PROJECT REPORT SOCIAL IMPACT ASSESSMENT FOR LAND ACQUISITION IN THE CONSTRUCTION OF RAJGIR BYPASS ROAD IN NALANDA DISTRICT

Size: px
Start display at page:

Download "PROJECT REPORT SOCIAL IMPACT ASSESSMENT FOR LAND ACQUISITION IN THE CONSTRUCTION OF RAJGIR BYPASS ROAD IN NALANDA DISTRICT"

Transcription

1 PROJECT REPORT SOCIAL IMPACT ASSESSMENT FOR LAND ACQUISITION IN THE CONSTRUCTION OF RAJGIR BYPASS ROAD IN NALANDA DISTRICT 26 April 2016 CHANDRAGUPT INSTITUTE OF MANAGEMENT PATNA

2 TABLE OF CONTENTS S. No. 1 Chapter Executive Summary 2 Project Description 3 Research Methodology 4 Land Assessment Estimation of Affected Families Socio-economic Profile of Affected Area Social and Psychological Impact Cost-Benefit Analysis & Social Impact Mitigation Plan Contents 1.1 Project and Public Purpose 1.2 Location 1.3 Size and Attributes of Land Acquisition 1.4 Alternatives Considered 1.5 Social Impact 1.6 Mitigation Measures 1.7 Assessment of Costs and Benefits 2.1 Background of the Project 2.2 Rationale for the Project 2.3 Examination of Alternatives 2.4 Core Design Features 2.5 Need for Ancillary Infrastructure 2.6 Workforce Requirements 2.7 Details of SIA/EIA if already conducted 2.8 Applicable Legislations and Policies 3.1 Research Methodology 3.2 Sources of Data 3.3 Method of Primary Data Collection 3.4 Work Plan 3.5 Team Composition 4.1 Total Land Requirement 4.2 Land (if any) already Purchased/Delineated/Leased/Acquired in the Project Area 4.3 Quantity and Proportion of Land Proposed to be Acquired 4.4 Nature, Present Use, and Classification, and Irrigation Coverage of Land Page No Estimation of the Families Directly and Indirectly Affected Demographic Details 6.2 Kinship Patterns and Social and Cultural Organizations 6.3 Vulnerable Groups 6.4 Land Use and Livelihood 6.5 Economic Activities 7.1 Quantitative Data through Household Survey 7.2 Qualitative Data through Focus Group Discussions 8.1 Cost-Benefit Analysis (Economic Costs) 8.2 Social and Psychological Costs and Benefits 8.3 Social Impact Mitigation Plan (SIMP) References 69 Annexure Questionnaire for Household Survey

3 LIST OF TABLES S. No. Table Page Title No. No Distribution of Respondent Households by Nature of Impact Total Land Requirement for the Project Quantity and Proportion of Land Proposed to be Acquired Nature and Classification of Land Distribution of Affected Households by Nature of Impact Distribution of Respondents by Social Category Distribution of Respondents by Religion Distribution of Respondents by Type of Family Distribution of Respondents by Residence Status in the Village Distribution of Respondents by Type of House Distribution of Respondents by Number of Rooms in House Distribution of Respondents by Condition of House Distribution of Respondents by Type of Ration Card Owned Distribution of Respondents by Gender of Family Head Distribution of Respondents by Family Size Distribution of Households by No. of Family Members in 0-6 Years Age 27 Group Distribution of Households by No. of Family Members in 7-18 Years 28 Age Group Distribution of Households by No. of Family Members in Years 28 Age Group Distribution of Households by No. of Family Members in Years 29 Age Group Distribution of Households by No. of Family Members in 61+ Years Age 30 Group Distribution of Households by Health Status: Normal Health Distribution of Households by Health Status: Diseased Distribution of Households by Health Status: Physically Challenged Distribution of Households by Health Status of Family Members Distribution of Households by Occupational Status Distribution of Households by Occupational Activity Distribution of Households by Sector of Occupation Distribution of Households by Nature of Occupation Distribution of Households by Professional Skills Distribution of Households by No. of Members Migrated Distribution of Family Members Migrated (In-Migrants) Distribution of Family Members Migrated (Out-Migrants) Distribution of Respondents by Migration Status Distribution of Respondents by Reason for Migration Distribution of Respondents by Average Area of Land Affected by the 38 Project Distribution of Respondents by Average Annual Loss of Income From 39 Land Affected Total and Average Area of Land Affected and Annual Loss of Income Distribution of Land Owners by No. of Trees Affected Distribution of Respondents by Other Losses to the Household Total and Average Other Losses to the Household Expected Social Costs - Loss of Farming Activities Expected Social Costs - Loss of Business Activities 43 2

4 S. No. Table Page Title No. No Expected Social Costs - Loss of Daily Wage Earnings Expected Social Costs - Loss to Share Croppers Expected Social Costs - Dislocation of Workplace Expected Social Costs - Environmental Hazards during the Project 44 Period Expected Social Costs - Rise in Illicit Activities during the Project Period Expected Social Costs - Health Hazards during the Project Period Expected Social Benefits - Increase in Agricultural Yield Expected Social Benefits - Expansion in Small Business Activities Expected Social Benefits - Improvement in Mobility Expected Social Benefits - Improvement in Marketing of Local Produce Expected Social Benefits - Better Access to Education Expected Social Benefits - Better Access to Healthcare Facilities Expected Social Benefits - Better Access to Credit Facilities Expected Social Benefits Saving of Productive Time Expected Social Benefits - Shortening of Distance Expected Social Benefits - Receiving Good Price for the Land Expected Social Benefits - Receiving a Good Rehabilitation Package Psychological Costs Feeling Tense Psychological Costs - Feeling Anxious Psychological Costs - Feeling Depressed Psychological Costs - Feeling Fearful Psychological Costs - Loss of Social Status Psychological Costs - Loss of Self Esteem Psychological Costs Possibility of Conflict with Neighbours Psychological Costs - Obstruction to Cultural Programmes/Festivals Psychological Costs Hurt to Religious Sentiments Assistance Required for Rehabilitation Cost-Benefit Analysis under Scenario Cost-Benefit Analysis under Scenario-2 65 S. No. Figure No. Title LIST OF FIGURES Data Collection Methodology Distribution of Respondents by Social Category Distribution of Respondents by Type of House Distribution of Respondents by Average Area of Land Affected by the Project Distribution of Respondents by Average Annual Loss of Income From Land Affected Land Acquisition Plan Pilkhi Village FGD at Hasanpur Village NH-82 Yatri Shed at Hasanpur Village FGD Team with Mukhia at Pathraura Village Alang at Pilkhi Village 59 3 Page No

5 CHAPTER I EXECUTIVE SUMMARY 1.1 Project and Public Purpose The proposed Rajgir Bypass Road (from 58 th K.M. Post of SH-71 in Village Niman to Yatri Shed in Village Hasanpur at NH-82) passes through eight villages Barhari, Hasanpur, Miar, Nahub, Nonhi, Panditpur, Pathraura Duhai Suhai, and Pilkhi in the Rajgir block under Nalanda district. The total length of proposed road is km. SH-71, a very important road originating from Jahanabad and terminating at Parwatipur in Nalanda district via Ghosi, Islampur, Rajgir, and Giriyak, is the shortest route to the International University of Nalanda. The proposed Rajgir Bypass Road project is expected to benefit the population in the eight affected villages by way of increase in agricultural yield on account of better access to seeds, fertilisers and other agricultural inputs and farm implements, employment generation during construction and maintenance of the project, expansion in small business activities, which in turn generate employment opportunities, improvement in market value of agricultural produce on account of improved mobility and better access to market, better access to education, healthcare facilities, and credit facilities, saving of productive time due to ease of traffic congestion, and shortening of distance to the nearest town. 1.2 Location The proposed Rajgir Bypass Road (from 58 th K.M. Post of SH-71 in Village Niman to Yatri Shed in Village Hasanpur at NH-82) passes through eight villages Barhari, Hasanpur, Miar, Nahub, Nonhi, Panditpur, Pathraura Duhai Suhai, and Pilkhi in the Rajgir block under Nalanda district. The total length of proposed road is km. 1.3 Size and Attributes of Land Acquisition The land acquisition process in three villages Barhari, Nonhi, and Panditpur is in progress under the old laws. In one village (Miar), the land earmarked for the project belongs to the government. Hence the area of land proposed to be acquired under new laws in the remaining four villages is acres. 4

6 1.4 Alternatives Considered SH-71, a very important road originating from Jahanabad and terminating at Parwatipur in Nalanda district via Ghosi, Islampur, Rajgir, and Giriyak, is the shortest route to the International University of Nalanda. In view of a breach in market portion at Rajgir in the alignment of SH-71, there is a requirement of a link road at either end of the said breach for uninterrupted traffic flow. It is worth noting that the width of road in village Mahadeopur (before Rajgir) is hardly 4 metres, which is a bottleneck for heavy vehicles and causes traffic jam. Further, widening of road is not possible in the said breach because of densely populated village portion. That is why the only viable option is to provide a bypass road in order to secure uninterrupted traffic flow. 1.5 Social Impact The population affected by the proposed Rajgir Bypass Road project is classified into two categories those directly affected (land owners) and those indirectly impacted (share croppers, and agricultural labourers). Out of a total of 336 households, those directly affected (land owners) constitute 76.2%, while those indirectly impacted (share croppers and agricultural labourers put together) account for 23.8%. The loss of land per household is less than 0.5 acre (80.1% of total respondents and 94.5% of land owners are affected by a loss of less than 0.5 acre of land). For the highest percentage of respondents (39.9% of total respondents and 50% of land owners), the annual loss of income ranges from Rs. 1,000 to Rs. 5,000. The average loss of annual income for total respondents and land owners is Rs. 8,132 and Rs. 6,491 respectively. There is no land affected in Unirrigated agricultural land, Bari Land and Other lands. While 96.4% of respondents (247 out of 256) are not affected by loss of trees, 1.2% of respondents reported an annual loss of income of Rs. 1,20,000 on account of the highest number of trees (10) affected and 0.8% of respondents reported an annual loss of income of Rs, 1,06,000 on account of 8 trees affected. The total annual loss of income reported by the respondents on account of trees affected is Rs. 2,83,000. The total other losses reported by the respondents is Rs. 1,06,800 and the average is Rs. 2,180. 5

7 1.6 Mitigation Measures Based on the feedback received from the affected people in the villages through focus group discussions, the following measures are recommended for mitigating the social impact of the project: Land survey may be redone, particularly in Pilkhi, in view of concerns of inaccurate land records expressed by the land owners. The option of using the already existing road (govt. land of approx. 200 ft.) known as Alang, situated between the villages of Pilkhi and Niman, may be explored as it would bring relief to the affected households in Pilkhi in view of the fact that land acquisition has been conducted for six times so far in the village. The Paein in Pilkhi village lying between government land and Niman village may be shifted to some other place. Hasanpur may be treated as an industrial area and compensation be awarded as per industrial land rates. Categorisation of land may be revised to ensure that fertile, three-crop land is not categorised as Bari land; similarly, efforts may be made to ensure that land up to 5 decimals is not categorised as residential ( awasiya ). Compensation may be awarded as per the latest circle rate of land (current market value). Compensation may be awarded by organising camps in the affected villages, preferably before the project commences. A nodal officer may be designated as a single point of contact (SPOC) to look into the grievances of the affected people and address them on a priority basis. 1.7 Assessment of Costs and Benefits Economic Costs and Benefits The cost-benefit analysis for the project is done for a period of 14 years, which includes three years for the construction and 11 years for maintenance of the road. Costs include: investment cost, maintenance cost, and cost of structures. The total cost in Year 0 is estimated to be cr. (investment cost + maintenance cost + cost of structures = 23 cr cr. = cr.). It is worth noting that investment cost in Year 0 is the sum of the land acquisition cost of 17 cr. and 1/3 rd of construction cost i.e. 6 cr. Similarly, the total cost is 6

8 estimated for all the 14 years and the present value (PV) of the total cost at a discounting rate of 10 per cent (Scenario-1) is estimated for all the 14 years. The total PV of the cost over a 14-year period is thus estimated to be cr. The benefits expected to be accrued from the project to the population in the affected villages include: agricultural benefits, better market access benefits, labour employment opportunities, savings in vehicle operating cost, and small business activities. Based on the Gross Cultivable Area (GCA) in the eight affected villages of 1,876 hectares and assuming a 20 per cent increase in yield, the increment in agricultural produce value for paddy, wheat, and vegetables is estimated at 2.16 cr. This benefit to the land owners would start flowing from Year 3 and is expected to steadily increase over the next 11 years. Better market access benefits refer to increase in market value of agricultural produce on account of improved mobility. Assuming a 30 per cent increase in market value, the benefit would amount to 3.25 cr. This benefit too would start flowing from Year 3 and is expected to steadily increase over the next 11 years. Labour employment opportunities include the substantial employment benefit to the local population during the construction period and a little less significant employment benefit during the maintenance period. Labour cost accounts for 30 per cent of the construction cost while material costs accounts for the remaining 70 per cent. Labour cost is thus estimated to be 4.8 cr. distributed uniformly across the construction period. Savings in vehicle operating cost (VOC) is a significant benefit to the local population since the project would help enhance the life of the vehicles used and reduce their maintenance cost. Assuming a traffic density of 1,100 vehicles per day and a saving of 50, the total savings in VOC is estimated to be 2 cr. per annum. Another significant benefit from the project is expansion in small business activities along the bypass road. Assuming 10 small business units per km. of the road, a total of 60 units are expected to be established along the total length of 6.1 km. of the bypass road. Assuming three labourers working per establishment and a MGNREGA wage rate of 162, the total labour value per annum generated by small business activities is estimated to be 1.06 cr. As in the previous section, total benefits and the present value (PV) of the total benefits at a discounting rate of 10 per cent are estimated for the 14-year period. The total PV of benefits is thus estimated to be cr. 7

9 Finally, net cash flows, internal rate of return (IRR), and benefit-cost ratio (BC Ratio) for the project are estimated. IRR is 19 per cent and BC Ratio (at a discounting rate of 10 per cent) is The exercise is repeated by using a discounting rate of 6 per cent in order to generate Senario-2 with a BC Ratio of Social and Psychological Costs and Benefits The social costs expected by the respondents from the project include: loss of farming activities (31.3% of respondents), loss of business activities (7.7%), loss of daily wage earnings (6.9%), loss to share croppers (15.8%), dislocation of workplace (7.7%), environmental hazards during the project period (12.2%), rise in illicit activities during the project period (8.9%), and health hazards during the project period (11%). In conclusion, the low-to-extremely low percentages indicate that the social costs of the project for the respondents are minimal. The social benefits expected by the respondents from the project include: increase in agricultural yield (64.5% of respondents), expansion in business/industries (88.7%), improvement in mobility (90.5%), improvement in the marketing of local produce (91.1%), better access to education (88.1%), better access to healthcare facilities (86.3%), better access to credit facilities (88.4%), saving of productive time due to ease of traffic congestion (71.4%), shortening of distance (83.9%), receiving good price for the land (89.3%), and receiving a good rehabilitation package (47.9%). In conclusion, the extremely high percentages indicate that the social benefits of the project for the respondents are extremely high. On balance, it is very clear that the social benefits of the project far exceed its social costs. The psychological costs expected by the respondents from the project: feeling tense (37.2% of respondents), feeling anxious (11.3%), feeling depressed (17%), feeling fearful (11.9%), loss of social status (11.6%), loss of self esteem (9.8%), possibility of conflicts with neighbours (3.9%), obstruction to cultural programmes/festivals (28%), and hurt to religious sentiments (27.7%). On the whole, the low-to-extremely low percentages indicate that the psychological impact of the project on the respondents is minimal. 8

10 CHAPTER II DETAILED PROJECT DESCRIPTION 2.1 Background of the Project The proposed Rajgir Bypass Road, 6.16 km. long, passes through eight villages Barhari, Hasanpur, Miar, Nahub, Panditpur, Nonhi, Pathraura Duhai Suhai, and Pilkhi in the Rajgir block under Nalanda district. The total length of proposed road is km. The land acquisition process in three villages Barhari, Panditpur, and Nonhi is in progress under the old laws. In one village (Miar), the land earmarked for the project belongs to the government. Hence the area of land proposed to be acquired under new laws in the remaining four villages is acres. 2.2 Rationale for the Project The proposed Rajgir Bypass Road (from 58 th K.M. Post of SH-71 in Village Niman to Yatri Shed in Village Hasanpur at NH-82) passes through eight villages Barhari, Hasanpur, Miar, Nahub, Nonhi, Panditpur, Pathraura Duhai Suhai, and Pilkhi in the Rajgir block under Nalanda district. The total length of proposed road is km. SH-71, a very important road originating from Jahanabad and terminating at Parwatipur in Nalanda district via Ghosi, Islampur, Rajgir, and Giriyak, is the shortest route to the International University of Nalanda. In view of a breach in market portion at Rajgir in the alignment of SH-71, there is a requirement of a link road at either end of the said breach for uninterrupted traffic flow. It is worth noting that the width of road in village Mahadeopur (before Rajgir) is hardly 4 metres, which is a bottleneck for heavy vehicles and causes traffic jam. Further, widening of road is not possible in the said breach because of densely populated village portion. That is why the only viable option is to provide a bypass road in order to secure uninterrupted traffic flow. The proposed bypass road connecting SH-71 approximately 100 m. before Mahadeopur village and NH-82 near railway level crossing in Hasanpur village would also provide easy approach to the Ordnance Factory Road. The proposed Rajgir Bypass Road is expected to benefit the population in the eight affected villages by way of increase in agricultural yield on account of better access to seeds, 9

11 fertilisers and other agricultural inputs and farm implements, employment generation during construction and maintenance of the project, expansion in small business activities, which in turn generate employment opportunities, improvement in market value of agricultural produce on account of improved mobility and better access to market, better access to education, healthcare facilities, and credit facilities, saving of productive time due to ease of traffic congestion, and shortening of distance to the nearest town. 2.3 Examination of Alternatives It is worth noting that the width of road in village Mahadeopur (before Rajgir) is hardly 4 metres, which is a bottleneck for heavy vehicles and causes traffic jam. Further, widening of road is not possible in the said breach because of densely populated village portion. That is why the only viable option is to provide a bypass road in order to secure uninterrupted traffic flow. 2.4 Core Design Features There is an existing earthen carriage way of 6,494.2 m. length. The proposed formation (road) is 12.0 m. wide and the depth of pavement (specification: road crust) is 690 mm. 2.5 Need for Ancillary Infrastructure Adequate cross drainage (CD) works have been provided. The width of the CD structures is 12.0 m., which would replace the existing CD structures that are in a bad condition. 2.6 Workforce Requirements All categories of skilled as well as unskilled labour force are available in sufficient number. Other facilities such as transport, food, water, and medical care are readily available. 2.7 Details of SIA/EIA if already conducted No SIA/EIA was conducted for the project in the past. 10

12 2.8 Applicable Legislations and Policies Land acquisition for the project is to be carried out under the RFCTLARR Act (Right to Fair Compensation and Transparency in Land Acquisition, Rehabilitation and Resettlement Act, 2013). 11

13 CHAPTER III TEAM COMPOSITION, APPROACH, METHODOLOGY, AND SCHEDUEL OF THE SIA 3.1 Methodology In order to conduct the socio-economic study of the affected households from the Rajgir Bypass Road project, census data and other relevant information regarding the district was accessed through internet, desk research and field visits. Quantitative questionnaires were used to capture the socio-economic status of all directly affected parties (land owners) and a sample of indirectly affected parties (share croppers, agricultural labours and small business men). Sample data for only those indirectly affected parties were collected who were working in the affected lands. Attempts were made to contact all directly affected households. In order to substantiate this study, the qualitative research technique of Focus Group Discussion was also used. Focus Group Discussions were used to elicit as much information as possible. Before conducting FGDs, all affected households were informed through field investigators concerning date, time, place and agenda of the FGDs. FGDs were subsequently held in four villages, viz. Hasanpur, Pathraura, Nahub and Pilkhi in the presence of village heads / Circle officers, Panchayat members etc. FGDs guides were used to drive the discussions on various socio-economic aspects and the consequent benefits/losses accruing from this project. Since a number of households own multiple lands / plots in the affected area, an attempt was made to include them only once to avoid duplication. It was also decided that each owner to be considered as a household in case of joint owners. Finally, after maintaining the above filtering process we have finally collected 256 responses from directly affected parties (land owners). In order to cover the indirectly affected parties, convenience sampling has been used and detailed responses have been collected from 80 indirectly affected parties (share croppers and agricultural labourers). In this study a peculiar aspect was the absence of any form of small business. Thus, our total sample amounts to 336 households (Table 3.1). 12

14 Table 3.1 Distribution of Respondent Households by Nature of Impact Nature of Impact Number Percent Direct Impact (Land Owners) Indirect Impact (Share Croppers) Indirect Impact (Agricultural Labour) Total Sources of Data Secondary Data Sources Land Registers and Khatiyans Census 2001 Socio-economic survey Other administrative records Primary Data Sources Questionnaires Focus Group Discussions (FGDs) The assessment used extensive participatory tools to generate data for the report. Orientation meetings, interviews with key stakeholders (officials of State Govt both at District and Block level as well as GPs, NGOs, PRIs, Experts and Policy Makers), focus group discussions, personal interviews, mapping, observations and periodic debriefings were organized to collect data and track progress. 3.3 Method of Collection of Primary Data Data collection was done both through field visits by our field investigators including focus group discussions through structured questionnaires devised for each particular set of stakeholders. This structured questionnaires included both quantitative/objective as well as the qualitative/subjective aspects to capture the impact of land acquisition. The study team has interviewed all directly and a sample of indirectly affected households to measure the impact of land acquisition process. 13

15 3.4 Work Plan Steps used in the study 1. Discussion with concerned District Level Officials, local Gram Panchayat functionaries and local line department officials on a common platform for sensitization and orientation. 2. Conducted multiple focus group discussions (FGDs) at multiple layers ranging from Gram Panchayat level to hamlet/neighbourhood level, with both directly and indirectly affected people from this project. 3. Preparation of Base Line Socio-Economic conditions from FGD and other secondary data sources 14

16 4. Identification and survey of every affected household (directly and indirectly) with the help of survey instruments 5. Understanding of the various assorted problems of the different stakeholders either in the form of directly affected or indirectly affected households and individuals and coming to a qualitative and quantitative understanding of the impact of this project 6. Prepared tentative Rehabilitation and Resettlement Plan. 3.5 Team Composition The research team comprises the following members: 1. Dr. V. Mukunda Das (Director, CIMP): Project Director 2. Prof. Sayan Banerjee (Fellow of NITIE, Mumbai): Coordinator 3. Prof. Madhulima Sekhar (M.A., JNU): Coordinator 4. Prof. G. K. Murthy (PhD, Berhampur University): Coordinator 15

17 CHAPTER IV LAND ASSESSMENT 4.1 Total Land Requirement The total area of land required for the project is acres as depicted in the following table (Table 4.1.1). Table Total Land Requirement for the Project LAND REQUIREMENT S. No. Village Area (Acres) 1 Pilkhi Panditpur Barhari Pathraura Duhai Suhai Nonhi Nahub Miar Hasanpur 3.73 TOTAL Land (if any) already Purchased/Delineated/Leased/Acquired in the Project Area acres of land (45.2% of the total land required) located in the villages of Barhari, Panditpur, and Nonhi is already under the process of acquisition under the old laws of land acquisition as depicted in Table in the following section. 4.3 Quantity and Proportion of Land Proposed to be Acquired acres of land located in the villages of Nahub, Pathraura, Pilkhi, and Hasanpur is proposed to be acquired, which is 52.2% of the total land requirement as depicted in Table below. 16

18 Table Quantity and Proportion of Land Proposed to be Acquired (Acres) S. No. Village Land Already Under Acquisition (as per old laws) LAND REQUIREMENT Govt. Land Land Proposed to be Acquired Total Land Required 1 Pilkhi Panditpur Barhari Pathraura Duhai 4 Suhai Nonhi Nahub Miar Hasanpur TOTAL Percent Nature, Present Use, and Classification, and Irrigation Coverage of Land From Tables (a) and (b) below, it can be inferred that out of the total geographical area of 2,471 ha. in the eight affected villages, 75.9% (1,786.3 ha.) is the net sown area (Gross Cultivable Area). 42.4%% of the total geographical area (which is 55.8% of GCA) is irrigated by source while 33.5% (which is 44.2% of GCA) is un-irrigated. Cultivable waste land area is 5.7% and there is no forest area or barren/uncultivable area or grazing area or land under miscellaneous tree crops area. 33.2% of the total geographical area is wells/tube wells area while 9.2% is tanks/lakes area. Current fallows area is 0.45% while there is no fallows land other than current fallows area or canals area (Census 2001). 17

19 Table (a) Nature and Classification of Land Table (b) Nature and Classification of Land 18

20 CHAPTER V ESTIMATION AND ENUMERATION OF AFFECTED FAMILIES AND ASSETS The population affected by the proposed Rajgir Bypass Road project is classified into two categories those directly affected (land owners) and those indirectly impacted (share croppers, and agricultural labourers). Table 5.1 below captures the distribution of respondents (households) by the nature of impact: the households directly affected (land owners) constitute 76.2% of the total of 336 households, while those indirectly impacted (share croppers and agricultural labourers put together) account for 23.8%. Table 5.1 Distribution of Affected Households by Nature of Impact Nature of Impact Number Percent Direct Impact (Land Owners) Indirect Impact (Share Croppers) Indirect Impact (Agricultural Labour) Total There are no Scheduled Tribes or other traditional forest dwellers in the project area. 19

21 CHAPTER VI SOCIO-ECONOMIC AND CULTURAL PROFILE (OF THE AFFECTED AREA AND RESETTLEMENT SIZE) 6.1 Demographic Details The following sections describe the demographic details of the population of the villages affected by the project, identify vulnerable groups, and detail economic activities, land use and livelihood patterns, kinship patterns, and social and cultural organizations. While the current Social Impact Assessment (SIA) study covers the four villages of Hasanpur, Nahub, Pathraura, and Pilkhi, where land is proposed to be acquired, the Rajgir Bypass Road project affects four additional villages Barhari, Miar, Panditpur, and Nonhi i.e. a total of eight villages under Nalanda district. Land acquisition in three villages Barhari, Panditpur, and Nonhi had already been initiated under the old rules of acquisition while the affected land in Miar belongs to the government. Demographic details of the population in the villages of Hasanpur, Nahub, Pathraura, and Pilkhi were collected through a survey of the affected households while secondary data pulled out from Census 2001 were used to describe the composite demographic profile of the population in all the eight villages. Since the project would affect not only the owners of the land proposed to be acquired, but also, in certain cases, those engaged in share cropping on the said land as well as those landless agricultural labourers working on the said land, it was important to classify the total number of affected households into two categories those directly affected (land owners) and those indirectly impacted (share croppers, and agricultural labourers). As depicted in Table 5.1 in the previous chapter, the households directly affected (land owners) constitute 76.2% of the total of 336 households, while those indirectly impacted (share croppers and agricultural labourers put together) account for 23.8%. Table below depicts the social class of the respondents; OBCs account for the highest percentage (55.7%) of the total respondents as well as of the land owners (62.1%) while SCs constitute the highest percentage (61.4%) of agricultural labourers. Census data suggest that SCs account for 33.76% of the total population of the eight villages (5,775 out of 17,102); there are no ST persons; EBCs, OBCs, and general category persons constitute the rest. 20

22 Table Distribution of Respondents by Social Category Social Category Land Owner Share Cropper Agricultural Labour Total No. % No. % No. % No. % EBC SC OBC General % 7.4% 22.6% 55.7% EBC SC OBC General Fig Distribution of Respondents by Social Category From Table below, it is evident that the respondents are mostly Hindus. Table Distribution of Respondents by Religion Land Owner Share Cropper Agricultural Labour Total Religion Hindu Muslim Grand Total

23 6.2 Kinship Patterns and Social and Cultural Organizations In a reflection of the evolving family structures, nuclear families account for the highest percentage (64.9%) of the total respondents, as can be seen in the following Table Table Distribution of Respondents by Type of Family Type of Land Owner Share Cropper Agricultural Labour Total Family Nuclear Joint Individual From Table below, it is evident that only 6% of the families do not reside in the village in which their land proposed to be acquired is located, while 94% do. Census data suggest that social (recreational) and cultural organizations (facilities) such as cinema/video hall, sports club, and stadium/auditorium are not available in any of the eight villages. For most of the villages, such facilities are available at a distance of 5-10 km. or more than 10 km. Table Distribution of Respondents by Residence Status in the Village Agricultural Land Owner Share Cropper Residence Labour Total Status Resident Non-resident Vulnerable Groups The World Health Organization (WHO) defines vulnerability as the degree to which a population, individual, or organization, is unable to anticipate, cope with, resist, and recover, from the impact of disasters. Poverty, and its common consequences such as malnutrition, homelessness, poor housing, and destitution, is a major contributor to vulnerability. Children, 22

24 pregnant women, elderly people, malnourished people, and people who are ill or immunocompromised, are particularly vulnerable when a disaster, natural or man-made, strikes ( accessed on ). These factors contributing to vulnerability are equally applicable to the current project. Further, large families, families headed by female members, and those owning Below-Poverty-Line (BPL) and Antyodaya ration cards are considered vulnerable to any changes in livelihood patterns expected to be brought about by the project. The following sections describe the trends in the vulnerability factors that emerge from the survey. While examining the type and condition of house in which the respondents live, it was discovered that 55.4% of the respondents live in pucca houses, 19.9% of the houses have a total of three rooms, and 75% of the houses are in an average condition, followed by 15.5% in good condition and 9.5% dilapidated, as depicted in the following tables: 6.3.1, 6.3.2, and Table Distribution of Respondents by Type of House Agricultural Land Owner Share Cropper Type of Labour Total House Kuchha Pucca Mixed Thatched roof

25 3.6% 7.4% 33.6% 55.4% Kuccha Pucca Mixed Thatched roof Fig Distribution of Respondents by Type of House Table Distribution of Respondents by Number of Rooms in House Agricultural Land Owner Share Cropper No. of Rooms Labour Total

26 Agricultural Land Owner Share Cropper No. of Rooms Labour Total No Response Table Distribution of Respondents by Condition of House Agricultural Land Owner Share Cropper Condition of House Labour Total Good Average Dilapidated More than half (56%) of the respondent families had APL cards while the rest had BPL (36.9%) and Antyodaya (1.2%) cards, as depicted in the following Table Table Distribution of Respondents by Type of Ration Card Owned Share Agricultural Type of Ration Land Owner Total Cropper Labour Card Owned BPL Card APL Card Antyodaya Card Others

27 Share Agricultural Type of Ration Land Owner Total Cropper Labour Card Owned No Card/ No Response The following tables and depict the percentage of respondent families headed by males (89.6%) and females (10.4%) and size of family respectively (70.5% of families have up to six members). Table Distribution of Respondents by Gender of Family Head Share Agricultural Land Owner Head of Family Cropper Labour Total Male family head Female family head Table Distribution of Respondents by Family Size Family Size Share Agricultural Land Owner (No. of Cropper Labour Total Members)

28 Family Size Share Agricultural Land Owner (No. of Cropper Labour Total Members) Table below describes the percentage of households with members in the vulnerable age group (0-6 years of age). While 54.8% of the households have no children in the 0-6 age group, 42.9% have up to three children in the said age group. Tables to depict the percentage of respondent households with members in the working-age population (typically described as years of age). 46.1% of households in the years age group (Table ) and 49.4% of households in the years age group (Table ) have two members. Table Distribution of Households by Number of Family Members In The Age Group of 0-6 Years No. of Persons Land Owner Share Cropper Agricultural Labour Total

29 No. of Persons Land Owner Share Cropper Agricultural Labour Total Table Distribution of Households by Number of Family Members In The Age Group of 7-18 Years Agricultural Land Owner Share Cropper No. of Persons Labour Total Table Distribution of Households by Number of Family Members in The Age Group of Years Agricultural Land Owner Share Cropper No. of Persons Labour Total

30 Agricultural Land Owner Share Cropper No. of Persons Labour Total Table Distribution of Households by Number of Family Members In The Age Group of Years No. of Persons Land Owner Share Cropper Agricultural Labour Total

31 Table Distribution of Households by Number of Family Members In The Age Group of 61 & Above Years No. of Persons Land Owner Share Cropper Agricultural Labour Total Tables below depict the percentage of respondents under each of the three health status categories normal health, diseased, and physically challenged. 98.3% of the total number of members of the respondent households (total number of 336 households have a total of 2,028 members at an average family size of 6) are in a normal health condition. Table Distribution of Households by Health Status: No. of Family Members Normal Health No. of Persons Land Owner Share Cropper Agricultural Labour Total

32 No. of Persons Land Owner Share Cropper Agricultural Labour Total Table Distribution of Households by Health Status: No. of Family Members Diseased Agricultural Land Owner Share Cropper No. of Persons Labour Total Table Distribution of Households by Health Status: No. of Family Members Physically Challenged Agricultural Land Owner Share Cropper No. of Persons Labour Total

33 Table Distribution of Households by Health Status of Family Members Agricultural Land Owner Share Cropper Health Status Labour Total Normal Disease Physically challenged Grand Total In sum, Tables to indicate that vulnerability among the affected households is low on account of the low-to-very-low percentages of households meeting the vulnerability criteria: kuchha, mixed, and thatched-roof houses (44.6%), dilapidated houses (9.5%), BPL and Antyodaya card holders (38.1%), female-headed families (10.4%), average family size (6), households with children of 1-3 years of age (42.9%), and households with diseased and physically challenged members (1.6%). 6.4 Land Use and Livelihood It may be recalled that Tables (a) and (b) in Chapter 4 depict the data pulled out from Census 2001 on the total geographical area, net sown area, total irrigated area, total unirrigated area, forest area, canals area, wells/tube wells area, and lakes/tanks area in the eight affected villages. Net area sown (Gross Cultivable Area) is 1,876 hectares, which is 75.9% of the total geographical area of 2,471 ha. while 17.9% of the area is under non-agricultural use. 42.4% of the area is irrigated by source and 33.5% is un-irrigated. Wells/tube wells area is 33.1%, tanks/lakes area is 9.2%, and there is no canals area or forest area or barren/uncultivable area. 6.5 Economic Activities Tables below depict the occupational details of the respondents occupational status, type of occupational activity, sector and nature of occupation, and professional skills. Table indicates that students constitute the highest percentage (39.3%) of respondents, 32

34 followed by those currently working (25.7%). 91.7% of the respondents have no professional skills (Table 6.5.5). Table Distribution of Households by Occupational Status Share Agricultural Occupational Land Owner Total Cropper Labour Status Working Now Seeking first job Housewife Student Retiree Not working Grand Total Table Distribution of Households by Occupational Activity Occupational Activity Land Owner Share Cropper Agricultural Labour Total Landless Agri. Labour Marginal farmer Small farmer Big farmer Casual Labour Artisan Small & Micro Enterprise Business Govt. Service Private Service Small shop Others No Response Grand Total

35 Table Distribution of Households by Sector of Occupation Sector Land Owner Share Cropper Agricultural Labour Total Organized Unorganized No Response Grand Total Table Distribution of Households by Nature of Occupation Sector Land Owner Share Cropper Agricultural Labour Total Permanent Temporary No Response Grand Total Table Distribution of Households by Professional Skills Sector Land Owner Share Cropper Agricultural Labour Total Computer Typing Construction Mechanic Carpentry Driving Others No Skills/ No Response Grand Total

36 The following tables from to depict the migration details of the respondents: percentage of in-migrants and out-migrants and reasons for migration. It can be inferred from Table that a total of 221 members (out of a total of 2028, or 10.89%) have migrated. For land owners, the percentage is 11.58% (183 out of 1579). Table indicates that education (36.2%) and job (23.1%) are the primary reasons for migration among the respondents. Table Distribution of Households by Number of Members Migrated No. of Persons Land Owner Share Cropper Agricultural Labour Total in Family Table Distribution of Family Members Migrated (In-Migrants) No. of persons in Land Owner Share Cropper Agricultural Labour Total a family

37 Table Distribution of Family Members Migrated (Out-Migrants) No. of Persons Land Owner Share Cropper Agricultural Labour Total in Family Table Distribution of Respondents by Migration Status Response Land Owner Share Cropper Agricultural Labour Total Total In migrated persons Total Out migrated persons Total Seasonal migrated Total Permanent migrated Total migrated persons Percentage Table Distribution of Respondents by Reason for Migration Share Agricultural Reason for Land Owner Total Cropper Labour Migration Job Education Business

38 Share Agricultural Reason for Land Owner Total Cropper Labour Migration Bought land Married there Others No Response Grand Total

39 CHAPTER VII SOCIAL AND PSYCHOLOGICAL IMPACT In order to assess the social and psychological impact and the costs and benefits associated with the project, primary data quantitative (through household survey) and qualitative (through focus group discussions) were collected from all the individuals affected, which included land owners, share croppers, and agricultural labourers from the four villages in the project area, viz. Pathraura, Nahub, Pilkhi, and Hasanpur. The following sections describe the analysis of and conclusions drawn from the data so collected. 7.1 Quantitative Data through Household Survey Loss of Income from the Project Tables to below depict the quantum of expected annual loss of income as reported by the respondents on account of land affected by the project. From Table , it is evident that 80.1% of total respondents and 94.5% of land owners are affected by a loss of less than 0.5 acre of land. Table indicates that for the highest percentage of respondents (39.9% of total respondents and 50% of land owners), the annual loss of income ranges from Rs. 1,000 to Rs. 5,000. The average loss of annual income for total respondents and land owners is Rs. 8,132 and Rs. 6,491 respectively. There is no land affected in Unirrigated agricultural land, Bari Land and Other lands. Table Distribution of Respondents by Average Area of Land Affected by the Project Land in Acres Land Owner Share Cropper Agricultural Labour Total Less than 0.5 Acre to 1 Acre More than 1 Acre No Land

40 1.80% 3.60% 14.60% 80.10% Less than 0.5 Acre 0.5 to 1 Acre More than 1 Acre No Land Fig Distribution of Respondents by Average Area of Land Affected by the Project Table Distribution of Respondents by Average Annual Loss of Income from Land Affected Share Agricultural Land Owner Annual Loss Cropper Labour Total Up to Rs. 1, Rs to 5, Rs to 10, Rs to 20, More than Rs. 20, Amount not calculated No Land Grand Total

41 2.70% 6.30% 14.60% 10.10% 8.90% 39.90% 17.60% Upto Rs Rs to 5000 Rs to Rs to More than Rs Amount not calculated No Land Fig Distribution of Respondents by Average Annual Loss of Income from Land Affected Table Total and Averagee Area of Land Affected & Annual Loss of Income Land Affected/ Loss of Income Total Land affected (in Acres) Average Land affected (in Acres) Total Annual Loss of Income (In Rs.) Average Annual Loss of Income (In Rs.) Land Owner ,48,600 6,491 Share Cropper ,000 5,000 Agricultural Labour ,87,000 30,,895 Grand Total ,60,600 8,132 Tables to below depict the annual loss of income reported by the land owner respondents on account of trees affected and other losses expected to be incurred as a result of the project. While 96.4% of respondents (247 out of 256) are not affected by loss of trees, 1.2% of respondents reported an annual loss of income of Rs. 1,20,0000 on account of the highest number of trees (10) affected and 0.8% of respondents reported an annual loss of income of Rs, 1,06,000 on account of 8 trees affected. The total annual loss of income 40

42 reported by the respondents on account of trees affected is Rs. 2,83,000. The total other losses reported by the respondents is Rs. 1,06,800 and the average is Rs. 2,180. Table Distribution of Land Owners by Number of Trees Affected No. of Trees Affected Number Percent Total Loss (Trees) , , , ,06, , ,20,000 Not Applicable Grand Total ,83,000 Table Distribution of Respondents by Other Losses to the Household Share Agricultural Land Owner Annual Loss Cropper Labour Total Less than Rs. 1, Rs. 1,000 to 5, More than Rs. 5, No loss

43 Table Total and Average Other Losses to the Household Response Land Owner Share Cropper Agricultural Labour Grand Total Total Loss (in Rs.) 0 71,400 35,400 1,06,800 Average Loss (in Rs.) 0 14, , Social and Psychological Costs and Benefits from the Project (a) Social Costs The following tables from to depict the social costs expected by the respondents from the project: loss of farming activities (31.3% of respondents), loss of business activities (7.7%), loss of daily wage earnings (6.9%), loss to share croppers (15.8%), dislocation of workplace (7.7%), environmental hazards during the project period (12.2%), rise in illicit activities during the project period (8.9%), and health hazards during the project period (11%). In sum, the low-to-extremely low percentages indicate that the social costs of the project for the respondents are minimal. Table Expected Social Costs - Loss of Farming Activities Response Land Owner Share Cropper Agricultural Labour Total Strongly Disagree Disagree Neutral Agree Strongly Agree

44 Table Expected Social Costs - Loss of Business Activities Response Land Owner Share Cropper Agricultural Labour Total Strongly Disagree Disagree Neutral Agree Strongly Agree Table Expected Social Costs - Loss of Daily Wage Earnings Response Land Owner Share Cropper Agricultural Labour Total No % No. % No. % No. % Strongly Disagree Disagree Neutral Agree Strongly Agree Table Expected Social Costs - Loss to Share Croppers Response Land Owner Share Cropper Agricultural Labour Total Strongly Disagree Disagree Neutral Agree Strongly Agree

45 Table Expected Social Costs - Dislocation of Workplace Response Land Owner Share Cropper Agricultural Labour Total Strongly Disagree Disagree Neutral Agree Strongly Agree Table Expected Social Costs - Environmental Hazards during the Project Period Agricultural Land Owner Share Cropper Response Labour Total Strongly Disagree Disagree Neutral Agree Strongly Agree Table Expected Social Costs - Rise in Illicit Activities during the Project Period Agricultural Land Owner Share Cropper Response Labour Total Strongly Disagree Disagree Neutral Agree Strongly Agree

46 Table Expected Social Costs - Health Hazards during the Project Period Agricultural Land Owner Share Cropper Response Labour Total Strongly Disagree Disagree Neutral Agree Strongly Agree (b) Social Benefits Tables from to below depict the social benefits expected by the respondents from the project: increase in agricultural yield (64.5% of respondents), expansion in small business activities (88.7%), improvement in mobility (90.5%), improvement in the marketing of local produce (91.1%), better access to education (88.1%), better access to healthcare facilities (86.3%), better access to credit facilities (88.4%), saving of productive time due to ease of traffic congestion (71.4%), shortening of distance (83.9%), receiving good price for the land (89.3%), and receiving a good rehabilitation package (47.9%). In sum, the extremely high percentages indicate that the social benefits of the project for the respondents are extremely high. On balance, it is very clear that the social benefits of the project far exceed its social costs. Table Expected Social Benefits - Increase in Agricultural Yield Agricultural Land Owner Share Cropper Response Labour Total Strongly Disagree Disagree Neutral Agree Strongly Agree

47 Table Expected Social Benefits - Expansion in Small Business Activities Agricultural Land Owner Share Cropper Response Labour Total Strongly Disagree Disagree Neutral Agree Strongly Agree Table Expected Social Benefits - Improvement in Mobility Response Land Owner Share Cropper Agricultural Labour Total Strongly Disagree Disagree Neutral Agree Strongly Agree Table Expected Social Benefits - Improvement in Marketing of Local Produce Agricultural Land Owner Share Cropper Response Labour Total Strongly Disagree Disagree Neutral Agree Strongly Agree

48 Table Expected Social Benefits - Better Access to Education Agricultural Land Owner Share Cropper Response Labour Total Strongly Disagree Disagree Neutral Agree Strongly Agree Table Expected Social Benefits - Better Access to Healthcare Facilities Response Land Owner Share Cropper Agricultural Labour Total Strongly Disagree Disagree Neutral Agree Strongly Agree Table Expected Social Benefits - Better Access to Credit Facilities Response Land Owner Share Cropper Agricultural Labour Total Strongly Disagree Disagree Neutral Agree Strongly Agree

49 Table Expected Social Benefits Saving of Productive Time due to Ease of Traffic Congestion Agricultural Land Owner Share Cropper Response Labour Total Strongly Disagree Disagree Neutral Agree Strongly Agree Table Expected Social Benefits - Shortening of Distance Agricultural Land Owner Share Cropper Response Labour Total Strongly Disagree Disagree Neutral Agree Strongly Agree Table Expected Social Benefits - Receiving Good Price for the Land Response Land Owner Share Cropper Agricultural Labour Total Strongly Disagree Disagree Neutral Agree

50 Land Owner Share Cropper Agricultural Labour Total Response Strongly Agree Table Expected Social Benefits - Receiving a Good Rehabilitation Package Response Land Owner Share Cropper Agricultural Labour Total Strongly Disagree Disagree Neutral Agree Strongly Agree (c) Psychological Costs The following tables from to depict the psychological costs expected by the respondents from the project: feeling tense (37.2% of respondents), feeling anxious (11.3%), feeling depressed (17%), feeling fearful (11.9%), loss of social status (11.6%), loss of self esteem (9.8%), possibility of conflict with neighbours (3.9%), obstruction to cultural programmes/festivals (28%), and hurt to religious sentiments (27.7%). On the whole, the low-to-extremely low percentages indicate that the psychological impact of the project on the respondents is minimal. Table Psychological Costs Feeling Tense Response Land Owner Share Cropper Agricultural Labour Total Not at all Sometimes/partial Always

51 Table Psychological Costs - Feeling Anxious Response Land Owner Share Cropper Agricultural Labour Total Not at all Sometimes/partial Always Table Psychological Costs - Feeling Depressed Response Land Owner Share Cropper Agricultural Labour Total Not at all Sometimes/partial Always Table Psychological Costs - Feeling Fearful Response Land Owner Share Cropper Agricultural Labour Total Not at all Sometimes/partial Always Table Psychological Costs - Loss of Social Status Response Land Owner Share Cropper Agricultural Labour Total Not at all Sometimes/partial

52 Land Owner Share Cropper Agricultural Labour Total Response Always Table Psychological Costs - Loss of Self Esteem Response Land Owner Share Cropper Agricultural Labour Total Not at all Sometimes/partial Always Table Psychological Costs Possibility of Conflict with Neighbours Response Land Owner Share Cropper Agricultural Labour Total Not at all Sometimes/partial Always Table Psychological Costs - Obstruction to Cultural Programmes/Festivals Response Land Owner Share Cropper Agricultural Labour Total Not at all Sometimes/partial Always

53 Table Psychological Costs Hurt to Religious Sentiments Response Land Owner Share Cropper Agricultural Labour Total Not at all Sometimes/partial Always Finally, when it comes to the kind of assistance required for rehabilitation, 20.5% of the total respondents expressed a desire for a rehabilitation package, as can be seen from Table below. Table Assistance Required for Rehabilitation Agricultural Land Owner Share Cropper Assistance Required Labour Total Rehabilitation Package NA No Response Qualitative Data through Focus Group Discussions In the process of primary data collection a team of CIMP visited all the four villages (Hasanpur, Pathraura, Pilkhi and Nahub) of Rajgir district on 16th and 17 th Feb People were informed in advance about this visit as field investigators were already doing the data collection in their areas and notice from land acquisition department, Nalanda were already pasted at all public places like Panchayat Bhawan, School etc. People gathered in huge numbers at public places like Panchayat Bhawan, School, and Anganwadi Centre and shared their views. Government officials like DCLR, Rajgir, CO, Rajgir, CI, Rajgir, Assistant Engineer, and Road Construction Department were also present and participated in the discussion. An attempt was made to invite all the people who were directly or indirectly 52

54 being affected by the construction of Rajgir Bypass Road. All the Focus Group Discussions were video-recorded and the same are enclosed with the report. In all the four villages except Pilkhi, people are mainly concerned about the compensation rate they are going to receive from the government. They are not against the construction of the road but want the compensation at the current market value rate. The lands to be acquired in all these villages are fertile three-crop lands. People have no other source of livelihood except farming. Pilkhi is the most affected village as this will be the seventh time their land is going to be acquired by the government. The entire population dependent on agriculture will be deprived of their only means of livelihood. People of Pilkhi village want that the government redo the land survey for this project and explore the option of acquiring the already existing road (govt. land of approx. 200 ft.) known as Alang, situated between Pilkhi village and Niman Village. Fig Land Acquisition Plan Pilkhi Village Details of discussions in all the four villages are mentioned below: Name of the Village: Hasanpur Venue of FGD: Panchayat Bhawan, Nahub Date of FGD: 16 th February, 2016 No. of Participants: 23 53

55 Officials Present Name and Designation: Mr. Sadhu Sharan, Assistant Engineer, Road Construction Department, Nalanda, Mukhia, Prof. Sayan Banerjee, CIMP, Prof. Madhulima Shekhar, CIMP Benefits from the Project: Distance from Hasanpur to major cities and locations like Gaya, Islampur (approx.3-4 km), Jahanabad and Nalanda University will be shortened. Opportunities for jobs to the local people will increase as more hotels, factories and markets will be opened. Occurrence of crime and illicit activities, especially from the perspective of women s safety, will decrease in this area. Costs/Loss: No change in access to Banking/Credit facilities/post Office. Road construction may affect the crops of nearby fields. What kind of assistance is required? Compensation rate and Land registration rate should be the same. Compensation should be given as per the new circle rate. Hasanpur should be considered as an Industrial area and the people should get compensation as per Industrial rate. People should get compensation before the road construction starts. Government officials should ensure that compensation sum is distributed at a camp in the village. Any other feedback Categorisation of land should be revised and updated. Land up to five decimals is considered as Awasiya, which is not accurate. As the quality of land is very fertile and people do farming throughout the year and grow multiple crops, it cannot be considered as Bari Land. 54

56 Fig FGD at Hasanpur Village Fig NH-82 Yatri Shed at Hasanpur Name of the Village: Pathraura Venue of FGD: MadhyaVidyalaya, Pathraura Date of FGD: 16 th February, 2016 No. of Participants: 33 55

57 Officials Present Name and Designation: Mr. Sadhu Sharan, Assistant Engineer, Road Construction Department, Nalanda, Shri Anuj Kumar, Mukhia, Pathraura, Prof. Sayan Banerjee,CIMP, Prof. Madhulima Shekhar, CIMP Benefits from the Project: Transportation will become easy. People can easily sell their produce in the market. It will bring prosperity to the village. It will help in the development of the village in respect to health, education and business. Costs/Loss: People who do farming on other fields (share cropping) fear that they will not get land for farming after the land acquisition. What kind of assistance is required? Compensation should be given at the current market value rate. Affected people should get the compensation directly. No middleman should be involved in the distribution of compensation money. People should get the money before the construction of the road begins. Any other feedback The construction of the road should start soon. 56

58 Fig FGD Team with Mukhia at Pathraura Village Name of the Village: Pilkhi Venue of FGD: Anganwadi Centre Date of FGD: 17 th February, 2016 No. of Participants: 23 Officials Present Name and Designation: Mr. Satish Kumar, Circle Officer, Rajgir, Mr. Anand Kumar, Circle Inspector, Rajgir and Mr. Prabhat Kumar, DCLR, Rajgir, Prof. Sayan Banerjee,CIMP, Prof. Madhulima Shekhar, CIMP Benefits from the Project: Costs/Loss: This will be the seventh time that land in Pilkhi is being acquired by the Government. More than 65 percent of agricultural land has already been acquired for different projects. Another acquisition will result in landlessness of a large number of peasants. Most of the people are left with very little agricultural land. As their main occupation is farming, they want that government should consider using govt. land (200 ft. lying between Pilkhi and Niman village) for the project instead of acquiring their agricultural land. 57

59 Agricultural workers will be the worst hit, as they will be losing their employment. Many small farmers migrated to Delhi and other big cities to work as a daily wage labourers for livelihood after losing their land. Some farmers purchased land with their compensation money at a higher market value rate. Now again they are losing their land in this project. What kind of assistance is required? As people of Pilkhi village are left with very little agricultural land, they want that government should acquire 200 ft. government land instead of their fertile land which lies between Niman village and Pilkhi Village. People would not mind parting with their land in the event of the government land falling short of the project requirement. This would also minimise the government s cost of land acquisition by way of reduced number of people requiring compensation. Paein can also be shifted which is lying between govt. land and Niman village. People want that government officials should visit Pilkhi village again and restructure the land acquisition plan of Rajgir Bypass Road. Earlier people received very little compensation (based on old Land survey report of 1907) as their land was classified as Bhit (less fertile). But now with the new technology, people grow crops throughout the year. They want that they should get the compensation as per the rate fixed for developing land. People do not want any delay in getting the compensation money. Any other feedback The land to be acquired for Rajgir Bypass Road is fertile three-crop land where apart from wheat and rice, commercial crops like potato, onion, mustard, sunflower, garlic and other spices are grown. People want the compensation as per the current market rate. 58

60 Government should offer a job to one member of each of the family being affected by this project. Fig Alang at Pilkhi Village Name of the Village: Nahub Venue of FGD: Panchayat Bhawan, Nahub Date of FGD: 17 th February, 2016 No. of Participants: 43 Officials Present Name and Designation: Mr. Satish Kumar, Circle Officer, Rajgir, Mukhia, Prof. Sayan Banerjee, CIMP, Prof. Madhulima Shekhar, CIMP Benefits from the Project: Costs/Loss: What kind of assistance is required? Local people should get employment during road construction under MGNREGA. The list of affected households should be reviewed and revised as there are many discrepancies like duplication of entries (names), missing names, and wrong names. 59

61 Seventy percent of the names are either missing or wrong names are entered in the list. The compensation should be six times the registered sales deed value. Government should offer a job to one member of each of the family being affected by this project as people do not have any other source of livelihood. Any other feedback The land to be acquired for Rajgir Bypass Road is fertile three-crop land where apart from wheat and rice, commercial crops like potato, onion, mustard, sunflower, garlic and other spices are grown. People want the compensation as per the current market rate. Categorisation of land should be revised and updated. Land up to five decimals is considered as Awasiya, which is not accurate as the land is very fertile and people do farming throughout the year and grow multiple crops. Government officials should camp in the village and distribute the compensation to the affected people. Road construction should begin only after distributing the compensation to the affected people. TDS should not be deducted from the amount received as compensation. Details of compensation amount should be mentioned in the AWARD. 60

62 CHAPTER VIII ANALYSIS OF COSTS AND BENEFITS AND RECOMMENDATION ON ACQUISITION 8.1 Cost-Benefit Analysis (Economic Costs) Costs As per the information received from the Road Construction Department (Central Circle, RCD, Patna), the estimated total cost of the Rajgir Bypass Road project is `34.16 crores, which includes the cost of land acquisition of `17.31 cr. The costs to be considered for the analysis include: Investment cost Maintenance cost Cost of structures The cost-benefit analysis is done for a period of 14 years, which includes three years for the construction and 11 years for maintenance of the road Investment Cost For Year 0, the investment cost is `23 cr., arrived at as follows: Investment Cost = Cost of Land Acquisition + (Cost of Construction/3) = `17.31 cr. + (`16.84 cr. /3) = `22.92 cr. `23 cr. Investment cost for Years 1-2 is taken as `6 cr. and `5 cr. respectively by distributing the total construction cost more or less uniformly across the construction period of three years Maintenance Cost Maintenance cost for the next 11 years (Years 3-13) is estimated at a rate of 2 per cent of the project cost i.e. `0.6 cr. 61

63 Cost of structures Cost of structures to be affected in Year 0 (trees in this case) is estimated to be `0.283 cr. ( `0.3 cr.) as depicted in Table in Chapter 7. Therefore, the total cost in Year 0 is cr. Similarly, the total cost is estimated for all the 14 years and the present value (PV) of the total cost at a discounting rate of 10 per cent (Scenario-1) is estimated for all the 14 years. The total PV of the cost over a 14-year period is thus estimated to be cr Benefits The benefits expected to be accrued from the project to the population in the affected villages include: Agricultural benefits Better market access benefits Labour employment opportunities Savings in vehicle operating cost Small business activities Agricultural Benefits Agricultural benefits include increase in agricultural yield on account of better access to seeds, fertilisers and other agricultural inputs and farm implements. The Gross Cultivable Area (GCA) in the eight affected villages is 1,876 hectares as depicted in Table 6.4.1(b) in Chapter 6. Since the land in the affected villages is fertile, three-crop-per-year land, the GCA for paddy and wheat considered for the analysis is 1,876 ha. each and 375 ha. (20% of GCA) for vegetables. Nalanda district falls under the category of low productivity districts with an average yield of tons per hectare (Source: accessed on ). Assuming a yield per annum of 1.5 tons, 1.2 tons, and 10 tons for paddy, wheat, and vegetables respectively, the gross production per annum is estimated at 2,814 tons, 2,251 tons, and 3,752 tons respectively. At a price per ton of 14,000, 14,000, and 10,000 respectively, the total produce value for the three crops is 3.93 cr., 3.15 cr., and 3.75 cr. respectively. The total produce value per annum for all the three crops put together is cr. Assuming a 20 per cent increase in yield on account of better access to seeds, fertilisers 62

64 and other agricultural inputs and farm implements as a result of the project, the increment in agricultural produce value is estimated at 2.16 cr. This benefit to the land owners would start flowing from Year 3 and is expected to steadily increase over the next 11 years Better Market Access Benefits Better market access benefits refer to increase in market value of agricultural produce on account of improved mobility. Assuming a 30 per cent increase in market value, the benefit would amount to 3.25 cr. This benefit too would start flowing from Year 3 and is expected to steadily increase over the next 11 years Labour Employment Opportunities Labour employment opportunities include the substantial employment benefit to the local population during the construction period and a little less significant employment benefit during the maintenance period. Labour cost accounts for 30 per cent of the construction cost while material costs accounts for the remaining 70 per cent. Labour cost is thus estimated to be 4.8 cr. distributed uniformly across the construction period Savings in Vehicle Operating Cost (VOC) Savings in vehicle operating cost (VOC) is a significant benefit to the local population since the project would help enhance the life of the vehicles used and reduce their maintenance cost. Assuming a traffic density of 1,100 vehicles per day and a saving of 50, the total savings in VOC is estimated to be 2 cr. per annum Small Business Activities Another significant benefit from the project is expansion in small business activities along the bypass road. Assuming 10 small business units per km. of the road, a total of 60 units are expected to be established along the total length of 6.1 km. of the bypass road. Assuming three labourers working per establishment and a MGNREGA wage rate of 162, the total labour value per annum generated by small business activities is estimated to be 1.06 cr. As in the previous section, total benefits and the present value (PV) of the total benefits at a discounting rate of 10 per cent are estimated for the 14-year period. The total PV of benefits is thus estimated to be cr. 63

65 Finally, net cash flows, internal rate of return (IRR), and benefit-cost ratio (BC Ratio) for the project are estimated. IRR is 19 per cent and BC Ratio is The exercise is repeated by using a discounting rate of 6 per cent in order to generate Senario-2 with a BC Ratio of The following Tables and depict the cost-benefit analysis under Scenario-1 and Scenario-2 respectively. Table Cost-Benefit Analysis under Scenario-1 Year Costs Investment Cost Maintenance Cost Cost of Structures Total Cost PV of Cost Total PV of Cost Benefits Agricultural Benefits Better Market Access Benefits Labor Employment Opportunities Savings in Vehicle Operating Cost Small Business Activities Total Benefits PV of Benefits Total PV of Benefits Net Cash Flows IRR 19% BC Ratio

66 Table Cost-Benefit Analysis under Scenario-2 Year Costs Investment Cost Maintenance Cost Cost of Structures Total Cost PV of Cost Total PV of Cost Benefits Agricultural Benefits Better Market Access Benefits Labor Employment Opportunities Savings in Vehicle Operating Cost Small Business Activities Total Benefits PV of Benefits Total PV of Benefits Net Cash Flows IRR 19% BC Ratio

67 8.2 Social and Psychological Costs and Benefits The following sections summarise the analysis of data collected from a survey of the affected households in the four villages of Hasanpur, Nahub, Pathraura, and Pilkhi in the Rajgir block under Nalanda district presented Chapter 7 as well as secondary data culled from Census 2001 on the vulnerability of the population in all the eight villages affected by the Rajgir Bypass Road project presented in Chapter 6. The following factors contributing to vulnerability of the population in the affected area were examined: poor housing, large family size, families with children, female-headed families, and families owning Below-Poverty-Line (BPL) and Antyodaya ration cards. From the analysis in Chapter 6, it can be inferred that vulnerability among the affected households is low on account of the low-to-very-low percentages of households meeting the vulnerability criteria: kuchha, mixed, and thatched-roof houses (44.6%), dilapidated houses (9.5%), BPL and Antyodaya card holders (38.1%), female-headed families (10.4%), average family size (6), households with children of 1-3 years of age (42.9%), and households with diseased and physically challenged members (1.6%). From the analysis in Chapter 6, it can be inferred that the loss of land per household is less than 0.5 acre (80.1% of total respondents and 94.5% of land owners are affected by a loss of less than 0.5 acre of land). For the highest percentage of respondents (39.9% of total respondents and 50% of land owners), the annual loss of income ranges from Rs. 1,000 to Rs. 5,000. The average loss of annual income for total respondents and land owners is Rs. 8,132 and Rs. 6,491 respectively. There is no land affected in Un-irrigated agricultural land, Bari Land and Other lands. While 96.4% of respondents (247 out of 256) are not affected by loss of trees, 1.2% of respondents reported an annual loss of income of Rs. 1,20,000 on account of the highest number of trees (10) affected and 0.8% of respondents reported an annual loss of income of Rs, 1,06,000 on account of 8 trees affected. The total annual loss of income reported by the respondents on account of trees affected is Rs. 2,83,000. The total other losses reported by the respondents is Rs. 1,06,800 and the average is Rs. 2,180. The social costs expected by the respondents from the project include: loss of farming activities (31.3% of respondents), loss of business activities (7.7%), loss of daily wage earnings (6.9%), loss to share croppers (15.8%), dislocation of workplace (7.7%), environmental hazards during the project period (12.2%), rise in illicit activities during the 66

68 project period (8.9%), and health hazards during the project period (11%). In conclusion, the low-to-extremely low percentages indicate that the social costs of the project for the respondents are minimal. The social benefits expected by the respondents from the project include: increase in agricultural yield (64.5% of respondents), expansion in business/industries (88.7%), improvement in mobility (90.5%), improvement in the marketing of local produce (91.1%), better access to education (88.1%), better access to healthcare facilities (86.3%), better access to credit facilities (88.4%), saving of productive time due to ease of traffic congestion (71.4%), shortening of distance (83.9%), receiving good price for the land (89.3%), and receiving a good rehabilitation package (47.9%). In conclusion, the extremely high percentages indicate that the social benefits of the project for the respondents are extremely high. On balance, it is very clear that the social benefits of the project far exceed its social costs. The psychological costs expected by the respondents from the project: feeling tense (37.2% of respondents), feeling anxious (11.3%), feeling depressed (17%), feeling fearful (11.9%), loss of social status (11.6%), loss of self esteem (9.8%), possibility of conflicts with neighbours (3.9%), obstruction to cultural programmes/festivals (28%), and hurt to religious sentiments (27.7%). On the whole, the low-to-extremely low percentages indicate that the psychological impact of the project on the respondents is minimal. In all the four villages except Pilkhi, people are mainly concerned about the compensation rate they are going to receive from the government. They are not against the construction of the road but want the compensation at the current market value rate. The lands to be acquired in all these villages are fertile three-crop lands. People have no other source of livelihood except farming. Pilkhi is the most affected village as this will be the seventh time their land is going to be acquired by the government. The entire population dependent on agriculture will be deprived of their only means of livelihood. People of Pilkhi village want that the government redo the land survey for this project and explore the option of acquiring the already existing road (govt. land of approx. 200 ft.) known as Alang, situated between Pilkhi village and Niman Village. Finally, while the project is expected to contribute significantly to public good by way of improving mobility, access to education, health care and marketing facilities, expanding business activities, and generating employment opportunities for the local populace, one less- 67

69 displacing alternative clearly emerges the option of using the government land (existing kuchha road of approx. 200 ft.) situated between the villages of Pilkhi and Niman which would bring relief to the affected households in Pilkhi. 8.3 Social Impact Mitigation Plan (SIMP) Based on the feedback received from the affected people in the villages through focus group discussions, the following measures are recommended for mitigating the social impact of the project: Land survey may be redone, particularly in Pilkhi, in view of concerns of inaccurate land records expressed by the land owners. The option of using the already existing road (govt. land of approx. 200 ft.) known as Alang, situated between the villages of Pilkhi and Niman, may be explored as it would bring relief to the affected households in Pilkhi in view of the fact that land acquisition has been conducted for six times so far in the village. The Paeen in Pilkhi village lying between government land and Niman village may be shifted to some other place. Hasanpur may be treated as an industrial area and compensation be awarded as per industrial land rates. Categorisation of land may be revised to ensure that fertile, three-crop land is not categorised as Bari land; similarly, efforts may be made to ensure that land up to 5 decimals is not categorised as residential ( awasiya ). Compensation may be awarded as per the latest circle rate of land (current market value). Compensation may be awarded by organising camps in the affected villages, preferably before the project commences. A nodal officer may be designated as a single point of contact (SPOC) to look into the grievances of the affected people and address them on a priority basis. 68

70 REFERENCES Census accessed on Mar. 5, accessed on Mar. 8,

71 ANNEXURE QUESTIONNAIRE FOR HOUSEHOLD SURVEY 1. BACKGROUND INFORMATION 1.1 Name of the respondent: 1.2 Father s/husband s Name: 1.3 Village: 1.4 Tola: 1.5 GP: 1.6 Caste: (EBC=1, ST =2, SC=3, OBC =4, General=5) 1.7 Religion: (Hindu = 1, Muslim = 2, Christian= 3, Sikh = 4, Others = 5) 1.8 Mobile no. 2. HOUSEHOLD/FAMILY INFORMATION 2.1 Type of family: (Nuclear = 1, Joint = 2, Individual = 3) 2.2 Does your family reside in this area? (Yes = 1, No = 2) 2.3 If yes, for how many years? 2.4 If no, where does your family normally stay? 2.5 Type of House: (Kachcha = 1, Pukka = 2, Mixed = 3, Thatched roof = 4) No. of rooms: Condition of house: (Good = 1, Average = 2, Dilapidated = 3) 70

A Case Study on Socio - Economic Conditions of Agricultural Labourers in Idaikal Village in Tirunelveli District. Dr. T.

A Case Study on Socio - Economic Conditions of Agricultural Labourers in Idaikal Village in Tirunelveli District. Dr. T. Volume: 3; No: 2; June-2017. pp 256-264. ISSN: 2455-3921 A Case Study on Socio - Economic Conditions of Agricultural Labourers in Idaikal Village in Tirunelveli District Dr. T. Vijayanthi Assistant Professor

More information

SOCIO ECONOMIC CONDITIONS OF BPL RATION CARD HOLDERS IN THE STUDY AREA

SOCIO ECONOMIC CONDITIONS OF BPL RATION CARD HOLDERS IN THE STUDY AREA Chapter-V SOCIO ECONOMIC CONDITIONS OF BPL RATION CARD HOLDERS IN THE STUDY AREA This is necessary to examine the socio-economic conditions of poor or BPL ration card holders (sample households) in the

More information

Overview of PADR process

Overview of PADR process SECTION 3 Overview of PADR process PADR is a methodology for use at community level. It involves active engagement, with the community, in a process to explore the risks they face and the factors contributing

More information

Survey on MGNREGA. (July 2009 June 2011) Report 2. (Preliminary Report based on Visits 1, 2 and 3)

Survey on MGNREGA. (July 2009 June 2011) Report 2. (Preliminary Report based on Visits 1, 2 and 3) Survey on MGNREGA (July 2009 June 2011) Report 2 (Preliminary Report based on Visits 1, 2 and 3) National Sample Survey Office Ministry Statistics & Programme Implementation Government India March 2012

More information

Resettlement Planning Document. IND: Bihar State Highways Project Subproject: SH-74 (Hajipur Areraj)

Resettlement Planning Document. IND: Bihar State Highways Project Subproject: SH-74 (Hajipur Areraj) Resettlement Planning Document Resettlement Plan Document Stage: Updated Project Number: 41127 August 2008 IND: Bihar State Highways Project Subproject: SH-74 (Hajipur Areraj) Prepared by Road Construction

More information

ASIAN DEVELOPMENT BANK RESETTLEMENT PLAN. Subproject: SH-70 (Gaya to Rajauli)

ASIAN DEVELOPMENT BANK RESETTLEMENT PLAN. Subproject: SH-70 (Gaya to Rajauli) ASIAN DEVELOPMENT BANK RESETTLEMENT PLAN Subproject: SH-70 (Gaya to Rajauli) BIHAR STATE HIGHWAYS PROJECT ROAD CONSTRUCTION DEPARTMENT (RCD) GOVERNMENT OF BIHAR FEBRUARY 2008 TABLE OF CONTENTS ITEM Page

More information

Ras al Far'a village profile

Ras al Far'a village profile Ras al Far'a village profile Produced by The Applied Research Institute - Jerusalem In cooperation with Funded by February, 2006 This document has been produced with the financial assistance of the European

More information

Maharashtra State Development Report. xviii

Maharashtra State Development Report. xviii Tables Table 1.1: Growth rates in State Domestic Product in the Eighth and Ninth Plans and those Targeted in the Tenth Plan... 1 Table 1.2: Trends in Rates of Growth in Gross State Domestic Product at

More information

Education and Employment Status of Dalit women

Education and Employment Status of Dalit women Volume: ; No: ; November-0. pp -. ISSN: -39 Education and Employment Status of Dalit women S.Thaiyalnayaki PhD Research Scholar, Department of Economics, Annamalai University, Annamalai Nagar, India. Abstract

More information

Socio-economic Status of Scheduled Tribes in Visakhapatnam District of Andhra Pradesh

Socio-economic Status of Scheduled Tribes in Visakhapatnam District of Andhra Pradesh Socio-economic Status of Scheduled Tribes in Visakhapatnam District of Andhra Pradesh D. PULLA RAO Department of Economics, Andhra University, Visakhapatnam 530003, Andhra Pradesh E-mail: pullaraod_2003@yahoo.co.in

More information

A study to understand the saving pattern and credit needs of the tribal families of Maharashtra and Gujarat State of India

A study to understand the saving pattern and credit needs of the tribal families of Maharashtra and Gujarat State of India A study to understand the saving pattern and credit needs of the tribal families of Maharashtra and Gujarat State of India Abstract Veena Halwe BAIF Development Research Foundation Poor households face

More information

IMPACT OF NREGA ON AGRICULTURAL LABOUR FORCE IN THOOTHUKUDI DISTRICT INTERVIEW SCHEDULE. 1. Name of Beneficiary: Contact: 2. Village Name Village Code

IMPACT OF NREGA ON AGRICULTURAL LABOUR FORCE IN THOOTHUKUDI DISTRICT INTERVIEW SCHEDULE. 1. Name of Beneficiary: Contact: 2. Village Name Village Code IMPACT OF NREGA ON AGRICULTURAL LABOUR FORCE IN THOOTHUKUDI DISTRICT INTERVIEW SCHEDULE A. Primary Information 1. Name of Beneficiary: Contact: 2. Village Name Village Code 3. Ward Name Ward Code 4. Block

More information

Southern Punjab Poverty Alleviation Project (SPPAP)

Southern Punjab Poverty Alleviation Project (SPPAP) Southern Punjab Poverty Alleviation Project (SPPAP) Initial Impact of Community Revolving Funds for Agriculture Input Supply (CRFAIS) ~A Pilot Activity of SPPAP National Rural Support Programme (NRSP)

More information

ASIAN DEVELOPMENT BANK RESETTLEMENT PLAN. Subproject: SH-69 (Dumaria - Ranitalab)

ASIAN DEVELOPMENT BANK RESETTLEMENT PLAN. Subproject: SH-69 (Dumaria - Ranitalab) ASIAN DEVELOPMENT BANK RESETTLEMENT PLAN Subproject: SH-69 (Dumaria - Ranitalab) BIHAR STATE HIGHWAYS PROJECT ROAD CONSTRUCTION DEPARTMENT (RCD) GOVERNMENT OF BIHAR FEBRUARY 2008 TABLE OF CONTENTS ITEM

More information

BASELINE SURVEY OF MINORITY CONCENTRATION DISTRICT. Executive Summary of Leh District (Jammu and Kashmir)

BASELINE SURVEY OF MINORITY CONCENTRATION DISTRICT. Executive Summary of Leh District (Jammu and Kashmir) BASELINE SURVEY OF MINORITY CONCENTRATION DISTRICT Background: Executive Summary of Leh District (Jammu and Kashmir) The Ministry of Minority Affairs (GOI) has identified 90 minority concentrated backward

More information

Strategy beyond Twelfth Five Year Plan - Achievement of Sustainable Development Goals

Strategy beyond Twelfth Five Year Plan - Achievement of Sustainable Development Goals Strategy beyond Twelfth Five Year Plan - Achievement of Sustainable Development Goals Demographic Indicators Indicator Himachal Pradesh (Census 2011) All India Population (million) 6.8 1210 Decennial Growth

More information

Earthquake 2005 Recovery and Reconstruction

Earthquake 2005 Recovery and Reconstruction Earthquake 2005 Recovery and Reconstruction 2 Earthquake 8 Oct 2005 Nine Districts 1. MANSHERA 2. BATAGRAM 3. SHANGLA 4. ABBOTTABAD 5. KOHISTAN Epicentre 6. MUZAFFARABAD 7. NELUM 8. BAGH 9. RAWALAKOT Depth:

More information

A BRIEF NOTE ON THE IMPLEMENTATION OF NATIONAL RURAL EMPLOYMENT GUARANTEE SCHEME IN HIMACHAL PRADESH

A BRIEF NOTE ON THE IMPLEMENTATION OF NATIONAL RURAL EMPLOYMENT GUARANTEE SCHEME IN HIMACHAL PRADESH A BRIEF NOTE ON THE IMPLEMENTATION OF NATIONAL RURAL EMPLOYMENT GUARANTEE SCHEME IN HIMACHAL PRADESH NATIONAL RURAL EMPLOYMENT GUARANTEE SCHEME The National Rural Employment Guarantee Act was notified

More information

FUNDAMENTALS OF INSURANCE (PART-3) INSURANCE AS A SOCIAL SECURITY TOOL

FUNDAMENTALS OF INSURANCE (PART-3) INSURANCE AS A SOCIAL SECURITY TOOL FUNDAMENTALS OF INSURANCE (PART-3) INSURANCE AS A SOCIAL SECURITY TOOL 1. INTRODUCTION Hello students, welcome to the series on Fundamentals of Insurance. The topic of this lecture is insurance as a social

More information

1. Demographic Profile

1. Demographic Profile SVNIT Surat Ichchhanath Circle, Athwa, Surat, Gujrat- 395007 Select Village Mora Comment for Report Analysis Submit 1. Demographic Profile Total Household 119 Total Population 402 Gender Ratio 1051 Females

More information

Executive summary Siddharth Nagar

Executive summary Siddharth Nagar Executive summary Siddharth Nagar 1.1. Introduction: A Survey conducted by Centre Government highlighted the fact that as many as 90 districts, having minority concentration, are backward and of these

More information

UNITED REPUBLIC OF TANZANIA NATIONAL AGEING POLICY

UNITED REPUBLIC OF TANZANIA NATIONAL AGEING POLICY UNITED REPUBLIC OF TANZANIA NATIONAL AGEING POLICY MINISTRY OF LABOUR, YOUTH DEVELOPMENT AND SPORTS September, 2003 TABLE OF CONTENTS CHAPTER ONE PAGE 1. INTRODUCTION. 1 1.1 Concept and meaning of old

More information

CBMS Database / Repository Information Sheet B A N G L A D E S H 1

CBMS Database / Repository Information Sheet B A N G L A D E S H 1 CBMS Database / Repository Information Sheet B A N G L A D E S H 1 Project Title: Local Level Poverty Monitoring System: Process and Poverty Situation in Muhammadpur (West) Union of Daudkandi Upazila Administrative

More information

PROFILE OF THE STUDY AREA AND THE BORROWERS OF THE PRIORITY SECTOR LOANS IN HAVERI DISTRICT

PROFILE OF THE STUDY AREA AND THE BORROWERS OF THE PRIORITY SECTOR LOANS IN HAVERI DISTRICT Chapter-III PROFILE OF THE STUDY AREA AND THE BORROWERS OF THE PRIORITY SECTOR LOANS IN HAVERI DISTRICT The presentation in this chapter of the research study relates to providing of major socio-economic

More information

STEP 7. Before starting Step 7, you will have

STEP 7. Before starting Step 7, you will have STEP 7 Gap analysis Handing out mosquito nets in Bubulo village, Uganda Photo credit: Geoff Sayer/Oxfam Step 7 completes the gap-analysis strand. It should produce a final estimate of the total shortfall

More information

Planning, Budgeting and Financing

Planning, Budgeting and Financing English Version Planning, Budgeting and Financing Post-Disaster Recovery and Reconstruction Activities in Khammouane Province, Lao PDR Developed under the Khammouane Development Project (KDP), Implemented

More information

Fighting Hunger Worldwide

Fighting Hunger Worldwide WFP LEBANON FOOD SECURITY OUTCOME MONITORING ROUND 7: AUGUST Fighting Hunger Worldwide Highlights WFP assisted 665,996 displaced Syrians in August, of which 20 percent were female-headed and 65 percent

More information

Hawala cash transfers for food assistance and livelihood protection

Hawala cash transfers for food assistance and livelihood protection Afghanistan Hawala cash transfers for food assistance and livelihood protection EUROPEAN COMMISSION Humanitarian Aid and Civil Protection In response to repeated flooding, ACF implemented a cash-based

More information

DEPARTMENT OF LAND AFFAIRS

DEPARTMENT OF LAND AFFAIRS DEPARTMENT OF LAND AFFAIRS MONITORING AND EVALUATING THE QUALITY OF LIFE OF LAND REFORM BENEFICIARIES: 2000/2001 Technical Report prepared for the Department of Land Affairs, Directorate Monitoring and

More information

Executive Summary. Findings from Current Research

Executive Summary. Findings from Current Research Current State of Research on Social Inclusion in Asia and the Pacific: Focus on Ageing, Gender and Social Innovation (Background Paper for Senior Officials Meeting and the Forum of Ministers of Social

More information

Context/ Questions/ Methods/ Findings/ Policy Implications

Context/ Questions/ Methods/ Findings/ Policy Implications Built-In-Resilience: Learning from Grassroots Coping Strategies to Climate Variability Huraera Jabeen BRAC University, Bangladesh Adriana Allen University College London, UK Dr Cassidy Johnson University

More information

Climate Risk Insurance Models from India

Climate Risk Insurance Models from India Climate Risk Insurance Models from India Regional Dialogue on Climate Resilient Growth & Development Dhyanesh Bhatt 21 st Feb 2018 Agenda Crop insurance in India Guwahati city & Risk financing A case study

More information

Two Decades of Geographical Targeting in Food Distribution: Drawing Lessons from an Indian State

Two Decades of Geographical Targeting in Food Distribution: Drawing Lessons from an Indian State Global Conference on Prosperity, Equality and Sustainability Perspective and Policies for a Better World Two Decades of Geographical Targeting in Food Distribution: Drawing Lessons from an Indian State

More information

Role & Impact of Microfinance Institutions in Coastal Communities

Role & Impact of Microfinance Institutions in Coastal Communities Role & Impact of Microfinance Institutions in Coastal Communities Nikita Gopal & B. Meenakumari # Central Institute of Fisheries Technology (Indian Council of Agricultural Research) Matsyapuri P.O., Cochin

More information

1 - Organisation, functions and duties

1 - Organisation, functions and duties 1 - Organisation, functions and duties Introduction The Department of Economics and Statistics in Himachal Pradesh is functioning since the year 1955-56. The Directorate of Economics & Statistics came

More information

Policy Implementation for Enhancing Community. Resilience in Malawi

Policy Implementation for Enhancing Community. Resilience in Malawi Volume 10 Issue 1 May 2014 Status of Policy Implementation for Enhancing Community Resilience in Malawi Policy Brief ECRP and DISCOVER Disclaimer This policy brief has been financed by United Kingdom (UK)

More information

MFF - Bihar Urban Development Investment Program (Facility Concept)

MFF - Bihar Urban Development Investment Program (Facility Concept) India: MFF - Bihar Urban Development Investment Program (Facility Concept) Project Name Project Number 41603-013 Country Project Status Project Type / Modality of Assistance Source of Funding / Amount

More information

Lecture No.7. Economies of scale - external and internal economies and diseconomies -

Lecture No.7. Economies of scale - external and internal economies and diseconomies - Lecture No.7. Economies of scale - external and internal economies and diseconomies - Returns to scale - Economies of size e. Minimum Loss Principle There can be two decision situations: ) when selling

More information

F.NO. MINISTRY OF HOME AFFAIRS (OFFICE OF REGISTRAR GENERAL, INDIA) NOTIFICATION NEW DELHI, THE JUNE, 2011

F.NO. MINISTRY OF HOME AFFAIRS (OFFICE OF REGISTRAR GENERAL, INDIA) NOTIFICATION NEW DELHI, THE JUNE, 2011 F.NO. MINISTRY OF HOME AFFAIRS (OFFICE OF REGISTRAR GENERAL, INDIA) NOTIFICATION NEW DELHI, THE JUNE, 2011 The Central Government has decided to conduct the Socio Economic and Caste Census in the year

More information

A Level Satisfaction about Usefulness of NREGS Among the Villagers Paper ID IJIFR/V4/ E6/ 027 Page No Subject Area Commerce

A Level Satisfaction about Usefulness of NREGS Among the Villagers Paper ID IJIFR/V4/ E6/ 027 Page No Subject Area Commerce www.ijifr.com Volume 4 Issue 6 February 2017 International Journal of Informative & Futuristic Research A Level Satisfaction about Usefulness of NREGS Among the Villagers Paper ID IJIFR/V4/ E6/ 027 Page

More information

Empowerment and Microfinance: A socioeconomic study of female garment workers in Dhaka City

Empowerment and Microfinance: A socioeconomic study of female garment workers in Dhaka City J. Bangladesh Agril. Univ. 11(1): 125 132, 23 ISSN 183030 Empowerment and Microfinance: A socioeconomic study of female garment workers in Dhaka City M. A. Rahman*, M. Khatun, Z. Tasnim and N. Islam Department

More information

TERMS OF REFERENCE EXTERNAL EVALUATION OF UNICEF S CASH TRANSFER PROJECT IN NIGER SEPTEMBER 2010

TERMS OF REFERENCE EXTERNAL EVALUATION OF UNICEF S CASH TRANSFER PROJECT IN NIGER SEPTEMBER 2010 TERMS OF REFERENCE EXTERNAL EVALUATION OF UNICEF S CASH TRANSFER PROJECT IN NIGER SEPTEMBER 2010 I. Background Following poor crops in 2009-2010 in Niger, the vulnerability survey conducted in April 2010

More information

Tracking Government Investments for Nutrition at Country Level Patrizia Fracassi, Clara Picanyol, 03 rd July 2014

Tracking Government Investments for Nutrition at Country Level Patrizia Fracassi, Clara Picanyol, 03 rd July 2014 Tracking Government Investments for Nutrition at Country Level Patrizia Fracassi, Clara Picanyol, 03 rd July 2014 1. Introduction Having reliable data is essential to policy makers to prioritise, to plan,

More information

Performance of MGNREGA in Andhra Pradesh

Performance of MGNREGA in Andhra Pradesh International Journal of Humanities and Social Science Invention ISSN (Online): 2319 7722, ISSN (Print): 2319 7714 Volume 4 Issue 4 April. 2015 PP.22-27 Performance of MGNREGA in Andhra Pradesh Dr.K.Padma

More information

The Bill of National Commission for Enterprises in the Unorganised Sector, 2006

The Bill of National Commission for Enterprises in the Unorganised Sector, 2006 The Bill of National Commission for Enterprises in the Unorganised Sector, 2006 UNORGANISED SECTOR WORKERS (EMPLOYMENT AND WELFARE) BILL The Bill submitted by NCEUS in the year 2006 for the social security

More information

Kh ar Ras al Ahmar Profile

Kh ar Ras al Ahmar Profile Kh ar Ras al Ahmar Profile Produced by The Applied Research Institute - Jerusalem In cooperation with Funded by February, 2006 This document has been produced with the financial assistance of the European

More information

MAHATMA GANDHI NATIONAL RURAL EMPLOYMENT GUARANTEE ACT (MGNREGA): A TOOL FOR EMPLOYMENT GENERATION

MAHATMA GANDHI NATIONAL RURAL EMPLOYMENT GUARANTEE ACT (MGNREGA): A TOOL FOR EMPLOYMENT GENERATION DOI: 10.3126/ijssm.v3i4.15974 Research Article MAHATMA GANDHI NATIONAL RURAL EMPLOYMENT GUARANTEE ACT (MGNREGA): A TOOL FOR EMPLOYMENT GENERATION Lamaan Sami* and Anas Khan Department of Commerce, Aligarh

More information

PRODUCTIVE SECTOR COMMERCE PDNA GUIDELINES VOLUME B

PRODUCTIVE SECTOR COMMERCE PDNA GUIDELINES VOLUME B PRODUCTIVE SECTOR COMMERCE PDNA GUIDELINES VOLUME B 2 COMMERCE CONTENTS n INTRODUCTION 2 n ASSESSMENT PROCESS 3 n PRE-DISASTER SITUATION 4 n FIELD VISITS FOR POST-DISASTER DATA COLLECTION 5 n ESTIMATION

More information

Impact of MGNREGA on Rural Employment and Migration: A Study in Agriculturally-backward and Agriculturally-advanced Districts of Haryana

Impact of MGNREGA on Rural Employment and Migration: A Study in Agriculturally-backward and Agriculturally-advanced Districts of Haryana Agricultural Economics Research Review Vol. 24 (Conference Number) 2011 pp 495-502 Impact of MGNREGA on Rural Employment and Migration: A Study in Agriculturally-backward and Agriculturally-advanced Districts

More information

NATIONWIDE EVALUATION OF THE FLAGSHIP PROGRAMME OF MAHATMA GANDHI NATIONAL RURAL EMPLOYMENT GUARANTEE ACT (MGNREGA)

NATIONWIDE EVALUATION OF THE FLAGSHIP PROGRAMME OF MAHATMA GANDHI NATIONAL RURAL EMPLOYMENT GUARANTEE ACT (MGNREGA) A REPORT ON NATIONWIDE EVALUATION OF THE FLAGSHIP PROGRAMME OF MAHATMA GANDHI NATIONAL RURAL EMPLOYMENT GUARANTEE ACT (MGNREGA) 0 Evaluating Agencies Academy of Management Studies; Awadh Research Foundation;

More information

Evaluating the Mchinji Social Cash Transfer Pilot

Evaluating the Mchinji Social Cash Transfer Pilot Evaluating the Mchinji Social Cash Transfer Pilot Dr. Candace Miller Center for International Health and Development Boston University & Maxton Tsoka Centre for Social Research University of Malawi Benefits

More information

GOVERNMENT OF KARNATAKA

GOVERNMENT OF KARNATAKA Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized GOVERNMENT OF KARNATAKA Karnataka Urban Water Supply Modernization Project (KUWSMP) RESETTLEMENT

More information

Delhi Development Report

Delhi Development Report Delhi Development Report PLANNING COMMISSION GOVERNMENT OF INDIA NEW DELHI Published by ACADEMIC FOUNDATION NEW DELHI '&.' " ': Contents o The Core Committee, including Partner Agencies and Project Team

More information

RESULTS OF THE KOSOVO 2015 LABOUR FORCE SURVEY JUNE Public Disclosure Authorized. Public Disclosure Authorized. Public Disclosure Authorized

RESULTS OF THE KOSOVO 2015 LABOUR FORCE SURVEY JUNE Public Disclosure Authorized. Public Disclosure Authorized. Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized RESULTS OF THE KOSOVO 2015 LABOUR FORCE SURVEY JUNE 2016 Kosovo Agency of Statistics

More information

BEST PRACTICES ON LABOUR MARKET INFORMATION IN INDIA. Debasish Chaudhuri, Deputy Director General, Ministry of Labour and Employment

BEST PRACTICES ON LABOUR MARKET INFORMATION IN INDIA. Debasish Chaudhuri, Deputy Director General, Ministry of Labour and Employment BEST PRACTICES ON LABOUR MARKET INFORMATION IN INDIA Debasish Chaudhuri, Deputy Director General, Ministry of Labour and Employment 1 Labour & Employment Statistics as components of Labour Market Information

More information

Lok Manch: Development and Access to Entitlements of the Marginalised National Report Card

Lok Manch: Development and Access to Entitlements of the Marginalised National Report Card Lok Manch Lok Manch: Development and Access to Entitlements of the Marginalised National Report Card Lok Manch (People s Forum) is envisioned as a movement of and by the dalits, adivasis, women, minorities,

More information

India s Support System for Elderly Myths and Realities

India s Support System for Elderly Myths and Realities India s Support System for Elderly Myths and Realities K S James Institute for Social and Economic Change Bangalore, India AGEING IN ASIA-PACIFIC: Balancing the State and the Family 20TH BIENNIAL GENERAL

More information

COMMUNITY SURVEY FOR LAKE BLUFF SCHOOL DISTRICT 65

COMMUNITY SURVEY FOR LAKE BLUFF SCHOOL DISTRICT 65 COMMUNITY SURVEY FOR LAKE BLUFF SCHOOL DISTRICT 65 JANUARY 16, 2018 PRESENTATION aqity Research & Insights Evanston, IL 1 Methods Research Methods Research findings based on a community survey with n=379

More information

Gram Panchayat Development Plan(GPDP) Ministry of Panchayati Raj

Gram Panchayat Development Plan(GPDP) Ministry of Panchayati Raj Gram Panchayat Development Plan(GPDP) Ministry of Panchayati Raj 1 Panchayat Statistics Avg. population per GP National Average population per GP: 3,416 No. of PRIs in the country : 2,56,103 No. of Gram

More information

SIB Reasoning and computer questions with answers

SIB Reasoning and computer questions with answers SIB Reasoning and computer questions with answers Reasoning & Computer Competency Directions (1 5) : Study the following information carefully and answer he given questions: Eight friends P, Q, R, S, T,

More information

Socio-Economic Status Of Rural Families: With Special Reference To BPL Households Of Pauri District Of Uttarakhand

Socio-Economic Status Of Rural Families: With Special Reference To BPL Households Of Pauri District Of Uttarakhand IOSR Journal Of Humanities And Social Science (IOSR-JHSS) Volume 22, Issue 6, Ver. 2 (June. 2017) PP 16-20 e-issn: 2279-0837, p-issn: 2279-0845. www.iosrjournals.org Socio-Economic Status Of Rural Families:

More information

COMPENSATION, ASSISTANCE AND RESETTLEMENT POLICY PROPOSED FOR

COMPENSATION, ASSISTANCE AND RESETTLEMENT POLICY PROPOSED FOR Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized DIRECTORATE FOR ROADS OF VIETNAM PROJECT MANAGEMENT UNIT 3 ================= COMPENSATION,

More information

A DOSSIER: BILLS ON UNORGANISED WORKERS

A DOSSIER: BILLS ON UNORGANISED WORKERS The Bill Proposed by National Commission for Enterprises in the Unorganised Sector 2005, which was discussed at Indian Labour Conference, December 2005 UNORGANISED SECTOR WORKERS (CONDITIONS OF WORK &

More information

Protec on Risk Analysis

Protec on Risk Analysis Protec on Risk Analysis Associated with food distribu on North Waziristan Agency IDPs response October, 2014 This document has been produced and released by the Vulnerability Analysis and Mapping (VAM)

More information

TRIAGE STATEMENT GUIDE

TRIAGE STATEMENT GUIDE TRIAGE STATEMENT GUIDE The Triage Statement As part of the Government of Canada s regulatory policy, the Cabinet Directive on Streamlining Regulation (CDSR), regulatory proposals will be assessed at an

More information

Skardu, Pakistan. Local progress report on the implementation of the 10 Essentials for Making Cities Resilient (First Cycle)

Skardu, Pakistan. Local progress report on the implementation of the 10 Essentials for Making Cities Resilient (First Cycle) Skardu, Pakistan Local progress report on the implementation of the 10 Essentials for Making Cities Resilient (First Cycle) Name of focal point: Habib Mughal Organization: UN-HABITAT - Pakistan Title/Position:

More information

Government of Bihar welcomes. Sri M.S. Ahluwalia Deputy Chairman Planning Commission 18 th November 2009

Government of Bihar welcomes. Sri M.S. Ahluwalia Deputy Chairman Planning Commission 18 th November 2009 Government of Bihar welcomes Sri M.S. Ahluwalia Deputy Chairman Planning Commission 18 th November 2009 Presentation Format Plan Expenditure Per Capita Development Expenditure Annual Plan 2009-10 Brief

More information

Republic of Uzbekistan Project «Construction of new electrified railway Angren-Pap» World Bank SJSRWC «UzbekistonTemirYullari»

Republic of Uzbekistan Project «Construction of new electrified railway Angren-Pap» World Bank SJSRWC «UzbekistonTemirYullari» Republic of Uzbekistan SFG1338 v2 Project «Construction of new electrified railway Angren-Pap» World Bank SJSRWC «UzbekistonTemirYullari» Livelihood Restoration Plan for Persons Affected by Project Public

More information

An Evaluation of Rural Social Service Programme of the Government of Bangladesh

An Evaluation of Rural Social Service Programme of the Government of Bangladesh An Evaluation of Rural Social Service Programme of the Government of Bangladesh M Harunur Rashid Bhuyan Sharifa Begum S M Zahedul Islam Chowdhury Maruf Ahmed December 6, 2017 Introduction Outline of the

More information

How the Irish pension system provides for current retirees. The Irish pension system:

How the Irish pension system provides for current retirees. The Irish pension system: How the Irish system provides for current retirees Jonathan Briody 1 Introduction This note examines the data from The Irish Longitudinal Study on Ageing (TILDA) 2 in relation to the incomes of the current

More information

CONSTITUENCY PROFILE: DUBLIN SOUTH-WEST

CONSTITUENCY PROFILE: DUBLIN SOUTH-WEST CONSTITUENCY PROFILE: DUBLIN SOUTH-WEST CONTENTS Introduction 2 Glossary 3 Demographics 4 Families 8 Education 10 Employment 12 Households and housing 16 Voting and turnout 20 This profile is based on

More information

Two cases: Naga City Hangberg, Cape Town

Two cases: Naga City Hangberg, Cape Town PMapping and PGIS for Participatory Hazard-Risk Management (CRA) M.K. McCall, ITC, Enschede Use of GIS and RS in Disaster Risk Management APDC ITC AIT Bangkok, May 2008 Two cases: Naga City Hangberg, Cape

More information

THE CAYMAN ISLANDS LABOUR FORCE SURVEY REPORT SPRING 2017

THE CAYMAN ISLANDS LABOUR FORCE SURVEY REPORT SPRING 2017 THE CAYMAN ISLANDS LABOUR FORCE SURVEY REPORT SPRING 2017 Published AUGUST 2017 Economics and Statistics Office i CONTENTS SUMMARY TABLE 1: KEY LABOUR FORCE INDICATORS BY STATUS... 1 SUMMARY TABLE 2: KEY

More information

Vulnerability of Norwegian Municipalities to Natural Hazards

Vulnerability of Norwegian Municipalities to Natural Hazards Vulnerability of Norwegian Municipalities to Natural Hazards Trondheim Ivar S. Holand PhD Research Fellow Department of Geography, Norwegian university of Science and Technology (NTNU), Norway Ivar.S.Holand@hint.no

More information

SEZs in Mangalore: Preliminary findings CASUMM 1 January 2007

SEZs in Mangalore: Preliminary findings CASUMM 1 January 2007 SEZs in Mangalore: Preliminary findings CASUMM 1 January 2007 Background details on Special Economic Zones in Mangalore I. One SEZ called Mangalore SEZ (MSEZ) is planned at a distance of only 12 km from

More information

Nemat Khuduzade, Deputy Head Labour Statistics Department, SSC of Azerbaijan

Nemat Khuduzade, Deputy Head Labour Statistics Department, SSC of Azerbaijan Decent Work Situation and Overview of the Labour Force Survey in Azerbaijan and New Opportunities with the implementation of the 19 th ICLS Resolution concerning statistics of work, employment and labour

More information

GLOSSARY. 1 Crop Cutting Experiments

GLOSSARY. 1 Crop Cutting Experiments GLOSSARY 1 Crop Cutting Experiments Crop Cutting experiments are carried out on all important crops for the purpose of General Crop Estimation Surveys. The same yield data is used for purpose of calculation

More information

More Data Regarding District Planning Office, Keonjhar

More Data Regarding District Planning Office, Keonjhar More Data Regarding District Planning Office, Keonjhar Block Profile Champua - Total geographical area sq. K.MS 478.475 Total agricultural Land Unit 27,004 Total irrigated area Ha 4621 Total Nos. of G.Ps

More information

Market Research Findings Kriti Social Initiatives

Market Research Findings Kriti Social Initiatives Market Research Findings Social Initiatives May 23, 2009 Focus group discussions Summary of findings Qualitative Research 5 focus group discussions in Yellammabanda and Film Nagar, in March April 2009.

More information

Introduction. Poverty

Introduction. Poverty Unit 4 Poverty Introduction In previous chapters, you have studied the economic policies that India has taken in the last five and a half decades and the outcome of these policies with relation to the

More information

APPENDIX AN ANALYSIS OF FARMERS SUICIDES IN RURAL PUNJAB SCHEDULE

APPENDIX AN ANALYSIS OF FARMERS SUICIDES IN RURAL PUNJAB SCHEDULE APPENDIX AN ANALYSIS OF FARMERS SUICIDES IN RURAL PUNJAB SCHEDULE 1. Village :- Block:- Tehsil: District:- 2. Name of the farmer who committed suicide:- 3. Name of the respondent:- 4. Father s name:- 5.

More information

Sustainable Recovery and Reconstruction Framework (SURRF)

Sustainable Recovery and Reconstruction Framework (SURRF) Sustainable Recovery and Reconstruction Framework (SURRF) Saroj Kumar Jha Program Manager Global Facility for Disaster Reduction and Recovery The World Bank Group, Washington DC 1 The definitional challenge

More information

Final Evaluation & Outcome Assessment of Promotion of Sustainable Agriculture for Nutrition and Food Security (POSAN FS) Project

Final Evaluation & Outcome Assessment of Promotion of Sustainable Agriculture for Nutrition and Food Security (POSAN FS) Project Terms of Reference (TOR) For Final Evaluation & Outcome Assessment of Promotion of Sustainable Agriculture for Nutrition and Food Security (POSAN FS) Project Re-circulation date: 11/01/ Closing date: 18/01/

More information

CRMP DEMOGRAPHIC PROFILE 2018

CRMP DEMOGRAPHIC PROFILE 2018 COMMUNITY RISK MANAGEMENT PLAN 2014-2020 Mid-Point Review 2017-18 CRMP DEMOGRAPHIC PROFILE 2018 CRMP Demographic Profile 2018 Contents 1. Introduction 3 2. Population 4 3. Age and Sex 6 4. Ethnicity 8

More information

COMMUNITY QUESTIONNAIRE 2012

COMMUNITY QUESTIONNAIRE 2012 CLUSTER ID REPUBLIC OF ZAMBIA MINISTRY OF COMMUNITY DEVELOPMENT, MOTHER AND CHILD HEALTH Child Grant 24 Month Follow-up Survey in Kalabo, Kaputa and Shang ombo Districts IDENTIFICATION PARTICULARS 1. CONSTITUENCY

More information

CHAPTER I INTRODUCTION AND DESIGN OF THE STUDY

CHAPTER I INTRODUCTION AND DESIGN OF THE STUDY CHAPTER I INTRODUCTION AND DESIGN OF THE STUDY 1.1 INTRODUCTION Labour in economics refers to all the physical and mental exertions of people in the expectation of a reward. This implies that labour rendered

More information

A STUDY ON COMMUNITY INVESTMENT FUND IN ANDHRA PRADERSH

A STUDY ON COMMUNITY INVESTMENT FUND IN ANDHRA PRADERSH A STUDY ON COMMUNITY INVESTMENT FUND IN ANDHRA PRADERSH APMAS Presentation by Dr. K. Raja Reddy, krajareddy@apmas.org 1 OBJECTIVIES OF THE STUDY To understand the socio-economic profile of the CIF beneficiaries

More information

MIMAP-Nepal Poverty and Development Monitoring System & Decentralized Planning in Nepal

MIMAP-Nepal Poverty and Development Monitoring System & Decentralized Planning in Nepal MIMAP-Nepal Poverty Monitoring System & Decentralized Planning in Nepal Shiva Sharma (MIMAP-Nepal Team Leader) National Labour Academy-Nepal Anamnagar, Kathmu Phone: 977-1-268076, Fax: 977-1-248073 Email:

More information

AWARENESS OF FINANCIAL INCLUSION ON TRIBAL PEOPLE IN DHARMAPURI DISTRICT

AWARENESS OF FINANCIAL INCLUSION ON TRIBAL PEOPLE IN DHARMAPURI DISTRICT AWARENESS OF FINANCIAL INCLUSION ON TRIBAL PEOPLE IN DHARMAPURI DISTRICT Mr. C. ANNAMALAI Ph.D Research Scholar, Department of Commerce, Annamalai University, Annamalainagar, Chidambaram, Tamil Nadu. Dr.

More information

Odisha State Action Plan on Climate Change (A Review with Special focus on women and children)

Odisha State Action Plan on Climate Change (A Review with Special focus on women and children) Background Odisha State Action Plan on Climate Change (A Review with Special focus on women and children) Climate change is now a global phenomenon and its impact on livelihood, health and wellbeing and

More information

Community-Based SME For Road Maintenance

Community-Based SME For Road Maintenance Community-Based SME For Road Maintenance Insights from the W.B and IADB-Peruvian Rural Roads maintenance contracts Project & Poverty Reduction Presented by Jacob Greenstein (EGAT) Scope of Presentation

More information

Resettlement Plan. India: National Capital Region Urban Infrastructure Financing Facility Project 1 - Bahadurgarh-Badli Road

Resettlement Plan. India: National Capital Region Urban Infrastructure Financing Facility Project 1 - Bahadurgarh-Badli Road Resettlement Plan Document Stage: Draft Project Number: 41598 September 2013 India: National Capital Region Urban Infrastructure Financing Facility Project 1 - Bahadurgarh-Badli Road Prepared by the Haryana

More information

Terms of Reference. Impact Assessment Study of

Terms of Reference. Impact Assessment Study of Terms of Reference For Impact Assessment Study of Partnership in Climate Services for Resilient Agriculture in India (PCSRA) ToR No: ABC122019XYZ Dated: 31-1-2019 Partnership in Climate Services for Resilient

More information

Are embankments a good floodcontrol strategy? A case study of the Kosi river. E. Somanathan Indian Statistical Institute, Delhi

Are embankments a good floodcontrol strategy? A case study of the Kosi river. E. Somanathan Indian Statistical Institute, Delhi Are embankments a good floodcontrol strategy? A case study of the Kosi river E. Somanathan Indian Statistical Institute, Delhi Background Between 1736 and 1950, the Kosi shifted its course westwards across

More information

Study Report on Rice Credit Line in Guntur District: Andhra Pradesh

Study Report on Rice Credit Line in Guntur District: Andhra Pradesh Study Report on Rice Credit Line in Guntur District: Andhra Pradesh In keeping with the development commitment of the state and as envisaged in Swarnandhra Pradesh ' Vision 2020 ' policy document, Andhra

More information

Banking Awareness of The Residents in The Present Financial Inclusion ERA in Nagapattinam District, Tamil Nadu

Banking Awareness of The Residents in The Present Financial Inclusion ERA in Nagapattinam District, Tamil Nadu Banking Awareness of The Residents in The Present Financial Inclusion ERA in Nagapattinam District, Tamil Nadu Dr. S. Rajaswaminathan Guest Faculty, Department of Commerce School of Management, Pondicherry

More information

GUJARAT EARTHQUAKE 2001?

GUJARAT EARTHQUAKE 2001? WHAT HAS CHANGED AFTER GUJARAT EARTHQUAKE 2001? Presented by V. Thiruppugazh Joint Chief Executive Officer Gujarat State Disaster Management Authority Government of Gujarat HAVOC AND DEVASTATION 26 January

More information

Health Policies for Vulnerable Groups Case Study of Egypt

Health Policies for Vulnerable Groups Case Study of Egypt Health Policies for Vulnerable Groups Case Study of Egypt Omkolthoum A. Mogheith, MBA, MPP American University in Cairo New Cairo Campus, AUC Avenue, P.O. Box 74, New Cairo 11835, Egypt +20 100 35 14 183

More information

ECONOMIC AND FINANCIAL ANALYSIS

ECONOMIC AND FINANCIAL ANALYSIS Bihar New Ganga Bridge Project (RRP IND 48373) ECONOMIC AND FINANCIAL ANALYSIS A. Introduction 1. The proposed project is to build a new six-lane bridge across the Ganges River near Patna in the state

More information

J. D. Kennedy, M.C.I.P., R.P.P. C. A. Tyrrell, M.C.I.P., R.P.P. Associate

J. D. Kennedy, M.C.I.P., R.P.P. C. A. Tyrrell, M.C.I.P., R.P.P. Associate MARSHALL MACKLIN MONAGHAN LIMITED 80 COMMERCE VALLEY DR. EAST THORNHILL, ONTARIO L3T 7N4 TEL: (905) 882-1100 FAX: (905) 882-0055 EMAIL: mmm@mmm.ca WEB SITE: www.mmm.ca January 6, 2004 File No. 14.02138.01.P01

More information