1 Senate Fiscal Committee Central Distributions Subcommittee April 17, 2012 TOPIC: Physical Plant Assessment Rates (Plant Operation and Maintenance) CONTEXT: Consistent with the principles of budget restructuring, the cost of utilities, maintenance, and a basic level of custodial services are allocated on a uniform campus-wide average across general funds and earnings unit space. Units can choose to voluntarily contract for higher levels of service. As part of the previously approved plan to increase the deferred maintenance and renewal component to $1.00 per ASF by FY 2016, the maintenance and renewal rate has increased from $0.65 per assignable square foot to $0.75 per ASF for FY Similarly, as part of the previously approved plan to increase the preventive maintenance component to $0.75 per ASF by FY2015, the preventative maintenance rate has increased from $0.30 to $0.45 per ASF for FY This is to be used for maintenance to be performed when it is needed or scheduled, and therefore not delayed or deferred to a future period. Last year an additional maintenance component, Priority Deferred Maintenance Projects, was added to provide the funding for the university to catch up on certain major deferred maintenance projects that are currently necessary. The component is not funded in FY 13, because the total POM rate increases by $0.05 before it is added in. In contrast, last year s POM margin would have been negative without this component. Last year s total physical plant rate before adding Priority Deferred Maintenance Projects was $ This year s rate without this component is $15.53, for an increase of $0.44, or 3%. This increase is driven most significantly by the Utilities Debt Service rate, which is increasing by $0.46. Projects to be funded through this assessment include chiller plant buildout and renewal, steam and condensate distribution system, and boiler replacement. This year s proposed rate eliminates the previous $1M allocation to Utility Reserve, which has a current uncommitted cash balance of $29.4 million.
2 Colleges and support units are charged for increases in physical plant costs resulting from space increases and credited with costs of vacated space since FY 03. In FY 13, as in prior years, colleges will be: Charged an inflationary increase on space assigned to them prior to January 1, 2011 and charged the full physical plant rate for space newly assigned to them between January 1 and December 31, Credited with the costs associated with the physical plant for space vacated by the unit between January 1 and December 31, Cost allocations are adjusted at the close of the fiscal year to reflect changes in the units space assignments through mid-fiscal year. Costs for FY 12 will be favorably impacted by four facilities that ceased receiving PPA services between January 1, 2011 and December 31, 2011 and eventually were demolished: Boyd Lab, Johnston Lab, Haskett Hall, and the Aviation Building. In addition, the university is transferring its space in McCampbell Hall to the Medical Center in exchange for a slightly larger space in Starling Loving Hall. The costs resulting from additional space will be moved into the physical plant assessment. Please see Attachment A for details. As in previous years, several buildings were analyzed to determine if their estimated utility costs exceed the university s rate by more than 15%, which would initiate a recommendation to implement a surcharge. Based on this analysis, a surcharge will be charged again for BRT utilities, McCorkle, and RPAC. Please see Attachment B for details. RECOMMENDATIONS: The FY 13 university-wide average physical plant assessment is calculated to be $15.53 per assignable square foot, which is an increase of 0.3% from FY 12 s assessment. Please see Attachment C for details. This contrasts with last year s 0% increase, primarily as a result of increases in utilities debt service, as well as somewhat lower increases in purchased power and water & sewerage cost. Please see Attachment D for increases in previous years. CONSIDERATIONS: Are there unintended consequences from the implementation of this proposed increase? Who else should be consulted before the FY 13 rate is approved?
3 Attachment A The Ohio State University Projected Annual PBA Cost of New Facilities FY2013 PBA Project # OSU Building Name Demolitions Boyd/Johnston/ Aviation/ Haskett Transfer of McCampbell Hall to Medical Center Building # 027,036,074, Transfer of Starling Loving From Medical Center FY2013 PBA Total POM Date 7/1/2011 1/1/2012 1/1/2012 POM % 100% 100% 100% ASF Change (75,944) (50,912) 54,560 (72,296) ASF Custodial (75,944) (50,912) 54,560 (72,296) Maintenance (75,944) (50,912) 54,560 (72,296) Utilities (75,944) (50,912) 54,560 (72,296) Cost 2012 $/ASF Buildings (195,176.08) (130,843.84) 140, (185,801) Maintenance (187,581.68) (125,752.64) 134, (178,571) Utilities Operations (52,401.36) (35,129.28) 37, (49,884) Repair & Renovation (73,665.68) (49,384.64) 52, (70,127) Total Cost (508,824.80) (341,110.40) 365, (484,383.20)
4 Attachment B DRAFT Adequacy of PPA for BRT/McCorkle/RPAC Utilities Funding As Recommended by Central Distributions Subcommittee Projected FY 2013 Cost ASF PPA Rate Projected Funding Shortfall Surcharge/ ASF BRT Utilities $3,358, ,458 $8.08 $2,891,978 $466,736 $1.65 McCorkle Utilities $860,358 76,777 $8.08 $620,358 $240,000 $3.13 RPAC Utilities $1,635, ,519 $8.08 $1,345,474 $290,000 $1.74 Utilities surcharges are recommended for BRT, McCorkle, and RPAC because the projected FY 2013 utilities rates per ASF for these buildings are more than 15% in excess of the rate for the rest of the university.
5 Attachment C DRAFT Analysis of FY 2013 Physical Plant Assessment Rates (numbers in thousands) FY 2013 Proposed FY13 Budget Marginal Change $/ASF Change from 2012 Pcnt Change Utilities Utilities Revenues Heat & Power Income -26,798-2, % Water Income -3, % McCorkle Surcharge % RPAC Surcharge % BRT Utilities Surcharge % Subtotal Utilities Revenue -31,047-2, % Utilities Costs Gas, Fuel Oil 15,100-3, % Metering/Equipment Install % Purchased Power 36,000 1, % Water & Sewerage 10,397 1, % Utilities Chemicals NA Utilities Repair & Renov % Utilities Debt Service 22,991 3, % Utility Reserve 2 0-1, % Utilities Operations 3,4 6, % New Facilities NA Subtotal Utilities Costs 91,842 1, % Total Utilities 60, % ASF 7,421, % Maintenance Maintenance Operations 3,6 22, % Net Maint. Operations 22, % New Facilities NA Repair and Renovation 8, % Total Maintenance 30, % ASF 7,913, % Custodial Contract Services 7, % Custodial Operations 3 9, % New Facilities NA Total Custodial 17, % ASF 6,573, % Deferred Maintenance/Renewal Deferred Maint/Renewal 7 5, % ASF 7,177, % Preventive Maintenance Preventive Maintenance 8 3,230 1, % ASF 7,177, % Priority Deferred Maintenance Projects Priority Defer Maint Proj 0-2, NA ASF 7,177, % Total 117, % 1 BRT Utilities Surcharge is based partly on actual meter readings, partly on projections. 2 Utilties Reserve has a current uncommitted cash balance of $29.4 M. 3 FY 2013 Utilities, Maintenance, and Custodial Operations are based on 3.0% guidelines for salaries; 6.85% for benefits. 4 Utilities operations includes Chilled Water Staffing starting in FY New Facilities is shown as a separate line in each cost pool because new space is included in ASF figures, but increases/decreases in costs due to new/demolished space are not reflected in cost projections for utilities, maintenance, and custodial operations. 6 Maintenance operations includes Elevator Inspection II starting in FY Annual increases of $0.10 in the Deferred Maintenance/Renewal rate are planned until it reaches $ Annual increases of $0.15 in the Preventive Maintenance rate are planned until it reaches $0.75.
6 Attachment D DRAFT The Ohio State University Physical Plant Rates Trends from FY 2003 to FY 2013 Recommended by Central Distributions Subcommittee Actual Rec FY 2003 FY 2004 FY 2005 FY 2006 FY 2007 FY 2008 FY 2009 FY 2010 FY 2011 FY 2012 FY 2013 Utilities $ 3.60 $ 4.19 $ 4.81 $ 5.54 $ 7.22 $ 7.97 $ 8.38 $ 8.69 $ 8.74 $ 8.07 $ 8.08 Maintenance $ 2.50 $ 2.52 $ 2.61 $ 2.73 $ 2.76 $ 2.97 $ 3.16 $ 3.32 $ 3.48 $ 3.50 $ 3.62 Custodial $ 2.09 $ 2.11 $ 2.15 $ 2.12 $ 2.19 $ 2.37 $ 2.47 $ 2.52 $ 2.56 $ 2.57 $ 2.63 Maintenance & Renewal $ $ $ 0.06 $ 0.12 $ 0.19 $ 0.25 $ 0.35 $ 0.45 $ 0.55 $ 0.65 $ 0.75 Preventive Maintenance $ $ $ $ $ $ $ $ $ 0.15 $ 0.30 $ 0.45 Priority Deferred Maint Projects $ $ $ $ $ $ $ $ $ $ 0.39 $ Total Rate $ 8.19 $ 8.82 $ 9.63 $ $ $ $ $ $ $ $ Percentage Change FY 2003 FY 2004 FY 2005 FY 2006 FY 2007 FY 2008 FY 2009 FY 2010 FY 2011 FY 2012 FY 2013 Utilities 16.4% 14.8% 15.2% 30.3% 10.4% 5.1% 3.7% 0.6% 7.7% 0.1% Maintenance 0.8% 3.6% 4.6% 1.1% 7.6% 6.4% 5.1% 4.8% 0.6% 3.4% Custodial 1.0% 1.9% 1.4% 3.3% 8.2% 4.2% 2.0% 1.6% 0.4% 2.3% Maintenance & Renewal na na 100.0% 58.3% 31.6% 40.0% 28.6% 22.2% 18.2% 15.4% Preventive Maintenance na na na na na na na na 100.0% 50.0% Priority Deferred Maint Projects na na na na na na na na na 100.0% Total Rate 7.7% 9.2% 9.1% 17.6% 9.7% 5.9% 4.3% 3.3% 0.0% 0.3%
Projects Approved to Move Forward FY Capital Investment Program (CIP) August 31, 2012
Projects to Move FY203 7 Capital Investment Program (CIP) August 3, 202 2 3 4 5 6 7 8 9 0 2 3 4 5 6 7 8 9 20 2 22 23 24 25 26 27 28 29 Expenses FY203 Athletics Projects from $40M Line of Credit $ 40.0
More informationFaculty Senate Fiscal Committee February 24, 2015
Faculty Senate Fiscal Committee February 24, 2015 TOPIC: Overhead Rates for FY 2016 CONTEXT: This is the annual calculation of overhead rates charged by the University to non-general Fund (earnings) units
More information14 Capital Improvements
Capital Improvements Supporting Data The purpose of the Capital Improvements element is to evaluate the need for public facilities as identified in other campus master plan elements; to estimate the cost
More informationK. (Cheena) Srinivasan Professor and Chair, Mechanical Engineering Chair, Senate Fiscal Committee
Department of Mechanical Engineering Peter L. and Clara M. Scott Laboratory 201 West 19th Avenue Suite N350 Columbus, OH 43210-1142 Joseph A. Alutto Executive Vice-President and Provost Office of Academic
More informationThe CFS brought their recommendation to the full SFC at its February 27, 2018, meeting, where it was discussed and approved.
University Senate Senate Fiscal Committee 115 Independence Hall 1923 Neil Ave Columbus, OH 43210 614-292-2423 Phone senate.osu.edu March 8, 2018 To: Bruce McPheron, Executive Vice President and Provost
More informationDeferred Maintenance and Renewal Program Briefing
Deferred Maintenance and Renewal Program Briefing Business and Finance December 2007 1 Briefing Overview Nature of the challenge How we compare Progress to date Remaining barriers What s next? 2 Context
More informationBruce McPheron, Interim Executive Vice President and Provost Geoff Chatas, Senior Vice President and Chief Financial Officer
Department of Accounting and MIS 400 Fisher Hall 2100 Neil Avenue Columbus, OH 43210 614-247-6299 Phone 614-292-2118 Fax dietrich@fisher.osu.edu February 29, 2016 To: Bruce McPheron, Interim Executive
More informationDue to the numerous sections and comprehensiveness of this PP/OP, the following index is provided for quick reference and clarity:
PHYSICAL PLANT OPERATING POLICY AND PROCEDURE : Utility Cost Projection DATE: September 7, 2007 PURPOSE The purpose of this Physical Plant Operating Policy and Procedure (PP/OP) is to establish a standard
More informationBruce McPheron, Executive Vice President and Provost Geoff Chatas, Senior Vice President and Chief Financial Officer
Department of Accounting and MIS 400 Fisher Hall 2100 Neil Avenue Columbus, OH 43210 614-247-6299 Phone 614-292-2118 Fax dietrich@fisher.osu.edu March 2, 2017 To: From: Bruce McPheron, Executive Vice President
More informationTracking Expenses in Facilities
Tracking Expenses in Facilities Requirements for Tracking Expenses when maintaining, building or improving a facility Minnesota State Colleges and Universities The Minnesota State Colleges and Universities
More informationThe Ohio State University Board of Trustees. October 28, 2009
The Ohio State University Board of Trustees TOPIC: October 28, 2009 CONTEXT: Capital Recommendations At the September 17 th Fiscal Affairs Committee meeting, the University Administration promised to come
More informationPlant Organization and Operations. Operations. Overview of Session. Responsibilities 8/19/2015
Plant Organization and Operations Jeff Zumwalt and Larry Schuster University of New Mexico Overview of Session Performance Measurement Customer Connections Environment Human Resources Budgeting Emergency
More informationSECTION 3 CAPITAL PLAN AND BUDGET
Capital Plan and Budget 33 SECTION 3 CAPITAL PLAN AND BUDGET CAPITAL PLAN The Stanford campus is a unique resource that helps to shape and define University life. The central campus has more than 670 major
More informationFY17 Budget Highlights
FY17 Budget Highlights GENERAL FUND REVENUE STATE FUNDING Capital Component A scheduled payout of funds remaining from previous State of Ohio capital bills, this amount is scheduled to decrease by $11,428
More informationNATIONAL ASSOCIATION OF HOUSING COOPERATIVES ANNUAL CONFERENCE. MONTE CARLO HOTEL and CASINO
ANNUAL CONFERENCE MONTE CARLO HOTEL and CASINO LAS VEGAS, NV Basics For Board Treasurers is a session on the basic financial aspects of operating a cooperative housing company. It is designed for new treasurers
More informationUniversity of Virginia Status Report on the Plan to Address Deferred Maintenance
Executive Summary University of Virginia Status Report on the Plan to Address Deferred Maintenance The University of Virginia s facilities portfolio includes 540 buildings and related infrastructure, encompassing
More informationTO THE MEMBERS OF THE COMMITTEE ON GROUNDS AND BUILDINGS: ACTION ITEM CONSENT
GB1 Office of the President TO THE MEMBERS OF THE COMMITTEE ON GROUNDS AND BUILDINGS: For Meeting of January 22, 2014 ACTION ITEM CONSENT AMENDMENT OF THE BUDGET AND APPROVAL OF EXTERNAL FINANCING, LI
More informationAlbemarle County Service Authority FY 2005 Budget
Albemarle County Service Authority FY 2005 Budget Adopted June 17, 2004 Albemarle County Service Authority Revenue and Expense Summary FY 2005 Approved Budget OPERATING REVENUE Total Volume Charges $ 9,453,021
More informationGoverning Board Bond Update. Measure G Bond Program. for. Solano Community College District
Governing Board Bond Update for Measure G Bond Program prepared by Kitchell for the Solano Community College District Included in Booklet: Board Update Bond Financial Summary Completed Projects Projects
More informationNebraska Utility Corporation
Independent Auditor s Report and Financial Statements June 30, 2017 and 2016 June 30, 2017 and 2016 Contents Independent Auditor s Report... 1 Management s Discussion and Analysis (Unaudited)... 3 Financial
More informationFinancial Report Building Partnerships for the Future
Financial Report 1998-1999 Building Partnerships for the Future Virginia Tech s founding as a land-grant institution was rooted in an important state and federal partnership. The Morrill Act of 1862 apportioned
More informationCONVENTION CENTER ORGANIZATION CHART. City of Minneapolis - Convention Center 433 Council Adopted Budget
CONVENTION CENTER MISSION The Minneapolis Convention Center is the major national convention and trade show venue of the State of Minnesota. By hosting events and offering a variety of services, the convention
More informationGreat Lakes Water Authority/ Detroit Water and Sewerage Department Five-year Financial Forecast Cash Basis. July 1, 2015 through June 30, 2020
Great Lakes Water Authority/ Detroit Water and Sewerage Department Cash Basis July 1, 2015 through June 30, 2020 Table of Contents Report Letter... 1 Project Summary... 2-3 Executive Summary... 4 Financial
More informationNATIONAL ASSOCIATION OF HOUSING COOPERATIVES ANNUAL CONFERENCE GRAND HYATT SEATTLE SEATTLE, WA BASICS FOR BOARD TREASURERS NOVEMBER 1, 2012
NATIONAL ASSOCIATION OF HOUSING COOPERATIVES ANNUAL CONFERENCE GRAND HYATT SEATTLE SEATTLE, WA BASICS FOR BOARD TREASURERS NOVEMBER 1, 2012 Mark B. Shernicoff, CPA (Retired) 212 362-9004 mark@shernicoff.com
More informationBerea City School District
Financial Report Five Year Forecast May, 2018 Public Finance Resources, 2015 1 Table of Contents Table of Contents 2 Executive Summary 3 PAGE # Revenue Overview 4 1.010 General Property Tax (Real Estate)
More informationORGANIZATION CHART (ALL FUNDS) BY PROGRAM
CITY OF PHILADELPHIA 50 ORGANIZATION CHART (ALL FUNDS) BY PROGRAM Managing Director's Office Office of Arts and Culture 10 12 Public Art & Civic Engagement Operations & Advancement 1 2 9 10 FY19 PROPOSED
More informationSightlines LLC FY2012 Facilities MB&A Presentation Middlesex Community College. Date: January 22, 2012 Presented by: Brendon Martin and Josh Vidro
Sightlines LLC FY2012 Facilities MB&A Presentation Middlesex Community College Date: January 22, 2012 Presented by: Brendon Martin and Josh Vidro 1 Sightlines profile: 41 states, DC, Nova Scotia Common
More informationCollege Dean Budget System Survey Fisher College of Business
Introduction and Background College Dean Budget System Survey Fisher College of Business This survey is being distributed by the Provost s Budget System Advisory Committee to all college deans to obtain
More informationOperating & Capital Budget Plan May 2017
2017-2018 Operating & Capital Budget Plan May 2017 Operating and Capital Budget Plan FY 2018 Operating Budget - Highlights Table 1: Composite Operating Budget 4 Table 2: Composite Operating Budget - by
More informationTO THE MEMBERS OF THE COMMITTEE ON GROUNDS AND BUILDINGS: DISCUSSION ITEM EXECUTIVE SUMMARY
Office of the President 107 TO THE MEMBERS OF THE COMMITTEE ON GROUNDS AND BUILDINGS: DISCUSSION ITEM For the Meeting of January 18, 2005 ENGINEERING UNIT 3, IRVINE CAMPUS EXECUTIVE SUMMARY Campus: Irvine
More informationBUDGET AND FINANCE COMMITTEE February 3, 2010 Minutes
Board of Governors BUDGET AND FINANCE COMMITTEE February 3, 2010 Minutes The meeting was called to order at 11:17 a.m. by Governor Massaron in the Assembly Hall of the University Center Building at the
More informationPriority #1 Request for Construction FY Priority #2 Anticipated Request for Planning FY 2019
V. IMPLEMENTATION PLAN a) Prioritize major capital projects requested from the State, including a brief project description and estimated cost, in the format provided. (Adjust previously developed or prior
More informationOregon State University 4 th Quarter Operating Management Report
Oregon State University 4 th Quarter Operating Management Report Oregon State University s 4 th Quarter FY 2014 Operating Management Report presents the final fiscal year operating results for the three
More informationVillage of Kenilworth Fiscal Year 2019 Adopted Budget
F Village of Kenilworth Fiscal Year 2019 Adopted FY 16 Delta FY18B v. FY19P 23 GENERAL FUND Total General Operating Revenues: 4,793,044 4,514,062 4,429,149 3,993,544 4,584,330 4,491,415 62,266 Administration
More informationUniversity of Virginia Status Report on the Plan to Address Deferred Maintenance
Executive Summary University of Virginia Status Report on the Plan to Address Deferred Maintenance The University of Virginia s facilities portfolio includes 552 buildings and related infrastructure, encompassing
More informationDr. George Parker, President PO Box 309, Jamestown, NC (336)
EDUCATION Guilford Technical Community College Dr. George Parker, President PO Box 309, Jamestown, NC 27282 (336) 334-4822 Links to County Goals and Strategic Priorities: COUNTY GOAL: Further Community
More informationSightlines, LLC University of Alaska System Presentation FY2012
Sightlines, LLC University of Alaska System Presentation FY2012 Date: April 3, 2013 Presented by: Colin Sanders, Laura Vassilowitch & Sheena Salsberry University of Illinois at Urbana-Champaign The University
More informationResidential Permits R-2, R-3, R-4, and U Occupancies 2018 Building Permit Valuation/Fee Schedule
Residential Permits R-2, R-3, R-4, and U Occupancies 2018 Building Permit Valuation/Fee Schedule The base valuation to determine permit fees for residential buildings and additions are based on a dollar
More informationADVANCING CAPITAL OUTLAY
ADVANCING CAPITAL OUTLAY Robert R. Broyden Assistant Vice President for Capital Assets and Financial Management 1 Major Topics Today: 1) Commitment to long-range planning processes 2) Update on 2012 General
More informationOPERATIONS AND MAINTENANCE (O&M) FORMULA
OPERATIONS AND MAINTENANCE (O&M) FORMULA Facilities program transferred in 1987 from the Department of the Interior to the Bureau of Indian Affairs. The O&M formula was developed to provide the most equitable
More informationHOUSING AND DINING SYSTEM
Table of Contents Management s Discussion and Analysis... 3 Independent Auditor s Report... 11 Financial Statements Statements of Net Position... 14 Statements of Revenues, Expenses and Changes in Net
More informationOrlando Utilities Commission
THREE MONTHS ENDED December 2018 1 Orlando Utilities Commission Table of Contents Management s Discussion and Analysis 3 Statements of Revenues, Expenses and Changes 7 in Net Position based on Budget -
More informationCPHD DEVELOPMENT FUND Department of Community Planning, Housing and Development DEVELOPMENT FUND SUMMARY
Department of Community Planning, Housing and Development Our Mission: To set the standard for excellence in public service by providing consistent quality and timely permitting, plan review, and inspection
More informationThe University of Memphis. October Analysis
October 2017-2018 Analysis 2018 October Budget Analysis Table of Contents Form 3 Summary by Unit - R & R and Contingency Allocation Computations Form 4 (A) Centers of Excellence/Emphasis - Actual 2016-17
More informationREVENUES RECAP REVENUE REQUIREMENTS RECAP (OPERATING EXPENSES AND DEBT COSTS) OPERATING BUDGET BALANCING WORKSHEET
2019 MUNICIPAL TAX BASED BUDGET REPORT PUBLIC INPUT STAGE OPERATING BUDGET SECTION 1 - RECAPS REVENUES RECAP REVENUE REQUIREMENTS RECAP (OPERATING EXPENSES AND DEBT COSTS) OPERATING BUDGET BALANCING WORKSHEET
More informationWestern Oklahoma State College Table of Contents June 30, 2018 and 2017
Table of Contents Independent Auditors Report... 1 Management s Discussion and Analysis... i Financial Statements Statements of Net Position... 3 Statements of Revenues, Expenses, and Changes in Net Position...
More informationPROJECT BANK ACCOUNTS
PROJECT BANK ACCOUNTS BUILDING INDUSTRY FAIRNESS In late 2017 the Queensland Government passed the Building Industry Fairness (Security of Payment) Act 2017 (the Act). The Act introduces significant changes
More informationUse of State and District Construction Funds
8 Use of State and District Construction Funds Through its long-range planning process, the district has met its facilities needs without issuing significant debt. To improve cost efficiency, however,
More informationPennsylvania Intergovernmental Cooperation Authority
Pennsylvania Intergovernmental Cooperation Authority Staff Report on the City of Philadelphia s Quarterly City Managers Report for the Period Ending September 30, 2016 January 3, 2017 Executive Summary
More informationPROJECT BANK ACCOUNTS
PROJECT BANK ACCOUNTS BUILDING INDUSTRY FAIRNESS KEY TAKEAWAYS: 1 PBAs are to be implemented in two phases. The first phase, to commence on 1 January 2018, will only apply to certain construction contracts
More informationCITY OF SPARTA REVENUES WITH COMPARISON TO BUDGET FOR THE 10 MONTHS ENDING OCTOBER 31, 2018 GENERAL FUND
REVENUES WITH COMPARISON TO BUDGET PRIOR YTD PERIOD AMT YTD ACTUAL BUDGET UNEARNED PCNT TAXES 100-41100 GENERAL PROPERTY TAXES 1,297,987.00 8,800.66 21,134.90 1,478,479.80 1,457,344.90 1.4 100-41140 MOBIL
More informationYEAR BUDGET
YEAR 2012-2013 BUDGET The Brick Township Municipal Utilities Authority operates on a fiscal year basis from April 1st through the following March 31st. The BTMUA adopts a detailed Operating and Capital
More informationUniversity of Virginia Addressing the University s Deferred Maintenance Backlog
University of Virginia Addressing the University s Deferred Maintenance Backlog Introduction At its December 2004 meeting, the Buildings and Grounds Committee heard a presentation regarding the University
More informationMPOAC REVENUE STUDY. Study Update Northwest Florida Regional TPO January 18, 2012
Study Update Northwest Florida Regional TPO January 18, 2012 Study History 2008 Florida Senate Bill 1688 Recommend funding mechanism 13 members- 3 governor s, 3 Senate, 3 House, FDOT, MPOAC, FL Association
More informationSan Antonio Water System
CONDENSED MONTHLY FINANCIAL REPORT December 2018 San Antonio, Texas CONDENSED MONTHLY FINANCIAL REPORT SAN ANTONIO WATER SYSTEM DECEMBER 31, 2018 Attached is the monthly financial report of the (SAWS)
More informationDATE: May 31, 2017 Data Code: PROJECT: Alamo Colleges Program Management. SUBJECT: Reaffirmation Information: Construction Report
DATE: May 31, 2017 Data Code: 1.02 TO: John W. Strybos, PE FROM: K. LeBlanc, PE, CFM, LEED GA PROJECT NO.: 170-11026-000 Routing V. Buzzelli R. Reyes J. Grom PROJECT: Alamo Colleges Program Management
More informationFiscal Year Budget Proposal
Fiscal Year 20182019 Budget Proposal Board of Directors March 27, 2018 RIVANNA WATER & SEWER AUTHORITY FY 2019 Proposed Budget Table of Contents Budget Highlights Prepared: March 6, 2018 Adopted: Draft
More informationPICA Staff Report on the City of Philadelphia s Quarterly City Managers Report for the Second Quarter of FY2013
PICA Staff Report on the City of Philadelphia s Quarterly City Managers Report for the Second Quarter of FY2013 Submitted to PICA on February 15, 2013 March 26, 2013 Introduction: PICA Staff Report on
More informationCapital Projects Ordinances (CPO)
Capital Projects Ordinances (CPO) This section accounts for financial resources to be used for the acquisition or construction of major capital facilities. Listed below are brief descriptions for active
More informationCITY OF SPARTA REVENUES WITH COMPARISON TO BUDGET FOR THE 6 MONTHS ENDING JUNE 30, 2018 BLOCK GRANT FUND
BLOCK GRANT FUND PRIOR YTD PERIOD AMT YTD ACTUAL BUDGET UNEARNED PCNT 200-43902 ED LOANS 23,394.85 2,909.58 32,536.54 40,000.00 7,463.46 81.3 200-43903 HOME LOANS 40,030.75.00 21,535.41 35,000.00 13,464.59
More informationCitizens of Leon County
FACILITIES MANAGEMENT General Operations Citizens of Leon County Citizen Advisory Boards Board of County Commissioners County Administrator Constitutional Officers County Attorney Director, Office of &
More informationBUILD NYC RESOURCE CORPORATION PROJECT COST/BENEFIT ANALYSIS June 7, 2018
BUILD NYC RESOURCE CORPORATION PROJECT COST/BENEFIT ANALYSIS June 7, 2018 APPLICANT Blue School and Blue School Real Estate, LLC 241 Water Street New York, NY 10038 PROJECT LOCATION 156 William Street
More informationTRF Application Manual For Fiscal Year (FY) 2014 Grants
TRF Application Manual For Fiscal Year (FY) 2014 Grants Getting Started 1. Go to URL: http://oregonstate.edu/trf/submit 2. Login into ONID. IF you don't have an ONID sign up for one at http://oregonstate.edu/helpdocs/onid/getting-
More informationMICHAEL BERTHELSEN, M.A.
MICHAEL BERTHELSEN, M.A. SUMMARY As a senior executive for the University of Minnesota, Michael leads the University Services divisions. His business approach includes focusing on strategy, improving customer
More informationTABLE OF CONTENTS CAPITAL BUDGET
TABLE OF CONTENTS Capital Organization Chart... 763 Capital Programs... 764 Capital Items Defined as Fixed Assets... 764 Summary of Programs (schedule)... 765 Building and Building Improvements Program...
More informationBenchmarking Report. State College Area School District Physical Plant November Page 1 of 14
Benchmarking Report State College Area School District Physical Plant November 2011 Page 1 of 14 Table of Contents Introduction and Background Pages 3-5 Operational Spending Pages 6-9 Existing Facility
More informationAudited Financial Report and Reports Required by Uniform Guidance As of and for the Years Ended June 30, 2017 and 2016 The University of Oklahoma
Audited Financial Report and Reports Required by Uniform Guidance As of and for the Years Ended June 30, 2017 and 2016 The University of Oklahoma Health Sciences Center Table of Contents June 30, 2017
More informationIn FY , the following projects will be actively under design or construction:
PASCO COUNTY FISCAL YEAR 216-22 CAPITAL IMPROVEMENT PLAN INTERNAL SERVICES The Pasco County Board of County Commissioners has a broad responsibility to provide equipment, buildings, and other facilities
More informationFinancial Operating. & Capital Plan Reviews FY Budget Forum. February 14, FY 2014 Budget Forum - February
Financial Operating & Capital Plan Reviews FY 2014 Budget Forum February 14, 2013 FY 2014 Budget Forum - February 2013 0 University Budget Council (UBC) Bob Warren, Chair VP Administration & Finance Dennis
More informationSALISBURY TOWNSHIP REVENUES WITH COMPARISON TO BUDGET FOR THE 5 MONTHS ENDING MAY 31, 2010 GENERAL FUND
REVENUES WITH COMPARISON TO BUDGET GENERAL FUND PERIOD ACTUAL YTD ACTUAL BUDGET UNEARNED PCNT PROPERTY TAXES 01-301.100 REAL ESTATE TAX - CURRENT 242,748.24 262,606.11 1,300,000.00 1,037,393.89 20.2 01-301.400
More informationFood Services Advisory Committee. UH Planning and Budgeting
Food Services Advisory Committee UH Planning and Budgeting November 12, 2010 Food Services Advisory Committee UH Planning and Budgeting Budgeting Process 2 Overview of the Planning and Budget Process Internal
More informationThe Ohio State University (A Component Unit of the State of Ohio) Financial Statements as of and for the Year Ended June 30, 2011 and 2010, and
The Ohio State University (A Component Unit of the State of Ohio) Financial Statements as of and for the Year Ended June 30, 2011 and 2010, and Report on Federal Awards in Accordance with OMB Circular
More informationOhio University (a component unit of the State of Ohio) Financial Statements June 30, 2017 and 2016
(a component unit of the State of Ohio) Financial Statements Contents Independent Auditor s Report 1-3 Financial Statements Management s Discussion and Analysis 4-12 Statements of Net Position 13-14 Statements
More informationFY 2017 Stockton University Expenditure Report as of May 31, 2017
FY 2017 Stockton University Expenditure Report Table of Contents Page Operational Budgets 1-2 Internal Capital Projects Summary 3 FY17 Internal Capital Projects 4 State Bond/Grants 5 STOCKTON UNIVERSITY
More informationAUTOMOTIVE EQUIPMENT FUND Department of Environmental Services
Department of Environmental Services Our Mission: To ensure that safe, energy-efficient, and environmentally friendly vehicles are available to agency staff to accomplish their work/missions The Automotive
More informationUniversity of Missouri System. Guidelines for FY 2018 Facilities Inventory Report And FY 2020 Annual Property Insurance Reporting
University of Missouri System Guidelines for FY 2018 Facilities Inventory Report And FY 2020 Annual Property Insurance Reporting Table of Contents 1.0 Introduction... 2 2.0 Inventory Data Collection...
More informationFY2018 Operating Budget
FY2018 Operating Budget SUMMARY OF PROPOSAL The Board of Trustees is charged with reviewing and approving the university s annual operating budget. The budget supports the educational, research, and outreach
More informationFive Year Forecast Financial Report
LOGO Springboro Community City Schools Five Year Forecast Financial Report May, 2017 Terrah Floyd, CFO 1 Table of Contents Table of Contents 2 Executive Summary 3 PAGE # Revenue Overview 4 1.010 General
More informationMETROPOLITAN SEWER DISTRICT OF GREATER CINCINNATI HAMILTON COUNTY TABLE OF CONTENTS. Independent Auditor s Report... 1
METROPOLITAN SEWER DISTRICT OF GREATER CINCINNATI TABLE OF CONTENTS TITLE PAGE Independent Auditor s Report... 1 Prepared by Management: Management s Discussion and Analysis... 5 Basic Financial Statements:
More informationSAMPLE PRIVATE USE ANALYSIS. UW Sample Building
1 SAMPLE PRIVATE USE ANALYSIS UW Sample Building 2 UW Sample Building Project The UW Building is a 4-story research facility located in UW Medicine s South Lake Union campus. It was developed by a 501(c)(3)
More informationFiscal Year 2019 Proposed Budget. City Council Worksession August 7, 2018
Fiscal Year 2019 Proposed Budget City Council Worksession August 7, 2018 Presentation Overview Property values and proposed tax rate FY 2019 proposed revenues and expenditures by fund FY 2019 proposed
More informationBROOKS DEVELOPMENT AUTHORITY BALANCE SHEET AS OF MAY 31, 2017 (Unaudited)
BROOKS DEVELOPMENT AUTHORITY BALANCE SHEET AS OF MAY 31, 2017 (Unaudited) ASSETS Current Assets Unrestricted Cash 1,514,975 Restricted Cash 35,090,701 Total Cash 36,605,676 Accounts Receivable 2,067,039
More informationWelcome! Understanding Facilities and Administration (F&A) Costs. Matt Michener
Understanding Facilities and Administration (F&A) Costs Also known as Overhead Costs, or Indirect Costs. Revised April 2017 1 Welcome! Presenters: Matt Michener matthew.michener@wsu.edu Grant and Contract
More informationOVERVIEW OF STATE DEBT
OVERVIEW OF STATE DEBT AND OTHER LIABILITIES PRESENTED TO SENATE FINANCE COMMITTEE LEGISLATIVE BUDGET BOARD STAFF MARCH 30, 2016 Texas State and Local Debt Obligations Total Debt Outstanding = $259.5 billion
More information($ in Thousands) Governor s Planning Estimates. Governor s Rec. Agency Request
Project Funding Summary ($ in Thousands) Agency Request Governor s Rec Governor s Planning Estimates Project Title Agency Strategic Funding Priority Score Source 2004 2006 2008 2004 2006 2008 Systemwide
More informationFiscal Years Financial Plan
Fiscal Years 2017-2022 Financial Plan 1 FY 2017 Operating Budget Highlights FY2017 Operating Budget Highlights FY2017 budget ended with a surplus of $1.6M, most of which will be used to fund the multi-year
More informationTAB I. FY2015 Q2 Operating Management Report
FY2015 Q2 Operating Management Report Oregon State University s FY2015 Second Quarter (Q2) Operating Management Report presents the first six months of operating results for the three operating fund groups:
More informationBond Financed Capital Project Funds Described
Bond Financed Capital Project Funds Described These funds are established to account for bond proceeds used for the acquisition or construction of major capital facilities. (other than those financed by
More informationUniversity of South Florida System and DSO Financial Reports FISCAL YEAR MID-YEAR FORECASTS
University of South Florida System and DSO Financial Reports FISCAL YEAR 2014-2015 MID-YEAR FORECASTS Board of Trustees Finance & Audit Workgroup Meeting February 26, 2015 INDEX University of South Florida
More informationFiscal Year 2015 Columbia Generating Station Annual Operating Budget
Fiscal Year 2015 Columbia Generating Station Annual Operating Budget Table of Contents Table Page Summary 3 Key Assumptions/Qualifications 4 Memorandum of Agreement (MOA) Table 1 5 Columbia Station Costs
More informationAUDITED FINANCIAL STATEMENTS
AUDITED FINANCIAL STATEMENTS Fiscal Independent Auditor s Report To the Board of Trustees University of Toledo We have audited the accompanying basic financial statements of University of Toledo and its
More informationTOWN OF IOWA REVENUES WITH COMPARISON TO BUDGET FOR THE 1 MONTHS ENDING JULY 01, 2017 GENERAL FUND
REVENUES WITH COMPARISON TO BUDGET GENERAL FUND PERIOD ACTUAL YTD ACTUAL BUDGET UNEARNED PCNT TAXES 01-31-100 TAXES - PROPERTY.00.00 85,000.00 85,000.00.0 01-31-300 TAXES - SALES.00.00 245,098.00 245,098.00.0
More informationOPERATING BUDGETS FOR FISCAL YEAR
OPERATING BUDGETS FOR FISCAL YEAR 2018 FY 2018 BUDGET DOCUMENTS A. The FY 2018 Education and General Budget Page 1. Executive Summary 1 2. General Budget Priorities 1 3. Revenue Assumptions 1 4. Planned
More informationSB 5701 BUDGET REPORT and MEASURE SUMMARY Joint Committee On Ways and Means
79th Oregon Legislative Assembly 2018 Regular Session BUDGET REPORT and MEASURE SUMMARY Joint Committee On Ways and Means Prepared By: Reviewed By: Jean Gabriel, Department of Administrative Services Amanda
More informationNew Jersey Institute of Technology
New Jersey Institute of Technology FY18 Budget Status Report and FY19 Budget Development Status Presented to the Joint Session of the Strategic Planning Steering Committee and Committee on Academic Strategic
More informationGeorgia Institute of Technology Advanced Computing Technology Building. Draft Program. Mission Model Initial Program Development
Georgia Institute of Technology Advanced Computing Technology Building Draft Program Initial Program Development Issued April 2, 2001 Introduction Scope This document is a summary of the Session for the
More informationCONSTRUCTION PROJECTS STATUS REPORT BOARD OF TRUSTEES MEETING December 12, 2012
Project Name by Phase Project # Current BOT Approved Budget Encumbrances (As of 11/28/12) Budget Phase Budgeted Funding Source(s) (s) Planning Budget Phase Ecology and Evolutionary Biology (EEB) 201583
More informationDepartment of Legislative Services Maryland General Assembly 2010 Session
Senate Bill 911 Finance Department of Legislative Services Maryland General Assembly 2010 Session FISCAL AND POLICY NOTE Revised (Senator Astle, et al.) Underground Facilities - Damage Prevention SB 911
More informationROCHESTER COMMUNITY AND TECHNICAL COLLEGE
ROCHESTER COMMUNITY AND TECHNICAL COLLEGE A MEMBER OF THE MINNESOTA STATE COLLEGES AND UNIVERSITIES SYSTEM ANNUAL FINANCIAL REPORT FOR THE YEARS ENDED JUNE 30, 2013 and 2012 Prepared by: Rochester Community
More informationOverview of Georgia s 2018 Fiscal Year Budget
Overview of Georgia s 2018 Fiscal Year Budget By Wesley Tharpe, Research Director The $25 billion state budget proposed by Gov. Nathan Deal for the 2018 fiscal year starting July 1, 2017 lays out his desired
More information