1 Company : ASTRAL SUPREME BERHAD ( ASB or Company ) Subject : Non-Related Party Transactions Description : Letter of award to Astral Supreme Construction Sdn. Bhd. ( ASC ) by Kuasa Lumpadang Sdn. Bhd.( KLSB ) to undertake subcontract works ( Award ) 1. INTRODUCTION The Board of Directors of ASB ( Board ) wishes to announce that its wholly-owned subsidiary, ASC has today received a Letter of Award ( LOA ) from Kuasa Lumpadang Sdn.Bhd.( KLSB ) to undertake subcontract works for a total contract value of approximately RM80.53 million in relation to Program Perumahan Rakyat Project at Ulu Perasan, Kota Belud, Sabah ( Kota Belud Project ). 2. INFORMATION OF KOTA BELUD PROJECT On 3 November 2015, ASC has received a LOA from KLSB to undertake subcontract works for a total contract value of approximately RM80.53 million for Kota Belud Project. ASC will not enter into any definitive contracts or agreements with KLSB as the LOA is comprehensive and legally binding. The details of the Kota Belud Project and salient terms of the LOA are set out below:- Date of LOA 3 November 2015 Design and Building Contractor Main Contractor Owner of the project Nature of sub contract and scope of work Contract sum Contract cost Estimated gross profit ( GP ) margin Status of the project Duration of the contract Expected commencement date and completion date of the project ASC KLSB Jabatan Perumahan Negara To supply material, labour, necessary tools and equipment to carry out design, build and deliver 900 units single storey terrace house and other related works at Ulu Perasan, Kota Belud, Sabah. ASC will undertake the main building works (except for earthwork) which includes structure, architecture and mechanical and electrical works complete with ancillary building, landscaping and infrastructural works. RM80.53 million Estimated RM75.05 million 6.80% Earthwork is in progress and part of the earthwork is completed and ready for the sub-structure works of the main building works. 24 months Commencement date: 4 th Quarter 2015 Expected completion date: 24 months from the commencement 1

2 The salient terms of the LOA are as follows: (i) Subcontract sum The awarded subcontract sum shall be fixed at a lump sum of approximately RM80.53 million. The agreed terms and conditions as stipulated in the main contract of the Kota Belud Project ( Main Contract ) shall be on back-to-back basis. The back-to-back arrangement shall mean that the subcontract between ASC and KLSB shall be based on the agreed terms stipulated in the Main Contract, as follow: (a) (b) (c) The Main Contract is based on firm price tender for the execution for the whole of the construction works for the Kota Belud Project, and no adjustment will be made to the contract sum and rates for any fluctuations, and the contractor will not be reimbursed; The defect liability period ( DLP ) is 24 months from the date of practical completion; and The liquidated and ascertained damages ( LAD ), wherein, if the subcontractor fails to furnish any cause of the delay and is unable to complete the whole subcontract works by the date of completion in accordance to the agreed work program or any extended date of completion thereof, the subcontractor shall pay at a rate of 0.018% of the total contract value per day. The total contract value of approximately RM80.53 million for the Award, comprises the following:- RM( 000) Preliminaries site expenses (1) 4,210 Main building works 47,782 Electrical works 4,536 Mechanical services 4,721 Civil works 16,832 Piling works 1,048 Provisional sum 1,396 Total contract value 80,525 Note: (1) Preliminaries site expenses include, amongst others, the supply of plant and machinery, site management, site storage, scaffolding, site office and equipment, electricity, water, telephone and fax, workers accommodation, clearing and cleaning, survey, shop drawings and as-built drawings, sample submission, mock-up unit, testing and commissioning and site security. (ii) Subcontract and construction period The completion date shall be in accordance with Main Contract of KLSB. The subcontract is for a period of 24 months. (iii) Insurances ASC is required to purchase all the necessary insurances except the coverage of Contractor All Risks and Workman s Compensation which is covered under the Main Contract. (iv) LAD The LAD of the subcontract shall be based on back-to-back basis of the Main Contract terms and conditions contained thereof. If the subcontractor fails to furnish any cause of the delay and is unable to complete the whole subcontract works by the date of completion in accordance to the agreed work program or any extended date of completion thereof, the subcontractor shall pay to KLSB at a rate of 0.018% of the total contract value or approximately RM14,495 per day. 2

3 (v) DLP The DLP of the subcontract shall be based on back-to-back basis of the Main Contract terms and conditions contained thereof. (vi) Withdrawal of subcontract KLSB reserves the right to withdraw the whole or part of the subcontract works should the progress of the work is not satisfactory in accordance to its requirement. 3. INFORMATION OF KLSB KLSB was incorporated in Malaysia on 13 June 2011 under the Companies Act 1965 of Malaysia as a private limited company with an authorised share capital of RM1,000,000 comprising 1,000,000 ordinary shares of RM1.00 each, of which 775,000 ordinary shares have been issued and fully paid-up. KLSB is engaged in the business of general contractor, land and housing developer, interior design and other construction works. It is registered with Kementerian Pembangunan Sumber dan Kemajuan Teknologi Maklumat with bumiputera status and is a registered Grade G7 contractor with Construction Industry Development Board ( CIDB ). The Directors of KLSB are Encik Ahmad Farduain Bin Ismail ( AF ) and Mr Richa Sipaina Jusilie ( RSJ ). The shareholders of KLSB are set out below:- Shareholders No. of KLSB shares held % AF 53, Roney Julius 395, RSJ 326, Total 775, RATIONALE FOR THE AWARD In March 2014, ASC commenced its construction activities by undertaking two (2) subcontract works for a total contract value of RM105.0 million for the Melaka Projects. The Melaka Projects are ASC s maiden projects in its foray into construction sector and are expected to be completed by the 1st quarter of Following thereto, the Award presents an opportunity for the Group to replenish its order book and is expected to provide the Group with additional source of revenue for the next three (3) financial years, considering the near completion of the Melaka Projects. The Award demonstrates the Board s initiative in pursuing continuing growth in its construction business. The Board believes the Award will lead to an expansion of the Group s construction activities in the future and contribute positively to the Group s financial performance. Further, as a relatively new player in the construction sector, the Award provides an opportunity for the Group to enhance their credentials in the construction segment and open up new opportunities in the state of Sabah. The Group intends to source the funding of the Award through internally generated funds. 5. INDUSTRY REVIEW AND PROSPECTS OF THE ASTRAL GROUP 5.1 Overview of the Malaysian economy The Malaysian economy recorded a growth of 4.9% in the second quarter of 2015 (Q1 2015: 5.6%), driven mainly by private sector demand. On the supply side, growth was underpinned by the major economic sectors. On a quarter-on-quarter seasonally-adjusted basis, the economy grew by 1.1% (Q1 2015:1.2%). 3

4 The private sector remained the key driver of growth during the quarter. Private consumption expanded at a more moderate rate of 6.4% (Q1 2015: 8.8%) as households adjust to the implementation of the Goods and Services Tax (GST). Private investment grew more moderately by 3.9% (Q1 2015: 11.7%), due to a decline in spending on machinery and equipment, especially in the transportation segment, and slower investment in dwelling services. Growth in public investment turned negative in the second quarter (-8.0%; Q1 2015: 0.5%), attributed mainly to the near completion of a few projects by public enterprises, which more than offset the positive growth of capital expenditure by the Federal Government. Meanwhile, public consumption recorded a higher growth of 6.8% (Q1 2015: 4.1%) following the stronger expansion in supplies and services expenditure amid sustained growth in emoluments. On the supply side, the major economic sectors registered more moderate growth during the quarter. The construction sector recorded lower growth due to a moderation in real activity in the residential, non-residential and civil engineering sub-sectors. (Source: Economic and Financial Developments in the Malaysian Economy in the Second (2nd) Quarter of 2015, Bank Negara Malaysia) 5.2 Overview of the construction, property investment, and project management services industries in Malaysia The construction sector continues to expand driven by ongoing private investment and Tenth Malaysia Plan (10MP) projects. In addition, the residential subsector is expected to expand with steady demand for affordable houses. Value-added of the construction sector grew at a moderate pace of 7.7% during the first half of 2015 (January June 2014: 14.5%) on slower civil engineering and residential activities. The highest share was contributed by the residential (27.7%) followed by civil engineering (27.1%), non-residential (26.4%) and specialized construction activities (18.8%) subsectors. The total value of construction work completed during the first half of 2015 expanded by 11.6% to RM56.0 billion with 20,056 construction projects registered (January June 2014: 15.7%; RM50.0 billion; 19,649 projects). The private sector continued to dominate construction activities with a share of 67.7% in the first half of Amid the moderate growth outlook, the construction sector is expected to expand by 8.8% in 2015 (2014: 11.8%). The residential subsector expanded moderately by 9.8% (January June 2014: 22.1%) partly due to the decline in new housing approvals which decreased by 32.9% to 66,770 units (January June 2014: 37.3%; 99,461 units), reflecting cautious sentiment among housing developers amid a challenging environment. However, the moderation was cushioned by the steady growth in incoming supply at 13.8% (January June 2014: 10.3%). The take-up rate for residential units increased to 31.4% to 8,542 units in the first half of 2015 (January June 2014: 23.8 %; 11,588 units). (Source: Economic Report 2015/2016, Ministry of Finance) 5.3 Overview of the construction, property investment, and project management services industries in Sabah Sabah property market saw a recovery in the first half of A total of 4,405 transactions worth RM2.37 billion were recorded, up by 1.7% and 9.2% in volume and value respectively against the first half of Residential property spearheaded the overall market activity, dominating 56.8% of the total volume. Prices of residential property were generally stable across the state with movements noted in choice locations served with better infrastructure and social facilities. In the primary market, 917 units were launched. Sale performance was quite encouraging at 47.3%. On the other hand, the residential overhang volume increased. There were 248 units worth 4

5 RM million, up by 10.2% in volume against the first half of However, value of primary market was down by 7.0%. On similar upward trend, the unsold under construction increased to 2,405 units, up by 3.4% while the unsold not constructed units grew more than double to 500 units. The construction sector was promising. Both residential and shops sub-sectors recorded more completions, starts and new planned supply against the first half of The industrial sub-sector was inactive with no completion, starts and new planned supply. In the first quarter of 2015, the non-residential subsector rose by 17.4% (Q4 2014:16.9%) bolstered by the construction of factories, particularly in Sabah and Sarawak as well as the construction of buildings for education. The residential subsector increased by 15.3% (Q4 2014: 15%) mainly due to higher housing construction activities amid favourable economic and business conditions. This indicates an upward trend in the Sabah construction sector for (Source: Property Market Report First Half 2014, Valuation and Property Services Department, Ministry of Finance and Malaysia Economy First Quarter 2015, Ministry of Finance) 5.4 Prospects of the Astral Group The Board takes cognisance that Malaysia s construction sector, based on the total value of construction projects awarded, has registered healthy growth rates historically, having grown from RM60.9 billion in 2006 to RM156.8 billion in 2014 at CAGR of 12.5%. Both residential as well as commercial and industrial construction sectors witnessed high growth between 2006 and 2014, having registered CAGR of 12.5% and 17.9% respectively over the period. Although the residential, commercial and industrial construction sectors are expected to be adversely impacted by an anticipated slower economic growth in Malaysia in the next one (1) to two (2) years, any fall in construction project values awarded is expected to be short-term, and these sectors are anticipated to witness growth in following years as economic conditions improve in the country, based on historical trends. As stated in Section 4 of this announcement, the Award presents an opportunity for the Group to replenish its order book and is expected to provide the Group with additional source of revenue for the next three (3) financial years, considering the near completion of the Melaka Projects. The Kota Belud Project is a property development under Malaysia Government s Program Perumahan Rakyat or People s Housing Program initiative which aims to provide affordable housing for low income group (source: Therefore, the Group is of the view that the Award would provide a platform to further improve its credentials in the construction segment and to venture into the property related activity, in the state of Sabah, eventually enabling the Group to continue to accumulate experiences and credentials in construction industry. After taking into consideration the favourable prospects of the construction industries in Malaysia and Sabah as stated in Sections 5.2 and 5.3 of this announcement and in line with the Group s long term objectives in venturing into the property and construction industry, the Board is of the view that the Award would augur well for the Group s performance. 6. RISK FACTORS The Board of Astral does not foresee any material change to the risk profile of the Group as a result of the Award as ASC has previously commenced its construction activities by undertaking two (2) subcontract works for a total contract value of RM105.0 million for the Melaka Projects. The Melaka Projects are ASC s maiden projects in its foray into construction sector and is expected to be completed by the 1st quarter of Notwithstanding the above, the additional risks specific to the Award, which are by no means exhaustive are set out below:- 5

6 (a) Risk of non-payment by KLSB The Award provides that the progress for the subcontract works would be valued and certified by KLSB, and the disbursement of the payment shall be made by KLSB within two (2) months upon receiving the claim submitted by ASC. Notwithstanding the above, there is no assurance that ASC will receive the payment although the risk of non-payment by KLSB is low given that KLSB s financing for the project is in place and whether such non-payment by KLSB will not have any material adverse effect on our Group s financial performance in the future. To mitigate the risk of such non-payment, the Board will monitor the outstanding amount closely by analysing the monthly aging report and follow-up closely with KLSB. (b) Adequacy of insurance coverage In ASC s business there can be no assurance that all liabilities incurred will be sufficiently covered by insurance and as such, claims for damages arising from ASC s operations which are not adequately covered by ASC s insurance coverage may have an adverse impact on ASC s financial conditions or results of operations. Nevertheless, ASC believes that it has adequate insurance coverage on its assets, employees and construction projects. It is also ASC s practice as well as a condition imposed by the Main Contractor on ASC to commence subcontract works to take up, amongst others, contractors all risk insurance and public liability insurance in ensuring risks of under-coverage are minimised. ASC reviews its insurance policies on a regular basis to ensure that there is adequate coverage on its assets, employees and construction projects. Such policies include contractors all risk insurance, fire insurance, workers insurance and public liability insurance to mitigate any potential losses which may arise due to unforeseen circumstances For information purposes, ASC has not filed any claim for damages against the insurers arising from its operations in the past. (c) Ability of ASC to manage the costs of the Kota Belud Project The profits derived from the Kota Belud Project are dependent on ASC s ability to manage the costs of the project meticulously and deploy its resources efficiently to ensure timely delivery of the subcontract. There can be no assurance that ASC is able to sustain the profitability of the Kota Belud Project given the continuing weakening of RM against USD due to the possible hike of importing construction material. If ASC is unable to maintain the cost of the Kota Belud Project, this may have a material adverse impact on Astral Group s future profitability, financial performance and prospects. 7. EFFECTS OF THE AWARD 7.1 Issued and paid-up share capital and substantial shareholders shareholdings The Award will not have any effect on the issued and paid-up share capital and the substantial shareholders shareholdings of ASB as the Award does not involve any issuance of new shares in ASB. 7.2 Net assets ( NA ) and gearing The Award is not expected to have any material effects on the NA and gearing of the Group for the financial year ended / ending ( FYE ) 31 May For illustrative purposes, the pro forma effects of the Award on the NA and gearing of the Group are as follows:- 6

7 Audited As At FPE 31 May 2015 After the Award (RM 000) (RM 000) Share capital 58,372 58,372 Share premium 6,994 6,994 Capital reserve 5,527 5,527 ICULS Warrants reserve 4,418 4,418 Accumulated losses (59,542) (54,066) (1) Equity attributable to owners of the Company/ 16,100 21,576 NA No. of Shares in issue ( 000) 291, ,859 NA per Share (RM) Total borrowings (RM 000) Gearing (time) Note: (1) The pro forma effects of the Award to the NA and gearing of the Group is depicted herein for illustrative purposes only, assuming that the Kota Belud Project is completed within FYE 31 May 2015 and the expected net profits from the Award of approximately RM5.48 million (being the contract value of approximately RM80.53 million less estimated cost to be incurred of approximately RM75.05 million) have been fully realised as at 31 May Earnings and EPS Barring any unforeseen circumstances, the Award is expected to contribute positively to the earnings and earnings per share of the Group for the next three (3) financial years as the earnings would be realised in stages over the tenure of the subcontract based on the progress of the project. Any profits attributable to the Group would be realised in stages over the tenure of the subcontract based on the progress of the subcontract. 7.4 Convertible securities The Award is not expected to have any effect of the existing Warrants 2011/2016, Warrants 2013/2018 and ICULS of ASB. 8. APPROVAL REQUIRED The Award is not subject to any approvals from the shareholders of the Company and any other relevant authorities and/or parties. In addition, the Award is not conditional upon any other proposals undertaken / to be undertaken by the Company. 9. INTERESTS OF DIRECTORS, MAJOR SHAREHOLDERS AND/OR PERSONS CONNECTED WITH THEM None of the Directors and/or major shareholders of ASB and/or persons connected to them has any interest, either direct or indirect, in the Award. 10. DIRECTORS STATEMENT The Board, having considered all aspects of the Award including the rationale and effects, is of the opinion that the Award is in the best interest of ASB. 7

8 11. DOCUMENTS AVAILABLE FOR INSPECTION A copy of the LOA is available for inspection at the registered office of the Company at No. 2-1, Jalan Hartamas 8, Sri Hartamas, Kuala Lumpur during normal business hours from 9.00 a.m. to 5.00 p.m. from Monday to Friday (excluding public holidays) for the period of three (3) months from the date of this announcement. This announcement is dated 3 November

SASBADI HOLDINGS BERHAD - PROPOSED ACQUISITION OF 100% EQUITY INTEREST IN UNITED PUBLISHING HOUSE (M) SDN BHD

SASBADI HOLDINGS BERHAD - PROPOSED ACQUISITION OF 100% EQUITY INTEREST IN UNITED PUBLISHING HOUSE (M) SDN BHD SASBADI HOLDINGS BERHAD - PROPOSED ACQUISITION OF 100% EQUITY INTEREST IN UNITED PUBLISHING HOUSE (M) SDN BHD 1. INTRODUCTION The Board of Directors of Sasbadi Holdings Berhad ( Sasbadi Holdings or the

More information

Description of H2O Project (i) 3 blocks of 15-storey service apartments with a total of 877 units; 1 June December 2018

Description of H2O Project (i) 3 blocks of 15-storey service apartments with a total of 877 units; 1 June December 2018 M-MODE BERHAD ( M-MODE OR THE COMPANY ) PROPOSED DIVERSIFICATION INTO THE CONSTRUCTION BUSINESS 1. INTRODUCTION On behalf of the Board of Directors of M-Mode ( Board ), TA Securities Holdings Berhad (

More information

Further details of the Proposed Disposal are set out in the ensuing sections.

Further details of the Proposed Disposal are set out in the ensuing sections. WZ SATU BERHAD ( WZ SATU OR THE COMPANY ) PROPOSED DISPOSAL OF THE ENTIRE ISSUED SHARE CAPITAL OF WENG ZHENG TRADING SDN BHD ( WZ TRADING ) TO TAN JING XIN ( PURCHASER ) FOR A CASH CONSIDERATION OF RM22,800,000

More information

PROPOSED JOINT VENTURE BETWEEN CAPILLARY ARGOTECH (M) SDN BHD, A WHOLLY-OWNED SUBSIDIARY OF ICB AND DEMETER FARMS SDN BHD IN PEAK PLATFORM SDN BHD

PROPOSED JOINT VENTURE BETWEEN CAPILLARY ARGOTECH (M) SDN BHD, A WHOLLY-OWNED SUBSIDIARY OF ICB AND DEMETER FARMS SDN BHD IN PEAK PLATFORM SDN BHD PROPOSED JOINT VENTURE BETWEEN CAPILLARY ARGOTECH (M) SDN BHD, A WHOLLY-OWNED SUBSIDIARY OF ICB AND DEMETER FARMS SDN BHD IN PEAK PLATFORM SDN BHD General Announcement Reference No IC-091105-59662 Company

More information

Upon completion of the Proposed Acquisition, CHRE will be a subsidiary company of GHSB.

Upon completion of the Proposed Acquisition, CHRE will be a subsidiary company of GHSB. GUNUNG CAPITAL BERHAD ( GUNUNG OR COMPANY ) PROPOSED ACQUISITION BY 90%-OWNED SUBSIDIARY GUNUNG HYDROPOWER SDN BHD ( GHSB ) OF 1,500,000 ORDINARY SHARES OF RM1.00 EACH IN CONSO HYDRO RE SDN BHD ( CHRE

More information

SPRING GALLERY BERHAD ( SGB OR THE COMPANY ) AND ITS SUBSIDIARIES ( SGB GROUP )

SPRING GALLERY BERHAD ( SGB OR THE COMPANY ) AND ITS SUBSIDIARIES ( SGB GROUP ) SPRING GALLERY BERHAD ( SGB OR THE COMPANY ) AND ITS SUBSIDIARIES ( SGB GROUP ) MANAGING CONTRACTOR AGREEMENT BETWEEN PRINSIP NUSANTARA SDN BHD ( PNSB ) AND PROFIT SUNLAND SDN BHD ( PSSB ), A WHOLLY OWNED

More information

ASTRAL SUPREME BERHAD ( ASTRAL OR THE COMPANY )

ASTRAL SUPREME BERHAD ( ASTRAL OR THE COMPANY ) ASTRAL SUPREME BERHAD ( ASTRAL OR THE COMPANY ) - PROPOSED PAR VALUE REDUCTION; - PROPOSED CAPITAL RESERVE REDUCTION; - PROPOSED SHARE PREMIUM REDUCTION; - PROPOSED DIVERSIFICATION; - PROPOSED RIGHTS ISSUE

More information

CONSTRUCTION OF A NEW INTEGRATED IMMIGRATION, CUSTOM, QUARANTINE AND SECURITY COMPLEX ( ICQS COMPLEX ), BUKIT KAYU HITAM, KEDAH

CONSTRUCTION OF A NEW INTEGRATED IMMIGRATION, CUSTOM, QUARANTINE AND SECURITY COMPLEX ( ICQS COMPLEX ), BUKIT KAYU HITAM, KEDAH 1. INTRODUCTION Further to its Announcement dated 2 February 2012, Zelan Berhad ( ZB ) wishes to announce that: Zelan Construction Sdn Bhd ( ZCSB ), a wholly owned subsidiary of ZB, has on 28 May 2012

More information

the subscription for up to 20,000,000 redeemable preference shares in the SPV ( RPS ) by MNC for a total cash consideration of RM20,000,000.

the subscription for up to 20,000,000 redeemable preference shares in the SPV ( RPS ) by MNC for a total cash consideration of RM20,000,000. M N C WIRELESS BERHAD ( MNC OR COMPANY ) PROPOSED JOINT VENTURE WITH SPNB DANA SDN BHD ( SPNB DANA ), A WHOLLY- OWNED SUBSIDIARY OF SYARIKAT PERUMAHAN NEGARA BERHAD ( SPNB ) TO SET UP A SPECIAL PURPOSE

More information

SGSB is a 99.99%-owned subsidiary of Sunsuria and is principally engaged in investment holding.

SGSB is a 99.99%-owned subsidiary of Sunsuria and is principally engaged in investment holding. SUNSURIA BERHAD ("SUNSURIA" OR THE COMPANY") PROPOSED JOINT VENTURE BETWEEN SUNSURIA CITY SDN. BHD. (FORMERLY KNOWN AS SIME DARBY SUNSURIA DEVELOPMENT SDN. BHD.) ( SCSB ), SUNSURIA GATEWAY SDN. BHD. (

More information

On even date, MPB had further granted an irrevocable and unconditional letter of undertaking to the Sellers to:

On even date, MPB had further granted an irrevocable and unconditional letter of undertaking to the Sellers to: MEDIA PRIMA BERHAD ("MPB" OR THE "COMPANY") PROPOSED ACQUISITION OF 100% EQUITY IN REV ASIA HOLDINGS SDN. BHD. (THE "TARGET COMPANY") BY MEDIA PRIMA DIGITAL SDN. BHD., A WHOLLY-OWNED SUBSIDIARY OF MPB

More information

CASH SUBSCRIPTION PRICE OF USD540 MILLION (OR EQUIVALENT TO APPROXIMATELY RM2,247 MILLION); AND

CASH SUBSCRIPTION PRICE OF USD540 MILLION (OR EQUIVALENT TO APPROXIMATELY RM2,247 MILLION); AND SAPURA ENERGY BERHAD ( SEB OR COMPANY ) PROPOSED STRATEGIC PARTNERSHIP BETWEEN SEB AND OMV AKTIENGESELLSCHAFT ( OMV AG ) THROUGH SEB UPSTREAM SDN BHD ( SUP ), A JOINT VENTURE COMPANY INCORPORATED TO HOLD

More information

SASBADI HOLDINGS BERHAD - PROPOSED ACQUISITION OF 30% EQUITY INTEREST IN SANJUNG UNGGUL SDN BHD

SASBADI HOLDINGS BERHAD - PROPOSED ACQUISITION OF 30% EQUITY INTEREST IN SANJUNG UNGGUL SDN BHD SASBADI HOLDINGS BERHAD - PROPOSED ACQUISITION OF 30% EQUITY INTEREST IN SANJUNG UNGGUL SDN BHD 1. INTRODUCTION The Board of Directors of Sasbadi Holdings Berhad ( Sasbadi Holdings or the Company ) is

More information

JOINT VENTURE AGREEMENT ENTERED INTO BETWEEN E&J BUILDERS SDN BHD, A WHOLLY- OWNED SUBSIDIARY OF M-MODE, AND REXALLENT CONSTRUCTION SDN BHD

JOINT VENTURE AGREEMENT ENTERED INTO BETWEEN E&J BUILDERS SDN BHD, A WHOLLY- OWNED SUBSIDIARY OF M-MODE, AND REXALLENT CONSTRUCTION SDN BHD 1. INTRODUCTION Pursuant to Paragraph 9.03 of Main Market Listing Requirements of Bursa Malaysia Securities Berhad, the Board of Directors of M-MODE wishes to announce that E&J Builders Sdn Bhd ( EJBSB

More information

DISPOSAL BY MTOUCHE OF ITS ENTIRE EQUITY INTEREST IN JUZ TECHNOLOGY SDN OF RM1.00 TO NELSON CHUI CHEE CHUNG AND SHAWN EDGAR LIEW

DISPOSAL BY MTOUCHE OF ITS ENTIRE EQUITY INTEREST IN JUZ TECHNOLOGY SDN OF RM1.00 TO NELSON CHUI CHEE CHUNG AND SHAWN EDGAR LIEW MTOUCHE TECHNOLOGY BERHAD ( MTOUCHE OR THE COMPANY ) (I) (II) DISPOSAL BY MTOUCHE OF ITS ENTIRE EQUITY INTEREST IN MTB SECURENET SDN BHD (A WHOLLY-OWNED SUBSIDIARY OF MTOUCHE) FOR A CASH CONSIDERATION

More information

LION CORPORATION BERHAD ( LCB or the Company )

LION CORPORATION BERHAD ( LCB or the Company ) LION CORPORATION BERHAD ( LCB or the Company ) Proposed disposal by Lion General Trading & Marketing (S) Pte Ltd, a wholly-owned subsidiary of the Company, of its entire 100% equity interest in Lion Plate

More information

REPORT PACIFIC ISLAMIC CASH FUND QUARTERLY. For The Financial Period From 1 January 2018 To 30 June

REPORT PACIFIC ISLAMIC CASH FUND QUARTERLY. For The Financial Period From 1 January 2018 To 30 June REPORT QUARTERLY For The Financial Period From 1 January 2018 To 30 June 2018 PACIFIC ISLAMIC CASH FUND www.pacificmutual.com.my PACIFIC MUTUAL FUND BHD (336059-U) A member of the OCBC Group CONTENTS Fund

More information

(Company No. : D) JOINT VENTURE AGREEMENT ENTERED BETWEEN KOTA EKSPRES SDN BHD AND GREENLAND MALAYSIA URBAN DEVELOPMENT SDN BHD

(Company No. : D) JOINT VENTURE AGREEMENT ENTERED BETWEEN KOTA EKSPRES SDN BHD AND GREENLAND MALAYSIA URBAN DEVELOPMENT SDN BHD 1. INTRODUCTION We refer to our announcement on 11 February 2015 in relation to the Heads of Agreement entered between Kota Ekspres Sdn Bhd ( KESB ) and Greenland Malaysia Urban Development Sdn Bhd ( GREENLAND

More information

MMC CORPORATION BERHAD ( MMC OR COMPANY )

MMC CORPORATION BERHAD ( MMC OR COMPANY ) ( MMC OR COMPANY ) PROPOSED ACQUISITION OF 7,000 ORDINARY SHARES OF RM1.00 EACH REPRESENTING 70.0% ORDINARY EQUITY INTEREST AND 4,990,000 IRREDEEMABLE CONVERTIBLE CUMULATIVE PREFERENCE SHARES OF RM1.00

More information

approval with the requisite vote by a meeting of the shareholders of SYMC for the following:

approval with the requisite vote by a meeting of the shareholders of SYMC for the following: TIME DOTCOM BERHAD ( TIME ) PROPOSED ACQUISITION OF 37% OF THE ISSUED AND PAID-UP ORDINARY SHARES IN SYMPHONY COMMUNICATION PUBLIC COMPANY LIMITED ( SYMC ), A PUBLICLY LISTED COMPANY ON THE STOCK EXCHANGE

More information

ENRA GROUP BERHAD ( ENRA OR THE COMPANY ) [FORMERLY KNOWN AS PERDUREN (M) BERHAD]

ENRA GROUP BERHAD ( ENRA OR THE COMPANY ) [FORMERLY KNOWN AS PERDUREN (M) BERHAD] ENRA GROUP BERHAD ( ENRA OR THE COMPANY ) [FORMERLY KNOWN AS PERDUREN (M) BERHAD] - SHAREHOLDERS AGREEMENT ENTERED BETWEEN THE COMPANY S SUBSIDIARY, ENRA OIL & GAS SDN BHD (FORMERLY KNOWN AS RATUS NUSA

More information

MALAYSIA BUILDING SOCIETY BERHAD (Company No K) EXPLANATORY NOTES FOR FINANCIAL QUARTER ENDED 30 JUNE 2013

MALAYSIA BUILDING SOCIETY BERHAD (Company No K) EXPLANATORY NOTES FOR FINANCIAL QUARTER ENDED 30 JUNE 2013 Page 1 of 15 A1. Basis of Preparation The unaudited interim financial statements for the 2 nd quarter ended 30 June 2013 have been prepared under the historical cost convention except for the following

More information

No. of Sale Shares to be acquired. % of the Vendors

No. of Sale Shares to be acquired. % of the Vendors FOUNDPAC GROUP BERHAD ( FPG OR COMPANY ) - PROPOSED ACQUISITION OF 187,500 ORDINARY SHARES, REPRESENTING 75% EQUITY INTEREST IN DYNAMIC STENCIL SDN BHD FOR A TOTAL CASH CONSIDERATION OF RM16.50 MILLION.

More information

Further details of the Proposed Private Placement are set out in the ensuing sections.

Further details of the Proposed Private Placement are set out in the ensuing sections. SCANWOLF CORPORATION BERHAD ( SCANWOLF OR THE COMPANY ) PROPOSED PRIVATE PLACEMENT OF NEW ORDINARY SHARES IN SCANWOLF, REPRESENTING UP TO 10% OF THE TOTAL NUMBER OF ISSUED SHARES OF SCANWOLF (EXCLUDING

More information

Further details of the Proposed Private Placement are set out in the ensuing sections.

Further details of the Proposed Private Placement are set out in the ensuing sections. JAKS RESOURCES BERHAD ( JRB OR COMPANY ) PROPOSED PRIVATE PLACEMENT OF UP TO 43,836,100 NEW ORDINARY SHARES OF JRB REPRESENTING APPROXIMATELY 10% OF THE EXISTING TOTAL NUMBER OF ISSUED SHARES OF JRB (

More information

the implementation of the Proposed SUR (as defined below); and (collectively referred to as the Proposed Amendment );

the implementation of the Proposed SUR (as defined below); and (collectively referred to as the Proposed Amendment ); BOUSTEAD HOLDINGS BERHAD ( BHB OR COMPANY ) PROPOSED CONVERSION OF AL-HADHARAH BOUSTEAD REIT TO A PRIVATE PROPERTY TRUST BY WAY OF AMENDMENT TO THE TRUST DEED, PROPOSED SELECTIVE UNIT REDEMPTION EXERCISE

More information

(PROPOSED PNB SUBSCRIPTION AND PROPOSED FUNDS SUBSCRIPTION COLLECTIVELY REFERRED TO AS PROPOSED SUBSCRIPTION );

(PROPOSED PNB SUBSCRIPTION AND PROPOSED FUNDS SUBSCRIPTION COLLECTIVELY REFERRED TO AS PROPOSED SUBSCRIPTION ); UMW OIL & GAS CORPORATION BERHAD ( UMW-OG OR COMPANY ) (I) PROPOSED RENOUNCEABLE RIGHTS ISSUE OF UP TO 6,053,600,000 NEW ORDINARY SHARES IN UMW-OG ( RIGHTS SHARES ) AT AN ISSUE PRICE OF RM0.30 PER RIGHTS

More information

ETMSSB 2,730,000 70% 2,730, UEM Sunrise 1,170,000 30% 1,170, Total 3,900, % 3,900, No. Items Details

ETMSSB 2,730,000 70% 2,730, UEM Sunrise 1,170,000 30% 1,170, Total 3,900, % 3,900, No. Items Details UEM SUNRISE BERHAD ( UEM SUNRISE OR COMPANY ) PROPOSED JOINT VENTURE BETWEEN UEM SUNRISE AND EDGENTA TOWNSHIP MANAGEMENT SERVICES SDN BHD ( ETMSSB ), A WHOLLY-OWNED SUBSIDIARY OF UEM EDGENTA BERHAD (FORMERLY

More information

2.1 INFORMATION ON MINETECH QUARRIES SABAH SDN BHD

2.1 INFORMATION ON MINETECH QUARRIES SABAH SDN BHD ANNOUNCEMENT MINETECH RESOURCES BERHAD ( MRB or THE COMPANY ) PROPOSED JOINT VENTURE BETWEEN MINETECH QUARRIES SABAH SDN BHD AND LALUAN BINA SDN BHD TO FORM A JOINT VENTURE COMPANY ( PROPOSED JV ) 1. INTRODUCTION

More information

TALIWORKS CORPORATION BERHAD ( TCB OR THE COMPANY )

TALIWORKS CORPORATION BERHAD ( TCB OR THE COMPANY ) TALIWORKS CORPORATION BERHAD ( TCB OR THE COMPANY ) PROPOSED JOINT VENTURE VIA A DISPOSAL OF 50% EQUITY INTEREST IN PINGGIRAN MUHIBBAH SDN. BHD. ( PMSB ), A WHOLLY-OWNED SUBSIDIARY OF TCB, TO PINGGIRAN

More information

GADANG HOLDINGS BERHAD ( GADANG OR THE COMPANY ) PROPOSED SHARE SPLIT; PROPOSED BONUS ISSUE OF SHARES; PROPOSED BONUS ISSUE OF WARRANTS;

GADANG HOLDINGS BERHAD ( GADANG OR THE COMPANY ) PROPOSED SHARE SPLIT; PROPOSED BONUS ISSUE OF SHARES; PROPOSED BONUS ISSUE OF WARRANTS; GADANG HOLDINGS BERHAD ( GADANG OR THE COMPANY ) (I) (II) (III) (IV) (V) (VI) PROPOSED SHARE SPLIT; PROPOSED BONUS ISSUE OF SHARES; PROPOSED BONUS ISSUE OF WARRANTS; PROPOSED ESOS; PROPOSED INCREASE IN

More information

2. INFORMATON ON EOGS, SPM TERMINALS AND ENRA SPM

2. INFORMATON ON EOGS, SPM TERMINALS AND ENRA SPM ENRA GROUP BERHAD ( COMPANY ) - SHAREHOLDERS AGREEMENT ENTERED INTO BETWEEN THE COMPANY S WHOLLY OWNED INDIRECT SUBSIDIARY, ENRA OIL & GAS SERVICES SDN BHD AND SPM TERMINALS PTY LTD 1. INTRODUCTION The

More information

PROPOSED SUBSCRIPTION OF 51% EQUITY INTEREST IN MEMANG PERKASA SDN BHD

PROPOSED SUBSCRIPTION OF 51% EQUITY INTEREST IN MEMANG PERKASA SDN BHD 1. INTRODUCTION The Board of Directors of Malton wishes to announce that the Company had on 22 January 2016 entered into a conditional subscription agreement ( SA ) with Memang Perkasa Sdn Bhd ( MPSB )

More information

Further details of the Proposed Rights Issue of Shares with Warrants are set out in the ensuing sections.

Further details of the Proposed Rights Issue of Shares with Warrants are set out in the ensuing sections. AHB HOLDINGS BERHAD ( AHB OR THE COMPANY ) PROPOSED RIGHTS ISSUE OF SHARES WITH WARRANTS 1. INTRODUCTION On behalf of the Board of Directors of AHB ( Board ), TA Securities Holdings Berhad ( TA Securities

More information

Selling and marketing expenses (7) Gain on disposal of a subsidiary

Selling and marketing expenses (7) Gain on disposal of a subsidiary (442371-A) () UNAUDITED INTERIM FINANCIAL REPORT FOR THE 4TH QUARTER ENDED 31 MAY 2017 CONDENSED CONSOLIDATED STATEMENT OF COMPREHENSIVE INCOME INDIVIDUAL CUMULATIVE Current Year Preceding Year Current

More information

(b) all outstanding warrants 2016/2021 ( IDEALUBB Warrants ) with new warrants to be issued by Newco ( Newco Warrants ) on a one-for-one basis;

(b) all outstanding warrants 2016/2021 ( IDEALUBB Warrants ) with new warrants to be issued by Newco ( Newco Warrants ) on a one-for-one basis; IDEAL UNITED BINTANG BERHAD ( IDEALUBB OR THE COMPANY ) PROPOSED INTERNAL REORGANISATION 1. INTRODUCTION On behalf of the Board of Directors of IDEALUBB ( Board ), M&A Securities Sdn Bhd wishes to announce

More information

STONE MASTER CORPORATION BERHAD

STONE MASTER CORPORATION BERHAD General Announcement (Amended) Company Name : STONE MASTER CORPORATION BERHAD Stock Name : STONE Date Announced : 21 st June 2016 Type Subject : OTHERS : STONE MASTER CORPORATION BERHAD ( SMCB OR THE DEBTOR

More information

1.0 INTRODUCTION 2.0 INFORMATION ON DTSB, FHSB AND THE VENDORS 2.1 DTSB

1.0 INTRODUCTION 2.0 INFORMATION ON DTSB, FHSB AND THE VENDORS 2.1 DTSB DATASONIC GROUP BERHAD ( DATASONIC ) - SHARE SALE AGREEMENT AND SHAREHOLDERS AGREEMENT BETWEEN DATASONIC TECHNOLOGIES SDN BHD, A WHOLLY-OWNED SUBSIDIARY OF DATASONIC, HKS PRIMATRIX SDN BHD, HABIBUL RAHMAN

More information

Details. Title No./ Lot No. : Lot No. 1749, Mukim Tangga Batu, Daerah Melaka Tengah, Negeri Melaka held under PN 16988

Details. Title No./ Lot No. : Lot No. 1749, Mukim Tangga Batu, Daerah Melaka Tengah, Negeri Melaka held under PN 16988 SEACERA GROUP BERHAD ( SGB OR COMPANY ) PROPOSED ACQUISITION OF LAND KNOWN AS LOT 1749, MUKIM TANGGA BATU, DAERAH MELAKA TENGAH, NEGERI MELAKA AND HELD UNDER PN 16988 TOGETHER WITH THE BUILDING ERECTED

More information

REPORT PACIFIC CASH DEPOSIT FUND QUARTERLY. For The Financial Period From 1 January 2018 To 30 June

REPORT PACIFIC CASH DEPOSIT FUND QUARTERLY. For The Financial Period From 1 January 2018 To 30 June REPORT QUARTERLY For The Financial Period From 1 January 2018 To 30 June 2018 PACIFIC CASH DEPOSIT FUND www.pacificmutual.com.my PACIFIC MUTUAL FUND BHD (336059-U) A member of the OCBC Group CONTENTS Fund

More information

RCE CAPITAL BERHAD ( RCE OR COMPANY )

RCE CAPITAL BERHAD ( RCE OR COMPANY ) RCE CAPITAL BERHAD ( RCE OR COMPANY ) Proposed Bonus Issue Proposed Rights Issue Proposed Exemption Proposed Increase In Authorised Share Capital Proposed Amendments I Proposed Amendments II 1. INTRODUCTION

More information

SANICHI TECHNOLOGY BERHAD ( SANICHI OR THE COMPANY ) PROPOSED SHARE CONSOLIDATION; AND PROPOSED BY-LAWS AMENDMENTS

SANICHI TECHNOLOGY BERHAD ( SANICHI OR THE COMPANY ) PROPOSED SHARE CONSOLIDATION; AND PROPOSED BY-LAWS AMENDMENTS SANICHI TECHNOLOGY BERHAD ( SANICHI OR THE COMPANY ) (I) (II) PROPOSED SHARE CONSOLIDATION; AND PROPOSED BY-LAWS AMENDMENTS (COLECTIVELY REFERRED TO AS THE PROPOSALS ) 1. INTRODUCTION On behalf of the

More information

PROPERTY INSIGHTS. Market Overview. Subdued economic growth dampen investment sentiments. Citigold Private Client

PROPERTY INSIGHTS. Market Overview. Subdued economic growth dampen investment sentiments. Citigold Private Client Citigold Private Client PROPERTY INSIGHTS Malaysia Quarter 2, 2016 Subdued economic growth dampen investment sentiments Market Overview Malaysia s economy grew at a slower pace in Q1 2016 due to slower

More information

TRIVE PROPERTY GROUP BERHAD (FORMERLY KNOWN AS ETI TECH CORPORATION BERHAD) ( TRIVE OR THE COMPANY )

TRIVE PROPERTY GROUP BERHAD (FORMERLY KNOWN AS ETI TECH CORPORATION BERHAD) ( TRIVE OR THE COMPANY ) TRIVE PROPERTY GROUP BERHAD (FORMERLY KNOWN AS ETI TECH CORPORATION BERHAD) ( TRIVE OR THE COMPANY ) (I) (II) PROPOSED REDUCTION OF THE EXISTING ISSUED AND PAID-UP SHARE CAPITAL OF TRIVE INVOLVING THE

More information

This announcement is made in accordance with disclosures pursuant to:

This announcement is made in accordance with disclosures pursuant to: ACQUISITION VIA SUBLEASE OF SIX (6) PARCELS OF QUARRY LANDS MEASURING 32.57 HECTARES HELD UNDER DOCUMENT OF TITLES NT113026421, NT113026430, NT113026403, NT113026396, NT113026387 AND NT113026350 DATED

More information

Further details on the Proposed Bonus Issue are set out in the ensuing sections.

Further details on the Proposed Bonus Issue are set out in the ensuing sections. ( HUA YANG OR THE COMPANY ) OF 88,000,000 NEW ORDINARY SHARES OF RM1.00 EACH IN HUA YANG ( BONUS SHARE(S) ) ON THE BASIS OF ONE (1) BONUS SHARE FOR EVERY THREE (3) EXISTING ORDINARY SHARES OF RM1.00 EACH

More information

The summary of the material amendments to the scheme of the Proposed Regularisation Plan are as follows:- SSA

The summary of the material amendments to the scheme of the Proposed Regularisation Plan are as follows:- SSA ASIA KNIGHT BERHAD ( A-KNIGHT OR THE COMPANY ) (I) (II) (III) (IV) (V) (VI) (VII) PROPOSED SHARE PREMIUM REDUCTION; PROPOSED CAPITAL REDUCTION; PROPOSED RIGHTS ISSUE WITH WARRANTS; PROPOSED ACQUISITION;

More information

PROPOSED INCREASE IN THE AUTHORISED SHARE CAPITAL; AND

PROPOSED INCREASE IN THE AUTHORISED SHARE CAPITAL; AND LAY HONG BERHAD ( LHB OR THE COMPANY ) PROPOSED BONUS ISSUE OF SHARES; PROPOSED SHARE SPLIT; PROPOSED FREE WARRANTS ISSUE; PROPOSED INCREASE IN THE AUTHORISED SHARE CAPITAL; AND PROPOSED AMENDMENT (COLLECTIVELY

More information

KUMPULAN PERANGSANG SELANGOR BERHAD (Company No K) TRANSACTIONS (CHAPTER 10 OF LISTING REQUIREMENTS): NON-RELATED PARTY TRANSACTIONS

KUMPULAN PERANGSANG SELANGOR BERHAD (Company No K) TRANSACTIONS (CHAPTER 10 OF LISTING REQUIREMENTS): NON-RELATED PARTY TRANSACTIONS KUMPULAN PERANGSANG SELANGOR BERHAD (Company No. 23737-K) ANNOUNCEMENT NON-RELATED PARTY TRANSACTIONS KUMPULAN PERANGSANG SELANGOR BERHAD ( PERANGSANG SELANGOR OR COMPANY ) PROPOSED INVESTMENT IN THE REHABILITATION

More information

(COLLECTIVELY REFERRED TO AS THE PROPOSED REGULARISATION SCHEME )

(COLLECTIVELY REFERRED TO AS THE PROPOSED REGULARISATION SCHEME ) IDEAL SUN CITY HOLDINGS BERHAD (formerly known as Equator Life Science Berhad) ("IDEAL" OR "THE COMPANY") I. (A) PROPOSED SHARE PREMIUM CANCELLATION OF RM22,026,619 UNDER SECTION 64(1) OF THE COMPANIES

More information

DENKO INDUSTRIAL CORPORATION BERHAD ( DENKO OR THE COMPANY )

DENKO INDUSTRIAL CORPORATION BERHAD ( DENKO OR THE COMPANY ) DENKO INDUSTRIAL CORPORATION BERHAD ( DENKO OR THE COMPANY ) (I) (II) HEADS OF AGREEMENT IN RELATION TO THE PROPOSED ACQUISITION OF THE ENTIRE EQUITY INTEREST IN INTEGRATED MANUFACTURING SOLUTIONS SDN

More information

Mr Leong and Mr Yu are also the directors of MYO as of 14 March 2018.

Mr Leong and Mr Yu are also the directors of MYO as of 14 March 2018. XINGHE HOLDINGS BERHAD( XINGHE OR COMPANY ) JOINT VENTURE AND SHAREHOLDERS AGREEMENT BETWEEN XINGHE-JEFI SDN BHD (FORMERLY KNOWN AS XINGHE MARKETING SDN BHD)[ XINGHE-JEFI ]AND MY OCEAN VENTURE SDN BHD

More information

RADIANT GLOBALTECH BERHAD ( RADIANT GLOBALTECH OR THE COMPANY )

RADIANT GLOBALTECH BERHAD ( RADIANT GLOBALTECH OR THE COMPANY ) RADIANT GLOBALTECH BERHAD ( RADIANT GLOBALTECH OR THE COMPANY ) (I) PROPOSED ACQUISITION OF 650,000 ORDINARY SHARES IN INFOCONNECT COMMERCE SDN. BHD. ( ICSB ), REPRESENTING THE ENTIRE EQUITY INTEREST,

More information

Details of the Proposed Acquisition are set out in the ensuing sections.

Details of the Proposed Acquisition are set out in the ensuing sections. POWER ROOT BERHAD ( POWER ROOT OR THE COMPANY ) PROPOSED ACQUISITION 1. INTRODUCTION On behalf of the Board of Directors of Power Root ("Board"), RHB Investment Bank Berhad ("RHBIB") is pleased to announce

More information

Further details on the Proposals are set out in the ensuing sections.

Further details on the Proposals are set out in the ensuing sections. MALAYSIA STEEL WORKS (KL) BHD ( MASTEEL OR THE COMPANY ) (I) (II) PROPOSED PRIVATE PLACEMENT OF UP TO 24,450,800 NEW ORDINARY SHARES IN MASTEEL ( MASTEEL SHARE(S) OR SHARE(S) ), REPRESENTING UP TO 10%

More information

Proposed transfer by AHB of the following identified companies to ABB: AHIB, a wholly-owned subsidiary of AHB;

Proposed transfer by AHB of the following identified companies to ABB: AHIB, a wholly-owned subsidiary of AHB; Description and Announcement Details : AFFIN HOLDINGS BERHAD ( AHB OR THE COMPANY ) PROPOSED REORGANISATION OF THE AHB GROUP OF COMPANIES Reference is made to the announcements dated 16 February 2017,

More information

PROPOSED PRIVATE PLACEMENT OF UP TO 10% OF THE ISSUED ORDINARY SHARES IN GFM SERVICES (EXCLUDING TREASURY SHARES)

PROPOSED PRIVATE PLACEMENT OF UP TO 10% OF THE ISSUED ORDINARY SHARES IN GFM SERVICES (EXCLUDING TREASURY SHARES) GFM SERVICES BERHAD ( GFM SERVICES OR COMPANY ) PROPOSED PRIVATE PLACEMENT OF UP TO 10% OF THE ISSUED ORDINARY SHARES IN GFM SERVICES (EXCLUDING TREASURY SHARES) 1. INTRODUCTION On behalf of the Board

More information

FACB INDUSTRIES INCORPORATED BERHAD ("FACBII" OR THE "COMPANY")

FACB INDUSTRIES INCORPORATED BERHAD (FACBII OR THE COMPANY) FACB INDUSTRIES INCORPORATED BERHAD ("FACBII" OR THE "COMPANY") PROPOSED CAPITALISATION OF THE DEBT OWING BY DAPAN HOLDINGS SDN BHD, AN INDIRECTLY WHOLLY-OWNED SUBSIDIARY OF KARAMBUNAI CORP BHD ("KCB"),

More information

HANDAL RESOURCES BERHAD ( HRB or Company )

HANDAL RESOURCES BERHAD ( HRB or Company ) HANDAL RESOURCES BERHAD ( HRB or Company ) PROPOSED ACQUISITION BY HRB OF 51,000 ORDINARY SHARES REPRESENTING 51% EQUITY INTEREST IN SIMFLEXI SDN. BHD. ( SIMFLEXI ) FOR A TOTAL PURCHASE CONSIDERATION OF

More information

Upon the completion of the Acquisition of Shares, MAAKL Mutual will become a wholly-owned subsidiary of MANULIFE.

Upon the completion of the Acquisition of Shares, MAAKL Mutual will become a wholly-owned subsidiary of MANULIFE. MANULIFE HOLDINGS BERHAD TRANSACTIONS (CHAPTER 10 OF LISTING REQUIREMENTS) NON-RELATED PARTY TRANSACTIONS MANULIFE HOLDINGS BERHAD ("MANULIFE" OR "THE COMPANY")- ACQUISITION OF 6,000,000 ORDINARY SHARES

More information

E.A. TECHNIQUE (M) BERHAD ( EAT OR THE COMPANY )

E.A. TECHNIQUE (M) BERHAD ( EAT OR THE COMPANY ) E.A. TECHNIQUE (M) BERHAD ( EAT OR THE COMPANY ) JOINT-VENTURE & SHAREHOLDERS AGREEMENT BETWEEN EAT, MTC ENGINEERING SDN. BHD AND EAT MTC FLOATING SERVICES SDN. BHD. CONTENTS: 1. INTRODUCTION The Board

More information

DESTINI BERHAD ("DESTINI" OR "THE COMPANY") - Proposed Disposal of 51.92% Equity Interest in Green Pluslink Sdn Bhd

DESTINI BERHAD (DESTINI OR THE COMPANY) - Proposed Disposal of 51.92% Equity Interest in Green Pluslink Sdn Bhd DESTINI BERHAD ("DESTINI" OR "THE COMPANY") - Proposed Disposal of 51.92% Equity Interest in Green Pluslink Sdn Bhd 1. INTRODUCTION The Board of Directors of Destini wishes to announce that Destini had

More information

Further details of the Proposed Acquisition are set out in the ensuing sections. The Power Plant shall consist of the following key components:

Further details of the Proposed Acquisition are set out in the ensuing sections. The Power Plant shall consist of the following key components: HENG HUAT RESOURCES GROUP BERHAD ( HENG HUAT ) (Company No. 969678-D) (Incorporated in Malaysia under the Companies Act, 1965) GENERAL ANNOUNCEMENT SUBJECT: TRANSACTIONS (CHAPTER 10 OF THE LISTING REQUIREMENTS):

More information

Reference is made to the announcement dated 17 October 2016 in relation to the Proposals.

Reference is made to the announcement dated 17 October 2016 in relation to the Proposals. ORION IXL BERHAD ( ORION OR THE COMPANY ) PROPOSED ACQUISITION; AND PROPOSED RIGHTS ISSUE WITH WARRANTS (COLLECTIVELY, THE PROPOSALS ) Unless otherwise defined, the abbreviations used throughout this announcement

More information

The diagram below sets out the group structure of Mercury upon completion of the Proposed Disposal. Mercury 100% 100% 100% 100% 100%

The diagram below sets out the group structure of Mercury upon completion of the Proposed Disposal. Mercury 100% 100% 100% 100% 100% MERCURY INDUSTRIES BERHAD ( MERCURY OR COMPANY ) PROPOSED DISPOSAL BY MERCURY TO INTERGLOBAL DYNASTY SDN BHD OF ITS EQUITY INTEREST IN SILVERLIGHT PROSPECTS SDN BHD ( SILVERLIGHT ), A WHOLLY-OWNED SUBSIDIARY

More information

- 1 - MMC CORPORATION BERHAD ( MMC OR COMPANY )

- 1 - MMC CORPORATION BERHAD ( MMC OR COMPANY ) MMC CORPORATION BERHAD ( MMC OR COMPANY ) PROPOSED ACQUISITION OF 35,990,501 ORDINARY SHARES OF RM1.00 EACH IN PENANG PORT SDN BHD ( PPSB ) REPRESENTING APPROXIMATELY 49.0% ORDINARY EQUITY INTEREST IN

More information

2.1.1 Proposed Employee Share Option Scheme ( Proposed ESOS )

2.1.1 Proposed Employee Share Option Scheme ( Proposed ESOS ) CORPORATION BERHAD ( ) PROPOSED ESTABLISHMENT OF A LONG TERM INCENTIVE PLAN FOR THE ELIGIBLE EMPLOYEES AND DIRECTORS OF AND ITS SUBSIDIARIES ( GROUP ) ( PROPOSED LTIP ) 1. INTRODUCTION On behalf of the

More information

PROPOSED PRIVATE PLACEMENT OF UP TO TEN PERCENT (10%) OF THE ISSUED SHARE CAPITAL OF IRIS ( PROPOSED PRIVATE PLACEMENT )

PROPOSED PRIVATE PLACEMENT OF UP TO TEN PERCENT (10%) OF THE ISSUED SHARE CAPITAL OF IRIS ( PROPOSED PRIVATE PLACEMENT ) IRIS CORPORATION BERHAD ( IRIS OR COMPANY ) PROPOSED PRIVATE PLACEMENT OF UP TO TEN PERCENT (10%) OF THE ISSUED SHARE CAPITAL OF IRIS ( PROPOSED PRIVATE PLACEMENT ) 1. INTRODUCTION On behalf of the Board

More information

Proposed amendments to the Articles of Association of the Company to facilitate the implementation of the Proposed Transfer ( Proposed Amendments ).

Proposed amendments to the Articles of Association of the Company to facilitate the implementation of the Proposed Transfer ( Proposed Amendments ). HSS ENGINEERS BERHAD ( HEB OR COMPANY ) (I) (II) PROPOSED TRANSFER; AND PROPOSED AMENDMENTS 1. INTRODUCTION On behalf of the Board of Directors of the Company ( Board ), M&A Securities Sdn Bhd wishes to

More information

Further details on the Proposed Bonus Issue are set out in the ensuing sections.

Further details on the Proposed Bonus Issue are set out in the ensuing sections. MALAYSIA STEEL WORKS (KL) BHD ( MASTEEL OR THE COMPANY ) PROPOSED BONUS ISSUE OF UP TO 106,810,281 NEW ORDINARY SHARES IN MASTEEL ( MASTEEL SHARE(S) OR SHARE(S) ) ( BONUS SHARE(S) ) ON THE BASIS OF 1 BONUS

More information

RHB Capital Berhad s First Half 2014 Net Profit at RM1.0 billion, up 31.2% year-on-year

RHB Capital Berhad s First Half 2014 Net Profit at RM1.0 billion, up 31.2% year-on-year FOR IMMEDIATE RELEASE RHB Capital Berhad s First Half 2014 Net Profit at RM1.0 billion, up 31.2% year-on-year Total income at RM2.9 billion, up 4.1% Pre-tax profit increased by 31.4% to RM1.4 billion Gross

More information

Press Releases. RHB Capital Berhad ś First Half 2014 Net Profit at RM1.0 billion, up 31.2% year-on-year

Press Releases. RHB Capital Berhad ś First Half 2014 Net Profit at RM1.0 billion, up 31.2% year-on-year RHB Capital Berhad ś First Half 2014 Net Profit at RM1.0 billion, up 31.2% year-on-year Total income at RM2.9 billion, up 4.1% Pre-tax profit increased by 31.4% to RM1.4 billion Gross loans expanded by

More information

The principal business of Innobird is investment holding. Innobird is the registered and beneficial owner of Supara (collectively, the Group ).

The principal business of Innobird is investment holding. Innobird is the registered and beneficial owner of Supara (collectively, the Group ). ACQUISITION OF 1,000,000 ORDINARY SHARES OF RM1.00 EACH REPRESENTING 100% EQUITY INTEREST IN THE ISSUED AND PAID-UP SHARE CAPITAL OF INNOBIRD (M) SDN BHD 1.0 INTRODUCTION Further to our announcement on

More information

Further details on the Proposed Bonus Issue are set out in the following sections.

Further details on the Proposed Bonus Issue are set out in the following sections. HUA YANG BERHAD ( HYB OR THE COMPANY ) PROPOSED BONUS ISSUE OF 18,000,000 NEW ORDINARY SHARES OF RM1.00 EACH IN HYB ( HYB SHARE(S) OR SHARE(S) ) ( BONUS SHARE(S) ) ON THE BASIS OF ONE (1) BONUS SHARE FOR

More information

Subsequent to the Disposal, MWSB shall cease to be the subsidiary of the Company. 28 August 2012 as a private limited. shares of RM1.

Subsequent to the Disposal, MWSB shall cease to be the subsidiary of the Company. 28 August 2012 as a private limited. shares of RM1. GENERAL ANNOUNCEMENT Company Name : FOCUS DYNAMICS TECHNOLOGIES BERHAD Stock Name : FOCUS Stock Code : 0116 Date Announced : 5 JUNE, 2015 Type : Transactions (Chapter 10 of Listing Requirements) - Non

More information

ASTRAL SUPREME BERHAD ( ASTRAL OR THE COMPANY )

ASTRAL SUPREME BERHAD ( ASTRAL OR THE COMPANY ) ASTRAL SUPREME BERHAD ( ASTRAL OR THE COMPANY ) - PROPOSED PAR VALUE REDUCTION; - PROPOSED CAPITAL RESERVE REDUCTION; - PROPOSED SHARE PREMIUM REDUCTION; - PROPOSED DIVERSIFICATION; - PROPOSED RIGHTS ISSUE

More information

Please refer to Section 2 of this Announcement for further details of the Proposals.

Please refer to Section 2 of this Announcement for further details of the Proposals. EMAS KIARA INDUSTRIES BERHAD ( EKIB OR COMPANY ) (I) (II) (III) PROPOSED ACQUISITION; PROPOSED INCREASE IN AUTHORISED SHARE CAPITAL; AND PROPOSED AMENDMENT (COLLECTIVELY REFERRED TO AS THE PROPOSALS )

More information

The Board of Directors of OSKH wishes to announce that:

The Board of Directors of OSKH wishes to announce that: OSK HOLDINGS BERHAD ( OSKH OR THE COMPANY ) SHARE SALE AGREEMENT ENTERED BY PJ DEVELOPMENT HOLDINGS BERHAD AND EMPLOYEES PROVIDENT FUND BOARD AND SUBSCRIPTION AGREEMENT ENTERED BY YARRA AUSTRALIA DEVELOPMENT

More information

MATRIX CONCEPTS HOLDINGS BERHAD

MATRIX CONCEPTS HOLDINGS BERHAD MATRIX CONCEPTS HOLDINGS BERHAD (414615-U) (Incorporated in Malaysi JOINT VENTURE CUM SHAREHOLDERS AGREEMENT AND SUBSCRIPTION AGREEMENT BETWEEN MATRIX CONCEPTS HOLDINGS BERHAD, NISSIN EX.CO 1. INTRODUCTION

More information

(COLLECTIVELY REFERRED TO AS THE PROPOSED AMENDMENTS )

(COLLECTIVELY REFERRED TO AS THE PROPOSED AMENDMENTS ) ATTA GLOBAL GROUP BERHAD ( ATTA OR COMPANY ) (I) (II) (III) (IV) PROPOSED TRUST DEED AMENDMENTS; PROPOSED DEED POLL B AMENDMENTS; PROPOSED DEED POLL C AMENDMENTS; AND PROPOSED BY-LAWS AMENDMENTS. (COLLECTIVELY

More information

Further details on the Proposed Acquisition are set out in the ensuing sections.

Further details on the Proposed Acquisition are set out in the ensuing sections. EA HOLDINGS BERHAD ("EAH" OR THE "COMPANY") PROPOSED ACQUISITION BY EAH OF 5,000,000 ORDINARY SHARES OF RM1.00 EACH IN MURASAKI TECHNOLOGY SDN BHD ("MTSB"), REPRESENTING 100% EQUITY INTEREST IN MTSB FROM

More information

FWAP entails the setting-up and management of centralised and integrated living quarters or hostels for the purpose of housing the foreign workers.

FWAP entails the setting-up and management of centralised and integrated living quarters or hostels for the purpose of housing the foreign workers. MY E.G. SERVICES BERHAD ("MYEG" OR THE "COMPANY") PROPOSED DIVERSIFICATION OF THE EXISTING PRINCIPAL ACTIVITIES OF MYEG AND ITS SUBSIDIARIES TO INCLUDE THE FOREIGN WORKERS ACCOMMODATION PROGRAMME ("PROPOSED

More information

Further details on the Proposed Share Split are set out in the ensuing sections of this announcement.

Further details on the Proposed Share Split are set out in the ensuing sections of this announcement. KPJ HEALTHCARE BERHAD ( KPJ OR THE COMPANY ) PROPOSED SHARE SPLIT INVOLVING THE SUBDIVISION OF EVERY 1 ORDINARY SHARE IN KPJ INTO 4 ORDINARY SHARES IN KPJ HELD ON AN ENTITLEMENT DATE TO BE DETERMINED AND

More information

IDEAL JACOBS (MALAYSIA) CORPORATION BHD ( IJACOBS OR THE COMPANY )

IDEAL JACOBS (MALAYSIA) CORPORATION BHD ( IJACOBS OR THE COMPANY ) IDEAL JACOBS (MALAYSIA) CORPORATION BHD ( IJACOBS OR THE COMPANY ) HEADS OF AGREEMENT IN RELATION TO THE PROPOSED REVERSE TAKE- OVER OF IJACOBS BY CEKAP TECHNICAL SERVICES SDN BHD ( CTSSB ) AND MECIP GLOBAL

More information

Inta Bina Group Berhad Fair Value: RM 0.25 Facing Headwinds. Not rated. Ace Market Listing

Inta Bina Group Berhad Fair Value: RM 0.25 Facing Headwinds. Not rated. Ace Market Listing A Member of the TA Group MENARA TA ONE, 22 JALAN P. RAMLEE, 50250 KUALA LUMPUR, MALAYSIA TEL: +603-20721277 / FAX: +603-20325048 IPO Friday, 12 May 2017 FBM KLCI: 1,775.39 Sector: Construction Inta Bina

More information

ACQUISITION OF 70% EQUITY INTEREST IN JIMAH EAST POWER SDN. BHD. ( JEP )

ACQUISITION OF 70% EQUITY INTEREST IN JIMAH EAST POWER SDN. BHD. ( JEP ) TENAGA NASIONAL BERHAD ACQUISITION OF 70% EQUITY INTEREST IN JIMAH EAST POWER SDN. BHD. ( JEP ) 1. INTRODUCTION Tenaga Nasional Berhad ( TNB ) wishes to announce that it has today submitted the Letter

More information

DAYANG ENTERPRISE HOLDINGS BERHAD ( DAYANG OR COMPANY )

DAYANG ENTERPRISE HOLDINGS BERHAD ( DAYANG OR COMPANY ) DAYANG ENTERPRISE HOLDINGS BERHAD ( DAYANG OR COMPANY ) (I) (II) PROPOSED ACQUISITION OF 42,965,100 ORDINARY SHARES OF RM0.50 EACH IN PERDANA PETROLEUM BERHAD ( PPB ) ( PPB SHARES ), REPRESENTING APPROXIMATELY

More information

KERJAYA PROSPEK GROUP BERHAD (Company No U) (Incorporated in Malaysia) CIRCULAR TO SHAREHOLDERS IN RELATION TO THE

KERJAYA PROSPEK GROUP BERHAD (Company No U) (Incorporated in Malaysia) CIRCULAR TO SHAREHOLDERS IN RELATION TO THE THIS CIRCULAR IS IMPORTANT AND REQUIRES YOUR IMMEDIATE ATTENTION. If you are in any doubt about the course of action to be taken, you should consult your stockbroker, bank manager, solicitor, accountant

More information

SUNWAY BERHAD ( SUNWAY OR THE COMPANY )

SUNWAY BERHAD ( SUNWAY OR THE COMPANY ) SUNWAY BERHAD ( SUNWAY OR THE COMPANY ) (I) (II) PROPOSED BONUS ISSUE OF UP TO 2,804,471,128 NEW ORDINARY SHARES IN SUNWAY ( SUNWAY SHARES OR SHARES ) ( BONUS SHARES ) ON THE BASIS OF FOUR (4) BONUS SHARES

More information

PROPOSED PRIVATE PLACEMENT OF UP TO TEN PERCENT (10%) OF THE ISSUED AND PAID-UP SHARE CAPITAL OF GADANG ( PROPOSED PRIVATE PLACEMENT )

PROPOSED PRIVATE PLACEMENT OF UP TO TEN PERCENT (10%) OF THE ISSUED AND PAID-UP SHARE CAPITAL OF GADANG ( PROPOSED PRIVATE PLACEMENT ) GADANG HOLDINGS BERHAD ( GADANG OR THE COMPANY ) PROPOSED PRIVATE PLACEMENT OF UP TO TEN PERCENT (10%) OF THE ISSUED AND PAID-UP SHARE CAPITAL OF GADANG ( PROPOSED PRIVATE PLACEMENT ) 1. INTRODUCTION On

More information

PROPOSED ACCELERATION OF THE CONVERSION PERIOD OF THE IRREDEEMABLE CONVERTIBLE PREFERENCE SHARES ("ICPS") OF YTB ("PROPOSED ACCELERATION OF ICPS")

PROPOSED ACCELERATION OF THE CONVERSION PERIOD OF THE IRREDEEMABLE CONVERTIBLE PREFERENCE SHARES (ICPS) OF YTB (PROPOSED ACCELERATION OF ICPS) YONG TAI BERHAD ("YTB" OR THE COMPANY") PROPOSED ACCELERATION OF THE CONVERSION PERIOD OF THE IRREDEEMABLE CONVERTIBLE PREFERENCE SHARES ("ICPS") OF YTB ("PROPOSED ACCELERATION OF ICPS") 1. INTRODUCTION

More information

METRONIC GLOBAL BERHAD ( MGB

METRONIC GLOBAL BERHAD ( MGB METRONIC GLOBAL BERHAD ( MGB or the Company ) - PROPOSED DISPOSAL OF MGB S ENTIRE EQUITY INTEREST IN METRONIC I-CARES SDN BHD ( MiCare ), A SUBSIDIARY ( PROPOSED DISPOSAL ) References are made to the announcement

More information

Market Access. Results Review (4Q16) M&A Securities. Scientex Berhad. Unstoppable Growth Amid Challenging Times. Tuesday, September 27, 2016

Market Access. Results Review (4Q16) M&A Securities. Scientex Berhad. Unstoppable Growth Amid Challenging Times. Tuesday, September 27, 2016 Market Access M&A Securities Results Review (4Q16) PP14767/04/2012(029 Tuesday, September 27, 2016 Scientex Berhad Unstoppable Growth Amid Challenging Times BUY (TP: RM8.33) Current Price (RM) New Target

More information

PROPOSED PRIVATE PLACEMENT OF UP TO 10% OF THE ISSUED ORDINARY SHARES IN DGSB

PROPOSED PRIVATE PLACEMENT OF UP TO 10% OF THE ISSUED ORDINARY SHARES IN DGSB DIVERSIFIED GATEWAY SOLUTIONS BERHAD ( DGSB OR COMPANY ) PROPOSED PRIVATE PLACEMENT OF UP TO 10% OF THE ISSUED ORDINARY SHARES IN DGSB 1. INTRODUCTION On behalf of the Board of Directors of DGSB ( Board

More information

ANCOM LOGISTICS BERHAD ( ALB OR THE COMPANY )

ANCOM LOGISTICS BERHAD ( ALB OR THE COMPANY ) ANCOM LOGISTICS BERHAD ( ALB OR THE COMPANY ) PROPOSED DISPOSAL OF 7,911,192 ORDINARY SHARES OF SINSENMOH TRANSPORTATION PTE LTD ( SSM ) ( SSM SHARE(S) ), REPRESENTING 100% OF THE ISSUED AND PAID-UP SHARE

More information

The Proposed Share Exchange and Proposed Transfer of Listing are collectively referred to as the Proposed Internal Reorganisation.

The Proposed Share Exchange and Proposed Transfer of Listing are collectively referred to as the Proposed Internal Reorganisation. TRIplc BERHAD ( TRIplc OR COMPANY ) (I) (II) (III) PROPOSED SCHEME OF ARRANGEMENT UNDER SECTION 176 OF THE COMPANIES ACT, 1965 INVOLVING TRIplc, EXISTING SHAREHOLDERS OF TRIplc AND A NEW INVESTMENT HOLDING

More information

Further details of the Proposed Free Warrants Issue are set out in the ensuing sections.

Further details of the Proposed Free Warrants Issue are set out in the ensuing sections. HIBISCUS PETROLEUM BERHAD ( HIBISCUS PETROLEUM OR COMPANY ) PROPOSED FREE WARRANTS ISSUE 1. INTRODUCTION On behalf of the Board of Directors of Hibiscus Petroleum ( Board ), RHB Investment Bank Berhad

More information

As at the LPD, KESM Test does not have any subsidiaries or associated companies.

As at the LPD, KESM Test does not have any subsidiaries or associated companies. KESM INDUSTRIES BERHAD ( KESMI OR THE COMPANY ) PROPOSED ACQUISITION OF THE REMAINING 692,308 ORDINARY SHARES OF RM1.00 EACH IN KESM TEST (M) SDN BHD ( KESM TEST ) ( KESM TEST SHARE(S) ), REPRESENTING

More information

We refer to the announcement dated 8 June 2015 in relation to the Proposed Disposal ( First Announcement ).

We refer to the announcement dated 8 June 2015 in relation to the Proposed Disposal ( First Announcement ). ( GLBHD OR COMPANY ) (I) (II) PROPOSED DISPOSAL OF ENTIRE EQUITY INTERESTS IN YAPIDMAS PLANTATION SDN BHD, SRI KEHUMA SDN BHD, LADANG KLUANG SDN BHD AND TANAH EMAS OIL PALM PROCESSING SDN BHD, AND A PARCEL

More information

PROPOSED ACQUISITION OF THE REMAINING 15% OF THE EQUITY INTEREST THAT IT DOES NOT CURRENTLY OWN IN AN EXISTING SUBSIDIARY COMPANY

PROPOSED ACQUISITION OF THE REMAINING 15% OF THE EQUITY INTEREST THAT IT DOES NOT CURRENTLY OWN IN AN EXISTING SUBSIDIARY COMPANY ( LATTREE OR COMPANY ) OF THE REMAINING 15% OF THE EQUITY INTEREST THAT IT DOES NOT CURRENTLY OWN IN AN EXISTING SUBSIDIARY COMPANY (Unless otherwise stated, the exchange rate of Thai Baht ( THB ) 100:

More information