1 1. Introduction Agenda Item 10.3-Micro Eco Reform-Att A-Ann 3 INDONESIA - ANNEX 3 This Annex sets out our findings in relation to the current status of implementation of the IPP Principles in Indonesia. In relation to each Principle the current status of implementation is described. Where possible and appropriate, we have identified potential barriers or impediments to improved implementation of the Principles. These findings reflect research carried out in the period January April The sensitive nature of IPPs in Indonesia at present created significant difficulties in obtaining information regarding the terms and conditions of either existing or proposed IPPs in Indonesia. 2. Background 2.1 Recent developments in the Indonesian electricity sector After many years of strong economic growth and expansion, Indonesia has suffered substantial losses as a result of the Asian economic crisis. From , the country s GDP growth rate rose an average of 8% per year. But in 1998, Indonesia s GDP rate became negative at 13.5%. The IMF has recommended that Indonesia implement economic reform including the creation of greater transparency in the issuing of government loans and subsidies, and enforcing laws and regulations in the area of government procurement. The government has announced several reform initiatives since receiving IMF assistance, including the planned privatisation of several sectors of the economy. Indonesia has an installed capacity estimated at 21.3 GW, with 82% coming from thermal sources, 15% from hydro sources, and 3% from geothermal sources. Electricity is supplied by the vertically integrated monopoly Perusahaan Listrik Negara (PLN), the state owned energy corporation. PLN is responsible for the majority of Indonesia s generation, and is the monopoly provider of transmission, distribution and supply of electricity. It is the sole buyer and seller of electricity in the power market, currently purchasing approximately 80% of the power produced by IPPs. The sharp decline in the GDP of Indonesia and devaluation of the Rupiah has significantly affected the financial standing of PLN. The fact that 60% of the PLN s costs (ie. fuel purchases and debt payments) are denominated in US dollars while revenues (subsidised tariffs) are earned in Rupiah has increased PLN s debt significantly. The Rupiah has been significantly devalued due to the financial crisis. Additionally, the inclusion of take-or-pay provisions in PPAs has meant payment obligations to IPPs (in US dollars) remain even though demand has decreased significantly. 1

2 2.2 The role of IPPs in Indonesia Prior to the occurrence of the Asian financial crisis, Indonesia had plans for rapid expansion of power generation, to be achieved through opening up its power market to IPPs. IPPs provided a solution to the serious shortage of electricity experienced in Indonesia between 1989 and 1991 due to the rapid growth of industry. The bulk of the parties in large IPPs projects were international energy companies (foreign investors) partnered with family and associates of former President Suharto. In early 1997, there were 39 IPP projects (totalling 30,072 MW) under way. A number of these projects had successfully secured debt financing and in the case of one project, capital markets refinancing. As a result of the Asian financial crisis, a number of IPP projects have been cancelled or put on hold and those projects which have secured debt financing or have been constructed or partly constructed are perceived to be in difficulty. Given the over-capacity in the Indonesian power sector, further investment in new IPPs is unlikely in the near future. There are now approximately 26 IPP projects that have been signed, involving about US$18 billion in investments and totalling 24,751 MW. A list of operational IPPs in Indonesia is provided in Appendix A. A table of the keys risks associated with IPP projects is provided in Appendix B. All 26 IPPs have entered into Power Production Agreements (PPAs). PLN is counter party to all the PPAs. Characteristics of the PPAs include: tariff structure and tariff paths; denomination of prices in $US (prices range from 5.7 cents to 8.4 cents per kwh); take or pay obligations on PLN (For example under Paiton Energy s PPA, PLN is obliged to pay Paiton $598 million per year if it does not use power supplies); applicable law - generally governed by Indonesian law; arbitration clauses for disputes - dispute resolution clauses may refer parties to an international arbitration; and force majeure provisions. As a result of PLN s losses in 1998 and 1999 it has been incapable of making payments to IPPs. Initially the government failed to support PLN, forcing PLN to fail in meeting its payment obligations to some IPPs. This resulted in some IPPs resorting to arbitration in an attempt to recover payments. While the government has now ensured that payments are being made it is generally accepted by industry sources that a renegotiation of nearly all of the PPAs will take place as this is essential for the successful restructure of PLN, the government credibility with foreign investors and the resolution of budgetary shortfalls of the 1

3 Government (arising from these and other subsidies in the energy sector). This issue is currently an extremely sensitive political issue. Case Study on Indonesian PPAs: The CalEnergy Dispute Himpurna California Energy (HCE) in conjunction with Patuha Power (PPL) brought an action against PLN for a breach of the Energy Sales Contract in The breach involved PLN failing to fulfil their obligations under the contract to pay the IPP for electricity supplied and for breach under the PPA over two 400MW projects. The initial arbitration between the parties was conducted in Jakarta, under the United Nations Commission on International Trade Law (UNCITRAL) Arbitration Rules. Chairing the arbitration was an international attorney, and the panel included an Australian business person and an Indonesian judge. In a unanimous decision by the panel HCE was awarded $391,711,652 and PPL $180,570,322. PLN failed to make the repayment resulting in HCE and PPL demanding repayment pursuant to the sovereign performance undertakings issued by the Minister of Finance on behalf of the Republic of Indonesia. When the Indonesian government refused to make the repayment HCE and PPL took further international action in September As a result the panel made the following interim awards: the Republic of Indonesia defaulted under the Terms of Appointment and the UNCITRAL rules that the parties agreed would govern the arbitration; the tribunal continues to have jurisdiction over the dispute notwithstanding Indonesian court orders purporting to enjoin the arbitration and has jurisdiction to issue final awards in this matter; and certain Indonesian court orders purporting to prevent the arbitration constitute a denial of justice in violation of generally recognised principles of international law. An international arbitration panel ruled that PLN had to pay MidAmerican Energy, formally CalEnergy, US$572.3 million for breaching the PPA over two 400 MW projects. One of the major challenges facing the promotion of private sector development in Indonesia is the perception that transactions in the past have not resulted from arm s length dealings or had due regard to the principles of transparency, non-discrimination and fair competition. 2

4 3. Institutional and Regulatory Structures 3.1 Principle 1 Energy sector policies Energy sector policies formulated to create a stable framework for power sector development (a) Clear, published and consistent energy sector policies Indonesian energy sector policies have been set out in a number of laws, Presidential Decrees, regulations and policy documents. Many of the energy sector policies were introduced as part of the Indonesian government s initiative to promote IPP projects. Each is clearly stated and published, but never in a completely formal way (other than by means of formal decree). The main documents setting out the government s broad approach to energy sector development are described in Appendix C. The objectives of energy sector policies in Indonesia are clear: to attract private sector investment in power production. At a micro level there is little clear consistency with other sector policies. While there have been attempts to encourage investment in all sectors, the electricity industry is the most advanced. (b) Environmental policy objectives Publication and clarity of environmental policies Current government policy suggests that environmental issues will be given greater priority in the future. Indonesia has made significant progress in energy conservation in the past 20 years, both in the area of institutional development and in program implementation. Indonesia launched its first national energy conservation program in early 1980 with a national awareness campaign. In 1982, under Presidential Instruction No. 9, all government ministries and agencies were directed to undertake energy conservation measures. At the end of 1983, the second phase of Indonesia s energy conservation program was initiated with in-depth audits of energy-intensive industries. In 1987, with financial assistance from the World Bank, PT. Konservasi Energi Abadi (KOMEBA), Indonesia s National Energy Conservation Company was established. KONEBA made significant accomplishments, including detailed energy audits of over 30 large industrial facilities, energy conservation planning activities, data base development, training, information dissemination, and the procurement and installation of energy saving equipment. By 1990, KONEBA was operating at a profit on a cash-flow basis. However, during the mid-90s KONEBA was unable to maintain self-financing operation. 3

5 (c) In September, 1991, President Soeharto issued a Presidential Decree on Energy Conservation (Decree No. 43), directing that a broad program in energy conservation be undertaken aimed at efficient use of energy and environmental sustainability. The Ministerial Energy Coordination Board (Bakoren) issues general policy guidelines on energy matters. The Technical Committee on Energy (PTE) reports to Bakoren and provides an active forum for consideration of energy-related policy and technical issues. The Permanent Working Group on Energy (PWGE) conducts analysis of energy supply and use on a quarterly basis, serves as a forum for exchange of data and information, and prepares technical reports for PTE. In June 1990, a permanent National Committee on Energy Conservation which also reports to PTE was established with the responsibilities of formulating energy efficiency-related laws, regulations and guidelines, implementing campaigns and taking other actions to promote energy efficiency. Within the Ministry of Mines and Energy, the Directorate General for Electric Power and New Energy (DGENE) has developed substantial capability to conduct energy planning and analysis in electricity, energy conservation and renewable energy. In the late 1980 s, DGENE worked with the US AID-funded ASEAN Building Energy Conservation Program to conduct energy audits and surveys. Fair application of environmental policies The environmental policies are applied fairly to all sector participants, as they are required under the PPA to follow a number of environmental requirements and procedures. The requirements deal with air emissions, water discharges and noise. Additionally the PPA sets out the environmental procedures that IPPs are required to follow for the development of power generators. It is stated that the AMDAL is the responsible body along with the Ministry of Mines and Energy (See Appendix E for an outline of the environmental approvals required). Placing energy efficiency and conservation options on an equal basis with supply-side options, such as through all-source bidding programs PLN s efforts to limit captive power production have been unsuccessful due to Indonesian government fuel subsidies that encourage the use of diesel-generated power. To some extent there has been a move to more environmental friendly forms of energy: geothermal, combined cycle and nuclear. However, the development of environmentally sensitive generation has been tempered against the need for large load generation that is perceived to be dependent upon domestic coal. Established legislative framework 4

6 (d) (e) (f) (g) There is an extensive legislative regime governing the electricity industry in Indonesia. This regime clearly establishes the respective roles and functions of the government, the industry (principally PLN) and the private sector. The primary laws and regulations applicable to the electricity industry and defining the role of the government in the sector are set out in Appendix C. Regulatory bodies There is no independent regulatory body in Indonesia. The Indonesian electricity industry is regulated principally by the Ministry of Mines and Energy. The Ministry is not independent of direct government control and while a separate entity, is not independent from government owned business (ie. PLN). PLN also exercises a number of regulatory functions. PLN is significantly influenced by the government. Amongst other things, the government appoints the members of the PLN board, and heavily subsidises the activities of PLN. Internal consistency among regulatory structures The process for obtaining a PPA is predominantly coordinated by the Indonesian Ministry for Energy, but there are also a number of permits required from other ministries. Material approvals and regulation are dealt with at the central government level. The approvals required at the local level are, in practice, generally forthcoming once the central government has allowed the project. Local approvals are required in respect of e.g. construction licenses. Appendices D and E provide a detailed description of all permits and approvals required for IPPs. Traditionally, there has been a significant degree of coordination between central and local approvals. This may change as a result of the recent passage of the Decentralisation Law pursuant to which local governments are to receive a greater degree of fiscal authority and independence. Transparency of regulations Regulations are made by Presidential Decree. The process for making regulations is neither clear nor transparent, nor is it subject to independent review. Equal regulatory treatment of utilities and business sector While regulated under the same regime, PLN and IPPs are treated differently. Important issues affecting the relative regulatory treatment of PLN and the business sector are: 5

7 (h) at present there is no competitive electricity market operating in Indonesia. As a consequence IPPs have no choice but to sell electricity to PLN, as set out in the individual PPAs; notwithstanding the internal separation of certain generation and transmission functions of PLN (see below), PLN remains vertically integrated; and PLN is government-owned and heavily subsidised by the Indonesian government. Conclusions It appears that the main difficulties being encountered in Indonesia with the implementation of this aspect of Principle 1 are: overcoming lack of transparency in the system of government and law-making; the financial difficulties of PLN; achieving practical implementation of sector policies Energy sector policies formulated to facilitate competition (a) Current status of policies for power sector reform and restructuring Restructuring and privatisation of PLN As part of the reform of the Indonesian electricity industry, PLN is to be privatised. Steps towards privatisation have been taken by the Indonesian government such as the separation of PLN into PT PLN Pembangkitan Tenaga Listrik Java Bali I and II, and the commencement of the restructuring process pursuant to Presidential Decree 139/1998 (see Appendix C). Under this Decree the government has established a committee to advise on the restructuring and rehabilitation of PLN. That committee has established working groups to examine the following issues: improvement of PLN s finances; renegotiation of the PPAs with IPPs; renegotiation of other long-term contracts; and improvement of PLN s operational efficiency. However, the restructuring and privatisation process has been very slow and PLN remains essentially vertically integrated and state owned. Establishment of competitive market The government has also obtained two loans from the Asian Development Bank to assist with establishing a competitive market for electricity. The 6

8 (b) (c) first loan, granted to the Ministry of Finance for US$380 million, is to assist the establishment of a competitive electricity market in the Java-Bali region (market will include multiple buyers and multiple sellers), increase private sector participation and strengthen the regulatory environment. The second loan, granted to Directorate General of Electricity and Energy Development, is for US$20 million and is to assist with establishing market rules, financial settlement procedures, developing computer software, providing support for the development of regulatory capabilities and strengthening consumer participation in a competitive electricity market. As far as we are aware no concrete steps have been taken to implement the introduction of competitive markets. Current status of policies The reform process in Indonesia has halted due to difficulties arising from the Asian financial crisis, and in particular the financial difficulties faced by PLN. No clear indication has been given as to the way forward. Separation between generation and transmission functions Currently, PLN holds a monopoly over transmission and distribution of electricity. Notwithstanding the separation of PLN into PT PLN Pembangkitan Tenaga Listrik Java Bali I and II, and the existence of the IPPs, PLN remains responsible for the production of the majority of power in Indonesia. There is thus no effective separation of generation from transmission. There is no stated or transparent policy regarding separation between transmission and generation. It is not clear how this aspect of the sector will develop, for example whether PLN will be restructured and individual generating companies (Genco s) will be split off, and whether such entities will be privatised. Complementary development of transmission grids No development of the transmission grid and distribution system is currently being undertaken. This is a major issue because power stations are being built while no transmission lines are being constructed. As electricity sector reform in Indonesia is very much in its infancy, it is difficult to determine the policy approach that the Indonesian government will take in allowing the private sector to be involved in the transmission sector. The Indonesian government s major stated concern at present is to ensure that electricity is available at a reasonable price to the public. There have been proposals to allow private sector investment in the transmission sector, and thereby promote the development of transmission lines. However it seems that none of these proposals have been progressed. 7

9 (d) (e) (f) (g) Autonomy, accountability and commercial operation of public utilities PLN has been corporatised, and some internal separation has taken place between generation and transmission businesses. Given the large debts it currently faces, it is questionable whether PLN is run on commercial lines. This is difficult to verify as PLN does not publish accounts. Further, PLN s financial operations remain largely a matter of government policy. It appears that there is a significant subsidisation of domestic tariffs. In general, wholesale tariffs payable to IPPs probably do not reflect the efficient costs of production Competitive market in generation and supply Generation Notwithstanding the existence of the IPPs, there does not appear to be any significant competition at the generation level. All of the IPPs have been executed pursuant to unsolicited tenders, thus the prices and other terms and conditions of PPAs are not the result of an effective competitive tendering process. Further, there is no competition between the IPPs in their supply and delivery of electricity to PLN. The current policy on this issue is unclear. Supply IPPs are entitled to supply local industry, as occurs for example with auto-generation facilities. However, as IPPs are not entitled to access the PLN transmission and distribution grids, all electricity is supplied to consumers by the PLN. It is noted that in September 1998 the government had announced that it proposed to allow IPPs to be able to sell directly to customers. It is understood that this proposal has not been implemented and that there are no concrete plans for its implementation in the near future. Accordingly, it can be concluded that there is no policy in place to facilitate the development of a competitive market for electricity supply. Cross-border interconnection Discussion has occurred about whether to progress the development of interconnection projects. Some argue that small IPPs (eg. on the islands) may be more cost-effective and less complicated than an interconnection project. For example, land acquisition is a major problem for interconnection project because there are no compulsory acquisition laws in Indonesia. Whether it is feasible to develop interconnection will depend on the sources of fuel and electricity market (ie. demand). Interconnection projects that have previously been considered are set out in Appendix F. Conclusions The major difficulties in achieving a competitive electricity market in Indonesia are twofold: 8

10 (i) the financial position of the PLN. Prior to the Asian financial crisis Indonesia had planned to expand the power generation industry, through opening up the power market to IPPs. However, since that point the state owned utility PLN has had difficulty paying for the electricity it agreed to purchase under the PPAs. As a consequence, further expansion has been delayed or halted until the situation can be resolved. (ii) the perception that in the past decisions have been made on the basis of discrimatory criteria that do not reflect transparent pro-competitive policies. 3.2 Principle 2: Commercial viability of electricity utilities (a) Commercial wholesale tariffs Prices received by IPPs for electricity they generate are determined by negotiation between the IPP and PLN. These are set out in the PPAs and are denominated in $US. It is understood that prices range from 5.7 cents to 8.4 cents per kwh. These prices are intended to reflect the cost of capital at the time the PPAs were entered into. However, when compared, for example, with the rates applicable in Thailand (around US2 cents per kwh) they appear to be very high, and it must be doubtful whether they reflect truly arm s length negotiations or the efficient costs of supply. (b) (c) Fuel supply market The PPAs provide that fuel supply is the responsibility of the IPP. As far as we are aware there are no restrictions in the PPAs on the scope of the IPP to source its fuel competitively. However, under the Presidential Decree No. 16/1994 there is emphasis on local content which is twofold: 1) a requirement to use domestic products to the maximum ; 2) a requirement that contracts within specific value bands must be tendered to local suppliers or contractors. The prices paid by IPPs for fuel inputs (generally coal or gas) are determined by commercial negotiation, or failing negotiation by a basket price. The price agreed to is generally denominated in US dollars (cf. PLN purchases coal for its own plants from domestic mines under medium term Rupiah denominated contracts) and is adjusted annually or by the Ministry of Mines and Energy. Access issues and treatment under tax regime Access to Sites We understand that PLN is able to gain access to sites for the development of generation facilities on more favourable terms that IPPs. Access to fuel markets 9

11 (d) (e) IPPs may determine from which market they obtain their fuel, as set out in the PPAs. However, as noted above, there are certain local content requirements with which all sector participants must comply. These would appear to apply to both PLN and IPPs indiscriminately. Treatment under Tax regime IPPs treatment under the tax regime is different to PLN s as PLN is a state owned utility. Foreign ownership and control of IPPs Foreign investment in Indonesia is regulated by the Foreign Investment Law (Act No. 1/1967 amended by Act No. 11/1970 the FCIL ), decrees of the President and Chairman of the Capital Investment Coordinating Board (the BKPM ), the New Share Ownership Regulation (20/1994 Regulation 20 ) and its implementing regulation (Decree No. 15/SK/94). The effect of this legislation is to create a partially-regulated investment environment. Foreign interests are permitted throughout Indonesia, however there are certain regulations that prohibit foreign interests from investing in designated sectors of the economy without securing the participation of Indonesian investors as joint venture partners. Pursuant to Article 6 of the Foreign Investment Act (Law No. 1 of 1967), the production, transmission and distribution of electric power to the public may not be fully controlled by a foreign entity. As a result, all IPPs have local partners, generally with around a 10-15% interest in the IPP project. Conclusions Major difficulties experienced with the implementation of this Principle include: the lack of real transparency; in the past the vast majority of approvals for power projects have been unsolicited and appear to have been based upon personal interests rather than objective, non-discriminatory criteria. lack of industry restructuring to ensure that the private sector can have access to the transmission and distribution sector. 3.3 Principle 3: Regulatory framework and process for IPP approvals (a) Consistent regulations and approval processes Appendices D and E outline the various permits and approvals required under Indonesian law. The most significant approvals required in Indonesia are as follows: 10

12 (b) (c) approval by PKLN/Bank Indonesia of foreign currency loans and the documentation; foreign investment approval by the Investment Coordinating Board; and approval by the Ministry of Mines and Energy of the Tariff and PPA. There is no central coordinating body in Indonesia to assist IPPs with the obtaining the necessary regulatory approvals for IPP projects. It is therefore necessary for each IPP to secure regulatory approvals at various levels. Clear, published and transparent approvals process There are many difficulties with the approval processes in Indonesia. In the past, the approval process has been characterised by degrees of delay, uncertainty and lack of transparency. As a result there has been large duplication of effort and large administrative and development costs. The approval and decision making process for an IPP (as at April 1997) has been divided between unsolicited and solicited bids, most being unsolicited. There are no published guidelines as to the permits required for a power project. However, a set list of approval requirements is contained in the standard form PPA that has unofficially become the form of permit/approvals required for the financing of projects in that jurisdiction. Consideration has not been given to incorporating in the tender processes mechanisms for granting pre-approvals of projects put out to bid because the bulk of projects in Indonesia have been done on an unsolicited basis as opposed to a tender/competitive basis. Conclusions The main difficulties in achieving the objective of a streamlined approval mechanism in Indonesia largely derive from the development of the IPP process in Indonesia. Given that it is largely developed on an unsolicited basis, as opposed to a competitive basis, there has never been any formal development of mechanisms to assist IPP developers in facilitating projects. Instead, there was development of ad hoc assistance and, by the financing of these projects, the setting up of criteria required for successful financing. 4. Tender/Bid Processes and Evaluation Criteria 4.1 Principles 4, 5, 6 and & Tender/Bid processes and evaluation criteria (a) Tendering approach and evaluation The process for the establishment of a private power development project is set out in Appendix G. In summary: 11

13 (b) a PPA is negotiated between the State Owned Electricity Corporation (PLN) and the project sponsor; a PPA must obtain approval for investment from the Board of Investment and price approval from the Minister of Mines and Energy prior to being signed by the PLN and Project sponsor; and implementation of the PPA requires approval from the Off-shore Commercial Borrowing team (PKLN). All but one of the 26 IPP power projects signed by the Indonesian government have been awarded on an unsolicited bid basis, rather than a solicited basis (See: Appendix A for a discussion of solicited and unsolicited projects). Thus, there has not been a great deal of tendering of IPPs in Indonesia. It is unclear what information is given to prospective bidders of IPP projects as there have been a limited number of solicited projects. There are no published evaluation criteria, however there is a list of permits and approvals required under Indonesian law in relation to power plant projects (see Appendices D and E). A pre-qualification process is only in place for solicited (competitive tender) projects. As stated, all but one of the projects to date have been placed on an unsolicited tender basis. Conclusions Given that most IPPs have been awarded on an unsolicited basis, there is little evidence of the details of bid processes in Indonesia. Aspects of the assessment process have been drawn up, but a complete framework is not in place and therefore current procedures fall short of the requirements of this Principle. 5. Power Purchase Agreements (PPAs) and Associated Tariff Structures 5.1 Principle 9: Retail tariffs (a) Nature and structure of retail tariffs The price of electricity in Indonesia is set in Rupiahs and controlled by the government. Two separate tariffs are used to determine the selling price of electricity: (i) Basic/Uniform Electricity Tariff This is determined pursuant to Presidential Decree No. 68/1994 and based on the recommendation of the Minister of Mines and Energy. (ii) Periodic Electricity Tariff 12

14 This is determined by the Minister of Mines and Energy. It can be adjusted every 3 months for changes in the: price of electricity purchased by PLN; US dollar exchange rate to Rupiah; CPI, both for foreign and local currencies; fuel price; and tax regime and other government regulation (eg.environmental provision). The calculation of prices can be broken down into the following components: (i) Capacity charge component - calculated using financial model and based on the following factors: Capital cost consisting of cost for Engineering Construction, Testing and Commissioning test; Development Cost, Working Capital and Land Procurement; Term and Condition of Loan, Financing Sources, Interest and other Financial Cost; Debt/Equity Ratio; Return on Equity; Availability Factor; Disbursement Schedule of Loan and Equity; Taxes and Depreciation based on current regulation; and Contract Capacity and Contract Term. (ii) Fixed operation and maintenance charge (iii) Energy charge component - The extent of pass-through of this component depends on: quantity and type of fuel; specific heat rate (for coal fired); and fuel price. (iv) Variable operation and maintenance charge. The price for the supply of electricity to domestic consumers is heavily subsidised by the government to ensure that it is at an affordable level for the community, consumers paying approximately 2 cents per kw/h. Owing to the lack of financial information about PLN there is little transparency regarding these subsidies. 13

15 (b) Retail tariffs probably do not reflect the economic costs of supply. They are used to support the high electricity prices payable (in $US) to IPPs pursuant to their PPAs (see above). Conclusions The major difficulty at present is influence on retail prices of the structure and implementation of the wholesale prices pursuant to PPAs. The resolution of this issue depends on how the government decides to resolve the restructuring of PLN and the renegotiations with IPPs. 5.2 Principle 10: Transition to competitive markets (a) PPA tariff structures that promote competition The standard form Indonesian PPA does not provide a mechanism for a transition to a more competitive market structure. The tariff structure used is a two-part tariffs system: (i) Capacity Payment This payment represents payment for net dependable capacity of the Power Station and consists of Component A and B. Component A Capital Cost Recovery Charge A fee designed to cover Project fixed costs including debt service, and provide a return on investment to Shareholders. Component B Fixed O&M Cost Recovery Charge An agreed Rp/kW for Part 1 (Rupiah costs) An agreed Rp/kW for Part 2 (non-rupiah Costs). (ii) Energy Payment This fee represents payment for kwhs of electrical energy generated by the Power Station and consists of Component C and D. Component C Energy Component Rate This fee covers the cost of fuel required by the Company to generate units of electrical energy. Component D Variable O&M Cost Recovery Charge This is a fee designed to cover Project variable operating and maintenance costs. In addition, the charge includes: Supplemental Payments 14

16 . (b) These payments shall be payable for fuel if a minimum off-take is not achieved. Transmission line charges The electricity price will also include Component E being the capacity payment for the transmission line. The fee is a capacity cost recovery charge designed to cover fixed costs for the transmission line. If the traditional PPAs remain in their current form, it will be extremely difficult to privatise the PLN because of the high electricity prices it is required to pay to IPPs under the PPAs. It will also make it difficult for privately owned transmission and/or generation companies to enter the market (ie. the high electricity prices may make it prohibitive to enter the market). Thus, it is essential to the development of a competitive market for prices under current PPAs to be renegotiated. Conclusions None of the existing Indonesian PPAs contain mechanisms allowing for a transition to a more competitive market structure. There do not appear to be any policies to facilitate the inclusion of such mechanisms. 5.3 Principle 11: Allocation of risks (a) Risk allocation under PPAs An indicative table summarising the allocation of the various risks associated with an IPP project between the parties is provided in Appendix B. In summary, the following risks are borne by the government/pln: market risk (ie, price shifts due to changes in market structure); (b) foreign exchange risk (IPPs paid in $US); changes in fuel prices (ie. PLN is also a generator); changes in the law; and political risk. IPPs also assume some of the risk of changes in fuel prices, the law and the political situation. These risks are dealt with by initially adjusting the tariff and if more extreme measures are required (and available) by claiming force majeure (Note: claiming force majeure for a failure breach of contract by PLN (ie. failure to make payments) may result in a buy-out of the IPP). Conclusions At present the government and PLN bear the predominant risks through take-or-pay provisions in the PPA and payment being in US dollars. 15

17 However, due to the political and financial situation in Indonesia the government and PLN have not been able to fulfil their obligations. As a consequence, the IPPs have been forced to renegotiate their PPAs to ensure that they receive payment and can continue their operations. Essentially, the IPPs have been forced to absorb some of the risk as PLN and the government cannot pay the negotiated price. The other alternative to renegotiation is arbitration. However, as the CalEnergy example highlights arbitration does not necessarily result in a satisfactory outcome. 6. Financing and its implications 6.1 Principle 12: Regulatory, taxation and foreign exchange regimes (a) (b) (c) (d) Transparency of taxation regime A complicated, but well defined, taxation regime has been developed to encourage and assist with IPP projects. Certain double tax treaties can be utilised for projects to minimise taxation liability and certain exemptions are granted to IPPs from customs duty and import tax in particular. Conversion of local currency to foreign currency The PPA provides for assistance in the conversion of local currency to foreign currency. Essentially, it is incumbent upon the IPP to seek to convert the currency. If this is not possible, then entering into the relevant FX contract is supported by PLN. However, in practice, this process does not work particularly well given the currency difficulties in Indonesia. Availability and transferability of foreign exchange There are no foreign exchange restrictions as such in Indonesia. Indonesia controls foreign exchange through Presidential Decree No. 59 of 1972 which states that any transaction creating any liability in foreign currency is required to be reported to Bank Indonesia and to the Ministry of Finance. No prior approvals of the Ministry of Finance are required for offshore credit for foreign investment companies unless the state owns a percentage of the company. However, there have been large restrictions on the availability of foreign exchange, purely due to a scarcity of US dollars, in particular, in Indonesia. Whilst there are no restrictions upon the ability to transfer such amounts overseas, there are structural restrictions (such as the approval of US dollar currency loans by the Indonesia Central Bank). Payments to IPPs pursuant to a PPA are denominated in US dollars. In this way, the amounts payable under the PPAs are protected from exchange rate changes. Protection is also provided through the adjustment of the relevant portions of the tariff that are denominated in US dollars. Financial information on power purchasers and other parties 16

18 (e) As discussed above, there is very little information publically available regarding the finances of PLN. IPPs are not subject to any formal financial disclosure requirements. However, they do issue annual reports. Conclusions The main difficulties with implementation of this Principle in Indonesia are: In practice, there has been great difficulty in the recent Asian currency crisis in the mechanism provided for in the PPA as amounts payable have been in US dollars. PLN, in particular, set an exchange rate which did not reflect the actual exchange rate at the time of negotiating the PPAs. For instance, the rate of exchange was set at approximately 2,450 Rupiah/to US$1 when the actual rate of conversion was something more akin to 8,000/to US$1. As can be seen by the recent move by PLN to renegotiate all PPAs and the recent arbitration between parties to PPA, the major difficulty is the provision for payment in US dollars, as the region is facing financial hardship. 6.2 Principle 13: Security over project assets (a) Legal framework for creating security over project assets There is a legal framework for creating security over project assets in favour of lenders in Indonesia. The structure is largely derived from Dutch civil law and is very convoluted and inefficient. As a result, assets are commonly transferred offshore to a jurisdiction where security can be obtained. For an outline of the Indonesian security documentation required for a power plant project see Appendix H. The types of security available for IPPs in Indonesia are as follows: (i) Hypothec (Indonesian mortgage over land) Hypothecs can cover buildings and fixtures placed on the land after creation and must be in notarial form and registered to give priority. Under the scheme, the hypothecs usually contains the power of attorney to sell. This allows the creditor to proceed with a sale of the property upon default by the borrower. Without the power of attorney, the creditor must obtain a court order to sell the property. (ii) Personal/Corporate guarantee Personal guarantees are regulated by articles 1820 to 1850 of the Indonesian Civil code and generally work in favour of the guarantor. Essentially, they require that the lender must first exhaust all remedies against the borrower before going against the guarantor. 17

19 (b) (iii) Fiduciary Transfer of ownership Fiduciary assignment is established by the assignment to the assignee of the legal title to the assets. This allows the assignor to retain physical possession of such assets. In the event of the assignor defaulting, the assignee is entitled to sell the assets at a public action. (iv) Assignment of Rights against Indonesian Borrower In Indonesian there is no restriction on assignment. The only practical problem arises in relation to registered hypothecs; in which case, any assignment of a lender s rights under the hypothec should be effected by the new lender submitting a request in notarial form to the Agrarian Office. The request should include a copy of the assignment and requests that the new bank be substituted in the hypothec for the bank selling its participation. In practice, this procedure is not accepted by the Agrarian Office and it requires that a new hypothec be registered with the assignee being included as a party thereto rather than the assignor. This is the only information regarding assignment and security. Indonesia has an established procedure dealing with bankruptcy. This procedure is set out under the law on bankruptcy promulgated in 1906, and is regulated separately from the Commercial Code. Under the Bankruptcy Law the creditors are ranked as follows: (i) claims for judicial expenses related to enforcement and other efforts to save the assets; (ii) taxes; (iii) claims secured with hypothecation and pledge; (iv) claims for costs and expenses for the preservation of the assets; and (v) unsecured creditors. Conclusions There are significant difficulties in creating an effective security package in Indonesia, largely due to the inadequacy of the legal system. In practice, it has also been difficult to convince the relevant State entities, in particular the PLN, as to the acknowledgment of security or to grant step-in rights. A standard form Direct Agreement was established under Paiton I. However, PLN showed no willingness to move away from this structure for future deals or to consider changes to this document. 6.3 Principle 14: Bankability of IPPs (a) Project structure providing a determined income stream 18

20 The income stream (to be) generated by an IPP project is protected by the following aspects of the PPA: Term The PPAs are long-term fixed rate agreements that are capped for a set period and then have a step down in price. Responsibilities during construction Cost overruns or time delays are the biggest risks during construction. Business interruption insurance is taken out to protect against time delays. In addition, responsibility of connecting the IPP to the grid rests with the State and a capacity fee will be imposed on PLN if connection does not occur within the required time frame. (i) Company s Responsibilities under the PPA arranging for the design, engineering, supply, construction, testing and commissioning of the Project, including the Special Facilities, in accordance with the design and equipment parameters set out in the PPA; the acquisition of the Site for Power Station and Special Facilities; applying for, and obtaining, all consents and GOI authorisations required to be in the Company name contemplated by the Project Documents including the Environmental Impact Assessment; applying for all work permits, visas and other permits required by Project personnel; protecting and securing the Site; and consulting with, and obtaining the approval of, PLN with respect to Special Facilities and the design, construction and installation of the Special Facilities in accordance with the parameters set out in the PPA. (ii) PLN s Responsibilities under the PPA assisting the Company to obtain all consents, GOI authorisation and permits required for the Power Station and Special Facilities; applying for, and obtaining, all consents and GOI authorisations required to be in PLN s name for the Project; arranging for the operation and maintenance of the special Facilities; and 19

21 (b) supplying power and energy required by the Company during the testing and commissioning of the Special Facilities, the Units and Power Plant. Terms of purchase Take-or-pay provisions protect the IPP against the failure of PLN to purchase electricity from the IPP. Penalties for non-delivery of power Two forms of penalty are available under the PPA for non-delivery of power: a reduction in the capacity charge or, in more extreme circumstances, termination of the PPA. Force majeure General force majeure is covered by insurance. If force majeure is of a political nature, then PLN is still obligated to ensure the maintenance of the IPP s income stream. Creditworthiness and track record of all parties PLN, the sole IPP power purchaser, was perceived as having little or no credit worthiness at the time of the significant IPP development in Indonesia in 1994/1996. As the Asian currency crisis illustrated, PLN showed an inability to meet its debt obligations to the IPPs. The support provided by the State to PLN was minimal and consisted of a letter of support from the Ministry of Finance noting that it would ensure PLN met its obligations. The form of the letter as support falls far short of a full guarantee. PLN s track record of meeting debt obligations and showing a consistent level of profitability is poor (ie. PLN has failed to fulfil payment obligations to a number of IPPs and in 1998 PLN reported losses of $US1.1 billion and estimated its total domestic and external debt to be approximately $US9 billion). Few steps appear to have been taken in the past by the Indonesian government to ensure local companies in IPP projects have proven track records. The local companies selected to participate as joint venture partners in Indonesian IPPs generally had contact with the Suharto family and their proven track record was on the whole related to political expediency. This said, there is a requirement for local participation in any project in Indonesia (which is usually around 15%). A local requirement does exist, with the basis for it being found in Presidential Decree No. 16/1994 (22 March 1994). However the Decree does not contain any specific percentage(s). Additional to this it is suggested that there is an informal requirement of 25% local content for government turnkey contracts (this information is dated 9/11/94). 20

22 (c) (d) (e) There are no government guarantees of PLN s obligations under the PPA. Instead, a letter of support (by the Indonesian Government), which is regarded as weak, is utilised. During the Paiton I Power Project, PLN showed no willingness to move away from the letter of support approach for subsequent power projects. Support from international lending agencies The bulk of the IPPs in Indonesia rely upon export credit agencies and multi-lateral lending agencies for financing. This support, on the whole, takes the form of revision of either subsidised financing or, more importantly, political risk guarantees. Political risk guarantees, are, for instance, provide by USEXIM (the United States export credit agency) and ERG (the Swiss export credit agency). Generally, these guarantees are in line with OECD guidelines and provide a level of support for debt on the project (approximately 85%). To date no political risk guarantee has been called upon by any financier. Commercial and political risk insurance The commercial insurance market available in Indonesia is very limited. The bulk of IPPs reinsure offshore in either the US or European markets. However, there are requirements to have a primary insurance policy onshore. Due to this requirement one of the following structures is used to reinsure offshore: (i) reinsurance with cut through arrangements. (ii) identical policies onshore and offshore. The latter requires the insurance provider to have both a domestic and an offshore office and is regarded by financiers as a preferable method. It effectively means that financiers/sponsors have two policies in identical terms that they can claim against. Each policy provides a provision that a claimant may only claim upon one of the two policies. In practice, it is always intended that a claimant would only ever claim off the offshore insurances. Conclusions The major difficulties that are currently experienced with the implementation of this Principle, and are likely to be experienced in the future, are: the perceived lack of creditworthiness of PLN; the relative lack of government support for the obligations of PLN; perceived lack of transparency in the process of renegotiation of the PPAs. 21

23 6.4 Principle 15: Development of domestic capital (a) IPP financing techniques The bulk of the IPPs developed in Indonesia have utilised a combination of multi-lateral and bilateral financing. Generally, because of the inherent political risk in Indonesia (even before the Asian currency crisis), IPPs in Indonesia required a combination of export credit agency subsidised or guaranteed financing and/or multi-lateral agencies financing all political risk support (such as the IFC or CDC). By way of example, the following table sets out the financing sources utilised for some landmark IPPs in Indonesia: Project Paiton I Tanjung Jati B Sengkang Sources of Debt of Financing USEXIM JEXIM, IFC ERG (b) (c) The following points are worth noting: there has been very little domestic debt or capital markets financing used in IPPs in Indonesia. all financing has been utilised in US dollars. The support granted by export credit agencies has been either in the form of subsidised financing or, more commonly, in the provision of political risk guarantees supporting commercial debt financing. Policies to encourage the development of domestic capital markets The domestic capital markets in Indonesia are reasonably immature. There are little or no domestic capital funds available for equity investment in electricity projects. However, offshore investment funds are used. Domestic markets have not been used for IPP financing in Indonesia. However, in the case of Paiton I, offshore bond market (a 144A capital markets issue) was utilised. Domestic capital is tight in Indonesia and has generally had former President Suharto s family attached to it. IPPs have generally used (foreign) assisted domestic equity investors. We are not aware of any policies explicitly designed to promote the development of domestic capital markets. Conclusions 22

CHAPTER NINE INVESTMENT. 1. This Chapter shall apply to measures adopted or maintained by a Party related to:

CHAPTER NINE INVESTMENT. 1. This Chapter shall apply to measures adopted or maintained by a Party related to: CHAPTER NINE INVESTMENT SECTION A: INVESTMENT ARTICLE 9.1: SCOPE OF APPLICATION 1. This Chapter shall apply to measures adopted or maintained by a Party related to: investors of the other Party; covered

More information

The policy and regulatory aspects of a bankable solar power project. Uzbekistan Energy Forum, London 18 April 2018 Louis Skyner Partner

The policy and regulatory aspects of a bankable solar power project. Uzbekistan Energy Forum, London 18 April 2018 Louis Skyner Partner The policy and regulatory aspects of a bankable solar power project Uzbekistan Energy Forum, London 18 April 2018 Louis Skyner Partner Contents 1. The restriction of subsidies and policy priorities. 2.

More information

PROGRAM EXPENDITURE AND FINANCING ASSESSMENT

PROGRAM EXPENDITURE AND FINANCING ASSESSMENT Sustainable Energy Access in Eastern Indonesia Electricity Grid Development Program (RRP INO 50016) PROGRAM EXPENDITURE AND FINANCING ASSESSMENT 1. The program expenditure and financing assessment reviews

More information

Global Project Finance Alert

Global Project Finance Alert Global Project Finance Alert March 20, 2018 Project Finance: Structuring for Success Mini-Summary This Practice Note considers the meaning of the term structure in a project finance transaction and identifies

More information

ECONOMIC CONSULTING ASSOCIATES LIMITED 41 Lonsdale Road London NW6 6RA UK tel +44 (0) / fax +44 (0)

ECONOMIC CONSULTING ASSOCIATES LIMITED 41 Lonsdale Road London NW6 6RA UK tel +44 (0) / fax +44 (0) Ghana Power Sector Review of Reform Programme Ray Tomkins (ECA) ECONOMIC CONSULTING ASSOCIATES LIMITED 41 Lonsdale Road London NW6 6RA UK tel +44 (0)20 7604 4545 / fax +44 (0)20 7604 4547 www.eca-uk.com

More information

FINANCIAL ANALYSIS. 3. Assumptions. The following assumptions were used in carrying out the financial analysis:

FINANCIAL ANALYSIS. 3. Assumptions. The following assumptions were used in carrying out the financial analysis: Java Bali 500-Kilovolt Power Transmission Crossing Project (RRP INO 42362) FINANCIAL ANALYSIS 1. General Methodology. Financial analysis of the project has been undertaken in accordance with Asian Development

More information

renewables Made in Germany Initiative

renewables Made in Germany Initiative renewables Made in Germany Initiative Renewable Energy Sector Indonesia Financing Opportunities and Risk Mitigation Jakarta, November 3rd, 2015 Project Finance International: Dr. Joachim Richter PFI Corporate

More information

Nigeria Power Series - Part 2: Unlocking Financing for Developing Independent Power Projects in Nigeria

Nigeria Power Series - Part 2: Unlocking Financing for Developing Independent Power Projects in Nigeria dentons.com Nigeria Power Series - Part 2: Unlocking Financing for Developing Independent Power Projects in Nigeria Briefing Note: December 2016 Contacts Dominic Spacie Partner Dentons UKMEA LLP One Fleet

More information

Electricity Sector Regulatory Developments, Opportunities and Challenges

Electricity Sector Regulatory Developments, Opportunities and Challenges Indonesian Energy and Infrastructure Seminar Electricity Sector Regulatory Developments, Luke Devine Hadiputranto, Hadinoto & Partners is a member of Baker & McKenzie International, a Swiss Verein with

More information

PART FIVE INVESTMENT, SERVICES AND RELATED MATTERS. Chapter Eleven. Investment

PART FIVE INVESTMENT, SERVICES AND RELATED MATTERS. Chapter Eleven. Investment PART FIVE INVESTMENT, SERVICES AND RELATED MATTERS Chapter Eleven Investment Section A - Investment Article 1101: Scope and Coverage 1. This Chapter applies to measures adopted or maintained by a Party

More information

PART FIVE INVESTMENT, SERVICES AND RELATED MATTERS. Chapter Eleven. Investment

PART FIVE INVESTMENT, SERVICES AND RELATED MATTERS. Chapter Eleven. Investment CHAP-11 PART FIVE INVESTMENT, SERVICES AND RELATED MATTERS Chapter Eleven Investment Section A - Investment Article 1101: Scope and Coverage 1. This Chapter applies to measures adopted or maintained by

More information

Overview of the framework

Overview of the framework Overview of the framework To meet the infrastructure deficit, the Twelfth Five Year Plan envisages a renewed thrust on investment in infrastructure, particularly in the power sector. The additional thermal

More information

CHAPTER 9 INVESTMENT

CHAPTER 9 INVESTMENT CHAPTER 9 INVESTMENT Article 9.1: Definitions For the purposes of this Chapter: 1. enterprise means any entity constituted or organized under applicable law, whether or not for profit, and whether privately

More information

PT Paiton Energy A Case Study in Renegotiation

PT Paiton Energy A Case Study in Renegotiation PT Paiton Energy A Case Study in Renegotiation Session on Yong Hee Kong PPP Resource & Research Centre, Kuala Lumpur PT Paiton During Construction 1 PT Paiton Energy (almost complete) Pt Paiton Energy

More information

A MULTILATERAL AGREEMENT ON INVESTMENT

A MULTILATERAL AGREEMENT ON INVESTMENT GENERAL DISTRIBUTION OCDE/GD(95)65 A MULTILATERAL AGREEMENT ON INVESTMENT REPORT BY THE COMMITTEE ON INTERNATIONAL INVESTMENT AND MULTINATIONAL ENTERPRISES (CIME) AND THE COMMITTEE ON CAPITAL MOVEMENTS

More information

Risk Factors. We are exposed to fluctuations in fuel prices

Risk Factors. We are exposed to fluctuations in fuel prices Risk Factors We are exposed to fluctuations in fuel prices Fuel is our most significant operating cost, accounting for 81.7 percent of our total expenses in 2014. Whether and to what extent we can pass

More information

Power Sector Reform and Investment Comparing Uganda with Kenya and Tanzania

Power Sector Reform and Investment Comparing Uganda with Kenya and Tanzania Power Sector Reform and Investment Comparing Uganda with Kenya and Tanzania Prof Anton Eberhard Management Program in Infrastructure Reform and Regulation University of Cape Town Drivers for utility reform

More information

Raising Equity for large biomass to power projects

Raising Equity for large biomass to power projects Specialist investment. 16/09/2016 Raising Equity for large biomass to power projects Presentation to IrBEA 'Financing Bioenergy Projects' Workshop Dublin 14 th September 2016 Dedicated Renewable Focused

More information

Indonesia A Legal Framework

Indonesia A Legal Framework Indonesia Now Seminar Swain Roberts Special Counsel 6 November 2014 Background to the Indonesian legal system Property ownership Commercial arrangements and enforcement Intellectual property Trade law

More information

World Bank Group Risk Mitigation Solutions for Myanmar s Infrastructure Projects. Workshop Program

World Bank Group Risk Mitigation Solutions for Myanmar s Infrastructure Projects. Workshop Program World Bank Group Risk Mitigation Solutions for Myanmar s Infrastructure Projects Workshop Program 3 June, 2015 Richard MacGeorge Successful preparation of bankable projects Getting Projects From Fairway

More information

LEGAL ASPECTS OF PROJECT FINANCE. Anjan Neupane Partner/Advocate Neupane Law Associates IN NEPAL

LEGAL ASPECTS OF PROJECT FINANCE. Anjan Neupane Partner/Advocate Neupane Law Associates IN NEPAL ` LEGAL ASPECTS OF PROJECT FINANCE Anjan Neupane Partner/Advocate Neupane Law Associates IN NEPAL About the speaker Anjan Neupane, Partner/Advocate, Neupane Law Associates LLB (Hons.) First Class, University

More information

Electricity Industry Bill

Electricity Industry Bill Electricity Industry Bill Request for additional information by Finance and Expenditure Committee The additional information sought by the committee on 17 February 2010 is set out in the following tables.

More information

Consultation for Modification Proposal P146: New Participation Category to the BSC Clearing House

Consultation for Modification Proposal P146: New Participation Category to the BSC Clearing House Consultation for Modification Proposal P146: New Participation Category to the BSC Clearing House A consultation document developed on behalf of the Settlement Standing Modification Group. For Attention

More information

North American Free Trade Agreement. Chapter 11: Investment

North American Free Trade Agreement. Chapter 11: Investment NORTH AMERICAN FREE TRADE AGREEMENT (NAFTA), TEXT OF THE AGREEMENT (EXCERPTS RELATING TO THE PROTECTION OF INVESTMENTS, CHAPTER 11: ARTICLES 1101-1120) North American Free Trade Agreement PART FIVE: INVESTMENT,

More information

BLACKGOLD NATURAL RESOURCES LIMITED (Company Registration Number: C) (Incorporated in the Republic of Singapore)

BLACKGOLD NATURAL RESOURCES LIMITED (Company Registration Number: C) (Incorporated in the Republic of Singapore) BLACKGOLD NATURAL RESOURCES LIMITED (Company Registration Number: 199704544C) (Incorporated in the Republic of Singapore) SIGNING OF HEADS OF AGREEMENT FOR THE FORMATION OF A NEW CONSORTIUM TO DEVELOP

More information

CYPRUS ENERGY REGULATORY AUTHORITY

CYPRUS ENERGY REGULATORY AUTHORITY CYPRUS ENERGY REGULATORY AUTHORITY METHODOLOGY AND CRITERIA FOR THE EVALUATION OF INVESTMENTS IN ELECTRICITY AND GAS INFRASTRUCTURE PROJECTS (ARTICLE 13(6) OF REGULATION (EU) No. 347/2013) 2015 WWW. C

More information

Revenue Requirement Application 2004/05 and 2005/06. Volume 2

Revenue Requirement Application 2004/05 and 2005/06. Volume 2 Revenue Requirement Application 2004/05 and 2005/06 Volume 2 Appendix K. BC Hydro Transfer Pricing Agreement Fiscal year 2004 TRANSFER PRICING AGREEMENT FOR ELECTRICITY AND GAS This Agreement is dated

More information

Cayman Islands: Restructuring & Insolvency

Cayman Islands: Restructuring & Insolvency The In-House Lawyer: Comparative Guides Cayman Islands: Restructuring & Insolvency inhouselawyer.co.uk /index.php/practice-areas/restructuring-insolvency/cayman-islands-restructuringinsolvency/ 5/3/2017

More information

Overview of the framework

Overview of the framework Overview of the framework Need for a framework Economic growth and trade expansion in recent years have enhanced the relevance of port sector as a critical element in globalisation of the Indian economy.

More information

(1986 to 1994) ( 1 ), in particular under Article 3(1)(a) and paragraph (j) of Annex I thereto;

(1986 to 1994) ( 1 ), in particular under Article 3(1)(a) and paragraph (j) of Annex I thereto; L 148/22 EN Official Journal of the European Communities COUNCIL DIRECTIVE 98/29/EC of 7 May 1998 on harmonisation of the main provisions concerning export credit insurance for transactions with medium

More information

Impact Summary: A New Zealand response to foreign derivative margin requirements

Impact Summary: A New Zealand response to foreign derivative margin requirements Impact Summary: A New Zealand response to foreign derivative margin requirements Section 1: General information Purpose The Reserve Bank of New Zealand (RBNZ) and the Ministry of Business, Innovation and

More information

Cross-Strait Bilateral Investment Protection and Promotion Agreement

Cross-Strait Bilateral Investment Protection and Promotion Agreement Cross-Strait Bilateral Investment Protection and Promotion Agreement [This translation is for reference only. The content and interpretation of the Cross-Strait Bilateral Investment Protection and Promotion

More information

1. Introduction. 2. Background. Agenda Item 10.3-Micro Eco Reform-Att A-Ann 4 MALAYSIA - ANNEX 4

1. Introduction. 2. Background. Agenda Item 10.3-Micro Eco Reform-Att A-Ann 4 MALAYSIA - ANNEX 4 1. Introduction MALAYSIA - ANNEX 4 This Annex sets out our findings in relation to the current status of implementation of the IPP Principles in Malaysia. In relation to each Principle the current status

More information

IPP s Project Risk Classification

IPP s Project Risk Classification IPP has to ensure that under all Project Agreements and Contracts he only bears, as far as possible, those risks within its control. The table below is a summary of relevant risks and mitigating factors

More information

Financing in Ukraine. Key issues. Regulatory requirements. NBU registration. 1 Financing in Ukraine. Briefing note September 2016.

Financing in Ukraine. Key issues. Regulatory requirements. NBU registration. 1 Financing in Ukraine. Briefing note September 2016. 1 Financing in Ukraine Briefing note September 2016 Financing in Ukraine July 2015 Whether lending directly to a Ukrainian borrower, or relying on guarantees or security from a Ukrainian obligor, there

More information

Overview of the framework

Overview of the framework Overview of the framework Need for a framework The highways sector in India is witnessing a significant interest from both domestic as well as foreign investors following the policy initiatives taken by

More information

Basics of PPA Negotiations. Eng. David M. Mwangi, Individual Energy Consultant Nairobi, Kenya

Basics of PPA Negotiations. Eng. David M. Mwangi, Individual Energy Consultant Nairobi, Kenya Basics of PPA Negotiations Eng. David M. Mwangi, Individual Energy Consultant Nairobi, Kenya Introduction Power Purchase Agreements (PPAs) are commercial/legal documents necessary for financing of power

More information

INVESTMENT OPPORTUNITIES in Central Asia Power Sector

INVESTMENT OPPORTUNITIES in Central Asia Power Sector INVESTMENT OPPORTUNITIES in Central Asia Power Sector Business Mission to Kazakhstan Almaty - Kazakhstan September 5, 2017 Pedro Robiou Senior Energy Specialist FOR DISCUSSION ONLY. The opinions expressed

More information

Sumant Chak MAKING PPP ATTRACTIVE FOR PRIVATE FINANCE IN INFRASTRUCTURE THE INDIA STORY. Asian Institute of Transport Development

Sumant Chak MAKING PPP ATTRACTIVE FOR PRIVATE FINANCE IN INFRASTRUCTURE THE INDIA STORY. Asian Institute of Transport Development MAKING PPP ATTRACTIVE FOR PRIVATE FINANCE IN INFRASTRUCTURE THE INDIA STORY Sumant Chak Asian Institute of Transport Development Railway Staff College, Vadodara Course: BIMSTEC and MGC officers Course,

More information

Product Disclosure Statement. ASCF Mortgage Funds. ASCF #1 Fund ARSN ASCF #2 Fund ARSN

Product Disclosure Statement. ASCF Mortgage Funds. ASCF #1 Fund ARSN ASCF #2 Fund ARSN Product Disclosure Statement ASCF Mortgage Funds ASCF #1 Fund ARSN 616 367 410 ASCF #2 Fund ARSN 616 367 330 Responsible Entity Australian Secure Capital Fund Ltd ACN 613 497 635 AFS licence no. 491201

More information

The Government of the People s Republic of China and the Government of the Republic of Korea (hereinafter referred to as the Contracting Parties),

The Government of the People s Republic of China and the Government of the Republic of Korea (hereinafter referred to as the Contracting Parties), AGREEMENT BETWEEN THE GOVERNMENT OF THE PEOPLE S REUBLIC OF CHINA AND THE GOVERNMENT OF THE REPUBLIC OF KOREA ON THE PROMOTION AND PROTECTION OF INVESTMENTS Department of Treaty and Law 2010-02-05 16:25

More information

Annex. GUIDELINES FOR CONDUCTING ADVANCE PRICING ARRANGEMENTS UNDER THE MUTUAL AGREEMENT PROCEDURE ("MAP APAs")

Annex. GUIDELINES FOR CONDUCTING ADVANCE PRICING ARRANGEMENTS UNDER THE MUTUAL AGREEMENT PROCEDURE (MAP APAs) Annex GUIDELINES FOR CONDUCTING ADVANCE PRICING ARRANGEMENTS UNDER THE MUTUAL AGREEMENT PROCEDURE ("MAP APAs") A. Background i) Introduction 1. Advance Pricing Arrangements ("APAs") are the subject of

More information

AIRPORT BOTS/ CONCESSIONS CHECKLIST OF LEGAL AND REGULATORY ISSUES

AIRPORT BOTS/ CONCESSIONS CHECKLIST OF LEGAL AND REGULATORY ISSUES AIRPORT BOTS/ CONCESSIONS CHECKLIST OF LEGAL AND REGULATORY ISSUES The list below highlights the key legal issues that need to be considered in relation to Airport Concessions (assuming single site airport

More information

Public Disclosure Authorized. Public Disclosure Authorized. Public Disclosure Authorized. Public Disclosure Authorized CONFORMED COPY

Public Disclosure Authorized. Public Disclosure Authorized. Public Disclosure Authorized. Public Disclosure Authorized CONFORMED COPY Public Disclosure Authorized CONFORMED COPY LOAN NUMBER 3978 IND Loan Agreement Public Disclosure Authorized (Second Power Transmission and Distribution Project) between REPUBLIC OF INDONESIA and INTERNATIONAL

More information

For personal use only

For personal use only Company Announcements ASX Limited Exchange Plaza 2 The Esplanade PERTH WA 6000 By Electronic Lodgement 14 September 2011 REALM RESOURCES SECURES $15 MILLION FUNDING PACKAGE CORNERSTONE INVESTOR TAKES SIGNIFICANT

More information

NIGERIAN POWER SECTOR REFORMS AND PRIVATISATION. By Bolanle Onagoruwa Director General, Bureau of Public Enterprises

NIGERIAN POWER SECTOR REFORMS AND PRIVATISATION. By Bolanle Onagoruwa Director General, Bureau of Public Enterprises NIGERIAN POWER SECTOR REFORMS AND PRIVATISATION By Bolanle Onagoruwa Director General, Bureau of Public Enterprises A Presentation to the West African Power Industry Convention November 2011 Outline Introduction

More information

Developing the Power Sector through Private Investment in Mongolia. Edgar Saravia Program Manager

Developing the Power Sector through Private Investment in Mongolia. Edgar Saravia Program Manager Developing the Power Sector through Private Investment in Mongolia Edgar Saravia Program Manager October 2008 Setting the Context Government of Mongolia ( GoM ) wishes to introduce PSP in power generation

More information

KINGDOM OF CAMBODIA NATION RELIGION KING ELECTRICITY AUTHORITY OF CAMBODIA REGULATIONS

KINGDOM OF CAMBODIA NATION RELIGION KING ELECTRICITY AUTHORITY OF CAMBODIA REGULATIONS KINGDOM OF CAMBODIA NATION RELIGION KING ELECTRICITY AUTHORITY OF CAMBODIA REGULATIONS ON GENERAL PRINCIPLES FOR REGULATING ELECTRICITY TARIFFS IN THE KINGDOM OF CAMBODIA Under Electricity Law of The Kingdom

More information

Operation Evaluation Summary. A car manufacturer. (A private sector investment operation) December 11. ab0cd. Evaluation Department (EvD)

Operation Evaluation Summary. A car manufacturer. (A private sector investment operation) December 11. ab0cd. Evaluation Department (EvD) Operation Evaluation Summary A car manufacturer (A private sector investment operation) December 11 Evaluation Department (EvD) ab0cd Operation Evaluation Summary A car manufacturer December 2011 Executive

More information

Investing in Renewable Assets in Emerging Markets

Investing in Renewable Assets in Emerging Markets Investing in Renewable Assets in Emerging Markets Jonathan Cohen Principal Associate 20 June 2017 Contents Eversheds Sutherland approach The global renewable energy market Development challenges and mitigating

More information

SECTOR ASSESSMENT (SUMMARY): INDUSTRY AND TRADE

SECTOR ASSESSMENT (SUMMARY): INDUSTRY AND TRADE Stepping Up Investments for Growth Acceleration Program- Subprogram 2 (RRP INO 48134) SECTOR ASSESSMENT (SUMMARY): INDUSTRY AND TRADE 1. This sector assessment describes the binding constraints to achieving

More information

FINANCIAL ANALYSIS: PROJECT 1

FINANCIAL ANALYSIS: PROJECT 1 Green Power Development and Energy Efficiency Improvement Investment Program (RRP SRI 47037) A. Background and Rationale FINANCIAL ANALYSIS: PROJECT 1 1. Project 1 of the Green Power Development and Energy

More information

DEVELOPING WIND AND SOLAR POWER IN VIETNAM: KEY ISSUES

DEVELOPING WIND AND SOLAR POWER IN VIETNAM: KEY ISSUES BRIEFING DEVELOPING WIND AND SOLAR POWER IN VIETNAM: KEY ISSUES JANUARY 2018 THE GOVERNMENT OF VIETNAM HAS SET A TARGET OF GENERATING 850 MW AND 800 MW OF SOLAR AND WIND POWER RESPECTIVELY BY 2020 THE

More information

Bilateral Investment Treaty between Australia and Indonesia

Bilateral Investment Treaty between Australia and Indonesia Bilateral Investment Treaty between Australia and Indonesia This document was downloaded from ASEAN Briefing (www.aseanbriefing.com) and was compiled by the tax experts at Dezan Shira & Associates (www.dezshira.com).

More information

Japanese ODA Loan. Ex-ante Evaluation

Japanese ODA Loan. Ex-ante Evaluation Japanese ODA Loan Ex-ante Evaluation 1. Name of the Program Country: The Islamic Republic of Pakistan Project: Energy Sector Reform Program Loan Agreement Signed: June 4, 2014 Loan Amount: 5,000 million

More information

By Director of Various New and Renewable Energy T

By Director of Various New and Renewable Energy T MINISTRY OF ENERGY AND MINERAL RESOURCES OF THE REPUBLIC OF INDONESIA DIRECTORAT GENERAL OF NEW RENEWABLE ENERGY AND ENERGY CONSERVATION By Director of Various New and Renewable Energy T Jakarta, 10 May

More information

Initial Project Information Document (PID) Report No: AB484. INDONESIA - Domestic Gas Sector Restructuring Region. Project Name

Initial Project Information Document (PID) Report No: AB484. INDONESIA - Domestic Gas Sector Restructuring Region. Project Name Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Initial Project Information Document () Report No: AB484 Project Name INDONESIA - Domestic

More information

ELECTRICITY ACT, 2005

ELECTRICITY ACT, 2005 ELECTRICITY ACT, 2005 ARRANGEMENTOF SECTIONS Section PART 1 PRELIMINARY 1. Short title 2. Interpretation 3. Objectives PART II FUNCTIONS OF THE DEPARTMENT OF STATE 4. Functions of the Department of State

More information

BENCHMARKING PPP PROCUREMENT 2017 IN MAURITIUS

BENCHMARKING PPP PROCUREMENT 2017 IN MAURITIUS BENCHMARKING PPP PROCUREMENT 2017 IN MAURITIUS Regulatory and Institutional Framework for PPPs Does the regulatory framework in your country allow procuring PPPs?. If yes, please specify the relevant regulatory

More information

Create and integrate

Create and integrate Sponsors should be aware of issues in the integration of project documents and financing documents for wind facilities, or pay for them later. By Mark D. Safty, chair, and Tyler N. Hand, associate, with

More information

Saudi Arabia Solar Trade Mission: Financing Panel - Introduction. Tim Armsby, Partner and Regional Head of Energy & Infrastructure

Saudi Arabia Solar Trade Mission: Financing Panel - Introduction. Tim Armsby, Partner and Regional Head of Energy & Infrastructure Saudi Arabia Solar Trade Mission: Financing Panel - Introduction Tim Armsby, Partner and Regional Head of Energy & Infrastructure Agenda Introduction Background to private sector participation in regional

More information

India Infrastructure Debt Fund: A Concept Paper

India Infrastructure Debt Fund: A Concept Paper India Infrastructure Debt Fund: A Concept Paper - Gajendra Haldea Creation of world-class infrastructure has been recognised as a key priority and a necessary condition for sustaining the growth momentum

More information

Overview of cogeneration project development

Overview of cogeneration project development Overview of cogeneration project development 2004 Cogeneration Week in Thailand 23-25 March 2004 Miracle Grand Convention Hotel, Bangkok Romel M. Carlos Financial Advisor Project Development Process Commissioning

More information

The Question of Sovereign Guarantee for the Development of Electricity Generation in Ethiopia

The Question of Sovereign Guarantee for the Development of Electricity Generation in Ethiopia The Question of Sovereign Guarantee for the Development of Electricity Generation in Ethiopia By Mollalign Abebe Ethiopian Electricity Agency November 27, 2006 1 Four parts of the Presentation: Policy,

More information

Appendix 1. Regulatory Impact Statement Retentions in construction contracts. Agency Disclosure Statement

Appendix 1. Regulatory Impact Statement Retentions in construction contracts. Agency Disclosure Statement Regulatory Impact Statement Retentions in construction contracts Appendix 1 Agency Disclosure Statement This Regulatory Impact Statement (RIS) has been prepared by the Construction Market Policy team in

More information

AGREEMENT BETWEEN AND THE GOVERNMENT OF THE CZECH REPUBLIC

AGREEMENT BETWEEN AND THE GOVERNMENT OF THE CZECH REPUBLIC AGREEMENT BETWEEN THE GOVERNMENT OF THE REPUBLIC OF MAURITIUS AND THE GOVERNMENT OF THE CZECH REPUBLIC FOR THE PROMOTION AND RECIPROCAL PROTECTION OF INVESTMENTS The Government of the Republic of Mauritius

More information

THE EU STATE AID REGIME: AN OVERVIEW

THE EU STATE AID REGIME: AN OVERVIEW THE EU STATE AID REGIME: AN OVERVIEW 1. Introduction The starting point of European Union State aid policy is that aid given by individual EU Member States to industrial and commercial undertakings is

More information

BUSINESS COUNCIL OF AUSTRALIA SUBMISSION TO THE ENERGY REFORM IMPLEMENTATION GROUP SEPTEMBER 2006

BUSINESS COUNCIL OF AUSTRALIA SUBMISSION TO THE ENERGY REFORM IMPLEMENTATION GROUP SEPTEMBER 2006 BUSINESS COUNCIL OF AUSTRALIA SUBMISSION TO THE ENERGY REFORM IMPLEMENTATION GROUP SEPTEMBER 2006 TABLE OF CONTENTS 1 Introduction...2 2 The Benefits of Past Reform...4 3 Policy Outcomes and Steps for

More information

Business Environment: Russia

Business Environment: Russia Business Environment: Russia Euromonitor International 13 April 2010 Despite the economic recession of 2009, a recovery is expected in 2010. The business environment remains challenging due to over-regulation,

More information

Finnish Arbitration Act (23 October 1992/967)

Finnish Arbitration Act (23 October 1992/967) Finnish Arbitration Act (23 October 1992/967) Comments of the Secretariat of the United Nations Commission on International Trade Law (UNCITRAL) on the basis of the unofficial translation from Finnish

More information

Model Concession Agreement for Highways: An Overview

Model Concession Agreement for Highways: An Overview Model Concession Agreement for Highways: An Overview - Gajendra Haldea The highways sector in India is witnessing significant interest from both domestic as well as foreign investors following the policy

More information

Loan Agreement. Public Disclosure Authorized CONFORNED COPY LOAN NUMBER 2214 IND. Public Disclosure Authorized. (Twelfth Power Project)

Loan Agreement. Public Disclosure Authorized CONFORNED COPY LOAN NUMBER 2214 IND. Public Disclosure Authorized. (Twelfth Power Project) Public Disclosure Authorized CONFORNED COPY LOAN NUMBER 2214 IND Public Disclosure Authorized Loan Agreement (Twelfth Power Project) Public Disclosure Authorized between REPUBLIC OF INDONESIA and INTERNATIONAL

More information

The investment shall be newly originated (not a refinancing). The investments shall be expected to be financially viable.

The investment shall be newly originated (not a refinancing). The investments shall be expected to be financially viable. Financial Instrument Envisaged state aid regime Investment focus Investment range Eligible investees Expansion Capital Fund Envisaged to be Article 21 of General Block Exemption Regulation 1 (GBER) or

More information

The Government of the United Mexican States and the Government of the Republic of Belarus, hereinafter referred to as "the Contracting Parties,"

The Government of the United Mexican States and the Government of the Republic of Belarus, hereinafter referred to as the Contracting Parties, AGREEMENT BETWEEN THE GOVERNMENT OF THE UNITED MEXICAN STATES AND THE GOVERNMENT OF THE REPUBLIC OF BELARUS ON THE PROMOTION AND RECIPROCAL PROTECTION OF INVESTMENTS The Government of the United Mexican

More information

83C Questions and Answers

83C Questions and Answers 83C Questions and Answers (2) Section 1.7.4.1 Can the Evaluation Team provide guidance on the scope and amount of information that could be requested from ISO-NE, and the expected magnitude of any associated

More information

FACILITATING ACCESS TO FINANCE FOR INFRASTRUCTURE PROJECTS: ESTABLISHING DEDICATED INSTITUTIONS

FACILITATING ACCESS TO FINANCE FOR INFRASTRUCTURE PROJECTS: ESTABLISHING DEDICATED INSTITUTIONS INDONESIA INFRASTRUCTURE GUARANTEE FUND (IIGF) FACILITATING ACCESS TO FINANCE FOR INFRASTRUCTURE PROJECTS: ESTABLISHING DEDICATED INSTITUTIONS United Nations Economic And Social Commission For Asia And

More information

1. Financial instrument KOFFI

1. Financial instrument KOFFI Appendix No 9 to the Rules for the Submission and Selection of Tenders for Venture Capital Funds (Financial Intermediaries) under the KOFFI Programme Term Sheet for the Call for and Selection of VC Funds

More information

Green Bond Second Opinion

Green Bond Second Opinion Green Bond Second Opinion Based on the International Capital Markets Association s The Green Bond Principles, Voluntary Process Guidelines for Issuing Green Bonds, 2017 February 2018 Prepared for: Star

More information

Banking and Financial Services

Banking and Financial Services Banking and Financial Services Introduction The purpose of our paper is to contribute our views on how the banking sector in Vietnam can continue to grow, and to support the development goals of the country

More information

AGREEMENT BETWEEN THE GOVERNMENT OF THE REPUBLIC OF INDIA AND THE GOVERNMENT OF THE UNION OF MYANMAR FOR THE RECIPROCOL PROMOTION AND PROTECTION

AGREEMENT BETWEEN THE GOVERNMENT OF THE REPUBLIC OF INDIA AND THE GOVERNMENT OF THE UNION OF MYANMAR FOR THE RECIPROCOL PROMOTION AND PROTECTION AGREEMENT BETWEEN THE GOVERNMENT OF THE REPUBLIC OF INDIA AND THE GOVERNMENT OF THE UNION OF MYANMAR FOR THE RECIPROCOL PROMOTION AND PROTECTION OF INVESTMENTS The Government of the Republic of India and

More information

S E C T I O N. two. Power

S E C T I O N. two. Power S E C T I O N two Power 32 VOLUME 15: EXAMPLES OF SUCCESSFUL PUBLIC-PRIVATE PARTNERSHIPS 3 Nationwide Water and Power, Gabon P R O J E C T S U M M A R Y In July 1997, the Government of Gabon signed a 20-year

More information

DECISION No 2/2000 OF THE EC-MEXICO JOINT COUNCIL of 23 March 2000 (2000/415/EC)

DECISION No 2/2000 OF THE EC-MEXICO JOINT COUNCIL of 23 March 2000 (2000/415/EC) L 157/10 DECISION No 2/2000 OF THE EC-MEXICO JOINT COUNCIL of 23 March 2000 (2000/415/EC) THE JOINT COUNCIL, Having regard to the Interim Agreement on trade and traderelated matters between the European

More information

EFC SUB-COMMITTEE ON EU SOVEREIGN DEBT MARKETS COLLECTIVE ACTION CLAUSE EXPLANATORY NOTE

EFC SUB-COMMITTEE ON EU SOVEREIGN DEBT MARKETS COLLECTIVE ACTION CLAUSE EXPLANATORY NOTE EFC SUB-COMMITTEE ON EU SOVEREIGN DEBT MARKETS COLLECTIVE ACTION CLAUSE EXPLANATORY NOTE 1. Introduction On 28 November 2010, euro area finance ministers announced a number of policy measures intended

More information

OJK: Foreign capital in insurance industry complies with the law

OJK: Foreign capital in insurance industry complies with the law OJK: Foreign capital in insurance industry complies with the law Discussion with the Supervising Deputy Commissioner of the Non-Bank Financial Industry (NBFI) of the Financial Service Authority, Edy Setiadi.

More information

ECONOMIC AND FINANCIAL CRISIS ON POWER SECTOR INVESTMENTS IN LCR

ECONOMIC AND FINANCIAL CRISIS ON POWER SECTOR INVESTMENTS IN LCR ASSESSING THE IMPACT OF THE ECONOMIC AND FINANCIAL CRISIS ON POWER SECTOR INVESTMENTS IN LCR COLOMBIA, PERU and JAMAICA Sustainable Development Department LCR - Energy Unit The World Bank Outline Introduction

More information

Project financing: guidelines & best practices

Project financing: guidelines & best practices Project Organizing in the construction industry Project financing: guidelines & best practices Padova, March 28th 2014 Palazzo del Bo Put simply: a PPP Project is considered bankable if lenders are willing

More information

Greece. Country Q&A Greece Restructuring and Insolvency 2005/06. Johnny Vekris and George Bersis, PI Partners. Country Q&A SECURITY AND PRIORITIES

Greece. Country Q&A Greece Restructuring and Insolvency 2005/06. Johnny Vekris and George Bersis, PI Partners. Country Q&A SECURITY AND PRIORITIES Greece Restructuring and Insolvency 2005/06 Greece Johnny Vekris and George Bersis, PI Partners www.practicallaw.com/a47896 SECURITY AND PRIORITIES 1. What are the most common forms of security taken in

More information

Guidelines May Banking & Finance Kyiv. General provisions on lending. Parties to the loan agreement. Applicable law and jurisdiction

Guidelines May Banking & Finance Kyiv. General provisions on lending. Parties to the loan agreement. Applicable law and jurisdiction Banking & Finance Kyiv Guidelines May 2017 In This Issue: Cross-border financing in Ukraine - General provisions on lending - Loan registration - Licensing requirements and approvals - Payment restrictions

More information

IPP Project Development

IPP Project Development IPP Project Development AFRICA UTILITY WEEK CONFERENCE Yesufu Longe Alonge Head, Power Procurement & Power Contracts And Dr. Nnaemeka Ewelukwa General Counsel & Company Secretary May 13, 2013 1 Outline

More information

COMMISSION OF THE EUROPEAN COMMUNITIES COMMUNICATION FROM THE COMMISSION

COMMISSION OF THE EUROPEAN COMMUNITIES COMMUNICATION FROM THE COMMISSION COMMISSION OF THE EUROPEAN COMMUNITIES Brussels, 7.1.2004 COM(2003) 830 final COMMUNICATION FROM THE COMMISSION on guidance to assist Member States in the implementation of the criteria listed in Annex

More information

National Interest Analysis

National Interest Analysis National Interest Analysis Date of proposed binding Treaty action Scope Reasons for New Zealand to become party to the Treaty Impacts on New Zealand of the Treaty entering into force Obligations Economic,

More information

Listing Authority Policies

Listing Authority Policies - Listing Authority Policies Feedback Statement further to Industry Responses to MFSA Circular 5 th July, 2010 16 th August 2010 1.0 Background On the 5 th July 2010, MFSA issued a circular entitled Consultation

More information

Authorisation means an authorisation, consent, approval, resolution, licence, exemption, filing, notarisation, lodgement or registration.

Authorisation means an authorisation, consent, approval, resolution, licence, exemption, filing, notarisation, lodgement or registration. USD540m subordinated loan agreement between DBS Bank (Hong Kong) Limited (the Borrower ) and DBS Group Holdings Ltd (the Lender ) Full terms and conditions 1 DEFINITIONS AND INTERPRETATION 1.1 Definitions

More information

Ventus 2 VCT plc. Strategy Note Executive Summary

Ventus 2 VCT plc. Strategy Note Executive Summary 1 Executive Summary This note summarises the outcome of a strategy review undertaken by the Board of Ventus 2 VCT plc (the Company ) over the past year during the period when the last of the Company s

More information

PROTOCOL ON INVESTMENT TO THE NEW ZEALAND AUSTRALIA CLOSER ECONOMIC RELATIONS TRADE AGREEMENT

PROTOCOL ON INVESTMENT TO THE NEW ZEALAND AUSTRALIA CLOSER ECONOMIC RELATIONS TRADE AGREEMENT PROTOCOL ON INVESTMENT TO THE NEW ZEALAND AUSTRALIA CLOSER ECONOMIC RELATIONS TRADE AGREEMENT Preamble New Zealand and Australia ( the Parties ), Conscious of their longstanding friendship and close historic,

More information

Revised Guidelines on the recognition of External Credit Assessment Institutions

Revised Guidelines on the recognition of External Credit Assessment Institutions 30 November 2010 Revised Guidelines on the recognition of External Credit Assessment Institutions Executive Summary 1. The Capital Requirements Directive 1 (CRD) allows institutions to use external credit

More information

Middle East - Developments in Restructuring

Middle East - Developments in Restructuring 8 Clifford Street London W1S 2LQ F: +44.20.7851.6000 Middle East - Developments in Restructuring 1. MIDDLE EAST RESTRUCTURINGS AND REFORM OF INSOLVENCY LEGISLATION 2 2. THE FEDERAL LAWS OF THE UNITED ARAB

More information

EMERGING MARKETS RISK DISCLOSURE STATEMENT

EMERGING MARKETS RISK DISCLOSURE STATEMENT EMERGING MARKETS RISK DISCLOSURE STATEMENT This Risk Disclosure Statement is intended to inform investors of the uncertainties and risks associated with investments and transactions in various types of

More information

Due Diligence checklist for [insert project name]

Due Diligence checklist for [insert project name] Due Diligence checklist for [insert project name] Draft February 2016 PricewaterhouseCoopers, ABN 52 780 433 757 Darling Park Tower 2, 201 Sussex Street, GPO BOX 2650, SYDNEY NSW 1171 T: +61 2 8266 0000,

More information

Iraq is a country of both tremendous. Secured lending transactions in Iraq: defining market practice in a volatile environment

Iraq is a country of both tremendous. Secured lending transactions in Iraq: defining market practice in a volatile environment repayment of loans and depreciation of direct investment; and remittance of funds for family expenses in reasonable amounts. Foreign investors who bring investment funds into Myanmar must declare to the

More information