3 Appendix C1 Resource Consents

4 This page has been intentionally left blank.

5 AUCKLAND REGIONAL COUNCIL RESOURCE CONSENT Granted Pursuant to the Resource Management Act 1991 CONSENT NO CONSENT HOLDER: Enviro Waste Services Limited and Auckland Regional Council FILE NUMBER: CONDITIONS OF CONSENT: Date of Expiry of Permit: 31 December 2025 Purpose of Consent: To divert and discharge stormwater in the vicinity of Rosedale Landfill, from two permanent stormwater detention ponds to be constructed upstream (east) and downstream (west) of the Landfill and two temporary ponds to be constructed downstream during refuse filling. Works: 1. Completion of the perimeter drain around the entire site. 2. Upgrading three existing ponds. 3. Construction of a new pond. 4. Installation of a flocculant dosing system initially in Pond 2 and later in pond 7. Legal Description of land on which discharge to be undertaken: Lot 5 DP (CT 17A/372); Lots 6 and 7 DP (CT 22B/869) Pt Allot 171 S ; Allot 594 SO Lot 1 DP (CT 74B/525). Site Location: Territorial Authority: 101 Rosedale Road, Browns Bay. North Shore City Council. Map Reference: NZMS 260 R Final Discharge Quantity AEP Total Discharge m 3 /s 50% % % 2.755

6 This page has been intentionally left blank.

7 CONSENT NO CONSENT HOLDER: Enviro Waste Services Limited and Auckland Regional Council FILE NUMBER: CONDITIONS OF CONSENT: Date of Expiry of Permit: 31 December Purpose of Consent: Works: Site Location: Diffuse discharge of contaminants (landfill leachate) into land and groundwater. Construction of a clay liner. 101 Rosedale Road, Browns Bay. Legal description of land on which discharge to be undertaken: Lot 5 DP (CT 17A/372); Lots 6 and 7 DP (CT 22B/869); Pt Allot 171 SO 56933; Allot 594 SO 39085, lot 1 DP (CT 74B/525). Territorial Authority: North Shore City Council. Map Reference: NZMS N E. Quantity: Maximum rate of discharge is 10m 3 /day. CONSENT NO CONSENT HOLDER: Enviro Waste Services Limited and Auckland Regional Council FILE NUMBER: CONDITIONS OF CONSENT: Date of Expiry of Permit: 31 December Purpose of Permit: Works: Site Location: To divert groundwater into subsoil drains beneath the landfill and hence keep groundwater from entering the refuse. Extension of existing diversion drains and batter drains. 101 Rosedale Road, Browns Bay. Legal description of land on which discharge to be undertaken: Lot 5 DP (CT 17A/372); Lots 6 and 7 DP (CT 22B/869); Pt Allot 171 SO 56933; Allot 594 SO lot 1 DP (CT 74B/525). Territorial Authority: North Shore City Council. Map Reference: NZMS N E. Quantity: The maximum rate of discharge from the diversion and batter drains shall be 180 m 3 /day.

8 LANDFILL MANAGEMENT PLAN CONDITIONS ON CONSENTS, 34031, 34032, The consent holder shall prepare an Aftercare Management Plan (AMP) for the site in accordance with the Proposed Auckland Regional Plan: Air, Land and Water (PARP: ALW). An initial draft AMP shall be submitted within 90 days of granting this consent. The final AMP shall be submitted to the Manager and the Peer Review Panel for written approval within six months of the granting of this consent. All provisions of the AMP shall be complied with once approved. The AMP provisions shall be to the satisfaction of the Manager and the Peer Review Panel and can be reviewed should sufficient data be collected to indicate that a change is warranted or if other relevant information comes to light. Any changes shall be approved by the Manager and Peer Review Panel in writing prior to implementation. 2. The Aftercare Management Plan may be reviewed by the consent holder at not greater than yearly intervals. Before completing such a review, the consent holder shall follow the procedures in s.15.0 Community Liaison of the Management Plan and consult concerning the proposed revisions. Thereafter those revisions are to be subject to the approval in writing of the Peer Review Panel and the Group Manager Environmental Management Department, ARC. MONITORING AND CONTINGENCY 3. The Aftercare Management Plan shall describe in detail practices for water and soil chemistry monitoring, shall contain guidelines for the determination of whether contamination is occurring including alert and response levels for individual contaminants, and shall provide contingency plans for remedial actions should leachate contamination occur in any part of the landfill, the groundwater underdrain, groundwater monitoring bores, the stormwater ponds, or the stream on and downstream of the site. 4. The Consent Holder shall ensure that all chemical analyses and sampling techniques are carried out in accordance with the latest edition of "Standard Methods for the Examination of Water and Wastewater", APHA AWWA WPCE or other standards approved in writing by the Group Manager, Environmental Management Department, Auckland Regional Council. 5. Where any leachate or other pollutants associated with the Consent Holder's operations escapes to natural water other than as authorised under this permit, the Consent Holder shall: a. Undertake appropriate remedial action as soon as practicable as prescribed in the Consent Holder's Aftercare Management Plan required by Condition 1 or other such action required by the Group Manager, Environmental Management, Auckland Regional Council. b. As soon as reasonably practicable notify the Group Manager, Environmental Management Department, Auckland Regional Council of the escape of wastes. c. Provide the Group Manager, Environmental Management Department, Auckland Regional Council, as soon as practicable following receipt of monitoring results, a written account of the waste character, manner or cause of such escape, remedial actions undertaken and strategy for prevention of future similar occurrences. 6. The Group Manager, Environmental Management Department, Auckland Regional Council, shall review the Aftercare Management Plan at not greater than 12 month intervals and require such reasonable modifications as are considered necessary. 7. The Consent Holder shall forward the results of all water quality analyses to the Group Manager, Environmental Management Department, Auckland Regional Council, for the

9 preceding twelve months to 31 March, by 30 April of each year for which monitoring data has been collected, unless unusual results or results exceeding trigger values are recorded, in which case such results shall be reported immediately. WATER QUALITY MONITORING 8. The Consent Holder shall monitor at the inlets to the sedimentation ponds for electrical conductivity on a weekly basis for a period of 12 months following the completion of the landfill capping. Electrical conductivity shall then be monitored at the inlets to the sedimentation ponds on a monthly basis for a period of one year. For the first year following completion of capping works a copy of the monitoring results shall be forwarded to the Group Manager, Environmental Management Department, Auckland Regional Council for the preceding three months to 31 March, 30 June, 30 September and 31 December of each year, within 20 working days of the end of the period concerned. Thereafter a copy of the monitoring results shall be forwarded for the preceding twelve months to 31 March by 30 April of each year for which monthly monitoring data has been collected. 9. The Consent Holder shall continuously monitor the final discharge from the sedimentation ponds for turbidity for a 12 month period following the completion of landfill capping. The level of suspended solids present in the discharge shall then be monitored at the final discharge point from the sedimentation ponds on a monthly basis for a period of two years. A copy of the continuous turbidity monitoring results shall be forwarded to the Group Manager, Environmental Management Department, Auckland Regional Council, for the preceding three months to 31 March, 30 June, 30 September and 31 December of each year, within 20 working days of the end of the period concerned. Thereafter a copy of the suspended solids monitoring results shall be forwarded for the preceding twelve months to 31 March by 30 April of each year for which monitoring data has been collected. 10. The Consent Holder shall calibrate and operate the meters required for continuous monitoring in accordance with the manufacturers specifications. 11. The Consent Holder shall ensure that if electrical conductivity indicates that leachate contamination is occurring as defined under Condition 3 at the sites required to be monitored under condition 8, a grab sample shall be taken from that site and analysed for the following parameters. PARAMETER UNITS Temperature o C ph Conductivity m S/m Total Ammoniacal Nitrogen N/m 3 Total Phenols gphenol/m 3 Volatile Acids mg VA/m 3 COD g O/m 3 Chloride g Cl/m 3 Detection limits shall be as set out in the Aftercare Management Plan required under Condition 1. Should contamination as defined in the Aftercare Management Plan required under Condition 1 be detected by the analysis, then the requirements of Condition 5 for reporting procedures and polluted stormwater control shall be complied with forthwith.

10 12. Notwithstanding conditions above, the Consent Holder shall monitor the final discharge from the sedimentation ponds by taking a grab sample once every three months and analyse for the following parameters. PARAMETER UNITS Temperature o C ph COD g O/m 3 Total Ammoniacal Nitrogen g N/m 3 Chloride g Cl/m 3 Detection limits shall be as set out in the Aftercare Management Plan required under Condition number 1. Should contamination as defined in the Aftercare Management Plan be detected by the analysis, then the requirements of Condition 5 for reporting procedures and polluted stormwater control shall be complied with forthwith. 13. The Consent Holder shall sample on a six monthly basis at the final discharge from the sedimentation ponds and analyse for the following parameters: PARAMETER UNITS Total Hardness g CaCO 3 /m 3 Sulphate g SO /m 3 4 Copper g Cu/m 3 Chromium (Total) g Cr/m 3 Nickel g Ni/m 3 Zinc g Zn/m 3 Detection limits shall be as set out in the Aftercare Management Plan (Condition 1). Should contamination as defined in the Aftercare Management Plan be detected by the analysis, then the requirements of Condition 5 for reporting procedures shall be complied with forthwith. 14. If water chemistry sampling completed under any of these conditions confirms that leachate contamination has occurred then the Consent Holder shall take immediate steps to remedy the contamination and shall take all practicable steps to avoid discharging stormwater from the stormwater pond in which the contamination has occurred until it can be shown by the Consent Holder that contamination as defined in the Aftercare Management Plan required under Condition 1 is no longer occurring. GROUNDWATER QUALITY MONITORING 15. Sampling and analysis of groundwater quality monitoring bores 2007A, 2008R, and 2015, or other alternative locations approved in writing by the Group Manager, Environmental Management Department, Auckland Regional Council, shall be undertaken by taking a grab sample six monthly. The analysis shall be for the following parameters:

11 PARAMETER Temperature ph UNITS o C Total Ammoniacal Nitrogen g N/m 3 Chloride g Cl/m 3 Detection limits shall be as set out in the Aftercare Management Plan (Condition 1). Should contamination as defined in the Aftercare Management Plan be detected by the analysis, then the requirements of Condition 5 for reporting procedures and polluted groundwater control shall be complied with forthwith. 16. The Consent Holder shall sample and analyse the groundwater from the groundwater quality monitoring bores 2007A, 2008R and 2015, or at other locations with the written approval of the Group Manager, Environmental Management Department, Auckland Regional Council, annually. The analyses shall be for the following parameters. PARAMETER UNITS Zinc g Zn/m 3 Copper g Cu/m 3 Detection limits shall be as set out in the Aftercare Management Plan (Condition 1). Should contamination as defined in the Aftercare Management Plan be detected by the analysis, then the requirements of Condition 5 for reporting procedures and polluted groundwater control shall be complied with forthwith. 17. The Consent Holder shall monitor the groundwater from the following locations or at other locations with the written approval of the Group Manager, Environmental Management Department, Auckland Regional Council by taking a grab sample on a two monthly basis: GD4 GD1 The sample shall be analysed for the following: PARAMETER ph Total Ammoniacal Nitrogen Chloride Copper Zinc UNITS g N/m³ g Cl/m³ g Cu/m³ g Zn/m³ Detection limits shall be as set out in the Aftercare Management Plan required under Condition 1. Should contamination as defined in the Aftercare Management Plan be detected by the analysis, then the requirements of Condition 5 for reporting procedures and polluted groundwater control shall be complied with forthwith.

12 18. The Consent Holder shall forward to the Group Manager, Environmental Management Department, Auckland Regional Council prior to exercising this permit, a copy of the stratigraphic and construction logs and the results of any hydraulic or chemical testing carried out for the commissioning of any new bores constructed on the site. 19. The Consent Holder shall measure and record at six monthly intervals each date, time, and corresponding water level, in piezometer bores 2007A, 2008R and 2015, or at other locations with the written approval of the Group Manager, Environmental Management Department, Auckland Regional Council and shall submit to the Group Manager, Environmental Management Department, Auckland Regional Council, no later than 30 April each year, a return of the records for the preceding 12 months ending 31 March of that year. The water level shall be measured from the top of the casing, and shall be recorded to the nearest 0.01 of a metre. LEACHATE MONITORING 20. The Consent Holder shall sample and analyse leachate that is disposed of to sewer annually. The analysis shall be for the following parameters: PARAMETER UNITS Sulphate gso4/ m 3 Copper gcu/ m 3 Chromium gcr/ m 3 Nickel gni/ m 3 Zinc gzn/ m 3 BOD go/ m 3 Detection limits shall be as set out in the Aftercare Management Plan (as required under Condition 1). PEER REVIEW PANEL 21. The Consent Holder shall retain at its cost an independent Peer Review Panel, suitably qualified and knowledgeable in landfill development and operational procedures. The composition of the panel shall be subject to approval in writing by the Group Manager, Environmental Management Department, ARC. The objective of the peer review panel is to ensure that all engineering works, operations and related activity associated with landfill closure, are designed according to good engineering practice, constructed appropriately, and routinely managed in accordance with accepted best practice and in accordance with the intent of the consent conditions. Apart from other activities undertaken by the Panel, it shall undertake six monthly reviews of landfill operations for the first two years of the consents duration and annually thereafter. 22. The Consent Holder shall ensure that records are kept of any site investigations for any engineering works associated with all water permits granted as part of this consent and that these records are forwarded to the Peer Review Panel. 23. The Consent Holder shall comply with any changes in design and/or construction and/or operational techniques which may be required at any time by the Peer Review Panel, if in the Panel s opinion this is necessary to achieve the satisfactory operation of the site, and compliance with the conditions of consent.

13 24. Prior to commencing the construction of any works associated with landfill closure, the Consent Holder shall submit all final design calculations and drawings relevant to these permits for approval by the Peer Review Panel. The Peer Review Panel shall communicate this approval to the Group Manager, Environmental Management Department, Auckland Regional Council. POST CLOSURE CARE 25. The Consent Holder shall adopt a minimum post-closure care period of 30 years or until such time as the Group Manager, Environmental Management Department, Auckland Regional Council, certifies that Post-Closure Care is no longer required, and shall, if required, continue monitoring and maintenance during this period. The term of this requirement may be reviewed in accordance with the provisions of Special Condition 9. STORMWATER 26. All outfalls shall be terminated with structures of such location, design and performance as to minimise erosion, risk of obstruction of the waterway, and hazards to safety. The said outfall structures shall be maintained by the Consent Holder to the preceding standards. 27. The Consent Holder shall supply the Group Manager, Environmental Management, with details of the outfall structures, indicating the size, erosion control measures and location prior to their construction. 28. The Consent Holder shall install and maintain, in a suitable position within the landfill boundary, a rain station, and record the rainfall on a daily basis while the site is manned. 29. Any changes in the location of outlets, or the location or number of the ponds shall be approved by the Group Manager, Environmental Management, prior to their construction. 30. The Consent Holder shall prepare a management plan for the operation and maintenance of all stormwater ponds and structures as part of the Management Plan required under Condition The Consent Holder shall dispose of sediment from ponds in a position where the sediment shall not be eroded and re-enter the stormwater system. 32. A complete set of as built plans shall be submitted to the Group Manager, Environmental Management, within one month of completion of the stormwater system. 33. The Consent Holder shall check and clear the debris arresters/screens on a six monthly basis and after each significant storm event. FINANCIAL ASSURANCES 34. ARC Corporate shall make provision for ensuring that it: - maintains its Landfill Aftercare Fund to provide for all the obligations it has assumed under its statutory powers to dispose of leachate, gas and other noxious or harmful substances in relation to former Auckland Regional Council landfills. - identifies within the Aftercare Fund a sub-account ( Rosedale Account ) and thereafter credits to the Rosedale Account all levies payable by Enviro Waste Services Limited in respect of the Rosedale Landfill and any other monies received on account of the Rosedale Landfill;

14 - preserves and expends the Rosedale Account for the purpose of compliance with all the requirements and conditions of this consent and other resource consents relating to the Rosedale Landfill exclusively of any other purpose. - discloses its intention to exercise its statutory rating powers in respect of the Rosedale Landfill only in the event of the exhaustion of the Rosedale Account. - discloses in its Annual Accounts the opening and closing annual balances of the Rosedale Account and summarising the annual receipts and expenditure through the Rosedale Account. 35. (a) Enviro Waste Services Limited shall within 3 months of granting of the resource consent enter into and maintain a bond (cash or equivalent), in terms acceptable to the Group Manager, Environmental Management Department, Auckland Regional Council. (b) The bond shall be in favour of the Auckland Regional Council. The bond shall provide for compliance with conditions of this resource consent. The bond shall comprise a sum of $408,000 and its term shall be until 30 September (c) The Bond shall also provide for: (i) (ii) (iii) Variation of the bond on an annual basis within the term amending the sum of bond in accordance with the Works Construction Cost Index or other suitable alternative approved by the Group Manager, Environmental Management department, Auckland Regional Council. Such variation to be prepared by the Auckland Regional Council s solicitors. Security to be provided in a lump sum by either a cash deposit with the Auckland Regional Council, a Bank Guarantee or other Guarantee acceptable to the Auckland Regional Council. Such further or other securities from time to time as the Auckland Regional Council thinks fit for any increased sum of the bond. (iv) (v) Its registration (and as to Variations) against all certificates of title to the land on which the consent is to be exercised. Payment forthwith upon demand of the Auckland Regional Council s reasonable legal costs and disbursements on a solicitor and own client basis in respect of settling the terms and conditions of the bond, its preparation, execution, generation, enforcement, variation and ultimate release of the bond and any actions or proceedings relating to it or relative to any section of the conditions of consent under Section 128 of the Resource Management Act (d) Northern Disposal Systems and Enviro Waste Services Limited shall remain liable under the Resource Management Act 1991, for any breach of the conditions of this Resource Consent which occur before the expiry of this consent and for any adverse effects on the environment which become apparent during or after the expiry of the consent and the bond shall provide accordingly. (e) The terms of the Bond may be reviewed on the request of Enviro Waste Services Limited or by the Auckland Regional Council at yearly intervals pursuant to Section 128 of the Resource Management Act 1991 for the purpose of ensuring that this condition of consent, (including the sum and duration of the Bond) is appropriate to the level of risk occasioned by the activities which are the subject of this consent and the matters to be

15 bonded for in this condition. (The review provided for in this condition shall be in addition to the reviews provided for elsewhere in this consent). (f) The Consent Holder shall not transfer this resource consent to any person pursuant to Sections 136 and 137 of the Resource Management Act 1991 unless prior to the transfer, the transferee enters into and thereafter maintains a cash (or equivalent) bond in favour of the Auckland Regional Council in the same terms as provided in this Condition, save that the initial amount of the bond shall be determined by the Group Manager, Environmental management Department, Auckland Regional Council. LANDFILL STABILITY 36. The Consent Holder shall undertake a review of slope stability of all permanent and long term temporary slopes, both those already constructed and those yet to be constructed and shall submit this review for approval of the Peer Review Panel. 37. The Consent Holder shall undertake redesign of proposed slopes and shall design remedial measures for existing slopes as required by the Peer Review Panel. The final design shall be approved by the Peer Review Panel. 38. The Consent Holder shall undertake remedial works as approved by the Peer Review Panel. REVIEW OF CONDITIONS 39. Where any condition specifies a monitoring frequency, the Group Manager, Environmental Management Department, Auckland Regional Council, may decrease that frequency once adequate information is available, and the environmental record indicates that a reduction is appropriate. 40. The conditions of these consents may be reviewed by the Group Manager, Environmental Management Department, Auckland Regional Council in the year 2000, in the year 2002 and subsequently at not less than 5 yearly intervals in order: i. to deal with any adverse effect on the environment which may arise from the exercise of this consent, or ii. iii. iv. to require the discharge permit holder to adopt the best practicable option to remove or reduce any adverse effect on the environment, or to alter the monitoring requirements in light of the results obtained from the preceding years monitoring. to implement the rules of any relevant regional plan which is proposed or becomes operative after the date of commencement of this consent. LAND USE CONSENTS 41. The Consent Holder shall hold and comply with all necessary consents for the operation of the landfill and for the post-closure care period. STANDARD CONDITION 42. The servants or agents of the Auckland Regional Council shall be permitted access to the relevant parts of the property at all reasonable times for the purpose of carrying out inspections, surveys, investigations, tests, measurements or taking samples.

16 Advice Note The Consent Holder is advised that they will be required to pay to the Auckland Regional Council any administrative charge faxed in accordance with S.36(1) of the Resource Management Act 1991, or any additional charge required pursuant to S.36(3) of the resource Management Act 1991, in respect of these resource consents. THESE CONSENTS HAVE BEEN GRANTED BY THE AUCKLAND REGIONAL COUNCIL PURSUANT TO THE RESOURCE MANAGEMENT ACT Eddie Grogan Date: Manager Land and Water Quality

17

18

19

20

21

22

23

24

25

26

27

28

29

30

31

32

33

34

35

36

37

38

39 Appendix C2 Feedback from the CLCLR Team

40 This page has been intentionally left blank.

41

42

FRANKLIN TOWNSHIP MUNICIPAL SANITARY AUTHORITY SERVICE AGREEMENT

FRANKLIN TOWNSHIP MUNICIPAL SANITARY AUTHORITY SERVICE AGREEMENT FRANKLIN TOWNSHIP MUNICIPAL SANITARY AUTHORITY SERVICE AGREEMENT INDUSTRIAL SEWER USE SERVICE AGREEMENT This Service Agreement, dated as of the day of,, by and between the Franklin Township Municipal Sanitary

More information

CODE OF PRACTICE FOR WORKS AFFECTING THE CANAL & RIVER TRUST

CODE OF PRACTICE FOR WORKS AFFECTING THE CANAL & RIVER TRUST CODE OF PRACTICE FOR WORKS AFFECTING THE CANAL & RIVER TRUST PART 3 FORMS April 2018 Third Party Works Code of Practice: Part 3: Forms April 2018 1 CONTENTS FORM 1:NOTIFICATION FORM FORM 2: COST UNDERTAKING

More information

Guidelines for Management of Contaminated Sites in Nova Scotia

Guidelines for Management of Contaminated Sites in Nova Scotia Guidelines for Management of Contaminated Sites in Nova Scotia Approval Date: March 27, 1996 Effective Date: March 27, 1996 Approved By: Dianne Coish, Acting Deputy Minister Version Control: Latest revision

More information

TITLE 252. DEPARTMENT OF ENVIRONMENTAL QUALITY CHAPTER 301. LABORATORY ACCREDITATION SUBCHAPTER 1. GENERAL PROVISIONS

TITLE 252. DEPARTMENT OF ENVIRONMENTAL QUALITY CHAPTER 301. LABORATORY ACCREDITATION SUBCHAPTER 1. GENERAL PROVISIONS TITLE 252. DEPARTMENT OF ENVIRONMENTAL QUALITY CHAPTER 301. LABORATORY ACCREDITATION SUBCHAPTER 1. GENERAL PROVISIONS 252:301-1-3. Definitions In addition to the definitions contained in the Environmental

More information

FREQUENTLY ASKED QUESTION ABOUT FLOODPLAINS Michigan Department of Environmental Quality

FREQUENTLY ASKED QUESTION ABOUT FLOODPLAINS Michigan Department of Environmental Quality FREQUENTLY ASKED QUESTION ABOUT FLOODPLAINS Michigan Department of Environmental Quality WHAT IS A FLOOD? The National Flood Insurance Program defines a flood as a general and temporary condition of partial

More information

Yukon Mine Site and Reclamation Closure Policy Financial and Technical Guidelines

Yukon Mine Site and Reclamation Closure Policy Financial and Technical Guidelines Yukon Mine Site and Reclamation Closure Policy Financial and Technical Guidelines September 2013 Table of Contents EXPLANATORY NOTES... 1 GUIDELINES SUMMARY... 2 FINANCIAL GUIDELINES... 5 CASH... 6 LETTER

More information

CHAPTER House Bill No. 1123

CHAPTER House Bill No. 1123 CHAPTER 2003-173 House Bill No. 1123 An act relating to site rehabilitation of contaminated sites; creating s. 376.30701, F.S.; extending application of risk-based corrective action principles to all contaminated

More information

(2) BOARD means the Colorado Water and Wastewater Facility Operators Certification Board or its designee.

(2) BOARD means the Colorado Water and Wastewater Facility Operators Certification Board or its designee. 100.1 PURPOSE 100.1.1 Article 9 of Title 25, C.R.S., requires that every water treatment facility, domestic or industrial wastewater treatment facility, wastewater collection system and water distribution

More information

Content Copy Of Original

Content Copy Of Original Content Copy Of Original Ministry of the Environment and Climate Change Ministère de l Environnement et de l Action en matière de changement climatique Halton Crushed Stone Limited 85 Passmore Avenue P.O.

More information

CONTRACT FOR SNOW AND ICE MANAGEMENT SERVICES. Updated November 15, 2018

CONTRACT FOR SNOW AND ICE MANAGEMENT SERVICES. Updated November 15, 2018 CONTRACT FOR SNOW AND ICE MANAGEMENT SERVICES Updated November 15, 2018 This contract ( Contract ) is entered into by and between [contractor company] ( Contractor ) and [name of property owner] ( Owner

More information

2. Address: (Number) (Street) (City) (Prov) (Postal Code) 3. Is Applicant an Individual Partnership Corporation Other (give details)

2. Address: (Number) (Street) (City) (Prov) (Postal Code) 3. Is Applicant an Individual Partnership Corporation Other (give details) Intact Insurance Company Limited Pollution Liability Insurance Application All questions are to be answered as completely as possible. If a question is not applicable to your situation state N. A. If insufficient

More information

Charging arrangements for new connection services. Our latest proposals. December 2017.

Charging arrangements for new connection services. Our latest proposals. December 2017. Charging arrangements for new connection services. Our latest proposals. December 2017. 1 April 2018 to 31 March 2019 1 Index. Charging arrangements 1. Introduction... 2. You have a choice... Water charging

More information

terms and conditions of supply definitions Talisman Marketing Solutions Limited

terms and conditions of supply definitions Talisman Marketing Solutions Limited Talisman Marketing Solutions Limited terms and conditions of supply definitions In these terms and conditions, the following expressions have the following meanings: 1.1 "Company" Talisman Marketing Solutions

More information

City of Centerville BMP Pages Table of Contents. Minimum Control Measure 1. Public Education and Outreach

City of Centerville BMP Pages Table of Contents. Minimum Control Measure 1. Public Education and Outreach i City of Centerville s Table of Contents Minimum Control Measure 1. Public Education and Outreach Best Management Practice Page 1-1: Outreach Publications...1 1-2: 30-day Public Notice for Annual Storm

More information

STORMWATER MANAGEMENT FUND Department of Environmental Services

STORMWATER MANAGEMENT FUND Department of Environmental Services Department of Environmental Services Mission: To implement a comprehensive stormwater management program that balances the following goals: 1) to reduce the potential for stormwater threats to public health,

More information

1301: (a) The same purpose for which it was used originally;

1301: (a) The same purpose for which it was used originally; ACTION: Final DATE: 07/31/2017 11:27 AM 1301:7-9-16 Petroleum contaminated soil. (A) Purpose and scope. For the purpose of prescribing rules pursuant to divisions (A) and (E) of section 3737.88 and division

More information

SOLID WASTE FINANCIAL ASSURANCE PROGRAM REPORT

SOLID WASTE FINANCIAL ASSURANCE PROGRAM REPORT SOLID WASTE FINANCIAL ASSURANCE PROGRAM REPORT OKLAHOMA DEPARTMENT OF ENVIRONMENTAL QUALITY WASTE MANAGEMENT DIVISION December 22, 2000 Chapter 5 Chapter 5 - Procedure for Calculating Final Closure and

More information

SEPA Technical Guidance Note Estimate of Amount of Financial Provision for Landfill Sites

SEPA Technical Guidance Note Estimate of Amount of Financial Provision for Landfill Sites SEPA Technical Guidance Note Estimate of Amount of Financial Provision for Landfill Sites This guidance document has been developed to assist SEPA staff in assessing financial provision submissions made

More information

Single Project Professional Indemnity Insurance Proposal Form. Note: This is a proposal form for a claims made policy

Single Project Professional Indemnity Insurance Proposal Form. Note: This is a proposal form for a claims made policy Single Project Professional Indemnity Insurance Proposal Form Note: This is a proposal form for a claims made policy Please provide any necessary explanations or additional details by attaching separate

More information

Thames Water Wholesale Tariff Document Version 1.4 Copyright Thames Water Utilities Ltd

Thames Water Wholesale Tariff Document Version 1.4 Copyright Thames Water Utilities Ltd Thames Water Wholesale Tariff Document Copyright Thames Water Utilities Ltd 2017 1 Legal foreword This version of the Wholesale Tariff Document dated 20 October 2017 was published by Thames Water Utilities

More information

Water Supply Customer Contract Terms & Conditions. Table of Contents

Water Supply Customer Contract Terms & Conditions. Table of Contents Water Supply Customer Contract Terms & Conditions Table of Contents 1. What is a customer contract and who is covered by it? 1.1 What is a customer contract? 1.2 Customer categories covered by the contract?

More information

Facility Name, Address, State & Zip Code

Facility Name, Address, State & Zip Code New Business Application for Environmental Impairment Liability Answer all questions, use separate sheets if necessary. NOTE: There are two sections to this application (1-9) and (A - Q) 1. Applicant/Parent

More information

Aquasol Pty Ltd. Water Services (Operating) Licence. Operational Audit and Asset Management System Effectiveness Review. Report 18 September 2018

Aquasol Pty Ltd. Water Services (Operating) Licence. Operational Audit and Asset Management System Effectiveness Review. Report 18 September 2018 Aquasol Pty Ltd (Operating) Licence Operational Audit and Asset Management System Effectiveness Review Report 18 September 2018 Perth Melbourne Sydney September 2018 Final Version Liability limited by

More information

Pollution Incident Response Management

Pollution Incident Response Management for Pollution Incident Response Management Document Table of Contents 1 Introduction... 3 1.1 Background... 3 1.2 Scope... 3 2 ning... 4 2.1 Regulatory Requirements... 4 2.2 Site Details... 6 2.3 Environmental

More information

Marine Protection Rules Part 143 Shipboard Marine Pollution Emergency Plans for Noxious Liquid Substances

Marine Protection Rules Part 143 Shipboard Marine Pollution Emergency Plans for Noxious Liquid Substances Marine Protection Rules Part 143 Shipboard Marine Pollution Emergency Plans for Noxious Liquid Substances ISBN 978-0-947527-51-8 Published by Maritime New Zealand, PO Box 25620, Wellington 6146, New Zealand

More information

Rulemaking Hearing Rules of Tennessee Department of Environment and Conservation Division of Solid Waste Management

Rulemaking Hearing Rules of Tennessee Department of Environment and Conservation Division of Solid Waste Management Rulemaking Hearing Rules of Tennessee Department of Environment and Conservation Division of Solid Waste Management Chapter 1200-01-07 Solid Waste Processing and Disposal Amendments Subpart (xix) of part

More information

Spinifex Ridge Molybdenum Project

Spinifex Ridge Molybdenum Project Spinifex Ridge Molybdenum Project MOLY MINES LIMITED Annual Environmental Report Ministerial Statement 772 (5 th August 2008) Ministerial Statement 948 (2 nd September 2013) June 2017 Document history

More information

Abstraction Charges Scheme 2017/18

Abstraction Charges Scheme 2017/18 Abstraction Charges Scheme 2017/18 On 1 April 2013 Natural Resources Body for Wales (NRW) brought together the work of the Countryside Council for Wales, Environment Agency Wales and Forestry Commission

More information

West Virginia Department of Environmental Protection MS4 Phase II Storm Water Program Storm Water Management Annual Report

West Virginia Department of Environmental Protection MS4 Phase II Storm Water Program Storm Water Management Annual Report West Virginia Department of Environmental Protection MS4 Phase II Srm Water Program Srm Water Management Annual Report City of Vienna, West Virginia May 23, 2009 1.0 INTRODUCTION The City of Vienna was

More information

STATUTORY INSTRUMENTS. S.I. No. 122 of EUROPEAN COMMUNITIES (ASSESSMENT AND MANAGEMENT OF FLOOD RISKS) REGULATIONS 2010.

STATUTORY INSTRUMENTS. S.I. No. 122 of EUROPEAN COMMUNITIES (ASSESSMENT AND MANAGEMENT OF FLOOD RISKS) REGULATIONS 2010. STATUTORY INSTRUMENTS. S.I. No. 122 of 2010. EUROPEAN COMMUNITIES (ASSESSMENT AND MANAGEMENT OF FLOOD RISKS) REGULATIONS 2010. (Prn. A10/0432) 2 [122] S.I. No. 122 of 2010. EUROPEAN COMMUNITIES (ASSESSMENT

More information

*** DRAFT - NOT YET FILED ***

*** DRAFT - NOT YET FILED *** 3745-39-03 Ohio EPA NPDES requirements for small MS4s. [Comment: For dates of non-regulatory government publications, publications of recognized organizations and associations, federal rules and federal

More information

TOWN OF DEEP RIVER AND TOWN OF CHESTER INTERMUNICIPAL WASTEWATER TREATMENT AGREEMENT

TOWN OF DEEP RIVER AND TOWN OF CHESTER INTERMUNICIPAL WASTEWATER TREATMENT AGREEMENT TOWN OF DEEP RIVER AND TOWN OF CHESTER INTERMUNICIPAL WASTEWATER TREATMENT AGREEMENT This INTERMUNICIPAL WASTEWATER TREATMENT AGREEMENT ( Agreement ), dated as of August 19, 2005, is made and entered into

More information

Pollution Incident Response Management Plan

Pollution Incident Response Management Plan Pollution Incident Response Management Plan Maintenance Dredging Port of Newcastle Revision A 5 June 2014 Page 1 Revision A 5 June 2014 Page 1 Revision A 5 June 2014 Page 2 Pollution Incident Response

More information

*Editor's note: Art. XIII was formerly art. XII, div. 4. The section numbers have not changed.

*Editor's note: Art. XIII was formerly art. XII, div. 4. The section numbers have not changed. ARTICLE XIII. WELLFIELD PROTECTION* *Editor's note: Art. XIII was formerly art. XII, div. 4. The section numbers have not changed. Sec. 27-376. Definitions. The following definitions apply only to this

More information

1 In these Domestic Sub-Contract Conditions the following expressions and terms shall have the meanings given below:

1 In these Domestic Sub-Contract Conditions the following expressions and terms shall have the meanings given below: DOMESTIC SUB-CONTRACT CONDITIONS These are the Domestic Sub-Contract Conditions referred to by the Articles of Agreement to which they are attached. In the event that these Domestic Sub-Contract Conditions

More information

A G R E E M E N T IN RELATION TO MEMBERSHIP OF BIFFPACK BETWEEN

A G R E E M E N T IN RELATION TO MEMBERSHIP OF BIFFPACK BETWEEN A G R E E M E N T IN RELATION TO MEMBERSHIP OF BIFFPACK BETWEEN BIFFA WASTE SERVICES LTD AND Full Name: Whose [registered office is situated at] address is: QF/184/12 1 January 2010 The following are the

More information

Lake County Stormwater Utility Fee

Lake County Stormwater Utility Fee County of Lake Stormwater Management Department 550 Blackbrook Road Painesville, OH 44077 Phone: (440) 350-2770 Fax: (440) 352-8133 www.lakecountyohio.org/smd Lake County Stormwater Utility Fee Credit

More information

Content Copy Of Original

Content Copy Of Original Content Copy Of Original Ministry of the Environment and Climate Change Ministère de l Environnement et de l Action en matière de changement climatique Greystone Village Inc. 1737 Woodward Drive, Unit.

More information

MEMORANDUM OF UNDERSTANDING

MEMORANDUM OF UNDERSTANDING MEMORANDUM OF UNDERSTANDING THE INSTALLATION AND REPAIR OF FIRE HYDRANTS AND THE USE OF WATER FOR FIREFIGHTING PURPOSES 1 Introduction West Sussex Fire Brigade/ South East Water 1.1 This Memorandum of

More information

DECLARATIONS. Limits of Liability in respect of each Occurrence and in the aggregate: Underlying Amount(s) or Each Occurrence Retention:

DECLARATIONS. Limits of Liability in respect of each Occurrence and in the aggregate: Underlying Amount(s) or Each Occurrence Retention: DECLARATIONS Item 1. Name and Address of the Named Insured: Item 2. Limits of Liability in respect of each Occurrence and in the aggregate: Item 3. Underlying Amount(s) or Each Occurrence Retention: Item

More information

Frequently Asked Questions Oxbow / Hickson / Bakke Ring Levee Option

Frequently Asked Questions Oxbow / Hickson / Bakke Ring Levee Option Frequently Asked Questions Oxbow / Hickson / Bakke Ring Levee Option October 16, 2012 Q1. Why has the position on a ring-levee changed? The feasibility study recommended buy-outs for areas with staging

More information

Pollution Legal Liability Questionnaire

Pollution Legal Liability Questionnaire INSTRUCTIONS Pollution Legal Liability Questionnaire A. This questionnaire requires that contact persons be provided for each location. The applicant is responsible for obtaining and reviewing whatever

More information

Professional Indemnity Insurance. Single Project Proposal Form

Professional Indemnity Insurance. Single Project Proposal Form Professional Indemnity Insurance Single Project Proposal Form LIABILITY OF THE COMPANY DOES NOT COMMENCE UNTIL THE PROPOSAL HAS BEEN ACCEPTED AND THE PREMIUM HAS BEEN RECEIVED IN A ACCORDANCE WITH THE

More information

Pollution Incident Response Management Plan. Kooragang 2, Port of Newcastle

Pollution Incident Response Management Plan. Kooragang 2, Port of Newcastle Pollution Incident Response Management Plan Kooragang 2, Pollution Incident Response Management Plan Kooragang Berth 2, Revision F 26 June 2014 Page 1 Quality Information Document Ref Pollution Incident

More information

Requirements for Mapping Levees Complying with Section of the NFIP Regulations

Requirements for Mapping Levees Complying with Section of the NFIP Regulations FACT SHEET Requirements for Mapping Levees Complying with Section 65.10 of the NFIP Regulations As part of a mapping project, it is the levee owner s or community s responsibility to provide data and documentation

More information

Assessing and Dealing with Environmental Liabilities of Local Governments. LGANT 2014 Dennis Kefalas, P. Eng. SAO City of Yellowknife

Assessing and Dealing with Environmental Liabilities of Local Governments. LGANT 2014 Dennis Kefalas, P. Eng. SAO City of Yellowknife Assessing and Dealing with Environmental Liabilities of Local Governments LGANT 2014 Dennis Kefalas, P. Eng. SAO City of Yellowknife Overview Obligations Environmental Liabilities Landfill Closure and

More information

PREMISES POLLUTION LIABILITY APPLICATION

PREMISES POLLUTION LIABILITY APPLICATION ace westchester specialty group PREMISES POLLUTION LIABILITY APPLICATION PREMISES POLLUTION LIABILITY COVERAGE APPLICATION CLAIMS MADE Answer ALL questions completely, leaving no blanks. If any questions,

More information

Charges schemes. New connections and developer services charges scheme 2019/2020 Page 1 of 64

Charges schemes. New connections and developer services charges scheme 2019/2020 Page 1 of 64 s schemes Page 1 of 64 United Utilities Water Limited has published four charges schemes for 2019/2020 charging year. They include the charges to be paid for services provided by us in the course of carrying

More information

Pollution Incident Response Management Plan. EPL 1697 Newcastle Bulk Terminal

Pollution Incident Response Management Plan. EPL 1697 Newcastle Bulk Terminal Pollution Incident Response Management Plan EPL 1697 Newcastle Bulk Terminal Kooragang Berth 2 PIRMP Port of Newcastle Pollution Incident Response Management Plan Kooragang Berths 2 & 3, Port of Newcastle

More information

Summary of Commercial Facility and Demonstration Facility Legal Agreements

Summary of Commercial Facility and Demonstration Facility Legal Agreements ENVIRONMENT C 61 DOCUMENT 1 Summary of Commercial Facility and Demonstration Facility Legal Agreements Plasco Energy Group Inc. ( Plasco Group ), through its subsidiary Plasco Energy Ottawa Inc. ( Plasco

More information

Site Specific Pollution Liability Application

Site Specific Pollution Liability Application Email: info@eiains.com Phone: (800) 977-3335 Mail: PO Box 23605 Portland, OR 97281 Fax: (503) 977-3334 Site Specific Pollution Liability Application NOTICE: If a policy is issued, the limit of liability

More information

DESIGN VARIANCE REQUIREMENT & FORM

DESIGN VARIANCE REQUIREMENT & FORM 00 00 01 DESIGN VARIANCE REQUIREMENT 1. GENERAL A. The Project Variance Request Form must be submitted by the Design Professional and / or Contractor for any deviations from The University of Georgia Design

More information

Entitlements Contract

Entitlements Contract Parties Murray Irrigation Limited ABN 23 067 197 933 The person identified in Item 1 of Schedule 1 Registered office 443 Charlotte Street (PO Box 528) Deniliquin NSW 2710 Phone : 1300 138 265 Fax : 03

More information

Contaminated Sites. Municipal Officers Forum June 17, 2015

Contaminated Sites. Municipal Officers Forum June 17, 2015 Contaminated Sites Municipal Officers Forum June 17, 2015 Contaminated Sites -Applying the Standard -Definitions -Liability Recognition -Recognition Criteria -Liability Measurement -Liability Disclosure

More information

Britannia Village Flood Control Project

Britannia Village Flood Control Project Britannia Village Flood Control Project Summary of Background Information February 2011 Contents 1) Flood Risks in the Village 2) Alternative Flood Risk Management Approaches Status Quo The Proposed Remedial

More information

Ministry of Government Relations. PS 3260 Liability for Contaminated Sites

Ministry of Government Relations. PS 3260 Liability for Contaminated Sites Ministry of Government Relations PS 3260 Liability for Contaminated Sites October 2015 Table of Contents Introduction... 2 Effective date of PS 3260. 2 Contamination defined..2 Recognition... 4 Environmental

More information

rural customer charter

rural customer charter Celtink Creative: Coliban Water: Rural Customer Charter Cover. 110309c rural customer charter C M Y K 1. WHAT IS THIS DOCUMENT? Table of contents 1. What is this document? 4 1.1 The Rural Customer Charter

More information

SUPPLY CONDITIONS FOR DISTRICT COOLING SERVICE

SUPPLY CONDITIONS FOR DISTRICT COOLING SERVICE SUPPLY CONDITIONS FOR DISTRICT COOLING SERVICE TABLE OF CONTENTS 1. General and Administrative Provisions 1.1 Purpose of the Conditions 1.2 Definitions 1.3 Hierarchy of Documents 2. General Obligations

More information

New Business Application for Environmental Impairment Liability (EIL) Insurance

New Business Application for Environmental Impairment Liability (EIL) Insurance New Business Application for Environmental Impairment Liability (EIL) Insurance Answer all questions, use separate sheets if necessary. NOTE: There are two sections to this application (1-9) and (A - Q)

More information

ENVIRONMENTAL ASSESSMENT CERTIFICATE TEMPLATE

ENVIRONMENTAL ASSESSMENT CERTIFICATE TEMPLATE ENVIRONMENTAL ASSESSMENT OFFICE ENVIRONMENTAL ASSESSMENT CERTIFICATE TEMPLATE Version # Date (yyyy-mm-dd) Modifications 1 2016-12-01 N/A 2 2017-01-18 IEM condition and plan development conditions In the

More information

Consolidated Financial Statements. City of Camrose. December 31, 2016

Consolidated Financial Statements. City of Camrose. December 31, 2016 Consolidated Financial Statements City of Camrose December 31, 2016 December 31, 2016 Contents Consolidated Financial Statements Management's Responsibility for Financial Reporting 1 Independent Auditors'

More information

WASTE MANAGEMENT AGREEMENT

WASTE MANAGEMENT AGREEMENT WASTE MANAGEMENT AGREEMENT 1. DEFINITIONS 1.1 Equipment means the Equipment described in the Proposal Document as the equipment for the each of the Sites provided by or on behalf of the Company for the

More information

Petroleum and Geothermal Energy Resources (Environment) Regulations 2012

Petroleum and Geothermal Energy Resources (Environment) Regulations 2012 Western Australia Petroleum and Geothermal Energy Resources Act 1967 Petroleum and Geothermal Energy Resources (Environment) Regulations As at 29 Aug Version 00-a0-01 Western Australia Petroleum and Geothermal

More information

Event Weather Insurance Policy. Australia

Event Weather Insurance Policy. Australia Event Weather Insurance Policy Australia THE ASSURED IS REQUESTED TO READ THIS POLICY AND, IF IT IS INCORRECT, RETURN IT IMMEDIATELY TO THEIR BROKER OR AGENT FOR ALTERATION. 2 Event Weather Insurance Policy

More information

AGREEMENT AND CONDITIONS OF SUB-CONTRACT (DOMESTIC)

AGREEMENT AND CONDITIONS OF SUB-CONTRACT (DOMESTIC) AGREEMENT AND CONDITIONS OF SUB-CONTRACT (DOMESTIC) FOR USE IN CONJUNCTION WITH THE FORMS OF MAIN CONTRACT FOR PUBLIC WORKS ISSUED BY THE OFFICE OF GOVERNMENT PROCUREMENT, DEPARTMENT OF PUBLIC EXPENDITURE

More information

Terms and Conditions.

Terms and Conditions. Terms and Conditions 1. Interpretation 1.1 In these terms and conditions ( Conditions ) the following words have the following meanings. 1.1.2 Collection Service a Service whereby M&WR Ltd collects Waste

More information

ENVIRONMENTAL ASSESSMENT CERTIFICATE AMENDMENT TEMPLATE

ENVIRONMENTAL ASSESSMENT CERTIFICATE AMENDMENT TEMPLATE ENVIRONMENTAL ASSESSMENT OFFICE ENVIRONMENTAL ASSESSMENT CERTIFICATE AMENDMENT TEMPLATE Version # Date (yyyy-mm-dd) Modifications 1 2016-12-01 N/A 2 2017-01-18 IEM condition and plan development conditions

More information

GENERAL TERMS AND CONDITONS of Afvalstoffen Terminal Moerdijk B.V.

GENERAL TERMS AND CONDITONS of Afvalstoffen Terminal Moerdijk B.V. October 2016 GENERAL TERMS AND CONDITONS of Afvalstoffen Terminal Moerdijk B.V. Article 1 Applicability of General Terms and Conditions 1 These General Terms and Conditions are applied by Afvalstoffen

More information

***EXPEDITED REVIEW***

***EXPEDITED REVIEW*** ***EXPEDITED REVIEW*** Application for Erosion and Sediment Pollution Control Plan Adequacy Review General NPDES Plan Review This application must be completed and accompanied by the required fees, plans,

More information

BUREAU OF WASTE MANAGEMENT. DIVISION OF MUNICIPAL and RESIDUAL WASTE GENERAL PERMIT WMGR147

BUREAU OF WASTE MANAGEMENT. DIVISION OF MUNICIPAL and RESIDUAL WASTE GENERAL PERMIT WMGR147 BUREAU OF WASTE MANAGEMENT DIVISION OF MUNICIPAL and RESIDUAL WASTE GENERAL PERMIT WMGR147 PROCESSING AND BENEFICIAL USE OF SPENT GARNET IN WATERJET CUTTING AND Issued: April 28, 2015 Amended: June 9,

More information

AGREEMENT made as of the in the year (In words, indicate day, month and year.) BETWEEN the Owner: (Name, legal status and address)

AGREEMENT made as of the in the year (In words, indicate day, month and year.) BETWEEN the Owner: (Name, legal status and address) Document A134 2009 Standard Form of Agreement Between Owner and Construction Manager as Constructor where the basis of payment is the Cost of the Work Plus a Fee without a Guaranteed Maximum Price AGREEMENT

More information

PLEASE NOTE. For more information concerning the history of these regulations, please see the Table of Regulations.

PLEASE NOTE. For more information concerning the history of these regulations, please see the Table of Regulations. PLEASE NOTE This document, prepared by the Legislative Counsel Office, is an office consolidation of this regulation, current to September 1, 2012. It is intended for information and reference purposes

More information

SECTION PS 3260 liability for contaminated sites

SECTION PS 3260 liability for contaminated sites SECTION PS 3260 liability for contaminated sites TABLE OF CONTENTS Paragraph Purpose and scope.01-.07 Recognition.08-.39 Environmental standard.09-.13 Contamination.14-.17 Direct responsibility.18-.22

More information

NSW negotiated electricity and natural gas customer supply contract

NSW negotiated electricity and natural gas customer supply contract NSW negotiated electricity and natural gas customer supply contract This document sets out the terms of our electricity and/or natural gas supply agreement with you Effective date: NSW Negotiated Electricity

More information

Pollution Incident Response Management Plan

Pollution Incident Response Management Plan Pollution Incident Response Management Plan 24-28 Childs Road Chipping Norton NSW 2170 Version 1 Initial Release Date: 2 nd February 2015 PIRMP Barca Metals 24-28 Childs Road, Chipping Norton NSW 2170

More information

GENERAL PROVISIONS I. WORK REQUIREMENTS

GENERAL PROVISIONS I. WORK REQUIREMENTS GENERAL PROVISIONS I. WORK REQUIREMENTS 1. Inspection The Permittee shall request initial inspection from the County at 408-573-2429 a minimum of twenty-four (24) hours prior to any work being performed.

More information

The Government of the Republic of South Africa and the Government of the Kingdom of Lesotho (hereinafter called "the Parties");

The Government of the Republic of South Africa and the Government of the Kingdom of Lesotho (hereinafter called the Parties); TREATY ON THE LESOTHO HIGHLANDS WATER PROJECT BETWEEN THE GOVERNMENT OF THE REPUBLIC OF SOUTH AFRICA AND THE GOVERNMENT OF THE KINGDOM OF LESOTHO SYLLABUS OF THE TREATY PREAMBLE ARTICLE 1: Definitions

More information

VIRIDOR WASTE MANAGEMENT LIMITED TERMS AND CONDITIONS OF TRADE

VIRIDOR WASTE MANAGEMENT LIMITED TERMS AND CONDITIONS OF TRADE VIRIDOR WASTE MANAGEMENT LIMITED TERMS AND CONDITIONS OF TRADE The Supplier will collect/accept Waste for disposal and will supply/deliver quarried or other material subject to the conditions set out below:

More information

HONG KONG EXCHANGES AND CLEARING LIMITED. AMENDED AND RESTATED RULES RELATING TO THE HKEx EMPLOYEES SHARE AWARD SCHEME

HONG KONG EXCHANGES AND CLEARING LIMITED. AMENDED AND RESTATED RULES RELATING TO THE HKEx EMPLOYEES SHARE AWARD SCHEME HONG KONG EXCHANGES AND CLEARING LIMITED AMENDED AND RESTATED RULES RELATING TO THE HKEx EMPLOYEES SHARE AWARD SCHEME Effective Date: 17 th June 2015 Table of Contents Contents Page 1 Definitions and Interpretation...

More information

STORMWATER MANAGEMENT FUND DEPARTMENT OF ENVIRONMENTAL SERVICES

STORMWATER MANAGEMENT FUND DEPARTMENT OF ENVIRONMENTAL SERVICES DEPARTMENT OF ENVIRONMENTAL SERVICES Mission: To implement a comprehensive stormwater management program that balances the following goals: 1) to reduce the potential for stormwater threats to public health,

More information

Chicopee River CSO Project Springfield Water & Sewer Commission. APWA Congress September 9, CSO Control Plan. CSO Control

Chicopee River CSO Project Springfield Water & Sewer Commission. APWA Congress September 9, CSO Control Plan. CSO Control Chicopee River CSO Project Springfield Water & Sewer Commission APWA Congress September 9, 2007 CSO Control Plan Typical Approach Different Thinking on Controlling Costs Case Example Springfield MA CSO

More information

The Utility is responsible for providing wastewater treatment and disposal services to [town].

The Utility is responsible for providing wastewater treatment and disposal services to [town]. This document has been prepared for the purposes of the PPP IN INFRASTRUCTURE RESOURCE CENTER FOR CONTRACTS, LAWS AND REGULATIONS (PPPIRC) website. It is a sample document FOR REFERENCE PURPOSES ONLY and

More information

Report. Banksia Woodland Rehabilitation - Age 7

Report. Banksia Woodland Rehabilitation - Age 7 Falcon Report Compliance 2017 Banksia Woodland Rehabilitation - Age 7 MS790 Compliance Report 2017 CONTENTS: 1. Introduction... 4 1.1. Company Number and Site Address... 4 1.2. Site Operations and Lease

More information

MODEL DEED OF GUARANTEE AND INDEMNITY (2003 Edition)

MODEL DEED OF GUARANTEE AND INDEMNITY (2003 Edition) MODEL DEED OF GUARANTEE AND INDEMNITY (2003 Edition) The Steering Committee has updated and revised the Model Deed of Guarantee and Indemnity launched in 2001. The updated version is referred to as the

More information

Town of South Kingstown Public Services Department. Regulations Governing On-Site Wastewater Management

Town of South Kingstown Public Services Department. Regulations Governing On-Site Wastewater Management Town of South Kingstown Public Services Department Regulations Governing On-Site Wastewater Management 1 REGULATIONS GOVERNING THE SOUTH KINGSTOWN ONSTIE WASTEWATER MANAGEMENT DISTRICT October 15, 2001

More information

Applicant/Parent Company Address: 2. Requested Coverages: Proposed Limits/Retention. Onsite Cleanup Only. Other

Applicant/Parent Company Address: 2. Requested Coverages: Proposed Limits/Retention. Onsite Cleanup Only. Other New Business Application for Environmental Impairment Liability Answer all questions, use separate sheets if necessary. NOTE: There are two sections to this application (1-9) and (A - Q) 1. Applicant/Parent

More information

TOWN OF LA RONGE FINANCIAL STATEMENTS. December 31, 2016

TOWN OF LA RONGE FINANCIAL STATEMENTS. December 31, 2016 TOWN OF LA RONGE FINANCIAL STATEMENTS December 31, 2016 Deloitte LLP 767, 801 15th Street East Prince Albert, SK S6V 0C7 Canada Tel: (306) 763-7411 Fax: (306) 763-0191 www.deloitte.ca INDEPENDENT AUDITOR

More information

Annexure 7 Compliance Schedule for Relevant Development Consent Conditions for Calga Sand Quarry Activities during 2011

Annexure 7 Compliance Schedule for Relevant Development Consent Conditions for Calga Sand Quarry Activities during 2011 2011 NNUL ENVIRONMENTL 7-1 ROCL MTERILS PT LT Report No. 264/39 nnexure 7 nnexure 7 Compliance Schedule for Relevant evelopment Consent Conditions for Calga Sand Quarry ctivities during 2011 (Total No.

More information

6.0 MONITORING AND CONTINGENCY PLANS

6.0 MONITORING AND CONTINGENCY PLANS 6.0 MONITORING AND CONTINGENCY PLANS 6.1 MONITORING The primary objective of compliance and effects monitoring is to confirm whether mitigation and protective measures are effectively implemented and to

More information

Forecasting Long-Term Care Period for Landfills. SWANA 2015 NW Symposium

Forecasting Long-Term Care Period for Landfills. SWANA 2015 NW Symposium Forecasting Long-Term Care Period for Landfills SWANA 2015 NW Symposium Forecasting Long-Term Care Period for Landfills Travis Pyle and Michelle Langdon, CH2M SWANA Northwestern Regional Symposium, Troutdale,

More information

THIS LICENCE IS ISSUED TO:/CET LICENCE EST DONNE A: MILLER ENVIRONMENTAL CORPORATION:

THIS LICENCE IS ISSUED TO:/CET LICENCE EST DONNE A: MILLER ENVIRONMENTAL CORPORATION: --- THE DANGEROUS GOODS HANDLING and TRANSPORTATION ACT LA LOI SUR LA MANUTENTION ET LE TRANSPORT DES MARCHANDISES DANGEREUSES LICENCE Manitoba ~ Conservation~5 Conservation Manitoba Licence No./Licence

More information

XXXXX TOWN WATER SUPPLY XXXXX TOWN WATER SUPPLY SYSTEM AND SEWERAGE AUTHORITY MANAGEMENT CONTRACT FOR. Date:

XXXXX TOWN WATER SUPPLY XXXXX TOWN WATER SUPPLY SYSTEM AND SEWERAGE AUTHORITY MANAGEMENT CONTRACT FOR. Date: REPUBLIC OF UGANDA XXXXX TOWN WATER SUPPLY AND SEWERAGE AUTHORITY MANAGEMENT CONTRACT FOR XXXXX TOWN WATER SUPPLY SYSTEM Date:------------------------------ This MANAGEMENT CONTRACT is made this day of..,

More information

THE COLLECTIVE INVESTMENT SCHEMES (DESIGNATED PERSONS) RULES Index

THE COLLECTIVE INVESTMENT SCHEMES (DESIGNATED PERSONS) RULES Index THE COLLECTIVE INVESTMENT SCHEMES (DESIGNATED PERSONS) RULES 1988 PART 1- INTRODUCTORY Index 1.01 Citation, commencement and application 1.02 Interpretation PART 2- FINANCIAL RECORDS 2.01 Accounting records

More information

CLEARING PARTICIPANTSHIP, FINANCIAL REQUIREMENTS & REGISTERED PERSONS

CLEARING PARTICIPANTSHIP, FINANCIAL REQUIREMENTS & REGISTERED PERSONS Chapter 2 CLEARING PARTICIPANTSHIP, FINANCIAL REQUIREMENTS & REGISTERED PERSONS 200 Participantship Classes The classes of participantship are: General Clearing Participants; Direct Clearing Participants;

More information

Environmental Improvement Fund

Environmental Improvement Fund Informational Paper 64 Environmental Improvement Fund Wisconsin Legislative Fiscal Bureau January, 2009 Environmental Improvement Fund Prepared by Kendra Bonderud Wisconsin Legislative Fiscal Bureau One

More information

Upper Tukituki Flood Control Scheme. Asset Management Plan. October 2017 HBRC Plan Number 4559 HBRC Report Number AM 15-04

Upper Tukituki Flood Control Scheme. Asset Management Plan. October 2017 HBRC Plan Number 4559 HBRC Report Number AM 15-04 Upper Tukituki Flood Control Scheme Asset Management Plan October 2017 HBRC Plan Number 4559 HBRC Report Number AM 15-04 Asset Management Group Technical Report ISSN 1174 3085 Engineering Section Upper

More information

MEMORANDUM OF UNDERSTANDING

MEMORANDUM OF UNDERSTANDING MEMORANDUM OF UNDERSTANDING THE INSTALLATION AND REPAIR OF FIRE HYDRANTS AND THE USE OF WATER FOR FIREFIGHTING PURPOSES Kent and Medway Towns Fire Authority /Folkestone and Dover Water Services 1 Introduction

More information

RETAIL INSTALMENT PLAN TERMS AND CONDITIONS

RETAIL INSTALMENT PLAN TERMS AND CONDITIONS 1. Introduction 1.1. Please read the Agreement carefully. 1.2. The Facility is only available to individuals aged 18 years or older who are permanent residents of Ireland and for personal or household

More information

BP Plus Terms and Conditions

BP Plus Terms and Conditions BP Plus Terms and Conditions 1. Terms and Conditions Binding. By applying for or first using the BP Plus Card, the Customer acknowledges acceptance of these terms and conditions and ensures their observance

More information

Planning and Urban Management (Environmental Impact Assessment) Regulations 2007 SAMOA

Planning and Urban Management (Environmental Impact Assessment) Regulations 2007 SAMOA 1 Planning Urban Management (Environmental Impact Assessment) Regulations 2007 SAMOA Arrangement of provisions 1. Short title commencement 2. Interpretation 3. When an EIA is required 4. Forms of EIA 5.

More information