1 Stage 01: : Gas Performance Assurance Framework and Governance Arrangements u At what stage is this document in the process? 01 Modi(ication Workgroup Report Draft Modi(ication Report Final Modi(ication Report This modification seeks to introduce a Gas Performance Assurance Framework to be used to facilitate assurance and incentivisation of settlement accuracy post-implementation of Project Nexus. This modification proposal only applies to energy and supply points within LDZs (including Connected System Exit Supply Points), it does not apply to the National Transmission System and supply points connected to it. The Proposer recommends that this modification is issued to consultation High Impact: Shippers and Transporters Medium Impact: None Low Impact: None Page 1 of 9

2 Contents 1 Summary 3 2 Why Change? 4 3 Solution 5 4 Relevant Objectives 7 5 Implementation 8 6 Legal Text 98 7 Recommendation 98 About this document: This document is a proposal, which was presented by the Proposer to the Panel on 15 January Any questions? Contact: Code Administrator enquiries@gasgovern ance.co.uk Proposer: Mark Jones mark.jones@sse.com Transporter: Wales & West Utilities steven.j.edwards@ww utilities.co.uk Systems Provider: Xoserve Page 2 of 9

3 1 Summary Is this a Self-Governance? This modification will have a material impact on commercial activities connected with the shipping and transportation of gas and is, therefore considered not to meet the Self-Governance criteria. Why Change? Unlike the electricity market, under the current gas settlement arrangements there is no performance assurance regime and there are a number of areas where the Ofgem and industry have discussed the benefits of having performance incentives to improve settlement accuracy and reduce risk. In addition Ofgem has on a number of occasions advised that they want to see a Performance Assurance Scheme developed in the gas market including in their recent determination on s 473/A 1. At the same time to coincide with the planned replacement of the main UKLINK systems, improved gas allocation and reconciliation processes (together referred to as settlement ) will be introduced through the Project Nexus suite of modifications. Whilst Project Nexus enhancements are expected to offer benefits, the new settlement arrangements introduce an element of risk, for example through the introduction of site specific meter point reconciliation for all meter points which may lead to cashflow problems for shippers. As with the current regime there is also a risk that the energy will never be reconciled before the line in the sand date is reached (presently 3-4 years). Given the value of energy that is delivered in Great Britain each day, any small percentage of error in aggregate allocations or poor performance in reconciliation activity is potentially significant. The volume of un-reconciled energy after any period is dependent upon industry participant performance including accuracy of offtake metering data, quality of asset data and available meter readings. Data quality is driven by the requirements placed on industry parties, and also on those parties meeting those requirements. A framework is therefore needed to establish performance requirements in an optimal manner and provide assurance that gas settlement has accurate measurement, allocation, reconciliation, control and self-monitoring and governance post-project Nexus implementation, so that calculations are accurate and no unfair commercial advantage can be derived from settlement by any Shipper User. Solution A Performance Assurance Framework (PAF) is to be introduced into the gas market arrangements to facilitate the monitoring and reporting of Transporter and Shipper performance and incentivise parties to reduce settlement risk and improve accuracy. The Performance Assurance Framework proposed under MOD506A encompasses Transporter and Shipper activity that impacts energy once it has entered the Local Distribution Zone, The PAF is to include CSEP Supply Points and CSEP Supply Meter Points following the implementation of 0440 Project Nexus igt Single Service Provision,. Gas transported through the National Transmission System (NTS) and supply points and supply meter points connected to the NTS are excluded from the arrangements created by this modification. This framework encompasses a new UNCC Sub-Committee, an administrator role (Performance Assurance Framework Administrator), and supporting business rules (as set out in a UNC Related Document see Appendix 1).. The proposed solution requires that the Gas Transporters appoint the Transporter Agency as the Performance Assurance Administrator 1 (page 1 - summary) Page 3 of 9

4 Relevant Objectives This modification proposal is expected to have a positive effect on Relevant Objectives d) and (f) as it is expected to lead to more accurate and up to date information being held on Xoserve s system and therefore improve accuracy of settlement. In addition the creation of the UNCC Sub-Committee and the UNC Related Document will facilitate the implementation of other modifications related to the Performance Assurance Framework. Implementation No implementation timescales are proposed. However, this proposal should be implemented as soon as possible after an Ofgem approval. This modification is expected to be one of a series of modifications to create a Performance Assurance regime. Each modification can be developed independently and implemented at different times. For the avoidance of doubt it is intended that this modification can be implemented without any modification on risk assessment being approved. It is expected that this modification will be a platform for existing modifications and those in the future relating to performance assurance. 2 Why Change? Unlike the electricity market, under the current gas settlement arrangements there is no performance assurance regime and there are a number of areas where the Ofgem and industry have discussed the benefits of having performance incentives to improve settlement accuracy and reduce risk. In addition Ofgem has on a number of occasions advised that they want to see a Performance Assurance Scheme developed in the gas market including in their recent determination on s 473/A 2. At the same time to coincide with the planned replacement of the main UKLINK systems, improved gas allocation and reconciliation processes (together referred to as settlement ) will be introduced through the Project Nexus suite of modifications. Whilst Project Nexus enhancements are expected to offer benefits, the new settlement arrangements introduce an element of risk, for example through the introduction of site specific meter point reconciliation for all meter points which may lead to cashflow problems for shippers. As with the current regime there is also a risk that the energy will never be reconciled before the line in the sand date is reached (presently 3-4 years). Essentially to be most efficient data accuracy, quality, quantity and frequency, must be optimal from all parties or Transporter or Shipper activity could expose other parties to settlement risk either deliberately or accidently through their performance. To address these issues the industry must consider the optimal performance levels to reduce overall risk to settlement accuracy and determine which risks are most material and most probabley if there is no monitoring or incentives in place to address them. The Performance Assurance Workgroup (PAW) was established by the UNC Panel on 20 December 2012 to consider the development of a framework that can help to ensure the risks are understood, and to provide assurance that the actions of some parties are not inappropriately passing costs to others. Given the value of energy that is delivered in Great Britain each day, any small percentage of error in accuracy of offtake metering data, aggregate allocations or poor performance in reconciliation activity is potentially significant. The Proposer believes that it is imperative that the amount of energy paid for by Shippers should be representative of their customers usage at the point of time for which the charges relate and that incentives should be in place on all parties to ensure that measurement, reconciliation 2 (page 1 - summary) Page 4 of 9

5 and allocation amounts are closely matched to allow this to happen. Equal to that under the Project Nexus arrangements there is an opportunity to ensure that there are controls put in place to improve asset data and the provision of meter readings and narrow any scope for Shippers inappropriately passing costs onto other parties through the settlement process. The Proposer also believes that introducing a PAF could bring benefits to consumers through the change of supplier process by ensuring that targets for switching times are met and erroneous transfers are minimised, and help facilitate the realisation of benefits expected both from Project Nexus changes and the roll out of smart metering. In addition if accuracy of settlement and reduction of error can be improved through the introduction of PAF then it should improve market attractiveness and possibly encourage new entrants into the market by reducing cost uncertainty. 3 Solution The purpose of this is to introduce a Performance Assurance Framework for a gas Performance Assurance Scheme. The Performance Assurance Framework Administrator will run the scheme, under the oversight of the UNCC or any relevant sub-committee. The purpose of this is to introduce a Performance Assurance Framework (PAF) for a gas Performance Assurance Scheme into the gas market arrangements to facilitate the monitoring and reporting of Transporter and Shipper performance and incentivise parties to reduce settlement risk and improve accuracy. The Performance Assurance Framework proposed under MOD506A encompasses Transporter and Shipper activity that impacts energy once it has entered the Local Distribution Zone, The PAF is to include CSEP Supply Points and CSEP Supply Meter Points following the implementation of 0440 Project Nexus igt Single Service Provision,. Gas transported through the National Transmission System (NTS) and supply points and supply meter points connected to the NTS are excluded from the arrangements created by this modification. This framework encompasses a new UNCC Sub-Committee, an administrator role (Performance Assurance Framework Administrator), and supporting business rules (as set out in a UNC Related Document see Appendix 1). The Performance Assurance Framework Administrator will run the scheme, under the oversight of the UNCC or any relevant sub-committee. The proposed solution requires that the Gas Transporters appoint the Transporter Agency as the Performance Assurance Administrator of the UNC is required to recognise the role of the Performance Assurance Framework, the Performance Assurance Scheme and the Performance Assurance Framework Administrator and incorporate appropriate arrangements to monitor performance of Shippers and Transporters. Business Rules business rules 1. This modification (and everything created by it) shall terminate at the end of the gas day 30 September years after the Project Nexus Implementation Date. Page 5 of 9

6 2. This modification does not apply to gas transportation on the NTS and supply points and supply meter points connected to the NTS 3. This modification creates the Performance Assurance Committee, which is the Uniform Network Code Committee or any relevant sub-committee. 4. The terms of reference for the Performance Assurance Committee have been prepared and are an appendix to this modification. 5. The ESPAR Guidelines is the document entitled Energy Settlement Performance Assurance Regime Guidelines which sets out the : a. Performance Assurance Framework b. Performance Assurance Scheme c. Performance Assurance Committee d. Performance Assurance Framework Administrator e. Potential extension of these Guidelines as other UNC modifications are developed f. Performance Assurance Committee Documents: Document 1 Performance Assurance Framework Performance Report Register Document 2 Report Specification template Document 3 Risk Register Document 4 Performance Assurance Framework Administrator Scope definition, against which cost estimate to be provided, including the Change process The ESPAR Guidelines, and its supporting documents, are an appendix to this modification. 6. The ESPAR Guidelines are governed by the UNCC. Some aspects of the ESPAR Guidelines (as defined within the ESPAR Guidelines) are governed by the UNCC or any relevant sub-committee 7. The Performance Assurance Framework (the PA Framework ) means the overarching framework comprising the Performance Assurance Scheme and its operation, the Performance Assurance Committee and its operation, the scope, operation and provision of services to be provided by the Performance Assurance Framework Administrator 8. The Performance Assurance Scheme means the measure and any other indices against which Shipper or Transporter performance is monitored 9. The Performance Assurance Framework Administrator is the administrator of the Performance Assurance Scheme. 10. This modification creates the Performance Assurance Framework which is described in Section 3 of the ESPAR Guidelines. 11. The role and scope of the Performance Assurance Framework Administrator is described in Section 6 and Document 4 of the ESPAR Guidelines. 12. The Performance Assurance Framework Administrator is the Transporter Agency. 13. The PA Framework is to include CSEP Supply Points and CSEP Supply Meter Points following the implementation of 0440 Project Nexus igt Single Service Provision. User Pays Classification of the modification as User Pays, or not, and the justification for such classification. This modification proposal creates additional services in the UNC to be provided by the Transporter Agency and to be defined in Appendix 1 of the Agency Charging Statement. Page 6 of 9

7 Identification of Users of the service, the proposed split of the recovery between Gas Transporters and Users for User Pays costs and the justification for such view. As Users are the beneficiaries of the services created by this modification proposal 100% of the costs are to be recovered from Users. The charging basis for Users is: Total AQ for all LDZs for the relevant billing period for each Shipper (as at the end of the relevant billing period (30 th September) as a percentage of the total AQ for all LDZs for the relevant billing period for all Shippers (as at the end of the relevant billing period (30 th September)) Proposed charge(s) for application of User Pays charges to Shippers. tbc Proposed charge for inclusion in the Agency Charging Statement (ACS) to be completed upon receipt of a cost estimate from Xoserve. tbc 4 Relevant Objectives Impact of the modification on the Relevant Objectives: Relevant Objective Identified impact a) Efficient and economic operation of the pipe-line system. None b) Coordinated, efficient and economic operation of (i) the combined pipe-line system, and/ or (ii) the pipe-line system of one or more other relevant gas transporters. None c) Efficient discharge of the licensee's obligations. None Page 7 of 9

8 d) Securing of effective competition: (i) between relevant shippers; (ii) between relevant suppliers; and/or (iii) between DN operators (who have entered into transportation arrangements with other relevant gas transporters) and relevant shippers. e) Provision of reasonable economic incentives for relevant suppliers to secure that the domestic customer supply security standards are satisfied as respects the availability of gas to their domestic customers. f) Promotion of efficiency in the implementation and administration of the Code. Positive None Positive g) Compliance with the Regulation and any relevant legally None binding decisions of the European Commission and/or the Agency for the Co-operation of Energy Regulators. This modification proposal should have a positive effect on Relevant Objectives (d) and (f). It is intended that the Performance Assurance Framework will allow for the monitoring of Shipper performance in elements related to settlement accuracy and facilitate an incentive regime to improve performance and reduce settlement risk. This is expected to lead to more accurate and up to date information being held on Xoserve s system and therefore improve accuracy of settlement and information in relation to system utilisation and capacity needs. Introducing a PAF should help facilitate the realisation of benefits expected both from Project Nexus changes and the roll out of smart metering. In addition by introducing a competitive tender exercise to appoint the Performance Assurance Administrator this should ensure that there is competitive pressure on the cost of this service. If accuracy of settlement and reduction of error can be improved and the PAF meets its objective of ensuring that no unfair commercial advantage can be derived from settlement market attractiveness should also improve and this may encourage new entrants to the market. This should therefore further Relevant Objective (d). The creation of the UNCC Sub-Committee and UNC Related Document will facilitate the implementation of other modifications related to the Performance Assurance Framework, this modification proposal also furthers Relevant Objective (f). 5 Implementation No implementation timescales are proposed. However, this modification proposal should be implemented as soon as possible after Ofgem approval. This modification is expected to be one of a series of modifications around Performance Assurance, which should be able to be developed independently and implemented at different times. For the avoidance of doubt it is intended that this modification can be implemented without any modification on risk assessment being approved. Page 8 of 9

9 Note: the UNCC can create the Performance Assurance Framework Sub-Committee at any point in time, this may be prior to the modification implementation. 6 Legal Text Legal text to be provided by the Gas Transporters. 7 Recommendation The Proposer invites the Workgroup to: AGREE that this modification should be issued to consultation. Page 9 of 9

0442 and 0442A: Amendment to the implementation date of the Allocation of Unidentified Gas Statement (AUGS) for the 2013/14 AUG Year

0442 and 0442A: Amendment to the implementation date of the Allocation of Unidentified Gas Statement (AUGS) for the 2013/14 AUG Year Stage 03: : Amendment to the implementation date of the Allocation of Unidentified Gas Statement (AUGS) for the 2013/14 AUG Year u At what stage is this document in the process? It is proposed that, for

More information

0364: An Appeals Process for Entry. Capacity Manifest Errors. Stage 02: Workgroup Report

0364: An Appeals Process for Entry. Capacity Manifest Errors. Stage 02: Workgroup Report Stage 02: What stage is this document in the process? : An Appeals Process for Entry u Capacity Manifest Errors This proposal would add an Appeal process to the Entry Capacity Manifest Error Process proposed

More information

Joint Office of Gas Transporters 0262: Treatment of Capacity affected by Force Majeure

Joint Office of Gas Transporters 0262: Treatment of Capacity affected by Force Majeure Draft Modification Report Treatment of Capacity affected by Force Majeure Modification Reference Number 0262 Version 1.0 This Draft Modification Report is made pursuant to Rule 9.1 of the Modification

More information

Joint Office of Gas Transporters 0231: Changes to the Reasonable Endeavours Scheme to better incentivise the detection of Theft

Joint Office of Gas Transporters 0231: Changes to the Reasonable Endeavours Scheme to better incentivise the detection of Theft Workstream Report Changes to the Reasonable Endeavours Scheme Modification Reference Number 0231 Version 3.0 This Workstream Report is presented for the UNC Modification Panel's consideration. The Distribution

More information

Joint Office of Gas Transporters 0231V: Changes to the Reasonable Endeavours Scheme to better incentivise the detection of theft

Joint Office of Gas Transporters 0231V: Changes to the Reasonable Endeavours Scheme to better incentivise the detection of theft CODE MODIFICATION PROPOSAL No 0231V Changes to the Reasonable Endeavours Scheme to better incentivise the detection of Theft Version 1.0 Date: 20/11/2009 Proposed Implementation Date: Urgency: TBC Non

More information

Addressing under-allocation of flows from BBL arising from misalignment of reference conditions

Addressing under-allocation of flows from BBL arising from misalignment of reference conditions Stage 01: Modification 0560 Urgent: Addressing under-allocation of flows from BBL arising from misalignment of reference conditions At what stage is this document in the process? 01 Modification 02 03

More information

Joint%Office%of%Gas%Transporters%2014%Report%

Joint%Office%of%Gas%Transporters%2014%Report% Code%Administration%Code%of%Practice%KPIs% Joint%Office%of%Gas%Transporters%2014%Report% As part of its energy Codes Governance Review (CGR), Ofgem proposed that a Code of Practice, (the CACoP) be established

More information

Daily Meter Reading Simplification

Daily Meter Reading Simplification Stage 02: At what stage is this document in the process? / A: Daily Meter Reading Simplification u It is proposed that that the provisions of UNC TPD Section M4 be modified to reflect a number of changes

More information

UNC 0680: UNC Changes as a Consequence of no deal United Kingdom Exit from the European Union. UNC Modification

UNC 0680: UNC Changes as a Consequence of no deal United Kingdom Exit from the European Union. UNC Modification UNC Modification At what stage is this document in the process? UNC 0680: UNC Changes as a Consequence of no deal United Kingdom Exit from the European Union Purpose of Modification: A number of minor

More information

UNC Text Allocation Register

UNC Text Allocation Register UNC Allocation Register This register identifies the text provider, in column G, for each modification. Column F '' shows who is next using the numerical order in the Transporter list at the top of this

More information

Guidelines document for the Energy Settlement Performance Assurance Regime

Guidelines document for the Energy Settlement Performance Assurance Regime Guidelines document for the Energy Settlement Performance Assurance Regime The Performance Assurance Framework is limited to energy once it has entered the Local Distribution Zone. Gas transported through

More information

Performance Assurance Framework Document for the (Gas) Energy Settlement Performance Assurance Scheme

Performance Assurance Framework Document for the (Gas) Energy Settlement Performance Assurance Scheme Performance Assurance Framework Document for the (Gas) Energy Settlement Performance Assurance Scheme Prepared and maintained by the Uniform Network Code Committee or any relevant Sub-committee Version

More information

CODE MODIFICATION PROPOSAL No 0262 Treatment of Capacity affected by Force Majeure Version 4.0 Date: 18/08/2009. Non Urgent

CODE MODIFICATION PROPOSAL No 0262 Treatment of Capacity affected by Force Majeure Version 4.0 Date: 18/08/2009. Non Urgent CODE MODIFICATION PROPOSAL No 0262 Treatment of Capacity affected by Force Majeure Version 4.0 Date: 18/08/2009 Proposed Implementation Date: 01/10/09 Urgency: Non Urgent 1 The Modification Proposal a)

More information

Joint Office of Gas Transporters 0321V: Code Governance Review: Approach to environmental assessments within the UNC

Joint Office of Gas Transporters 0321V: Code Governance Review: Approach to environmental assessments within the UNC Modification Report Code Governance Review: Approach to environmental assessments within the UNC Modification Reference Number 0321V Version 2.0 This Modification Report is made pursuant to Rule 9.3.1

More information

UNC 0636B: Updating the parameters for the NTS Optional Commodity Charge. UNC Modification

UNC 0636B: Updating the parameters for the NTS Optional Commodity Charge. UNC Modification UNC Modification UNC 0636B: Updating the parameters for the NTS Optional Commodity Charge At what stage is this document in the process? Purpose of Modification: To update the parameters used in the derivation

More information

British Gas Consultation Response to the 2014 Allocation of Unidentified Gas Statement for 2015/16

British Gas Consultation Response to the 2014 Allocation of Unidentified Gas Statement for 2015/16 British Gas Consultation Response to the 2014 Allocation of Unidentified Gas Statement for 2015/16 11 th June 2014 Inaccurate calculation of CSEP consumption The CSEP aggregate current AQ is not an accurate

More information

2. User Pays a) Classification of the Proposal as User Pays or not and justification for classification

2. User Pays a) Classification of the Proposal as User Pays or not and justification for classification Tim Davies Joint Office By email to enquiries@gasgovernance.co.uk 9 th February 2011 Dear Tim SUBJECT: Total Gas & Power Ltd (TGP) consultation response to Modifications 0339, 0339A & 0340. Total Gas &

More information

0338 Remove the UNC requirement for a gas trader User to hold a Gas Shipper Licence

0338 Remove the UNC requirement for a gas trader User to hold a Gas Shipper Licence Code Logo to be inserted here Stage 01: Proposal What stage is this document in the process? Remove the UNC requirement for a gas trader User to hold a Gas Shipper Licence Provision within the Uniform

More information

Record'of'Determinations:''Panel'Meeting'19'September'2013''!!''

Record'of'Determinations:''Panel'Meeting'19'September'2013''!!'' Record'of'Determinations:''Panel'Meeting'19'September'2013''!!'' Modification Vote'Outcome Shipper'Voting'Members Transporter'Voting'Members Consumer' Representativ e Determination'Sought AB PB'for' AG

More information

Large NDM Load Factors Presentation to DN Charging Methodology Forum

Large NDM Load Factors Presentation to DN Charging Methodology Forum Large NDM Load Factors Presentation to DN Charging Methodology Forum 28th June 2016 Objective Project Nexus Implementation requires some changes to the Load Factor formula used for Large NDM EUCs The following

More information

UNC 0623: Governance Arrangements for Alternatives to Self-Governance Modification Proposals. UNC Workgroup Report

UNC 0623: Governance Arrangements for Alternatives to Self-Governance Modification Proposals. UNC Workgroup Report UNC Workgroup Report At what stage is this document in the process? UNC 0623: Governance Arrangements for Alternatives to Self-Governance Modification Proposals Purpose of Modification: This is a Governance

More information

0349 Introduction of a Force Majeure. Capacity Management Arrangement. Stage 01: Proposal

0349 Introduction of a Force Majeure. Capacity Management Arrangement. Stage 01: Proposal Stage 01: Proposal What stage is this document in the process? Introduction of a Force Majeure Capacity Management Arrangement This modification proposal addresses the impact upon Users NTS Entry Capacity

More information

the "AUGE Document"is the document entitled 'Framework for the appointment of an Allocation of Unidentified Gas Expert' which sets out:

the AUGE Documentis the document entitled 'Framework for the appointment of an Allocation of Unidentified Gas Expert' which sets out: Draft 2.1: 1 July 2014 MODIFICATION 0473 PROJECT NEXUS - ALLOCATION OF UNIDENTIFIED GAS Dentons 1/7/14 08:14 Deleted: 1 Dentons 1/7/14 19:33 Deleted: 0 Dentons 1/7/14 08:14 Deleted: 13 May Proposed legal

More information

DN Charging Methodology Forum (DNCMF) Minutes Tuesday 27 September 2016 Consort House, 6 Homer Road, Solihull, B91 3QQ

DN Charging Methodology Forum (DNCMF) Minutes Tuesday 27 September 2016 Consort House, 6 Homer Road, Solihull, B91 3QQ DN Charging Methodology Forum (DNCMF) Minutes Tuesday 27 September 2016 Attendees Bob Fletcher (Chair) (BF) Joint Office Helen Cuin (Secretary) (HC) Joint Office Colette Baldwin (CB) EON Craig Neilson

More information

CODE MODIFICATION PROPOSAL No 0230 Amendment to the QSEC and AMSEC Auction Timetables Version 2.0 Date: 15/10/2008. Non Urgent

CODE MODIFICATION PROPOSAL No 0230 Amendment to the QSEC and AMSEC Auction Timetables Version 2.0 Date: 15/10/2008. Non Urgent CODE MODIFICATION PROPOSAL No 0230 Amendment to the QSEC and AMSEC Auction Timetables Version 2.0 Date: 15/10/2008 Proposed Implementation Date: 01/04/2009 Urgency: Non Urgent 1 The Modification Proposal

More information

CDSP SERVICE DOCUMENT UK LINK MANUAL UK LINK MANUAL FRAMEWORK DOCUMENT

CDSP SERVICE DOCUMENT UK LINK MANUAL UK LINK MANUAL FRAMEWORK DOCUMENT CDSP SERVICE DOCUMENT UK LINK MANUAL UK LINK MANUAL FRAMEWORK DOCUMENT Version: 1.0 Effective date: 15 December 2016 1 General 1.1 Introduction 1.1.1 This document (Document) is the UK Link Manual referred

More information

MOD 329 Analysis of & Potential Changes to the UNC Rules Governing the Submission of SHQs - Including Transportation Price Incentivising Solution.

MOD 329 Analysis of & Potential Changes to the UNC Rules Governing the Submission of SHQs - Including Transportation Price Incentivising Solution. MOD 329 Analysis of & Potential Changes to the UNC Rules Governing the Submission of SHQs - Including Transportation Price Incentivising Solution. Joel Martin / Denis Aitchison. 10 th January 2011 MOD

More information

!"#$%&'$(')"*"%+,-.*,$-/0'1.-"2'3""*,-45'67'3.8'9:66''!!''

!#$%&'$(')*%+,-.*,$-/0'1.-2'3*,-45'67'3.8'9:66''!!'' !"#$%&'$(')"*"%+,-.*,$-/0'1.-"2'3""*,-45'67'3.8'9:66''!!'' 3$&,(,#.*,$- K$*"'M

More information

LDZ Exit Capacity NTS (ECN) Charges March 2017 Craig Neilson UK GAS DISTRIBUTION

LDZ Exit Capacity NTS (ECN) Charges March 2017 Craig Neilson UK GAS DISTRIBUTION LDZ Exit Capacity NTS (ECN) Charges March 2017 Craig Neilson Purpose and scope Continuation of GND ambition to add more value to DNCMF with a series of deep dives Previous topics: DN Entry Pricing (Sep-16)

More information

Purpose of Modification: The Modification proposes to amend BSC Section K to allow ELEXON to carry over BSC Seasonal GC/DC.

Purpose of Modification: The Modification proposes to amend BSC Section K to allow ELEXON to carry over BSC Seasonal GC/DC. BSC Modification Proposal Form P358 At what stage is this document in the process? 01 Modification 02 Workgroup Report Roll over of BSC Seasonal GC/DC 03 04 Draft Modification Report Final Modification

More information

Modification Proposal 0116V/0116VA/0116VB/0116VC/0116VD: Reform of the NTS Offtake Arrangements

Modification Proposal 0116V/0116VA/0116VB/0116VC/0116VD: Reform of the NTS Offtake Arrangements Perrie Street Dundee DD2 2RD Modification Panel Secretary Joint Office of Gas Transporters Ground Floor Red 51 Homer Road Solihull West Midlands B91 3QJ 6 December 2006 Dear Julian Modification Proposal

More information

2018 / 19 Indicative Statement. 150-day notice of transportation charges effective from 1 st April 2018

2018 / 19 Indicative Statement. 150-day notice of transportation charges effective from 1 st April 2018 / 19 Indicative Statement 150-day notice of transportation charges effective from 1 st April Indicative Notice of LDZ Transportation Charges from 1 April 1. Introduction This notice provides indicative

More information

Variation Request. Modification 0510 Reform of Gas Allocation Regime at GB Interconnection Points

Variation Request. Modification 0510 Reform of Gas Allocation Regime at GB Interconnection Points Variation Request Modification 0510 Reform of Gas Allocation Regime at GB Interconnection Points Date: 3 rd July 2015 The Proposer, National Grid NTS, requests a variation to this Modification, pursuant

More information

Inclusion and Amendment of Entry Incremental Capacity Release NPV test in UNC

Inclusion and Amendment of Entry Incremental Capacity Release NPV test in UNC UNC Modification At what stage is this document in the process? UNC 0667 (Urgent): Inclusion and Amendment of Entry Incremental Capacity Release NPV test in UNC Purpose of Modification: This Modification

More information

Indicative Notice of Change to Transportation Charges. From 1 st April 2016

Indicative Notice of Change to Transportation Charges. From 1 st April 2016 Indicative Notice of Change to Transportation Charges 30 th October 2015 Table of contents Introduction... 3 Indicative Transportation Charges... 3 Reason for the price change... 3 Uncertainties and assumptions...

More information

Smart metering Implementation Programme

Smart metering Implementation Programme Smart metering Implementation Programme A consultation on a draft Statutory Instrument the Electricity and Gas (Prohibition of Communications Activities) Order 2012 10 February 2012 Department of Energy

More information

UNC 0686 (Urgent): Removal of the NTS Optional Commodity Rate with adequate notice. UNC Modification

UNC 0686 (Urgent): Removal of the NTS Optional Commodity Rate with adequate notice. UNC Modification UNC Modification At what stage is this document in the process? UNC 0686 (Urgent): Removal of the NTS Optional Commodity Rate with adequate notice Purpose of Modification: Removal of the NTS Optional Commodity

More information

Consultation on Capacity Methodology Statements. Conclusions Report

Consultation on Capacity Methodology Statements. Conclusions Report Consultation on Capacity Methodology Statements Conclusions Report 30 th May 2017 National Grid Gas Transmission Page 1 30 th May 2017 Executive Summary Introduction National Grid Gas plc s ( National

More information

References to Ratchet Charges in the IGT UNC re UNC Review Group Background

References to Ratchet Charges in the IGT UNC re UNC Review Group Background References to Ratchet Charges in the IGT UNC re UNC Review Group 0619 1. Background From the initial release of the IGT UNC up to the version released for Single Service under IGT039, the only reference

More information

Inclusion and Amendment of Entry Incremental Capacity Release NPV test in UNC

Inclusion and Amendment of Entry Incremental Capacity Release NPV test in UNC UNC Modification At what stage is this document in the process? UNC 0667: Inclusion and Amendment of Entry Incremental Capacity Release NPV test in UNC Purpose of Modification: This Modification seeks

More information

Query relating to the use of historic data to calculate the Balancing Number Calculation

Query relating to the use of historic data to calculate the Balancing Number Calculation Query relating to the use of historic data to calculate the Balancing Number Calculation Whilst the Balancing Number has been calculated using the training period, it would appear that an old data set

More information

EU Codes Legal Roadmap

EU Codes Legal Roadmap EU Codes Legal Roadmap 1 Purpose 1.1 This note outlines the legal steps leading up to and following 1 October 2015 to implement the respective EU Codes and Guidelines, which comprise so far: Commission

More information

EU Capacity Regulations Capacity Allocation Mechanisms with Congestion Management Procedures

EU Capacity Regulations Capacity Allocation Mechanisms with Congestion Management Procedures Stage 02: Workgroup Report At what stage is this document in the process? : EU Capacity Regulations Capacity Allocation Mechanisms with Congestion Management Procedures This modification seeks to facilitate

More information

Inclusion and Amendment of Entry Incremental Capacity Release NPV test in UNC

Inclusion and Amendment of Entry Incremental Capacity Release NPV test in UNC UNC At what stage is this document in the process? UNC 0XXX: Inclusion and Amendment of Entry Incremental Capacity Release NPV test in UNC Purpose of : This modification seeks to insert the Net Present

More information

Analysis using historic SAP prices

Analysis using historic SAP prices Analysis using historic SAP prices Changes to SAP October 2012 to November 2016 Gas prices as demonstrated by System Average Price (SAP) trends in the last four years have fluctuated, while trending towards

More information

DN Charging Methodology Forum (DNCMF) Minutes Monday 09 January 2017 Consort House, 6 Homer Road, Solihull, B91 3QQ

DN Charging Methodology Forum (DNCMF) Minutes Monday 09 January 2017 Consort House, 6 Homer Road, Solihull, B91 3QQ DN Charging Methodology Forum (DNCMF) Minutes Monday 09 January 2017 Consort House, 6 Homer Road, Solihull, B91 3QQ Attendees Bob Fletcher (Chair) (BF) Joint Office Helen Cuin (Secretary) (HC) Joint Office

More information

UNC Workgroup 0565 Minutes Central Data Service Provider: General framework and obligations Tuesday 01 December Homer Road, Solihull, B91 3LT

UNC Workgroup 0565 Minutes Central Data Service Provider: General framework and obligations Tuesday 01 December Homer Road, Solihull, B91 3LT UNC Workgroup 0565 Minutes Central Data Service Provider: General framework and obligations Tuesday 01 December 2015 Attendees Bob Fletcher (Chair) (BF) Joint Office Helen Cuin (Secretary) (HCu) Joint

More information

Indicative Notice of Change to Transportation Charges. From 1 st April 2018

Indicative Notice of Change to Transportation Charges. From 1 st April 2018 Indicative Notice of Change to Transportation Charges From 1 st April 2018 31 st October 2017 Table of contents Contents Introduction... 3 Our Allowed Revenue and the impact of NTS charges... 3 Indicative

More information

UK LINK Committee Minutes Thursday 10 May 2007

UK LINK Committee Minutes Thursday 10 May 2007 UK LINK Committee Minutes Thursday 10 May 2007 held by teleconference Attendees John Bradley (JB) Joint Office Mike Berrisford (MiB) Joint Office Alexandra Crump (AC) E.ON UK plc Andrew Keogh (AK) e=mc

More information

LDZ Shrinkage Quantity Initial Proposals Formula Year 2012/13

LDZ Shrinkage Quantity Initial Proposals Formula Year 2012/13 LDZ Shrinkage Quantity Initial Proposals Formula Year 2012/13 Scotia Gas Networks 26 th September 2012 2008 Scotia Gas Networks plc all rights reserved September 2012 Scotia Gas Networks LDZ Shrinkage

More information

The Entry Capacity Substitution Methodology Statement

The Entry Capacity Substitution Methodology Statement Issue 6.06.2 Revision ApprovedCons ultation Draft The Entry Substitution Methodology Statement Effective from 27 th February1 st November 2015 Page 1 of 32 The Entry Substitution Methodology Statement

More information

European Update. 5 January 2017

European Update. 5 January 2017 European Update 5 January 2017 1. General Update 2 Code Status Update Code Current Status Implementation date CAM amendments Incremental Capacity EP/Council Scrutiny UNC MOD 598 raised EP/Council Scrutiny

More information

Entry Capacity Substitution Methodology Statement

Entry Capacity Substitution Methodology Statement Issue Revision 7.0 Approved Entry Substitution Methodology Statement Effective from 1 st November 2015 Page 1 of 30 ENTRY CAPACITY SUBSTITUTION METHODOLOGY STATEMENT Document Revision History Version/

More information

CMP228 Definition of Qualified Bank

CMP228 Definition of Qualified Bank Stage 06: Final CUSC Modification Self- Governance Report Connection and Use of System Code CMP228 Definition of Qualified Bank 01 02 03 What stage is this document at? Initial Written Assessment Workgroup

More information

George Moran, British Gas 28th August 2015

George Moran, British Gas 28th August 2015 CMP 251: Removing the error margin in the cap on total TNUoS recovered by generation and introducing a new charging element to TNUoS to ensure compliance with European Commission Regulation 838/2010 George

More information

Notice of Indicative Gas Transmission Transportation Charges effective from 1 April November 2018

Notice of Indicative Gas Transmission Transportation Charges effective from 1 April November 2018 Notice of Indicative Gas Transmission Transportation Charges effective from 1 April 2019 2 November 2018 National Grid Notice of Indicative NTS Charges 1 April 2019 0 Contents 1. Introduction 2 Basis of

More information

Final Gas Distribution Transportation Charges

Final Gas Distribution Transportation Charges Final Gas Distribution Transportation Charges From 1 April 2018 For East of England, London, North West and West Midlands Gas Distribution Networks Issued 31 January 2018 Contents Introduction... 3 Average

More information

UNC Workgroup 0597 Minutes Rules for the release of incremental capacity at Interconnection Points Tuesday 13 December 2016

UNC Workgroup 0597 Minutes Rules for the release of incremental capacity at Interconnection Points Tuesday 13 December 2016 UNC Workgroup 0597 Minutes Rules for the release of incremental capacity at Interconnection Points Tuesday 13 December 2016 at Energy UK, Charles House, 5-11 Regent Street, London SW1Y 4LR Attendees Chris

More information

UK LINK Committee Minutes Thursday 12 April 2007

UK LINK Committee Minutes Thursday 12 April 2007 UK LINK Committee Minutes Thursday 12 April 2007 held at Elexon, 350, Euston Road, London Attendees John Bradley (JB) Lorna Dupont (LD) Andrew Keogh (AT) e=mc 2 (for Shell) Caroline Purcell (for Transporters)

More information

LDZ Shrinkage Quantity Initial Proposals Formula Year 2010/11

LDZ Shrinkage Quantity Initial Proposals Formula Year 2010/11 LDZ Shrinkage Quantity Initial Proposals Formula Year 2010/11 Scotia Gas Networks 1 st January 2010 2008 Scotia Gas Networks plc all rights reserved 1 st January 2010 Scotia Gas Networks LDZ Shrinkage

More information

Assessment Procedure Consultation Responses. P318 Change of Party ID/Company Number Through Enabling Assignment

Assessment Procedure Consultation Responses. P318 Change of Party ID/Company Number Through Enabling Assignment Assessment Procedure Consultation Change of Party ID/Company Number Through Enabling Assignment Phase Initial Written Assessment This Assessment Procedure Consultation was issued on 9 July 2015, with responses

More information

CMP223 Arrangements for Relevant Distributed Generators Under the Enduring Generation User Commitment

CMP223 Arrangements for Relevant Distributed Generators Under the Enduring Generation User Commitment Stage 04: Code Administrator Consultation Connection and Use of System Code (CUSC) CMP223 Arrangements for Relevant Distributed Generators Under the Enduring Generation User Commitment 01 02 03 04 05 What

More information

The Entry Capacity Substitution Methodology Statement

The Entry Capacity Substitution Methodology Statement Issue 5.26.1 Revision Informal Consultation Draft The Entry Substitution Methodology Statement Effective from 2 nd February1 st September 2015 Page 1 of 31 ENTRY CAPACITY SUBSTITUTION METHODOLOGY STATEMENT

More information

UK Link Committee Meeting. Implementation Plan Summary. UK-LINK Change Requests. April 2014

UK Link Committee Meeting. Implementation Plan Summary. UK-LINK Change Requests. April 2014 UK Link Meeting Plan UK-LINK s April 2014 Page 1 of 7 Glossary Of Terms and erences The following Terms and erences allow for an easier understanding of the vocabulary used in the implementation plan.

More information

2019/20 Indicative Statement

2019/20 Indicative Statement /20 Indicative Statement 150-day notice of transportation charges effective from 1 st April Indicative Notice of LDZ Transportation Charges from 1 April 1. Introduction This notice provides indicative

More information

Change Management Committee Meeting. Implementation Plan Summary. UK-LINK Change Requests

Change Management Committee Meeting. Implementation Plan Summary. UK-LINK Change Requests Management Committee Meeting Implementation Plan UK-LINK Requests 11 th May 017 Page 1 of 15 Glossary Of Terms and erences The following Terms and erences allow for an easier understanding of the vocabulary

More information

Uniform Network Code modification proposals 0023, 0031 and 0041: Reassessment of User Unsecured Credit Limits

Uniform Network Code modification proposals 0023, 0031 and 0041: Reassessment of User Unsecured Credit Limits Bringing choice and value to customers The Joint Office, Transporters, Shippers and other interested parties Our Ref: Net/Cod/Mod/023-31-41 Direct Dial: 020 7901 7355 Email: modifications@ofgem.gov.uk

More information

Customer Settlement Error Claims Process Guidance Document

Customer Settlement Error Claims Process Guidance Document Guidance Document all rights reserved CSEC - 1 Version 2 Document Control Version Date Reason for Change 2 1 April 2014 Updated following implementation of modification 0565 Central Data Service Provider:

More information

Changes to the Stages of Emergency Resulting from Changes Introduced by Exit Reform v0.1. Draft Legal Text

Changes to the Stages of Emergency Resulting from Changes Introduced by Exit Reform v0.1. Draft Legal Text TPD Section Q 1.1 1.2 1.3 Emergency Procedures Draft Legal Text 1.3.1 "Emergency Procedures" means in relation to a Network Gas Supply Emergency, the document issued by National Grid NTS entitled 'Network

More information

CMP288: Explicit charging arrangements for customer delays and backfeeds.

CMP288: Explicit charging arrangements for customer delays and backfeeds. CUSC Modification Proposal Form CMP288: Explicit charging arrangements for customer delays and backfeeds. At what stage is this document in the process? 01 02 Proposal Form Workgroup Consultation 03 Workgroup

More information

MOFFAT DESIGNATED ARRANGEMENTS NTS EXIT POINT AT MOFFAT

MOFFAT DESIGNATED ARRANGEMENTS NTS EXIT POINT AT MOFFAT MOFFAT DESIGNATED ARRANGEMENTS NTS EXIT POINT AT MOFFAT 1 Introduction 1.1 This Document sets out the Moffat Designated Arrangements pursuant to Section A1.4 of the European Interconnection Document which

More information

UNIFORM NETWORK CODE OFFTAKE ARRANGEMENTS DOCUMENT SECTION H NTS LONG TERM DEMAND FORECASTING 1

UNIFORM NETWORK CODE OFFTAKE ARRANGEMENTS DOCUMENT SECTION H NTS LONG TERM DEMAND FORECASTING 1 1 General Joint Office of Gas Transporters UNIFORM NETWORK CODE OFFTAKE ARRANGEMENTS DOCUMENT 1.1 Introduction SECTION H NTS LONG TERM DEMAND FORECASTING 1 1.1.1 This Section H sets out requirements for

More information

European Workgroup. European Workgroup 3 rd April 2014

European Workgroup. European Workgroup 3 rd April 2014 European Workgroup Place your chosen image here. The four corners must just cover the arrow tips. For covers, the three pictures should be the same size and in a straight line. European Workgroup 3 rd

More information

Direct Dial: August Our Ref: MP No P125

Direct Dial: August Our Ref: MP No P125 Direct Dial: 020 7901 7412 The National Grid Company, BSC Signatories and Other Interested Parties 08 August 2003 Our Ref: MP No P125 Dear Colleague Modification to the Balancing and Settlement Code (

More information

*via teleconference. Page 1 of 5

*via teleconference. Page 1 of 5 UNC Workgroup 0647 Minutes Opening Class 1 reads to Competition (including IGT Modification 119 Opening Class 1 read services on IGT Meter Supply Points to Competition) Monday 17 December 2018 at Elexon,

More information

Gas Meter Charges. Effective from ***

Gas Meter Charges. Effective from *** ESP PIPELINES LTD Gas Meter Charges Effective from *** 1. Contents 1. Contents... 1 2. Introduction... 2 3. Persons Entitled to Transport Gas... 2 4. Standards of Service... 2 5. ESPP Network Code... 3

More information

Record of Determinations: Panel Meeting 17 August 2017

Record of Determinations: Panel Meeting 17 August 2017 Record of Determinations: Panel Meeting 17 August 2017 Modification Vote Outcome Shipper Voting Members Transporter Voting Members IGT Voting Member Consumer Voting Member Determination Sought AG AM AL

More information

Report for Modification Panel January 2006 Transmission Workstream

Report for Modification Panel January 2006 Transmission Workstream Meetings Held 5 January 2006 Planned 2 February 2006 Matters for Panel s Attention None Modifications Activity Report for Modification Panel January 2006 Transmission Workstream Modification Proposals

More information

Modification Report Re-assessment of User Unsecured Credit Limits Modification Reference Number 0041 Version 2.0

Modification Report Re-assessment of User Unsecured Credit Limits Modification Reference Number 0041 Version 2.0 Modification Report Re-assessment of User Unsecured Credit Limits Modification Reference Number 0041 Version 2.0 This Modification Report is made pursuant to Rule 7.3 of the Modification Rules and follows

More information

PRIDe Techniques Low Level Example. 8 May 2018

PRIDe Techniques Low Level Example. 8 May 2018 PRIDe Techniques Low Level Example 8 May 2018 Content Overview Risk description PAF model Worked example Lag in DM read submission progress Questions for consideration Techniques available Gemserv 2 Overview

More information

Record of Determinations: Panel Meeting 18 and 19 July 2018

Record of Determinations: Panel Meeting 18 and 19 July 2018 Record of Determinations: Panel Meeting 18 and 19 July 2018 Modification Vote Outcome Shipper s Transporter s IGT Determination Sought AG DF GW JCh RF SM CW DL HC JF RP NR JA JCo 0658 (Urgent) - CDSP to

More information

CMP223 Arrangements for

CMP223 Arrangements for Stage 02: 03: Workgroup Consultation Report Connection and and Use Use of of System Code (CUSC) CMP223 Arrangements for Relevant Distributed Generators Under the Enduring Generation User Commitment What

More information

Methodology for LDZ System Entry Commodity Charge Explanatory Note

Methodology for LDZ System Entry Commodity Charge Explanatory Note Methodology for LDZ System Entry Commodity Charge Explanatory Note Determination of Unit Rate for Opex Costs This unit rate will be determined from the forecast operating costs relating to the entry facilities

More information

Indicative Interruption Requirements

Indicative Interruption Requirements Indicative Interruption Requirements March 2010 Ad-hoc Invitation Wales & West House Spooner Close Celtic Springs Newport NP10 8FZ www.wwutilities.co.uk Document Control Version Date Reason for Change

More information

P294 Addition of Offshore Transmission System and OTSUA to the definition of the Total System

P294 Addition of Offshore Transmission System and OTSUA to the definition of the Total System Stage 03: Assessment Report What stage is this document in the process? Addition of Offshore Transmission System and OTSUA to the definition of the Total System Amend the BSC definition of Total System

More information

Tariff for Virtual Reverse Flow Product at Moffat

Tariff for Virtual Reverse Flow Product at Moffat Tariff for Virtual Reverse Flow Product at Moffat DOCUMENT TYPE: REFERENCE: DATE PUBLISHED: FURTHER INFORMATION: Decision Paper CER/11/190 11 th November 2011 cjohnston@cer.ie The Commission for Energy

More information

CAM Modification 500. CAM-CMP Development Workgroup 2

CAM Modification 500. CAM-CMP Development Workgroup 2 CAM Modification 500 CAM-CMP Development Workgroup 2 CMP processes - CMP/CAM interaction TSO oversell Oversubscription and Buyback (Risk & reward) TSO buyback TSO Additional capacity Unsold Technical capacity

More information

Structure of Charges project WPD workshop

Structure of Charges project WPD workshop Structure of Charges project WPD workshop 1 Agenda Background to project Summary of proposed charging methodology Changes since October stakeholder meeting Scaling demand charges to required revenue Alternatives

More information

CMP282: The effect Negative Demand has on Zonal Locational Demand Tariffs. CUSC Modification Proposal Form

CMP282: The effect Negative Demand has on Zonal Locational Demand Tariffs. CUSC Modification Proposal Form CUSC Modification Proposal Form CMP282: The effect Negative has on Zonal Locational Tariffs At what stage is this document in the process? 01 02 Proposal Form Workgroup Consultation 03 Workgroup Report

More information

UNC European Workgroup Minutes Thursday 06 February 2014 Energy Networks Association, 52 Horseferry Road, London SW1P 2AF

UNC European Workgroup Minutes Thursday 06 February 2014 Energy Networks Association, 52 Horseferry Road, London SW1P 2AF UNC European Workgroup Minutes Thursday 06 February 2014 Energy Networks Association, 52 Attendees Les Jenkins (Chair) (LJ) Joint Office Lorna Dupont (Secretary) (LD) Joint Office Alison Chamberlain* (AC)

More information

DRAFT January Modelling Approach: Spring 2019

DRAFT January Modelling Approach: Spring 2019 Modelling Approach: Spring 2019 Ahead of the commencement of the annual process to develop the End User Category (EUC) demand models required by the NDM algorithms, it is customary to prepare a note for

More information

CMP291. Garth Graham for SSE Generation Ltd. CUSC Panel 23 rd February 2018

CMP291. Garth Graham for SSE Generation Ltd. CUSC Panel 23 rd February 2018 CMP291 The open, transparent, non discriminatory and timely publication the harmonised rules for grid connection (in accordance with the RfG, DCC and HVDC) and the harmonised rules on system operation

More information

1.0 Introduction and Status Review 1.1. Approval of minutes (06 December 2018)

1.0 Introduction and Status Review 1.1. Approval of minutes (06 December 2018) UNC Workgroup 0667 Minutes Inclusion and Amendment of Entry Incremental Capacity Release NPV test in UNC Tuesday 08 January 2019 at Radcliffe House, Blenheim Court, Warwick Road, Solihull B91 2AA Attendees

More information

Summary Principal terms

Summary Principal terms The legal stuff Bristol Energy and You Thank you for choosing Bristol Energy as your new energy provider. Terms and Conditions may seem like boring legal stuff, but there s lots of important information

More information

General Terms and Conditions for Domestic Customers

General Terms and Conditions for Domestic Customers General Terms and Conditions for Domestic Customers Applicable from 1 December 2017 Contents 1. About us... 1 2. Contacting us... 2 3. General... 4 4. Definitions... 4 5. Standards of service... 11 6.

More information

P344 Project TERRE implementation into GB market arrangements

P344 Project TERRE implementation into GB market arrangements Project TERRE implementation into GB market arrangements This Modification seeks to align the Balancing and Settlement Code (BSC) with the European Balancing Project TERRE (Trans European Replacement Reserves

More information

EU CODES - MODIFICATION CORE LEGAL DRAFTING - EXPLANATORY TABLE. European Interconnection Document (EID)

EU CODES - MODIFICATION CORE LEGAL DRAFTING - EXPLANATORY TABLE. European Interconnection Document (EID) Dentons: [31/10/14] EU CODES - MODIFICATION 0500 - CORE LEGAL DRAFTING - EXPLANATORY TABLE European Interconnection Document (EID) Notes 1. The table is based on the legal drafting for Modification 0500

More information

Request for Advice on Cost Recovery for Mandated Smart Metering Infrastructure

Request for Advice on Cost Recovery for Mandated Smart Metering Infrastructure FINAL REPORT Request for Advice on Cost Recovery for Mandated Smart Metering Infrastructure Commissioners Pierce Henderson Spalding 30 November 2010 Reference: EPR0018 Final Report EMBARGO until 22 December

More information

CHAPTER II INTERCONNECTION AGREEMENTS

CHAPTER II INTERCONNECTION AGREEMENTS INT 0326 121023 25 October 2012 Draft CHAPTER II INTERCONNECTION AGREEMENTS 2.1. General Requirements 2.1.1. General Provisions (i) This section of the Network Code aims to provide for the appropriate

More information

Direct Dial: May Your Ref: Our Ref : MP No: P12

Direct Dial: May Your Ref: Our Ref : MP No: P12 Direct Dial: 020-7901 7412 2 May 2002 The National Grid Company, BSC Signatories and Other Interested Parties Your Ref: Our Ref : MP No: P12 Dear Colleague, Modification to the Balancing and Settlement