1 Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Project Number: P Grant Number: TFOA1754 Public Disclosure Authorized

2 CONTENTS PAGE GLOSSARY OF ABBREViATIONS 1 1 INTRODUCTION BACKGROUND PROJECT GENERAL INFORMATION AUDIT OBJECTiVES AUDIT SCOPE AUDIT APPROACH 4 2. STATEMENT OF PROJECT MANAGEMENT'S RESPONSIBILITIES 5 3. AUDITOR GENERAL'S AUDIT REPORT 6 4. STATEMENT OF RECEIPTS AND EXPENDITURE 8 5. STATEMENT OF BUDGET COMPARISON WITH ACTUALS 9 6. STATEMENT OF RECEIPTS AND EXPENDITURE - CUMMULATIVE NOTES TO THE FINANCIAL STATEMENT 11

3 GLOSSARY OF ABBREVIATIONS EAFS External Assistance Fiduciary Section ISSAls International Standards of Supreme Audit Institutions IPSAS OAG UNOP International Public Sector Accounting Standard Office of Auditor General United Nations Office for Project Services PIU Project Implementation Unit SUIPP Somalia Urban Investment Planning Project 1

4 Forthe Period 29 July 2016 to 31 December INTRODUCTION 1.1 Background The International Development Association, acting as the administrator of the Somalia Multi- Partner Fund signed a Grant Agreement with Federal Govemment of Somalia on 24 February 2016 to finance the cost of the (SUIPP) in feasibility, assessment and preliminary design studies for urban investment activities in Mogadishu, Hargeisa and Garowe Municipality. The SUIPP comprises a "project to prepare a project". The main project - to be prepared by SUIPP is called the Somali Urban Development Project (SUDP). Subsequent to signing the Grant agreement, the Government of Puntland signed a Subsidiary Agreement with Federal Govemment of Somalia for the Puntland component amounting to 650,000 which was expected to run for a duration of 1 year from 30 June 2016 to 30 June However, the Project closure period has been extended to 31 December The Project in Puntland is under the supervision of the Garowe Municipality and its strategic goal is to undertake technical and economic feasibility studies and preliminary design work for portfolios of potential investments in urban infrastructure and the strengthening of urban management institutions in Garowe. The activities to be undertaken by the recipient under SUIPP comprises enhancement of the main project preparation and implementation capacity through the hiring, training and equipping core specialists who will be charged with managing the implementation of the SUDP. Garowe Municipality is implementing these activities with procurement and financial management support of the EAFS and in accordance with the Grant Agreement between the Federal Govemment of Somalia and the International Development Association (acting as administrator of the Somalia Multi-Partner Fund), the SubSidiary Agreement between the Federal Govemment of Somalia and the and the Implementation Agreement between the and the Garowe Municipality. At 31 December 2016, SUIPProject Implementation Unit (PIU) had achieved the following milestones that are in line with the Project's objectives; Recruitment of the PIU staff; Participation in UNOP&IPE Global's feasibility study and preliminary design studies on identified priority roads and bridges to estimate the costs; and Facilitation of Garowe municipality institutional assessment exercise that was focused on assessing the basic conditions of performance, strategic planning capacity, technical and operational capacity, fiduciary accountability mechanism and environmental and social management of the municipality. 2

5 For the Period 29 J4.1Y 2016 to 31 December Project General Information Registered Office Garowe Municipality, Puntland Designated Bank Account First community Bank Kimathi Street Branch Nairobi, Kenya Auditors Auditor General Office of the Auditor General Garowe, Puntland Fiduciary Management Extemal Assistance Fiduciary Section (EAFS) Office of the Accountant General Ministry of Finance Garowe, Puntland Project Management Name Role Position Contact Information Abdirizak Said Nur Accountant Accountant General General Abdirizak Hassan Director General Director General Mohamed AbdirahmanGure Project coordination Project Manager Said Ismail Said Nuh Omar Muse Abshir Abdulkadir Ahmed Finance Management FM Specialist Director of EAFS Section FM Specialist for SUIPP Head of EAFS Procurement Procurement section 3

6 For the Period ~ July 2016 to 31 December Audit Objectives In line with the Grant Agreement and the Puntland Audit Law, the Office of the Auditor General was mandated to carry out external audit of the project for the period 29 July 2016 to 31 December The specific objectives of the audit were to enable the Auditor General to express an opinion as to whether; The Project funds received and expenditures incurred during the fiscal year were for the purpose intended; The Project books of accounts were kept based on the Generally Accepted Accounting Principles (GAAP) and the International Public Sector Accounting Standards (IPSAS) Cash Basis and the financial transactions therein reflect a true record of the transactions that took place during the period; Adequate Internal Control processes and systems were maintained by the implementing agencies during the period under the audit. 1.4 Audit Scope The audit report covers the statement of receipts and expenditure of Somali Urban Investment Planning Project for the period 29 July 2016 to 31 December The audit also assessed SUIPP's internal controls structure relevant to the Project Agreement and the project financial management. 1.5 Audit Approach In order to cover the scope of the financial audit for the SUIP Project for the period 29 July 2016 to 31 December 2016, we performed the audit in accordance with International Standards of Supreme Audit Institutions. The procedures involved, among others:- Tested transactions carried out during the period to ensure expenditure was supported, properly authorized and incurred for the Project. Reviewed the internal control structure and tested the controls in place to ensure that the Project funds and resources were utilized on Project activities and that goods, works and services financed by the Project funds were procured in accordance with relevant financing agreement and specific provisions of World Bank guidelines, as applicable. Reviewed the accounting system of the Project as implemented by EAFS to ensure that the Project funds and resources were utilized on budgeted activities and were fully accounted for; and all supporting documents, records and accounts have been kept in respect of all Project's activities. Tested the Project'scompliance with the Grant Agreement terms, Project Implementation Manual and applicable laws and regulations. Planned and executed the audit in accordance with Intemational Standards of Supreme Audit Institutions (ISSAls) and obtained from the implementing agency and fiduciary agency a written confirmation conceming representations made during the audit. Tested the year end cash balance and grant receipt by doing confirmations to bank and World Bank respectively. 4

7 For the Period 29 J4Jy 2016 to 31 December STATEMENT OF PROJECT MANAGEMENT'S RESPONSIBILITIES The Project management is required to keep proper books of account and records of the Project's financial transactions adequate to reflect the operations, resources and payments related to the Project. The Project management is also responsible for designing, implementing and maintaining internal control relevant to the preparation and fair presentation of Project'sfinancial reportsthat are free of material misstatement, whether due to fraud or error; selecting and applying appropriate accounting policies; and making accounting estimates that are reasonable in the circumstances. The Project management accepts responsibility for the financial reports which has been prepared using appropriate accounting policies supported by reasonable and prudent judgments and estimates, in accordance with the International Public Sector Accounting Standards (IPSAS), Cash Basis. The Project management is of the opinion that the Project financial reports gives a true and fair view of the state of the financial affairs of the Project. The management further accepts responsibility for the maintenance of accounting records that may be relied upon in the preparation of the financial report as well as adequate systems of internal control. Abdirizak S Nu Accountant eneral Ministry of Finance...:Lf. /fj/:lp.j?t... Date /.l 5

8 3. AUDITOR GENERAL'S AUDITREPORT I have audited the accompanying financial report of Somali Urban Investment Planning Project, set out on pages 8 to 14 which comprise the statement of receipt and expenditure, statement of budget comparison with actual, statement of cumulative receipt and expenditure for the period for the period 29 July 2016 to 31 December 2016 and notes to the financial statements, including a summary of significant accounting policies. PROJECT MANAGEMENT'S RESPONSIBILITY FOR THE FINANCIAL REPORT The Project management is responsible for the preparation and fair presentation of this financial report in accordance with Generally Applicable Accounting Principles and the International Public Sector Accounting Standards - Cash Basis. This responsibility includes: designing, implementing and maintaining internal controls relevant to the preparation and fair presentation of the financial report that is free of material misstatement, whether due to fraud or error; selecting and applying appropriate accounting policies; and making accounting estimates that are reasonable in the circumstances. AUDITOR'S RESPONSIBILITY My responsibility is to express an independent opinion on the financial report based on the audit conducted. I conducted the audit in accordance with International Standards for Supreme Audit Institutions (ISSAls). Those standards require that i comply with ethical requirements and plan and perform the audit to obtain reasonable assurance whether the financial report is free of material misstatement. An audit involves performing procedures to obtain audit evidence about the amounts and disclosures in the financial report. The procedures selected depend on the auditor's judgement, including the assessment of the risks of material misstatement of the financial statements, whether due to fraud or error. In making those risk assessments, the auditor considers intemal control relevant to the Project's preparation and fair presentation of the financial statements in order to design audit procedures that are appropriate in the circumstances, but not for the purpose of expressing an opinion on the reliability of the Project's internal control. An audit also includes evaluating the appropriateness of accounting policies used and the reasonableness of accounting estimates made by the.. Project management, as well as evaluating the overall presentation of the financial statements. I believe that the audit evidence i have obtained is sufficient and appropriate to provide a basis for my audit opinion. 6

9 OPINION In my opinion, the financial report presents fairly, in all material respect, the financial status of for the period 29 July 2016 to 31 December 2016 in accordance International Public Sector Accounting Standards (IPSAS), Cash Basis. I have communicated with Project management regarding, among other matters, the planned scope and timing of the audit and significant audit findings, including any significant deficiencies in internal control that I identified during our audit. Jama Mohamed Osman Auditor General Garowe,... &.~o/

10 Project Number: E' Grant Number: TFOA STATEMENT OF RECEIPTS AND EXPENDITURE FOR THE PERIOD 29 JULY 2016 TO 31 DECEMBER 2016 Notes 2016 RECEIPTS Grant receipts , Total receipts 219, EXPENDITURE BY BUDGET COMPONENTS Component 1: Consultancy service Component 2: Goods Component 3: Operating costs , , Total Expenditure 28, GRANT BALANCE 191, REPRESENTED BY Designated bank account balance , The st I~ment of receipt ~nd expe~diture wa5~pproved by the Project Management on.:1:,/ d Signed on ItS behalf by. - Abdirizak S r ----~ Accountant eneral Ministry of Finance The accounting financial report. policies and notes set out on pages 11 to 14 form an integral part of the 8

11 Project Number: P~1492 Grant Number: TFOA STATEMENT OF BUDGET COMPARISON WITH ACTUALS FOR THE PERIOD 29 JULY 2016 TO 31 DECEMBER ACTUAL BUDGET PERCENTAGE BUDGET OUTTURN VARIANCE VARIANCE RECEIPTS % World Bank(Somalia Multi-Partner Fund) 220, , % TOTAL RECEIPTS 220, , % EXPENDITURE Consultancy service 38, , , % Goods 76, , % Operating cost 71, , , % TOTAL EXPENDITURE 186, , , % 9

12 6. STATEMENT OF RECEIPTS AND EXPENDITURE - CUMULATIVE AT 31 DECEMBER2016 RECEIPTS Balance BIF Current Year Cumulative Balance Grant receipts 219, , TOTAL RECEIPTS 219, , Expenditure by budget components Component 1: Consultancy service 26, , Component 2: Goods Component 3: Operating costs 2, , TOTAL EXPENDITURE 28, , Grant Balance 191, ,

13 For the Period 29 Ju~y2016 to 31 December NOTES TO THE FINANCIAL STATEMENT 7.1 Significant Accounting Policies a) Basis of Preparation of the Financial Report The Project's financial report is prepared in accordance with the International Public Sector Accounting Standards (IPSAS), Cash Basis. The measurement basis applied is the historical cost basis, except where otherwise stated in the accounting policies below. The accounting policies adopted have been consistently used throughout. b) Foreign Currency Transactions The functional currency is the United States dollar and the reporting currency is also the United States dollar. Items included in the financial statements are measured in the currency of the primary economic environment in which the entity operates. c) Reporting Period The reporting period for these financial statements is the 2016 financial year of the Government, which runs from January 1, 2016 to December 31, However the Project period is less than a year, from 29 July 2016 to December d) Grant Receipt Receipts represent cash received by the Project during the period and comprise solely grants received from the World Bank under the Somalia Multi-Partner Fund (SMPF). These grant receipts have been recognized when received into the Projects Designated Account (DA) in line IPSAS Cash Basis. e) Project Expenditure Expenditure represents outlays of cash made by the Project and/or the World Bank for and on behalf of the Project. The expenses comprise both operating and capital expenditure and are recognized in the books of account when paid out in line with IPSAS Cash Basis. 11

14 7.2 Grant Receipt During the period ended 31 December 2016, the World Bank disbursed SUIPP as follows:- 219,990 to Date Received Reference Description Amount 10/11/2016 RV/33/11/2016 World Bank Grant 219, Total Grant Received 219, Component 1: Consultancy Service Actual Budget Sub-component 1.1: Project coordinator 13, , Sub-component 1.2: Safeguard specialist 4, , Sub-component 1.3: Financial management specialist 3, Sub-component 1.4:Procurement specialist 3, SUb-component 1.5: M&E specialist 7, , Sub-component 1.5: Project engineer 3, Component 2: Goods 26, , Actual Budget Sub-component Procurement of Equipment 76, , Component 3: Operating Costs Actual Budget Sub-component 3.1: Costs of specialized and short training for staff 2, , sub-component 2.7: Costs related to the PIU operations , , ,

15 7.6 Reconciliationbetween Application for Withdrawals and Receipts from the World Bank Withdrawal Application Actual Receipt Date of Application Amount Date of Amount Difference Application Number Receipt 03/11/ , /11/201E 219, Total 220, , Designated Bank Account Balance The designated account balance as at 31 December 2016 is detailed below:- Designated Account Reconciliation Statement Grant Number TFOA1754 Bank Name: First Community Bank Branch Name: Kimathi Branch, Nairobi Bank Account Number: Part I I I 1. Cumulative receipts to end of current reporting period 219, Cumulative expenditures to end of current reporting period 28, Outstanding advances to be accounted (1-2) 191, Part II 4. Opening balance at beginning of reporting period (per Bank statement) - 5. Add/Subtract: Cumulative adjustments, including interest earned and recoveries 6. Grants received from the World Bank during current reporting period 219, Closing balance at end of current reporting (per Bank statement) 191, Outstanding amount of advances to be accounted for ( ) 28, Total Expenditures reported for current reporting period, including this 28, Difference (if any) Remarks None 13

16 7.8 Comparatives This is the first financial reporting by the Project hence no comparative. Performance have been compared to budget, where necessary. 7.9 Events after Reporting Date There are no subsequent events that have occurred after the reporting period which are either to be disclosed that could materially affect the financial report of the Project, or curtails its activities in attaining its objectives Capital Expenditure The Project had not incurred any capital expenditure as at the end of the period. 14

Federal Republic of Somalia Ministry of Post and Telecommunications REQUEST FOR EXPRESSIONS OF INTEREST/APPLICATIONS

Federal Republic of Somalia Ministry of Post and Telecommunications REQUEST FOR EXPRESSIONS OF INTEREST/APPLICATIONS JAMHUURIYADDA FEDRAALKA SOOMAALIYA Wasaaradda raz Boostada & Isgaarsiinta Mashruuca Taakulaynta Isgaarsiinta (P148588) Federal Republic of Somalia Ministry of Post and Telecommunications جمهورية الصومال

More information

WEST AFRICA REGIONAL COMMUNICATIONS INFRASTRUCTURE PROGRAM (WARCIP) MINISTRY OF INFORMATION, COMMUNICATION & INFORMATION TECHNOLOGY (THE GAMBIA)

WEST AFRICA REGIONAL COMMUNICATIONS INFRASTRUCTURE PROGRAM (WARCIP) MINISTRY OF INFORMATION, COMMUNICATION & INFORMATION TECHNOLOGY (THE GAMBIA) Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized WEST AFRICA REGIONAL COMMUNICATIONS INFRASTRUCTURE PROGRAM (WARCIP) MINISTRY OF INFORMATION, COMMUNICATION & INFORMATION

More information

MASHRUUCA TAAKULAYNTA ISGAARSIINTA ICT SECTOR SUPPORT PROJECT (P152358)

MASHRUUCA TAAKULAYNTA ISGAARSIINTA ICT SECTOR SUPPORT PROJECT (P152358) DOWLADDA PUNTLAND EE SOOMAALIYA PUNTLAND STATE OF SOMALIA JAMHUURIYADDA FEDRAALKA SOOMAALIYA MASHRUUCA TAAKULAYNTA ISGAARSIINTA ICT SECTOR SUPPORT PROJECT (P152358) WasaaraddaWarfaafintaIsgaarsiintaBoostadaHiddaha&Dhaqanka

More information

THE MINISTRY OF HEALTH OF UKRAINE OBLAST HEALTH SECTOR REFORM PROJECT PREPARATION PROJECT, FINANCIAL STATEMENTS

THE MINISTRY OF HEALTH OF UKRAINE OBLAST HEALTH SECTOR REFORM PROJECT PREPARATION PROJECT, FINANCIAL STATEMENTS THE MINISTRY OF HEALTH OF UKRAINE OBLAST HEALTH SECTOR REFORM PROJECT PREPARATION PROJECT, Public Disclosure Authorized FINANCIAL STATEMENTS For the period from December 10, 2013 to December 09, 2015 Auditor's

More information

HEALTH RESULTS-BASED FINANCING PROJECT

HEALTH RESULTS-BASED FINANCING PROJECT HEALTH RESULTS-BASED FINANCING PROJECT IDA GRANT NUMBER TF013310 IMPLEMENTED BY RESULT-BASED FINANCING SECRETARIAT UNIT UNDER THE MINISTRY OF HEALTH OF THE KYRGYZ REPUBLIC SPECIAL PURPOSE PROJECT FINANCIAL

More information

"Public Institution EMP Management Durabil POP" Project ECAPDEV Grant no.: TF0A2544

Public Institution EMP Management Durabil POP Project ECAPDEV Grant no.: TF0A2544 "Public Institution EMP Management Durabil POP" Project ECAPDEV Grant no.: TF0A2544 Public Disclosure Authorized Special purpose project financial statements for the period November 14, 2016 to March 15,

More information

City of Greater Sudbury Audit Planning Report to the Finance Committee for year ending December 31, February, 2007

City of Greater Sudbury Audit Planning Report to the Finance Committee for year ending December 31, February, 2007 City of Greater Sudbury Audit Planning Report to the Finance Committee for year ending December 31, 2006 February, 2007 Contents Purpose of the Report 2 Key Responsibilities 3 Audit Deliverables 4 Our

More information

Project Financial Statements and Independent Auditor's Report. People in Need non-governmental organization

Project Financial Statements and Independent Auditor's Report. People in Need non-governmental organization Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Project Financial Statements and Independent Auditor's Report People in Need non-governmental organization Youth Inclusion

More information

Central Asia Hydrometeorology Modernisation Project (Tajikistan) Grant No , Grant No. H679-TJ

Central Asia Hydrometeorology Modernisation Project (Tajikistan) Grant No , Grant No. H679-TJ Public Disclosure Authorized Central Asia Hydrometeorology Modernisation Project (Tajikistan) Grant No. 099848, Grant No. H679-TJ Financial statements Public Disclosure Authorized For the year ended 31

More information

THE UNITED REPUBLIC OF TANZANIA NATIONAL AUDIT OFFICE

THE UNITED REPUBLIC OF TANZANIA NATIONAL AUDIT OFFICE Public Disclosure Authorized Public Disclosure Authorized I j THE UNITED REPUBLIC OF TANZANIA NATIONAL AUDIT OFFICE Public Disclosure Authorized REPORT OF THE CONTROLLER AND AUDITOR GENERAL ON THE AUDIT

More information

UNITED NATIONS OFFICE FOR PROJECT SERVICES (UNOPS) FINANCIAL AUDIT REPORT. 27 February 2017

UNITED NATIONS OFFICE FOR PROJECT SERVICES (UNOPS) FINANCIAL AUDIT REPORT. 27 February 2017 UNITED NATIONS OFFICE FOR PROJECT SERVICES (UNOPS) FINANCIAL AUDIT REPORT 27 February 2017 PROJECT NAME: EMERGENCY SUPPORT FOR HEALTH RESPONSE CAPACITY IN UKRAINE PROJECT NUMBER: 00011980 COUNTRY: SERBIA

More information

Responsibility Statement... 3 Management Report Statement of Comprehensive Income... 9 Statement of Financial Position...

Responsibility Statement... 3 Management Report Statement of Comprehensive Income... 9 Statement of Financial Position... Responsibility Statement... 3 Management Report... 4... 8 Statement of Comprehensive Income... 9 Statement of Financial Position... 10 Statement of Changes in Equity... 11 Statement of Cash Flows... 12

More information

MINISTRY OF FINANCE, PLANNING AND ECONOMIC DEVELOPMENT

MINISTRY OF FINANCE, PLANNING AND ECONOMIC DEVELOPMENT THE REPUBLIC OF UGANDA MINISTRY OF FINANCE, PLANNING AND ECONOMIC DEVELOPMENT REPORT OF THE AUDITOR GENERAL ON THE FINANCIAL STATEMENTS OF COMPETITIVENESS AND ENTERPRISE DEVELOPMENT PROJECT (CEDP) COMPONENT

More information

AUDITOR GENERAL'S REPORT

AUDITOR GENERAL'S REPORT Public Disclosure Authorized Public Disclosure Authorized AUDITOR GENERAL'S REPORT Public Disclosure Authorized Integrated Public Financial Management Reform Project (IPFMRP) For the fiscal Period 2015/2016

More information

Position Title: Accountable and reporting to: PROCUREMENT SPECIALIST Project Manager - Somalia ICT Sector Support Project:

Position Title: Accountable and reporting to: PROCUREMENT SPECIALIST Project Manager - Somalia ICT Sector Support Project: TERMS OF REFERENCE Position Title: Accountable and reporting to: PROCUREMENT SPECIALIST Project Manager - Somalia ICT Sector Support Project: 1.0 Background: The ICT Sector Unit of the World Bank Group

More information

Rural Renewable Energy Agency (RREA) Financial Audit Report. for the period from 1 March 2016 to 30 June Project ID: P

Rural Renewable Energy Agency (RREA) Financial Audit Report. for the period from 1 March 2016 to 30 June Project ID: P Public Disclosure Authorized Public Disclosure Authorized Rural Renewable Energy Agency (RREA) Financial Audit Report for the period from 1 March 2016 to 30 June 2017 Public Disclosure Authorized Liberia

More information

THE REPUBLIC OF UGANDA REPORT OF THE AUDITOR GENERAL

THE REPUBLIC OF UGANDA REPORT OF THE AUDITOR GENERAL THE REPUBLIC OF UGANDA REPORT OF THE AUDITOR GENERAL ON THE FINANCIAL STATEMENTS OF THE UGANDA EMBASSY IN MOGADISHU FOR THE FINANCIAL YEAR ENDED 30TH JUNE 2015 OFFICE OF THE AUDITOR GENERAL UGANDA TABLE

More information

GUIDELINES: ANNUAL FINANCIAL REPORTING AND AUDITING FOR WORLD BANK-FINANCED ACTIVITIES

GUIDELINES: ANNUAL FINANCIAL REPORTING AND AUDITING FOR WORLD BANK-FINANCED ACTIVITIES GUIDELINES: ANNUAL FINANCIAL REPORTING AND AUDITING FOR WORLD BANK-FINANCED ACTIVITIES FINANCIAL MANAGEMENT SECTOR BOARD JUNE 30, 2003 ACRONYMS FMR IAS IASB IFAC-PSC IFRS INTOSAI IPSAS ISA MDB OECD-DAC

More information

REPORT OF THE AUDITOR GENERAL ON THE FINANCIAL STATEMENTS OF THE ENERGY FOR RURAL TRANSFORMATION PROJECT II (ERT II) UGANDA

REPORT OF THE AUDITOR GENERAL ON THE FINANCIAL STATEMENTS OF THE ENERGY FOR RURAL TRANSFORMATION PROJECT II (ERT II) UGANDA THE REPUBLIC OF UGANDA REPORT OF THE AUDITOR GENERAL ON THE FINANCIAL STATEMENTS OF THE ENERGY FOR RURAL TRANSFORMATION PROJECT II (ERT II) UGANDA COMMUNICATION COMMISSION COMPONENT (IDA CREDIT AGREEMENT

More information

BRIDGE ATTAINABLE HOUSING SOCIETY. Financial Statements. Year Ended November 30, 2013

BRIDGE ATTAINABLE HOUSING SOCIETY. Financial Statements. Year Ended November 30, 2013 BRIDGE ATTAINABLE HOUSING SOCIETY Financial Statements Year Ended November 30, 2013 Index to the Financial Statements Year Ended November 30, 2013 Page INDEPENDENT AUDITOR'S REPORT 1 FINANCIAL STATEMENTS

More information

Parent company financial statements. Notes to the parent company. financial statements

Parent company financial statements. Notes to the parent company. financial statements Notes to the Group financial statements and Parent company financial statements 117 In this section we present the balance sheet of our parent company, InterContinental Hotels Group PLC, and the related

More information

UNITED NATIONS OFFICE FOR PROJECT SERVICES (UNOPS) FINANCIAL AUDIT REPORT. 20 September 2017

UNITED NATIONS OFFICE FOR PROJECT SERVICES (UNOPS) FINANCIAL AUDIT REPORT. 20 September 2017 UNITED NATIONS OFFICE FOR PROJECT SERVICES (UNOPS) FINANCIAL AUDIT REPORT 20 September 2017 PROJECT NAME: PALESTINIAN MATURITY PROGRAM PROJECT NUMBER: 96457 COUNTRY: ISRAEL AUDITOR: MOORE STEPHENS LLP

More information

FEDERAL MINISTRIY OF WATER RESOURCES, ABUJA NATIONAL URBAN WATER SECTOR REFORM PROJECT (NUWSRP III) IDA CREDIT NO 51460

FEDERAL MINISTRIY OF WATER RESOURCES, ABUJA NATIONAL URBAN WATER SECTOR REFORM PROJECT (NUWSRP III) IDA CREDIT NO 51460 FEDERAL MINISTRIY OF WATER RESOURCES, ABUJA NATIONAL URBAN WATER SECTOR REFORM PROJECT (NUWSRP III) IDA CREDIT NO 51460 Public Disclosure Authorized FINANCIAL STATEMENTS AND MANAGEMENT LETTER FOR THE YEAR

More information

OFFICE OF THE AUDITOR GENERAL

OFFICE OF THE AUDITOR GENERAL OFFICE OF THE AUDITOR GENERAL THE REPUBLIC OF UGANDA REPORT OF THE AUDITOR GENERAL ON THE FINANCIAL STATEMENTS OF NAMASALE TOWN COUNCIL AMOLATAR DISTRICT FOR THE YEAR ENDED 30 TH JUNE 2015 REPORT OF THE

More information

Public Disclosure Authorized. Public Disclosure Authorized

Public Disclosure Authorized. Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Montenegro Institutional Development and Agriculture Strengthening Project MIDAS Project ID: P107473 GLOBAL ENVIRONMENT

More information

External Audit. April 2012

External Audit. April 2012 External Audit April 2012 Audit Definition Ex post review of the books of account, financial statements, records of transactions & financial systems Examines the adequacy of accounting systems & procedures,

More information

AUDIT UNDP COUNTRY OFFICE SOMALIA. Report No Issue Date: 20 June 2014

AUDIT UNDP COUNTRY OFFICE SOMALIA. Report No Issue Date: 20 June 2014 UNITED NATIONS DEVELOPMENT PROGRAMME AUDIT OF UNDP COUNTRY OFFICE IN SOMALIA Report No. 1299 Issue Date: 20 June 2014 Table of Contents Executive Summary ii I. About the Office 1 II. Audit results 1 A.

More information

Ref: NAO 217/5 3rd July, 2017

Ref: NAO 217/5 3rd July, 2017 Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Ref: NAO 217/5 3rd July, 2017 FROM TO cc THE AUDITOR GENERAL, P.O. BOX 30045, LILONGWE

More information

MINUTES OF THE SFF OVERSIGHT BOARD MEETING HELD ON NOVEMBER 27, 2013 AT AMISOM CONFERENCE CENTER MOGADISHU-SOMALIA

MINUTES OF THE SFF OVERSIGHT BOARD MEETING HELD ON NOVEMBER 27, 2013 AT AMISOM CONFERENCE CENTER MOGADISHU-SOMALIA MINUTES OF THE SFF OVERSIGHT BOARD MEETING HELD ON NOVEMBER 27, 2013 AT AMISOM CONFERENCE CENTER MOGADISHU-SOMALIA ATTENDANCE 1. Mr. Mohamoud Hassan Suleiman Minister of Finance and Planning (Chairperson)

More information

2014 Gas Tax Annual Expenditure Report January 1, December 31, 2014

2014 Gas Tax Annual Expenditure Report January 1, December 31, 2014 2014 Gas Tax Annual Expenditure Report January 1, 2014 - December 31, 2014 UBCM January 1, 2014 to December 31, 2014 Cumulative Date of Signing Opening Balance of Unspent Funding 325,401,993.65 325,401,993.65

More information

ANNOUNCEMENT PURSUANT TO RULE 704(5) OF THE LISTING MANUAL IN RELATION TO THE AUDITED FINANCIAL STATEMENTS

ANNOUNCEMENT PURSUANT TO RULE 704(5) OF THE LISTING MANUAL IN RELATION TO THE AUDITED FINANCIAL STATEMENTS NOVO GROUP LTD. Registration No. 198902648H Incorporated in the Republic of Singapore ANNOUNCEMENT PURSUANT TO RULE 704(5) OF THE LISTING MANUAL IN RELATION TO THE AUDITED FINANCIAL STATEMENTS Rule 704(5)

More information

Project: Serbia Deposit Insurance Strengthening Project (IBRD Loan No. 8340YF)

Project: Serbia Deposit Insurance Strengthening Project (IBRD Loan No. 8340YF) Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Project: Serbia Deposit Insurance Strengthening Project (IBRD Loan No. 8340YF) Project Financial Statements for the

More information

REPORT OF THE AUDITOR GENERAL

REPORT OF THE AUDITOR GENERAL THE REPUBLIC OF UGANDA REPORT OF THE AUDITOR GENERAL ON THE FINANCIAL STATEMENTS OF UGANDA NATIONAL EDUCATION SUPPORT PROJECT (IDB-FUNDED) (LOAN AGREEMENT NOS: UG-0071 & UG-0076) FOR THE YEAR ENDED 30

More information

TERMS OF REFERENCE FOR AUDITS OF NIM/NGO PROJECTS

TERMS OF REFERENCE FOR AUDITS OF NIM/NGO PROJECTS United Nations Development Programme Office of Audit and Investigations Annex I TERMS OF REFERENCE FOR AUDITS OF NIM/NGO PROJECTS 2014 02 November 2014 TABLE OF CONTENTS Page INTRODUCTION... 3 A. Background...

More information

IFAD Handbook for Financial Reporting and Auditing of IFAD- Financed Projects

IFAD Handbook for Financial Reporting and Auditing of IFAD- Financed Projects - 2018 IFAD Handbook for Financial Reporting and Auditing of IFAD- Financed Projects 1 The IFAD Handbook for Financial Reporting and Auditing for IFAD-Financed Projects is available online for public use

More information

KENYA GAZETTE SUPPLEMENT

KENYA GAZETTE SUPPLEMENT SPECIAL ISSUE Kenya Gazette Supplement No. 15 (Acts No. 8) REPUBLIC OF KENYA KENYA GAZETTE SUPPLEMENT ACTS, 2013 NAIROBI, 25th January, 2013 CONTENT Act PAGE The County Governments Public Finance Management

More information

Supreme Audit Office 0 Government of Islamic Republic of Afghanistan

Supreme Audit Office 0 Government of Islamic Republic of Afghanistan Public Disclosure Authorized To Supreme Audit Office 0 Government of Islamic Republic of Afghanistan INDEPENDENT AUDITORS' REPORT The President of the Government of Islamic Republic of Afghanistan { Public

More information

Additional financing for the Montenegro Energy Efficiency Project - MEEP AF Project ID: P LOAN AGREEMENT No 8324-ME

Additional financing for the Montenegro Energy Efficiency Project - MEEP AF Project ID: P LOAN AGREEMENT No 8324-ME Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Additional financing for the Montenegro Energy Efficiency Project - MEEP AF Project ID: P107992 LOAN AGREEMENT No

More information

I I I I I I. Financial Statements for the year ended 31 December 2016

I I I I I I. Financial Statements for the year ended 31 December 2016 Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Financial Management mprovement and Consolidation Project (PFMCP) Financial Statements

More information

IFAD Handbook for Financial Reporting and Auditing of IFAD-financed Projects

IFAD Handbook for Financial Reporting and Auditing of IFAD-financed Projects IFAD Handbook for Financial Reporting and Auditing of IFAD-financed Projects The IFAD Handbook for Financial Reporting and Auditing of is available online for public use and dissemination. It is primarily

More information

NATIONAL WATER RESOURCES MANAGEMENT PROJECT - PHASE 1

NATIONAL WATER RESOURCES MANAGEMENT PROJECT - PHASE 1 Public Disclosure Authorized NATIONAL WATER RESOURCES MANAGEMENT PROJECT - PHASE 1 SWISS GRANT NO. TF016315 Public Disclosure Authorized IMPLEMENTED BY PROJECT IMPLEMENTATION UNIT UNDER THE DEPARTMENT

More information

ACCOUNTANTS OF KENYA. Credibility. Professionalism. AccountAbility

ACCOUNTANTS OF KENYA. Credibility. Professionalism. AccountAbility INSTITUTE OF CERTIFIED PUBLIC ACCOUNTANTS OF KENYA Credibility. Professionalism. AccountAbility BUDGET INFORMATION IPSAS 24 Presentation of Budget Information in Financial Statements By CPA D. O. GICHANA

More information

COUNTY GOVERNMENTS PUBLIC FINANCE MANAGEMENT Transition ACT

COUNTY GOVERNMENTS PUBLIC FINANCE MANAGEMENT Transition ACT LAWS OF KENYA COUNTY GOVERNMENTS PUBLIC FINANCE MANAGEMENT Transition ACT Published by the National Council for Law Reporting with the Authority of the Attorney-General www.kenyalaw.org County Governments

More information

City of Greater Sudbury

City of Greater Sudbury Audit Planning Report Year ended December 31, 2005 This audit plan is prepared for the year ending December 31, 2005 and is designed to provide an overview for Council of the of the audit procedures to

More information

THE REPUBLIC OF UGANDA

THE REPUBLIC OF UGANDA THE REPUBLIC OF UGANDA REPORT OF THE AUDITOR GENERAL ON THE FINANCIAL STATEMENTS OF THE KAMPALA INSTITUTIONAL AND INFRASTRACTURE DEVELOPMENT PROJECT (KIIDP 2) IDA CREDIT NO. 53840 UG FOR THE FOURTEEN (14)

More information

THE REPUBLIC OF UGANDA MINISTRY OF WATER AND ENVIRONMENT LAKE VICTORIA ENVIRONMENTAL MANAGEMENT PROJECT PHASE II IDA CREDIT NO.

THE REPUBLIC OF UGANDA MINISTRY OF WATER AND ENVIRONMENT LAKE VICTORIA ENVIRONMENTAL MANAGEMENT PROJECT PHASE II IDA CREDIT NO. THE REPUBLIC OF UGANDA MINISTRY OF WATER AND ENVIRONMENT LAKE VICTORIA ENVIRONMENTAL MANAGEMENT PROJECT PHASE II IDA CREDIT NO.4531-UG REPORT AND OPINION OF THE AUDITOR GENERAL ON THE FINANCIAL STATEMENTS

More information

Improving the Financial Management Capacity of Executing Agencies in Afghanistan and Pakistan

Improving the Financial Management Capacity of Executing Agencies in Afghanistan and Pakistan Technical Assistance Report Project Number: 46539 Regional Capacity Development Technical Assistance (R CDTA) August 2014 Improving the Financial Management Capacity of Executing Agencies in Afghanistan

More information

(Donor Reference No )

(Donor Reference No ) Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized OFFICIAL DOCUMENTS Administration Arrangement between Government of the Netherlands,

More information

REPORT OF THE AUDITOR GENERAL ON THE FINANCIAL STATEMENTS OF THE UGANDA ELECTRICITY TRANSMISSION COMPANY LIMITED

REPORT OF THE AUDITOR GENERAL ON THE FINANCIAL STATEMENTS OF THE UGANDA ELECTRICITY TRANSMISSION COMPANY LIMITED THE REPUBLIC OF UGANDA REPORT OF THE AUDITOR GENERAL ON THE FINANCIAL STATEMENTS OF THE UGANDA ELECTRICITY TRANSMISSION COMPANY LIMITED KARUMA INTERCONNECTION PROJECT FEASIBILITY STUDY FOR PERIOD 5 TH

More information

Royal Mail plc parent Company financial statements

Royal Mail plc parent Company financial statements parent Company The majority of the Annual Report and Financial Statements relates to the Group consolidated accounts, which comprise the aggregation of all the Group s trading entities. This mandatory

More information

AUDIT UNDP COUNTRY OFFICE AFGHANISTAN FINANCIAL MANAGEMENT. Report No Issue Date: 10 December 2013

AUDIT UNDP COUNTRY OFFICE AFGHANISTAN FINANCIAL MANAGEMENT. Report No Issue Date: 10 December 2013 UNITED NATIONS DEVELOPMENT PROGRAMME AUDIT OF UNDP COUNTRY OFFICE IN AFGHANISTAN FINANCIAL MANAGEMENT Report No. 1233 Issue Date: 10 December 2013 Table of Contents Executive Summary i I. Introduction

More information

THE REPUBLIC OF UGANDA

THE REPUBLIC OF UGANDA THE REPUBLIC OF UGANDA REPORT OF THE AUDITOR GENERAL ON THE FINANCIAL STATEMENTS OF EAST AFRICAN PUBLIC HEALTH LABORATORIES NETWORKING PROJECT (EAPHLNP) IDA CREDIT NO.47330-UG FOR THE YEAR ENDED 30 TH

More information

MDTF GRANT No. TF017411

MDTF GRANT No. TF017411 Public Disclosure Authorized EXTRACTIVE INDUSTRIES TRANSPARENCY INITIATIVE (EITI) - POST COMPLIANCE PHASE II IN KYGYZ REPUBLIC IN KYRGYZ REPUBLIC MDTF GRANT No. TF017411 Public Disclosure Authorized IMPLEMENTED

More information

Georgian State Electrosystem JSC. Special Purpose Project Financial Statements for the year ended 31 December 2016

Georgian State Electrosystem JSC. Special Purpose Project Financial Statements for the year ended 31 December 2016 Public Disclosure Authorized Georgian State Electrosystem JSC Public Disclosure Authorized Special Purpose Project Financial Statements for the year ended 31 December 2016 Public Disclosure Authorized

More information

IT RPORT OF if ATOR GENERA

IT RPORT OF if ATOR GENERA Public Disclosure Authorized SUPREME AUDIT OFFICE ISLAMIC REPUBLIC OF AFGHANISTAN Public Disclosure Authorized IT RPORT OF if ATOR GENERA Public Disclosure Authorized Volume - 26 PROJECT ID GRANT NUMBERS

More information

Federal Government of Somalia Office of Prime Minister

Federal Government of Somalia Office of Prime Minister Federal Government of Somalia Office of Prime Minister Public Sector Capacity Injection Project (CIP) Vacancy Possition at the Prime Minister s Office Project Coordination Unit (PCU) Terms of Reference

More information

Hartlepool and Stockton on Tees CCG Annual Audit Letter On the Audit for the year ending 31 March 2015 July 2015

Hartlepool and Stockton on Tees CCG Annual Audit Letter On the Audit for the year ending 31 March 2015 July 2015 Hartlepool and Stockton on Tees CCG Annual Audit Letter On the Audit for the year ending 31 March 2015 July 2015 Contents 1. Introduction 2 2. Financial audit 3 3. Value for Money 5 4. Conclusions 6 Appendix

More information

Project Reporting: GCF Legal Agreements and GCF Monitoring & Evaluation

Project Reporting: GCF Legal Agreements and GCF Monitoring & Evaluation Project Reporting: GCF Legal Agreements and GCF Monitoring & Evaluation ARMENIA De-risking and Scaling-up Investment in Energy Efficient Building Retrofits UNDP-GCF Project INCEPTION WORKSHOP Cynthia Page,

More information

Financial Sector Modernization Project. SECO Grant No TF011975/Component 2

Financial Sector Modernization Project. SECO Grant No TF011975/Component 2 Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Financial Sector Modernization Project SECO Grant No TF011975/Component 2 Special Purpose

More information

Public Disclosure Authorized

Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized INTERNATIONAL BANK FOR RECONSTRUCTION AND DEVELOPMENT (IBRD) LOAN No. 8286 - AZ REPORT OF INDEPENDENT AUDITORS AND SPECIAL PURPOSE FINANCIAL STATEMENTS

More information

TRANSPORT REFORM AND REHABILITATION CENTER LOAN NO.7741-GE (THIRD EAST-WEST HIGHWAY IMPROVEMENT PROJECT)

TRANSPORT REFORM AND REHABILITATION CENTER LOAN NO.7741-GE (THIRD EAST-WEST HIGHWAY IMPROVEMENT PROJECT) Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized TRANSPORT REFORM AND REHABILITATION CENTER LOAN NO.7741-GE (THIRD EAST-WEST HIGHWAY IMPROVEMENT PROJECT) Special Purpose

More information

OFFICE OF THE AUDITOR GENERAL THE REPUBLIC OF UGANDA

OFFICE OF THE AUDITOR GENERAL THE REPUBLIC OF UGANDA OFFICE OF THE AUDITOR GENERAL THE REPUBLIC OF UGANDA REPORT OF THE AUDITOR GENERAL ON THE FINANCIAL STATEMENTS OF NAMAYINGO TOWN COUNCIL NAMAYINGO DISTRICT FOR THE YEAR ENDED 30 TH JUNE 2016 TABLE OF CONTENTS

More information

IRRIGATION AND LAND MARKET DEVELOPMENT PROJECT IDA CREDIT NUMBER 5456-GE

IRRIGATION AND LAND MARKET DEVELOPMENT PROJECT IDA CREDIT NUMBER 5456-GE Public Disclosure Authorized IRRIGATION AND LAND MARKET DEVELOPMENT PROJECT IDA CREDIT NUMBER 5456-GE Public Disclosure Authorized IMPLEMENTED BY DONORS PROJECTS MANAGEMENT AND MONITORING UNIT (DPMMU)

More information

Audit based on the agreement for the project financed from funds allocated by the World Bank

Audit based on the agreement for the project financed from funds allocated by the World Bank Public Disclosure Authorized Public Disclosure Authorized Document No: 21.10.7-2017-08 Public Disclosure Authorized AUDIT REPORT ON SPECIAL PURPOSE FINANCIAL STATEMENTS FOR THE PROJECT KOSOVO AGRICULTURE

More information

TERMS OF REFERENCE (TOR) FOR AUDITS OF UN-WOMEN NGO, GOV T, IGO AND GRANT PROJECTS

TERMS OF REFERENCE (TOR) FOR AUDITS OF UN-WOMEN NGO, GOV T, IGO AND GRANT PROJECTS TERMS OF REFERENCE (TOR) FOR AUDITS OF UN-WOMEN NGO, GOV T, IGO AND GRANT PROJECTS TABLE OF CONTENTS Introduction... 3 A. Background... 7 B. Project Management... 7 C. Consultations with concerned parties...

More information

Independent Auditor s Report To the Members of Singapore Telecommunications Limited

Independent Auditor s Report To the Members of Singapore Telecommunications Limited REPORT ON THE AUDIT OF THE FINANCIAL STATEMENTS Opinion We have audited the financial statements of Singapore Telecommunications Limited (the Company ) and its subsidiaries (the Group ) which comprise

More information

REPORT OF THE AUDITOR GENERAL ON THE FINANCIAL STATEMENTS OF THE UGANDA MEDICAL AND DENTAL PRACTITIONERS COUNCIL FOR THE YEAR ENDED 30 TH JUNE 2014

REPORT OF THE AUDITOR GENERAL ON THE FINANCIAL STATEMENTS OF THE UGANDA MEDICAL AND DENTAL PRACTITIONERS COUNCIL FOR THE YEAR ENDED 30 TH JUNE 2014 OFFICE OF THE AUDITOR GENERAL THE REPUBLIC OF UGANDA REPORT OF THE AUDITOR GENERAL ON THE FINANCIAL STATEMENTS OF THE UGANDA MEDICAL AND DENTAL PRACTITIONERS COUNCIL FOR THE YEAR ENDED 30 TH JUNE 2014

More information

UNITED NATIONS OFFICE FOR PROJECT SERVICES (UNOPS) FINANCIAL AUDIT REPORT. 26 August 2016

UNITED NATIONS OFFICE FOR PROJECT SERVICES (UNOPS) FINANCIAL AUDIT REPORT. 26 August 2016 UNITED NATIONS OFFICE FOR PROJECT SERVICES (UNOPS) FINANCIAL AUDIT REPORT 26 August 2016 PROJECT NAME: MODERNIZATION AND IMPROVEMENT OF POLICING PROJECT (MIPP) PROJECT NUMBER: 00093090 COUNTRY: NEPAL AUDITOR:

More information

THE UNITED REPUBLIC OF TANZANIA NATIONAL AUDIT OFFICE (NAO)

THE UNITED REPUBLIC OF TANZANIA NATIONAL AUDIT OFFICE (NAO) THE UNITED REPUBLIC OF TANZANIA NATIONAL AUDIT OFFICE (NAO) REPORT OF THE CONTROLLER AND AUDITOR GENERAL ON THE FINANCIAL STATEMENTS OF THE REGISTRAR OF POLITICAL PARTIES VOTE 27 FOR THE FINANCIAL YEAR

More information

REPORT OF THE AUDITOR GENERAL ON THE FINANCIAL STATEMENTS OF UGANDA INVESTMENT AUTHORITY (UIA) FOR THE YEAR ENDED 30 TH JUNE 2015

REPORT OF THE AUDITOR GENERAL ON THE FINANCIAL STATEMENTS OF UGANDA INVESTMENT AUTHORITY (UIA) FOR THE YEAR ENDED 30 TH JUNE 2015 THE REPUBLIC OF UGANDA REPORT OF THE AUDITOR GENERAL ON THE FINANCIAL STATEMENTS OF UGANDA INVESTMENT AUTHORITY (UIA) FOR THE YEAR ENDED 30 TH JUNE 2015 OFFICE OF THE AUDITOR GENERAL UGANDA TABLE OF CONTENTS

More information

ERNST & YOUNG 2017/18 ENGAGEMENT LETTER AND AUDIT PLAN

ERNST & YOUNG 2017/18 ENGAGEMENT LETTER AND AUDIT PLAN AUDIT AND RISK COMMITTEE 5 MARCH 2018 ERNST & YOUNG 2017/18 ENGAGEMENT LETTER AND AUDIT PLAN PURPOSE The purpose of this report is to receive and note the Audit Engagement Letter and the proposed audit

More information

March Guidance on Using the Audited Project Financial Statements (APFS) Standard Review Checklist

March Guidance on Using the Audited Project Financial Statements (APFS) Standard Review Checklist March 2015 Guidance on Using the Audited Project Financial Statements (APFS) Standard Review Checklist Page 1 of 7 REVISED GUIDANCE ON USING THE APFS STANDARD REVIEW CHECKLIST Please note: The review checklist

More information

RESERVE BANK OF MALA WI '"" FINANCIAL SECTOR TECHNICAL ASSISTANCE PROJECT (FSTAP) ID P AUDIT REPORT FOR THE YEAR ENDED DECEMBER 31, 2017

RESERVE BANK OF MALA WI ' FINANCIAL SECTOR TECHNICAL ASSISTANCE PROJECT (FSTAP) ID P AUDIT REPORT FOR THE YEAR ENDED DECEMBER 31, 2017 Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized GOVERNOR'S OFFICE TEL: (265) 1 770 600/771 600 FAX: (265) 1 772 752/7,74 289 WEBSITE:

More information

Mongolia: Development of State Audit Capacity

Mongolia: Development of State Audit Capacity Technical Assistance Report Project Number: 47198-001 Capacity Development Technical Assistance (CDTA) November 2013 Mongolia: Development of State Audit Capacity The views expressed herein are those of

More information

and independent auditors' report Public Disclosure Authorized

and independent auditors' report Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized "Improving Social Accountability in the Water Sector through the Development of Quality Standards and Citizen Participation in Monitoring Project"

More information

L/C/TF Number(s) Closing Date (Original) Total Project Cost (USD) IBRD Jun ,670,000.00

L/C/TF Number(s) Closing Date (Original) Total Project Cost (USD) IBRD Jun ,670,000.00 Public Disclosure Authorized Independent Evaluation Group (IEG) 1. Project Data Report Number : ICRR0020366 Public Disclosure Authorized Public Disclosure Authorized Project ID P107666 Country Peru Project

More information

REPORT OF THE AUDITOR GENERAL ON THE FINANCIAL STATEMENTS OF MINISTRY OF TRADE, INDUSTRY AND COOPERATIVES FOR THE YEAR ENDED 30 TH JUNE 2017

REPORT OF THE AUDITOR GENERAL ON THE FINANCIAL STATEMENTS OF MINISTRY OF TRADE, INDUSTRY AND COOPERATIVES FOR THE YEAR ENDED 30 TH JUNE 2017 THE REPUBLIC OF UGANDA REPORT OF THE AUDITOR GENERAL ON THE FINANCIAL STATEMENTS OF MINISTRY OF TRADE, INDUSTRY AND COOPERATIVES FOR THE YEAR ENDED 30 TH JUNE 2017 OFFICE OF THE AUDITOR GENERAL UGANDA

More information

Puntland s Consumer Price Index & Exchange Rate Regime. Updated Report. Garoowe, Puntland State of Somalia

Puntland s Consumer Price Index & Exchange Rate Regime. Updated Report. Garoowe, Puntland State of Somalia Ministry of Planning and International Co-operation Puntland s Consumer Price Index & Exchange Rate Regime Updated Report Garoowe, Puntland State of Somalia October, 2017 Puntland s Consumer Price Index

More information

Results of Implementation of Joint 2006 Country Portfolio Performance Review Action Plan 2006

Results of Implementation of Joint 2006 Country Portfolio Performance Review Action Plan 2006 Attachment I: Results of Implementation of Joint 2006 Country Portfolio Performance Review Action Plan 2006 ISSUES BACKGROUND ACTIONS DEADLINE RESPONSIBLE STATUS as of 15 June 2008 1.1 With relevant capacity

More information

MUNICIPAL DEVELOPMENT FUND OF GEORGIA LOAN NO.8380-GE GRANT NO.TF (SECOND REGIONAL AND MUNICIPAL INFRASTRUCTURE DEVELOPMENT PROJECT)

MUNICIPAL DEVELOPMENT FUND OF GEORGIA LOAN NO.8380-GE GRANT NO.TF (SECOND REGIONAL AND MUNICIPAL INFRASTRUCTURE DEVELOPMENT PROJECT) Public Disclosure Authorized Public Disclosure Authorized MUNICIPAL DEVELOPMENT FUND OF GEORGIA (SECOND REGIONAL AND MUNICIPAL INFRASTRUCTURE DEVELOPMENT PROJECT) Special Purpose Project Financial Statements

More information

The Shareholders of T.Krungthai Industries Public Company Limited

The Shareholders of T.Krungthai Industries Public Company Limited REPORT OF CERTIFIED PUBLIC ACCOUNTANT To The Shareholders of T.Krungthai Industries Public Company Limited I have audited the accompanying of financial statements of T.Krungthai Industries Public Company

More information

UNIVERSITY OF CENTRAL FLORIDA INVESTMENT POLICY AND MANUAL

UNIVERSITY OF CENTRAL FLORIDA INVESTMENT POLICY AND MANUAL UNIVERSITY OF CENTRAL FLORIDA INVESTMENT POLICY AND MANUAL TABLE OF CONTENTS INVESTMENT POLICY... 1 INVESTMENT OBJECTIVES... 2 PERFORMANCE MEASUREMENT... 3 PRUDENCE AND ETHICAL STANDARDS... 3 BROKER DEALERS,

More information

Unitary Enterprise "Talimarjan Thermal Power Plant"

Unitary Enterprise Talimarjan Thermal Power Plant Public Disclosure Authorized Unitary Enterprise "Talimarjan Thermal Power Plant" Public Disclosure Authorized Talimarjan Transmission Project ("Construction Of 500 Kv High Voltage Line "Talimarjan TPP

More information

145 DRURY LANE (MANAGEMENT) LIMITED (A COMPANY LIMITED BY GUARANTEE NOT HAVING A SHARE CAPITAL) DIRECTORS' REPORT AND FINANCIAL STATEMENTS

145 DRURY LANE (MANAGEMENT) LIMITED (A COMPANY LIMITED BY GUARANTEE NOT HAVING A SHARE CAPITAL) DIRECTORS' REPORT AND FINANCIAL STATEMENTS Company Registration No. 03723911 (England and Wales) 145 DRURY LANE (MANAGEMENT) LIMITED DIRECTORS' REPORT AND FINANCIAL STATEMENTS COMPANY INFORMATION Directors Secretary M A Adams H Y Wong M A Adams

More information

PROGRAM FIDUCIARY SYSTEMS ASSESSMENT

PROGRAM FIDUCIARY SYSTEMS ASSESSMENT Sustainable Transport Infrastructure Improvement Program (RRP SOL 46499) A. Background and Information Sources PROGRAM FIDUCIARY SYSTEMS ASSESSMENT 1. Under the proposed program, country public financial

More information

KENYA NATIONAL AUDIT OFFICE REPORT OF THE AUDITOR-GENERAL KENYA TRANSPORT SECTOR SUPPORT PROJECT (KTSSP) IDA CREDIT NO.4926KE FOR THE YEAR ENDED

KENYA NATIONAL AUDIT OFFICE REPORT OF THE AUDITOR-GENERAL KENYA TRANSPORT SECTOR SUPPORT PROJECT (KTSSP) IDA CREDIT NO.4926KE FOR THE YEAR ENDED Public Disclosure Authorized RF Pl. R LIC OF KENYA KENYA NATIONAL AUDIT OFFICE Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized REPORT OF THE AUDITOR-GENERAL ON KENYA

More information

ARM: Sustainable Urban Development Investment Program, Tranche 1

ARM: Sustainable Urban Development Investment Program, Tranche 1 Environmental Monitoring Report Bi-annual Report July-December 2012 ARM: Sustainable Urban Development Investment Program, Tranche 1 Project Number: 42417 Loan Number: L2752 May 2013 Prepared by the Yerevan

More information

Puntland s Consumer Price Index & Exchange Rate Regime. Updated Report. Garoowe, Puntland State of Somalia

Puntland s Consumer Price Index & Exchange Rate Regime. Updated Report. Garoowe, Puntland State of Somalia Ministry of Planning and International Co-operation Puntland s Consumer Price Index & Exchange Rate Regime Updated Report Garoowe, Puntland State of Somalia January, 2018 Puntland s Consumer Price Index

More information

REPORT (2016/C 449/35)

REPORT (2016/C 449/35) C 449/188 EN Official Journal of the European Union 1.12.2016 REPORT on the annual accounts of the European Foundation for the Improvement of Living and Working Conditions for the financial year 2015,

More information

IDF GRANT No. TF013658

IDF GRANT No. TF013658 ENVIRONMENTAL GOVERNANCE, INCLUSION AND TRANSPARENCY IN MINING SECTOR PROJECT F, IDF GRANT No. TF013658 IMPLEMENTED BY ENVIRONMENTAL PROJECT IMPLEMENTATION UNIT STATE AGENCY UNDER THE MINISTRY OF NATURE

More information

Freetown GOVERNMENT OF SIERRA LEONE

Freetown GOVERNMENT OF SIERRA LEONE Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Our Ref: 4144/ask/aiw 22nd July 2015 The Financial Management Specialist World Bank Country

More information

BEAUFORT INVESTMENT MANAGEMENT LIMITED FINANCIAL STATEMENTS FOR THE YEAR ENDED. 31st MARCH 2015

BEAUFORT INVESTMENT MANAGEMENT LIMITED FINANCIAL STATEMENTS FOR THE YEAR ENDED. 31st MARCH 2015 COMPANY REGISTRATION NUMBER 06150317 BEAUFORT INVESTMENT MANAGEMENT LIMITED FINANCIAL STATEMENTS FOR THE YEAR ENDED 31st MARCH 2015 Century House Wargrave Road Henley-on-Thames Oxfordshire RG9 2LT FINANCIAL

More information

Independent Auditor s Report

Independent Auditor s Report Independent auditor s report to the members of Hang Lung Properties Limited (incorporated in Hong Kong with limited liability) Opinion We have audited the consolidated financial statements of Hang Lung

More information

Project Agreement. (Private Sector Development Support Project) between INTERNATIONAL DEVELOPMENT ASSOCIATION. and

Project Agreement. (Private Sector Development Support Project) between INTERNATIONAL DEVELOPMENT ASSOCIATION. and Public Disclosure Authorized CONFORMED COPY GRANT NUMBER H275-AF Public Disclosure Authorized Project Agreement (Private Sector Development Support Project) Public Disclosure Authorized between INTERNATIONAL

More information

THE REPUBLIC OF UGANDA

THE REPUBLIC OF UGANDA THE REPUBLIC OF UGANDA REPORT OF THE AUDITOR GENERAL ON THE FINANCIAL STATEMENTS OF THE AGRICULTURAL TECHNOLOGY AND AGRIBUSINESS ADVISORY SERVICES (ATAAS) NARO PROJECT FOR THE YEAR ENDED 30 th JUNE, 2017

More information

Policy: 3330 PETTY CASH ACCOUNTS

Policy: 3330 PETTY CASH ACCOUNTS Policy: 3330 PETTY CASH ACCOUNTS Petty cash funds may be established as needed to for schools, central office units, and special programs as they will expedite the purchase of minor items and/or provide

More information

2 6 DEC 2014 HARMONIZATION OF NATIONAL ACTION PLAN TO COMBAT DESERTIFICATION IN ARMENIA AND PREPARATION OF NATIONAL REPORT PROJECT

2 6 DEC 2014 HARMONIZATION OF NATIONAL ACTION PLAN TO COMBAT DESERTIFICATION IN ARMENIA AND PREPARATION OF NATIONAL REPORT PROJECT Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized 2 6 DEC 2014 HARMONIZATION OF NATIONAL ACTION PLAN TO COMBAT DESERTIFICATION IN ARMENIA

More information

CIMB THAI BANK PUBLIC COMPANY LIMITED CONSOLIDATED AND SEPARATE FINANCIAL STATEMENTS 31 DECEMBER 2016

CIMB THAI BANK PUBLIC COMPANY LIMITED CONSOLIDATED AND SEPARATE FINANCIAL STATEMENTS 31 DECEMBER 2016 CIMB THAI BANK PUBLIC COMPANY LIMITED CONSOLIDATED AND SEPARATE FINANCIAL STATEMENTS 31 DECEMBER 2016 Independent Auditor s Report To the shareholders of My opinion In my opinion, the consolidated financial

More information

Multi-Donor Trust Fund for the Malawi Public Finance and Economic Management Reform Program Grant Agreement

Multi-Donor Trust Fund for the Malawi Public Finance and Economic Management Reform Program Grant Agreement Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized MDTF GRANT NUMBER TF013825 Multi-Donor Trust Fund for the Malawi Public Finance and Economic Management Reform Program

More information

JSDF GRANT FOR THE SUPPORT TO COMMUNITY SEED FUNDS PROJECT

JSDF GRANT FOR THE SUPPORT TO COMMUNITY SEED FUNDS PROJECT JSDF GRANT FOR THE SUPPORT TO COMMUNITY SEED FUNDS PROJECT JSDF GRANT NO. TF014029 IMPLEMENTED BY AGRIBUSINESS COMPETITIVENESS CENTER SPECIAL PURPOSE FINANCIAL STATEMENTS AND INDEPENDENT AUDITOR'S REPORT

More information