PUBLICATION SCHEME APPROVAL CHECKLIST BESPOKE SCHEMES 11 7 PUBLICATION SCHEME APPROVAL checklist MODEL SCHEMES MODEL PUBLICATION SCHEME ADOPTION CHECKLIST SHOULD THE PUBLICATION SCHEME BE APPROVED? WHAT IF THE PUBLICATION SCHEME IS UNSATISFACTORY? TRAINING REVIEW OF THIS PROCEDURE NOTE Appendices A PUBLICATION SCHEME APPROVAL QUESTIONNAIRE B MODEL PUBLICATION SCHEME APPROVAL QUESTIONNAIRE C MODEL PUBLICATION SCHEME ADOPTION QUESTIONNAIRE D STYLE LETTERS E PUBLICATION SCHEME APPROVAL CHECKLIST F MODEL PUBLICATION SCHEME APPROVAL CHECKLIST G MODEL PUBLICATION SCHEME ADOPTION CHECKLIST... 49
3 1 INTRODUCTION 1.1 Approving publication schemes is an integral part of the work of the OSIC. It is estimated that there are around 10,000 public authorities covered by the Act. Although many of the publication schemes which we receive will be model schemes, there are still likely to be around 2,000 publication schemes to be approved by this office during As a result, every Freedom of Information Officer (FOIO) will need to be involved in the approval of publication schemes with assistance from the Head of Investigations and from the Admin staff. 2 APPROVING PUBLICATION SCHEMES A SUMMARY 2.1 It is very important that everyone involved in the approval of publication schemes knows the Commissioner s guidance on publication schemes in detail see..\..\publications AND GUIDANCE\Guidance\guipublicationschemes051103MK.doc. 2.2 There are two types of publication schemes: bespoke schemes and model schemes. Model schemes are expected to be submitted 6 weeks prior to the final deadline for schemes to be submitted (see the timetable at 3.1). 2.3 FOIOs approving publication schemes will receive three different types of submission: bespoke scheme approvals, model scheme approvals and model scheme adoptions. The schemes and the accompanying documentation can be submitted electronically a special address, publicationschemes@itspublicknowledge.info, has been set up for this. Admin check this address on a daily basis. 2.4 Where a bespoke scheme is submitted to the Commissioner for approval, the public authority must also submit a completed Form OSIC 1 (Appendix A). If the publication scheme is received without the form or vice versa, the public authority must be advised as soon as possible of what paperwork is required before the approval process can begin. (Style letters have already been prepared for this and for other matters. The style letters are contained in Appendix D. Further information about these is given below.) 1
4 2.5 Where a model scheme is submitted for approval, the body submitting the scheme must also submit a completed Form OSIC 2 (Appendix B). Again, if the scheme is received without the form or vice versa, the body submitting the documentation must be advised as soon as possible of what paperwork is required before the approval process can begin. However, where an approved model publication scheme is being adopted, the public authority need only submit Form OSIC 3 (Appendix C) to let the Commissioner know which model scheme they want to adopt. The scheme itself does not have to be submitted. (FOIOs should be aware that separate arrangements may be put in place in relation to the adoption of model schemes by GPs, dentists, etc.) 2.6 All publication schemes submitted to OSIC will be delegated to FOIOs as set out below by the Admin staff. A separate procedure note has been prepared to cover the work done by Admin Staff: propsapprovaladmin09jan04mk.doc. Where Admin are unsure who to delegate a scheme to (perhaps because an FOIO is off sick or because it is unclear from the form which type of public authority is making the submission) they should seek advice from the Head of Investigations. All FOIOs must read the Admin procedure note as it includes directions on the naming and filing of documents. 2.7 There are three main steps in approving publication schemes. These are all set out in more detail below, but can be summarised as follows: Checking that the correct documentation has been submitted and that it has been completed in full Checking that all of the information which must appear in a publication scheme is in fact contained in the scheme and Checking that the responses contained in the submission forms are satisfactory. 2.8 All approvals will be carried out using the publication scheme approval database. This includes checklists to allow the three steps to be completed. 3 TIMETABLE 3.1 As agreed between the Commissioner and the Scottish Ministers, publication schemes will be submitted to OSIC in three separate tranches throughout The full timetable, taking into account the comments made by the Commissioner in the publication schemes guidance, reads as follows: 2
5 SECTOR FIRST SUBMISSION DATE MODEL SCHEME TO BE SUBMITTED DEADLINE FOR SUBMISSION SCHEMES TO BE APPROVED AND INTO EFFECT (Parts 1,2,3 and 6 of schedule 1 to the Act) 1 December January February June 2004 Scottish Ministers Scottish Parliament Scottish Parliamentary Corporate Body Non-Ministerial Office Holders in the Scottish Administration Local Government Police (Parts 4 and 5 of schedule 1 to the Act) 1 March April May September 2004 National Health Service Educational Institutions All public bodies listed in Part 7 of schedule 1 to the Act and publicly owned companies 1 June July August November RESPONSIBILITY FOR SECTORS 4.1 In order the speed up the approval process, there will need to be a certain amount of specialisation within OSIC. For example, it would not be helpful to have eight FOIOs involved in approving schemes from one particular sector, when, if one or two FOIOs were involved with that particular sector, they could acquire specialist knowledge about that sector which would allow them to deal with the approval process more quickly. 3
6 4.2 The approval process will therefore be split up as follows: TRANCHE OF APPROVAL SECTOR NUMBER IN SCHEDULE 1 FOIO(S)/HEAD OF INVESTIGATIONS SECTOR EXPERTS 1 Scottish Ministers, the 1-3 M Keyse M Keyse Parliament Non-ministerial office 4-19 M Keyse M Keyse holders in the Scottish Administration S Abrahams C Dalgleish Local Government 20 C Sigsworth C Sclater 21 C Sclater C Sclater C Sigsworth A Davies 22, 24 P Mutch C Sclater 23 L Scharbert C Sclater Police M Hughes N/A 2 National Health Service 25-26, M Hughes L Scharbert 27 C Sigsworth L Scharbert L Scharbert L Scharbert P Mutch L Scharbert A Davies L Scharbert Educational Institutions S Abrahams C Dalgleish C Sclater S Abrahams 3 Part 7 Bodies The Accounts Commission for Scotland The Advisory Committee on Sites of Special Scientific Interest An area tourist board established by virtue of section 172(1) of the Local Government (Scotland) Act 1994 (c.39) 53 Alison Davies n/a 54 Alison Davies n/a 56 Alison Davies n/a Audit Scotland 57 Alison Davies n/a The Auditor General for Scotland The Board of Trustees for the National Galleries of Scotland The Board of Trustees for the National Museums of Scotland The Board of Trustees of the Royal Botanic Garden, Edinburgh The Commissioner for Public Appointments in Scotland 58 Alison Davies n/a 59 Caitlin Dalgleish n/a 60 Claire Sigsworth n/a 61 Sarah Hutchison n/a 62A Sarah Hutchison n/a 4
7 The Crofters Commission 63 Lucy Scharbert n/a The Deer Commission for Scotland The Fisheries Committee continued in existence by paragraph 5 of Schedule 9 to the Electricity Act 1989 (c.29) The General Teaching Council for Scotland Highlands and Islands Enterprise Historic Environment Advisory Council for Scotland A justice of the peace advisory committee Learning and Teaching Scotland The Local Government Boundary Commission for Scotland The Mental Welfare Commission for Scotland A National Park authority, established by virtue of schedule 1 to the National Parks (Scotland) Act 2000 (asp 10) The Parole Board for Scotland A person appointed for Scotland under section 3(1) of the Local Government and Housing Act 1989 (c.42) The Royal Commission on the Ancient and Historical Monuments of Scotland The Scottish Agricultural Wages Board 64 Martin Hughes n/a 65 Martin Hughes n/a 66 Margaret Keyse n/a 67 Claire Sigsworth n/a 67A Caitlin Dalgleish n/a 69 Claire Sigsworth n/a 70 Claire Sigsworth n/a 71 Simin Abrahams n/a 72 Claire Sigsworth n/a 73 Claire Sigsworth n/a 74 Simin Abrahams n/a 75 Caitlin Dalgleish n/a 76 Simin Abrahams n/a 77 Simin Abrahams n/a The Scottish Arts Council 78 Simin Abrahams n/a The Scottish charities nominee, appointed under section 12 of the Law Reform (Miscellaneous Provisions) (Scotland) Act 1990 (c.40) The Scottish Children s Reporter Administration 79 Simin Abrahams n/a 80 Lucy Scharbert n/a 5
8 The Scottish Commission for the Regulation of Care The Scottish Criminal Cases Review Commission 81 Lucy Scharbert n/a 83 Sarah Hutchison n/a Scottish Enterprise 84 Lucy Scharbert n/a The Scottish Environment Protection Agency The Scottish Further Education Funding Council The Scottish Higher Education Funding Council 85 Sarah Hutchison n/a 86 Lucy Scharbert n/a 87 Lucy Scharbert n/a Scottish Homes 88 Paul Mutch n/a The Scottish Industrial Development Advisory Board The Scottish Information Commissioner The Scottish Law Commission The Scottish Legal Aid Board 89 Margaret Keyse n/a 90 Margaret Keyse n/a 91 Caitlin Dalgleish n/a 92 Margaret Keyse n/a Scottish Natural Heritage 93 Margaret Keyse n/a The Scottish Prisons Complaints Commission The Scottish Public Services Ombudsman The Scottish Qualifications Authority The Scottish Records Advisory Council 94 Martin Hughes n/a 95 Caitlin Dalgleish n/a 96 Martin Hughes n/a 97 Martin Hughes n/a Scottish Screen 98 Martin Hughes n/a The Scottish Social Services Council 99 Caitlin Dalgleish n/a The Scottish Sports Council 100 Paul Mutch n/a The Scottish Tourist Board 101 Alison Davies n/a Scottish Water 102 Paul Mutch n/a Social Inclusion Partnerships 103 Paul Mutch n/a The Standards Commission for Scotland The Trustees of the National Library of Scotland The Water Industry Commissioner for Scotland 104 Paul Mutch n/a 105 Paul Mutch n/a 106 Paul Mutch n/a Publicly owned companies To be allocated on a rota basis. 6
9 4.3 Schedule 1 will of course change from time to time and it is important for all FOIOs to have access to an updated Schedule 1 at all times. 4.4 Where one sector proves to be more difficult and/or time consuming than others, FOIOs will be expected to help out to try to ensure an even workload throughout the office. It is also possible that some of the publication schemes which come in during the first tranche will be allocated on a rota basis to ensure even sharing of the work and to make sure that everyone gains some experience of approving publication schemes from the start of It is the responsibility of FOIOs to tell their line mangers if their workload in relation to publication scheme approvals is too light or too heavy. 4.5 It is important that FOIOs spend time becoming acquainted with the public authorities for which they are responsible. Some of this work has already been carried out, particularly for example in relation to health and higher and further education. A number of FOIOs have already been designated as experts in particular fields, who will be able to give advice to others approving schemes in that field. The experts are listed in the final column in the above table. The experts will also be expected to have an overview of what is happening in a particular sector and to advise management if, for example, additional resources are required in a particular area or public authorities from that sector are failing to submit their schemes in time. 4.6 Where a meeting is arranged between OSIC and a particular sector, the FOIOs responsible for that sector s publication schemes will wherever possible be asked to attend the meeting. 5 PUBLICATION SCHEME APPROVAL PROCESS - FLOWCHARTS 5.1 The following flowchart sets out the various steps to be taken in approving publication schemes (including the approval of model schemes and their adoption). The flowchart is in two separate sections: Part 1 submission Part 2 - approval 7
10 5.2 The letters referred to in the flowcharts are all contained in Appendix D and the approval checklists can be found in Appendices E (bespoke schemes), F (model schemes) and G (adoption of model schemes). FOIOs should be aware that slightly different letters have been prepared depending on whether the application relates to the approval of a publication scheme (bespoke or model) or the adoption of a model publication scheme. Therefore, if the flowchart states that Letter 1/1A is to be issued, the FOIO will issue Letter 1 if dealing with the approval of a (bespoke or model) publication scheme and Letter 1A if dealing with the adoption of a model scheme. The headings in the style letters make it clear which are the correct letters to send. 8
11 PUBLICATION SCHEME APPROVAL PART 1: SUBMISSION Publication Scheme (approval or adoption) submitted to OSIC Documentation in electronic format? yes autoresponder acknow ledges receipt no Admin check database. Is an FOIO already dealing w ith this application? yes Admin allocate documentation to FOIO no Admin enter details of application into database and allocate to FOIO on day of receipt FOIO checks documentation submitted w ithin 2 w orking days Has the correct document been received and completed in full? no FOIO to issue Letter 1/1A same day to inform applicant of w hat is required yes FOIO issues Letter 2/2A confirming the Approval Process is about to begin yes Has the correct document been received and completed in full? Proceed to Part 2: Approval no FOIO issues reminder Letter 3/3A to applicant 9
12 PART 2: APPROVAL FOIO considers application using approval checklist w ithin 3 w eeks of Letter 2 or 2 w eeks of Letter 2A being issued Is the submission satisfactory? yes no Send out Letter 4/4A for further clarification Satisfactory response received? yes no Issue Letter 5/5A - unable to recommend approval Satisfactory response received? yes no Issue Letter 6/6A (formal refusal w ith deadline for resubmission) Satisfactory resubmission? yes Issue Letter 7/7A (formal approval) no no Is deadline for scheme coming into effect less than 1 w eek aw ay? yes Consider enforcement action in terms of s.10 of the guidance 10
13 6 PUBLICATION SCHEME APPROVAL CHECKLIST BESPOKE SCHEMES 6.1 The approval checklist for bespoke schemes is at Appendix E. An electronic version of the checklist has been integrated into the approvals database. 6.2 The checklist sets out the information which must be contained in a publication scheme before it can be approved. Some of this information is easier to consider than others. For example, the publication scheme must state the title of the senior manager with FOI responsibility for that public authority. That type of information is usually easy to locate. However, FOIOs will also be expected to consider more difficult questions, such as whether the public authority has adequately taken the public interest into account in preparing its publication scheme. Advice on how to consider specific questions in the checklist is given below. 6.3 When considering whether a bespoke publication scheme should be approved, FOIOs should take each question in the checklist in turn and tick either the yes or no box as appropriate. If further action is required, tick the Action required box. If no further action is required for that particular question, tick the Approved box. 6.4 Once the list has been run through in full, go back to any ticked Action required boxes and implement whatever action is necessary. For example, you may need to contact the public authority to ask for a day to day FOI contact to be added to the publication scheme and for the scheme to be resubmitted. You may also want to ask for further information before deciding if the public authority has taken the public interest into account before submitting the publication scheme (see 9.7 for further guidance). 6.5 FOIOs can request further information either by telephone or in writing ( or letter). If information is requested by telephone but the telephone call does not sufficiently answer the query, follow up the request up by or letter. 6.6 At the end of the process, FOIOs must ensure that all of the actions triggered by ticks in the Action required boxes have been completed satisfactorily and must be able to demonstrate that this is the case. This may involve checking the resubmitted scheme and considering any further information provided by the public authority. FOIOs should consider taking notes of their reasons for any decisions in the Notes section of the checklist. The Approved box should also be ticked when an action has been completed satisfactorily. 11
14 6.7 When all of the Approved boxes have been ticked, the FOIO should then arrange for a formal letter (signed by the Commissioner or on his behalf by the Head of Investigations or the Head of Policy and Information) to be sent to the public authority confirming that the scheme has been formally approved. 7 PUBLICATION SCHEME APPROVAL CHECKLIST MODEL SCHEMES 7.1 The approval checklist for model publications schemes is at Appendix F. An electronic version of the checklist has been integrated into the approvals database. 7.2 The checklist sets out the information which must be contained in a publication scheme before it can be approved. Some of this information is easier to consider than others, for example the type of public authority for which the scheme would be suitable. That type of information is usually easy to locate. However, FOIOs will also be expected to consider more difficult questions, such as whether the body submitting the publication scheme has adequately taken the public interest into account in preparing its publication scheme for the sector. Advice on how to consider specific questions in the checklist is given below. 7.3 Remember that model schemes will have to be dealt with in a slightly different manner than bespoke schemes. For example, the actual names of the public authorities to be covered by the model scheme or the names of the FOI contacts in each of those public authorities do not need to be listed in the model scheme. However, you need to make sure that there is a section in the model scheme which allows for this type of information to be inserted into the scheme when it is adopted by public authorities. 7.4 When considering whether a model publication scheme should be approved, FOIOs should take each question in the checklist in turn and tick either the yes or no box as appropriate. If further action is required, tick the Action required box. If no further action is required for that particular question, tick the Approved box. 7.5 Once the list has been run through in full, go back to any ticked Action required boxes and implement whatever action is necessary. For example, you may need to contact the body submitting the model scheme to ask for a section to be inserted for the day to day FOI contact to be added and for the scheme to be resubmitted. You may also want to ask for further information before deciding if the body submitting the scheme has taken the public interest into account (see 9.7 for further guidance). 12
15 7.6 FOIOs can request further information either by telephone or in writing ( or letter). If information is requested by telephone but the telephone call does not sufficiently answer the query, follow up the request up by or letter. 7.7 The guidance from the Commissioner makes it clear that model schemes may contain opt-out classes which public authorities either do or not have to adopt. If a model scheme does contain opt-outs, make sure that you are satisfied that the opt-outs would not make the model scheme unacceptable, particularly if all of the possible opt-outs were to be used by the same public authority. 7.8 At the end of the process, FOIOs must ensure that all of the actions triggered by ticks in the Action required boxes have been completed satisfactorily and must be able to demonstrate that this is the case. This may involve checking the resubmitted scheme, considering any further information provided by the body submitting the scheme and taking a note of reasons for any decisions in the Notes section of the checklist. The Approved box should also be ticked when an action has been completed satisfactorily. 7.9 When all of the Approved boxes have been ticked, the FOIO should then arrange for a formal letter (signed by the Commissioner or on his behalf by the Head of Investigations or the Head of Policy and Information) to be sent to the body submitting the scheme and confirming that the scheme has been formally approved The Commissioner has stated in the publication scheme guidance that information about approved model schemes will be made available on his website. As a result, when you are considering a model scheme, Alison Davies or Martin Hughes to let them know. 8 MODEL PUBLICATION SCHEME ADOPTION CHECKLIST 8.1 The checklist for adopting approved model schemes is at Appendix G. An electronic version of the checklist has been integrated into the approvals database. Remember that a model scheme can only be adopted once it has been formally approved by the Commissioner. If a public authority wishes to adopt a scheme which has not been approved, the submission form must be returned immediately to the authority with an explanation why and a request that the application be resubmitted once the model scheme has been approved. 13
16 8.2 The checklist sets out the information which the Commissioner requires before allowing a public authority to adopt a model scheme. The checklist is much more basic than the checklist for the approval of bespoke or model schemes, given that the model scheme has already been through the approval process. However, FOIOs may still need to check that the model publication scheme the authority wishes to adopt is suitable for their needs (e.g. is the work of a special health board sufficiently similar to that of a health board to allow the special board to adopt the health boards model scheme?). They will also need to check whether opt-outs are available in the model scheme and that it is clear from the submission form which opt-outs are or are not being used. 8.3 When considering the adoption of model schemes, FOIOs are likely to be asked questions about variations to model schemes. Further guidance on these is available from the Commissioner s publication scheme guidance (see link in 2.1). 8.4 When considering whether an adoption request should be approved, as with other approvals, take each question in the checklist in turn and tick either the yes or no box as appropriate. If further action is required, tick the Action required box. If no further action is required for that particular question, tick the Approved box. 8.5 Once the list has been run through in full, go back to any ticked Action required boxes and implement whatever action is necessary. 8.6 FOIOs can request further information either by telephone or in writing ( or letter). If information is requested by telephone and the telephone call does not sufficiently answer the query, follow up the request up by or letter. 8.7 At the end of the process, FOIOs must ensure that all of the actions triggered by ticks in the Action required boxes have been completed satisfactorily and must be able to demonstrate that this is the case. Take a note of reasons for any decisions in the Notes section of the checklist. The Approved box should also be ticked when an action has been completed satisfactorily. 8.8 When all of the Approved boxes have been ticked, the FOIO should then arrange for a formal letter (signed by the Commissioner or on his behalf by the Head of Investigations or the Head of Policy and Information) to be sent to the public authority confirming that their adoption of the model scheme has been formally approved. 14
17 9 SHOULD THE PUBLICATION SCHEME BE APPROVED? 9.1 As mentioned above, there are three main parts to the publication scheme approval checklist: ensuring that the proper documentation has been submitted, that the publication scheme contains all of the mandatory information and assessing overall whether the contents of the publication scheme are sufficient. In order to make a decision on the final point, FOIOs need to consider whether the public authority has sufficiently taken the public interest into account in preparing its scheme. 9.2 This will always be a subjective decision and without real life publication schemes to deal with, it is difficult to give precise guidance on what to look out for when deciding whether a public authority has sufficiently taken the public interest into account. However, knowing how public authorities work and what their duties are will help FOIOs recognise when inadequate regard has been had to the public interest. This is why the publication scheme approval process as been split up in line with paragraph 4.2 to try to ensure that there is specialisation in OSIC. And, obviously, if the answers provided do not ring true, appear absurd or seem inadequate it will be necessary to question the response provided. 9.3 The best way for FOIOs to know if a publication scheme is adequate is to have some knowledge about the work of the public authority involved. This is why FOIOs have been given specific public authorities to deal with. OSIC already has details of most of the public authorities covered by schedule 1 and FOIOs should acquaint themselves with, for example, the websites of the public authorities they are responsible for as the websites should give a clear idea of what functions the public authorities carry out etc. The amount of research required will depend on the public authority involved. 9.4 One other consideration which has to be taken into account is whether the publication scheme can be easily understood by the FOIO considering its approval. If the scheme is difficult for the FOIO to understand, it will also be difficult for the public to understand what information is to be published under the scheme. 9.5 It is clear that, over time, FOIOs will find it easier to differentiate good publication schemes from bad or inadequate publication schemes. However, OSIC needs to have an opportunity to discuss concerns or queries and the office will therefore meet on Friday mornings to discuss questions about specific schemes. In addition, advice and assistance will be available from the sector experts and from the Head of Investigations and the Commissioner, particularly if the timescales involved mean that a quick decision is needed. 15
18 9.6 As mentioned earlier, it is very important for all FOIOs involved in approving publication schemes to be aware of the contents of the good practice guidance on publication scheme issued by the Commissioner (see link in 2.1). As mentioned, this is good practice guidance and public authorities do not have to comply in full with the guidance in order to have their publication scheme approved. However, if a publication scheme is inadequate (or, indeed, absurd ) then obviously further steps should be taken to have the publication scheme improved. 9.7 In assessing whether a publication scheme is acceptable, it is important to remember that, once the Act comes into force, the public will be able to access information held by public authorities which does not appear in their publication schemes. 9.8 The Commissioner would like to see high quality publication schemes being submitted. He is aware that publication schemes are an entirely new concept to Scottish public authorities and as such the quality of schemes may vary. FOIOs should therefore consider the approval of schemes which do not achieve standards of best practice, on the understanding that the Commissioner will expect to see improvements in such schemes when they are resubmitted for approval in the future. However schemes which are inadequate should be refused. 9.9 Where publication schemes fulfil the minimum criteria but could be improved, it is open to FOIOs to suggest improvements to the schemes see paragraphs 6.8 and 7.10 above The following points should be of assistance in considering whether to approve a publication scheme. The comments relate to the questions contained in the approval questionnaires for bespoke and model schemes (Forms OSIC 1 and 2). However, it should be noted that where a publication scheme is acceptable as a whole but the questionnaire attached to it has not been completed as fully as it might have been, it may be unfair to reject the publication scheme on that basis. 16
19 Has an information audit been carried out? The Section 61 guidance recommends that each public authority carries out an information audit to ensure that it knows what information it holds and where it is held. Although the Commissioner can take enforcement action against a public authority which breaches the Section 61 code, a publication scheme should not be refused simply because a formal information audit has not been carried out. However, a public authority should still be able to prove that it has satisfactory knowledge of what information it holds and where it can be found. The questionnaire only asks for further comments if an information audit has been carried out, but if other parts of the questionnaire are of concern, contact the public authority to ask about their records management. It may be, for example, that an audit was carried out when the Data Protection Act came into force or that the public authority holds so little information that it already knows in detail what it does and does not hold. What consultation did the public authority carry out to assess what information is of public interest and so should be contained in their publication scheme? Has the public authority considered FAQs when preparing its publication scheme? The publication scheme guidance recommends that public authorities carry out some consultation with, for example, service users while preparing their schemes. However, the guidance also recognises that, particularly for the public authorities covered in the first tranche of authorities, there will not be a lot of time to carry out any consultation. The same argument has also been made by some second tranche bodies. In the circumstances, a publication scheme should not be refused simply because a full consultation has not been carried out. However, public authorities should be able to demonstrate that they have considered previous requests for information by members of the public and other stakeholder bodies in deciding what to include in their schemes. If it is not clear from the submission form that they have done this, contact the public authority for further information. Any commitment given by the public authority to future consultation should also be taken into account, although FOIOs may wish to remain in contact with the public authority to ensure that the consultation is in fact carried out and that the results of the consultation are taken into account in considering whether any changes require to be made to the authority s publication scheme. 17
20 Does the publication scheme contain information about the services provided by the public authority, the cost of those services and the standards of those services? Section 23(3)(a)(i) of the Act states that public authorities, when adopting a publication scheme, must have regard to the public interest in accessing information relating to these issues. Although not specifically referred to in the submission form, FOIOs must make sure that the publication scheme contains information about these issues. If information is not clear in the publication scheme, FOIOs should contact the public authority to ask for this information to be included and for the publication scheme to be resubmitted. Does the publication scheme give information about the facts/statistics on which decisions are based? Section 23(3)(a)(ii) of the Act states that public authorities, when adopting a publication scheme, must have regard to the public interest in accessing information about the facts/statistics on which decisions are based. Although not specifically referred to in the submission form, FOIOs must make sure that the publication scheme contains information about these issues. If such information is not clear from the publication scheme, FOIOs should contact the public authority to ask for this information to be included and for the publication scheme to be resubmitted. Does the publication scheme allow the public to access information about the reasons for decisions made by the public authority? Section 23(3)(b) of the Act states that public authorities, when adopting a publication scheme, must have regard to the public interest in the publication of reasons for decisions made by it. Although not specifically referred to in the submission form, FOIOs must make sure that the publication scheme contains information about this issue. If information is not clear in the publication scheme, FOIOs should contact the public authority to ask for this information to be included and for the publication scheme to be resubmitted. Is the public authority publishing less information under its scheme than was previously available? The publication scheme guidance states that public authorities should include in their publication scheme all of the information which they previously made available. The guidance is good practice guidance and the Commissioner has limited powers to make public authorities include certain information in their schemes. If the answer to this question is yes and FOIOs are unhappy with the reason for this (the reason given may be that the information not included in the publication scheme is information which the public authority does not consider to be in the public interest), then further information should be sought from the public authority. 18
21 10 WHAT IF THE PUBLICATION SCHEME IS UNSATISFACTORY? 10.1 There are a number of steps OSIC can take if a publication scheme which has been submitted for approval is thought to be unsatisfactory. These are as follows: to suggest improvements which could be made to the scheme to bring it up to the acceptable standard and to ask for the scheme to be resubmitted if, after changes have been suggested, the publication scheme is acceptable but only just (for example where only some of the changes have been accepted by the public authority), to approve the publication scheme for a limited period if, after changes have been suggested, the publication scheme is still not acceptable or the public authority refuses to take on board the comments made by an FOIO, to refuse to approve the publication scheme if, after refusal, a new publication scheme is not submitted within the appropriate time limits or if a public authority refuses to submit a publication scheme, to take enforcement action against the public authority. By following the flowchart contained in 5 above, FOIOs will be guided through these various options Public authorities should usually be given an opportunity to make changes to their publication scheme in line with an FOIO s recommendations before officially refusing to adopt the scheme. However, there are circumstances where an automatic refusal will be justified, for example if a publication scheme is so poor that it would involve a lot of work on the part of the FOIOs dealing with it to bring it up to an acceptable standard. This will be particularly relevant the nearer to the submission date the publication scheme is submitted. Although FOIOs can make recommendations about what could be included in a publication scheme to bring it up to an acceptable standard, it is the responsibility of the public authority, not the FOIO, to ensure that a submitted scheme is of an appropriate quality Depending on the timescales involved, it may be appropriate to give a public authority more than one opportunity to make changes to their publication scheme to bring it up to approval standard. This is allowed for in the flowchart in 5. 19
22 10.4 The Commissioner has the power to approve publication schemes for a limited period under section 23(5)(a) of the Act (section 24(3)(a) for model schemes). The publication scheme guidance states that the Commissioner intends to approve publication schemes for a period of at least 4 years. This is intended to give public authorities some certainty about the future of their scheme. However, if a publication scheme only just borders on the acceptable and there is no time before it is due to take effect to suggest changes to the scheme, then one alternative would be to accept the publication scheme for a limited period, for example for 1 or 2 years. Obviously, the more borderline the publication scheme, the shorter period it should be approved for Schemes can of course simply be refused. As mentioned in 10.2, if a scheme is submitted very late or is so bad that it would take a lot of time to bring it up to acceptable standard, then refusal may be the appropriate step. However, if a scheme is refused, the Commissioner must set out the reasons why (section 23(6) of the Act or section 23(4) for model schemes) and FOIOs should weigh up whether the time taken to list all of these reasons could be better spent working with the public authority to try to improve the publication scheme Enforcement action is likely to be taken in two specific cases when considering the approval of publication schemes: after refusal, when a public authority refuses to take account of the reasons for the refusal or fails to resubmit a publication scheme or if a public authority simply fails to submit a publication scheme to the Commissioner for approval If a publication scheme has been refused and, despite the refusal letter setting out what requires to be done to bring the scheme up to a reasonable standard, the public authority fails to resubmit the scheme either in line with the letter or at all, this must be brought to the attention of the Head of Investigations, who will advise the Commissioner on the possibility of taking enforcement action against the public authority involved. (This task will be delegated to FOIOs once OSIC has experience of taking enforcement action against authorities.) 10.8 If a public authority simply fails to submit a publication scheme, then enforcement action can be taken against the authority. However, it is possible (although increasingly unlikely) that some public authorities may not know that the Act applies to them. FOIOs should therefore try to ensure that, if they do not receive a publication scheme from one of the public authorities for which they are responsible under 4.2, they contact the public authority to find out why no publication scheme has been submitted. The authority should also be advised of their responsibilities under the Act and of their legal duty to submit a publication scheme to the Commissioner for approval. (Style letter 8 in Appendix D.) 20
23 10.9 If this letter fails to receive a response, FOIOs should send a further reminder advising that enforcement action is likely to be taken against them. (Style letter 9 in Appendix D.) If this second letter fails to achieve a satisfactory response, then the FOIO should speak to the Head of Investigations who will then advise the Commissioner about taking enforcement action against the public authority involved. Again, this task will be delegated to FOIOs once OSIC has experience of taking enforcement action against authorities As mentioned earlier, FOIOs must be aware of changes being made to Schedule 1 and must have an up-to-date version of the Schedule at all times. The Commissioner will issue further guidance on submitting publication schemes for public authorities which are to be added to Schedule 1 after 1 January However, where FOIOs know what new bodies are to be added, they should consider making contact with the bodies in advance to ensure that they are aware of their forthcoming duties under the Act. 11 TRAINING 11.1 Training will take place on this procedure note in January The training will include advice on how to use the approval software and will include guidance on the practical aspects of dealing with approvals, such as the scanning of documents received and where electronic versions of the schemes should be saved. 12 REVIEW OF THIS PROCEDURE NOTE 12.1 This procedure will be at the end of April 2004 when the first sector s publication schemes have been submitted to the Commissioner for approval. 21
24 APPENDICES 22
25 APPENDIX A PUBLICATION SCHEME APPROVAL QUESTIONNAIRE (FORM OSIC1) This form is to be used by public authorities who wish to submit a bespoke publication scheme to the Scottish Information Commissioner for approval or who wish to modify an approved model scheme. Use form OSIC2 to submit model publication schemes for approval and form OSIC3 to adopt a model publication scheme. The responses to the following questions will, in addition to the information contained in the publication scheme, be used by the Commissioner to assess whether a publication scheme complies with section 23 of the Freedom of Information (Scotland) Act 2002 and, consequently, whether the publication scheme should be approved by the Commissioner. This form must be submitted to the Commissioner at the same time as the publication scheme. It may be submitted online, but only if the publication scheme is also to be submitted online. PART I GENERAL INFORMATION Name of Authority Type of public authority as classified under Schedule 1 to the Act Address of Authority Contact Details of person with overall responsibility for the scheme (please include postal and address) If your publication scheme is to be available on the Internet, insert the web address of the publication scheme* If your publication scheme will not be made available on the Internet, insert a postal address from which the scheme will be available. *Please remember to keep the Scottish Information Commissioner informed of any changes to the website or postal address. 23
26 PART II APPROVAL QUESTIONS The following questions are designed to provide the Commissioner with information about the steps you have taken to prepare your publication scheme and, in particular, how you have decided what information to make available in the scheme. Please give as full an answer to each of these questions as possible. 1. Have you conducted an audit to establish what information is held by your authority? YES NO If yes, please give specific details. 1. What exercises, consultations and initiatives did you carry out in order to assess what information is of public interest and so should be included in your publication scheme? Please give specific details. 2. How does your scheme provide access to records of the decisions taken by your authority, the information upon which those decisions are based and information about the decision making process itself? Please give specific examples. 24
27 4. Have you considered frequently asked questions and specific areas of interest when determining your classes of information? YES NO Please give specific details 5. Are you making information available within your scheme which you did not make available previously? YES NO If YES, please give details of new information If NO, please give reasons why no new information is to be made available 6. Have you decided not to include in your scheme any information which has been made available by you in the past? YES NO If YES, please give specific details 25
28 7. What steps have been taken to produce your publication scheme in alternative formats so that it is accessible to all individuals? Please give specific examples If this questionnaire is not being submitted electronically, please sign and date your response below: Name Signature Date Insert contact details if different from those given in Part I above. 26
29 APPENDIX B MODEL PUBLICATION SCHEME APPROVAL QUESTIONNAIRE (FORM OSIC2) This form is only to be used by bodies who wish to submit a model publication scheme to the Scottish Information Commissioner for approval. Use form OSIC1 to submit bespoke publication schemes and modified model publication schemes for approval. Use form OSIC3 to adopt a model publication scheme. The responses to the following questions will, in addition to the information contained in the model publication scheme, be used by the Commissioner to assess whether a model scheme will comply with section 23 of the Freedom of Information (Scotland) Act 2002 and, consequently, whether the model publication scheme should be approved by the Commissioner and subsequently adopted by public authorities in the same class. This form must be submitted to the Commissioner at the same time as the model publication scheme. It may be submitted online, but only if the model scheme is also to be submitted online. PART I GENERAL INFORMATION Name of the Body submitting the Publication Scheme Contact Name and Job Title Contact Details of person with overall responsibility for the scheme (please include postal and address) Please name the type of public authority for which this model publication scheme will be suitable, as classified under Schedule 1 to the Act. 27
30 PART II APPROVAL QUESTIONS The following questions are designed to provide the Commissioner with information about the steps taken to prepare the model publication scheme and, in particular, how you have decided what information to make available in the scheme. Please give as full an answer to each of these questions as possible. 1. How did you involve the public authorities to be covered by this model scheme in the preparation of the scheme? 2. What exercises, consultations and initiatives did you carry out in order to assess what information is of public interest and so should be included in the model publication scheme? Please give specific details. 3. How does the model scheme provide access to records of the decisions taken by the relevant authorities, the information upon which those decisions are based and information about the decision making process itself? Please give specific examples. 28
31 4. Have you considered frequently asked questions and specific areas of interest when determining the classes of information to be contained in the model publication scheme? YES NO Please give specific details 5. By following the model publication scheme, will the public authorities make information available which they have not generally made available in the past? YES NO If YES, please give details of new information If NO, please give reasons why no new information is to be made available 6. Have you decided not to include in the model publication scheme any information which has been made available by the bodies to be covered by the model publication scheme in the past? YES NO If YES, please give specific details 29
32 7. What steps have been taken to produce the model publication scheme in alternative formats so that it is accessible to all individuals? Please give specific examples If this questionnaire is not being submitted electronically, please sign and date your response below: Name Signature Date Insert contact details if different from those given in Part I above 30
33 APPENDIX C MODEL PUBLICATION SCHEME ADOPTION QUESTIONNAIRE (FORM OSIC3) This form is only to be used by a public authority which wishes to adopt a model publication scheme which has already been approved by the Scottish Information Commissioner. Use form OSIC1 to submit bespoke publication schemes and modified model publication schemes for approval. Use form OSIC2 to submit a model publication scheme for approval. The responses to the following questions will be used by the Commissioner to assess whether a model publication scheme is suitable for a public authority to adopt. This form may be submitted electronically or by post. PART I GENERAL INFORMATION Name of Authority Type of public authority as classified under Schedule 1 to the Act Address of Authority Contact Name and job title (insert details of the person who will have overall responsibility for the publication scheme once adopted) Contact Details of person with overall responsibility for the scheme (please include postal and address) If your publication scheme is to be available on the Internet, insert the web address of the publication scheme* If your publication scheme will not be made available on the Internet, insert a postal address from which the scheme will be available. *Please remember to keep the Commissioner informed of any change to the website of postal address 31
34 PART II THE MODEL PUBLICATION SCHEME Name the model publication scheme you wish to adopt. If the approved model scheme has been approved subject to various options, please clearly state which options you do or do not wish to adopt. If this questionnaire is not being submitted electronically, please sign and date your response below: Name Signature Date Contact details if different from those given in Part I above. 32
35 APPENDIX D STYLE LETTERS (Note: Letters 1, 2, 3 etc are designed to be used by FOIOs approving bespoke and model schemes. Letters 1A, 2A, 3A etc are designed to be used by FOIOs considering the adoption of model schemes.) LETTER 1 BESPOKE AND MODEL Style letters\let1missingdocument18feb04mk.doc Dear (MODEL) PUBLICATION SCHEME AND QUESTIONNAIRE MISSING DOCUMENT Thank you for submitting your organisation s [(model) publication scheme or questionnaire] to this office. Unfortunately you have not enclosed the [publication scheme itself or the questionnaire]. Please forward this document by no later than [date no later than 7 days from date of letter] to enable me to process the approval of the scheme. I will be the officer dealing with your scheme, so please mark any future correspondence for my attention. Yours sincerely/faithfully LETTER 1A ADOPTION OF MODEL Style letters\let1amissingdocument18feb04mk.doc Dear MODEL PUBLICATION SCHEME ADOPTION Thank you for submitting documentation relating to your organisation s adoption of a model publication scheme to this office. Unfortunately you have [not enclosed Form OSIC 3, which is the form which must be submitted when adopting a publication scheme. The Form is available on our website or by contacting the office] or [free text]. Please forward the completed Form OSIC 3 to me by no later than [date 7 days from date of letter] to enable me to process your application to adopt a model scheme. I will be the officer dealing with your publication scheme adoption, so please mark any future correspondence for my attention. Yours sincerely/faithfully 33
Correspondence with the University of Edinburgh and the Scottish Public Services Ombudsman
Correspondence with the University of Edinburgh and the Scottish Public Services Ombudsman Reference No: 201100338 Decision Date: 19 May 2011 Kevin Dunion Scottish Information Commissioner Kinburn Castle
More informationReferendum on the voting system for UK Parliamentary elections. Counting Officers Expenses Guidance Notes
Referendum on the voting system for UK Parliamentary elections Counting Officers Expenses Guidance Notes March 2011 Translations and other formats For information on obtaining this publication in another
More informationOmbudsman s Determination
Ombudsman s Determination Applicant Scheme Respondent Mr B NHS Pension Scheme (the Scheme) NHS Business Service Authority (NHS BSA) Outcome 1. I do not uphold Mr B s complaint and no further action is
More informationDecision 160/2010 Ms Kirstin Scott and Scottish Borders Council
Title deeds for Council owned properties in Selkirk Reference No: 201000065 Decision Date: 10 September 2010 Kevin Dunion Scottish Information Commissioner Kinburn Castle Doubledykes Road St Andrews KY16
More informationThe data protection fee
The General Data Protection Regulation The data protection fee A guide for controllers Contents 1. Introduction 2. Overview of the 2018 Regulations 3. How much is the data protection fee? 4. Working out
More informationProcedures of the Labour Court for cases under the Industrial Relations (Amendment) Act, Guidelines for Trade Unions and Employers
Procedures of the Labour Court for cases under the Industrial Relations (Amendment) Act, 2001 [as amended in the light of the Industrial Relations (Miscellaneous Provisions) Act, 2004] Guidelines for Trade
More informationInformation on. Protecting Vulnerable Groups (PVG) Scheme and Self Directed Support (SDS)
Information on Protecting Vulnerable Groups (PVG) Scheme and Self Directed Support (SDS) July 2011 Information on Protecting Vulnerable Groups (PVG) Scheme and Self Directed Support (SDS) July 2011 The
More informationAssessment report. Kevin Dunion Scottish Information Commissioner. Kinburn Castle Doubledykes Road St Andrews KY16 9DS Tel:
Assessment report Scottish public authority: Transport Scotland Dates of on-site assessment: 24 and 25 February 2010 Assessors from OSIC: Claire Sigsworth and Avril Mills Date of publication: 25 August
More informationFINANCIAL SERVICES GUIDE
FINANCIAL SERVICES GUIDE Australian Private Wealth Group Pty Ltd (APWG) ABN 27 600 417 614 AR 1247650 102/237 Scottsdale Drive Robina, Qld 4226 Australia Telephone 1300 098 765 Email info@australianpwg.com.au
More informationBudget (Scotland) (No.2) Bill [AS INTRODUCED]
Budget (Scotland) (No.2) Bill [AS INTRODUCED] CONTENTS Section PART 1 FINANCIAL YEAR 13/14 1 The Scottish Administration 2 Direct-funded bodies 3 Borrowing by statutory bodies Use of etc. The Scottish
More informationand the details of anyone complaining with you surname title title first name(s) occupation (if retired, previous occupation)
our ref Financial Ombudsman Service Ltd, July 2011 complaint form Please use this form to tell us about your complaint so we can see if we re able to help you. If you re not sure about anything or have
More informationInformation regarding an assessment for Asperger s syndrome
Information regarding an assessment for Asperger s syndrome Reference Nos: 200800100 & 200800101 Decision Date: 13 October 2008 Kevin Dunion Scottish Information Commissioner Kinburn Castle Doubledykes
More informationINTERNAL DISPUTE RESOLUTION PROCEDURE
INDUSTRY-WIDE COAL STAFF SUPERANNUATION SCHEME INTERNAL DISPUTE RESOLUTION PROCEDURE What is the Internal Dispute Resolution Procedure for? The Trustees of the Industry-Wide Coal Staff Superannuation Scheme
More information2
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 SLC Framework Document Annex A REGISTER OF APPROVED ACTIVITIES FOR THE STUDENT LOANS COMPANY LIMITED In accordance with paragraphs 1.3 and
More informationCTSI Requirements and Guidance on seeking approval as a Consumer ADR Body operating in non regulated sectors.
CTSI Requirements and Guidance on seeking approval as a Consumer ADR Body operating in non regulated sectors. For the purpose of The Alternative Dispute Resolution for Consumer Disputes (Competent Authorities
More informationSORP Committee Briefing PAPER 2 Steering the way forward: challenges and options
1. The issue for consideration 1.1. The Accounting Standards Board s (ASB) code of practice requires the SORP to be reviewed annually. This paper sets out the drivers for change, key issues that require
More informationAn Introduction to Gift Aid
Gift Aid Gift Aid is a simple government initiative which allows you to increase the value of your donations at no extra cost to you or your Scout Group. For every pound donated or paid in membership subscriptions
More informationNew Payee Pack. Page 1 New Payee pack
New Payee Pack To enable us to create a record, we need you to complete the following forms as soon as possible. These forms are for people who are joining our payroll for the first time or re-joining
More informationDecision 063/2011 Mr Paul Giusti and North Lanarkshire Council. Contact details for landlords on the register of private landlords
Contact details for landlords on the register of private landlords Reference No: 201000644 Decision Date: 22 March 2011 Kevin Dunion Scottish Information Commissioner Kinburn Castle Doubledykes Road St
More informationFINANCE COMMITTEE REVIEW OF THE BUDGET PROCESS CONSULTATION PAPER
FINANCE COMMITTEE REVIEW OF THE BUDGET PROCESS CONSULTATION PAPER Introduction 1. The Finance Committee is conducting a review of the Parliament s process for scrutinising the Scottish Government s budget.
More informationScottish Episcopal Church
Scottish Episcopal Church Completion of the OSCR Annual Return and Supplementary Monitoring Return Charges within the Scottish Episcopal Church will have submitted Annual Returns and, in most cases, a
More informationChild Poverty (Scotland) Bill [AS PASSED]
Child Poverty (Scotland) Bill [AS PASSED] CONTENTS Section Targets relating to child poverty 1 targets 1A Interim targets 2 Relative poverty 3 Absolute poverty 4 Combined low income and material deprivation
More informationGROUP PERSONAL PENSION. A guide to help you prepare for the retirement you want. Prepared for Grant Thornton partners
THE GRANT THORNTON UK LLP GROUP PERSONAL PENSION PLAN GROUP PERSONAL PENSION A guide to help you prepare for the retirement you want Prepared for Grant Thornton partners Your Grant Thornton company pension
More informationLife of a company part 2 event driven filings
Life of a company part 2 event driven filings GP3 February 2014 Companies Act 2006 This guidance is available in alternative formats which include Braille, large print and audio tape. For further details
More informationOfficial. NHS standard sub-contract for the provision of clinical services 2017/18 and 2018/19 (full length and shorterform.
NHS standard sub-contract for the provision of clinical services 2017/18 and 2018/19 (full length and shorterform versions) Guidance NHS standard sub-contract for the provision of clinical services 2017/18
More informationUNINCORPORATED ASSOCIATIONS: CONVERSION TO A SCIO
UNINCORPORATED ASSOCIATIONS: CONVERSION TO A SCIO CONFIDENCE THROUGH CLARITY A Brief Guide K:\COPYDOCS\CI675\X293\14251678.DOC 1 Important Notice You should be aware that there are significant legal and
More informationThis document is a record of the information provided in the Annual Return 2017.
Charity Commission Charity Commission Annual Return 2017 WORLD HERITAGE UK Charity registration number: 1163364 Submitted on 16/01/2018 Most of the information you give in this form will become publicly
More informationTHE AURUM COMPANY PENSION GROUP PERSONAL PENSION. A guide to help you prepare for the retirement you want
THE AURUM COMPANY PENSION GROUP PERSONAL PENSION A guide to help you prepare for the retirement you want Your AURUM company pension is provided by Scottish Widows. SUPPORTING LITERATURE AND TOOLS TO HELP
More informationThese terms of business (the Terms ) explain the entire rights and obligations of You and Us regarding the provision of our Services.
Investor Compensation (UK) Limited - Terms and Conditions PPI These terms of business (the Terms ) explain the entire rights and obligations of You and Us regarding the provision of our Services. You should
More informationDecision 036/2013 Mr George Matthews and Borders NHS Board. Comparative costs of hearing aids. Reference No: Decision Date: 6 March 2013
Board Comparative costs of hearing aids Reference No: 201201743 Decision Date: 6 March 2013 Rosemary Agnew Scottish Information Commissioner Kinburn Castle Doubledykes Road St Andrews KY16 9DS Tel: 01334
More informationApplication for Approval of a Restricted Funds Reorganisation
Application for Approval of a Restricted Funds Reorganisation Section 43A of the Charities and Trustee Investment (Scotland) Act 2005 Please read Restricted Funds Reorganisation on the OSCR website at
More informationThank you for choosing a Pension Portfolio Plan with Royal London. You ll need to complete this application form to apply for your plan.
65A55 BENEFICIARY INCOME RELEASE Application form Thank you for choosing a Pension Portfolio Plan with Royal London. You ll need to complete this application form to apply for your plan. 1 Important information
More informationSelf assessment: Taking away the hassles of tax
Self assessment: Taking away the hassles of tax Adrian Mooy & Co Ltd 61 Friar Gate Derby DE1 1DJ T: 01332 202660 E: info@adrianmooy.com ADRIAN MOOY & Co Chartered Certified Accountants 01332 202660 adrianmooy.com
More informationAdditional contribution application form
65A6 CORE INVESTMENTS (PERSONAL PENSION) Additional application form You ll need to complete this application form to apply an additional to your Pension Portfolio Plan with Royal London. 1 Important information
More informationCritical Incident Reviews, Significant Adverse Event Reports and action plans
Critical Incident Reviews, Significant Adverse Event Reports and action plans Reference No: 201100433 Decision Date: 21 February 2012 Kevin Dunion Scottish Information Commissioner Kinburn Castle Doubledykes
More informationAccruals accounts. How to prepare accruals accounts and the trustees annual report
Accruals accounts How to prepare accruals accounts and the trustees annual report CCNI ARR04 consultation document 1 December 2015 The Charity Commission for Northern Ireland The Charity Commission for
More informationAny reference in this Due Diligence Procedure to a gift or gifts shall be construed as referring to a philanthropic gift or gifts.
SOAS Due Diligence Procedure for the acceptance of Philanthropic Gifts All philanthropic gifts received by SOAS will be subject to this Due Diligence Procedure for Philanthropic Gifts. The definition of
More informationinheritance options the flexible approach to inheritance tax planning
inheritance options the flexible approach to inheritance tax planning more options for your future 055 About us Founded in 1939, we have been taking care of our customers' financial futures for over 60
More informationDecision 126/2007 Mr Rob Edwards of the Sunday Herald and the Scottish Executive
Decision 126/2007 Mr Rob Edwards of the Sunday Herald and the Scottish Executive Details of the 100 farmers or farm businesses receiving the greatest agricultural grants and subsidies in Scotland between
More informationHomeowner Contract (with Consultant) 2013 Edition for use in Scotland. This publication contains:
Homeowner Contract (with Consultant) 2013 Edition for use in Scotland This publication contains: SBC 543 Page Homeowner Contract 3 for a homeowner/occupier who has appointed a consultant to oversee the
More informationTHE ANTHONY AND GWENDOLINE WYLDE MEMORIAL CHARITY (Registered charity number: ) SMALL GRANT APPLICATION FORM - ORGANISATIONS
THE ANTHONY AND GWENDOLINE WYLDE MEMORIAL CHARITY (Registered charity number: 700239) SMALL GRANT APPLICATION FORM - ORGANISATIONS NB: Due to recent regulatory changes, the Trustees are legally required
More informationHourly rates for care and support
c p c scoalition OF CARE AND SUPPORT PROVIDERS I N S C O T L A N D COALITION OF CARE AND SUPPORT PROVIDERS IN SCOTLAND Hourly rates for care and support Report into a Freedom of Information exercise by
More informationCIS. Designed to help you comply with the new CIS legislation
50 CIS Designed to help you comply with the new CIS legislation As you probably know, the Government is making changes to the way contractors like you figure out how much tax to deduct from your sub-contractors
More informationHOW TO MANAGE YOUR PENSION ONLINE ALL YOU NEED TO KNOW ABOUT ONLINE MEMBER SERVICES AND DETAILS OF HOW TO SWITCH FUNDS ONLINE
HOW TO MANAGE YOUR PENSION ONLINE ALL YOU NEED TO KNOW ABOUT ONLINE MEMBER SERVICES AND DETAILS OF HOW TO SWITCH FUNDS ONLINE PUTTING THE PERSONAL TOUCH INTO CORPORATE PENSIONS PAGE 1 ONLINE MEMBER SERVICES
More informationDecision 066/2009 Thomas Crooks and the Board of Management of Stevenson College Edinburgh
Thomas Crooks and the Board of Management of Stevenson College Edinburgh Employment-related questions Reference No: 200801460, 200900268 Decision Date: 15 June 2009 Kevin Dunion Scottish Information Commissioner
More informationNON-PERSONAL SAVINGS ACCOUNT CONDITIONS. Effective from 13th January 2018.
NON-PERSONAL SAVINGS ACCOUNT CONDITIONS Effective from 13th January 2018. WELCOME TO SCOTTISH WIDOWS BANK This booklet explains how your Scottish Widows Bank savings account works, and includes its main
More informationAn update from Pace. What s inside this issue? Autumn 2014
An update from Pace Autumn 2014 Welcome to our annual update. The big news this year is that the Government wants to change the pensions rules to give you even more flexibility and freedom to use your
More informationSOCIAL INVESTMENT TAX RELIEF
SOCIAL INVESTMENT TAX RELIEF A GUIDE TO ADVANCE ASSURANCE May 2017 For more information and resources on SITR, please visit www.bigsocietycapital.com/sitr. This note has been prepared to help provide some
More informationBuyout Bond I t Illustra tures Key Fea
Key features of your Buyout Bond The Financial Conduct Authority is a financial services regulator. It requires us, Old Mutual Wealth, to give you this important information to help you decide whether
More informationTax-free cash payment instruction
For customers Why do I need to fill in this form? This form instructs us to pay tax-free cash or a stand-alone lump sum. You must meet the conditions on page 2 for us to make the payment. This form should
More informationCollECtIVE INVEstMENt ACCouNt selfselect WEAltHsElECt AIMs the CollECtIVE INVEstMENt ACCouNt ANd Its benefits About us
Key Features of the Collective Investment Account The Financial Conduct Authority is a financial services regulator. It requires us, Old Mutual Wealth, to give you this important information to help you
More informationA Guide to the Local Government Pension Scheme for Councillors in Scotland (from 1 April 2015) Councillors in Scotland issued April 2018 V1.
A Guide to the Local Government Pension Scheme for Councillors in Scotland (from 1 April 2015) Councillors in Scotland issued April 2018 V1.3 Index 1. About this Booklet pg 4 2. About the Local Government
More informationDetailed guidance for employers
April 2014 6 Detailed guidance for employers Opting in, joining and contractual enrolment: How to process pension scheme membership outside of the automatic enrolment process Publications in the series
More informationThe Xafinity SIPP and SimplySIPP application form for transferring into an existing SIPP
The Xafinity SIPP and SimplySIPP application form for transferring into an existing SIPP If you require this document in another format for ease of reading, please let us know. Making Sense of Pensions
More informationGuidance for ADR Applicants - updated CAP 1324
Guidance for ADR Applicants - updated CAP 1324 Published by the Civil Aviation Authority 2016 Civil Aviation Authority, CAA House, 45-59 Kingsway London WC2B 6TE You can copy and use this text but please
More informationScottish Law Commission s Discussion Paper Unincorporated Associations. Briefing Paper for Governing Bodies of Sport. Introduction
Scottish Law Commission s Discussion Paper Unincorporated Associations Briefing Paper for Governing Bodies of Sport Introduction On the 3 December 2008, the Scottish Law Commission 1 (SLC) published a
More informationREQUEST FOR INFORMATION
REQUEST FOR INFORMATION 1. ANTI-MONEY LAUNDERING (AML) REQUIREMENTS Savills Investment Management (UK) Limited (the Manager ) is required to obtain certain information from you in order to comply with
More informationVodafone. Insurance. Vodafone. Power to you. Vodafone Business Premier Inclusive Damage and Breakdown Insurance
Vodafone Insurance Vodafone Business Premier Inclusive Damage and Breakdown Insurance Vodafone Power to you 1 Vodafone Business Premier Inclusive Damage and Breakdown Insurance This insurance, administered
More informationManually entering employee data
Manually entering employee data This guide is designed to walk you through entering employee data manually in your employer Online Services account. This method is suitable for employers who don t use
More informationEducation Funding Agency
Education Funding Agency Pre-Qualification Questionnaire Funding Advisory Services to provide advice on the structuring of a capital markets or other financing solution to support the delivery of the Priority
More informationacie Independent Examination OSCR Guidance for Charities and Independent Examiners
Independent Examination OSCR Guidance for Charities and Independent Examiners www.oscr.org.uk OSCR would like to acknowledge the significant contribution made by ACIE in the preparation of this guidance
More informationDecision 175/2012 Mr Paul Bova and Highland Council. Failure to respond to request and request for review
Failure to respond to request and request for review Reference No: 201201664 Decision Date: 26 October 2012 Rosemary Agnew Scottish Information Commissioner Kinburn Castle Doubledykes Road St Andrews KY16
More informationWho s In Charge: Control and Independence in Scottish Charities
Who s In Charge: Control and Independence in Scottish Charities Page : 02 Who s In Charge: Control and Independence in Scottish Charities 2011 Contents Page Executive Summary Introduction 4 Chapter 1.
More informationFrequently Asked Questions For Mandatory E-Filing*
E-Filing General Questions* Department of Judicial Administration Frequently Asked Questions For Mandatory E-Filing* When does the new mandatory e-filing rule begin? June 1, 2009. What gives the Clerk
More informationTHE PASSPORT UNDER MIFID
THE COMMITTEE OF EUROPEAN SECURITIES REGULATORS Ref: CESR/07-318 THE PASSPORT UNDER MIFID Recommendations for the implementation of the Directive 2004/39/EC Feedback Statement May 2007 11-13 avenue de
More informationCUK Insider s Guide to IR35
The UK's most visited IT Contractor Site - Online since 1998 CUK Insider s Guide to IR35 Compiled with from advice from Ray McMahon, ex Tax Inspector Contents: What is IR35? 2 How will I know if I m caught
More informationInterest rates, charges and important information
Interest rates, charges and important information Guide to Changes: We are making some changes to this brochure. The changes will come into effect on 6 April 2018 and will apply to all Intelligent Finance
More informationWelcome to your pension
For customers Welcome to your pension We re pleased to welcome you to your pension plan and to Aegon We ve been helping our customers with their pensions for over 180 years and, with over 34,000 company
More informationIntroduction to the PVG Scheme. Your Guide to the PVG Application Process
Introduction to the PVG Scheme Your Guide to the PVG Application Process About the PVG Scheme Background The Protecting Vulnerable Groups (PVG) (Scotland) Act 2007 came into being as a response to the
More informationSTATEMENT OF INSOLVENCY PRACTICE 9 (SCOTLAND) REMUNERATION OF INSOLVENCY OFFICE HOLDERS
STATEMENT OF INSOLVENCY PRACTICE 9 (SCOTLAND) 1 INTRODUCTION REMUNERATION OF INSOLVENCY OFFICE HOLDERS 1.1 This Statement of Insolvency Practice (SIP) is one of a series issued to licensed insolvency practitioners
More informationCORE INVESTMENTS (PERSONAL PENSION) WITH INCOME RELEASE
65A50 CORE INVESTMENTS (PERSONAL PENSION) WITH INCOME RELEASE Application form Thank you for choosing a Pension Portfolio Plan with Royal London. You ll need to complete this application form to apply
More informationA Guide to the Local Government Pension Scheme for Employees in Scotland (from 1 April 2015)
A Guide to the Local Government Pension Scheme for Employees in Scotland (from 1 April 2015) Employees in Scotland issued April 2016 V1.4 Page 1 Index 1. About this Booklet pg 5 2. About the Local Government
More informationA brief guide to our Flexible Trust
A brief guide to our Flexible Trust A Trust is a legal document and Trust Laws are complex, often with a lot of confusing legal jargon. At British Seniors we pride ourselves on doing the right thing by
More informationServices, Terms and Conditions
James Brearley Investment Managers & Stockbrokers Established 1919 Services, Terms and Conditions www.jbrearley.co.uk James Brearley Services, Terms and Conditions INTRODUCTION This section is relevant
More informationSage Guide to ENROLMENT. Everything you need to know about Workplace Pensions: Automatic Enrolment
Sage Guide to AUTOMATIC ENROLMENT Everything you need to know about Workplace Pensions: Automatic Enrolment 1 CONTENTS INTRODUCTION What is Automatic Enrolment? 01 SEVEN STEPS TO AUTO ENROLMENT? 02-05
More informationStandard Life Active Retirement For accessing your pension savings
Standard Life Active Retirement For accessing your pension savings Standard Life Active Retirement our ready-made investment solution that allows you to access your pension savings while still giving your
More informationNew Payee Pack. Page 1 New Payee pack
New Payee Pack To enable us to create a record, we need you to complete the following forms as soon as possible. These forms are for people who are joining our payroll for the first time or re-joining
More informationDecision 092/2007 Mr Ian McCulloch and Glasgow Cultural Enterprises. Information about two murals commissioned by Strathclyde Regional Council
Decision 092/2007 Mr Ian McCulloch and Glasgow Cultural Enterprises Information about two murals commissioned by Strathclyde Regional Council Applicant: Mr Ian McCulloch Authority: Glasgow Cultural Enterprises
More informationSuper contribution splitting with your spouse
Fact sheet and form Super contribution splitting with your spouse What this fact sheet covers Explains the rules and benefits of splitting super contributions with your spouse. Who is this fact sheet for?
More informationTRUSTED TRADER. Trusted Trader terms and conditions. Contents.
Trusted Trader terms and conditions Contents 1. TRUSTED TRADER... 2 2. TRADING STANDARDS COMMITMENTS... 2 3. TRUSTED DIRECTORY SERVICES LTD COMMITMENTS... 2 4. BUSINESS CODE OF PRACTICE... 3 5. REQUIREMENT
More informationPersonal Pension. This document was last updated in October 2017 and is valid until October 2018.
Key Features of your Personal Pension The Financial Conduct Authority is a financial services regulator. It requires us, Old Mutual Wealth, to give you this important information to help you decide whether
More informationCampaign spending return - referendum on independence for Scotland 2014
Form RIS3B Campaign spending return - referendum on independence for Scotland 2014 You should read the related guidance before completing this form. You can also report your campaign spending online. Who
More informationVodafone. Insurance. Vodafone. Power to you. Vodafone Corporate Damage and Breakdown Insurance
Vodafone Insurance Vodafone Corporate Damage and Breakdown Insurance Vodafone Power to you 1 Vodafone Corporate Damage and Breakdown Insurance This insurance, administered by Lifestyle Service Group Limited
More informationDecision 008/2007 Prison Governors Association - Scotland and the Scottish Prison Service
Decision 008/2007 Prison Governors Association - Scotland and the Scottish Prison Service Information about pay bill of Scottish Prison Service HQ over the last 3 years Applicant: Prison Governors Association
More informationGuide to trusts. A brief guide to Trusts and our Trustbuilder tool. Trusts the basics. Settlor makes a gift to the trust
Guide to trusts A brief guide to Trusts and our Trustbuilder tool This brief guide explains some of the main features and benefits of our trusts, and gives you some information to help you decide whether
More informationDebt Management Plan Agreement
Debt Management Plan Agreement Introduction Following the review of your financial circumstances which led to our recommendation of a debt management plan (DMP) to deal with your debts, this Agreement
More informationInterest Rates, Charges & Important Information
Interest Rates, Charges & Important Information Guide To Changes We are making some changes to this brochure. The changes will come into effect on 6th April 2018 and will apply to all St. James s Place
More informationPrudential Onshore Portfolio Bond Additional Investment application form Some important information before you start
Prudential Onshore Portfolio Bond Additional Investment application form Some important information before you start Please return this form to Prudential International Assurance plc, Stirling FK9 4UE.
More informationDecision 063/2009 Mr David Rule and Historic Scotland. Flags flown over Edinburgh Castle. Reference No: Decision Date: 29 May 2009
Flags flown over Edinburgh Castle Reference No: 200900170 Decision Date: 29 May 2009 Kevin Dunion Scottish Information Commissioner Kinburn Castle Doubledykes Road St Andrews KY16 9DS Tel: 01334 464610
More informationTo: All NHS trust and NHS foundation trust finance directors and finance teams
Wellington House 133-155 Waterloo Road London SE1 8UG 13 November 2018 T: 020 3747 0000 E: nhsi.enquiries@nhs.net W: improvement.nhs.uk To: All NHS trust and NHS foundation trust finance directors and
More informationProfessional Indemnity Insurance Management Consultants
Professional Indemnity Insurance Management Consultants The PI Desk Limited Suite B, Sheffield Business Centre Europa Link, Sheffield, South Yorkshire, S9 1XZ Tel: 0114 242 1176 Fax: 0114 242 2372 Email:
More informationConstruction Industry Scheme (CIS)
Construction Industry Scheme (CIS) Contact Details Surrey Office 56, Little Heath Road Chobham Surrey t: 0870 609 2824 f: 01276 488049 Hampshire Office Scrapps Hill Farm, Worting Road Basingstoke RG23
More informationSmall pots lump sum. Payment instruction. You shouldn t complete this form if... You should complete this form if... Why do I need to ll in this form?
For customers Payment instruction Why do I need to ll in this form? This form instructs us to pay you a small pots from your Retiready Pension plan with us, if you meet the conditions described on page
More informationGuidance for calculating and certifying block transfers
Guidance for calculating and certifying block transfers 2018/19 levy year Contents Part 1 : Part 2 : Terminology Purpose of this Guidance Part 3 : Treatment for 2018/19 Part 4 : Part 5 : Appendix: Certification
More informationAdditional contribution with tax-free cash application form
65A39 CORE INVESTMENTS (PERSONAL PENSION) WITH INCOME RELEASE Additional contribution with tax-free cash application form You ll need to complete this application form to apply an additional contribution
More informationAuto-enrolment. guidance for employers
Auto-enrolment guidance for employers Introduction No matter what size your business Johnson Fleming is able to support you through your autoenrolment journey; we understand that for some the cost may
More informationA Guide to the Local Government Pension Scheme for Employees in Scotland (from 1 April 2015)
A Guide to the Local Government Pension Scheme for Employees in Scotland (from 1 April 2015) Employees in Scotland issued April 2018 V1.6 Index 1. About this Booklet pg 5 2. About the Local Government
More informationMember application form
14P7 GROUP STAKEHOLDER PENSION PLAN Member application form Thank you for applying for your Retirement Solutions Group Stakeholder Pension Plan. You ll need to complete this application form to apply for
More informationDecision 087/2013 Mr Paul Bova and Highland Council. Communications regarding a specified planning site
Communications regarding a specified planning site Reference No: 201202474 Decision Date: 13 May 2013 Rosemary Agnew Scottish Information Commissioner Kinburn Castle Doubledykes Road St Andrews KY16 9DS
More informationGuidance notes (continued)
Help and advice about other benefits If you want general advice about any other benefits you may be able to claim Ring the Benefit Enquiry Line (BEL) for people with disabilities on 0800 88 22 00. People
More information