1 August 15, 2012 Bud Smallwood, P.E. Meran Dadgostar, P.E., R.S. Public Works Director Town Engineer City of University Park, Texas Town of Highland Park, Texas 3800 University Blvd MacArthur Ave., Suite 265B University Park, Texas Highland Park, Texas Re: Agreement for Hydraulic Analysis for 30-Inch Turtle Creek Sewer Interceptor Dear Mr. Smallwood and Mr. Dadgostar: In response to our meeting with you on July 18, 2012 regarding the issues the City of University Park and the Town of Highland Park are experiencing with the 30-inch Turtle Creek sewer interceptor, we are pleased to submit this proposal for providing professional engineering services to the City of University Park and the Town of Highland Park. We understand that this is a joint project for the City of University Park and the Town of Highland Park, but that our contract will be with the City of University Park. Specifically, we propose to provide the following Scope of Services: SCOPE OF SERVICES Project Intent: The City of University Park and the Town of Highland Park share a 30-inch sanitary sewer interceptor in Turtle Creek. The interceptor and associated siphons were originally constructed in the 1930s and flow from this interceptor is received by Dallas Water Utilities (DWU) through a meter south of Wycliff Avenue. The interceptor has historically experienced sanitary sewer overflows (SSOs) immediately upstream of the siphon on Armstrong Avenue during rain events. This scope of work will consist of a review of permanent flow meter data (for both the City and Town) and drainage basin contributing areas to develop wastewater flow assumptions for the interceptor. This analysis will consist of developing projected flows for each individual wastewater line in Highland Park and University Park that contributes to the 30-inch Turtle Creek interceptor by defining the contributing subbasin area and calculating resulting wastewater flows. This scope of services will also consist of development of an InfoWorks CS sanitary sewer model of the Turtle Creek interceptor and contributing sub-basins from McFarlin Avenue to the DWU Point of Entry. Recent survey data collected by C&P Engineering will be utilized for model development. The model will be calibrated to a historical wet weather event, develop a hydraulic grade profile for existing conditions, and used to evaluate improvement alternatives to reduce the potential for SSOs. The assumptions, analysis, and recommendations will be summarized in a technical report.

2 Page 2 Our proposed schedule for this effort is 90 calendar days from Notice to Proceed. Every effort will be made to complete these services in a timely manner, as we know the importance of this project to the City and the Town. We believe that the meetings outlined in the Scope of Services will be necessary to ensure adequate communication and buy-in from all stakeholders. However, we have structured this proposal as a not-to-exceed contract so that if, during the course of the project, it is determined that one or more of the progress meetings are not necessary, the City and Town will not be charged for these meetings. In addition, meetings will be attended only by necessary FNI personnel and will be productive in nature consisting of necessary project interaction, presentation and discussion of results, input from all stakeholders, decision-making, and determination of a path forward. 1. Project Kick-Off Meeting: Freese and Nichols, Inc. (FNI) will meet with the Town of Highland Park (Town) and the City of University Park (City) to review project goals, scope, team, schedule, and data requirements. 2. Data Collection and Review: FNI will compile and review information from the Town and City related to the 30-inch Turtle Creek sewer line including GIS files, drawings, flow data, CCTV data, previous reports, survey data collected by C&P Engineering, and any other pertinent data. 3. Review Permanent Flow Metering Data and Develop Wastewater Flows: FNI will review webbased wastewater flow data for the four permanent flow meters to develop typical average dry weather and peak wet weather wastewater flows. FNI will use available data to identify contributing areas and quantify infiltration and inflow allowances and flows from wastewater lines that flow into the 30-inch turtle Creek interceptor. FNI will develop weekday and weekend diurnal patterns. 4. Construct Model of 30-inch line and Contributing Sub-basins: FNI will construct a hydraulic model of the 30-inch Turtle Creek sewer line in InfoWorks CS software (by Innovyze) using GIS mapping, survey data, as-built drawings, schematics, and other available data. Flow from contributing sub-basins and entry points along the 30-inch line will be represented in the model. Wastewater lines, siphons, manholes, and other structures will be included in the model. FNI will perform a one-day site visit to view the configuration and layout of critical structures on the 30- inch Turtle Creek sewer line. 5. Coordination meeting with Dallas Water Utilities (DWU): FNI will attend one coordination meeting with DWU to collect data and discuss assumptions related to the HGL/flows at the DWU connection point and planned downstream improvements. 6. Calibrate InfoWorks CS Model to Existing Conditions: FNI will calibrate the InfoWorks CS model to a selected recent rainfall event using on-line flow metering and rainfall gage data by comparing model output to recorded values for flow, depth, and velocity. 7. Progress Meeting Wastewater Flows and Model Calibration: FNI will meet with the Town and City to review wastewater flows and model calibration. 8. Hydraulic Analysis for Existing Dry Weather and Peak Wet Weather Flow Conditions: FNI will run the InfoWorks model under existing dry weather and wet weather flow conditions for a 5-year 6-hour design storm to develop HGL profiles of the 30-inch Turtle Creek sewer interceptor. FNI will review model output to identify areas where the HGL may be higher than the ground elevation, indicating a potential capacity restriction. FNI will develop an HGL profile graph and mapping.

3 Page 3 9. Evaluate Improvement Alternatives: FNI will utilize the InfoWorks CS model to evaluate up to three (3) separate improvement alternatives to address problem areas and improve the hydraulic capacity of the 30-inch Turtle Creek interceptor. Improvement alternatives will provide the necessary capacity to handle flows from a 5-year 6-hour storm event with no overflows. The improvement alternative will be evaluated with and without planned downstream improvements in DWU s system. 10. Progress Meeting Hydraulic Analysis and Improvement Alternatives: FNI will meet with the Town and City to review the results of the hydraulic modeling and improvement alternatives analysis. 11. Develop Cost Estimates: FNI will develop planning level cost estimates for the three improvements alternatives including construction, contingency, and engineering/survey costs. 12. Develop Draft Report: FNI will develop a draft report that summarizes the assumptions, methodology, results, and recommendation of the hydraulic analysis. FNI will submit the draft report in electronic PDF format. 13. Progress Meeting Review Draft Report: FNI will meet with the Town and City to review the draft report and solicit comments from Town and City staff. 14. Develop Final Report: FNI will incorporate Town and City comments and finalize the report. FNI will deliver an electronic PDF copy and ten (10) hard copies of the report. ADDITIONAL SERVICES: Additional Services to be performed by FNI, if authorized by OWNER, which are not included in the above described basic services, shall be computed based on a negotiated fee. TIME OF COMPLETION FNI is authorized to commence work on the Project upon execution of this Agreement and agrees to complete the services within 90 calendar days of Notice to Proceed. If FNI s services are delayed through no fault of FNI, FNI shall be entitled to equitable adjustment of compensation and FNI shall be entitled to adjust contract schedule consistent with the number of days of delay. RESPONSIBILITIES OF CLIENT Client will perform the following in a timely manner so as not to delay the services of FNI: A. Designate in writing a person to act as Client s representative with respect to the services to be rendered under this Agreement. Such person shall have contract authority to transmit instructions, receive information, interpret and define Client s policies and decisions with respect to FNI s services for the Project. B. Assist FNI by placing at FNI s disposal all available information pertinent to the Project including previous reports and any other data relative to the Project.

4 Page 4 C. Arrange for access to and make all provisions for FNI to enter upon public and private property as required for FNI to perform services under this Agreement. D. Examine all studies, reports, sketches, drawings, specifications, proposals and other documents presented by FNI, obtain advice of an attorney, insurance counselor and other consultants as Client deems appropriate for such examination and render in writing decisions pertaining thereto within a reasonable time so as not to delay the services of FNI. E. Provide such accounting, independent cost estimating and insurance counseling services as may be required for the Project, such legal services as Client may require or FNI may reasonably request with regard to legal issues pertaining to the Project. DESIGNATED REPRESENTATIVES FNI and CLIENT designate the following representatives: CITY s Designated Representative: Bud Smallwood, P.E., 3800 University Blvd, University Park, Texas 75205; Phone ; bsmallwood@uptexas.org CITY s Accounting Representative: FNI s Designated Representative: Scott Cole, P.E., 1701 N. Market St., Suite 500, Dallas, Texas, 75202; Phone ; Fax ; sac@freese.com FNI s Accounting Representative: Jana Collier, 4055 International Plaza, Ste. 200, Fort Worth, Texas 76109; Phone ; Fax ; jvc@freese.com COMPENSATION FNI proposes to furnish our services as described herein in accordance with Attachment CO, Compensation. The total fee for Basic Services shall be computed on the basis of Attachment CO but shall be a not-to-exceed fee of: Project Kick-Off Meeting (Task 1): $ 1,300 Data Collection and Review (Task 2): $ 3,200 Review Metering Data and Develop Flows (Task 3): $ 5,700 Construct Model (Task 4): $ 9,400 Meeting with Dallas Water Utilities (DWU) (Task 5): $ 1,300 Calibrate InfoWorks CS Model (Task 6): $ 6,800 Progress Meeting Flows and Calibration (Task 7): $ 1,300 Hydraulic Analysis (Task 8): $ 7,900 Evaluate Improvement Alternatives (Task 9): $11,000 Progress Meeting Improvement Alternatives (Task 10): $ 1,300 Develop Cost Estimates (Task 11): $ 4,400 Develop Draft Report (Task 12): $ 5,900 Progress Meeting Review Draft Report (Task 13): $ 1,300 Develop Final Report (Task 14): $ 4,200 Total Fee Not to Exceed: $65,000

5 Page 5 If FNI sees the Scope of Services changing so that additional services are needed, FNI will notify the City s representative for approval before proceeding. Additional services shall be computed based on the Schedule of Charges found in Attachment CO. Payment of the services shall be due and payable upon submission of a statement for services. Statements for services shall not be submitted more frequently than monthly. TERMS AND CONDITIONS OF AGREEMENT We propose to furnish our services as described herein in accordance with Attachment TC, "Terms and Conditions of Agreement". We appreciate this opportunity to submit this proposal. If additional information or clarification is desired, please do not hesitate to contact us. If you are in agreement with the services described above and wish for us to proceed with this assignment, please sign below and return one copy of the agreement for our files. Yours very truly, FREESE AND NICHOLS, INC. Approved: City of University Park Brian Coltharp, P.E. Principal By: Name: Print or Type Scott Cole, P.E. Principal Title: Date: L:\Resources\cbs\U\University Park\Hyland Park Hydraulic Analysis Turtle Crk\Let Agree

6 COMPENSATION ATTACHMENT CO Not to Exceed: The total fee for Basic Services in Attachment SC shall be computed on the basis of the Schedule of Charges, but shall not exceed Sixty Five Thousand Dollars ($65,000.00). If FNI sees the Scope of Services changing so that Additional Services are needed, including but not limited to those services described as Additional Services in Attachment SC, FNI will notify OWNER for OWNER's approval before proceeding. Additional Services shall be computed based on the Schedule of Charges. Schedule of Charges: Position PRINICIPAL GROUP MANAGER ENGINEER VIII ENGINEER VII ENGINEER VI ENGINEER V ENGINEER IV ENGINEER III ENGINEER II ENGINEER I ELECTRICAL ENGINEER VI ELECTRICAL ENGINEER V ELECTRICAL ENGINEER IV ELECTRICAL ENGINEER III ELECTRICAL ENGINEER II ELECTRICAL ENGINEER I MECHANICAL ENGINEER VI MECHANICAL ENGINEER V MECHANICAL ENGINEER IV MECHANICAL ENGINEER III MECHANICAL ENGINEER II MECHANICAL ENGINEER I PROGRAM MANAGER II PROGRAM MANAGER I CONSTRUCTION CONTRACT ADMIN III CONSTRUCTION CONTRACT ADMIN II CONSTRUCTION CONTRACT ADMIN I CONSTRUCTION MANAGER V CONSTRUCTION MANAGER IV CONSTRUCTION MANAGER III CONSTRUCTION MANAGER II CONSTRUCTION MANAGER I Min Max Position Min Max D VISUALIZATION COORDINATOR O&G ENGINEER VI O&G ENGINEER V O&G ENGINEER II O&G ENGINEER - TRANSITION ENVIRONMENTAL SCIENTIST VII ENVIRONMENTAL SCIENTIST VI ENVIRONMENTAL SCIENTIST V ENVIRONMENTAL SCIENTIST IV ENVIRONMENTAL SCIENTIST III ENVIRONMENTAL SCIENTIST II ENVIRONMENTAL SCIENTIST I ARCHITECT VI ARCHITECT V ARCHITECT IV ARCHITECT III ARCHITECT II ARCHITECT I LANDSCAPE ARCHITECT V LANDSCAPE ARCHITECT INTERN II LANDSCAPE ARCHITECT INTERN I PLANNER VII PLANNER VI PLANNER V PLANNER IV PLANNER III PLANNER II PLANNER I HYDROLOGIST VI HYDROLOGIST V HYDROLOGIST IV HYDROLOGIST III DOCUMENT CONTROL SPECIALIST II HYDROLOGIST II DOCUMENT CONTROL SPECIALIST SR DESIGNER DESIGNER II DESIGNER I SR CADD DESIGNER CADD DESIGNER TECHNICIAN IV TECHNICIAN III TECHNICIAN II TECHNICIAN I GIS ANALYST V GIS ANALYST IV GIS ANALYST III GIS ANALYST II GIS ANALYST I SENIOR GEOLOGIST GEOTECHNICAL ENGINEER VI RIGHT OF WAY AGENT PUBLIC INVOLVEMENT COORDINATOR WORD PROCESSING/SECRETARIAL OPERATIONS ANALYST CONTRACT ADMINISTRATOR PROJECT CONTROL SPECIALIST INFORMATION SERVICES CLERK III INFORMATION SERVICES CLERK II INFORMATION SERVICES CLERK I CO-OP The ranges and individual salaries will be adjusted annually. RATES FOR INHOUSE SERVICES Computer and CAD Calcomp Plotter Print Shop PC CAD Stations $10.00 per hr. Bond $2.50 per plot Color Copies & Printing $0.50 per single side copy Other $5.00 per plot $1.00 per double side copy Color $5.75 per plot Black & White Copies & Printing $0.10 per single side copy Testing Apparatus $0.20 per double side copy Density Meter $ per month Gas Detection $20.00 per test Binding $5.75 per book OTHER DIRECT EXPENSES: Other direct expenses are reimbursed at actual cost times a multiplier of They include outside printing and reproduction expense, communication expense, travel, transportation and subsistence away from the FNI office and other miscellaneous expenses directly related to the work, including costs of laboratory analysis, test, and other work required to be done by independent persons other than staff members. For Resident Representative services performed by non-fni employees and CAD services performed In-house by non-fni employees where FNI provides workspace and equipment to perform such services, these services will be billed at cost times a multiplier of 2.0. This markup approximates the cost to FNI if an FNI employee was performing the same or similar services. ggp0360:3/7/2012 FNI OWNER

7 ATTACHMENT TC TERMS AND CONDITIONS OF AGREEMENT 1. DEFINITIONS: The term Owner as used herein refers to the City of University Park, Texas. The term FNI as used herein refers to Freese and Nichols, Inc., its employees and agents; also its subcontractors and their employees and agents. As used herein, Services refers to the professional services performed by Freese and Nichols pursuant to the AGREEMENT. 2. CHANGES: Owner, without invalidating the AGREEMENT, may order changes within the general scope of the WORK required by the AGREEMENT by altering, adding to and/or deducting from the WORK to be performed. If any change under this clause causes an increase or decrease in FNI's cost of, or the time required for, the performance of any part of the Services under the AGREEMENT, an equitable adjustment will be made by mutual agreement and the AGREEMENT modified in writing accordingly. 3. TERMINATION: The obligation to provide services under this AGREEMENT may be terminated by either party upon ten days' written notice. In the event of termination, FNI will be paid for all services rendered and reimbursable expenses incurred to the date of termination and, in addition, all reimbursable expenses directly attributable to termination. 4. CONSEQUENTIAL DAMAGES: In no event shall FNI or its subcontractors be liable in contract, tort, strict liability, warranty, or otherwise for any special, indirect, incidental or consequential damages, such as loss of product, loss of use of the equipment or system, loss of anticipated profits or revenue, non-operation or increased expense of operation or other equipment or systems. 5. INFORMATION FURNISHED BY OWNER: Owner will assist FNI by placing at FNI's disposal all available information pertinent to the Project including previous reports and any other data relative to design or construction of the Project. FNI shall have no liability for defects or negligence in the Services attributable to FNI's reliance upon or use of data, design criteria, drawings, specifications or other information furnished by Owner and Owner agrees to indemnify and hold FNI harmless from any and all claims and judgments, and all losses, costs and expenses arising therefrom. FNI shall disclose to Owner, prior to use thereof, defects or omissions in the data, design criteria, drawings, specifications or other information furnished by Owner to FNI that FNI may reasonably discover in its review and inspection thereof. 6. INSURANCE: FNI shall provide to Owner certificates of insurance which shall contain the following minimum coverage (All limits in thousands): Commercial General Liability Workers' Compensation General Aggregate $2,000 Each Accident $500 Automobile Liability (Any Auto) Professional Liability CSL $1,000 $3,000 Annual Aggregate 7. SUBCONTRACTS: If, for any reason, at any time during the progress of providing Services, Owner determines that any subcontractor for FNI is incompetent or undesirable, Owner will notify FNI accordingly and FNI shall take immediate steps for cancellation of such subcontract. Subletting by subcontractors shall be subject to the same regulations. Nothing contained in the AGREEMENT shall create any contractual relation between any subcontractor and Owner. 8. OWNERSHIP OF DOCUMENTS: All drawings, reports data and other project information developed in the execution of the Services provided under this AGREEMENT shall be the property of the Owner upon payment of FNI's fees for services. FNI may retain copies for record purposes. Owner agrees such documents are not intended or represented to be suitable for reuse by Owner or others. Any reuse by Owner or by those who obtained said documents from Owner without written verification or adaptation by FNI will be at Owner's sole risk and without liability or legal exposure to FNI, or to FNI's independent associates or consultants, and Owner shall indemnify and hold harmless FNI and FNI's independent associates and consultants from all claims, damages, losses and expenses including attorneys' fees arising out of or resulting therefrom. Any such verification or adaptation will entitle FNI to further reasonable compensation. FNI may reuse all drawings, report data and other project information in the execution of the Services provided under this AGREEMENT in FNI's other activities. Any reuse by FNI will be at FNI's sole risk and without liability or legal exposure to Owner, and FNI shall indemnify and hold harmless Owner from all claims, damages, losses and expenses including attorneys' fees arising out of or resulting therefrom. Page 1of 2 FNI OWNER

8 9. POLLUTANTS AND HAZARDOUS WASTES: It is understood and agreed that FNI has neither created nor contributed to the creation or existence of any hazardous, radioactive, toxic, irritant, pollutant, or otherwise dangerous substance or condition at the site, if any, and its compensation hereunder is in no way commensurate with the potential risk of injury or loss that may be caused by exposures to such substances or conditions. The parties agree that in performing the Services required by this AGREEMENT, FNI does not take possession or control of the subject site, but acts as an invitee in performing the services, and is not therefore responsible for the existence of any pollutant present on or migrating from the site. Further, FNI shall have no responsibility for any pollutant during clean-up, transportation, storage or disposal activities. 10. OPINION OF PROBABLE COSTS: FNI will furnish an opinion of probable project development cost based on present day cost, but does not guarantee the accuracy of such estimates. Opinions of probable cost, financial evaluations, feasibility studies, economic analyses of alternate solutions and utilitarian considerations of operations and maintenance costs prepared by FNI hereunder will be made on the basis of FNI s experience and qualifications and represent FNI's judgment as an experienced and qualified design professional. It is recognized, however, that FNI does not have control over the cost of labor, material, equipment or services furnished by others or over market conditions or contractors' methods of determining their prices. 11. CONSTRUCTION REPRESENTATION: If required by the AGREEMENT, FNI will furnish Construction Representation according to the defined scope for these services. FNI will observe the progress and the quality of work to determine in general if the work is proceeding in accordance with the Contract Documents. In performing these services, FNI will endeavor to protect Owner against defects and deficiencies in the work of Contractors; FNI will report any observed deficiencies to Owner, however, it is understood that FNI does not guarantee the Contractor's performance, nor is FNI responsible for the supervision of the Contractor's operation and employees. FNI shall not be responsible for the means, methods, techniques, sequences or procedures of construction selected by the Contractor, or the safety precautions and programs incident to the work of the Contractor. FNI shall not be responsible for the acts or omissions of any person (except his own employees or agent) at the Project site or otherwise performing any of the work of the Project. If Owner designates a person to serve in the capacity of Resident Project Representative who is not a FNI's employee or FNI's agent, the duties, responsibilities and limitations of authority of such Resident Project Representative(s) will be set forth in writing and made a part of this AGREEMENT before the Construction Phase of the Project begins. 12. PAYMENT: Progress payments may be requested by FNI based on the amount of services completed. Payment for the services of FNI shall be due and payable upon submission of a statement for services to OWNER and in acceptance of the services as satisfactory by the OWNER. Statements for services shall not be submitted more frequently than monthly. Any applicable new taxes imposed upon services, expenses, and charges by any governmental body after the execution of this AGREEMENT will be added to FNI's compensation. If OWNER fails to make any payment due FNI for services and expenses within thirty (30) days after receipt of FNI's statement for services therefore, the amounts due FNI will be increased at the rate of one percent (1%) per month from said thirtieth (30th) day, and, in addition, FNI may, after giving seven (7) days' written notice to OWNER, suspend services under this AGREEMENT until FNI has been paid in full, all amounts due for services, expenses and charges. 13. ARBITRATION: No arbitration arising out of, or relating to, this AGREEMENT involving one party to this AGREEMENT may include the other party to this AGREEMENT without their approval. 14. SUCCESSORS AND ASSIGNMENTS: OWNER and FNI each are hereby bound and the partners, successors, executors, administrators and legal representatives of OWNER and FNI are hereby bound to the other party to this AGREEMENT and to the partners, successors, executors, administrators and legal representatives (and said assigns) of such other party, in respect of all covenants, agreements and obligations of this AGREEMENT. Neither OWNER nor FNI shall assign, sublet or transfer any rights under or interest in (including, but without limitation, moneys that may become due or moneys that are due) this AGREEMENT without the written consent of the other, except to the extent that any assignment, subletting or transfer is mandated by law or the effect of this limitation may be restricted by law. Unless specifically stated to the contrary in any written consent to an assignment, no assignment will release or discharge the assignor from any duty or responsibility under this AGREEMENT. Nothing contained in this paragraph shall prevent FNI from employing such independent associates and consultants as FNI may deem appropriate to assist in the performance of services hereunder. 15. PURCHASE ORDERS: If a Purchase Order is used to authorize FNI's Services, only the terms, conditions/instructions typed on the face of the Purchase Order shall apply to this AGREEMENT. Should there be any conflict between the Purchase Order and the terms of this AGREEMENT, then this AGREEMENT shall prevail and shall be determinative of the conflict. Page 2of 2 FNI OWNER

RESOLUTION NO

RESOLUTION NO RESOLUTION NO. 2017-003 A RESOLUTION OF THE CITY COUNCIL OF THE CITY OF DUNCANVILLE, TEXAS, APPROVING THE TERMS AND CONDITIONS OF A PROFESSIONAL ENGINEERING SERVICES AGREEMENT WITH FREESE AND NICHOLS,

More information

SHORT FORM OF AGREEMENT BETWEEN OWNER AND ENGINEER FOR PROFESSIONAL SERVICES

SHORT FORM OF AGREEMENT BETWEEN OWNER AND ENGINEER FOR PROFESSIONAL SERVICES SHORT FORM OF AGREEMENT BETWEEN OWNER AND ENGINEER FOR PROFESSIONAL SERVICES THIS IS AN AGREEMENT effective as of March 3, 2016 ( Effective Date ) between College Community School District ("Owner") and

More information

CONSULTING AGREEMENT STANDARD TERMS AND CONDITIONS

CONSULTING AGREEMENT STANDARD TERMS AND CONDITIONS CONSULTING AGREEMENT STANDARD TERMS AND CONDITIONS The following Standard Terms and Conditions, together with the attached scope of services constitute the terms of the Agreement between ("Consultant")

More information

SARPY COUNTY AND SARPY CITIES WASTEWATER AGENCY

SARPY COUNTY AND SARPY CITIES WASTEWATER AGENCY SARPY COUNTY AND SARPY CITIES WASTEWATER AGENCY RESOLUTION APPROVING AGREEMENT WITH HDR FOR ENGINEERING SERVICES RELATED TO THE SOUTHERN SARPY COUNTY WASTEWATER TREATMENT STUDY PHASE 2B WHEREAS, Sarpy

More information

AGREEMENT BETWEEN OWNER AND CONSTRUCTION MANAGER PRE-CONSTRUCTION AND CONSTRUCTION SERVICES

AGREEMENT BETWEEN OWNER AND CONSTRUCTION MANAGER PRE-CONSTRUCTION AND CONSTRUCTION SERVICES AGREEMENT BETWEEN OWNER AND CONSTRUCTION MANAGER PRE-CONSTRUCTION AND CONSTRUCTION SERVICES AGREEMENT made by and between, hereinafter called the Owner, and SITESCOMMERCIAL, LLC 185 WIND CHIME COURT, SUITE

More information

STANDARD FORM AGREEMENT BETWEEN OWNER AND ARCHITECT/ENGINEER FOR PROFESSIONAL SERVICES. THIS AGREEMENT is made this day of, 20,

STANDARD FORM AGREEMENT BETWEEN OWNER AND ARCHITECT/ENGINEER FOR PROFESSIONAL SERVICES. THIS AGREEMENT is made this day of, 20, STANDARD FORM AGREEMENT BETWEEN OWNER AND ARCHITECT/ENGINEER FOR PROFESSIONAL SERVICES THIS AGREEMENT is made this day of, 20, (AGREEMENT) between, (OWNER) and, a Virginia Corporation, whose office location

More information

CONSULTING SERVICES AGREEMENT [Lump Sum]

CONSULTING SERVICES AGREEMENT [Lump Sum] MWH CONTRACT No. CONSULTING SERVICES AGREEMENT [Lump Sum] This agreement ( Agreement ), with an effective date of September 20, 2013, is by and between the CITY OF NORTH ROYALTON ( CLIENT ) and MWH Americas,

More information

DGR ENGINEERING Master Agreement for Professional Services Task Order Version

DGR ENGINEERING Master Agreement for Professional Services Task Order Version DGR ENGINEERING Master Agreement for Professional Services Task Order Version THIS AGREEMENT is entered into on the 7th day of March, 2016, by and between the City of Volga, South Dakota, hereinafter referred

More information

STANDARD FORM OF MASTER AGREEMENT BETWEEN OWNER AND ENGINEER FOR PROFESSIONAL SERVICES

STANDARD FORM OF MASTER AGREEMENT BETWEEN OWNER AND ENGINEER FOR PROFESSIONAL SERVICES STANDARD FORM OF MASTER AGREEMENT BETWEEN OWNER AND ENGINEER FOR PROFESSIONAL SERVICES THIS IS AN AGREEMENT between the City of Oskaloosa, Iowa ( Owner ) and FOX Engineering Associates, Inc. ( Engineer

More information

CONTRACT FOR PROFESSIONAL SERVICES - ARCHITECT

CONTRACT FOR PROFESSIONAL SERVICES - ARCHITECT THE STATE OF TEXAS COUNTY OF GALVESTON CONTRACT FOR - ARCHITECT THIS AGREEMENT, entered into as of this 9TH day of January, 2017, by and between the City of Friendswood, Texas (hereinafter called the CITY

More information

3 Any additional projects that may be added by the Parish providing the cost does not

3 Any additional projects that may be added by the Parish providing the cost does not f F r CONTRACT FOR PROFESSIONAL PROGRAM MANAGEMENT SERVICES FOR ST JOHN THE BAPTIST PARISH FOR 2009 BOND ISSUE IMPROVEMENTS The St John the Baptist Parish Council herein referred to as the Parish and represented

More information

AIA Document B141 TM 1997 Part

AIA Document B141 TM 1997 Part 1 AIA Document B141 TM 1997 Part Standard Form of Agreement Between Owner and Architect with Standard Form of Architect's Services TABLE OF ARTICLES 1.1 INITIAL INFORMATION 1.2 RESPONSIBILITIES OF THE

More information

Standard Form of Agreement Between Owner and Architect for a Federally Funded or Federally Insured Project

Standard Form of Agreement Between Owner and Architect for a Federally Funded or Federally Insured Project Document B108 2009 Standard Form of Agreement Between Owner and Architect for a Federally Funded or Federally Insured Project AGREEMENT made as of the in the year (In words, indicate day, month and year.)

More information

SHORT FORM OF AGREEMENT BETWEEN OWNER AND ENGINEER FOR PROFESSIONAL SERVICES

SHORT FORM OF AGREEMENT BETWEEN OWNER AND ENGINEER FOR PROFESSIONAL SERVICES SHORT FORM OF AGREEMENT BETWEEN OWNER AND ENGINEER FOR PROFESSIONAL SERVICES THIS IS AN AGREEMENT effective as of February 11, 2017 ( Effective Date ) between Des Moines Area Metropolitan Planning Organization

More information

ANNEX A Standard Special Conditions For The Salvation Army

ANNEX A Standard Special Conditions For The Salvation Army ANNEX A Standard Special Conditions For The Salvation Army TO BE ATTACHED TO AIA B101-2007 EDITION ABBREVIATED STANDARD FORM OF AGREEMENT BETWEEN OWNER AND ARCHITECT 1. Contract Documents. This Annex supplements,

More information

AGREEMENT FOR PROFESSIONAL CONSULTANT SERVICES CITY OF SAN MATEO PUBLIC WORKS DEPARTMENT

AGREEMENT FOR PROFESSIONAL CONSULTANT SERVICES CITY OF SAN MATEO PUBLIC WORKS DEPARTMENT AGREEMENT FOR PROFESSIONAL CONSULTANT SERVICES CITY OF SAN MATEO PUBLIC WORKS DEPARTMENT Sanitary Sewer Rehabilitation Design Services [name of consultant] This agreement, made and entered into this day

More information

Civil Design Consultants, Inc.

Civil Design Consultants, Inc. Civil Design Consultants, Inc. AGREEMENT FOR PROFESSIONAL ENGINEERING SERVICES Project: CLIENT: Dakota Ridge waterline replacement Dakota Ridge Homeowner s Association ENGINEER: Civil Design Consultants,

More information

WORK AUTHORIZATION NUMBER BMC-OC TO AGREEMENT FOR PROFESSIONAL ENGINEERING CONSULTING SERVICES

WORK AUTHORIZATION NUMBER BMC-OC TO AGREEMENT FOR PROFESSIONAL ENGINEERING CONSULTING SERVICES CITY ENGINEER Name: CITY OF JOPLIN 602 S. MAIN STREET Address: 9400 Ward Parkway, Kansas City, MO 64114 Attention: Mr. Jeff Barnard, P.E. JOPLIN, MO 64801 Attention: Department: Phone: Mr. Chris Parker,

More information

TERREBONNE PARISH CONSOLIDATED GOVERNMENT MINIMUM INSURANCE REQUIREMENTS PROFESSIONAL SERVICES (ARCHITECTS, ENGINEERS, CONSULTANTS, ETC.

TERREBONNE PARISH CONSOLIDATED GOVERNMENT MINIMUM INSURANCE REQUIREMENTS PROFESSIONAL SERVICES (ARCHITECTS, ENGINEERS, CONSULTANTS, ETC. TERREBONNE PARISH CONSOLIDATED GOVERNMENT MINIMUM INSURANCE REQUIREMENTS PROFESSIONAL SERVICES (ARCHITECTS, ENGINEERS, CONSULTANTS, ETC.) STANDARD FORM OF AGREEMENT BETWEEN OWNER AND CONSULTANT FOR PROFESSIONAL

More information

WBK ENGINEERING, LLC ENGINEERING SERVICES PROPOSAL

WBK ENGINEERING, LLC ENGINEERING SERVICES PROPOSAL WBK Opportunity No. 15-0152.P WBK ENGINEERING, LLC ENGINEERING SERVICES PROPOSAL Prairie Centre Sanitary Sewer Evaluation St. Charles, IL 116 West Main Street, Suite 201 St. Charles, Illinois 60174 P:

More information

Document B101 TM. Standard Form of Agreement Between Owner and Architect

Document B101 TM. Standard Form of Agreement Between Owner and Architect Document B101 TM 2007 Standard Form of Agreement Between Owner and Architect AGREEMENT made as of the day of in the year (In words, indicate day, month and year.) BETWEEN the Architect s client identified

More information

Document A201 TM 2007 SP

Document A201 TM 2007 SP AIA Document A201 TM 2007 SP General Conditions of the Contract for Construction, for use on a Sustainable Project for the following PROJECT: (Name and location or address) THE OWNER: (Name, legal status

More information

TOWN OF DEEP RIVER AND TOWN OF CHESTER INTERMUNICIPAL WASTEWATER TREATMENT AGREEMENT

TOWN OF DEEP RIVER AND TOWN OF CHESTER INTERMUNICIPAL WASTEWATER TREATMENT AGREEMENT TOWN OF DEEP RIVER AND TOWN OF CHESTER INTERMUNICIPAL WASTEWATER TREATMENT AGREEMENT This INTERMUNICIPAL WASTEWATER TREATMENT AGREEMENT ( Agreement ), dated as of August 19, 2005, is made and entered into

More information

INDEPENDENT CONTRACTOR AGREEMENT

INDEPENDENT CONTRACTOR AGREEMENT INDEPENDENT CONTRACTOR AGREEMENT WHEREAS Dixie Electric Membership Corporation (hereinafter DEMCO ) is a nonprofit electric membership cooperative authorized to do and doing business in the State of Louisiana;

More information

Standard Form of Agreement Between Owner and Architect without a Predefined

Standard Form of Agreement Between Owner and Architect without a Predefined Document B102 2007 Standard Form of Agreement Between Owner and Architect without a Predefined Scope of Architect s Services AGREEMENT made as of the in the year (In words, indicate day, month and year.)

More information

General Conditions for Construction GCC201. Contract Type: Document No. for the following PROJECT: (Name and location or address) EXAMPLE

General Conditions for Construction GCC201. Contract Type: Document No. for the following PROJECT: (Name and location or address) EXAMPLE Page 1 of 37 for the following PROJECT: (Name and location or address) EXAMPLE THE OWNER: (Name and address) Example, THE ARCHITECT: (Name and address) TABLE OF ARTICLES 1 GENERAL PROVISIONS 2 OWNER 3

More information

AIA Document A103 TM 2007

AIA Document A103 TM 2007 AIA Document A103 TM 2007 Standard Form of Agreement Between Owner and Contractor where the basis of payment is the Cost of the Work plus a fee without a Guaranteed Maximum Price AGREEMENT made as of the

More information

RENOVATION CONTRACT. Borrower Name(s): Phone #: Phone #:

RENOVATION CONTRACT. Borrower Name(s): Phone #: Phone #: RENOVATION CONTRACT Case Number: Date: Borrower Name(s): Phone #: Phone #: THIS RENOVATION CONTRACT ( Contract ) dated as of, by and between ( Owner ) and ( Contractor ). Owner and Contractor, in consideration

More information

Document A General Conditions of the Contract for Construction, Construction Manager as Adviser Edition

Document A General Conditions of the Contract for Construction, Construction Manager as Adviser Edition Document A232 2009 General Conditions of the Contract for Construction, Construction Manager as Adviser Edition for the following PROJECT: (Name, and location or address) THE CONSTRUCTION MANAGER: (Name,

More information

AGREEMENT FOR CONSTRUCTION MANAGEMENT SERVICES FOR

AGREEMENT FOR CONSTRUCTION MANAGEMENT SERVICES FOR AGREEMENT FOR CONSTRUCTION MANAGEMENT SERVICES FOR By and Between WILLIAM S. HART UNION HIGH SCHOOL DISTRICT And Dated as of TABLE OF CONTENTS Page RECITALS... 1 PART 1 PROVISION OF CM SERVICES... 1 Section

More information

Standard Form of Agreement Between OWNER AND CONSTRUCTION MANAGER Construction Manager as Owner s Agent

Standard Form of Agreement Between OWNER AND CONSTRUCTION MANAGER Construction Manager as Owner s Agent CMAA Document A-1 Standard Form of Agreement Between OWNER AND CONSTRUCTION MANAGER Construction Manager as Owner s Agent 2013 EDITION This document is to be used in connection with the Standard Form of

More information

THIS CONSTRUCTION CONTRACT ( Contract ) dated as of ( Owner ) and ( Contractor ) having a principal place of business at.

THIS CONSTRUCTION CONTRACT ( Contract ) dated as of ( Owner ) and ( Contractor ) having a principal place of business at. Homeowner Contractor HomeStyle Renovation Contract Loan Number: Date: Borrower Name(s): Phone #: Phone #: THIS CONSTRUCTION CONTRACT ( Contract ) dated as of by and between ( Owner ) and ( Contractor )

More information

STANDARD FORM OF AGREEMENT BETWEEN OWNER AND ENGINEER FOR PROFESSIONAL SERVICES FUNDING AGENCY EDITION

STANDARD FORM OF AGREEMENT BETWEEN OWNER AND ENGINEER FOR PROFESSIONAL SERVICES FUNDING AGENCY EDITION This document has important legal consequences; consultation with an attorney is encouraged with respect to its use or modification. This document should be adapted to the particular circumstances of the

More information

AIA Document B101 TM 2007

AIA Document B101 TM 2007 AIA Document B101 TM 2007 Standard Form of Agreement Between Owner and Architect AS MODIFIED BY OWNER AGREEMENT made as of the day of in the year (In words, indicate day, month and year.) BETWEEN the Architect

More information

CONSULTANT SERVICES AGREEMENT (Hazardous Material Assessment/ Abatement Consulting Services)

CONSULTANT SERVICES AGREEMENT (Hazardous Material Assessment/ Abatement Consulting Services) CONSULTANT SERVICES AGREEMENT (Hazardous Material Assessment/ Abatement Consulting Services) This AGREEMENT is made and entered into this day of in the year 20 ( EFFECTIVE DATE ), between the Los Alamitos

More information

AGREEMENT FOR SERVICES

AGREEMENT FOR SERVICES AGREEMENT FOR SERVICES This AGREEMENT FOR SERVICES (the Agreement ) made as of the date stated below, between the Village of South Lebanon, Ohio, 10 N. High Street, South Lebanon, OH 45065 (the Village

More information

PROFESSIONAL SERVICES AGREEMENT NO

PROFESSIONAL SERVICES AGREEMENT NO PROJECT: PROFESSIONAL SERVICES AGREEMENT NO. 000000 PROJECT MANAGER: PROJECT NO. CONSULTANT: THIS AGREEMENT is made and entered into by and between the Port of Olympia (hereinafter referred to as the "Port")

More information

General Conditions of the Construction Contract Between CONSTRUCTION MANAGER AND CONTRACTOR

General Conditions of the Construction Contract Between CONSTRUCTION MANAGER AND CONTRACTOR CMAA Document CMAR-3 General Conditions of the Construction Contract Between CONSTRUCTION MANAGER AND CONTRACTOR 2004 EDITION This document is to be used in connection with the Standard Form of Agreement

More information

AGREEMENT BETWEEN OWNER AND CONSTRUCTION MANAGER. Pre-Construction and Construction Phase Services

AGREEMENT BETWEEN OWNER AND CONSTRUCTION MANAGER. Pre-Construction and Construction Phase Services AGREEMENT BETWEEN OWNER AND CONSTRUCTION MANAGER Pre-Construction and Construction Phase Services FP&M Project No, CP00Error! Bookmark not defined. AGREEMENT made by and between the Board of Regents, State

More information

ARTICLE 8 - OWNER S RESPONSIBILITIES

ARTICLE 8 - OWNER S RESPONSIBILITIES properly integrate with such other work. Contractor shall not endanger any work of others by cutting, excavating, or otherwise altering their work and will only cut or alter their work with the written

More information

Document A Standard Form of Agreement Between Contractor and Subcontractor

Document A Standard Form of Agreement Between Contractor and Subcontractor Document A401 2017 Standard Form of Agreement Between Contractor and Subcontractor AGREEMENT made as of the day of in the year (In words, indicate day, month and year.) BETWEEN the Contractor: (Name, legal

More information

HCAOG CONSULTANT SERVICES CONTRACT FOR PREPARATION OF THE

HCAOG CONSULTANT SERVICES CONTRACT FOR PREPARATION OF THE HCAOG CONSULTANT SERVICES CONTRACT FOR PREPARATION OF THE This is a contract, entered into on, in Eureka, California, between the HUMBOLDT COUNTY ASSOCIATION OF GOVERNMENTS, hereinafter called HCAOG, and,

More information

CITY OF NAPERVILLE: SERVICES TERMS AND CONDITIONS

CITY OF NAPERVILLE: SERVICES TERMS AND CONDITIONS CITY OF NAPERVILLE: SERVICES TERMS AND CONDITIONS THE FOLLOWING TERMS AND CONDITIONS APPLY TO ALL PURCHASES OF SERVICES BY OR ON BEHALF OF THE CITY OF NAPERVILLE UNLESS SPECIFICALLY PROVIDED OTHERWISE

More information

PROFESSIONAL SERVICES AGREEMENT For Project Description, Project #

PROFESSIONAL SERVICES AGREEMENT For Project Description, Project # PROFESSIONAL SERVICES AGREEMENT For Project Description, Project #00-00-0000 Page 1 Contract # THIS AGREEMENT, made and entered into this day of, 2014, by and between SPOKANE AIRPORT, by and through its

More information

AGREEMENT FOR ENGINEERING SERVICES (AHTD VERSION COST PLUS FEE) JOB NO. FEDERAL AID PROJECT ( FAP ) NO. JOB TITLE PREAMBLE

AGREEMENT FOR ENGINEERING SERVICES (AHTD VERSION COST PLUS FEE) JOB NO. FEDERAL AID PROJECT ( FAP ) NO. JOB TITLE PREAMBLE AGREEMENT FOR ENGINEERING SERVICES (AHTD VERSION COST PLUS FEE) JOB NO. FEDERAL AID PROJECT ( FAP ) NO. JOB TITLE PREAMBLE THIS AGREEMENT, entered into this day of, by and between the Arkansas State Highway

More information

FATIGUE TECHNOLOGY INC. PURCHASE ORDER TERMS AND CONDITIONS DATED JANUARY 4, 2006

FATIGUE TECHNOLOGY INC. PURCHASE ORDER TERMS AND CONDITIONS DATED JANUARY 4, 2006 FATIGUE TECHNOLOGY INC. PURCHASE ORDER TERMS AND CONDITIONS DATED JANUARY 4, 2006 1. CONTRACT. Fatigue Technology Inc. s, hereinafter called FTI, purchase order, or change order to a purchase order, collectively

More information

Contracting for Small Projects. DPLE 246 July 5, 2017

Contracting for Small Projects. DPLE 246 July 5, 2017 Contracting for Small Projects DPLE 246 July 5, 2017 RLI Design Professionals is a Registered Provider with The American Institute of Architects Continuing Education Systems. Credit earned on completion

More information

1997 Part 2. Document B141. Standard Form of Architect's Services: Design and Contract Administration TABLE OF ARTICLES

1997 Part 2. Document B141. Standard Form of Architect's Services: Design and Contract Administration TABLE OF ARTICLES TM Document B141 Standard Form of Architect's Services: Design and Contract Administration 1997 Part 2 TABLE OF ARTICLES 2.1 PROJECT ADMINISTRATION SERVICES 2.2 SUPPORTING SERVICES 2.3 EVALUATION AND PLANNING

More information

General Conditions of the Construction Contract Between OWNER AND CONTRACTOR

General Conditions of the Construction Contract Between OWNER AND CONTRACTOR CMAA Document A-3 General Conditions of the Construction Contract Between OWNER AND CONTRACTOR 2005 EDITION This document is to be used in connection with the Standard Form of Agreement Between Owner and

More information

MASTER PURCHASE AGREEMENT (For Sale of Non-Potable Fresh or Salt Water)

MASTER PURCHASE AGREEMENT (For Sale of Non-Potable Fresh or Salt Water) MASTER PURCHASE AGREEMENT (For Sale of Non-Potable Fresh or Salt Water) THIS MASTER PURCHASE AGREEMENT (this Agreement ) is made and entered into this day of, 201 (the Effective Date ), by and between

More information

Standard Form of Agreement Between Contractor and Subcontractor

Standard Form of Agreement Between Contractor and Subcontractor Standard Form of Agreement Between Contractor and Subcontractor GENERAL TERMS AND CONDITIONS ARTICLE 1 THE SUBCONTRACT DOCUMENTS 1.1 The Subcontract Documents consist of (1) these General Terms and Conditions,

More information

Document A401 TM. Standard Form of Agreement Between Contractor and Subcontractor

Document A401 TM. Standard Form of Agreement Between Contractor and Subcontractor Document A401 TM 2017 Standard Form of Agreement Between Contractor and Subcontractor AGREEMENT made as of the day of in the year (In words, indicate day, month and year.) BETWEEN the Contractor: (Name,

More information

PROPOSAL January 11, 2019

PROPOSAL January 11, 2019 PROPOSAL January 11, 2019 Project Information Project: West Plains Aquatic Center Pumphouse Renovation 1136 W. Broadway West Plains, MO 65775 For: City of West Plains c/o Mike Davis 1910 Holiday Ln, West

More information

REQUEST FOR PROPOSAL FOR AUDIT SERVICES City of Yreka, California Dated February 08, 2018

REQUEST FOR PROPOSAL FOR AUDIT SERVICES City of Yreka, California Dated February 08, 2018 REQUEST FOR PROPOSAL FOR AUDIT SERVICES City of Yreka, California Dated February 08, 2018 RETURN PROPOSALS TO: Rhetta Hogan Finance Department City of Yreka 701 Fourth Street Yreka, CA 96097 DEADLINE FOR

More information

Document A133 TM. AGREEMENT made as of the day of in the year 20 (In words, indicate day, month and year.)

Document A133 TM. AGREEMENT made as of the day of in the year 20 (In words, indicate day, month and year.) Document A133 TM 2009 Standard Form of Agreement Between Owner and Construction Manager as Constructor where the basis of payment is the Cost of the Work Plus a Fee with a Guaranteed Maximum Price AGREEMENT

More information

M E M O R A N D U M GLYNN COUNTY MANAGER S OFFICE

M E M O R A N D U M GLYNN COUNTY MANAGER S OFFICE GLYNN COUNTY MANAGER S OFFICE 1725 Reynolds Street, Third Floor, Brunswick, GA 31520 Phone: (912) 554-7401 Fax: (912) 554-7596 www.glynncounty.org M E M O R A N D U M TO: GLYNN COUNTY BOARD OF COMMISSIONERS

More information

INTRODUCTION TERMS AND CONDITIONS

INTRODUCTION TERMS AND CONDITIONS MASTER AGREEMENT FOR PROFESSIONAL SERVICES (AIA) (Unlimited) THIS AGREEMENT FOR PROFESSIONAL SERVICES shall become effective DATE, 2016, between the City of Meridian, a municipal corporation organized

More information

LANDSCAPE ARCHITECTURAL DESIGN SERVICES EXHIBIT A TO CONTINUING SERVICES AGREEMENT SERVICE PROVIDER S BASIC SERVICES

LANDSCAPE ARCHITECTURAL DESIGN SERVICES EXHIBIT A TO CONTINUING SERVICES AGREEMENT SERVICE PROVIDER S BASIC SERVICES EXHIBIT A TO CONTINUING SERVICES AGREEMENT SERVICE PROVIDER S BASIC SERVICES 1.1 GENERAL RESPONSIBILITIES. Service Provider accepts the relationship of trust and confidence established between it and Owner

More information

Document A133 TM. AGREEMENT made as of the day of in the year Two Thousand and Sixteen. BETWEEN the Owner:

Document A133 TM. AGREEMENT made as of the day of in the year Two Thousand and Sixteen. BETWEEN the Owner: Document A133 TM 2009 Standard Form of Agreement Between Owner and Construction Manager as Constructor where the basis of payment is the Cost of the Work Plus a Fee with a Guaranteed Maximum Price AGREEMENT

More information

ATTACHMENT A AIA DOCUMENT B EDITION STANDARD FORM OF AGREEMENT BETWEEN OWNER AND ARCHITECT

ATTACHMENT A AIA DOCUMENT B EDITION STANDARD FORM OF AGREEMENT BETWEEN OWNER AND ARCHITECT ATTACHMENT A AIA DOCUMENT B141 1987 EDITION STANDARD FORM OF AGREEMENT BETWEEN OWNER AND ARCHITECT Winston-Salem/Forsyth County Board of Education June 15-2015 Revised Edition for Project: Architect: Amendments,

More information

Document A SP General Conditions of the Contract for Construction, for use on a Sustainable Project, Construction Manager as Adviser Edition

Document A SP General Conditions of the Contract for Construction, for use on a Sustainable Project, Construction Manager as Adviser Edition Document A232 2009 SP General Conditions of the Contract for Construction, for use on a Sustainable Project, Construction Manager as Adviser Edition for the following PROJECT: (Name, and location or address)

More information

Telemetry Upgrade Project: Phase-3

Telemetry Upgrade Project: Phase-3 Telemetry Upgrade Project: Phase-3 Cedar River Water & Sewer District is soliciting Statements of Qualifications from interested consulting engineering firms capable of providing Telemetry/SCADA Engineering

More information

STATE OF VERMONT STANDARD FORM. GENERAL CONDITIONS FOR F P R DESIGN BUILD CONTRACTS (March 2017)

STATE OF VERMONT STANDARD FORM. GENERAL CONDITIONS FOR F P R DESIGN BUILD CONTRACTS (March 2017) STATE OF VERMONT STANDARD FORM GENERAL CONDITIONS FOR F P R DESIGN BUILD CONTRACTS (March 2017) The following general conditions are for use with DESIGN BUILD construction contracts with the State of Vermont,

More information

STANDARD FORM OF AGREEMENT BETWEEN OWNER AND ENGINEER

STANDARD FORM OF AGREEMENT BETWEEN OWNER AND ENGINEER f This document has important legal consequences consultation with an attorney is encouraged with respect to its completion or modification SEWER MANHOLE RESTORATION PROJECT PHASE STANDARD FORM OF AGREEMENT

More information

WESTERN RIVERSIDE COUNCIL OF GOVERNMENTS EQUIPMENT PURCHASE AGREEMENT

WESTERN RIVERSIDE COUNCIL OF GOVERNMENTS EQUIPMENT PURCHASE AGREEMENT WESTERN RIVERSIDE COUNCIL OF GOVERNMENTS EQUIPMENT PURCHASE AGREEMENT This Equipment Purchase Agreement ( Agreement ) is entered into this day of, 20, by and between the Western Riverside Council of Governments,

More information

Document A201 TM. General Conditions of the Contract for Construction. (Name and location or address)

Document A201 TM. General Conditions of the Contract for Construction. (Name and location or address) Document A201 TM 2007 General Conditions of the Contract for Construction for the following PROJECT: (Name and location or address) THE OWNER: (Name, legal status and address) Case Western Reserve University

More information

Standard Form of Agreement Between Owner and Contractor for a Residential or Small Commercial Project

Standard Form of Agreement Between Owner and Contractor for a Residential or Small Commercial Project Document A105 2007 Standard Form of Agreement Between Owner and Contractor for a Residential or Small Commercial Project AGREEMENT made as of the in the year (In words, indicate day, month and year.) BETWEEN

More information

AIA Document A201 TM 1997

AIA Document A201 TM 1997 AIA Document A201 TM 1997 General Conditions of the Contract for Construction for the following PROJECT: (Name and location or address): Project University of Maine at Farmington THE OWNER: (Name and address):

More information

PROFESSIONAL SERVICES AGREEMENT

PROFESSIONAL SERVICES AGREEMENT PROFESSIONAL SERVICES AGREEMENT THIS AGREEMENT is made and entered into effective, 2017 (the Agreement Date ) by and between: CLIENT Name: CITY OF PASCAGOULA Address: 603 Watts Avenue, Pascagoula, MS,

More information

Standard Form of Agreement between Owner and Construction Manager

Standard Form of Agreement between Owner and Construction Manager Standard Form of Agreement between Owner and Construction Manager Agreement made as of the day of in the year 20 Between the Owner: Town of Warwick 132 Kings Highway Warwick, New York 10990 and the Construction

More information

APPENDIX J. CIP Renewal and Replacement Process. Revision History

APPENDIX J. CIP Renewal and Replacement Process. Revision History APPENDIX J CIP Renewal and Replacement Process Revision History Revision Date Approval Reason 0 09/30/05 Original 1 05/25/11 2 09/27/12 3 03/26/14 4 11/14/16 E. Yong Updated Clearinghouse process and replaced

More information

SAFETY FIRST GRANT CONTRACT

SAFETY FIRST GRANT CONTRACT SAFETY FIRST GRANT CONTRACT This agreement (the Contract ) is made this day of, by and between (the Contractor ) and (the Owner ), for the (Name of Parish Corporation, ABN or high school corporation) purpose

More information

REQUEST FOR PROPOSAL For PROFESSIONAL SERVICES. Water & Stormwater Utility Rate Analyses

REQUEST FOR PROPOSAL For PROFESSIONAL SERVICES. Water & Stormwater Utility Rate Analyses REQUEST FOR PROPOSAL For PROFESSIONAL SERVICES Water & Stormwater Utility Rate Analyses 1. INTRODUCTION The intent of this REQUEST FOR PROPOSAL is to obtain a qualified person, firm, or corporation, hereafter

More information

DRY SWEEPING SERVICES AGREEMENT

DRY SWEEPING SERVICES AGREEMENT DRY SWEEPING SERVICES AGREEMENT This DRY SWEEPING SERVICES AGREEMENT (this Agreement ) is made and entered into this day of, 200_ (the Effective Date ), by and between STANDARD PARKING CORPORATION, a Delaware

More information

City of Beverly Hills Beverly Hills, CA

City of Beverly Hills Beverly Hills, CA City of Beverly Hills Beverly Hills, CA REQUEST FOR PROPOSAL For Professional Services for Conducting a Department Needs Assessment and Developing a Grant Funding Strategy to Support City Priority Projects

More information

Sale Agreement - Bill of Sale #4415. Newfield Exploration Co. Property / Exhibit A. Lot Number Description Location Price () Return To

Sale Agreement - Bill of Sale #4415. Newfield Exploration Co. Property / Exhibit A. Lot Number Description Location Price () Return To Seller Buyer Newfield Exploration Co Property / Exhibit A Lot Number Description Location Price () Pick up Date Return To support@networkintl.com Effective Date In witness... Seller Newfield Exploration

More information

Standard Form of Agreement Between Contractor and Subcontractor

Standard Form of Agreement Between Contractor and Subcontractor Document A401 2007 Standard Form of Agreement Between Contractor and Subcontractor AGREEMENT made as of the in the year (In words, indicate day, month and year.) day of BETWEEN the Contractor: (Name, legal

More information

AGREEMENT FOR ENGINEERING SERVICES. J.R.MacKenzie, P.Eng Goodlad Street Burnaby, BC, V5E 2H9 (herinafter called ENGINEER)

AGREEMENT FOR ENGINEERING SERVICES. J.R.MacKenzie, P.Eng Goodlad Street Burnaby, BC, V5E 2H9 (herinafter called ENGINEER) AGREEMENT FOR ENGINEERING SERVICES This Agreement made this 16 day of January, 2016 between: (herinafter called CLIENT) J.R.MacKenzie, P.Eng. 7916 Goodlad Street Burnaby, BC, V5E 2H9 Canada (herinafter

More information

REQUEST FOR PROPOSAL

REQUEST FOR PROPOSAL REQUEST FOR PROPOSAL The City of Sachse is soliciting submittals for the herein described services and/or commodities for the purpose defined in this document. By responding to this request, the offeror

More information

AGREEMENT BETWEEN OWNER AND ENGINEER FOR PROFESSIONAL SERVICES

AGREEMENT BETWEEN OWNER AND ENGINEER FOR PROFESSIONAL SERVICES This document has important legal consequences; consultation with an attorney is encouraged with respect to its use or modification. This document should be adapted to the particular circumstances of the

More information

Name: Address: Attention: AMENDMENT TO WORK AUTHORIZATION NUMBER TO AGREEMENT FOR PROFESSIONAL ENGINEERING CONSULTING SERVICES

Name: Address: Attention: AMENDMENT TO WORK AUTHORIZATION NUMBER TO AGREEMENT FOR PROFESSIONAL ENGINEERING CONSULTING SERVICES CITY OF JOPLIN 602 S. MAIN STREET JOPLIN, MO 64801 CITY Name: Address: ENGINEER Burns & McDonnell Engineering Company, Inc. 9400 Ward Parkway Kansas City, MO 64114 Attention: Mr. Chris Parker, PE Attention:

More information

FIXTURE TERMS & CONDITIONS Materials & Goods

FIXTURE TERMS & CONDITIONS Materials & Goods FIXTURE TERMS & CONDITIONS Materials & Goods 1. BINDING EFFECT; ACCEPTANCE. This purchase order and all subsequent purchase orders delivered by Supplier to The Pep Boys Manny, Moe & Jack, and its affiliates,

More information

SAMPLE DOCUMENT SUBCONTRACT AGREEMENT

SAMPLE DOCUMENT SUBCONTRACT AGREEMENT SUBCONTRACT AGREEMENT THIS SUBCONTRACT, made this day of by and between (hereinafter "Contractor"), with an office and principal place of business at and (hereinafter "Subcontractor") with an office and

More information

Contractor for any and all liability, costs, expenses, fines, penalties, and attorney s fees resulting from its failure to perform such duties.

Contractor for any and all liability, costs, expenses, fines, penalties, and attorney s fees resulting from its failure to perform such duties. SUBCONTRACT AGREEMENT THIS SUBCONTRACT, made this day of, 20 by and between (hereinafter "Contractor"), with an office and principal place of business at and (hereinafter "Subcontractor") with an office

More information

W I T N E S S E T H:

W I T N E S S E T H: GENERAL CONTRACTORS SUBCONTRACT AGREEMENT THIS CONTRACT, made and entered into the day of, 20, by and between, a Tennessee, having its principal place of business at, hereinafter referred to as "Contractor"

More information

CONSULTANT SERVICES AGREEMENT

CONSULTANT SERVICES AGREEMENT CONSULTANT SERVICES AGREEMENT THIS AGREEMENT ( Agreement ) is made and entered into this 20 th day of December, 2012, by and between the City of Rio Vista, a municipal corporation of the State of California

More information

Subcontract Agreement

Subcontract Agreement S THIS AGREEMENT made as of the day of, 2012 BETWEEN the Contractor: TCL Partners 5212 123 rd Place SE Everett, WA 98208 and the For the Following Project: The Architect for the Project: The Contractor

More information

PADRE DAM MUNICIPAL WATER DISTRICT PROFESSIONAL SERVICES AGREEMENT

PADRE DAM MUNICIPAL WATER DISTRICT PROFESSIONAL SERVICES AGREEMENT PADRE DAM MUNICIPAL WATER DISTRICT PROFESSIONAL SERVICES AGREEMENT This Agreement is made and entered into as of, 20, by and between the PADRE DAM MUNICIPAL WATER DISTRICT (hereinafter referred to as the

More information

SUPPLIER - TERMS AND CONDITIONS Materials and Goods

SUPPLIER - TERMS AND CONDITIONS Materials and Goods SUPPLIER - TERMS AND CONDITIONS Materials and Goods 1. BINDING EFFECT; ACCEPTANCE. This purchase order and all subsequent purchase orders delivered by Buyer to Seller (each, an "order"), shall be governed

More information

Construction Management-at-Risk Agreement

Construction Management-at-Risk Agreement This ( Agreement ), by and between the Lone Star College ( LSC or Owner ) and ( Construction Manager ), referred to as Party individually or Parties collectively, shall become effective upon the date this

More information

PROFESSIONAL SERVICES AGREEMENT. For On-Call Services WITNESSETH:

PROFESSIONAL SERVICES AGREEMENT. For On-Call Services WITNESSETH: PROFESSIONAL SERVICES AGREEMENT For On-Call Services THIS AGREEMENT is made and entered into this ENTER DAY of ENTER MONTH, ENTER YEAR, in the City of Pleasanton, County of Alameda, State of California,

More information

AIA Document A201 TM 2007

AIA Document A201 TM 2007 AIA Document A201 TM 2007 General Conditions of the Contract for Construction for the following PROJECT: (Name and location or address) THE OWNER: (Name and address) THE ARCHITECT: (Name and address) TABLE

More information

LANCASTER COUNTY SOLID WASTE MANAGEMENT AUTHORITY REQUEST FOR PROPOSAL. for. Construction & Demolition Waste Characterization Study

LANCASTER COUNTY SOLID WASTE MANAGEMENT AUTHORITY REQUEST FOR PROPOSAL. for. Construction & Demolition Waste Characterization Study LANCASTER COUNTY SOLID WASTE MANAGEMENT AUTHORITY REQUEST FOR PROPOSAL for Construction & Demolition Waste Characterization Study JUNE 2018 TABLE OF CONTENTS Section Page 1. Request for Proposal 3 2. Definitions

More information

OREGON STATE UNIVERSITY CM/GC CONTRACT. (Construction Manager/General Contractor)

OREGON STATE UNIVERSITY CM/GC CONTRACT. (Construction Manager/General Contractor) OREGON STATE UNIVERSITY CM/GC CONTRACT (Construction Manager/General Contractor) THE CONTRACT IS BETWEEN: OWNER: Oregon State University And CONSTRUCTION MANAGER/ GENERAL CONTRACTOR (referred to as Contractor

More information

AIA Document A133 TM 2009

AIA Document A133 TM 2009 AIA Document A133 TM 2009 Standard Form of Agreement Between Owner and Construction Manager as Constructor where the basis of payment is the Cost of the Work Plus a Fee with a Guaranteed Maximum Price

More information

REQUEST FOR PROPOSAL LOOMIS PARK MASTER PLAN GENERAL INFORMATION LOOMIS PARK MASTER PLAN

REQUEST FOR PROPOSAL LOOMIS PARK MASTER PLAN GENERAL INFORMATION LOOMIS PARK MASTER PLAN REQUEST FOR PROPOSAL LOOMIS PARK MASTER PLAN Issue Date: August 1, 2016 Proposal Receipt Date: Issuing Office: August 29, 2016, 3:00 PM Parks and Recreation The City of Jackson, Michigan is requesting

More information

Town of Highlands Board Approved as of May 17, 2012

Town of Highlands Board Approved as of May 17, 2012 TOWN OF HIGHLANDS INTERCONNECTION AGREEMENT FOR SMALL PHOTOVOLTAIC GENERATION FACILITY OF 10 kw OR LESS This PHOTOVOLTAIC INTERCONNECTION AGREEMENT FOR SMALL GENERATION 10 kw or less (the Agreement ),

More information

CONSTRUCTION AGREEMENT/CONTRACT

CONSTRUCTION AGREEMENT/CONTRACT Contract Number: Office Use Only 2233 Citygate Drive Columbus, Ohio 43219 614.418.7725 tel 614.418.7720 fax www.creativehousing.org CONSTRUCTION AGREEMENT/CONTRACT Between: For the Project: Creative Housing,

More information

REQUEST FOR PROPOSALS (RFP) ARBORIST CONSULTANT SERVICES

REQUEST FOR PROPOSALS (RFP) ARBORIST CONSULTANT SERVICES REQUEST FOR PROPOSALS (RFP) ARBORIST CONSULTANT SERVICES INTRODUCTION The urban forest of Menlo Park is composed of trees growing along streets, in parks and on private property. The sustainability of

More information

CONTRACT. Owner and Contractor agree as follows: 1. Scope of Work.

CONTRACT. Owner and Contractor agree as follows: 1. Scope of Work. CONTRACT This agreement (the "Contract") is made this day of, by and between (the "Contractor") and (name of parish corporation, ABN or high school corporation) (the "Owner"), for the purpose of stating

More information