1 Resettlement Planning Document Due Diligence Report Loan Number: 2796 and Grant Number: 0267 NEP June 2012 Nepal: Decentralized Rural Infrastructure and Livelihood Project- Additional Financing Ghupa-Sanghu Road Subproject Taplejung Prepared by the Government of Nepal The Due Diligence Report is a document of the borrower. The views expressed herein do not necessarily represent those of ADB s Board of Directors, Management, or staff, and may be preliminary in nature.

2 District Development Committee, Taplejung Office of District Development Committee, Taplejung District Technical Office, Taplejung Decentralized Rural Infrastructure and Livelihood Project-Additional Financing (DRILP-AF) District Project Office, Taplejung Decentralized Rural Infrastructure and Livelihood Project-Additional Financing (DRILP-AF) Detailed Project Report Ghupa-Sanghu Road Sub-Project Section III : Safeguards Volume II: Safeguard (Resettlement) June 2012

3 Due Diligence Report Gupha-Sanghu Subproject, Taplejung Section III, Volume II Due Diligence (Resettlement) TABLE OF CONTENTS 1 INTRODUCTION BACKGROUND OF THE SUBPROJECT DUE DILIGENCE FINDINGS Scope of Impacts by the Subproject Status of RP Implementation Outstanding Activities DRILP AF REQUIREMENTS CONCLUSION AND FURTHER ACTION... 5 APPENDIXES Minutes of DLRCC, GRC, Safeguard Desk formation 2. Letter of Endorsement for Safeguard Desk Formation LIST OF TABLES Table 1: Summary of Losses by the Sub-Project... 2 Table 2: Checklist of Safeguard Requirements... 3 Table 3: Compensation Disbursement and Deed Transfer Progress

4 Due Diligence Report Gupha-Sanghu Subproject, Taplejung Section III, Volume I Due Diligence(Resettlement) 1 INTRODUCTION 1. This due diligence report is prepared in order to document the implementation and related issues of Ghupa-Sanghu Road Resettlement Plan (RP) prepared in Decentralized Rural Infrastructure Livelihood Project (DRILP). The due diligence report is prepared by resettlement team of Central Implementation Support Consultant (CISC) lead by Resettlement Advisor in close coordination with District Implementation Support Consultant (DISC) and District Technical Office (DTO). 2. The major objective of the due diligence report is to examine safeguard issues and ensure appropriate mitigation measures are incorporated in the safeguard plan and project design. It documents the implementation progress status and commits to fulfill all outstanding activities within given time frame. This document reports the involuntary resettlement plan prepared, approved from ADB and its implementation in Ghupa-Sanghu subproject. 2 BACKGROUND OF THE SUBPROJECT 3. The construction of Ghupa-Sanghu Road in Taplejung was started under ADB funded DRILP. The road is located in south-western part of Taplejung district of Eastern Development Region. Although the road is taken as subproject of Taplejung District, the first 3 km section falls in neighboring Sankhuwasava District. The road starts at Ghupa Bazar of Nundhaki VDC in Sankhuwasabha District and ends at Sanghupati of Sanghu VDC of Taplejung District. The road length is km. The subproject will establish linkage between Taplejung District to Koshi Highway through Sankhuwasava District which is more attractive and shorter route to reach market in the south. The distance from district headquarter of Taplejung, Phungliing, to reach Itahari, nearest trade center along the East-West Highway is reduced by nearly half compared to currently used motor-road. 4. The km Ghupa-Sanghu Road is actually taken as first segment of bigger scope, Ghupa- Dovan Road of km. Subproject Ghupa-Sanghu road directly affect 494 people of 84 households.the motorable track has been opened intermittently throughout section under Ghupa-Sanghu road sub project.however the road could not be completed in DRILP due to difficult geological formation and also due to budget constraints. Overall 2.6 km section of road remains as untouched section. The road sub project directly affects 119 families of 853 persons. The district intends to complete the remaining civil works and as such the road is included in the indicative list of road projects in DRILP AF. DDC has expressed intention to undertake road construction further to Sanghu. This due diligence report covers the Ghupha- Sanghu road for which the RP was prepared. 1

5 Due Diligence Report Gupha-Sanghu Subproject, Taplejung Section III, Volume II Due Diligence (Resettlement) 3.1 Scope of Impacts by the Subproject 3 DUE DILIGENCE FINDINGS 5. The Resettlement Plan (RP) of this subproject was approved by ADB on May 2008, prepared by the DDC with support of CISC. It basically includes the assessment of loss incurred by the subproject section and the degree of vulnerability of the affected families. There is no change in the affected families or affected plots. Additionally substantial compensation has been paid and other mitigation measures and requirements proposed in approved resettlement plan have been found fully addressed during implementation of resettlement plan as already reported in Verification Report. Hence the approved RP is sufficient to address the requirement of DRILP AF. Nonetheless additional requirements according to Project Administration Manual (PAM) of DRILP AF have been incorporated in this report. 6. The approved RP of Ghupa-Sanghu Road showed that resettlement impact was experienced by 494 people of 84 households in terms of use and need of additional land and other assets. During assessment survey, people showed willingness to donate their land; however land donation was accepted only from the eligible families through poverty analysis of those affected families. The approved RP has documented that 7.19 ha of private land need to acquire from the 84 affected families for the road construction. There was no private structures affected along the alignment but there were 6 public structures (Drinking water structures, Chautara, Irrigation canal) to be relocated and cardamom plants were compensated which is one of the major cash crops in the region. 7. Although every family along the alignment was willing for land donation, the socio-economic condition of the families revealed 2 household lost more than 10 percent of their total land holding and another 5 households' annual food security was found to be less than 9 months. Hence these families were not opted for land donation but compensated for their sqm of land area. Summary of losses incurred along the alignment according to approved RP is under Table 1. Table 1: Summary of Losses by the Sub-Project Nature of Loss Unit Total Remarks Land loss Ha 7.19 Land loss HH 84 Compensatory land Ha 0.52 ( sqm) Public structure No 6 Relocation required Cash crops No Cardamom plants Source: Resettlement Plan, Status of RP Implementation 8. After the approval of RP, DDC had started distribution of compensation, deed transfer and implementation of proposed trainings. Further safeguard requirements were met during the whole RP preparation and implementation process. Two formal meetings and several informal and were conducted with community and affected families at different dates and venues during resettlement surveys and resettlement plan preparation in The consultation included discussion about project benefits, entitlement matrix, land acquisition and donation procedures. Communities were well informed that road construction could reduce their walking 2

6 Due Diligence Report Gupha-Sanghu Subproject, Taplejung Section III, Volume II Due Diligence (Resettlement) time, enhance business opportunities and networks. The safeguard requirements as per RP and their present status are presented in following table 2. Table 2: Checklist of Safeguard Requirements SN Activity Status Notes and Progress 1 GRC, VWRCC and GRSC formation Achieved VWRCC and GRSC in each affected VDC 2 Notification about preferential employment for Achieved affected people in construction 3 Training need assessment and participant identification 4 Livelihood trainings implementation 100 % 5 Disbursement of compensation for land 100 % 6 Disbursement of compensation for trees 100 % 7 Disbursement of compensation for crops NA 8 Disbursement of compensation for private structure 9 Transfer of all deeds for road section to DRILP/DDC Source: DPO Reporting Achieved Trainings are completed 100 % Completed for private structures 100 % 9. The table shows most of the activities related to RP implementation have been substantially completed. Compensation payment has been completed for more than 90 percent and deed transfer has been done for more than 80 percent. Further physically displaced households were relocated at nearby plots which are nearly 500 m away from the affected land. The present status of implementation is summarized in following Table 3. Table 3: Compensation Disbursement and Deed Transfer Progress Indicator Unit RP data Progress Remaining Land Compensation sqm Deed Transfer HH Deed Transfer* plot Public Structure Relocation No Compensation Payment Land Compensation Rs Cash crop Compensation* Rs Total Amount Source: RP Monitoring Report, 2011 * Compensation for Cardamom exceeded the amount proposed in RP and affected plot number also increased (owned by the same 84 families) due to alignment shift. This has been reported in External monitoring report and other monitoring reports and exit plan as well. 10. There was 15 different livelihood restoration trainings proposed in RP but demand assessment during training implementation showed 11 trainings were in demand by APs. Awareness raising trainings are all completed and a long with these income generation trainings which incorporated all the affected families. Livelihood trainings organized for the affected families are Electrical Training, Furniture Making, Sewing/Cutting, Cook/Hotel 3

7 Due Diligence Report Gupha-Sanghu Subproject, Taplejung Section III, Volume II Due Diligence (Resettlement) Management, and other short term agriculture related trainings like Commercial Vegetable Farming, Cardamom Farming House Wiring, Bee Keeping, Goat Raising. The completed trainings benefitted 332 participants from the affected families. 11. The absentee families reported in the approved RP are 23 households who were out of district at time of RP preparation. These absentee families were communicated and contacted during RP implementation and there is no due work related with absentee families. 3.3 Outstanding Activities 12. Total Rs / has been allocated for compensation in the approved RP which is completed in DRILP. Total of Rs was compensated to the affected families. There is no reserve fund to be explained as all the absentee families were reached and RP works have been completed. 13. Out of 6 different structures, 2 structures are already reinstated and relocation of remaining are included in DRILP AF and provisions have been made in the estimate of civil works to be undertaken under DRILP-AF. (refer Section II: Detail Engineering Survey, Design and Cost Estimate 4 DRILP AF REQUIREMENTS 14. The Resettlement Framework (RF) of DRILP AF states that compensation payment and livelihood restoration trainings of approved RP must be completed before starting the work at DRILP AF. In addition, formation of District Level Resettlement Coordination Committee (DLRCC), District Grievance Redress Committee (GRC) and safeguard desk need to be established at each district. 15. DLRCC, GRC and safeguard desk have been established in Taplejung with district authorities meeting on 11 April 2012 under the chair of Acting Local Development Officer of Taplejung, Rajesh Kumar Yadav. The committees have been decided with the position held in the district and not with the name holding the position. The decision on DLRCC, GRC and safeguard desk is given in following boxes. Minutes have been annexed. 4

8 Due Diligence Report Gupha-Sanghu Subproject, Taplejung Section III, Volume II Due Diligence (Resettlement) GRC Formation in Taplejung 1. Chair: Local Development Officer 2. Member: Representative from affected families 3. Member: Representative from VDC 4. Member: Representative from local level 5. Member: District Project Office DLRCC Formation in Taplejung 1. Chair: Local Development Officer 2. Member: Representative from affected families 3. Member: Representative from VDC 4. Member: District Land Revenue Office 5. Member: District Survey Office 6. Member: District Agriculture Office 7. Member: District Forest Office 8. Member: District Project Office 16. ToR for Social Safeguard has been decided to transfer to Planning and Administrative Officer of District Development Office, Taplejung for coordinating the safeguard activities effective from 12 April CONCLUSION AND FURTHER ACTION 17. According to DRILP AF resettlement framework, social safeguard requirements in order to initiate work of DRILP AF have been achieved in Taplejung. There are no due-activities of DRILP to be carried out prior to the start of road construction. Hence the work on Ghupa- Sanghu Road subproject in DRILP AF can proceed from resettlement aspect. 5

9 APPENDIXES Central Implementation Support Consultant (CISC)

10 Minutes of DLRCC, GRC, Safeguard Desk Formation Page 1: Minute of DLRCC, GRC, Safeguard Desk formation Central Implementation Support Consultant (CISC)

11 Page 2: Minute of DLRCC, GRC, Safeguard Desk formation Central Implementation Support Consultant (CISC)

12 Page 3: Minute of DLRCC, GRC, Safeguard Desk formation Theme Translation This meeting is set up in order to form DLRCC, GRC and Safe Guard Desk in Taplejung for discussion and resolution of resettlement related issues. DLRCC and GRC is chaired by head of the district, LDO at the moment where, district land revenue, survey, agriculture, forest, respective VDC head and representatives from affected families will be member in the committee. Safeguard desk responsibilities have been decided to handover to Planning and Administrative Officer of DDC, Taplejung. Central Implementation Support Consultant (CISC)

13 Letter of Endorsement for Safeguard Desk Formation Theme Translation This letter is forwarded to Planning and Administrative Officer in DDC Taplejung informing that s/he is responsible for Social Safeguard Desk and its associated responsibilities. Central Implementation Support Consultant (CISC)

Safeguards Monitoring Report

Safeguards Monitoring Report Safeguards Monitoring Report Semiannual Report Covering July-Dec 2016 period February 2017 (ESDIP) Tranche-2 Chimtala- Arghandi 220 kv DC Transmission Line Subproject (DABS - 006/ICB) Prepared by Da Afghanistan

More information

PROJECT PREPARATORY TECHNICAL ASSISTANCE

PROJECT PREPARATORY TECHNICAL ASSISTANCE Appendix 4 11 A. Justification PROJECT PREPARATORY TECHNICAL ASSISTANCE 1. The government has identified the priority areas to be covered under the ensuing loan project and prepared outline technical studies

More information

COMPENSATION, ASSISTANCE AND RESETTLEMENT POLICY PROPOSED FOR

COMPENSATION, ASSISTANCE AND RESETTLEMENT POLICY PROPOSED FOR Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized DIRECTORATE FOR ROADS OF VIETNAM PROJECT MANAGEMENT UNIT 3 ================= COMPENSATION,

More information

Final Evaluation & Outcome Assessment of Promotion of Sustainable Agriculture for Nutrition and Food Security (POSAN FS) Project

Final Evaluation & Outcome Assessment of Promotion of Sustainable Agriculture for Nutrition and Food Security (POSAN FS) Project Terms of Reference (TOR) For Final Evaluation & Outcome Assessment of Promotion of Sustainable Agriculture for Nutrition and Food Security (POSAN FS) Project Re-circulation date: 11/01/ Closing date: 18/01/

More information

Semi-Annual Social Safeguards Monitoring Report. SRI: Greater Colombo Wastewater Management Project

Semi-Annual Social Safeguards Monitoring Report. SRI: Greater Colombo Wastewater Management Project Semi-Annual Social Safeguards Monitoring Report Project No. 36173-013 Period Covering July to December 2013 April 2014 SRI: Greater Colombo Wastewater Management Project Prepared by the Ministry of Local

More information

Detailed Project Report. Devitar-Phulasi-Pokhari Road Subproject Ramechhap

Detailed Project Report. Devitar-Phulasi-Pokhari Road Subproject Ramechhap Government of Nepal Ministry of Federal Affairs and Local Development Central Level Project Implementation Unit Earthquake Emergency Assistance Project Lalitpur, Nepal Earthquake Emergency Assistance Project

More information

PROJECT PREPARATORY TECHNICAL ASSISTANCE

PROJECT PREPARATORY TECHNICAL ASSISTANCE Appendix 3 13 A. Justification PROJECT PREPARATORY TECHNICAL ASSISTANCE 1. The project preparatory technical assistance (PPTA) is required to help the government of Mongolia design the Regional Road Development

More information

VIE: Power Transmission Investment Program Tranche 3

VIE: Power Transmission Investment Program Tranche 3 Social Monitoring Report 2 nd Quarterly Report June 2017 VIE: Power Transmission Investment Program Tranche 3 Installation of a second transformer bank for 220 kv Duc Hoa substation Installation of a second

More information

GEO: Sustainable Urban Transport Investment Program, Tranche 2 Tbilisi-Rustavi Urban Road Link (Section-1: km 0 to 4 Tbilisi Phonichala) (Addendum)

GEO: Sustainable Urban Transport Investment Program, Tranche 2 Tbilisi-Rustavi Urban Road Link (Section-1: km 0 to 4 Tbilisi Phonichala) (Addendum) Resettlement Plan December 2014 GEO: Sustainable Urban Transport Investment Program, Tranche 2 Tbilisi-Rustavi Urban Road Link (Section-1: km 0 to 4 Tbilisi Phonichala) (Addendum) Prepared by the Municipal

More information

INTEGRATED SAFEGUARDS DATA SHEET ADDITIONAL FINANCING

INTEGRATED SAFEGUARDS DATA SHEET ADDITIONAL FINANCING Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Date ISDS Prepared/Updated: 13-Jan-2014 INTEGRATED SAFEGUARDS DATA SHEET ADDITIONAL FINANCING

More information

Prepared by the Department of Roads for the Ministry of Finance and the Asian Development Bank.

Prepared by the Department of Roads for the Ministry of Finance and the Asian Development Bank. Social Monitoring Report Semiannual Report December 2016 NEP: SASEC Road Connectivity Prepared by the Department of Roads for the Ministry of Finance and the Asian Development Bank. This social monitoring

More information

RESETTLEMENT POLICY FRAMEWORK

RESETTLEMENT POLICY FRAMEWORK Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized RESETTLEMENT POLICY FRAMEWORK HURRICANE TOMAS EMERGENCY RECOVERY PROJECT Saint Lucia

More information

NEPAL ELECTRICITY AUTHORITY

NEPAL ELECTRICITY AUTHORITY Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized NEPAL ELECTRICITY AUTHORITY ENGINEERING SERVICES RESETILEMENT ACTION PLAN Khimti Dhalkebar

More information

Environmental Safeguard Monitoring Report. FIJ: Transport Infrastructure Investment Sector Project

Environmental Safeguard Monitoring Report. FIJ: Transport Infrastructure Investment Sector Project Environmental Safeguard Monitoring Report Semi Annual Report July 2016 ADB Project Number: 48141-001 ADB Loan Number: 3210 FIJ: Transport Infrastructure Investment Sector Project Prepared by Fiji Roads

More information

PROJECT PREPARATORY TECHNICAL ASSISTANCE

PROJECT PREPARATORY TECHNICAL ASSISTANCE 8 Appendix 3 A. Justification PROJECT PREPARATORY TECHNICAL ASSISTANCE 1. The Government of the Republic of the Union of Myanmar has requested the Asian Development Bank (ADB) to provide a project preparatory

More information

PROJECT PREPARATION TECHNICAL ASSISTANCE

PROJECT PREPARATION TECHNICAL ASSISTANCE 12 Appendix 4 A. Justification PROJECT PREPARATION TECHNICAL ASSISTANCE 1. A regional project preparatory technical assistance (R-PPTA) is required to prepare the Pacific Renewable Energy Investment Facility

More information

ASIAN DEVELOPMENT BANK RESETTLEMENT PLAN. Subproject: SH-70 (Gaya to Rajauli)

ASIAN DEVELOPMENT BANK RESETTLEMENT PLAN. Subproject: SH-70 (Gaya to Rajauli) ASIAN DEVELOPMENT BANK RESETTLEMENT PLAN Subproject: SH-70 (Gaya to Rajauli) BIHAR STATE HIGHWAYS PROJECT ROAD CONSTRUCTION DEPARTMENT (RCD) GOVERNMENT OF BIHAR FEBRUARY 2008 TABLE OF CONTENTS ITEM Page

More information

INTEGRATED SAFEGUARDS DATASHEET APPRAISAL STAGE

INTEGRATED SAFEGUARDS DATASHEET APPRAISAL STAGE Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized I. Basic Information Date prepared/updated: 04/27/2010 INTEGRATED SAFEGUARDS DATASHEET

More information

Land Acquisition & Resettlement Plan Corrective Action Plan. PAK: Second Power Transmission Enhancement Investment Program, Tranche 1

Land Acquisition & Resettlement Plan Corrective Action Plan. PAK: Second Power Transmission Enhancement Investment Program, Tranche 1 Land Acquisition & Resettlement Plan Corrective Action Plan April 2018 PAK: Second Power Transmission Enhancement Investment Program, Tranche 1 Safeguard Due Diligence and Corrective Action Plan (CAP)

More information

Da Nang - Quang Ngai Expressway Development Project

Da Nang - Quang Ngai Expressway Development Project Public Disclosure Authorized Public Disclosure Authorized DA NANG-QUANG NGAI EXPRESSWAY PROJECT Due Dilligence report, Phu Ninh district, Quang Nam province MINISTRY OF TRANSPORT VIETNAM EXPRESSWAY CORPORATION

More information

Republic of Uzbekistan Project «Construction of new electrified railway Angren-Pap» World Bank SJSRWC «UzbekistonTemirYullari»

Republic of Uzbekistan Project «Construction of new electrified railway Angren-Pap» World Bank SJSRWC «UzbekistonTemirYullari» Republic of Uzbekistan SFG1338 v2 Project «Construction of new electrified railway Angren-Pap» World Bank SJSRWC «UzbekistonTemirYullari» Livelihood Restoration Plan for Persons Affected by Project Public

More information

Multitranche Financing Facility India: Rural Road Sector II Investment Program (Project 1)

Multitranche Financing Facility India: Rural Road Sector II Investment Program (Project 1) Validation Report Reference Number: PVR-326 Project Number: 37066 Loan Number: 2248 October 2014 Multitranche Financing Facility India: Rural Road Sector II Investment Program (Project 1) Independent Evaluation

More information

People s Republic of China: Emergency Assistance for Wenchuan Earthquake Reconstruction Project

People s Republic of China: Emergency Assistance for Wenchuan Earthquake Reconstruction Project Validation Report Reference Number: PVR-462 Project Number: 42496-013 Loan Number: 2508 December 2016 People s Republic of China: Emergency Assistance for Wenchuan Earthquake Reconstruction Project Independent

More information

Earthquake 2005 Recovery and Reconstruction

Earthquake 2005 Recovery and Reconstruction Earthquake 2005 Recovery and Reconstruction 2 Earthquake 8 Oct 2005 Nine Districts 1. MANSHERA 2. BATAGRAM 3. SHANGLA 4. ABBOTTABAD 5. KOHISTAN Epicentre 6. MUZAFFARABAD 7. NELUM 8. BAGH 9. RAWALAKOT Depth:

More information

Initial Environmental Examination

Initial Environmental Examination Initial Environmental Examination June 2017 IND: Green Energy Corridor and Grid Strengthening Project (320 kv VSC-HVDC power transmission lines between Pugalur, Tamil Nadu and North Trichur, Kerala) Annexures

More information

TECHNICAL ASSISTANCE: HIMACHAL PRADESH POWER SECTOR CAPACITY DEVELOPMENT AND IMPLEMENTATION SUPPORT

TECHNICAL ASSISTANCE: HIMACHAL PRADESH POWER SECTOR CAPACITY DEVELOPMENT AND IMPLEMENTATION SUPPORT Himachal Pradesh Clean Energy Transmission Investment Program (RRP IND 43464) TECHNICAL ASSISTANCE: HIMACHAL PRADESH POWER SECTOR CAPACITY DEVELOPMENT AND IMPLEMENTATION SUPPORT A. INTRODUCTION 1. The

More information

PROJECT INFORMATION DOCUMENT (PID) APPRAISAL STAGE

PROJECT INFORMATION DOCUMENT (PID) APPRAISAL STAGE Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Project Name PROJECT INFORMATION DOCUMENT (PID) APPRAISAL STAGE Bhutan Second Rural Access

More information

Asian Development Bank Accountability Mechanism Compliance Review Panel

Asian Development Bank Accountability Mechanism Compliance Review Panel Asian Development Bank Accountability Mechanism Compliance Review Panel Terms of Reference for Monitoring under the Chashma Right Bank Irrigation Project (Stage III) Inspection Request I. Introduction

More information

VIE: Renewable Energy Development and Network Expansion and Rehabilitation for Remote Communes Sector Project. Sub-project: So Vin Hydropower Project

VIE: Renewable Energy Development and Network Expansion and Rehabilitation for Remote Communes Sector Project. Sub-project: So Vin Hydropower Project Final Resettlement Monitoring Report Document stage: Final Project number: Loan 2517 May, 2017 VIE: Renewable Energy Development and Network Expansion and Rehabilitation for Remote s Sector Project Sub-project:

More information

Responding to the Earthquake in Nepal. Avani Dixit, Disaster Risk Management Specialist Jyoti Pandey, Social Protection Analyst

Responding to the Earthquake in Nepal. Avani Dixit, Disaster Risk Management Specialist Jyoti Pandey, Social Protection Analyst Responding to the Earthquake in Nepal Avani Dixit, Disaster Risk Management Specialist Jyoti Pandey, Social Protection Analyst Earthquake and the response needs Housing reconstruction project: Grant &

More information

SECOND PROGRESS REPORT INDIA VISHNUGAD PIPALKOTI HYDRO ELECTRIC PROJECT (LOAN NO IN)

SECOND PROGRESS REPORT INDIA VISHNUGAD PIPALKOTI HYDRO ELECTRIC PROJECT (LOAN NO IN) INTERNATIONAL BANK FOR RECONSTRUCTION AND DEVELOPMENT INTERNATIONAL DEVELOPMENT ASSOCIATION SECOND PROGRESS REPORT ON THE IMPLEMENTATION OF MANAGEMENT S ACTION PLAN IN RESPONSE TO THE INSPECTION PANEL

More information

Resettlement Planning Document. IND: Bihar State Highways Project Subproject: SH-74 (Hajipur Areraj)

Resettlement Planning Document. IND: Bihar State Highways Project Subproject: SH-74 (Hajipur Areraj) Resettlement Planning Document Resettlement Plan Document Stage: Updated Project Number: 41127 August 2008 IND: Bihar State Highways Project Subproject: SH-74 (Hajipur Areraj) Prepared by Road Construction

More information

OPERATIONS MANUAL BANK POLICIES (BP)

OPERATIONS MANUAL BANK POLICIES (BP) BANK POLICIES (BP) OM Section F1/BP Page 1 of 2 These policies were prepared for use by ADB staff and are not necessarily a complete treatment of the subject. SAFEGUARD POLICY STATEMENT 1. The Asian Development

More information

Response from the World Bank and ADB (dated 16 December 2016) to Mekong Watch s inquiries

Response from the World Bank and ADB (dated 16 December 2016) to Mekong Watch s inquiries Response from the World Bank and ADB (dated 16 December 2016) to Mekong Watch s inquiries (dated 5 & 23 August 2016) === RE: Request for your attention on the riverbank erosion in Lao PDR s Nam Theun 2

More information

Resettlement Plan. India: National Capital Region Urban Infrastructure Financing Facility Project 1 - Bahadurgarh-Badli Road

Resettlement Plan. India: National Capital Region Urban Infrastructure Financing Facility Project 1 - Bahadurgarh-Badli Road Resettlement Plan Document Stage: Draft Project Number: 41598 September 2013 India: National Capital Region Urban Infrastructure Financing Facility Project 1 - Bahadurgarh-Badli Road Prepared by the Haryana

More information

Section 3.06 is deleted and the following is substituted therefor:

Section 3.06 is deleted and the following is substituted therefor: 2 (c) Section 3.03 is deleted and the following is substituted therefor: Commitment Charge; Credit; Maturity Premium. (a) The Borrower shall pay a commitment charge on the unwithdrawn amount of the Loan

More information

Combined Resettlement and Indigenous Peoples Plan

Combined Resettlement and Indigenous Peoples Plan Regional Urban Development Project (RRP NEP 47252) Combined Resettlement and Indigenous Peoples Plan August 2017 NEPAL: Regional Urban Development Project Construction of Integrated Waste Processing Sites

More information

VIE: Power Transmission Investment Program, Tranche 1 220kV Phu My 2 Industrial Zone Substation and Connection Lines Subproject

VIE: Power Transmission Investment Program, Tranche 1 220kV Phu My 2 Industrial Zone Substation and Connection Lines Subproject Social Monitoring Report Final Report December 2016 VIE: Power Transmission Investment Program, Tranche 1 220kV Phu My 2 Industrial Zone Substation and Connection Lines Subproject Prepared by the Southern

More information

Nepal: Road Connectivity Sector I Project

Nepal: Road Connectivity Sector I Project Validation Report October 2017 Nepal: Road Connectivity Sector I Project Reference Number: PVR-523 Project Number: 37266-032 Grant Number: 0051 ABBREVIATIONS ADB Asian Development Bank DOR Department of

More information

PAK: MFF Power Distribution Enhancement Investment Program (Tranche 2)

PAK: MFF Power Distribution Enhancement Investment Program (Tranche 2) Social Monitoring Report Bi-annual Social Monitoring Report July 2014 PAK: MFF Power Distribution Enhancement Investment Program (Tranche 2) Prepared by Lahore Electric Supply Company, Punjab for the Asian

More information

Timor-Leste: Baucau to Viqueque Highway Project

Timor-Leste: Baucau to Viqueque Highway Project Resettlement Plan Project Number: 51115 June 2017 Timor-Leste: Baucau to Viqueque Highway Project Prepared by the Government of Timor-Leste for the Asian Development Bank. Table of Contents EXECUTIVE

More information

Performance of MGNREGA in Mysore District, Karnataka

Performance of MGNREGA in Mysore District, Karnataka International Journal of Research in Humanities and Social Studies Volume 3, Issue 6, June 2016, PP 1-7 ISSN 2394-6288 (Print) & ISSN 2394-6296 (Online) Performance of MGNREGA in Mysore District, Karnataka

More information

ASIAN DEVELOPMENT BANK RESETTLEMENT PLAN. Subproject: SH-69 (Dumaria - Ranitalab)

ASIAN DEVELOPMENT BANK RESETTLEMENT PLAN. Subproject: SH-69 (Dumaria - Ranitalab) ASIAN DEVELOPMENT BANK RESETTLEMENT PLAN Subproject: SH-69 (Dumaria - Ranitalab) BIHAR STATE HIGHWAYS PROJECT ROAD CONSTRUCTION DEPARTMENT (RCD) GOVERNMENT OF BIHAR FEBRUARY 2008 TABLE OF CONTENTS ITEM

More information

PROJECT INFORMATION DOCUMENT (PID) APPRAISAL STAGE Report No.: AB4291 Project Name. Wenchuan Earthquake Recovery Project Region

PROJECT INFORMATION DOCUMENT (PID) APPRAISAL STAGE Report No.: AB4291 Project Name. Wenchuan Earthquake Recovery Project Region Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized PROJECT INFORMATION DOCUMENT (PID) APPRAISAL STAGE Report No.: AB4291 Project Name Wenchuan

More information

LOAN AGREEMENT (Special Operations) LOAN AGREEMENT dated 17 January 2013 between KINGDOM OF CAMBODIA ( Borrower ) and ASIAN DEVELOPMENT BANK ( ADB ).

LOAN AGREEMENT (Special Operations) LOAN AGREEMENT dated 17 January 2013 between KINGDOM OF CAMBODIA ( Borrower ) and ASIAN DEVELOPMENT BANK ( ADB ). LOAN AGREEMENT (Special Operations) LOAN AGREEMENT dated 17 January 2013 between KINGDOM OF CAMBODIA ( Borrower ) and ASIAN DEVELOPMENT BANK ( ADB ). WHEREAS (A) by a loan agreement of even date herewith

More information

LAND ACQUISITION AND RESETTLEMENT COMPENSATION POLICY FRAMEWORK AND IMPLEMENTING GUIDELINES

LAND ACQUISITION AND RESETTLEMENT COMPENSATION POLICY FRAMEWORK AND IMPLEMENTING GUIDELINES LAND ACQUISITION AND RESETTLEMENT COMPENSATION POLICY FRAMEWORK AND IMPLEMENTING GUIDELINES Supplementary Appendix to the Report Recommendation of the President to the Board of Directors on the HEALTH

More information

Resettlement Planning Document.

Resettlement Planning Document. Resettlement Planning Document. Document: Land Acquisition and Resettlement Plan Document Stage: Final Project Number: 40190 June 2012 GMS - Flood and Drought Risk Management and Mitigation Project (FDRMMP)

More information

Nepal: Preparing the North South Fast Track Road Project

Nepal: Preparing the North South Fast Track Road Project Technical Assistance Report Project Number: 40011 September 2006 Nepal: Preparing the North South Fast Track Road Project (Financed by the Japan Special Fund) CURRENCY EQUIVALENTS (as of 15 September 2006)

More information

COMPARATIVE ANALYSIS OF DMC LEGAL FRAMEWORK AND ADB SAFEGUARD POLICY STATEMENT BANGLADESH

COMPARATIVE ANALYSIS OF DMC LEGAL FRAMEWORK AND ADB SAFEGUARD POLICY STATEMENT BANGLADESH COMPARATIVE ANALYSIS OF DMC LEGAL FRAMEWORK AND ADB SAFEGUARD POLICY STATEMENT BANGLADESH Note: The following is based on the provisions of The Acquisition and Requisition of Immovable Property Ordinance

More information

Georgia: Emergency Assistance for Post-Conflict Recovery

Georgia: Emergency Assistance for Post-Conflict Recovery Validation Report Reference Number: PCV: GEO 2011-49 Project Number: 32023 Loan Number: 2469-GEO(SF) December 2011 Georgia: Emergency Assistance for Post-Conflict Recovery Independent Evaluation Department

More information

AZERBAIJAN MOTORWAY IMPROVEMENT AND DEVELOPMENT Baku Shamakhi Road Widening

AZERBAIJAN MOTORWAY IMPROVEMENT AND DEVELOPMENT Baku Shamakhi Road Widening SFG1532 Public Disclosure Authorized AZERBAIJAN REPUBLIC Public Disclosure Authorized Public Disclosure Authorized MINISTRY OF TRANSPORT AZERROADSERVICE OPEN JOINT STOCK COMPANY AZERBAIJAN MOTORWAY IMPROVEMENT

More information

VIE: Power Transmission Investment Program, Tranche 2 220kV Cau Bong-Hoc Mon-Binh Tan Transmission Line

VIE: Power Transmission Investment Program, Tranche 2 220kV Cau Bong-Hoc Mon-Binh Tan Transmission Line Social Monitoring Report Semi Annual Report January June 2016 VIE: Power Transmission Investment Program, Tranche 2 220kV Cau Bong-Hoc Mon-Binh Tan Transmission Line Prepared by the Southern Vietnam Power

More information

XII. CGIF Environmental and Social Safeguards Policy and Framework 1

XII. CGIF Environmental and Social Safeguards Policy and Framework 1 A. Policy XII. CGIF Environmental and Social Safeguards Policy and Framework 1 1. Credit Guarantee and Investment Facility (CGIF), a trust fund of the Asian Development Bank (ADB) was established to promote

More information

Terms of Reference (ToR) Business Potential survey in Doti District

Terms of Reference (ToR) Business Potential survey in Doti District Terms of Reference (ToR) Business Potential survey in Doti District 1. Background Good Neighbors International (GNI) is an international humanitarian and development NGO in general consultative status

More information

PROJECT AGREEMENT. (Renewable Energy Development Sector Investment Program Project 1) between ASIAN DEVELOPMENT BANK. and PROVINCE OF PUNJAB

PROJECT AGREEMENT. (Renewable Energy Development Sector Investment Program Project 1) between ASIAN DEVELOPMENT BANK. and PROVINCE OF PUNJAB LOAN NUMBER 2286/2287(SF)-PAK PROJECT AGREEMENT (Renewable Energy Development Sector Investment Program Project 1) between ASIAN DEVELOPMENT BANK and PROVINCE OF PUNJAB DATED 5 October 2007 PAL:PAK 34339

More information

INTEGRATED SAFEGUARDS DATA SHEET CONCEPT STAGE Report No.: AC3247. Date ISDS Prepared/Updated: 11/28/2007 I. BASIC INFORMATION. A. Basic Project Data

INTEGRATED SAFEGUARDS DATA SHEET CONCEPT STAGE Report No.: AC3247. Date ISDS Prepared/Updated: 11/28/2007 I. BASIC INFORMATION. A. Basic Project Data Date ISDS Prepared/Updated: 11/28/2007 I. BASIC INFORMATION A. Basic Project Data INTEGRATED SAFEGUARDS DATA SHEET CONCEPT STAGE Report No.: AC3247 Country: Madagascar Project ID: P104049 Project Name:

More information

Republic of Indonesia: Aligning Asian Development Bank and Country Systems for Improved Project Performance

Republic of Indonesia: Aligning Asian Development Bank and Country Systems for Improved Project Performance Technical Assistance Report Project Number: 47287-001 Capacity Development Technical Assistance (CDTA) December 2013 Republic of Indonesia: Aligning Asian Development Bank and Country Systems for Improved

More information

6 Report No.: JSDSC1361 1

6 Report No.: JSDSC1361 1 Public Disclosure Authorized INTEGRATED SAFEGUARDS DATA SHEET CONCEPT STAGE 6 Report No.: JSDSC1361 1,2 Date ISDS Prepared/Updated: 05-Nov-2015 Date ISDS Approved/Disclosed: 06-Nov-2015 Public Disclosure

More information

VIE: Power Transmission Investment Program, Tranche 1 220kV Phu My Industrial Zone Substation and 220kV Song May-Uyen Hung Transmission Line

VIE: Power Transmission Investment Program, Tranche 1 220kV Phu My Industrial Zone Substation and 220kV Song May-Uyen Hung Transmission Line Social Monitoring Report Semestral Report July to December 2014 VIE: Power Transmission Investment Program, Tranche 1 220kV Phu My Industrial Zone Substation and 220kV Song May-Uyen Hung Transmission Line

More information

Land Acquisition and Resettlement

Land Acquisition and Resettlement Land Acquisition and Resettlement Internal Monitoring Report (E-35, Hassanabdal Havelian Expressway-Phase I, Package -I) May 2015, PAK: National Trade Corridor Highway Investment Program (NTCHIP) Tranche

More information

AFG: Transport Network Development Investment Program Proposed Tranche 2 (Paktika Economic Corridor: Sar Hawzar Orgun/ Rabat Shkin Roads Subproject)

AFG: Transport Network Development Investment Program Proposed Tranche 2 (Paktika Economic Corridor: Sar Hawzar Orgun/ Rabat Shkin Roads Subproject) Resettlement Plan November 2012 AFG: Transport Network Development Investment Program Proposed Tranche 2 (Paktika Economic Corridor: Sar Hawzar Orgun/ Rabat Shkin Roads Subproject) Prepared by Ministry

More information

INTEGRATED SAFEGUARDS DATASHEET APPRAISAL STAGE

INTEGRATED SAFEGUARDS DATASHEET APPRAISAL STAGE Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized I. Basic Information Date prepared/updated: 04/15/2010 1. Basic Project Data Original

More information

VIETNAM INDUSTRIAL POLLUTION MANAGEMENT PROJECT (P113151)

VIETNAM INDUSTRIAL POLLUTION MANAGEMENT PROJECT (P113151) Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized VIETNAM INDUSTRIAL POLLUTION MANAGEMENT PROJECT (P113151) Due Diligence Review of Involuntary

More information

Ebola Recovery and Reconstruction Trust Fund Grant Agreement

Ebola Recovery and Reconstruction Trust Fund Grant Agreement Public Disclosure Authorized OFFICIAL DOCUMENTS GRANT NUMBER: TFOA1023 Public Disclosure Authorized Ebola Recovery and Reconstruction Trust Fund Grant Agreement (LABOR-INTENSIVE PUBLIC WORKS TO MITIGATE

More information

Report No.: ISDSA13781

Report No.: ISDSA13781 Public Disclosure Authorized 0 o Date ISDS Prepared/Updated: 03-Aug-2015 INTEGRATED SAFEGUARDS DATA SHEET APPRAISAL STAGE Date ISDS Approved/Disclosed: 06-Aug-2015 Report No.: ISDSA13781 Public Disclosure

More information

LOAN AGREEMENT (Ordinary Operations) (National Grid Improvement Project) between POWER GRID CORPORATION OF INDIA LIMITED. and ASIAN DEVELOPMENT BANK

LOAN AGREEMENT (Ordinary Operations) (National Grid Improvement Project) between POWER GRID CORPORATION OF INDIA LIMITED. and ASIAN DEVELOPMENT BANK LOAN NUMBER 2787-IND LOAN AGREEMENT (Ordinary Operations) (National Grid Improvement Project) between POWER GRID CORPORATION OF INDIA LIMITED and ASIAN DEVELOPMENT BANK DATED 30 MARCH 2012 IND 44426 LOAN

More information

Draft Resettlement Plan

Draft Resettlement Plan Document stage: Draft for consultation Project Number: 51228-001 February 2018 IND: Railways Track Electrification Project Rohtak to Panipat Subproject Prepared by Central Organisation for Railway Electrification

More information

INTEGRATED SAFEGUARDS DATA SHEET ADDITIONAL FINANCING. Parent Project ID:

INTEGRATED SAFEGUARDS DATA SHEET ADDITIONAL FINANCING. Parent Project ID: Public Disclosure Authorized INTEGRATED SAFEGUARDS DATA SHEET ADDITIONAL FINANCING Date ISDS Prepared/Updated: 10-Aug-2015 Report.: ISDSA15003 Date ISDS Approved/Disclosed: 03-Aug-2015, 16-Aug-2015 Public

More information

Section 3.07 is deleted and the following is substituted therefor:

Section 3.07 is deleted and the following is substituted therefor: 2 outstanding Loan and the Fixed Spread that will be applied to new Loans (expressed as a percentage per annum), by (ii) the principal amount of the outstanding Loan on which the Borrower shall pay interest

More information

Community Managed Revolving Fund (Sustainable mechanism of microfinance practices to disadvantaged community)

Community Managed Revolving Fund (Sustainable mechanism of microfinance practices to disadvantaged community) Community Managed Revolving Fund (Sustainable mechanism of microfinance practices to disadvantaged community) A paper presented in Micro Finance Summit 2008 New departure in expanding the outreach of Micro-finance

More information

ASIAN DEVELOPMENT BANK

ASIAN DEVELOPMENT BANK ASIAN DEVELOPMENT BANK TAR:NEP 37266 TECHNICAL ASSISTANCE (Financed by the Japan Special Fund) TO THE KINGDOM OF NEPAL FOR PREPARING THE TRANSPORT CONNECTIVITY SECTOR PROJECT June 2004 CURRENCY EQUIVALENTS

More information

LOAN AGREEMENT (Ordinary Operations) (National Power Grid Development Investment Program Tranche 2) between POWER GRID CORPORATION OF INDIA LIMITED

LOAN AGREEMENT (Ordinary Operations) (National Power Grid Development Investment Program Tranche 2) between POWER GRID CORPORATION OF INDIA LIMITED LOAN NUMBER 2510-IND LOAN AGREEMENT (Ordinary Operations) (National Power Grid Development Investment Program Tranche 2) between POWER GRID CORPORATION OF INDIA LIMITED and ASIAN DEVELOPMENT BANK DATED

More information

LOAN AGREEMENT (Special Operations) (Climate Resilient Rice Commercialization Sector Development Project) between KINGDOM OF CAMBODIA.

LOAN AGREEMENT (Special Operations) (Climate Resilient Rice Commercialization Sector Development Project) between KINGDOM OF CAMBODIA. LOAN NUMBER 3007-CAM (SF) LOAN AGREEMENT (Special Operations) (Climate Resilient Rice Commercialization Sector Development Project) between KINGDOM OF CAMBODIA and ASIAN DEVELOPMENT BANK DATED 26 AUGUST

More information

Proposed Programmatic Approach, Policy-Based Loan, and Technical Assistance Loan Cambodia: Strengthening Public Financial Management Program

Proposed Programmatic Approach, Policy-Based Loan, and Technical Assistance Loan Cambodia: Strengthening Public Financial Management Program Concept Paper Project Number: 49041-002 January 2016 Proposed Programmatic Approach, Policy-Based Loan, and Technical Assistance Loan Cambodia: Strengthening Public Financial Management Program This document

More information

Socialist Republic of Viet Nam: GMS Corridor Connectivity Enhancement Project

Socialist Republic of Viet Nam: GMS Corridor Connectivity Enhancement Project Technical Assistance Project Number: 50098 Project Preparatory Technical Assistance (PPTA) November 2016 Socialist Republic of Viet Nam: GMS Corridor Connectivity Enhancement Project This document is being

More information

Islamic Republic of Pakistan: Karachi Bus Rapid Transit Project

Islamic Republic of Pakistan: Karachi Bus Rapid Transit Project Project Design Advance Project Number: 47279-003 September 2016 Islamic Republic of Pakistan: Karachi Bus Rapid Transit Project This document is being disclosed to the public in accordance with ADB's Public

More information

The Republic of the Union of Myanmar. Eastern States Agribusiness Project (ESAP) Negotiated financing agreement

The Republic of the Union of Myanmar. Eastern States Agribusiness Project (ESAP) Negotiated financing agreement Document: EB 2015/114/R.12/Sup.1 Agenda: 6(c)(iii) Date: 17 April 2015 Distribution: Public Original: English E The Republic of the Union of Myanmar Eastern States Agribusiness Project (ESAP) Negotiated

More information

SECTOR ASSESSMENT (SUMMARY): TRANSPORT (ROAD TRANSPORT [NONURBAN])

SECTOR ASSESSMENT (SUMMARY): TRANSPORT (ROAD TRANSPORT [NONURBAN]) CAREC Corridors 1 and 6 Connector Road (Aktobe Makat) Reconstruction Project (RRP KAZ 48424) SECTOR ASSESSMENT (SUMMARY): TRANSPORT (ROAD TRANSPORT [NONURBAN]) 1. Sector Performance, Problems, and Opportunities

More information

INITIAL POVERTY AND SOCIAL ANALYSIS. Country: India Project Title: Loan to PNB Housing Finance Limited. FI Department/Division: PSOD/PSFI

INITIAL POVERTY AND SOCIAL ANALYSIS. Country: India Project Title: Loan to PNB Housing Finance Limited. FI Department/Division: PSOD/PSFI INITIAL POVERTY AND SOCIAL ANALYSIS Country: India Project Title: Loan to PNB Housing Finance Limited Lending/ Financing Modality: FI Department/Division: PSOD/PSFI I. POVERTY IMPACT AND SOCIAL DIMENSIONS

More information

Resettlement Planning Document. India: Rural Roads Sector II Investment Program

Resettlement Planning Document. India: Rural Roads Sector II Investment Program Resettlement Planning Document Community Participation Framework Document Stage: Final Project Number: 37066 December 2005 India: Rural Roads Sector II Investment Program Prepared by Orissa State Rural

More information

RESTRUCTURING PAPER ON A

RESTRUCTURING PAPER ON A Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Document of The World Bank RESTRUCTURING PAPER ON A Report No: 63424-AR PROPOSED PROJECT

More information

Independent State of Samoa: Port Development Project

Independent State of Samoa: Port Development Project Project Design Advance Project Number: 47358-003 April 2018 Independent State of Samoa: Port Development Project This document is being disclosed to the public in accordance with ADB s Public Communications

More information

Prepared by Himachal Pradesh Power Corporation Limited (HPPCL), Government of Himachal Pradesh for the Asian Development Bank.

Prepared by Himachal Pradesh Power Corporation Limited (HPPCL), Government of Himachal Pradesh for the Asian Development Bank. Final Resettlement Plan SHONGTONG KARCHHAM HYDRO ELECTRIC PROJECT March 2018 IND: Himachal Pradesh Clean Energy Development Investment Program (HPCEDIP) Prepared by Himachal Pradesh Power Corporation Limited

More information

Resettlement Plan Due Diligence Report

Resettlement Plan Due Diligence Report Resettlement Plan Due Diligence Report Document Stage: Updated Project Number: 34304 April 2014 NEP: Kathmandu Valley Water Supply Improvement Project Block Distribution System and Service Reservoir (Package

More information

IND: Bihar Power System Improvement Project

IND: Bihar Power System Improvement Project Resettlement Plan (Revised) Document Stage: Revised Project Number: 41626 (IND) July 2014 IND: Bihar Power System Improvement Project Prepared by: Bihar State Power Transmission Company Ltd. Government

More information

INTEGRATED SAFEGUARDS DATA SHEET CONCEPT STAGE

INTEGRATED SAFEGUARDS DATA SHEET CONCEPT STAGE Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized INTEGRATED SAFEGUARDS DATA SHEET CONCEPT STAGE Date ISDS Prepared/Updated: 14-Jul-2014

More information

INTEGRATED SAFEGUARDS DATA SHEET CONCEPT STAGE

INTEGRATED SAFEGUARDS DATA SHEET CONCEPT STAGE Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized INTEGRATED SAFEGUARDS DATA SHEET CONCEPT STAGE Date ISDS Prepared/Updated: 02-Sep-2014

More information

Resettlement Action Plan (RAP)

Resettlement Action Plan (RAP) Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Resettlement Action Plan (RAP) FATA EMERGENCY RURAL ROADS PROJECT (PHASE-2) Bajaur Agency

More information

Republic of the Maldives: Preparing Business Strategy for Port Development

Republic of the Maldives: Preparing Business Strategy for Port Development Technical Assistance Report Project Number: 47283 Capacity Development Technical Assistance (CDTA) November 2013 Republic of the Maldives: Preparing Business Strategy for Port Development The views expressed

More information

Report and Recommendation of the President to the Board of Directors. Proposed Loan and Grant Nepal: Subregional Transport Enhancement Project

Report and Recommendation of the President to the Board of Directors. Proposed Loan and Grant Nepal: Subregional Transport Enhancement Project Report and Recommendation of the President to the Board of Directors Project Number: 44143 October 2010 Proposed Loan and Grant Nepal: Subregional Transport Enhancement Project CURRENCY EQUIVALENTS (as

More information

CSS South and South Asia Subregional Workshop

CSS South and South Asia Subregional Workshop BAPPENAS CSS South and South Asia Subregional Workshop Dewobroto Joko Putranto, Acting Director of Multilateral Foreign Funding, Director of International cooperation, BAPPENAS Naning Mardiniah, Social

More information

Semi-annual Social Safeguards Monitoring Report

Semi-annual Social Safeguards Monitoring Report Semi-annual Social Safeguards Monitoring Report (January to June 2015) Armenia: Sustainable Urban Development Investment Program Tranche 1 and Tranche 2 Project Number: 42417 Loan Number: L2752 (T1) Prepared:

More information

OUTLINE TERMS OF REFERENCE FOR CONSULTANTS

OUTLINE TERMS OF REFERENCE FOR CONSULTANTS Strengthening Public Financial Resource Management through Information and Communication Systems Technology Systems (TRTA MON 51084) OUTLINE TERMS OF REFERENCE FOR CONSULTANTS 1. The transaction technical

More information

PAK: National Motorway M-4 Gojra Shorkot Khanewal Section Project

PAK: National Motorway M-4 Gojra Shorkot Khanewal Section Project Internal Monitoring Report September 2016 PAK: National Motorway M-4 Gojra Shorkot Khanewal Section Project Prepared by National Highway Authority of Ministry of Communications for the Islamic Republic

More information

Lao Peoples Democratic Republic: Northern Rural Infrastructure Development Sector Project

Lao Peoples Democratic Republic: Northern Rural Infrastructure Development Sector Project Resettlement Plan June 2013 Lao Peoples Democratic Republic: Northern Rural Infrastructure Development Sector Project Prepared by the Ministry of Agriculture and Forestry for the Asian Development Bank.

More information

SECTOR ASSESSMENT (SUMMARY): TRANSPORT 1

SECTOR ASSESSMENT (SUMMARY): TRANSPORT 1 Country Partnership Strategy: Viet Nam, 2012 2015 SECTOR ASSESSMENT (SUMMARY): TRANSPORT 1 Sector Road Map 1. Sector Performance, Problems, and Opportunities 1. Investment in the transport sector in Viet

More information

Evaluation Approach Project Performance Evaluation Report for Loan 2167 and Grant 0006-SRI: Tsunami-Affected Areas Rebuilding Project September 2015

Evaluation Approach Project Performance Evaluation Report for Loan 2167 and Grant 0006-SRI: Tsunami-Affected Areas Rebuilding Project September 2015 Asian Development Bank 6 ADB Avenue, Mandaluyong City, 1550 Metro Manila, Philippines Tel +63 2 632 4444; Fax +63 2 636 2163; evaluation@adb.org www.adb.org/evaluation Evaluation Approach Project Performance

More information

VIE: Power Transmission Investment Program, Tranche 2 500kV Pleiku-My Phuoc-Cau Bong Transmission Line (Binh Duong Province)

VIE: Power Transmission Investment Program, Tranche 2 500kV Pleiku-My Phuoc-Cau Bong Transmission Line (Binh Duong Province) Social Monitoring Report July 2014 VIE: Power Transmission Investment Program, Tranche 2 500kV Pleiku-My Phuoc-Cau Bong Transmission Line (Binh Duong Province) Prepared by Central Vietnam Power Projects

More information

48081 v1. India: Andhra Pradesh Road Sector Project. Environmental and. Social Management Framework. For. Maintenance Road. (approx.

48081 v1. India: Andhra Pradesh Road Sector Project. Environmental and. Social Management Framework. For. Maintenance Road. (approx. Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized 48081 v1 India: Andhra Pradesh Road Sector Project Environmental and Social Management

More information

Combined Resettlement Plan and Ethnic Minority Development Plan. VIE: GMS Kunming-Haiphong Transport Corridor Noi Bai-Lao Cai Highway Project

Combined Resettlement Plan and Ethnic Minority Development Plan. VIE: GMS Kunming-Haiphong Transport Corridor Noi Bai-Lao Cai Highway Project Combined Resettlement Plan and Ethnic Minority Development Plan December 2017 VIE: GMS Kunming-Haiphong Transport Corridor Noi Bai-Lao Cai Highway Project Prepared by Vietnam Expressway Corporation for

More information