FICHE 1B - DRAFT MODEL FOR THE COOPERATION PROGRAMME UNDER THE EUROPEAN TERRITORIAL

Size: px
Start display at page:

Download "FICHE 1B - DRAFT MODEL FOR THE COOPERATION PROGRAMME UNDER THE EUROPEAN TERRITORIAL"

Transcription

1 FICHE 1B - DRAFT MODEL FOR THE COOPERATION PROGRAMME UNDER THE EUROPEAN TERRITORIAL COOPERATION GOAL Based on the draft template and guidance on the content of the cooperation programme (Version 3 28 June 2013) Version 2 28 June 2013 Regulation Common Provisions Regulation (CPR) Article Article 24 - Content of programmes European territorial cooperation Regulation (ETC Regulation) Article 7 (10) Content of cooperation programmes This document is provisional, without prejudice to the on-going Trilogues between the Council and the European Parliament (in line with the principle that "nothing is agreed until everything is agreed"). This document is a draft that shall be adjusted following the expert meeting. It does not prejudge the final nature of the basic act, nor the content of any delegated or implementing act that may be prepared by the Commission. 1/30

2 1. EMPOWERMENT Article 7 (10) of the ETC Regulation sets out that: "7. The Commission shall adopt that model by means of implementing acts. Those implementing acts shall be adopted in accordance with the advisory procedure referred to in Article 30(2). This fiche is based on the preliminary agreement reached between the co-legislators on the ETC Regulation, as documented in the texts agreed at the COREPER meeting on 26 June It remains a provisional text, without prejudice to the on-going negotiations (in line with the principle that "nothing is agreed until everything is agreed"). 2. MAIN OBJECTIVES AND SCOPE OF THE IMPLEMENTING ACT The model for the preparation of the cooperation programme shall set out uniform conditions for the presentation of information under each section of the cooperation programme. These conditions should ensure that information included in programmes is consistent, comparable and can, where necessary, be aggregated. 3. MAIN ELEMENTS OF THE IMPLEMENTING ACT The implementing acts will mirror the structure of the cooperation programme set out in Article 7 of the ETC Regulation It shall define the technical characteristics of each field, including the format of the data, the input method and the character limits. It shall also identify the information which is subject to Commission decision and information which is not, based on Article 7 (11) of the ETC Regulation. 2/30

3 ANNEX - DRAFT MODEL FOR THE COOPERATION PROGAMME UNDER THE EUROPEAN TERRITORIAL COOPERATION GOAL CCI <0.1 maxlength="15" input="s"> 1 Title Version First Year Last Year Eligible From Eligible To EC Decision Number EC Decision Date Programme Decision Number Programme Decision Date Programme Entry Into Force Date Regions covered by the programme <0.2 maxlength="255" <0.3 <0.4 maxlength="4" <0.5 maxlength="4" > <0.6 type="d" <0.7 type="d" > <0.8 > <0.9 type="d" > <0.10 maxlength="20" > <0.11 type="d" > <0.12 type="d" > <0.13 input="s">> SECTION 1. STRATEGY FOR THE COOPERATION PROGRAMME'S CONTRIBUTION TO THE UNION STRATEGY FOR SMART, SUSTAINABLE AND INCLUSIVE GROWTH AND THE ACHIEVEMENT OF ECONOMIC, SOCIAL AND TERRITORIAL COHESION (ARTICLE 24 (1) AND ARTICLE 7(2)(A) ETC REGULATION)1.1 Strategy for the cooperation programme's contribution to the Union strategy for smart, sustainable and inclusive growth and to the achievement of economic, social and territorial cohesion Description of the cooperation programme s strategy to contribute to the delivery of the Union strategy for smart, sustainable and inclusive growth and to the achievement of economic, social and territorial cohesion. <1.1.1 maxlength="35000" 1 Legends: type: N=Number, D=Date, S=String, C=Checkbox, P=Percentage, B=Boolean decision: N=Not part of the Decision input: M=Manuel, S=Selection, G=Generated by system 3/30

4 Justification for the choice of thematic objectives and corresponding investment priorities, having regard to the Common Strategic Framework, based on an analysis of the situation of the programme area as a whole in terms of needs and the strategy chosen in response, addressing, where appropriate, the missing links in cross-border infrastructure, taking into account the ex-ante evaluation, and with reference to, existing national, regional, cross-border/transnational/macro-regional or sea-basin strategies coherent with the Union strategy for smart, sustainable and inclusive growth, where relevant (table). Table 1: A synthetic overview of the justification for the selection of thematic objectives and investment priorities Selected thematic objective Selected investment priority Justification for selection <1.1.2 input="s" > <1.1.3 input="s"> <1.1.4 maxlength="500" 1.2 Justification of the financial allocation The justification of the financial allocation (i.e. the Union support) to each thematic objective and, where appropriate, investment priority, in accordance with the thematic concentration requirements, taking into account the ex-ante evaluation. <1.2.1 maxlength="7000" input="m" > 4/30

5 Table 2: Overview of the programme investment strategy This table is generated automatically by the SFC based on information inserted under other sections of the cooperation programme. Priority axis Thematic objective Investment priorities Specific objectives corresponding to the investment priorities Result indicators corresponding to the specific objective ERDF (EUR) support Share of the total Union support to the cooperation programme (by Fund) 2 ERDF ENI (where applicable) IPA applicable) (where <1.2.2 input="g" > <1.2.3 <1.2.4 <1.2.5 <1.2.6 <1.2.7 <1.2.8 type="n' " <1.2.9 type="p' < type="P' 1 1. Title 1.1. Title 2 2. Title 2.1 Title 3. Title 3.1 Title TA NA NA 2 Presentation of amounts transferred from ENI and IPA depends on management option chosen, cfr. fiche no. 28 on Elements related to proposed integration of allocations under external financing instruments into ETC programmes. 5/30

6 SECTION 2. DESCRIPTION OF THE PRIORITY AXES (ARTICLE 7(2) (B) AND (C) ETC REGULATION) Section 2.A. A description of the priority axes other than technical assistance (Article 7(2) (b) ETC Regulation)) Priority Axis (repeated for each Priority Axis) ID Title <2A.1 <2A.2 maxlength="500" The entire priority axis will be implemented solely through financial instruments The entire priority axis will be implemented solely though financial instruments set up at Union level The entire priority axis will be implemented through community-led local development Fund (repeated for each Fund under the Priority Axis) Fund <2A.5 input="s"> Investment Priority (Article 87 (2) (b) (i)) (repeated for each Investment Priority under the Priority axis) Investment Priority <2A.4 input="s"> Calculation basis for the Union support Calculation Basis (public or total) <2A.6 input="s"> 6/30

7 2.A.1. Specific objectives corresponding to the investment priority and expected results (Article 7 (2) (b) (i)-(ii) ETC Regulation)) Specific Objective (repeated for each specific objective under the Investment Priority) ID Specific objective The results, which the Member States seek to achieve with EU support <2A.1.1 <2A.1.2 maxlength="500" <2A.1.3 maxlength="2000" 7/30

8 Table 3: Programme Specific Result indicators (by Specific Objective) (Article 7.2 (b)(ii) ETC Regulation)) One (if possible) and no more than two result indicators should be used for each specific objective. ID Indicator Measurement Unit Baseline Value Baseline Year Target Value 3 (2022) Source of Data Frequency of reporting <2A.1.4 maxlength="5 " <2A.1.5 maxlength="255" <2A.1.6 Quantitative <2A.1.8 <2A.1.9 type="n' Quantitative <2A.1.10 Qualitative <2A.1.10 maxlength="100" <2A.1.11 maxlength="200" <2A.1.12 maxlength="1 00" 3 For ERDF and Cohesion Fund the target values can be qualitative or quantitative. 8/30

9 2.A.2. Actions to be supported under the investment priority (by investment priority) 2.A.2.1 A description of the type and examples of actions to be financed and their expected contribution to the corresponding specific objectives, including, where appropriate(article 7 (2) (b) (iii) ETC Regulation) : Investment Priority <2A input="s"> <2A maxlength="10500" 2.A.2.2. The guiding principles for the selection of operations (Article 7 (2) (b) (iii) ETC) Investment Priority <2A input="s"> <2A maxlength="3500" 2.A.2.3 The planned use of financial instruments (Article 7 (2) (b) (iii) ETC Regulation) Investment Priority Planned use of financial instruments <2A input="s"> <2A type="c" Description of the planned use of financial instruments, where applicable <2A maxlength="7000" 2.A.2.4 The planned use of major projects (Article 7 (2) (be ) (iiie) ETC Regulation)) Investment Priority <2A input="s"> <2A maxlength="3500" 9/30

10 3.A.2.5 Output indicators (by investment priority) (Table 4) (Article 7 (2) (b) (iv) ETC Regulation) Table 5: Common and programme specific output indicators (by investment priority) ID Indicator (name of indicator) Measurement unit Target value (2022) Source of data <2A input="s"> <2A input="s"> <2A input="s"> <2A type="n' <2A maxlength="200" 10/30

11 2.A.3. Performance framework (Article 7 (2) (b) (v) ETC Regulation)) An identification of implementation steps and financial and output indicators and, where appropriate, results indicators 4, to act as milestones and targets for the performance framework in accordance with Article 19(1) CPR and Annex (xx) Table 5: The performance framework of the priority axis Priority Axis Indicat or Type ID Implementati on step, financial, output or result indicator Measurement unit, where appropriate Milestone 2018 for Final (2022) target Source of data Explanation of the relevance of the indicator, where appropriate <2A.3.1 input="s" > <2A.3.2 type="s " input=" S"> Implementat ion Step or Financial <2A.3.3 maxlength= "5" input="m" > Output or result<2a.3. 3 input="s"> Implementation Step or Financial <2A.3.4 maxlength="25 5" Output or Result <2A.4.4 Implementation Step or Financial <2A.3.5 Output or Result <2A.3.5 <2A.3.7 maxlength="255" <2A.3.8 Output or Result <2A.3.8 <2A.3.9 maxlength="200" Output or Result <2A.3.9 <2A.3.10 maxlength="500" 4 The compromise text on Article 7 ETC Regulation does not refer to result indicators in the context of the performance framework. However, according to the draft compromise text of the annex of the CPR setting out requirements for the performance framework, result indicators are included in the performance framework. On the basis of the compromise text on Article 20 of the CPR, result indicators included in the performance framework shall not be taken into account for the purposes of Article 20(3) and Article 20(4) CPR. 11/30

12 Additional qualitative information on the set-up of the performance framework may be added if needed <2A.3.11 maxlength="7000" 12/30

13 2.A.4. Categories of intervention (Article 7 (2) (b) (vii) ETC Regulation) Categories of intervention corresponding to the content of the priority axis, based on a nomenclature adopted by the Commission, and an indicative breakdown of the Union support (Tables 6-10) Tables 6-10: Categories of intervention Table 6: Dimension 1 Intervention field Priority Axis Code amount <2A input="s" Decision=N> <2A input="s"> <2A Table 7: Dimension 2 Form of finance Priority Axis Code amount <2A input="s" Decision=N> <2A input="s"> <2A Table 8: Dimension 3 Territory Priority Axis Code amount <2A input="s" Decision=N> <2A input="s"> <2A Table 9: Dimension 6 Territorial delivery mechanisms Priority Axis Code amount <2A input="s" Decision=N> <2A input="s"> <2A /30

14 Table 10: Dimension 12:Thematic objective Priority Axis Code amount <2A input="s" Decision=N> <2A input="s"> <2A For the remaining dimensions of categorisation, data is requested for information purposes through electronic data exchange system during implementation. 2.A.5. A summary of the planned use of technical assistance including, where necessary, actions to reinforce the administrative capacity of authorities involved in the management and control of the programmes and beneficiaries and, where necessary, actions for the enhancement of the administrative capacity of relevant partners to participate in the implementation of programmes (by priority axis) (by priority axis) (Article 7 (2) (b) (vi) ETC Regulation) Priority Axis <3A.5.1 input="s"> <2A.5.2 maxlength="2000" 14/30

15 SECTION 2.B. A DESCRIPTION OF THE PRIORITY AXIS FOR TECHNICAL ASSISTANCE (ARTICLE 7 2 (C) ETC REGULATION) Priority Axis (repeated for each TA Priority Axis) ID Title <2B.0.1 maxlength="5" <2B.0.2 maxlength="255" Fund (repeated for each Fund under the Priority Axis) Fund <2B.0.3 input="s"> Calculation basis for Union support Calculation Basis <2B.0.4 input="s"> 2.B.1. Specific objectives and expected results (Article 7 (2) (c) (i)-(ii) ETC Regulation Specific Objective (repeated for each specific objective under the TA Priority Axis) ID Specific objective The results, which the Member States seek to achieve with EU support 5 <2B.1.1 maxlength="5" <2B.1.2 maxlength="500" <2B.1.3 maxlength="3500" 5 Required where the Union support to technical assistance in the cooperation programme exceeds EUR 15 million 15/30

16 2.B.2. The list of result indicators 6 Table 11: Programme specific result indicators (by specific objective) (Article 7 (2) (c) (ii) ETC Regulation)) ID Indicator Measurement Unit Baseline Value Baseline Year Target Value 7 (2022) Source of Data Frequency of reporting <2.B.2.1 maxlength="5 " <2.B.2.2 maxlength="255 " <2.B.2.3 Quantitat ive <2.B.2.4 input=" M"> <2.B.2.5 type="n' input="m" > Quantitative <2.B.2.6 Qualitative <2A.1.10 maxlength="100" <2.B.2.7 maxlength="10 0" <2.B.2.8 maxlength="1 00" 2.B.3. Actions to be supported and their expected contribution to the specific objectives (by priority axis) (Article 7 (2) (c) (iii) ETC Regulation) 2.B.3.1. A description of actions to be supported and their expected contribution to the specific objectives (Article 7 (2) (c) (iii) ETC Regulation) Priority axis <2.B input="s"> <2.B maxlength="7000" 2.B.3.2 Output indicators expected to contribute to results (by priority axis) (Table 12) (Article 7(2) (c) (iv) ETC Regulation) Table 12: Output indicators (by priority axis) ID Indicator (name of indicator) Measurement unit Target (2022) value Source of data (optional) <2.B maxlength="5" <2.B maxlength="255" <2.B <2.B type="n' <2.B maxlength="100" 6 Required where the Union support to technical assistance in the cooperation programme exceeds EUR 15 million. 7 The target values can be qualitative or quantitative. 16/30

17 2.B.4. Categories of intervention (Article 7 (2) (c) (v) ETC Regulation) The corresponding categories of intervention based on a nomenclature adopted by the Commission, and an indicative breakdown of the Union support Tables 13-15: Categories of intervention Table 13: Dimension 1 Intervention field Priority Axis Code EU support <2B input="s" > <2B input="s"> <2B Table 14: Dimension 2 Form of finance Priority Axis Code EU support <2B input="s" > <2B input="s"> <2B Table 15: Dimension 3 Territory Priority Axis Code EU support <2B input="s" > <2B input="s"> <2B ,000, ,000,000 17/30

18 SECTION 3 THE FINANCING PLAN OF THE COOPERATION PROGRAMME (ARTICLE 7 (2) (D) ETC REGULATION 3.1 A table specifying for each year, in accordance with Articles 53, 110 and 111 of the CPR, the amount of the total financial appropriation envisaged for the support from the ERDF (EUR) (Article 7 2 (d) (i) ETC Regulation) Table 16 Fund Total <3.1.1 ERDF <3.1.3 input=" M"> <3.1.4 input="m "> <3.1.5 input="m "> <3.1.6 input="m "> <3.1.7 input="m "> <3.1.8 input="m "> <3.1.9 input="m "> < input="g "> IPA amounts (where applicable) ENI amounts (where applicable) Total 18/30

19 3.2.A Financial plan of the cooperation programme specifying, for the whole programming period, for the cooperation programme and for each priority axis, the amount of the total financial appropriation of the support from the ERDF and the national co-financing. (EUR) (Table 17) (Article 7 (2)(d) (ii) ETC Regulation 1. The financial table should set out the financial plan of the cooperation programme by priority axis. Where outermost regions programmes combine cross-border and transnational allocations, separate priority axes need to be set out for each of these. 2. The financial table shall show for information purposes, any contribution from third countries participating in the cooperation programme (other than contributions from IPA and ENI, e.g. NO, CH) 3. The EIB contribution should be presented at the level of the priority axis. Table 17 8 Fund Basis for the calculation of the Union support (Total eligible cost or public eligible cost) Union (a) support National counterpart (b) = (c) + (d)) Indicative breakdown of the national counterpart National Public funding (c) National private funding (1) (d) Total funding (e) = (a) + (b) (2) Co-financing rate (f) = (a)/(e) Contributions from third countries For information EIB contributions <3.2.A.1 Priority axis 1 <3.2.A.2 ERDF (possibly incl. amounts transferred <3.2.A.3 <3.2.A.4 <3.2.A.5 <3.2.A.6 <3.2.A.7 <3.2.A.8 <3.2.A.9 type="p" <43.2.A.10 <43.2.A.11 8 Special allocation for outermost regions pursuant to Article 4 (2) ETC Regulation needs to be reflected in a separate priority axis given the different co-financing rate. 19/30

20 Priority axis N Total Total from IPA and ENI) 9 IPA ENI ERDF (possibly incl. amounts transferred from IPA and ENI) IPA ENI ERDF IPA ENI Total all Funds (1) To be completed only when priority axes are expressed in total costs. (2) This rate may be rounded to the nearest whole number in the table. The precise rate used to reimburse payments is the ratio (f). 3.2.B. Breakdown of the financial plan of the cooperation programme by priority axis, and thematic objective (Table 19) Article 7 (2) (d) (ii) ETC Regulation This breakdown is required in order to fulfil the requirement set out under (Article 7(2) (d) (ii) to specify for priority axes, which combine investment priorities from different thematic objectives, the amount of total financial appropriation and the national co-financing for each of the corresponding thematic objectives. Where each priority axis corresponds to a single thematic objective, this table will not require a breakdown below the level of a priority axis. 9 Presentation of amounts transferred from ENI and IPA depends on management option chosen, cfr. fiche no. 28 on Elements related to proposed integration of allocations under external financing instruments into ETC programmes. 20/30

21 Table 18 Priority axis Thematic objective Union support National counterpart Total funding <3.2.B.1 <3.2.B.2 <3.2.B.3 Priority axis N Thematic objective 1 TOTAL Thematic objective 2 <3.2.B.4 <3.2.B.5 Table 19: The indicative amount of support to be used for climate change objectives (Article 24 (5) CPR) This table is generated automatically by SFC based on categorisation tables included under each of the priority axes. The information provided in this table is based on uniform conditions on the implementation of a methodology to each of the ESI Funds adopted by the Commission based on Article 8 of the CPR. Priority axis The indicative amount of support to be used for climate change objectives (EUR) Share of the total allocation to the cooperation programme (%) <3.2.B.8 <3.2.B.9 <3.2.B.10 type="p" Total 21/30

22 SECTION 4. INTEGRATED APPROACH TO TERRITORIAL DEVELOPMENT (ARTICLE 7(3) ETC REGULATION) A description, taking into account the content and objectives of the cooperation programme, of the integrated approach to territorial development, including in respect of areas referred to in Article 174 (3) TFEU, having regard to the Partnership Agreements of the participating Member States, and showing how it contributes to the accomplishment of the programme objectives and expected results <4.0 maxlength="3500" 4.1. Where appropriate, for cross-border cooperation programmes, the approach to the use of community-led local development instruments and the principles for identifying the areas where it will be implemented <4.1 maxlength="7000" input="m" > 4.2. Where appropriate, the principles for identifying the urban areas where integrated actions for sustainable urban development are to be implemented and the indicative allocation of the ERDF support for these actions, Article 7 (3) (b) ETC Regulation <4.2.1 maxlength="3500" Table 20: The indicative amount of the ERDF support for sustainable urban integrated actions Fund Indicative amount of the ERDF support for sustainable urban integrated actions (EUR)support for integrated actions <4.2.2 <4.2.3 ERDF 22/30

23 4.3. Where appropriate, the approach to the use of Integrated Territorial Investment (ITI) (as defined in Article [99] of the Common Provisions Regulation) other than in cases covered by 4.2 and their indicative financial allocation from each priority axis <4.3.1 maxlength="5000" input="m "> Table 21: An indicative financial allocation to ITI other than those mentioned under point 4.2 (aggregate amount) Priority <4.3.2 input="g" > Priority axis 1 Indicative financial allocation (Union support) (EUR) <4.3.3 Priority axis 2 TOTAL 4.4 Where Member States and regions participate in macro-regional and sea basin strategies, the contribution of planned interventions towards such strategies, subject to the needs of the programme area as identified by the relevant Member States and taking into account, where applicable, strategically important projects identified in the respective strategies The contribution of the cooperation programme to the planned interventions under the macro-regional and sea basin strategies, taking into account, where applicable, strategically important projects identified in the respective strategies. < maxlength="7000" input="m" > 23/30

24 SECTION 5: IMPLEMENTING PROVISIONS FOR THE COOPERATION PROGRAMME (ARTICLE 7 (4) ETC REGULATION) 5.1 Identification of the relevant authorities and bodies (Article 7 (4) ETC Regulation) Table 22: Identification of and contact details for the relevant authorities and bodies 10 Authority/body Name of the authority/body Head of the authority/body Managing authority. <5,1,1 maxlength="255" input="m" >. <5,1,2 maxlength="255" input="m" > Certifying authority, where applicable. <5,1,3 maxlength="255" input="m" >. <5,1.4 maxlength="255" input="m" > Audit authority. <5,1,5 maxlength="255" input="m" >. <5,1,6 maxlength="255" input="m" > The body to which payments will be made by the Commission is: the managing authority the certifying authority Authority/body Name of the authority/body Head of the authority/body Body or bodies designated to carry out control tasks. <5,1,7 maxlength="255" input="m" >. <5,1,8 maxlength="255" input="m" > Body or bodies designated to be responsible for carrying out audit tasks <5,1,9 maxlength="255" input="m" >. <5,1,10 maxlength="255" input="m" > 10 In accordance with Article 7 (11) ETC Regulation, the information on the identification of the managing authority, the certifying authority, where appropriate, and the audit authority is not subject to the Commission decision approving the cooperation programme, but remain under the responsibility of the participating Member States. 24/30

25 5.1.2 Procedure for setting up the joint secretariat <5,1,2. maxlength="3500" input="m" > A summary description of the management and control arrangements <5,1,3. maxlength="35000" input="m" > The apportionment of liabilities among the participating Member States in case of financial corrections imposed by the managing authority or the Commission <5,1,4. maxlength="10500" input="m" > Use of the Euro (Article 26 ETC Regulation) Where applicable, the method chosen for the conversion of expenditure incurred in another currency than the Euro <5,1,5. maxlength="2000" input="m" > 5.2. Involvement of partners (Article 23(2) CPR and Article 7 (4) (c) ETC Regulation) Role of the relevant partners in the preparation and implementation, of the cooperation programme. <7.2.1 maxlength=" " input="m" Decisions=N> 25/30

26 SECTION 6. COORDINATION - ARTICLE 7(5) (A) ETC REGULATION 11 The mechanisms that ensure an effective coordination between the Funds, the EAFRD, the EMFF and other Union and national funding instruments, including the coordination and possible combination with CEF, ENI, EDF and IPA and with the EIB taking into account the provisions laid down in the CSF as set out in Annex I of the CPR. Where Member States and third countries participate in cooperation programmes that include the use of ERDF appropriations for outermost regions and resources from the EDF, coordination mechanisms at the appropriate level to facilitate effective coordination in the use of these resources <6.1 maxlength="14000" input="m" Decisions=N > SECTION 7. REDUCTION OF THE ADMINISTRATIVE BURDEN FOR BENEFICIARIES (ARTICLE 7 (5) (B) ETC REGULATION 12 ) A summary of the assessment of the administrative burden for beneficiaries and, where necessary, the actions planned accompanied by an indicative timeframe to reduce administrative burden. <7..0 maxlength="7000" input="m" decision=n > 11 Information required to be adapted to URBACT, INTERACT and ESPON. 12 Not required for INTERACT and ESPON. 26/30

27 SECTION 8. HORIZONTAL PRINCIPLES (ARTICLE 7(3) ETC REGULATION) 7.1. Sustainable development 13 A description of specific actions to take into account environmental protection requirements, resource efficiency, climate change mitigation and adaptation, disaster resilience and risk prevention and management, in the selection of operations. <7.1 maxlength="5500" input="m" decision=n> 7.2. Equal opportunities and non-discrimination 14 A description of the specific actions to promote equal opportunities and prevent any discrimination based on sex, racial or ethnic origin, religion or belief, disability, age or sexual orientation during the preparation, design and implementation of the cooperation programme and in particular in relation to access to funding taking account of the needs of the various target groups at risk of such discrimination and in particular the requirements of ensuring accessibility for persons with disability. <7.2 maxlength="5500" input="m" decision=n> 7.3. Equality between men and women 15 A description of the contribution to the promotion of equality between men and women and, where appropriate, the arrangements to ensure the integration of the gender perspective at cooperation programme and operation level. <7.3 maxlength="5500" input="m" decision=n> 13 Not applicable to URBACT, INTERACT and ESPON. 14 Not applicable to URBACT, INTERACT and ESPON 15 Not applicable to URBACT, INTERACT and ESPON. 27/30

28 SECTION 9. SEPARATE ELEMENTS - PRESENTED AS ANNEXES IN PRINTED DOCUMENT VERSION 9.1. A list of major projects for which the implementation is planned during the programming period (Article 7 (2) (e) ETC Regulation) Table 23: A list of major projects 16 Title Planned time of notification/submissi on of the major project application to the Commission (year, quarter) Planned start of implementation (year, quarter) Planned completion date of implementation (year quarter) Investment priority Priority axis <9.1.1 maxlength="500" input="s" decision=n> <9.1.2 type="d" <9.1.3 type="d" <9.1.4 type="d" <9.1.5 maxlength="500 " input="s"> <9.1.6 maxlength="500 " input="s"> 9.2. The performance framework of the cooperation programme The summary table is generated automatically by SFC based on the tables outlined by priority axis. Table 24: The performance framework of the cooperation programme Priority axis Implementation step, financial, output or result indicator Measurement unit, where appropriate Milestone for 2018 Final target (2022) <9.2.1 maxlength="500 " <9.2.3 maxlength="500" <9.2.4 maxlength="500 " <9.2.5 maxlength="500 " <9.2.6 maxlength="500" 9.3 List of relevant partners involved in the preparation of the cooperation programme <9.3 maxlength="10500" input="m" decision=n> 16 Not applicable to INTERACT and ESPON. 28/30

29 DRAFT Applicable programme implementation conditions governing the financial management, programming, monitoring, evaluation and control of the participation of third countries in transnational and interregional programmes through a contribution of ENI and IPA resources (Article 24 bis ETC Regulation) <9,4 maxlength="14000" input="s"> 29/30

30 DRAFT ANNEXED (uploaded to SFC 2014 as a separate files): Draft report of the ex-ante evaluation, with an executive summary (mandatory) (Article 48 (2) CPR) Confirmation of agreement in writing to the contents of the cooperation programme, Article 7 (8) ETC Regulation. A citizens' summary of the cooperation programme (as appropriate) 30/30

(Non-legislative acts) REGULATIONS

(Non-legislative acts) REGULATIONS 22.3.2014 Official Journal of the European Union L 87/1 II (Non-legislative acts) REGULATIONS COMMISSION IMPLEMENTING REGULATION (EU) No 288/2014 of 25 February 2014 laying down rules pursuant to Regulation

More information

DRAFT TEMPLATE AND GUIDELINES FOR THE CONTENT

DRAFT TEMPLATE AND GUIDELINES FOR THE CONTENT DRAFT 21.05.2013 DRAFT TEMPLATE AND GUIDELINES FOR THE CONTENT OF THE OPERATIONAL PROGRAMME Version 3 21.05.2013 This document is based on the Presidency compromise text (from 19 December 2012), which

More information

FICHE 4A. Version 1 4 April 2013

FICHE 4A. Version 1 4 April 2013 FICHE 4A IMPLEMENTING ACT ON THE MODEL FOR THE ANNUAL AND FINAL IMPLEMENTATION REPORT UNDER THE INVESTMENT FOR GROWTH AND JOBS GOAL Version 1 4 April 2013 Regulation Article Article 44 Implementation Reports

More information

DRAFT TEMPLATE AND GUIDELINES ON THE CONTENT PARTNERSHIP AGREEMENT OF THE

DRAFT TEMPLATE AND GUIDELINES ON THE CONTENT PARTNERSHIP AGREEMENT OF THE DRAFT TEMPLATE AND GUIDELINES ON THE CONTENT OF THE PARTNERSHIP AGREEMENT This is a draft document based on the new ESIF Regulations published in OJ 347 of 20 December 2013 and on the most recent version

More information

EUROPEAN PARLIAMENT Committee on Regional Development

EUROPEAN PARLIAMENT Committee on Regional Development EUROPEAN PARLIAMT 2009-2014 Committee on Regional Development 27.11.2012 MANDATE 1 for opening inter-institutional negotiations adopted by the Committee on Regional Development at its meeting on 11 July

More information

Official Journal of the European Union L 347/259

Official Journal of the European Union L 347/259 20.12.2013 Official Journal of the European Union L 347/259 REGULATION (EU) No 1299/2013 OF THE EUROPEAN PARLIAMENT AND OF THE COUNCIL of 17 December 2013 on specific provisions for the support from the

More information

Obecné nařízení Přílohy obecného nařízení Nařízení pro ERDF Nařízení o podpoře EÚS z ERDF Nařízení pro ESF Nařízení pro FS

Obecné nařízení Přílohy obecného nařízení Nařízení pro ERDF Nařízení o podpoře EÚS z ERDF Nařízení pro ESF Nařízení pro FS Texty nařízení předběžně schválené dánským a kyperským předsednictvím Rady EU formou částečného obecného přístupu pro fondy Společného strategického rámce a politiky soudržnosti: Obecné nařízení Přílohy

More information

Mainstreaming of Horizontal Principles: art. 7-8 CPR. Peter Berkowitz ESIF SD - 17 November 2015

Mainstreaming of Horizontal Principles: art. 7-8 CPR. Peter Berkowitz ESIF SD - 17 November 2015 Mainstreaming of Horizontal Principles: art. 7-8 CPR Peter Berkowitz ESIF SD - 17 November 2015 Regulation 1303/2013 Common Provisions Regulation for ESI Funds Article 7 Promotion of equality between men

More information

INTERACT III Draft Cooperation Programme

INTERACT III Draft Cooperation Programme INTERACT III 2014-2020 Draft Cooperation Programme version 2.5.1, 18 July 2014 Contents 1. Strategy for the cooperation programme s contribution to the Union strategy for smart, sustainable and inclusive

More information

The modifications highlighted in bold are those in comparison to the revised versions (corrigendum) presented by the Commission on 14 March 2012.

The modifications highlighted in bold are those in comparison to the revised versions (corrigendum) presented by the Commission on 14 March 2012. COUNCIL OF THE EUROPEAN UNION Brussels, 20 April 2012 Inte rinstitutional File: 2011/0276 (COD) 8207/12 ADD 4 REV 2 FSTR 26 FC 17 REGIO 39 SOC 240 AGRISTR 40 PECHE 103 CADREFIN 165 CODEC 831 ADDDUM 4 to

More information

Articles 42 to 44 - LEADER. Articles 58-66

Articles 42 to 44 - LEADER. Articles 58-66 DRAFT GUIDANCE FICHE FOR DESK OFFICERS ARRANGEMENTS ON TERRITORIAL DEVELOPMENT VERSION 2 22/01/2014 RELEVANT PROVISIONS IN THE LEGISLATION Regulation Common Provisions Regulation (N 1303/2013) ERDF Regulation

More information

FICHE NO 25 APPLICABILITY OF FLAT RATES FOR FINANCING INDIRECT COSTS IN OTHER UNION POLICIES VERSION 1 22/10/2013. Version

FICHE NO 25 APPLICABILITY OF FLAT RATES FOR FINANCING INDIRECT COSTS IN OTHER UNION POLICIES VERSION 1 22/10/2013. Version FICHE NO 25 APPLICABILITY OF FLAT RATES FOR FINANCING INDIRECT COSTS IN OTHER UNION POLICIES VERSION 1 22/10/2013 Regulation Common Provisions Regulation (CPR) Article 58 of CPR: Article Flat rate financing

More information

DRAFT GUIDANCE FICHE FOR DESK OFFICERS VERSION 3-28/01/2014 RELEVANT PROVISIONS IN THE LEGISLATION INTEGRATED TERRITORIAL INVESTMENT (ITI)

DRAFT GUIDANCE FICHE FOR DESK OFFICERS VERSION 3-28/01/2014 RELEVANT PROVISIONS IN THE LEGISLATION INTEGRATED TERRITORIAL INVESTMENT (ITI) DRAFT GUIDANCE FICHE FOR DESK OFFICERS INTEGRATED TERRITORIAL INVESTMENT (ITI) VERSION 3-28/01/2014 RELEVANT PROVISIONS IN THE LEGISLATION Regulation Articles Article 36 - Integrated territorial investment

More information

INFRASTRUCTURE INVESTMENT

INFRASTRUCTURE INVESTMENT ANNEX MAJOR PROJECT 1 NOTIFICATION TO THE COMMISSION OF THE SELECTED MAJOR PROJECT UNDER ARTICLE 92.1. OF COMMON PROVISIONS REGULATION (CPR) (EC) NO ( ) 2 EUROPEAN REGIONAL DEVELOPMENT FUND / COHESION

More information

ESPON Cooperation Programme. Final version

ESPON Cooperation Programme. Final version Version 12 May 2014 ESPON 2020 Cooperation Programme Final version Agreed by Member and Partner States on XX June 2014 to be submitted to the European Commission for approval EN EN CCI 1 Title ESPON 2020

More information

WORKING PAPER OF THE COMMISSION SERVICES CONSOLIDATED VERSION OF ANNEX XVIII ANNUAL AND FINAL REPORTING

WORKING PAPER OF THE COMMISSION SERVICES CONSOLIDATED VERSION OF ANNEX XVIII ANNUAL AND FINAL REPORTING EN EN EN WORKING PAPER OF THE COMMISSION SERVICES CONSOLIDATED VERSION OF ANNEX XVIII ANNUAL AND FINAL REPORTING 1. IDENTIFICATION OPERATIONAL PROGRAMME Objective concerned Eligible area concerned Programming

More information

Draft template and guidelines on the content of the Partnership Agreements (PAs) (Article 14 of the CPR) CLLD aspects

Draft template and guidelines on the content of the Partnership Agreements (PAs) (Article 14 of the CPR) CLLD aspects Draft template and guidelines on the content of the Partnership Agreements (PAs) (Article 14 of the CPR) CLLD aspects 1 Definition PA constitutes a joint strategy at national level for the ESI Funds, which

More information

Programming Period. European Social Fund

Programming Period. European Social Fund 2014 2020 Programming Period European Social Fund f Legislative package 2014-2020 European Regional Development Fund (EC) 1301/2013 Cohesion Fund (EC) 1300/2013 European Social Fund (EC) 1304/2013 European

More information

Part I COMMISSION STAFF WORKING DOCUMENT. Elements for a Common Strategic Framework 2014 to 2020

Part I COMMISSION STAFF WORKING DOCUMENT. Elements for a Common Strategic Framework 2014 to 2020 EUROPEAN COMMISSION Brussels, 14.3.2012 SWD(2012) 61 final Part I COMMISSION STAFF WORKING DOCUMENT Elements for a Common Strategic Framework 2014 to 2020 the European Regional Development Fund the European

More information

Proposal for a REGULATION OF THE EUROPEAN PARLIAMENT AND OF THE COUNCIL

Proposal for a REGULATION OF THE EUROPEAN PARLIAMENT AND OF THE COUNCIL EUROPEAN COMMISSION Brussels, 14.3.2012 COM(2011) 611 final/2 2011/0273 (COD) CORRIGENDUM: Annule et remplace le document COM(2011) 611 du 6.10.2011 Concerne: toutes les versions linguistiques Proposal

More information

European Union Regional Policy Employment, Social Affairs and Inclusion. EU Cohesion Policy Proposals from the European Commission

European Union Regional Policy Employment, Social Affairs and Inclusion. EU Cohesion Policy Proposals from the European Commission EU Cohesion Policy 2014-2020 Proposals from the European Commission 1 Legislative package The General Regulation Common provisions for cohesion policy, the rural development policy and the maritime and

More information

ANNEX X Model for the implementation reports for the European territorial cooperation goal

ANNEX X Model for the implementation reports for the European territorial cooperation goal ANNEX X Model for the implementation reports for the European territorial cooperation goal PART A - DATA REQUIRED EVERY YEAR ("LIGHT REPORTS") (Article 50(2) of Regulation (EU) No 1303/2013) 1. IDENTIFICATION

More information

Guidance for Member States on Integrated Sustainable Urban Development (Article 7 ERDF Regulation)

Guidance for Member States on Integrated Sustainable Urban Development (Article 7 ERDF Regulation) EUROPEAN COMMISSION European Structural and Investment Funds Guidance for Member States on Integrated Sustainable Urban Development (Article 7 ERDF Regulation) p10 addition of 3 bullet points for specific

More information

Guidance for Member States on the Drawing of Management Declaration and Annual Summary

Guidance for Member States on the Drawing of Management Declaration and Annual Summary EGESIF_15-0008-02 19/08/2015 EUROPEAN COMMISSION European Structural and Investment Funds Guidance for Member States on the Drawing of Management Declaration and Annual Summary Programming period 2014-2020

More information

Annual Implementation Report 2015

Annual Implementation Report 2015 Annual Implementation Report 215 of the INTERREG V-A SLOVAKIA-HUNGARY COOPERATION PROGRAMME Content 1. Identification of the annual implementation report... 4 2. Overview of the implementation... 4 3.

More information

EUROPEAN COMMISSION. European Structural and Investment Funds. Guidance Note on

EUROPEAN COMMISSION. European Structural and Investment Funds. Guidance Note on EGESIF_15_0019-02 final 15/06/2016 EUROPEAN COMMISSION European Structural and Investment Funds Guidance Note on Nomenclature of Categories of Intervention and the Methodology for Tracking of Climate Change

More information

Proposal for a REGULATION OF THE EUROPEAN PARLIAMENT AND OF THE COUNCIL. on the European Social Fund and repealing Regulation (EC) No 1081/2006

Proposal for a REGULATION OF THE EUROPEAN PARLIAMENT AND OF THE COUNCIL. on the European Social Fund and repealing Regulation (EC) No 1081/2006 EUROPEAN COMMISSION Brussels, 6.10.2011 COM(2011) 607 final 2011/0268 (COD) Proposal for a REGULATION OF THE EUROPEAN PARLIAMENT AND OF THE COUNCIL on the European Social Fund and repealing Regulation

More information

DRAFT GUIDANCE FICHE FOR DESK OFFICERS PROGRAMMING OF TECHNICAL ASSISTANCE AT THE INITIATIVE OF THE MEMBER STATES VERSION 2 25/06/2014

DRAFT GUIDANCE FICHE FOR DESK OFFICERS PROGRAMMING OF TECHNICAL ASSISTANCE AT THE INITIATIVE OF THE MEMBER STATES VERSION 2 25/06/2014 DRAFT GUIDANCE FICHE FOR DESK OFFICERS PROGRAMMING OF TECHNICAL ASSISTANCE AT THE INITIATIVE OF THE MEMBER STATES VERSION 2 25/06/2014 Regulation Common Provisions Regulation (N 1303/2013) European Territorial

More information

GUIDANCE FICHE PERFORMANCE FRAMEWORK REVIEW AND RESERVE IN VERSION 1 9 APRIL 2013 RELEVANT PROVISIONS IN THE DRAFT LEGISLATION

GUIDANCE FICHE PERFORMANCE FRAMEWORK REVIEW AND RESERVE IN VERSION 1 9 APRIL 2013 RELEVANT PROVISIONS IN THE DRAFT LEGISLATION GUIDANCE FICHE PERFORMANCE FRAMEWORK REVIEW AND RESERVE IN 2014-2020 VERSION 1 9 APRIL 2013 RELEVANT PROVISIONS IN THE DRAFT LEGISLATION Regulation Articles Article 18 Performance reserve Article 19 Performance

More information

COMMISSION IMPLEMENTING DECISION. of XXX

COMMISSION IMPLEMENTING DECISION. of XXX EUROPEAN COMMISSION Brussels, XXX [ ](2015) XXX draft COMMISSION IMPLEMENTING DECISION of XXX approving certain elements of the operational programme Territorial and Settlement Development for support

More information

Launch Event. INTERREG IPA CBC Croatia- Serbia

Launch Event. INTERREG IPA CBC Croatia- Serbia Launch Event INTERREG IPA CBC Croatia- Serbia 2014-2020 Vicente Rodriguez Saez, DG Regional Policy, European Commission Head of Unit for Macro-regional Strategies, European Transnational and Interregional

More information

Key elements of the Commission proposal for the future European Social Fund

Key elements of the Commission proposal for the future European Social Fund Key elements of the Commission proposal for the future 2014-2020 Thomas Bender Head of Unit Employment, Social Affairs and Inclusion DG London, 8 December 2011 1 Guiding political principles of the reform

More information

ESF Evaluation Partnership 17 November Key elements of the Commission proposal for the future ESF

ESF Evaluation Partnership 17 November Key elements of the Commission proposal for the future ESF ESF Evaluation Partnership 17 November 2011 Key elements of the Commission proposal for the future ESF 2014-2020 Thomas Bender DG EMPL, Unit E1, ESF Policy and Legislation Legislative package The General

More information

The urban dimension. in the legislative proposals for the future cohesion policy. Zsolt Szokolai DG REGIO C.2 Urban development, territorial cohesion

The urban dimension. in the legislative proposals for the future cohesion policy. Zsolt Szokolai DG REGIO C.2 Urban development, territorial cohesion The urban dimension in the legislative proposals for the future cohesion policy Zsolt Szokolai DG REGIO C.2 Urban development, territorial cohesion EC proposal for 2014-2020 Alignment of cohesion policy

More information

DRAFT REVISED GUIDANCE NOTE ON MAJOR PROJECTS IN THE PROGRAMMING PERIOD : THRESHOLD AND CONTENTS OF COMMISSION DECISIONS

DRAFT REVISED GUIDANCE NOTE ON MAJOR PROJECTS IN THE PROGRAMMING PERIOD : THRESHOLD AND CONTENTS OF COMMISSION DECISIONS COCOF 08/0006/04-EN EUROPEAN COMMISSION DIRECTORATE-GENERAL REGIONAL POLICY DRAFT REVISED GUIDANCE NOTE ON MAJOR PROJECTS IN THE PROGRAMMING PERIOD 2007-2013: THRESHOLD AND CONTENTS OF COMMISSION DECISIONS!WARNING!

More information

ANNUAL IMPLEMENTATION REPORT

ANNUAL IMPLEMENTATION REPORT ANNUAL IMPLEMENTATION REPORT for the years 2014-2015 of the INTERREG IPA Cross-border Cooperation Programme Bulgaria Serbia CCI No 2014TC16I5CB007 1. IDENTIFICATION OF THE ANNUAL IMPLEMENTATION REPORT

More information

This document is meant purely as a documentation tool and the institutions do not assume any liability for its contents

This document is meant purely as a documentation tool and the institutions do not assume any liability for its contents 2006R1083 EN 25.06.2010 004.001 1 This document is meant purely as a documentation tool and the institutions do not assume any liability for its contents B COUNCIL REGULATION (EC) No 1083/2006 of 11 July

More information

Amended proposal for a REGULATION OF THE EUROPEAN PARLIAMENT AND OF THE COUNCIL

Amended proposal for a REGULATION OF THE EUROPEAN PARLIAMENT AND OF THE COUNCIL EUROPEAN COMMISSION Brussels, 22.4.2013 COM(2013) 246 final 2011/0276 (COD) Amended proposal for a REGULATION OF THE EUROPEAN PARLIAMENT AND OF THE COUNCIL laying down common provisions on the European

More information

EU Budget for the future ERDF/CF. June 2018 EVALNET. #CohesionPolicy #EUinmyRegion #ESIFOpendata

EU Budget for the future ERDF/CF. June 2018 EVALNET. #CohesionPolicy #EUinmyRegion #ESIFOpendata EU Budget for the future ERDF/CF June 2018 EVALNET #CohesionPolicy #EUinmyRegion #ESIFOpendata Overview Key themes Modern Focus on smart, low carbon Enabling conditions Link to Economic Goverance Performance

More information

INTERREG EUROPE Cooperation Programme document

INTERREG EUROPE Cooperation Programme document INTERREG EUROPE 2014-2020 CCI 2014 TC 16 RFIR 001 Cooperation Programme document Final 07 May 2014 Based on the Model for cooperation programmes under the European territorial cooperation goal as established

More information

3 rd Call for Project Proposals

3 rd Call for Project Proposals IPA CROSS-BORDER PROGRAMME "GREECE THE FORMER YUGOSLAV REPUBLIC OF MACEDONIA 2007-2013" 3 rd Call for Project Proposals Project Selection Criteria CCI: 2007 CB 16 I PO 009 The following Project Selection

More information

Guidance for Member States on Preparation, Examination and Acceptance of Accounts

Guidance for Member States on Preparation, Examination and Acceptance of Accounts EGESIF_15_0018-02 final 09/02/2016 EUROPEAN COMMISSION European Structural and Investment Funds Guidance for Member States on Preparation, Examination and Acceptance of Accounts DISCLAIMER: This is a document

More information

Guidance for Member States on Performance framework, review and reserve

Guidance for Member States on Performance framework, review and reserve EGESIF_18-0021-01 19/06/2018 Version 2.0 EUROPEAN COMMISSION European Structural and Investment Funds Guidance for Member States on Performance framework, review and reserve This version was updated further

More information

Welcome and Introduction

Welcome and Introduction Welcome and Introduction Halfway through the programming 2014-2020 halfway through the programme spending? 22 February 2018 I Nice, France Iuliia Kauk, Interact Objectives Get an update on the state of

More information

The approved ESPON 2020 Cooperation Programme. ESPON ECP Meeting 9-10 December 2015 in Luxembourg

The approved ESPON 2020 Cooperation Programme. ESPON ECP Meeting 9-10 December 2015 in Luxembourg The approved ESPON 2020 Cooperation Programme ESPON ECP Meeting 9-10 December 2015 in Luxembourg The approved ESPON 2020 Cooperation Programme Guiding questions How is the third ESPON programme generation

More information

COUNCIL OF THE EUROPEAN UNION. Brussels, 19 October /05 Interinstitutional File: 2004/0163 (AVC) LIMITE

COUNCIL OF THE EUROPEAN UNION. Brussels, 19 October /05 Interinstitutional File: 2004/0163 (AVC) LIMITE COUNCIL OF THE EUROPEAN UNION Brussels, 9 October 005 05/05 Interinstitutional File: 004/06 (AVC) LIMITE FSTR 57 FC 4 REGIO 50 SOC 68 CADREFIN 9 NOTE from : Presidency to : Structural Actions Working Party

More information

COMMISSION STAFF WORKING DOCUMENT Accompanying the document

COMMISSION STAFF WORKING DOCUMENT Accompanying the document EUROPEAN COMMISSION Brussels, 9.10.2017 SWD(2017) 330 final PART 9/13 COMMISSION STAFF WORKING DOCUMENT Accompanying the document REPORT FROM THE COMMISSION TO THE EUROPEAN PARLIAMENT, THE COUNCIL, THE

More information

Template for EMMF operational programme (CLLD elements) FARNET MA meeting, 25 March 2014

Template for EMMF operational programme (CLLD elements) FARNET MA meeting, 25 March 2014 Template for EMMF operational programme 2014-2020 (CLLD elements) FARNET MA meeting, 25 March 2014 EMFF OP template Based final consolidated version (COD 2011/ 0380 of 10 February 2014) of the amended

More information

COHESION POLICY

COHESION POLICY INTEGRATED SUSTAINABLE URBAN DEVELOPMENT COHESION POLICY 2014-2020 The new rules and legislation governing the next round of EU Cohesion Policy investment for 2014-2020 have been formally endorsed by the

More information

Regional development & cohesion & cooperation 7 June IPA-CBC

Regional development & cohesion & cooperation 7 June IPA-CBC EU Budget for the future Regional development & cohesion & cooperation 7 June 2018 - IPA-CBC #CohesionPolicy #EUinmyRegion Content 1. Legal architecture 2. Shorter modern menu of priorities 3. Main changes

More information

CATEGORIES OF INTERVENTION. Fiche no 6. Brussels, 14 November Commission Proposals

CATEGORIES OF INTERVENTION. Fiche no 6. Brussels, 14 November Commission Proposals CATEGORIES OF INTERVENTION Fiche no 6 Brussels, 14 November 2011 Articles Commission Proposals Articles 87 (2) (b) (iv) and 102 (2) Common Provisions Regulation [COM(2011) 615] This draft working paper

More information

Session 3: Round table on cross border cooperation opportunities for Interreg V

Session 3: Round table on cross border cooperation opportunities for Interreg V Session 3: Round table on cross border cooperation opportunities for Interreg V Opportunities for Growth in Small & Medium Sized Ports in Europe Quelles opportunités de croissance pour les Brussels ports

More information

COMMISSION OF THE EUROPEAN COMMUNITIES COMMISSION DECISION

COMMISSION OF THE EUROPEAN COMMUNITIES COMMISSION DECISION COMMISSION OF THE EUROPEAN COMMUNITIES Brussels, C(2007) NOT FOR PUBLICATION COMMISSION DECISION of [ ] adopting the operational programme for Community assistance from the European Social Fund under the

More information

Major projects in the programming period

Major projects in the programming period Regional Major projects in the 2014-2020 programming period Major Project Team Unit G.1 Competence Centre: Smart and Sustainable Growth DG Regional and Urban Legal framework 2014-2020 Regional New Cohesion

More information

FICHE 21 MODEL OF DELEGATED ACTS SETTING OUT STANDARD SCALES OF UNIT COSTS VERSION 2-21 OCTOBER Version

FICHE 21 MODEL OF DELEGATED ACTS SETTING OUT STANDARD SCALES OF UNIT COSTS VERSION 2-21 OCTOBER Version Version 2-21.10.2013 FICHE 21 MODEL OF DELEGATED ACTS SETTING OUT STANDARD SCALES OF UNIT COSTS AND LUMP SUMS DEFINED BY THE COMMISSION VERSION 2-21 OCTOBER 2013 Regulation Article European Social Fund

More information

Multi-country European Integration Facility

Multi-country European Integration Facility 1 INSTRUMENT FOR PRE-ACCESSION ASSISTANCE (IPA II) 2014-2020 Multi-country European Integration Facility Action Summary The objective of the EU Integration Facility is to assist the IPA II beneficiaries

More information

Financial management: comparing and

Financial management: comparing and Financial management: comparing 2007-2013 and 2014-2020 Trainer: Robin Smail Independent Consultant & Visiting Expert EIPA This training has been organised by EIPA-Ecorys-PwC under the Framework Contract

More information

PLANNING BUREAU SUMMARY. December 2009

PLANNING BUREAU SUMMARY. December 2009 PLANNING BUREAU EUROPEAN UNION REPUBLIC OF CYPRUS EVALUATION OF THE INDICATORS OF THE OPERATIONAL PROGRAMMES SUSTAINABLE DEVELOPMENT AND COMPETITIVENESS AND EMPLOYMENT, HUMAN CAPITAL AND SOCIAL COHESION

More information

ANNEX: IPA 2010 NATIONAL PROGRAMME PART II - BOSNIA AND HERZEGOVINA. at the latest by 31 December years from the final date for contracting.

ANNEX: IPA 2010 NATIONAL PROGRAMME PART II - BOSNIA AND HERZEGOVINA. at the latest by 31 December years from the final date for contracting. EN EN EN ANNEX: IPA 2010 NATIONAL PROGRAMME PART II - BOSNIA AND HERZEGOVINA 1. IDENTIFICATION Beneficiary Bosnia and Herzegovina CRIS number 2010 / 022-674 Year 2010 Cost EUR 6 000 000 Implementing Authority

More information

(Legislative acts) REGULATIONS

(Legislative acts) REGULATIONS 12.3.2014 Official Journal of the European Union L 72/1 I (Legislative acts) REGULATIONS REGULATION (EU) No 223/2014 OF THE EUROPEAN PARLIAMENT AND OF THE COUNCIL of 11 March 2014 on the Fund for European

More information

Guidance for Member States on Performance framework, review and reserve

Guidance for Member States on Performance framework, review and reserve EGESIF_18-0021-01 19/06/2018 Version 12.0 07/01/2015 EUROPEAN COMMISSION European Structural and Investment Funds Guidance for Member States on Performance framework, review and reserve This version was

More information

Project Selection Criteria Transnational Cooperation Programme Interreg Balkan Mediterranean

Project Selection Criteria Transnational Cooperation Programme Interreg Balkan Mediterranean Project Selection Criteria Transnational Cooperation Programme Interreg Balkan Mediterranean 2014 2020 CCI 2014TC16M4TN003 22/06/2015 Version 1.0 Balkan-Mediterranean is co-financed by European Union and

More information

ANNUAL IMPLEMENTATION REPORT. The URBACT II Programme YEAR Objective concerned: Objective 3: European Territorial Cooperation

ANNUAL IMPLEMENTATION REPORT. The URBACT II Programme YEAR Objective concerned: Objective 3: European Territorial Cooperation The URBACT II Programme 2007-2013 ANNUAL IMPLEMENTATION REPORT YEAR 2007 OPERATIONNAL PROGRAMME: Objective concerned: Objective 3: European Territorial Cooperation Eligible area concerned: UE Member States

More information

COMMISSION OF THE EUROPEAN COMMUNITIES COMMISSION DECISION

COMMISSION OF THE EUROPEAN COMMUNITIES COMMISSION DECISION COMMISSION OF THE EUROPEAN COMMUNITIES Brussels, C(2007) NOT FOR PUBLICATION COMMISSION DECISION of [ ] adopting the operational programme for Community assistance from the European Social Fund under the

More information

The INTERREG III Community Initiative

The INTERREG III Community Initiative Version: 14 March 2003 The INTERREG III Community Initiative How to prepare programmes A practical guide for preparing new, and amending existing, INTERREG III Community Initiative Programmes as a result

More information

Fiche no 14. Brussels,

Fiche no 14. Brussels, REPORTING ARRANGEMENTS FOR THE CSF FUNDS IN 2014-2020 Fiche no 14 Brussels, 17.02.2012 Articles Articles 44, 46, 75, 101, 102, Commission Proposals Common Provisions [COM(2011) 615] 114, 116, 126, 128

More information

Committee on Transport and Tourism. of the Committee on Transport and Tourism. for the Committee on Regional Development

Committee on Transport and Tourism. of the Committee on Transport and Tourism. for the Committee on Regional Development European Parliament 2014-2019 Committee on Transport and Tourism 2018/0197(COD) 30.8.2018 DRAFT OPINION of the Committee on Transport and Tourism for the Committee on Regional Development on the proposal

More information

The funding possibilities to build up adaptation capacities and take action

The funding possibilities to build up adaptation capacities and take action The funding possibilities to build up adaptation capacities and take action Federica Alcozer Studio GAP associati, planning consultant Water and risk management facing climate change: towards the local

More information

REPORT FROM THE COMMISSION TO THE EUROPEAN PARLIAMENT AND THE COUNCIL

REPORT FROM THE COMMISSION TO THE EUROPEAN PARLIAMENT AND THE COUNCIL EUROPEAN COMMISSION Brussels, 30.1.2018 COM(2018) 48 final REPORT FROM THE COMMISSION TO THE EUROPEAN PARLIAMENT AND THE COUNCIL on the implementation of the Common Monitoring and Evaluation System for

More information

Factsheet n. 1 Introduction and Background

Factsheet n. 1 Introduction and Background INTERREG V A Italy Croatia CBC Programme Factsheet n. 1 Introduction and Background Version N 1 of 20 th February 2017 Programme co-financed by the European Regional Development Fund (ERDF) TABLE OF CONTENTS

More information

Financial Instruments in Cohesion Policy

Financial Instruments in Cohesion Policy Financial Instruments in Cohesion State of play, lessons learned and outlook 2014-2020 Directorate General for and Urban Unit B3 : Financial Instruments and IFI Relations Workshop on Financial Instruments

More information

Multi-country European Integration Facility

Multi-country European Integration Facility 1 INSTRUMENT FOR PRE-ACCESSION ASSISTANCE (IPA II) 2014-2020 Multi-country European Integration Facility Action Summary The objective of the EU Integration Facility is to assist the IPA II beneficiaries

More information

MARITIME AFFAIRS & FISHERIES. EMFF Strategic Programming

MARITIME AFFAIRS & FISHERIES. EMFF Strategic Programming EMFF Strategic Programming 2014-2020 Christine Falter, MARE A3, 15 February 2012 EU level Strategic Programming THE COMMON STRATEGIC FRAMEWORK ERDF, ESF, CF, EAFRD, EMFF National level THE PARTNERSHIP

More information

FriendsofthePresidencygroup(MFF) MultiannualFinancialFramework( ) -SectionoftheNegotiatingBoxrelatingtoHeading1(cohesionandCEF)

FriendsofthePresidencygroup(MFF) MultiannualFinancialFramework( ) -SectionoftheNegotiatingBoxrelatingtoHeading1(cohesionandCEF) ConseilUE COUNCILOF THEEUROPEANUNION PUBLIC Brusels,20 March2012 7635/12 LIMITE CADREFIN143 POLGEN46 NOTE from: to: Subject: Presidency FriendsofthePresidencygroup(MFF) MultiannualFinancialFramework(2014-2020)

More information

Investing in regions: The reformed EU Cohesion Policy

Investing in regions: The reformed EU Cohesion Policy Investing in regions: The reformed EU Cohesion Policy 2014-2020 Presentation by David Müller, Member of cabinet For Alpeuregio summer school Cohesion policy Basics on EU Cohesion Policy Cohesion policy

More information

(Non-legislative acts) REGULATIONS

(Non-legislative acts) REGULATIONS 22.9.2010 Official Journal of the European Union L 248/1 II (Non-legislative acts) REGULATIONS COMMISSION REGULATION (EU) No 832/2010 of 17 September 2010 amending Regulation (EC) No 1828/2006 setting

More information

IPA National Programme 2009 Part II - Bosnia and Herzegovina Fiche 3 Preparation for IPA components III and IV

IPA National Programme 2009 Part II - Bosnia and Herzegovina Fiche 3 Preparation for IPA components III and IV IPA National Programme 2009 Part II - Bosnia and Herzegovina Fiche 3 Preparation for IPA components III and IV 1. Basic information 1.1 CRIS Number: 2009 / 021-650 1.2 Title: Preparation for IPA components

More information

Working Paper Elements of strategic programming for the period

Working Paper Elements of strategic programming for the period EUROPEAN COMMISSION DIRECTORATE-GENERAL FOR AGRICULTURE AND RURAL DEVELOPMENT Working Paper Elements of strategic programming for the period 2014-2020 Working paper prepared in the context of the Seminar

More information

COMMON GUIDELINES Consultation deadline for Bulgaria and Romania: 2 May 2006

COMMON GUIDELINES Consultation deadline for Bulgaria and Romania: 2 May 2006 COUNCIL OF THE EUROPEAN UNION Brussels, 28 April 2006 8750/06 Interinstitutional File: 2004/0163 (AVC) FSTR 24 FC 15 REGIO 18 SOC 196 CADREFIN 108 OC 318 NOTE from : Structural Actions Working Party to

More information

PART 1: DANUBE TRANSNATIONAL PROGRAMME

PART 1: DANUBE TRANSNATIONAL PROGRAMME Applicants Manual for the period 2014-2020 Version 1 PART 1: DANUBE TRANSNATIONAL PROGRAMME edited by the Managing Authority/Joint Secretariat Budapest, Hungary, 2015 Applicants Manual Part 1 1 PART 1:

More information

Key features and opportunities of financial instruments under ESI Funds in

Key features and opportunities of financial instruments under ESI Funds in Key features and opportunities of financial instruments under ESI Funds in 2014-2020 Nicholas Martyn, Deputy Director-General, and Urban, EC Key features and opportunities of financial instruments under

More information

Cohesion Policy

Cohesion Policy European Union Cohesion Policy Cohesion Policy 2014-2020 Investing in growth and jobs www.ec.europa.eu/inforegio Table of contents 1 2 3 4 5 6 7 Legislative proposals for EU Cohesion Policy: 2014-2020

More information

EN Official Journal of the European Union L 77/11

EN Official Journal of the European Union L 77/11 15.3.2014 EN Official Journal of the European Union L 77/11 REGULATION (EU) No 231/2014 OF THE EUROPEAN PARLIAMENT AND OF THE COUNCIL of 11 March 2014 establishing an Instrument for Pre-accession Assistance

More information

Official Journal of the European Union

Official Journal of the European Union 13.5.2014 L 138/5 COMMISSION DELEGATED REGULATION (EU) No 480/2014 of 3 March 2014 supplementing Regulation (EU) No 1303/2013 of the European Parliament and of the Council laying down common provisions

More information

COHESION POLICY

COHESION POLICY INTEGRATED SUSTAINABLE URBAN DEVELOPMENT COHESION POLICY 2014-2020 The European Commission adopted legislative proposals for cohesion policy for 2014-2020 in October 2011 This factsheet is one in a series

More information

Marche Region. Ex Ante Evaluation report. Executive summary. Roma, June 2015

Marche Region. Ex Ante Evaluation report. Executive summary. Roma, June 2015 Marche Region 2014-2020 COMMITTENTE RDP for Marche Ex Ante Evaluation report Roma, June 2015 Executive summary EXECUTIVE SUMMARY Introduction The Ex Ante Evaluation (EAE) of the Rural Development Programme

More information

ESF PR 2.9. ESF Programme for Employability, Inclusion and Learning OP

ESF PR 2.9. ESF Programme for Employability, Inclusion and Learning OP ESF Programme for Employability, Inclusion and Learning OP 2014-2020 Priority: Priority 2: Promoting Social Inclusion and combating discrimination in the labour market Thematic Objective and investment

More information

ABBREVIATIONS AND GLOSSARY

ABBREVIATIONS AND GLOSSARY Applicants Manual for the period 2014-2020 Version 1.1 edited by the Managing Authority/Joint Secretariat Budapest, Hungary, 2016 Applicants Manual Abbreviations and Glossary 1 ABBREVIATIONS AA AF AfR

More information

Summary of the Partnership Agreement for Hungary,

Summary of the Partnership Agreement for Hungary, EUROPEAN COMMISSION Brussels, 26 August 2014 Summary of the Partnership Agreement for Hungary, 2014-2020 Overall information The Partnership Agreement (PA) covers five funds: the European Regional Development

More information

EN 1 EN. Rural Development HANDBOOK ON COMMON MONITORING AND EVALUATION FRAMEWORK. Guidance document. September 2006

EN 1 EN. Rural Development HANDBOOK ON COMMON MONITORING AND EVALUATION FRAMEWORK. Guidance document. September 2006 Rural Development 2007-2013 HANDBOOK ON COMMON MONITORING AND EVALUATION FRAMEWORK Guidance document September 2006 Directorate General for Agriculture and Rural Development EN 1 EN CONTENTS 1. A more

More information

Skills and jobs: transnational cooperation and EU programmes Information note (28 February 2013)

Skills and jobs: transnational cooperation and EU programmes Information note (28 February 2013) Skills and jobs: transnational cooperation and EU programmes 2014-2020 Information note (28 February 2013) Introduction In the context of the Committee of the Regions conference on skills and jobs on 28

More information

Annual Implementation Report 2017

Annual Implementation Report 2017 INTERREG-IPA Cross-border Cooperation Programme Hungary-Serbia Annual Implementation Report 2017 Approved by the Joint Monitoring Committee on 28 May 2018 CONTENT 1. IDENTIFICATION OF THE ANNUAL / FINAL

More information

CORRIGENDUM: Annule et remplace le document COM(2011) 615 du Concerne: toutes les versions linguistiques. Proposal for a

CORRIGENDUM: Annule et remplace le document COM(2011) 615 du Concerne: toutes les versions linguistiques. Proposal for a EUROPEAN COMMISSION Brussels, 14.3.2012 COM(2011) 615 final/2 2011/0276 (COD) CORRIGENDUM: Annule et remplace le document COM(2011) 615 du 6.10.2011 Concerne: toutes les versions linguistiques Proposal

More information

EUROPEAN COMMISSION. Observations on the Partnership Agreement with the Netherlands

EUROPEAN COMMISSION. Observations on the Partnership Agreement with the Netherlands Ref. Ares(2014)1617982-19/05/2014 EUROPEAN COMMISSION Introduction Observations on the Partnership Agreement with the Netherlands The observations set out below have been made within the framework of the

More information

Reporting on financial instruments (FI) in the annual implementation report for the programming period

Reporting on financial instruments (FI) in the annual implementation report for the programming period Reporting on financial instruments (FI) in the annual implementation report for the programming period 2014-2020 Online learning on financial instruments June 2017 Jörg Lackenbauer and Ieva Zalite European

More information

This note has been prepared by the Directorate-General for Regional Policy.

This note has been prepared by the Directorate-General for Regional Policy. COCOF 08/0006/00-EN EUROPEAN COMMISSION DIRECTORATE-GENERAL REGIONAL POLICY DRAFT INFORMATION NOTE TO THE COCOF MAJOR PROJECTS IN THE PROGRAMMING PERIOD 2007-2013: THRESHOLDS AND CONTENTS OF COMMISSION

More information

COMMISSION IMPLEMENTING DECISION. of XXX

COMMISSION IMPLEMENTING DECISION. of XXX EUROPEAN COMMISSION Brussels, XXX [ ](2015) XXX draft COMMISSION IMPLEMENTING DECISION of XXX approving certain elements of the cooperation programme "Interreg V-A Germany/Mecklenburg-Vorpommern/Brandenburg-Poland"

More information

EU Regional Policy. EU Structural Funds

EU Regional Policy. EU Structural Funds EU Regional Policy EU Structural Funds EU Regional Policy Regional policy is the vehicle for delivering regional aid Biggest slice of the EU budget which helps: poorer regions catch up areas undergoing

More information

INTERREG EUROPE program. Statement. March Position of the MOT on the consultation of stakeholders on INTERREG EUROPE program

INTERREG EUROPE program. Statement. March Position of the MOT on the consultation of stakeholders on INTERREG EUROPE program Statement INTERREG EUROPE program Position of the MOT on the consultation of stakeholders on INTERREG EUROPE program 2014-2020 March 2014 Position of the MOT on the stakeholder consultation on INTERREG

More information

ANNEX. ANNEX 3 Fiches per policy area(s) to the

ANNEX. ANNEX 3 Fiches per policy area(s) to the EUROPEAN COMMISSION Brussels, 8.2.2012 COM(2012) 42 final Annex 3 ANNEX ANNEX 3 Fiches per policy area(s) to the COMMUNICATION FROM THE COMMISSION TO THE EUROPEAN PARLIAMENT, THE COUNCIL, THE EUROPEAN

More information