Additional Financing. Project Number: April Nepal: Establishing Women and Children Service Centers

Size: px
Start display at page:

Download "Additional Financing. Project Number: April Nepal: Establishing Women and Children Service Centers"

Transcription

1 Additional Financing Project Number: April 2011 Nepal: Establishing Women and Children Service Centers

2 CURRENCY EQUIVALENTS (as of 31 March 2011) Currency Unit Nepalese rupee/s (NRe/NRs) NRe1.00 = $ $1.00 = NRs71.60 ABBREVIATIONS ADB Asian Development Bank DFID Department for International Development of the United Kingdom GIU grant implementation unit JFPR Japan Fund for Poverty Reduction NGO nongovernment organization WCSC women and children service center NOTES (i) (ii) The fiscal year (FY) of the government and its agencies ends on 15 July. FY before a calendar year denotes the year in which the fiscal year ends, e.g., FY2011 ends on 31 July In this report, "$" refers to US dollars. Vice-President X. Zhao, Operations 1 Director General S. H. Rahman, South Asia Department (SARD) Director T. Matsuo, Environment, Natural Resources and Agriculture Division, SARD Team leader Team members E-A.S. Campbell, Social Development Specialist, SARD F. Mathew, Financial Control Specialist, Controller s Department J. Versantvoort, Counsel, Office of the General Counsel In preparing any country program or strategy, financing any project, or by making any designation of or reference to a particular territory or geographic area in this document, the Asian Development Bank does not intend to make any judgments as to the legal or other status of any territory or area.

3 CONTENTS Page I. INTRODUCTION 1 II. BACKGROUND 1 III. PROJECT PERFORMANCE 2 IV. THE PROPOSED CHANGES 3 V. ASSESSMENT 4 VI. THE PRESIDENT'S RECOMMENDATION 4 APPENDIXES 1. Revised Design and Monitoring Framework 5 2. Revised Cost Tables 9 3. JFPR Progress Report 11

4 I. INTRODUCTION 1. In July 2009, a grant of $750,000 from the Japan Fund for Poverty Reduction (JFPR) was approved by the Asian Development Bank (ADB) for establishing Women and Children Service Centers (WCSCs). 1 The government contribution is $58,500 to cover portions of cost requirements and part of (i) incremental recurrent staff costs, (ii) operational costs and costs for equipment and supplies for the WCSCs, and (iii) costs for consultation meetings. The communities will provide $12,000 through participation and in-kind contributions. At the time of the grant approval, the total estimated project cost was $820,500. The grant became effective on 19 January 2010 and is expected to be completed by 19 January The project has experienced cost overruns and additional financing is needed. An additional $195,894 2 cofinancing grant from the Department for International Development (DFID) of the United Kingdom is available. Approval of the ADB Board of Directors is sought on a no-objection basis for ADB to administer the grant in accordance with ADB s Operation Manual (section H.5: Additional Financing). 3 The additional financing will not entail a change in the project scope and implementation. II. BACKGROUND 3. Poverty in Nepal is characterized by the exclusion of poor and vulnerable groups such as low castes, ethnic groups, and women from access to resources and opportunities. Nepal s Tenth Plan (FY2003 FY2007) 4 and the following 3-year interim development plan (FY2008 FY2010) 5 recognize that overcoming low levels of human development requires ensuring development addresses the needs of women, the very poor, and deprived communities, castes, and regions. 4. The high incidence of crimes against women and children, including domestic and other violence, exacerbates the difficulties these groups face in participating in development. Violence against women and children is unacceptable from a social justice standpoint, and has an associated economic cost, as both women and their dependent children experience (i) reduced (a) productivity, (b) participation in community and development activities, (c) control over resources, and (d) self-confidence; and (ii) increased (a) homelessness and helplessness, (b) demand for medical and community support services, and (c) expenditures on police and judicial services. In addition, child abuse, early child labor, and child marriage prevent affected children from participating in education, thereby decreasing their chance of later elevating themselves out of poverty. 5. The central WCSC was established in 1996 at police headquarters and a district WCSC was established in Kathmandu with the main task of investigating crimes against women and children, in close cooperation with various government agencies, nongovernment organizations (NGOs), and civil society. The central WCSC is under the direct command of the crime investigation department of the Nepal Police. Its objective is to create a conducive environment in which women and child victims of crimes feel safe in filing complaints against offenders. It formulates policy and programs for all service centers. Prior to the establishment of WCSCs, the victims of such crimes were reluctant to lodge their complaints against offenders, in particular to 1 ADB Proposed Grant Assistance to Nepal for Establishing Women and Children Service Centers. Manila. ( 2 Equal to 24% of the original grant amount of $820, ADB Additional Financing. Operations Manual. OM H5/BP and H5/OP. Manila (issued on 24 February). 4 National Planning Commission Nepal: Tenth Plan (FY2003 FY2007). 5 National Planning Commission Nepal: Three-Year Interim Plan (FY2008 FY2010).

5 2 male investigating officers, because of privacy and sensitivity issues and the risk of further verbal and/or physical attacks. This situation highlighted the need for a special investigative team composed of female police officers. 6. To date, there are 27 WCSCs, mostly in Kathmandu Valley and in border districts, where the focus is on trafficking. Major issues faced by the existing central and district WCSCs are the lack of (i) recognition of their status as an independent department within the police; (ii) separate allocation of a budget and human resources; (iii) systematic staff training to help WCSCs assist women and child victims of highly sensitive crimes; (iv) systematic, institutionalized coordination with NGOs, communities, and civil society, and of a clear understanding by all stakeholders of the different roles and responsibilities of police and civil society; and (v) awareness by the public at large of their existence and role. The project is intended to address these issues and establish new WCSCs. 7. The goal of the project is to reduce the vulnerability and helplessness of women and children in five districts of Nepal through the provision of professional and coordinated protection and assistance to women and children who are victims of rape, domestic violence, polygamy, alleged witchcraft, child abuse, child marriage, and trafficking. This will increase their chances of reintegration into mainstream society and thus their participation in the development process, leading eventually to poverty reduction. 8. The project is under implementation through its five components: (i) civil society consultation prior to establishing WCSCs, (ii) establishment of five WCSCs in rural districts and one for central Kathmandu, (iii) capacity development, (iv) outreach and networking, and (v) project management. The Nepal Police Headquarters is the executing agency and its central WCSC is the implementing agency, together with district-level WCSCs. 9. A minor change was approved on 19 October 2010 reducing the target districts from seven to five. 6 Four out of five were replacements based on changes in need as evidenced by reported crime incidence since the project was designed. All remain within the original project area which represents the poorest and most disadvantaged areas of Nepal where gender discrimination is pervasive. The change in districts did not change the project s objective, scope, implementation and benefits. 10. All procurement under the project is being conducted in accordance with ADB s Procurement Guidelines (2010, as amended from time to time). International project consultants will be recruited by the executing agency in accordance with ADB s Guidelines on the Use of Consultants (2010, as amended from time to time). Local NGOs and consultants are contracted by the grant implementation unit (GIU) in accordance with ADB s Guidelines on the Use of Consultants. Grant funds are being disbursed in accordance with ADB s Loan Disbursement Handbook (2007, as amended from time to time). The government is maintaining separate accounts and records for the project in accordance with sound accounting principles and the Financial Management Guidelines of ADB 7. III. PROJECT PERFORMANCE 11. During the inception mission in March 2010, it was found that the funding for the civil works under this project was insufficient to cover the construction costs for all of six WCSCs. The current fund allocation would allow completion of only three out of the six WCSCs to be 6 Districts are Bara, Dhanusha, Doti (retained), Jumla, and Rautahat. 7 ADB Financial Management and Analysis of Projects. Manila

6 3 constructed. The staff assessment of this cost overrun was that (i) 51% 8 was due to an initial cost estimate found to be based on an inappropriate model; (ii) 39% 9 was due to significant increase in costs of materials, transportation, and labor during the 6 years lapsed between the project design and implementation and (iii) the Nepalese rupee has appreciated against the US dollar during this period After a slow start-up and despite the cost overrun, the pace of implementation started to accelerate when the project coordinator and management consultant joined the GIU in October 2010 to assist in project coordination and monitoring. The project is performing well with physical progress as of February 2011 at 12% against the elapsed period of 36%. Major performance aspects are summarized below: (i) The JFPR progress report (Appendix 3) rated the project not at risk and on track to meet its output targets with major activities including: (a) establishing the GIU and the national project advisory committee in 2010; (b) holding consultation workshops in Bara, Doti, Jumla, and Rautahat before establishment of the WCSCs; (c) launching an advance public information campaign using awareness-raising radio dramas, short films, information posters, and a video documentary in the project districts to sensitize people about the objectives of establishing the WCSC and its services; (d) forwarding expressions of interest and short-listed organizations for the recruitment for the baseline survey on violence against women and children to ADB for review and approval; and (e) approving bidding documents for the construction of the WCSCs in Bara, Doti, and Rautahat. (ii) Contract awards totaled $72,000 (9.6%) and disbursement $66,000 (8%). The disbursement represents the initial advance to the imprest account. (iii) (iv) The project has not encountered any safeguard issues. The executing agency has reiterated its commitment to managing risk by agreeing to (a) have strict financial controls including annual external audits of the project accounts; (b) have special arrangements regarding the use of equipment (which is intended only for the WCSCs), and have the executing agency replace it in case of disappearance; (c) assign women recruits to the WCSCs who have special training in crimes against women and children; (d) not transfer trained staff for at least 3 years; and (e) facilitate the assignment of women staff who can communicate in local languages. 13. The project will deliver significant economic and social benefits to the women and children of Nepal, especially those who are poor and disadvantaged. IV. THE PROPOSED CHANGES 14. ADB approached DFID for additional financing to make up for the shortfall in the cost of construction of the WCSCs. DFID responded by committing $195,894 in cofinancing, which will support completion of the remaining three WCSCs. 8 The cost was taken from a community building at village level from the ADB (2004) L2143:-NEP Gender Equality and Empowerment of Women project (Manila). That building was considerably smaller, built using local materials (e.g., mud), and had no provision for utilities. This original design-cost error accounts for 51% of the cost overrun. The budget also had no provision for escalation since all construction was expected to take place in Year 1. 9 ADB. Jan Domestic Cost Escalation Factors, (percent). Manila. Average inflation in Nepal between FY2000 and FY2010 was 5.7%. Implementation was delayed by 6 years due to heavy insurrection in the project areas during this period. 10 Exchange rate in April 2004 was 1 USD = NRs 73 vs. exchange rate in March 2011 of 1 USD, = NRs 71.6 which accounts for 2% of the cost overrun.

7 4 15. Arrangements for implementation and monitoring and evaluation will remain the same as in the original design. The design and monitoring framework is in Appendix 1. The project implementation period will remain at 4 years, with no change in the implementation schedule. Regarding public relations and financing acknowledgement, of the six WCSCs to be constructed, three will have the JFPR logo exclusively, and three will have both the JFPR and DFID logos. JFPR will still finance the project management cost, and all communication will mention JFPR before DFID. 16. The additional $195,894 contribution from DFID will increase the overall project cost from $820,500 to $1,016,394. The rest of the funding allocation will remain unchanged. The revised cost tables by component and fund sources are in Appendix 2. A comparative financing plan is provided below. Comparative Project Financing Plan ($ 000) Item Original % Revised % Government of Nepal JFPR DFID b Beneficiaries Total a , DFID = Department for International Development of the United Kingdom, JFPR = Japan Fund for Poverty Reduction a Excludes taxes and duties. b Administered by the Asian Development Bank. This amount excludes the Asian Development Bank administration fee, audit costs, and bank charges. Source: Asian Development Bank estimates. V. ASSESSMENT 17. The project scope impact, outcomes, and outputs will remain the same as originally approved. The project will deliver significant economic and social benefits to the women and children of Nepal especially those who are poor and disadvantaged. The additional financing of $195,894 will be used to meet the cost overrun to be incurred above the project cost estimate as originally approved by the President and enable the project to deliver its benefits and development objectives. VI. THE PRESIDENT'S RECOMMENDATION 18. The President recommends that the Board approve the administration by ADB of a grant not exceeding the equivalent of $195,894 as additional financing to Nepal for Establishing Women and Children Service Centers, to be provided by the Department for International Development of the United Kingdom. 19. If the Board approves the recommended changes, the grant agreement will be amended as needed to reflect the changes where appropriate.

8 Appendix 1 5 REVISED DESIGN AND MONITORING FRAMEWORK Design Summary Impact Reduced vulnerability and helplessness of women and children in five a rural districts of Nepal as victims of crimes such as rape, domestic violence, polygamy, allegations of witchcrafts, child abuse, child marriage, and trafficking. Performance Targets and/or Indicators with Baselines The number of convictions for reported crimes against women and children in the target districts increased by 30% (from 2009 baseline). The number of crimes against women and children decreased by 20% by the end of the project (from 2009 baseline). 50% of the women and children victims that report crimes are reintegrated into the community. Data Sources and/or Reporting Mechanisms Police statistics at national level Police books and district police court reports Duty books and police journals of WCSCs staff ADB evaluation study Evaluation and research reports from donors (e.g., World Bank and DFID) on social inclusion Assumptions and Risks Assumptions Political changes continue to support addressing issues of concern to women. Society continues to be receptive towards an increased role for women and respect for rights of women and children. Prosecutors and judges are committed to the protection of the rights of women and children. Outcome Improved access by Nepalese women and children in five rural districts of Nepal to professional and coordinated protection from and assistance with crimes committed against them Outputs 1. Civil society consultations prior to establishing WCSCs to provide information about the intended purpose and mandate of the WCSCs and to Increase of 30% in the number of reported crimes against women and children in the first 2 years of implementation (from 2009 baseline). 50% increase in confidence in WCSCs and supporting agencies by the end of the project. At least 60% of crimes against women and children reported in the last 2 years of the project are satisfactorily handled by WCSCs and the supporting agencies. By the end of the project, the number of reported crimes against women and children that are prosecuted has increased by 50%. One information campaign through media outlets carried out in the first 6 months of project implementation Police crime reports at district level Public opinion surveys Victim surveys Progress reports from the executing agency Reports from ADB TA review missions Police reports Progress reports from the executing agency Risk Local government agencies and communities are not supportive of activities to reintegrate victims into communities. Assumptions Trained female police officers are transferred infrequently. Trained female police officers communicate in the local language. There is effective networking and coordination among supporting agencies. Male policy officers support female colleagues when needed. Risk Male police officers and men in the communities are reluctant to change their attitudes. Assumption Executing agency continuously engages with civil society. Risks

9 6 Appendix 1 Design Summary have local communities identify their main concerns related to crimes against women and children 2. Established the central WCSC in Kathmandu and five WCSCs in Bara, Dhanusha, Doti, Jumla, and Rautahat. Performance Targets and/or Indicators with Baselines Three workshops carried out in each districts, with outcome reports by month 6 One survey in the project districts in years 1 and 3, with analytical reports on the results One strategy paper for each new WCSC developed by month 6 One central WCSC operational in Kathmandu within year 1 The five target districts have an operational WCSC and network of supporting agencies within year 3 Data Sources and/or Reporting Mechanisms Minutes of focus groups and network meetings Minutes of communities meetings Public opinion survey reports Aide memoire from ADB review missions Assumptions and Risks Equipment dedicated to WCSCs used for regular police operations Civil society is reluctant to fully cooperate with the police. 3. Strengthened institutional capacity of the Nepal Police and civil society in dealing with crimes against women and children WCSCs provided with basic office package (computer, printer, camera, tape recorder, basic office furnishing, and accessories) Five modules and a training skills module focused on improving behavioral skills of police officers in the area of crimes against women and children are adapted to include elements on how to deal with crimes against women and children by year 2. Two specialized interactive training course developed on counseling and investigative techniques by year 2 The above training modules and the interactive training courses are integrated into the permanent curriculum of both the Police Academy and the regional police training centers (for the basic police training courses). 50% of the victims have access to the counseling services offered by the WCSCs. 30 police trainers trained in the new training programs 80 staff of WCSCs trained in policing with society, stress and trauma prevention for police officers, and investigative skills 50 WCSC staff and 250 representatives of supporting agencies jointly trained on

10 Appendix 1 7 Design Summary Performance Targets and/or Indicators with Baselines domestic violence, rape and sexual assault, sexual abuse of children, treatment of victims, and communication skills Data Sources and/or Reporting Mechanisms Assumptions and Risks 4. Expanded, strengthened, and institutionalized networking on issues related to crimes against women and children between the district WCSCs and supporting agencies Standard operating procedures (SOPs) on how to treat victims of crimes against women and children have been notified to all police stations and WCSCs by end of year 2 of the project Five districts have a functional district network that has met at least 10 times in the previous year by the end of the project. District-level MOUs signed between WCSCs and other supporting agencies By the end of the project, additional support (such as legal aid, medical or housing support) is provided to victims in 60% of crimes against women and children reported to the WCSCs. Public awareness campaign on crimes against women and children and the role of WCSCs and other supporting agencies implemented continuously Activities with Milestones 1. Civil society consultations prior to establishing WCSCs to provide information about the intended purpose and mandate of the WCSCs and to have local communities identify their main concerns related to crimes against women and children. Activity Scheduled Start Scheduled Finish 1.1 Establish grant implementation unit Jan 19, 2010 Feb 18, 2010 within month Recruit consultants in coordination Apr 19, 2010 May 18, 2010 with ADB within month Provide reports and information to Apr 19, 2010 May 18, 2010 the consultants within month Establish project advisory committee Apr 19, 2010 May 18, 2010 at national level within month Consult with and provide information Jul 19, 2010 Aug 18, 2010 to local communities on the mandate of WCSCs within month Implement information campaign Jul 19, 2010 Aug 18, 2010 within month Conduct three workshops in each Jul 19, 2010 Aug 18, 2010 district within month Engage a survey organization for the initial survey within month 6 Jul 19, 2010 Aug 18, 2010 Inputs JFPR - $750,000 DFID b - $195, Established the central WCSC in Kathmandu and 5 WCSCs in Bara, Dhanusha, Doti, Jumla, and Rautahat. Activity Scheduled Start Scheduled Finish 2.1 Manage civil works for the construction of the six WCSCs continuous from month 6 to month 36 Jul 19, 2010 Jan 19, 2013

11 8 Appendix 1 Design Summary Performance Targets and/or Indicators with Baselines Data Sources and/or Reporting Mechanisms Assumptions and Risks 3. Strengthened institutional capacity of the Nepal Police and Civil society in dealing with crimes against women and children. Activity Scheduled Start Scheduled Finish 3.1 Develop two specialized interactive Jul 19, 2010 Aug 18, 2010 training modules within month Adapt 5 training modules on Jul 19, 2010 Aug 18, 2010 behavioral skills of police trainers within month Train police trainers, police staff, and representatives of NGOs and communities from month 1 to month 24 Jan 19, 2010 Feb 19, Expanded, strengthened, and institutionalized networking on issues related to crimes against women and children between the district WCSCs and supporting agencies. Activity Scheduled Start Scheduled Finish 4.1 Develop MoU to be signed by Jan 19, 2011 Feb 18, 2011 WCSCs and NGOs within month Organize monthly meetings for the networking activities continuous from month 12 to month 48 Jan 19, 2011 Jan 19, 2014 ADB = Asian Development Bank, DFID = Department for International Development, MOU = memorandum of understanding, NGO = nongovernment organization, TA = technical assistance, WCSC = Women and Children Service Centers. a On 19 October 2010, a minor change to decrease the number of target districts from 7 to 5 was approved by the director, Environment, Natural Resources and Agriculture Division; 4 of the 5 were replacements based on reported crime incidents. b Supplementary funding received from DFID. Source: Asian Development Bank.

12 Inputs / Expenditure category REVISED COSTS TABLES Table A2.1: Detailed Cost Estimates by Expense Category ($) Grant Components Component A Civil Society Consultations Prior to Establishing W6SCS Component B Establishment of WCSCs Component c Capacity Building Component D Outreach and Networking, Component E Project Management Total (Input) Percent 1. Civil Works (including technical surveys and designs, and supervision of constructions) 2. Equipment and Supplies (e.g., power tools, turbines, excavation and construction tools, agricultural tools and equipment, communications devices, audio-visual, computing and other office equipment, furniture, etc.) 3. Training, Workshops, Seminars, Public Campaigns (e.g., resource persons, technical training specialists, community mobilizes and organizers, venue rental, travel, food and accommodation for participants and other related costs) 4. Consulting Services (e.g., for surveys, assessments and reviews, technical specialists, advisors, external auditors, etc., including related costs such as travel, accommodation, and per diem) 5. Grant Management (management of the specific components and of the PIU, including wages for project staff, travel costs and per diem, office equipment, rental, O&M, and recurrent costs, etc.) 6. Other Inputs: {For other specific project inputs that cannot be included in any of the above categories, such as, specific livelihood development costs by specialized NGOs, seed capital and funds for establishing micro-finance systems, etc.) 7. Contingencies (0% 10% of total estimated grant fund) Use of contingencies requires prior approval from ADB. Subtotal JFPR grant financed Government contribution {e.g., salaries for government staff, provision of project office, land acquisition, participation in workshops and/or meetings) Community's Contributions (mostly in kind): {e.g., participation in all training and community development; land development, and in-kind labor contribution through food for work) 1 436, , ,000 54, , ,500 50, , ,000 14, , , ,500 10,500 41, ,500 13, ,000 20,000 7,000 5,000 5,000 41, , , ,000 68, , , ,000 22,000 11,000. 5,000 14,500 58,500 7,000 4,000 1,000 12, Total Estimated Costs 54, , ,000 74, ,000 1,016,394 ADB = Asian Development Bank, NGO = nongovernment organization, O&M = operation and maintenance, PIU = project implementation unit, WCSC = Women and Children Service Center. Source: Asian Development Bank estimates. 5.7 Appendix 2 9

13 10 Appendix 2 Table A2.2: Detailed Cost Estimates by Component and Fund Source ($) Code Supplies and Services Rendered Unit Quantity Units Cost per Unit Total Fund Source (Amount) JFPR DFID GOV Communities Method of Procurement Component A: Civil Society Consultations Prior to Establishing WCSCs 1.3 Training, Workshops, and Seminars Information Campaign Lump sum 7 2,000 14,000 14, Community Meetings Lump sum 7,000 4,000 2,000 1, Surveys Lump sum 2 9,500 19,000 19, Community participation 10,000 4,000 6,000 Subtotal 50,000 37, ,000 7,000 Component B: Establishment of WCSCs 2.1 Civil Works Central WCSCs Lump sum 1 61,231 61,232 30,500 30,732 NCB WCSCs at district level Lump sum 5 75, , , ,162 NCB 2.2 Equipment and Supplies Central WCSCs Lump sum 1 5,000 5,000 5,000 Shopping WCSCs at district level Lump sum 5 9,800 49,000 49,000 Shopping 2.4 Consulting Services National Consultant Engineer person-month 2 3,000 6,000 6,000 INDV 2.5 Management and Coordination of this Component Component 1 - Staff INDV Travel and Per Diem Operational Costs Year 1 Lump sum 5 3,500 17,500 14,500 3,000 Operational Costs Year 2 Lump sum 5 3,500 17,500 10,500 7,000 Operational Costs Year 3 Lump sum 5 3,500 17,500 5,500 12,000 Subtotal 548, , ,894 22,000 0 Component C: Capacity Building 1.2 Equipment and Supplies Project Office 4,500 4,500 PDFS Office Supply 1,500 1,500 PDFS 1.3 Training, Workshops, and Seminars Curricula Development (adaptation of modules, manuals, programs) Lump sum 39,500 38,500 1, Training of Trainers Trainee ,000 18,500 1,500 1, Training of WCSCs Staff Trainee ,000 8,000 1, Joint training of WCSCs and NGOs staff Trainee ,000 69,000 3, Workshop on internal procedures Lump sum 9,500 9, Consulting Services Curriculum Development on couseling (national) Day ,750 3,750 INDV Curriculum Development on investigation skills (international) Day ,000 7,000 INDV Curriculum Development on investigation skills (national) Day ,750 3,750 INDV 1.5 management and Coordination of this Component Component 1 - Staff 1,000 1, Travel and Per Diem Operational Costs Subtotal 173, , ,000 4,000 Component D: Outreach and Networking 1.3 Training, Workshops, Seminars Public Awareness Campaign Lump sum 5 7,000 35,000 35, Community Meetings Year 1 Lump sum ,000 6, Community Meetings Year 2 Lump sum ,000 5,000 1, Community Meetings Year 3 Lump sum ,000 4,000 1, Other Project Inputs (Specify: e.g., costs for NGO's, microfinance) District Networks Year 1 Lump sum ,500 5, District Networks Year 2 Lump sum ,500 4,500 1, District Networks Year 3 Lump sum ,500 3,500 1, Subtotal 69,500 63, ,000 1,000 Component E: Project Management 3.3 Consulting Services (e.g., for management and monitoring/assessments) External Audit 10,000 10, Domestic Consultant for Management person-month 36 2,000 72,000 72,000 INDV Domestic Consultant for Civil Works person-month 18 1,500 27,000 27,000 INDV 3.4 Management and Coordination of this Component Component 1 - Staff 4,000 4, Travel and Per Diem Lump sum 15,000 10,500 4, Operational Costs Lump sum 6,000 6,000 Subtotal 134, , ,500 0 Components A - E = Subtotal 975, , ,894 58,500 12,000 Contingency (Maximum 10% of total JFPR Contribution 41,000 41,000 Total Grant Costs 1,016, , ,894 58,500 12,000 DFID = Department for International Development of the United Kingdom, GOV = Government of Nepal, INDV = individual consultants, JFPR = Japan Fund for Poverty Reduction, NCB = national competitive bidding, NGO = nongovernment organization, PDFS = purchase directly from a supplier, WCSC = women and children service center. Source: Asian Development Bank estimates.

14 Appendix 3 11

Improving the Financial Management Capacity of Executing Agencies in Afghanistan and Pakistan

Improving the Financial Management Capacity of Executing Agencies in Afghanistan and Pakistan Technical Assistance Report Project Number: 46539 Regional Capacity Development Technical Assistance (R CDTA) August 2014 Improving the Financial Management Capacity of Executing Agencies in Afghanistan

More information

PROJECT PREPARATORY TECHNICAL ASSISTANCE

PROJECT PREPARATORY TECHNICAL ASSISTANCE Appendix 3 13 A. Justification PROJECT PREPARATORY TECHNICAL ASSISTANCE 1. The project preparatory technical assistance (PPTA) is required to help the government of Mongolia design the Regional Road Development

More information

ASIAN DEVELOPMENT BANK

ASIAN DEVELOPMENT BANK ASIAN DEVELOPMENT BANK TAR:INO 34147 TECHNICAL ASSISTANCE (Cofinanced by the Government of the United Kingdom) TO THE REPUBLIC OF INDONESIA FOR INTEGRATION OF POVERTY CONSIDERATIONS IN DECENTRALIZED EDUCATION

More information

ASIAN DEVELOPMENT BANK

ASIAN DEVELOPMENT BANK ASIAN DEVELOPMENT BANK TAR:NEP 37266 TECHNICAL ASSISTANCE (Financed by the Japan Special Fund) TO THE KINGDOM OF NEPAL FOR PREPARING THE TRANSPORT CONNECTIVITY SECTOR PROJECT June 2004 CURRENCY EQUIVALENTS

More information

India: Preparing for the Ara Canal Water Productivity Improvement Project

India: Preparing for the Ara Canal Water Productivity Improvement Project Technical Assistance Report Project Number: 52153-002 Transaction Technical Assistance (TRTA) June 2018 India: Preparing for the Ara Canal Water Productivity Improvement Project This document is being

More information

PROJECT PREPARATORY TECHNICAL ASSISTANCE

PROJECT PREPARATORY TECHNICAL ASSISTANCE Appendix 3 9 A. Justification PROJECT PREPARATORY TECHNICAL ASSISTANCE 1. The PPTA will review and assess the performance of the secondary education subsector in Viet Nam and identify the challenges, which

More information

Republic of the Philippines: Supporting Capacity Development for the Bureau of Internal Revenue

Republic of the Philippines: Supporting Capacity Development for the Bureau of Internal Revenue Technical Assistance Report Project Number: 46429-001 Capacity Development Technical Assistance (CDTA) April 2013 Republic of the Philippines: Supporting Capacity Development for the Bureau of Internal

More information

Republic of the Maldives: Preparing Business Strategy for Port Development

Republic of the Maldives: Preparing Business Strategy for Port Development Technical Assistance Report Project Number: 47283 Capacity Development Technical Assistance (CDTA) November 2013 Republic of the Maldives: Preparing Business Strategy for Port Development The views expressed

More information

Democratic Socialist Republic of Sri Lanka: Preparing the Health System Enhancement Project

Democratic Socialist Republic of Sri Lanka: Preparing the Health System Enhancement Project Technical Assistance Report Project Number: 51107-001 Transaction Technical Assistance (TRTA) October 2017 Democratic Socialist Republic of Sri Lanka: Preparing the Health System Enhancement Project This

More information

Mongolia: Developing an Information System for Development Policy and Planning

Mongolia: Developing an Information System for Development Policy and Planning Technical Assistance Report Project Number: 51136-001 Knowledge and Support Technical Assistance (KSTA) September 2017 Mongolia: Developing an Information System for Development Policy and Planning This

More information

PROJECT PREPARATORY TECHNICAL ASSISTANCE

PROJECT PREPARATORY TECHNICAL ASSISTANCE Appendix 4 11 A. Justification PROJECT PREPARATORY TECHNICAL ASSISTANCE 1. The government has identified the priority areas to be covered under the ensuing loan project and prepared outline technical studies

More information

ASIAN DEVELOPMENT BANK

ASIAN DEVELOPMENT BANK ASIAN DEVELOPMENT BANK TAR: NEP 37196 TECHNICAL ASSISTANCE TO THE KINGDOM OF NEPAL FOR RESTRUCTURING OF NEPAL ELECTRICITY AUTHORITY December 2004 CURRENCY EQUIVALENTS (as of 3 November 2004) Currency Unit

More information

People s Republic of China: Study on Natural Resource Asset Appraisal and Management System for the National Key Ecological Function Zones

People s Republic of China: Study on Natural Resource Asset Appraisal and Management System for the National Key Ecological Function Zones Technical Assistance Report Project Number: 50004-001 Policy and Advisory Technical Assistance (PATA) October 2016 People s Republic of China: Study on Natural Resource Asset Appraisal and Management System

More information

Republic of Indonesia: Promoting Innovative Financial Inclusion (Financed by ADB Technical Assistance Special Fund)

Republic of Indonesia: Promoting Innovative Financial Inclusion (Financed by ADB Technical Assistance Special Fund) Technical Assistance Report Program Number: 48207-003 Transaction Technical Assistance (TRTA) June 2017 Republic of Indonesia: Promoting Innovative Financial Inclusion (Financed by ADB Technical Assistance

More information

Lao People's Democratic Republic: Strengthening the Capacity of the State Audit Organization

Lao People's Democratic Republic: Strengthening the Capacity of the State Audit Organization Completion Report Project Number: 46-01 Technical Assistance Number: 7857 April 016 Lao People's Democratic Republic: Strengthening the Capacity of the State Audit Organization This document is being disclosed

More information

PROJECT PREPARATION TECHNICAL ASSISTANCE

PROJECT PREPARATION TECHNICAL ASSISTANCE 12 Appendix 4 A. Justification PROJECT PREPARATION TECHNICAL ASSISTANCE 1. A regional project preparatory technical assistance (R-PPTA) is required to prepare the Pacific Renewable Energy Investment Facility

More information

People s Republic of China: Promotion of a Legal Framework for Financial Consumer Protection

People s Republic of China: Promotion of a Legal Framework for Financial Consumer Protection Technical Assistance Report Project Number: 47042-001 Policy and Advisory Technical Assistance (PATA) October 2013 People s Republic of China: Promotion of a Legal Framework for Financial Consumer Protection

More information

Republic of the Philippines: Strengthening Provincial and Local Planning and Expenditure Management Phase 2

Republic of the Philippines: Strengthening Provincial and Local Planning and Expenditure Management Phase 2 Technical Assistance Report Project Number: 40345 April 2008 Republic of the Philippines: Strengthening Provincial and Local Planning and Expenditure Management Phase 2 The views expressed herein are those

More information

Republic of Indonesia: Strengthening National Public Procurement Processes

Republic of Indonesia: Strengthening National Public Procurement Processes Technical Assistance Report Project Number: 43219-01 Capacity Development Technical Assistance (CDTA) November 2010 Republic of Indonesia: Strengthening National Public Procurement Processes (Financed

More information

Cambodia: Rural Credit and Savings Project

Cambodia: Rural Credit and Savings Project Project Validation Report Reference Number: CAM 2008-06 Project Number: 30327 Loan Number: 1741 July 2008 Cambodia: Rural Credit and Savings Project Operations Evaluation Department ABBREVIATIONS ADB Asian

More information

People s Republic of China: Supporting the Reform of the Role of the People s Bank of China

People s Republic of China: Supporting the Reform of the Role of the People s Bank of China Technical Assistance Report Project Number: 49401-001 Policy and Advisory Technical Assistance (PATA) April 2016 People s Republic of China: Supporting the Reform of the Role of the People s Bank of China

More information

Mongolia: Development of State Audit Capacity

Mongolia: Development of State Audit Capacity Technical Assistance Report Project Number: 47198-001 Capacity Development Technical Assistance (CDTA) November 2013 Mongolia: Development of State Audit Capacity The views expressed herein are those of

More information

OUTLINE TERMS OF REFERENCE FOR CONSULTANTS

OUTLINE TERMS OF REFERENCE FOR CONSULTANTS Strengthening Public Financial Resource Management through Information and Communication Systems Technology Systems (TRTA MON 51084) OUTLINE TERMS OF REFERENCE FOR CONSULTANTS 1. The transaction technical

More information

People s Republic of Bangladesh: Updating the Road Master Plan

People s Republic of Bangladesh: Updating the Road Master Plan South Asia Subregional Economic Cooperation Dhaka Northwest Corridor Road Project, Phase 2 (RRP BAN 40540) Technical Assistance Report Project Number: 40540-016 Transaction Technical Assistance (TRTA)

More information

Georgia: Preparing the Second Domestic Resource Mobilization Program

Georgia: Preparing the Second Domestic Resource Mobilization Program Technical Assistance Report Project Number: 52161-002 Transaction Technical Assistance (TRTA) September 2018 Georgia: Preparing the Second Domestic Resource Mobilization Program This document is being

More information

Islamic Republic of Pakistan: Karachi Bus Rapid Transit Project

Islamic Republic of Pakistan: Karachi Bus Rapid Transit Project Project Design Advance Project Number: 47279-003 September 2016 Islamic Republic of Pakistan: Karachi Bus Rapid Transit Project This document is being disclosed to the public in accordance with ADB's Public

More information

Project Administration Instructions

Project Administration Instructions Project Administration Instructions PAI 6.02 Page 1 of 2 PROJECT ADMINISTRATION MISSIONS A. Introduction 1. ADB missions dispatched for loan and technical assistance (TA) project administration are classified

More information

LOAN AGREEMENT (Special Operations) LOAN AGREEMENT dated 17 January 2013 between KINGDOM OF CAMBODIA ( Borrower ) and ASIAN DEVELOPMENT BANK ( ADB ).

LOAN AGREEMENT (Special Operations) LOAN AGREEMENT dated 17 January 2013 between KINGDOM OF CAMBODIA ( Borrower ) and ASIAN DEVELOPMENT BANK ( ADB ). LOAN AGREEMENT (Special Operations) LOAN AGREEMENT dated 17 January 2013 between KINGDOM OF CAMBODIA ( Borrower ) and ASIAN DEVELOPMENT BANK ( ADB ). WHEREAS (A) by a loan agreement of even date herewith

More information

OPERATIONS MANUAL BANK POLICIES (BP) These policies were prepared for use by ADB staff and are not necessarily a complete treatment of the subject.

OPERATIONS MANUAL BANK POLICIES (BP) These policies were prepared for use by ADB staff and are not necessarily a complete treatment of the subject. OM Section H5/BP Page 1 of 4 BANK POLICIES (BP) These policies were prepared for use by ADB staff and are not necessarily a complete treatment of the subject. A. Introduction ADDITIONAL FINANCING 1. The

More information

MFF - Bihar Urban Development Investment Program (Facility Concept)

MFF - Bihar Urban Development Investment Program (Facility Concept) India: MFF - Bihar Urban Development Investment Program (Facility Concept) Project Name Project Number 41603-013 Country Project Status Project Type / Modality of Assistance Source of Funding / Amount

More information

Socialist Republic of Viet Nam: GMS Corridor Connectivity Enhancement Project

Socialist Republic of Viet Nam: GMS Corridor Connectivity Enhancement Project Technical Assistance Project Number: 50098 Project Preparatory Technical Assistance (PPTA) November 2016 Socialist Republic of Viet Nam: GMS Corridor Connectivity Enhancement Project This document is being

More information

Governance Assessment (Summary) Nepal

Governance Assessment (Summary) Nepal Governance Assessment (Summary) Nepal Country Partnership Strategy: Nepal, 2013 2017 A. Current State of Governance GOVERNANCE ASSESSMENT 1. Nepal is passing through a historic political transition. The

More information

PROJECT PREPARATORY TECHNICAL ASSISTANCE

PROJECT PREPARATORY TECHNICAL ASSISTANCE 8 Appendix 3 A. Justification PROJECT PREPARATORY TECHNICAL ASSISTANCE 1. The Government of the Republic of the Union of Myanmar has requested the Asian Development Bank (ADB) to provide a project preparatory

More information

India: Supporting the Second West Bengal Development Finance Program

India: Supporting the Second West Bengal Development Finance Program Second West Bengal Development Finance Program (RRP IND 49209) Technical Assistance Report Project Number: 49209-001 Transaction Technical Assistance (TRTA) August 2017 India: Supporting the Second West

More information

ASIAN DEVELOPMENT BANK

ASIAN DEVELOPMENT BANK ASIAN DEVELOPMENT BANK TAR:CAM 36593 TECHNICAL ASSISTANCE TO THE KINGDOM OF CAMBODIA FOR IMPROVING INSURANCE SUPERVISION December 2002 CURRENCY EQUIVALENTS (as of 3 December 2002) Currency Unit riel (KR)

More information

Republic of Kazakhstan: Enhancing Insurance Market Efficiency and Outreach

Republic of Kazakhstan: Enhancing Insurance Market Efficiency and Outreach Technical Assistance Report Project Number: 48037-001 Policy and Advisory Technical Assistance (PATA) October 2014 Republic of Kazakhstan: Enhancing Insurance Market Efficiency and Outreach (Cofinanced

More information

Developing Anti-Money Laundering and Combating the Financing of Terrorism Approaches, Methodologies, and Controls

Developing Anti-Money Laundering and Combating the Financing of Terrorism Approaches, Methodologies, and Controls Technical Assistance Report Project Number: 50258-001 Cluster Regional Capacity Development Technical Assistance (C-R-CDTA) December 2016 Developing Anti-Money Laundering and Combating the Financing of

More information

Armenia: Infrastructure Sustainability Support Program

Armenia: Infrastructure Sustainability Support Program Technical Assistance Report Project Number: 46220 Policy and Advisory Technical Assistance (PATA) December 2012 Armenia: Infrastructure Sustainability Support Program The views expressed herein are those

More information

Republic of Fiji: Supporting Public Financial Management Reform

Republic of Fiji: Supporting Public Financial Management Reform Technical Assistance Report Project Number: 50378-001 Knowledge and Support Technical Assistance (KSTA) November 2017 Republic of Fiji: Supporting Public Financial Management Reform This document is being

More information

Lao People s Democratic Republic: Strengthening Capacity for Health Sector Governance Reforms

Lao People s Democratic Republic: Strengthening Capacity for Health Sector Governance Reforms Technical Assistance Report Project Number: 47137-004 Capacity Development Technical Assistance (CDTA) September 2016 Lao People s Democratic Republic: Strengthening Capacity for Health Sector Governance

More information

Establishment of the High-Level Technology Fund

Establishment of the High-Level Technology Fund April 2017 Establishment of the High-Level Technology Fund Distribution of this document is restricted until it has been approved by Management. Following such approval, ADB will disclose the document

More information

Additional Cofinancing

Additional Cofinancing Additional Cofinancing Sri Lanka Sri Lanka Project Number: 45148 Loan Number: 3029/3030-SRI May 2014 Proposed Administration of Loan Democratic Socialist Republic of Sri Lanka: Greater Colombo Water and

More information

Maldives: Developing the Revenue Administration Management Information System

Maldives: Developing the Revenue Administration Management Information System Completion Report Project Number: 44414-012 Technical Assistance Number: 7946 July 2015 Maldives: Developing the Revenue Administration Management Information System This document is being disclosed to

More information

Nepal: Preparing the North South Fast Track Road Project

Nepal: Preparing the North South Fast Track Road Project Technical Assistance Report Project Number: 40011 September 2006 Nepal: Preparing the North South Fast Track Road Project (Financed by the Japan Special Fund) CURRENCY EQUIVALENTS (as of 15 September 2006)

More information

Viet Nam: Microfinance Development Program (Subprograms 1 and 2)

Viet Nam: Microfinance Development Program (Subprograms 1 and 2) Validation Report Reference Number: PVR-478 Project Numbers: 42235-013 and 42235-023 Loan Numbers: 2877 and 3213 December 2016 Viet Nam: Microfinance Development Program (Subprograms 1 and 2) Independent

More information

INTERNAL AUDIT DIVISION REPORT 2018/014. Audit of quick-impact projects in the African Union-United Nation Hybrid Operation in Darfur

INTERNAL AUDIT DIVISION REPORT 2018/014. Audit of quick-impact projects in the African Union-United Nation Hybrid Operation in Darfur INTERNAL AUDIT DIVISION REPORT 2018/014 Audit of quick-impact projects in the African Union-United Nation Hybrid Operation in Darfur The Mission needed to ensure that completed projects are used, field

More information

Technical Assistance to the Islamic Republic of Pakistan for the Developing Social Health Insurance Project

Technical Assistance to the Islamic Republic of Pakistan for the Developing Social Health Insurance Project Technical Assistance TAR: PAK 37359 Technical Assistance to the Islamic Republic of Pakistan for the Developing Social Health Insurance Project July 2005 CURRENCY EQUIVALENTS (as of 7 July 2005) Currency

More information

Mongolia: Social Security Sector Development Program

Mongolia: Social Security Sector Development Program Validation Report Reference Number: PVR196 Project Number: 33335 Loan Numbers: 1836 and 1837(SF) November 2012 Mongolia: Social Security Sector Development Program Independent Evaluation Department ABBREVIATIONS

More information

Nepal: Rural Finance Sector Development Cluster Program (Subprogram 2)

Nepal: Rural Finance Sector Development Cluster Program (Subprogram 2) Validation Report July 2017 Nepal: Rural Finance Sector Development Cluster Program (Subprogram 2) Reference Number: PVR-497 Project Number: 36169-023 Loan Number: 2641 Grant Number: 0208 ABBREVIATIONS

More information

ASIAN DEVELOPMENT BANK

ASIAN DEVELOPMENT BANK ASIAN DEVELOPMENT BANK TAR: INO 34149 TECHNICAL ASSISTANCE (Financed from the Japan Special Fund) TO THE REPUBLIC OF INDONESIA FOR PREPARING THE SECOND DECENTRALIZED HEALTH SERVICES PROJECT November 2001

More information

Ex-Ante Evaluation (for Japanese ODA Loan)

Ex-Ante Evaluation (for Japanese ODA Loan) Japanese ODA Loan Ex-Ante Evaluation (for Japanese ODA Loan) 1.Name of the Project Country: Federal Democratic Republic of Nepal Project: Emergency Housing Reconstruction Project Loan Agreement: December

More information

Tuvalu: Outer Island Maritime Infrastructure Project

Tuvalu: Outer Island Maritime Infrastructure Project Project Design Advance Project Number: 48484-003 November 2015 Tuvalu: Outer Island Maritime Infrastructure Project This document is being disclosed to the public in accordance with ADB s Public Communications

More information

Institutional Strengthening for Aviation Regulation

Institutional Strengthening for Aviation Regulation Technical Assistance Report Project Number: 43429 Regional capacity development technical assistance (R-CDTA) December 2010 Institutional Strengthening for Aviation Regulation The views expressed herein

More information

Republic of Indonesia: Aligning Asian Development Bank and Country Systems for Improved Project Performance

Republic of Indonesia: Aligning Asian Development Bank and Country Systems for Improved Project Performance Technical Assistance Report Project Number: 47287-001 Capacity Development Technical Assistance (CDTA) December 2013 Republic of Indonesia: Aligning Asian Development Bank and Country Systems for Improved

More information

Islamic Republic of Pakistan: Update on Energy Sector Plan

Islamic Republic of Pakistan: Update on Energy Sector Plan Technical Assistance Report Project Number: 50081-001 Knowledge and Support Technical Assistance (KSTA) August 2017 Islamic Republic of Pakistan: Update on Energy Sector Plan This The views document expressed

More information

Republic of the Philippines: Institutionalizing Capital Market Reforms

Republic of the Philippines: Institutionalizing Capital Market Reforms Encouraging Investment through Capital Market Reforms Program, SP2 (RRP PHI 48427-002) Technical Assistance Report Project Number: 48427-002 Transaction Technical Assistance (TRTA) October 2017 Republic

More information

GAMAS means Mongolia Customs Automated Data Processing

GAMAS means Mongolia Customs Automated Data Processing 2 System; (c) GAMAS means Mongolia Customs Automated Data Processing (d) Grant Account means the account opened by ADB on its books in the name of Mongolia for the purposes of the Project and to which

More information

People s Republic of Bangladesh: Rural Infrastructure Maintenance Program

People s Republic of Bangladesh: Rural Infrastructure Maintenance Program Project Design Advance Project Administration Manual Project Number: 47243-003 June 2016 People s Republic of Bangladesh: Rural Infrastructure Maintenance Program CONTENTS I. PROPOSED PROJECT DESCRIPTION

More information

Establishing Sound Microinsurance Markets in Asia and the Pacific

Establishing Sound Microinsurance Markets in Asia and the Pacific Technical Assistance Report Project Number: 46202-001 Regional Capacity Development Technical Assistance (R-CDTA) December 2013 Establishing Sound Microinsurance Markets in Asia and the Pacific The views

More information

ATTACHED TECHNICAL ASSISTANCE

ATTACHED TECHNICAL ASSISTANCE Third Capital Market Development Program (RRP BAN 45253) ATTACHED TECHNICAL ASSISTANCE A. Introduction 1. The attached technical assistance (TA) of $700,000 will support implementation of the proposed

More information

Completion Report Project Number: Loan Number 2252/2253 October 2013 Lao People s Democratic Republic: Rural Finance Sector Development Program

Completion Report Project Number: Loan Number 2252/2253 October 2013 Lao People s Democratic Republic: Rural Finance Sector Development Program Completion Report Project Number: 33357 Loan Number 2252/2253 October 2013 Lao People s Democratic Republic: Rural Finance Sector Development Program CURRENCY EQUIVALENTS Currency Unit kip (KN) At Appraisal

More information

SECTOR ASSESSMENT (SUMMARY): FINANCE 1

SECTOR ASSESSMENT (SUMMARY): FINANCE 1 Country Partnership Strategy: Thailand, 2013 2016 A. Sector Issues and Opportunities SECTOR ASSESSMENT (SUMMARY): FINANCE 1 1. Thailand has a sound and well-regulated banking system, capital market, and

More information

Technical Assistance Report

Technical Assistance Report Technical Assistance Report Project Number: 47291-001 Regional Capacity Development Technical Assistance (R-CDTA) December 2014 Enhancing Roles of Supreme Audit Institutions in Selected Association of

More information

The UN Trust Fund to End Violence against Women Annex 3: Budget Guidelines

The UN Trust Fund to End Violence against Women Annex 3: Budget Guidelines Contents The UN Trust Fund to End Violence against Women Annex 3: Budget Guidelines 1. General Guidelines & Requirements... 1 2. Budget for Project Activities... 2 3. Budget for M&E/Audit/Management Costs...

More information

Completion Report. Project Number: Loan Number: 2199-PHI October Philippines: Microfinance Development Program

Completion Report. Project Number: Loan Number: 2199-PHI October Philippines: Microfinance Development Program Completion Report Project Number: 38579 Loan Number: 2199-PHI October 2009 Philippines: Microfinance Development Program CURRENCY EQUIVALENTS Currency Unit peso (P) At Appraisal At Project {or Program}

More information

(i) Loan Disbursement Handbook means ADB s Loan Disbursement Handbook (2012, as amended from time to time);

(i) Loan Disbursement Handbook means ADB s Loan Disbursement Handbook (2012, as amended from time to time); 2 (f) Goods means equipment and materials to be financed out of the proceeds of the Loan, including related services such as transportation, insurance, installation, commissioning, training, and initial

More information

Georgia: Strengthening Domestic Resource Mobilization

Georgia: Strengthening Domestic Resource Mobilization Technical Assistance Report Project Number: 48044-003 Policy and Advisory Technical Assistance (PATA) September 2014 Georgia: Strengthening Domestic Resource Mobilization This document is being disclosed

More information

India: Enhancing Capacity of State Utilities in Preparing Energy Sector Projects

India: Enhancing Capacity of State Utilities in Preparing Energy Sector Projects Technical Assistance Report Project Number: 51308-002 Transaction Technical Assistance Facility (F-TRTA) December 2017 India: Enhancing Capacity of State Utilities in Preparing Energy Sector Projects Distribution

More information

Validation Report. India: North Karnataka Urban Sector Investment Program, Tranche 1. Independent Evaluation Department

Validation Report. India: North Karnataka Urban Sector Investment Program, Tranche 1. Independent Evaluation Department Validation Report Reference Number: PVR-451 Project Number: 38254-033 Loan Number: 2312 August 2016 India: North Karnataka Urban Sector Investment Program, Tranche 1 Independent Evaluation Department ABBREVIATIONS

More information

Technical Assistance Report

Technical Assistance Report Technical Assistance Report Project Number: 40280 September 2007 Islamic Republic of Afghanistan: Technical Assistance for Support for Economic Policy Management (Cofinanced by the Government of Australia

More information

LOAN AGREEMENT (Special Operations) (Higher Education Reform Project) between MONGOLIA. and ASIAN DEVELOPMENT BANK DATED 9 SEPTEMBER 2011

LOAN AGREEMENT (Special Operations) (Higher Education Reform Project) between MONGOLIA. and ASIAN DEVELOPMENT BANK DATED 9 SEPTEMBER 2011 LOAN NUMBER 2766-MON(SF) LOAN AGREEMENT (Special Operations) (Higher Education Reform Project) between MONGOLIA and ASIAN DEVELOPMENT BANK DATED 9 SEPTEMBER 2011 LAS:MON 43007 LOAN AGREEMENT (Special Operations)

More information

ANNEX I: TERMS OF REFERENCE (TOR)

ANNEX I: TERMS OF REFERENCE (TOR) ANNEX I: TERMS OF REFERENCE (TOR) National Communications Consultant for UNDP Project: Strengthening Transparency and Code of Ethics for Enhanced Public Confidence in Court of Cassation in Turkey 1. Background

More information

Mongolia: Regional Road Development Project

Mongolia: Regional Road Development Project Validation Report Reference Number: PVR-481 Project Numbers: 35377-013 and 35377-023 Loan/Grant Numbers: 2087, 2621, and 0199 December 2016 Mongolia: Regional Road Development Project Independent Evaluation

More information

Recent Developments at the Inter-American Development Bank. J. James Spinner General Counsel Inter-American Development Bank

Recent Developments at the Inter-American Development Bank. J. James Spinner General Counsel Inter-American Development Bank Recent Developments at the Inter-American Development Bank J. James Spinner General Counsel Inter-American Development Bank 2002 Seminar on Current Developments in Monetary and Financial Law International

More information

FOR OFFICIAL USE ONLY

FOR OFFICIAL USE ONLY Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Document of The World Bank FOR OFFICIAL USE ONLY PROJECT PAPER ON A PROPOSED ADDITIONAL

More information

Maldives: Enhancing Tax Administration Capacity

Maldives: Enhancing Tax Administration Capacity Completion Report Project Number: 47150-001 Technical Assistance Number: 8525 August 2018 Maldives: Enhancing Tax Administration Capacity This document is being disclosed to the public in accordance with

More information

SECTOR ASSESSMENT (SUMMARY): TRANSPORT 1

SECTOR ASSESSMENT (SUMMARY): TRANSPORT 1 Country Partnership Strategy: Viet Nam, 2012 2015 SECTOR ASSESSMENT (SUMMARY): TRANSPORT 1 Sector Road Map 1. Sector Performance, Problems, and Opportunities 1. Investment in the transport sector in Viet

More information

Country: INDONESIA. Initiation Plan

Country: INDONESIA. Initiation Plan United Nations Development Programme Country: INDONESIA Initiation Plan Project Title: Expected CP Outcome(s): (Those that are linked to the project and extracted from the CPAP) Initiation Plan Start Date:

More information

NATIONAL LIVELIHOOD COORDINATOR FOR LIVELIHOOD IMPROVEMENT AND NUTRITIONAL SECURITY (LN) PROJECT POVERTY REDUCTION FUND (PRF) Terms of Reference

NATIONAL LIVELIHOOD COORDINATOR FOR LIVELIHOOD IMPROVEMENT AND NUTRITIONAL SECURITY (LN) PROJECT POVERTY REDUCTION FUND (PRF) Terms of Reference NATIONAL LIVELIHOOD COORDINATOR FOR LIVELIHOOD IMPROVEMENT AND NUTRITIONAL SECURITY (LN) PROJECT POVERTY REDUCTION FUND (PRF) Terms of Reference Project Name: Poverty Reduction Fund, Livelihood Improvement

More information

Pakistan: Decentralization Support Program

Pakistan: Decentralization Support Program Validation Report Reference Number: PCV: PAK 2011-53 Program Number: 34328 Loan Numbers: 1935/1936/1937/1938 December 2011 Pakistan: Decentralization Support Program Independent Evaluation Department ABBREVIATIONS

More information

Section 3.07 is deleted and the following is substituted therefor:

Section 3.07 is deleted and the following is substituted therefor: 2 outstanding Loan and the Fixed Spread that will be applied to new Loans (expressed as a percentage per annum), by (ii) the principal amount of the outstanding Loan on which the Borrower shall pay interest

More information

LOAN AGREEMENT (Special Operations) (Road Network Upgrading Project) between DEMOCRATIC REPUBLIC OF TIMOR-LESTE. and ASIAN DEVELOPMENT BANK

LOAN AGREEMENT (Special Operations) (Road Network Upgrading Project) between DEMOCRATIC REPUBLIC OF TIMOR-LESTE. and ASIAN DEVELOPMENT BANK LOAN NUMBER 2858-TIM (SF) LOAN AGREEMENT (Special Operations) (Road Network Upgrading Project) between DEMOCRATIC REPUBLIC OF TIMOR-LESTE and ASIAN DEVELOPMENT BANK DATED 2 MAY 2012 TIM 45094 LOAN AGREEMENT

More information

Report and Recommendation of the President to the Board of Directors

Report and Recommendation of the President to the Board of Directors Report and Recommendation of the President to the Board of Directors Project Number: 43309-015 Loan Number: 2839-CAM September 2016 Proposed Loan for Additional Financing Kingdom of Cambodia: Provincial

More information

People s Republic of China: Emergency Assistance for Wenchuan Earthquake Reconstruction Project

People s Republic of China: Emergency Assistance for Wenchuan Earthquake Reconstruction Project Validation Report Reference Number: PVR-462 Project Number: 42496-013 Loan Number: 2508 December 2016 People s Republic of China: Emergency Assistance for Wenchuan Earthquake Reconstruction Project Independent

More information

Uzbekistan: Second Small and Microfinance Development Project

Uzbekistan: Second Small and Microfinance Development Project Completion Report Project Number: 42007-013 Loan Number: 2634 September 2015 Uzbekistan: Second Small and Microfinance Development Project This document is being disclosed to the public in accordance with

More information

Policy Coordination and Planning of Border Economic Zones of the People's Republic of China and Viet Nam

Policy Coordination and Planning of Border Economic Zones of the People's Republic of China and Viet Nam Technical Assistance Report Project Number: 49400-001 Policy and Advisory Technical Assistance (PATA) January 2017 Policy Coordination and Planning of Border Economic Zones of the People's Republic of

More information

3 years $ 305,241 $ 500,000. Grant Overview. Project Information. Cycle 20 Year of Grant Award 2017

3 years $ 305,241 $ 500,000. Grant Overview. Project Information. Cycle 20 Year of Grant Award 2017 Grant Overview Project Duration 3 years No. of Countries Covered 1 Grant Approved in USD $ 500,000 Disbursements in USD $ 305,241 Project Information Name of Organization Shirkat Gah-Women's Resource Centre

More information

Community Managed Revolving Fund (Sustainable mechanism of microfinance practices to disadvantaged community)

Community Managed Revolving Fund (Sustainable mechanism of microfinance practices to disadvantaged community) Community Managed Revolving Fund (Sustainable mechanism of microfinance practices to disadvantaged community) A paper presented in Micro Finance Summit 2008 New departure in expanding the outreach of Micro-finance

More information

LCRP Steering Committee Meeting 3 JULY 2018

LCRP Steering Committee Meeting 3 JULY 2018 LCRP Steering Committee Meeting 3 JULY 2018 Agenda Opening speech by H.E. Minister of Social Affairs, Pierre Bou Assi Welcome note by the UN RC/HC, Philippe Lazzarini Overview of the LCRP 2017: funding,

More information

Introduction Chapter 1, Page 1 of 9 1. INTRODUCTION

Introduction Chapter 1, Page 1 of 9 1. INTRODUCTION Introduction Chapter 1, Page 1 of 9 1. INTRODUCTION 1.1 OVERVIEW Preamble 1.1.1 The African Development Bank is the premier financial development institution in Africa dedicated to combating poverty and

More information

Policy Paper. March Establishing the Project Design Facility

Policy Paper. March Establishing the Project Design Facility Policy Paper March 2011 Establishing the Project Design Facility ABBREVIATIONS ADB Asian Development Bank ADF Asian Development Fund COBP country operations business plan DMC developing member country

More information

Global Environment Facility Grant Agreement

Global Environment Facility Grant Agreement Public Disclosure Authorized CONFORMED COPY GEF GRANT NUMBER TF092100 Public Disclosure Authorized Global Environment Facility Grant Agreement (Agricultural Development Program Support Project) Public

More information

INSPECTORATE OF GOVERNMENT POLICY STATEMENT PRESENTATION TO THE PARLIAMENTARY AND LEGAL AFFAIRS COMMITTEE OF PARLIAMENT

INSPECTORATE OF GOVERNMENT POLICY STATEMENT PRESENTATION TO THE PARLIAMENTARY AND LEGAL AFFAIRS COMMITTEE OF PARLIAMENT THE REPUBLIC OF UGANDA INSPECTORATE OF GOVERNMENT POLICY STATEMENT PRESENTATION TO THE PARLIAMENTARY AND LEGAL AFFAIRS COMMITTEE OF PARLIAMENT VOTE 03 FY 206/7 By Irene Mulyagonja Kakooza Inspector General

More information

Nepal: Road Connectivity Sector I Project

Nepal: Road Connectivity Sector I Project Validation Report October 2017 Nepal: Road Connectivity Sector I Project Reference Number: PVR-523 Project Number: 37266-032 Grant Number: 0051 ABBREVIATIONS ADB Asian Development Bank DOR Department of

More information

Tajikistan: Microfinance Systems Development Program

Tajikistan: Microfinance Systems Development Program Validation Report Reference Number: PCV: TAJ 2010-55 Project Number: 33040 Loan Number: 2000; 2001 November 2010 Tajikistan: Microfinance Systems Development Program Independent Evaluation Department ABBREVIATIONS

More information

OFFICIAL -1 L(-L DOCUMENTS. Between. and

OFFICIAL -1 L(-L DOCUMENTS. Between. and Public Disclosure Authorized OFFICIAL -1 L(-L DOCUMENTS ADDENDUM No 2 TO ADMINISTRATION AGREEMENT Between Public Disclosure Authorized Public Disclosure Authorized the EUROPEAN UNION (represented by the

More information

E Distribution: GENERAL. Executive Board Second Regular Session. Rome, October September 2007 ORIGINAL: ENGLISH

E Distribution: GENERAL. Executive Board Second Regular Session. Rome, October September 2007 ORIGINAL: ENGLISH Executive Board Second Regular Session Rome, 22 26 October 2007! E Distribution: GENERAL 11 September 2007 ORIGINAL: ENGLISH Cost (United States dollars) Current budget Increase Revised budget WFP food

More information

Public Disclosure Copy

Public Disclosure Copy Public Disclosure Authorized MIDDLE EAST AND NORTH AFRICA Lebanon Social Protection & Labor Global Practice Recipient Executed Activities Investment Project Financing FY 2014 Seq No: 5 ARCHIVED on 09-Jan-2017

More information

Programme Advisory Committee Programme Implementation Manual Pro-poor rewards for Environmental Services in Africa v PROGRAMME FOR RURAL OUTREACH OF FINANCIAL INNOVATIONS & TECHNOLOGIES (PROFIT) 1.1 Risk

More information

PERIODIC FINANCING REQUEST. RE: Higher Education in the Pacific Investment Program: Periodic Financing Request #1

PERIODIC FINANCING REQUEST. RE: Higher Education in the Pacific Investment Program: Periodic Financing Request #1 PERIODIC FINANCING REQUEST Date: April 2012 To: Asian Development Bank 6 ADB Avenue Mandaluyong City, Metro Manila ATTENTION: Director General, Pacific Department Fax No. +632-632-6318 Sir: RE: Higher

More information