1 Mount Magnet South NL ABN Quarterly Activities & Cashflow Report 30 September 2011 Summary Upgraded Mineral Resource Estimate at Kirkalocka finalised increasing Indicated category by 13% to 305,000 ounces Au, and overall JORC resource to 413,000 ounces Au Stage 1 and Stage 2 of a three stage drilling program completed to the areas north and south of the Curara Well open pit, comprising 33 holes for 5,264m RC and 664m DDH High grade intercepts returned from initial assays, with results pending for +1,300 samples Successful completion of share placement and underwritten rights issue to shareholders raising a total of $4.9m before costs Feasibility study program on track to complete by end November 2011

2 Kirkalocka Gold Project JORC Mineral Resource Estimate The Company has released another upgrade to its Curara Well Mineral Resource Estimate as follows: Category Tonnes (Mt) Grade (g/t au) Gold (ounces) Indicated ,000 Inferred ,000 TOTAL ,000 Following the generation of 3,907 metres in additional exploration data from 24 reverse circulation (RC) holes, the Company engaged Snowdens Mining Industry Consultants to estimate the resource. The total dataset comprises 176,032 metres of RC, air core and diamond drilling. The mineral resource has been reported above cut-off grades of 0.3 grams per tonne gold for the laterite mineralisation, and 0.5 grams per tonne gold for the oxide and fresh mineralisation. The mineral resource is constrained within an optimisation shell that extends to 290m below the surface, with cut-off grades based upon economic factors determined from the application of open pit mining methods and historical gold recoveries from the Kirkalocka treatment plant. Feasibility Study Program The feasibility study program commenced in February 2011 is targeting a November 2011 completion. Quarterly Activities & Cashflow Report June 2011

3 For personal use only Exploration Activity Staged Drilling Program The Company has planned a 3 stage drilling program to the areas north and south of the Curara Well open pit, with the purpose of in-filling areas of known mineralisation in order to bring them into the current resource model, increase the confidence in the mineralisation already in the resource model, and to thirdly extend the mineralisation to depth and along strike. Refer Figure 1 below. Figure 1: The Company has planned a 3 Stage Drilling Program to the mineralised areas north and south of the Curara Well open pit Three diamond holes from Stage 1 drilling are yet to be assayed, pending the completion of geotechnical and metallurgical testwork on the core, which is currently in progress and nearing completion. Stage 2 of the drilling program (Figure 2), focussed on targets south of the Curara Well open pit, commenced in July 2011 and was completed during the quarter. The program comprised 27 RC holes to depths ranging between 100m and 180m, for a total of 4,001m drilled. Significant intersections reported to date are contained in Table 1 below, with Figure 3 showing intersections across the previously unidentified high-grade cross cutting NE1 Quarterly Activities & Cashflow Report June 2011

4 structure. The NE1 structure remains open at depth and along strike, with the thickest intersection to date occurring in the southern most section. Results are pending for +1,300 samples still being assayed. Table 1: Stage 2 - Significant Intersections July 2011 Curara Well RC Drilling Grid Coordinates Hole Data Significant Intersections Hole Number MGA Easting MGA Northing Azimuth (deg) Dip (deg) Total Depth (m) From (m) To (m) Interval (m) Grade Au (g/t) 11CWRC CWRC CWRC CWRC CWRC CW4RC CW4RC CW4RC CW4RC CW4RC CW4RC CW4RC CW4RC CW4RC CW4RC CW4RC CW4RC (i) Results are based on 40g fire assay (ii) Intersections are calculated from RC drilling (iii) Minimum sample interval of 1.0 metre (iv) Mean grades have been calculated on a 0.5g/t lower cut-off grade, with no upper cut-off grade applied, and maximum internal waste of 4.0 metres (v) Collar coordinates are based on GPS survey and downhole survey based up Eastman Multishot (vi) All intersections are downhole intervals Quarterly Activities & Cashflow Report June 2011

5 Figure 2: Stage 2 - Curara Well Southern mN Cross Section High Grade NE1 Cross Cutting Structure Figure 3: Stage 2 - Curara Well Southern mN Cross Section High Grade NE1 Cross Cutting Structure Quarterly Activities & Cashflow Report June 2011

6 Competent Person s Statements Resource Estimate The estimation, depletion and reporting was completed by Lynn Olssen MAusIMM (CP) who is a full-time employee of Snowden Mining Industry Consultants. Lynn Olssen has sufficient experience that is relevant to the style of mineralisation, type of deposit under consideration and to the activity being undertaken to qualify as a Competent Person as defined in the 2004 edition of the Australasian Code for Reporting of Exploration, Results, Mineral Resource and Ore Reserves (JORC, 2004). Lynn Olssen consents to the inclusion in this report of the matters based on the information in the form and context that the information appears. The information including database compilation, geological interpretation and mineralisation wireframing were completed under the overall supervision and direction of Graham Howard, MAusIMM, who is a full time employee of Mount Magnet South NL. Graham Howard has sufficient experience that is relevant to the style of mineralisation, type of deposit under consideration and to the activity being undertaken to qualify as a Competent Person as defined in the 2004 edition of the Australasian Code for Reporting of Exploration, Results, Mineral Resource and Ore Reserves (JORC, 2004). Graham Howard consents to the inclusion in this report of the matters based on the information in the form and context in which it appears. Rounding, conforming to the JORC Code, may cause some computation discrepancies. Competent Person s Statements Exploration Results The information in this report that relates to exploration results is based on information compiled by Graham Howard, MAusIMM, who is a full time employee of Mount Magnet South NL. Graham Howard has sufficient experience that is relevant to the style of mineralisation, type of deposit under consideration and to the activity being undertaken to qualify as a Competent Person as defined in the 2004 edition of the Australasian Code for Reporting of Exploration Results, Mineral Resource and Ore Reserves (JORC, 2004). Graham Howard consents to the inclusion in this report of the matters based on the information in the form and context in which it appears. Quarterly Activities & Cashflow Report June 2011

7 Corporate Activity Entitlements Issue of Shares During the quarter the Company completed a pro-rata entitlements issue of shares to shareholders on a 1 for 5 basis priced at 5.5 cents, raising $2.9m before costs. On closure, the Company issued 45,748,226 shares, which represented an 85% take-up of rights by shareholders. The shortfall of 7,739,860 shares were subsequently applied for and issued to the underwriter to the issue. Placement of Shares During the quarter the Company completed a placement of 28,571,428 shares at an issue price of 7 cents per share, with one free attaching option exercisable at 7 cents for each 2 shares placed. The placement raised a total of $2m before costs. Tenure Project Area Tenements under Area of granted tenements administration (hectares) Mount Magnet 16 3,135 Kirkalocka 10 29,563 Paynes Find 2 3,026 TOTAL 28 41,719 Quarterly Activities & Cashflow Report June 2011

8 Appendix 5B Mining exploration entity quarterly report Name of entity Mount Magnet South NL ABN Quarter ended ( current quarter ) September 2011 Consolidated statement of cash flows Cash flows related to operating activities Current quarter Year to date (3 months) 1.1 Receipts from product sales and related debtors Payments for (a) exploration and evaluation (2,240) (2,240) (b) development - - (c) production - - (d) administration (272) (272) 1.3 Dividends received Interest and other items of a similar nature received Interest and other costs of finance paid Income taxes paid BAS (GST) Refunds Net operating cash flows (2,190) (2,190) Cash flows related to investing activities 1.8 Payment for purchases of: (a) prospects - - (b) equity investments - - (c) other fixed assets (306) (306) 1.9 Proceeds from sale of: (a) prospects - - (b) equity investments - - (c) other fixed assets Loans to other entities Loans repaid by other entities Other - security deposit - - Net investing cash flows (306) (306) 1.13 Total operating and investing cash flows (carried forward) (2,496) (2,496) Quarterly Activities & Cashflow Report October 2011 Page 1 of 5

9 1.13 Total operating and investing cash flows (brought forward) Cash flows related to financing activities (2,496) (2,496) 1.14 Proceeds from issues of shares, options, etc. 4,941 4, Proceeds from sale of forfeited shares Proceeds from borrowings Repayment of borrowings Dividends paid Other - share issue costs (296) (296) Net financing cash flows 4,645 4,645 Net increase (decrease) in cash held 2,149 2, Cash at beginning of quarter/year to date Exchange rate adjustments to item Cash at end of quarter 2,899 2,899 Payments to directors of the entity and associates of the directors Payments to related entities of the entity and associates of the related entities Current quarter 1.23 Aggregate amount of payments to the parties included in item Aggregate amount of loans to the parties included in item Explanation necessary for an understanding of the transactions Item 1.23 Amounts paid to related parties include remuneration, directors fees, consulting fees and reimbursement of expenses to directors. Non-cash financing and investing activities 2.1 Details of financing and investing transactions which have had a material effect on consolidated assets and liabilities but did not involve cash flows Nil 2.2 Details of outlays made by other entities to establish or increase their share in projects in which the reporting entity has an interest Nil Financing facilities available Amount available Amount used 3.1 Loan facilities Credit standby arrangements 0 0 Quarterly Activities & Cashflow Report October 2011 Page 2 of 5

10 Estimated cash outflows for next quarter 4.1 Exploration and evaluation (1,133) 4.2 Development Production Administration (292) Total (1,425) Reconciliation of cash Reconciliation of cash at the end of the quarter (as shown in the consolidated statement of cash flows) to the related items in the accounts is as follows. Current quarter Previous quarter 5.1 Cash on hand and at bank 2, Deposits at call Bank overdraft Other (rehabilitation bonding) - - Total: cash at end of quarter (item 1.22) 2, At 30 September, the Company had $1.485 million held in a bank deposit which is subject to lien and is provided as collateral for a bank guarantee issued to the Department of Mines in relation to environmental rehabilitation provisions concerning the Company s mineral permits. This deposit amount is not included in cash balances at the quarter end for the purposes of this cash flow statement. Changes in interests in mining tenements 6.1 Interests in mining tenements relinquished, reduced or lapsed 6.2 Interests in mining tenements acquired or increased Tenement reference N/A N/A Nature of interest (note (2)) Interest at beginning of quarter Interest at end of quarter Quarterly Activities & Cashflow Report October 2011 Page 3 of 5

11 Issued and quoted securities at end of current quarter Description includes rate of interest and any redemption or conversion rights together with prices and dates. 7.1 Preference + securities (description) 7.2 Changes during quarter (a) Increases through issues (b) Decreases through returns of capital, buy-backs, redemptions Ordinary securities (fully paid) 7.4 Changes during quarter (a) Increases through issues Total number Number quoted Issue price per security (see note 3) (cents) Amount paid up per security (see note 3) (cents) ,928, ,928, , , N/A (non-cash issue) 28,571,428 28,571, ,488,086 53,488, (b) Decreases through returns of capital, buy-backs Convertible debt securities (description) 10m unsecured notes convertible to 10m shares, redeemable by 27/11/2012, 5% coupon rate 7.6 Changes during quarter (a) Increases through issues (b) Decreases through securities matured, converted 7.7 Options & Performance Rights (description and conversion factor) ,000, ,000,000 D&E options Exercise price 10c, 15c & 20c Expiry date 19 May ,000 C Note options - 10c,15c,20c 19 May ,500,000 CIP options - 6c 31 December ,000,000 Options - 9c 31 October ,499,998 Performance Rights - - See table below Quarterly Activities & Cashflow Report October 2011 Page 4 of 5

12 7.7 Options & Performance Rights (description and conversion factor) 14,285,714 Placement Options - 7c 31 August Issued during the quarter 14,285,714-7c 31 August Exercised during quarter Expired during quarter Debentures (totals only) Unsecured notes (totals only) - - Each Performance Right can convert to one ordinary share upon satisfaction of specified performance conditions. No. Performance Rights Expiry Date 5,999, November ,000, May ,500, June ,000, ,000 on 31 March 2012, 500,000 on 30 June 2012, 500,000 on 31 December 2012 and 500,000 on 31 December Compliance statement 1 This statement has been prepared under accounting policies which comply with accounting standards as defined in the Corporations Act or other standards acceptable to ASX (see note 4). 2 This statement does give a true and fair view of the matters disclosed. Sign here: (Company Secretary) Date: 31 October 2011 Print name: Susmit Shah Notes 1 The quarterly report provides a basis for informing the market how the entity s activities have been financed for the past quarter and the effect on its cash position. An entity wanting to disclose additional information is encouraged to do so, in a note or notes attached to this report. 2 The Nature of interest (items 6.1 and 6.2) includes options in respect of interests in mining tenements acquired, exercised or lapsed during the reporting period. If the entity is involved in a joint venture agreement and there are conditions precedent which will change its percentage interest in a mining tenement, it should disclose the change of percentage interest and conditions precedent in the list required for items 6.1 and Issued and quoted securities The issue price and amount paid up is not required in items 7.1 and 7.3 for fully paid securities. 4 The definitions in, and provisions of, AASB 1022: Accounting for Extractive Industries and AASB 1026: Statement of Cash Flows apply to this report. 5 Accounting Standards ASX will accept, for example, the use of International Accounting Standards for foreign entities. If the standards used do not address a topic, the Australian standard on that topic (if any) must be complied with. Quarterly Activities & Cashflow Report October 2011 Page 5 of 5

Appendix 5B. Mining exploration entity quarterly report

Appendix 5B. Mining exploration entity quarterly report Introduced 1/7/96. Origin: Appendix 8. Amended 1/7/97, 1/7/98, 30/9/2001, 1/6/10, 17/12/10 Rule 5.3 SOUTHERN CROSS EXPLORATION N.L. QUARTER ENDED ("Current Quarter") : 31st MARCH 2016 Consolidated Statement

More information

Appendix 5B. Mining exploration entity quarterly report

Appendix 5B. Mining exploration entity quarterly report Introduced 1/7/96. Origin: Appendix 8. Amended 1/7/97, 1/7/98, 30/9/2001, 1/6/10, 17/12/10 Rule 5.3 SOUTHERN CROSS EXPLORATION N.L. QUARTER ENDED ("Current Quarter") : 30th September 2015 Consolidated

More information

Argent Minerals Limited

Argent Minerals Limited ASX ANNOUNCEMENT 28 January 2010 QUARTERLY ACTIVITIES REPORT FOR QUARTER ENDED 31 st DECEMBER 2009 HIGHLIGHTS Kempfield Scoping Study The Scoping Study into the Kempfield silver project is expected to

More information

Mining exploration entity quarterly report

Mining exploration entity quarterly report Appendix 5B Mining exploration entity quarterly report Introduced 01/07/96 Origin Appendix 8 Amended 01/07/97, 01/07/98, 30/09/01, 01/06/10, 17/12/10 Name of entity Predictive Discovery Ltd ABN 11 127

More information

Appendix 5B. Mining exploration entity and oil and gas exploration entity quarterly report

Appendix 5B. Mining exploration entity and oil and gas exploration entity quarterly report Mining exploration entity and oil and gas exploration entity ly report Appendix 5B Rule 5.5 Mining exploration entity and oil and gas exploration entity ly report Introduced 01/07/96 Origin Appendix 8

More information

For personal use only

For personal use only Mining exploration entity ly report Rule 5.3 Mining exploration entity ly report Introduced 01/07/96 Origin Appendix 8 Amended 01/07/97, 01/07/98, 30/09/01, 01/06/10, 17/12/10 Name of entity Australian

More information

Consolidated Tin Mines Limited

Consolidated Tin Mines Limited Snapshot: Registered Office: 395 Lake Street, Cairns North, QLD, 4870 Ph: (07) 4032 3319 Current CSD Share Price: $0.08 Current LME Tin Price: $28,775 Detailed information at www.csdtin.com.au JUNE QUARTER

More information

Appendix 5B. Mining exploration entity quarterly report. Quarter ended ( current quarter ) December 2011

Appendix 5B. Mining exploration entity quarterly report. Quarter ended ( current quarter ) December 2011 Mining exploration entity ly report Appendix 5B Rule 5.3 Mining exploration entity ly report Introduced 1/7/96. Origin: Appendix 8. Amended 1/7/97, 1/7/98, 30/9/2001. Name of entity BERKELEY RESOURCES

More information

Appendix 5B. Quarter ended ( current quarter ) June 2011

Appendix 5B. Quarter ended ( current quarter ) June 2011 Mining exploration entity ly report Appendix 5B Rule 5.3 Mining exploration entity ly report Introduced 1/7/96. Origin: Appendix 8. Amended 1/7/97, 1/7/98, 30/9/2001, 01/06/10. Name of entity AusNiCo Limited

More information

Mining exploration entity quarterly report. Quarter ended ( current quarter ) December 2012

Mining exploration entity quarterly report. Quarter ended ( current quarter ) December 2012 Appendix 5B Rule 5.3 Introduced 01/07/96 Origin Appendix 8 Amended 01/07/97, 01/07/98, 30/09/01, 01/06/10, 17/12/10 Name of entity ASCOT RESOURCES LIMITED ABN Quarter ended ( current ) 85 146 530 378 31

More information

Appendix 5B. Quarter ended ( current quarter ) September Receipts from product sales and related debtors - -

Appendix 5B. Quarter ended ( current quarter ) September Receipts from product sales and related debtors - - Mining exploration entity ly report Appendix 5B Rule 5.3 Mining exploration entity ly report Introduced 1/7/96. Origin: Appendix 8. Amended 1/7/97, 1/7/98, 30/9/2001, 01/06/10. Name of entity REGALPOINT

More information

Appendix 5B. Quarter ended ( current quarter ) December Receipts from product sales and related debtors - -

Appendix 5B. Quarter ended ( current quarter ) December Receipts from product sales and related debtors - - Mining exploration entity ly report Appendix 5B Rule 5.3 Mining exploration entity ly report Introduced 1/7/96. Origin: Appendix 8. Amended 1/7/97, 1/7/98, 30/9/2001, 01/06/10, 17/12/10. Name of entity

More information

Appendix 5B. Brazilian Metals Group Limited. Quarter ended ( current quarter ) March 2011

Appendix 5B. Brazilian Metals Group Limited. Quarter ended ( current quarter ) March 2011 Mining exploration entity ly report Appendix 5B Rule 5.3 Mining exploration entity ly report Introduced 1/7/96. Origin: Appendix 8. Amended 1/7/97, 1/7/98, 30/9/2001, 01/06/10. Name of entity Brazilian

More information

Mining exploration entity quarterly report. Quarter ended ( current quarter ) March 2013

Mining exploration entity quarterly report. Quarter ended ( current quarter ) March 2013 Appendix 5B Rule 5.3 Introduced 01/07/96 Origin Appendix 8 Amended 01/07/97, 01/07/98, 30/09/01, 01/06/10, 17/12/10 Name of entity ASCOT RESOURCES LIMITED ABN Quarter ended ( current ) 85 146 530 378 31

More information

Axiom Mining Limited. Cash Flow Report Appendix 5B. For the Quarter Ended 30 June 2010

Axiom Mining Limited. Cash Flow Report Appendix 5B. For the Quarter Ended 30 June 2010 Axiom Mining Limited Cash Flow Report Appendix 5B For the Quarter Ended 30 June 2010 Axiom Mining Limited ( Axiom ASX:AVQ) hereby releases it s Appendix 5B in accordance with the ASX Listing Rules. This

More information

Appendix 5B. Mining exploration entity and oil and gas exploration entity

Appendix 5B. Mining exploration entity and oil and gas exploration entity Mining exploration entity and oil and gas exploration entity ly report Appendix 5B Rule 5.5 Mining exploration entity and oil and gas exploration entity ly report Introduced 01/07/96 Origin Appendix 8

More information

For personal use only

For personal use only Newfield Resources Limited 79 Broadway Nedlands WA 6009 Telephone: +61 8 6389 2688 Facsimile: +61 8 6389 2588 Email: info@newfieldresources.com.au Website: www.newfieldresources.com.au Quarterly Report

More information

For personal use only

For personal use only Quarterly Report & Appendix 5B Exalt Resources Ltd 31 December 2014 Exploration General The Company has continued to explore opportunities for the quarter ended 31 December 2014. In particular, the Company

More information

Mining exploration entity and oil and gas exploration entity quarterly report

Mining exploration entity and oil and gas exploration entity quarterly report Rule 5.5 Appendix 5B Mining exploration entity and oil and gas exploration entity quarterly report Introduced 1/7/96. Origin: Appendix 8. Amended 1/7/97, 1/7/98, 30/9/2001, 01/06/10, 17/12/10, 01/05/2013

More information

For personal use only

For personal use only Mining exploration entity and oil and gas exploration entity ly report Rule 5.5 Mining exploration entity and oil and gas exploration entity ly report Introduced 01/07/96 Origin Appendix 8 Amended 01/07/97,

More information

Appendix 5B Mining exploration entity and oil and gas exploration entity quarterly report. Appendix 5B

Appendix 5B Mining exploration entity and oil and gas exploration entity quarterly report. Appendix 5B Mining exploration entity and oil and gas exploration entity ly report Appendix 5B Rule 5.5 Mining exploration entity and oil and gas exploration entity ly report Introduced 01/07/96 Origin Appendix 8

More information

Mining exploration entity and oil and gas exploration entity quarterly report

Mining exploration entity and oil and gas exploration entity quarterly report Rule 5.5 Appendix 5B Mining exploration entity and oil and gas exploration entity ly report Introduced 01/07/96 Origin Appendix 8 Amended 01/07/97, 01/07/98, 30/09/01, 01/06/10, 17/12/10, 01/05/2013 Name

More information

For personal use only

For personal use only QUARTERLY REPORT for the three months ending 31 March 2011 HIGHLIGHTS SIHAYO PUNGKUT GOLD PROJECT, INDONESIA (75%) As a result of infill and resource extenstion drilling at the Sihayo resource a new JORC

More information

Appendix 5B. Mindax Limited. Quarter ended ( current quarter ) June 2012

Appendix 5B. Mindax Limited. Quarter ended ( current quarter ) June 2012 Mining exploration entity ly report Appendix 5B Rule 5.3 Mining exploration entity ly report Introduced 1/7/96. Origin: Appendix 8. Amended 1/7/97, 1/7/98, 30/9/2001, 01/06/10. Name of entity Mindax Limited

More information

QUARTERLY ACTIVITIES REPORT FOR PERIOD ENDED 31 DECEMBER 2016

QUARTERLY ACTIVITIES REPORT FOR PERIOD ENDED 31 DECEMBER 2016 31 January 2017 ASX RELEASE ASX:AWV QUARTERLY ACTIVITIES REPORT FOR PERIOD ENDED 31 DECEMBER 2016 HIGHLIGHTS Exploration and geotechnical drilling program completed at Big Springs. High grade zones intersected

More information

Scoping study (assuming toll milling) estimates $A24M (US$17M) operating surplus

Scoping study (assuming toll milling) estimates $A24M (US$17M) operating surplus 30 th April 2009 March December 2009 Quarterly Quarterly Report Report 2008 Highlights Akoko Project 76,000 ounce Indicated and Inferred Mineral Resource estimated for Akoko North gold deposit Pit optimisation

More information

Appendix 5B. Introduced 01/07/96 Origin Appendix 8 Amended 01/07/97, 01/07/98, 30/09/01, 01/06/10, 17/12/10 COALBANK LIMITED

Appendix 5B. Introduced 01/07/96 Origin Appendix 8 Amended 01/07/97, 01/07/98, 30/09/01, 01/06/10, 17/12/10 COALBANK LIMITED Appendix 5B Rule 5.3 Introduced 01/07/96 Origin Appendix 8 Amended 01/07/97, 01/07/98, 30/09/01, 01/06/10, 17/12/10 Name of entity COALBANK LIMITED ABN Quarter ended ( current ) 20 075 877 075 31 December

More information

Appendix 5B. Mining exploration entity quarterly report. Quarter ended ( current quarter ) March 2009

Appendix 5B. Mining exploration entity quarterly report. Quarter ended ( current quarter ) March 2009 Mining exploration entity ly report Appendix 5B Rule 5.3 Mining exploration entity ly report Introduced 1/7/96. Origin: Appendix 8. Amended 1/7/97, 1/7/98, 30/9/2001. Name of entity Axiom Mining Ltd ARBN

More information

Quarterly activities report For Qtr ended 30 June 2013 OPERATIONS

Quarterly activities report For Qtr ended 30 June 2013 OPERATIONS Quarterly activities report For Qtr ended 30 June 2013 ASX:AWV Anova Metals Limited ABN 20 147 678 779 OPERATIONS 26 July 2013 Directors Jon Parker Chairman & NED Tim Dobson Managing Director Bill Fry

More information

For personal use only

For personal use only Suite 1502, Tower B, 799 Pacific Highway, Chatswood NSW 2067 Tel. (02) 9411 6033 Fax (02) 9411 6066 www.malachite.com.au Mining exploration entity quarterly report Introduced 1/7/96. Origin: Appendix 8.

More information

For personal use only

For personal use only Mining exploration entity and oil and gas exploration entity ly report Rule 5.5 Mining exploration entity and oil and gas exploration entity ly report Introduced 01/07/96 Origin Appendix 8 Amended 01/07/97,

More information

Appendix 5B. Mining exploration entity and oil and gas exploration entity quarterly report

Appendix 5B. Mining exploration entity and oil and gas exploration entity quarterly report Rule 5.5 Mining exploration entity and oil and gas exploration entity ly report Introduced 01/07/96 Origin Appendix 8 Amended 01/07/97, 01/07/98, 30/09/01, 01/06/10, 17/12/10, 01/05/2013 Name of entity

More information

ASX RELEASE 28 February, Half Year Ended 31 December 2006

ASX RELEASE 28 February, Half Year Ended 31 December 2006 Half Year Ended ember This document provides a review of the financial results and operations of Equigold NL for the half year ended ember. Highlights Profit before tax and hedge accounting adjustments

More information

Appendix 5B. Mining exploration entity quarterly report. Quarter ended ( current quarter ) June 2014

Appendix 5B. Mining exploration entity quarterly report. Quarter ended ( current quarter ) June 2014 Rule 5.3 Introduced 1/7/96. Origin: Appendix 8. Amended 1/7/97, 1/7/98, 30/9/2001. Name of entity NIUMINCO GROUP LIMITED ABN 44 009 163 919 30 June 2014 Quarter ended ( current ) Consolidated statement

More information

For personal use only

For personal use only Rule 5.3 Introduced 01/07/96 Origin Appendix 8 Amended 01/07/97, 01/07/98, 30/09/01, 01/06/10, 17/12/10 Name of entity International Coal Limited ABN Quarter ended ( current ) 65 149 197 651 31 March 2015

More information

For personal use only

For personal use only Rule 5.5 Mining exploration entity and oil and gas exploration entity quarterly report Introduced 01/07/96 Origin Appendix 8 Amended 01/07/97, 01/07/98, 30/09/01, 01/06/10, 17/12/10, 01/05/2013 Name of

More information

Emerging Producer in the. Murchison Goldfields

Emerging Producer in the. Murchison Goldfields Emerging Producer in the Kirkalocka Gold Project Update April 2012 Murchison Goldfields ASX:MUM Release of Feasibility Study Released April 2, 2012 Demonstrates the recommissioning of Kirkalocka is economic

More information

Appendix 5B. Mining exploration entity and oil and gas exploration entity

Appendix 5B. Mining exploration entity and oil and gas exploration entity Mining exploration entity and oil and gas exploration entity ly report Appendix 5B Rule 5.5 Mining exploration entity and oil and gas exploration entity ly report Introduced 01/07/96 Origin Appendix 8

More information

For personal use only

For personal use only Quarterly Activities Report - period ending April 2012 Havilah Resources (ASX: HAV) Havilah Resources NL aims to become a significant new producer of copper, gold, cobalt and molybdenum from its 100% owned

More information

For personal use only

For personal use only 31 January 2011 ASX Code: KAS DECEMBER QUARTERLY REPORT BOARD & MANAGEMENT Mike Spratt Non Executive Chairman Rod Marston Non Executive Director Rob Weinberg Non Executive Director Wayne Bramwell Managing

More information

QUARTERLY ACTIVITIES REPORT TO 30 SEPTEMBER 2009 HIGHLIGHTS

QUARTERLY ACTIVITIES REPORT TO 30 SEPTEMBER 2009 HIGHLIGHTS 45 Ventnor Avenue, West Perth WA 6005 PO Box 829, West Perth WA 6872 (08) 9389 4450 Fax: (08) 9389 4400 0418 928 180 wayne@eagleeyemetals.com ABN 11 113 931 105 30 October 2009 The Company Announcements

More information

HIGHLIGHTS. Total gold production for the quarter of 69,878 ounces at a cash cost of production A$701 per ounce prior to royalties.

HIGHLIGHTS. Total gold production for the quarter of 69,878 ounces at a cash cost of production A$701 per ounce prior to royalties. GOLD PRODUCTION HIGHLIGHTS Total gold production for the quarter of 69,878 ounces at a cash cost of production A$701 per ounce prior to royalties. MOOLART WELL OPERATIONS Gold production of 25,403 ounces

More information

For personal use only

For personal use only Rule 5.5 Mining exploration entity and oil and gas exploration entity ly report Introduced 01/07/96 Origin Appendix 8 Amended 01/07/97, 01/07/98, 30/09/01, 01/06/10, 17/12/10, 01/05/2013 Name of entity

More information

Mineral Hill Mine, NSW

Mineral Hill Mine, NSW HIGHLIGHTS Mineral Hill Mine, NSW PRODUCTION: September 213 was recorded as the best gold production month for KBL since the commencement of operations with 789 ounces of gold in copper concentrate produced,

More information

Quarterly Activities Report

Quarterly Activities Report ASX: CYL Quarterly Activities Report Quarter ended 30 June 2012 SUMMARY High grade gold intersected in aircore drilling programme at Four Eagles Gold Project. Very high grade gold mineralisation in diamond

More information

WOOLGAR GOLD PROJECT QUEENSLAND

WOOLGAR GOLD PROJECT QUEENSLAND ACN 008 901 380 ABN 35 008 901 380 Level 1 460 Roberts Road Subiaco, Western Australia 6008 29th OCTOBER 2007 ANNOUNCEMENTS AUSTRALIAN STOCK EXCHANGE ASX ONLINE SYDNEY NSW P.O. Box 66 Floreat Forum WA

More information

Haoma Mining NL A.B.N

Haoma Mining NL A.B.N Haoma Mining NL A.B.N 12 008 676 177 Registered Office & Head Office: 411 Collins Street, Melbourne, Vic., 3000, GPO Box 2282U, Melbourne, Vic., 3001. Telephone (03) 9629 6888, Facsimile (03) 9629 1250

More information

Appendix 5B. Mining exploration entity quarterly report. Quarter ended ( current quarter ) MARCH 2010

Appendix 5B. Mining exploration entity quarterly report. Quarter ended ( current quarter ) MARCH 2010 Mining exploration entity ly report Appendix 5B (Rule 5.3) Mining exploration entity ly report Introduced 1/7/96. Origin: Appendix 8. Amended 1/7/97, 1/7/98, 30/9/2001. Name of entity PO VALLEY ENERGY

More information

Quarterly Report for the Period Ended 31 December 2013

Quarterly Report for the Period Ended 31 December 2013 ABN 63 124 706 449 Address: Postal: Phone: Fax: Email: Level 1, 95 Canning Highway South Perth, WA 6151, Australia PO Box 6731, East Perth WA 6892, Australia 61 8 9221 6813 61 8 9474 9304 admin@nexmetals.com

More information

For personal use only

For personal use only 29 January 2016 December 2015 Quarterly Report GUNUNG ROSA HIGH GRADE GOLD, SILVER AND BASE METAL PROJECT WEST JAVA PROVINCE, INDONESIA Map 1: The Gunung Rosa IUP is located in Indonesia s West Java Province,

More information

For personal use only

For personal use only 31st March 2013 Quarterly Report March 2012 Forte Energy NL ( Forte Energy or the Company ) (ASX/AIM: FTE) is an emerging international uranium company focused on the exploration and development of a portfolio

More information

For personal use only

For personal use only Mining exploration entity ly report Rule 5.3 Mining exploration entity ly report Introduced 01/07/96 Origin Appendix 8 Amended 01/07/97, 01/07/98, 30/09/01, 01/06/10, 17/12/10 Name of entity EMPIRE RESOURCES

More information

ASX Release ASX Code: RLC

ASX Release ASX Code: RLC Reedy Lagoon Corporation Limited ABN 41 006 639 514 ASX Release ASX Code: RLC 29 January 2016 Quarterly Report for the period ended 31 December 2015 HIGHLIGHTS Cassilis gold project assessment for acquisition

More information

Quarterly Cash Flow Report

Quarterly Cash Flow Report Quarterly Cash Flow Report 30 April 2012 Company Announcements Office Australian Securities Exchange Limited Quarterly Cash Flow Report The Company s Appendix 5B Quarterly Cash Flow Statement for the Quarter

More information

For personal use only

For personal use only (Formerly Fission Energy Ltd) ACN 119 057 457 ASX QUARTERLY REPORT FOR PERIOD ENDED 30 TH JUNE 2013 Mt Thirsty Cobalt Nickel Oxide Project positive results continue Highlights Further metallurgical test

More information

Strengthening of board with the appointment of Dr Allan Trench as a Non-executive Director

Strengthening of board with the appointment of Dr Allan Trench as a Non-executive Director Highlights Corporate Strengthening of board with the appointment of Dr Allan Trench as a Non-executive Director Land Acquisition Substantial increase to Productora uranium-copper-gold project with the

More information

For personal use only

For personal use only FOR THE PERIOD ENDED 31/12/11 ASX Code: Issued Shares: Market Capitalisation: AAL 250m $3.5m Cash: $16,000 Review of Operations Coal Concession The outcome of the Judicial Review adjudicated by the Administrative

More information

June 2016 Quarterly Activity Report. Makabingui Gold Project Permit Update. Moura Permit Konkoutou Gold Project. Corporate

June 2016 Quarterly Activity Report. Makabingui Gold Project Permit Update. Moura Permit Konkoutou Gold Project. Corporate Bassari Resources Limited is an Australian ASXlisted company focused on discovering and developing multimillion ounce gold deposits in the Birimian Gold Belt, Senegal, West Africa. FAST FACTS ASX Code

More information

June 2012 Quarterly Activity Report. Makabingui Gold Project. Konkouto Gold Prospect. Aeromagnetic/radiometric survey

June 2012 Quarterly Activity Report. Makabingui Gold Project. Konkouto Gold Prospect. Aeromagnetic/radiometric survey Bassari Resources Limited is an Australian listed company focused on discovering multimillion ounce gold deposits in the Birimian Gold Belt, Senegal, West Africa. FAST FACTS ASX Code BSR Issued Capital

More information

For personal use only

For personal use only 25 July 2013 ASX Code: BAB, AIM Code: BGL QUARTERLY ACTIVITY REPORT FOR THE THREE MONTHS ENDED 30 JUNE 2013 Highlights Exploration and Resource Development Resources upgraded at the Gryphon and Edwards

More information

REPORT ON ACTIVITIES FOR THE QUARTER ENDED 30 JUNE 2007

REPORT ON ACTIVITIES FOR THE QUARTER ENDED 30 JUNE 2007 REPORT ON ACTIVITIES FOR THE QUARTER ENDED 30 JUNE 2007 As we continue to build the Company, the Directors of Tri Origin Minerals Ltd (TRO) are pleased to announce the following achievements during the

More information

For personal use only

For personal use only ACN 072 692 365 Report for September Quarter 26 October 2016 ASX Code: HEG, HEGOA CORPORATE A subscription agreement was signed with Bao Industry Pty Ltd (01.08.2016) for a number of placements to raise

More information

For personal use only

For personal use only Rule 5.3 Introduced 1/7/96. Origin: Appendix 8. Amended 1/7/97, 1/7/98, 30/9/2001, 01/06/10. Name of entity HARANGA RESOURCES LIMITED ABN Quarter ended ( current ) 83 141 128 841 31 December 2010 Consolidated

More information

For personal use only

For personal use only 30 July 2018 Quarterly Report for the period ending 30 June 2018 ASX: AVZ HIGHLIGHTS Manono Lithium Project, DRC JORC compliant Mineral Resource Estimate to be completed by end of July 2018 AVZ commences

More information

Quarterly Activities Report - For Quarter Ended 30 September 2013

Quarterly Activities Report - For Quarter Ended 30 September 2013 Quarterly Activities Report For Quarter Ended 30 September 2013 HIGHLIGHTS AND ACHIEVEMENTS Company Announcements Office Australian Securities Exchange 31 October 2013 Mt Kare Gold/Silver Project PNG ASX:IDC

More information

Appendix 5B. Mining exploration entity quarterly report. Quarter ended ( current quarter ) JUNE 2013

Appendix 5B. Mining exploration entity quarterly report. Quarter ended ( current quarter ) JUNE 2013 Introduced 1/7/96. Origin: Appendix 8. Amended 1/7/97, 1/7/98, 30/9/2001, 01/06/10, 17/12/10. Name of entity SUN RESOURCES NL ABN Quarter ended ( current ) 69 009 196 810 30 JUNE 2013 Consolidated statement

More information

June 2016 Quarterly Report

June 2016 Quarterly Report 29 July 2016 June 2016 Quarterly Report GUNUNG ROSA HIGH GRADE GOLD, SILVER AND BASE METAL PROJECT WEST JAVA PROVINCE, INDONESIA Map 1: The Gunung Rosa IUP is located in Indonesia s West Java Province,

More information

For personal use only

For personal use only Mining exploration entity and oil and gas exploration entity ly report Rule 5.5 Mining exploration entity and oil and gas exploration entity ly report Introduced 01/07/96 Origin Appendix 8 Amended 01/07/97,

More information

Detailed mining study on Malcolm Challenger Project in progress

Detailed mining study on Malcolm Challenger Project in progress QUARTERLY REPORT December 2016 Highlights Devon Gold Mine Low grade ore stock piles processed Rehabilitation work near complete Total profit from operation - $5.94M NiWest Nickel - Cobalt Laterite Project

More information

Appendix 5B. Mining exploration entity quarterly report GINDALBIE METALS LTD. Quarter ended ( current quarter ) SEPTEMBER 2007

Appendix 5B. Mining exploration entity quarterly report GINDALBIE METALS LTD. Quarter ended ( current quarter ) SEPTEMBER 2007 Rule 5.3 Introduced 1/7/96. Origin: Appendix 8. Amended 1/7/97, 1/7/98, 30/9/2001. Name of entity GINDALBIE METALS LTD ABN Quarter ended ( current ) 24 060 857 614 30 SEPTEMBER 2007 Consolidated statement

More information

Appendix 5B. Mining exploration entity quarterly report. Consolidated statement of cash flows. Current quarter $A 000

Appendix 5B. Mining exploration entity quarterly report. Consolidated statement of cash flows. Current quarter $A 000 Appendix 5B Rule 5.3 Introduced 01/07/96 Origin Appendix 8 Amended 01/07/97, 01/07/98, 30/09/01, 01/06/10, 17/12/10 Name of entity ATTILA RESOURCES LIMITED ABN Quarter ended ( current ) 53 142 165 080

More information

Appendix 5B. Mining exploration entity quarterly report. Year to date (3 months) $A 1.1 Receipts from product sales and related debtors 81,371 81,371

Appendix 5B. Mining exploration entity quarterly report. Year to date (3 months) $A 1.1 Receipts from product sales and related debtors 81,371 81,371 Rule 5.3 Introduced 1/7/96. Origin: Appendix 8. Amended 1/7/97, 1/7/98, 30/9/2001. Name of entity CHALICE GOLD MINES LIMITED ABN Quarter ended ( current ) 47 116 648 956 30 SEPTEMBER 2008 Consolidated

More information

QUARTERLY ACTIVITIES REPORT For the Quarter ended 31 March 2012

QUARTERLY ACTIVITIES REPORT For the Quarter ended 31 March 2012 QUARTERLY ACTIVITIES REPORT For the Quarter ended 31 March 2012 Liontown Resources Limited ABN 39 118 153 825 HIGHLIGHTS Jubilee Reef Joint Venture Project (Northern Tanzania) 7,000 metre drilling program

More information

For personal use only

For personal use only ASX: CYL Quarterly Activities Report Quarter ended 31 March 2015 SUMMARY Catalyst secures up to $4.2 million private funding for Four Eagles Gold Project Four Eagles Gold Project tenement EL4525 renewed

More information

Kingsgate Consolidated NL ACN

Kingsgate Consolidated NL ACN Kingsgate Consolidated NL ACN 000 837 472 Level 17, 33 Bligh Street, Sydney NSW Australia 2000 Email: info@kingsgate.com.au 31 January, 2002 The Manager Announcements Company Announcements Office FOR PUBLIC

More information

For personal use only

For personal use only QUARTERLY ACTIVITIES REPORT For the Quarter to 30 September 2015 CORPORATE BMG strategic priority to identify and secure new investment opportunities Completed assessment of the potential acquisition of

More information

Quarterly Activities Report

Quarterly Activities Report ASX: CYL Quarterly Activities Report Quarter ended 30 September 2013 SUMMARY Data review confirms shallow gold potential beneath Hayanmi and Boyd s Dam Prospects at Four Eagles Gold Project 2014 drilling

More information

For personal use only

For personal use only ASX QUARTERLY REPORT MARCH 216 Quarterly Report March 216 Highlights 29 April 216 Maiden JORC resource of 131.1Mt @7.9% TGC at the Mahenge Project including 37.6Mt @1.2% TGC or 16.7Mt@ 11.1% TGC Largest

More information

For personal use only

For personal use only Rule 5.5 Mining exploration entity and oil and gas exploration entity ly report Introduced 01/07/96 Origin Appendix 8 Amended 01/07/97, 01/07/98, 30/09/01, 01/06/10, 17/12/10, 01/05/2013 Name of entity

More information

RE: QUARTERLY ACTIVITIES REPORT FOR THE QUARTER ENDED 30 SEPTEMBER

RE: QUARTERLY ACTIVITIES REPORT FOR THE QUARTER ENDED 30 SEPTEMBER Activities Report Quarter Ended 30 September 2010 21 October 2010 Company Announcements Office ASX Limited RE: QUARTERLY ACTIVITIES REPORT FOR THE QUARTER ENDED 30 SEPTEMBER 2010 As part of its expansion

More information

Quarterly Activities Report

Quarterly Activities Report ASX: CYL Quarterly Activities Report Quarter ended 31 December 2015 SUMMARY January 2016 drilling and gravity geophysical programme finalised for Four Eagles Joint Venture Up to 24,000 metres of Aircore

More information

Quarterly Activities Report For the three months ending 30 September 2013 HIGHLIGHTS

Quarterly Activities Report For the three months ending 30 September 2013 HIGHLIGHTS Aeon Metals Ltd (formerly Aussie Q Resources Limited) ABN 91 121 964 725 Level 3, Suite 11, 88 Pitt St, Sydney NSW 2000, Australia PO Box 8155, Gold Coast MC Qld 9726, Australia P: 61 7 5574 3830 F: 61

More information

Bankable feasibility study on the Coburn project continued broadly on schedule with completion due in late March 2004.

Bankable feasibility study on the Coburn project continued broadly on schedule with completion due in late March 2004. QUARTERLY REPORT TO END OF DECEMBER 2003 GUNSON RESOURCES LIMITED QUARTERLY REPORT FOR THE PERIOD ENDED 31 st DECEMBER 2003 HIGHLIGHTS A significant increase in the Amy Zone resource at the Coburn heavy

More information

For personal use only

For personal use only Formerly OGI Group Ltd QUARTERLY ACTIVITIES REPORT FOR PERIOD ENDING 31 DECEMBER 2014 HIGHLIGHTS The Board of Directors of Mustang Resources Ltd (ASX:OGI) ( Mustang or the Company ) is pleased to provide

More information

QUARTERLY REPORT. 30 September 2004 Highlights

QUARTERLY REPORT. 30 September 2004 Highlights QUARTERLY REPORT 30 September 2004 Highlights AUSTRALIA TELFER, WESTERN AUSTRALIA GOLD EXPLORATION, Deep diamond drilling currently being conducted by Barrick Gold of Australia Limited MOUNT ELVIRE, WESTERN

More information

For personal use only

For personal use only 29 July 2016 QUARTERLY REPORT For the Period Ending 30 June 2016 Redstone Resources Limited (ASX Code: RDS) ( Redstone or the Company ) presents its quarterly report for the period ending 30 June 2016

More information

Activities Report for the Quarter Ending 30 September Highlights

Activities Report for the Quarter Ending 30 September Highlights Activities Report for the Quarter Ending 30 September 2007 Highlights Anomalous rock chip results confirm the presence of a potential new copper-gold mineralized zone paralleling the interpreted Tanami

More information

Appendix 5B. Mining exploration entity and oil and gas exploration entity quarterly report

Appendix 5B. Mining exploration entity and oil and gas exploration entity quarterly report +Rule 5.5 Mining exploration entity and oil and gas exploration entity quarterly report Introduced 01/07/96 Origin Appendix 8 Amended 01/07/97, 01/07/98, 30/09/01, 01/06/10, 17/12/10, 01/05/13, 01/09/16

More information

TRAKA RESOURCES LTD (A.B.N )

TRAKA RESOURCES LTD (A.B.N ) TRAKA RESOURCES LTD (A.B.N. 63 103 323 173) Quarterly Activity Report for the three months ended 30 th June 2008 Suite 2 Ground floor, 43 Ventnor Avenue, West Perth Western Australia 6005 Telephone: (+61)

More information

Quarterly Activities Report For the three months ending 30 June 2013 HIGHLIGHTS

Quarterly Activities Report For the three months ending 30 June 2013 HIGHLIGHTS Aeon Metals Ltd (formerly Aussie Q Resources Limited) ABN 91 121 964 725 Level 3, Suite 11, 88 Pitt St, Sydney NSW 2000, Australia PO Box 8155, Gold Coast MC Qld 9726, Australia P: 61 7 5574 3830 F: 61

More information

For personal use only

For personal use only +Rule 5.5 Mining exploration entity and oil and gas exploration entity quarterly report Introduced 01/07/96 Origin Appendix 8 Amended 01/07/97, 01/07/98, 30/09/01, 01/06/10, 17/12/10, 01/05/13, 01/09/16

More information

31 December 2012 Quarterly Activities Report

31 December 2012 Quarterly Activities Report Alara Resources Limited A.B.N. 27 122 892 719 Level 14, The Forrest Centre 221 St Georges Terrace Perth Western Australia 6000 Telephone +61 8 9214 9787 Facsimile +61 8 9322 1515 Web www.alararesources.com

More information

QUARTERLY REPORT. Third Quarter Activities & Cashflow Report for the period ended 31 March 2004

QUARTERLY REPORT. Third Quarter Activities & Cashflow Report for the period ended 31 March 2004 ASHBURTON MINERALS LTD Suite 3, 2 Richardson Street, West Perth WA 6005 PO Box 517, West Perth WA 6872 Tel: +61 8 9321 6600; Fax: +61 8 9321 6633; www.ashburton-minerals.com.au QUARTERLY REPORT Third Quarter

More information

For personal use only

For personal use only ASX ANNOUNCEMENT ASX: IVG Date: 29 July 2011 Number: 013/290711 JUNE 2011 QUARTERLY REPORT SUMMARY Market Cap A$3.78 m ($0.105 p/s) Issued Capital 36,000,006 First pass and infill soil geochemistry surveys

More information

Consolidated Tin Mines Limited

Consolidated Tin Mines Limited 31 January 2013 DECEMBER 2012 QUARTER ACTIVITIES & CASHFLOW REPORT ASX RELEASE ABN: 57 126 634 606 Phone: +61 (7) 4032 3319 info@csdtin.com.au Snapshot: ASX: CSD Registered Office: 395 Lake Street, Cairns

More information

For personal use only

For personal use only ABN: 31 008 402 391 Level 8, 210 George Street Sydney NSW 2000 GPO Box 225 Sydney NSW 2001 Tel: 61 2 9191 4543 Fax: 61 2 8247 7999 Website: www.gatewaymining.com.au Email: info@gatewaymining.com.au 29

More information

Appendix 5B. Quarter ended ( current quarter ) MARCH 2009

Appendix 5B. Quarter ended ( current quarter ) MARCH 2009 Rule 5.3 Introduced 1/7/96. Origin: Appendix 8. Amended 1/7/97, 1/7/98, 30/9/2001. Name of entity CHALICE GOLD MINES LIMITED ABN Quarter ended ( current quarter ) 47 116 648 956 31 MARCH 2009 Consolidated

More information

FOR THE PERIOD ENDING 31 DECEMBER 2018 CORPORATE EXPLORATION. Cash and Cash Equivalents. As at 31 December 2018, the Company had cash of $28,253,941.

FOR THE PERIOD ENDING 31 DECEMBER 2018 CORPORATE EXPLORATION. Cash and Cash Equivalents. As at 31 December 2018, the Company had cash of $28,253,941. FOR THE PERIOD ENDING 31 DECEMBER 2018 CORPORATE Cash and Cash Equivalents As at 31 December 2018, the Company had cash of $28,253,941. Restructure of Board of Directors and Appointment of Non-Executive

More information

REPORT FOR DECEMBER 2005 QUARTER

REPORT FOR DECEMBER 2005 QUARTER G V M M E T A L S L I M I T E D ABN 98 008 905 388 Level 1, Old Swan Brewery, 173 Mounts Bay Road, Perth WA 6000 Australia Telephone: +61 8 9322 6776 Facsimile: +61 8 9322 6778 Website: www.gvm.com.au

More information

For personal use only

For personal use only Quarterly Report FOR PERIOD ENDING 30 SEPTEMBER 2013 ASX Code: FAS Contact Details Unit 3, 136 Main Street, Osborne Park WA 6017 PO Box 1520 Osborne Park WA 6916 T: 08 9242 5111 F: 08 9242 5677 E: admin@fairstarresources.com