Alternative project delivery Gastonia s experience with CMAR. Presented by: Rusty Bost, City of Gastonia Keith Garbrick, LaBella Associates
|
|
- Roxanne Haynes
- 5 years ago
- Views:
Transcription
1 Alternative project delivery Gastonia s experience with CMAR Presented by: Rusty Bost, City of Gastonia Keith Garbrick, LaBella Associates
2 When we Last met
3 presentation preview: Review of the basics for how CMAR works, governing statutes and legal requirements. The City of Gastonia s Water Treatment Plant, basics of the project into lessons learned Up Next: FUSE (Franklin Urban Sports and Entertainment) project.
4 Construction manager at risk (cmar) Construction Manager is chosen by qualifications CMAR becomes part of the design team and provides Value Engineering input and estimates based on progress drawings (30%, 60% and 90%). CMAR provides owners with a Guaranteed Maximum Price (GMP) CMAR cannot self perform work*
5 Governing statutes NC General Statute , October 1, 2014 Allows Construction Manager At Risk Municipality has to have concluded that Construction Management at Risk service is in the best interest of the project and have to have compared to other delivery methods. NC General Statute , October 1, 2014 Allows prequalification of subcontractors
6 Selecting a construction manager at risk Qualifications Based Selection Standard RFQ process for Professional Services RFQ Suggestions: Litigation History GMP vs Actual cost history (possible payback) Bonding Capacity and grade of Bonding Agency Page limits are a must Short List Interview Suggestions: Time Limit Bring the Superintendent Limit number of representatives from applicant
7 Construction manager At risk contract Single contract for pre-construction services, with GMP added later. Separate contracts for Preconstruction Services and Construction.
8 Construction manager At risk fees Preconstruction Services 0.25% per pricing exercise or 1% of the cost of work General Conditions Includes costs associated with the project team - (Senior Project Manager, Superintendent, etc.) Includes items required to administer the project -(job trailer, storage trailer, etc.) Typically 8% of the cost of work
9 Construction manager At risk fees Construction Fee Typically in the range of 2.5% to 3% Includes profit and home office overhead (including the Project Executive, Accounting, etc.) Contingencies Preconstruction: Team Decision Construction Contingency: 3% Bonds and Insurance Typically 2% of the cost of work (P&P Bond/GL Insurance/Builders Risk)
10 pre-construction services Value Engineering CMAR Provides estimates at 30%, 60% and 90% Constructability review/input Materials/equipment reviews, field trips to other facilities Possible early bid package for long lead items
11 Construction CMAR cannot self perform All work is still competitively bid to 1 st Tier Subcontractors The CMAR has to prequalify all 1 st Tier Subs Minimum score method, with points awarded for experience, bonding capacity, references, staffing, etc. Changes in work Two separate contingencies Contractors contingency carried by CMAR in the GMP Owners contingency can be carried separately A CMAR is still a contractor At close out, CMAR carries the warranty. The subs may have to come back to repair/finish items; however, it is the CMAR s responsibility.
12 Close out Water Treatment Plant: Was under operation during the entire project, and was a phased approach with Temporary CO s being issued for parts throughout the project. CMAR may help with Soft Openings
13 Gastonia case studies Water Treatment Plant Renovations New 5 m.g. clearwell Membrane treatment of surface water $56 million dollar upgrade Very limited site (in downtown)
14 Gastonia case studies FUSE (Franklin Urban Sport & Entertainment) District $15 Million economic development investment Surrounding private redevelopment Lots of public attention
15 Contingency funds Gastonia (WTP) elected to not encumber an owners contingency within the GMP. Funds were held within existing enterprise fund accounts Contractors Contingency was established within the GMP for Scope Gap, used by the contractor with our advise, but not consent Split savings as motivator
16 Expect the unexpected Union issues with 3 rd tier subcontractor (you never know what will make the news) Claims from subcontractors City s risk (or CMAR)? Quality of Work how do issues get resolved? Responsiveness to schedule, and total cost to municipality
17 Team building and buy in Would we use cmaragain? Off ramp if GMP negotiations aren t working out, you still have options. Certainty of pricing open book. Pre construction services.
18 The future of cmar Owners going to design build, time = money, time savings (due to current market, general conditions cost) Changes to statutes self performing (where subs works needs correcting)
ILLINOIS COMMUNITY COLLEGE CFO SPRING 2010 CONFERENCE DANCING WITH CONSTRUCTION FIRMS WHAT ARE YOUR OPTIONS? CONSTRUCTION MANAGER VS GENERAL
ILLINOIS COMMUNITY COLLEGE CFO SPRING 2010 CONFERENCE DANCING WITH CONSTRUCTION FIRMS WHAT ARE YOUR OPTIONS? CONSTRUCTION MANAGER VS GENERAL CONTRACTOR APRIL 30, 2010 1 Agenda The Players A Major Decision
More informationREQUEST FOR QUALIFICATIONS CONSTRUCTION MANAGER SERVICES DICKINSON PUBLIC SCHOOL DISTRICT NO. 1 DICKINSON, NORTH DAKOTA
REQUEST FOR QUALIFICATIONS CONSTRUCTION MANAGER SERVICES NEW MIDDLE SCHOOL 212,000 SQUARE FEET DICKINSON PUBLIC SCHOOL DISTRICT NO. 1 DICKINSON, NORTH DAKOTA November 25, 2014 1. INTRODUCTION: Dickinson
More informationConstruction Management at Risk. Cheryl Olson, CPPO, C.P.M., FCCN Kristine Rumping, CPPB, FCCM
Construction Management at Risk Cheryl Olson, CPPO, C.P.M., FCCN Kristine Rumping, CPPB, FCCM 1 Welcome and Introductions Construction Management at Risk Defined Benefits Statutory Guidelines Solicitation
More informationGREENVILLE UTILITIES COMMISSION Greenville, North Carolina REQUEST FOR QUALIFICATIONS. Construction Manager at Risk (CMR) Services
GREENVILLE UTILITIES COMMISSION Greenville, North Carolina REQUEST FOR QUALIFICATIONS Construction Manager at Risk (CMR) Services NEW OPERATIONS CENTER A. SCOPE OF SOLICITATION AND TECHNICAL INFORMATION
More informationRequest for Proposal for Construction Manager-at Risk Responses Due: 3:00 p.m. Thursday, September 10, 2015
Request for Proposal for Construction Manager-at Risk Responses Due: 3:00 p.m. Thursday, September 10, 2015 The Housing Authority of the Town of Glastonbury (the GHA ) is seeking a qualified firm to serve
More informationREQUEST FOR QUALIFICATIONS SUBMITTAL INSTRUCTIONS
REQUEST FOR QUALIFICATIONS SUBMITTAL INSTRUCTIONS CONSTRUCTION MANAGEMENT AT RISK (CMAR) SERVICES Burleigh County Courthouse Renovation Burleigh County BISMARCK, NORTH DAKOTA December 26, 2016 1. INTRODUCTION:
More informationWILLIAMS COUNTY HIGHWAY COMPLEX REQUEST FOR QUALIFICATIONS CONSTRUCTION MANAGER AT-RISK. January 2nd, PO Box E.
WILLIAMS COUNTY HIGHWAY COMPLEX REQUEST FOR QUALIFICATIONS CONSTRUCTION MANAGER AT-RISK January 2nd, 2014 PO Box 2047 205 E. Broadway Williston, ND 58802 1 TABLE OF CONTENTS INSTRUCTIONS TO RESPONDENTS
More informationWEST VIRGINIA UNIVERISITY REQUEST FOR PROPOSAL M FOR MILAN PUSKAR STADIUM CONCOURSE RENOVATIONS CONSTRUCTION MANAGER AT-RISK SERVICES
WEST VIRGINIA UNIVERISITY REQUEST FOR PROPOSAL 90003363M FOR MILAN PUSKAR STADIUM CONCOURSE RENOVATIONS CONSTRUCTION MANAGER AT-RISK SERVICES OFFICIAL RELEASE DATED: MONDAY, OCTOBER 27, 2014 {W0015509.1}
More informationRequest For Qualifications Construction Management at Risk
Request For Qualifications Construction Management at Risk DAVIE COUNTY HIGH SCHOOL REPURPOSING PROJECT SOLICITATION: REC-2018-020 Representative for RFQ: Brad Blackwelder bblackwelder@daviecountync.gov
More informationARTICLE 8: BASIC SERVICES
THE SCOPE OF SERVICES ADDED BY THIS AMENDMENT IS FOR A CM AT RISK PROJECT ONLY. THE SCOPE OF SERVICES SPECIFIED BELOW INCLUDES ARTICLES 8.1, 8.3, 8.4, 8.5, 8.6, 8.7 AND 8.8. THE SERVICES SPECIFIED IN ARTICLE
More informationAlpena County Sheriff s Office & Jail Expansion April 16, 2018 RFP for Construction Manager at Risk Services
SECTION 1: ADVERTISEMENT FOR PROPOSALS / GENERAL INFORMATION Alpena County ( County ) requests proposals for Construction Manager at Risk ( CMAR ) to provide preconstruction and construction services for
More informationREQUEST FOR QUALIFICATIONS/ PROPOSALS LEASE-LEASEBACK CONTRACTOR FOR
SANTA BARBARA UNIFIED SCHOOL DISTRICT REQUEST FOR QUALIFICATIONS/ PROPOSALS LEASE-LEASEBACK CONTRACTOR FOR Multi-Purpose Building Renovation Projects at Harding University Partnership School and Roosevelt
More informationNC General Statutes - Chapter 143 Article 8 1
Article 8. Public Contracts. 143-128. Requirements for certain building contracts. (a) Preparation of specifications. Every officer, board, department, commission or commissions charged with responsibility
More informationCONTRACTOR QUALIFICATION QUESTIONNAIRE. May 23, 2010
CONTRACTOR QUALIFICATION QUESTIONNAIRE May 23, 2010 1 CONTRACTOR QUALIFICATION QUESTIONNAIRE Public Improvement Contracts Federal Requirements funding & laws State Requirements funding & laws Local o Chapter
More informationLIBERTY HILL INDEPENDENT SCHOOL DISTRICT REQUEST FOR QUALIFICATIONS FOR CONSTRUCTION MANAGER-AT-RISK SERVICES
LIBERTY HILL INDEPENDENT SCHOOL DISTRICT REQUEST FOR QUALIFICATIONS FOR CONSTRUCTION MANAGER-AT-RISK SERVICES Pursuant to the provisions of Texas Education Code 44.038, as amended, it is the intention
More informationREQUEST FOR QUALIFICATIONS FOR CONSTRUCTION MANAGER-AT-RISK SERVICES ("RFQ") January 20, 2018
1. INTRODUCTION REQUEST FOR QUALIFICATIONS FOR CONSTRUCTION MANAGER-AT-RISK SERVICES ("RFQ") January 20, 2018 The Board of Education of the Dublin City School District ("Owner"), in accordance with Ohio
More informationSTATE OF FLORIDA DEPARTMENT OF MANAGEMENT SERVICES DIVISION OF REAL ESTATE DEVELOPMENT AND MANAGEMENT PUBLIC ANNOUNCEMENT FOR CONSTRUCTION CONTRACTORS
STATE OF FLORIDA DEPARTMENT OF MANAGEMENT SERVICES DIVISION OF REAL ESTATE DEVELOPMENT AND MANAGEMENT PUBLIC ANNOUNCEMENT FOR CONSTRUCTION CONTRACTORS TO PROVIDE CONSTRUCTION MANAGEMENT AT RISK SERVICES
More informationTitle 28 (Authorize ADOT to procure multiple Job Order Contracting contracts in a single procurement)
Changes to Existing Law 2010 Proposal (SB 1406 and Proposed Committee Amendment) -- Alternative Project Delivery Methods (APDM) Legislation February 17, 2010 Title 15 (Repeal requirement for schools to
More informationBV-1 RFP ADDENDUM 1 December 8, 2014
BV-1 RFP ADDENDUM 1 December 8, 2014 REQUEST FOR PROPOSALS Campus Beautification Projects 2011/2012 (Torchbearer Plaza) UT Knoxville SBC No. 540/009-04-2011 This Addendum forms a part of the Request for
More informationPANAMA-BUENA VISTA UNION SCHOOL DISTRICT
Panama-Buena Vista Union School District KEVIN SILBERBERG, ED.D. BOARD OF TRUSTEES District Superintendent Linda S. Brenner Dean Haddock, Psy.D. 4200 Ashe Road Cheryl Palla Bakersfield, CA 93313 Dolores
More informationRFP ATTACHMENT 3 For Best Value Procurement Option One Thornton Student Life Center Renovations UT Knoxville SBC No.
RFP ATTACHMENT 3 For Best Value Procurement Option One Thornton Student Life Center Renovations UT Knoxville SBC No. 540/009-06-2017 TECHNICAL PROPOSAL SECTION A: MANDATORY REQUIREMENTS MANDATORY REQUIREMENTS
More informationSTATE OF FLORIDA DEPARTMENT OF MANAGEMENT SERVICES DIVISION OF REAL ESTATE DEVELOPMENT AND MANAGEMENT PUBLIC ANNOUNCEMENT FOR CONSTRUCTION CONTRACTORS
STATE OF FLORIDA DEPARTMENT OF MANAGEMENT SERVICES DIVISION OF REAL ESTATE DEVELOPMENT AND MANAGEMENT PUBLIC ANNOUNCEMENT FOR CONSTRUCTION CONTRACTORS TO PROVIDE CONSTRUCTION MANAGEMENT AT RISK SERVICES
More informationLessons Learned: Construction Bidding & Procurement Item D.1
Lessons Learned: Construction Bidding & Procurement Item D.1 Facilities Subcommittee Meeting February 28, 2017 Bid Limits The District must competitively bid any contract involving an expenditure of: Bid
More informationSCHOOL FACILITIES CONSTRUCTION AND IMPROVEMENT BONDS. Presented by: Rebecca C. Princehorn, Esq. & Sylvia L. Gillis, Esq.
SCHOOL FACILITIES CONSTRUCTION AND IMPROVEMENT BONDS Presented by: Rebecca C. Princehorn, Esq. & Sylvia L. Gillis, Esq. BRICKER & ECKLER LLP 100 South Third Street Columbus, Ohio 43215 (614) 227-2300 1001
More information(Electronic Submission Only)
DEERFIELD BEACH HOUSING AUTHORITY REQUEST FOR QUALIFICATIONS NUMBER RFQ 2016-001R General Contractor for Pre-Construction and Construction Services THE PALMS OF DEERFIELD APARTMENTS REDEVELOPMENT PROJECT
More informationI. PROJECT DESCRIPTION
REQUEST FOR QUALIFICATIONS The Board of Education of the Mariemont City School District (the Owner ) is seeking sealed, signed, written qualification statements from qualified Construction Management firms
More informationKansas Board of Regents Procedures for Implementation of the State Educational Institution Project Delivery Construction Procurement Act
Kansas Board of Regents Procedures for Implementation of the State Educational Institution Project Delivery Construction Procurement Act February 12, 2010 The following Procedures set forth the process
More informationConstruction Management-at-Risk Agreement
This ( Agreement ), by and between the Lone Star College ( LSC or Owner ) and ( Construction Manager ), referred to as Party individually or Parties collectively, shall become effective upon the date this
More informationCommunity Center Cost & Financing Proposal
Community Center Cost & Financing Proposal Contents Contractor Selection Process Project Costs Financing Proposal Member Costs Voting Process Contractor Selection Bid solicitations went public on January
More informationDrinking Water State Revolving Fund (SRF) Rulemaking FSAWWA 2015 Fall Conference Funding Infrastructure Improvements Workshop November 30, 2015
Drinking Water State Revolving Fund (SRF) Rulemaking FSAWWA 2015 Fall Conference Funding Infrastructure Improvements Workshop November 30, 2015 Shanin Speas Frost DWSRF Program Administrator Division of
More informationFAYETTE COUNTY SCHOOL DISTRICT REQUEST FOR PROPOSAL FOR CONSTRUCTION MANAGEMENT AT RISK SERVICES
FAYETTE COUNTY SCHOOL DISTRICT REQUEST FOR PROPOSAL FOR CONSTRUCTION MANAGEMENT AT RISK SERVICES The Fayette County School District (FCSD) desires to retain the services of a professional Construction
More informationSECTION GENERAL CONTRACTOR/CONSTRUCTION MANAGER (GC/CM) AGREEMENT TABLE OF CONTENTS ARTICLE 1 DEFINITIONS... 2
SECTION 00 50 00 GENERAL CONTRACTOR/CONSTRUCTION MANAGER (GC/CM) AGREEMENT TABLE OF CONTENTS ARTICLE 1 DEFINITIONS... 2 ARTICLE 2 THE CONTRACT DOCUMENTS... 3 ARTICLE 3 WORK OF THIS CONTRACT... 4 ARTICLE
More informationREQUEST FOR PRE-QUALIFICATION. Fine Arts HVAC Upgrade and Interior Renovation SADDLEBACK COLLEGE CAMPUS SOCCCD PROJECT NO. 2041
REQUEST FOR PRE-QUALIFICATION FOR Fine Arts HVAC Upgrade and Interior Renovation ON SADDLEBACK COLLEGE CAMPUS SOCCCD PROJECT NO. 2041 September 22, 2015 South Orange County Community College District 09/22/2015
More informationOREGON STATE UNIVERSITY CM/GC CONTRACT. (Construction Manager/General Contractor)
OREGON STATE UNIVERSITY CM/GC CONTRACT (Construction Manager/General Contractor) THE CONTRACT IS BETWEEN: OWNER: Oregon State University And CONSTRUCTION MANAGER/ GENERAL CONTRACTOR (referred to as Contractor
More informationRequest for Qualifications Construction Management-at-Risk FOOTBALL OPERATIONS FACILITY State Project # H MJ Feb. 9, 2016
University of South Carolina Request for Qualifications Construction Management-at-Risk FOOTBALL OPERATIONS FACILITY State Project # H27-6114-MJ Feb. 9, 2016 It is the intention of the University of South
More informationIntroduction by Philip Croessmann, V.P., Director of Risk Management Sources of Construction Claims Common Types of Construction Claims Risk
Introduction by Philip Croessmann, V.P., Director of Risk Management Sources of Construction Claims Common Types of Construction Claims Risk Management Preconstruction & Construction Managing Construction
More informationAUDITING CONSTRUCTION CAPITAL PROJECTS 101
AUDITING CONSTRUCTION CAPITAL PROJECTS 101 January 9, 2018 Adam Rouse Managing Consultant acrouse@bkd.com 1 TO RECEIVE CPE CREDIT Participate in entire webinar Answer polls when they are provided If you
More informationREQUEST FOR PROPOSALS (RFP) CONSTRUCTION MANAGER AS CONSTRUCTORS LAWRENCE POLICE DEPARTMENT HEADQUARTERS
April 12, 2018 REQUEST FOR PROPOSALS (RFP) CONSTRUCTION MANAGER AS CONSTRUCTORS LAWRENCE POLICE DEPARTMENT HEADQUARTERS I. Authority The City of Lawrence is seeking a Construction Manager as Constructor
More informationfor Job Order Contract Washington State University
for Job Order Contract Issued 1/12/2018 For Washington State University By Facilities Services, Capital Statement of Qualifications Deadline: February 15th, 2018, 3:00 pm Issued 1/12/2018 Page 1 of 11
More informationADVERTISEMENT: REQUEST FOR PROPOSALS FOR GHS SOFTBALL FIELD RENOVATION FOR GAINESVILLE CITY SCHOOLS
ADVERTISEMENT: REQUEST FOR PROPOSALS FOR GHS SOFTBALL FIELD RENOVATION FOR GAINESVILLE CITY SCHOOLS The Gainesville City School System will receive proposals for the GHS Softball Field Renovation at Gainesville
More informationRequest for Fee Proposals (RFFP) Progressive Design-Build Services. New High School
Request for Fee Proposals (RFFP) Progressive Design-Build Services New High School Issaquah School District February 12, 2018 TABLE OF CONTENTS 1. INTRODUCTION 2. PROJECT OVERVIEW 3. APPLICATION OF FEE
More informationCMR Agreement Exhibit D: GMP Amendment
GMP Amendment Construction Manager at Risk State of Ohio Standard Requirements for Public Facility Construction Suite 101 Harbourt Hall 615 Loop Road Kent, Ohio 44242-0001 phone: 330-672-3880 fax: 330-672-2648
More informationREQUEST FOR QUALIFICATIONS FOR CONSTRUCTION MANAGER AT RISK SERVICES TWO STEP PROCESS
REQUEST FOR QUALIFICATIONS FOR CONSTRUCTION MANAGER AT RISK SERVICES TWO STEP PROCESS Construction of Decatur HS 2018 Additions and Renovations DECATUR HIGH SCHOOL February 20, 2018 Table of Contents Construction
More informationDesign-Build Agreement Exhibit G: GMP Amendment
GMP Amendment University Design-Build Project State of Ohio Standard Requirements for Public Facility Construction Suite 101 Harbourt Hall 615 Loop Road Kent, Ohio 44242-0001 phone: 330-672-3880 fax: 330-672-2648
More informationACKNOWLEDGEMENT: Each qualification package shall include a signed copy of this ADDENDUM NUMBER ONE as acknowledgement.
! ADDENDUM NUMBER ONE REQUEST FOR QUALIFICATION (RFQ) Page 1 of 2 CMc CONSTRUCTION MANAGER AS CONSTRUCTOR PUBLIC WORKS & PARKS SERVICE FACILITY PROJECT TOWN OF WINDSOR, COLORADO April 5, 2016 Issued by:
More informationREQUEST FOR QUALIFICATIONS FOR GENERAL CONTRACTOR/CONSTRUCTION MANAGER SERVICES FOR ALTERNATIVE PROJECT DELIVERY FOR THE CONSTRUCTION OF A NEW LIBRARY
Missoula Public Library P a g e 1 REQUEST FOR QUALIFICATIONS FOR GENERAL CONTRACTOR/CONSTRUCTION MANAGER SERVICES FOR ALTERNATIVE PROJECT DELIVERY FOR THE CONSTRUCTION OF A NEW LIBRARY September 2015 Missoula
More informationINVITATION FOR STATEMENT OF QUALIFICATIONS
INVITATION FOR PROJECT NAME: WWTP HEADWORKS AND CLARIFIER PROJECT RFQ NUMBER: 2015-017 Statement of Qualifications Due Date: Thursday, May 14, 2015 Time: 2:00 PM CITY OF NORTHGLENN PUBLIC WORKS DEPARTMENT
More informationMini-Brooks Qualifications Based Selection Supplement of Design/Build Statutes
The Supplement Presentation as of August, 2015 Mini-Brooks Qualifications Based Selection Supplement of Design/Build Statutes (the full Statutes for Design/Build approaches with an analysis of each) David
More informationRequest for Qualifications (RFQ) Annual Notice. University of Washington. April Critical Patient Care and
Request for Qualifications (RFQ) Annual Notice Critical Patient Care and Specialized Medical Research Facilities Roster for Projects Advertised in CY 2015 and 2016 General Contractors The roster will be
More informationLEGAL ADVERTISEMENT CITY OF WINTER GARDEN REQUEST FOR QUALIFICATIONS (RFQ) RFQ #EN DESIGN CRITERIA PROFESSIONAL SERVICES
LEGAL ADVERTISEMENT CITY OF WINTER GARDEN REQUEST FOR QUALIFICATIONS (RFQ) RFQ #EN13-004 DESIGN CRITERIA PROFESSIONAL SERVICES REQUEST FOR QUALIFICATIONS (RFQ) NO. EN13-004 FOR A DESIGN CRITERIA PROFESSIONAL
More informationPROFESSIONAL SERVICES FOR CONSTRUCTION MANAGER AT RISK (CMAR) FOR THE MOBILE DOWNTOWN TERMINAL BROOKLEY AEROPLEX MOBILE, ALABAMA
MOBILE AIRPORT AUTHORITY PROFESSIONAL SERVICES FOR CONSTRUCTION MANAGER AT RISK (CMAR) FOR THE MOBILE DOWNTOWN TERMINAL BROOKLEY AEROPLEX MOBILE, ALABAMA REQUEST FOR PROPOSAL (RFP) Date: September 24,
More informationThe Liberia Annual Conference Monrovia, Liberia. REQUEST FOR PROPOSAL TO PROVIDE CONSTRUCTION MANAGEMENT and GENERAL CONTRACTOR SERVICES FOR
The Liberia Annual Conference Monrovia, Liberia REQUEST FOR PROPOSAL TO PROVIDE CONSTRUCTION MANAGEMENT and GENERAL CONTRACTOR SERVICES FOR NEW RESIDENTIAL TWO-STORY CLASSROOM BUILDING AND VOCATIONAL SCHOOL
More informationREQUEST FOR QUALIFICATION PROPOSALS FOR GUARANTEED ENERGY SAVINGS PERFORMANCE CONTRACT POTH INDEPENDENT SCHOOL DISTRICT POTH, TEXAS FEBRUARY 1, 2017
REQUEST FOR QUALIFICATION PROPOSALS FOR A GUARANTEED ENERGY SAVINGS PERFORMANCE CONTRACT BY POTH INDEPENDENT SCHOOL DISTRICT POTH, TEXAS FEBRUARY 1, 2017 REQUEST FOR QUALIFICATION PROPOSALS FOR A GUARANTEED
More informationRe: IO AFP Vendor Performance Program Scorecard for [Name of Company] (the Company )
[Date] [Company Name] [Street Address] [City, Province Postal Code] Attention: [Recipient Name] Re: IO AFP Vendor Performance Program Scorecard for [Name of Company] (the Company ) Dear [Recipient Name]:
More informationSanta Ana Unified School District
Santa Ana Unified School District Facilities & Governmental Relations Orin Williams, Assistant Superintendent Stefanie P. Phillips, Ed.D. Superintendent of Schools REQUEST FOR QUALIFICATIONS FOR PROPERTY
More informationPaul McDevitt Verona School District 121 Fairview Avenue Verona, NJ (973)
ADVERTISEMENT OF PUBLIC NOTICE Request for Proposals Notice is hereby given that Verona School District( School ) is seeking Proposals from qualified Energy Service Companies for the planning, development
More informationCONTRACT GENERAL CONDITIONS FOR COLLABORATIVE DESIGN-BUILD MAJOR PROJECTS
CONTRACT GENERAL CONDITIONS FOR COLLABORATIVE DESIGN-BUILD MAJOR PROJECTS THE CALIFORNIA STATE UNIVERSITY Prepared by: OFFICE OF THE CHANCELLOR CAPITAL PLANNING, DESIGN AND CONSTRUCTION (www.calstate.edu/cpdc/cm)
More informationSpecial PLS Update: Construction Contracts and Change Orders August 22, 2016 Custom Policies for the Tyrrell County Board of Education Sent 3.2.
9030 Facility Construction Adds new information in Section B pertaining to change orders for construction contracts: Specifies a threshold amount for change orders that determines whether Board approval
More informationThe City of Tarpon Springs
Prepared By: Carr, Riggs & Ingram August 29, 2018 The City of Tarpon Springs Contract Compliance Assessment of The Reverse Osmosis Water Treatment Facility Table of Contents Transmittal Letter... 1 Executive
More informationOFFEROR S STATEMENT OF QUALIFICATIONS
RBHA.ORG 804-819-4000 107 SOUTH FIFTH STREET, RICHMOND, VA 23219 OFFEROR S STATEMENT OF QUALIFICATIONS CAMPUS PHASE II CONSTRUCTION MANAGEMENT AT RISK 2016-AD-0004 TO BE COMPLETED BY OFFERORS IN RESPONSE
More informationBEST PRACTICE IN COST ESTIMATION. Presentation by : Dr.-Ing Chris Mbatha
BEST PRACTICE IN COST ESTIMATION Presentation by : Dr.-Ing Chris Mbatha OBJECTIVE The attendee will be able to: Describe a unit price bid Decide when and where the different types of estimates are used
More informationPermitting, Procurement, Construction and Performance Risks
Permitting, Procurement, Construction and Performance Risks Daniel Bailey, Pierce Atwood LLP (moderator) Lynn Gresock, Tetra Tech John Zimmer, TRC Bill Allard, Burns & McDonnell Parker Hadlock, Cianbro
More informationREQUEST FOR PROPOSAL
REQUEST FOR PROPOSAL For Construction Manager as Constructor for Tri-North Middle School Response Due: April 2, 2018, 1:00 pm MCCSC Service Building 560 E. Miller Drive Bloomington, IN 47401. REQUEST FOR
More informationMiller Act. Nabil dmaidi 1
Miller Act Enacted in 1935 Federal Contracts over $25,000 Contractor shall provide Bonds Performance Bonds in the amount to protect the U.S. List of Surety Companies acceptable in Federal Register Bid
More informationREQUEST FOR PROPOSAL CONSTRUCTION MANAGEMENT SERVICES (CM AT RISK)
REQUEST FOR PROPOSAL FOR CONSTRUCTION MANAGEMENT SERVICES (CM AT RISK) Midwestern State University Moffett Library Renovation Project Request for Proposal #735-18 - 8185 TABLE OF CONTENTS Page Notice for
More informationP3 Procurement Lessons Learned: Regina WWTP
P3 Procurement Lessons Learned: Regina WWTP 1 WWTP City of Regina 2 Jayne Krueger and Rob Court Project Awesomeness Group February 25, 2016 3 4 Reasons for Project Tighter effluent limits (December 31,
More informationRequest for Qualifications for Owner s Program Management Services For Wilton Police Headquarters Renovation and Expansion
Page 1 of 11 Request for Qualifications for Owner s Program Management Services For Wilton Police Headquarters Renovation and Expansion The Town of Wilton (the Town) will receive sealed qualifications
More informationThese regulations are issued pursuant to the following Sections of the Municipal Code of Chicago:
1. GENERAL PROVISIONS 1.1. Statement of Authority These regulations are issued pursuant to the following Sections of the Municipal Code of Chicago: Section 2-92-410 of the Municipal Code of Chicago establishes
More informationHelena Public Schools. Helena, MONTANA REQUEST FOR QUALIFICATIONS FOR GENERAL CONTRACTOR/CONSTRUCTION MANAGER SERVICES FOR
Helena Public Schools P a g e 1 Helena Public Schools Helena, MONTANA REQUEST FOR QUALIFICATIONS FOR GENERAL CONTRACTOR/CONSTRUCTION MANAGER SERVICES FOR ALTERNATIVE PROJECT DELIVERY FOR NEW CENTRAL ELEMENTARY
More informationLEGAL SERVICES RFP # AUGUST 13, 2018
LEGAL SERVICES RFP #2018-27 AUGUST 13, 2018 Electronic Submittals are due by 4:30 PM on September 5, 2018 The EVERETT HOUSING AUTHORITY is soliciting proposals for Licensed Professional Legal Services.
More informationGeorgia State Financing & Investment Commission
Georgia State Financing & Investment Commission Request for Qualifications (Step I) () And Request for Proposals (Step II) To Provide Design-Build Services For PROJECT No. SMMA-001 Evergreen & Stone Mountain
More informationPreventing and Managing the Risk of a Subcontractor Default A Best Practices Checklist
Tough times have depleted balance sheets and left working capital levels dangerously low for many subcontractors. Defaults are on the rise and expected to increase; a trend that has somewhat been masked
More informationOWNER ARIZONA BOARD OF REGENTS. for and on behalf of ARIZONA STATE UNIVERSITY CMAR DESIGN PROFESSIONAL
Date (type in) Issued: CONSTRUCTION CONTRACT FOR CONSTRUCTION MANAGER AT RISK PROJECTS (SINGLE PROJECT FORM) Request for Qualifications Number OWNER ARIZONA BOARD OF REGENTS for and on behalf of ARIZONA
More informationConstruction Workshop
Build United Construction Workshop 1 Agenda Welcome Overview of 2013 Bond Program Procurement Methods & Procedures for Contractors Design Build Method Construction Manager at Risk Competitive Sealed Proposals
More informationFINAL PROJECT REPORT
FINAL PROJECT REPORT TO: FROM: DATE: Pat Gamble President Kit Duke AVP Facilities and Land Management Chancellor Vice Chancellor Associate Vice Chancellor Director Project Manager (insert ) SUBJECT: Project
More informationGranville Township Request for Qualifications Construction Manager at Risk (CMAR)
Article 1 Project Identification Granville Township Request for Qualifications Construction Manager at Risk (CMAR) Project Owner: Project Name: Project Description: Granville Township Trustees P.O. Box
More informationRICHMOND HEIGHTS LOCAL SCHOOL DISTRICT REQUEST FOR QUALIFICATIONS ( RFQ ) FOR OWNER S REPRESENTATIVE SERVICES
RICHMOND HEIGHTS LOCAL SCHOOL DISTRICT REQUEST FOR QUALIFICATIONS ( RFQ ) FOR OWNER S REPRESENTATIVE SERVICES The Board of Education of the Richmond Heights Local School District Board of Education ( Owner
More informationCITY OF SUNSET VALLEY 11. AGENDA DATE: May 15, 2018
CITY OF SUNSET VALLEY 11 AGENDA DATE: May 15, 2018 SUBJECT: Consider approval of Contingency Modification Number 1 for the Sunset Valley Police and Public Works Facilities Construction project and approval
More informationOSE FORM STANDARD MODIFICATIONS TO THE STANDARD FORM OF AGREEMENT BETWEEN OWNER AND CONSTRUCTION MANAGER AS CONSTRUCTOR
OSE FORM 00502 STANDARD MODIFICATIONS TO THE STANDARD FORM OF AGREEMENT BETWEEN OWNER AND CONSTRUCTION MANAGER AS CONSTRUCTOR OWNER: PROJECT NUMBER: PROJECT NAME: PROCUREMENT OFFICER:. 1 Standard Modifications
More informationRequest for Qualifications Number 1470 General Construction Services
RICHARDSON INDEPENDENT SCHOOL DISTRICT PURCHASING DEPARTMENT 970 Security Row Richardson, TX 75081 Request for Qualifications Number 1470 General Construction Services Richardson Independent School District
More informationTerre View Research Facility Relocation Washington State University Pullman, WA Project Manual
Terre View Research Facility Relocation Washington State University Pullman, WA Project Manual Project No. 9574-2018 Issued 7/19/2017 Washington State University Facility Services, Capital Terre View Research
More informationREQUEST FOR PROPOSAL (RFP) OWNER S REPRESENTATION/PROJECT MANAGER. New Combined Court Facility In Montezuma County
REQUEST FOR PROPOSAL (RFP) OWNER S REPRESENTATION/PROJECT MANAGER New Combined Court Facility In Montezuma County 12/11/2015 Prepared by: Montezuma County 109 W. Main, Room 302 Cortez, CO 81321 Melissa
More informationPLANNING & CONSTRUCTION COMMITTEE MEETING MINUTES June 10, 10:14 a.m. Conference Room A/B
PLANNING & CONSTRUCTION COMMITTEE MEETING MINUTES June 10, 2014 @ 10:14 a.m. Conference Room A/B MEMBERS PRESENT: Jerry Hall, Chair Bob Larkin, Committee Member Nat Carasali, Alternate Committee Member
More informationCONSTRUCTION MANAGER AT RISK CONTRACT MASTER CONTRACT CONTRACT NO.
MARICOPA COUNTY SPECIAL HEALTHCARE DISTRICT dba MARICOPA INTEGRATED HEALTH SYSTEM Integrated Program Management Office 2601 East Roosevelt Street Phoenix, Arizona 85008-6092 CONSTRUCTION MANAGER AT RISK
More informationTULSA DEVELOPMENT AUTHORITY STAFF REPORT
TULSA DEVELOPMENT AUTHORITY STAFF REPORT MEETING DATE: July 6, 2017 TO: Chairman and Board Members FROM: O.C. Walker SUBJECT: Former Morton Hospital LOCATION: 605 East Pine Street, Tulsa, Oklahoma Background:
More informationREQUEST FOR PROPOSAL CONSTRUCTION MANAGEMENT SERVICES (CM AT RISK)
REQUEST FOR PROPOSAL FOR CONSTRUCTION MANAGEMENT SERVICES (CM AT RISK) Midwestern State University Fire Marshal & Texas Accessibility Standards Project Request for Proposal #735-17-8177 TABLE OF CONTENTS
More informationDocument A133 TM. AGREEMENT made as of the day of in the year 20 (In words, indicate day, month and year.)
Document A133 TM 2009 Standard Form of Agreement Between Owner and Construction Manager as Constructor where the basis of payment is the Cost of the Work Plus a Fee with a Guaranteed Maximum Price AGREEMENT
More informationPerforming Contract Audits. Thomas A. Mock, CIA, CCA Director of Internal Audit Lake County Schools
Performing Contract Audits Thomas A. Mock, CIA, CCA Director of Internal Audit Lake County Schools Overview of Session Types of Construction Contracts Architectural Agreement Contract Documents Bonds and
More informationAPPLICATION FOR PRE-QUALIFICATION of GENERAL CONTRACTORS and PRIME CONTRACTORS
Name of Prequalifying Contractor: FYE2017Prequalification APPLICATION FOR PRE-QUALIFICATION of GENERAL CONTRACTORS and PRIME CONTRACTORS (For construction contracts valued at more than $500,000) For SAN
More informationGENERAL ASSEMBLY OF NORTH CAROLINA SESSION 2013 SESSION LAW HOUSE BILL 857
GENERAL ASSEMBLY OF NORTH CAROLINA SESSION 2013 SESSION LAW 2013-401 HOUSE BILL 857 AN ACT AUTHORIZING PUBLIC CONTRACTS TO UTILIZE THE DESIGN-BUILD METHOD OR PUBLIC-PRIVATE PARTNERSHIP CONSTRUCTION CONTRACTS.
More informationCONSTRUCTION MANAGEMENT-AT-RISK AGREEMENT
CONSTRUCTION MANAGEMENT-AT-RISK AGREEMENT This Construction Management-at-Risk Agreement ( Agreement ) is entered into effective as of XXXXX (the Effective Date ), by and between City of South Padre Island,
More informationRequest for Qualifications. for. Construction Management at Risk Services (CMR) for. Concourse A North Expansion - Phase I. Project # TM15-019
Request for Qualifications for Construction Management at Risk Services (CMR) for Concourse A North Expansion - Phase I Project # TM15-019 Date: November 6, 2015 1 TABLE OF CONTENTS Section Page 1 Project
More informationRENEWABLE WATER RESOURCES
RENEWABLE WATER RESOURCES Purchasing Department 561 Mauldin Road Greenville, South Carolina 29607 REQUEST FOR QUALIFICATION For Indefinite Delivery Contract Construction Services For Process (WRRFs) and
More informationCITY OF AZLE REQUEST FOR QUALIFICATIONS CONSTRUCTION MANAGER AT RISK NEW JOINT CITY HALL & POLICE ADMINISTRATION & JAIL FACILITY
CITY OF AZLE REQUEST FOR QUALIFICATIONS CONSTRUCTION MANAGER AT RISK NEW JOINT CITY HALL & POLICE ADMINISTRATION & JAIL FACILITY The City of Azle will accept Request for Qualifications for Construction
More informationBUILDING CONSTRUCTION AGREEMENT BETWEEN OWNER AND CONSTRUCTION MANAGER
Agenda Item: Action Consent BUILDING CONSTRUCTION AGREEMENT BETWEEN OWNER AND CONSTRUCTION MANAGER OWNER: Palm Beach State College 4200 Congress Avenue Lake Worth, FL 33461 CONSTRUCTION MANAGER: Date Table
More informationREQUEST FOR QUALIFICATIONS CONSTRUCTION MANAGEMENT AT RISK (CMAR)
1 REQUEST FOR QUALIFICATIONS CONSTRUCTION MANAGEMENT AT RISK (CMAR) Preconstruction and Construction Services Safety Bay Improvement Project December 20, 2017 Table of Contents REQUEST FOR QUALIFICATIONS
More informationARIZONA STATE UNIVERSITY - STANDARD FORM AGREEMENT BETWEEN OWNER AND ON THE BASIS OF A GUARANTEED MAXIMUM PRICE March 1, 2015 Edition
ARIZONA STATE UNIVERSITY - STANDARD FORM AGREEMENT BETWEEN OWNER AND CM@RISK ON THE BASIS OF A GUARANTEED MAXIMUM PRICE March 1, 2015 Edition Standard Form Agreement Between Owner and CM@Risk (March 1,
More informationJob No REQUEST FOR QUALIFICATIONS CONSTRUCTION MANAGEMENT SERVICES
CLEAR CREEK INDEPENDENT SCHOOL DISTRICT Job No. 2019.408 REQUEST FOR QUALIFICATIONS FOR CONSTRUCTION MANAGEMENT SERVICES (CM AT RISK) (TWO STEP PROCESS) CCISD 2017 BOND PROGRAM Step One Districtwide Security
More informationCONSTRUCTION MANAGEMENT AGREEMENT. between WEST VILLAGES IMPROVEMENT DISTRICT. and. for the construction of the
CONSTRUCTION MANAGEMENT AGREEMENT between WEST VILLAGES IMPROVEMENT DISTRICT and for the construction of the ATLANTA BRAVES SPRING TRAINING FACILITY PROJECT AT WEST VILLAGES, FL EAST\140928137.2 TABLE
More informationPOLICY NUMBER: POL 131
Chapter: CLAIMS Subject: HOME MODIFICATIONS AND SPECIAL EQUIPMENT Effective Date: April 27, 2006 Last Update: November 22, 2016 PURPOSE STATEMENT: The purpose of this policy is to explain the criteria
More information