Unexploded Ordnance (UXO) Risk Management Hazard and Risk Assessments in Offshore European Waters. Lee Gooderham Principal Consultant
|
|
- Collin Charles
- 5 years ago
- Views:
Transcription
1 Unexploded Ordnance (UXO) Risk Management Hazard and Risk Assessments in Offshore European Waters Lee Gooderham Principal Consultant
2 Agenda Introduction Risk tolerability and applying ALARP. Current best practice and risk management framework. Facets to an offshore UXO risk assessment, when implement early and throughout the project life-cycle. Clear outputs from the study to unsure it is a useable operation document for the client.
3 Why consider UXO? - Legislation the main four in the UK Health and Safety Drivers Health & Safety at Work (H&SW) Act 1974 Management of H&SW Regulations 1999 Construction Design and Management Regulations 2007 Corporate Manslaughter and Corporate Homicide Act 2007 The effects of high explosives
4 Defining Hazard and Risk Although hazard and risk are often used interchangeably in everyday vocabulary, it is useful to make a conceptual distinction between a "hazard" and a "risk" as follows: Hazard - the potential for harm arising from an intrinsic property or disposition of something to cause detriment Risk - the chance that someone or something that is valued will be adversely affected in a stipulated way by the hazard Irrespective of the precise definitions, "risk" has two key components: Likelihood or frequency component (representing the extent of the chance or possibility) Consequence or severity component (representing the extent of the adverse impact or danger)
5 Risk Calculation Risk = Probability x Consequence
6 Ordtek s Risk Management Framework Ordtek's UXO Risk Management Framework for the amelioration of UXO risks consists of six interrelated and sequential components, (which are specifically designed to discharge clients legal liabilities to ALARP).
7 As Low As Reasonably Practicable (ALARP)
8 ALARP and Risk Tolerability When applying ALARP for UXO one should consider: ALARP is a conceptual model and its application is not mandated through legislation. Furthermore, there are no legislated quantified boundaries to determine what are tolerable residual risks. Expert judgement based on experience, best practice and benchmarked against similar projects. The nature and level of the risks are comprehensively assessed and the results used transparently determine control measures. The residual risks are not unduly high and considered de minimis. The risks are periodically reviewed to ensure that they still meet the ALARP criteria.
9 Ordtek s Risk Management Framework
10 Stage One Historical Desk Based Hazard Assessment Comprehensive research required, not one source has all of the required data example of project in France. Public archives. Military sources. Historical data to be digitised and georeferenced for spatial mapping.
11 Stage One Historical Desk Based Hazard Assessment Important to subdivide the site based on the UXO threat sources to determine the probability of encounter.
12 Ordtek s Risk Management Framework
13 Stage Two Conceptual Risk Assessment Important to subdivide the site based on the environmental factors to determine UXO burial, UXO migration and the geophysical methods required to detect the UXO threat items.
14 Conceptual Risk Model and Environmental Interaction Detonation Effects Burial from Initial Impact of Bomb or air-delivered mine UXO Burial through natural processes UXO Migration How would a LMB mine, for example, interact with the project site?.
15 Stage Two Conceptual Risk Assessment This risk assessment model is generally considered best practice for assessing risk in the marine environment, although it has been modified where required to ensure it is UXO centric.
16 Ordtek Risk Assessment
17 Geophysical Survey and Mitigation Ahead of Geotechnical Investigation Risk assessment and ALARP test will demonstrate that generally: Probability of UXO encounter is low. Therefore the risk to the geotechnical campaign is low. Level of mitigation required is proportionate to the risk, therefore a lower specification of geophysical campaign is warranted. Client will require survey specification and Data Quality Objectives
18 Ordtek s Risk Management Framework
19 Stage Three Site Investigation Data Review the existing risk assessment and conceptual site model with: Geotechnical data (CPTs etc). Geophysical data. This is undertaken in the knowledge that a Phase One geophysical survey will not be as comprehensive in terms of: Coverage compared with an engineering survey. Sensors deployed - Magnetometer line spacing will be wide circa 50m.
20 Conceptual Risk Model and Environmental Interaction - Refinement Detonation Effects Burial from Initial Impact of Bomb or air-delivered Mine UXO Burial through natural processes UXO Migration How would a LMB mine, for example, interact with the project site?
21 Ordtek Semi Quantitative Risk Assessment (SQRA)
22 Geophysical Survey and Risk Mitigation ahead of engineering areas (WTG boxes and cable corridors) Risk assessment and ALARP test will demonstrate that generally: Client will require survey specification and Data Quality Objectives Probability of UXO encounter is greater due to scale of operations. Given the cost of vessels and program risk, other factors must be considered Level of mitigation required is proportionate to the holistic project risk, therefore a higher specification of geophysical campaign is warranted as relocation or WTG etc not an option.
23 Ordtek s Risk Management Framework
24 UXO Risk Mitigation Recommendations The key output for the client is: Comprehensive data analysis. Robust and transparent risk assessment. Clear and concise recommendations. A mitigation strategy to lower the risk to ALARP and work alongside the project programme and maintenance the integrity of the project. These may include: Geophysical contact avoidance by a realistic safety distance. Geophysical contact investigation. Safety briefings.
D7 Risk Management Policy
D7 Risk Management Policy Purpose and scope The aim of Kelda s policy is to establish and embed effective risk management in normal business process and culture. This will improve Kelda s ability to predict
More informationRISK MANAGEMENT ON USACE CIVIL WORKS PROJECTS
RISK MANAGEMENT ON USACE CIVIL WORKS PROJECTS Identify, Quantify, and 237 217 200 237 217 200 Manage 237 217 200 255 255 255 0 0 0 163 163 163 131 132 122 239 65 53 80 119 27 252 174.59 110 135 120 112
More informationChapter 7: Risk. Incorporating risk management. What is risk and risk management?
Chapter 7: Risk Incorporating risk management A key element that agencies must consider and seamlessly integrate into the TAM framework is risk management. Risk is defined as the positive or negative effects
More informationTOOL #15. RISK ASSESSMENT AND MANAGEMENT
TOOL #15. RISK ASSESSMENT AND MANAGEMENT 1. INTRODUCTION Assessing risks 121 is complex and often requires in-depth expertise and specialist knowledge spanning various policy fields. The purpose of this
More informationMaster Class: Construction Health and Safety: ISO 31000, Risk and Hazard Management - Standards
Master Class: Construction Health and Safety: ISO 31000, Risk and Hazard Management - Standards A framework for the integration of risk management into the project and construction industry, following
More informationAPPLICATION OF LOPA AND SIL ASSESSMENT TO A NEW COMAH PLANT
APPLICATION OF LOPA AND ASSESSMENT TO A NEW COMAH PLANT Jerry Mullins Principal Consultant, Abbott Risk Consulting, Manchester, UK High hazard industries such as those regulated by COMAH face a number
More informationClassification Based on Performance Criteria Determined from Risk Assessment Methodology
OFFSHORE SERVICE SPECIFICATION DNV-OSS-121 Classification Based on Performance Criteria Determined from Risk Assessment Methodology OCTOBER 2008 This document has been amended since the main revision (October
More informationAPPENDIX 1. Transport for the North. Risk Management Strategy
APPENDIX 1 Transport for the North Risk Management Strategy Document Details Document Reference: Version: 1.4 Issue Date: 21 st March 2017 Review Date: 27 TH March 2017 Document Author: Haddy Njie TfN
More informationALARP Guidance Part of the Petroleum Safety Framework and the Gas Safety Regulatory Framework
ALARP Guidance Part of the Petroleum Safety Framework and the Gas Safety Regulatory Framework DOCUMENT TYPE: Policy Proposal Document REFERENCE: CER/15/212 DATE PUBLISHED: 6 October 2015 VERSION 3.0 QUERIES
More informationSafety Risk Assessment for High Hazard Industries: To Quantify or Not To Quantify?
Safety Risk Assessment for High Hazard Industries: To Quantify or Not To Quantify? About ARCADIS ARCADIS was established in the Netherlands more than a century ago Our global reach extends across Europe,
More informationrisk management and assessment for business Risk Reduction Practical Solutions Egyptian Petroleum Ministry, Cairo, Egypt 14 th October 2014
Risktec Solutions risk management and assessment for business Risk Reduction Practical Solutions Egyptian Petroleum Ministry, Cairo, Egypt 14 th October 2014 Gareth Book, Director, Risktec Solutions Risk
More informationBERGRIVIER MUNICIPALITY. Risk Management Risk Appetite Framework
BERGRIVIER MUNICIPALITY Risk Management Risk Appetite Framework APRIL 2018 1 Document review and approval Revision history Version Author Date reviewed 1 2 3 4 5 This document has been reviewed by Version
More informationPART 1 2 HAZARDS, RISKS & SAFETY.
PART 1 2 HAZARDS, RISKS & SAFETY arshad@utm.my 1 Types of Hazards Definition of Risk & Safety Content 2 Hazard 3 Hazards A "source of danger" is a property, a situation, or a state. It is not an event
More informationTangible Assets Threats and Hazards: Risk Assessment and Management in the Port Domain
Journal of Traffic and Transportation Engineering 5 (2017) 271-278 doi: 10.17265/2328-2142/2017.05.004 D DAVID PUBLISHING Tangible Assets Threats and Hazards: Risk Assessment and Management in the Port
More informationINTEGRATING RISK AND EARNED VALUE MANAGEMENT
INTEGRATING RISK AND EARNED VALUE MANAGEMENT A White Paper Contents Introduction... 3 Integrating Risk and Earned Value Management Processes... 3 Using Risk Mitigation to Improve Value... 4 An Integrated
More informationRisk Assessment for Drug Products with Device Components
Risk Assessment for Drug Products with Device Components Khaudeja Bano, M.D. Senior Medical Director, Medical Device Safety Head, Pharmacovigilance and Patient Safety AbbVie Inc. Process consisting of:
More informationReservoir safety risk assessment a new guide
Reservoir safety risk assessment a new guide Mark Morris 1,2, Mike Wallis 1, Alan Brown 3, David Bowles 4, John Gosden 3, Dr Andy Hughes 5, Alex Topple 1, Paul Sayers 6 and Keith Gardiner 7 1 HR Wallingford
More informationClient Risk Solutions Going beyond insurance. Risk solutions for Energy. Oil, Gas and Petrochemical. Start
Client Risk Solutions Going beyond insurance Risk solutions for Energy Oil, Gas and Petrochemical Start Partnering to Reduce Risk AIG s Client Risk Solutions (CRS) partners with organizations to build
More informationUNITED NATIONS SECURITY MANAGEMENT SYSTEM
UNITED NATIONS SECURITY MANAGEMENT SYSTEM Security Policy Manual Chapter IV SECURITY MANAGEMENT SECTION A Policy and Conceptual of Overview of the Security Risk Management Process. Date: 20 April 2009
More informationIntroduction. What is ESG?
Contents Introduction 2 Purpose of this Guide 6 Why reporting on ESG is important 10 Best Practice Recommendations 14 Appendix: Sustainability Reporting Initiatives 20 01 Introduction Environmental, social
More informationJob Safety Analysis Preparation And Risk Assessment
Job Safety Analysis Preparation And Risk Assessment Sample Only Reference CPL_PCR_JSA_Risk_Assessment Revision Number SAMPLE ONLY Document Owner Sample Date 2015 File Location Procedure Revision Date Major
More informationISO/IEC INTERNATIONAL STANDARD. Information technology Security techniques Information security risk management
INTERNATIONAL STANDARD ISO/IEC 27005 Second edition 2011-06-01 Information technology Security techniques Information security risk management Technologies de l'information Techniques de sécurité Gestion
More informationEnvironment Agency pre-application advice incorporating Local Flood Risk Standing Advice from East Lindsey District Council
Environment Agency pre-application advice incorporating Local Flood Risk Standing Advice from East Lindsey District Council Version 1 UNCLASSIFIED We are the Environment Agency. We protect and improve
More informationINTERNATIONAL ASSOCIATION OF INSURANCE SUPERVISORS
Guidance Paper No. 2.2.x INTERNATIONAL ASSOCIATION OF INSURANCE SUPERVISORS GUIDANCE PAPER ON ENTERPRISE RISK MANAGEMENT FOR CAPITAL ADEQUACY AND SOLVENCY PURPOSES DRAFT, MARCH 2008 This document was prepared
More informationClient Risk Solutions Going beyond insurance. Risk solutions for Energy. Chemical. Start
Client Risk Solutions Going beyond insurance Risk solutions for Energy Chemical Start Partnering to Reduce Risk AIG s Client Risk Solutions (CRS) partners with organizations to build long-term relationships
More informationRisk Management Guideline July, 2017
Risk Management Guideline July, 2017 Check the Capital Project Delivery website to ensure this is the current version. Table of Contents PREFACE... 1 SECTION OVERVIEW... 1 SECTION 1 - INTRODUCTION... 2
More informationPRINCE2-PRINCE2-Foundation.150q
PRINCE2-PRINCE2-Foundation.150q Number: PRINCE2-Foundation Passing Score: 800 Time Limit: 120 min File Version: 6.0 Exam PRINCE2-Foundation Version: 6.0 Exam A QUESTION 1 What process ensures focus on
More informationESMA Risk Assessment Work Programme 2017
ESMA Risk Assessment Work Programme 2017 ESMA50-1121423017-286 Table of Contents 1 Summary... 3 2 Introduction... 4 2.1 Objectives of ESMA Risk Assessment... 4 2.2 Coverage... 4 2.2.1 Risk monitoring and
More informationConnecting Risk and Levels of Service at the Region of Peel BY LEANNE BRANNIGAN, THE REGION OF PEEL
TANGIBLE CAPITAL ASSETS Photo: Kai Schreiber Connecting Risk and Levels of Service at the Region of Peel BY LEANNE BRANNIGAN, THE REGION OF PEEL Organizational asset management for municipalities is very
More informationThe Basics of Risk Management
The Basics of Risk Management Greg Sepeda, PE Sigma Consulting Group, Inc. Louisiana Transportation Conference March 1, 2016 The Basics of Risk Management What Why When Who and How? What is Risk? Risk
More informationINTERNATIONAL ASSOCIATION OF INSURANCE SUPERVISORS
Guidance Paper No. 2.2.6 INTERNATIONAL ASSOCIATION OF INSURANCE SUPERVISORS GUIDANCE PAPER ON ENTERPRISE RISK MANAGEMENT FOR CAPITAL ADEQUACY AND SOLVENCY PURPOSES OCTOBER 2007 This document was prepared
More informationAir Partner plc (the Company ) Terms of reference for the Audit and Risk Committee (the Committee )
P a g e 1 1. Membership Air Partner plc (the Company ) Terms of reference for the Audit and Risk Committee (the Committee ) 1.1 The Committee shall comprise at least three members including, where possible,
More informationRisk & Analytics. Trends within Insurance Companies Risk Management. Marc Paasch June Willis Towers Watson. All rights reserved.
Risk & Analytics Trends within Insurance Companies Risk Management Marc Paasch June 2017 2017 Willis Towers Watson. All rights reserved. Key drivers & benefits Outcomes from an analytical approach to own
More informationFISHERIES MEASURES FOR MARINE NATURA 2000 SITES A consistent approach to requests for fisheries management measures under the Common Fisheries Policy
FISHERIES MEASURES FOR MARINE NATURA 2000 SITES A consistent approach to requests for fisheries management measures under the Common Fisheries Policy It is the responsibility of Member States to designate
More informationRisk Management Policy
Risk Management Policy Contents Executive summary... 3 Aim & introduction... 3 Definitions... 3 Consequence... 3 Event... 3 Likelihood... 3 Risk... 4 Risk Appetite... 4 Risk Management... 4 Risk Management
More informationCOMMON SENSE INVESTING A TRULY MODERN APPROACH
COMMON SENSE INVESTING A TRULY MODERN APPROACH A WARM WELCOME At Tier One Capital we pride ourselves on providing each and every one of our clients with a first class investment experience. We position
More informationThe basics of verification. Richard Nott Lloyd s Register EMEA
The basics of verification Richard Nott Lloyd s Register EMEA Introductions Richard Nott Manager, Compliance and Engineering Services Lloyd s Register EMEA Agenda The Offshore Installation (Safety Case)
More informationFCA Pillar 3 Disclosure
FCA Pillar 3 Disclosure Introduction Regulatory Context Evoia Capital LLP ( Evoia or the Firm ) is incorporated in the UK and authorised and regulated by the Financial Conduct Authority ( FCA ). As such,
More informationRisk Management. Seminar June Compiled by: Raaghieb Najjaar, Yaeesh Yasseen & Rashied Small
Risk Management Seminar June 2017 Compiled by: Raaghieb Najjaar, Yaeesh Yasseen & Rashied Small Defining Risk Risk reflects the chance that the actual event may be different than the planned / expected
More informationUSACE Levee Screening Tool application guide and user s manual: Levee Safety Action Classification (LSAC)
USACE Levee Screening Tool application guide and user s manual: Levee Safety Action Classification (LSAC) (Attachment 1 to the USACE LST application guide with user s manual) Chapter 14 Attachment 1. Levee
More informationBraindumps.PRINCE2-Foundation.150.QA
Braindumps.PRINCE2-Foundation.150.QA Number: PRINCE2-Foundation Passing Score: 800 Time Limit: 120 min File Version: 29.1 http://www.gratisexam.com/ I was a little apprehensive at first about an online
More informationRisk Approach to Prioritising Maintenance Risk Factors for Value Management
Transport Research Laboratory Risk Approach to Prioritising Maintenance Risk Factors for Value Management by R Abell CPR966 2/462_155 CLIENT PROJECT REPORT Transport Research Laboratory CLIENT PROJECT
More informationGoodman Group. Risk Management Policy. Risk Management Policy
Goodman Group Contents 1. Overview... 3 1.1 Introduction... 3 1.2 Objectives of the... 3 1.3 Application... 3 1.4 Operative Provisions... 4 2. Risk Management... 5 2.1 Overview of Risk Management... 5
More informationManaging risk appetite for operational and non-financial risks
Managing risk appetite for operational and non-financial risks John Thirlwell IIA, Bodø, 27 May 2013 Agenda What do we mean by operational and nonfinancial risks? What do we mean by risk appetite? A framework
More informationGL ON COMMON PROCEDURES AND METHODOLOGIES FOR SREP EBA/CP/2014/14. 7 July Consultation Paper
EBA/CP/2014/14 7 July 2014 Consultation Paper Draft Guidelines for common procedures and methodologies for the supervisory review and evaluation process under Article 107 (3) of Directive 2013/36/EU Contents
More informationDEFINING BEST PRACTICE IN FLOODPLAIN MANAGEMENT
DEFINING BEST PRACTICE IN FLOODPLAIN MANAGEMENT M Babister 1 M Retallick 1 1 WMAwater, Level 2,160 Clarence Street Sydney Abstract With the upcoming release of the national best practice manual, Managing
More informationRisk Assessment Policy
Risk Assessment Policy Updated: April 2018 Date of next Review: April 2019 Policy Lead: Bursar Checked by: Middle Leadership Team 1. INTRODUCTION Beachborough School will have hazards which if not controlled
More informationNote: This policy incorporates key elements of the former Risk Taking and Assessment Policy (SO-0080).
Risk Assessment Policy Document Title Reference Number Risk Assessment Policy Version Number V2.3 Date of Issue 01/09/06 Latest Revision 17/03/16 Distribution Owner Policy Lead Department All Employees
More informationPosition Statement. Adoption and use of AS
Version 1.1 Approved for release December 2012 1.0 Australian Standard AS 1851 has undergone extensive development and technical enhancement in recent years culminating in the release of the 2012 edition.
More informationChapter-8 Risk Management
Chapter-8 Risk Management 8.1 Concept of Risk Management Risk management is a proactive process that focuses on identifying risk events and developing strategies to respond and control risks. It is not
More informationValue for Money Analysis: Choosing the Best Project Delivery Method. Ken L. Smith, PE, CVS -HDR Engineering, Inc.
Value for Money Analysis: Choosing the Best Project Delivery Method Ken L. Smith, PE, CVS -HDR Engineering, Inc. 1 Overview What is a VfM analysis Why is it used Key VfM components and principles Life
More informationESMA Risk Assessment Work Programme 2018
ESMA Risk Assessment Work Programme 2018 9 February 2018 ESMA20-95-839 Table of Contents 1 Summary... 3 2 Introduction... 4 2.1 Objectives of ESMA Risk Assessment... 4 2.2 Coverage... 4 2.2.1 Risk monitoring
More informationThe IASB s Exposure Draft Hedge Accounting
Date: 11 March 2011 ESMA/2011/89 IASB Sir David Tweedie Cannon Street 30 London EC4M 6XH United Kingdom The IASB s Exposure Draft Hedge Accounting The European Securities and Markets Authority (ESMA) is
More informationEuropean Railway Agency Recommendation on the 1 st set of Common Safety Methods (ERA-REC SAF)
European Railway Agency Recommendation on the 1 st set of Common Safety Methods (ERA-REC-02-2007-SAF) The Director, Having regard to the Directive 2004/49/EC 1 of the European Parliament, Having regard
More informationClient Risk Solutions Going beyond insurance. Risk solutions for the Manufacturing sector. Start
Client Risk Solutions Going beyond insurance Risk solutions for the Manufacturing sector Start Partnering to Reduce Risk Manufacturers are faced with a myriad of challenges including a rapid pace of innovation,
More informationSupervisory Statement SS5/17 Dealing with a market turning event in the general insurance sector. July 2017
Supervisory Statement SS5/17 Dealing with a market turning event in the general insurance sector July 2017 Supervisory Statement SS5/17 Dealing with a market turning event in the general insurance sector
More informationRisk Management Framework
Risk Management Framework Anglican Church, Diocese of Perth November 2015 Final ( Table of Contents Introduction... 1 Risk Management Policy... 2 Purpose... 2 Policy... 2 Definitions (from AS/NZS ISO 31000:2009)...
More informationESMA-EBA Principles for Benchmark-Setting Processes in the EU
ESMA-EBA Principles for Benchmark-Setting Processes in the EU 6 June 2013 2013/659 Date: 6 June 2013 ESMA/2013/659 Table of Contents List of acronyms 3 Principles for Benchmark-Setting Processes in the
More informationIndustrial Accident Risk Assessment Procedures and Risk Reduction Measures
Republic of Latvia Cabinet Regulation No. 131 Adopted 1 March 2016 Industrial Accident Risk Assessment Procedures and Risk Reduction Measures Issued pursuant to Section 11, Paragraph two of the Chemical
More informationAdvancing the Science of Safety. A Holistic Approach To Effective Security Risk Management 3rd Annual IIRSM UAE Branch Symposium / AGM 2 nd May, 2018
A Holistic Approach To Effective Security Risk Management 3rd Annual IIRSM UAE Branch Symposium / AGM 2 nd May, 2018 Introduction What is Security? The state of being free from danger or threat How is
More informationPerpetual s Risk Management Framework
Perpetual s Risk Management Framework Perpetual s Risk Management Framework Context Perpetual Limited (Perpetual) is a diversified financial services firm, listed on the Australian Securities Exchange.
More informationPRINCE2 - Business Case
Created/updated 05/11/17 PRINCE2 - Business Case Downloaded from stakeholdermap.com. Visit Prince2 Templates for more Prince2 downloads. Get a Business Case Mind Map Project Name:
More informationActualtests.PRINCE2Foundation.120questions
Actualtests.PRINCE2Foundation.120questions Number: PRINCE2 Passing Score: 800 Time Limit: 120 min File Version: 4.8 http://www.gratisexam.com/ PRINCE2 Foundation PRINCE2 Foundation written Exam 1. Dump
More informationInfrastructure Prioritization Framework: Considering Resilience in Infrastructure Investment Decisions
Infrastructure Prioritization Framework: Considering Resilience in Infrastructure Investment Decisions The World Bank Infrastructure and Public-Private Partnerships Group February 2017 Policy Maker Drivers
More informationIntroduction to Quantitative Risk Assessment
Introduction to Quantitative Risk Assessment Webinar June 2017 14 June 2017 1 SAFER, SMARTER, GREENER Speakers Speakers Kenny Shaba Phast and Safeti Product Manager with extensive experience in Technical
More informationReliability Risk Analysis
Reliability Risk Analysis and Control August 2, 2012 Andy Rodriquez Director of Reliability Risk Analysis and Control What is Risk? Webster's Collegiate Dictionary Possibility of loss or injury; peril
More informationKidsafe NSW Risk Management Plan. August 2014
Kidsafe NSW Risk Management Plan August 2014 Document Control Document Approval Name & Position Signature Date Document Version Control Version Status Date Prepared By Comments Document Reviewers Name
More informationAppendix L Methodology for risk assessment
Bay of Plenty Regional Policy Statement 347 Appendix L Methodology for risk assessment Compliance with Appendix L means: (a) (b) Use of Steps 1 to 6 below (the default methodology); or Use of a recognised
More informationNIIFL E&S Management Policy. NIIF Group. Strategic Fund
NIIFL E&S Management Policy National Investment and Infrastructure Fund Limited ( NIIFL ), an institution anchored by the Government of India, will act as the investment manager to alternative funds set
More informationSEQWATER PORTFOLIO RISK ASSESSMENT AND MANAGEMENT
SEQWATER PORTFOLIO RISK ASSESSMENT AND MANAGEMENT BARTON MAHER PRINCIPAL STORAGE PLANNING SEQWATER AUSTRALIA THE WHOLE POINT OF RISK ASSESSMENT SEQWATER DOWN UNDER WHERE WE OPERATE One of Australia s largest
More informationRisk Management. Webinar - July 2017
Risk Management Webinar - July 2017 Compiled by: Raaghieb Najjaar, Yaeesh Yasseen & Rashied Small Adapted and Facilitated by: Professor Enslin J. van Rooyen Risk Management - June 2017 2 Defining Risk
More informationCNAM Risk Management for Utility Managers
CNAM 2013 Heather McGinnity PEng. Region of Peel Project Manager Roop Lutchman, PEng. GHD Leader, Business Consulting May 07 th, 2013 Agenda 1. Introduction 2. Risk Management Framework 3. Case Study (Lake
More informationSTANDARDISATION OF RISK ASSESSMENT PROCESS BY MODIFYING THE RISK MATRIX
STANDARDISATION OF RISK ASSESSMENT PROCESS BY MODIFYING THE RISK MATRIX C. S.SatishKumar 1, Dr S. Shrihari 2 1,2 Department of Civil Engineering National institute of technology Karnataka (India) ABSTRACT
More informationENTERPRISE RISK MANAGEMENT (ERM) POLICY Republic Glass Holdings Corporation. Purpose. Goals
Purpose This Enterprise Risk Management Policy (the ERM policy) provides the framework for managing risks across ( RGHC or the Company ). It contains the policies to guide employees, management and the
More informationMethodology and Inputs for the 2017 Valuation: Initial assessment. Technical discussion document for sponsoring employers
NOTE: This document was first circulated to stakeholders in February 2017 as part of the Trustee's preparations for the 2017 valuation. In December 2017, a formal actuarial report was submitted to the
More informationThe Proactive Quality Guide to. Embracing Risk
The Proactive Quality Guide to Embracing Risk Today s Business Uncertainties Are Driving Risk Beyond the Control of Every Business. Best Practice in Risk Management Can Mitigate these Threats The Proactive
More informationAttachment C: How capital expenditure is proposed and approved under the capex IM
ISBN no. 978-1-869455-84-2 Project no. 14.09/16274 Public version Attachment C: How capital expenditure is proposed and approved under the capex IM Transpower capex input methodology review - Proposed
More informationRisk Management Guideline
Risk Management Guideline [Selected Pages] Version 1.1 (August 2012) 1 P a g e 1 Objective This Guideline outlines the processes used at Panoramic Resources Limited (Panoramic) to identify and manage risk
More informationVocabulary of Flood Risk Management Terms
USACE INSTITUTE FOR WATER RESOURCES Vocabulary of Flood Risk Management Terms Appendix A Leonard Shabman, Paul Scodari, Douglas Woolley, and Carolyn Kousky May 2014 2014-R-02 This is an appendix to: L.
More informationThirty-Second Board Meeting Risk Management Policy
Thirty-Second Board Meeting Risk Management Policy 00 Month 2014 Location, Country Page 1 Board Decision THE RISK MANAGEMENT POLICY Purpose: 1. This document, Risk Management Policy (), presents: i) a
More informationPMP EXAMINATION PREP CHAPTER 11 RISK MANAGEMENT. PMP Exam Prep
PMP EXAMINATION PREP CHAPTER 11 RISK MANAGEMENT PMP Exam Prep RISK MANAGEMENT Page 441 Communications Management Process : Contains 7 of the 49 total processes Plan Risk Management Identify Risks Perform
More informationM_o_R (2011) Foundation EN exam prep questions
M_o_R (2011) Foundation EN exam prep questions 1. It is a responsibility of Senior Team: a) Ensures that appropriate governance and internal controls are in place b) Monitors and acts on escalated risks
More informationMyners Principles - Application Principle Best Practice Guidance (CIPFA) Havering Position/Compliance
1. Effective decision-making Administrating authorities should ensure that : (a) Decisions are taken by persons or organisations with the skills, knowledge, advice and resources necessary to make them
More informationIllustrative IPSAS Entity Financial Statements Public Sector Entity (PSE) Year ended 31 December [January 2016]
Illustrative IPSAS Entity Financial Statements Public Sector Entity (PSE) Year ended 31 December [January 2016] Introduction A cornerstone of accountability is fair and transparent reporting of transactions
More informationSection 1 - GER Comments on the documents entitled: Updates to the Elaboration of an Enterprise Risk Management Program
September 10, 2013 Comments from Germany on Approval by mail: Documents entitled: Updates to the Elaboration of an Enterprise Risk Management Program for the Climate Investment Funds and Proposed Duties
More informationPlanning and Urban Management (Environmental Impact Assessment) Regulations 2007 SAMOA
1 Planning Urban Management (Environmental Impact Assessment) Regulations 2007 SAMOA Arrangement of provisions 1. Short title commencement 2. Interpretation 3. When an EIA is required 4. Forms of EIA 5.
More informationFinal draft RTS on the assessment methodology to authorize the use of AMA
Management Solutions 2015. All rights reserved. Final draft RTS on the assessment methodology to authorize the use of AMA European Banking Authority www.managementsolutions.com Research and Development
More informationEnterprise Risk Management Integrated Framework
ISACA S IT Audit, Information Security & Risk Insights Africa 2014, Alisa Hotel Enterprise Risk Management Integrated Framework Tony Bediako May 20, 2014 Today s organizations are concerned about: Risk
More informationCatastrophe Risk Engineering Solutions
Catastrophe Risk Engineering Solutions Catastrophes, whether natural or man-made, can damage structures, disrupt process flows and supply chains, devastate a workforce, and financially cripple a company
More informationUse of QRM to Quantify Particulate Contamination Risks
Use of QRM to Quantify Particulate Contamination Risks PDA Ireland Chapter Quality Risk Management Seminar NIBRT Mount Merrion, Blackrock, Co. Dublin Chris Roberts Agenda Background Objective / Scope Execution
More informationACTUAL METHODS ON TECHNOLOGICAL RISK ASSESSMENT
ACTUAL METHODS ON TECHNOLOGICAL RISK ASSESSMENT Marco Nicola Carcassi First European Summer School on Hydrogen Safety Belfast UK, 15th - 21st August 2006 Presentation Outline Technological Risk Categories
More informationThe PRINCE2 Practitioner Examination. Sample Paper TR. Answers and rationales
The PRINCE2 Practitioner Examination Sample Paper TR Answers and rationales For exam paper: EN_P2_PRAC_2017_SampleTR_QuestionBk_v1.0 Qu Correct Syll Rationale answer topic 1 A 1.1a a) Correct. PRINCE2
More informationALARP v AFAP. Figure 1 illustrates this approach. Note that the manufacturer determines the location of each of the three regions.
ALARP v AFAP EN ISO 14971:2012, Annex ZA, points out that the requirements in the Medical Device Directive, MDD, do not align with ISO 14971:2007. Content Deviation #3 has created some confusion; this
More informationAdvances in Layer of Protection Analysis. Wayne Chastain, P.E. Eastman Chemical Company
Advances in Layer of Protection Analysis Wayne Chastain, P.E. Eastman Chemical Company Agenda Overview of Layer of Protection Analysis Guidelines for Initiating Events and Independent Protection Layers
More informationPrincipal risks and uncertainties
Principal risks and uncertainties Strategic report Principal risks are a risk or a combination of risks that, given the Group s current position, could seriously affect the performance, future prospects
More informationNORMIZATION AND ACCREDITATION 03. COMPETENCE ASSESSMENT OF LEGAL ENTITIES AUTHORISED FOR THE CONDUCT OF HUMANITARIAN DEMINING OPERATIONS
STANDARD OPERATING PROCEDURE S O P NORMIZATION AND ACCREDITATION 03. COMPETENCE ASSESSMENT OF LEGAL ENTITIES AUTHORISED FOR THE CONDUCT OF HUMANITARIAN DEMINING OPERATIONS 03.02 HUMANITARIAN DEMINING TO
More informationRegulation DD-12.0: Risk Assessment Study
Regulation DD-12.0: Risk Assessment Study 12.0 Risk Assessment Study 12.1 Guidelines for Conducting Risk Assessment (RA) Study 12.2 Outline for Risk Assessment Study Report 12.3 Specific Fire Protection
More informationRISK MANAGEMENT GUIDELINES
RISK MANAGEMENT GUIDELINES Purpose of Guidelines These guidelines outline the way South West Healthcare operates its Risk Management Program and are to assist the organisation, its divisions, departments
More informationADVANCE SUSTAINABLE INVESTMENT APPROACH
ADVANCE SUSTAINABLE INVESTMENT APPROACH July 2018 CONTENTS What is sustainable investing?... 1 What are ESG factors?... 2 Our beliefs... 2 Our approach to sustainable investment... 2 1. Investment process...3
More informationCost-effectiveness of protection measures to mitigate terrorist attacks on bridges and tunnels
Safety and Security Engineering V 341 Cost-effectiveness of protection measures to mitigate terrorist attacks on bridges and tunnels C. A. Andersen, K. C. Jørgensen & E. K. Lauritzen NIRAS A/S, Denmark
More information