PROJECT BUDGET REVISION FOR APPROVAL BY THE REGIONAL DIRECTOR

Size: px
Start display at page:

Download "PROJECT BUDGET REVISION FOR APPROVAL BY THE REGIONAL DIRECTOR"

Transcription

1 PROJECT BUDGET REVISION FOR APPROVAL BY THE REGIONAL DIRECTOR 5) To: Initials In Date Out Date Reason for Delay David Kaatrud, Regional Director 4) Through: Initials In Date Out Date Reason for Delay Peter Guest, Senior Programme Adviser, RB 3) Through: Initials In Date Out Date Reason for Delay Logistic Officer, RB 2) Through: Initials In Date Out Date Reason for Delay Resource Management Analyst, RB 1) From: Brenda Barton Initials In Date Out Date Reason for Delay Country Office Sri Lanka, EMOP BR No. 1 Total revised number of beneficiaries 100,000 Duration of entire project 7 months Extension / Reduction period 1 month extension Gender marker code 2A WFP food tonnage 22.5 mt Start date: 15/04/2017 End date: 15/10/2017 Extension Period: One Month New end date: 15/11/2017 Cost (United States dollars) Current Budget Increase (Decrease) Revised Budget Food and Related Costs US$ - US$ 24,413 US$ 24,413 Cash and Vouchers and Related Costs US$ 2,437,500 US$ 2,430,000 US$ 4,867,500 Capacity Development & Augmentation US$ - US$ - US$ DSC US$ 459,183 US$ - US$ 459,183 ISC US$ 202,768 US$ 171,809 US$ 374,577 Total cost to WFP US$ 3,099,451 US$ 2,626,221 US$ 5,725,672 CHANGES TO: Food Tool C&V Tool Project Rates MT C&V Transfers CD&A LTSH ($/MT) Commodity Value C&V Related Costs DSC ODOC ($/MT) External Transport Project duration C&V Related (%) LTSH Other DSC (%) ODOC

2 NATURE OF THE INCREASE 1. This budget revision will increase the current food assistance for disaster struck Sri Lankans to include households affected by the May 2017 floods. The floods were spread across 5 major river basins and have affected approximately 620,000 people, resulting in 202 deaths and the destruction of thousands of houses. A total of 382 temporary camps have been set up to provide temporary accommodation to over 80,000 people. The floods occurred in the southwest of the country and constitute the worst flooding since Meanwhile drought conditions continue in the north and eastern part of the country. 2. Under this budget revision, an additional 75,000 beneficiaries (36,000 male and 39,000 female) will be reached using the EMOP cash-based modality, whereby an immediate cash transfer is channelled through the existing Samurdhi social safety net programme. The monthly transfer value (USD 65 per household) will remain unchanged. Assistance will be provided for a period of two months for a total transfer value of USD 130 per beneficiary household. An additional one-off distribution of pulses (lentils) to all beneficiaries in camps aims to provide variety and added nutrition to the cooked meals already being provided by the Ministry of Disaster Management (MDM). 3. LTSH will be managed by the Ministry of Disaster Management who will facilitate the transport of the pulses to the temporary camps and oversee distribution of the rations by district governments. 4. The EMOP monitoring framework EMOP will be applied to the additional flood-affected households, including a baseline survey and monthly process and outcome monitoring. 5. The total increase in cost of the emergency operation will be USD 2,626,221, including USD 2,430,000 for C&V and USD 24,413 for in-kind food. No additional DSC will be applied as operational costs will be covered under the current budget. JUSTIFICATION FOR THE REVISION Summary of existing project activities 1. Towards the end of 2016 and at the beginning of 2017, Sri Lanka experienced the worst drought in 40 years, affecting most parts of the country and particularly the north-west. The total cumulative rainfall received during 2016 was below normal and failed to bring enough rainfall in the wet and dry zones of the country. As a result, the March 2017 Maha harvest was less than 50 percent of normal production. A joint impact assessment showed that 900,000 people suffered from food insecurity. The assessment also found that poor food consumption was twice as likely to occur in female-headed as in male-headed households. Loss of income led to increased levels of debt among the poor, and diminished the seed-base of paddy in the country for subsequent plantings. The 2017 May-September season harvest is also expected to be only around 50 percent of the average. 2. Based on findings from the joint drought assessment, 25,000 people (6,250 households) in the four worst drought affected districts were determined to be severely food insecure and in need of urgent food assistance.

3 3. Each beneficiary household of four members (the average family size in Sri Lanka) will receive USD 65 per month as unrestricted cash assistance, equivalent to approximately Rs 10,000. The cash transfer value per household was set in line with government standards during the drought assistance. It is based on current market prices for a basic emergency food basket of rice, lentils, oil and vegetables satisfying the daily nutrition and minimum energy requirement of 2,100 kcal per person and per day. 4. Targeting of beneficiaries will be done in several steps. The initial step will use the Samurdhi beneficiary database to filter categories of the most vulnerable households registered in the target districts. The shortlist of vulnerable households will be further reviewed by Division level committees consisting of local Samurdhi officers, disaster response officers, village officer and community leaders, village representatives and members from welfare societies. These committees will review the target list to verify and validate that households meet the vulnerability criteria and ensure that only those who are landless paddy farmers or casual labourers are selected. Women will equally participate in the decision-making committees and on the targeting list. 5. Funds will be transferred to the targeted households via the Treasury according to national regulation through local governments and to the Samurdhi banking system, which has some 1,075 community development banks nation-wide. All Samurdhi beneficiaries have accounts with this community development banking network. 6. In addition, WFP is working with the government to set up a vulnerability analysis system to continuously assess the impact of the drought during the coming year, using a combination of remote sensing data, field data collection and mobile phone surveying techniques (mvam). The vulnerability analysis system will be operated by the Disaster Management Center of the Ministry of Disaster Management with whom WFP is also engaged for institutionalizing a 72 hours assessment approach. Conclusion and recommendation of the re-assessment. 7. During 25 th -26 th May the monsoon season hit the southern districts of the country in full force, causing severe flooding and landslides in 5 river basins, affecting 15 districts across the south and east of the country. More than 200 people are reported to have died and estimated 620,000 people (approximately 315,000 men and 305,000 women) were displaced. Rain continued intermittently over the following three days, leaving people stranded and cut off from both road and river access. Two major towns were completely inundated, over 8,000 houses were destroyed or damaged, and roads throughout the affected area were washed out. Landslides continued to occur throughout the week, further damaging villages and forcing people who had evacuated high-risk areas to seek shelter in the temporary safety shelter. According to the latest assessment, 93 people remain missing and up to 80,000 people have sought shelter in temporary camps. Flooding of this extent, in the most affected districts, has not been witnessed since A map of the impact is attached as Annex Immediately following the flood event, a preliminary assessment was carried out using the 72- hour assessment approach with the Ministry of Disaster Management. Estimates derived from the latest assessment indicate that out of the total of 1.1 million impacted up to 75,000 people are in most urgent need of assistance.

4 9. Despite these floods, little or no rain has fallen in the drought affected northern districts, resulting in a situation of extreme weather events impacting vulnerable households and damaging livelihood assets across both the north and south of Sri Lanka. A follow-up mvam assessment of the drought situation is currently being planned. Until then the food security needs remain as initially calculated. There is no change in the assistance being given to drought affected households under this budget revision. Purpose of change in project duration and budget increase. 10. The purpose of the budget revision is to expand the existing Emergency Operation to reach flood-affected people through a combination of cash-based and in-kind assistance. Requests for assistance from the Ministry of Foreign Affairs have been formally delivered to WFP and the Resident Coordinator s Office. 11. An immediate one-off in-kind ration of pulses will be provided across nine of the most affected districts to people taking refuge in the camps that have been set up and are being operated by the district governments. Daily meals are provided by the government but the Ministry of Disaster Management has express a strong need for immediate food assistance in order to enhance the minimal cooked meals that are being provided. A written requests has been made to WFP for this purpose. The supply of pulses will cover a portion of the basic food basket with 100g rations for 75,000 people for three days. 12. Protection concerns are high in the temporary camp settings, and reports of gender-based violence (GBV) and child protection issues have been raised in similar previous emergencies. Blanket supply of additional food to camp inhabitants will help ensure all beneficiaries have access to some kind of food all the time at the time of greatest need. People are expected to return to their homes within two weeks after the flood as waters recede and road access is reestablished. 13. Cash-based assistance will be provided to vulnerable, food insecure households who have lost homes or livelihoods or are at risk of food insecurity. Assistance will be target towards the Priority One GNs (GN is the lowest administrative level area in Sri Lanka) as identified in the 72-hours assessment conducted by the DMC with support from WFP in the four worst affected districts of Matara, Ratnapura, Kalutara, and Galle (these districts do not overlap with those under the drought response) and will cover 75,000 people, approximately 6% of the total affected population as identified by the rapid assessment. The monthly household ration will be approximately $65 for two months. The targeting of beneficiaries will be facilitated to the extent possible through the government social safety net programme, Samurdhi. Gender concerns for needs of beneficiaries that are already identified under the EMOP are also applicable for the flood affected caseload, as female-headed households are more likely to face difficulty re-establishing livelihoods and encounter greater labour market discrimination. 14. In order to reach the new beneficiary caseload for a two-month period, a one month project extension will be required. 15. The Ministry Social Empowerment and Welfare (MSEW) will continue to be the direct government partner for the implementation of the operation. The Ministry of National Policies and Economic Affairs remains WFP s designated interlocutor for the government and is also participating in the oversight and coordination of the flood response.

5 16. The extension of the EMOP with this additional caseload and in additional geographical areas will continue to seek to improve the capacity of the Samurdhi social safety net scheme to operate as a shock responsive safety net. Opportunities will be sought to improve efficiencies in transfer processes as well as to strengthen partnerships for identifying and targeting vulnerable households through the social safety net scheme. TABLE 1: BENEFICIARIES BY ACTIVITY Activity Category of beneficiaries Current Increase Revised Emergency CBT One round emergency in-kind assistance Boys / Men Girls / Women Total Boys / Men Girls / Women Total Boys / Men Girls / Women Total 12,250 12,750 25,000 36,000 39,000 75,000 48,250 51, , ,000 39,000 75,000 36,000 39,000 75,000 TOTAL 12,250 12,750 25,000 36,000 39,000 75,000 48,250 51, , Describe the changes in modalities of food/cash transfer to beneficiaries (if applicable). TABLE 2: REVISED DAILY FOOD RATION/TRANSFER BY ACTIVITY (g/person/day) Activity 1 Activity 2 Dhal Cash/voucher (US$/person/day) TOTAL Revised duration 0.54 Revised Total kcal/day 338 % kcal from protein 33.3% % kcal from fat 2.7% Number of feeding days per year or per month (as applicable) 100g 30 days per month for two months 3 days per month for one month

6 FOOD REQUIREMENTS 18. Outline the additional and total food quantity needed for achieving revised operation TABLE 3: FOOD/CASH AND VOUCHER REQUIREMENTS BY ACTIVITY Activity Commodity 1 Food requirements (mt) Cash/Voucher (US$) / Cash & voucher Increase / Current Revised total Decrease Emergency CBT Cash transfer 2,437,500 2,430,000 4,867,500 Emergency in-kind assistance TOTAL Dhal mt 22.5mt Hazard / Risk Assessment and Preparedness Planning 19. The inclusion of in-kind assistance to beneficiaries in camps adds a new small additional lowlevel risk to the EMOP. As this assistance will be undertaken in a camp setting, 20. There is no significant change in the type or mode of cash-based assistance being provided to the affected population. Drafted by: Chris Turton, Country Office Cleared by: Brenda Barton, Country Office on [2 June 17] Reviewed by: [Siemon Hollema, Michiel Meerdink] RBB Cleared by: [Peter Guest Regional Bureau on [2 June 2017] 1 Please only present overall food requirement. Do not split by commodity.

7 ANNEX I-A PROJECT COST BREAKDOWN Quantity (mt) Value (US$) Value (US$) Food Transfers Cereals - - Pulses ,413 Oil and fats - - Mixed and blended food - - Others - - Total Food Transfers - - External Transport - LTSH - ODOC Food Food and Related Costs 2 24,413 24,413 C&V Transfers 2,430,000 C&V Related costs - Cash and Vouchers and Related Costs - 2,430,000 Capacity Development & Augmentation - - Direct Operational Costs 2,454,413 Direct support costs (see Annex I-B) Total Direct Project Costs Indirect support costs (7.0 percent) 3 171,808 TOTAL WFP COSTS 2,626,221 2 This is a notional food basket for budgeting and approval. The contents may vary. 3 The indirect support cost rate may be amended by the Board during the project.

8 ANNEX I-B DIRECT SUPPORT REQUIREMENTS (USD). No additional DSC for this Budget Revision WFP Staff and Staff-Related Professional staff * General service staff ** Danger pay and local allowances - Subtotal Recurring and Other Capital Equipment Security Travel and transportation Assessments, Evaluations and Monitoring 4 TOTAL DIRECT SUPPORT COSTS * Costs to be included in this line are under the following cost elements: International Professional Staff (P1 to D2), Local Staff - National Officer, International Consultants, Local Consultants, UNV ** Costs to be included in this line are under the following cost elements: International GS Staff, Local Staff - General Service, Local Staff - Temporary Assist. (SC, SSA, Other), Overtime 4 Reflects estimated costs when these activities are performed by third parties. If WFP Country Office staff perform these activities, the costs are included in Staff and Staff Related and Travel and Transportation.

9 Number and distribution of affected people and number of established camps

PROJECT BUDGET REVISION FOR APPROVAL BY THE REGIONAL DIRECTOR

PROJECT BUDGET REVISION FOR APPROVAL BY THE REGIONAL DIRECTOR PROJECT BUDGET REVISION FOR APPROVAL BY THE REGIONAL DIRECTOR 5) To: Initials In Date Out Date Reason for Delay Denise Brown, Regional Director, RBD 4) Through: Initials In Date Out Date Reason for Delay

More information

Emergency Operation: Sri Lanka

Emergency Operation: Sri Lanka Emergency Operation: Sri Lanka 200990 Targeted emergency cash assistance to the most vulnerable in support of the Government of Sri Lanka s response to the flood and landslide disaster Number of beneficiaries

More information

PROJECT BUDGET REVISION FOR APPROVAL BY THE REGIONAL DIRECTOR

PROJECT BUDGET REVISION FOR APPROVAL BY THE REGIONAL DIRECTOR PROJECT BUDGET REVISION FOR APPROVAL BY THE REGIONAL DIRECTOR 5) To: Initials In Date Out Date Reason for Delay Denise Brown, Regional Director, RBD 4) Through: Initials In Date Out Date Reason for Delay

More information

PROJECT REVISION FOR THE APPROVAL OF: Deputy Executive Director and Chief Operating Officer

PROJECT REVISION FOR THE APPROVAL OF: Deputy Executive Director and Chief Operating Officer HAITI DEVELOPMENT PROJET 200150 B/R No.: 3 Support for the National School Meals Programme PROJECT REVISION FOR THE APPROVAL OF: Deputy Executive Director and Chief Operating Officer Initials In Date Out

More information

BUDGET INCREASE TO PROTRACTED RELIEF AND RECOVERY OPERATION (PRRO) - SUDAN

BUDGET INCREASE TO PROTRACTED RELIEF AND RECOVERY OPERATION (PRRO) - SUDAN BUDGET INCREASE TO PROTRACTED RELIEF AND RECOVERY OPERATION (PRRO) SUDAN 200808 Support for Food Security and Nutrition for Conflictaffected and Chronically Vulnerable Populations Start date: 01 July 2015

More information

TRANSITIONAL INTERIM COUNTRY STRATEGIC PLAN REVISION FOR APPROVAL BY THE COUNTRY DIRECTOR

TRANSITIONAL INTERIM COUNTRY STRATEGIC PLAN REVISION FOR APPROVAL BY THE COUNTRY DIRECTOR TRANSITIONAL INTERIM COUNTRY STRATEGIC PLAN REVISION FOR APPROVAL BY THE COUNTRY DIRECTOR Swaziland Transitional Interim Country Plan Revision Two 5) To: Initials In Date Out Date Reason for Delay Country

More information

PROJECT BUDGET REVISION FOR APPROVAL BY THE CHIEF OF STAFF

PROJECT BUDGET REVISION FOR APPROVAL BY THE CHIEF OF STAFF PROJECT BUDGET REVISION FOR APPROVAL BY THE CHIEF OF STAFF 5) To: Division Room Approval and Date Mr. Jim Harvey Chief of Staff OED 6G36 4) Through: Division Room Signature and Date Ms. Elisabeth Rasmusson

More information

COUNTRY STRATEGIC PLAN REVISION FOR APPROVAL BY THE EXECUTIVE DIRECTOR

COUNTRY STRATEGIC PLAN REVISION FOR APPROVAL BY THE EXECUTIVE DIRECTOR COUNTRY STRATEGIC PLAN REVISION FOR APPROVAL BY THE EXECUTIVE DIRECTOR Revision of Strategic Outcome Addition of Strategic Outcome Revision of Strategic Outcome Emergency Revision of Strategic Outcome

More information

BUDGET INCREASE TO EMERGENCY OPERATION BANGLADESH

BUDGET INCREASE TO EMERGENCY OPERATION BANGLADESH BUDGET INCREASE TO EMERGENCY OPERATION BANGLADESH 10715.0 Food Assistance to Cyclone-Affected Populations in Southern Bangladesh Cost (United States dollars) 1 Present budget Increase Revised budget Food

More information

PROJECT BUDGET SUMMARY SHEET

PROJECT BUDGET SUMMARY SHEET PROJECT BUDGET SUMMARY SHEET Project Type: EMOP Recipient Country: MALAWI Project Number: 10153.0 Duration (months): 3.0 Start Date: 01Jan2002 End Date: 31Mar2002 Total US$ DIRECT OPERATIONAL COSTS (DOC)

More information

BUDGET INCREASE No. 5 TO ZIMBABWE PROTRACTED RELIEF AND RECOVERY OPERATION

BUDGET INCREASE No. 5 TO ZIMBABWE PROTRACTED RELIEF AND RECOVERY OPERATION BUDGET INCREASE No. 5 TO ZIMBABWE PROTRACTED RELIEF AND RECOVERY OPERATION 200162 Assistance for Food Insecure Vulnerable Groups Start date: 1 January 2011 End date: 31 December 2012 Extension period:

More information

Routing Slip 13 (T-ICSP and Project BRs)

Routing Slip 13 (T-ICSP and Project BRs) TRANSITIONAL ICSP AND PROJECT BUDGET REVISION(S) FOR T-ICSPs FOR APPROVAL BY THE EXECUTIVE DIRECTOR 6) To: Division Room Approval and Date Mr David Beasley Executive Director OiC OED 6G30 5) Released for

More information

Emergency Operation Dominica Emergency Food Assistance to Communities Affected by Hurricane Maria in Dominica

Emergency Operation Dominica Emergency Food Assistance to Communities Affected by Hurricane Maria in Dominica Emergency Operation Dominica 201109 Emergency Food Assistance to Communities Affected by Hurricane Maria in Dominica Number of beneficiaries 25,000 Duration of project Gender Marker Code WFP food tonnage

More information

5) To: Initials In Date Out Date Reason for Delay. 4) Through: Initials In Date Out Date Reason for Delay

5) To: Initials In Date Out Date Reason for Delay. 4) Through: Initials In Date Out Date Reason for Delay TRANSITIONAL INTERIM COUNTRY STRATEGIC PLAN REVISION FOR APPROVAL BY THE COUNTRY DIRECTOR Burkina Faso Transitional Interim Country Plan 2018, Revision 2 5) To: Initials In Date Out Date Reason for Delay

More information

BUDGET REVISION TO PROTRACTED RELIEF AND RECOVERY OPERATION:

BUDGET REVISION TO PROTRACTED RELIEF AND RECOVERY OPERATION: BUDGET REVISION TO PROTRACTED RELIEF AND RECOVERY OPERATION: Relief Food Assistance to Tackle Food Security Challenges Afghanistan PRRO 200063 Cost (United States dollars) Current budget Increase Revised

More information

BUDGET REVISION TO PROTRACTED RELIEF AND RECOVERY OPERATION (PRRO) occupied Palestinian territory No

BUDGET REVISION TO PROTRACTED RELIEF AND RECOVERY OPERATION (PRRO) occupied Palestinian territory No BUDGET REVISION TO PROTRACTED RELIEF AND RECOVERY OPERATION (PRRO) occupied Palestinian territory No.103871 Targeted Assistance for Relief, Support to Productive Activities and Skills Development for Vulnerable

More information

E Distribution: GENERAL PROJECTS FOR EXECUTIVE BOARD APPROVAL. Agenda item 9

E Distribution: GENERAL PROJECTS FOR EXECUTIVE BOARD APPROVAL. Agenda item 9 Executive Board Second Regular Session Rome, 14 17 November 2011 PROJECTS FOR EXECUTIVE BOARD APPROVAL Agenda item 9 For approval BUDGET INCREASES TO PROTRACTED RELIEF AND RECOVERY OPERATIONS KENYA PRRO

More information

NATURE OF THE INCREASE

NATURE OF THE INCREASE BUDGET REVISION TO COUNTRY PROGRAMME Title of the project: Country Programme Nepal (CP 200319 ) Start date: 1 January 2013 End date: 31 December 2017 Extension/Reduction period: N/A New end date: N/A Cost

More information

E Distribution: GENERAL PROJECTS FOR EXECUTIVE BOARD APPROVAL. Agenda item 9

E Distribution: GENERAL PROJECTS FOR EXECUTIVE BOARD APPROVAL. Agenda item 9 Executive Board Second Regular Session Rome, 12 14 November 2012 PROJECTS FOR EXECUTIVE BOARD APPROVAL Agenda item 9 For approval BUDGET INCREASES TO DEVELOPMENT ACTIVITIES ARMENIA DEVELOPMENT PROJECT

More information

Update on the Financial Framework Review. Informal Consultation 25 July 2016

Update on the Financial Framework Review. Informal Consultation 25 July 2016 Update on the Financial Framework Review Informal Consultation 25 July 2016 Integrated Roadmap: Alignment of Strategic Plan, Country Strategic Plan, Corporate Results Framework and Financial Framework

More information

STEP 7. Before starting Step 7, you will have

STEP 7. Before starting Step 7, you will have STEP 7 Gap analysis Handing out mosquito nets in Bubulo village, Uganda Photo credit: Geoff Sayer/Oxfam Step 7 completes the gap-analysis strand. It should produce a final estimate of the total shortfall

More information

E Distribution: GENERAL. Executive Board Second Regular Session. Rome, October September 2007 ORIGINAL: ENGLISH

E Distribution: GENERAL. Executive Board Second Regular Session. Rome, October September 2007 ORIGINAL: ENGLISH Executive Board Second Regular Session Rome, 22 26 October 2007! E Distribution: GENERAL 11 September 2007 ORIGINAL: ENGLISH Cost (United States dollars) Current budget Increase Revised budget WFP food

More information

BUDGET INCREASE TO INDIA COUNTRY PROGRAMME Budget Revision No. 7 INDIA COUNTRY PROGRAMME ( )

BUDGET INCREASE TO INDIA COUNTRY PROGRAMME Budget Revision No. 7 INDIA COUNTRY PROGRAMME ( ) BUDGET INCREASE TO INDIA COUNTRY PROGRAMME 105730 Budget Revision No. 7 INDIA COUNTRY PROGRAMME 105730 (2008-2012) Cost (United States dollars) Current budget Increase Revised budget Food cost 20,217,131

More information

Management response to the recommendations deriving from the evaluation of the Mali country portfolio ( )

Management response to the recommendations deriving from the evaluation of the Mali country portfolio ( ) Executive Board Second regular session Rome, 26 29 November 2018 Distribution: General Date: 23 October 2018 Original: English Agenda item 7 WFP/EB.2/2018/7-C/Add.1 Evaluation reports For consideration

More information

Monitoring & Evaluation Quarterly

Monitoring & Evaluation Quarterly YEMEN CO M&E REPORT ISSUE 07: APRIL- JUNE 2017 Monitoring & Evaluation Quarterly Yemen EMOP Highlights Photo: WFP/Fares Khoailed In Q2 2017, an average of 4.9 million beneficiaries per month received general

More information

E Distribution: GENERAL PROJECTS FOR EXECUTIVE BOARD APPROVAL. Agenda item 9

E Distribution: GENERAL PROJECTS FOR EXECUTIVE BOARD APPROVAL. Agenda item 9 Executive Board Second Regular Session Rome, 8 11 November 2010 PROJECTS FOR EXECUTIVE BOARD APPROVAL Agenda item 9 For approval E Distribution: GENERAL WFP/EB.2/2010/9-D 19 October 2010 ORIGINAL: ENGLISH

More information

Responding to Shocks through the Social Protection System: Opportunities for Sri Lanka

Responding to Shocks through the Social Protection System: Opportunities for Sri Lanka Responding to Shocks through the Social Protection System: Opportunities for Sri Lanka Paula Bulancea Deputy Representative H i g h - L e v e l C o n f e r e n c e C o l o m b o, 2 5 S e p t e m b e r

More information

Adaptive Social Protection in Sri Lanka: Building Resilience to Disasters and Climate Change

Adaptive Social Protection in Sri Lanka: Building Resilience to Disasters and Climate Change Adaptive Social Protection in Sri Lanka: Building Resilience to Disasters and Climate Change Disaster Response and Relief in Sri Lanka Chaminda Pathiraja Director- National Disaster Relief Services Centre

More information

WFP Executive Board. 2 nd Informal Consultation Management Plan September 2016

WFP Executive Board. 2 nd Informal Consultation Management Plan September 2016 WFP Executive Board 2 nd Informal Consultation Management Plan 2017-2019 2 September 2016 Upcoming Key dates for the Management Plan (2017-2019) Second Informal Consultation 2 September FAO Finance 2-3

More information

WFP Yemen Crisis Response Pre-assistance Baseline Survey

WFP Yemen Crisis Response Pre-assistance Baseline Survey World Food Programme: Fighting Hunger Worldwide WFP Yemen Crisis Response Pre-assistance Baseline Survey Highlights This baseline survey was conducted in June 2015 in seven governorates (Aden, Al Hudaydah,

More information

Life saving integrated food security and livelihoods support for IDPs and vulnerable host communities affected by conflict and drought in Ayod County.

Life saving integrated food security and livelihoods support for IDPs and vulnerable host communities affected by conflict and drought in Ayod County. HSSD19-FSC-153004-1 Life saving integrated food security and livelihoods support for IDPs and vulnerable host communities affected by conflict and drought in Ayod County. Last updated by Justus Vundi on

More information

POVERTY, GROWTH, AND PUBLIC TRANSFERS IN TANZANIA PROGRESS REPORT ON THE NATIONAL SAFETY NET STUDY

POVERTY, GROWTH, AND PUBLIC TRANSFERS IN TANZANIA PROGRESS REPORT ON THE NATIONAL SAFETY NET STUDY POVERTY, GROWTH, AND PUBLIC TRANSFERS IN TANZANIA PROGRESS REPORT ON THE NATIONAL SAFETY NET STUDY Preliminary Presentation Poverty Week December 2010 OBJECTIVES AND OUTPUTS How can Tanzania get maximum

More information

GEORGIA: DROUGHT. The context. appeal no. 31/00 situation report no. 1 period covered: November January 2001.

GEORGIA: DROUGHT. The context. appeal no. 31/00 situation report no. 1 period covered: November January 2001. GEORGIA: DROUGHT 7 February 21 appeal no. 31/ situation report no. 1 period covered: November 2 - January 21 The drought in Georgia compounds an already dire economic situation in the country. While the

More information

E Distribution: GENERAL PROJECTS FOR EXECUTIVE BOARD APPROVAL. Agenda item 9 PROTRACTED RELIEF AND RECOVERY OPERATIONS PAKISTAN

E Distribution: GENERAL PROJECTS FOR EXECUTIVE BOARD APPROVAL. Agenda item 9 PROTRACTED RELIEF AND RECOVERY OPERATIONS PAKISTAN Executive Board Second Regular Session Rome, 12 14 November 2012 PROJECTS FOR EXECUTIVE BOARD APPROVAL Agenda item 9 PROTRACTED RELIEF AND RECOVERY OPERATIONS PAKISTAN 200250 For approval Enhancing Food

More information

EMERGENCY OPERATION MALAWI RELIEF FOOD ASSISTANCE FOR VICTIMS OF CONSECUTIVE YEARS CROP FAILURE AND ACUTE LOSS OF ACCESS

EMERGENCY OPERATION MALAWI RELIEF FOOD ASSISTANCE FOR VICTIMS OF CONSECUTIVE YEARS CROP FAILURE AND ACUTE LOSS OF ACCESS EMERGENCY OPERATION MALAWI RELIEF FOOD ASSISTANCE FOR VICTIMS OF CONSECUTIVE YEARS CROP FAILURE AND ACUTE LOSS OF ACCESS SYNOPSIS Project Country: Malawi Project Number: 10201.0 Number of beneficiaries:

More information

Sri Lanka: Preliminary Damage and Needs Assessment Page 25 of 29

Sri Lanka: Preliminary Damage and Needs Assessment Page 25 of 29 Sri Lanka: Preliminary Damage and Needs Assessment Page 25 of 29 F. IMMEDIATE AND MEDIUM TERM RECOVERY STRATEGY Implementation Approach 75. One of the main challenges of developing a comprehensive, as

More information

Proposal Report On Flood Hazard Mapping Project in Prey Veng Province

Proposal Report On Flood Hazard Mapping Project in Prey Veng Province Proposal Report On Flood Hazard Mapping Project in Prey Veng Province Prepared by CHUM Sphy. Department of Water Resources and Meteorology Prey Veng Province Cambodia FLOOD HAZARD MAPPING TRAINING COURSE

More information

2.1 Approximately how many people in this district lost all their sources of income as a result of the disaster?

2.1 Approximately how many people in this district lost all their sources of income as a result of the disaster? Questionnaire No. : Date District Interviewer Division Village Suggested respondents: Secretary General or President of District Chambers of Commerce, Secretary General or President of District Trade Union

More information

Emergency Cash-based Interventions in Urban Areas: Tropical Storm Washi in the Philippines

Emergency Cash-based Interventions in Urban Areas: Tropical Storm Washi in the Philippines gfsc Good Practice Case Study ACF in the Philippines Emergency Cash-based Interventions in Urban Areas: Tropical Storm Washi in the Philippines Background to the project/programme Tropical Storm Washi

More information

Survival Minimum Expenditure Basket, Yemen. Guidance Document for Multi-Purpose Grants

Survival Minimum Expenditure Basket, Yemen. Guidance Document for Multi-Purpose Grants Survival Minimum Expenditure Basket, Yemen Guidance Document for Multi-Purpose Grants November 2017 v1.5 Approved by CMWG and ICCM for use. Prepared by Thomas Byrnes CashCap Adviser on behalf, and with

More information

E Distribution: GENERAL ! "#$ Executive Board Annual Session. Rome, 8 12 June May 2009 ORIGINAL: ENGLISH. Cost (United States dollars)

E Distribution: GENERAL ! #$ Executive Board Annual Session. Rome, 8 12 June May 2009 ORIGINAL: ENGLISH. Cost (United States dollars) Executive Board Annual Session Rome, 8 12 June 2009! "#$ E Distribution: GENERAL 6 May 2009 ORIGINAL: ENGLISH Cost (United States dollars) Current budget Increase Revised budget WFP food cost 17 322 328

More information

Emergency Operation (Malawi, EMOP )

Emergency Operation (Malawi, EMOP ) Emergency Operation (Malawi, EMOP 200608) TITLE: TARGETED RELIEF FOOD ASSISTANCE TO VULNERABLE POPULATION AFFECTED BY NATURAL DISASTERS Number of beneficiaries 1 928 536 Duration of project 7 months (September

More information

Hawala cash transfers for food assistance and livelihood protection

Hawala cash transfers for food assistance and livelihood protection Afghanistan Hawala cash transfers for food assistance and livelihood protection EUROPEAN COMMISSION Humanitarian Aid and Civil Protection In response to repeated flooding, ACF implemented a cash-based

More information

Quarter 1: Post Distribution Monitoring Report. January - March 2017 HIGHLIGHTS. 2. Methodology

Quarter 1: Post Distribution Monitoring Report. January - March 2017 HIGHLIGHTS. 2. Methodology Quarter 1: Post Distribution Monitoring Report January - March 2017 HIGHLIGHTS In December 2016, off camp assistance increased to 100 TL per person; in January 2017, off camp assistance switched from s

More information

!"#$#%&!''("$(#' #$" ) *+ Number of beneficiaries 25,000. Duration of project January June WFP food tonnage Cost (United States dollars)

!#$#%&!''($(#' #$ ) *+ Number of beneficiaries 25,000. Duration of project January June WFP food tonnage Cost (United States dollars) !"#$#%&!''("$(#' #$" Number of beneficiaries 25,000 Duration of project January 2013 - June 2014 WFP food tonnage WFP food cost Total cost to WFP 837 mt Cost (United States dollars) US$746,350 US$4,035,912

More information

E Distribution: GENERAL PROJECTS FOR EXECUTIVE BOARD APPROVAL. Agenda item 9 DEVELOPMENT PROJECTS JORDAN For approval

E Distribution: GENERAL PROJECTS FOR EXECUTIVE BOARD APPROVAL. Agenda item 9 DEVELOPMENT PROJECTS JORDAN For approval Executive Board Second Regular Session Rome, 12 14 November 2012 PROJECTS FOR EXECUTIVE BOARD APPROVAL Agenda item 9 DEVELOPMENT PROJECTS JORDAN 200478 For approval Support for the National School Feeding

More information

Somalia Common Humanitarian Fund Standard Allocation Document 2015

Somalia Common Humanitarian Fund Standard Allocation Document 2015 Somalia Common Humanitarian Fund Standard Allocation Document 2015 First standard allocation 2015 This document outlines the strategic objectives of the Somalia Common Humanitarian Fund (CHF) first standard

More information

APPLICATION FOR GRANT FUNDING

APPLICATION FOR GRANT FUNDING Funding APPLICATION FOR GRANT FUNDING COUNTRY NAME: Humanitarian Country Teams, cluster or sector leads, agencies and their implementing partners should contribute to the development of this application

More information

RESOURCE, FINANCIAL AND BUDGETARY MATTERS

RESOURCE, FINANCIAL AND BUDGETARY MATTERS Executive Board Annual Session Rome, 7 11 June 2010 RESOURCE, FINANCIAL AND BUDGETARY MATTERS Agenda item 6 For approval SECOND UPDATE ON THE WFP MANAGEMENT PLAN (2010 2011) E Distribution: GENERAL WFP/EB.A/2010/6-D/1

More information

TERMS OF REFERENCE EXTERNAL EVALUATION OF UNICEF S CASH TRANSFER PROJECT IN NIGER SEPTEMBER 2010

TERMS OF REFERENCE EXTERNAL EVALUATION OF UNICEF S CASH TRANSFER PROJECT IN NIGER SEPTEMBER 2010 TERMS OF REFERENCE EXTERNAL EVALUATION OF UNICEF S CASH TRANSFER PROJECT IN NIGER SEPTEMBER 2010 I. Background Following poor crops in 2009-2010 in Niger, the vulnerability survey conducted in April 2010

More information

Summary evaluation report of the Central African Republic country portfolio (2012 mid-2017)

Summary evaluation report of the Central African Republic country portfolio (2012 mid-2017) Executive Board Annual session Rome, 18 22 June 2018 Distribution: General Date: 14 May 2018 Original: English Agenda item 7 WFP/EB.A/2018/7-D Evaluation reports For consideration Executive Board documents

More information

Table-1: Overall Cost of the Flood

Table-1: Overall Cost of the Flood EXECUTIVE SUMMARY Preliminary Damage and Needs Assessment Disaster Overview 1. Pakistan experienced extraordinary rainfall in mid-july 2010, which continued until September 2010. The result was unprecedented

More information

Overview of the Social Transfers Policy Framework. NAP 2 Pillars Key features of the HSCT Who are the stakeholders? How will it be implemented?

Overview of the Social Transfers Policy Framework. NAP 2 Pillars Key features of the HSCT Who are the stakeholders? How will it be implemented? Overview of the Social Transfers Policy Framework. NAP 2 Pillars Key features of the HSCT Who are the stakeholders? How will it be implemented? Where will it be implemented? When will it be implemented?

More information

Rapid Response Fund Payment Request No. 05/2017

Rapid Response Fund Payment Request No. 05/2017 Rapid Response Fund Payment Request No. 05/2017 Funds Sent To: 1.Churches Action in Relief and Development (CARD) 2. Evangelical Lutheran Development Service (ELDS) Amount Sent: USD 118,239 Date: 22/02/2017

More information

Overview of PADR process

Overview of PADR process SECTION 3 Overview of PADR process PADR is a methodology for use at community level. It involves active engagement, with the community, in a process to explore the risks they face and the factors contributing

More information

Common Humanitarian Fund for Somalia

Common Humanitarian Fund for Somalia Common Humanitarian Fund for Somalia Standard Allocation Document First Standard Allocation 2012, March/April 2012 I. Introduction Following extensive consultations, the Common Humanitarian Fund for Somalia

More information

PRODUCTIVE SECTOR COMMERCE PDNA GUIDELINES VOLUME B

PRODUCTIVE SECTOR COMMERCE PDNA GUIDELINES VOLUME B PRODUCTIVE SECTOR COMMERCE PDNA GUIDELINES VOLUME B 2 COMMERCE CONTENTS n INTRODUCTION 2 n ASSESSMENT PROCESS 3 n PRE-DISASTER SITUATION 4 n FIELD VISITS FOR POST-DISASTER DATA COLLECTION 5 n ESTIMATION

More information

Multi-Sector Rapid Assessment

Multi-Sector Rapid Assessment Print Back To Detail Multi-Sector Rapid Assessment RAF Status RAF Current Status Pending Date Remarks RAF Refer Organizations 1.Incident Information Incident : Disaster Type: IRF00472/BMY RAF Number: RAF01589/BMY

More information

Fighting Hunger Worldwide. Emergency Social Safety Net. Post-Distribution Monitoring Report Round 1. ESSN Post-Distribution Monitoring Round 1 ( )

Fighting Hunger Worldwide. Emergency Social Safety Net. Post-Distribution Monitoring Report Round 1. ESSN Post-Distribution Monitoring Round 1 ( ) Emergency Social Safety Net Post-Distribution Monitoring Report Round 1 ESSN Post-Distribution Monitoring Round 1 ( ) Table of Contents 1. Introduction 3 2. Approach, methodology and Data 3 2.1. Method

More information

Fighting Hunger Worldwide

Fighting Hunger Worldwide WFP LEBANON FOOD SECURITY OUTCOME MONITORING ROUND 7: AUGUST Fighting Hunger Worldwide Highlights WFP assisted 665,996 displaced Syrians in August, of which 20 percent were female-headed and 65 percent

More information

WFP Executive Board. 2 nd Informal Consultation Management Plan September 2015

WFP Executive Board. 2 nd Informal Consultation Management Plan September 2015 WFP Executive Board 2 nd Informal Consultation Management Plan 2016-2018 2 September 2015 Agenda for Informal Consultation I. Directions of Change Introduced in the Management Plan (2016-2018) II. Section-by-Section

More information

MYANMAR S FIRST NATIONAL SOCIAL PROTECTION STRATEGY: A GOLDEN OPPORTUNITY FOR MYANMAR CHILDREN AND FAMILIES

MYANMAR S FIRST NATIONAL SOCIAL PROTECTION STRATEGY: A GOLDEN OPPORTUNITY FOR MYANMAR CHILDREN AND FAMILIES MYANMAR S FIRST NATIONAL SOCIAL PROTECTION STRATEGY: A GOLDEN OPPORTUNITY FOR MYANMAR CHILDREN AND FAMILIES Cristina Roccella OVERALL POVERTY PICTURE Population heavily clustered around the poverty line

More information

UPDATE ON THE FINANCIAL FRAMEWORK REVIEW DRAFT. Informal Consultation. 5 September World Food Programme Rome, Italy

UPDATE ON THE FINANCIAL FRAMEWORK REVIEW DRAFT. Informal Consultation. 5 September World Food Programme Rome, Italy UPDATE ON THE FINANCIAL FRAMEWORK REVIEW DRAFT Informal Consultation 5 September 2016 World Food Programme Rome, Italy I. Introduction 1. The Financial Framework Review (FFR) is one of four elements in

More information

OPERATIONAL PROGRAMME under THE FUND FOR EUROPEAN AID TO THE MOST DEPRIVED

OPERATIONAL PROGRAMME under THE FUND FOR EUROPEAN AID TO THE MOST DEPRIVED OPERATIONAL PROGRAMME under THE FUND FOR EUROPEAN AID TO THE MOST DEPRIVED 2014-2020 1. IDENTIFICATION (max. 200 characters) The purpose of this section is to identify only the programme concerned. It

More information

UPDATE ON THE INTEGRATED ROAD MAP

UPDATE ON THE INTEGRATED ROAD MAP UPDATE ON THE INTEGRATED ROAD MAP Consultation 30 January 2017 World Food Programme Rome, Italy Introduction 1. The Board s approval of the Integrated Road Map (IRM) at the Second Regular Session of 2016

More information

Hundred and Forty-second Session. Rome, 7-8 November WFP Management Plan ( )

Hundred and Forty-second Session. Rome, 7-8 November WFP Management Plan ( ) October 2011 FC 142/2 E FINANCE COMMITTEE Hundred and Forty-second Session Rome, 7-8 November 2011 WFP Management Plan (2012 2014) Queries on the substantive content of this document may be addressed to:

More information

Multi-Purpose Cash Grant (MPCG) Operational Guidelines

Multi-Purpose Cash Grant (MPCG) Operational Guidelines Cash Working Group (CWG) in Bangladesh- led by Oxfam Multi-Purpose Cash Grant (MPCG) Operational Guidelines Draft Version 02 20 th February 2018 1. Introduction Bangladesh is one of the most disaster-prone

More information

PRODUCTIVE SECTOR MANUFACTURING PDNA GUIDELINES VOLUME B

PRODUCTIVE SECTOR MANUFACTURING PDNA GUIDELINES VOLUME B PRODUCTIVE SECTOR MANUFACTURING PDNA GUIDELINES VOLUME B 2 MANUFACTURE CONTENTS n INTRODUCTION 4 n ASSESSMENT PROCESS 5 n PRE-DISASTER SITUATION 6 n FIELD VISITS FOR POST-DISASTER DATA COLLECTION 6 n ESTIMATING

More information

(1) PROJECT COORDINATOR (2) SENIOR EXPERT RESILIENCE

(1) PROJECT COORDINATOR (2) SENIOR EXPERT RESILIENCE TERMS OF REFERENCE bx (1) PROJECT COORDINATOR (2) SENIOR EXPERT RESILIENCE INCEPTION PHASE OF UNICEF RESILIENCE PROJECT IN SOMALIA This TOR is to support the process of hiring a consultant for the project

More information

Induction Session Resource Management Department

Induction Session Resource Management Department Induction Session Resource Management Department EXECUTIVE BOARD 21 September 2018 SLIDE 1 Supporting and enabling operations by leading performance management and safeguarding resources to improve the

More information

A Note on the Regional Dimensions of Population and Unemployment in Sri Lanka

A Note on the Regional Dimensions of Population and Unemployment in Sri Lanka A Note on the Regional Dimensions of Population and Unemployment in Sri Lanka Seneka Abeyratne & Tahani Iqbal Economic Affairs Division Peace Secretariat September 9, 2005 Introduction The objective of

More information

Q&A THE MALAWI SOCIAL CASH TRANSFER PILOT

Q&A THE MALAWI SOCIAL CASH TRANSFER PILOT Q&A THE MALAWI SOCIAL CASH TRANSFER PILOT 2> HOW DO YOU DEFINE SOCIAL PROTECTION? Social protection constitutes of policies and practices that protect and promote the livelihoods and welfare of the poorest

More information

Earthquake 2005 Recovery and Reconstruction

Earthquake 2005 Recovery and Reconstruction Earthquake 2005 Recovery and Reconstruction 2 Earthquake 8 Oct 2005 Nine Districts 1. MANSHERA 2. BATAGRAM 3. SHANGLA 4. ABBOTTABAD 5. KOHISTAN Epicentre 6. MUZAFFARABAD 7. NELUM 8. BAGH 9. RAWALAKOT Depth:

More information

The CASH+ approach in the Sahel

The CASH+ approach in the Sahel The CASH+ approach in the Sahel as a tool to reinforce RESILIENCE Mali // Mauritania MauritaniA Nejiha, a CASH+ beneficiary, at her market stall FAO/Sonia Nguyen 2 The CASH+ approach in the Sahel MALI

More information

Proposal ANNEX A. Project title

Proposal ANNEX A. Project title ANNEX A Proposal Project title One line summary of project Start/end dates Organisation name Primary contact person, email and phone number Secondary contact person, email and phone number Relief Support

More information

E Distribution: GENERAL. Executive Board Second Regular Session. Rome, 6 10 November 2006

E Distribution: GENERAL. Executive Board Second Regular Session. Rome, 6 10 November 2006 Executive Board Second Regular Session Rome, 6 10 November 2006 E Distribution: GENERAL 30 October 2006 ORIGINAL: ENGLISH This document is printed in a limited number of copies. Executive Board documents

More information

Emergency Food Assistance through Cash Transfer Program: Kyrgyzstan

Emergency Food Assistance through Cash Transfer Program: Kyrgyzstan Emergency Food Assistance through Cash Transfer Program: Kyrgyzstan Penelope Anderson, Director of Food Security Feed the Future, Stakeholder Meeting March 10, 2011 Cash Transfer Programming Cash Transfer

More information

CHF Sudan 2015 Standard Allocation. Project Proposal and Budget Guidelines: SUBMISSION OF CONCEPT NOTES

CHF Sudan 2015 Standard Allocation. Project Proposal and Budget Guidelines: SUBMISSION OF CONCEPT NOTES CHF Sudan 2015 Standard Allocation Project Proposal and Budget Guidelines: SUBMISSION OF CONCEPT NOTES Content 1. Eligibility criteria and allocation process 2. Creation of project Concept Note 3. Project

More information

ANNEX. Support to the Productive Safety Net Programme (PSNP) CRIS 2008/ Total cost EC contribution : EUR 20,230,000

ANNEX. Support to the Productive Safety Net Programme (PSNP) CRIS 2008/ Total cost EC contribution : EUR 20,230,000 ANNEX 1. IDTIFICATION Title/Number Support to the Productive Safety Net Programme (PSNP) CRIS 2008/020-930 Total cost EC contribution : EUR 20,230,000 Aid method / Management mode Contribution of the beneficiary

More information

POST DISTRIBUTION MONITORING

POST DISTRIBUTION MONITORING POST DISTRIBUTION MONITORING West Nile Region, October 2017 PDM in West Nile Region October 2017 INTRODUCTION This PDM survey helps WFP to assess beneficiaries access to, use of, and satisfaction with

More information

CORPORATE RESULTS FRAMEWORK ( )

CORPORATE RESULTS FRAMEWORK ( ) CORPORATE RESULTS FRAMEWORK (2017 2021) Informal Consultation 523 September 2016 World Food Programme Introduction 1. WFP is committed to attaining the highest standards of accountability. This means optimizing

More information

Government of Rwanda. Rwanda School Feeding Programme Cost Analysis

Government of Rwanda. Rwanda School Feeding Programme Cost Analysis Government of Rwanda Rwanda School Feeding Programme Cost Analysis Programme Implementa.on One Cup of Milk per Child 2 days per week (72 feeding days) Secondary School every day (245 feeding days) WFP

More information

RESEARCH BACKGROUND Figure 1: Map of MRED Target Districts Central and Western Nepal experienced several devastating flooding events from August 11 14, 2017, resulting in 180 deaths, 445,000 displaced

More information

AHA Centre Executive (ACE) Programme 2017 Red Cross Red Crescent Induction October 2017 Semarang, Indonesia

AHA Centre Executive (ACE) Programme 2017 Red Cross Red Crescent Induction October 2017 Semarang, Indonesia AHA Centre Executive (ACE) Programme 2017 Red Cross Red Crescent Induction 09-14 October 2017 Semarang, Indonesia https://www.youtube.com/watch?v=7jej66w R1u4 1. Cash transfer programming in emergency

More information

CARIBBEAN DEVELOPMENT BANK SUPPORT FOR HAITI TO MEET COMMITMENT TO CARIBBEAN CATASTROPHE RISK INSURANCE FACILITY FOR THE HURRICANE SEASON

CARIBBEAN DEVELOPMENT BANK SUPPORT FOR HAITI TO MEET COMMITMENT TO CARIBBEAN CATASTROPHE RISK INSURANCE FACILITY FOR THE HURRICANE SEASON PUBLIC DISCLOSURE AUTHORISED CARIBBEAN DEVELOPMENT BANK SUPPORT FOR HAITI TO MEET COMMITMENT TO CARIBBEAN CATASTROPHE RISK INSURANCE FACILITY FOR THE 2017-2018 HURRICANE SEASON This Document is being made

More information

BHUTAN TRANSITIONAL INTERIM COUNTRY STRATEGIC PLAN (YEAR 2018)

BHUTAN TRANSITIONAL INTERIM COUNTRY STRATEGIC PLAN (YEAR 2018) BHUTAN TRANSITIONAL INTERIM COUNTRY STRATEGIC PLAN (YEAR 2018) Duration 1 January 2018 31 December 2018 Total cost to WFP USD 1,220,857 Gender and Age Marker Code * 1 EXECUTIVE SUMMARY Bhutan has a national

More information

Policy Implementation for Enhancing Community. Resilience in Malawi

Policy Implementation for Enhancing Community. Resilience in Malawi Volume 10 Issue 1 May 2014 Status of Policy Implementation for Enhancing Community Resilience in Malawi Policy Brief ECRP and DISCOVER Disclaimer This policy brief has been financed by United Kingdom (UK)

More information

Proposal for a DECISION OF THE EUROPEAN PARLIAMENT AND OF THE COUNCIL. on the mobilisation of the EU Solidarity Fund

Proposal for a DECISION OF THE EUROPEAN PARLIAMENT AND OF THE COUNCIL. on the mobilisation of the EU Solidarity Fund EUROPEAN COMMISSION Brussels, 23.7.2015 COM (2015) 370 final Proposal for a DECISION OF THE EUROPEAN PARLIAMENT AND OF THE COUNCIL on the mobilisation of the EU Solidarity Fund EN EN INFORMATION AND CONDITIONS

More information

shocks do not have long-lasting adverse development consequences (Food Security Information Network)

shocks do not have long-lasting adverse development consequences (Food Security Information Network) Submission by the World Food Programme to the Executive Committee of the Warsaw International Mechanism for Loss and Damage on best practices, challenges and lessons learned from existing financial instruments

More information

Padang Lawas, Indonesia

Padang Lawas, Indonesia Padang Lawas, Indonesia Local progress report on the implementation of the 10 Essentials for Making Cities Resilient (2013-2014) Name of focal point: Yusniar Nurdin Organization: BNPB Title/Position: Technical

More information

BUSINESS-BASED SOLUTIONS IN HUMANITARIAN CRISES: LESSONS FROM ZIMBABWE

BUSINESS-BASED SOLUTIONS IN HUMANITARIAN CRISES: LESSONS FROM ZIMBABWE BUSINESS-BASED SOLUTIONS IN HUMANITARIAN CRISES: LESSONS FROM ZIMBABWE Credit: Cynthia R Matonhodze 2017/CARE EXECUTIVE SUMMARY / In response to heightened food insecurity in Zimbabwe, Crown Agents and

More information

Disaster Risk Reduction

Disaster Risk Reduction Disaster Risk Reduction AHI M2 Extreme Environement Risk and vulnerability UPEC Universityof Creteil-Paris XII Aloysius John March 2012 Introduction There is growing international concern at the present

More information

Assets Channel: Adaptive Social Protection Work in Africa

Assets Channel: Adaptive Social Protection Work in Africa Assets Channel: Adaptive Social Protection Work in Africa Carlo del Ninno Climate Change and Poverty Conference, World Bank February 10, 2015 Chronic Poverty and Vulnerability in Africa Despite Growth,

More information

Summary of main findings

Summary of main findings IMPACT ASSESSMENT REPORT NUSAF2 - Northern Uganda Social Action Fund 12-13 Project in Moroto Municipality and Nadunget Sub-County Karamoja, Uganda Summary of main findings There is a reduction from % to

More information

Global insured losses from disaster events were USD 54 billion in 2016, up 43% from 2015, latest Swiss Re Institute sigma says

Global insured losses from disaster events were USD 54 billion in 2016, up 43% from 2015, latest Swiss Re Institute sigma says News release Global insured losses from disaster events were USD 54 billion in 2016, up 43% from 2015, latest Swiss Re Institute sigma says Global total economic losses from disaster events were USD 175

More information

Protec on Risk Analysis

Protec on Risk Analysis Protec on Risk Analysis Associated with food distribu on North Waziristan Agency IDPs response October, 2014 This document has been produced and released by the Vulnerability Analysis and Mapping (VAM)

More information

WFP Executive Board. 1 st Informal Consultation WFP Management Plan ( ) 13 July 2017

WFP Executive Board. 1 st Informal Consultation WFP Management Plan ( ) 13 July 2017 WFP Executive Board 1 st Informal Consultation WFP Management Plan (2018-2020) 13 July 2017 Agenda for 1 st Informal Consultation 1. Resourcing and Financial Context for the 2018-2020 Management Plan 2.

More information

The Impact of Social Capital on Managing Shocks to Achieve Resilience: Evidence from Ethiopia, Kenya, Uganda, Niger and Burkina Faso

The Impact of Social Capital on Managing Shocks to Achieve Resilience: Evidence from Ethiopia, Kenya, Uganda, Niger and Burkina Faso The Impact of Social Capital on Managing Shocks to Achieve Resilience: Evidence from Ethiopia, Kenya, Uganda, Niger and Burkina Faso Tim Frankenberger TANGO International January 5, 2016 10:00 11:30 AM

More information

Global Workshop on Cash and Vouchers

Global Workshop on Cash and Vouchers SYNTHESIS REPORT Global Workshop on Cash and Vouchers Johannesburg 17-19 November 2009 Initiative supported by the Government of Spain SYNTHESIS REPORT OF THE WFP GLOBAL WORKSHOP ON CASH AND VOUCHERS The

More information

THE NATIONAL SOCIAL PROTECTION STRATEGY (NSPS): INVESTING IN PEOPLE GOVERNMENT OF GHANA. Ministry of Manpower, Youth and Employment (MMYE) 2008

THE NATIONAL SOCIAL PROTECTION STRATEGY (NSPS): INVESTING IN PEOPLE GOVERNMENT OF GHANA. Ministry of Manpower, Youth and Employment (MMYE) 2008 THE NATIONAL SOCIAL PROTECTION STRATEGY (NSPS): INVESTING IN PEOPLE GOVERNMENT OF GHANA Ministry of Manpower, Youth and Employment (MMYE) 2008 GHANA DELEGATION GHANA OVERVIEW WHAT IS THE NSPS: Finalized

More information