1 SUMMARY OF THE ASSESSMENT OF THE COMMENTS FROM THE PUBLIC CONSULTATION OF REGARDING PRICE OF THE SERVICES OF ACCESS TO INTERCONNECTION LINES 1 Estonian Competition Authority, November 16, 2015 (Estonian NRA) Commenter Comments Answers On the 6th November 2015 letter is stated that NCC will launch the public consultation and opinion is asked not only from the Baltic States regulators and market participants but also Finland, Sweden Denmark and Norway regulators and market participants. The Estonian Competition Authority is in view that cross-border transmission tariffs for electricity export from Lithuania to the 3rd countries will affect the whole Baltic electricity market functioning and implementing the cross-border transmission tariffs must be seriously considered and analyzed. Therefore, the Estonian Competition Authority wishes that NCC should make results from public consultation available for the Baltic States regulators and after analysis of the results from the public consultation the Estonian Competition Authority can give the opinion regarding the cross-border transmission tariff for electricity export from Lithuania to the 3rd countries. 2 Danish Energy Regulatory Authority (DERA) November 19, 2015 It is not clear from proposal how a NJL tariff would comply with Commission regulation (EU) No 838/2010 of 23 September 2010 on laying down guidelines relating to the inter- 1. Results of the public consultation are published in webpage. 2. The main purpose of NJL tariff is to cover cross-border transmission costs, which are not covered through the Inter-Transmission System Operator Compensation Mechanism (hereinafter ITC mechanism). According to the NJL tariff calculation methodology of National

2 2 3 Energinet.dk November 19, 2015 (Danish TSO) transmission system operator compensation mechanism and a common regulatory approach to a transmission charging. In that connection DERA would like to point to Annex A, article 7 on Transmission system use fee on third country imports and exports of electricity in Commission regulation (EU) No 838/2010 of 23 September 2010 which regulates tariffs on third countries and especially Article 7.3 in Annex A, which states that the fee for each year shall be calculated in advance by ENTSO-E. The article also states, that the fee shall be set at the estimated contribution per megawatt hour transmission system operators from a participating country would make that the ITC Fund based on projected cross-border flows of electricity for the relevant year. It is Energinet.dk s clear interpretation that the compensation for electricity export to non-eu and non-eea countries (referred to as perimeter countries by ACER and ENTSO-E) is already covered by a use fee set by the ENTSO-E under the ITC mechanism. In the Commissions regulation (EU) No 838/2010 of 23 September 2010 in Annex part A in point 7.3 regarding transmission system use fee on third country imports and exports of electricity, it is stated that the transmission system use fee for each year shall be calculated in advance by ENTSO-E. Commission Energy Control and Prices (hereinafter Commission) (which could be find in Commission webpage the costs incurred in accordance with the ITC mechanism shall not be included in the costs of the service of access to interconnection lines. Therefore the same costs will not be attributed to the same amount of energy twice. The same mechanism of subtracting ITC fee from cross-border tariff is used in Finland. According to the Article 14 (1) of EU Regulation No. 714/2009 charges applied by network operators for access to networks should reflect actual costs. There aren t stated in Commission regulation (EU) No 838/2010 of 23 September 2010 that other cost-based tariffs, except the ITC tariff, cannot be set. NJL tariff is set in accordance with Law on Electricity of Republic of Lithuania Article 67 paragraph 10. Also we would like to emphasize that similar tariff is set in Finland. 3. Please see the answer No. 2.

3 3 4 Public Utilities Commission of Latvia (PUC), November 20, 2015 (Latvian regulator) This perimeter countries fee shall be set at the estimated contribution per megawatt hour transmission system operators from participating country would make to the ITC Fund based on projected cross-border flows of electricity for the relevant year. In 2015 the fee is set at 0.6 EUR/MWh, and was 0.7 EUR/MWh in 2013 and Energinet.dk strongly advices the NCC to cancel the proposed fee. Answering to NCC's request to provide an opinion on export tariff, PUC expresses the following concerns: 1. According to the information provided by NCC, the legal background for introduction of the export tariff is Article 67 paragraph 10 of the Law on Electricity of the Republic of Lithuania and a letter from the Ministry of Energy of the Republic of Lithuania in which the ministry outlines the practical reasons for the necessity to introduce the export tariff. PUC holds the opinion that the above-mentioned justification is not sufficient to introduce such measure as the export tariff that is directly related with the development of the European Union electricity market, especially with the Commission Regulation (EU) 2015/1222 of 24 July 2015 establishing a guideline on capacity allocation and congestion management (CACM). 2. As already stated in the PUC's letter No /2205 of October 19, 2015, the Baltic 4. Please see the answer No The Rules is the trilateral document, prepared by three Baltic TSOs and adopted by three Baltic NRAs. According to CACM, next year there will

4 4 States' National Regulatory Authorities (Estonian Competition Authority, PUC, NCC, hereinafter -NRAs) on October 8, 2015 with the joint letter No. No.R2-(E)/l- 2.81/2155 approved "Agreement on Terms, Conditions and Methodologies on Cross- Zonal Capacity Calculation, Provision and Allocation within the Baltic States and with the 3rd Countries" with annexed The Terms, Conditions and Methodologies on Cross-Zonal Capacity Calculation, Provision and Allocation within the Baltic States and with the 3rd Countries" (hereinafter - Rules). In accordance with the Rules the Baltic States' market participants should carry out electricity trade with the 3rd countries only via cross-border mentioned in the Rules and the Rules do not envisage the proposed export tariff. 3. The assumptions and results calculated by Lithuanian electricity transmission system operator Litgrid AB and included in the NCC's letter without additional clarification are disputable. Therefore, more be even more parties to agree and NRAs to adopt the common capacity calculation rules as these are supposed to cover the whole region. It is important to emphasize that EU integrated electricity market legislation does not specify terms and conditions for the cross-border transmission service between EU member state and a 3 rd country. Therefore, the decision on cross-border tariff for the export to 3 rd countries as the national decision to be taken following the Law on Electricity of the Republic of Lithuania, indicating that need for introducing the tariff should be reasoned in and a letter from the Ministry of Energy of the Republic of Lithuania which was received by the Commission on 18 th of May, Moreover, the discussion on implementing the common cross-border tariff for 3 rd country issues are ongoing from the year In year Baltic and Finish TSOs prepared the draft methodology and calculations for the Pricing of the Cross-Border Electricity Transmission Services with Regard to Trade in Electricity with the Third Countries. However, further discussions on TSOs level were suspended until year 2016 referring to new interconnections coming. Moreover, it was indicated that there could be national fee in Lithuania if common solution is not approved. During the meetings of Committees of Senior Officials of Baltic Council of Ministers held on 27 th of February and 27 th of March, 2015 Lithuania presented its willingness to introduce the tariff from 1 st of January, 2016 using entry/exit fee model. Lithuanian TSO Litgrid AB in its letter No SD-4829 as of 7 th December 2015 also emphasized that all interested parties were informed about the discussion ongoing and position of Lithuania according to the 3 rd countries tariff. 6. The results of the analysis performed by Litgrid AB have been published by Commission when announcing the public consultation also presented in the 20th Baltic Electricity Market Forum working group meeting on November 2, As the decision to implement such tariff is national, no extended analysis for the region with many different scenarios have been made. However, Commission is of opinion that

5 5 detailed presentation on the results, by taking into account different scenarios, is necessary. 4. Regarding the formula for calculation of the export tariff PUC has the following concerns: 4.1. "market price" should be directly linked to Nord Pool Spot day ahead prices and not specially calculated; 4.2. "market price" calculation formula is not further explained (Methodology for Setting the Market Price of Electricity, mentioned in the NCC's letter, is not available in English); 4.3. the transit compensation with the third countries is not mentioned and therefore it is not clear whether these costs will be included in the export tariff calculation. common solution for the 3 rd countries tariff should be implemented in the near future and the extended analysis should be performed by all the parties. It should be emphasized that the initial objective and aspiration is to implement common regional solution for the 3 rd countries tariff. National decision is an intermediate step in the process. The final goal for both regulators and market participants should be to implement more harmonized, transparent and reciprocal principles on the trade with the non-eea countries. 7. According to the NJL tariff calculation methodology, NJL tariff shall be calculated according to the actual costs and scope of the NJL services. But in the first two years of setting the NJL tariff in absence of actual costs and scope data, NJL tariff is calculated using different formula in which market price, calculated according to the Commission s Methodology for Setting the Market Price of Electricity approved by the Commission s Resolution No O3-175 of 8 July 2011 (it could be find here: (text available only in Lithuanian). It should be noted that market price is calculated and very much linked to data used from Nord Pool Spot day ahead prices, also takes into account bilateral contracts and auxiliary services. For future projections of the market price is used the Nasdaq OMX data of future transactions. Regarding transit compensation it should be noted that the income form transit from and to the 3 rd countries reduce the total costs and by this amount transmission tariff is being reduced according to The Methodology for Setting the Price Caps of the Electricity Transmission, Distribution and Public Supply Services and the Public Price approved by the Commission Resolution No O3-3 of 15 January It has to be noted that the transit flows from and to the 3 rd countries are not considered as the export to the 3 rd countries and will not be charged NJL tariff.

6 6 5 AS Augstsprieguma tikls (AST), November 20, 2015 (Latvian TSO) AST is grateful to see that previously expressed concerns are taken into account and public consultation for all involved stakeholders is held, however AST would like to emphasize that NCC given time is not sufficient for quality analysis of the situation. Also, in AST opinion, the analysis and calculations provided about NJL tariffs necessity are not complete, therefore stakeholders do not have the full overview of situation to provide respective opinion and feedback. As already mentioned in 15 th October letter, AST would like to repeatedly emphasize the agreed principles of cross-border capacity calculation and allocation between Baltic countries and with 3 countries stipulated in the Terms, Conditions and Methodologies on Cross-Zonal Capacity Calculation, Provision and Allocation within the Baltic States and with the 3rd Countries" (hereinafter - Baltic CCCA Rules). As expressed in previous letter. AST would like to see the social-economic welfare analysis of the entire Baltic States area regarding to the introduction of cross-border tariffs and proof based on calculations and/or simulations that NJL tariff will not affect negatively electricity prices in Latvian and Estonian electricity markets since all trading capacity with third countries (Russia. Belorussia) and Baltic countries is allocated through Lithuanian-Belorussian and 8. Please note that the information about the NJL tariff was communicated several times. Firstly, during the meetings of Committees of Senior Officials of Baltic Council of Ministers held on 27 th of February and 27 th of March, 2015 Lithuania presented its willingness to introduce the tariff from 1 st of January, 2016 using entry/exit fee model. Secondly, by Commission letter No R2-(E)-3151 as of 8 October 2015, finally, discussed in the 20th Baltic Electricity Market Forum working group meeting on November 2, 2015 by providing the assumptions and modeling of the NJL tariff. Finally, the second public consulattion introduced by Commission letter No R2-(E)-3421 as of 6 November Therefore Commission is of opinijon that overall timeframe for assesment of the NJL tariff calculation was reasonably sufficient. Regarding other comments, please see comments by the Commission in points 5 and 6.

7 7 6 Energy Authority of Finland, November 23, 2015 (Finish NRA) 7 Energy Regulatory Office of Poland, November 23, 2015 Lithuanian-Kaliningrad cross-borders according to Baltic CCCA Rules. AST disagrees with calculation results presented in public consultation documents as not all possible conditions and considerations are taken into account. Based on already received notice from non-eu state counterparty AST would like to point out that such regionally not coordinated decisions of NCC might cause reverse reactions from involved stakeholders of non- EU states and directly cause losses for AST and eventually other Baltic market participants. Taking into account all above mentioned, AST is against introducing the NJL tariff from l st January In general the tariff structure seems reasonable as price of the service covers transmission costs. The Energy Authority would support further harmonization of transmission tariffs between Member States and third countries. Energy Authority of Finland doesn t know if the new tariff in Lithuania has influence on Finland or other Nordic countries. Since we don't know exact details in this issue we have no greater comments to NJL tariff. According to Commission Regulation (EU) No 838/2010 of 23 September 2010 on laying down guidelines relating to the intertransmission system operator compensation 9. The positive answer from Finnish national regulatory authority is a very important and significant in the implementation of NJL tariff. The Commission is also of the opinion that further discussions and initiatives should be on implementation of regional solution for the 3 rd countries tariff. Also please see the answers No 5 and It is important to emphasize that EU integrated electricity market legislation does not specify terms and conditions for the cross-border transmission service between EU member state and a 3 rd country. Therefore, the decision on cross-border tariff for the export to 3 rd

8 8 (Polish NRA) mechanism and a common regulatory approach to transmission charging, each regulatory authority shall ensure that transmission system operators in its area of competence participate in the ITC mechanism and that no additional charges for hosting cross-border flows of electricity are included in charges applied by transmission system operators for access to networks (point 2.1 of Part A of the Annex). Transmission system operators from third countries which have concluded agreements with the Union whereby they have adopted and are applying Union law in the field of electricity shall be entitled to participate in the ITC mechanism point 2.2 of Part A of the Annex). In a case that the TSO responsible for the transmission system of a third country is not involved in the mechanism of the ITC (is not a party to the ITC agreement) or the third country has not concluded agreement with the Union on applying Union law in the field of electricity; TSO which is participant of ITC mechanism shall charge transmission system use fee used for all scheduled imports and exports of electricity from/to the third country (section 7 of Part A of the Annex). This fee is to be calculated annually by ENTSO-E (point 7.3 of Part A of the Annex). The above provisions of Regulation 838/2010 therefore regulate the issue of determining and collecting fees for system use, applied for the exports/imports of countries as the national decision to be taken following the Law on Electricity of the Republic of Lithuania, indicating that need for introducing the tariff should be reasoned in and a letter from the Ministry of Energy of the Republic of Lithuania which was received by the Commission on 18 th of May, Moreover, please see the answers No 3 and 5.

9 energy from third countries to the countries which are parties of ITC mechanism and taking them into account in the ITC mechanism. The abovementioned legislation does not contain additional regulations on charging additional fees for exports/imports of energy to/from third countries. However, it should be noted that point 2.1 of Regulation 838/2010 indicates that regulators will ensure that they will not apply additional charges for hosting cross-border flows of electricity, which will be included in fees for access to the network. The legal grounds indicated by NCC in the letter of 6 November 2015 are Law on Electricity of Republic of Lithuania and a letter of Ministry of Energy of Lithuania, submitted on 18 May 2015, which provides following reasons for the necessity of NJL tariff: (i) costs of usage of interconnection services are not covered by the ITC mechanism, (ii) therefore the costs are assessed in transmission tariff and covered by energy consumers in Lithuania, (iii) the new interconnections (NordBalt and LitPol Link) will result in additional costs that are not covered by the ITC mechanism and (iv) there will be new possibilities for energy exports to third countries. Taking the above into account, I would like to express an opinion that the proposal presented by a letter of National Commission for Prices and Energy Control requires a 9

10 10 detailed legal analysis on the contingency of setting and applying fees for transmission of electricity to/from third countries, other than those stipulated in point 7 of Regulation 838/ Regardless of the remarks on a legal basis for determining the NJL tariff, it should be noted that the fee will be applied to energy exports from Lithuania to Russia and Belarus, and its level will have an impact on the volume of imported/exported energy between: Lithuania -Belarus and Russia, and possibly also between Lithuania and Poland, what in part has been shown in the NCC letter. The assessment of the impact of implementation of the NJL tariff on the Polish and European markets requires a detailed analysis using the data of the Lithuanian and Scandinavian market, which are not held by URE. It should be also noted that the amount of the fee (5.45 /MWh) is many times higher than the fee calculated by ENTSO-E for the third countries. 9 Fingrid Oyj, November 27, 2015 (Finnish TSO) Nordic and Baltic countries formulate a common electricity market with equal market rules and conditions. Fingrid emphasizes the importance of harmonized and reciprocal solutions in the whole market area. This includes also the cross border trade principles with the non-eea third countries. The reinforced Baltic Energy Market Interconnection Plan, BEMIP, also 11. Please see answers No 5 and 6. The purpose of the NJL tariff is to cover cross-border transmission costs, which are not covered through the ITC mechanism. The NJL is calculated according to the actual costs. Moreover, please see answer No Please see answers No 5 and 6.

11 11 10 Swedish Energy Markets Inspectorate (Swedish NRA) highlights compatible trading principles and platform towards non-eea countries as a common target of the BEMIP-parties. Fingrid finds the proposed NJL tariff as a step to the right direction towards more harmonized, transparent and reciprocal principles applied on the trade with the non- EEA countries. On behalf of the Swedish Energy Markets Inspectorate I can confirm that we do not have any comments or objections to the new tariff that will be introduced. 13. The positive answer from Swedish national regulatory authority as a very important and significant in the implementation of NJL tariff.

Draft. COMMISSION REGULATION (EU) No /

Draft. COMMISSION REGULATION (EU) No / EN EN EN EUROPEAN COMMISSION Brussels, C(2010) XXX final Draft COMMISSION REGULATION (EU) No / of on laying down guidelines relating to the inter-transmission system operator compensation mechanism and

More information

COMMISSION REGULATION (EU)

COMMISSION REGULATION (EU) 24.9.2010 Official Journal of the European Union L 250/5 COMMISSION REGULATION (EU) No 838/2010 of 23 September 2010 on laying down guidelines relating to the inter-transmission system operator compensation

More information

Terms, Conditions and Methodologies on Cross-Zonal Capacity Calculation, Provision and Allocation within the Baltic States and with the 3 rd Countries

Terms, Conditions and Methodologies on Cross-Zonal Capacity Calculation, Provision and Allocation within the Baltic States and with the 3 rd Countries Terms, Conditions and Methodologies on Cross-Zonal Capacity Calculation, Provision and Allocation within the Baltic States and with the 3 rd Countries Among: AS Augstsprieguma tīkls Elering AS LITGRID

More information

All Baltic CCR TSOs Common Proposal for Regional Design of Long-Term Transmission Rights in Accordance with Article 31 of the Commission Regulation

All Baltic CCR TSOs Common Proposal for Regional Design of Long-Term Transmission Rights in Accordance with Article 31 of the Commission Regulation All Baltic CCR TSOs Common Proposal for Regional Design of Long-Term Transmission Rights in Accordance with Article 31 of the Commission Regulation (EU) 2016/1719 of 26 September 2016 establishing a guideline

More information

According to article 9 (8) (d) of Regulation 2015/1222 the proposal is subject to approval by each national regulatory authority.

According to article 9 (8) (d) of Regulation 2015/1222 the proposal is subject to approval by each national regulatory authority. 1 (6) Request for amendment on Nordic TSOs proposal for Arrangements concerning more than one NEMO in one bidding zone in accordance with Article 45 and 57 of the Commission Regulation (EU) 2015/1222 Between

More information

Supporting document of the necessary arrangements to support the functioning of wholesale electricity markets in accordance to Article 30(6) of

Supporting document of the necessary arrangements to support the functioning of wholesale electricity markets in accordance to Article 30(6) of Supporting document of the necessary arrangements to support the functioning of wholesale electricity markets in accordance to Article 30(6) of Commission Regulation (EU) no 2016/1719 of 26 September 2016

More information

Work Programme Nordic Energy Regulators (NordREG)

Work Programme Nordic Energy Regulators (NordREG) Work Programme 2009 Nordic Energy Regulators (NordREG) Work Programme 2009 Nordic Energy Regulators (NordREG) Nordic Energy Regulators 2009 Report 1/2009 NordREG c/o Norwegian Water Resources and Energy

More information

Grid Investments from a Nordic Perspective

Grid Investments from a Nordic Perspective Grid Investments from a Nordic Perspective NordREG recommendations 1 Background and task As one of the challenges for the further development of the Nordic electricity market has in the last few years

More information

AS LATVENERGO. in order to reflect recent developments concerning the Company and the Group;

AS LATVENERGO. in order to reflect recent developments concerning the Company and the Group; AS LATVENERGO Supplement No.3 to the Base Prospectus of the Programme for the issuance of Notes in the amount of LVL 85,000,000 or its equivalent in EUR This document (the Supplementary Prospectus ) constitutes

More information

Baltic Harmonised Imbalance Settlement Model Document

Baltic Harmonised Imbalance Settlement Model Document Baltic Harmonised Imbalance Settlement Model Document Elering AS July 12, 2017 AS Augstsprieguma tīkls Litgrid AB 1. Update on the Baltic harmonised imbalance settlement model... 3 2. Description of Baltic

More information

View on the perspective on Regional Gas Market Development in Eastern Baltic Region

View on the perspective on Regional Gas Market Development in Eastern Baltic Region View on the perspective on Regional Gas Market Development in Eastern Baltic Region Saulius Bilys General Manager of AB Amber Grid Baltic Gas Market Mini Forum 2 May 2016, Vilnius Vision 2020 Based on

More information

BASREC WS, St. Petersburg, February 28 th, 2014 NORD POOL SPOT LEADING THE POWER MARKETS INTEGRATION

BASREC WS, St. Petersburg, February 28 th, 2014 NORD POOL SPOT LEADING THE POWER MARKETS INTEGRATION BASREC WS, St. Petersburg, February 28 th, 2014 NORD POOL SPOT LEADING THE POWER MARKETS INTEGRATION North Western Europe (NWE) FINLAND North Western Europe (NWE) NORWAY SWEDEN ESTONIA LATVIA RUSSIA DENMARK

More information

The Concept of Baltic CoBA

The Concept of Baltic CoBA The Concept of Baltic CoBA Explanatory document Supporting public consultation material 27 th June, 2016 Elering, Augstsprieguma tīkls, LITGRID 1 1. Introduction According to draft guideline on Electricity

More information

EQUITY AND LIABILITIES

EQUITY AND LIABILITIES CONDENSED INTERIM STATEMENTS OF FINANCIAL POSITION AS AT 30 JUNE 2015 No- Group Company tes 30.06.2015 31.12.2014 30.06.2015 31.12.2014 ASSETS Non-current assets Intangible assets 3 776 944 756 915 Property,

More information

DISPUTE RESOLUTION SIMPLIFYING MATTERS

DISPUTE RESOLUTION SIMPLIFYING MATTERS DISPUTE RESOLUTION SIMPLIFYING MATTERS SWEDEN FINLAND THE BALTIC SEA REGION LAW FIRM NORWAY ESTONIA LATVIA RUSSIA MAGNUSSON WHO ARE WE? DENMARK LITHUANIA POLAND BELARUS We offer seamless legal services

More information

Baltic Harmonised Imbalance Settlement Model Document

Baltic Harmonised Imbalance Settlement Model Document Baltic Harmonised Imbalance Settlement Model Document Elering AS February 17 th, 2017 AS Augstsprieguma tīkls Litgrid AB 1. Introduction... 3 2. Building Blocks... 3 2.1. Single Portfolio Model... 4 2.2.

More information

LITGRID AB CONDENSED INTERIM CONSOLIDATED AND THE COMPANY S FINANCIAL STATEMENTS, PREPARED ACCORDING TO INTERNATIONAL FINANCIAL REPORTING STANDARDS

LITGRID AB CONDENSED INTERIM CONSOLIDATED AND THE COMPANY S FINANCIAL STATEMENTS, PREPARED ACCORDING TO INTERNATIONAL FINANCIAL REPORTING STANDARDS LITGRID AB CONDENSED INTERIM CONSOLIDATED AND THE COMPANY S FINANCIAL STATEMENTS, PREPARED ACCORDING TO INTERNATIONAL FINANCIAL REPORTING STANDARDS AS ADOPTED BY THE EUROPEAN UNION (UNAUDITED), FOR THE

More information

How to avoid market manipulation lessons learnt in Norway. 10th Baltic Electricity Market Mini-Forum June 4, 2010 Anne Dønnem, NVE

How to avoid market manipulation lessons learnt in Norway. 10th Baltic Electricity Market Mini-Forum June 4, 2010 Anne Dønnem, NVE How to avoid market manipulation lessons learnt in Norway 10th Baltic Electricity Market Mini-Forum June 4, 2010 Anne Dønnem, NVE Overview Nord Pool Spot History and organisation The role of the power

More information

All TSOs response to the consultation on the Intraday Cross-Zonal Gate Opening and Gate Closure Times

All TSOs response to the consultation on the Intraday Cross-Zonal Gate Opening and Gate Closure Times All TSOs response to the consultation on the Intraday Cross-Zonal Gate Opening and Gate Closure Times Background information In December 2016, all TSOs submitted to all NRAs the all TSOs proposal for the

More information

29 June 2016 Disclaimer This explanatory document is submitted by all TSOs to all NRAs for information and clarification purposes only accompanying the All TSOs proposal for methodology for congestion

More information

CID Methodology Explanatory note

CID Methodology Explanatory note 29 June 2016 Disclaimer This explanatory document is submitted by all TSOs to all NRAs for information and clarification purposes only accompanying the All TSOs proposal for methodology for congestion

More information

NordREG Activities 2008

NordREG Activities 2008 NordREG Activities 2008 NordREG Activities 2008 NordREG c/o Norwegian Water Resources and Energy Directorate P.O. Box 5091, Majorstua N-0301 Oslo Norway Telephone: +47 22 95 95 95 Telefax: +47 22 95 90

More information

Cross-Border Intraday: Questions & Answers

Cross-Border Intraday: Questions & Answers Cross-Border Intraday: Questions & Answers 1. What is the Cross-Border Intraday initiative? The Cross-Border Intraday initiative (XBID Project) is a joint initiative by the Power Exchanges (PXs): APX/Belpex,

More information

The Model of Implicit Capacity Allocation in the Baltic States

The Model of Implicit Capacity Allocation in the Baltic States The Model of Implicit Capacity Allocation in the Baltic States This document describes a model of implicit allocation of gas transmission capacity in the Baltic States. Implicit capacity allocation is

More information

Comments on CEPA s draft conclusions in relation to European transmission tariffs

Comments on CEPA s draft conclusions in relation to European transmission tariffs July 2015 Frontier Economics 1 ACER commissioned CEPA to review harmonisation of transmission tariffs in Europe, and specifically to: assess whether increased harmonisation of electricity transmission

More information

UNAUDITED INTERIM CONDENSED CONSOLIDATED FINANCIAL STATEMENTS FOR THE 3 MONTH PERIOD ENDING 31 MARCH 2013

UNAUDITED INTERIM CONDENSED CONSOLIDATED FINANCIAL STATEMENTS FOR THE 3 MONTH PERIOD ENDING 31 MARCH 2013 UNAUDITED INTERIM CONDENSED CONSOLIDATED FINANCIAL STATEMENTS FOR THE 3 MONTH PERIOD ENDING 31 MARCH 2013 Latvenergo Group is the most valuable company in Latvia and one of the most valuable companies

More information

Work Programme 2007 Report 1/2007

Work Programme 2007 Report 1/2007 Work Programme 2007 Report 1/2007 WORK PROGRAMME 2007 NORDIC ENERGY REGULATORS (NordREG) Nordic Energy Regulators 2007 Report 1/2007 NordREG c/o The Energy Markets Inspectorate P.O. Box 310 SE- 631 04

More information

OST and Nord Pool. Status of the Albanian power exchange , En.Trading Seminar Tirana

OST and Nord Pool. Status of the Albanian power exchange , En.Trading Seminar Tirana OST and Nord Pool Status of the Albanian power exchange 14.09.2017, En.Trading Seminar Tirana Matias Peltoniemi Elton B. Radheshi Nord Pool Consulting OST sh.a. European target model the same basic solution

More information

Explanatory document for the Nordic synchronous area proposal for limits for the exchange of FCR between the TSOs in accordance with Article 163(2)

Explanatory document for the Nordic synchronous area proposal for limits for the exchange of FCR between the TSOs in accordance with Article 163(2) Explanatory document for the Nordic synchronous area proposal for limits for the exchange of FCR between the TSOs in accordance with Article 163(2) of the Commission Regulation (EU) 2017/1485 of 2 August

More information

Energinet.dk s proposal for Arrangements concerning more than one NEMO in one bidding zone in accordance with Article 45 and 57 of the Commission

Energinet.dk s proposal for Arrangements concerning more than one NEMO in one bidding zone in accordance with Article 45 and 57 of the Commission Energinet.dk s proposal for Arrangements concerning more than one NEMO in one bidding zone in accordance with Article 45 and 57 of the Commission Regulation (EU) 2015/1222 of 24 July 2015 establishing

More information

APPROVAL BY ALL CONCERNED CCR HANSA AUTHORITIES

APPROVAL BY ALL CONCERNED CCR HANSA AUTHORITIES APPROVAL BY ALL CONCERNED CCR HANSA AUTHORITIES OF CCR HANSA TSO PROPOSAL FOR CCR HANSA REGIONAL REQUIREMENTS TO HARMONISED ALLOCATION RULES IN ACCORDANCE WITH ARTICLE 52 OF THE COMMISSION REGULATION (EU)

More information

Supporting document for the Danish TSO, Energinet, of the Nordic Capacity Calculation Region proposal for splitting long-term cross-zonal capacity

Supporting document for the Danish TSO, Energinet, of the Nordic Capacity Calculation Region proposal for splitting long-term cross-zonal capacity Supporting document for the Danish TSO, Energinet, of the Nordic Capacity Calculation Region proposal for splitting long-term cross-zonal capacity methodology in accordance with Article 16(1) of Commission

More information

Proposal of the Transmission System Operators of the Baltic. Capacity Calculation Region for the regional design of longterm

Proposal of the Transmission System Operators of the Baltic. Capacity Calculation Region for the regional design of longterm Proposal of the Transmission System Operators of the Baltic Capacity Calculation Region for the regional design of longterm transmission rights in accordance with Article 31 of the Commission Regulation

More information

EURELECTRIC - CIS EPC Joint Report: Key differences in electricity trade market rules and obstacles to trade between the EU and Russia/Belarus

EURELECTRIC - CIS EPC Joint Report: Key differences in electricity trade market rules and obstacles to trade between the EU and Russia/Belarus EURELECTRIC - CIS EPC Joint Report: Key differences in electricity trade market rules and obstacles to trade between the EU and Russia/Belarus --------------------------------------------------------------------------------------------------

More information

Introduction. 1.1 The CACM Regulation & all TSOs. 1.2 Geographical application of this proposal

Introduction. 1.1 The CACM Regulation & all TSOs. 1.2 Geographical application of this proposal Explanatory Document to all TSOs proposal for intraday cross-zonal gate opening and gate closure times in accordance with Article 59 of Commission Regulation (EU) 2015/1222 of 24 July 2015 establishing

More information

MARI Project. BSG meeting 7/12. Manually Activated Reserves Initiative - Creating a European platform for the exchange of mfrr balancing energy

MARI Project. BSG meeting 7/12. Manually Activated Reserves Initiative - Creating a European platform for the exchange of mfrr balancing energy Project Manually Activated Reserves Initiative - Creating a European platform for the exchange of mfrr balancing energy BSG meeting 7/12 Presented by: Ulf Kasper/Benjamin Genet The MARI project now formally

More information

We appreciate your feedback

We appreciate your feedback Publishing date: 05/09/2012 Document title: We appreciate your feedback Please click on the icon to take a 5 online survey and provide your feedback about this document Draft Framework Guidelines on rules

More information

REQUEST FOR AMENDMENT BY ALL REGULATORY AUTHORITIES AGREED AT THE ENERGY REGULATORS FORUM ON

REQUEST FOR AMENDMENT BY ALL REGULATORY AUTHORITIES AGREED AT THE ENERGY REGULATORS FORUM ON REQUEST FOR AMENDMENT BY ALL REGULATORY AUTHORITIES AGREED AT THE ENERGY REGULATORS FORUM ON ALL TSO s PROPOSAL FOR CONGESTION INCOME DISTRIBUTION METHODOLOGY 24.01.2017 I. Introduction and legal context

More information

Nord Pool Spot s Market Surveillance focuses on insider trading and market manipulation according to REMIT Article 15

Nord Pool Spot s Market Surveillance focuses on insider trading and market manipulation according to REMIT Article 15 Quarterly report for Market Surveillance 1 October to 31 December This report gives an update on matters regarding surveillance, regulations and incidents Market Surveillance (MS) has worked on as well

More information

Draft Outline of the 2016 Work Programme

Draft Outline of the 2016 Work Programme Draft Outline of the 2016 Work Programme This document presents an outline of the tasks that the Agency plans to perform in 2016. As such, it focuses primarily on the external deliverables the Agency expects

More information

7 April ENTSO-E AISBL Avenue de Cortenbergh Brussels Belgium Tel Fax www. entsoe.

7 April ENTSO-E AISBL Avenue de Cortenbergh Brussels Belgium Tel Fax www. entsoe. All TSOs Proposal for a Congestion Income Distribution (CID) methodology in accordance with Article 73 of the Commission Regulation (EU) 2015/1222 of 24 July 2015 establishing a Guideline on Capacity Allocation

More information

Nordic bidding zones. Commissioned by the Swedish Ministry of Enterprise, Energy and Communications / The Nordic Council of Ministers.

Nordic bidding zones. Commissioned by the Swedish Ministry of Enterprise, Energy and Communications / The Nordic Council of Ministers. Public ISBN-number: 978-82-93150-43-5 Nordic bidding zones Commissioned by the Swedish Ministry of Enterprise, Energy and Communications / The Nordic Council of Ministers October 2013 Thema Report 2013-27

More information

LATVENERGO CONSOLIDATED AND LATVENERGO AS UNAUDITED CONDENSED INTERIM FINANCIAL STATEMENTS

LATVENERGO CONSOLIDATED AND LATVENERGO AS UNAUDITED CONDENSED INTERIM FINANCIAL STATEMENTS LATVENERGO CONSOLIDATED AND LATVENERGO AS UNAUDITED CONDENSED INTERIM FINANCIAL STATEMENTS FOR THE 3-MONTH PERIOD ENDING 31 MARCH 2017 LATVENERGO GROUP UNAUDITED INTERIM CONDENSED CONSOLIDATED FINANCIAL

More information

Proposed methodology for the assessment of candidate projects for the 3rd PCI list. Electricity transmission and storage projects

Proposed methodology for the assessment of candidate projects for the 3rd PCI list. Electricity transmission and storage projects Proposed methodology for the assessment of candidate projects for the 3rd PCI list Electricity transmission and storage projects 1 INTRODUCTION This document describes a methodology of evaluating benefits,

More information

The market setup in the Baltics explanation with examples

The market setup in the Baltics explanation with examples The market setup in the Baltics explanation with examples Table of Contents The market setup in the Nordic-... 3 Baltic exchange area... 3 Daily routines at Nord Pool... 4 Price calculation principles...

More information

ACER. Congestion income distribution methodology. in accordance with Article 73 of the Commission Regulation

ACER. Congestion income distribution methodology. in accordance with Article 73 of the Commission Regulation Annex I Capacity Allocation and Congestion Management in accordance with Article 73 of the Commission Regulation (EU) 2015/1222 of 24 July 2015 establishing a Guideline on Congestion income distribution

More information

1. Foreword Main developments in the gas and electricity market The electricity market Wholesale...

1. Foreword Main developments in the gas and electricity market The electricity market Wholesale... NATIONAL REPORT DENMARK STATUS FOR 2016 2017 Contents 1. Foreword... 3 2. Main developments in the gas and electricity market... 4 2.1 The electricity market... 4 2.1.1 Wholesale... 4 2.1.2 Retail... 4

More information

Draft Outline of the 2019 Work Programme

Draft Outline of the 2019 Work Programme Draft Outline of the 2019 Work Programme This document presents an outline of the tasks the Agency plans to perform in 2019. As such, it focuses primarily on the external deliverables the Agency expects

More information

ACER ON THE CONGESTION INCOME DISTRIBUTION METHODOLOGY. of 14 December 2017 THE AGENCY FOR THE COOPERATION OF ENERGY REGULATORS,

ACER ON THE CONGESTION INCOME DISTRIBUTION METHODOLOGY. of 14 December 2017 THE AGENCY FOR THE COOPERATION OF ENERGY REGULATORS, ON THE CONGESTION INCOME DISTRIBUTION METHODOLOGY of 14 December 2017 DECISION OF THE AGENCY FOR THE COOPERATION OF ENERGY REGULATORS No 07/2017 Page 1 b10 and submit it to all regulatory authorities for

More information

13 th February th February 2017 Page 1 of 7

13 th February th February 2017 Page 1 of 7 Intraday Coupling Model proposal for Italian Borders in accordance with Article 63 of the Commission Regulation (EU) 2015/1222 of 24 July 2015 establishing a Guideline on Capacity Allocation and Congestion

More information

Regulatory framework for crossborder redispatching and countertrading

Regulatory framework for crossborder redispatching and countertrading Regulatory framework for crossborder redispatching and countertrading Joint Task Force ACER ENTSO-E 1 OUTLINE The need for an efficient and coordinated redispatch measures framework Current situation:

More information

20 years operation of the Nordic electricity market

20 years operation of the Nordic electricity market ENERGY 20 years operation of the Nordic electricity market ADB Regional Energy Trade Workshop September 8-9, 2014 Manila Dr. Per Christer Lund 1 SAFER, SMARTER, GREENER Electricity market world wide 2

More information

Minutes BASREC GSEO meeting 2 June, 2010 Vilnius Venue: Lithuanian Exhibition Centre LITEXPO, Laisves av. 5, Vilnius

Minutes BASREC GSEO meeting 2 June, 2010 Vilnius Venue: Lithuanian Exhibition Centre LITEXPO, Laisves av. 5, Vilnius Minutes BASREC GSEO meeting 2 June, 2010 Vilnius Venue: Lithuanian Exhibition Centre LITEXPO, Laisves av. 5, Vilnius Participants (BASREC GSEO members): Josephine Bahr Ljungdell and Pia Norrman (Sweden),

More information

ERGEG Public Consultation on Guidelines on Transmission Tarification 1. - Evaluation of the Comments Received

ERGEG Public Consultation on Guidelines on Transmission Tarification 1. - Evaluation of the Comments Received ERGEG Public Consultation on Guidelines on Transmission Tarification 1 - Evaluation of the Comments Received - 18-07-2005 INTRODUCTION This document contains the evaluation by ERGEG of the comments received

More information

Methodology for the Calculation of Scheduled Exchanges resulting from single day-ahead coupling Explanatory Note

Methodology for the Calculation of Scheduled Exchanges resulting from single day-ahead coupling Explanatory Note Methodology for the Calculation of Scheduled Exchanges resulting from single day-ahead coupling Explanatory Note 13 December 2016 Disclaimer This explanatory document is approved by All TSOs, but only

More information

UNAUDITED INTERIM CONDENSED CONSOLIDATED FINANCIAL STATEMENTS FOR THE 9 MONTH PERIOD ENDING 30 SEPTEMBER 2013

UNAUDITED INTERIM CONDENSED CONSOLIDATED FINANCIAL STATEMENTS FOR THE 9 MONTH PERIOD ENDING 30 SEPTEMBER 2013 UNAUDITED INTERIM CONDENSED CONSOLIDATED FINANCIAL STATEMENTS FOR THE 9 MONTH PERIOD ENDING 30 SEPTEMBER 2013 Latvenergo Group is the most valuable company in Latvia and one among the most valuable companies

More information

AGREEMENT ON TRANSMISSION SERVICE ON FINGRID'S CROSS-BORDER CONNECTIONS BETWEEN RUSSIA AND FINLAND, NO /2018

AGREEMENT ON TRANSMISSION SERVICE ON FINGRID'S CROSS-BORDER CONNECTIONS BETWEEN RUSSIA AND FINLAND, NO /2018 AGREEMENT ON TRANSMISSION SERVICE ON FINGRID'S CROSS-BORDER CONNECTIONS BETWEEN RUSSIA AND FINLAND, NO. 2128 /2018 PARTIES This agreement (the Agreement ) has been concluded by and between: 1) Fingrid

More information

Capacity Calculation Region Nordics regional design of long-term transmission rights in accordance with Article 31 of the Commission Regulation (EU)

Capacity Calculation Region Nordics regional design of long-term transmission rights in accordance with Article 31 of the Commission Regulation (EU) Capacity Calculation Region Nordics regional design of long-term transmission rights in accordance with Article 31 of the Commission Regulation (EU) 2016/1719 of 26 September 2016 establishing a guideline

More information

Electricity market in the. Simon-Erik Ollus Baltic Energy Forum, Vilnius 20 November 2014

Electricity market in the. Simon-Erik Ollus Baltic Energy Forum, Vilnius 20 November 2014 Electricity market in the Baltic Sea area today Simon-Erik Ollus Baltic Energy Forum, Vilnius 20 November 2014 Disclaimer This presentation does not constitute an invitation to underwrite, subscribe for,

More information

LITGRID AB CONDENSED CONSOLIDATED AND THE COMPANY S INTERIM FINANCIAL STATEMENTS FOR 2016, PREPARED ACCORDING TO INTERNATIONAL FINANCIAL REPORTING

LITGRID AB CONDENSED CONSOLIDATED AND THE COMPANY S INTERIM FINANCIAL STATEMENTS FOR 2016, PREPARED ACCORDING TO INTERNATIONAL FINANCIAL REPORTING LITGRID AB CONDENSED CONSOLIDATED AND THE COMPANY S INTERIM FINANCIAL STATEMENTS FOR 2016, PREPARED ACCORDING TO INTERNATIONAL FINANCIAL REPORTING STANDARDS AS ADOPTED BY THE EUROPEAN UNION (UNAUDITED)

More information

Stock exchange release 1 (18) FINGRID OYJ EET FINGRID GROUP S INTERIM REPORT 1 JANUARY - 30 SEPTEMBER 2016

Stock exchange release 1 (18) FINGRID OYJ EET FINGRID GROUP S INTERIM REPORT 1 JANUARY - 30 SEPTEMBER 2016 Stock exchange release 1 (18) FINGRID GROUP S INTERIM REPORT 1 JANUARY - 30 SEPTEMBER 2016 Fingrid s consolidated financial statements have been drawn up in accordance with the International Financial

More information

Measures to support the functioning of the Nordic financial electricity market

Measures to support the functioning of the Nordic financial electricity market Public ISBN nr. 978-82-93150-84-8 Measures to support the functioning of the Nordic financial electricity market Commissioned by NordREG November 2015 THEMA Report 2015-35 About the project About the report

More information

All NEMOs proposal for the price coupling algorithm and for the continuous trading matching algorithm, also incorporating TSO and NEMO proposals for

All NEMOs proposal for the price coupling algorithm and for the continuous trading matching algorithm, also incorporating TSO and NEMO proposals for All NEMOs proposal for the price coupling algorithm and for the continuous trading matching algorithm, also incorporating TSO and NEMO proposals for a common set of requirements, in accordance with Article

More information

Nord Pool. XBID webinar, May 2018

Nord Pool. XBID webinar, May 2018 Nord Pool XBID webinar, May 2018 Timeline 2 nd May: Member test starting 14 th to 18 th May: XBID common trial period 12 th JUNE XBID Go-live 2 Nord Pool intraday market areas Nord Pool markets, part of

More information

THE MONITORING REPORT FROM 16 MARCH 2018 ON THE IMPLEMENTATION OF THE JOINT DECLARATION

THE MONITORING REPORT FROM 16 MARCH 2018 ON THE IMPLEMENTATION OF THE JOINT DECLARATION Opinion on THE MONITORING REPORT FROM 16 MARCH 2018 ON THE IMPLEMENTATION OF THE JOINT DECLARATION IN JULY 2017 THE FEDERAL MINISTRY OF ECONOMIC AFFAIRS AND ENERGY OF THE FEDERAL REPUBLIC OF GERMANY AND

More information

Mr Alberto Pototschnig, Director ACER. CC: Dr Klaus-Dieter Borchardt, Director Internal Energy Market DG ENER European Commission

Mr Alberto Pototschnig, Director ACER. CC: Dr Klaus-Dieter Borchardt, Director Internal Energy Market DG ENER European Commission Mr Alberto Pototschnig, Director ACER CC: Dr Klaus-Dieter Borchardt, Director Internal Energy Market DG ENER European Commission Mr Laurent Schmitt, Secretary General ENTSO-E 14 June 2017 Dear Alberto,

More information

Power Trading in the Coupled European Markets

Power Trading in the Coupled European Markets Power Trading in the Coupled European Markets Challenges for policy-makers February 2016-1 - Europe Economics is registered in England No. 3477100. Registered offices at Chancery House, 53-64 Chancery

More information

Status quo: Network Codes and Guidelines from NRAs perspective. Dace Bite Public Utilities Commission of Latvia Deputy Director of Energy Department

Status quo: Network Codes and Guidelines from NRAs perspective. Dace Bite Public Utilities Commission of Latvia Deputy Director of Energy Department Status quo: Network Codes and Guidelines from NRAs perspective Dace Bite Public Utilities Commission of Latvia Deputy Director of Energy Department 25 th Baltic Electricity Market Forum Tartu 18 April

More information

Integrated Single Electricity Market (I-SEM)

Integrated Single Electricity Market (I-SEM) Integrated Single Electricity Market (I-SEM) TSO Obligations under the Forward Capacity Allocation Regulation Decision Paper CRU-18-032 05 th March 2018 0 Executive Summary On 6th September 2017, the Utility

More information

18 April 2016 Draft for consultation

18 April 2016 Draft for consultation All TSOs proposal for intraday cross-zonal gate opening and gate closure times in accordance with Article 59 of Commission Regulation (EU) 2015/1222 of 24 July 2015 establishing a guideline on capacity

More information

Regional market framework

Regional market framework h t t p : / / w w w. n o r d p o o l s p o t. c o m / s e r v Regional market framework 21.05.2017 Manama Nord Pool Consulting Nord Pool Consulting are participating in developing modern power markets

More information

DK1-DE COUNTERTRADE MODELS IMPACT ASSESSMENT

DK1-DE COUNTERTRADE MODELS IMPACT ASSESSMENT DK1-DE Countertrade models Collected Impact Assessment 1/46 FINAL REPORT DK1-DE COUNTERTRADE MODELS IMPACT ASSESSMENT Date: 1. 29th november of November 2017 2017 Author: Contents 1. Executive summary...

More information

Cross-Border Intraday: Questions & Answers

Cross-Border Intraday: Questions & Answers Last update: 04/12/2018 Cross-Border Intraday: Questions & Answers 1. What is the Cross-Border Intraday initiative? The Cross-Border Intraday initiative (XBID Project) started as a joint initiative by

More information

European transmission tariff structures Cambridge Economic Policy Associates

European transmission tariff structures Cambridge Economic Policy Associates European transmission tariff structures Cambridge Economic Policy Associates 24 March 2015 Cambridge Economic Policy Associates (CEPA) We are an economic and financial policy consulting business Our energy

More information

LITGRID AB CONSOLIDATED INTERIM REPORT AND CONDENSED INTERIM CONSOLIDATED AND THE COMPANY S FINANCIAL STATEMENTS, PREPARED ACCORDING TO INTERNATIONAL

LITGRID AB CONSOLIDATED INTERIM REPORT AND CONDENSED INTERIM CONSOLIDATED AND THE COMPANY S FINANCIAL STATEMENTS, PREPARED ACCORDING TO INTERNATIONAL LITGRID AB CONSOLIDATED INTERIM REPORT AND CONDENSED INTERIM CONSOLIDATED AND THE COMPANY S FINANCIAL STATEMENTS, PREPARED ACCORDING TO INTERNATIONAL FINANCIAL REPORTING STANDARDS AS ADOPTED BY THE EUROPEAN

More information

Baltic Marine Environment Protection Commission

Baltic Marine Environment Protection Commission Baltic Marine Environment Protection Commission Nature Protection and Biodiversity Group Gothenburg, Sweden 13-16 May 2014 HABITAT 16-2014 Document title Summary report on seal management plans Code 6-3

More information

Content Abbreviations Article 1 Article 2 Article 3 Article 4 Article 5 Article 6 Article 7 Article 8 Article 9 Article 10 Article 11 Article 12

Content Abbreviations Article 1 Article 2 Article 3 Article 4 Article 5 Article 6 Article 7 Article 8 Article 9 Article 10 Article 11 Article 12 All TSOs proposal for common settlement rules applicable to all intended exchanges of energy as a result of the reserve replacement process, frequency restoration process with manual and automatic activation

More information

ENTSO-E Network Code on Electricity Balancing

ENTSO-E Network Code on Electricity Balancing Annex II to Recommendation of the Agency for the Cooperation of Energy Regulators No 03/2015 of 20 July 2015 on the Network Code on Electricity Balancing Proposed amendments to the Network Code ENTSO-E

More information

Harmonised Allocation Rules for Forward Capacity Allocation Summary of the assessment of the comments from the public consultation

Harmonised Allocation Rules for Forward Capacity Allocation Summary of the assessment of the comments from the public consultation Harmonised Allocation Rules for Forward Capacity Allocation Summary of the assessment of the comments from the public 29 June 2016 Disclaimer This explanatory document is submitted by the relevant TSOs

More information

MARKET REPORT. August 2011

MARKET REPORT.     August 2011 ust MARKET REPORT Highlights physical markets ust : POWER: Nord Pool Spot market share of Nordic consumption was 72.6 per cent in ust. The total Nordic preliminary consumption for ust was 26.8 TWh compared

More information

Congestion Management Guidelines. Compliance report

Congestion Management Guidelines. Compliance report Congestion Management Guidelines Compliance report Report 8/2007 Congestion Management Guidelines Compliance report Report 8/2007 NordREG c/o Danish Energy Regulatory Authority Nyropsgade 30 DK- 1780

More information

Wholesale Electricity Market Monitoring Report for the Energy Community Contracting Parties and Georgia

Wholesale Electricity Market Monitoring Report for the Energy Community Contracting Parties and Georgia Wholesale Electricity Market Monitoring Report for the Energy Community Contracting Parties and Georgia Reporting Period 2014 Publication date April 2016 Contents Contents... 1 List of Tables... 2 List

More information

EFET reaction 25 April 2017

EFET reaction 25 April 2017 Energitilsynet consultation on the proposed decision of the Danish and Swedish NRAs on long- term hedging opportunities in Denmark and at its Northern borders n EFET reaction 25 April 2017 The European

More information

Report on Proposed principles for Common Balance Management

Report on Proposed principles for Common Balance Management Report on Proposed principles for Common Balance Management 2007-11-16 1 Contents 1. INTRODUCTION AND BACKGROUND...3 2. COMMON COST ALLOCATION...3 3. FEE STRUCTURE... 4 4. NEW MODEL FOR ENCOMPASSING TWO

More information

NordREG s status update to EMG July June Approved by NordREG Board

NordREG s status update to EMG July June Approved by NordREG Board NordREG s status update to EMG July 2017 - June 2018 Approved by NordREG Board 2018 06 19 NordREG Report 2018 1 2 Preface European cooperation and the drive towards a well functioning internal European

More information

Eesti Energia Audited Financial Results for February 2019 Transcription

Eesti Energia Audited Financial Results for February 2019 Transcription Eesti Energia Audited Financial Results for 2018 28 February 2019 Transcription 1 Andri Avila Dear investors and partners, you are welcome to our regular conference call introducing Eesti Energia s financial

More information

ACER ON ALL TRANSMISSION SYSTEM OPERATORS PROPOSAL FOR INTRADAY CROSS-ZONAL GATE OPENING AND INTRADAY CROSS-ZONAL GATE CLOSURE TIMES

ACER ON ALL TRANSMISSION SYSTEM OPERATORS PROPOSAL FOR INTRADAY CROSS-ZONAL GATE OPENING AND INTRADAY CROSS-ZONAL GATE CLOSURE TIMES ACER DECISION OF THE AGENCY FOR THE COOPERATION OF ENERGY REGULATORS No 04/2018 of24 April 2012 ON ALL TRANSMISSION SYSTEM OPERATORS PROPOSAL FOR INTRADAY CROSS-ZONAL GATE OPENING AND INTRADAY CROSS-ZONAL

More information

EUROPEA U IO. Brussels, 12 June 2009 (OR. en) 2007/0198 (COD) PE-CO S 3651/09 E ER 173 CODEC 704

EUROPEA U IO. Brussels, 12 June 2009 (OR. en) 2007/0198 (COD) PE-CO S 3651/09 E ER 173 CODEC 704 EUROPEA U IO THE EUROPEA PARLIAMT THE COU CIL Brussels, 12 June 2009 (OR. en) 2007/0198 (COD) PE-CO S 3651/09 ER 173 CODEC 704 LEGISLATIVE ACTS A D OTHER I STRUMTS Subject: REGULATION OF THE EUROPEAN PARLIAMENT

More information

APPROVAL BY ALL REGULATORY AUTHORITIES AGREED AT THE ENERGY REGULATORS FORUM

APPROVAL BY ALL REGULATORY AUTHORITIES AGREED AT THE ENERGY REGULATORS FORUM APPROVAL BY ALL REGULATORY AUTHORITIES AGREED AT THE ENERGY REGULATORS FORUM OF ALL TSO PROPOSAL FOR THE SINGLE ALLOCATION PLATFORM METHODOLOGY AND SAP COST SHARING METHODOLOGY 18 September 2017 1 I. Introduction

More information

Publishing date: 31/05/2017. We appreciate your feedback. Share this document

Publishing date: 31/05/2017. We appreciate your feedback. Share this document Publishing date: 31/05/2017 Document title: ACER Position on Potential Improvements to the EIP We appreciate your feedback Please click on the icon to take a 5 online survey and provide your feedback about

More information

COMMISSION IMPLEMENTING DECISION

COMMISSION IMPLEMENTING DECISION L 338/70 Official Journal of the European Union 17.12.2013 DECISIONS COMMISSION IMPLEMENTING DECISION of 9 December 2013 on an additional financial towards Member States fisheries control programmes for

More information

EUROPEAN GAS TARGET MODEL SELF-EVALUATION BY DERA AND EI

EUROPEAN GAS TARGET MODEL SELF-EVALUATION BY DERA AND EI SELF-EVALUATION REPORT, JUNE 2017 EUROPEAN GAS TARGET MODEL SELF-EVALUATION BY DERA AND EI TABLE OF CONTENTS 1. INTRODUCTION AND CONCLUSIONS... 3 INTRODUCTION... 3 SUMMARY AND CONCLUSIONS... 5 PUBLIC CONSULTATION...

More information

REGIONAL ACTION PLAN FOR MARKET INTEGRATION IN SOUTH EAST EUROPE

REGIONAL ACTION PLAN FOR MARKET INTEGRATION IN SOUTH EAST EUROPE ANNEX 2 Ref: 22 nd PHLG/05/10/2011-Annex 2/16.09.2011 REGIONAL ACTION PLAN FOR MARKET INTEGRATION IN SOUTH EAST EUROPE Content Overview 1. BACKGROUND... 1 2. CAPACITY CALCULATION... 3 3. FORWARD CAPACITY

More information

The Road to the I-SEM

The Road to the I-SEM The Road to the I-SEM 1 Agenda Development of power markets in Ireland and Northern Ireland Development of power markets across Europe Market coupling explained The road to the I-SEM The elements of the

More information

Conclusions of the European Council discussions on energy infrastructure issues

Conclusions of the European Council discussions on energy infrastructure issues Conclusions of the European Council discussions on energy infrastructure issues Slovenia Overall support for the regulation as this will allow to tackle the known problems regarding infrastructure The

More information

MARKET REPORT. December 2010

MARKET REPORT. December 2010 December 21 MARKET REPORT Highlights physical markets December 21: POWER: Nord Pool Spot market share of Nordic consumption was 73.4 per cent in December. The total Nordic preliminary consumption for December

More information

Mr. Heinz HILBRECHT Director DG TREN EC Rue de la Loi 200 BE-1049 BRUXELLES. 17 March Dear Mr. Hilbrecht,

Mr. Heinz HILBRECHT Director DG TREN EC Rue de la Loi 200 BE-1049 BRUXELLES. 17 March Dear Mr. Hilbrecht, Mr. Heinz HILBRECHT Director DG TREN EC Rue de la Loi 200 BE-1049 BRUXELLES 17 March 2009 Dear Mr. Hilbrecht, We are very pleased to send you ETSO response to the EC Consultation Document on the Inter-TSO

More information

Present: Philippe de LADOUCETTE, Chairman, Olivier CHALLAN BELVAL, Hélène GASSIN, Jean-Pierre SOTURA and Michel THIOLLIERE, Commissioners.

Present: Philippe de LADOUCETTE, Chairman, Olivier CHALLAN BELVAL, Hélène GASSIN, Jean-Pierre SOTURA and Michel THIOLLIERE, Commissioners. Deliberation Deliberation of the French Energy Regulatory Commission (CRE) dated 2 October 2013 approving the implicit Day-Ahead allocation method for interconnection capacity within the North- West Europe

More information

TSOs perspective of the CACM requirements. Athanasios Troupakis Market Advisor ENTSO-E

TSOs perspective of the CACM requirements. Athanasios Troupakis Market Advisor ENTSO-E TSOs perspective of the CACM requirements Athanasios Troupakis Market Advisor ENTSO-E Energy Community Secretariat Energy Community Secretariat Table of contents 1. Introductory remarks 2. Elements of

More information

Copyright 2011, The NASDAQ OMX Group, Inc. All rights reserved. MARKET INDEGRATION CASE STUDIES EUROPE, NORDICS, BALTICS

Copyright 2011, The NASDAQ OMX Group, Inc. All rights reserved. MARKET INDEGRATION CASE STUDIES EUROPE, NORDICS, BALTICS Copyright 2011, The NASDAQ OMX Group, Inc. All rights reserved. MARKET INDEGRATION CASE STUDIES EUROPE, NORDICS, BALTICS Agenda Drivers for seeking regional collaboration Various regional market models

More information