PHILIPPINES: A Litany of Unresolved Issues in Power Privatization ABNER P. ELERIA. President NAPOCOR Employees Consolidated Union (NECU)

Size: px
Start display at page:

Download "PHILIPPINES: A Litany of Unresolved Issues in Power Privatization ABNER P. ELERIA. President NAPOCOR Employees Consolidated Union (NECU)"

Transcription

1 PHILIPPINES: A Litany of Unresolved Issues in Power Privatization ABNER P. ELERIA President NAPOCOR Employees Consolidated Union (NECU) Presented at: Public Services International (PSI) Regional Workshop on Quality Public Services 1-33 December 2009, Manila, Philippines

2 About Privatization of Philippine Power Sector Power privatization is part of structural adjustment program of international financial institutions like World Bank and IMF. Even before passage of 2001 electricity law, the government already embarked on efforts to privatize power sector in mid-1990s, thru Build-Operate Operate-Transfer projects with Independent Power Producers (IPPs( IPPs).

3 Asian Development Bank (ADB) is lead donor in Philippine power reforms 1998: Power Sector Restructuring Program ADB loan of US$300M Japan Bank for International Cooperation (JBIC) co-financed with additional US$300M Loan conditionalities include:» Enact Electricity Law» Unbundle & privatize National Power Corp (NPC) 2006: : Power Sector Development Program ADB continued support to NPC privatization thru $450M loan

4 EPIRA (Electric Power Industry Reform Act) Enacted in 2001 Unbundled & privatized National Power Corp (NPC) Created PSALM to sell NPC s power plants & IPP contracts Created TRANSCO to take over NPC s transmission function, and later be privatized Reduced role of NPC to missionary electrification Opened gates for electricity trading under Wholesale Electricity Spot Market (WESM) Provided legal basis for termination of all NPC employees (Feb 03)

5 Restructured Power Industry GENERATION NPC NPC IPPs (PSALM) Private IPPs TRANSMISSION TRANSCO (formerly NPC) DISTRIBUTION (wires) & supply Private utilities (e.g. MERALCO, VECO) Electric coops dispatch SUPPLY * aggregator CONSUMER residential commercial industrial sell WESM Power trading (PEMC) buy Buy min. 1MW FDC

6 Electricity Rate (per kwh) 2001 (pre-epira) 2007 (6 yrs after EPIRA) 2008? (with stranded cost recovery) P5 P10 P11 P15?

7 Power rates are high and will remain high Philippines among top 10 highest rates in world 1 st in Asia, industrial rates (2006) 3 nd in Asia, residential rates (2006) Rates will remain high due to: Continuous rate increases granted to private utilities to ensure their high profits Huge costs of take-or-pay IPP contracts Removal of subsidy to residential users from industrial / commercial users

8 Status of NPC Privatization (ao end-oct 2009) PSALM has privatized 26 generating plants (Total capacity = 3,900 MW) 1,700 MW of contracted capacities also auctioned off to IPP Administrators (the first of its kind in Asia & perhaps globally) PSALM reached 81% privatization level, and is aiming 100% in next 2 years NPC share in total power generation now only 13%

9 New private owners/operators Old oligarchies (Lopez) Political cronies (Aboitiz( Aboitiz, Razon/Monte Oro) Japanese firms (Sumitomo, Marubeni) Korea & China state-owned utilities (KEPCO, China State Grid) New players San Miguel beer/food business DMCI construction business Un-bundling in the public sector --> Re-bundling in the private sector e.g. Lopez & Aboitiz distribution & now generation companies

10 Generation Share per Utility/Owner (as of end-oct 2009) Generation Share per Utility / Owner (as of Oct 09) DMCI 4% Salcon Power 2% Others 7% Lopez Group 23% Masinloc Power (AES) 4% San Miguel Energy 4% J-Power-Sumitomo 5% Aboitiz Group 14% KEPCO 10% NPC 13% Team Energy 14%

11

12 Massive job losses due to retrenchment, reorganization, termination Retrenchment, reorganization : NPC has 17,000 employees : NPC has 13,500 employees Termination (as provided by 2001 EPIRA law) : All NPC employees (8,530( 8,530) ) terminated: > 3,800 employees rehired (with NPC) > 3,400 employees rehired (with TransCo) > 30 employees rehired (with PSALM) > 1,300 employees not rehired

13 Rehired NPC workers with lower working conditions & pay NPC workers who were rehired after termination were forced to accept employment contracts at: position grade levels lower than what they previously enjoyed 25-30% reduction of salaries & benefits Increase in contractualization and service agreements at NPC

14 High Court: NPC employees were illegally terminated Sep 06: : Supreme Court ruled that NPC Board Resolutions terminating NPC employees in Feb 2003 were void and without legal effect because they lacked votes for adoption Sep 08: : Supreme Court (SC) ruled with finality: Immediate reinstatement of NPC employees Payment of P34.7B++ in backwages,, wage adjustments to NPC employees Still awaiting enforcement August 17, 2009: Recognition by ADB that backwages and other financial claims of NPC workers as recognized by SC form part of legitimate costs of restructuring of Philippine Power Sector

15 Outstanding claims of NPC workers Outstanding claims: (to date) 1. DAMA (Supreme Court) case: P 34.7B++ 2. COLA: P 8.4B++ 3. WAIVE (step increment): P 594M++ TOTAL: P B++ Court cases still awaiting action Damages due to illegal termination: Based on remaining years of service: Average = 5 yrs / employee = P 50,000 (average salary / mo) x 12 mo / yr x 5 yrs / employee x 8,530 employees = P 26B (conservative estimate) Claims chargeable to ADB

16 Non-recognition of NPC unions Unions rights to representation and collective bargaining undermined a violation of Core Labor Standards No full recognition by NPC management Non-remittance of union dues since 2005 to date Non-recognition of unions by PSALM Lack of transparency & no consultation with unions: NPC reorganization plans Employees issues in drafting of EPIRA (and IRR) Sale of NPC plants etc

17 No workers protection in sale of NPC plants PSALM does not recognize bargaining power of unions, weakening the unions PSALM does not obligate buyers to retain existing workforce, hence more job losses PSALM does not include Manual of Employees Benefits (MEB) as part of bidding documents, citing huge costs But labor costs is only 3-5% 3 of total costs PSALM does not consult with unions before sale of any plant in violation of EPIRA No overtime beyond 8 hrs in privatized plants a violation of Philippine Labor Laws

18 Other issues in sale of NPC plants Efficient and earning plants are first to be privatized (e.g. hydro plants) Hydropower and geothermal plants are also being sold (cheaply-produced produced power and part of national patrimony) Sale is illegal, still within 10-year prohibitive period under EPIRA Non-profitable power plants remain with NPC Undervalued assets, Buy 1, Take 1 1 Nasipit Power Barge (117) is sold at cost of only spare parts Maco Power Barge (118) payable thru operation income Down-payment of 25-yr TransCo concession payable from 2 years of operation income NPC still subsidizing privatized plants Fuel supply subsidy to SPC Island Power Corp in operation of Panay Power Diesel Plants 1 and 2 (from March 2009)

19 New OMA (Feb 09) Feb 2009: : NPC & PSALM signed Operations & Maintenance Agreement (OMA) April 09: : NPC unions filed case in court against OMA provision in violation of EPIRA Still awaiting decision

20 Campaign vs privatization of Agus-Pulangi Hydropower Complex Contributes 55 % of the Mindanao Power Requirement All Plants are ISO Certified Manned by Competent Managers and Employees Multi-awarded Hydro Plants Integrated Water Management and Dispatching One ECC and EMP Conditionalities Compliances

21 Very profitable operations of Agus-Pulangi REVENUE RESULTS OF OPERATION (For the period January to July 2009) AGUS 1 P 344,657, AGUS 2 949,529, AGUS 4 920,382, AGUS 5 415,634, AGUS 6 1,275,422, AGUS 7 281,315, PULANGI 1,199,674, RORB % (Return-On On-Rate Base) 7.55 % % % % 1, % % % TOTAL P 5,386,613, [GOCC : 12% RORB]

22 Generation / Production Cost of Agus Plants (Average) VERY CHEAP POWER 2007 = 0.62 (P / kwhr) 2008 = 0.43 (P / kwhr) Average Mindanao Grid Rate = 2.71 (P /kwh/ kwh)

23 People of Mindanao Oppose the Privatization of Agus and Pulangi Complexes Instead: Extension of the Moratorium on privatization (under EPIRA) for another 10 years OR MINDANAO POWER CORPORATION

24

25 HUMAN RIGHT TO WATER: Campaign vs privatization of Angat Hydro Aside from power generation, Angat is also major source of potable water in Metro Manila Metropolitan Waterworks and Sewerage System (MWSS) and local government officials oppose sale by PSALM of Angat Hydropower plant Nov 09: : Commission on Human Rights (CHR) against Angat sale Human right to drinking water is fundamental for life and health. Sufficient and safe drinking water is a precondition for the realization of all human rights. The right to water is more fundamental and primary over the need for power. Privatization of Angat Hydro Electric Power Plant will put reliability of water supply for Metro Manila at risk. Management of Angat is better left to MWSS being a government body and considering the amount of public interest involved.

26 NPC Unions need support Support multi-sectoral campaign against privatization of remaining NPC power plants (e.g. Agus-Pulangi, Angat hydropower) which are efficient, cheaply produced, and part of national patrimony. Support case to be filed at ADB for harm and damages inflicted on NPC workers and their unions in ADB-assisted power sector reforms using ADB s Accountability (or inspection )) Mechanism. Repeal EPIRA (2001 Electricity Law) which treats electricity as economic commodity and not a public good, and will not provide Quality Public Services.

27

ASIAN DEVELOPMENT BANK

ASIAN DEVELOPMENT BANK ASIAN DEVELOPMENT BANK PCR: PHI 31216 PROGRAM COMPLETION REPORT ON THE POWER SECTOR RESTRUCTURING PROGRAM (Loan 1662-PHI) IN THE PHILIPPINES July 2004 CURRENCY EQUIVALENTS Currency Unit Philippine peso

More information

Second Quarter / First Half 2011 Financial & Operating Results 29 July 2011

Second Quarter / First Half 2011 Financial & Operating Results 29 July 2011 Second Quarter / First Half 2011 Financial & Operating Results 29 July 2011 AGENDA Overview Review of Business Units Pilmico Foods Corporation City Savings Bank Union Bank of the Philippines Aboitiz Power

More information

MAGAZINE TITLE HERE. The. Infrastructure Issue. is set in Univers. Businessmen and. Investors

MAGAZINE TITLE HERE. The. Infrastructure Issue. is set in Univers. Businessmen and. Investors MAGAZINE The TITLE HERE Infrastructure Issue Magazine descriptor / Issue No. / Month 2011 This Philippines heading style is set in Univers bold A Guide 27.5pt for on 30pt This paragraph style is set at

More information

First Quarter 2010 Financial & Operating Results. 7 May 2010

First Quarter 2010 Financial & Operating Results. 7 May 2010 First Quarter 2010 Financial & Operating Results 7 May 2010 AGENDA Overview AEV Financials Review of Business Units Aboitiz Power Corporation Union Bank of the Philippines Aboitiz Transport System Pilmico

More information

Competition in Electricity Markets: The Case of the Philippines 1 Maria Fe Villamejor-Mendoza 2 August 2008

Competition in Electricity Markets: The Case of the Philippines 1 Maria Fe Villamejor-Mendoza 2 August 2008 Competition in Electricity Markets: The Case of the Philippines 1 Maria Fe Villamejor-Mendoza 2 August 2008 I. Introduction A major policy reform was introduced in the Philippine electricity industry (PEI)

More information

Achieving a Competitive Power Rate. July 17, 2014

Achieving a Competitive Power Rate. July 17, 2014 Achieving a Competitive Power Rate July 17, 2014 1 Power Rate Reduction: How much? (Quantum) For what reason? (Rationale) From where? For whom? 2 Power production cost from coal and oil tripled in 2 decades

More information

More with Less. First Gen Corpora.on Annual Stockholders Mee.ng. 12 May 2010

More with Less. First Gen Corpora.on Annual Stockholders Mee.ng. 12 May 2010 More with Less First Gen Corpora.on Annual Stockholders Mee.ng 12 May 2010 1 2 WE ARE AT THE FOREFRONT OF DEVELOPING MORE INDIGENOUS ENERGY GEOTHERMAL HYDRO WIND Our business model will not only be benign

More information

Regional Comparison of Retail Electricity Tariffs

Regional Comparison of Retail Electricity Tariffs Regional Comparison of Retail Electricity Tariffs Executive Summary June, 2012 www.energyconsultants.com.au Report Contents Disclaimer Introduction and Methodology Executive Summary: Key Questions & Answers

More information

REPUBLIC OF THE PHILIPPINES DEPARTMENT OF FINANCE BUREAU OF INTERNAL REVENUE REVENUE MEMORANDUM CIRCULAR NO

REPUBLIC OF THE PHILIPPINES DEPARTMENT OF FINANCE BUREAU OF INTERNAL REVENUE REVENUE MEMORANDUM CIRCULAR NO REPUBLIC OF THE PHILIPPINES DEPARTMENT OF FINANCE BUREAU OF INTERNAL REVENUE March 22, 2012 REVENUE MEMORANDUM CIRCULAR NO. 11-2012 SUBJECT : Tax Consequences of Power Sector Assets and Liabilities Management

More information

Third Quarter / YTD September 2013 Financial & Operating Results 30 October 2013

Third Quarter / YTD September 2013 Financial & Operating Results 30 October 2013 Third Quarter / YTD September 2013 Financial & Operating Results 30 October 2013 AGENDA Review of Business Units Pilmico Foods Corporation Union Bank of the Philippines AboitizLand Aboitiz Power Corporation

More information

Third Quarter / YTD September 2011 Financial & Operating Results 4 November 2011

Third Quarter / YTD September 2011 Financial & Operating Results 4 November 2011 Third Quarter / YTD September 2011 Financial & Operating Results 4 November 2011 AGENDA Overview Review of Business Units Pilmico Foods Corporation Aboitiz Power Corporation Union Bank of the Philippines

More information

The Philippine Power Market

The Philippine Power Market WESM 101 The Philippine Power Market The EPIRA reform agenda promote competition and choice State monopoly in generation and transmission 1970 1980 1990 2000 Power Supply Crisis Private sector participation

More information

COVER SHEET. ( Company's Full Name ) ( Business Address: No. Street City / Town / Province ) 3rd Quarterly Report Q

COVER SHEET. ( Company's Full Name ) ( Business Address: No. Street City / Town / Province ) 3rd Quarterly Report Q COVER SHEET C 1 9 9 8 0 0 1 3 4 S.E.C. Registration Number A B O I T I Z P O W E R C O R P O R A T I O N ( Company's Full Name ) A B O I T I Z C O R P O R A T E C E N T E R G O V. M A N U E L A. C U E

More information

Is the International Power Producer a relic of the past? Sarah Fairhurst, The Lantau Group

Is the International Power Producer a relic of the past? Sarah Fairhurst, The Lantau Group Is the International Power Producer a relic of the past? Sarah Fairhurst, In the beginning, need met opportunity Back in the late 1980s and into 1990s, demand growth in developing countries started to

More information

Sector Assistance Program Evaluation of Asian Development Bank Assistance to Philippines Power Sector

Sector Assistance Program Evaluation of Asian Development Bank Assistance to Philippines Power Sector Sector Assistance Program Evaluation SAP: PHI 2005-09 Sector Assistance Program Evaluation of Asian Development Bank Assistance to Philippines Power Sector September 2005 Operations Evaluation Department

More information

COVER SHEET. ( Company's Full Name ) ( Business Address: No. Street City / Town / Province ) 3rd Quarterly Report Q

COVER SHEET. ( Company's Full Name ) ( Business Address: No. Street City / Town / Province ) 3rd Quarterly Report Q COVER SHEET C 1 9 9 8 0 0 1 3 4 S.E.C. Registration Number A B O I T I Z P O W E R C O R P O R A T I O N ( Company's Full Name ) A B O I T I Z C O R P O R A T E C E N T E R G O V. M A N U E L A. C U E

More information

Fourth Quarter / Full Year 2013 Financial & Operating Results 12 March 2014

Fourth Quarter / Full Year 2013 Financial & Operating Results 12 March 2014 Fourth Quarter / Full Year 2013 Financial & Operating Results 12 March 2014 AGENDA Review of Business Units Pilmico Foods Corporation Union Bank of the Philippines AboitizLand Aboitiz Power Corporation

More information

Second Quarter First Half 2017 Results. 2 August 2017

Second Quarter First Half 2017 Results. 2 August 2017 Second Quarter First Half 2017 Results 2Q/1H2017 EBITDA 18,969 14% 21,706 QUARTERLY BREAKDOWN 10,766 10,940 vs 1Q 2017 9,223 2% 9,433 vs 2Q 2016 16% 9,443 8,007 16,103 18,656 vs 2Q 2016 +16% 1,449 1,466

More information

May 8, Dear Ms. Vina:

May 8, Dear Ms. Vina: Energy Development Corporation 38 th Floor, One Corporate Centre Building, Julia Vargas corner Meralco Avenue Ortigas Center, Pasig 1605, Philippines Trunklines: +63 (2) 667-7332 (PLDT) / +63 (2) 755-2332

More information

Management s Discussion and Analysis of Financial Position and Results of Operations

Management s Discussion and Analysis of Financial Position and Results of Operations Management s Discussion and Analysis of Financial Position and Results of Operations The following discussion and analysis of financial position and results of operations of Manila Electric Company or

More information

Electricity Market Liberalization Developing Countries, the ASEAN, the Philippines

Electricity Market Liberalization Developing Countries, the ASEAN, the Philippines Electricity Market Liberalization Developing Countries, the ASEAN, the Philippines Non-OECD countries about to surpass OECD countries economically Development of Population and Gross Domestic Product (GDP)

More information

COVER SHEET A B O I T I Z P O W E R C O R P O R A T I O N A B O I T I Z C O R P O R A T E C E N T E R G O V. M A N U E L A. C U E N C O A V E N U E,

COVER SHEET A B O I T I Z P O W E R C O R P O R A T I O N A B O I T I Z C O R P O R A T E C E N T E R G O V. M A N U E L A. C U E N C O A V E N U E, COVER SHEET C 1 9 9 8 0 0 1 3 4 S.E.C. Registration Number A B O I T I Z P O W E R C O R P O R A T I O N ( Company's Full Name ) A B O I T I Z C O R P O R A T E C E N T E R G O V. M A N U E L A. C U E

More information

Reforming Power Markets: Lessons from Five Developing Countries presented at: World Forum on Energy Regulation Rome, 6 October 2003

Reforming Power Markets: Lessons from Five Developing Countries presented at: World Forum on Energy Regulation Rome, 6 October 2003 Reforming Power Markets: Lessons from Five Developing Countries presented at: World Forum on Energy Regulation Rome, 6 October 2003 David G. Victor Program on Energy and Sustainable Development Stanford

More information

Philippines: Metropolitan Waterworks and Sewerage System New Water Source Development Project

Philippines: Metropolitan Waterworks and Sewerage System New Water Source Development Project Validation Report Reference Number: PCV: PHI 2011-15 Project Number: 35379 Loan Number: 2012 July 2011 Philippines: Metropolitan Waterworks and Sewerage System New Water Source Development Project Independent

More information

COVER SHEET C 1 9 9 8 0 0 1 3 4 S.E.C. Registration Number A B O I T I Z P O W E R C O R P O R A T I O N ( Company's Full Name ) 3 2 N D S T R E E T, B O N I F A C I O G L O B A L C I T Y, T A G U I G

More information

May 13, Dear Ms. Salonga:

May 13, Dear Ms. Salonga: Energy Development Corporation 38 th Floor, One Corporate Centre Building, Julia Vargas corner Meralco Avenue Ortigas Center, Pasig 1605, Philippines Trunklines: +63 (2) 667-7332 (PLDT) / +63 (2) 755-2332

More information

FINANCIAL ANALYSIS. A. Financial Capacity Assessment of MWSS

FINANCIAL ANALYSIS. A. Financial Capacity Assessment of MWSS Angat Water Transmission Improvement Project (RRP PHI 46362-002) FINANCIAL ANALYSIS 1. The project is estimated to be $134.0 million of which $98.4 million is for the design and build contract, $6.0 million

More information

COVER SHEET P H I N M A E N E R G Y C O R P O R A T I O N A N D S U B. (Company s Full Name) L e v e l 1 1 P H I N M A P l a z a 3 9 P l a z a

COVER SHEET P H I N M A E N E R G Y C O R P O R A T I O N A N D S U B. (Company s Full Name) L e v e l 1 1 P H I N M A P l a z a 3 9 P l a z a COVER SHEET 0 6 9-0 3 9 2 7 4 SEC Registration Number P H I N M A E N E R G Y C O R P O R A T I O N A N D S U B S I D I A R I E S (Company s Full Name) L e v e l 1 1 P H I N M A P l a z a 3 9 P l a z a

More information

outlook Net income Shareholders Report FIRST QUARTER 2014 Core Net Income 6,849 EPS = P1.24 4,868 EPS = P0.88 5,529 EPS = P1.00 4,398 EPS = P0.

outlook Net income Shareholders Report FIRST QUARTER 2014 Core Net Income 6,849 EPS = P1.24 4,868 EPS = P0.88 5,529 EPS = P1.00 4,398 EPS = P0. Shareholders Report FIRST QUARTER 2014 outlook Net income Power Core Net Income Power 6,849 EPS = P1.24 325 1,794 3,530 Banking 5,529 EPS = P1.00 325 1,794 4% 3,483 8,364 Banking Food Food 29% 4,868 EPS

More information

PHILIPPINES: CASE STUDIES ON Private Sector Development and Operations

PHILIPPINES: CASE STUDIES ON Private Sector Development and Operations PHILIPPINES: CASE STUDIES ON Private Sector Development and Operations A Case Study from the 2007 Special Evaluation Study on Private Sector Development and Operations: Harnessing Synergies with the Public

More information

Report and Recommendation of the President to the Board of Directors

Report and Recommendation of the President to the Board of Directors Report and Recommendation of the President to the Board of Directors Project Number: 48423-001 June 2015 Proposed Partial Credit Guarantee and Loan AP Renewables, Inc. Tiwi and MakBan Geothermal Power

More information

COVER SHEET. ( Company's Full Name ) ( Business Address: No. Street City / Town / Province ) 2nd Quarterly Report Q

COVER SHEET. ( Company's Full Name ) ( Business Address: No. Street City / Town / Province ) 2nd Quarterly Report Q COVER SHEET C 1 9 9 8 0 0 1 3 4 S.E.C. Registration Number A B O I T I Z P O W E R C O R P O R A T I O N ( Company's Full Name ) A B O I T I Z C O R P O R A T E C E N T E R G O V. M A N U E L A. C U E

More information

Is the International Power Producer a relic of the past? Sarah Fairhurst Partner The Lantau Group Hong Kong

Is the International Power Producer a relic of the past? Sarah Fairhurst Partner The Lantau Group Hong Kong Is the International Power Producer a relic of the past? Sarah Fairhurst Partner The Lantau Group Hong Kong We are all familiar with the classic IPP structure, but perhaps now is the time to review the

More information

Aboitiz Equity Ventures, Inc. Shareholders Report YTD September 2014

Aboitiz Equity Ventures, Inc. Shareholders Report YTD September 2014 Aboitiz Equity Ventures, Inc. Shareholders Report YTD September 2014 net income 16,558 EPS = P3.00 1,178 163 932 3,314 10,971 14% 14,256 EPS = P2.58 315 565 942 2,371 10,062 AEV s consolidated net income

More information

The Question of Sovereign Guarantee for the Development of Electricity Generation in Ethiopia

The Question of Sovereign Guarantee for the Development of Electricity Generation in Ethiopia The Question of Sovereign Guarantee for the Development of Electricity Generation in Ethiopia By Mollalign Abebe Ethiopian Electricity Agency November 27, 2006 1 Four parts of the Presentation: Policy,

More information

Philippines: Rural Electric Cooperatives Development Project (TA 7012-PHI) (Financed by the Japan Special Fund)

Philippines: Rural Electric Cooperatives Development Project (TA 7012-PHI) (Financed by the Japan Special Fund) Technical Assistance Consultant s Report Project Number: 41067 May 2009 Philippines: Rural Electric Cooperatives Development Project (TA 7012-PHI) (Financed by the Japan Special Fund) Prepared by: Snowy

More information

ECONOMIC CONSULTING ASSOCIATES LIMITED 41 Lonsdale Road London NW6 6RA UK tel +44 (0) / fax +44 (0)

ECONOMIC CONSULTING ASSOCIATES LIMITED 41 Lonsdale Road London NW6 6RA UK tel +44 (0) / fax +44 (0) Ghana Power Sector Review of Reform Programme Ray Tomkins (ECA) ECONOMIC CONSULTING ASSOCIATES LIMITED 41 Lonsdale Road London NW6 6RA UK tel +44 (0)20 7604 4545 / fax +44 (0)20 7604 4547 www.eca-uk.com

More information

Philippines. Yield Movements

Philippines. Yield Movements Market Summaries Philippines Yield Movements Between end-september and end-december, Philippine local currency (LCY) government bond yields fell for most tenors with the exception of the 2- and 3-year

More information

Philippines. Yield Movements

Philippines. Yield Movements Philippines 71 Philippines Yield Movements Between 1 June and 15 August, the yields of Philippine local currency (LCY) bonds of all tenors increased except for the 3-month tenor, which decreased 58 basis

More information

PROJECT INFORMATION DOCUMENT (PID) APPRAISAL STAGE

PROJECT INFORMATION DOCUMENT (PID) APPRAISAL STAGE Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Project Name PROJECT INFORMATION DOCUMENT (PID) APPRAISAL STAGE PH - Bicol Power Restoration

More information

Philippines. Yield Movements

Philippines. Yield Movements Philippines 117 Philippines Yield Movements Between 31 August and 15 October, the yields of Philippine local currency (LCY) bonds of all tenors jumped an average of 189 basis points (bps) (Figure 1). The

More information

2014 Fixed Income Investor Update

2014 Fixed Income Investor Update 2014 Fixed Income Investor Update Toronto April 23, 2014 Montreal April 24, 2014 Winnipeg April 28, 2014 Disclaimer Certain information included in this presentation or incorporated by reference herein

More information

AXA UL Funds. Annual Report 2017

AXA UL Funds. Annual Report 2017 AXA UL Funds Annual Report 2017 Table of Contents Statement of Assets and Liabilities Philippine Economy: 2017 Snapshot Local Equity Market Fixed Income Market Update Wealth Equity Fund Opportunity Fund

More information

COVER SHEET C 1 9 9 8 0 0 1 3 4 S.E.C. Registration Number A B O I T I Z P O W E R C O R P O R A T I O N ( Company's Full Name ) 3 2 N D S T R E E T, B O N I F A C I O G L O B A L C I T Y, T A G U I G

More information

A Product of Wealth Securities, Inc.

A Product of Wealth Securities, Inc. A Product of Wealth Securities, Inc. Index Value Change % Chg PSEi 4,645.86 84.78 1.8588 All Shares 3,151.11 44.68 1.4383 Financials 1,036.98 8.11 0.7882 Industrial 7,371.01 7.10 0.0964 Holding Firms 3,656.28

More information

ATTENTION : DIR. VICENTE GRACIANO P. FELIZMENIO JR. Director, Markets and Securities Regulation Department

ATTENTION : DIR. VICENTE GRACIANO P. FELIZMENIO JR. Director, Markets and Securities Regulation Department November 14, 2016 SECURITIES AND EXCHANGE COMMISSION SEC Building, EDSA Greenhills, Mandaluyong City, Metro Manila ATTENTION : DIR. VICENTE GRACIANO P. FELIZMENIO JR. Director, Markets and Securities Regulation

More information

August 14, SECURITIES AND EXCHANGE COMMISSION SEC Building, EDSA Greenhills, Mandaluyong City, Metro Manila

August 14, SECURITIES AND EXCHANGE COMMISSION SEC Building, EDSA Greenhills, Mandaluyong City, Metro Manila August 14, 2015 SECURITIES AND EXCHANGE COMMISSION SEC Building, EDSA Greenhills, Mandaluyong City, Metro Manila ATTENTION : ATTY. JUSTINA CALLANGAN Director, Corporate Finance Department PHILIPPINE STOCK

More information

Philippines. Yield Movements. Size and Composition

Philippines. Yield Movements. Size and Composition Philippines 73 Philippines Yield Movements Between 1 September and 15 October, yield movements for Philippine local currency (LCY) government bond yields were mixed (Figure 1). At the short-end of the

More information

PROJECT INFORMATION DOCUMENT (PID) APPRAISAL STAGE. PH - Bicol Power Restoration Project

PROJECT INFORMATION DOCUMENT (PID) APPRAISAL STAGE. PH - Bicol Power Restoration Project Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Project Name PROJECT INFORMATION DOCUMENT (PID) APPRAISAL STAGE PH - Bicol Power Restoration

More information

Ratchaburi Electricity Generating Company Limited ( RATCHGEN ) is a project company which acquired Ratchaburi power plant from EGAT.

Ratchaburi Electricity Generating Company Limited ( RATCHGEN ) is a project company which acquired Ratchaburi power plant from EGAT. Thai Corporate Day July 29-30, 2003 ! " Agenda RATCH Overview Power Industry Benefits of Interest Reduction Operating Performance Future Projects Investment Consideration Awards in 2002 & 2003 Appendix

More information

Public Utility Regulatory Policies Act (PURPA)

Public Utility Regulatory Policies Act (PURPA) Public Utility Regulatory Policies Act (PURPA) National Association of Regulatory Utility Commissioners Staff Subcommittee on Accounting and Finance September 21, 2016 Overview of PURPA What is PURPA?

More information

DMCI Holdings, Inc. 3/F, DACON Building 2281 Pasong Tamo Ext. Makati 1231 Philippines. Dr. Victor Limlingan, Managing Director September 2014

DMCI Holdings, Inc. 3/F, DACON Building 2281 Pasong Tamo Ext. Makati 1231 Philippines. Dr. Victor Limlingan, Managing Director September 2014 DMCI Holdings, Inc. 3/F, DACON Building 2281 Pasong Tamo Ext. Makati 1231 Philippines Dr. Victor Limlingan, Managing Director September 2014 1 Disclaimer The information contained in this document is strictly

More information

DEFINITION OF TERMS 6 EXECUTIVE SUMMARY 23 SUMMARY OF FINANCIAL INFORMATION.. 28 SUMMARY OF THE OFFER 31 DESCRIPTION OF THE BONDS..

DEFINITION OF TERMS 6 EXECUTIVE SUMMARY 23 SUMMARY OF FINANCIAL INFORMATION.. 28 SUMMARY OF THE OFFER 31 DESCRIPTION OF THE BONDS.. Table of Contents DEFINITION OF TERMS 6 EXECUTIVE SUMMARY 23 SUMMARY OF FINANCIAL INFORMATION.. 28 SUMMARY OF THE OFFER 31 DESCRIPTION OF THE BONDS.. 36 USE OF PROCEEDS 59 PLAN OF DISTRIBUTION. 61 CAPITALIZATION

More information

The Project on System Loss Reduction for Philippine Electric Cooperatives (ECs) Project Completion Report

The Project on System Loss Reduction for Philippine Electric Cooperatives (ECs) Project Completion Report Republic of the Philippines National Electrification Administration (NEA) The Project on System Loss Reduction for Philippine Electric Cooperatives (ECs) Project Completion Report March 2013 Japan International

More information

Market Monitoring, Mitigation & Analysis

Market Monitoring, Mitigation & Analysis Market Monitoring, Mitigation & Analysis Ken Galarneau Supervisor, Mitigation Performance & Analysis New York Independent System Operator New York Market Orientation Course (NYMOC) October 19, 2017 Rensselaer,

More information

Management Discussion and Analysis

Management Discussion and Analysis Management Discussion and Analysis For the Annual Operating Results 2014 Ended December 31, 2014 Note: This Management Discussion and Analysis (MD&A) was made to disclose information and the vision of

More information

THE ELECTRIC HONEYPOT: THE PROFITABILITY OF DEREGULATED ELECTRIC GENERATION COMPANIES By Edward Bodmer

THE ELECTRIC HONEYPOT: THE PROFITABILITY OF DEREGULATED ELECTRIC GENERATION COMPANIES By Edward Bodmer THE ELECTRIC HONEYPOT: THE PROFITABILITY OF DEREGULATED ELECTRIC GENERATION COMPANIES By Edward Bodmer EXECUTIVE SUMMARY Purpose and Conclusions of the Study This report presents the results of an investigative

More information

ASIAN DEVELOPMENT BANK

ASIAN DEVELOPMENT BANK ASIAN DEVELOPMENT BANK TAR: NEP 37196 TECHNICAL ASSISTANCE TO THE KINGDOM OF NEPAL FOR RESTRUCTURING OF NEPAL ELECTRICITY AUTHORITY December 2004 CURRENCY EQUIVALENTS (as of 3 November 2004) Currency Unit

More information

November 16, SECURITIES AND EXCHANGE COMMISSION SEC Building, EDSA Greenhills, Mandaluyong City, Metro Manila

November 16, SECURITIES AND EXCHANGE COMMISSION SEC Building, EDSA Greenhills, Mandaluyong City, Metro Manila November 16, 2015 SECURITIES AND EXCHANGE COMMISSION SEC Building, EDSA Greenhills, Mandaluyong City, Metro Manila ATTENTION : ATTY. JUSTINA CALLANGAN Director, Corporate Finance Department PHILIPPINE

More information

Philippines. Yield Movements. Size and Composition

Philippines. Yield Movements. Size and Composition Philippines 71 Philippines Yield Movements Between end-june and end-december 2013, yields fell for most Philippine local currency (LCY) bonds, particularly for those with tenors of 3 years and less (Figure

More information

NIGERIAN POWER SECTOR REFORMS AND PRIVATISATION. By Bolanle Onagoruwa Director General, Bureau of Public Enterprises

NIGERIAN POWER SECTOR REFORMS AND PRIVATISATION. By Bolanle Onagoruwa Director General, Bureau of Public Enterprises NIGERIAN POWER SECTOR REFORMS AND PRIVATISATION By Bolanle Onagoruwa Director General, Bureau of Public Enterprises A Presentation to the West African Power Industry Convention November 2011 Outline Introduction

More information

Philippines. Yield Movements. 112 Asia Bond Monitor

Philippines. Yield Movements. 112 Asia Bond Monitor 112 Asia Bond Monitor Philippines Yield Movements Between 1 September and 31 October, yields movements for Philippine local currency (LCY) government bonds were mixed (Figure 1). Yields at the short-end

More information

ATTENTION : DIR. VICENTE GRACIANO P. FELIZMENIO JR., Director, Markets and Securities Regulation Department

ATTENTION : DIR. VICENTE GRACIANO P. FELIZMENIO JR., Director, Markets and Securities Regulation Department May 7, 2014 SECURITIES AND EXCHANGE COMMISSION SEC Building, EDSA Greenhills, Mandaluyong City, Metro Manila ATTENTION : DIR. VICENTE GRACIANO P. FELIZMENIO JR., Director, Markets and Securities Regulation

More information

Regional Power Market Challenges and Opportunities from Nepalese perspective

Regional Power Market Challenges and Opportunities from Nepalese perspective Regional Power Market Challenges and Opportunities from Nepalese perspective Hitendra Dev Shakya Director, Power Trade Department, Nepal Electricity Authority Outline of the Presentation 1. Energy sector

More information

Docket No. DE Dated: 12/09/2016 Attachment CJG-1 Page 1

Docket No. DE Dated: 12/09/2016 Attachment CJG-1 Page 1 Docket No. DE 1-8 Dated: 1/09/01 Attachment CJG-1 Page 1 1 01 ENERGY SERVICE RATE CALCULATION 8 9 Summary of Forecasted Energy Service 10 Cost For January 01 Through December 01 TOTAL COST Cents per KWH

More information

REC Genesis: Separating green attribute from electricity

REC Genesis: Separating green attribute from electricity Renewable Power Purchase Obligation and REC Trading in India Devesh Singh Regional Head (SR) Email: devesh.singh@iexindia.com Oct 14 Schemes to promote RE in the country Mid 1990s Focused on capacity addition

More information

Japanese ODA Loan. Ex-ante Evaluation

Japanese ODA Loan. Ex-ante Evaluation Japanese ODA Loan Ex-ante Evaluation 1. Name of the Program Country: The Islamic Republic of Pakistan Project: Energy Sector Reform Program Loan Agreement Signed: June 4, 2014 Loan Amount: 5,000 million

More information

Welfare Impacts of Electricity Generation Sector Reform in the Philippines

Welfare Impacts of Electricity Generation Sector Reform in the Philippines ERD Working Paper No. 44 Welfare Impacts of Electricity Generation Sector Reform in the Philippines NATSUKO TOBA June 2003 Natsuko Toba is a poverty reduction economist in the Infrastructure Division,

More information

PSC NO: 219 GAS STATEMENT TYPE: TRA NIAGARA MOHAWK POWER CORPORATION STATEMENT NO: 149 INITIAL EFFECTIVE DATE: 11/01/15 PAGE 1 OF 8

PSC NO: 219 GAS STATEMENT TYPE: TRA NIAGARA MOHAWK POWER CORPORATION STATEMENT NO: 149 INITIAL EFFECTIVE DATE: 11/01/15 PAGE 1 OF 8 INITIAL EFFECTIVE DATE: 11/01/15 PAGE 1 OF 8 Applicable to Billing for Service Classification No. 6 S.C. NO. 6 INTERRUPTIBLE Service Classification No. 6, Interruptible Monthly Administrative Charge FIRST

More information

Docket No. DE Dated: 05/09/2016 Attachment CJG-1 Page 1

Docket No. DE Dated: 05/09/2016 Attachment CJG-1 Page 1 Docket No. DE 1-1 Dated: 0/09/01 Attachment CJG-1 Page 1 1 8 9 Summary of Forecasted Energy Service 10 Cost For January 01 Through December 01 TOTAL COST Cents per KWH Reference 11 1 Fossil energy costs

More information

Docket No. DE Dated: 06/16/2017 Attachment CJG-1 Page 1

Docket No. DE Dated: 06/16/2017 Attachment CJG-1 Page 1 Docket No. DE 16-8 Dated: 06/16/017 Attachment CJG-1 Page 1 1 3 4 6 7 8 9 Summary of Forecasted Energy Service 10 Cost For January 017 through December 017 TOTAL COST Cents per KWH Reference 11 1 Fossil

More information

SEC Form 17Q 2Q

SEC Form 17Q 2Q - SEC Number 66381 File Number ENERGY DEVELOPMENT CORPORATION (Company s full Name) Merritt Road, Fort Bonifacio, Taguig City (Company s Address) (632) 667-7332 (Telephone Number) June 30, 2011 (Quarter

More information

A Product of Wealth Securities, Inc.

A Product of Wealth Securities, Inc. A Product of Wealth Securities, Inc. Index Value Change % Chg PSEi 5,265.94-5.84 0.11 All Shares 3,486.58-6.96 0.20 Financials 1,311.67 1.85 0.14 Industrial 7,888.47-5.79 0.07 Holding Firms 4,426.70 6.43

More information

Power Sector Reform India The Long Road Ahead

Power Sector Reform India The Long Road Ahead Power Sector Reform India The Long Road Ahead Rahul Tongia Department of Engineering & Public Policy/ School of Computer Science University February 19, 2003 2 Outline Overview of the Indian power sector

More information

ENERGY DEVELOPMENT CORPORATION (Company s full Name)

ENERGY DEVELOPMENT CORPORATION (Company s full Name) SEC Number 66381 File Number ENERGY DEVELOPMENT CORPORATION (Company s full Name) One Corporate Centre Julia Vargas cor. Meralco Ave., Ortigas Center, Pasig City (Company s Address) (632) 755-2332 (Telephone

More information

o RATCH Overview o RATCH Highlights

o RATCH Overview o RATCH Highlights 4th CLSA Corporate Access Forum: 12-14 May 2010 Table of Contents o RATCH Overview o RATCH Highlights Appendix RATCH Overview Company History In February 1999 the Thai Cabinet approved private participation

More information

Financing for Sustainable Urbanization

Financing for Sustainable Urbanization Place Date here Financing for Sustainable Urbanization Rana Hasan* Asian Development Bank The 4th Asian Think Tank Development Forum New Delhi, India October 27 2016 This presentation has benefited from

More information

Philippines. Yield Movements. Size and Composition

Philippines. Yield Movements. Size and Composition Philippines 67 Philippines Yield Movements Between 1 June and 14 August, Philippine local currency (LCY) government bond yields fell for most tenors (Figure 1). Yields for tenors of 2 years and below fell

More information

Docket No. DE Dated: 09/28/2015 Attachment CJG-1 Page 1

Docket No. DE Dated: 09/28/2015 Attachment CJG-1 Page 1 Docket No. DE 1-1 Dated: 09/8/01 Attachment CJG-1 Page 1 1 01 ENERGY SERVICE RATE CALCULATION (Dollars in 000s) 8 9 Summary of Forecasted Energy Service 10 Cost For January 01 Through December 01 TOTAL

More information

Docket No. DE Dated: 05/02/2014 Attachment CJG-1 Page 1

Docket No. DE Dated: 05/02/2014 Attachment CJG-1 Page 1 Docket No. DE 1- Attachment CJG-1 Page 1 1 8 9 Summary of Forecasted Energy Service 10 Cost For January 01 Through December 01 TOTAL COST Cents per KWH Reference 11 1 Fossil energy costs $ 19,0 $.0, page

More information

Comprehensive Tax Reform Program (CTRP) Package 1 and 2. Philippine Economic Briefing 9 March 2018 Davao City

Comprehensive Tax Reform Program (CTRP) Package 1 and 2. Philippine Economic Briefing 9 March 2018 Davao City Comprehensive Tax Reform Program (CTRP) Package 1 and 2 Philippine Economic Briefing 9 March 2018 Davao City Package 1 Key provisions Fiscal impact Package 2 Contents Rationale of the reform DOF proposal

More information

Electricity trading and risk management in liberalised market

Electricity trading and risk management in liberalised market www.pwc.com/jp Electricity trading and risk management in liberalised market PricewaterhouseCoopers Agenda Page 1 Current electricity trading in Japan 1 2 Evolution of trading in a deregulated market 5

More information

Introduction to Presentation &

Introduction to Presentation & Introduction to Presentation & Brief Discussion of Haiti Paper Silvia Alvarado de Cordoba Director, Energy Intelligence Consulting Juan A. B. Belt Senior Associate (non-resident), Center for Strategic

More information

Energy Budgeting and Procurement: Securing Stable Energy Prices in Today s Volatile Markets

Energy Budgeting and Procurement: Securing Stable Energy Prices in Today s Volatile Markets Energy Budgeting and Procurement: Securing Stable Energy Prices in Today s Volatile Markets Advisory Service for Energy and Climate Change John Lambert Senior Business Development Manager Direct Energy

More information

Washington Utilities and Transportation Commission

Washington Utilities and Transportation Commission Mission Statement: The UTC protects consumers by ensuring that utility and transportation services are fairly priced, available, reliable, and safe. Washington Utilities and Transportation Commission Beginning

More information

Building on strengths

Building on strengths Building on strengths CIBC World Markets 10 th Annual Whistler Institutional Investor Conference Steve Snyder, President & CEO February 23, 2007 Forward looking statements This presentation may contain

More information

The policy and regulatory aspects of a bankable solar power project. Uzbekistan Energy Forum, London 18 April 2018 Louis Skyner Partner

The policy and regulatory aspects of a bankable solar power project. Uzbekistan Energy Forum, London 18 April 2018 Louis Skyner Partner The policy and regulatory aspects of a bankable solar power project Uzbekistan Energy Forum, London 18 April 2018 Louis Skyner Partner Contents 1. The restriction of subsidies and policy priorities. 2.

More information

South Asia Subregional Economic Cooperation Power System Expansion Project (RRP NEP 44219) FINANCIAL ANALYSIS

South Asia Subregional Economic Cooperation Power System Expansion Project (RRP NEP 44219) FINANCIAL ANALYSIS South Asia Subregional Economic Cooperation Power System Expansion Project (RRP NEP 44219) A. Approach FINANCIAL ANALYSIS 1. Financial analysis of the project was carried out in accordance with the Financial

More information

POWER SECTOR REFORM AND SUBSIDIES. Budak Dilli ESMAP KNOWLEDGE EXCHANGE FORUM GENEVA October 2018

POWER SECTOR REFORM AND SUBSIDIES. Budak Dilli ESMAP KNOWLEDGE EXCHANGE FORUM GENEVA October 2018 POWER SECTOR REFORM AND SUBSIDIES Budak Dilli ESMAP KNOWLEDGE EXCHANGE FORUM GENEVA October 2018 OVERVIEW OF TURKISH POWER SECTOR Population :80 Million, Geographic Area :780,500 km 2 Rapid demand growth:

More information

FY2008 Financial & Operating Results 11 March 2009

FY2008 Financial & Operating Results 11 March 2009 FY2008 Financial & Operating Results 11 March 2009 AGENDA Overview AEV Financials Review of Business Units Aboitiz Power Corporation Union Bank of the Philippines Aboitiz Transport System Pilmico Foods

More information

Market structure in Saudi Arabia

Market structure in Saudi Arabia Market structure in Saudi Arabia ERRA Tariff / Pricing Committee meeting 19 October 2016, Bratislava, Slovakia Engr. Zaid Rajeh Al-Zaid Economic & Tariff Affairs, ECRA 1 Outline Introduction 2015 Facts

More information

AFRICAN UTILITY WEEK 2009 At van der Merwe & Louis Fourie

AFRICAN UTILITY WEEK 2009 At van der Merwe & Louis Fourie Utility Sustainability- Business Essentials AFRICAN UTILITY WEEK 2009 At van der Merwe & Louis Fourie BUSINESS IS LIKE THE WEATHER- EVERYONE TALKS ABOUT IT, BUT FEW UNDERSTAND WHERE IT COMES FROM PRF 2

More information

The World Bank. East Asia. Assessing the Potential Impact of the Credit Crisis on the Power Sector. Background Presentation Material

The World Bank. East Asia. Assessing the Potential Impact of the Credit Crisis on the Power Sector. Background Presentation Material The World Bank East Asia Assessing the Potential Impact of the Credit Crisis on the Power Sector Background Presentation Material Towards an Integrated Energy Agenda Beyond 2020 International Energy Conference,

More information

COMPANY PRESENTATION 6th Annual dbaccess Asia Conference Marina Bay Sands, Singapore; May 18-20, 2015

COMPANY PRESENTATION 6th Annual dbaccess Asia Conference Marina Bay Sands, Singapore; May 18-20, 2015 COMPANY PRESENTATION 6th Annual dbaccess Asia Conference Marina Bay Sands, Singapore; May 18-20, 2015 2 DISCLAIMER This presentation contains certain forward looking statements. These forward looking statements

More information

Private Financing of Infrastructure in Asia

Private Financing of Infrastructure in Asia 2010/SOM2/SOM-SFOM/WKSP/008 Session 2-2 Private Financing of Infrastructure in Asia Submitted by: Asian Development Bank Workshop on the APEC Growth Strategy Sapporo, Japan 1 June 2010 Private Financing

More information

DEVELOPING BEST PRACTICES FOR PROMOTING PRIVATE SECTOR INVESTMENT IN INFRASTRUCTURE

DEVELOPING BEST PRACTICES FOR PROMOTING PRIVATE SECTOR INVESTMENT IN INFRASTRUCTURE ADB DEVELOPING BEST PRACTICES FOR PROMOTING PRIVATE SECTOR INVESTMENT IN INFRASTRUCTURE POWER Asian Development Bank The views, conclusions, and recommendations presented here are those of the study consultants,

More information

Investor update. 3 March Rawi Corsiri Somruedee Somphong

Investor update. 3 March Rawi Corsiri Somruedee Somphong Investor update 3 March 2003 Rawi Corsiri Somruedee Somphong COO CFO Agenda 1 Quarterly overview 2 Results highlight 3 Industry outlook 4 Business scenario 2 www.banpu.co.th Quarterly overview Corporate

More information

Financing Renewable Energy in Developing Countries: A Global Perspective Dana R. Younger International Finance Corporation Japan Renewable Energy

Financing Renewable Energy in Developing Countries: A Global Perspective Dana R. Younger International Finance Corporation Japan Renewable Energy Financing Renewable Energy in Developing Countries: A Global Perspective Dana R. Younger International Finance Corporation Japan Renewable Energy Foundation Experts Meeting on Renewable Energy Tokyo September

More information

Fortum in Russia. Tapio Kuula. Senior Vice President Fortum Corporation. Capital Markets Day

Fortum in Russia. Tapio Kuula. Senior Vice President Fortum Corporation. Capital Markets Day Fortum in Russia Tapio Kuula Senior Vice President Fortum Corporation Capital Markets Day Stockholm, 4 June 2007 Disclaimer This presentation does not constitute an invitation to underwrite, subscribe

More information

Manitoba Hydro 2015 General Rate Application

Manitoba Hydro 2015 General Rate Application Manitoba Hydro 2015 General Rate Application OVERVIEW & REASONS FOR THE APPLICATION Darren Rainkie Vice-President, Finance & Regulatory Manitoba Hydro Why Rate Increases are Needed 2 Manitoba Hydro is

More information