1 Headline Verdana Bold Uganda PPP Act - Implications for Public Sector Accounting Kenneth LEGESI Deloitte (Uganda) Limited
2 About us Kenneth Legesi Infrastructure and Capital Projects / PPP Advisory Deloitte East Africa Experience in providing programme management, transaction advisory services for Lenders, Governments and Investors in Public Private Partnership (PPP) projects across different geographies and industries. Specialise in providing technical and financial advice in the infrastructure and capital projects space including economic/financial analysis and modelling, programme management and advisory. Advised public and private sector clients on both corporate and project financed transactions (including PPP/PFI projects) to prepare feasibility studies, undertake due diligence, preparation of transaction materials, develop contract documentation and gain successful financial close. Education / Training: BSc in Civil Engineering, Makerere University, Uganda MSc in Environmental Engineering & Business Management, Imperial College London, UK Completed the Chartered Financial Analysts (CFA) Program, USA 2
3 Contents Introduction - Background and Context - What is a PPP - Different PPP Models PPPs in Uganda - Overview - PPP Act - PPP Process - Feasibility Study PPPs Accounting treatment - Private Sector, IFRIC 12 - Public Sector, IPSAS 32 Summary Please send any questions / clarifications to klegesi@deloitte.co.ug 3
4 Contents Introduction - Background and Context - What is a PPP - Different PPP Models PPPs in Uganda - Overview - PPP Act - PPP Process - Feasibility Study PPPs Accounting treatment - Private Sector, IFRIC 12 - Public Sector, IPSAS 32 Summary Please send any questions / clarifications to klegesi@deloitte.co.ug 4
5 Introduction Background and Context Uganda targeting middle income status by 2020, guided by strategies and plans as outlined in Vision 2040 and NDP2 Infrastructure investment is acknowledged and recognized as a key contributor to economic growth. However, the condition and coverage of Uganda s infrastructure is not adequate to support the levels of economic growth for Vision To this end, NDP2 sets out the next major phase of infrastructure investment including the Standard Gauge Railway (SGR) at $2bn (by 2018), the Oil Refinery ($0.5bn), Oil Pipeline at $2bn, and oil exploitation infrastructure ($0.7bn in place by 2020). Roads and expressways estimated at $1.5bn. Over $12bn of infrastructure planned in Currently the majority of financing for infrastructure in Uganda is through domestic borrowing and concessional financing with limited private sector investment in infrastructure Concessional finance model is seen as increasingly less important and is expected to decline. Stretched and competing budgets from different votes means funding of infrastructure through domestic borrowing alone is not sustainable Consequently, the potential for private sector investment in infrastructure via PPPs is envisaged across various sectors at national and sub-national level. 5
6 Introduction What is a PPP? PPP refers to a partnership/commercial transaction between a public sector institution and a private party, in which the private party assumes substantial financial, technical and operational risk in the design, financing, building and operation of a project in consideration for some benefit. Medium to Long Term Contractual agreement Partnership between public & private sector PPP Sharing of risks The project may be tangible (physical infrastructural development) or intangible (provision of services). Outcomes that are in the public s Finance, Sharing of benefits PPP is premised on a value for money and public interest assessment (cost, quality, quantity, risk). interest construct or manage infrastructure or provide service 6
7 Introduction Different PPP Models Concession: lease of the asset to the private party for a long period of time. For example, Kilembe Mines. Operation and maintenance: private party to operate and maintain a property of the contracting authority. Lease, develop and operate: long-term lease for private party to operate and expand an existing infrastructure. For example, Serena Hotel Kampala. Build, own and maintain: private party to build, own and maintain an infrastructure asset Build, own, operate and transfer: private party to finance, build, own and operate an infrastructure for a specific period and to hand-over to the contracting authority. Design, build, finance and operate: private party to design, build, finance and operate an infrastructure for a specific period and to hand-over to the contracting authority. Build, own and operate: private party to own the project in perpetuity Who pays / compensates the private sector for the risk that they are undertaking? Implications for accounting treatment 1) Government pays Availability Based; and / or 2) User pays Demand / Revenue Risk Based 7
8 Contents Introduction - Background and Context - What is a PPP - Different PPP Models PPPs in Uganda - Overview - PPP Act - PPP Process - Feasibility Study PPPs Accounting treatment - Private Sector, IFRIC 12 - Public Sector, IPSAS 32 Summary Please send any questions / clarifications to klegesi@deloitte.co.ug 8
9 PPPs in Uganda Overview PPPs not new TOURISM (HOTEL): KAMPALA SERENA HOTEL, 30 YRS, CONCESSION TRANSPORT (RAIL): RVR RAILWAY, 25 YRS, CONCESSION MINING: KILEMBE MINES, 25 YRS, CONCESSION ELECTRICITY: ELECTRICITY DISTRIBUTION (UMEME), 20 YRS, CONCESSION legal framework new Project Development Facilitation Fund (PDFF) Fund PPP unit and Contracting Authority (Project Development) Uganda PPP Act Legal Framework and Guidance for PPPs in Uganda PPP Committee Oversight and Regulation of PPPs PPP Unit Technical arm and secretariat of PPP Committee Ministry of Finance ELECTRICITY: ELECTRICITY GENERATION, ESKOM, 20 YRS, CONCESSION INFRASTRUCTURE: KALANGALA INFRASTRUCTURE SERVICES, 20 YRS, BUILD OPERATE TRANSFER (BOT) ELECTRICITY: ELECTRICITY GENERATION, BUJAGALI - 250MW HYDROPOWER, 30 YR, BUILD OWN OPERATE TRANSFER (BOOT) Process Auditor Assurance of alignment with PPP Act Accounting Officer Initiates and oversees the entire PPP process Project Officer In-charge of PPP project delivery Private Sector Evaluation Committee Oversee procurement process PPP Project Agreement Contracting Authority 9 Transaction Advisor Support the Contracting Authority 9
10 PPPs in Uganda Uganda PPP Act, Overview The PPP Act commenced on 1 October 2015 by virtue of the Public-Private Partnerships (Commencement) Instrument Regulations being developed to cover the following aspects in detail: project inception, feasibility studies, bid evaluation, bidding methods and procedures and bidding documents / forms. PPP agreements excluded from the ambit of the Public Procurement and Disposal of Public Assets Act
11 PPPs in Uganda Uganda PPP Act, Key Players 1. The Public-Private Partnership Committee: High-level committee whose members include the Attorney General, Permanent Secretary of the Ministry of Finance, Permanent Secretary of the Office of the Prime Minister and Permanent Secretary of the Ministry of Local Government as well as representation from the private sector. Principal role of the committee is to review and approve every single project agreement, as well as exercise general oversight responsibilities over the implementation of public-private partnerships in Uganda. 2. The Public-Private Partnership Unit: Unit established within the Ministry of Finance to act as the secretariat and technical arm of the Committee, and to provide technical, financial and legal expertise to the Committee. Unit to be headed by a Director. Key function of the Unit is to manage, through a transparent and equitable process, the identification, screening, prioritization, procurement, monitoring and implementation of PPP projects Unit also mandated to ensure that all projects comply with the requirements of the PPP Act. All PPP Projects in Uganda have to be registered with the PPP Unit 11
12 PPPs in Uganda Uganda PPP Act, Key Players 3. PPP participants: Contracting authority: role of the contracting authority is to identify, appraise, develop, procure and monitor a public-private partnership. Notably, the contracting authority shall not incur a debt or contingent obligation unless the approval of Parliament is obtained [Article 159 of the Constitution] Accounting officer: role of the accounting officer is to appoint the project team and oversee the procurement and implementation process to ensure that the value for money objective is not compromised. Project officer: role of the project officer is to manage the procurement and implementation of the project and monitor the performance of the private party. Process auditor: role of the process auditor is to ensure that the contracting authority complies with the requirements for implementing PPPs. Transaction advisor: role of the transaction advisor is to undertake a comprehensive feasibility study for a project and safeguard the interests of the contracting authority in the management and execution of a project. Evaluation committee: the accounting officer shall point an evaluation committee for each project, which shall be composed of officials with the technical skills required for the evaluation of a bid. The officials in question may also be appointed from outside the contracting authority. 12
13 PPPs in Uganda Uganda PPP Act, Key Players 3. PPP participants: PPP project team: every contracting authority shall establish a PPP project team to be headed by the project officer and officials of the contracting authority. The project team shall also include the project officer, process auditor and transaction advisor. Where an appropriately skilled person cannot be found to act as the project officer, process auditor or transaction advisor, the contracting authority shall procure the services of a qualified individual, firm or company under the Public Procurement and Disposal of Public Assets Act Private Party: The private party shall be a special purpose company incorporated under the laws of Uganda. The private party shall not undergo any changes in the shareholding, share capital structure or other corporate restructuring without the approval of the Minister of Finance and the relevant line Minister for the concerned project. Private party s evidence of technical and financial capacity. 13
14 Delivery Project Preparation PPPs in Uganda PPP Process Project Inception Feasibility Study PPP Procurement Ensure project meets definition of a PPP and that the proposed project is the best option to meet services and is worth the cost Carry out a pre-assessment of needs, service delivery options and a cost-benefit analysis Test project suitability for development as a PPP Check readiness of Contracting Authority (budget and capacity) to implement Recruit a Transaction Advisor Carry out a detailed study of the Project s feasibility Identify optimal PPP procurement option, develop a first draft of procurement documents and the procurement strategy/plan Seek Ministry of Finance approval to proceed with the procurement Run a competitive tender process to select the most qualified private sector partner for the PPP Contract negotiations with the preferred bidder Seek clearance of PPP contract with the AG Contract award and signing Financial close Project Implementation Mobilisation Construction Operation & Maintenance Transfer back and Exit 14
15 Delivery Project Preparation PPPs in Uganda Feasibility Study - Overview Project Inception Feasibility Study PPP Procurement Project Implementation Feasibility & Due diligence Project definition and scope (components, bundling/packaging) Technical feasibility of PPP project Market assessment including scenarios Financial analysis - determining financial returns/ support requirement; VfM analysis Socio cost benefit analysis Structure backward/forward linkage Market feedback/dialogue with stakeholder PPP Design PPP contract type Project & Implementation structure Financial structuring Procurement plan Risk assessment and allocation In this phase, Accounting treatment in line with relevant guidance and recommend best practices is key from public and private sector point of view 15
16 PPPs in Uganda Feasibility Study - Viability, Bankability, Value for Money, Affordability and Risk Transfer 1. Project Need / Economic and Social Cost Benefit Analysis 2. Project Scope / Solutions Options Analysis 3. Project Viability 4. Financial Model 5. Financial Assumptions 6. Accounting 7. Tax 8. Affordability 9. Contingent Liabilities 10. Risk Transfer 11. Value for Money 12. Procurement Strategy 13. Procurement Documents 14. Summary 16
17 Contents Introduction - Background and Context - What is a PPP - Different PPP Models PPPs in Uganda - Overview - PPP Act - PPP Process - Feasibility Study PPPs Accounting treatment - Private Sector, IFRIC 12 - Public Sector, IPSAS 32 Summary Please send any questions / clarifications to klegesi@deloitte.co.ug 17
18 PPP Accounting Treatment Private Sector IFRIC 12 Arrangement between govt (grantor) and private sector (operator). Grantor regulates services of operator and controls residual interest IFRIC Recognize Service concession arrangements Rights granted to operator to receive guaranteed periodic availability payments Rights granted to operator to charge end users a fee and revenue based on usage Revenue provided either from construction or operation services Financial Asset IAS 39 Intangible Asset IAS 33 IAS 11 & IAS 18 18
19 PPP Accounting Treatment Public Sector IPSAS 32 IPSAS 32 deals specifically with service concession agreements, focusing on their governmental accounting consequences. IPSAS 32 describes service concession agreements as long-term contracts between a government and a private party whereby: The operator uses a public asset (such as a prison, airport, or dam) to provide a public service for a specified period of time on behalf of the government; and The operator is compensated for its services over the period of the service concession arrangement. Both government-pays and user-pays PPP contracts are covered by IPSAS 32. Furthermore, IPSAS 32 states that all contracts with the following characteristics should have consequences for the governmental balance sheet in terms of gross debt. The government controls or regulates what services the operator must provide with the asset, to whom it must provide them, and at what price; and The government also controls any significant residual interest in the asset at the end of the arrangement term. Under IPSAS 32, most PPPs are expected to have an impact on the aggregate public debt. 19
20 PPP Accounting Treatment Public Sector - IPSAS 32 Overview: This standard applies to entities that prepare and present financial statements under the accrual basis of accounting [IPSAS 32.2]. IPSAS 32 applies to all public sector entities other than Government Business Entities (GBEs) [IPSAS 32.3]. Key definitions [IPSAS 32.8] Grantor: the entity that grants the right to use the service concession asset to the operator. Operator: the entity that uses the service concession asset to provide public services subject to the grantor s control of the asset. Service concession arrangement: a binding arrangement between a grantor and an operator in which: (i) The operator uses the service concession asset to provide a public service on behalf of the grantor for a specified period of time; and (ii) The operator is compensated for its services over the period of the service concession arrangement. 20
21 PPP Accounting Treatment Public Sector Public Sector - IPSAS 32 Service concession asset: an asset used to provide public services in a service concession arrangement that: (1) Is provided by the operator which: (i) the operator constructs, develops, or acquires from a third party; or (ii) is an existing asset of the operator (2) Is provided by the grantor which: (i) is an existing asset of the grantor; or (ii) is an upgrade to an existing asset of the grantor. Recognition of the asset: The grantor should recognize a service concession asset if [IPSAS 32.9]: (i) The grantor controls or regulates what services the operator must provide with the asset, to whom it must provide them, and at what price; and (ii) The grantor controls through ownership, beneficial entitlement or otherwise any significant residual interest in the asset at the end of the term of the arrangement. If the asset is a whole-of-life asset (i.e. an asset used in a service concession arrangement over the entire of the useful life), only the conditions under (i) need to be met [IPSAS 32.10]. 21
22 PPP Accounting Treatment Public Sector Public Sector - IPSAS 32 Measurement of the asset: The grantor recognizes assets provided by the operator at fair value if the recognition criteria are met [IPSAS 32.11]. Existing assets of the grantor, meeting the conditions are reclassified as service concession assets and accounted for according to IPSAS 17 Property, Plant and Equipment or IPSAS 31 Intangible Assets [IPSAS 32.12]. Two types of service concession arrangements Financial Liability model: A financial liability has to be recognized if the grantor has an unconditional obligation to compensate the operator for the construction, development, acquisition, or upgrade of a service concession asset via a predetermined series of payments [IPSAS ]. The IPSAS standards relating to financial instruments (IPSAS 28, 29 and 30) are applicable to this financial liability [IPSAS 32.20]. The grantor should allocate and account for the payments to the operator according to their substance as a reduction in the liability, a finance charge, and charges for services provided by the operator [IPSAS 32.21]. Grant of right to the operator model: Under this model the grantor does not have the unconditional obligation to pay cash to the operator. The grantor compensates the operator for the construction, development, acquisition, or upgrade of a service concession asset and related services by granting the operator the right to earn revenue from third-party users of the service concession asset or another revenue-generating asset. The grantor accounts for this liability as the unearned portion of the revenue arising from the exchange of assets between the grantor and the operator [IPSAS 32.24]. 22
23 PPP Accounting Treatment Public Sector Public Sector - IPSAS 32 Other Liabilities, Commitments, Contingent Liabilities and Contingent Assets With regard to other liabilities, commitments, contingent liabilities and contingent assets arising from a service concession arrangement IPSAS 19, 28, 29 and 30 are applicable [IPSAS 32.29]. Other revenues. Other revenues should be accounted for in accordance with IPSAS 9 [IPSAS 32.30]. Disclosures. Required disclosures for service concession agreements are: The grantor should present information in accordance with IPSAS 1 [IPSAS 32.31]. All aspects of a service concession arrangement shall be considered in determining the appropriate disclosures in the notes [IPSAS 32.32]. Following information in respect of each material service concession arrangements shall be disclosed in each reporting period [IPSAS ]: 1) description of the arrangement; 2) significant terms of the arrangement that may affect the amount, timing, and certainty of future cash flows (e.g., period of the concession, re-pricing dates, and the basis upon which re-pricing or re-negotiation); 3) nature and extent (e.g., quantity, time period, or amount, as appropriate) of: a. Rights to use specified assets; b. Rights to expect the operator to provide specified services in relation to the service concession arrangement; c. Service concession assets recognized as assets during the reporting period, including existing assets of the grantor reclassified as service concession assets; d. Rights to receive specified assets at the end of the service concession arrangement; e. Renewal and termination options; f. Other rights and obligations (e.g., major overhaul of service concession assets); and g. Obligations to provide the operator with access to service concession assets or other revenue-generating assets; and 4) changes in the arrangement 23
24 Contents Introduction - Background and Context - What is a PPP - Different PPP Models PPPs in Uganda - Overview - PPP Act - PPP Process - Feasibility Study PPPs Accounting treatment - Private Sector, IFRIC 12 - Public Sector, IPSAS 32 Summary Please send any questions / clarifications to klegesi@deloitte.co.ug 24
25 Summary We are in post PPP world: infrastructure need vs funding crunch PPPs are not new in Uganda but the legal regime is must comply As public sector practitioners, need to know the obligations on you under Uganda PPP Act - accounting officers/project officers/process auditors/evaluation committees Feasibility study is a key milestone for the PPP Process under the Act: implications for approvals and procurement, implementation; recognition of appropriate accounting treatment, public vs private sector Private sector accounting, IFRIC 12: Financial Asset, IAS 39 Intangible Asset, IAS 33 IAS 11 & IAS 18 Public Sector accounting, IPSAS 32: mirrors IFRIC 12 Financial Liability Grantor of right to the operator model 25
26 Contacts Norbert Kagoro Partner, Audit and Assurance Tel: Mob: Mr. John Ponsonby Director, Infrastructure & Capital Projects / PPP Leader Tel: Mob: jponsonby@deloitte.co.ke Mr. Kenneth Legesi Manager, Infrastructure & Capital Projects Tel: Mob: klegesi@deloitte.co.ug 26
27 Thank you, Discussions, Q&A Deloitte refers to one or more of Deloitte Touche Tohmatsu Limited, a UK private company limited by guarantee, and its network of member firms, each of which is a legally separate and independent entity. Please see for a detailed description of the legal structure of Deloitte Touche Tohmatsu Limited and its member firms. Deloitte provides audit, tax, consulting, and financial advisory services to public and private clients spanning multiple industries. With a globally connected network of member firms in more than 150 countries, Deloitte brings world-class capabilities and high-quality service to clients, delivering the insights they need to address their most complex business challenges. Deloitte's approximately 200,000 professionals are committed to becoming the standard of excellence. Deloitte's professionals are unified by a collaborative culture that fosters integrity, outstanding value to markets and clients, commitment to each other, and strength from cultural diversity. They enjoy an environment of continuous learning, challenging experiences, and enriching career opportunities. Deloitte's professionals are dedicated to strengthening corporate responsibility, building public trust, and making a positive impact in their communities Deloitte (Uganda) Limited. 27
INTERNATIONAL PUBLIC SECTOR ACCOUNTING STANDARDS (IPSAS) SEMINAR
INTERNATIONAL PUBLIC SECTOR ACCOUNTING STANDARDS (IPSAS) SEMINAR IPSAS 32: Service Concession Arrangements: Grantor CPA Andrew Rori Uphold. Public. Interest Objectives Understand the scope of service concession
More informationIPSASB. October IPSAS 32 Service Concession Arrangements: Grantor THE INTERNATIONAL PUBLIC SECTOR ACCOUNTING STANDARDS BOARD
IPSASB THE INTERNATIONAL PUBLIC SECTOR ACCOUNTING STANDARDS BOARD AT A GLANCE SERVICE CONCESSION ARRANGEMENTS: GRANTOR IPSAS 32 Service Concession Arrangements: Grantor This summary provides an overview
More information4.3 PFI AND PPP SERVICE CONCESSION ARRANGEMENTS: LOCAL AUTHORITIES AS GRANTOR
4.3 PFI AND PPP SERVICE CONCESSION ARRANGEMENTS: LOCAL AUTHORITIES AS GRANTOR 4.3.1 Introduction 4.3.1.1 Private Finance Initiatives (PFIs), Public Private Partnerships (PPPs) and similar schemes shall
More informationQ Russian Legislation Update Accounting, financial reporting and audit
Q3 2015 Russian Legislation Update Accounting, financial reporting and audit Contents ACCOUNTING 1 IFRS Documents Adopted in Russia 1 Archiving Requirements on Accounting Documentation Summarized 3 FINANCIAL
More informationRecent experience of establishing a PPP framework to mitigate fiscal risks in Bangladesh
(Strengthened Fiscal Management in Asia) Recent experience of establishing a PPP framework to mitigate fiscal risks in Bangladesh 4 June 2018 Mita Conference Hall, Tokyo PPP Authority Prime Minister s
More informationMINISTRY OF FINANCE AND ECONOMIC AFFAIRS
MINISTRY OF FINANCE AND ECONOMIC AFFAIRS Contents 1. PREAMBLE 4 2. THE POLICY OBJECTIVES 5 3. DEFINITION OF PPP 5 4. BENEFITS OF PPP 6 5. KEY GUIDING PRINCIPLES 7 6. SCOPE AND APPLICATION OF PPP PROJECTS
More informationService Concession Arrangements IPSAS 32 29/7/2016
Service Concession Arrangements IPSAS 32 29/7/2016 Presented by CPA Opanga +254 727 404289 At the end of this session, each learner be able to; Understand the scope of service concession arrangements Recognize
More informationInsurance Accounting Newsletter Divergence on new business revenue
Insurance Accounting Newsletter Divergence on new business revenue FASB diverges from IASB on new business revenue IASB decides on contract boundaries in line with industry proposals Issue 4 June 2009
More informationIPSASB: Current guidelines in IPSASs for recording PPPs
IPSASB: Current guidelines in IPSASs for recording PPPs Ian Carruthers IPSASB Chair IMF Government Finance Statistics Advisory Committee Washington, D.C. 15 th March 2017 Page 1 Proprietary and Copyrighted
More informationDraft PPP Policy Outline
Note 7 May 2012 Draft PPP Policy Outline This note is the seventh in a series of notes on developing a comprehensive policy, legal, and institution framework for public-private partnership (PPP) programs.
More informationPPP Ugandan Experience. September 5 th Speaker : Beatrice Florah Ikilai Team Leader: Privatisation Unit Ministry of Finance
PPP Ugandan Experience September 5 th 2011 Speaker : Beatrice Florah Ikilai Team Leader: Privatisation Unit Ministry of Finance Prior to PPPs- Infrastructure Investments Funding From Capex Budget Limited
More informationIFC Transaction Advisory Services Creating opportunity where it s needed most. From Concept Design to Project Execution
IFC Transaction Advisory Services Creating opportunity where it s needed most From Concept Design to Project Execution ECREEE Abidjan, March 2014 Introduction and agenda Introduction and agenda Introduction:
More informationWhat s new in financial reporting for March 2009? Quarterly Update
What s new in financial reporting for? Quarterly Update The analysis below provides a high level overview of new and revised financial reporting requirements that need to be considered for financial reporting
More informationStrategy #1: Partnering with the Private Sector through PPP. EY Infrastructure Advisory. October 2017
Strategy #1: Partnering with the Private Sector through PPP EY Infrastructure Advisory October 2017 EY Infrastructure Advisory Page 2 EY s Infrastructure Advisory and Project Finance Advisory Capabilities
More information1 ST ISTANBUL PPP SUMMIT, 2015
1 ST ISTANBUL PPP SUMMIT, 2015 OVERVIEW OF THE PPP FRAMEWORK IN KENYA MS. HADIJA R. DIBA PPP UNIT, NATIONAL TREASURY - KENYA TUESDAY, 3 RD NOVEMBER 2015 BOĞAZİÇİ UNIVERSITY CAMPUS, ISTANBUL - TURKEY OUTLINE
More informationGlobal Infrastructure Facility: Update for G20--September 2014
Global Infrastructure Facility: Update for G20--September 2014 1. Objectives and Operating Principles The Global Infrastructure Facility (GIF) is a global, open platform that will facilitate preparation
More informationService Concession Arrangements: Grantor
International Public Sector Accounting Standards Board Exposure Draft 43 February 2010 Comments are requested by June 30, 2010 Proposed International Public Sector Accounting Standard Service Concession
More informationKey lessons from South Africa s Renewable Energy IPP Programme
Key lessons from South Africa s Renewable Energy IPP Programme Management Program in Infrastructure Reform and Regulation University of Cape Town Competitive tenders for RE IPPs 2011 DoE issued RfP for
More informationGuidelines For Rajasthan Infrastructure Project Development Fund (RIPDF)
Guidelines For Rajasthan Infrastructure Project Development Fund (RIPDF) PPP Cell Planning Department Government of Rajasthan Contents 1. The RIPDF and its Role 2 i. Background of the RIPDF ---------------------------
More informationThe UNOPS Budget Estimates, Executive Board September 2013
The UNOPS Budget Estimates, 2014-2015 Executive Board September 2013 1 Key results of 2012 Benchmarks and standards Content UNOPS strategic plan 2014-2017 UNOPS budget estimates 2014-2015 Review of the
More informationNegotiations Roadmap
Background For many developing countries, large-scale projects carried out by foreign investors, for example, in extractive industries, or large-scale land investments in agriculture or forestry, are the
More informationAccounting for Service Concession agreements (PPPs)
Accounting for Service Concession agreements (PPPs) Seminar on Accounting reforms in the Public Sector: IPSAS/EPSAS Brussels, May 13, 2016 Thomas Müller-Marqués Berger, EY Germany Agenda Overview of service
More informationBoosting Infrastructure Financing through Risk Mitigation Instruments
Boosting Infrastructure Financing through Risk Mitigation Instruments Financing Sources for Public-Private Partnerships Forum Kuala Lumpur, 25 November 2015 Dr Armand Hermawan CFO Indonesia Infrastructure
More informationInterdepartmental Accounting Group Inc. Sustainable Finance today and tomorrow
Interdepartmental Accounting Group Inc. Sustainable Finance today and tomorrow November 2017 Contents Leandré Malan Partner Assurance & Advisory Brisbane, Qld AASB 15 Revenue Stephanie Serhan Client Manager
More informationIPP TRANSACTION ADVISOR TERMS OF REFERENCE
IPP TRANSACTION ADVISOR TERMS OF REFERENCE Terms of reference for transaction advisor services to the Government of [ ] for the [insert description of the project] (the Project ). Contents 1. Introduction
More informationAugust Valuing solar farm developers.
August 2011 Valuing solar farm developers. Table of contents 3 1. Foreword 4 2. Executive summary 5 3. Introduction 7 4. Choice of method and identification of transactions in the solar farm industry 9
More informationNATIONAL CAPACITY BUILDING WORKSHOP UTF OPERATIONS DOCUMENT
NATIONAL CAPACITY BUILDING WORKSHOP UTF OPERATIONS DOCUMENT Agenda UTF OPERATIONS DOCUMENT INTRODUCTION ROLES & RESPONSIBILITIES COLLECTION & DISBURSEMENT OF FUNDS TREASURY FUNCTIONS ACCOUNTING & BUDGETING
More informationAccounting update. A new approach to grantor accounting for public private partnerships
May 2015 Accounting update At a glance Exposure Draft released on service concession arrangements from a government grantor perspective Represents a major shift in current accounting from a risk and reward
More informationPublic Private Partnerships. The South African Experience
Public Private Partnerships The South African Experience Geneva UNECE 18 November 2003 1 Uven Bunsee PPP Unit, South African National Treasury 1 2 General Demographics Population: 44 m Credit rating S&P:
More informationIASB issues 2015 Amendments to the IFRS for SMEs
Published on: June 5, 2015 IASB issues 2015 Amendments to the IFRS for SMEs Why are there amendments to the IFRS for SMEs? The IFRS for SMEs was initially issued in 2009. At the time, the IASB proposed
More informationUMTA & UTF: NATIONAL WORKSHOP GENERIC V/S CITY SPECIFIC UTF
UMTA & UTF: NATIONAL WORKSHOP GENERIC V/S CITY SPECIFIC UTF Agenda POTENTIAL SOURCES OF FUNDS PRIORITIZED UTILIZATION OF FUNDS FUND MANAGEMENT DIVISION 2 Common consensus that UMTA would have its own dedicated
More informationNew Tax Code of Ukraine, and Risks for Corporate Structures. November 2011
Beneficial Ownership, New Tax Code of Ukraine, and Risks for Corporate Structures November 2011 Contents 1. Beneficial Ownership Concept History 2. Ukraine: Beneficial Ownership Concept before the Tax
More informationManagement. Highlights in 2013 MANAGEMENT 63
Management Highlights in 2013 Increase in collection rates of the assessed contributions Further increase in numbers of female staff in the Professional category Further progress in implementation of an
More informationAgenda Item 6: Leases
Agenda Item 6: Leases João Fonseca Manager, Standards Development and Technical Projects IPSASB Meeting New York, USA March 8-11, 2016 Page 1 Proprietary and Copyrighted Information Objective of Session
More informationIFRIC 12 Service Concession Arrangements (SCA) SIC 29 Disclosures - SCA
IFRIC 12 Service Concession Arrangements (SCA) SIC 29 Disclosures - SCA CA Rajkumar S Adukia B.Com (Hons), FCA, ACS, ACWA, LLB, DIPR, DLL &LP, IFRS(UK), MBA email id: rajkumarradukia@caaa.in Mob: 09820061049/09323061049
More informationGLOBAL INFRASTRUCTURE FACILITY. A partnership platform for greater investment in the infrastructure of emerging markets and developing economies
GLOBAL INFRASTRUCTURE FACILITY A partnership platform for greater investment in the infrastructure of emerging markets and developing economies COLLABORATION FINANCE LEVERAGE IMPACT The Global Infrastructure
More informationIFRS13 and Valuation Techniques
The Institute of Chartered Accountants of Pakistan Riyadh Chapter IFRS13 and Valuation Techniques Important Notice This document, which has been prepared by Deloitte Transaction Services LLC ( Deloitte
More informationPPP PUBLIC PRIVATE PARTNERSHIP
PPP PUBLIC PRIVATE PARTNERSHIP Definition by MOF 1. An arrangement between Government and Private party 2. To provide public assets and/or related services for public benefit 3. Private party makes investments
More information4th Edition - May Audit - Technical (External) TechnicallySpeaking. Avoid check mate
4th Edition - May 2008 Audit - Technical (External) TechnicallySpeaking Avoid check mate Contents page Next page Contents Word of welcome...3 The latest Exposure Drafts issued by the International Accounting
More informationMemo No. Issue Summary No. 1 * Issue Date September 12, Meeting Date(s) EITF September 22, 2016
Memo No. Issue Summary No. 1 * Memo Issue Date September 12, 2016 Meeting Date(s) EITF September 22, 2016 Contact(s) Thomas Faineteau Project Lead / Author (203) 956-5362 Rob Moynihan EITF Coordinator
More informationService Concession Arrangements: Disclosures
SIC Interpretation 29 Service Concession Arrangements: Disclosures In December 2001 the International Accounting Standards Board (IASB) issued Disclosure Service Concession Arrangements, which had originally
More informationService Concession Arrangements: Disclosures
SIC Interpretation 29 Service Concession Arrangements: Disclosures This version includes amendments resulting from IFRSs issued up to 31 December 2009. Disclosure Service Concession Arrangements was developed
More informationPUBLIC BENEFIT ENTITY FINANCIAL REPORTING STANDARD 45 SERVICE CONCESSION ARRANGEMENTS: OPERATOR (PBE FRS 45)
PUBLIC BENEFIT ENTITY FINANCIAL REPORTING STANDARD 45 SERVICE CONCESSION ARRANGEMENTS: OPERATOR (PBE FRS 45) Issued September 2014 and incorporates amendments to 31 December 2015 This Standard was issued
More informationCanada. 1. Noteworthy practices for project preparation. Case Study
Case Study Canada 1. Noteworthy practices for project preparation EXISTING ENABLING ENVIRONMENT Decentralised planning process with strong collaboration between provincial levels and the national government
More informationPublic Private Partnerships. Gautrain Rapid Rail Link. in St Petersburg. World Bank Institute. CEO: Gautrain Management Agency
Public Private Partnerships in St Petersburg Gautrain Rapid Rail Link World Bank Institute Jack van der Merwe (Pr.Eng) CEO: Gautrain Management Agency 07-08 December 2007 Why Gauteng... why Gautrain? The
More informationSustainable Island Resource Framework Fund OAS / Department of Environment Antigua and Barbuda
Sustainable Island Resource Framework Fund OAS / Department of Environment Antigua and Barbuda Marko Markov, St. John`s, 23 February 2016 1 WHAT IS SIRFF Special Fund established under the EPMA Independent
More informationKENYA S PPP EXPERIENCE AND PIPELINE PROJECTS
KENYA S PPP EXPERIENCE AND PIPELINE PROJECTS AFRICAN CONFERENCE ON PUBLIC PRIVATE PARTNERSHIP 6-7 DEC 2012 SPEKE RESORT, KAMPALA, UGANDA Presentation By ENG STANLEY K, KAMAU HEAD OF PUBLIC PRIVATE PARTNESRSHIPS,
More informationIASB finalises IFRS 9 which changes the classification and measurement of financial assets and introduces an expected loss impairment model
Published on: July, 2014 IASB finalises IFRS 9 which changes the classification and measurement of financial assets and introduces an expected loss impairment model Background and effective date The lasb's
More informationDeloitte Audit Reform Briefing: Unprecedented reform proposed for the EU audit market
Deloitte Audit Reform Briefing: Unprecedented reform proposed for the EU audit market Some of the European Commission s legislative proposals may have unintended negative consequences to businesses. A
More informationPRELIMINARY CONCLUSIONS
Helsinki, 28 March 2013 PUBLIC rev.2 PRELIMINARY CONCLUSIONS 29 TH MANAGEMENT BOARD MEETING 21-22 MARCH 2013, DUBLIN, EUROFOUND 1. Welcome speech by Mr Richard Bruton T.D., Minister for Jobs, Enterprise
More information7 September Nick Greatorex, Group Finance Director, commented:
7 September 2017 IFRS 15 early adoption and presentation Capita plc ( Capita ) is today hosting a presentation for institutional investors and analysts on the application of the International Accounting
More informationU.K./Netherlands Tax Alert
International Tax U.K./Netherlands Tax Alert 3 October 2008 New Tax Treaty Signed The U.K. and the Netherlands signed a new tax treaty and protocol on 26 September 2008 that will replace the current treaty,
More informationThe Benefits of P3s. Why do P3s work?
The Benefits of P3s Why do P3s work? P3s are a long-term performance-based approach for procuring public infrastructure where the private sector assumes a major share of the responsibility in terms of
More information27 июня 2013 года. Webcast Secondment draft amendments to the legislation
27 июня 2013 года Webcast Secondment draft amendments to the legislation Draft Federal Law No. 451173-5 On Introducing Amendments to Certain Legislative Acts of the Russian Federation (hereinafter Draft
More informationINTEGRATED SAFEGUARDS DATA SHEET
Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized INTEGRATED SAFEGUARDS DATA SHEET IDENTIFICATION / CONCEPT STAGE Date ISDS Prepared/Updated:
More informationHeadline Verdana Bold International Tax matters ICPAU Tax Seminar, Hotel Africana November, 2017
Headline Verdana Bold International Tax matters ICPAU Tax Seminar, Hotel Africana November, 2017 Contents Related party transactions 3 URA practice on international tax 14 OCED Action Plan on BEPS 30 2017
More informationFollow-Up on VFM Section 3.05, 2014 Annual Report RECOMMENDATION STATUS OVERVIEW
Chapter 1 Section 1.05 Ministry of Infrastructure (formerly the Ministry of Economic Development, Employment and Infrastructure) Infrastructure Ontario Alternative Financing and Procurement Follow-Up on
More informationSEETO priority projects rating methodology. July, SEETO Priority Projects rating methodology 13/07/2012 Page 1
SEETO priority projects rating methodology July, 2012 13/07/2012 Page 1 Table of content 1 Introduction... 3 1.1 Purpose of the Rating methodology... 3 1.2 Rationale for the Rating methodology... 3 1.3
More informationIAS 39 the sequel. Time for new measures. August Background
August 2009 IAS 39 the sequel. Time for new measures Background On 14 July 2009, the International Accounting Standards Board (IASB) issued an exposure draft (ED), ED/2009/7, Financial Instruments: Classification
More informationTHE FUTURE OF INFRASTRUCTURE FINANCE IN MEASA
Infrastructure brings economic and social value to a country: it can drive economic growth by facilitating business activity; it can provide residents with essential services, from mobility to electricity;
More informationProject Development Under PPPs
Project Development Under PPPs Presented by: Afzal Dar Senior Infrastructure Specialist Infrastructure Project Development Facility (IPDF) afzal.dar@ipdf.gov.pk Outline Understanding PPPs- what they are;
More informationIFRS 15. Revenue from Contracts with Customers
IFRS 15 Revenue from Contracts with Customers 17 February 2017 Why IFRS 15 is important? What does it mean for entities? Revenue recognition principles will change P/L may vary to a certain extent IT Systems,
More informationUpdate Changes to Dutch Accounting Standards for large and medium-sized legal entities Changes to annual edition 2014
Professional Practice Department Number 7, November 2014 Update Changes to Dutch Accounting Standards for large and medium-sized legal entities Changes to annual edition 2014 Changes to Dutch Accounting
More informationPublic Private Partnerships, The Rules Oranjestad February 18, Paul Swanenvleugel
Public Private Partnerships, The Rules Oranjestad Paul Swanenvleugel Paul Swanenvleugel Director PricewaterhouseCoopers Advisory N.V. P.O.Box 9616 1006 GC Amsterdam The Netherlands Ph: +31 88 792 32 19
More informationDeveloping a PPP market: Getting the fundamentals right
Developing a PPP market: Getting the fundamentals right Essentials for private sector participation 17 March 2016 Why does private sector care about PPP projects? PPP projects offers stable cash flows
More informationInternational Public Sector Accounting Standard 32 Service Concession Arrangements: Grantor IPSASB Basis for Conclusions
International Public Sector Accounting Standard 32 Service Concession Arrangements: Grantor IPSASB Basis for Conclusions International Public Sector Accounting Standards, Exposure Drafts, Consultation
More informationA Tale of Two Sisters: Bangladesh and Philippine PPP Programs 26 November 2014
A Tale of Two Sisters: Bangladesh and Philippine PPP Programs 26 November 2014 Presented at the UNESCAP PPP Workshop on Public-Private Partnerships for Infrastructure Development in Myanmar Background
More informationTax governance in the Middle East Governing tax activity within your business
Tax governance in the Middle East Governing tax activity within your business Globally, there is a trend towards increased tax transparency as businesses must meet higher standards of tax governance and
More informationChanges proposed for income tax accounting. Revised calculation methodology. Montreal Robert Lefrancois
April 2009 IAS Plus Update. Changes proposed for income tax accounting On 31 March 2009, the International Accounting Standards Board (IASB) issued an exposure draft (ED) ED/2009/2 Income Tax containing
More informationMajor Project Authority Integrated Assurance
Major Project Authority Integrated Assurance March 2012 Major Project Authority Integrated Assurance March 2012 Official versions of this document are printed on 100% recycled paper. When you have finished
More informationUndertaking Successful PPPs in Kazakhstan
Undertaking Successful PPPs in Kazakhstan Stephen Watson Head of Service PPP Astana, Kazakhstan 24 October 2013 image courtesy of stock.xchng Contents PPP Principles PPPs in Kazakhstan Renewables in Kazakhstan
More informationWorld Bank Group Risk Mitigation Solutions for Myanmar s Infrastructure Projects. Workshop Program
World Bank Group Risk Mitigation Solutions for Myanmar s Infrastructure Projects Workshop Program 3 June, 2015 Richard MacGeorge Successful preparation of bankable projects Getting Projects From Fairway
More informationMobilizing Islamic Finance for Long-Term Investment Financing Create an Enabling Environment for Long Term Islamic Financing
Mobilizing Islamic Finance for Long-Term Investment Financing Create an Enabling Environment for Long Term Islamic Financing Hatim El-Tahir, PhD, FCIB, FCISI Director, Islamic Finance Group Deloitte &
More informationSCOTTISH FUNDING COUNCIL CAPITAL PROJECTS DECISION POINT PROCESS
SCOTTISH FUNDING COUNCIL CAPITAL PROJECTS DECISION POINT PROCESS Incorporating amendments by Scottish Futures Trust (Proposals for Decision Points 2 5 Only) Executive summary... 1 Section 1: Introduction
More information2 nd INDEPENDENT EXTERNAL EVALUATION of the EUROPEAN UNION AGENCY FOR FUNDAMENTAL RIGHTS (FRA)
2 nd INDEPENDENT EXTERNAL EVALUATION of the EUROPEAN UNION AGENCY FOR FUNDAMENTAL RIGHTS (FRA) TECHNICAL SPECIFICATIONS 15 July 2016 1 1) Title of the contract The title of the contract is 2nd External
More informationTreasury Board of Canada Secretariat. Performance Report. For the period ending March 31, 2005
Treasury Board of Canada Secretariat Performance Report For the period ending March 31, 2005 Reg Alcock President of the Treasury Board and Minister responsible for the Canadian Wheat Board Departmental
More informationThe World Bank Kenya Infrastructure Finance/PPP project (P121019)
Public Disclosure Authorized AFRICA Kenya Financial Systems Practice Global Practice IBRD/IDA Adaptable Program Loan FY 2013 Seq No: 4 ARCHIVED on 22-Dec-2014 ISR17114 Implementing Agencies: Public Private
More informationFinancial Services Commission of Ontario. June 2009
Financial Services Commission of Ontario STATEMENT OF PRIORITIES June 2009 Introduction This is the twelfth Statement of Priorities for the Financial Services Commission of Ontario (FSCO). It provides
More informationAgenda Item 1.7: IPSAS-IFRS Alignment Dashboard
Agenda Item 1.7: IPSAS-IFRS Alignment Dashboard João Fonseca, Principal IPSASB Meeting Washington D.C., USA March 12 15, 2019 Page 1 Proprietary and Copyrighted Information Agenda Item 1.7 Outline Change
More informationSumant Chak MAKING PPP ATTRACTIVE FOR PRIVATE FINANCE IN INFRASTRUCTURE THE INDIA STORY. Asian Institute of Transport Development
MAKING PPP ATTRACTIVE FOR PRIVATE FINANCE IN INFRASTRUCTURE THE INDIA STORY Sumant Chak Asian Institute of Transport Development Railway Staff College, Vadodara Course: BIMSTEC and MGC officers Course,
More informationRe: International Public Sector Accounting Standards Board Strategy Consultation
Mr. Andreas Bergmann, Chairman International Public Sector Accounting Standards Board 529 5th Avenue, 6th Floor New York, New York 10017 United States of America Deloitte Touche Tohmatsu Limited 2 New
More information1.1 This briefing provides an overview of IFRS 15 and issues around the adoption of the standard by charities.
\ PAPER 2 Briefing Committee Venue Charities SORP Committee CIPFA s Offices, Edinburgh Date 12 March 2018 Author Subject Secretariat to the Charities SORP Committee IFRS 15 Revenue from Contracts with
More informationPeople s Republic of China TA 8940: Municipality-Level Public Private Partnership (PPP) Operational Framework for Chongqing
Consultant s Report Project Number: 49166-001 People s Republic of China TA 8940: Municipality-Level Public Private Partnership (PPP) Operational Framework for Chongqing PPP Project Cycle Checklists and
More informationBENCHMARKING PPP PROCUREMENT 2017 IN MAURITIUS
BENCHMARKING PPP PROCUREMENT 2017 IN MAURITIUS Regulatory and Institutional Framework for PPPs Does the regulatory framework in your country allow procuring PPPs?. If yes, please specify the relevant regulatory
More informationNonunderlying. Underlying items 1 m. items (note 4) m
Financial Statements Consolidated income statement For the year ended 30 June Continuing operations Revenue 3 Notes Underlying items 1 Nonunderlying items (note 4) 2 Total Underlying items 1 Nonunderlying
More informationWEST AFRICA REGIONAL MINING FORUM, CONAKRY, GUINEA
WEST AFRICA REGIONAL MINING FORUM, CONAKRY, GUINEA Creating Enabling Environment for Infrastructure Development For Large-scale Mining William Bulmer, Associate Director, Head of Mining Division, IFC February
More informationIntro Public-Private Partnership (P3) Finance Course
Intro Public-Private Partnership (P3) Finance Course Identifying P3 Projects and Knowing the Atmosphere Kylee Anastasi Director, Capital Projects and Infrastructure Advisory PricewaterhouseCoopers LLP
More informationAssessment of the suitability of the International Public Sector Accounting Standards for the Member States Public consultation
EUROPEAN COMMISSION EUROSTAT Directorate D: Government Finance Statistics Assessment of the suitability of the International Public Sector Accounting Standards for the Member States Public consultation
More informationTHE PRIME MINISTER ------- No. 71/2010/QD-TTg SOCIALIST REPUBLIC OF VIET NAM Independence - Freedom Happiness --------- Hanoi, November 09, 2010 DECISION PROMULGATING THE REGULATION ON PILOT INVESTMENT
More informationINVITATION TO TENDER: CONSULTANCY SERVICES TO DEVELOP A FINANCIAL MODEL FOR THE LESOTHO-BOTSWANA WATER TRANSFER SCHEME (LBWTS)
INVITATION TO TENDER: CONSULTANCY SERVICES TO DEVELOP A FINANCIAL MODEL FOR THE LESOTHO-BOTSWANA WATER TRANSFER SCHEME (LBWTS) I am pleased to inform you that your organisation is invited to take part
More informationPublic Private Partnerships (PPP): Value for Money. Matti Siemiatycki Geography and Planning University of Toronto
Public Private Partnerships (PPP): Value for Money Matti Siemiatycki Geography and Planning University of Toronto Presentation Overview 1. International Rationales for PPPs: In search of value for money
More informationThe Future of US infrastructure under the Trump administration Engineering and Construction Conference
The Future of US infrastructure under the Trump administration 2017 Engineering and Construction Conference Agenda Topic US Infrastructure Market Overview Trump Infrastructure Initiative and Success Stories
More informationScheme Financing Infrastructure Projects through the India Infrastructure Finance Company Limited (IIFCL)
Government of India Scheme Financing Infrastructure Projects through the India Infrastructure Finance Company Limited (IIFCL) Published by The Secretariat for the Committee on Infrastructure Planning Commission,
More informationPART A: THE PALESTINIAN ENVIRONMENTAL ASSESSMENT POLICY. A policy to establish an environmental assessment process in Palestine
PART A: THE PALESTINIAN ENVIRONMENTAL ASSESSMENT POLICY A policy to establish an environmental assessment process in Palestine WHEREAS the Palestinian National Authority seeks to achieve sustainable development
More informationACCOUNTING STANDARDS BOARD INTERPRETATION OF STANDARDS OF GRAP ON
ACCOUNTING STANDARDS BOARD INTERPRETATION OF STANDARDS OF GRAP ON SERVICE CONCESSION ARRANGEMENTS WHERE A GRANTOR CONTROLS A SIGNIFICANT RESIDUAL INTEREST IN AN ASSET (IGRAP 17) Issued by the Accounting
More informationTERMS OF REFERENCE TRANSFORMATION OF THE TRINIDAD AND TOBAGO POSTAL CORPORATION
TERMS OF REFERENCE TRANSFORMATION OF THE TRINIDAD AND TOBAGO POSTAL CORPORATION 1.0 BACKGROUND The Trinidad and Tobago Postal Corporation (TTPost) is a State Corporation, formed by an Act of Parliament,
More informationIFRS Center of Excellence (CoE) Newsletter
Luxembourg Audit 13 July 2017 IFRS Center of Excellence (CoE) Newsletter Dear all, Welcome to this edition of the IFRS Newsletter prepared by the Deloitte Luxembourg IFRS Centre of Excellence. We are happy
More informationAccounting news. Accounting news. June Deloitte Czech Republic
Accounting news Deloitte Czech Republic New Interpretation of the on Determining the Moment About the The (the NAC ) is an independent specialist institution promoting professional competencies and ethics
More informationLegal and tax compliance services Bound by excellence
Legal and tax compliance services Bound by excellence Tax & Legal Why will you need our legal corporate and tax compliance services? Kazakhstani economy is open to investors, but establishes some restrictions
More informationPROJECT PREPARATORY TECHNICAL ASSISTANCE
Appendix 3 9 A. Justification PROJECT PREPARATORY TECHNICAL ASSISTANCE 1. The PPTA will review and assess the performance of the secondary education subsector in Viet Nam and identify the challenges, which