[Project Name] NZTA Contract No. [Contract Number] Conditions of Contract

Size: px
Start display at page:

Download "[Project Name] NZTA Contract No. [Contract Number] Conditions of Contract"

Transcription

1 [Project Name] NZTA Contract No. [Contract Number]

2 <<This page is to be left blank.>> DOCUMENT CHANGE FORMAT CODES This proforma document provides the basis for the development of physical works contract documents for the Transport Agency s Design and Construct (contracts >$4.5M) and Design and Construct (Basic) (design and construct contracts up to $4.5M) contracts. The purpose of the proforma is to provide consistency throughout the Transport Agency s regional operations and to ensure that an appropriate level of detail is provided in tender documentation. Black Black text is mandatory and may not be changed without approval prior to issue by the Transport Agency s Project Manager, who will consult with the Transport Agency s Project Services Team on all material changes made. Red Red text is used for data which requires fields to be updated or at least considered for each contract and marked at the beginning with [ and the end with ]. Text can also be used as is, modified or replaced. All red text adjustments must have the Transport Agency s Project Manager s approval. All finalised text converted to Black text, prior to tender document release Blue Blue text is used for optional clauses which can be included as is or deleted in full. All finalised text converted to Black text, prior to tender document release Purple Purple text is used for prequalification clauses which are to be included for prequalification tenders only. For most contracts the Transport Agency requires that Prequalification is used. Prequalification clause details must be prior approved with the Project Manager. All finalised text converted to Black text, prior to tender document release <<Guidance Notes>> Blue text with yellow highlighting and marked at the beginning with << and the end with >> are guidance notes for the Tender Document creator. Guidance notes must be removed prior to tender document release.

3 CONTENTS <<Ensure the Table of Contents is updated once the final revisions have been undertaken as pagination may have changed. Highlight the TOC right click update field update entire table >> CONTRACT AGREEMENT 2 GENERAL CONDITIONS 4 SCHEDULES TO THE GENERAL CONDITIONS OF CONTRACT 5 SCHEDULE 1 SPECIAL CONDITIONS OF CONTRACT SPECIFIC CONDITIONS OF CONTRACT 5 Schedule 2 Special Other 21 Schedule 3 Form of Contractor s performance bond 28 Schedule 4 Form of Principal s bond 30 Schedule 5 Form of Contractor s bond in lieu of retentions 31 Schedule 6 Form of Producer Statement - Construction 33 Schedule 7 Information on Contractor arranged construction insurance 34 Schedule 8 Information on Contractor arranged Plant insurance 36 Schedule 9 Information on public liability insurance 38 Schedule 10 Information on Contractor arranged motor vehicle insurance 40 Schedule 11 Information on Contractor arranged professional indemnity insurance 42 Schedule 12 Information on Principal arranged construction insurance 43 Schedule 13 Form of Contract (or Subcontractor) warranty 46 Schedule 14 Agreement for off-site Materials 47 Schedule 15 Practical Completion Certificate 53 Schedule 16 Final Completion Certificate 54 Schedule 17 Deed of Novation 55 Schedule 18 Cost fluctuations 59 Page 1 of 60

4 Contract Agreement CONTRACT FOR CONTRACT NUMBER THIS AGREEMENT is made on 20 BETWEEN ( the Contractor ) AND The a Crown entity, established on 1 August 2008 by Section 93 of the Land Transport Management Act 2003 ( the Principal ) IT IS AGREED as follows: 1. The Contractor shall carry out the obligations imposed on the Contractor by the Contract. 2. The Principal shall pay the Contractor the sum of $ or such greater or less sum as shall become payable under the Contract together with goods and services tax at the times and in the manner provided in the Contract. 3. Each party agrees to the terms and conditions as set out in the Contract. 4. The Contract comprises the following documents: (a) (b) (c) This Contract Agreement; The notification of acceptance of tender or award of Contract; The following post-tender documents <<Guidance note: identify any agreed posttender documents to be included, for example correspondence or minutes of pre-let meetings dealing with tender tags etc>> (d) (e) (f) (g) (h) (i) (j) (k) Schedule 2: Special Other ; Schedule 1: Special Specific ; The General NZS3916: 2013 (including other Schedules); The Principal s Requirements and Specifications issued prior to the Date of Acceptance of Tender; Drawings issued prior to the Date of Acceptance of Tender; The Schedule of Prices <<Delete if not applicable>> The Contractor s tender; Notices to Tenderers <<guidance note: give details with dates>>: Page 2 of 60

5 (l) (m) (n) The Schedule to the Conditions of Tendering; The Conditions of Tendering; and The following additional documents: <<Identify any additional documents to be included for example agreed correspondence>> 5. The documents comprising the Contract shall be taken as mutually explanatory, but in the case of ambiguity or conflict the priority of documents shall be listed in clause 4 above, with each document prevailing over a document lower in the list. 6. This Contract shall constitute the entire agreement between the parties. This Contract supersedes all prior negotiations, representations, and warranties, except insofar as the same are expressly incorporated herein. SIGNED BY Authorised Signatory of Contractor SIGNED BY Authorised Signatory of Principal Page 3 of 60

6 General Conditions The General shall be those included in NZS 3916: 2013 Conditions of Contract for Building and Civil Engineering - Design and Construct and the following clauses. <<Important Guidance note: When preparing any part of this tender, document, if there are sections/schedules that you do not require e.g. Schedule 18 - Cost Fluctuations within the, DO NOT DELETE these schedules and ensure that you insert text at top of page This Section Not Used >>. Page 4 of 60

7 Schedules to the General Conditions of Contract Schedule 1 Special Specific (Clause numbers refer to General Conditions) Contract for: [Contract Number, Contract Name] Clause in General Conditions Title and subject matter Specific condition data (Expand cells if required or add reference to further detail provided in Schedule 2.) 1 INTERPRETATION 1.2 Definitions The Principal is: of: 1.2, 10.2 Separable Portions Are there any Separable Portions in this Contract? If yes, the Separable Portions are as follows and as further defined in the Contract. 2 THE CONTRACT The Principal is: the (Transport Agency), a Crown entity, established on 1 August 2008 by Section 93 of the Land Transport Management Act 2003 Click to enter street address Select yes or no Click to enter reference 2.1 Type of Contract This Contract is a: (a) Lump sum contract governed by Local authority contracts in public places, and road contracts Is this Contract a local authority contract to which applies Is this Contract a contract in a public place to which B1 and B2 of Appendix B apply? Is this Contract a road contract to which Appendix B applies? If yes, the allowance under B3 shall be: 2.5 Evidence of Contract No Yes Yes Refer to Schedule 2 Special Conditions of Contract - Other, Clause How is the Contract Agreement executed? (a) As stated in Page 5 of 60

8 Clause in General Conditions Title and subject matter Specific condition data (Expand cells if required or add reference to further detail provided in Schedule 2.) 2.6 Documents prepared by the Engineer or Principal Copies of the Contract shall be supplied without charge to the Contractor in the following electronic format: pdf 2.7 Documents prepared by the Contractor Copies of the Contract shall be supplied without charge to the Engineer: Number of hard copy sets: Click to enter number In the following electronic form: pdf 3. BONDS 3.1 Contractor s Bond Is a Contractor s Bond required? Select yes or no Note - Bonds are accepted in principle from those insurance companies and bond companies who hold a minimum interactive S&P rating of A If yes, the amount of the Contractor s Bond shall be: Click to enter value ($) or % Contract Price <<Guidance note: refer to section of the Transport Agency s Contract Procedures Manual (SM021) for guidance on the bonding policy>> 3.2 Principal s Bond Is a Principal s Bond required? No 4. SUBCONTRACTS 4.1 General Is the transfer of design agreements required? Select yes or no 5. GENERAL OBLIGATIONS <<If the transfer of design agreements are required, include Schedule 17>> , , , Time for review of Design Documentation by Engineer (a) 10 Working Days; (b) Within the following time: (select one to apply, (a) or (b)) Click to enter reference 5.4 Possession of the Site The Contractor shall be given possession of the Site (a) 10 Working Days after the Date of Acceptance of Tender: (b) On the following date: (select one to apply, (a) or (b) Click to enter a date <<OR>> Page 6 of 60

9 Clause in General Conditions Title and subject matter Specific condition data (Expand cells if required or add reference to further detail provided in Schedule 2.) On the date specified in the contract acceptance letter Limits on the Contractor s right of entry to adjoining properties are: Nil or As detailed in the Principal s Requirements 5.5 Separate Contractors Separate Contractors who may be carrying out work on the Site concurrently with the Contract Works are: Contract Number, Contract Name [Contractor to be named] Are facilities for Separate Contractors required? Select yes or no If yes, details of facilities required are: Click to enter text 5.6 Care of works and Site 5.6.6(f) Further risks specifically excepted are: Nil 5.10 Programme <<Guidance note: default is NIL. Risk and Insurance sub-vac should be consulted if you wish to change from the default>> Is the programme required to be a Comprehensive Programme? Yes (e) If yes, other requirements for the Comprehensive Programme are: Click to enter text The Comprehensive Programme shall us the following software: Updates of the Comprehensive Programme shall be provided at the following intervals: Click to enter text <<e.g. MS Project Version X>> Click to enter text <<To be determined based on the nature of the work e.g. fortnightly, monthly>> 5.11 Compliance with laws Exceptions to the Principal s obligations to obtain licences under are: Exceptions to the Contractor s obligations to give notices and obtain other licences under are: Exceptions to the Contractor s obligation to give notices and to obtain licences for Temporary Works and for temporary amenities and services under are: Nil <<Default is Nil unless Principal feels that the Contractor is best to obtain certain licences.>> Nil Nil 5.17 Safety plan Is a Site-specific safety plan required to be prepared by the Contractor? Yes 5.18 Quality plan Is a quality plan required to be prepared by the Contractor? Select yes or no 5.19 Traffic management plan Page 7 of 60

10 Clause in General Conditions Title and subject matter Is a traffic management plan required to be prepared by the Contractor? Specific condition data (Expand cells if required or add reference to further detail provided in Schedule 2.) Select yes or no 5.20 As-built drawings and operation and maintenance manuals (a) (b) Are as-built drawings required to be prepared by the Contractor, as set out in the project specification? Are operation and maintenance manuals required to be prepared by the Contractor, as set out in the project specification? Select yes or no Select yes or no 6. THE ENGINEER 6.1 Appointment of the Engineer The Engineer is: Name, Company, Street Address Whose professional qualification is: Click to enter text The Principal will recover the cost for reinspection, remeasuring or retesting at the following rates: Engineer or other professional [$220.00] per hour (exclusive of GST) Other personnel [$150.00] per hour (exclusive of GST) Vehicle running [$1.00] per km (exclusive of GST) Sub-consultant invoices Cost plus [5%] 8. INSURANCES 8.1 General The party identified below shall arrange the following insurances referred to in the following clauses 8.3 or 8.8 Construction Select Contractor or Principal <<Guidance note: Select Principal for all contracts with a base estimate of less than $100 million (PAI) >> 8.8 Existing structure(s) and contents) Select Principal if insurance is required <<Guidance note: Approval for insurance levels by risk and assurance sub-vac is required for any contract where construction work is contemplated on significant strategic parts of the Transport Agency asset, e.g. the Auckland Harbour Bridge, Newmarket Flyover, Thorndon Elevated Motorway, Christchurch Lyttleton Road Tunnel. While the Transport Agency does not insure any aspect of the roading network, bridges or tunnels, in such cases it is possible that the Transport Agency may need to insure the asset being worked on. Note that this would only apply to contracts where the structure supporting the asset was being worked upon and there might be a risk of physical collapse.>> Page 8 of 60

11 Clause in General Conditions Title and subject matter Specific condition data (Expand cells if required or add reference to further detail provided in Schedule 2.) 8.4 Plant Contractor <<Guidance note: Default is Contractor.>>. 8.5 or 8.9 Public liability Select Contractor or Principal Motor Vehicle Contractor 8.6 Professional Indemnity Contractor <<Guidance note: Select Principal for all contracts with a base estimate of less than $100 million (PAI) >> <<Guidance note: The value of the level of insurance is stated in below.>> The following forces of nature shall be specifically insured under 8.3 or 8.8 as applicable: (a) Landslip (b) Earthquake (c) Tsunami (d) Tornado (e) Cyclone (f) Storm (g) Flood (h) Lightning strike (i) Volcanic activity (j) Hydrothermal activity (k) Geothermal activity <<Guidance note: Select yes on all items under if PAI is used, otherwise yes or no, as appropriate given the location of the site, for Volcanic, Hydrothermal and Geothermal Activity.>> Yes Yes Yes Yes Yes Yes Yes Yes Select yes or no Select yes or no Select yes or no 8.3, 8.8 Construction insurance (These items are required to be completed whether the Contractor or the Principal is the insuring party (see 8.1 above) 8.3.2, 8.8 The following shall have their respective interests noted in the construction insurance policy: <<Guidance Note: list any third parties interests that need to be a named Insured in the insurance policy>> 8.3.3, 8.8 Where construction insurance is required (see 8.1 above), the amount of insurance to be effected for the Contract Works and Materials shall be for not less than the sum of the Contract Price, after acceptance of the tender or other offer, plus the following allowances: (a) An allowance for the Cost of demolition, disposal and preparation for replacement work, equal to: (Select one to apply, (i) or (ii)) Page 9 of 60

12 Clause in General Conditions Title and subject matter (i) The amount in the right hand column: (ii) The percentage of the Contract Price adjusted as above, stated in the right hand column: (b) An allowance for professional services fees including the Cost of clerks of works and inspectors, equal to: (i) The amount in the right hand column: (ii) The percentage of the Contract Price adjusted as above, stated in the right hand column: (c) An allowance for items to be incorporated in the Contract Works, the Cost of which is not included in the Contract Price, equal to: (i) The amount in the right hand column: (ii) The percentage of the Contract Price adjusted as above, stated in the right hand column: (d) An allowance for an increase in the Contract Price due to Variations, equal to: (i) The amount in the right hand column: (ii) The percentage of the Contract Price adjusted as above, stated in the right hand column: (e) An allowance for an increased construction Costs due to inflation, equal to: (i) The amount in the right hand column: (ii) The percentage of the Contract Price adjusted as above, stated in the right hand column: Specific condition data (Expand cells if required or add reference to further detail provided in Schedule 2.) [$xxxxx] [5%] (Select one to apply, (i) or (ii)) [$xxxxx] [5%] (Select one to apply, (i) or (ii)) [$xxxxx] [5%] (Select one to apply, (i) or (ii)) [$xxxxx] [5%] (Select one to apply, (i) or (ii)) [$xxxxx] The insurance shall make provision for automatic change of cover for items (a) and (e) above, to provide insurance for any additions to or deductions from the Contract Price which occur after acceptance of the tender or other offer. [5%] 8.4 Contractor arranged Plant insurance Where Plant is required to be insured (see 8.1 above): (a) The Contractor shall insure the following items of Plant on Site for the amounts stated: (b) The Contractor shall insure each item of Plant on the Site having a current market value of more than: (Select one to apply, (a) or (b)) [list specific items] <<Guidance Note: List any items of plant of exceptional nature and specifically critical to the timely completion of the contract>> $200,000 <<Guidance note: default is $200k if required, otherwise choose Not required >> 8.5 Contractor arranged public liability insurance Where required (see 8.1 above), public liability insurance shall be effected by the Contractor [$5,000,000] Page 10 of 60

13 Clause in General Conditions Title and subject matter for an amount not less than: Such public liability insurance may include sub limits: Specific condition data (Expand cells if required or add reference to further detail provided in Schedule 2.) For liability arising out of vibration, weakening or removal of support, of not less than: For liability under the Forest and Rural Fires Act 1977, of not less than: [$250,000.00] <<Guidance note: for any contract in an urban or built up area, cover shall be increased to the full minimum limit of $5M. Ensure your sub-limits match those listed within Schedule 9>> [$250,000.00] <<Guidance note: for any contract in forested area or vineyard, cover shall be increased to the full minimum limit of $5M. Ensure your sub-limits match those listed within Schedule 9>> Where required (see 8.1 above), motor vehicle third party liability insurance shall be effected for an amount not less than: [$5,000,000] 8.6 Contractor arranged professional indemnity insurance <<Guidance Note: Project specific contracts Insurance Levels must be reviewed and approved by the Risk and Insurance Sub VAC via Appendix XXIII of SM021 Manual Where required (see 8.1 above), professional indemnity insurance for design by the Contractor shall be effected for an amount not less than: For any one claim: [$XXXXX] And for an amount in the aggregate of: [$XXXXX] Sub limits of liability for design of parts of the Contract Works by Subcontracts shall not be less than: [List specific parts] or [Not required] <<Guidance note: list specific part(s) of Contract Works and applicable $ sub-limits for any one claim and for an amount in the aggregate, or state if not required>> 8.8 Principal arranged construction insurance (refer also to 8.3) <<Guidance note: For use on contracts with a base estimate of less than $100 million (PAI)>> In accordance with 8.7.2, the insurance policy wording title for and (a), (b), and (c) is: In accordance with 8.7.2, the extraordinary exclusions, conditions, warranties or endorsements to the policy for and (a), (b) and (c) are: The as Principal and its Contractors and their Sub Contractors for their respective rights and interests Specific policy wording applicable to this contract can be read at the following website: Where the Principal is required to effect construction insurance (see 8.1 above). The lead insurer is: Great Lakes Page 11 of 60

14 Clause in General Conditions Title and subject matter Address of lead insurer: The Nominal Deductibles are: Specific condition data (Expand cells if required or add reference to further detail provided in Schedule 2.) Corporate Branch, UK Original Estimated Contract Value >0 to 10m >10m to 20m >20m Each loss except as below: $10,000 $25,000 $50,000 Major Perils $25,000 $50,000 $100,000 Wet Work Contracts Tunnelling Contracts (including excavations / underpasses >100m) LEG 3/06 Defects Claims $300,000 $300,000 $300,000 $300,000 $300,000 $300,000 $250,000 $250,000 $500,000 For this contract, the Original Estimate Contract Value is in the range Select value <<Guidance Note: Consultant to ensure the above deductibles table is consistent with the Transport Agency s latest and current PAI policy wording at the time of tender close>> 8.8.2(a) The existing structures are: N/A 8.8.2(b) Other structures in the vicinity are: N/A 8.8.2(c) Contents insurance are: N/A 8.9 Principal s option to insure public liability <<Guidance note: default position is that this is not relevant to Transport Agency projects. If unsure insurance@nzta.govt.nz for project specific guidance>> <<Guidance note: default position is that this is not relevant to Transport Agency projects. If unsure insurance@nzta.govt.nz for project specific guidance>> <<Guidance note: default position is that this is not relevant to Transport Agency projects projects. If unsure insurance@nzta.govt.nz for project specific guidance>> Page 12 of 60

15 Clause in General Conditions Title and subject matter Specific condition data (Expand cells if required or add reference to further detail provided in Schedule 2.) <Guidance note: For use on contracts with a base estimate of less than $100 million (PAI)>> Where required (see 8.1 above), the Principal shall effect public liability insurance for an amount not less than: The lead insurer is: Address of lead insurer: Select an option Vero Liability New Zealand Ltd / Lloyd s of London <<Guidance note: leave this blank>> The Nominal Deductibles are: Original estimated contract value >0 to 5m >5m to 10m >10m Each occurrence (including Maintenance Contracts) $10,000* $20,000* $25,000* *Including costs and expenses For this contract, the Original Estimate Contract Value is in the range Select value <<Guidance Note: Consultant to ensure the above deductibles table is consistent with the Transport Agency s latest and current PAI policy wording at the time of tender close>> In accordance with 8.7.2: The policy wording title is: Specific policy wording applicable to this contract can be read at the following website: Extraordinary exclusions, conditions, warranties, or endorsements to the policy are: Specific policy wording applicable to this contract can be read at the following website: Such public liability insurance may include sublimits for: (specify as applicable or state not applicable ) Liability arising out of vibration, weakening or removal of support Liability under the Forest and Rural Fires Act 1977: [$250,000] <<Guidance note: For any contract in an urban or built up area, cover shall be increased to the full minimum limit of $5M. Ensure your sub-limits match those listed within Schedule 9>> [$250,000] <<Guidance note: for any contract in forested area or vineyard, cover shall be increased to the full minimum limit of $5M. Ensure your Page 13 of 60

16 Clause in General Conditions Title and subject matter Specific condition data (Expand cells if required or add reference to further detail provided in Schedule 2.) sub-limits match those listed within Schedule 9>> 9. VARIATIONS <<Guidance note: this should be consistent with the approach selected under the IFT (Schedule of Conditions of Tendering 105.3(e))>> 9.3 Valuation of Variations For On-site Overheads: (select one to apply, (a) or (b)) (a) The prices and rates in the Schedule of Prices are inclusive of full allowance for Onsite Overheads; (b) The prices and rates in the Schedule of (select one to apply, (i), (ii), (iii), or (iv)) Prices are exclusive of On-site Overheads and the allowances for On-site Overheads to be added in accordance with is: (i) Agreed percentage: [XX%] (ii) As nominated in the Schedule of Prices. (iii) As nominated in the Contractor s tender. (iv) A reasonable percentage. <<Guidance note: this is the preferred default, although (iii) may be adopted with the Transport Agency s Project Manager approval>> For Off-site Overheads and Profit: (select one to apply, (a) or (b)) (a) The price and rates in the Schedule of Prices are inclusive of full allowance for Off-site Overheads and Profit; (b) The prices and rates in the Schedule of (select one to apply, (i), (ii), (iii), or (iv)) Prices are exclusive of Off-site Overheads and the allowances for Off-site Overheads and Profit to be added in accordance with is: (i) Agreed percentage: [XX%] (ii) As nominated in the Schedule of Prices. (iii) As nominated in the Contractor s tender. (iv) A reasonable percentage For time related Cost, the Working Day rate in compensation for time-related On-site Overheads and Off-site Overheads and Profit in relation to an extension of time to be applied in accordance with is: (a) Agreed percentage: (b) As nominated in the Schedule of Prices. <<Guidance note: this is the preferred default, although (iii) may be adopted with the Transport Agency s Project Manager approval>> (select one to apply, (a), (b), (c,) or (d)) [XX%] Page 14 of 60

17 Clause in General Conditions Title and subject matter (c) As nominated in the Contractor s tender. (d) A reasonable compensation. Specific condition data (Expand cells if required or add reference to further detail provided in Schedule 2.) <<Guidance note: this is the preferred default, although (c) may be adopted with the Transport Agency s Project Manager approval>> For processing of Variations, the percentage to be paid in accordance with is: (a) Agreed percentage: (b) As nominated in the Schedule of Prices. (select one to apply, (a), (b), (c,) or (d)) [XX%] (c) As nominated in the Contractor s tender. (d) A reasonable Cost of processing the Variations. <<Guidance note: this is the preferred default, although (c) may be adopted with the Transport Agency s Project Manager approval>> 10. TIME FOR COMPLETION 10.2 Due Date for Completion The periods to be used for calculating the Due Date for Completion are: (a) For the Contract Works: (b) For any Separable Portions: (c) In respect of the Contract Works the Number of Weeks nominated by the Contractor in their Tender Submission (select one to apply, (a), (b) or (c)) Click to enter number of Working Days (Working Days) Click to enter number of Working Days (Working Days) Click to enter details Nil <<Guidance note: only used where the tenderer nominated duration process is used in the IFT>> 10.4 Practical Completion Certificate Prior to issue of the Practical Completion Certificate: (a) Producer Statements in the form of Schedule 6 are required; (b) Producer Statements as set out in the following parts of the Contract are required: (c) Producer Statements are not required. (select one to apply, (a), (b) or (c)) <<Default>> [Project Specification Section X] 10.5 Damages for late completion <<Guidance note: Where liquidated damages are provided for, the amount must be a genuine pre-estimate of the likely loss that would result from delay of completion. Where liquidated damages are provided for Separable Portions it may be necessary to provide different rates for each Separable Portion. Where liquidated damages are not provided, the Principal can recover and the Contractor will be liable only for such actual loss as the Principal can prove has resulted from the late completion, being loss of a kind reasonably foreseeable to the parties at the time the contract was made as being likely to result Page 15 of 60

18 Clause in General Conditions Title and subject matter Specific condition data (Expand cells if required or add reference to further detail provided in Schedule 2.) Liquidated damages shall be applied as follows: In respect of the Contract Works: In respect of the Separable Portions: [$XXX] per Working Day [$XXX] per Working Day for each Separable Portion 10.6 Bonus for early completion Is a bonus to be payable? Yes or no If yes, the bonus for the Contract Works is: [$XXXX] per Working Day If yes, bonuses for any Separable Portions are: 11. DEFECTS LIABILITY [$XXXX] per Working Day 11.1 Defects Notification Period The Defects Notification Period shall be: (3 Months unless otherwise stated) In respect of the Contract Works: [52] weeks In respect of the Separable Portions: [52] weeks 11.3 Final Completion Certificate Prior to issue of the Final Completion Certificate: (a) Producer Statements in the form of Schedule 6 are required; (b) Producer Statements as set out in the following parts of the Contract are required: (c) Producer Statements are not required. (select one to apply, (a), (b) or (c)) <<Default>> [Project Specification Section X] 11.5 Warranties (a) No warranties are required; 11.6 Guarantees , (a) No guarantees are required; (b) The Contractor shall provide guarantees in the following form: <<Default>> [State form] 12. PAYMENTS 12.1 Contractor s payment claims (b) (iii) Advances for Materials delivered to the Site (a) Advances for Materials delivered to the Site but which have yet to be incorporated in the Contract Works shall not be made; (select one to apply, (a) or (b)) <<Guidance note: this is the default if using D&C (Basic). The Transport Agency s Project Page 16 of 60

19 Clause in General Conditions (b) (iv) (b) (iv) Title and subject matter (b) Advances for Materials delivered to the Site but which have yet to be incorporated in the Contract Works shall be made, subject to the following conditions: Advances for Temporary Works or Plant (a) Advances for Temporary Works or Plant shall not be made. (b) Advances for Temporary Works or Plant shall be made, subject to the following conditions: Advances for Materials not yet on Site (a) Advances for Materials not yet on Site shall not be made. (b) Advances for Materials not yet on Site shall be made, subject to the following conditions: Specific condition data (Expand cells if required or add reference to further detail provided in Schedule 2.) Manager approval is required if option (b) below is selected>> [state any conditions] (select one to apply, (a) or (b)) <<Guidance note: this is the default if using D&C (Basic). the Transport Agency s Project Manager approval is required if option (b) below is selected>> [state any conditions] (select one to apply, (a) or (b)) <<Guidance note: this is the default if using D&C (Basic). The Transport Agency s Project Manager approval is required if option (b) below is selected>> (a) The Contractor agrees to execute an Agreement in respect of off-site materials in the form as set out in the Fourteenth Schedule of these. (b) The Contractor shall ensure that at all times the Materials are fully insured in accordance with the provisions of section 8 of the General (as appropriate), and supply evidence of same to the Principal. (c) The Contractor shall keep the Principal indemnified against loss, damage costs, claims, expenses or liability incurred by the Principal in respect to any loss of, or damage to, or defect in all or part of the Materials to the extent that the Principal is not so indemnified under section 7 of the General (d) The Contractor undertakes to keep the stored materials in good order, maintenance and condition. The Contractor warrants that in relation to such Materials, those Materials when incorporated into the Contract Works will be fit for their purpose as required under the Page 17 of 60

20 Clause in General Conditions Title and subject matter 12.3 Retention monies , The percentage to be retained from each progress payment and the limit of the total sums retained shall be in accordance with the following: (a) For the Contract Works, a total retention of: 10% on the first $200,000, and 5% on the next $800,000, and 1.75% on amounts in excess of $1,000,000, and With a maximum total retention when aggregated of $200,000, and With a defects liability retention of half the total retention. (b) For the Contract Works, the retention scale in the right hand column: Specific condition data (Expand cells if required or add reference to further detail provided in Schedule 2.) Contract Document. The Engineer shall be given reasonable access to inspect the relevant Materials. (e) Following payment to the Contractor ownership of the Materials shall vest in the Principal as legal and beneficial owner free of all charges and encumbrances of any nature whatsoever. The Contractor shall ensure that all secured creditors of the Contractor are given written notice of the existence of the Principal s ownership of the Materials and of the conditions of the relevant advance. Should any portion of the Materials no longer be required for the Contract Works, the Contractor shall be responsible for all costs of storage, handling and disposal of the surplus Materials. The Contractor shall only dispose off such surplus Materials following a written instruction from the Engineer. Ownership of such surplus Materials shall re-vest in the Contractor as the Contractor disposes of such surplus Materials. The Principal shall recover the value of disposed material from subsequent progress payments, at the same rates as paid to the Contractor for the Materials stored off site. (f) The advance payment for the Materials, shall be recovered progressively by deduction from progress payments as such Materials are incorporated into the Contract Works (select one to apply, (a) or (b), and (c)) <<Default for D&C Basic and contracts less than $20 million >> A total retention of: [XX%] on the first [$xxx,xxx], plus Page 18 of 60

21 Clause in General Conditions Title and subject matter (c) For Key Personnel Specific condition data (Expand cells if required or add reference to further detail provided in Schedule 2.) [x%] of the next [$xxx,xxx], plus [x%] on amounts in excess of [$xxx,xxx], and With a maximum total retention of [$xxx,xxx] when aggregated, and With a defects liability retention of 50 % of total retention <<Guidance note: for large construction contracts over $20Million, the capped retention limit needs to be approved via the Risk and Insurance Sub VAC>> Refer to Schedule 2 Special Conditions of Contract - Other, Clause 5.23 The amount to be retained in respect of the Contract Works in accordance with this clause shall not be reduced, until all Asset Register (RAMM) information, all as-built drawings and all operations and maintenance manuals required to be submitted at or before Practical Completion, have been submitted to the Engineer. The retention monies shall not be reduced, until all RAMM information, all as-built drawings and all operations and maintenance manuals required to be submitted at or before the end of the Defects Notification Period have been submitted to the Engineer <<Guidance Note: Project Specification to detail all RAMM information required from the Contractor for RAMM updates.>> Bond in lieu of retention (select one to apply, (a) or (b)) (a) The Contractor may provide a bond in lieu of retentions. The percentage to be retained from each progress payment and the limit of the total sums retained shall be nil if the Contractor provides a Bond in Lieu of Retentions (Schedule 5). The value of the bond shall be the applicable retention amount plus a further 10% (b) The Contractor may not provide a bond in lieu of retentions 12.8 Cost fluctuations (select one to apply, (a), (b) or (c)) (a) Cost fluctuations shall not be paid; <<guidance note: this is the default if using D&C (Basic)>> (b) Cost fluctuations shall be paid in accordance with Appendix A; (c) Cost fluctuations shall be paid in accordance with the method described in Schedule 18 <<Guidance note: choose this option when contract period exceeds 52 weeks>> Goods and services tax Payment Schedules provided by the Engineer: (select one to apply, (a) or (b)) (a) Shall not be in the form of a tax invoice; Page 19 of 60

22 Clause in General Conditions Title and subject matter (b) Shall be in the form of a buyer created tax invoice and the parties agree not to issue any other tax invoice for items covered by the Payment Schedule. 13. DISPUTES Specific condition data (Expand cells if required or add reference to further detail provided in Schedule 2.) 13.4 Arbitration If required, the arbitrator shall be nominated by the following Person: [Name, Position] <<Guidance noted: default is Engineer to the Contract>> 15. SERVICE OF NOTICES For the purposes of service of written notice: (a) The address of the Principal is: Postal address: Delivery address: Mark the attention of: address: Other agreed means of electronic communication and address detail: (b) The address of the Contractor is: Postal address: Delivery address: Mark the attention of: address: Other agreed means of electronic communication and address detail: (c) The address of the Engineer is: Postal address: Delivery address: Mark the attention of: address: Other agreed means of electronic communication and address detail: Page 20 of 60

23 Schedule 2 Special Other These conditions amend and supplement the General Conditions. Clause numbers refer to NZS 3916:2013. Section 1 INTERPRETATION In addition to 1.2 Definitions, add in the following definitions: CONTRACTOR S DESIGN means the design of the Contract Works including: (a) He performance by or on behalf of the Contractor of any design investigation, design feasibility study, design calculation, technical information calculation, design drawing, design specification, design instruction, design procedure, monitoring or testing of the design of the Contract Works by design personnel; and (b) (c) Development of all Design Documentation necessary to carry out and complete the Contract Works; and Preparation of As-built Drawings, operation manuals and maintenance manuals as required by the Contract Documents. CONTRACTOR'S DESIGNER means any Person who is employed or contracted by the Contractor to design any part of the Contract Works. KEY PERSONNEL means the Contractor s personnel nominated for the positions under the relevant skills Form C in the Contractor s Tender and any other persons identified by the Principal as key personnel with the Contractor s prior approval. UNDERGROUND SERVICES means existing pipework, cables, conduits, conveying services such as electricity, gas, water, waste and electronic communications, located below the existing ground. WINTER PERIOD means the period [31 May] through [31 August] inclusive. <<Guidance Note: the Consultant shall consider the appropriate Winter Period for sealing exclusion, noting that this will vary with the location of the works. If uncertain the consultant shall consult with the Transport Agency s National Pavement Manager.>> The following are modifications to the definitions in 1.2: CONTRACT WORKS means the works including the Temporary Works and the Contractor's Design to be executed in accordance with the contract. PRINCIPAL'S REQUIREMENTS means the Principal's Requirements written requirements for the Contract Works included in the Contract and identified as the Principal s Requirements which: (a) (b) (c) (d) Shall include the purpose and performance requirements for the Contract Works; and May include outline or preliminary design, design concepts for the Contract Works, and the Principal s, time, cost and quality objectives for the Contract Works; and May include Drawings, Specifications, or other design document prepared by or on behalf of the Principal; and May include any additions or modifications supplied by the Engineer to the Contractor for the purpose of the contract. SUBCONTRACTOR means any Person who contracts with the Contractor to design, carry out, or supply part of the Contract Works on behalf of the Contractor and includes any Contractor's Designer or a Nominated Subcontractor. Section 2 THE CONTRACT Page 21 of 60

24 Clause is deleted and replaced with the following: No discrepancy in the Schedule of Prices shall be treated as a Variation. Section 4 SUBCONTRACTS A new clause is added as follows: The Contractor shall be liable for all Costs associated with any delays or disruption caused by Nominated Subcontractors. The Engineer may take any such delays or disruptions into account in determining any extension of time. The Contractor shall not be entitled to compensation for time related costs where an extension of time is granted on such grounds. A new clause 4.3 Contractor s Designers is added as follows: The Contractor must ensure all Contractor's Designers are suitably experienced and hold appropriate professional qualifications with regard to the design to be undertaken by that Person. Section 5 GENERAL OBLIGATIONS Clause is deleted and replaced with the following: The Contractor shall: (a) (b) as part of the programme it is to prepare under clause 5.10, submit to the Engineer for approval a documentation program which makes allowance for draft Design Documentation to be submitted to the Engineer in a manner and at a rate which will give the Engineer a reasonable opportunity to review such documentation within the period of time provided in this clause 5.1; and submit the Design Documentation it prepares to the Engineer in accordance with the documentation program approved by the Engineer under 5.1.9(a) Add the following to clause : No review of, comments upon, rejection or approval of, or failure to review or comment upon or reject or approve, any Design Documentation prepared by the Contractor or any other direction by the Engineer about the Design Documentation shall: (a) (b) relieve the Contractor from, or alter or affect, the Contractor's liabilities or responsibilities whether under the Contract Documents or otherwise according to law; or prejudice the Principal's rights against the Contractor whether under the Contract Documents or otherwise according to law. A new clause is added as follows: During the term of the contract the Contractor must advise the Engineer to the Contract of any potential or actual conflicts of interest with any individual or organisation engaged to complete any of the contract works. This includes individuals and organisation s engaged in any subcontractor or other supply arrangement. The Contractor must advise the Engineer to the Contract the means that they intend to use to remove or mitigate such conflicts of interest. The Engineer must inform the Principal of any conflicts of interest notified to the Engineer by the Contractor in accordance with this clause, and the Engineer will, in discussion with the Principal and taking into account (but not bound by) the Page 22 of 60

25 Contractor s intended action, decide the appropriate action required to remove or mitigate any actual or potential conflict of interest. The Engineer must ensure the Contractor implements such required action. A new clause 5.22 Risk Allocation is added as follows: A number of risks may affect the performance of the services by the Contractor. This clause schedules those risks that the Principal shall assume responsibility for. Where a risk is allocated to the Principal, the Principal shall be solely responsible for the consequences of the relevant event, except where limited by the provisions of this clause or as otherwise expressly provided in the Contract Documents. To the extent that a risk is not identified in this clause as being assumed by the Principal or is otherwise expressly provided in the Contract Documents, the Contractor shall have responsibility for all consequences of the occurrence of the relevant event, matter or circumstance which may impact on the performance of the Contractor of the services or its obligations under the contract and no Variation or Extension of Time shall be due The Principal will bear the risk of the following: (a) (b) (c) (d) (e) (f) (g) (h) (i) (j) (k) Any changes in legislation or the Transport Agency s policy during the course of the contract which affects the contract. Any issues relating to land acquisition initiated by the Principal (does not include general liaison with landowners during the course of the contract). Any need for iwi construction monitoring fees that may be determined. Any time and risks associated with a flood even resulting in inundation which materially affects the project works, with a probability of occurrence at the site equal to or less than.04 in one year. (.04 is the probability of occurrence of a flood event within an average recurrence interval of 25 years in one year). The excepted risks in as interpreted in the context of clause 5.6 as a whole. Any need for random verification testing during the construction phase requested by the Principal. Unreasonable delays arising from Principal arranged approvals. Unreasonable delays arising from any instruction, clarification or direction issued by the Principal. Unreasonable delays arising from failure by the Principal to arrange for vacation of property required for the construction of the Contract Works. Any instruction from the police and highway authority to clear the site due to Incident Management requirements, which effects critical path operations in 40 hrs, including reinstatements of work. Unreasonable delays and disruption arising from the employment of utility controlling authorities, contractors, workmen, statutory bodies and any other companies as described within Clause of the Principal s Requirements, the Engineer shall take the circumstances into account to determine any extension of time, such extension of time being granted solely (and without costs) to relieve the Contractor for payment to the Principal of liquidated Damages due to such circumstances, all other risks remaining with the Contractor. Page 23 of 60

26 Notwithstanding section 9.5 the Principal will bear the risks of the following, in respect of the physical conditions encountered during earthworks, foundations, drainage or any other construction works below ground or the using or disposal of excavated materials, unless these risks could have been reasonably foreseen by a suitably experienced contractor advised by a suitably experienced geotechnical engineer at the time of tendering, in which case the risks shall remain with the Contractor. (a) (b) (c) (d) (e) (f) Mine workings Treasure or unidentified archaeologically or culturally important materials Human remains Contaminated ground requiring specific treatment, removal and disposal Old dump site (waste, not earthworks fill) Except in the case of founding conditions for structures, which shall remain the risk of the Contractor, materials of a nature completely different from those encountered within any investigations or identifiable from ground features, available soil or geotechnical maps, or the like A new clause 5.23 Key Personnel is added as follows: The Contractor must use all reasonable endeavours to: a) Supply and retain the Key Personnel and not remove the Key Personnel from their position without the prior written approval of the Principal or Project Management Board. b) Replace any of the Key Personnel if they are unable to undertake work due to termination of employment, resignation, illness, disability or death or other circumstances reasonably beyond the control of the Contractor. The parties acknowledge that the Contractor s primary focus is to ensure the continuity and quality of the performance of its obligations. Consequently, the Contractor must: (i) Promptly advise the Principal or Project Management Board if it is necessary to replace Key Personnel; and (ii) Provide a suitable replacement or substitute during the period of unavailability that has at least the same or better status, skills, qualifications, expertise and experience as the Key Personnel to be replaced; and (iii) Consult with the Principal or Project Management Board in relation to any proposed replacement; and (iv) If requested by the Principal or Project Management Board, provide details of the proposed replacement to the Principal or Project Management Board. c) Ensure that each of the Key Personnel is available at the times set out in the Contractor s Tender or as otherwise required to ensure the completion of such portion of the services as are assigned to them. Page 24 of 60

27 If any Key Personnel are not available to perform the role and responsibilities required of that Key Personnel because of an act or omission of the Contractor, and the Contractor does not within a period acceptable to the Principal and Project Management Board replace the relevant Key Personnel with a person of equivalent skills and experience, the Principal reserves the right to withhold [20%] of the value of the next contract progress payment due until such time as a suitable replacement has been made and notified to the Principal and Project Management Board. The monies retained, shall be paid to the Contractor by payment as part of the progress payment due after the replacement has been made. Section 8 INSURANCES A new clause is added as follows: Responsibility for pursing any claim under any insurance policy shall rest with the party bearing the deductible or excess. Where the Contractor is pursuing a claim, the Contractor is required to advise the Engineer of the outcome of the claim and provide the Engineer with information in relation to the claim on request. A new clause (c) is added as follows: (c) The actions of one insured shall not affect the rights of any other insured. A new clause (d) is added as follows: (d) Public Liability Insurance shall include liability arising out of damage to Underground Services and will be for a sub limit amount not less than [$250,000.00]. <<Guidance note: for any contract where works are taken out above on Underground Services of significant economic importance cover shall be increased to the full minimum limit of $5M. Ensure your sub-limits match those listed within Schedule 9.>> Clause is amended with the following: Delete the words "5.1.3, 5.1.4, 5.1.5, 5.6 and 7.1" and replace with "the Contract" Section 10 TIME FOR COMPLETION New clause is added as follows: No sealing operations shall take place over the Winter Period without the prior written approval of the Engineer. Clause (b) is deleted and replaced with the following: <<Guidance Note: the Consultant is reminded of the importance of specifying an accurate allowance for wet weather. This should be done on the basis of a robust assessment of the period to be allowed by the contractor, based on historical wet weather records appropriate to the area and to the site. The Consultant should be aware of the different risk allocations associated with the options and select the one option appropriate to the project.>> (b) Allowance for inclement weather [consultant to nominate] Working Days in the [consultant to nominate duration] -month contract period. << Guidance note: to be used where practical to use an independent station>> This allowance is based on automatic weather station [identify weather station reference (eg NIWA NRC Station No. A547338) and physical location], records from [date] to [date]: The Wet days are determined from the average over the [XX] year record; A Wet day is defined as a day in which the rainfall is [5] mm or greater. Any of the two (2) immediately following days on which rainfall is [1] mm or greater shall also qualify as Wet days. Page 25 of 60

Contract [Number] [Contract Name] Contract Documents. Minor Works / Direct Appoint

Contract [Number] [Contract Name] Contract Documents. Minor Works / Direct Appoint Contract [Number] [Contract Name] Contract Documents Minor Works / Direct Appoint This proforma document provides the basis for the development of physical works contract documents for the Transport Agency

More information

Outcome Maintenance Contract. Conditions of Contract

Outcome Maintenance Contract. Conditions of Contract Outcome Maintenance Contract Document Change Format Codes Black Black text is mandatory and may not be changed without approval from the OMC Model Control Group. Black

More information

Conditions of Contract

Conditions of Contract Conditions of Contract 1. Responsibilities of Builder and Results of Construction (a) The Builder will, subject to these Conditions and the contract work details in Schedule 3, execute and complete the

More information

CONDITIONS OF CONTRACT. The Builder must execute and complete the Works in a workmanlike manner and ensure the Works are adequately supervised.

CONDITIONS OF CONTRACT. The Builder must execute and complete the Works in a workmanlike manner and ensure the Works are adequately supervised. CONDITIONS OF CONTRACT 1. RESPONSIBILITY OF BUILDER The Builder must execute and complete the Works in a workmanlike manner and ensure the Works are adequately supervised. 2. WORK PERFORMED OR MATERIALS

More information

AGREEMENT AND CONDITIONS OF SUB-CONTRACT (DOMESTIC)

AGREEMENT AND CONDITIONS OF SUB-CONTRACT (DOMESTIC) AGREEMENT AND CONDITIONS OF SUB-CONTRACT (DOMESTIC) FOR USE IN CONJUNCTION WITH THE FORMS OF MAIN CONTRACT FOR PUBLIC WORKS ISSUED BY THE OFFICE OF GOVERNMENT PROCUREMENT, DEPARTMENT OF PUBLIC EXPENDITURE

More information

ENERGY FIJI LIMITED TENDER DOCUMENT

ENERGY FIJI LIMITED TENDER DOCUMENT ENERGY FIJI LIMITED TENDER DOCUMENT TENDER NUMBER: MR274/2018 TENDER NAME: Wailoa Vuda Tower 82 Foundation TENDER CLOSING: 4pm (UTC +12hrs) Wednesday 15th August, 2018 Mandatory Site Visit: Thursday 2nd

More information

NZS 3910:2013. Conditions of contract for building and civil engineering construction NZS 3910:2013. New Zealand Standard

NZS 3910:2013. Conditions of contract for building and civil engineering construction NZS 3910:2013. New Zealand Standard New Zealand Standard Conditions of contract for building and civil engineering construction Superseding (in part) NZS 3910:2003 NZS 3910:2013 COMMITTEE REPRESENTATION This Standard was prepared under the

More information

Subcontract Agreement

Subcontract Agreement Subcontract Agreement SA - 2009 Project: Trade: Subcontractor: SA - 2009 Number: FOREWORD A good working relationship between the Contractor and Subcontractor is critical to ensuring construction projects

More information

Form of Agreement Between the Client And the Quantity Surveyor

Form of Agreement Between the Client And the Quantity Surveyor Form of Agreement Between the Client And the Quantity Surveyor Second ACQS Edition (May 2009) Contents Agreement 1 Terms of Appointment 1. Quantity Surveyor's obligations 2 2. Client's obligations 2 3.

More information

Subcontract agreement

Subcontract agreement Subcontract agreement SA - 2017 Project: Trade: Subcontractor: Reference: FOREWORD to SA-2017 SA-2009 was a historic collaboration between parties representing builders and subcontractors to produce a

More information

PERMIT TO ENTER YOU ARE REQUIRED TO COMPLY WITH THE ENDORSEMENTS AND DETAILS SHOWN ON THIS PERMIT

PERMIT TO ENTER YOU ARE REQUIRED TO COMPLY WITH THE ENDORSEMENTS AND DETAILS SHOWN ON THIS PERMIT PERMIT TO ENTER PERMIT NO: YOU ARE REQUIRED TO COMPLY WITH THE ENDORSEMENTS AND DETAILS SHOWN ON THIS PERMIT KIWIRAIL OFFICE DETAILS OFFICE: Area Office, KiwiRail Network, CONTACT: PHONE NO: Mob Fax PROTECTION

More information

Conditions of Contract for PLANT and Design-Build

Conditions of Contract for PLANT and Design-Build Conditions of Contract for PLANT and Design-Build FOR ELECTRICAL AND MECHANICAL WORKS AND FOR BUILDING AND ENGINEERING WORKS DESIGNED BY THE CONTRACTOR General Conditions 1st Edition 1999 FEDERATION INTERNATIONALE

More information

2 CONTRACT 3 SPECIFIC ITEMS INCLUDED AND EXCLUDED FROM QUOTE. Balclutha. Cromwell

2 CONTRACT 3 SPECIFIC ITEMS INCLUDED AND EXCLUDED FROM QUOTE. Balclutha. Cromwell TERMS OF TRADE 1 DEFINITIONS (a) Quote means the quotation provided by Balcrom for the supply of Products. (b) Products means all goods and materials provided by Balcrom to the Customer under the Contract.

More information

(1) In these sub-contract conditions of agreement, the following words and phrases shall have the following meanings:-

(1) In these sub-contract conditions of agreement, the following words and phrases shall have the following meanings:- Anti-Bribery & Corruption Policy of Intent STONBURY LIMITED TERMS AND CONDITIONS FOR SUBCONTRACTORS 1. INTERPRETATION (1) In these sub-contract conditions of agreement, the following words and phrases

More information

AGREEMENT No... FOR THE SUPPLY, FABRICATION AND DELIVERY OF... BETWEEN

AGREEMENT No... FOR THE SUPPLY, FABRICATION AND DELIVERY OF... BETWEEN AGREEMENT No.... FOR THE SUPPLY, FABRICATION AND DELIVERY OF... BETWEEN LEND LEASE PROJECT MANAGEMENT & CONSTRUCTION (AUSTRALIA) PTY LIMITED ABN 97 000 098 162 AND... ABN... PROJECT: BARANGAROO PROJECT

More information

Cosmos Projects - Standard Terms and Conditions of Sub-Contract

Cosmos Projects - Standard Terms and Conditions of Sub-Contract Cosmos Projects - Standard Terms and Conditions of Sub-Contract These standard terms and conditions shall apply to any Sub Contract between Cosmos Projects Limited ( CPL ) and any Sub-Contractor following

More information

Standard Form Project Agreement (hub DBFM Projects)

Standard Form Project Agreement (hub DBFM Projects) Standard Form Project Agreement (hub DBFM Projects) Version 2: June 20122.1: October 2013 . THIS STANDARD FORM PROJECT AGREEMENT MUST BE USED IN CONJUNCTION WITH THE STANDARD PROJECT AGREEMENTS USER S

More information

NZS 3915:2005 AMENDMENTS. No. Date of issue Description Entered by, and date

NZS 3915:2005 AMENDMENTS. No. Date of issue Description Entered by, and date NZS 3915:2005 COMMITTEE REPRESENTATION This Standard was prepared by Technical Committee P 3915 for the Standards Council established under the Standards Act 1988. Peter Fehl New Zealand Contractors Federation

More information

SOUTHERN RESPONSE CANTERBURY EARTHQUAKE RECONSTRUCTION PROJECT GENERAL CONDITIONS OF CONTRACT FOR HOUSING REBUILD AND REPAIRS

SOUTHERN RESPONSE CANTERBURY EARTHQUAKE RECONSTRUCTION PROJECT GENERAL CONDITIONS OF CONTRACT FOR HOUSING REBUILD AND REPAIRS SOUTHERN RESPONSE CANTERBURY EARTHQUAKE RECONSTRUCTION PROJECT GENERAL CONDITIONS OF CONTRACT FOR HOUSING REBUILD AND REPAIRS TABLE OF CONTENTS Background 1 1. Introduction 1 2. Contract Works 1 3. Project

More information

MAIN CIVIL WORKS CONTRACT SCHEDULE 12 CHANGES TABLE OF CONTENTS

MAIN CIVIL WORKS CONTRACT SCHEDULE 12 CHANGES TABLE OF CONTENTS MAIN CIVIL WORKS CONTRACT SCHEDULE 12 CHANGES TABLE OF CONTENTS 1 INTERPRETATION... 1 1.1 Definitions... 1 2 CHANGES... 1 2.1 BC Hydro s Right to Require Changes... 1 2.2 Restrictions on Changes... 1 2.3

More information

DOUKPSC04 Rev Feb 2013

DOUKPSC04 Rev Feb 2013 DOUKPSC04 Purchasing Standard conditions for the Purchase of Consultancy Services 1 DEFINITIONS In the Contract (as hereinafter defined) the following words and expressions shall have the meanings hereby

More information

Terms of Trade relating to Produce and Grocery acquired for sale

Terms of Trade relating to Produce and Grocery acquired for sale Terms of Trade relating to Produce and Grocery acquired for sale Effective Date: [1 st February 2018] Introduction T&G Global Limited (T&G) operates its business in New Zealand through and under a number

More information

1 In these Domestic Sub-Contract Conditions the following expressions and terms shall have the meanings given below:

1 In these Domestic Sub-Contract Conditions the following expressions and terms shall have the meanings given below: DOMESTIC SUB-CONTRACT CONDITIONS These are the Domestic Sub-Contract Conditions referred to by the Articles of Agreement to which they are attached. In the event that these Domestic Sub-Contract Conditions

More information

MIRAGE DOORS NSW ABN:

MIRAGE DOORS NSW ABN: CREDIT APPLICATION (Application for Credit with Mirage Doors NSW) Entity Type: Company Partnership Trust Other Company/Trustee Name: Trading Name: ABN: Registered Office: Street Address: Postal Address:

More information

MDB Harmonised Particular Conditions

MDB Harmonised Particular Conditions FIDIC Plant and Design-Build Contract MDB Harmonised Particular Conditions 1. Introduction There is a need for FIDIC to provide sample Particular Conditions that render the General Conditions of the 1st

More information

Service Agreement The Client authorises the Service Provider to carry out the Services.

Service Agreement The Client authorises the Service Provider to carry out the Services. Service Agreement This agreement is made on BETWEEN: (1) The Pet Manny Ltd 45 Leithcote Gardens London SW16 2UX 07808 167620 ( the Service Provider ) (2) [insert name and address of the client] ( the Client

More information

Western Water Development Consultant Accreditation Deed

Western Water Development Consultant Accreditation Deed Western Water Development Consultant Accreditation Deed Western Water ABN 67 433 835 375 and Company name: ABN : February 2018 TABLE OF CONTENTS 1. DEFINITIONS AND INTERPRETATION... 1 1.1 Definitions...

More information

APPENDIX 3 FAYAIR (STANSTED) LIMITED STANDARD TERMS OF BUSINESS. Aircraft means any aircraft in respect of which the Customer has requested Services;

APPENDIX 3 FAYAIR (STANSTED) LIMITED STANDARD TERMS OF BUSINESS. Aircraft means any aircraft in respect of which the Customer has requested Services; APPENDIX 3 FAYAIR (STANSTED) LIMITED STANDARD TERMS OF BUSINESS 1 DEFINITIONS AND INTERPRETATION 1.1 In these Terms of Business: Aircraft means any aircraft in respect of which the Customer has requested

More information

Conditions of Contract

Conditions of Contract Contents 1 General 1 2 First Schedule: Special 2 3 Second Schedule: Contract Agreement 13 4 Third Schedule: Form of Contractor s Performance Bond 15 5 Fifth Schedule: Form of Contractor's Bond In Lieu

More information

QBCC PERIOD MINOR WORKS SUBCONTRACT

QBCC PERIOD MINOR WORKS SUBCONTRACT Build better. QBCC PERIOD MINOR WORKS SUBCONTRACT The General Conditions of the QBCC Period Minor Works Subcontract may not be suitable for all work and the QBCC does not make any representation as to

More information

General Conditions of Contract for Civil Works

General Conditions of Contract for Civil Works General Conditions of Contract for Civil Works Dear Sir/Madam, MODEL CONTRACT FOR WORKS Date Ref.: / / [INSERT PROJECT NUMBER AND TITLE] The United Nations Development Programme (hereinafter referred to

More information

GENERAL CONDITIONS OF ELECTRICAL INSTALLATION CONTRACT

GENERAL CONDITIONS OF ELECTRICAL INSTALLATION CONTRACT GENERAL CONDITIONS OF ELECTRICAL INSTALLATION CONTRACT 1. Definition and Duration These conditions form part of a quotation submitted by the Contractor to the Client named in the quotation. The Contractor

More information

LANTRAK PTY LTD (ABN )

LANTRAK PTY LTD (ABN ) LANTRAK PTY LTD (ABN 14 163 639 727) 1. Interpretation and construction of the Agreement: Definitions In the Agreement, except where the context otherwise requires: Accepted Waste Agreement Allowable Waste

More information

Schedule 10. Part 2 from Subcontractors to Beneficiaries DATED [ ] [NAME OF BENEFICIARY] and [NAME OF SUBCONTRACTOR] DEED OF WARRANTY

Schedule 10. Part 2 from Subcontractors to Beneficiaries DATED [ ] [NAME OF BENEFICIARY] and [NAME OF SUBCONTRACTOR] DEED OF WARRANTY Schedule 10 Part 2 from Subcontractors to Beneficiaries DATED [ ] [NAME OF BENEFICIARY] (1) and [NAME OF SUBCONTRACTOR] (2) DEED OF WARRANTY in relation to the NEC3 OPTION A TERM SERVICE CONTRACT FOR INTEGRATED

More information

Consultancy Services Contract

Consultancy Services Contract SERVICES AND RESOURCES INFRASTRUCTURE Consultancy Services Contract Based on AS 4122 2010 General Conditions of Contract for Consultants The University of Adelaide and The Consultant For Insert Project

More information

APPLICATION FOR CREDIT ACCOUNT

APPLICATION FOR CREDIT ACCOUNT Please Return to Head Office: PO Box 300-468 Albany, Auckland (09) 476 0001 Fax: (09) 476 0090 Email: accounts@anzor.co.nz APPLICATION FOR CREDIT ACCOUNT Purchaser Details Applicant/Customer ( the customer

More information

Construction Management Approach based on FIDIC Conditions of Contract for Construction, st Edition. Dr. Munther M.

Construction Management Approach based on FIDIC Conditions of Contract for Construction, st Edition. Dr. Munther M. Construction Management Approach based on FIDIC Conditions of Contract for Construction, 1999 1st Edition Dr. Munther M. Saket March 2015 1 Traditional Construction Contracts Owner of a construction project

More information

CONDITIONS OF CONTRACT FOR QUOTATION

CONDITIONS OF CONTRACT FOR QUOTATION CONDITIONS OF CONTRACT FOR QUOTATION Version 6.0 Page 1 of 18 CONTENTS Clause Subject matter 1 Definitions and Interpretation 2 Scope of Contract 3 Delivery 4 Removal and Replacement 5 Financial Provisions

More information

AIRPORT AUTHORITY HONG KONG

AIRPORT AUTHORITY HONG KONG AIRPORT AUTHORITY HONG KONG GENERAL CONDITIONS OF CONTRACT BUILDING AND CIVIL WORKS ISSUE NO. 10 August 2011 [this page not used] GENERAL CONDITIONS OF CONTRACT FOR BUILDING AND CIVIL WORKS TABLE OF CONTENTS

More information

AH: STANDARD CONDITIONS OF CONTRACT FOR CONSTRUCTION AND IMPROVEMENT WOPKS SCC.1

AH: STANDARD CONDITIONS OF CONTRACT FOR CONSTRUCTION AND IMPROVEMENT WOPKS SCC.1 COMPLIANCE TO CONDITIONS OF CONTRACT - SCC.1(Renovation) Please indicate clearly below your compliance to each clause of the Conditions of Contract. Where you are not in agreement, you should give your

More information

The New NZS 3910:2013

The New NZS 3910:2013 The New NZS 3910:2013 Introduction On the 1 st of October 2013, NZS 3910:2013 Conditions of Contract for Building and Civil Engineering Construction was released by New Zealand Standards. This is the first

More information

Hobson Engineering Co Pty Ltd

Hobson Engineering Co Pty Ltd Hobson Engineering Co Pty Ltd Terms & Conditions of Trade as displayed on Definitions Australian Consumer Law means Schedule 2 to the Competition and Consumer Act 2010 (Cth). Company means Hobson Engineering

More information

Goal General Terms and Conditions

Goal General Terms and Conditions Appendices: Appendix A Goal General Terms and Conditions I. LEGAL STATUS The Vendor shall be considered as having the legal status of an independent contractor vis-à-vis GOAL. The Vendor, its personnel

More information

These Standard Terms and Conditions form a contract between the Company and the Supplier. SUPPLY OF GOODS / SERVICES QUALITY PRICE AND PAYMENT

These Standard Terms and Conditions form a contract between the Company and the Supplier. SUPPLY OF GOODS / SERVICES QUALITY PRICE AND PAYMENT These Standard Terms and Conditions form a contract between the Company and the Supplier. SUPPLY OF GOODS / SERVICES 1. The Supplier shall supply and deliver to the Company all the goods/services set out

More information

Company. And. Contractor NORFOLK INDEPENDENT CONTRACTOR AGREEMENT

Company. And. Contractor NORFOLK INDEPENDENT CONTRACTOR AGREEMENT Company And Contractor NORFOLK INDEPENDENT CONTRACTOR AGREEMENT CONTENTS 1 Interpretations and Definitions... 1 2 Provision of Services by the Contractor... 3 3 Variations... 5 4 Fees Payable by the Company...

More information

General Terms and Conditions of Sale

General Terms and Conditions of Sale General Terms and Conditions of Sale April 2016 0 CONTENTS Clause Heading Page 1 Definitions and Interpretation...1 2 Basis of Contract...1 3 Description of the Goods and Services...2 4 Delivery and Acceptance

More information

Atradius Modula Policy - Sample

Atradius Modula Policy - Sample Atradius Modula Policy - Sample A flexible and tailored approach to Credit Insurance This is a sample of our Modula Policy wording only and is not a legally valid insurance policy. Agreement 00100.00 Agreement

More information

MILFORD SOUND INFRASTRUCTURE LIMITED Supplier. [ ] Customer WATER SUPPLY AGREEMENT

MILFORD SOUND INFRASTRUCTURE LIMITED Supplier. [ ] Customer WATER SUPPLY AGREEMENT MILFORD SOUND INFRASTRUCTURE LIMITED Supplier [ ] Customer WATER SUPPLY AGREEMENT 2 AGREEMENT dated first day of 200 PARTIES MILFORD SOUND INFRASTRUCTURE LIMITED ( Supplier ) [ ] ( Customer ) INTRODUCTION

More information

NSW Residential Building Contract for New Dwellings

NSW Residential Building Contract for New Dwellings NSW Residential Building Contract for New Dwellings OWNERS: JOB: Lot 5382 Proposed Road Marsden Park NSW 2765 LOT: 5382 SITE: Proposed Road Marsden Park NSW 2765 To verify your builder is a HIA member

More information

TERMS AND CONDITIONS OF SALE OF GOODS AND SUPPLY OF SERVICES

TERMS AND CONDITIONS OF SALE OF GOODS AND SUPPLY OF SERVICES TERMS AND CONDITIONS OF SALE OF GOODS AND SUPPLY OF SERVICES Section 1 - SALE OF GOODS 1.1. Definitions agreement is a reference to these Terms and Conditions and any order form and payment instructions

More information

Insert Project Title Here Reference Version. Insert Title of Works Here. United Nations Office for Project Services ( UNOPS ) -and-

Insert Project Title Here Reference Version. Insert Title of Works Here. United Nations Office for Project Services ( UNOPS ) -and- Insert Project Title Here Reference Version Insert Title of Works Here United Nations Office for Project Services ( UNOPS ) -and- Name of Contractor Short Form Construction Contract Contract No.: Insert

More information

Session 3 by Zoltán Záhonyi, FIDIC AIT,

Session 3 by Zoltán Záhonyi, FIDIC AIT, Session 3 by Zoltán Záhonyi, FIDIC AIT, zoltan.zahonyi@zandpartners.com Contents of Session 3 Session 3: FIDIC 1999 Red Book Part 2 The Quality Issues (Plant, Materials and Workmanship) The Time is of

More information

2 nd Edition September 2005 (Second Edition of CIDB document 1020)

2 nd Edition September 2005 (Second Edition of CIDB document 1020) Supply of Goods (Short Contract) 2 nd Edition September 2005 (Second Edition of CIDB document 1020) CIDB Supply of Goods (Short Contract) September 2005, Second Edition of CIDB document 1020 SUPPLY OF

More information

Terms of trade 1. Definitions 2. Quotations 3. Acceptance 4. Orders and Order Cancellations 5. Prices and Payments

Terms of trade 1. Definitions 2. Quotations 3. Acceptance 4. Orders and Order Cancellations 5. Prices and Payments Terms of trade 1. Definitions Company means Surfacefix Ltd Customer means the person, or company buying the goods from the Company. Products means benchtops or countertops or including any products that

More information

CS ENERGY LIMITED SERVICE CONDITIONS

CS ENERGY LIMITED SERVICE CONDITIONS CS ENERGY LIMITED SERVICE CONDITIONS 1. DEFINITIONS In these Conditions: Agreement means the agreement between CS Energy and the Contractor for the provision of Services and comprises the relevant Service

More information

DRAFT FORM OF CONTRACT

DRAFT FORM OF CONTRACT DRAFT FORM OF CONTRACT Dear Sir/Madam, Date Ref.: Maintenance of Panjwai Road from Mirwais Mina to Panjwai District Centre, (Lot 1), Maintenance of Arghandab Road from Brishna Kot to Sardeh Bagh, (Lot

More information

Domestic Building Contract Document D.B. Edition 3

Domestic Building Contract Document D.B. Edition 3 Domestic Building Contract Document D.B. Edition 3 AGREEMENT and CONDITIONS of BUILDING CONTRACT BETWEEN... (BUILDER) ACN and/or ABN No... AND... For use where an Architect is not employed to supervise

More information

Electronic & Mechanical Calibrations Pty Ltd Terms & Conditions of Trade Definitions Acceptance Change in Control 4.

Electronic & Mechanical Calibrations Pty Ltd Terms & Conditions of Trade Definitions Acceptance Change in Control 4. 1. Definitions 1.1 Supplier means Electronic & Mechanical Calibrations Pty Ltd ATF EMC Trust T/A Electronic & Mechanical Calibrations Pty Ltd, its successors and assigns or any person acting on behalf

More information

APPLICATION FOR CREDIT ACCOUNT, AND CONDITIONS OF SALE

APPLICATION FOR CREDIT ACCOUNT, AND CONDITIONS OF SALE ORGANISATION DETAILS: APPLICATION FOR CREDIT ACCOUNT, AND CONDITIONS OF SALE a Please provide: Organisation Proper Name:.. ( Purchaser ) Organisation s Trading Name if different:. Organisation Type e.g.,

More information

SECTION 2 : JURONG HEALTH SERVICES PTE LTD STANDARD CONDITIONS OF CONTRACT FOR CONSTRUCTION AND IMPROVEMENT WORKS

SECTION 2 : JURONG HEALTH SERVICES PTE LTD STANDARD CONDITIONS OF CONTRACT FOR CONSTRUCTION AND IMPROVEMENT WORKS SECTION 2 : JURONG HEALTH SERVICES PTE LTD STANDARD CONDITIONS OF CONTRACT FOR CONSTRUCTION AND IMPROVEMENT WORKS 1. DEFINITIONS AND INTERPRETATION 1.1 Definitions In this Contract (as hereinafter defined)

More information

VIRIDOR WASTE MANAGEMENT LIMITED TERMS AND CONDITIONS OF TRADE

VIRIDOR WASTE MANAGEMENT LIMITED TERMS AND CONDITIONS OF TRADE VIRIDOR WASTE MANAGEMENT LIMITED TERMS AND CONDITIONS OF TRADE The Supplier will collect/accept Waste for disposal and will supply/deliver quarried or other material subject to the conditions set out below:

More information

Basic Connection Service Connection of Micro Embedded Generator (less than or equal to 5kW)

Basic Connection Service Connection of Micro Embedded Generator (less than or equal to 5kW) Model Standing Offer Basic Connection Service Connection of Micro Embedded Generator (less than or equal to 5kW) 3072 30.06.2015 Page 1 of 10 Customer Name: Customer Address: Issue Date: Receipt of completed

More information

1997 Part 2. Document B141. Standard Form of Architect's Services: Design and Contract Administration TABLE OF ARTICLES

1997 Part 2. Document B141. Standard Form of Architect's Services: Design and Contract Administration TABLE OF ARTICLES TM Document B141 Standard Form of Architect's Services: Design and Contract Administration 1997 Part 2 TABLE OF ARTICLES 2.1 PROJECT ADMINISTRATION SERVICES 2.2 SUPPORTING SERVICES 2.3 EVALUATION AND PLANNING

More information

3.1. The Exhibitor should pay the Fee for provision of the Space by PURE LIFE SHOWS LTD in accordance with this clause 3.

3.1. The Exhibitor should pay the Fee for provision of the Space by PURE LIFE SHOWS LTD in accordance with this clause 3. 1 TERMS & CONDITIONS FOR EXHIBITORS 1. DEFINITIONS 1.1. In these terms & conditions: PURE Life Experiences means PURE LIFE SHOWS LTD; Invitation & Contract means the Invitation & Contract signed by the

More information

Schedule 10. Part 1 from Contractor to Beneficiaries DATED [ ] [NAME OF BENEFICIARY] and [CONTRACTOR] DEED OF WARRANTY

Schedule 10. Part 1 from Contractor to Beneficiaries DATED [ ] [NAME OF BENEFICIARY] and [CONTRACTOR] DEED OF WARRANTY Schedule 10 Part 1 from Contractor to Beneficiaries DATED [ ] [NAME OF BENEFICIARY] (1) and [CONTRACTOR] (2) DEED OF WARRANTY in relation to the NEC3 OPTION A TERM SERVICE CONTRACT FOR INTEGRATED FACILITIES

More information

AGREEMENT made as of the in the year (In words, indicate day, month and year.) BETWEEN the Owner: (Name, legal status and address)

AGREEMENT made as of the in the year (In words, indicate day, month and year.) BETWEEN the Owner: (Name, legal status and address) Document A134 2009 Standard Form of Agreement Between Owner and Construction Manager as Constructor where the basis of payment is the Cost of the Work Plus a Fee without a Guaranteed Maximum Price AGREEMENT

More information

Water Corporation July 2012 Version AS (Incorporating Amendment No. 1)

Water Corporation July 2012 Version AS (Incorporating Amendment No. 1) Water Corporation July 2012 Version AS 4906 2002 (Incorporating Amendment No. 1) AS 4906 2002 Water Corporation General conditions of contract amended from Australian Standard Minor Works Contract Conditions

More information

8-12 SEPTEMBER 2019 MARRAKECH TERMS & CONDITIONS FOR EXHIBITORS 1. DEFINITIONS

8-12 SEPTEMBER 2019 MARRAKECH TERMS & CONDITIONS FOR EXHIBITORS 1. DEFINITIONS 1 TERMS & CONDITIONS FOR EXHIBITORS 1. DEFINITIONS 1.1. In these terms & conditions: PURE Life Experiences means PURE LIFE SHOWS LTD; Invitation & Contract means the Invitation & Contract signed by the

More information

Emtelle UK Limited Conditions Of Sale Of Goods

Emtelle UK Limited Conditions Of Sale Of Goods Emtelle UK Limited Conditions Of Sale Of Goods 1. INTERPRETATION 1.1 In these terms and conditions the following words have the following meanings: Buyer the person(s) or company whose order for the Goods

More information

Exclaimer Cloud Signatures For Office 365: Terms and Conditions

Exclaimer Cloud Signatures For Office 365: Terms and Conditions Exclaimer Cloud Signatures For Office 365: Terms and Conditions The following terms of service (collectively, the Terms ) govern the use of the Exclaimer hosted email signature services (the Services )

More information

LABOUR ONLY CONDITIONS OF CONTRACT

LABOUR ONLY CONDITIONS OF CONTRACT LABOUR ONLY CONDITIONS OF CONTRACT Revision J. Date 01/05/12 1. Definitions 1.1 In these Conditions the Company means BDW Trading Limited and the Contractor means the individual firm or company named in

More information

Terms and conditions of sale of material

Terms and conditions of sale of material C1 DEFINITIONS In the Agreement, except where the context otherwise requires: Agreement means an agreement made in accordance with C3. Acceptance (of Order) means Western Power s written acceptance of

More information

Australian/New Zealand Standard

Australian/New Zealand Standard Water Corporation July 2012 Version AS/NZS 4911:2003 (Incorporating Amendment No. 1) AS/NZS 4911:2003 Australian/New Zealand Standard Water Corporation General conditions of contract amended from Australian

More information

General Conditions for Purchase (CG-2)

General Conditions for Purchase (CG-2) Page: 2 of 5 1 Definitions - CLIENT means the party placing an order, being the legal entity as mentioned in the Purchase Order, as well as his legal successors in title; - VENDOR means the party who delivers

More information

Bike n Blend Terms and Conditions

Bike n Blend Terms and Conditions Bike n Blend Terms and Conditions 1. DEFINITIONS Agreement means the agreement between Bike n Blend and the Customer for the hire of the Bike n Blend Package which includes: (iii) (iv) the Booking Form;

More information

Professional Indemnity Insurance

Professional Indemnity Insurance Professional Indemnity Insurance Proposal Form For Construction Professionals Important Notices to the Applicant Statement pursuant to Section 25 (5) of the Insurance Act (Cap. 142) (or any subsequent

More information

Insert heading depending. Insert heading depending on line on line length; please delete cover options once

Insert heading depending. Insert heading depending on line on line length; please delete cover options once Insert Insert heading depending Insert heading depending on line on line length; please delete on NHS on line length; line Standard length; please Contract please delete delete other other cover cover

More information

2 THE EMPLOYER Provision of Site 2.2 Permits and Licenses 2.3 Employer s Instructions 2.4 Approvals

2 THE EMPLOYER Provision of Site 2.2 Permits and Licenses 2.3 Employer s Instructions 2.4 Approvals GENERAL CONDITIONS 1 GENERAL PROVISIONS.................................... 1 1.1 Definitions The Contract Persons Dates, Times and Periods Money and Payments Other Definitions 1.2 Interpretation 1.3 Priority

More information

STANDARD TERMS AND CONDITIONS FOR THE SALE OF GOODS ALL MARKETS EXCEPT OIL AND GAS

STANDARD TERMS AND CONDITIONS FOR THE SALE OF GOODS ALL MARKETS EXCEPT OIL AND GAS STANDARD TERMS AND CONDITIONS FOR THE SALE OF GOODS ALL MARKETS EXCEPT OIL AND GAS 1. Scope of Application These terms and conditions of sale ( T&C ) apply to all sales by our company ( Supplier ) of goods

More information

CREDIT ACCOUNT APPLICATION FORM

CREDIT ACCOUNT APPLICATION FORM CREDIT ACCOUNT APPLICATION FORM Please print off this form and complete in block capitals. You can scan and email the completed form to accounts@gibbonsgroup.co.uk or post it to Gibbons Engineering Group,

More information

These conditions apply to all supplies of goods and services supplied by us to you, unless otherwise clearly agreed in writing signed by us and you.

These conditions apply to all supplies of goods and services supplied by us to you, unless otherwise clearly agreed in writing signed by us and you. SERVICE CONDITIONS Truck Moves New Zealand (4218738) A company of Sheehans Automotive Management Ltd (1851618) Service Conditions In these standard service conditions we, us and similar expressions, refer

More information

TERMS AND CONDITIONS (PRINTING INDUSTRY ASSOCIATION OF AUSTRALIA)

TERMS AND CONDITIONS (PRINTING INDUSTRY ASSOCIATION OF AUSTRALIA) TERMS AND CONDITIONS (PRINTING INDUSTRY ASSOCIATION OF AUSTRALIA) 1. INTRODUCTION 1.1 Application of these Terms and Conditions These Terms and Conditions are incorporated into any contract between a printer

More information

Townsville Office Furniture Pty Ltd Terms & Conditions of Trade Definitions Acceptance Change in Control 4. Price and Payment Delivery of Goods

Townsville Office Furniture Pty Ltd Terms & Conditions of Trade Definitions Acceptance Change in Control 4. Price and Payment Delivery of Goods 1. Definitions 1.1 T.O.F means Townsville Office Furniture Pty Ltd ATF Townsville Office Furniture Unit Trust T/A Townsville Office Furniture Pty Ltd, its successors and assigns or any person acting on

More information

INNOWOOD Australia Pty Ltd ( INNOWOOD ) ABN: STANDARD TERM & CONDITIONS OF TRADE

INNOWOOD Australia Pty Ltd ( INNOWOOD ) ABN: STANDARD TERM & CONDITIONS OF TRADE INNOWOOD Australia Pty Ltd ( INNOWOOD ) ABN: 44 143 723 933 STANDARD TERM & CONDITIONS OF TRADE These are the entire Standard Terms and Conditions of Sale for the goods supplied by Innowood on or after

More information

2. A quotation remains valid for 30 days from the date it is given. A quotation may be withdrawn by APSL at any time by notice to the Customer.

2. A quotation remains valid for 30 days from the date it is given. A quotation may be withdrawn by APSL at any time by notice to the Customer. Absolute Print Solutions Limited Terms and Conditions GENERAL 1. This Agreement forms the basis on which Absolute Print Solutions Limited (APSL) provides quotations to the Customer in respect of Goods,

More information

AIA Document A133 TM 2009

AIA Document A133 TM 2009 AIA Document A133 TM 2009 Standard Form of Agreement Between Owner and Construction Manager as Constructor where the basis of payment is the Cost of the Work Plus a Fee with a Guaranteed Maximum Price

More information

CODE OF PRACTICE FOR WORKS AFFECTING THE CANAL & RIVER TRUST

CODE OF PRACTICE FOR WORKS AFFECTING THE CANAL & RIVER TRUST CODE OF PRACTICE FOR WORKS AFFECTING THE CANAL & RIVER TRUST PART 3 FORMS April 2018 Third Party Works Code of Practice: Part 3: Forms April 2018 1 CONTENTS FORM 1:NOTIFICATION FORM FORM 2: COST UNDERTAKING

More information

ANDRA JEWELS LIMITED TERMS & CONDITIONS OF SUPPLY

ANDRA JEWELS LIMITED TERMS & CONDITIONS OF SUPPLY ANDRA JEWELS LIMITED TERMS & CONDITIONS OF SUPPLY 1 The customer's attention is drawn in particular to the provisions of clauses 2.3, 8 and 9. 1. INTERPRETATION 1.1 Definitions. In these Conditions, the

More information

Invitation to Quote ADM Golden Raven Marketing Program Review

Invitation to Quote ADM Golden Raven Marketing Program Review Invitation to Quote ADM-16-01 The Regional District of Fraser-Fort George is seeking quotations from qualified vendors to conduct an assessment of the Golden Raven Cultural Marketing Program. Three (3

More information

Australian Independent Hire A.B.N

Australian Independent Hire A.B.N Australian Independent Hire A.B.N. 47 114 959 296 PO Box 1158, Ashmore City QLD 4214 15 Jade Dr, Molendinar QLD 4214 Ph: (07) 5578 3777 Fax: (07) 5578 3999 www.aihire.com.au Email: sales@aihire.com.au

More information

PART 3. Comprehensive Agreement Between Department and Design-Builder

PART 3. Comprehensive Agreement Between Department and Design-Builder PART 3 Between Department and Design-Builder This COMPREHENSIVE AGREEMENT for the I-64 Hampton Roads Bridge-Tunnel Project (the Agreement ) is made as of [ ], 2019 (the Agreement Date ), by and between

More information

West City Auto Group Limited Terms & Conditions of Trade Definitions Acceptance Change in Control Price And Payment Delivery Of Works

West City Auto Group Limited Terms & Conditions of Trade Definitions Acceptance Change in Control Price And Payment Delivery Of Works 1. Definitions 1.1 WCAG shall mean West City Auto Group Limited, its successors and assigns or any person acting on behalf of and with the authority of West City Auto Group Limited. 1.2 Customer shall

More information

STANDARD FORM OF AGREEMENT BETWEEN DESIGN-BUILDER AND GENERAL CONTRACTOR - LUMP SUM

STANDARD FORM OF AGREEMENT BETWEEN DESIGN-BUILDER AND GENERAL CONTRACTOR - LUMP SUM STANDARD FORM OF AGREEMENT BETWEEN DESIGN-BUILDER AND GENERAL CONTRACTOR - LUMP SUM Document No. 555 Second Edition, 2010 Design-Build Institute of America Washington, DC Design-Build Institute of America

More information

RAIL SETTLEMENT PLAN LIMITED. [SUPPLIER or RETAILER] ACCREDITATION CONTRACT v01-00

RAIL SETTLEMENT PLAN LIMITED. [SUPPLIER or RETAILER] ACCREDITATION CONTRACT v01-00 RAIL SETTLEMENT PLAN LIMITED AND [SUPPLIER or RETAILER] v01-00 Date of Agreement: [SUPPLIER or RETAILER] CONTENTS OF LICENCE 1 Definitions 1 2 Representatives 3 3 Accreditation Services 4 4 Accreditation

More information

ARTICLE 8 - OWNER S RESPONSIBILITIES

ARTICLE 8 - OWNER S RESPONSIBILITIES properly integrate with such other work. Contractor shall not endanger any work of others by cutting, excavating, or otherwise altering their work and will only cut or alter their work with the written

More information

2017 TRAIL PAVING TENDER DOCUMENT FOR. THE MUNICIPALITY DISTRICT OF BONNYVILLE No. 87

2017 TRAIL PAVING TENDER DOCUMENT FOR. THE MUNICIPALITY DISTRICT OF BONNYVILLE No. 87 2017 TRAIL PAVING TENDER DOCUMENT FOR THE MUNICIPALITY DISTRICT OF BONNYVILLE No. 87-1 - Municipal District of Bonnyville No. 87 2017 Trail Paving INVITATION TO TENDER The Municipal District of Bonnyville

More information

ARTICLE 1 ARTICLE 3 CONTRACTOR THE SUBCONTRACT DOCUMENTS ARTICLE 2 MUTUAL RIGHTS AND RESPONSIBILITIES

ARTICLE 1 ARTICLE 3 CONTRACTOR THE SUBCONTRACT DOCUMENTS ARTICLE 2 MUTUAL RIGHTS AND RESPONSIBILITIES ARTICLE 1 THE SUBCONTRACT DOCUMENTS 1.1 The Subcontract Documents consist of (1) this Agreement; (2) the prime Contract, consisting of the Agreement between the Owner and Contractor and the other Contract

More information

Conditions for the Carriage of Goods by Road

Conditions for the Carriage of Goods by Road Conditions for the Carriage of Goods by Road The Conditions set down the basis on which the Carrier will carry goods for the Customer (definitions of Carrier and Customer are given in Condition 1). The

More information

IOP(SA) PLUMBING WORKS AGREEMENT

IOP(SA) PLUMBING WORKS AGREEMENT IOP(SA) PLUMBING WORKS AGREEMENT 1. INTERPRETATION 1.1 In this Agreement, unless inconsistent with the context, the words and phrases defined hereunder shall bear the meanings assigned to them in this

More information

CIOB TIME AND COST MANAGEMENT CONTRACT CONSULTANCY APPOINTMENT CONTRACT ADMINISTRATOR SCHEDULES EDITION

CIOB TIME AND COST MANAGEMENT CONTRACT CONSULTANCY APPOINTMENT CONTRACT ADMINISTRATOR SCHEDULES EDITION CIOB TIME AND COST MANAGEMENT CONTRACT CONSULTANCY APPOINTMENT 09 CONTRACT ADMINISTRATOR SCHEDULES 8 + 9 2015 EDITION CIOB TIME AND COST MANAGEMENT CONTRACT CONSULTANCY APPOINTMENT 09 CONTRACT ADMINISTRATOR

More information