CHF Sudan 2015 Standard Allocation. Project Proposal and Budget Guidelines: SUBMISSION OF CONCEPT NOTES
|
|
- Horatio Black
- 6 years ago
- Views:
Transcription
1 CHF Sudan 2015 Standard Allocation Project Proposal and Budget Guidelines: SUBMISSION OF CONCEPT NOTES
2 Content 1. Eligibility criteria and allocation process 2. Creation of project Concept Note 3. Project identification process (strategic review) 4. Selection of projects (preliminary approval)
3 Eligibility Criteria To apply for CHF funding NGO partners must: - Be nominated by the Sector Lead; - Have an approved project in the SRP 2015; - Meet the programme performance criteria of the Sector; - Satisfactory performance in Programme Monitoring; - Pass the UNDP Capacity Assessment; - Have fulfilled all UNDP and OCHA reporting requirements; - Not have any outstanding qualified audits; - Have submitted a Fraud Policy to UNDP; (prior to the finalization of the Project Partnership Agreement)
4 Standard Allocation Process Step 1. Submission of Projects Concept Notes Step 2. Strategic Reviews of Concept Notes Step 3. Selection of Projects (Preliminary Approval) Step 4. Submission of Full Project Proposal Step 8. Project Closure Step 7. Implementation & Monitoring Step 6. HC Final Approval and Disbursement Step 5. Technical Review
5 Submission of Project Concept Notes The registered member of the implementing partner creates a new project proposal in the CHF Grant Management System (GMS). Once the new project proposal has been initiated, the implementing partner defines the Project Concept Note. The Project Concept Note should address the priorities defined by their respective sectors as outlined in the Allocation Strategy Paper. It comprises of the following sections: Cover Page Logical Framework Budget Locations Step 1. Submission of Projects Concept Notes Step 2. Strategic Revies of Concept Notes Step 3. Selection of Projects (Preliminary Approval) Step 4. Submission of Full Project Proposal Step 8. Project Closure Step 7. Implementation & Monitoring Step 6. HC Final Approval and Disbursemement Step 5. Technical Review
6 Creation of Concept Notes
7 Creation of Concept Notes
8 Cover Page Project summary; Link with allocation strategy; Direct beneficiaries; Beneficiary type; Gender marker; Sub-Grants to Implementing Partners; Other contributions/matching funds (if any); Humanitarian context analysis; Grant request justification.
9 Cover Page Project Overview
10 Cover Page Project Beneficiaries
11 Cover Page Other Information
12 Cover Page Background
13 Logical Framework Overall project objective; Cluster objectives; SRP objectives; Sector Specific Objectives; Percentage of activities; Outcome; Output; Activities; Indicators;
14 Logical Framework Project Objectives
15 Logical Framework
16 Budget General principles Manually entered on GMS Submitted in US$ In line with the project proposal background and the logical framework For each budget line provide Unit Quantity, Unit Cost and Duration % of full cost of the project charged to CHF on a line by line basis Include sufficient details in the note field Add extra lines by selecting this option: Always Save and Stay option: Can be exported in Excel:
17 Budget Classification 1. Staff and Other Personnel Costs 2. Supplies, Commodities, Materials (Project Inputs) 3. Equipment 4. Contractual Services (DO NOT USE) 5. Travel 6. Transfers and Grants to Counterparts 7. General Operating and Other Direct Costs 8. PSC Cost 9. Audit Cost
18 1. Staff and Other Personnel Costs Direct Staff Salaries, social security contributions and other related benefits for staff working directly on the project. e.g. programme personnel like health officers, teachers, etc. Support Staff Salaries, social security contributions and other related benefits for staff engaged in management, support and administrative activities. e.g. country representative, administrative and finance personnel, human resources, logistic managers, etc.
19 2. Supplies, Commodities, Materials Purchase of goods and services (inputs) should be categorised by standard activities as appearing in the implementing partner s project logical framework: Procurement of consumable supplies for project implementation (e.g. drugs, food, NFIs, tents, seeds, tools, etc.) Costs associated with the delivery, storage and distribution of consumable supplies procured by the project, such as transportation, freight, customs, etc. Construction works: only the labor costs and known essential materials shall be budgeted and itemized, providing unit /quantity and unit cost Training costs associated with the direct implementation of the project (e.g. Technical training for direct personnel like training of community nutrition workers on Infant and Young Child Feeding practices) Communications materials for training and awareness raising, such as posters, pamphlets, etc., as well as the reproduction of these items.
20 3. Equipment Procurement of non-consumables for the benefit of project recipients and directly related to the project implementation (e.g. IT equipment for registration, medical equipment, etc.) Low value items should be included in budget section 2 CHF generally does not fund the purchase of vehicles. If included, a strong justification is required
21 4. Contractual Services DO NOT USE All costs for good and services should be inserted in budget section 2, irrespectively of who is providing the service (implementing partner or third supplier).
22 5. Travel Travel costs of staff, consultants and other project personnel, such as daily subsistence allowance, local flights, hazard pay and other travel entitlements, fuel and vehicle/boat rental costs for staff Details of the position who will be travelling should be indicated Staff travelling must be posts included in the budget under section1.
23 6. Transfers and Grants to Counterparts Entities receiving sub-grants could be NGOs, government or other non-commercial entities For each transfer and/or sub-grant provide the estimated cost breakdown of partnership agreements by: Staffing Direct project activities are purchase of goods and services categorised by standard activities as appearing in the agency s project logical framework Programme support costs (PSC) refer to the general operating and office running costs (max 7%)
24 7. General Operating and Other Direct Costs General operating costs, including office running costs, office stationary/supplies, and utilities such as telecommunications, internet, and office rental for the implementation of this project. For these costs provide information of office location. Other direct costs that cannot be mapped to the expense categories above, such as such as technical supervisory support, monitoring and evaluation, reporting, and others. General Operating Costs originating from Khartoum country offices, or from other locations other than the one where the project implementation takes place, are allowable under the conditions for inclusion of shared costs (section 3 page 12 of this document).
25 8. Programme Support Costs (PSC) PSC are indirect costs incurred by the implementing partner regardless of the scope and level of its activities and which cannot be traced unequivocally to specific activities, projects or programmes. i.e. headquarters and statutory bodies, legal services, general procurement and recruitment etc. PSC is charged as a maximum 7 per cent of the approved direct project expenditures (categories 1 to 7) incurred by the implementing partner.
26 9. Audit Cost All NGOs must allocate 1 per cent of the direct project expenditures to be retained by UNDP/FU to undertake independent project audits
27 Shared Costs The implementing partner may share certain country office costs to different uses and projects, for example staff, office rent, utilities, etc. All shared cost must be directly linked to the project implementation and allocated to the CHF project in direct proportion to the benefit or time input the project derives from that shared costs. For staff-related costs, if a position is cost-shared, the percentage of the monthly cost corresponding to the time that the person will dedicate to the project shall be budgeted. Non-staff shared costs should be shared on the basis of an equitable cost allocation system.
28 Ineligible Expenditures Debts and provisions for possible future losses or debts. Interest owed by the implementing partner to any third party. Items already financed from other sources. Incentives in the form of hardware to government entities. International travel unless directly linked to the delivery of the project objectives. In any case international travel will have to be approved on a caseby-case basis when requested to support project activities. Purchases of land or buildings. Currency exchange losses. Costs related to establishing reserves such as severance reserves or cessation benefits accrued by the implementing partner, contractors or staff. Government staff salaries except with those cases where the government staff has been fully seconded to a CHF funded project. Hospitality expenses, provision of food/refreshments for project staff (potable water is allowed). Incentives, mark-ups, gifts to staff. Fines and penalties. Duties, charges, taxes (including VAT) recoverable by the implementing partner. Global evaluation of programmes.
29 Locations
30 Strategic Review of Concept Notes Once all the Project Concept Notes have been received, the Sector Leads convenes the Programmatic Review Groups (PRG) to assess the received concept notes vis-à-vis the Sector Strategy as outlined in the Allocation Strategy Paper. The PRG is facilitated by the Sector Lead (and Co-lead if relevant), and comprises two UN partners, and two to three NGO partners (including a national NGO). The PRGs review and score the proposals according to four set of criteria, with the aim to put forward a limited number of concept notes considered best suited to address the needs identified in the allocation strategy. Step 1. Submission of Projects Concept Notes Step 2. Strategic Reviews of Concept Notes Step 3. Selection of Projects (Preliminary Approval) Step 4. Submission of Full Project Proposal Step 8. Project Closure Step 7. Implementation & Monitoring Step 6. HC Final Approval and Disbursement Step 5. Technical Review
31 Strategic Review of Concept Notes The PRG scores the proposals against Strategic and Programmatic Relevance, and Sector Specific Criteria; The selection of Project Concept Notes is made on the basis of eligibility (A) and selection (B,C,D) criteria:
32 Required Criteria: A.1. Is the partner eligible for CHF funding from the 2015 First Allocations? A.2. Is the project either top or high priority in the SRP? (Yes/No)
33 Strategic and Programmatic Relevance B.1. Is the Concept Note in line with the SRP Objectives? B.2. Is the Concept Note in line with the Sector Specific Objectives? B.3. HNO sector geographical score (0 to 5) B.4. Are the beneficiaries defined and targeted (reaching the most vulnerable)? B.5. Are the needs well explained and documented? B.6. Does the Concept Note demonstrate consultation with beneficiaries in the identification of needs and development of project outputs (delivery)? B.7. Is there a link between needs and activities planned in the Logical Framework? B.8. Does the Concept Note show clear linkage between objectives, outputs and activities? B.9. The targets listed in the Logical Framework are realistic. B.10. Gender issues have been sufficiently mainstreamed within the Concept Note. 70%
34 Cost Effectiveness C.1. Proportion of direct costs versus support costs; C.2. Proportion staff costs over total budget is approximate to sector average; C.3. Proportion of general operating costs over total budget is approximate to sector average; C.4. Cost per beneficiary is approximate to the sector average; 10%
35 Sector Specific Criteria D.1. Does the implementing partner have previous experience in the geographic area and in the work of the sector/sub sector? D.2. Does the partner participate actively in Khartoum and/or State Level coordination mechanisms; D.3. Compliance with sector defined criteria. 20%
36 Selection of Projects (Preliminary Approval) Based on the outcome of the PRGs, sector leads report on the PRGs and put forward a list of selected projects for review by the CHF Technical Unit. The CHF Technical Unit does quality control of the PRG process with aim to examining whether the process was fair, free and transparent and to examine whether or not the proposed Concept Notes are in line with the Sector Strategy. The CHF Technical Unit reports on the outcomes to the HC; Once the HC approves the list of pre-approved concept notes, partners will be invited to develop full project proposal for technical review. Step 1. Submission of Projects Concept Notes Step 2. Strategic Reviews of Concept Notes Step 3. Selection of Projects (Preliminary Approval) Step 4. Submission of Full Project Proposal Step 8. Project Closure Step 7. Implementation & Monitoring Step 6. HC Final Approval and Disbursement Step 5. Technical Review
37 Cross Cutting Issues Accountability to Affected Population
38 Accountability to Affected Populations AAP is about humanitarian agencies enhancing the effectiveness of their work by systematically engaging aid recipients in the decisions that affect their lives. It means giving people affected by humanitarian crises a voice and hand in the design and implementation of programmes intended to benefit them. Taking account of others ideas Accounting for our actions All segments: women, girls, boys, men of all ages, disabled etc.
39 How and When? Consult beneficiaries during assessment, design, implementation, monitoring, and evaluation of programmes Establishing transparent, two-way channels of communication for information sharing; Facilitate participatory processes for decision-making and mutual learning. Actively gather and respond to feedback and complaints ALNAP OCHA and AAP 39
40 AAP in the 2015 Standard Allocation Concept Notes B. Strategic and Programmatic Relevance B.6. Does the Concept Note demonstrate consultation with beneficiaries in the identification of needs and development of project outputs (delivery)? (Fully:5; Partially:2.5; No:0) CHF AAP Resources AAP Framework AAP Guidance Sheet (also available in Arabic) 40
41 Next Steps Step 1. Submission of Projects Concept Notes Step 2. Strategic Reviews of Concept Notes Step 3. Selection of Projects (Preliminary Approval) Step 4. Submission of Full Project Proposal Step 8. Project Closure Step 7. Implementation & Monitoring Step 6. HC Final Approval and Disbursement Step 5. Technical Review
42 Help in GMS:? FTS & GMS focal point: Adil Saad
43 Contacts 43
44 CHF Sector Focal Points 44
45 Thank you!
CHF Sudan 2015 Standard Allocation Budget Guidelines for NGOs Implementing Partners: FULL PROJECT PROPOSAL
CHF Sudan 2015 Standard Allocation Budget Guidelines for NGOs Implementing Partners: FULL PROJECT PROPOSAL Contents 1. Purpose... 2 2. Submission of Full Project Proposal Budgets... 2 3. New Elements...
More informationCERF Budget Template
Updated on 15 Feb 2019 CERF Budget Template CERF Project Budget Please ensure to follow the CERF application budget guidance (also available at https://cerf.un.org/partnerresources/guidanceandtemplates).
More informationAPPLICATION FOR GRANT FUNDING
Funding APPLICATION FOR GRANT FUNDING COUNTRY NAME: Humanitarian Country Teams, cluster or sector leads, agencies and their implementing partners should contribute to the development of this application
More information23/06/2017. Agenda. Myanmar Humanitarian Fund. Project Proposal Design Training. What is the MHF? MHF Governance and Management
Agenda Myanmar Humanitarian Fund Project Proposal Design Training 1. MHF Overview 2. Eligibility 3. Grant Management System 4. MHF Programme Cycle 5. MHF Feedback & Complaints Mechanism 6. MHF Visibility
More informationAFGHANISTAN ALLOCATION GUIDELINES 22 JANUARY 2014
AFGHANISTAN ALLOCATION GUIDELINES 22 JANUARY 2014 I. Contents Introduction... 2 Purpose... 2 Scope... 2 Rationale... 2 Acronyms... 2 I. Funding Mechanisms... 3 A. Eligibility... 3 B. Standard Allocation...
More informationOperational Manual 1
Sudan Humanitarian Fund Operational Manual 1 February 2016 FINAL VERSION 1 Also called Terms of Reference in reference to the current Standard Administrative Agreements that donors sign with the Multi
More informationSouth Sudan Common Humanitarian Fund Allocation Process Guidelines
South Sudan Common Humanitarian Fund Allocation Process Guidelines 27 January 2012 ACRONYMS AB CAP CERF CHF HC HCT HFU ISWG NCE NGO OCHA OPS PPA PRT PUNO TOR UN UNDP Advisory Board Consolidated Appeal
More informationSudan Humanitarian Fund. Operational Manual. November FINAL VERSION.
Sudan Humanitarian Fund Operational Manual November 2017 1 FINAL VERSION 1 This version replaces the SHF Operational Manual dated February 2017. www.unocha.org The mission of the United Nations Office
More informationREPORT 2016/038 INTERNAL AUDIT DIVISION. Audit of the Office for the Coordination of Humanitarian Affairs operations in South Sudan
INTERNAL AUDIT DIVISION REPORT 2016/038 Audit of the Office for the Coordination of Humanitarian Affairs operations in South Sudan Overall results relating to the effective management of operations in
More informationMyanmar Emergency Response Fund Operational Manual
Myanmar Emergency Response Fund Operational Manual 1 Myanmar Emergency Response Fund Operational Manual July 2015 Myanmar Emergency Response Fund Operational Manual 2 Table of Contents 1. Acronyms... 3
More informationConsolidated Annual Financial Report on Activities Implemented under the DRC Humanitarian Fund
Consolidated Annual Financial Report on Activities Implemented under the DRC Humanitarian Fund Report of the Administrative Agent of the DRC Humanitarian Fund for the period 1 January - 31 December 2016
More informationConsolidated Annual Financial Report on Activities Implemented under the Democratic Republic of Congo Pooled Fund
Consolidated Annual Financial Report on Activities Implemented under the Democratic Republic of Congo Pooled Fund Report of the Administrative Agent of the DRC Pooled Fund for the period 1 January 31 December
More informationSouth Sudan Humanitarian Fund Operational Manual
A South Sudan Humanitarian Fund Operational Manual December 2016 Juba, South Sudan www.unocha.org The mission of the is to mobilize and coordinate effective and principled humanitarian action in partnership
More informationProject costs have to be actually incurred due to the project implementation, in order to be considered as eligible costs.
Financial issues Extract from the guide for BONUS applicants 1 8. How to prepare project budget? Only the real costs required for the implementation should be indicated in the planned budget for the project.
More informationANNEXES. Allocation Strategy Paper Annexes Myanmar Humanitarian Fund 2018 Second Standard Allocation
MHF Allocation Strategy Paper - Annexes 1 Allocation Strategy Paper Annexes Myanmar Humanitarian Fund 2018 Second Standard Allocation ANNEXES Annex 1: MHF Operating Principles and Strategic Review... 2
More informationFinancial Reporting Guidelines
SHF Operational Manual: Annex 3 Financial Reporting Guidelines (16 Feb 2018) A. Types of financial reports I. Line level reports-each budget line is updated in detail These are: Interim Financial Report,
More informationSouth Sudan Common Humanitarian Fund (South Sudan CHF) Terms of Reference (TOR)
South Sudan Common Humanitarian Fund (South Sudan CHF) Terms of Reference (TOR) 14 February 2012 List of Acronyms AA Administrative Agent AB Advisory Board CAP Consolidated Appeal Process CHF Common Humanitarian
More informationEconomic and Social Council
United Nations E/ICEF/2013/AB/L.4 Economic and Social Council Distr.: Limited 11 July 2013 Original: English For action United Nations Children s Fund Executive Board Second regular session 2013 3-6 September
More informationSudan Common Humanitarian Fund (CHF) Revised Terms of Reference July 2008
Sudan Common Humanitarian Fund (CHF) Revised Terms of Reference July 2008 I -General 1. In 2006 and the subsequent years after that, the United Nations coordinated approach to the delivery of humanitarian
More informationVision Paper: OCHA Country-Based Pooled Funds (CBPFs) and Beyond
Vision Paper: OCHA Country-Based Pooled Funds (CBPFs) and Beyond Vision: By 2017, OCHA will get relief to people affected by conflicts and natural disasters in a quicker and more efficient way through
More informationOPERATIONAL PROGRAMME under THE FUND FOR EUROPEAN AID TO THE MOST DEPRIVED
OPERATIONAL PROGRAMME under THE FUND FOR EUROPEAN AID TO THE MOST DEPRIVED 2014-2020 1. IDENTIFICATION (max. 200 characters) The purpose of this section is to identify only the programme concerned. It
More informationLebanon Humanitarian Fund Operational Manual 2019
Lebanon Humanitarian Fund Operational Manual 2019 Coordination Saves Lives The mission of the is to mobilize and coordinate effective and principled humanitarian action in partnership with national and
More informationAnnex 2: SSHF Memorandum of Understanding [Template] STANDARD MEMORANDUM OF UNDERSTANDING (MOU) FOR SOUTH SUDAN HUMANITARIAN FUND
A Annex 2: SSHF Memorandum of Understanding [Template] STANDARD MEMORANDUM OF UNDERSTANDING (MOU) FOR SOUTH SUDAN HUMANITARIAN FUND Memorandum of Understanding between Participating UN Organizations 1,
More informationBUDGET REVISION TO PROTRACTED RELIEF AND RECOVERY OPERATION:
BUDGET REVISION TO PROTRACTED RELIEF AND RECOVERY OPERATION: Relief Food Assistance to Tackle Food Security Challenges Afghanistan PRRO 200063 Cost (United States dollars) Current budget Increase Revised
More informationSomalia Common Humanitarian Fund Standard Allocation Document 2015
Somalia Common Humanitarian Fund Standard Allocation Document 2015 First standard allocation 2015 This document outlines the strategic objectives of the Somalia Common Humanitarian Fund (CHF) first standard
More informationADMINISTRATION REQUIRIMENTS
DAY ONE TRAINING CERF BUDGET AND SESSION ADMINISTRATION REQUIRIMENTS WORKSHOP Objective of this session Understand administrative process for the funding of a CERF project Understand administrative issues
More informationFinancialGuidelines forunitaidgrantees
FinancialGuidelines forunitaidgrantees 6April2018 Table of Contents Purpose and Scope... 4 General Funding Principles... 5 Budgeting... 8 Budget Management... 10 Disbursements... 12 Financial Reporting...
More informationLebanon Humanitarian Fund Operational Manual
Lebanon Humanitarian Fund Operational Manual Coordination Saves Lives The mission of the is to mobilize and coordinate effective and principled humanitarian action in partnership with national and international
More informationManagement response to the recommendations deriving from the evaluation of the Mali country portfolio ( )
Executive Board Second regular session Rome, 26 29 November 2018 Distribution: General Date: 23 October 2018 Original: English Agenda item 7 WFP/EB.2/2018/7-C/Add.1 Evaluation reports For consideration
More informationTERMS OF REFERENCE EXTERNAL EVALUATION OF UNICEF S CASH TRANSFER PROJECT IN NIGER SEPTEMBER 2010
TERMS OF REFERENCE EXTERNAL EVALUATION OF UNICEF S CASH TRANSFER PROJECT IN NIGER SEPTEMBER 2010 I. Background Following poor crops in 2009-2010 in Niger, the vulnerability survey conducted in April 2010
More informationJoint report on cost recovery
United Nations Executive Board of the United Nations Development Programme, the United Nations Population Fund and the United Nations Office for Project Services Executive Board of the United Nations Children
More informationDRC Pooled Fund. Annual Report. January December UN Humanitarian Coordinator
DRC Pooled Fund Annual Report January December 2007 UN Humanitarian Coordinator Kinshasa, March 2008 TABLE OF CONTENTS Executive Summary... 6 1. DRC Pooled Fund in 2007: Overview... 8 2. DRC Pooled Fund:
More informationREPORT 2016/081 INTERNAL AUDIT DIVISION
INTERNAL AUDIT DIVISION REPORT 2016/081 Audit of selected subprogrammes and related technical cooperation projects in the Economic and Social Commission for Western Asia Overall results relating to the
More informationE Distribution: GENERAL. Executive Board Second Regular Session. Rome, October September 2007 ORIGINAL: ENGLISH
Executive Board Second Regular Session Rome, 22 26 October 2007! E Distribution: GENERAL 11 September 2007 ORIGINAL: ENGLISH Cost (United States dollars) Current budget Increase Revised budget WFP food
More informationNEPAD/Spanish Fund for African Women s empowerment
NEPAD/Spanish Fund for African Women s empowerment Project Proposal Format Annex 0 1 P age Proposal Format Proposal Cover Page: PROPOSAL TO THE NEPAD- SPANISH FUND FOR AFRICAN WOMEN s EMPOWERMENT Organization
More informationThe UN Trust Fund to End Violence against Women Annex 3: Budget Guidelines
Contents The UN Trust Fund to End Violence against Women Annex 3: Budget Guidelines 1. General Guidelines & Requirements... 1 2. Budget for Project Activities... 2 3. Budget for M&E/Audit/Management Costs...
More informationGuidelines for the United Nations Trust Fund for Human Security
Guidelines for the United Nations Trust Fund for Human Security Eighth Revision 1 30 October 2014 1 This sets out the revised Guidelines for the United Nations Trust Fund for Human Security, effective
More informationFinancial Statements and Independent Auditor's Report for the Year Ended December 31, 2013
Association for Women and Child Protection (AISHA) Gaza Palestine Financial Statements and Independent Auditor's Report for the Year Ended December 31, 2013 Talal Abu Ghazaleh & Co. International Certified
More informationOverall principles. Objective and scope
Ref. Ares(2017)5727618-23/11/2017 Guidance to partners funded by the Directorate-General for European Civil Protection and Humanitarian Aid Operations (ECHO) to deliver large-scale cash transfers Overall
More informationAnnotated Outline - Joint Cost Recovery Paper Background. I. Introduction. Presentation/Discussion of Proposals
Annotated Outline - Joint Cost Recovery Paper Background UNDP, UNFPA, UNICEF and UN Women (the agencies) are pleased to provide a summary of the planned content and evidence-based proposals of the joint
More informationTERMS OF REFERENCE FOR INTERNATIONAL CONSULTANT
TERMS OF REFERENCE FOR INTERNATIONAL CONSULTANT Title: Countries: Duration: Analysis and Advocacy for Child-Centred Budgeting Botswana, Lesotho, Namibia, South Africa and Swaziland 40 working days, spread
More informationOFFICIAL -1 L(-L DOCUMENTS. Between. and
Public Disclosure Authorized OFFICIAL -1 L(-L DOCUMENTS ADDENDUM No 2 TO ADMINISTRATION AGREEMENT Between Public Disclosure Authorized Public Disclosure Authorized the EUROPEAN UNION (represented by the
More informationTHE POLAND-RUSSIA CROSS-BORDER COOPERATION PROGRAMME ST CALL FOR PROPOSALS BUDGET
THE POLAND-RUSSIA CROSS-BORDER COOPERATION PROGRAMME 2014-2020 1 ST CALL FOR PROPOSALS BUDGET PROJECT BUDGET Project budget shall include only: ELIGIBLE COSTS Direct BH 1 Staff costs Indirect BH 7 Administrative
More informationREQUIRED DOCUMENT FROM HIRING UNIT
Terms of reference GENERAL INFORMATION Title: Finance Management Technical Assistance Consultant for the Global Fund Principal Recipient Aisyiyah (National Consultant) Project Name: Management and Technical
More informationGuidelines. 9 th Revision 1 1 May 2016
Guidelines 9 th Revision 1 1 May 2016 1 This sets out the revised Guidelines for the United Nations Trust Fund for Human Security, effective as of 1 May 2016. The eighth revision which became effective
More informationProgramme Expenditure: Eligible Cost Guidance for ACCOUNTABLE GRANTS
Department for International Development (DFID) Programme Expenditure: Eligible Cost Guidance for ACCOUNTABLE GRANTS Programme Expenditure: Eligible Cost Guidance for AG 01 August 2018 Version 2.0 1. Background
More informationLife saving integrated food security and livelihoods support for IDPs and vulnerable host communities affected by conflict and drought in Ayod County.
HSSD19-FSC-153004-1 Life saving integrated food security and livelihoods support for IDPs and vulnerable host communities affected by conflict and drought in Ayod County. Last updated by Justus Vundi on
More informationTERMS OF REFERENCE (TOR) FOR AUDITS OF UN-WOMEN NGO, GOV T, IGO AND GRANT PROJECTS
TERMS OF REFERENCE (TOR) FOR AUDITS OF UN-WOMEN NGO, GOV T, IGO AND GRANT PROJECTS TABLE OF CONTENTS Introduction... 3 A. Background... 7 B. Project Management... 7 C. Consultations with concerned parties...
More informationFirst Consolidated Annual Progress Report on Activities Implemented under the Lesotho One UN Fund
First Consolidated Annual Progress Report on Activities Implemented under the Lesotho One UN Fund Report of the Administrative Agent of the Lesotho One UN Fund for the Period 1 January to 31 December 2011
More informationPakistan Humanitarian. Pooled Fund (PHPF) Operational Manual. February PHPF Operational Manual 1
PHPF Operational Manual 1 Pakistan Humanitarian Pooled Fund (PHPF) Operational Manual February 2018 PHPF Operational Manual 2 www.unocha.org The mission of the is to mobilize and coordinate effective and
More informationWFP Executive Board. 1 st Informal Consultation WFP Management Plan ( ) 13 July 2017
WFP Executive Board 1 st Informal Consultation WFP Management Plan (2018-2020) 13 July 2017 Agenda for 1 st Informal Consultation 1. Resourcing and Financial Context for the 2018-2020 Management Plan 2.
More informationMALAWI. 2016/17 Social Welfare Budget Brief. March 2017 KEY MESSAGES
March 2017 MALAWI Social Welfare Budget Brief KEY MESSAGES Overall Budget for the Ministry of Gender, Children, Disability and Social Welfare (MoGCDSW) declined by 15% in nominal terms and 38% in real
More informationRemote Audit of the UNESCO Office in Khartoum. Internal Oversight Service Audit Section. IOS/AUD/2017/12 Original: English.
Internal Oversight Service Audit Section IOS/AUD/2017/12 Original: English Remote Audit of the UNESCO Office in Khartoum December 2017 Auditors: Afschin Lagies Dawn Clemitson EXECUTIVE SUMMARY Key Audit
More informationUnited Nations Fund for Recovery Reconstruction and Development in Darfur (UNDF)
United Nations Fund for Recovery Reconstruction and Development in Darfur (UNDF) Terms of Reference 29 March 2013 1 Contents I. Introduction... 3 II. Purpose, Scope and Principles of the UNDF... 4 III.
More informationInformation note. Revitalization of the Palestinian Fund for Employment and Social Protection
INTERNATIONAL LABOUR ORGANIZATION REGIONAL OFFICE FOR ARAB STATES Information note Revitalization of the Palestinian Fund for Employment and Social Protection Implementing Partners: Ministry of Labour,
More informationSPECIAL CONDITIONS OF TENDER
Page 1 SPECIAL CONDITIONS OF TENDER A. INTRODUCTION The following documents are available on http://emits.esa.int/ under "Reference Documentation" --> "Administrative Documents": ESA Procurement Regulations
More informationINTERNAL AUDIT DIVISION REPORT 2016/155. Audit of the United Nations Human Settlements Programme project management process
INTERNAL AUDIT DIVISION REPORT 2016/155 Audit of the United Nations Human Settlements Programme project management process Established policies and procedures need to be further strengthened, particularly
More informationInvesting in your future
Investing in your future ESF Certifying Authority, Department of Education and Skills Circular 1/2012 (Replacing ESF Certifying Authority, Department of Enterprise Trade and Employment Circular 1/2008)
More informationWSSCC, Global Sanitation Fund (GSF)
Annex I WSSCC, Global Sanitation Fund (GSF) Terms of Reference Country Programme Monitor (CPM) BURKINA FASO 1 Background The Water Supply and Sanitation Collaborative Council (WSSCC) was established in
More informationDepartment for International Development (DFID)
Department for International Development (DFID) Programme Expenditure: Eligible Cost Guidance Programme Expenditure: Eligible Cost Guidance Version 1.1 1. Background to guidance John Manzoni, Chief Executive
More informationFifth Consolidated Annual Progress Report on Activities Implemented under the United Nations Bhutan Country Fund
Fifth Consolidated Annual Progress Report on Activities Implemented under the United Nations Bhutan Country Fund Report of the Administrative Agent of the United Nations Bhutan Country Fund for the Period
More informationWe recommend the establishment of One UN at country level, with one leader, one programme, one budgetary framework and, where appropriate, one office.
HIGH-LEVEL PANEL ON UN SYSTEM WIDE COHERENCE Implications for UN operational activities at Country Level: What s new and what has already been mandated? Existing mandates and progress report HLP recommendations
More informationInternal Audit of the Lao People s Democratic Republic Country Office
Internal Audit of the Lao People s Democratic Republic Country Office March 2013 Office of Internal Audit and Investigations (OIAI) Report 2013/04 Audit of the Lao People s Democratic Republic Country
More informationOccupied Palestinian Territory Humanitarian Fund Operational Manual
Occupied Palestinian Territory Humanitarian Fund Operational Manual January 2017 www.unocha.org The mission of the is to mobilize and coordinate effective and principled humanitarian action in partnership
More informationAccelerating Progress toward the Economic Empowerment of Rural Women (RWEE) Multi-Partner Trust Fund Terms of Reference UN WOMEN, FAO, IFAD, WFP
Accelerating Progress toward the Economic Empowerment of Rural Women (RWEE) Multi-Partner Trust Fund Terms of Reference UN WOMEN, FAO, IFAD, WFP March 2013 TABLE OF CONTENTS I. Introduction II. Programme
More informationOverview of the UFE Country Selection Process
CERF UNDERFUNDED EMERGENCIES Overview of Technical Methodology Purpose This paper provides a general overview of the country selection decision-making process for the Central Emergency Response Fund (CERF)
More informationOFFICIAL DOCUMENTS. The World Bank. Public Disclosure Authorized. Public Disclosure Authorized
Public Disclosure Authorized OFFICIAL DOCUMENTS The World Bank 1818 H Street N.W. (202) 473-1000 INTERNATIONAL BANK FOR RECONSTRUCTION AND DEVELOPMENT Washington, D.C. 20433 Cable Address: INTBAFRAD INTERNATIONAL
More informationGUIDANCE NOTE Introduction
GUIDANCE NOTE 2018 Introduction 1. The IOM Development Fund, established in 2001, has been providing support to IOM developing Member States and Member States with economy in transition for the development
More informationEuropean Commission Directorate General for Development and Cooperation - EuropeAid
European Commission Directorate General for Development and Cooperation - EuropeAid Practical guide to procedures for programme estimates (project approach) Version 4.0 December 2012 CONTENTS 1. INTRODUCTION...
More informationOCHA s Management Response Plan (MRP) to Evaluation of the Common Humanitarian Fund Country Report: Sudan
OCHA s Management Response Plan (MRP) to Evaluation of the Common Humanitarian Fund Country Report: Sudan Prepared by: Bavo Christiaens, Pooled Fund Manager, HFRMS 18/11/2015 Cleared by: Name, Position,
More informationDFTAD Health and Nutrition Project Manager - Appointment
DFTAD Health and Nutrition Project Manager - Appointment Location: [Africa] [Central African Republic] Town/City: Bangui Category: Project Management Job Type: Open-ended, Full-time PURPOSE OF POSITION:
More informationRULES ON ELIGIBILITY OF COSTS
Annex 1 of the Call for proposals RULES ON ELIGIBILITY OF COSTS These rules present various possible categories of eligible costs. The call for proposal may then stipulate that only some of the below categories
More informationMTSP Planned Financial Estimates Executive Board September 2011
MTSP Planned Financial Estimates 2011-2014 Executive Board September 2011 Historical income trend (In millions of dollars) 4 000 3 500 3 000 Average annual growth: RR $ 46 M OR $227 M (5 x RR growth) 2
More informationUN-OHRLLS COUNTRY-LEVEL PREPARATIONS
UN-OHRLLS COMPREHENSIVE HIGH-LEVEL MIDTERM REVIEW OF THE IMPLEMENTATION OF THE ISTANBUL PROGRAMME OF ACTION FOR THE LDCS FOR THE DECADE 2011-2020 COUNTRY-LEVEL PREPARATIONS ANNOTATED OUTLINE FOR THE NATIONAL
More informationArrangements for the revision of the terms of reference for the Peacebuilding Fund
United Nations A/63/818 General Assembly Distr.: General 13 April 2009 Original: English Sixty-third session Agenda item 101 Report of the Secretary-General on the Peacebuilding Fund Arrangements for the
More informationYellow cells denote information required to be entered. Grey cells denote no information should be entered.
A guide and toolkit on project budgeting and cost allocation This guide contains a budget template to help organisations calculate the full cost of a particular project or service, including an appropriate
More informationMarch. Coordination Saves. Lives
Ethiopia Humanitarian Fund Operational Manual March 2016 www.unocha.org The mission of the United Nations Office for the Coordination of Humanitarian Affairs (OCHA) is to mobilize and coordinate effective
More informationAnnex 1. Action Fiche for Solomon Islands
Annex 1 Action Fiche for Solomon Islands 1. IDENTIFICATION Title/Number FED/2012/023-802 Second Solomon Islands Technical Cooperation Facility (TCF II) Total cost EUR 1,157,000 Aid method / Method of implementation
More informationAUDIT UNDP COUNTRY OFFICE BANGLADESH. Report No Issue Date: 28 May 2015
UNITED NATIONS DEVELOPMENT PROGRAMME AUDIT OF UNDP COUNTRY OFFICE IN BANGLADESH Report No. 1429 Issue Date: 28 May 2015 Table of Contents Executive Summary i I. About the Office 1 II. Good practice 1 III.
More informationReport of the Advisory Committee on Administrative and Budgetary Questions (ACABQ)
Executive Board Second regular session Rome, 26 29 November 2018 Distribution: General Date: 21 November 2018 Original: English Agenda item 6 WFP/EB.2/2018/6-(A,B)/2 WFP/EB.2/2018/5-A/2 Resource, financial
More informationARTES Competitiveness & Growth Full Proposal. Requirements for the Content of the Financial Proposal. Part 6
ARTES Competitiveness & Growth Full Proposal Requirements for the Content of the Financial Proposal Part 6 Statement of Applicability and Proposal Submission Requirements Applicable Domain(s) Space Ground
More informationNOW, THEREFORE, the UNDP and the Recipient Organizations (hereinafter referred to collectively as the Participants ) hereby agree as follows:
Memorandum of Understanding between the Recipient Organizations and the United Nations Development Programme regarding the Operational Aspects of UN Zika Response Multi-Partner Trust Fund WHEREAS, the
More informationREPORT 2015/079 INTERNAL AUDIT DIVISION. Audit of United Nations Office on Drugs and Crime operations in Peru
INTERNAL AUDIT DIVISION REPORT 2015/079 Audit of United Nations Office on Drugs and Crime operations in Peru Overall results relating to the management of operations in Peru were initially assessed as
More information2011 SURVEY ON MONITORING THE PARIS DECLARATION
TASK TEAM ON MONITORING THE PARIS DECLARATION 2011 SURVEY ON MONITORING THE PARIS DECLARATION Revised Survey Materials Initial Annotated Draft 3 May 2010 FOR COMMENT This initial text with annotations
More informationEconomic and Social Council
United Nations E/ICEF/2008/AB/L.2 Economic and Social Council Distr.: Limited 4 January 2008 Original: English For information United Nations Children s Fund Executive Board First regular session 2008
More informationWFP Executive Board. 2 nd Informal Consultation Management Plan September 2016
WFP Executive Board 2 nd Informal Consultation Management Plan 2017-2019 2 September 2016 Upcoming Key dates for the Management Plan (2017-2019) Second Informal Consultation 2 September FAO Finance 2-3
More informationIraq Humanitarian Pooled Fund Operational Manual
Iraq Humanitarian Pooled Fund Operational Manual July 2015 www.unocha.org The mission of the is to mobilize and coordinate effective and principled humanitarian action in partnership with national and
More informationINDIVIDUAL CONSULTANT PROCUREMENT NOTICE TOR - CONSULTANCY IC/2012/026. Date: 16 April 2012
INDIVIDUAL CONSULTANT PROCUREMENT NOTICE IC/2012/026 TOR - CONSULTANCY Date: 16 April 2012 Position: Consultant - RESOURCE MOBILISATION STRATEGY 2012-2015 for UNCT ETHIOPIA Duty Station: Addis Ababa, Ethiopia
More informationAUDIT UNDP COUNTRY OFFICE UGANDA. Report No Issue Date: 22 August 2013
UNITED NATIONS DEVELOPMENT PROGRAMME AUDIT OF UNDP COUNTRY OFFICE IN UGANDA Report No. 1155 Issue Date: 22 August 2013 Table of Contents Executive Summary i I. Introduction 1 II. About the Office 1 III.
More informationProcedures for financing the evaluation of initiatives funded by voluntary contributions FAO evaluation policy guidance
Food and Agriculture Organization of the United Nations Procedures for financing the evaluation of initiatives funded by voluntary contributions FAO evaluation policy guidance November 2013 Food and Agriculture
More informationE Distribution: GENERAL PROJECTS FOR EXECUTIVE BOARD APPROVAL. Agenda item 9
Executive Board Second Regular Session Rome, 12 14 November 2012 PROJECTS FOR EXECUTIVE BOARD APPROVAL Agenda item 9 For approval BUDGET INCREASES TO DEVELOPMENT ACTIVITIES ARMENIA DEVELOPMENT PROJECT
More informationEVALUATION REPORTS. Agenda item 6
Executive Board Second Regular Session Rome, 8 11 November 2010 EVALUATION REPORTS Agenda item 6 For consideration E MANAGEMENT RESPONSE TO THE RECOMMENDATIONS OF THE SUMMARY REPORT OF THE MID-TERM EVALUATION
More informationFIRST LEVEL CONTROL: PRINCIPLES AND PRACTICE
CENTRAL EUROPE PROGRAMME 2007-2013 Project financial management and controls Vienna, 7 th April 2011 FIRST LEVEL CONTROL: PRINCIPLES AND PRACTICE 1. Validation of expenditure: the FLC 2. General principles
More informationBUSINESS-BASED SOLUTIONS IN HUMANITARIAN CRISES: LESSONS FROM ZIMBABWE
BUSINESS-BASED SOLUTIONS IN HUMANITARIAN CRISES: LESSONS FROM ZIMBABWE Credit: Cynthia R Matonhodze 2017/CARE EXECUTIVE SUMMARY / In response to heightened food insecurity in Zimbabwe, Crown Agents and
More informationExecutive Board of the United Nations Development Programme and of the United Nations Population Fund
United Nations Executive Board of the United Nations Development Programme and of the United Nations Population Fund Distr.: General 14 May 2004 Original: English Second regular session 2004 20 to 24 September
More informationAn overview of the eligibility rules in the programming period
Rules and conditions applicable to actions co-financed from Structural Funds and Cohesion Fund An overview of the eligibility rules in the programming period 2007-2013 FEBRUARY 2009 1 Table of contents
More informationJob Description and Requirements Programme Manager State-building and Governance Job no in the EU Delegation to the Republic of Yemen
JOB PROFILE 17/08/2013 Job Description and Requirements Programme Manager State-building and Governance Job no. 127004 in the EU Delegation to the Republic of Yemen Job Type: Contract Agent Function Group
More informationAnnex 3: UNDP footprint and programme expenditure by source of funds
Output 1.1 Output 1.2 Output 1.3 Output 1.4 Output 1.5 Output 2.1 Output 2.2 Output 2.3 Output 2.4 Output 2.5 Output 2.6 Output 3.1 Output 3.2 Output 3.3 Output 3.4 Output 3.5 Output 4.1 Output 4.2 Output
More informationDevelopment Cooperation Development Education Partnership Fair. Writing a successful co financing application
Development Cooperation Development Education Partnership Fair Writing a successful co financing application 3 sessions to guide project preparation Session 1: Deciding on stakeholders and defining problems/issues.
More informationOFFICIAL MDTF-HRI GRANT NUMBER TF between REPUBLIC OF CAMEROON. and
Public Disclosure Authorized OFFICIAL IDOCUMENTS Public Disclosure Authorized MDTF-HRI GRANT NUMBER TF017128 Multi-donor Trust Fund for Health Results Innovation Grant Agreement (Additional Financing for
More information