CFA Institute Research Challenge Hosted by The CFA Society of Perth University of Western Australia Team One

Size: px
Start display at page:

Download "CFA Institute Research Challenge Hosted by The CFA Society of Perth University of Western Australia Team One"

Transcription

1 CFA Institute Research Challenge Hosted by The CFA Society of Perth University of Western Australia Team One The University of Western Australia 3 October 214 UNIVERISTY OF WESTERN AUSTRALIA STUDENT RESEARCH PAGE 1

2 Recommendation SELL (24% Downside) Date 3/1/14 Target Price AU$ DCF Valuation Current Price AU$3.45 Ticker FMG: ASX (Bloomberg) AU$/US$.88 Company Data GICS Sector Materials Volatility Index High Materials Sector, Metals and Mining Industry Fortescue Metals Group Tough Times Ahead We ground our SELL rating for Fortescue Metals Group (FMG): based on a bearish iron ore price, a poor competitive position relative to the majors and being overvalued with higher risks. Using a Discounted Cash Flow (DCF) valuation with a Weighted Average Cost of Capital (WACC) of 9% (nominal), our estimates suggest the current market price will fall ~24% to our target price of AU$ week Price Range (AU$) Market Cap (AU$ millions) Shares outstanding (millions) Source: Bloomberg ,774 3,144 Spot Iron Ore Market Data CFR China 62% Fe 81.4 (US$/dmt) FX (AU$/US$).87 S&P/ASX2 5,188.3 Dow Jones 16, Highlights China and Iron Ore Markets: Slowing growth in China has been met by reduced steel production growth. The supply side response of increased iron ore production, has resulted in an oversupply in the market causing current prices to plunge by 36% to US$ 79/dmt. Source: Bloomberg Figure 1: FMG Equity and S&P/ASX2 One year % change /1/13 14/12/13 14/2/14 14/4/14 14/6/14 14/8/14 Source: Bloomberg FMG AU Equity S&P/ASX2 Investment Fundamentals FY 3 June 214A 215E 216E 217E Sales (US$) 11,796 9,155 9,527 9,562 EBITDA (US$) 5,66 1,784 1,851 1,842 Net Profit (US$) 2, Net Op CF (US$) 6, ,688 1,65 EPS (US ) P/E DPS (US ) 2 Dividend Yield 5.8% ROA 12.7% 1.4% 2.% 2.2% ROE 43% 4% 5% 5.3% Source: Team estimates Financial year (FY15): It s forecasted that earnings will decrease by 88% to US$ 314m, as operating margins are squeezed. The major reason being a 39% fall in realised prices to US$ 65/dmt (FY13 US$ 16/dmt) based on the 62% Fe CFR China Platts Index. Uncertainty for debt and equity holders: Deterioration in earnings impedes FMG s accelerated debt repayment strategy. We forecast FMG to make reduced debt repayments and for dividends to be cut until targeted gearing levels are reached later than planned in 219. T155 expansion is complete: Developments cost US$9.2bn, leaving high levels of debt on the balance sheet. Future capacity to pay debt and dividends will largely depend on future earnings. Our forecasts suggest decreasing liquidity and cash reserves will pose significant credit risks to FMG. Production forecasted to increase slightly: An additional 5 Mtwpa from Solomon s DID is expected to be realised in 216 and so we model peak production at 163 Mtwpa. However we expect further expansions will be unlikely if iron ore prices continue to remain depressed. A long run EBITDA margin of ~ 24% is well below the majors: FMG is currently cheap on a trailing P/E basis (3.9x), but this discount is due to the high gearing and low operating margins. We expect FMG to become more expensive once they are exgrowth in FY16, based on a forward P/E of Main risk is the iron ore price: with tight margins and 1% dependence on iron ore sales, FMG s gearing of 56% creates a levered exposure to iron ore price fluctuations. With a breakeven cost of ~ US$7/dmt any short-term volatility below this price would cause operating losses and potentially could push FMG to the brink of disaster, as experienced in October 214 UNIVERISTY OF WESTERN AUSTRALIA STUDENT RESEARCH PAGE 2

3 Business Description Figure 2: FMG operations map Fortescue Metals Group (FMG) is an independent Australian iron ore mining company in the Pilbara region of Western Australia, exclusively trading seaborne iron-ore to China. Operations: FMG operations are organised into two central hubs containing four mines: Cloudbreak, Christmas Creek, and the relatively newer Firetail and Kings mines (Figure 2). It also receives ore from the Nullingine joint venture (JV) (25% FMG) operated by BC Iron as a mine gate sale. The Solomon and Chichester hubs are connected to the Herb Elliot Port via FMG s rail network. In August 213, construction of a fourth berth was completed, with a fifth due in 215. Resources and Exploration: FMG continues to explore its large (87,Km 2 ) Pilbara land base, with total resources summing to approximately 12bt dry in FY14. Current developmental hematite properties include Nyindinghu, the Western hub, greater Chichester and greater Solomon. Figure 3: Surface miner Source: FMG Figure 4: Revenue and net profits Source: Company reports Development: FMG is looking to access its large magnetite resources in the Pilbara by developing the Iron Bridge project in conjunction with Taiwan s Formosa Group and China s Boa Steel Group (see Appendix 5). This will begin realisation of its North Star and Glacier Valley ore bodies. Production of 1.5 Mtpa of weathered magnetic hematite is expected to commence in 215 along with 9.5 Mtpa of magnetite once the stage 2 development is completed (construction begins in FY15, pending approval). Production: The T155 expansion was completed in early 214 and is expected to produce Mtwpa in FY15. Smaller increases are also possible through utilisation of Detrital Iron Ore Deposits (DID) at Solomon. Currently FMG only produces fines and generally sells a discount product at an average grade of 58%. This is due to higher levels of impurities and lower average Fe grades of resources is ~ 56%, which require more processing and are lower quality than other Pilbara miners. The Cloud Break and Christmas Creek mines have used a continuous (surface) miner to closely manage and monitor its grade, whereas the newer Solomon mines use a traditional drill blast method. Priorities: Management has signalled priorities will shift from mine, port and rail infrastructure investment to consolidating existing operations and maximising annual output. Key targets are driving down C1 costs to US$31/wmt, improving product quality, maximising the benefits of low impurity Chichester ore and reducing their debt burden to a targeted gearing ratio of 4%. Strategies: FMG s strategies remain grounded in the following initiatives: Continuing exploration of potential mineralisation in and around Chichester and Solomon hubs will build upon their resource base and sustain their 5 mines and 5 processing facilities strategy once Iron Bridge commences production in FY15. A 4 berths (5 th berth due in FY15) 3-ship loaders strategy at Herb Elliot Port is paramount to increasing ship-loading efficiency in a tidally constrained port. Detrital processing at Solomon will add another 5mtpa to capacity An accelerated debt reduction strategy will target US$ 2-2.5bn of debt callable at Fortescue s option over the next months in addition to a committed US$.5bn in October. Gasification of operations through the Fortescue River Gas Pipeline aims to reduce energy costs by ~ US$2 m a year. Corporate: Established in 23 by Founder and now chairman Andrew Forrest, Fortescue Metals Limited is an ASX publicly listed company. The current CEO Neville Power has been an integral part of the key management team who have maintained an impressive track record of consistent revenue growth (Figure 4) and meeting ambitious production targets. Currently, ownership is dominated by Forrest family funds and institutional investors who constitute the top 2 shareholders owning 86.7% of FMG s ordinary shares 3 October 214 UNIVERISTY OF WESTERN AUSTRALIA STUDENT RESEARCH PAGE 3

4 Figure 5: Porter s Five Forces Analysis Industry Overview and Competitive Positioning The iron ore industry is characterized by high barriers to entry, low buyer and medium supplier bargaining power, a medium threat of substitute products and a high degree of rivalry among competitors (see Appendix 6). Surging growth in China during the early 2 s drove a boom in iron ore (see Appendix 7). However, the industry now faces a downturn, with the iron ore price plummeting from US$11 to ~ $US79 over the last 6 months. Source: Team estimates Figure 6: China s shifting GDP composition 1% Source: Bloomberg Figure 7: Falling property sales indicate drop in steel product Source: Bloomberg Figure 8: Additional seaborne supply will outweigh demand MtMt Seaborne Iron Surplus % % Agriculture Industry Services Source: Goldman Sachs and company data Figure 9: Flattening cost curve Slowing growth in China: China accounts for approximately 7% of global seaborne iron ore demand, and so slowing GDP growth raises concerns for the sustainability of iron ore producers, particularly FMG given it only sells to China and with falling demand putting downward pressure on commodity prices. The Chinese government has announced plans to target a growth rate above 7% in the near term. Transitioning growth drivers slow steel demand: The drivers of growth are changing, underpinned on the demand side by a shift from investment to consumption, and on the supply side a shift from manufacturing to services. Overheated investment has been driven by a real estate boom, which pushed construction in housing and transport, driving steel demand as a result. As the economy rebalances, we expect to see falling iron ore imports in the long term. Cooling real estate sector: Overdevelopment is raising bubble concerns, best illustrated by ghost cities, which have been built with government backing and now sit nearly empty. Government attempts to curb speculation via credit restrictions and a new real estate tax, in fear of a bubble burst, has led to rapid cooling of the sector. Property sales growth has been a leading indicator for crude steel production growth (Figure 7), so the downturn in the property market will likely result in lower steel output growth levels, with steel demand predicted to grow just 3.1% in 214 and 3.3% in 215, compared with growth of 3.8% in 213 according to World Steel. In the medium term, slowing steel production growth will put downward pressure on iron ore prices. Seaborne iron ore surplus: High iron ore prices over the last decade, resulting from boom in demand from China, have incentivized new entrants and underpinned substantial growth in supply. It is expected to result in an oversupply in the short to medium term. As existing projects ramp-up and productivity gains are delivered in Australia and Brazil, global iron ore production capacity is expected to reach 79Mtpa over the next 3 years, according to incremental supply increases from the majors only. This occurring, in spite of falling demand, will put downward pressure on prices. However due to large profit cushions for majors, prices could fall by 2-3% before materially altering production capacities, putting producers with higher breakeven costs at risk (see Appendix 8 for breakdown of cost curve). Long term prospects are better for the iron ore market, as emerging economies will support steel production growth (see Appendix 9). China s iron ore imports slump: Iron ore inventories in China recently reached record highs (see Appendix 1). Ample stock levels at steel mills coupled with slower demand from steel production will likely soften restocking momentum. Meanwhile, banks have tightened credit controls on import financing deals. These factors are causing short-term price volatility via downward pressure on import demand. Iron ore cost curve flattening: Majors have been committed to productivity, cost reduction and capital efficient growth (because the dropping price is squeezing margins), rather than major supply chain investment. Majors already sit low in the cost curve, helping them withstand future volatility in the iron ore price. High cost iron ore supply has been shown to be price elastic as private Chinese mines have responded to the price reduction, with 5Mtpa idled between December 213 and August 214 as reported by a SMM survey. Chinese state owned mines continue to operate at a loss. Closure of high cost mines may ease pressures on the iron ore price. Long term substitution: We also anticipate a large increase in steel supply from the scrap market in China, this currently does not have a significant impact on the market but with over 12 million new cars on the road in China since 29 it is inevitable that there will soon be a glut of scrap supply. Source: Macquarie Research, August October 214 UNIVERISTY OF WESTERN AUSTRALIA STUDENT RESEARCH PAGE 4

5 Figure 1: Seaborne iron ore production 213 Source: Based on public information at January 214 Vale and BHP Billiton are inclusive of their share in Samarco. Rio Tinto inclusive of Iron Ore Company of Canada seaborne production. Figure 11: Cash costs Competitive Positioning Lower diversification than the majors: FMG solely mines iron ore and ships 1% of their product to China, rendering their profitability entirely dependent on the iron ore price. For the majors BHP and Rio, iron ore contributes approximately 5% and 8% of underlying earnings respectively placing them in a better position to weather the iron ore downturn. FMG s lack of customer diversification will also continue to be a competitive disadvantage if iron ore demand from China continues to fall. Inferior product attracts discounts: FMG s iron ore products have an average Fe content of ~58% with significant amounts of silica, alumina and phosphorous attracting a discount from the 62% Fe CFR Platts price. Whereas the majors the generally sell at the index price and also sell lump, which sells at a premium. The discount FMG receives accounts for their smaller operating margins, in tandem with higher C1 costs. This has resulted in significantly lower EBITDA margins than the majors (Figure 12). Higher costs than the majors: The biggest weakness in FMG s cost structure is the higher processing and production costs. Due to lower grades and higher impurities, nearly 1% of run of mines (ROM) ore is put through a wet plant to improve ore quality. BHP and Rio generally engage in a dry processing operation and hence do not sustain wet processing losses, which coupled with FMG s higher strip ratio of ~ 3.5 limits the prospect of closing the gap to BHP and Rio s C1 cost levels. Without the same economies of scale as the majors, FMG s C1 costs are significantly higher than BHP and Rio (Figure 11). FMG has size and locational advantages in their Pilbara land ownership: With 87,Km 2 in land tenements held for both infrastructure and mining purposes, FMG potentially has the largest resource base of the Australian majors. This land base enjoys close proximity to the Asian markets positioning them well to export China and other developing countries in the future - a key advantage over non-australian competitors such as the Brazilian firm Vale. How much potential mineralisation can be converted into resources and mined is unknown due to long run price uncertainties. Source: Company reports Figure 12: EBITDA margins Financial position: FMG s financial position is not strong at our forecasted long run iron price at US$8/dmt (real). Tight margins and relatively high debt levels make FMG much more susceptible than the majors to falls in the iron ore price, as reflected in a lower credit rating. FMG s supply chain infrastructure: FMG has a modern, purpose built rail network that would be relatively low cost to expand in response to higher production. It also made a small (1.2%) contribution to operating sales revenue in FY14 through leasing arrangements. The key here is that FMG s rail network is highly desired by many junior miners such as Atlas Iron and Brockman, who do not have the resources to develop their own infrastructure. While it is uncertain if Atlas or Brockman will acquire access to FMG s train and port infrastructure (TPI), it undoubtedly gives FMG a competitive advantage against miners without their own TPI in the Pilbara. Source: Company reports Figure 13: Comparable company qualities BHP RIO FMG AGO MGX Mkt Cap US$ 172 B 18B 11.37B 572.7M 39M Vol. Mtpa Mine life Long Long Medium Short Short Net D/E 3% 28% 94% -4.9% 1.5% Investment Summary Overvalued on a NPV basis: We issue our SELL recommendation based on our DCF Net Present Value (NPV) of AU$2.79 a 24% downside to the current share price (AU$3.45). We base our recommendation on the DCF over the Comparable Company Analysis (CCA) for two key reasons: A DCF valuation is more suited to valuing finite life assets such as mines as it requires no terminal value calculation, and is therefore more reflective of intrinsic value. Also finding quality comparable Australian mining companies to FMG is difficult due to the lack of comparable qualities in terms of market capitalisation, production levels, mine life and gearing levels (Figure 13). Source: Bloomberg and Company reports 3 October 214 UNIVERISTY OF WESTERN AUSTRALIA STUDENT RESEARCH PAGE 5

6 Figure 14: Components of NPV VALUATION NPV 1/1/215 US$m US$/ps % Chichester 7, % Solomon 5, % Iron Bridge 1, % Closing Value 4.1 1% Enterprise Value 14, % Net Debt (7,159) (2.3) 1% Total US$ 7, % AU$m AU$/ps Total AU$ % Shares m 3,114 WACC (Nominal) 9.% MACRO - ASSUMPTIONS Company Tax Rate 3% Inflation 3% Long-Run Avg.USD/AUD.83 Figure 15: NPB Breakdown 37% 9% 54% Chichester Solomon Iron Bridge Comparable Analysis: Our CCA valuation focused on both large and small cap Australian iron ore miners producing a wide range of implied prices. Figure 13 highlights FMG s unique characteristics with respect to its small and large cap peers, and the difficulty of finding quality comparable companies. Consequently, our target price has not assigned any weight towards the CCA valuation. Rather it serves to outline the distinctive position FMG holds in the Australian iron ore market. Conservative DCF: An overarching feature of our DCF is the conservative nature of the models inputs. These have been based on current information, reasonably certain developments and management guidance we were able to rationalise. As a result, only the Chichester and Solomon operating hubs have been incorporated, omitting FMG s developmental properties into our NPV (Figure 14). These assets were not included in the DCF due to the uncertainty of their development. Magnetite: We have chosen to limit the amount of value assigned to FMG s magnetite resources. Given that Pilbara magnetite is relatively hard and costly to mine, the vast majority of Pilbara miners focus on the more economical hematite. Our conservative approach requires more guidance from FMG on magnetite cost of production and realised prices to justify its economic viability and subsequent inclusion into our NPV. The Iron Bridge magnetite project however, is expected to start production next year and has been included into FMG s NPV, but has been valued separately to the model (see Appendix 5). FMG is Ex-growth: Current inflow and outflow capacities of 18Mtwpa and ~ 175Mtwpa respectively (upon completion of AP5) means Fortescue has the capability to manage increased production. However, we do not believe that production increases are likely once FMG reaches peak production in FY 16 of 162Mtwpa. This assessment is rooted in the uncertainty of FMG s financial capabilities for funding developmental capex and the economic viability of new mines with a low long run iron ore price. As a result, we have made a simplifying assumption to value FMG on an ex-development capital basis from FY17. Balance sheet weakness: Debt is a key concern in our analysis and levels are forecasted to remain elevated as FMG is negative free cash flow in FY15 with significantly reduced cash levels. This will delay debt repayment goals to reach the targeted gearing level of 4% until FY19. Should FMG not meet our forecasted debt reduction rate, a higher discount rate is required and this would have a material effect on our NPV of the company (Figure 26). There is also the possibility of FMG s credit rating being downgraded; an event that would increase our forecasted cost of borrowings. Figure 16: Iron ore price gap US$/dmt % Platts CFR Index FMG Achieved CFR Price Relativity Source: FMG quarterly production reports 95% 9% 85% 8% 75% 7% FMG s profitability on the brink: FMG profitability in the short term will be impeded by the oversupply in seaborn iron ore supply surpluses are expected to increase to 175 Mt in FY15 (Figure 8). As the market corrects, FMG s levered position will be highly sensitive to iron ore price volatility. The key question is where prices will bottom out and crucially whether it falls below FMG s breakeven price. Our FY15 forecasts suggest only a ~5% buffer before the company begins to operate at a loss. The effect of falling prices on margins is compounded by increasing product discounts, which tend to occur when the iron ore price falls (Figure 16). This assessment is based on the assumption that as steel demand falls in line with slowing growth in China, Chinese steel mills demand higher Fe grade and low impurity iron to improve the productivity of their blast furnaces. Long run prospects better: As the Chinese property market begins to moderate and with GDP targeted at ~7%, we do not expect China s economy to go back to the levels seen over the last 1 years. However prospects improve in the long run, as demand will be supported by emerging economies. Hence our long-run assessment of the iron ore price is US$8/dmt (real), which we believe will not fall below US$7/dmt. At this price, FMG will struggle to outperform its competitors considering their smaller operating margins. Investment summary: Our analysis has found FMG to be a high-risk investment with a poor expected return prospect. We reaffirm our SELL rating based on the following key conclusions: Overvalued: Expected negative capital growth of ~24% and a cut to dividends until FY19. Overexposed: The company s lack of commodity diversification concentrates risks. 3 October 214 UNIVERISTY OF WESTERN AUSTRALIA STUDENT RESEARCH PAGE 6

7 Figure 18: Production and price forecast Figure 17: WACC inputs WACC Inputs Pre-tax Cost of Debt 5.36% Tax rate 3% Cost of Debt 3.35% Risk Free rate 3.31% Equity beta Market risk premium 6.9% Cost of Equity 12.8% Equity % 6% Debt % 4% WACC 9.% Source: Bloomberg and team estimates US$/dmt Annual Production Source: Company data and team estimates Figure 19: FMG operating mine lives Years Mwtpa 18 Cloudbreak Christmas Creek Firetail Kings NJV Source: Company data and team estimates Figure 2: FMG operating mine lives Dry In-Situ Mt 9, 8, 7, 6, 5, 4, 3, 2, 1, - 2, ,219 3,222 Total Hematite Resources (Inclusive of Reserves) 36 FMG Mineral Resources 4,676 Magnetite Resources 1,561 2,346 Saleable Ore ( 1% Reserves & 5% Resources) 13 2, Mineral Resource Development Properties Highly leveraged: FMG s high debt levels exacerbate its financial risks. The market correction to the iron ore price will result in a sharp deterioration of earnings and cash. High competition: Operating in an industry where competitors are increasing supply surpluses with higher quality products at lower costs Falling profitability: The falling iron ore price alongside relatively high production costs squeeze FMG s margins. Valuation Discounted cash flow: Our implied share price of AU$ 2.85 was derived projecting production on a per-mine per-year basis over the life of the mine/resources (Appendix 2(a)). We used a nominal WACC of 9% and a long run AU$/US$ of.83 (real) within our model, producing a long run EBITDA margin of ~ 2% (Appendix 2(e)). The most crucial inputs and assumptions are discussed below. WACC: Our WACC is determined by a long-term capital structure of a 4%/6% debtto-equity mix, which is a function of management s targeted capital structure. A higher discount rate was not used to reflect FMG s current high levels of balance sheet debt, but rather is accounted for in a more conservative projection of cash flows (Appendix 2(f)). Production: Forecasts for each mine was based on production reports from FMG & BCI. We expect FY15 production to be ~ 157 Mtw (152mtw FMG equity) with full ramp up of kings to bring the Chichester hub to 6 Mtpa, 9 Mtpa from the Chichester Hub and 6.2mtpa from the NJV. Further expansion can be achieved through developing detrital deposits (DID) at Solomon. A processing plant was approved in May 214 and is expected to be functioning within one year. We therefore add management s expectation of 5Mtpa and model peak production at ~163Mtpa in 216 (Figure 18). Expanding to 18Mtw pa: Further expansion is possible through the Western Hub (WH) and Nyidinghu (ND). However, the uncertainty in funding for developmental capital, timing of such projects and tight operating margins means we have not inputted them into our model. Furthermore, these long-dated undeveloped resources would provide a small NPV benefit, and not be material to our valuation. Price: Future contracts were used to derive the forward curve, until FY18 where we anchored the price on consensus of estimates to derive a long run iron ore price of US$8/dmt (real) (Appendix 2(a)). Mine-Life: Total saleable ore was based on 1% reserve and 5% resource conversion ratio, which seems reasonable as it produced a life-of-mine ~1 years above on reserves (Figure 33). We have chosen to be conservative in our model and not factor in any increase in mine-life through potential mineralisation in producing hubs. Resulting in an average mine life of 3 years and saleable ore of 397 Mdmt (Figure 19 & 2). Once again we believe that extending mine-life beyond our models forecasted end of 25, would only produce a small NPV benefit (US$ 1bn in cash flow is only worth US$46m in NPV). Magnetite: We have not ascribed any value on the any of FMG s large magnetite resources (see upside risks), with exception of Iron Bridge. It is not included in the model but we have valued it separately at ~ US$ 1.3bn (Appendix 5). Grade & Impurities: We have noted that FMG does have a challenge with their low Fe grade and high impurities, especially with alumina. While Decreasing Fe grade can be expected as a mine ages, we assume FMG will continue to process and throw away low grade ore to maintain an average 58% grade. However, we have increased the discount received by FMG s above management guidance of ~ 14% to 16% as our analysis shows FMG s high level impurity ores discounts generally increase as iron ore prices decreases (Appendix 2 (g)). Chichester Hub Solomon Hub Greater Chichester Western Hub Nydinghu Magnetite Iron Bridge Source: Company data and team estimates 3 October 214 UNIVERISTY OF WESTERN AUSTRALIA STUDENT RESEARCH PAGE 7

8 Figure 21: Forecasted costs and breakeven price US$/dmt C1 Royalties Shipping Corporate Sustaining Capex Net Interest Discount Breakeven Price Source: Company data and team forecast Figure 22: Forecasted capital expenditure US$m A 215F 216F 217F 218F 219F Development & Exploration Sustaining Capex Source: Company data and team forecast Figure 23: Debt profile US$m 1 Debt Repayment (LHS) Total Debt (LHS) Interest Expense (RHS) Source: Company data and team forecast US$m Figure 24: Multiples large caps P/Book P/Sales EV/EBITDA FWD TTM Source: Bloomberg and team estimates Costs: Cost reduction is one of the key drivers of value C1 costs down to $ 32/wmt in FY15, based on management guidance: We model a further decrease until FY17, where C1 costs are held constant at US$ 3/wmt (real). We believe a further reduction is possible, mainly from reduced mining costs as strip ratios decrease (less dirt moved) through the ramp-up of both Firetail and Kings - relatively newer mines with lower ratios - and is held constant as mines age. Capex: capex of $1.3 bn in FY15 has been based on management s guidance. Further development capital, apart from those already stated by management (Figure 22) has not been modelled and is in line with our simplifying assumption that FMG is ex-growth from FY17 onwards. The main reason for this assumption is the ability of FMG to fund development capital expenditure. We have assessed various ways FMG could raise development capital and deemed none plausible: We do not expect financing through debt as management intend to reduce gearing. Equity through a rights issue, would be difficult as the falling price has reduced equity holders appetite for iron ore exposure. While through generated earnings will be difficult with reduced cash flow forecasted over the short-term. This leaves joint ventures but is too early to start speculating on potential partnerships. Sustaining capex (SC): The critical factors for our SC projections have been the number of mines and age of infrastructure. As our model assumes no future mine development we have gradually reduced FMG s SC until FY19, where we make SC equal to normal straight-line depreciation (half of accelerated depreciation) (Appendix 2(d)). Debt repayments and dividends: According to our analysis FMG s reduced cash flow in FY15 brings cash levels dangerously low to ~US$ 75m. In order to hold this level of cash we forecast dividends to be cut and a reduced debt repayment strategy (Figure 23, Appendix 3(f) for financing assumption and notes 22), delaying targeted gearing of 4% to FY 19. We believe reducing debt is the most prudent action in the current climate and FMG will prioritise this over dividends. Lower net interest: A benefit of reducing debt is a lower interest cost. We calculate a lower cost of debt at ~ 5.3% (Figure 23 and Appendix 3 (f)). Comparable company analysis: We applied comparable company analysis by dividing our average multiples between two groups (Figures 24 & 25): (1) small caps, consisting of Mount Gibson Iron Ltd. (MGX) and Atlas Iron Ltd.; and (2) large caps, consisting of BHP Billiton Ltd. (BHP) and RIO Tinto Ltd. (RIO). When compared to the small caps, multiples produced a price of $1.81 for the trailing twelve months (TTM) and $2.33 for the forward-looking (FWD) multiples. Compared to the large caps multiples produced a price of $2.91 (TTM) and $3.88 (FWD). The ability of comparable analysis to reflect intrinsic value is dependent on the quality of comparable companies and so we believe comparable analysis is not appropriate for FMG. While BHP and RIO have relatively similar production tonnages they are different on a commodities, leverage and size basis to FMG. Conversely the minors are different on a production and size basis but like FMG mainly focus on iron ore production (Figure 13). Figure 25: Multiples small caps P/Book P/Sales EV/EBITDA FWD Source: Bloomberg and team estimates TTM 3 October 214 UNIVERISTY OF WESTERN AUSTRALIA STUDENT RESEARCH PAGE 8

9 Figure 26: Sensitivity analysis +1% +5% +1% Iron Ore -1% -5% -1% Price $5.18 $3.99 $3.39 <- $2.79 -> $2.19 $1.59 $ % +43% +8.5% Base case price change -8.5% -43% -86% +1% +5% +1% WACC -1% -5% -1% $2.32 $2.54 $2.74 <- $2.79 -> $2.84 $3.5 $ % -9% -1.8% Base case price change +1.8% 9% +2% Source: Team estimates Figure 27: Cash and debt US$ billions Source: Company data and team forecast Figure 28: Debt/EBITDA x 5.1x 4.6x 4.4x 3.7x 3.6x 214A215F216F217F218F219F Source: Company data and team forecast A 215F 216F 217F 218F 219F Debt Cash Figure 29: Gearing D/(D+E) 6% 5% 4% 3% 2% 1% % Source: Company data and team forecast Sensitivity Analysis While there are many inputs into our DCF the greatest driver of NPV is the iron ore price and the discount rate used. Our sensitivity analysis shows how a percentage change in our long-term iron ore price of US$ 8/dmt (real) affects our target price, which translates into a -/+1% change in the iron ore price results in a -/+8.5% change in NPV. This sensitivity can be attributed to the tight margins, leveraged balance sheet and ~1% of their revenue dependent on iron ore sales. We noted that a key risk is short-term fluctuation in the iron ore price, and the snowball effect this would have on FMG, especially in regards to the liquidity and credit rating. We also noted that any change to these metrics would warrant a higher cost of debt for FMG and therefore a change to our WACC of 9% (nominal). Accordingly, our sensitivity analysis also shows that a -/+1% change in WACC produces a +/-1.8% change in NPV. Financial Analysis Earnings: Driven down by lower prices and increasing costs. Iron ore prices are expected to drop to by 36% to US$77/dmt 62% Fe CFR China, (213:US$123/dmt). Net Profit After Tax set to decline to US$ 314 m in FY15: Despite production increasing to 157Mtw, we forecast a significant decline in operating revenue of 2% and earnings of 83% in FY15.The major reason for this is the significant decline in the iron ore price but also a further 2% increase to the discount FMG receives translating to a lower realised price of US$ 66/dmt. Degearing but not fast enough: High levels of debt and 1% exposure to iron ore are the biggest risks to the financials. While FMG has utilised the opportunity of a strong performance to repay US$3.1Bn debt, it s current gearing D/(D+E) of 56% is still high and FMG are not out of the woods yet. Management reiterating its strategy to pay down debt with a targeted gearing of 4% in the next months seems optimistic, as their ability to make the additional debt repayments is hindered from deteriorating operating cash flows in the next few years, and instead we predict targeted gearing will be reached in FY19 (Figure 29). Credit and liquidity risk increases: A large fall in earnings and cash reserves results in FMG s credit metrics deteriorating significantly (Figures 28, 3. While gearing has gone down to ~53% (Figure 29) with our assumed US$ 5m in repayments, interest coverage has almost halved (figure 3) and puts FMG at risk of breaking debt covenants and suffering a downgrade to its credit rating. Dwindling cash reserves poses cuts to dividends: After US$1.3bn capital expenditure and our assumed debt repayment of US$.5bn, FMG s cash balance reduces to ~$UD7M. At these low cash levels, FMG will be constrained to pay both debt holders and equity holders a return in the next few years and forecast a temporary cut to the dividends (see notes 23). We expect dividends to be reinstated once gearing of 4% is achieved in FY19 at a payout ratio based on management s comments of 3-4%. Reducing costs on a per tonnage basis but break-even price is still high: This trend of lowering breakeven price is being replicated amongst all iron ore miners currently as a strategy to deal with the decreasing price. We expect the range of initiatives from FMG to be able to reduce TDC by ~ 7% and all in cost by ~ 15% throughout our model. Despite this, FMG s break even with the CFR 62% China Platts price is still relatively higher than the majors at $US7/dmt, and averaging US$66/dmt in the long run. A reduced margin increases risk: The falling price and relatively high cost of production results in FMG s margins being squeezed in FY15. While our analysis expects slight improvement, they do not return to 214 levels at our long-run iron ore price of US$8/dmt (real). As a result FMG s long run EBITDA margin is ~ 2%. Ratio analysis: A look at FMG s net profit margin shows a sharp decrease in FY15 to 3.4% in line with the falling iron ore price. A DuPont analysis highlights how FMG s return on equity is mainly propped up by its leverage and is reflected in its share price volatility. 3 October 214 UNIVERISTY OF WESTERN AUSTRALIA STUDENT RESEARCH PAGE 9

10 Figure 3: Interest coverage (EBITDA/Interests) x 4.1x 4.6x 4.8x 5.8x 6.x Figure 31: DuPont Analysis 214A 215F 216F 217F 218F NET PROFIT MARGIN % 24% 3.4% 4.31% 5% 7% ASSET TURN OVER 52% 44% 45% 46% 47% LEVERAGE 299% 266% 252% 239% 225% ROE 37% 4% 5% 5% 7% Source: Team estimates Source: Company data and team forecast Volatile share price: Small margins, 1% dependence on iron ore along with a leveraged balance sheet, makes FMG s share price extremely sensitive to price fluctuations. Our financial analysis ends by simply describing FMG as essentially a leveraged play on the iron ore market, and therefore a relatively riskier investment than other miners. Figure 32 graphs the iron ore price and BHP s, Rio s and FMG s share price indexed to a base of 1. From July to September 214 FMG s share price has decreased 31% while BHP and Rio have decreased by 15% and 13.5% respectively in response to a 13% decrease in the iron ore price. Figure 32: FMG, BHP, RIO share price sensitivity to iron ore price Index /1/213 13/1/214 15/4/214 14/7/214 FMG Index BHP Index RIO Index Iron Ore Index Source: Bloomberg Figure 33: Anticipated production increases over the next 5 years Mwtpa Source: Company reports Vale BHP RIO Roy Hill Figure 34: Mine life Reserves (actual) Team modelled Mt Dry % Fe Life (years) Mt Dry %Fe Life (years) Cloud Break Christmas Creek Nullingine Firetail Kings Total/ Average % % 3 Source: Company reports and team estimates Downside Risks Investment risks Commodity price risks: The most critical risk is whether iron ore prices will fall below FMG s break-even price of ~US$69/dmt, and is the most sensitive input into our DCF (Figure 26). This risk is especially pertinent over the next few years as we expect a surplus of supply to create short-term volatility in the iron ore price until the market is rebalanced by significant closures at the top end of the cost curve. Figure 33 shows the majors, who are able to operate profitably at lower prices, and other miners ramping up production over the short-term. Increased Impurity Discounts: Lower grade iron ore and ore with impurities receives a discount to the 62% CFR price. Fortescue supplies lower grade ore than its major competitors and due to the oversupply in the iron ore market the discounts received for the lower grade ore have been increasing. The Fortescue annual report states: as balance is restored to the iron ore supply and demand, Fortescue expects to realise between 85 and 9% of the average 62 per cent Platts CFR index. Fortescue current discount averages ~15%, further discounts from historical averages will squeeze margins further. Reserves Reduction: A key risk to our models life-of-mine estimate is changes to reserve estimates with changing iron ore prices, as reserves needs to be deemed to be profitably mined for recognition. Operational risks Industrial Action: Ongoing conflict between Teekay Shipping and its unionised employees have led to repeated threats of stoppages on work. This disruption has the potential to remove FMG s ability to export for the duration of the strike. This would cause a loss of revenues to Fortescue in the order of $37.5M per day. The risk is mitigated by the $7 million per day of lost royalties that the state 3 October 214 UNIVERISTY OF WESTERN AUSTRALIA STUDENT RESEARCH PAGE 1

11 government would incur by a port closure; we anticipate that the WA government would intervene due to the national significance of iron ore exports from Port Hedland. Weather and Natural Disaster: The Pilbara region is subject to unpredictable weather and cyclones, which have the capacity to hinder production and potentially damage equipment. There is also moderate seismic activity in the Pilbara region, it is not anticipated but a major earthquake could damage property, plant and equipment. Employee Injury/Death: Fortescue has suffered several deaths of contractors in the past. If there are further deaths or serious injuries and Fortescue is found to be culpable there could be major fines or penalties imposed on them. Regulatory risk Environmental Regulations: Requirements such as mine rehabilitation represent a significant financial burden to the company. If these environmental regulations were to become more stringent or if there was a carbon tax imposed FMG, emissions this could cause costs to balloon. The Iron Bridge magnetite project has received conditional approval from the Environmental Protection Agency (EPA), ongoing mine production is estimated to take 7 years to reach an exclusion zone around an endangered bat colony s cave. It is expected FMG will come up with an action plan to protect the bat colony, but if they cannot satisfy EPA regulators, then the company will be denied access to the resources. Our NPV calculation assumes no regulation barriers. Native Title Claims: Claims may arise at any point for land Fortescue is operating on. The risk of this occurring is not possible to quantify but if it does occur the expense could be huge, with complicated and costly legal work being involved. Political Risk Royalties Increases: Bullish forecasts of the iron ore price by the WA state government have resulted in a significantly lower level of iron ore royalties received than they anticipated. After a recent downgrade by rating agencies the government is desperate to maintain surplus budgets, this may result in the government increasing royalties. MRRT Reapplication: The current government repealed the Mineral Resources Rent Tax (MRRT) that was imposed by their predecessors. Should there be a change of government at the next election we may see this tax reimposed which would express itself in an increased taxation burden for FMG. Financial Risks Exchange Rates: Iron ore prices are quoted in US$ so any appreciation of the US$ relative to the AU$ will result in Fortescue s exports becoming more competitive and improving margins as most costs are in AU$. Conversely a depreciation of the US$ has the potential to increase relative costs. Operating costs are subject to movements to in exchange rate every 1 cent movement in US to AU$ has an impact of US$.25 to US$.3 (FMG Annual Report 214). Interest Rates: Fortescue s substantial debt means that it is highly sensitive to changes in interest rates. If margins are already squeezed then the interest expense may represent a major cost to the company, any increases will damage free cash flows. Debt Repayment: We have already factored in depressed iron ore prices to reduce FMG s ability to make planned debt repayments. If FMG is unable to reduce debt to its desired level of 4% gearing this will result in higher than forecasted interest expense and a higher risk profile. This critically undermines our 9% discount rate and our assumed a long-term capital structure of 4/6 debt-to-equity (Figure 26). Credit Risks: Downgrades to Fortescue s credit rating would increase their cost of debt and compress cash flows lowering ICR. Balance sheet weakness and poor liquidity metrics then places debt covenants at risk and could reduce BB+ rating. Market Risk: Inability of the firm to refinance its debt at a later date is a threat to Fortescue s solvency. This will not be an issue in the short term as Fortescue has no scheduled debt repayments until 217, provided the company deleverages as desired there will still be a requirement for periodic refinancing, there is always an element of risk that the firm is not able to obtain new loans if there is a reduction in liquidity of debt capital markets. Upside Risks Mine life, ongoing exploration and greater conversion of resources into reserves may lead to an increase above and beyond our models forecasted mine life. Future identification of large quantities of high grade/low cost ore would represent potential upside for FMG. However from a discounted cash flow perspective, any long-dated increase in mine life would represent a small NPV benefit. Depreciation of the AU$ will lead to improved margins for Fortescue, as discussed above this would leave Fortescue as a more competitive player in the iron ore market. Unfortunately many of Fortescue s rivals would enjoy the same benefits as they are predominantly Australia based. Gasification of Fortescues truck fleet is a future option that the business is exploring. The excess capacity that FMG built into their gas pipeline suggests that this will be considered in the future. The combination of increased truck automation and a potential gasification would be expected to decrease FMG s C1 costs, as well as reducing Fortescues greenhouse emissions, having the additional benefit of reducing their exposure to future environmental regulations and taxes. Monetisation of South Australia tenements may be an additional source of income for Fortescue. There are currently no published plans regarding the development of these tenements but in the long term, if FMG can raise sufficient capital it may allow them to diversify into uranium production. The chance of this occurring, and the metrics surrounding it are not possible to quantify at this point. Iron Bride Magnetite project, with resources at 4.5bn mt provides a long life of mine, and magnetite into the company s product mix to combat FMG s low Fe grade. Sell down of development assets could provide a much-needed injection of cash. Developments such as the high phosphorous laden Nydinghu would be better off FMG s portfolio in a low iron ore price environment. Further dilution of FMG s JV interest in IB is another alternative to realise sooner the NPV of the project. 3 October 214 UNIVERISTY OF WESTERN AUSTRALIA STUDENT RESEARCH PAGE 11

12 Appendices Appendix 1(a) FMG Income Statement 212A 213A 214A 215F 216F 217F 218F 219F US$m US$m US$m US$m US$m US$m US$m US$m 1 Operating Sales Revenue 6,716 8,12 11,796 9,155 9,527 9,562 9,843 9,992 2 Cost of Sales (3,753) (4,813) (6,19) (7,372) (7,675) (7,72) (7,79) (8,13) EBITDA 2,963 3,37 5,66 1,784 1,851 1,842 2,53 1,979 3 Depreciation (26) (437) (924) (93) (858) (815) (775) (736) EBIT 2,73 2,87 4, ,27 1,278 1,243 4 Net Interest Expense (55) (553) (72) (432) (47) (382) (357) (332) Profit Before Income Tax 2,198 2,317 3, Income Tax Expense (74) (72) (1,189) (135) (176) (193) (276) (273) Net Profit 1,494 1,597 2, Appendix 1 (b) FMG Statement of Financial Position 3 BALANCE SHEET 212A 213A 214A 215F 216F 217F 218F 219F ASSETS US$m US$m US$m US$m US$m US$m US$m US$m Cash 2,343 2,158 2, ,112 1,151 Trade & Other Receivables Inventories ,467 1,139 1,185 1,189 1,224 1,243 Other Current Assets Current Assets 3,597 3,57 4,477 2,369 2,497 2,685 2,852 2,916 Intangible Assets Other Non-Current Assets Property, plant & equipment 11,357 17,159 18,68 18,465 18,324 18,94 18,131 18,142 Non-Current Assets 11,466 17,289 18,212 18,69 18,468 18,238 18,275 18,286 Total Assets 15,63 2,859 22,689 2,977 2,965 2,923 21,127 21,23 LIABILITIES Trade Payables 1,182 1,43 1,338 1,38 1,81 1,85 1,116 1,133 Deferred Income Provisions Borrowings Current tax Payable Current Liabilities 2,116 1,414 3,27 2,56 2,133 2,14 2,198 2,229 Trade Payables Deferred Income Provisions Deferred Tax Liabilities , Deferred Joint Venture Contributions Borrowings 8,218 12,486 9,43 8,93 8,43 7,93 7,43 6,93 Non-Current Liabilities 9,185 14,164 11,841 1,193 9,751 9,269 8,863 8,367 Total Liabilities 11,31 15,578 15,111 12,249 11,884 11,49 11,62 1,597 SHAREHOLDERS' EQUITY Share Capital 1,293 1,291 1,289 1,289 1,289 1,289 1,289 1,289 Reserves 41 (49) Retained Earnings 2,428 4,43 6,211 6,525 6,936 7,387 8,32 8,483 Non-Controlling Interest Total Equity 3,762 5,289 7,583 7,897 8,38 8,759 9,44 9,855 3 October 214 UNIVERISTY OF WESTERN AUSTRALIA STUDENT RESEARCH PAGE 12

13 Appendix 1 (c) FMG Statement of Cash Flows STATEMENT OF CASH FLOW 212A 213A 214A 215F 216F 217F 218F 219F OPERATING CASH FLOW 6 Cash Receipts US$m 6,625 8,725 12,212 9,45 9,492 9,558 9,817 9,978 Cash Payments US$m (3,694) (5,26) (5,847) (7,71) (7,628) (7,715) (7,754) (7,994 ) 8 Tax US$m (123) (695) (15) (81) (176) (193) (276) (273) Net Cash flow Operating US$m 2,88 3,4 6, ,688 1,65 1,786 1,711 INVESTING CASH FLOW 1 Capex US$m (6,44) (6,355) (1,995) (1,3) (718) (585) (812) (747) Sale Proceeds PPE & US$m (69) Other - 9 Interest Net Investing Cash flow US$m (6,6) (6,166) (1,392) (1,279) (697) (564) (791) (726) FINANCING CASH FLOW 11 Debt Proceeds US$m 3,638 7, Debt Repayments US$m (15) (3,232) (3,92) (5) (5) (5) (5) (5) 9 Interest Expense US$m (584) (893) (853) (453) (428) (43) (378) (353) 13 Dividends US$m (251) (131) (581) (311) (93) Other US$m 5 (85) (99) Net Financing Cash flow US$m 2,793 2,989 (4,625) (1,264) (928) (93) (878) (946) Net Change in Cash flow US$m (459) (173) 198 (1,649) Free Cash flow US$m -3,252-3,162 4, , October 214 UNIVERISTY OF WESTERN AUSTRALIA STUDENT RESEARCH PAGE 13

14 Appendix 2 Discounted Cash Flows Model (a) ASSUMPTIONS - PRODUCTION 212A 213A 214A 215F 216F 217F 218F 219F Mine Production (wet, product) Mwmt Mwmt Mwmt Mwmt Mwmt Mwmt Mwmt Mwmt Cloud Break Christmas Creek Nullingine JV BCI Firetail Kings Detrital Iron Ore Plant TOTAL SALES (wet, product) FMG Equity rd Party TOTAL SALES ASSUMPTIONS - PRICES 212A 213A 214A 215F 216F 217F 218F 219F AUD/USD US$/AU$ Iron Ore (Fines) CFR 62% Fe US$/dmt FMG Realised Price CFR US$/dmt Discount % 13% 1% 14% 16% 16% 16% 16% 16% Average Grade % 58% 58% 58% 58% 58% 58% 58% 58% Average Moisture % 9.5% 9.3% 9.3% 9.3% 9.3% 9.3% 9.3% 9.3% Source: Company reports and team estimates (b) REVENUE 214A 21F5 216F 217F 218F 219F Iron Ore Shipped-Dry Mdmt Realised Price-Dry USD$/dmt Revenue Sale of Iron Ore USD$M 11, , , , , , Other Revenue USD$M Operating Sales Revenue USD$M 11, , , , , ,992.8 Revenue per Tonne USD$/dmt (c) ASSUMPTIONS - COSTS 212A 213A 214A 215F 216F 217F 218F 219F C1 Costs US$/wmt Royalty US$/wmt Shipping US$/wmt Corporate (Admin) US$/wmt Total Delivered Cost US$/wmt Sustaining Capex US$/wmt Net Interest US$/wmt All in Costs US$/wmt Discount 16% 16% 16% 16% 16% 16% 16% 16% (d) ASSUMPTIONS - CAPEX 212A 213A 214 A 215F 216F 217F 218F 219F US$m US$m US$m US$m US$m US$m US$m US$m Development & Exploration 4,5 5,285 1, Sustaining 1,6 1, October 214 UNIVERISTY OF WESTERN AUSTRALIA STUDENT RESEARCH PAGE 14

15 Total 6,1 6,29 2,42 1, Source: FMG Annual Report 214, 213 and team estimates (e) Valuation 214 A 215F 216F 217F 218F 219F US$m Revenue 11, , , , , ,992.8 Total Delivered Costs (6,13.) (7,259.63) (7,556.12) (7,596.86) (7,663.61) (7,882.54) Other Expenses (87.) (111.89) (119.23) (122.8) (126.49) (13.28) EBITDA 5, , , , ,53.5 1, Margin % 19% 19% 19% 21% 2% Depreciation (924.) (93.4) (858.23) (815.32) (774.55) (735.82) EBIT 4, , , , Income tax (1,44.58) (264.17) (297.95) (37.99) (383.55) (373.3) EBIAT 3, Plus: Depreciation and Amortisation Less: Capital Costs (1,931.) (1,3.) (717.71) (585.23) (811.86) (746.95) Net Working Capital (3% of revenues) (398.) (38.91) (321.44) (322.61) (332.11) (337.14) Change in NWC (89.9) UNLEVERED FCF 2, (f) WACC Computation Pre-tax Cost of Debt 5.36% Team computed cost of debt based on FMG senior secured credit facility. Tax rate 3% Corporate tax rate. Cost of Debt 3.35% Risk Free rate 3.31% Effective Annual Spot rate of Australian 1 year Government Bonds Equity beta FMG returns regressed against the S&P/ASX 2 Index. Total Market return 1.21% ASX 2 average 1 years annual return with dividends reinvested. Market risk premium 6.9% Market return above the risk free rate. Cost of Equity 12.8% Equity % 6% Optimum capital structure based on management s targeted gearing level Debt % 4% WACC 9.% (g) Source: 214 Quarterly Report, pg 4 Jun 213 Quarter p1 Sep 213 Quarter p1 Dec 213 Quarter p1 Mar 214 Quarter p1 Jun 214 Quarter p1 62% Platts CFR Index US$/pdmt FMG US$/pdmt FY 14 Forward Guidance FY 15 Forecast 3 October 214 UNIVERISTY OF WESTERN AUSTRALIA STUDENT RESEARCH PAGE 15

16 Achieved CFR Price Realisation, Avg. Plats 62% Index 9% 91% 93% 89% 8% 86% 85-9% 84% ASSUMPTIONS - Saleable Ore Reserves (FMG) Team Modelled Life Mt Dry % Fe Life (years) Mt Dry %Fe (years) Cloud Break Christmas Creek Nullingine Firetail Kings Total/Average % % 3 Production (dry, product) LOI 215F 216F 217F 218F 219F Cloud Break 8% Christmas Creek 8% Nullingine JV BCI - (FMG25%) 12% Firetail 7% Kings 9% Detrital Iron Ore Plant 4% TOTAL SALES (dry, product) FMG Equity rd Party TOTAL SALES Breakeven Cost forecast 215F 216F 217F 218F 219F C1 Costs US$/dmt Royalty US$/dmt Shipping US$/dmt Corporate (Admin) US$/dmt Sustaining Capex US$/dmt Net Interest US$/dmt All in Costs - Breakeven US$/dmt Discount % 16% 16% 16% 16% 16% Breakeven 62% Fe Index Price US$/dmt CLOSING VALUES 25 US$ 24 PPE (5%) 8,194 Working Capital (96) 25 Net other balance sheet items (excluding WC & debt) (344) Borrowings (C&NC) (7,557) Detrital Iron Deposit 65 Total 847 PV 4 3 October 214 UNIVERISTY OF WESTERN AUSTRALIA STUDENT RESEARCH PAGE 16

17 Appendix 3 Financial Statement Calculations (a) RETAINED EARNINGS 212A 213A 214A 215F 216F 217F 218F 219F Net Profit US$m 1,494 1,597 2, Dividend US$m (126) (125) (623) (187) Retained Earnings US$m 2,428 4,43 6,211 6,525 6,936 7,387 8,32 8,483 Share Capital US$m 1,293 1,291 1,289 1,289 1,289 1,289 1,289 1,289 Reserves US$m 41 (49) (b) OPERATING CASHFLOW ADJUSTMENTS 212A 213A 214A 215F 216F 217F 218F 219F Operating Sales Revenue 6,716 8,12 11,796 9,155 9,527 9,562 9,843 9,992 (Increase) decrease in Inventory (21) (244) (45) 328 (46) (4) (35) (19) (Increase) decrease in Receivables (67) 19 (32) 131 (18) (2) (14) (7) 6 Increase (decrease) in Deferred Income ,123 (21) Cash Receipts 12,212 9,45 9,492 9,558 9,817 9,978 Cost of Sales 3,753 4,813 6,19 7,372 7,675 7,72 7,79 8,13 Increase (decrease) in Trade Payables 49 (139) 295 (3) Increase (decrease) in Provisions (39) Cash Payments (5,847) (7,71) (7,628) (7,715) (7,754) (7,994) (c) WORKING CAPITAL 212A 213A 214A 215A 216A 217A 218A 219A Trade & Other Receivables Inventories ,467 1,139 1,185 1,189 1,224 1,243 Deferred Income Trade Payables 1,182 1,43 1,338 1,38 1,81 1,85 1,116 1,133 Provisions Net Working Capital (77) 161 (398) (39) (321) (323) (332) (337) 5 % Of revenue -1.1% 2.% -3.4% -3.4% -3.4% -3.4% -3.4% -3.4% Increase (decrease) in NWC (d) BALANCE SHEET PROJECTIONS 212A 213A 214A 215F 216F 217F 218F 219F Revenue 6,716 8,12 11,796 9,155 9,527 9,562 9,843 9,992 Trade & Other Receivables % Revenue 8.8% 5.% 5.% 5.% 5.% 5.% 5.% 5.% Inventories % Revenue 9.2% 11.8% 12.4% 12.4% 12.4% 12.4% 12.4% 12.4% Deferred Income % Revenue.%.5% 7.9% 7.9% 7.9% 7.9% 7.9% 7.9% Trade Payables % Revenue 17.6% 12.8% 11.3% 11.3% 11.3% 11.3% 11.3% 11.3% Provisions % Revenue 1.5% 1.6% 1.5% 1.5% 1.5% 1.5% 1.5% 1.5% Other Current Assets Held constant Intangible Assets Held constant Other Non-Current Assets Held constant Current Tax Payable Trade Payables NC Held constant Deferred Income NC % Revenue.1% 4.1% 4.7% 4.7% 4.7% 4.7% 4.7% 4.7% Provisions NC Held constant Deferred Tax Liabilities , % PBIT 1% 35% 29% 29% 29% 29% 29% 29% Deferred Joint Venture Contributions Held constant October 214 UNIVERISTY OF WESTERN AUSTRALIA STUDENT RESEARCH PAGE 17

18 1 3 (e) ASSUMPTIONS - DIVIDENDS Annual Dividend US cps 212A 213A 214A 215F 216F 217F 218F 219F Dividend Payout % 16% 16% 21% % % % 3% US Interim cps US Final.4 cps Dividend Payable US$m Weighted Avg. Shares M 3,113.8 m 3,114 3,114 3,114 3,114 3,114 3,114 3,114 3,114 (f) ASSUMPTIONS - FINANCING 212A 213A 214A 215F 216F 217F 218F 219F Borrowings (Current + NC) US$m 8,51 12,691 9,557 9,57 8,557 8,57 7,557 7,57 22 Debt Reduction US$m (5) (5) (5) (5) (5) Cost of borrowings % 6.65% 4.62% 5.3% 5.% 5.% 5.% 5.% 5.% Interest Expense US$m (565) (586) (741) (453) (428) (43) (378) (353) Interest Income US$m Source: company data and team estimates 3 October 214 UNIVERISTY OF WESTERN AUSTRALIA STUDENT RESEARCH PAGE 18

19 Appendix 4: Notes to the financial statements 1 Operating sales are the sum of iron ore sales and other income from third party port access and provision of services 2 Components of operating costs are calculated on unit cost per production and have been based on 214 year figures divided by 214 production 3 Accelerated depreciation at 5% has been used and calculated as one over the life of the last operating mine (4 years) - actual depreciation charged as a % of PPE provide a similar % (5.39%). We assume accelerated depreciation as it seems logical FMG would use this accounting treatment as it provides a greater NPV benefit by expensing larger depreciation charges earlier. 4 Cost of borrowing has been reduced to 5% in 215 (5.3% 214) and is held constant, a reduction in the cost of borrowing is based on lower levels of debt in 215 and on our estimated cost of FMG's debt 5 Net working capital each year is 3% of revenues, based on 214 year numbers and checked with the previous years % for consistency saw a huge spike in prepayments resulting in an increase to deferred payments, we hold this % constant despite an expectation of decreasing prepayment 8 Despite companies paying last year s income tax in the current period and adjusting for lag, we have assumed tax for cash flow purposes is the same as the current year's income tax payable from the profit and loss 9 Interest expense and revenue for cash flow purposes has been assumed to be the same as on the profit and loss 1 We have assumed no further development and exploration capital expenditure except those that have already been stated by management, including the purchase of four very large ore carriers (VLOCs) to be delivered around 217 and another four VLOCs in 218, with payment on delivery - US$ 275 m and US$ 28 m respectively. 11 We have assumed no further sell off of PPE or raising of additional debt 12 We have based debt repayments on management guidance and our forecasted cash constraints (FMG Annual Report FY14, p11 & 94) and a targeted additional US$.5-1bn this year and an overall ( ) US$ 2-2.5bn in repayments over the next two years). In our model we have assumed US$.5bn debt repayments equally over the four years until FY Because of the limitations of balance sheet cash reserves we have modelled a cut to the dividends until gearing reaches 4 % (FY19). The dividend payout ratio from then has been based on management's comments on a pay-out ratio to 3%-4%.From FY19 the payout ratio is set to 3% and we hold debt and cash levels constant and from FY2 and assume full pay out of earnings as dividends keeping a constant gearing ratio ~4% in line with our optimum capital structure for our WACC. 13 Dividend payable for cash flow purposes includes last period's final dividend and current year's interim dividend, we have assumed an even split between interim and final dividends as well. 14 Retained Earnings for our forecasted period has been calculated as opening balance (last year's closing) plus net profit minus dividends 15 Assumed that current tax payable in FY14 (US$ 666 m) is paid off in FY15 and is kept at zero. 16 We have assumed that 1% of what is produced is sold 17 Royalties have been calculated using a rate of 7.5% for fines 18 Non-current provisions of US$ 467 m includes estimates for rehabilitation costs (US$463 m) 3 October 214 UNIVERISTY OF WESTERN AUSTRALIA STUDENT RESEARCH PAGE 19

20 and has been held constant, in line with our assumption of no further significant development and hence land disturbance. 19 We believe our WACC capital structure assumption is robust as management has claimed it wants to maintain debt at ~4%. Debt is cheaper than equity capital and so any further decreases would be under utilising its balance sheet. 2 We have used 3% as inflation based on the RBA's target of 2-3% 21 We assume what is mined equals what is sold and shipped. We assume no processing losses when FMG's run of mine ore is processed through a wet plant to reduce impurities. 22 Debt repayments are forecasted on the assumption FMG intend to pay it down as fast as possible (in line with their accelerated debt repayment strategy) but limited by maintaining cash balances at the US$ 75 level. 23 We assume that management will priorities debt reduction over dividend payments as it is more prudent and necessary to financial stability in a low iron ore price environment 1 OPERATING SALES 214A 215F 216F 217F 218F 219F US$m US$m US$m US$m US$m US$m Iron Ore Sales 11,654 9,11 9,378 9,49 9,686 9,83 Other Income Operating Sales 11,796 9,155 9,527 9,562 9,843 9,992 1 IRON ORE SALE 214A 215F 216F 217F 218F 219F IRON ORE SHIPPED (Mdmt) REALISED PRICE US$/dmt COST OF SALES 214A 215F 216F 217F 218F 219F C1 (4,6.) (4,872.8) (5,29.9) (5,13.7) (5,164.1) (5,319.) Shipping (1,21.) (1,556.2) (1,658.2) (1,77.9) (1,598.4) (1,646.4) Admin (112.) (144.) (153.5) (158.1) (162.8) (167.7) Royalties (775.) (686.7) (714.5) (717.1) (738.2) (749.4) Total Delivered Costs (6,13.) (7,259.6) (7,556.1) (7,596.9) (7,663.6) (7,882.5) Other operating (87.) (111.9) (119.2) (122.8) (126.5) (13.3) Cost of Sales (6,19.) (7,371.5) (7,675.3) (7,719.7) (7,79.1) (8,12.8) 3 DEPRECIATION FMG Source: FMG Annual Report 214 Accelerated Expense Depreciation FY /4 x 2 PPE % Dep rate 4.78% Expense FY14 13 PPE DEP rate 6.% 2-Year Average 5.39% 3 October 214 UNIVERISTY OF WESTERN AUSTRALIA STUDENT RESEARCH PAGE 2

21 Appendix 5 Iron Bridge JV ownership structure Source: Company data We have valued Iron Bridge JV on its capital costs and applied a discount rate to reflect the risk and uncertainty of the project as it has not yet commenced. Cost: Formosa has paid US$527m to fund the first capital expenditure in the FMG Iron Bridge JV project, second stage of development will require US$15m to be funded from FMG IB Ltd. Total investment into FMG IB JV ~US$ 1.55bn. We have valued IB by capitalising 1% all capital expenditure and applying a discount of ~2%. This produce a notional value of ~US$ 1.27bn Appendix 6 Porter s Five Forces Bargaining Power of Customers Bargaining Power of Suppliers Threat of New Entrants Source: Team estimates Overall rating = 2.4 Legend: = no threat to business 4 = high threat to business Competitive Rivalry within Industry Series 1 Threat of Substitute Products 3 October 214 UNIVERISTY OF WESTERN AUSTRALIA STUDENT RESEARCH PAGE 21

22 Threat of new entrants: 1. High barriers to entry 2. Large capital requirements 3. Need access to high quality reserves 4. Existence of economies of scale 5. Threat of China increasing the number of state owned mines Threat of substitute products: 1. No perfect substitute for iron ore 2. Electric arc furnace allows steel to be manufactured entirely from scrap, accounting for approximately 3% of world production 3. Increasing availability of scrap will effect long term demand for pig iron in China Competitive rivalry within industry: 1. Seaborne iron ore industry has CR3 of 62% indicating oligopoly with the three majors 2. Economies of scale 3. Large ramp production ramp ups following iron ore price increase 4. Competition to drive down costs and increase productivity 5. Product differentiation based on ore quality 6. Large exit costs Bargaining power of customers: 1. Highly fragmented steel market 2. Threat of increasing consolidations 3. Ore quality impacts buying decision 4. Oversupply enhances customers bargaining power Bargaining power of suppliers: 1. Limited number of mining equipment producers 2. Specialised labour force required 3. Influential labour unions Appendix 7 China driven iron ore boom Mt f215f216f % Source: Bloomberg Mine production of iron ore world total (Mt) China % GDP Growth 3 October 214 UNIVERISTY OF WESTERN AUSTRALIA STUDENT RESEARCH PAGE 22

23 Appendix 8 Breakdown of iron ore cost curve Source: FMG Appendix 9 Emerging economies will support long term demand Steel production in emerging Asian countries is outpacing China, supported by urbanization and industrialization, with significant potential for further growth in steel intensity per capita, therefore sustaining long term iron ore demand. More industrialized countries, like Vietnam and Thailand, will push towards the steel intensities of developed countries. The rise of manufacturing will support steel demand in service oriented economies, like Indonesia and India, despite lower levels of steel intensity. Hence long term iron ore demand will be supported by developing countries. Source: BHP Billiton 3 October 214 UNIVERISTY OF WESTERN AUSTRALIA STUDENT RESEARCH PAGE 23

24 Appendix 1 China Iron Ore Inventory (total) Mt Source: Bloomberg 3 October 214 UNIVERISTY OF WESTERN AUSTRALIA STUDENT RESEARCH PAGE 24

25 Disclosures: Ownership and material conflicts of interest: The author(s), or a member of their household, of this report does not hold a financial interest in the securities of this company. The author(s), or a member of their household, of this report does not know of the existence of any conflicts of interest that might bias the content or publication of this report. Receipt of compensation: Compensation of the author(s) of this report is not based on investment banking revenue. Position as a officer or director: The author(s), or a member of their household, does not serve as an officer, director or advisory board member of the subject company. Market making: The author(s) does not act as a market maker in the subject company s securities. Disclaimer: The information set forth herein has been obtained or derived from sources generally available to the public and believed by the author(s) to be reliable, but the author(s) does not make any representation or warranty, express or implied, as to its accuracy or completeness. The information is not intended to be used as the basis of any investment decisions by any person or entity. This information does not constitute investment advice, nor is it an offer or a solicitation of an offer to buy or sell any security. This report should not be considered to be a recommendation by any individual affiliated with CFA Society of Perth, CFA Institute or the CFA Institute Research Challenge with regard to this company s stock. CFA Institute Research Challenge 3 October 214 UNIVERISTY OF WESTERN AUSTRALIA STUDENT RESEARCH PAGE 25

31 December 2013 Half year results February 2014

31 December 2013 Half year results February 2014 31 December 2013 Half year results February 2014 Disclaimer Important Notice The purpose of this presentation is to provide general information about Fortescue Metals Group Limited ("Fortescue"). It is

More information

Fortescue Metals Group

Fortescue Metals Group Fortescue Metals Group March 2019 Together we are Fortescue Forward looking statements Disclaimer Important Notice The purpose of this presentation is to provide general information about Fortescue Metals

More information

Sustainable Competitive and Reliable Supplier of Iron Ore

Sustainable Competitive and Reliable Supplier of Iron Ore Sustainable Competitive and Reliable Supplier of Iron Ore Forward looking statements Disclaimer Important Notice The purpose of this presentation is to provide general information about Fortescue Metals

More information

China Iron Ore Beijing, 4 February 2015

China Iron Ore Beijing, 4 February 2015 China Iron Ore 2015 Beijing, 4 February 2015 Disclaimer Important Notice The purpose of this presentation is to provide general information about Fortescue Metals Group Limited ("Fortescue"). It is not

More information

Half Year Financial Results to 31 December 2017

Half Year Financial Results to 31 December 2017 21 February 2018 Half Year Financial Results to 31 December 2017 Fortescue Metals Group Limited (ASX: FMG, Fortescue) Net profit of US$681 million and interim dividend of A$0.11 per share Fortescue has

More information

MOUNT GIBSON IRON LIMITED QUARTERLY REPORT FOR THE PERIOD ENDED 31 DECEMBER January 2016

MOUNT GIBSON IRON LIMITED QUARTERLY REPORT FOR THE PERIOD ENDED 31 DECEMBER January 2016 MOUNT GIBSON IRON LIMITED QUARTERLY REPORT FOR THE PERIOD ENDED 31 DECEMBER 2015 20 January 2016 Key Points* December quarter iron ore sales of 1.5 million wet metric tonnes (Mwmt), and quarterly ore sales

More information

Global Iron Ore and Steel Forecast Unlocking value across our portfolio. Edgar Basto, Asset President Western Australia Iron Ore 21 March 2018

Global Iron Ore and Steel Forecast Unlocking value across our portfolio. Edgar Basto, Asset President Western Australia Iron Ore 21 March 2018 Global Iron Ore and Steel Forecast Unlocking value across our portfolio Edgar Basto, Asset President Western Australia Iron Ore Disclaimer Forward-looking statements This presentation contains forward-looking

More information

Fortescue Metals Group

Fortescue Metals Group AUSTRALIA FMG AU Price (at 3:1, 22 Feb 217 GMT) Outperform A$6.99 Valuation A$ - DCF (WACC 8.5%, beta 1.3, ERP 5.%, RFR 3.3%) 4.79 12-month target A$ 7.6 12-month TSR % +13.2 Volatility Index High GICS

More information

Fortescue Metals Group

Fortescue Metals Group AUSTRALIA FMG AU Price (at 08:49, 24 Jun 20 GMT) Outperform A$3.27 Valuation A$ - DCF (WACC 9.6%, beta 1.4, ERP 5.0%, RFR 3.3%) 3.57 12-month target A$ 3.60 12-month TSR % +.9 Volatility Index Very High

More information

Fortescue Metals Group

Fortescue Metals Group AUSTRALIA FMG AU Price (at 5:1, 17 Feb 217 GMT) Outperform A$6.88 Valuation A$ - DCF (WACC 8.5%, beta 1.3, ERP 5.%, RFR 3.3%) 4.96 12-month target A$ 7.6 12-month TSR % +14.9 Volatility Index High GICS

More information

Fortescue Metals Group

Fortescue Metals Group AUSTRALIA FMG AU Price (at 6:1, 17 Jul 212 GMT) Outperform A$4.54 Volatility index Medium 12month target A$ 7.6 12month TSR % +7.6 Valuation A$ 7.58 DCF (WACC 1.5%, beta 1.6, ERP 5.%, RFR 5.%, TGR 3.%)

More information

March 2018 Quarterly Report 17 April Summary

March 2018 Quarterly Report 17 April Summary March 2018 ly Report 17 April 2018 Summary 2 million wet metric tonnes shipped in the March C1 cash cost of A$41/wmt FOB; Full cash cost of A$62/wmt CFR Average realised price of A$59/wmt CFR, inclusive

More information

June 2018 Quarterly Report

June 2018 Quarterly Report 12 July 2018 June 2018 ly Report Summary 2.1 million wmt shipped in the June C1 cash costs of A$42/wmt FOB; Full cash cost of A$62/wmt CFR Average realised price of A$59/wmt CFR, inclusive of hedging gains

More information

Fortescue Metals Group

Fortescue Metals Group AUSTRALIA FMG AU Price (at 4:13, 31 Jan 217 GMT) Outperform A$6.6 Valuation A$ - DCF (WACC 8.5%, beta 1.3, ERP 5.%, RFR 3.3%) 4.91 12-month target A$ 7.6 12-month TSR % +19.1 Volatility Index High GICS

More information

For personal use only

For personal use only ASX RELEASE 11 AUGUST 2014 BC Iron to Acquire Iron Ore Holdings HIGHLIGHTS BC Iron Ltd (ASX:BCI) ( BC Iron ) to strengthen its Pilbara iron ore portfolio via recommended off-market takeover offer for Iron

More information

LABRADOR IRON MINES REPORTS THIRD QUARTER RESULTS. Requirement for Refinancing and Restructuring Voluntary Delisting from the TSX

LABRADOR IRON MINES REPORTS THIRD QUARTER RESULTS. Requirement for Refinancing and Restructuring Voluntary Delisting from the TSX LABRADOR IRON MINES REPORTS THIRD QUARTER RESULTS Requirement for Refinancing and Restructuring Voluntary Delisting from the TSX Toronto, Ontario, February 13, 2015. Labrador Iron Mines Holdings Limited

More information

Building on our sustainable production and infrastructure platform to create shareholder value. Atlas Iron Limited Investor Presentation March 2018

Building on our sustainable production and infrastructure platform to create shareholder value. Atlas Iron Limited Investor Presentation March 2018 Building on our sustainable production and infrastructure platform to create shareholder value Atlas Iron Limited Investor Presentation March 2018 Disclaimer Summary Information This Presentation contains

More information

March. Report. Highlights. expected. Full Cash. Wodgina

March. Report. Highlights. expected. Full Cash. Wodgina March 2017 ly Report 18 April 2017 Strong cashflow takes Atlas cash on hand too A$108m and Term Loan debt to A$ $112m Highlights Net operating cashflow of $22m after inventory build, interest, contractor

More information

Australian Iron Ore Miners

Australian Iron Ore Miners AUSTRALIA BHP Billiton Neutral Market Cap US$69,410m Price A$18.55/ 8.48/ZAR182.75 Price Target A$15.50/ 7.20/ZAR163 TSR (15%)/(13%)/(9%) Rio Tinto Outperform Market Cap US$56,484m Price A$46.47/ 21.05

More information

2017 Financial Year Presentation

2017 Financial Year Presentation Building on our sustainable production and infrastructure platform to create shareholder value Atlas Iron Limited 2017 Financial Year Presentation Disclaimer Summary Information This Presentation contains

More information

MOUNT GIBSON IRON LIMITED QUARTERLY REPORT FOR THE PERIOD ENDED 30 JUNE July 2018

MOUNT GIBSON IRON LIMITED QUARTERLY REPORT FOR THE PERIOD ENDED 30 JUNE July 2018 MOUNT GIBSON IRON LIMITED QUARTERLY REPORT FOR THE PERIOD ENDED 30 JUNE 2018 20 July 2018 Key Points* Steady quarterly sales of 1.0 million wet metric tonnes (Mwmt), for sales revenue for the quarter of

More information

Truckless system S11D. Vale s Performance in 3Q18

Truckless system S11D. Vale s Performance in 3Q18 Truckless system S11D Vale s Performance in 3Q18 Rio 1 de Janeiro, October 25 th, 2018 Agenda 2 This presentation may include statements that present Vale's expectations about future events or results.

More information

For personal use only

For personal use only September 2017 ly Report 20 October 2017 Another strong quarter sees Atlas become net cash-positive Highlights Net cash generated from operations of $15m in the September after interest and financial instruments

More information

MANAGEMENT S DISCUSSION AND ANALYSIS OF FINANCIAL CONDITION AND RESULTS OF OPERATIONS

MANAGEMENT S DISCUSSION AND ANALYSIS OF FINANCIAL CONDITION AND RESULTS OF OPERATIONS The following contains selected additional information regarding the business and operations of African Minerals Limited and certain of its subsidiaries, including Tonkolili Iron Ore (SL) Limited, African

More information

Developing a Diversified Minerals Portfolio Investor Presentation August 2017

Developing a Diversified Minerals Portfolio Investor Presentation August 2017 1 Developing a Diversified Minerals Portfolio Investor Presentation August 2017 2 Important Notices This presentation has been prepared by BC Iron Limited ABN 21 120 646 924 ( BCI ). This document contains

More information

Australian Iron Ore Miners A$ relief boosts upgrade momentum

Australian Iron Ore Miners A$ relief boosts upgrade momentum 21 January 2019 Australia EQUITIES BHP Group Market Cap Price Price Target Outperform US$114,553m A$33.33/ 16.29/R289.71 A$39.00/ 18.50/R332 TSR 27%/25%/26% Rio Tinto Market Cap Price Price Target Outperform

More information

Cliffs Natural Resources Inc. Reports First-Quarter 2011 Results

Cliffs Natural Resources Inc. Reports First-Quarter 2011 Results Cliffs Natural Resources Inc. Reports First-Quarter 2011 Results - Revenue Increases 63% over Last Year to a First-Quarter Record of $1.2 Billion; Net Income Reaches $423 Million, or $3.11 Per Diluted

More information

Half Year Results, FY18 Guidance Confirmed 27 February 2018

Half Year Results, FY18 Guidance Confirmed 27 February 2018 Half Year Results, FY18 Guidance Confirmed 27 February 2018 Summary On track to meet FY18 guidance Term Loan B debt reduced to A$103m at (H1 FY17: A$172m), with an additional repayment of A$20m in early

More information

Atlas Iron Limited Annual General Meeting 23 October 2017

Atlas Iron Limited Annual General Meeting 23 October 2017 Building on our sustainable production and infrastructure platform to create shareholder value Atlas Iron Limited Annual General Meeting 23 October 2017 Disclaimer Summary Information This Presentation

More information

Australian Mid-cap Iron-Ore

Australian Mid-cap Iron-Ore AUSTRALIA Recommendation changes None BC Iron Outperform Price $0.23 Market Cap A$45m Target Price $0.35 TSR 52% Mt Gibson Iron Neutral Price $0.18 Market Cap A$196m Target Price $0.25 TSR 39% Grange Resources

More information

MOUNT GIBSON IRON LIMITED QUARTERLY REPORT FOR THE PERIOD ENDED 30 JUNE July 2017

MOUNT GIBSON IRON LIMITED QUARTERLY REPORT FOR THE PERIOD ENDED 30 JUNE July 2017 MOUNT GIBSON IRON LIMITED QUARTERLY REPORT FOR THE PERIOD ENDED 30 JUNE 2017 24 July 2017 Key Points* Cash and liquid investments of $447 million at 30 June 2017, compared with $456 million at 31 March

More information

JAMBREIRO IRON ORE PROJECT SET TO DELIVER STRONG CASH FLOWS AND RETURNS: PRE-FEASIBILITY STUDY

JAMBREIRO IRON ORE PROJECT SET TO DELIVER STRONG CASH FLOWS AND RETURNS: PRE-FEASIBILITY STUDY 14 November 2011 JAMBREIRO IRON ORE PROJECT SET TO DELIVER STRONG CASH FLOWS AND RETURNS: PRE-FEASIBILITY STUDY Board approves Commencement of Bankable Feasibility Study Jambreiro Pre-Feasibility Study

More information

INTERIM RESULTS PRESENTATION

INTERIM RESULTS PRESENTATION BHP Billiton Limited BHP Billiton Plc 171 Collins Street Neathouse Place Melbourne Victoria 3000 Australia London SW1V 1LH UK GPO BOX 86 Tel +44 20 7802 4000 Melbourne Victoria 3001 Australia Fax + 44

More information

Managing Director s Review of Operations

Managing Director s Review of Operations ASX ANNOUNCEMENT Managing Director s Review of Operations 25 October 2017 Attached is a copy of the MD s review of operations as delivered at today s annual general meeting. For further information please

More information

Comparable company analysis:

Comparable company analysis: Comparable company analysis: Importance of comparability Abstract In undertaking a valuation of a business it is common to reference other companies which are comparable. Comparable companies can be used

More information

The Pilbara Infrastructure Pty Ltd (TPI) Final Determination on TPI s Costing Principles

The Pilbara Infrastructure Pty Ltd (TPI) Final Determination on TPI s Costing Principles The Pilbara Infrastructure Pty Ltd (TPI) Final Determination on TPI s Costing Principles 11 March 2010 A full copy of this document is available from the website at www.era.wa.gov.au. For further information,

More information

Ricardo Teles / Agência Vale. Vale s Performance in 2Q18

Ricardo Teles / Agência Vale. Vale s Performance in 2Q18 Ricardo Teles / Agência Vale Vale s Performance in 2Q18 Rio de Janeiro, July 25 th, 2018 1 Agenda 2 This presentation may include statements that present Vale's expectations about future events or results.

More information

Fortescue Metals Group

Fortescue Metals Group Vol m Mining Australia Equity research January 31, 2017 Australia HOLD (previously NOT RATED) Current price: Target price: Previous target: A$6.66 A$6.30 A$2.16 Up/downside: -5.4% Reuters: Bloomberg: Market

More information

2016 ANNUAL RESULTS 14 FEBRUARY 2017

2016 ANNUAL RESULTS 14 FEBRUARY 2017 2016 ANNUAL RESULTS 14 FEBRUARY 2017 DISCLAIMER Certain statements made in this presentation constitute forward-looking statements. Forward-looking statements are typically identified by the use of forward-looking

More information

ATLAS IRON LIMITED INVESTOR PRESENTATION June / July 2015

ATLAS IRON LIMITED INVESTOR PRESENTATION June / July 2015 ATLAS IRON LIMITED INVESTOR PRESENTATION June / July 2015 Investment Highlights Significant iron ore producer production returning to 14-15Mtpa Set to generate strong positive cash margin from mining operations

More information

Iron Ore - delivering optimal value

Iron Ore - delivering optimal value Iron Ore - delivering optimal value Investor roadshow August 2017 Chris Salisbury, chief executive, Iron Ore Cautionary statements This presentation has been prepared by Rio Tinto plc and Rio Tinto Limited

More information

Fortescue Metals Group

Fortescue Metals Group Fortescue Metals Group CEDA Resources Overview Julie Shuttleworth, Deputy CEO 13 November, 2018 Forward looking statements Disclaimer Important Notice The purpose of this presentation is to provide general

More information

2014 ANNUAL REPORT ABN:

2014 ANNUAL REPORT ABN: 2014 ANNUAL REPORT ABN: 57 002 594 872 CORPORATE DIRECTORY Australian Business Number ABN 57 002 594 872 Directors Andrew Forrest Non-Executive Chairman Herb Elliott Non-Executive Deputy Chairman Nev Power

More information

Australia Resources. Commodity cuts bite hard AUSTRALIA. Event. Impact. Outlook. Recommendation changes None

Australia Resources. Commodity cuts bite hard AUSTRALIA. Event. Impact. Outlook. Recommendation changes None AUSTRALIA Recommendation changes None BHP Billiton Price Target Outperform A$22.80 A$27.00 TSR 26% Rio Tinto Price Target Outperform A$47.99 A$57.00 TSR 26% South32 Price Target Outperform A$1.42 A$1.80

More information

Nominal NPV 10, 2% escalation applied to operating costs and revenues

Nominal NPV 10, 2% escalation applied to operating costs and revenues Emmerson Plc / Ticker: EML / Index: LSE / Sector: Mining 20 November 2018 Emmerson Plc ( Emmerson or the Company ) Scoping Study Confirms Potential for Low Capex, High Margin Potash Mine Emmerson Plc,

More information

Mount Gibson Iron Limited ABN

Mount Gibson Iron Limited ABN ABN 87 008 670 817 VIA: WWW.ASXONLINE.COM Level 1, 2 Kings Park Road West Perth 6005, Western Australia PO Box 55, West Perth WA 6872 Telephone: 61-8-9426-7500 Facsimile: 61-8-9485 2305 E-mail: admin@mtgibsoniron.com.au

More information

newest iron ore LABRADOR IRON MINES Canada s producer Q3 Conference Call (for the quarter ended December 31, 2012)

newest iron ore LABRADOR IRON MINES Canada s producer Q3 Conference Call (for the quarter ended December 31, 2012) LABRADOR IRON MINES Canada s newest iron ore producer Q3 Conference Call (for the quarter ended December 31, 2012) John Kearney, Chairman & CEO Rod Cooper, President & COO Richard Pinkerton, CFO February

More information

Fixed income investors update. March 2017

Fixed income investors update. March 2017 Fixed income investors update March 2017 Cautionary statements This presentation has been prepared by Rio Tinto plc and Rio Tinto Limited ( Rio Tinto ). By accessing/attending this presentation you acknowledge

More information

ASX Release 22 February 2018

ASX Release 22 February 2018 ASX Release 22 February 2018 APPENDIX 4D For the half-year ended 31 This information should be read in conjunction with BCI Minerals Limited s Financial Report for the half-year ended 31. Company Details

More information

SUPERGRADE IRON Right product - right time

SUPERGRADE IRON Right product - right time Investor Presentation December 2017 SUPERGRADE IRON Right product - right time 1 Disclaimer 2 This presentation has been prepared by the management of Carpentaria Exploration Limited (CAP) for the benefit

More information

Commodities Observing the fundamentals Written by: Dwayne Dippenaar, Research Analyst at Laurium Capital

Commodities Observing the fundamentals Written by: Dwayne Dippenaar, Research Analyst at Laurium Capital FUNDS ON FRIDAY b y G l a c i e r R e s e a r c h 24 J u n e 2 0 1 6 V o l u m e 8 6 7 Commodities Observing the fundamentals Written by: Dwayne Dippenaar, Research Analyst at Laurium Capital The South

More information

WHERE WILL THE PROF ITS COME FROM?

WHERE WILL THE PROF ITS COME FROM? WHERE WILL THE PROF ITS COME FROM? Issue 9 217 25 Allocating capital in the current economic climate is a serious challenge for equity investors. Among the root causes, the money printing by central banks

More information

PILBARA MAINTAINS GROWTH MOMENTUM WITH STRONG CUSTOMER SUPPORT TO UNDERPIN FUNDING PACKAGE FOR STAGE 2 PILGANGOORA EXPANSION

PILBARA MAINTAINS GROWTH MOMENTUM WITH STRONG CUSTOMER SUPPORT TO UNDERPIN FUNDING PACKAGE FOR STAGE 2 PILGANGOORA EXPANSION ASX / MEDIA ANNOUNCEMENT 2 January 2019 PILBARA MAINTAINS GROWTH MOMENTUM WITH STRONG CUSTOMER SUPPORT TO UNDERPIN FUNDING PACKAGE FOR STAGE 2 PILGANGOORA EXPANSION Terms agreed with both Ganfeng and Great

More information

Corsa Coal Corp The Coal Institute Summer Trade Seminar, Myrtle Beach, SC

Corsa Coal Corp The Coal Institute Summer Trade Seminar, Myrtle Beach, SC Corsa Coal Corp The Coal Institute Summer Trade Seminar, Myrtle Beach, SC July 2018 Acosta Deep Mine Day of Grand Opening Somerset County, Pennsylvania Forward-looking Statements Certain statements and

More information

Fortescue Metals Group

Fortescue Metals Group AUSTRALIA FMG AU Price (at 5:1, 5 Mar 215 GMT) Neutral A$2.29 Valuation A$ 2.6 - DCF (WACC 1.%, beta 1.4, ERP 5.%, RFR 3.8%, TGR 2.6%) 12-month target A$ 2.6 12-month TSR % +16. Volatility Index High GICS

More information

September 2018 Quarterly Report

September 2018 Quarterly Report 25 October 2018 2018 ly Report Summary 1.9M wmt shipped in the C1 cash costs of A$40/wmt FOB; Full cash cost of A$64/wmt CFR Average realised price of A$67/wmt CFR, inclusive of hedging gains and provisional

More information

Fixed income investors update. March 2018

Fixed income investors update. March 2018 Fixed income investors update March 2018 Cautionary statements 2 This presentation has been prepared by Rio Tinto plc and Rio Tinto Limited ( Rio Tinto ). By accessing/attending this presentation you acknowledge

More information

PRESENTATION OF NORDEN

PRESENTATION OF NORDEN PRESENTATION OF NORDEN EVP Martin Badsted SEB Nordic Seminar 8 January 2014 Copenhagen SEB Nordic Seminar 8 January 2014 1 A LEADING GLOBAL TRAMP OPERATOR Dry cargo Capesize Post-Panamax Panamax Handymax

More information

Addressing the challenges. Credit Suisse Latam Commodities CEO/CFO Conference São Paulo, March 25, 2015

Addressing the challenges. Credit Suisse Latam Commodities CEO/CFO Conference São Paulo, March 25, 2015 0 Addressing the challenges Credit Suisse Latam Commodities CEO/CFO Conference São Paulo, March 25, 2015 1 Disclaimer This presentation may include statements that present Vale's expectations about future

More information

Negotiating Cyclone project buy in

Negotiating Cyclone project buy in 4 July 2017 Negotiating Cyclone project buy in Cape Bedford : High quality silica sand Recommendation Strong BUY, High Risk Price Valuation Products : 0.7c 6.5c Mineral Sands (Zircon rich) Silica sand

More information

Fortescue Metals Group (FMG)

Fortescue Metals Group (FMG) 30 October 2015 Analyst David Coates 612 8224 2887 Authorisation John Hester 612 8224 2871 Recommendation Buy (Hold) Price $2.09 Target (12 months) $2.40 (unchanged) Expected Return Capital growth 14.8%

More information

Analysis & Outlook of Non-Ferrous Metals Market Trends

Analysis & Outlook of Non-Ferrous Metals Market Trends May 2014 Analysis & Outlook of Non-Ferrous Metals Market Trends Mark Keenan Head of Commodities Research - Asia Important Notice: The circumstances in which this publication has been produced are such

More information

Financial Results Half year ended 31 December February 2016

Financial Results Half year ended 31 December February 2016 Financial Results Half year ended 31 December 2015 19 February 2016 Improving the business and returns for shareholders Rapid deployment of business resetting actions $57 million in controllable costs

More information

Ricardo Teles / Vale. Vale s Performance in 2017

Ricardo Teles / Vale. Vale s Performance in 2017 Ricardo Teles / Vale Vale s Performance in 2017 Rio 1 de Janeiro, February 28 th, 2018 Agenda 2 This presentation may include statements that present Vale's expectations about future events or results.

More information

For personal use only

For personal use only NRW Holdings Limited (ASX: NWH) ABN 95 118 300 217 For the Half-Year Ended 31 December 2014 220142013 1 APPENDIX 4D RESULTS FOR ANNOUNCEMENT TO THE MARKET For the Half-Year Ended 31 December 2014 NRW Holdings

More information

HALF YEAR 2017 RESULTS PRESENTATION 16 FEBRUARY 2017

HALF YEAR 2017 RESULTS PRESENTATION 16 FEBRUARY 2017 HALF YEAR 2017 RESULTS PRESENTATION 16 FEBRUARY 2017 AGENDA 1 2 3 4 Highlights Operational Performance Financial Performance Growth Priorities and Innovation 5 Guidance Update HIGHLIGHTS Financial Revenue

More information

A New Paradigm for the Pilbara Melbourne Mining Club 15 November 2016 Hendrianto Tee Business Development Director

A New Paradigm for the Pilbara Melbourne Mining Club 15 November 2016 Hendrianto Tee Business Development Director A New Paradigm for the Pilbara Melbourne Mining Club 15 November 2016 Hendrianto Tee Business Development Director Disclaimer and Notices General information and disclaimer This presentation has been prepared

More information

Cliffs Natural Resources Inc. Reports 2013 Second-Quarter Results

Cliffs Natural Resources Inc. Reports 2013 Second-Quarter Results July 25, 2013 Cliffs Natural Resources Inc. Reports 2013 Second-Quarter Results - Company Reports 2013 Second-Quarter Revenues of $1.5 Billion and Net Income Attributable to Cliffs' Common Shareholders

More information

For personal use only

For personal use only ASX Announcement 23 February 2017 Half-Ye ear Results Atlas makes strong return to profit as production increases and costss fall Highlights Interim statutory net profit after tax of $18.9m (loss of $114.3m

More information

Delivering superior returns

Delivering superior returns Delivering superior returns J-S Jacques, chief executive 2017 Global Metals & Mining Conference Bank of America Merrill Lynch, 16 May 2017 Cautionary statements This presentation has been prepared by Rio

More information

Fortescue Metals Group

Fortescue Metals Group Vol m Mining Australia Equity research October 30, 2015 HOLD (no change) Current price: Target price: Previous target: A$2.20 A$2.16 A$2.16 Up/downside: -1.8% Reuters: Bloomberg: Market cap: Average daily

More information

Analyst Meet Presentation Standalone Financial Results, Quarter Ended 30 Sep 2011

Analyst Meet Presentation Standalone Financial Results, Quarter Ended 30 Sep 2011 Analyst Meet Presentation Standalone Financial Results, Quarter Ended 30 Sep 2011 Agenda Business Environment Key Developments Performance Overview Projects Update Guidance Update 2 Global economy Recovery

More information

Cliffs Natural Resources Inc. Reports Third-Quarter Results. Reports Realized Pricing of $101 Per Ton in U.S. Iron Ore in Q3 2014

Cliffs Natural Resources Inc. Reports Third-Quarter Results. Reports Realized Pricing of $101 Per Ton in U.S. Iron Ore in Q3 2014 NEWS RELEASE Cliffs Natural Resources Inc. Reports Third-Quarter Results Reports Adjusted EBITDA 1 of $233 million and Adjusted Earnings 2 of $0.21 per diluted share Reports Realized Pricing of $101 Per

More information

While this is my first visit to Kyoto I feel quite at home, surrounded as I am by so many of our customers and colleagues.

While this is my first visit to Kyoto I feel quite at home, surrounded as I am by so many of our customers and colleagues. TRENDS AND ISSUES IN THE RESOURCES SECTOR CHRIS LYNCH CFO BHP BILLITON 6 October 2003 Introduction Good afternoon my name is Chris Lynch and I am CFO of BHP Billiton. I would like to start by thanking

More information

ATLAS IRON LIMITED TARGET S STATEMENT

ATLAS IRON LIMITED TARGET S STATEMENT ATLAS IRON LIMITED TARGET S STATEMENT in relation to the offer by Hancock Prospecting Pty Ltd ACN 008 676 417 through its wholly-owned subsidiary Redstone Corporation Pty Ltd ACN 625 680 159 to purchase

More information

NRW HOLDINGS LIMITED ANNUAL GENERAL MEETING 28 th November 2012

NRW HOLDINGS LIMITED ANNUAL GENERAL MEETING 28 th November 2012 NRW HOLDINGS LIMITED 2012 ANNUAL GENERAL MEETING 28 th November 2012 DISCLAIMER AND IMPORTANT NOTICE 2 Information, including forecast financial information in this presentation should not be considered

More information

Australian Iron Ore Miners

Australian Iron Ore Miners AUSTRALIA/UNITED KINGDOM/SOUTH AFRICA A perfect storm Strong sentiment and weaker shipments A significant decline in Western Australia iron-ore shipment rates during January and February is likely to have

More information

INTERIM FINANCIAL REPORT

INTERIM FINANCIAL REPORT INTERIM FINANCIAL REPORT FOR THE HALF-YEAR ENDED 31 DECEMBER 2017 Page 1 of 17 CORPORATE DIRECTORY Board of Directors Dr Neil Williams Quentin Hill Bin Cai Paul Cholakos Non-Executive Chairman Managing

More information

Financial Results Full year ended 30 June August 2018

Financial Results Full year ended 30 June August 2018 Yesterday Today Tomorrow Financial Results Full year ended 30 June 2018 24 August 2018 Disclaimer The material contained in this document is a presentation of information about the Group s activities current

More information

Western Australia Iron Ore Overview. Michael Bailey General Manager, Port Operations

Western Australia Iron Ore Overview. Michael Bailey General Manager, Port Operations Western Australia Iron Ore Overview Michael Bailey General Manager, Port Operations Disclaimer Forward looking statements This release contains forward looking statements, including statements regarding:

More information

AUSTRALIAN INFRASTRUCTURE METRIC

AUSTRALIAN INFRASTRUCTURE METRIC AUSTRALIAN INFRASTRUCTURE METRIC December Quarter 216 The IPA/BIS Oxford Economics Australian Infrastructure Metric (the Metric) is the leading indicator of real investment in Australia s civil infrastructure.

More information

Whitehaven Coal Limited. Half Year FY 2013 Results. Sydney, Australia 26 February 2013

Whitehaven Coal Limited. Half Year FY 2013 Results. Sydney, Australia 26 February 2013 Whitehaven Coal Limited Half Year FY 2013 Results Sydney, Australia 26 February 2013 Disclaimer Statements contained in this material, particularly those regarding the possible or assumed future performance,

More information

BUILDING ON FIRM FOUNDATIONS DELIVERING A SUSTAINABLE FUTURE ENHANCING OUTCOMES

BUILDING ON FIRM FOUNDATIONS DELIVERING A SUSTAINABLE FUTURE ENHANCING OUTCOMES KUMBA IRON ORE LIMITED 2017 ANNUAL FINANCIAL RESULTS FOR THE YEAR ENDED 31 DECEMBER 2017 BUILDING ON FIRM FOUNDATIONS DELIVERING A SUSTAINABLE FUTURE ENHANCING OUTCOMES MEDIA Sinah Phochana sinah.phochana@angloamerican.com

More information

Generating significant business value

Generating significant business value Generating significant business value Andrew Harding Chief executive Iron Ore, China, Japan, Korea AJM Global Iron Ore & Steel Forecast Conference, Perth 2014 Cautionary statement 2 This presentation has

More information

Investor Day 2014: Strategic progress Mining exploiting our potential

Investor Day 2014: Strategic progress Mining exploiting our potential Investor Day 2014: Strategic progress Mining exploiting our potential Bill Scotting, EVP and CEO Mining 10 March 2014 Mary River iron ore project, Baffinland Disclaimer Forward-Looking Statements This

More information

Tubarão Port, ES, Brazil. Vale s Performance in 2Q16

Tubarão Port, ES, Brazil. Vale s Performance in 2Q16 0 Tubarão Port, ES, Brazil Vale s Performance in Rio de Janeiro, July 28 th, 2016 1 Disclaimer This presentation may include statements that present Vale's expectations about future events or results.

More information

The presentation will be webcast live at 7.30pm (Australian Eastern Daylight Time) and can be accessed at

The presentation will be webcast live at 7.30pm (Australian Eastern Daylight Time) and can be accessed at Notice to ASX 2016 full year results presentation 8 February 2017 Attached is the Rio Tinto 2016 full year results presentation to be given today by Rio Tinto chief executive Jean-Sébastien Jacques, and

More information

5 August 2010 Shiploader, Cape Lambert

5 August 2010 Shiploader, Cape Lambert 2010 interim results 5 August 2010 Shiploader, Cape Lambert Cautionary statement This presentation has been prepared by Rio Tinto plc and Rio Tinto Limited ( Rio Tinto ) and consisting of the slides for

More information

NORDEN RESULTS. Full year results of Hellerup, Denmark 7 March Our business is global tramp shipping. NORDEN Full year result of

NORDEN RESULTS. Full year results of Hellerup, Denmark 7 March Our business is global tramp shipping. NORDEN Full year result of NORDEN RESULTS Full year results of 2011 Hellerup, Denmark 7 March 2012 NORDEN Full year result of 2011 1 AGENDA Group highlights Strategy Financial highlights Market expectations Dry Cargo Tanker 2012

More information

ANNUAL MEETING OF SHAREHOLDERS AND CORPORATE UPDATE

ANNUAL MEETING OF SHAREHOLDERS AND CORPORATE UPDATE News Release ANNUAL MEETING OF SHAREHOLDERS AND CORPORATE UPDATE Toronto, Ontario, September 15, 2015. Labrador Iron Mines Holdings Limited ( LIM or the Company ) held its Annual Meeting of Shareholders

More information

LEGISLATIVE COUNCIL Question on notice

LEGISLATIVE COUNCIL Question on notice LEGISLATIVE COUNCIL Question on notice Tuesday, 17 February 2015 2338. Hon Robin Chappie to the Minister for Agriculture and Food representing the Minister for Mines and Petroleum. I refer to the royalty

More information

Zinc Market Outlook May 2013 Presented by Jonathan Downes

Zinc Market Outlook May 2013 Presented by Jonathan Downes Zinc Market Outlook May 2013 Presented by Jonathan Downes Managing Director Ironbark Zinc Limited Disclaimer The following information is not intended to guide any investment decisions in Ironbark Zinc

More information

Quarterly Investor Update

Quarterly Investor Update Quarterly Investor Update Glenn Kellow President and Chief Executive Officer Amy Schwetz EVP and Chief Financial Officer Vic Svec SVP Global Investor and Corporate Relations February 6, 2019 Statement

More information

Interim Results Half year ended 31 December 2013

Interim Results Half year ended 31 December 2013 Interim Results Half year ended 31 December 2013 Galdino Claro, Group Chief Executive Officer Rob Larry, Group Chief Financial Officer 14 February 2014 Disclaimer Cautionary Statements Regarding Forward-Looking

More information

Cliffs Natural Resources Inc. Reports Fourth-Quarter and Full-Year 2014 Results

Cliffs Natural Resources Inc. Reports Fourth-Quarter and Full-Year 2014 Results NEWS RELEASE Cliffs Natural Resources Inc. Reports Fourth-Quarter and Full-Year 2014 Results Reports Fourth-Quarter Adjusted EBITDA 1 of $297 million Reports U.S. Iron Ore Realized Pricing of $99 Per Ton

More information

Annual F inancial Financial Results 2008

Annual F inancial Financial Results 2008 Annual Financial Results 2008 16 February 2009 Disclaimer Our presentation contains some forward looking statements with respect to the financial Our presentation contains some forward looking statements

More information

Ascot Resources Limited Wonmunna Iron Ore Asset

Ascot Resources Limited Wonmunna Iron Ore Asset Ascot Resources Limited Wonmunna Iron Ore Asset Acquisition Presentation 25 March 2014 Disclaimer This document has been prepared by Ascot Resources Limited ( AZQ or the Company ) in connection with providing

More information

Ricardo Teles / Agência Vale. Vale s Performance in 2Q17

Ricardo Teles / Agência Vale. Vale s Performance in 2Q17 Ricardo Teles / Agência Vale Vale s Performance in 2Q17 Rio de Janeiro, July 27 th, 2017 1 Agenda 2 This presentation may include statements that present Vale's expectations about future events or results.

More information

Global Metals, Mining & Steel Conference

Global Metals, Mining & Steel Conference Global Metals, Mining & Steel Conference Don Lindsay, President and Chief Executive Officer May 15, 2018 Forward Looking Information Both these slides and the accompanying oral presentations contain certain

More information

2016 Half Year Financial Results. Presentation

2016 Half Year Financial Results. Presentation 2016 Half Year Financial Results Presentation 10 AUGUST 2016 Disclaimer Forward looking statements This presentation has been prepared by OZ Minerals Limited ( OZ Minerals ) and consists of written materials/slides

More information