BOOK 1 DESIGN-BUILD CONTRACT
|
|
- Aleesha Nicholson
- 6 years ago
- Views:
Transcription
1 BOOK 1 DESIGN-BUILD CONTRACT FUNDING PARTNERS: US DEPARTMENT OF TRANSPORTATION CALTRANS PORT OF LONG BEACH METRO Contract No. HD-7961 Federal Project Numbers: BRLS 5108 (137); ACNH (807) Project Identification Number: FINAL FOR EXECUTION
2 TABLE OF CONTENTS 1. CONTRACT COMPONENTS; INTERPRETATION OF CONTRACT DOCUMENTS Certain Definitions Contract Documents; Order of Precedence Interpretations Referenced Standards and Specifications Omission of Details; Clarification by Port Computation of Time Periods; Agreement to Change Time Periods Standard for Approvals Federal Requirements OBLIGATIONS OF DESIGN-BUILDER Performance Requirements General Obligations of Design-Builder Representations, Warranties and Covenants Design Requirements Alternative Technical Concepts Governmental Approvals Progression of Work Design and Engineering Personnel INFORMATION SUPPLIED TO CONTRACTOR; RESPONSIBILITY FOR DESIGN Information Supplied Responsibility for Design No Liability Regarding RID Professional Licensing Laws Notification of Third-Party Claims...15 PORT OF LONG BEACH Page i Final for Execution
3 4. TIME WITHIN WHICH PROJECT SHALL BE COMPLETED Notices to Proceed Completion Deadlines Contract Schedule Prerequisites to Start of Construction for Specific Design Packages CONTROL OF WORK Control and Coordination of Work Safety Process to be Followed for Discovery of Certain Site Conditions Obligation to Minimize Impacts Quality Management Effect of Oversight, Spot Checks, Audits, Tests, Acceptances, and Approvals Nonconforming Work SITE ACCESS; RELOCATIONS; ENVIRONMENTAL COMPLIANCE Access to Site Utility Relocations Environmental Compliance EQUAL EMPLOYMENT OPPORTUNITY; SUBCONTRACTS; LABOR Equal Employment Opportunity Disadvantaged Business Enterprises Subcontracting Requirements Key Personnel; Character of Workers Project Labor Agreement SURETY BONDS Payment and Performance Bonds...40 PORT OF LONG BEACH Page ii Final for Execution
4 8.2 Utility Work Not Used No Relief of Liability INSURANCE General Insurance Requirements Design-Builder Provided Insurance RISK OF LOSS Site Security Protection and Repair of the Work and other Property Builder s Risk Insurance Title PAYMENT Contract Price Invoices and Payment Limitations on Payment Mobilization Deductions Final Payment Payments to Subcontractors Interest on Late Payments Disputes CHANGES IN THE WORK Circumstances under which Change Orders May Be Issued Procedure for Port-Initiated Change Orders Procedure for Design-Builder Initiated Change Orders...58 PORT OF LONG BEACH Page iii Final for Execution
5 12.4 Contents of Change Orders Completion Deadline and Contract Price Adjustments; Certain Limitations Negotiated Price Change Orders Time and Materials Change Orders Differing Site Conditions Contaminated Materials Management Matters Not Eligible for Change Orders Waiver Disputed Contract Price and/or Completion Deadline Changes No Release or Waiver SUSPENSION OF WORK Suspension for Convenience Suspension for Cause Design-Builder Responsibilities During Suspension TERMINATION FOR CONVENIENCE Notice of Termination Design-Builder s Responsibilities Upon Termination Responsibility After Notice of Termination Negotiated Termination Settlement Determination of Settlement Amount If Negotiations Fail Partial Termination Reduction in Amount of Claim Partial Payments Inclusion in Subcontracts Limitation on Payments to Subcontractor...78 PORT OF LONG BEACH Page iv Final for Execution
6 14.11 No Unearned Profits or Consequential Damages No Waiver Dispute Resolution Suspension of Work Termination Due to Non-Appropriation of Funds DEFAULT Default By Design-Builder Remedies Right to Stop Work If Undisputed Payment Is Not Made Notice and Opportunity to Cure Other Types of Port Breaches DAMAGES Liquidated Damages Offset; Waiver Payment of Liquidated Damages INDEMNIFICATION Indemnifications by Design-Builder Responsibility of Port for Certain Contaminated Materials No Effect on Other Rights CERCLA Agreement Intent of Indemnity for Breach of Contract PARTNERING, CLAIMS FOR ADJUSTMENT AND DISPUTES Partnering Disputes Resolution Process ACCEPTANCE OF PROJECT Substantial Completion PORT OF LONG BEACH Page v Final for Execution
7 19.2 Final Acceptance Opening the Project to Traffic WARRANTIES Warranties by Design-Builder Warranty of Corrected Work Subcontractor and Supplier Warranties No Limitation of Liability Warranty Beneficiaries Remedies for Breach of Warranty Disputes DOCUMENTS AND RECORDS Escrowed Proposal Documents Subcontractor and Supplier Pricing Documents Project Records Retention of Records California Public Records Act Intellectual Property MISCELLANEOUS PROVISIONS Amendments Waiver Independent Contractor Successors and Assigns Designation of and Cooperation with Representatives Officials Not to Benefit Survival PORT OF LONG BEACH Page vi Final for Execution
8 22.8 Limitation on Third-Party Beneficiaries No Personal Liability Notices and Communications Taxes Assignment of Causes of Action under Section 4 of Clayton Act Gratuities and Conflicts of Interest Further Assurances Severability Headings Governing Law Entire Agreement Counterparts PORT OF LONG BEACH Page vii Final for Execution
9 EXHIBITS Exhibit A Exhibit B Exhibit C Exhibit D Exhibit E Exhibit F Exhibit G Exhibit H Exhibit I Exhibit J Exhibit K Exhibit L Acronyms and Definitions Major Permits Design-Builder s Proposal Commitments (see Exhibit C for table of contents) Labor Code Requirements Disadvantaged Business Enterprise (DBE) Special Provisions for Design-Build Projects Federal Requirements Exhibit F-1 Federal Requirements for Federal-Aid Construction Projects Exhibit F-2 FHWA Form 1273 Exhibit F-3 Exhibit F-4 Exhibit F-5 Key Personnel Federal and State Prevailing Wage Rates Equal Employment Opportunity Special Training Provisions Designation of Initial Representatives Disputes Review Board Agreement Project Labor Agreement Use Tax Form List of Established Documents PORT OF LONG BEACH Page viii Final for Execution
10 THIS Design-Build Contract is entered into by and between the City of Long Beach, acting by and through its Board of Harbor Commissioners, commonly known as the Port of Long Beach ( Port ) and Shimmick Construction Company, Inc. / FCC Construcción S.A. / Impregilo S.p.A., a Joint Venture ( Design-Builder ), effective as of the last date set forth on the signature page hereto, with reference to the definitions contained in Exhibit A hereto and the following facts: Recitals A. The Project is located in Los Angeles County, California, within the City of Long Beach and generally consists of the design and construction of a replacement Bridge and associated approach and ramp network for the existing Gerald Desmond Bridge. B. Port and Department collaborated to procure this Contract as one of the ten design-build projects Department is authorized to procure under the Design-Build Demonstration Program found in Public Contract Code section 6800 et seq. ( Section 6800 ). C. On November 3, 2010, pursuant to Section 6800, the California Transportation Commission, at a regularly scheduled public hearing, approved Port and Department s implementation of the Project through a design-build method of procurement. D. Port and Department issued a Request for Qualifications for the Project on November 5, E. Port and Department received seven Statements of Qualifications on January 20, 2011, and subsequently prequalified five Proposers. F. On September 2, 2011 Port and Department issued the Request for Proposals to the Proposers. G. On March 2, 2012, Port and Department received responses to the RFP from the Proposers, including the Proposal from Design-Builder. H. An RFP evaluation committee determined that the Proposal was the response to the RFP that provided best value to Port and Department, which ultimately led the Board of Harbor Commissioners to award this Contract to Design-Builder. I. This Contract and the other Contract Documents collectively constitute a part of the designbuild contract as contemplated under Section 6800, and are entered into in accordance with the provisions of the RFP. J. The Parties intend for the Contract to be a lump-sum design-build contract obligating Design-Builder to perform all work necessary to complete the Project by the deadlines specified herein, for the Contract Price, subject only to certain specified limited exceptions. To allow Port to budget for the Project and to reduce the risk of cost overruns, the Contract includes restrictions affecting Design-Builder s ability to make claims for an increase to the Contract Price or an extension of the Completion Deadlines. Except for changes expressly allowed under the Design-Build Contract, Design-Builder has agreed in the Contract to assume such responsibilities, risks and restrictions and has reflected the assumption of such responsibilities, risks and restrictions in the Contract Price. PORT OF LONG BEACH 1 Final for Execution
11 K. If Design-Builder fails to complete the Project by one or more of the Completion Deadlines, then Port will suffer substantial losses and damages. The Contract Documents therefore provide that Design-Builder shall pay Port liquidated damages if such Completion Deadlines are delayed. L. Port has provided the Basic Configuration to Design-Builder for the purpose of defining certain aspects of the Project. Port has also provided Reference Information Documents (RID) to Design-Builder. Design-Builder has no right to rely on the RID except to the extent specifically permitted in the Contract Documents. Port and Design-Builder both intend for Design-Builder to assume full responsibility and liability with respect to the design of the Project, including correction of any Errors in the Basic Configuration or RID, and Port and Design-Builder both intend for Design-Builder to indemnify and hold harmless Port and others with respect to any defects in the Project which may relate to Errors in the Basic Configuration or RID. NOW, THEREFORE, in consideration of the sums to be paid to Design-Builder by Port, the foregoing premises and the covenants and agreements set forth herein, the Parties hereby agree as follows. PORT OF LONG BEACH 2 Final for Execution
12 1. CONTRACT COMPONENTS; INTERPRETATION OF CONTRACT DOCUMENTS 1.1 Certain Definitions Exhibit A hereto contains the meaning of various terms used in the Contract Documents. 1.2 Contract Documents; Order of Precedence Each of the Contract Documents is an essential part of the Contract, and a requirement occurring in one is as binding as though occurring in all. The Contract Documents are those documents listed in Section 1.2.1, including all exhibits thereto, intended to be complementary and to describe and provide for a complete contract Order of Precedence Except as provided in Section 1.2.2, in the event of any conflict among the Contract Documents, the order of precedence, from highest to lowest, shall be as set forth below: (a) (b) (c) (d) (e) (f) (g) (h) (i) (j) Amendments, including Change Orders, to Book 1, including all Exhibits (Design-Build Contract), as executed by Port and Design-Builder, except amendments to Exhibit C which have a lower order of precedence; Book 1, as executed by Port and Design-Builder, including all Exhibits (Design-Build Contract), except Exhibit C which has a lower order of precedence; Amendments, including Change Orders, to Exhibit C-20 (Alternative Technical Concepts); Exhibit C-20 (Alternative Technical Concepts); Amendments, including Change Orders, to Book 2 (Project Requirements); Book 2 (Project Requirements); Amendments, including Change Orders, to Book 3 (Applicable Standards); Book 3 (Applicable Standards); Amendments, including Change Orders, to Exhibit C (Design-Builder s Proposal Commitments), except amendments to Exhibit C-20; and Exhibit C (Design-Builder s Proposal Commitments), except Exhibit C Conflicts Among Contract Document Provisions Notwithstanding the order of precedence among Contract Documents set forth in this Section 1.2, in the event of any conflict, ambiguity or inconsistency between or among any of the provisions in this Contract, or between provisions in this Contract and any other Contract Document, the provisions that establish the higher quality, manner or method of performing the Work, exceed Good Industry Practice or use more stringent standards will prevail. If Design- Builder s Proposal Commitments include statements, terms, concepts or designs that can PORT OF LONG BEACH 3 Final for Execution
13 reasonably be interpreted as offering to provide higher quality items than otherwise required by the Contract Documents or to perform services or meet standards in addition to or better than those otherwise required, then Design-Builder s obligations hereunder shall include compliance with all such statements, terms, concepts and designs. Additional details in a lower priority Contract Document shall be given effect except to the extent they irreconcilably conflict with requirements, provisions and practices contained in the higher priority Contract Document Conflicts Among Referenced Standards Notwithstanding Sections and 1.2.2, in the event of conflicting standards incorporated by reference into the Contract Documents, including the standards listed in Book 3, Port shall have the right to determine which standard applies. Port shall first refer the order of precedence set forth for these standards in individual sections of Book 2 to resolve the conflict. If Port determines that the order of precedence for standards in Book 2 does not resolve the conflict, then Port shall have the right to determine, in its sole discretion, which standard applies. Design-Builder shall request Port s determination respecting the order of precedence among conflicting standards promptly upon becoming aware of any such conflict Modification to Documents Since Addendum 11 The Parties agree that if a Contract Document listed in Exhibit L is different in any manner from the version of that document established through Addendum 11 of the Contract procurement process, then the version of that document established through Addendum 11 of the procurement process shall govern. This Section shall not apply to differences in the Exhibit L documents that result from amendments to the Contract that are mutually agreed to in writing by the Parties pursuant to Section Interpretations In the Contract Documents, where appropriate: the singular includes the plural and vice versa; references to statutes or regulations include all statutory or regulatory provisions consolidating, amending, or replacing the statute or regulation referred to; the words including, included, includes, and include are deemed to be followed by the words without limitation ; unless the context requires otherwise, in phrases involving performance by a Person, the word shall indicates a requirement imposed on the Person; unless otherwise indicated, references to sections, appendices and exhibits are to the document which contains such references; words such as herein, hereof, and hereunder refer to the entire document in which they are contained and not to any particular provision or Section; words not otherwise defined that have well-known technical or construction industry meanings are used in accordance with such recognized meanings; references to Persons include their respective permitted successors and assigns and, in the case of Governmental Persons, Persons succeeding to their respective functions and capacities; and words of any gender used herein include each other gender where appropriate. Unless otherwise specified, lists contained in the Contract Documents defining the Project or the Work shall not be deemed all-inclusive. Design-Builder acknowledges and agrees that it has independently reviewed the Contract Documents with legal counsel, and that it has the requisite experience and sophistication to understand, interpret and agree to the particular language of the Contract Documents. Accordingly, in the event of an ambiguity in or dispute regarding the interpretation of the Contract Documents, the Contract Documents shall not be construed against the Person who prepared them, and instead other rules of interpretation shall be used. Port and Department's answers to questions posed during the PORT OF LONG BEACH 4 Final for Execution
14 proposal process for the Contract shall in no event be deemed part of the Contract Documents and shall not be relevant in interpreting the Contract Documents. 1.4 Referenced Standards and Specifications Except as otherwise specified in the Contract Documents or otherwise directed by Port, Work specified by the number, symbol or title of any standard established by reference to a described publication affecting any portion of the Project shall comply with the latest edition or revision thereof and amendments and supplements thereto in effect on September 2, Omission of Details; Clarification by Port Design-Builder shall not take advantage of any apparent Error in the Contract. If it is discovered that the Work to be done or any matter relative thereto is not sufficiently detailed or explained in the Contract Documents, Design-Builder shall apply to Port in writing for such further written explanations as may be necessary and shall conform to the explanation provided. Design- Builder shall promptly notify Port of all Errors which it may discover in the Contract Documents, and shall obtain specific instructions in writing regarding any such Error before proceeding with the Work affected thereby. The fact that the Contract Documents omit any details of any Work which are necessary to carry out the intent of the Contract Documents, or which are customarily performed under similar circumstances, shall not relieve Design-Builder from performing such omitted Work and they shall be performed as if fully and correctly set forth and described in the Contract Documents, without entitlement to a Change Order hereunder except as specifically allowed under Section Computation of Time Periods; Agreement to Change Time Periods References to days or Days contained in the Contract Documents shall mean Calendar Days unless otherwise specified, provided that if the date to perform any act or give any notice specified in the Contract Documents (including the last date for performance or provision of notice within a specified time period) falls on a non-working Day, such act or notice may be timely performed on the next succeeding day which is a Working Day. Notwithstanding the foregoing, requirements contained in the Contract Documents relating to actions to be taken in the event of an emergency, requirements contained in Section 5.3 and any other requirements for which it is clear that performance is intended to occur on a non-working Day, shall be required to be performed as specified, even though the date in question may fall on a non- Working Day. The Parties may mutually agree to increase or decrease any time periods or to otherwise modify any deadline in the Contract Documents. 1.7 Standard for Approvals In all cases where approvals, acceptances or consents are required to be provided by Port or Design-Builder hereunder, such approvals, acceptances or consents shall not be withheld unreasonably except in cases where a different standard (such as sole discretion) is specified, and shall not be unreasonably delayed if no response time is specified. In cases where sole discretion is specified, the decision shall not be subject to dispute resolution or other legal challenge; provided, however, the issue of whether the decision was arbitrary or capricious shall be subject to dispute resolution hereunder. PORT OF LONG BEACH 5 Final for Execution
15 1.8 Federal Requirements Notwithstanding anything to the contrary contained herein, in the event of any conflict between any Federal Requirement and the other requirements of the Contract Documents, the Federal Requirements shall prevail, take precedence and be in force over and against any such conflicting provisions. PORT OF LONG BEACH 6 Final for Execution
16 2. OBLIGATIONS OF DESIGN-BUILDER 2.1 Performance Requirements Performance of Work All materials, services and efforts necessary to achieve Substantial Completion and Final Acceptance on or before the applicable Completion Deadline shall be Design-Builder s sole responsibility, except as otherwise specifically provided in the Contract Documents. Subject to the terms of Section 12, the costs of all such materials, services and efforts are included in the Contract Price Performance as Directed At all times during the term hereof, including during the course of, and notwithstanding the existence of, any Dispute, Design-Builder shall perform as directed in writing by Port in a diligent manner and without delay, shall abide by Port s decision or order, and shall comply with all applicable provisions of the Contract Documents. If a Dispute arises regarding such performance or direction, the Dispute shall be resolved in accordance with Section General Obligations of Design-Builder Design-Builder, in addition to performing all other requirements of the Contract Documents, shall: (a) (b) (c) furnish all design and other services, provide all materials and labor and undertake all efforts necessary or appropriate (excluding only those services, materials and efforts which the Contract Documents specify will be undertaken by other Persons): (i) to construct the Project and maintain it during construction in accordance with the Contract Documents, all Laws, all Governmental Approvals, Good Industry Practice, and all other applicable safety, environmental, licensing and other requirements, taking into account the R/W Work Map and other constraints affecting the Project, so as to achieve Substantial Completion and Final Acceptance by the applicable Completion Deadlines; (ii) to construct the Project free from material defects except to the extent that such defects are inherent in prescriptive specifications included in the Contract Documents, unless (a) Design-Builder has actual or constructive knowledge of such defects and (b) Design-Builder fails to notify Port of the defect in accordance with Section 1.5; and (iii) otherwise to do everything required by and in accordance with the Contract Documents; at all times provide Design-Builder s Project Manager, who (i) will have full responsibility for the prosecution of the Work, (ii) will act as agent and be a single point of contact in all matters on behalf of Design-Builder, (iii) will be present (or its Approved designee will be present) at the Site at all times that Work is performed, and (iv) will have authority to bind Design-Builder on all matters relating to the Project; obtain all Governmental Approvals (other than the Environmental Approvals and certain New Environmental Approvals as provided in Section , but specifically including any Governmental Approvals required to implement any Approved ATCs incorporated in the Contract Documents), including any revision, modification, amendment, supplement, renewal or extension of Governmental Approvals, required in connection with the Project or the Work; PORT OF LONG BEACH 7 Final for Execution
17 (d) (e) comply with all conditions imposed by and undertake all actions required by and all actions necessary to maintain in full force and effect all Governmental Approvals, including implementation of all environmental mitigation measures required by the Governmental Approvals and Contract Documents, except to the extent that such responsibility is expressly assigned in the Contract Documents to another Person; provide such assistance as is reasonably requested by Port in dealing with any Person and/or in prosecuting and defending lawsuits in any and all matters relating to the Project, which may include providing information and reports regarding the Project, executing declarations and attending meetings and hearings, but which shall in no event be deemed to require Design-Builder to provide legal services; (f) comply with the Quality Manual requirements in Book 2, Section 2.4; (g) (h) (i) (j) cooperate with Port and Governmental Persons with jurisdiction over the Project in the review and oversight of the Project and other matters relating to the Work; supervise and be responsible to Port for acts and omissions of all Design-Builder- Related Entities, as though all such Persons were directly employed by Design-Builder; mitigate delay to the Project and mitigate damages due to delay to the extent possible, including by resequencing, reallocating or redeploying Design-Builder s forces to other work, as appropriate; and pay all applicable federal, State and local sales, consumer, use and similar taxes, property taxes and any other taxes, fees, charges or levies imposed by a Governmental Person, whether direct or indirect, relating to, or incurred in connection with, the performance of the Work. 2.3 Representations, Warranties and Covenants Design-Builder represents, warrants and covenants to Port as described in this Section 2.3. The representations, warranties and covenants in this Section shall survive expiration or earlier termination of the Contract Maintenance of Professional Qualifications Design-Builder and its design Subcontractor(s) have maintained, and throughout the term of the Contract and its design Subcontract(s) shall maintain, all required authority, license status, professional ability, skills and capacity to perform the Work, and shall perform them in accordance with the requirements of the Contract Documents Evaluation of Constraints Design-Builder has evaluated the constraints affecting delivery of the Project, including the R/W Work Map and Basic Configuration as well as the conditions of the Environmental Approvals and has reasonable grounds for believing and does believe that the Project can be delivered within such constraints to the extent those constraints were accurately represented and/or consistent with Approved ATCs, if any. PORT OF LONG BEACH 8 Final for Execution
18 2.3.3 Feasibility of Performance Design-Builder has evaluated the feasibility of performing the Work by the Completion Deadlines and for the Contract Price, and has reasonable grounds for believing and does believe that such performance is feasible and practicable Review of Site Information To the extent Design-Builder deems it necessary or advisable for submittal of a Proposal, Design-Builder has, prior to submitting its Proposal, in accordance Good Industry Practice, undertaken appropriate activities sufficient to familiarize itself with surface conditions and subsurface conditions that may be discernible from the surface. Said activities have included inspection and examination of the Site and surrounding locations, to the extent possible. Based on its review, inspection, examination and other activities, Design-Builder is familiar with and accepts the physical requirements of the Work, subject to the right to receive a Change Order for Differing Site Conditions as specified in Section 12. Before commencing any Work on a particular aspect of the Project, Design-Builder shall verify all governing dimensions and conditions at the Site and shall examine all adjoining work which may have an impact on such Work. Design-Builder shall be responsible for ensuring that the Design Documents and Construction Documents accurately depict all governing and adjoining dimensions and conditions Governmental Approvals Obtained by Design-Builder After due consideration of all relevant factors, Design-Builder believes that all Governmental Approvals it is responsible for obtaining will be granted in due course and will thereafter remain in effect so as to enable the Work to proceed in accordance with the Contract Documents Organization Design-Builder is a joint venture duly organized and validly existing under the laws of the State of California with all requisite power to own its properties and assets and carry on its business as now conducted or proposed to be conducted. Design-Builder is duly qualified to do business, and is in good standing, in the State, and will remain in good standing throughout the term of the Contract and for as long thereafter as any obligations remain outstanding under the Contract Documents Authorization The execution, delivery and performance of the Contract have been duly authorized by all necessary actions of Design-Builder, and, if applicable, Design-Builder s members, and will not result in a breach or a default under the organizational documents of any such Person or any indenture, loan, credit agreement, or other material agreement or instrument to which any such Person is a party or by which their properties and assets may be bound or affected Legal, Valid and Binding Obligation The Contract constitutes the legal, valid and binding obligation of Design-Builder and, if applicable, of each member of Design-Builder, enforceable in accordance with its terms. PORT OF LONG BEACH 9 Final for Execution
19 2.3.9 False or Fraudulent Statements and Claims Design-Builder recognizes that the requirements of the Program Fraud Civil Remedies Act of 1986, as amended, 31 U.S.C. section 3801 et seq., the USDOT regulations, Program Fraud Civil Remedies, 49 C.F.R. Part 31, and the California False Claims Act, California Government Code section et seq., apply to its actions hereunder. Accordingly, by signing the Contract, Design-Builder certifies or affirms the truthfulness and accuracy of any statement it has made, it makes, or it may make pertaining to its performance of the Work. In addition to other penalties that may be applicable under State Law, Design-Builder also acknowledges that if it makes a false, fictitious, or fraudulent claim, statement, submission, or certification, the federal government reserves the right to impose the penalties of the Program Fraud Civil Remedies Act of 1986, as amended, on Design-Builder to the extent the federal government deems appropriate. 2.4 Design Requirements Required Approval Approval by Port is required prior to commencing any Work that would necessitate a modification to the Basic Configuration, regardless of whether the modification is required by a Governmental Approval or is desired by Design-Builder for its benefit or for any other reason. Design-Builder acknowledges and agrees that constraints set forth in the Contract Documents, as well as Site conditions, the R/W Work Map and the requirement to obtain Approval, will impact Design-Builder s ability to revise the Basic Configuration Design Review Process; Compliance with Design Design Review Process Design-Builder shall furnish the Released for Construction Documents and other Design Documents to Port in accordance with Book 2, Section 2.4. Design-Builder shall obtain Port s Approval of the Released for Construction Documents in accordance with Book 2, Section 2.4 and shall not commence any Construction Work covered by a Released for Construction Document until it receives that Approval. If required, Design-Builder shall obtain Port s Acceptance or Approval of the other Design Documents (as applicable) in accordance with Book 2. Port shall have the right to review and comment on all Released for Construction Documents and other Design Documents for compliance with the requirements of the Contract Documents in accordance with Book 2, Section 2.4. Design-Builder shall notify Port in writing within 14 Days after receipt of any such comments if Design-Builder believes incorporation of the comments would cause the Released for Construction Documents, other Design Documents or any Contract Documents to contain Errors in any respect or which would otherwise adversely affect in any manner the design or construction of the Project or the Contract Schedule, and Port shall have the right to modify its comments. Any failure of Design-Builder to so notify Port shall constitute Design-Builder s full acceptance of all responsibility for changes made to the Released for Construction Documents and other Design Documents in response to such Port comments and will be treated for all purposes hereunder as if Design-Builder had initiated such changes. Within 14 Days of receipt of Port s comments (including Port s modifications to previous comments) or such longer period as may be allowed by Port, Design-Builder shall revise and modify the Released for Construction Documents and other Design Documents, as applicable, to fully reflect the comments. PORT OF LONG BEACH 10 Final for Execution
20 Design Reviews Required by Third Parties Design-Builder, working with Port, shall be responsible for giving and obtaining all design reviews required by Utility Owners, Governmental Persons, Railroad owners and any other Persons other than Port, as applicable Compliance with Contract Documents and Design Design-Builder shall deliver the Project in accordance with and otherwise meet the requirements of the Contract Documents and Design Documents. To the extent of any conflicts between the Contract Documents and the Design Documents, the Contract Documents shall have precedence over the Design Documents Ownership of Design Subject to Section 21.6, all data, sketches, charts, calculations, plans, specifications, electronic files, correspondence, reports, analyses, studies and other documents and materials created or collected under the terms of the Contract Documents shall be considered works made for hire for which Port owns the copyright. Released for Construction Documents and other Design Documents become Port s property upon preparation. Subject to Section 21.6, other documents prepared or obtained by Design-Builder in connection with the performance of its obligations under the Contract, including Construction Documents, studies, manuals, as-built drawings, calculations, digital electronic program data, source code and output files, technical and other reports and the like, become Port s property upon Final Acceptance. 2.5 Alternative Technical Concepts Third-Party Alternative Technical Concept Approvals Design-Builder shall be solely responsible to obtain any approvals from Persons other than Port required to implement Approved Alternative Technical Concepts (ATC) incorporated in the Contract Documents. These Persons may disapprove such approvals for any reason (or for no stated reason). Design-Builder agrees that if Design-Builder fails to obtain any such approval, Design-Builder shall comply with the corresponding baseline requirements (unmodified by the ATC) without any increase in the Contract Price or extension of the Completion Deadlines Additional Real Property or Utility Work Notwithstanding anything herein to the contrary, if implementation of an ATC will require additional real property or Utility Work, Design-Builder shall have full responsibility for paying for any such real property and any other related costs, including costs to obtain any necessary Governmental Approvals (including New Environmental Approvals, as described in Section ) or for performing and paying for any related Utility Work, without the right to a Change Order. 2.6 Governmental Approvals General Prior to the Effective Date, Port undertook certain efforts and activities to secure specific Governmental Approvals as described in Book 2, Section 4. Notwithstanding such efforts and PORT OF LONG BEACH 11 Final for Execution
21 activities, Design-Builder shall comply with the requirements of Sections 2.2(c) and (d). Builder shall not be entitled to submit a Claim associated with securing and obtaining Governmental Approvals, except with regard to Design-Builder s rights to submit a Claim for delays in obtaining Major Permits as provided under Section Design-Builder shall not be in default and shall not be required to pay liquidated damages under Section 16.1 for failing to meet a Completion Deadline due to delays in obtaining Governmental Approvals, provided that (a) the delays are beyond the reasonable control of Design-Builder-Related Entities, (b) Design-Builder has made diligent efforts to obtain the delayed Governmental Approvals and (c) the delays could not have been mitigated by Design-Builder Governmental Approvals Issued in Port s Name If any of the Governmental Approvals that Design-Builder is responsible for obtaining must formally be issued in the name of Port, Design-Builder shall undertake all efforts to obtain such approvals, subject to Port s reasonable cooperation with Design-Builder, including execution and delivery of appropriate applications and other documentation in a form Approved by Port. Design-Builder shall assist Port in obtaining any Governmental Approvals which Port may be obligated to obtain, including providing information requested by Port and participating in meetings regarding such approvals Design-Builder Maintenance of Governmental Approvals Design-Builder shall take all actions necessary to comply with and to maintain in full force and effect all Governmental Approvals, including performance of all measures required by the Contract Documents or Governmental Approvals, except to the extent that responsibility for performance of such measures is expressly assigned to Port in the Contract Documents Major Permit Delays Design-Builder shall be entitled to submit a Claim under the Contract Documents due to delays in obtaining a Major Permit by the applicable Major Permits Deadline, provided that such delays are beyond the reasonable control of Design-Builder. Notwithstanding the above, Design- Builder shall not be entitled to any relief relating to delays in obtaining Major Permits if (a) the delays could have been mitigated by Design-Builder as described in Section 2.2(i) or (b) the delays are due to differences in the Basic Configuration and Design-Builder s final design Changes to Governmental Approvals Not Obtained by Design-Builder If Design-Builder s proposed Project design is inconsistent with any Governmental Approval obtained by Port, Department or another Governmental Person for the Project, then Design- Builder shall be solely responsible to obtain (or to provide the resources and work with the applicable Governmental Person to obtain) an amendment, revision, update or re-issuance, as applicable, of the Governmental Approval. Design-Builder shall not be entitled to any relief for increased costs or Delays associated with this responsibility. If, however, the inconsistency described in this section is solely caused by a failure of a Governmental Approval obtained by Port or Department prior to the Effective Date to be in agreement with the Basic Configuration or R/W Work Map, then Port shall be responsible to obtain the amendment, revision, update or reissuance, as applicable, to correct that inconsistency and any Delay directly resulting from that inconsistency shall be considered a Port-Caused Delay. PORT OF LONG BEACH 12 Final for Execution
22 2.7 Progression of Work Design-Builder shall at all times schedule and direct its Work to provide an orderly progression of the Work to achieve Substantial Completion and Final Acceptance by the applicable Completion Deadlines and in accordance with Exhibits C-15 and C-16, including furnishing such employees, materials, facilities and equipment and working such hours (including extra shifts and overtime operations) as may be necessary to achieve such goals, all at Design-Builder s own expense, except as otherwise specifically provided in Section Design and Engineering Personnel All design and engineering Work furnished by Design-Builder shall be performed by or under the supervision of Persons licensed to practice architecture, engineering or surveying (as applicable) in the State, and by personnel who are careful, skilled, experienced and competent in their respective trades or professions, who are professionally qualified to perform the Work in accordance with the Contract Documents, and who shall assume professional responsibility for the accuracy and completeness of the Design Documents and Construction Documents prepared or checked by them. PORT OF LONG BEACH 13 Final for Execution
23 3. INFORMATION SUPPLIED TO CONTRACTOR; RESPONSIBILITY FOR DESIGN 3.1 Information Supplied Port has made available to Design-Builder information which is described in the Contract Documents and certain Reference Information Documents regarding the Project, and has allowed Design-Builder access to the Site for purposes of inspection and testing. 3.2 Responsibility for Design Design-Builder agrees that it has full responsibility for preparation and submission of the Design Documents. Design-Builder specifically acknowledges and agrees that: (a) (b) (c) (d) The Basic Configuration is preliminary and conceptual in nature. Design-Builder is not entitled to rely on and has not relied on (i) the RID or (ii) any other documents or information provided by Port, except to the extent specifically permitted in the Contract Documents. Design-Builder is responsible for correcting any Errors in the Basic Configuration through the design and/or construction process as set forth in Book 2 without any increase in the Contract Price or extension of a Completion Deadline. Design-Builder s Warranties and indemnities hereunder cover Errors in the Project even though they may be related to Errors in the Basic Configuration or RID. 3.3 No Liability Regarding RID Port does not represent or warrant that the information contained in the RID is either complete or accurate or that such information conforms with the requirements of the Contract Documents. Design-Builder understands and agrees that Port shall not be responsible or liable in any respect for any loss, damage, injury, liability, cost or cause of action whatsoever suffered by any Design-Builder-Related Entity by reason of any use of any information contained in the RID or any action or forbearance in reliance thereon, except to the extent that Port has specifically agreed herein that Design-Builder shall be entitled to an increase in the Contract Price and/or extension of a Completion Deadline with respect to such matter. Design-Builder further acknowledges and agrees that (a) if and to the extent Design-Builder or anyone on Design- Builder s behalf uses any of said information in any way, such use is made on the basis that Design-Builder, not Port, has approved and is responsible for said information, and (b) Design- Builder is capable of conducting and is obligated hereunder to conduct any and all studies, analyses and investigations as it deems advisable to verify or supplement said information, and that any use of said information is entirely at Design-Builder s own risk and at its own discretion. 3.4 Professional Licensing Laws Port does not intend to contract for, pay for, or receive any design services which are in violation of any professional licensing laws, and by execution of the Contract, Design-Builder acknowledges that Port has no such intent. It is the intent of the Parties that Design-Builder is fully responsible for furnishing the design of the Project, although the fully licensed design firm(s) or individuals designated herein will perform the design services required by the Contract PORT OF LONG BEACH 14 Final for Execution
24 Documents. Any references in the Contract Documents to Design-Builder s responsibilities or obligations to perform the design portions of the Work shall be deemed to mean that Design- Builder shall furnish the design for the Project. The terms and provisions of this Section 3.4 shall control and supersede every other provision of the Contract Documents with respect to this issue. 3.5 Notification of Third-Party Claims Port and Design-Builder shall each provide timely written notification to the other Party of the receipt of any third-party claim relating to, arising out of, or connected with work performed by or on behalf of Design-Builder under this Contract. PORT OF LONG BEACH 15 Final for Execution
25 4. TIME WITHIN WHICH PROJECT SHALL BE COMPLETED 4.1 Notices to Proceed Issuance of NTP1 Upon the satisfaction of the conditions set forth in this section, Port shall issue NTP1 to Design- Builder authorizing Design-Builder to commence the following Work: the Design Work; mobilization; temporary construction activities; tree removal; clearing and grubbing; coordination with Utility Owners; soil borings; test piles; test shafts; and other items specifically authorized in writing by Port. Design-Builder shall not commence any such Work prior to issuance of NTP1. Port anticipates that it will issue NTP1 within 14 Days after all the following events have been fully satisfied: (a) (b) (c) (d) (e) (f) Design-Builder has obtained and delivered to Port certified conformed copies of the Payment Bond and Performance Bond, and Port has Accepted or Approved as applicable those bonds; Design-Builder has obtained and Port has Approved all insurance policies or, as described in Section 9.1.1, insurance binders required to be delivered to Port pursuant to Section 9 for the Work to be performed pursuant to NTP1, and all such policies remain in full force and effect; Design-Builder and/or Port, as applicable, have obtained all necessary rights of access for such portion of the Project; Design-Builder has developed and delivered to Port and Port has Accepted a preliminary 120-Day schedule, which schedule Design-Builder prepared in accordance with Exhibit 2-2-C of Book 2, Section 2; Design-Builder has developed and delivered to Port and Port has Accepted or Approved Design-Builder s DBE/UDBE Performance Plan for the Project; and Design-Builder has developed and delivered to Port and Port has Approved an initial version of Design-Builder s Quality Manual for the Project (described in Book 2, Section ) that includes a detailed description of the quality processes Design- Builder will use for Work under NTP1 and a conceptual description of the quality processes Design-Builder will use for Work under NTP Issuance of NTP2 Upon the satisfaction of the conditions set forth in this section, Port shall issue NTP2 to Design- Builder authorizing Design-Builder to commence the remainder of the Work not covered by NTP1, provided that Design-Builder must seek and obtain authorization to commence Construction Work pursuant to Section 4.4 for specific design packages. Design-Builder shall not commence any such Work prior to issuance of NTP2. Port anticipates that it will issue NTP2 within 14 Days after all of the following events have been fully satisfied: (a) The Payment Bond and Performance Bond delivered by Design-Builder to Port in accordance with Section 8.1 remain in full force and effect; PORT OF LONG BEACH 16 Final for Execution
26 (b) (c) (d) Design-Builder has obtained and Port has Approved all insurance policies or, as described in Section 9.1.1, insurance binders required to be delivered to Port pursuant to Section 9 for the Work to be performed pursuant to NTP2, and all such policies remain in full force and effect, provided that this requirement does not extend to any insurance policies that Design-Builder is not required to provide until a later date pursuant to Section 9; All Governmental Approvals necessary to begin the applicable portions of the Construction Work have been obtained and Design-Builder has furnished to Port fully executed copies of such Governmental Approvals; Design-Builder has satisfied all applicable pre-construction requirements contained in the Environmental Approvals, New Environmental Approvals and other Governmental Approvals for the applicable portion of the Construction Work; (e) Port s Approval of the Environmental Management Plan in accordance with Book 2, Section 4; (f) Port s Approval of the Traffic Management Plan in accordance with Book 2, Section 18; (g) (h) Design-Builder has developed and delivered to Port and Port has Accepted the Baseline Schedule, which schedule Design-Builder prepared in accordance with Exhibit 2-2-C of Book 2, Section 2; and Design-Builder has developed and delivered to Port and Port has Approved Design- Builder s Quality Manual for the Project (described in Book 2, Section ). 4.2 Completion Deadlines Substantial Completion Deadline Design-Builder shall achieve Substantial Completion by the Substantial Completion Deadline. Said deadline for Substantial Completion, is referred to herein as the Substantial Completion Deadline Final Acceptance Deadline Design-Builder shall achieve Final Acceptance by the Final Acceptance Deadline, which deadline may be extended hereunder No Time Extensions Except as otherwise specifically provided in Section 12, Port shall have no obligation to extend any Completion Deadline and Design-Builder shall not be relieved of its obligation to comply with the Contract Schedule and achieve Substantial Completion and Final Acceptance by the applicable Completion Deadlines for any reason. PORT OF LONG BEACH 17 Final for Execution
DESIGN-BUILD AGREEMENT LOOP 1604 WESTERN EXTENSION PROJECT
DESIGN-BUILD AGREEMENT LOOP 1604 WESTERN EXTENSION PROJECT Between Texas Department of Transportation and [DESIGN-BUILD CONTRACTOR] Dated as of:, 2013 Loop 1604 Western Extension Project Design-Build Agreement
More informationSTANDARD FORM OF CONTRACT FOR CONSTRUCTION MANAGEMENT SERVICES INCLUDING CONSTRUCTION FOR A GUARANTEED MAXIMUM PRICE BETWEEN
STANDARD FORM OF CONTRACT FOR CONSTRUCTION MANAGEMENT SERVICES INCLUDING CONSTRUCTION FOR A GUARANTEED MAXIMUM PRICE BETWEEN THE DEKALB COUNTY BOARD OF EDUCATION AND THE CONSTRUCTION MANAGER Construction
More informationAGREEMENT FOR CONSTRUCTION MANAGEMENT SERVICES FOR
AGREEMENT FOR CONSTRUCTION MANAGEMENT SERVICES FOR By and Between WILLIAM S. HART UNION HIGH SCHOOL DISTRICT And Dated as of TABLE OF CONTENTS Page RECITALS... 1 PART 1 PROVISION OF CM SERVICES... 1 Section
More informationWHOLESALE BROKER/CONTRACTOR AGREEMENT
WHOLESALE BROKER/CONTRACTOR AGREEMENT THIS WHOLESALE BROKER/CONTRACTOR AGREEMENT is entered into as of by and between Bondcorp Realty Services, Inc. ("Lender"), and, A CORPORATION ( Broker/Contractor ),
More informationCONTRACT FOR SERVICES RECITALS
CONTRACT FOR SERVICES THIS AGREEMENT is entered into between the (hereinafter Authority ) and [INSERT NAME] (hereinafter Contractor ) and sets forth the terms of this Agreement. Authority and Contractor
More informationCAPITAL MAINTENANCE AGREEMENT I-2/I-69C INTERCHANGE PROJECT. between TEXAS DEPARTMENT OF TRANSPORTATION. and [DB CONTRACTOR] Dated as of:, 2019
CAPITAL MAINTENANCE AGREEMENT I-2/I-69C INTERCHANGE PROJECT between TEXAS DEPARTMENT OF TRANSPORTATION and [DB CONTRACTOR] Dated as of:, 2019 HIDALGO COUNTY Texas Department of Transportation I-2/I-69C
More informationANNEX A Standard Special Conditions For The Salvation Army
ANNEX A Standard Special Conditions For The Salvation Army TO BE ATTACHED TO AIA B101-2007 EDITION ABBREVIATED STANDARD FORM OF AGREEMENT BETWEEN OWNER AND ARCHITECT 1. Contract Documents. This Annex supplements,
More informationStandard Form of Agreement Between. Owner and Design-Builder Cost Plus Fee with an Option for a Guaranteed Maximum Price
November 3, 2014 Standard Form of Agreement Between Owner and Design-Builder Cost Plus Fee with an Option for a Guaranteed Maximum Price This document has important legal consequences. Consultation with
More informationPART 3. Comprehensive Agreement Between Department and Design-Builder
PART 3 Between Department and Design-Builder This COMPREHENSIVE AGREEMENT for the I-64 Hampton Roads Bridge-Tunnel Project (the Agreement ) is made as of [ ], 2019 (the Agreement Date ), by and between
More informationDOUKPSC04 Rev Feb 2013
DOUKPSC04 Purchasing Standard conditions for the Purchase of Consultancy Services 1 DEFINITIONS In the Contract (as hereinafter defined) the following words and expressions shall have the meanings hereby
More informationSHORT FORM OF AGREEMENT BETWEEN OWNER AND ENGINEER FOR PROFESSIONAL SERVICES
SHORT FORM OF AGREEMENT BETWEEN OWNER AND ENGINEER FOR PROFESSIONAL SERVICES THIS IS AN AGREEMENT effective as of March 3, 2016 ( Effective Date ) between College Community School District ("Owner") and
More informationAMENDED AND RESTATED DESIGN-BUILD CONTRACT. Dulles Corridor Metrorail Project. Dated as of July 25, by and between
AMENDED AND RESTATED DESIGN-BUILD CONTRACT Dated as of July 25, 2008 by and between THE METROPOLITAN WASHINGTON AIRPORTS AUTHORITY and DULLES TRANSIT PARTNERS, LLC a Virginia Limited Liability Company
More informationDocument A133 TM. AGREEMENT made as of the day of in the year Two Thousand and Sixteen. BETWEEN the Owner:
Document A133 TM 2009 Standard Form of Agreement Between Owner and Construction Manager as Constructor where the basis of payment is the Cost of the Work Plus a Fee with a Guaranteed Maximum Price AGREEMENT
More informationWESTERN RIVERSIDE COUNCIL OF GOVERNMENTS EQUIPMENT PURCHASE AGREEMENT
WESTERN RIVERSIDE COUNCIL OF GOVERNMENTS EQUIPMENT PURCHASE AGREEMENT This Equipment Purchase Agreement ( Agreement ) is entered into this day of, 20, by and between the Western Riverside Council of Governments,
More informationCONSULTANT SERVICES AGREEMENT (Hazardous Material Assessment/ Abatement Consulting Services)
CONSULTANT SERVICES AGREEMENT (Hazardous Material Assessment/ Abatement Consulting Services) This AGREEMENT is made and entered into this day of in the year 20 ( EFFECTIVE DATE ), between the Los Alamitos
More informationCONSTRUCTION CONTRACT
CONSTRUCTION OR: Name Mailing Address City, State, Zip Code Telephone Number Fax Number E-mail address BID ACCEPTANCE DATE: COMPLETION DATE: DATE: TOTAL BID : TABLE OF CONTENTS ARTICLE 1 PARTIES... Page
More informationCboe Global Markets Subscriber Agreement
Cboe Global Markets Subscriber Agreement Vendor may not modify or waive any term of this Agreement. Any attempt to modify this Agreement, except by Cboe Data Services, LLC ( CDS ) or its affiliates, is
More informationDocument A201 TM. General Conditions of the Contract for Construction. (Name and location or address)
Document A201 TM 2007 General Conditions of the Contract for Construction for the following PROJECT: (Name and location or address) THE OWNER: (Name, legal status and address) Case Western Reserve University
More informationSAMPLE DOCUMENT SUBCONTRACT AGREEMENT
SUBCONTRACT AGREEMENT THIS SUBCONTRACT, made this day of by and between (hereinafter "Contractor"), with an office and principal place of business at and (hereinafter "Subcontractor") with an office and
More informationContractor for any and all liability, costs, expenses, fines, penalties, and attorney s fees resulting from its failure to perform such duties.
SUBCONTRACT AGREEMENT THIS SUBCONTRACT, made this day of, 20 by and between (hereinafter "Contractor"), with an office and principal place of business at and (hereinafter "Subcontractor") with an office
More informationSAMPLE CONTRACT BETWEEN THE BOARD OF COMMISSIONERS OF THE PORT OF NEW ORLEANS AND CONTRACTOR NAME FOR SERVICES
SAMPLE CONTRACT BETWEEN THE BOARD OF COMMISSIONERS OF THE PORT OF NEW ORLEANS AND CONTRACTOR NAME FOR SERVICES On this day of, 2017, the Board of Commissioners of the Port of New Orleans hereinafter sometimes
More informationFIRM FIXED PRICE TERMS AND CONDITIONS AES-1 Applicable to Architect-Engineering Services Contracts INDEX CLAUSE NUMBER TITLE PAGE
Applicable to Architect-Engineering Services Contracts INDEX CLAUSE NUMBER TITLE PAGE 1. DEFINITIONS 1 2. COMPOSITION OF THE ARCHITECT-ENGINEER 1 3. INDEPENDENT CONTRACTOR 1 4. RESPONSIBILITY OF THE ARCHETECT-ENGINEER
More informationDocument A101 TM. Standard Form of Agreement Between Owner and Contractor where the basis of payment is a Stipulated Sum
Document A101 TM 2007 Standard Form of Agreement Between Owner and Contractor where the basis of payment is a Stipulated Sum AGREEMENT made as of the day of in the year (In words, indicate day, month and
More informationFIXTURING/INSTALLATION AGREEMENT
Dept Index Contract No. Requisition No. FIXTURING/INSTALLATION AGREEMENT This FIXTURING/INSTALLATION AGREEMENT by and between THE UNIVERSITY OF NORTH FLORIDA BOARD OF TRUSTEES, a public body corporate
More informationSARPY COUNTY AND SARPY CITIES WASTEWATER AGENCY
SARPY COUNTY AND SARPY CITIES WASTEWATER AGENCY RESOLUTION APPROVING AGREEMENT WITH HDR FOR ENGINEERING SERVICES RELATED TO THE SOUTHERN SARPY COUNTY WASTEWATER TREATMENT STUDY PHASE 2B WHEREAS, Sarpy
More informationRENOVATION CONTRACT. Borrower Name(s): Phone #: Phone #:
RENOVATION CONTRACT Case Number: Date: Borrower Name(s): Phone #: Phone #: THIS RENOVATION CONTRACT ( Contract ) dated as of, by and between ( Owner ) and ( Contractor ). Owner and Contractor, in consideration
More informationAGREEMENT AND CONDITIONS OF SUB-CONTRACT (DOMESTIC)
AGREEMENT AND CONDITIONS OF SUB-CONTRACT (DOMESTIC) FOR USE IN CONJUNCTION WITH THE FORMS OF MAIN CONTRACT FOR PUBLIC WORKS ISSUED BY THE OFFICE OF GOVERNMENT PROCUREMENT, DEPARTMENT OF PUBLIC EXPENDITURE
More informationDFI FUNDING BROKER AGREEMENT Fax to
DFI FUNDING BROKER AGREEMENT Fax to 916-848-3550 This Wholesale Broker Agreement (the Agreement ) is entered i n t o a s o f (the Effective Date ) between DFI Funding, Inc., a California corporation (
More informationStandard Form of Agreement Between Contractor and Subcontractor
Standard Form of Agreement Between Contractor and Subcontractor GENERAL TERMS AND CONDITIONS ARTICLE 1 THE SUBCONTRACT DOCUMENTS 1.1 The Subcontract Documents consist of (1) these General Terms and Conditions,
More informationAGREEMENT BETWEEN OWNER AND CONSTRUCTION MANAGER PRE-CONSTRUCTION AND CONSTRUCTION SERVICES
AGREEMENT BETWEEN OWNER AND CONSTRUCTION MANAGER PRE-CONSTRUCTION AND CONSTRUCTION SERVICES AGREEMENT made by and between, hereinafter called the Owner, and SITESCOMMERCIAL, LLC 185 WIND CHIME COURT, SUITE
More informationPROJECT IMPLEMENTATION AGREEMENT September 1, 2009
PROJECT IMPLEMENTATION AGREEMENT September 1, 2009 This Project Implementation Agreement (this "Agreement") is entered into as of, 20, by and between the Climate Action Reserve, a California nonprofit
More informationHULL & COMPANY, INC. DBA: Hull & Company MacDuff E&S Insurance Brokers PRODUCER AGREEMENT
HULL & COMPANY, INC. DBA: Hull & Company MacDuff E&S Insurance Brokers PRODUCER AGREEMENT THIS PRODUCER AGREEMENT (this Agreement ), dated as of, 20, is made and entered into by and between Hull & Company,
More informationAssumption Reinsurance Depopulation Program. Offer and Assumption Agreement
Assumption Reinsurance Depopulation Program Offer and Assumption Agreement Offer and Assumption Agreement This Offer and Assumption Agreement (hereinafter Agreement) is effective as of the First day of
More informationI-2/I-69C INTERCHANGE PROJECT DESIGN-BUILD CONTRACT TERM SHEET
I-2/I-69C INTERCHANGE PROJECT DESIGN-BUILD CONTRACT TERM SHEET This document provides background information and summarizes the major terms of the Design- Build Contract ( DBC ) for the design and construction
More informationStandard Form of Agreement Between Owner and Contractor for a Residential or Small Commercial Project
Document A105 2007 Standard Form of Agreement Between Owner and Contractor for a Residential or Small Commercial Project AGREEMENT made as of the in the year (In words, indicate day, month and year.) BETWEEN
More informationDocument A General Conditions of the Contract for Construction, Construction Manager as Adviser Edition
Document A232 2009 General Conditions of the Contract for Construction, Construction Manager as Adviser Edition for the following PROJECT: (Name, and location or address) THE CONSTRUCTION MANAGER: (Name,
More informationAIA Document A201 TM 1997
AIA Document A201 TM 1997 General Conditions of the Contract for Construction for the following PROJECT: (Name and location or address): Project University of Maine at Farmington THE OWNER: (Name and address):
More informationON-CALL CIVIL ENGINEERING CONSULTING SERVICES AGREEMENT BETWEEN THE CITY OF PITTSBURG AND [NAME OF CONSULTANT]
ON-CALL CIVIL ENGINEERING CONSULTING SERVICES AGREEMENT BETWEEN THE CITY OF PITTSBURG AND [NAME OF CONSULTANT] THIS Agreement ( Agreement ) for consulting services is made by and between the City of Pittsburg
More informationPROFESSIONAL SERVICES AGREEMENT. For On-Call Services WITNESSETH:
PROFESSIONAL SERVICES AGREEMENT For On-Call Services THIS AGREEMENT is made and entered into this ENTER DAY of ENTER MONTH, ENTER YEAR, in the City of Pleasanton, County of Alameda, State of California,
More informationAMERICAN INTERNATIONAL SPECIALTY LINES INSURANCE COMPANY 175 Water Street Group, Inc. New York, NY 10038
AIG COMPANIES AIG MERGERS & ACQUISITIONS INSURANCE GROUP SELLER-SIDE R&W TEMPLATE AMERICAN INTERNATIONAL SPECIALTY LINES INSURANCE COMPANY 175 Water Street Group, Inc. New York, NY 10038 A Member Company
More informationGeneral Conditions for Construction GCC201. Contract Type: Document No. for the following PROJECT: (Name and location or address) EXAMPLE
Page 1 of 37 for the following PROJECT: (Name and location or address) EXAMPLE THE OWNER: (Name and address) Example, THE ARCHITECT: (Name and address) TABLE OF ARTICLES 1 GENERAL PROVISIONS 2 OWNER 3
More information2. Do you have any final geotechnical report for the proposed property? Yes, See attached. More to come.
Request for Proposals (RFP) for Construction Management at Risk Services for Austin Road Master Planning Including New East Barrow High School Phase 1 Project Addendum #1 Dated 9.24.2018 Page 1 See questions
More informationC R D A Capital Region Development Authority
C R D A Capital Region Development Authority 100 Columbus Boulevard Suite 500 Hartford, CT 06103-2819 Tel (860) 527-0100 Fax (860) 527-0133 www.crdact.net September 26, 2018 Addendum #3 Regional Market
More informationDrexel University Independent Contractor Service Provider Agreement. Name: [ ] Limited Liability Company [ ] Professional Corporation
This is a form agreement for discussion purposes only. It does not constitute a binding offer or contract of Drexel University until all of the terms have been approved and this agreement is executed by
More informationSTATE OF NORTH CAROLINA GUARANTEED ENERGY PERFORMANCE CONTRACTING PROGRAM ENERGY SERVICES AGREEMENT
STATE OF NORTH CAROLINA GUARANTEED ENERGY PERFORMANCE CONTRACTING PROGRAM ENERGY SERVICES AGREEMENT This Energy Services Agreement (the "Agreement" or "ESA") is entered into on,20, the Commencement Date,
More informationCONSULTING AGREEMENT STANDARD TERMS AND CONDITIONS
CONSULTING AGREEMENT STANDARD TERMS AND CONDITIONS The following Standard Terms and Conditions, together with the attached scope of services constitute the terms of the Agreement between ("Consultant")
More informationSHORT FORM OF AGREEMENT BETWEEN OWNER AND ENGINEER FOR PROFESSIONAL SERVICES
SHORT FORM OF AGREEMENT BETWEEN OWNER AND ENGINEER FOR PROFESSIONAL SERVICES THIS IS AN AGREEMENT effective as of February 11, 2017 ( Effective Date ) between Des Moines Area Metropolitan Planning Organization
More informationDEVELOPER EXTENSION AGREEMENT
DEVELOPER EXTENSION AGREEMENT SILVER LAKE WATER DISTRICT APPLICATION AND AGREEMENT TO CONSTRUCT EXTENSION TO DISTRICT SYSTEM Project: Developer: The undersigned, Developer (also referred to as Owner )
More informationPage of 5 PURCHASE AGREEMENT
Page - 1 - of 5 (the Effective Date ) PURCHASE AGREEMENT THIS PURCHASE AGREEMENT (this Purchase Agreement ), dated the date specified above, is by and between (the "Contractor") and (the "Subcontractor").
More informationForce Vector, Inc. Master Contract for Sales of Goods and Services
Force Vector, Inc. Master Contract for Sales of Goods and Services 1. Force Vector s Business. Force Vector, Inc., an Illinois corporation ( Force Vector ) sells various industrial goods as a reseller
More informationSHORT FORM STANDARD SUBCONTRACT. This Agreement is made this day of, 20, between
SHORT FORM STANDARD SUBCONTRACT This Agreement is made this day of, 20, between (Contractor) and (Subcontractor). The work described in Section I below shall be performed in accordance with the prime contract
More informationDocument A Standard Abbreviated Form of Agreement Between Owner and Contractor
Document A104 2017 Standard Abbreviated Form of Agreement Between Owner and Contractor AGREEMENT made as of the day of in the year (In words, indicate day, month and year.) BETWEEN the Owner: (Name, legal
More informationAgreement for Non-Professional Advisors Providing Services to Interactive Brokers Canada Customers
Agreement for Non-Professional Advisors Providing Services to Interactive Brokers Canada Customers This Agreement is entered into between Interactive Brokers Canada Inc. (IB) and the undersigned Family
More informationOREGON STATE UNIVERSITY CM/GC CONTRACT. (Construction Manager/General Contractor)
OREGON STATE UNIVERSITY CM/GC CONTRACT (Construction Manager/General Contractor) THE CONTRACT IS BETWEEN: OWNER: Oregon State University And CONSTRUCTION MANAGER/ GENERAL CONTRACTOR (referred to as Contractor
More informationACCEPTANCE OF CONTRACT/TERMS AND CONDITIONS
1. ACCEPTANCE OF CONTRACT/TERMS AND CONDITIONS 1.1. This Contract together with its referenced Exhibits, supersedes any prior offers, negotiations, and agreements concerning the subject matter hereof and
More informationI-635 LBJ EAST PROJECT DESIGN-BUILD CONTRACT TERM SHEET
I-635 LBJ EAST PROJECT DESIGN-BUILD CONTRACT TERM SHEET This document provides background information and summarizes the major terms of the Design-Build Contract ( DBC ) for the design and construction
More informationMASTER SUBCONTRACT AGREEMENT
MASTER SUBCONTRACT AGREEMENT This Master Subcontract Agreement ( Subcontract ), made this day of, 20 by and between (hereinafter "Contractor"), with an office and principal place of business at and (hereinafter
More informationCommonwealth of Virginia Alternate Project Delivery Office Design-Build Standard Template Documents
Alternate Project Delivery Office Design-Build Standard Template Documents Part 3 Lump Sum Agreement Part 4 General Conditions of Contract Division I Amendments to the Standard Specifications July 2013
More informationSouthern California Edison Revised Cal. PUC Sheet No E Rosemead, California (U 338-E) Cancelling Revised Cal. PUC Sheet No.
Southern California Edison Revised Cal. PUC Sheet No. 62200-E Rosemead, California (U 338-E) Cancelling Revised Cal. PUC Sheet No. 61862-E Sheet 1 TIME-OF-USE BASE INTERRUPTIBLE PROGRAM AGGREGATOR AGREEMENT
More informationDocument A201 TM 2007 SP
AIA Document A201 TM 2007 SP General Conditions of the Contract for Construction, for use on a Sustainable Project for the following PROJECT: (Name and location or address) THE OWNER: (Name, legal status
More informationHull & Company, LLC Tampa Bay Branch PRODUCER AGREEMENT
Hull & Company, LLC Tampa Bay Branch PRODUCER AGREEMENT THIS PRODUCER AGREEMENT (this Agreement ), dated as of, 20, is made and entered into by and between Hull & Company, LLC, a Florida corporation (
More informationCLAIMS ADMINISTRATION SERVICES AGREEMENT
CLAIMS ADMINISTRATION SERVICES AGREEMENT This Claims Administration Services Agreement (the "Agreement") is made and entered into by and between XYZ School District ("Client") and Keenan & Associates ("Keenan").
More informationTRINITY UNIVERSITY CONSULTING SERVICES AGREEMENT
TRINITY UNIVERSITY CONSULTING SERVICES AGREEMENT This CONSULTING SERVICES AGREEMENT (this Agreement ) is entered into effective as of, by and between Trinity University, an agency and institution of higher
More informationTHIS CONSTRUCTION CONTRACT ( Contract ) dated as of ( Owner ) and ( Contractor ) having a principal place of business at.
Homeowner Contractor HomeStyle Renovation Contract Loan Number: Date: Borrower Name(s): Phone #: Phone #: THIS CONSTRUCTION CONTRACT ( Contract ) dated as of by and between ( Owner ) and ( Contractor )
More informationSTANDARD FORM OF AGREEMENT BETWEEN DESIGN-BUILDER AND GENERAL CONTRACTOR - LUMP SUM
STANDARD FORM OF AGREEMENT BETWEEN DESIGN-BUILDER AND GENERAL CONTRACTOR - LUMP SUM Document No. 555 Second Edition, 2010 Design-Build Institute of America Washington, DC Design-Build Institute of America
More informationOwner and Design-Builder
for the following PROJECT: (Name and location or address) EXAMPLE Page 1 of 29 THE OWNER: (Name and address) Example, THE DESIGN-BUILDER: (Name and address) Nielsen Environmental 8484 Wilshire Blvd Suite
More informationDESIGN/BUILD CONTRACT FOR GENERAL AVIATION TERMINAL BUILDING
DESIGN/BUILD CONTRACT FOR GENERAL AVIATION TERMINAL BUILDING This DESIGN/BUILD CONTRACT (the Contract ) is made and entered into by and between the CITY OF OCALA, a Florida municipal corporation (the Owner
More information1997 Part 2. Document B141. Standard Form of Architect's Services: Design and Contract Administration TABLE OF ARTICLES
TM Document B141 Standard Form of Architect's Services: Design and Contract Administration 1997 Part 2 TABLE OF ARTICLES 2.1 PROJECT ADMINISTRATION SERVICES 2.2 SUPPORTING SERVICES 2.3 EVALUATION AND PLANNING
More informationAGREEMENT BETWEEN CITY OF NORTH LAS VEGAS AND [INSERT NAME OF SERVICES PROVIDER]
AGREEMENT BETWEEN CITY OF NORTH LAS VEGAS AND [INSERT NAME OF SERVICES PROVIDER] This Agreement (this AAgreement@) is executed this day of, 2016 by and between the City of North Las Vegas, a Nevada municipal
More informationU.S. DEPARTMENT OF HOMELAND SECURITY'S URBAN AREAS SECURITY INITIATIVE GRANT PROGRAM REQUIREMENTS FOR PROCUREMENT CONTRACTS
U.S. DEPARTMENT OF HOMELAND SECURITY'S URBAN AREAS SECURITY INITIATIVE GRANT PROGRAM REQUIREMENTS FOR PROCUREMENT CONTRACTS I. DEFINITIONS A. Agreement means the agreement between City and Contractor to
More informationComprehensive Development Agreement State Highway 288 Toll Lanes in Harris County. Between Texas Department of Transportation and [ ]
Comprehensive Development Agreement State Highway 288 Toll Lanes in Harris County Between Texas Department of Transportation and [ ] Dated [ ] PART A ARTICLE 1 TABLE OF CONTENTS THE TRANSACTION; FINANCING
More information7/14/16. Hendry County Purchase Order Terms and Conditions
Hendry County Purchase Order Terms and Conditions 1. Offer The order set forth in the Purchase Order is subject to cancellation by HENDRY COUNTY without notice if not accepted by VENDOR within fourteen
More informationINDEPENDENT CONTRACTOR AGREEMENT
INDEPENDENT CONTRACTOR AGREEMENT This agreement is entered into as of, 2004, by and between Rensselaer Polytechnic Institute (hereinafter called Rensselaer"), a non-profit educational institution with
More informationMASTER SUPPLY AND SERVICES AGREEMENT BETWEEN THE CROWN IN RIGHT OF ONTARIO AS REPRESENTED BY THE MINISTER OF TRANSPORTATION. - and - ACCENTURE INC.
MASTER SUPPLY AND SERVICES AGREEMENT BETWEEN THE CROWN IN RIGHT OF ONTARIO AS REPRESENTED BY THE MINISTER OF TRANSPORTATION - and - ACCENTURE INC. TABLE OF CONTENTS ARTICLE 1 SCOPE... 1 1.1 Agreement...
More informationCivil Design Consultants, Inc.
Civil Design Consultants, Inc. AGREEMENT FOR PROFESSIONAL ENGINEERING SERVICES Project: CLIENT: Dakota Ridge waterline replacement Dakota Ridge Homeowner s Association ENGINEER: Civil Design Consultants,
More informationCUSTOMER S ACCEPTANCE OF
Force Vector Master Contract for Equipment Rental and Services 1) FVI s Business. (a) Force Vector, Inc., an Illinois corporation, ( FVI ) rents various types of industrial equipment ( Rented Equipment
More informationREQUEST FOR PROPOSAL 3068 FOR METRO ETHERNET CONNECTIVITY
REQUEST FOR PROPOSAL 3068 FOR METRO ETHERNET CONNECTIVITY Prepared by Community College of Allegheny County Purchasing Department College Office 800 Allegheny Avenue Pittsburgh, Pennsylvania 15233 (412)
More informationHABCO TOOL & DEVELOPMENT COMPANY, INC. PURCHASE ORDER TERMS AND CONDITIONS
This Order (as defined herein) is expressly limited to and made conditional upon the terms and conditions contained herein, and any of the Seller's terms in addition to or different from those contained
More informationMASTER SUBCONTRACTOR AGREEMENT
The Builders Association of Minnesota, its local associations, and Fredrikson & Byron, P.A. disclaim any liability resulting from the use of these sample forms, and remind you that no single form is appropriate
More informationCONSULTING SERVICES AGREEMENT [Lump Sum]
MWH CONTRACT No. CONSULTING SERVICES AGREEMENT [Lump Sum] This agreement ( Agreement ), with an effective date of September 20, 2013, is by and between the CITY OF NORTH ROYALTON ( CLIENT ) and MWH Americas,
More informationW I T N E S S E T H:
GENERAL CONTRACTORS SUBCONTRACT AGREEMENT THIS CONTRACT, made and entered into the day of, 20, by and between, a Tennessee, having its principal place of business at, hereinafter referred to as "Contractor"
More information[ ] - AND - [ ] POWER PURCHASE AGREEMENT RELATING TO DATED [ ]
This document has been prepared for the purposes of the PPP IN INFRASTRUCTURE RESOURCE CENTER FOR CONTRACTS, LAWS AND REGULATIONS (PPPIRC) website. It is a sample document FOR REFERENCE PURPOSES ONLY and
More informationJSA PRODUCER AGREEMENT
JSA PRODUCER AGREEMENT This Producer Agreement (hereinafter, Agreement ) is entered into by and between Jackson Sumner and Associates, Inc. a North Carolina Corporation having its principal place of business
More informationSTANDARD GENERATION INTERCONNECTION AGREEMENT BETWEEN CITY OF ANAHEIM AND
STANDARD GENERATION INTERCONNECTION AGREEMENT BETWEEN CITY OF ANAHEIM AND This Standard Generation Interconnection Agreement ( Interconnection Agreement ), dated, for purposes of identification only, is
More informationMODEL DISTRIBUTION COOPERATIVE AGREEMENT FOR INTERCONNECTION AND PARALLEL OPERATION OF DISTRIBUTED GENERATION LONG FORM CONTRACT
APPENDIX A (insert date) MODEL DISTRIBUTION COOPERATIVE AGREEMENT FOR INTERCONNECTION AND PARALLEL OPERATION OF DISTRIBUTED GENERATION LONG FORM CONTRACT This Interconnection Agreement ( Agreement ) is
More informationAGREEMENT BETWEEN OWNER AND CONSTRUCTION MANAGER. Pre-Construction and Construction Phase Services
AGREEMENT BETWEEN OWNER AND CONSTRUCTION MANAGER Pre-Construction and Construction Phase Services FP&M Project No, CP00Error! Bookmark not defined. AGREEMENT made by and between the Board of Regents, State
More informationFEDERAL EMERGENCY MANAGEMENT AGENCY S GRANT PROGRAM REQUIREMENTS FOR PROCUREMENT CONTRACTS
FEDERAL EMERGENCY MANAGEMENT AGENCY S GRANT PROGRAM REQUIREMENTS FOR PROCUREMENT CONTRACTS I. DEFINITIONS A. Agreement means the agreement between City and Contractor to which this document (Federal Emergency
More informationDocument A SP General Conditions of the Contract for Construction, for use on a Sustainable Project, Construction Manager as Adviser Edition
Document A232 2009 SP General Conditions of the Contract for Construction, for use on a Sustainable Project, Construction Manager as Adviser Edition for the following PROJECT: (Name, and location or address)
More informationDeluxe Corporation Purchase Terms and Conditions
Deluxe Corporation Purchase Terms and Conditions The following standard purchase terms and conditions only apply to purchasing transactions (including but not limited to purchase orders) that do not have
More informationSOFTWARE LICENSE AGREEMENT
USE OF SUBMITTAL EXCHANGE ON THIS PROJECT IS GOVERNED BY THE SOFTWARE LICENSE AGREEMENT. IF SUBSCRIBER DOES NOT AGREE TO ALL OF THE TERMS AND CONDITIONS OF THIS AGREEMENT, DO NOT USE THE SERVICE. BY USING
More informationSTATE OF COLORADO BUILDING EXCELLENT SCHOOLS TODAY SUBLEASE OF MORGAN COUNTY SCHOOL DISTRICT RE-3. by and between
KR draft 12/16/14 After recording return to: Michael R. Johnson Kutak Rock LLP 1801 California Street, Suite 3000 Denver, Colorado 80202 STATE OF COLORADO BUILDING EXCELLENT SCHOOLS TODAY SUBLEASE OF MORGAN
More informationAH: STANDARD CONDITIONS OF CONTRACT FOR CONSTRUCTION AND IMPROVEMENT WOPKS SCC.1
COMPLIANCE TO CONDITIONS OF CONTRACT - SCC.1(Renovation) Please indicate clearly below your compliance to each clause of the Conditions of Contract. Where you are not in agreement, you should give your
More informationINTERNATIONAL GRAND INVESTMENT CORPORATION TERMS AND CONDITIONS
INTERNATIONAL GRAND INVESTMENT CORPORATION TERMS AND CONDITIONS Except as otherwise provided on the face of this Purchase Order or Supply Contract (the Order ) which is attached hereto, the parties agree
More informationAIA Document A201 TM 2007
AIA Document A201 TM 2007 General Conditions of the Contract for Construction for the following PROJECT: (Name and location or address) THE OWNER: (Name and address) THE ARCHITECT: (Name and address) TABLE
More informationNEW JOBS TRAINING AGREEMENT PART I
NEW JOBS TRAINING AGREEMENT PART I 1. College means Community College,,, Michigan. Notices, requests, or other communications directed to the College under this Agreement shall be addressed as follows:
More informationSTANDARD AGREEMENT BETWEEN OWNER AND CONTRACTOR For Construction Services for The University of Texas MD Anderson Cancer Center
STANDARD AGREEMENT BETWEEN OWNER AND CONTRACTOR For Construction Services for The University of Texas MD Anderson Cancer Center This Agreement is made as of, 20 (the Effective Date ), by and between The
More informationAGREEMENT RECITALS. C. COMPANY IN RECEIVERSHIP has outstanding and in force policies and is exiting this business and canceling those policies; and
AGREEMENT This Agreement ( Agreement ) is made and effective this day of, 200X ( Effective Date ), between the Florida Department of Financial Services, as Receiver for COMPANY IN RECEIVERSHIP (hereinafter
More informationTransurban Standard Terms and Conditions
Transurban Standard Terms and Conditions 1. General. 1.1 In the absence of an existing written contract between the parties in effect as of the Purchase Order date for the particular goods or services
More informationApplication to Sponsor VOICE 2018
Application to Sponsor VOICE 2018 COMPANY NAME ( Sponsor ): CONTACT NAME: EMAIL: Please indicate your desired sponsorship level, location and/or package from the selections below. Refer to the VOICE Sponsorship
More informationBUSINESS ASSOCIATE AGREEMENT
BUSINESS ASSOCIATE AGREEMENT This Agreement dated as of is made by and between, on behalf of its (School/Department/Division) (hereinafter referred to as Covered Entity ) and, (hereinafter Business Associate
More information