1 COMMUNITY-LED ACCELERATED WASH (COWASH) PROJECT 2007 EFY ANNUAL PROGRESS REPORT OF SNNPR Prepared by: SNNPR RSU AUGUST, 2015

2 Table of Contents 1 Introduction Capacity building Physical capacity building Human capacity building Trainings Workshops and Review Meetings WaSH Facilities Construction & Rehabilitation Financial utilization Investment, some capacity & operational funds from GoE Allocated and Transferred Investment, Capacity Building and Operational Funds GoF Capacity Building Fund Major challenges faced and measures taken during in 2007 EFY i P a g e

3 1 INTRODUCTION Improving accessibility of water supply, sanitation and hygiene for every citizen of Ethiopia has been a top agenda in the country over the last decade and there have been committed efforts towards achieving the GTP 1 or universal access plan targets.. Southern Nations, Nationalities and Peoples Region (SNNPR) is divided into 14 administrative zones, 22 town administrations, and 4 special Woredas (special districts). The number of woredas of the region accounts for 134. Under the Regional Water Resource Bureau, Water Supply, Sanitation and Hygiene (WaSH) Program has been implemented in different parts of the region. The need for potable water supply, sanitation and hygiene services is also increasing throughout the region. The Water Resource Bureau has been working closely with various stakeholders and partners to implement several WaSH activities in 70 woredas (districts) and 14 large and medium towns through financial support from various sources (Ethiopian Government, World Bank, DFID, African Development Bank and UNICEF) in the previous WASH program. Recently, the One WaSH National Program was planned to implement WaSH activities in 68 Woredas of the region (including 4 special Woredas) and 20 small towns. This shows that, despite the various implementation bottlenecks, the region has been trying hard to achieve the objective of improving access to sustainable water supply, sanitation and hygiene services for rural and urban population through improved capacity of the stakeholders in the WaSH sectors. Community-Led Accelerated WaSH (COWASH) project started in the region through financial support of the Finland Government (for capacity building & some operational costs), Regional, Zonal and Woreda governments (for investment, physical capacity building in some woredas and zones and some operational costs) and the community contribution (at least 15% by cash, 1 P a g e

4 material and/or labour). The project began its implementation in 2004 EFY in Arbaminch Zuria and Chencha Woredas in Gamogofa zone as pilot Woredas. In June 2015, these woredas are having projected total rural population of 205,204 and 131,497 respectively. In 2005 EFY, the project encompassed Hadiya Zone and 2 more woredas (Misha and Duna) in this zone. Last fiscal year (2006 EFY), the project expanded to 2 other zones (Sidama and Dawuro) and 4 woredas in these zones-arbegoan and Gorche Woredas in Sidama Zone and Tocha and Esara in Dawuro zone. In sum, to-date, COWASH has been supporting the improvement of access to WASH services in 4 zones and 8 woredas out of 14 zones and 134 woredas in the region. Among the project woredas, Misha has the least rural water supply access coverage (17.4%). On the other hand, Arbaminch Zuriya Woreda has the highest rural water supply access coverage (71%) at the end of 2007 EFY. The selection of Zones, Woredas and Kebeles for the project, among others, is undertaken mainly by considering level of the problem in terms of water supply and sanitation accesses as well as feasibility of low cost technology based water facilities in the area. The Woredas start the project with 5 Kebeles and continue by adding other new 5 Kebeles every fiscal year. Hence, there is a total number of 105 Kebeles supported by COWASH until the end of 2007 EFY and the number of CMP kebeles are expected to reach 145 in 2008 EFY. 2 P a g e

5 Table 1: Secondary Data on Water Supply Access Coverage, Sanitation Coverage and Institutional WaSH of Project Woredas Woreda Total no. of Rural Populatio n at the end of Sene (June) 2007 E.C Rural Water Supply Access Coverag e end of 2007 EFY Rural Water Supply Usage/Act ual coverage at end of 2007EFY Total number of schools at end of 2007EF Y Total Number of schools with Improved Water Supply at end of 2007EFY Total number of Helath Institutio ns at end of 2007 EFY Total number of Helath Institutions with Improved Water Supply at end of 2007 EFY Total number of schools with Improved /VIP/ latrine at end of 2007EFY Total number of Helath Institutions with Improved /VIP/ latrine at end of 2007EFY Proportio n of Rural Househol ds using Improved Sanitation Facilities end of 2007 EFY Proportion of Rural Households with Access to Sanitation Facilieties (Improved or unimproved) end of 2007 EFY Total Number of ODF Rural Kebeles end of 2007 EFY Total Number of ODF CMP Kebeles end of 2007 EFY Unit No. % % No. No. No. No. No. No. % % No. No. % A/Minch Zuria 205, (11 in 2006 EFY) Nonfunction ality Rate of Rural Water Supply Scheme s end of 2007 EFY 5 12 Chencha 131, (9 in 21 Misha 150, (25 in 41 (7 in (100 in 29 ( Duna 139, (8 EFY) in 2006EFY) EFY) 95 in Arbegona 2006 EFY) 19(8 in 1 (34 in 1(32 in * EFY) 2006 EFY) 2006 EFY) Gorche 132, Tocha 132, (33 in Isara 73, (13. 4(22 in in 2006 EFY) 3 P a g e

6 Table 1: continued Woreda Total no. of COWASH/CMP WPs Constructed for COMMUNITIES in the Woreda until end of No. of People Having Access to the Community WPs within 1.5km No. of People Using the Community WPs (Actual No. of Beneficiary Populaiton) Total no. of COWASH/CMP WPs Constructed for Schools in the Woreda until end of 2007 EFY Total no. of COWASH/CMP WPs Constructed for Health Faciliteis in the Woreda until end of Total no. of COWASH/CMP Ltrines Constructed for Schools in the Woreda until end of 2007 EFY Total no. of COWASH/CMP Latrines Constructed for Health Facilities in the Woreda until end of 2007 EFY A/Minch Unit No. No. No. No. No. No. No. Zuria Chencha Misha Duna Arbegona Gorche 24 6,750 11, Tocha Isara Total , , * In Arbegona Woreda, the total no. of schools with improved latrine at the end of 2006 EFY & total no. of health institutions with improved latrine at the end of 2006 EFY were wrongly reported to be 60 and 32 respectively. At the end of this fiscal year properly calculated to be 1 & 1 respectively. 4 P a g e

7 2 CAPACITY BUILDING 2.1 PHYSICAL CAPACITY BUILDING Since 2004 EFY, the COWASH project has built the physical (material procurement) and human (trainings, workshops, meetings, etc) capacities of the project woredas and zones in the region. In this respect, as part of physical capacity building efforts of the project, out of the ten desktop computers planned to be procured in 2007 EFY, four of them were rolled over from the preceding fiscal year. Accordingly, three desktop computers were procured by Tocha (1) and Esara(2) Woredas, which costed about Birr 37,430. In addition, 3 desktop computers were procured by Dawuro Zone water, Energy and mine (1) and Finance and Economic Development Departments (1) as well as Duna water, energy and mine office(1) in the fiscal year. Besides, 5 more computers were procured by Esara (4) and Arbaminch zuriya (1), which brought the total computers procured to 11 in 2007 EFY. Hence, the procurement of 110 % of the planned desktop computers was achieved in the reporting period. The number procured computers exceeds the planned computers as one more desktop computer was procured by Arbaminch zuriya by shifting the budget planned for LCD projector to this procurement. A total of Birr 96, was expended for this accomplishment. On top of this, 8 lap tops were also planned to be procured in this fiscal year by Esara (1), Gorche(1), Arbegona(1), Misha(1) and Duna (1) Woredas' water, mines and energy offices as well as RSU (1) and BoFED (2). Four laptops were also procured by Duna (2) Esara (1) and Gorche(1) Woredas, and four of them were procured by RSU (1), Dawuro Zone water, Energy and mine (1) and Finance and Economic Development Departments (1), Duna (1) in 2007 EFY. One laptop was also bought by Misha woreda in the fourth quarter of 2007 EFY. A total of 137, Birr was spent to procure these office materials. In sum, 112 % (as 1 unplanned laptop was procured by Duna) of the planned laptops were procured in the reporting period. Out of 14 printers planned to be procured in 2007 EFY, 16(114%) printers were procured in the reporting period. The printers were procured by Tocha (6), Esara(5), Dawuro zone water, energy and mine (1), Arbaminch Zuriya WWO (1), and Finance and Economic Development Departments (1) as well as Gorche (1) and Arbegona(1) woredas. The total cost of the printers amounted to Birr 94, In addition, 7 motorbikes planned to be procured in 2007 EFY. These motorbikes are for Tocha, Esara, Arbegona and Goriche Woredas, 2 for each, except Arbegona which planned to procure only one. Accordingly, eight (114%) motorbikes were procured for Arbegona (1), 5 P a g e

8 Tocha (1), Gorche (1), Tocha (3) and Essara (2) Woredas' water, mines and energy offices in the reporting period with a total cost of 379, Birr. In this respect, Tocha Woreda procured two more small motorbikes using the leftover budget for the procurement of the unplanned motorbikes. Five 5 photocopy machines, 3 of them rolled over from 2006 EFY, were planned to be procured by Tocha (1), Esara (1), Gorche (1) and Arbegona (1) Woredas and Dawuro zone (1). Accordingly, 5 (100%) photocopy machines were procured by all Woredas with a total cost of Birr 141, Also, 12 digital cameras were planned to be procured in the reporting period, 9 of them were rolled over from 2006 EFY plans of Misha, Duna, Gorche, Esara and Tocha Woredas, Dawuro, and Hadiya zones, RSU, BoFED and the other three were planned to be procured by Arbegona Woreda, Sidama zone and BoE. Eight (66.7%) digital cameras were procured by Duna, Gorche and Esara, Misha and Tocha Woreda water, energy and mine office, one for each, with a total cost of Birr 47, during the same period. Five artisan's tools were planned to be procured by Tocha(1), Duna (1), Esara (1), Gorche(1) and Arbegona(1) Woredas this fiscal year. Accordingly, Tocha, Gorche and Arbegoa Woredas procured 3 (60%) of the artisan tools, one for each, with a total cost of Birr 85, In addition, all woredas except Tocha, Arbegona and Gorche re-planned to procure 5 water quality test kits (as they were rolled over from 2006 EFY) in 2007 EFY. These kits were not procured by any of the project woredas during the previous fiscal years due to inadequacy of the planned budget for the kits and inability of the woredas to get a supplier for single kit as each woreda tried to advertise bids individually. To this end, as per the action plan devised to boost project performance in the region after the RWSC meeting held on December 2, 2014, these 5 kits were decided to be procured in bulk by Water Resource Bureau. Accordingly, agreement has been signed between the Water Resource Bureau and the supplier of the kits, which are expected to be delivered in the coming months. Four large diameter molds rolled over from 2006 EFY were re-planned to be procured in this fiscal year for Esara and Tocha Woredas, 2 for each. However, only Tocha woreda water, energy and mine office accomplished the procurement of 2(50%) large diameter molds in the reporting period with a total cost of Birr. Esara woreda has found large diameter molds irrelevant as the Woreda is giving emphasis on spring development and hence, canceled procuring these molds. Rather the woreda is on the process of shifting the budget to more appropriate material procurement after WWT approval. Likewise, 32 small diameter molds rolled over from 2006 EFY plans of Esara (10), Tocha (10), Chencha (6) and Arbaminch Zuriya (6) Woredas were re-planned to be procured in 6 P a g e

9 2007 EFY. However, only 16 (50%) of them were accomplished with a total cost of Birr 156,100 by Arbaminch zuriya, Chencha and Tocha Woredas. The procurement of one Double Cabin Toyota Pickup car for the RSU was rolled over from 2006 EFY plan and re-planned to be procured in 2007 EFY. However, its procurement was not accomplished during the reporting period due to a lengthy procurement process involved. In order to speed up the ongoing car procurement, as per the action plan devised following the decision of the RWSC meeting held on December 2,2014, it has been included into the first possible bulk car procurement of the region. To this end, an agreement has been signed between the Water Resource Bureau and the supplier of the car. Finally, the procurements of all of the equipments such as colour printer (1), external hard disk (1), and office furniture (2) flash disks (3) were also accomplished for RSU in the reporting period with a total cost of 29, Birr. In sum, types of materials and equipments (around 171 in quantity) were planned to be procured in 2007 EFY and 133 of them were already procured, which is 78.4% of achievement (Table 1). A total of Birr 4,721, was expended for building the physical capacity of the WASH sectors at regional, zonal and woreda levels. 7 P a g e

10 Table 1: Summary of Materials Planned and Procured in 2007EFY S/NMaterial or Equipment Unit Quantity Planned 4th Quarte Annual r 4th Quarte r Annu al 1 Desktop C omputer No ,212 2 Laptop C omputer No ,537 3 Printer No Photocopy Machine No LC D Projector No ,686 6 Scanner No. 0 2 o Digital C amera No ,270 8 File cabinet No ,947 9 Motorbike No ,579 Dawuro zone WO &FO; Tocha WWO & WEO ; Esara WWO & Duna WWO RSU;Tocha, Gorche & Duna WWOs; Dawuro Zone WO;Arbegona WWO Dawuro Zone water dep't and ZFO;Tocha WWO,WEO &WFEDO,EsaraWWO Tocha, Gorche & Esara WWOs;Dawuro zone WO; Arbegona WWO Dawuro zone WO; Duna WWO M isha, Duna, Gorche &Esara WWO; Tocha WWO;Dawuro zone WO;Arbegona WWO RSU, Arbegona WWO;Gcrche WWO;Tocha WWO; Esara WWO Arbegona WWO;Tocha, Gorche & Esara WWOs 10 Large diameter mol No ,800 Tocha WWO Q3 11 Small diameter mol No ,080 Chencha WWO & Tocha WWO 12 C hain block No ,900 Chencha WWO Q2 13 Artisan tools Set Water quality test kits No Stabilizers No ,665 16,245 Gorche WWO;Arbegona WWO;Tocha Wwo Chencha, A/Zuriya,M isha, Duna & Esara WWO Tocha WWO,WFO,WHO,WEO;Daw uro Zone Water and Finance 16 Fax machine No ,638 M isha WWO 17 GPS 18 Spring dev't tools Quantity Procured No No Total Cost (in Birr) 20,720 44,000 Beeficiary Office/s WWO;Chencha nd M isha WWO Chencha & Gorche Tocha WWO 18 External haed disk No ,782 RSU 19 C DMA No RSU 20 Office furniture No ,900 RSU 21 Double Cabin Toyot No ,470,000 Procured 22 C olour Printer No ,250 RSU 23 Flash Disk No RSU Total 4,721,666 Remark Dawuro Zone WO &FO; Duna procured one desktop in third quarter Arbegona WWO;Tocha procured in the third Gorche WWO;Arbegona WWO;Dawuro procured the machine in third quarter procured in the third quarter Dawuro, Arbegona &Tocha procured in the third quarter RSU, Arbegona &Esara procured in the third quarter Arbegona WWO proc Tocha procured in the Gorche WWO;Arbegona WWO procured in Procured i Dawuro Zone Water and Finance department procured in the third quarter Gorche WWO procured in the The procurement of 1 external hard disk, has been cancelled 8 P a g e

11 2.2 HUMAN CAPACITY BUILDING The accomplishments in trainings, workshops and meetings of the project are presented and illustrated as follows Trainings The project has been working hard to build the human capacity of the region, zones and woredas. In view of that, a number of trainings were planned in 2007 EFY. To begin with, it was planned to give CMP management training for 135 ZWT, WWT and Woreda CMP appraisal team members on CMP management in the second quarter of 2007 EFY. CMP promotion, application, appraisal and M&E training for CMP appraisal team members (52 trainees), WASHCO (48 trainees) TOT in CMP management were also planned to be held in the second quarter of 2007 EFY. However, these trainings were not conducted the reporting period. This was due to the fact that priority was given to construction activities and these refresher trainings will be planned to be conducted in the first quarter of the upcoming fiscal year. Likewise, ToT training on GLOWS/WSP for Woreda technical staffs were planned to be conducted in 2007 EFY. Even though, initially this training was intended and approved to be provided for all project woredas, latter it was decided to make it in one selected woreda. The training could not be implemented due to some preparatory activities expected from the project federal office. Duna woreda is now selected for the piloting of WSP in the region and the training will be included in the 2008 EFY annual plan of the region. Moreover, COWASH financial management training was also planned to be given for 52 zonal and woreda finance offices' technical staffs. This training was accomplished by BoFED financial experts for 45 (10 females) Woreda and zonal COWASH financial focal persons and woreda microfinance representatives, which accounts 86.5% achievement of the plan. On the other hand, TOT training on operation and maintenance for 26 zonal and woreda technical staffs was planned to be given in 2007 EFY. This training was conducted in collaboration with COWASH FTAT for 28 (1 female) zonal and woreda technical staffs for three days during the reporting period with a total cost of Birr, 64, In addition, WaSHCO CMP management training was planned to be conducted in 2007 EFY to 2,692 members of WASHCOs. To this end, the project woredas trained 1522 (749 females) members of WASHCOs in the same period, which is 56.5% achievement. The total cost spent for this training adds up to Birr 745, Likewise, KWT CMP promotion and appraisal training was planned to be given for 429 KWT members until end of 2007 EFY. This training was conducted by all of the project woredas for 444(161 females) KWT (103%) members and other Kebele level agents in the same period with a total cost of Birr 376, The woredas included more agents such as kebele level 9 P a g e

12 saving agents and women affairs agents who would support the promotion activities that made the accomplishment to exceed the plan. Moreover, WASHCO training in scheme management for 1,460 WASHCO members was planned to be conducted in 2007 EFY. Accordingly, the training was given to 948 (436 females) WASHCO members by Gorche, Duna, Misha, Chencha, Arbaminch Zuriya and Esara woredas with a total cost of Birr 502, WASHCOs training in O & M for old water points was planned for 800 WASHCO members. Four hindered fifteen (182 females)washco members in Chencha, Duna, Esara and Arbaminch zuriya Woredas have received this training with a total expense of Birr 267, The project Woredas also planned to provide training on CLTSH for 785 Kebele trainees, who are Kebele level experts, in 2007 EFY. This training was given to 784 trainees (345 female) by Arbaminch Zuriya, Chencha, Duna and Gorche Woredas during the same period with a total cost of 452, Birr, which is 99.8% achievement of the plan. WASHCO CMP implementation management refresher training was planned to be given for 1,095 WASHCO members in 2007 EFY. This training was given to 510 (220 females) by Duna, Chencha and Esara Woredas with an outlay of Birr 80, Chencha Woreda planned to provide water quality testing training for 266 WASHCO members. Consequently, the woreda experts trained 103 (50 females) WASHCO members (50%) for four days with a total cost of about Birr 84, Likewise, KWT gender awareness & mainstreaming training was planned to be provided for 605 KWT members in 2007 EFY. However, the training was given to 683 (365 females) KWT members (112%) by the project woredas, with a total cost of Birr 227, Finally, training for new pump attendants and caretakers was planned to be given for 858 trainees in 2007 EFY. This training was given to 299 (120 females) pump attendants and caretakers (34.8 %) with a total cost of about Birr 176, by Chencha, Duna, Arbaminch Zuriya and Gorche woredas in the reporting period. In all, out of 19 types of trainings planned to be conducted in 2007 EFY at regional, zonal and woreda levels, about 15 of them (78.9 %) were accomplished in the same period. To this end, about Birr 3,601, was expended to materialize the human capacity building at all levels in the region (Table 2). 10 P a g e

13 Table 2: Trainings planned and achieved in 2007 EFY S/ N Type of Training CMP Management Training for ZWT, WWT & appraisal 1 team CMP Promotion, Application, Appraisal & M&E Training 2 for CMP appraisal team Responsible body/trainer No. of Trainees Planned Annual 4th Quarter 4th Quarter Number Trained M F T M F T COWASH FTAT & RSU COWASH FTAT & RSU Annual No. of Days Trained Estimated cost of training (in Birr) 3 WaSHCO ToT in CMP Management COWASH FTAT & RSU O & M ToT trainig for zonal &Woreda technical staffs COWASH FTAT & RSU ,208 4 ToT Training in Water Safety Planning/GLOWS RSU Financial management & Utilization training for Zonal & Woreda technical staff. BoFED ,467 8 CLTSH ToT Training (for Woreda & Zone staff) BoH WASHCO Training in Scheme Management WWO 1, to 4 502,824 The Dun 7 Pump attendants & care takers Refreshment Training WWO ,500 cond 9 CLTSH Training for Kebele Level Experts W HO ,069 cond chen 10 KWT CM P Promotion & Appraisal Training WWO to 4 376,095 Cen A/Zu by E 11 WASHCO CMP Management Training WWO 2, to 5 745,413 Dun 12 WASHCO CMP Management refreshment Training WWO 1, to5 80, WASHCOs training in O & M for old WPS-referesher WWO , New artisans Training WWO to45 397, Refreshment training for old artisans WWO , by C 16 Pump Attendants & Caretakers Training WWO to 5 176,340 The Wo r 17 Kebele strategic plan in 5 kebeles per Woreda WWO ,000 Chen 18 WASHCOs GLOWS/WSP Training WWO KWT gender awareness & mainstreaming Training WWAO ,440 cond Q2), 20 Training of WASHCOs in Water Quality WWO ,964 Chen Total 10,417 2,236 1,831 1,459 3,290 3,358 2,6 82 6,040 3,6 01, P a g e

14 2.2.2 Workshops and Review Meetings Workshops and meetings are considered as one capacity building mechanism of the project. Cognizant of this fact, COWASH spends quite a lot of budget for such kinds of capacity building activities in the woredas and regional level. Annual review of 2006 EFY performance and 2007 EFY planning Workshop was planned to be undertaken with the participation of 117 people drawn from woreda, zone and regional sector offices.. In this respect, so as to identify structural challenges of project implementation that resulted for low project performance in the region and thereby to address them in the 2007 EFY planning, the RSU has reviewed, evaluated and planned the 2006 EFY performances and 2007 EFY plan respectively with each ZWT and WWT of intervention zones and woredas. Hence, the review was conducted late in the reporting period together with the 2008 EFY core plan with the participation of 92(78.6%) (7 females). This was done with the view to ensuring experiential learning among project woredas and zones as well as to aware the need for timely preparation for 2008 EFY planning. Some Birr 203, was spent for this review and planning workshop. Regarding workshops and review meetings at zonal and woreda levels, only few project woredas organized them until the end of the reporting period. Accordingly, annual review of 2006 EFY performances and Planning Workshop for 2007EFY plan were conducted by Esara and Tocha Woredas for one to three days with a total cost of Birr 87, The total participants were 286 (133 females). In addition, whole system in the Room (WSR) workshop was conducted by Duna, Tocha, Esara and Chencha Woredas' health offices with 302 participants (100 females) for 2 to 5 days in 2007 EFY. The cost of the workshop amounted to about Birr 208, P a g e

15 Table 3: Workshops & Review meetings planned and achieved in 2007 EFY S/ N Type of Workshop/Meeting Organizer No. of Participants Planned This Quarter Annual Number Attended 4th Quarter Annual M F T M F T No. of Workshop Days Total Cost of Workhop/Mee ting (in Birr) Remark 1 Three years' COWASH Review meeting and discussion on 2008 EFY Core plan RSU , Annual Review and Planning Workshop WWO to4 87, Esara in first qarter; Tocha in Q3, 3 Awareness Raising Workshop to Private Sector on the Availability of Market Opportunities , Esara conducted in the third qarter; 4 COWASH Zonal Quarterly Review Meeting with Woredas Whole System in the Room (WSR) Workshop WWO to 5 208, Duna in first quarter; Tocha&Esara in Q3; Chencha in 4th Q 6 Woreda Cabinet Briefing meeting WWO , Chencha and Tocha in Q4 Total , P a g e

16 3 WASH FACILITIES CONSTRUCTION & REHABILITATION In 2007 EFY, a total of water points were planned to be constructed in the project woredas of SNNPR. There has been encouraging progress in terms of improving construction performances by all COWASH project woredas. From these planned water points, a total of 340 water points (327 for community, 2 for health institutions and 11 for schools) were completed in the reporting period. Among the completed water points 331 and 9 of them are on spot springs and hand dug wells respectively. The worda distribution shows that, out of the 340 water points completed, 55 were constructed in Duna, 67 in Misha, 50 in Chencha and 53 in Arbaminch Zuria, 24 in Gorche, 40 in Tocha, 12 in Arbegona and 39 in Essara Woredas. This shows that, out of the 449 Water points planed to be constructed in 2007 EFY, 75.7% of them was achieved in the reporting period. As a result of this achievement, more than 125,759 rural people, 2,462 students and teachers are benefiting from these constructed water points. This brings the cumulative water points constructed in the region with the support of COWASH to 520 of which 496, 19 and 5 of them are community, school and health water points, respectively. A total of 182,210 rural people, 9,571 students and teachers and 874 health staff and some clients of the health facilities are benefiting from the communal, school and health facilities' water points constructed with the support of COWASH. As can be understood from the above information, institutional WASH has been poorly performing over the project implementation period. Particularly, it is the least for the health institutions though these institutions in the region are devoid of improved water supply. Needless to say, this further undermines the functionality of the physically existing latrine buildings. Hence, this poor performance of the institutional water supply has compounded adverse effects, among others, on hygiene and sanitation aspects. In addition, various field level evaluations conducted by the RSU staffs during the fiscal year has also revealed that CMP is recognized as an effective approach that maximizes participation and creates ownership at the community level. In this respect, to the extent possible WASHCOs have been capacitated to manage the whole process of project implementation. Moreover, the gender dimension has been also addressed by all project woredas via training and quota system. Data of the WPs constructed in the woredas reveal that 63.0% of the WASHCOs have 3 women members and 85.1% of the WASHCOs have 2 or more women members. All of the COWASH/CMP WPs constructed until the end of the reporting period in the woredas are 1 33 WPs are new additions from A/Zuriya (16) and Chencha (17) as theses woredas have revised their plans by incorporating those WPs rolled over from 2006 EFY to 2007 EFY annual plan 14 P a g e

17 functional. As far as rehabilitation of WPs is concerned, 37 water points to be rehabilitated were rolled over from 2006 EFY and re-planned to be implemented by all project woredas except Arbegona and Gorche woredas in this fiscal year. However, only 24 (64.9%) of them have been accomplished by Chencha (6), Misha (6), Tocha (2) and Esara (10) in 2007 EFY. COWASH is also focusing on sanitation and hygiene. Fourteen school latrines were planned to be constructed by Chencha (2), Arabaminch Zuriya(2), Misha (2), Duna(2), Tocha (2), Esara (2), Arbegona (1) and Gorche (1) Woredas in 2007 EFY. However, only 2(14.3%) of them were constructed by Chencha and Duna Woredas in the reporting period. This brings the total number of school latrines constructed with the support of COWASH to four over the course of four years project implementation period. This low performance of construction of latrines compared to WPS, is partly explained by weak inter-sectoral integration in general and lack of ownership of the project by education offices to facilitate its timely implementations. 15 P a g e

18 Table 4: Summary of water supply schemes planned, applied & approved in 2007 EFY A. Community Water Points HDW with RP <50% >50% Total HDW SPD SW DW SPD-RPS 0 0 Subtotal B. Institutional Water Points B.1 School Water Points HDW with RP HDW SPD SW DW RWH Subtotal B.2 Health Institutions Water Points HDW with RP HDW SPD SW DW Type of Water Point(WP) RWH No. of Planned WPs to be constructed in 2007EFY No. of WPs Applications made No. of WPs Applications Desk Appraised No. of WPs Application Field Appraised No. of WPs Applications Approved by WWT No. of WPs Not Started Construction No. of WPs under construction Subtotal Total No. of WPs Abandoned (could not be constructed) unplanned but constrcted unplanned but constructed 16 P a g e

19 Table 5: Summary of water supply schemes planned and constructed in 2007 EFY. Type of Water Point(WP) No. of WPs Planned to be 4th Constructed Annual Q uarter No. of WPs Construction 4th Completed Annual Q uarter Actual No of People Using the Completed WPs No. of People Having Access to the CO MPLETED WPs with in 1.5km radius of the WPs A. Community Water Points HDW with RP HDW ,901 1,742 SPD ,823 65,267 SW DW SPD RPS , Subtotal ,759 67,913 B. Institutional Water Points B.1 School Water Points HDW with RP HDW , SPD SW DW RWH Subtotal , B.2 Health Institutions Water Points HDW with RP HDW SPD 2-0 SW DW RWH Subtotal Total , Remark unplanned but constructed 17 P a g e

20 Table 6: Summary of Water Suply Schemes Constructed by COWASH until end of the Reporting Period (2004 EFY_2007 EFY) Year of Construction HDW with RP HDW SPD SW DW RWH RPS HDW from SP Total with RP HDW SPD SW DW RWH RPS from SP Total HDW with RP HDW SPD SW DW RWH RPS from SP Total A EFY A.1 Community WPs A.2 School WPs A.3 Health Facilities WPs Subtotal B. 2005EFY B.1 Community WPs ,615 22, ,020 16, B.2 School WPs , B.3 Health Facilities WPs Subtotal C. 2006EFY C.1 Community WPs ,946 24, ,056 20, C.2 School WPs ,585 1, C.3 Health Facilities WPs Subtotal , D. 2007EFY D.1 Community WPs , , , , D.2 School WPs , D.3 Health Facilities WPs Subtotal , E. 2004_2007 EFY E.1 Community WPs , , , , , , ,029 E.2 School WPs ,715 2, , E.3 Health Facilities W Total , , ### 192, , , ,029 Total Number of COWASH/CMP Water Points Non-Functional in the COWASH Woredas = 0 18 P a g e

21 Table 7: WASHCO and Water Quality Related Data (For COWASH/CMP Water Points Only) S/ n 1 Indicator/Type of Data Required Total number of (community + institutional) WASHCOs of WPs constructed with the support of COWASH (1a + 1b +1c) EFY Until end of 2005 EFY Until end of 2006 EFY Until end of 2007 EFY a Total Number of WASHCOs of community WPs constructed with the support of COWASH b Total Number of Parent-Teacher Associations (PTAs) of school WPs constructed with the support of COWASH c Total Number of Health Committees of health institutions WPs constructed with the support of COWASH a Total number of COWASH CMP Schemes (community + institutional) with trained pump attendants & caretakers(2a + 2b +2c) Total number of Community COWASH CMP Water Supply Schemes with trained pump attendants or caretakers b Total number of School COWASH CMP Water Supply Schemes with trained pump attendants or caretakers c 3 Total number of Health Institutions COWASH CMP Water Supply Schemes with trained pump attendants or caretakers Total number of WASHCOs (of community WPs constructed with the support of COWASH) with at least 50% women members Total number of water quality tests made on COWASH Community CMP water supply schemes (post construction period) Total number of chlorinations made on COWASH Community CMP water supply schemes (post construction period) P a g e

22 Table 8: Summary of water supply schemes planned and rehabilitated in 2007 EFY Annual A. Community Water Points HDW with RP 4th Quarter 4th Quarter Annual HDW ,904 3,950 SPD ,908 2,390 SW DW SPD-RPS - Subtotal ,812 6,340 B. Institutional Water Points B.1 School Water Points HDW with RP HDW SPD SW DW RWH Subtotal B.2 Health Institutions Water Points HDW with RP - HDW SPD Type of Water Point(WP) Number of WPs planned to be Rehabilitated Number of WPs rehabilitation Completed SW - DW - RWH - Actual No of People Using the Completed WPs No of People having access to the Completed WPs within 1.5KM radius of the WPs Subtotal Total ,812 6,340 Remark (including Rolled over) Chenche rehabilitated six 20 P a g e

23 21 P a g e

24 Table 9: Summary of Water Suply Schemes Rehabilitated by COWASH until end of the Reporting Period (2004 EFY_2007 EFY) A EFY A.1 Community WPs 0 0 A.2 School WPs 0 0 A.3 Health Facilities WPs 0 0 B. 2005EFY Subtotal B.1 Community WPs B.2 School WPs 0 0 B.3 Health Facilities WPs 0 0 Subtotal C.2006 EFY C.1 Community WPs , , C.2 School WPs 0 - C.3 Health Facilities WPs 0 - Subtotal D.2007 EFY D.1 Community WPs , , D.2 School WPs 0 - D.3 Health Facilities WPs 0 - Subtotal , , E. 2004EFY_2007 EFY) E.1 Community WPs ,397 7, ,635-8,214 3, E.2 School WPs E.3 Health Facilities WP Grand total ,397 7, ,635-8,214 3, P a g e

25 Table 10: Institutional Latrines Construction in 2007 EFY Institution No. of Latrines Planned to be Constructed 4th Quarter Annual No. of Latrines Construction Completed 4th Quarter Estimated No. of People Benefiting from the Completed Latrine Annual Male Female Total A. School , ,845 Remark Constructed by Chencha and Duna B. Health Institution Total (A+B) , ,845 Table 11: Summary of Institutional Latrines Planned, Applications submitted and Approved in 2007 EFY Institution No. of Planned Latrines No. of Latrines Applications made No. of Latrines Applications Desk Appraised No. of Latrines Application Field Appraised No. of Latrines Applications Approved by WWT No. of Latrines under construction <50% >50% Total A. Schools B. Health Institutions Total (A+B) Table 12: Summary of Institutional Latrines Constructed by COWASH until end of the Reporting Period (2004EFY 207 EFY) Male Female Total A EFY A.1 School Latrines A.2 Health Facilities Latrines B. 2005EFY Subtotal B.1 School Latrines B.2 Health Facilities Latrines C.2006 EFY Subtotal C.1 School Latrines C.2 Health Facilities Latrines D EFY Subtotal ,636 D.1 School Latrines ,645 D.2 Health Facilities Latrines Subtotal ,645 E. 2004EFY_ 2007 EFY Constructed D.1 School Latrines 4 1,683 1,598 3,281 D.2 Health Facilities Latrines Grand total 4 1,683 1,598 3, P a g e

26 4 FINANCIAL UTILIZATION COWASH Project is jointly financed by regional government of SNNPR (GoE) and Government of Finland (GoF) and is implemented by WASH sector offices of Water Resource Bureau (BoW), woreda sector offices of SNNPR with collaboration of sector Bureaus (Health Bureau, BoH, Education Bureau, BoE and Finance and Economic Development Bureau, BoFED). The three major cost categories of the project fund are Investment, Capacity building (physical and human) and Operational cost. While the whole investment costs and some physical capacity and operational costs of the project are covered by the regional government, capacity building and some operational costs are covered by the Finnish government contribution. 4.1 INVESTMENT, SOME CAPACITY & OPERATIONAL FUNDS FROM GOE The funds from regional, zones and woredas of SNNP region is for the activities: i) construction of water schemes (communal and institutional) and institutional latrines; ii) rehabilitation of water supply schemes; and iii) physical capacity buildings (for new zones and new woredas). Moreover, some fund is allocated from the regional government to cover operational costs such as communication, supervision of water schemes, fuel and maintenance of vehicles, motorbikes and office equipments, etc Allocated and Transferred Investment, Capacity Building and Operational Funds In 2007 EFY, the regional government has allocated Birr 30,133,464 for investment, some physical capacity building and operational costs. The breakdown of investment, physical capacity building and operational costs for the project woredas and regional sector bureaus and amount transferred and utilized are indicated in the following tables. In this respect, GoE operational budget was not allocated for regional level BoE and BoH due to budget shortage. Sidama zone has not used any allocated budget as its bank account was opened at the end of fourth quarter of 2007 EFY. On the other hand, about 84% of GoE investment fund transferred to project Woredas was utilized in 2007 EFY. As can be seen in the Table 14 below, Chencha reported the highest utilization rate as against the annual plan (99.0%) and Arbegona reported the least utilization rate (28.0%). Arbegona has shown the lowest financial utilization performance as it has started implementing the construction activities in the third quarter of 2007 EFY. Regarding to GoE physical capacity building budget utilization, the annual expenditures of 24 P a g e

27 Tocha woreda and Dawuro zone were greater than their annual plan as they have used a budget left over from the previous fiscal year. As can be seen in table 13 below, the financial utilization rate in the fourth quarter of the reporting period was much higher than the one planned for the same quarter. For instance, the human capacity building fund utilization rate for the fourth quarter of 2007 EFY was % of the planned one for the same quarter as woredas conducted majority of the trainings planned for the reporting period in this quarter. In the same vein, regarding the GoE investment budget utilization rate (632.2%), most of the payments for the artisans were paid in the fourth quarter of the reporting period even for those constructions completed earlier, which made the utilization rate for this quarter greater than its plan. The overall finical in terms of budget utilization rate to date has been 81.2% of both GoE and GoF budget transferred. In this respect, the delay in the approval of the 2007 EFY annual plans has delayed the timely transfer of the funds and utilizations which has in turn negatively affected its performance. Moreover, majority of the refresher trainings, planned for the reporting period, at all levels were not conducted. Priority has been given to construction activities and this has contributed for low budget utilization performances. The GoF fund of the fourth quarter of 2007 EFY was transferred by the end of the fiscal year and has not been utilized yet, which has contributed for low financial performance. 25 P a g e

28 Table 13: COWASH Funds Utilization Performance in 2007 EFY Category INVESTM ENT COST PHYSICA L CAPACIT Y BUILDING HUM AN CAPACIT Y BUILDING COST OPERATI ONAL COST Planned for Utilized 4th Planned(Annual) Cumulative Planned Cumulative Utilized 4th Quarter Quarter Utilization(%) (14 +17) (15+18 ) GoF GoE Total (1+2 ) GoF GoE GoF+GoE GoF GoE GoF+GoE GoF + GoE GoF + GoE Cumulative ( 9 / 6 ) *10 0 4th Quarter (11/ 10 ) * 10 0 Planned for 4th Quarter Utilized 4th Quarter Planned for 4th Quarter - 27,192,766 27,192,766-27,192,766 27,192,766 ###### 13,943,468 1,040,521 7,959, # DIV/0! 1,040,521 7,959, ,866,150 1,744,855 5,611,005 3,866,150 1,744,885 5,611,035 3,661,565 1,386,206 5,047, , # DIV/0! - 264,951 # DIV/0! - 471,589 # DIV/0! 11,217,561-11,217,561 11,217,561-11,217,561 5,439,380 5,439, ,269 2,964, ,269 2,964, # DIV/0! 2,140,296 1,195,843 3,336,139 2,140,296 1,195,843 3,336,139 1,709, ,433 2,131, , , , , , , Utilized 4th Quarter Utilization (%) ( 15/ 14 ) * GoF GoF 10 0 GoE GoE Utilization (%) ( 18 / 17) *1 00 TOTAL 17,224,007 30,133,464 47,357,471 17,224,007 30,133,494 47,357,501 10,810,087 15,752,107 26,562,194 2,675,078 12,401, ,307,433 3,755, ,367,645 8,645, Total in Euro (1 Euro = 22 Birr) 782,909 1,369,703 2,152, ,909 1,369,704 2,152, , ,005 1,207, , , , , , , P a g e

29 Table 14: GoE Investment Fund Transfer and Utilization in 2007 EFY Project Woreda Planned for 2007 EFY 2007 EFY Transfer Utilization Rate of utliztatiion as per transfer Rate of utilization as per plan A/minch Zuria Chencha Duna Misha Gorche Arbegona Tocha 3,909,779 1,936,688 2,331, ,223,596 1,597,112 2,209, ,209,939 3,059,482 2,801, ,022,728 2,656,224 2,350, ,336,840 1,115, , , , , ,456,297 2,644,002 1,467, Esara 5,119,463 2,401,900 1,513, Commission (3%) 0 485, , Total (in birr) 27,192,767 16,658,095 13,943, Total (in euro) (1Euro =22 1,236, , , P a g e

30 Table 14.1: GoE Physical Capacity Building Fund allocated (for new woredas & new Zones) Transfer and Utilization in 2007 EFY Project Woreda & Zones Planned for 2007 EFY 2007 EFY Transfer Utilized in 2007 EFY Rate of utilization (6/3)*100 Gorche 148,710 47,750 89, Arbegona 150, , , Tocha 519,750 36, , Esara 745, , , Sidama Zone 66, Dawuro Zone 114,000 31, , Total (in birr) 1,744, ,425 1,417, Total (in euro) (1Euro =22 Birr) 79, , , P a g e

31 Table 16: GoE Operational fund utilized in 2007EFY Region, Zones & Woredas Regional Bureaus: Annual plan for 2007 EFY Transfer in 2007EFY Utilization Rate of utilization (4/2)*100 WRB BoH BoE BoFED RSU Gamogofa Zone Hadiya Zone Sidama Zone Dawuro Zone A/minch Zuriya woreda C hencha woreda Duna woreda Misha woreda Gorche woreda Arbegona woreda Tocha woreda Esara woreda Total in Birr Total in euro (1Euro=22 Birr) 53,000 24,000 53, ,600 31,067 16, , ,156 9, , , , , ,457 58,637 22, ,435 42,728 26, ,015 35,474 31, ,136 38,936 33, ,714 55,171 16, ,935 36,244 10, ,778 27, ,758 39,989 39, ,091 38,097 44, ,195, , , ,357 30,848 19, P a g e

32 4.2 GOF CAPACITY BUILDING FUND Table 17: GoF Capacity building fund utilization in 2007EFY S/N 1 Implementers 2007 EFY Annual Plan 2007 EFY Transfer 2007 EFY Utilization Rate of utilization as per 1.1 Water Bureau 1,073,826 1,073, , Health Bureau 218, , Education Bureau 17, BoFED 177,650 61, , RSU 3,784, ,600 3,096, ,271,762 ####### ######### Gamogofa 104,775 75,303 37, Hadiya 140,469 51,611 51, Sidama 71, dawuro 62,283 35,366 35, Regional Sector Offices Subtotal Zones Subtotal Woredas 378, , , Arbaminch Zuria 1,889,748 1,000,162 1,140, C hencha 1,798, ,954 1,213, Duna 1,725, ,383 1,513, Misha 1,672, ,272 1,294, Gorche 925, , , Arbegona 626, , , Tocha 1,325, , , Esara 1,407, , , Subtotal Total in birr Total in Euro (1 Euro =24birr) 11,371,714 6,471,715 6,977, ,022,007 8,705,557 ######### , , , P a g e

33 Table 18: Total fund received and utilized to date in SNNP region, by fund source. Budge t Source Received from Source to date Transferred to Beneficiarie s to date Utilized by Beneficiaries to date Balance from Received to date Usage from Receive d (%) Transferre d (%) GoF 25,743, ,782, ,235, ,960, GoE 35,116, ,924, ,822, ,191, Total 60,859, ,706, ,058, ,152, Total exchange rate gains from EFY Birr 2,106, Total amount of unutilized exchange rate gains from EFY = Birr 1,441, Total amount of funds leftover from 2007 EFY (GoF & GoE) = 1,960, GoF & GoE Birr 2,191, Annex 5.3: Fund Transfer Request, CMP Audit and WASHCO Fund Utilization to Date S/N Indicator/Type of Data Required Unit 2004 EFY Number of Fund Transfer Requests submitted to Embassy of Finland Number of BoFED CMP Audit Reports Produced and submitted to Embassy of Finland Amount of Innvestment Funds Transferred to WASHCOs (in Birr) Amount of Investment Funds Settled by WASHCOs (in Birr) Until end of 2005 EFY Until end of 2006 EFY No No Birr 692,653 5,622,716 8,578,781 Birr 692,653 4,597,423 8,294,971 Until end of 2007 EFY 25,436,876 22,238, Note: - Cumulative figures will be filled under the Until end of 2005 EFY, Until end of 2006 EFY & Until end of 2007 EFY columns of the table. Example in S/n 3, amount of funds transferred/released to WASHCO in 2004 EFY are added to 2005 EFY transfers and 2004 EFY and 2005 EFY transfers are added to those transferred in 2006 EFY. - This table should be filled at the regional level by RSU Financial Specialist, based on WASHCO Investment Fund Settlement and BoFED reports. 31 P a g e

34 5. Frequency of meetings of RWSC, ZWT and WWT on COWASH issues 5.1 WWT Meetings on COWASH Issues S/N Name of Project Woreda No. of times the WWT met & discussed on COWASH issues in the Fiscal Year How many of the WWT meetings held on COWASH issues have signed Minutes of Meetings? 1 Chencha Arbaminch Zuriya Misha Duna Esara Tocha Gorche Arbegona ZWT Meetings on COWASH S/N Name of Project Zone No. of times the ZWT met & discussed on COWASH issues in the Fiscal Year How many of the ZWT meetings held on COWASH issues have signed Minutes of Meetings? 1 Gamogofa Hadiya Dawro Sidama Regional WaSH Steering Committee (RWSC) Meetings on COWASH S/N Name of Region No. of times the RWC met & discussed on COWASH issues in the Fiscal Year How many of the RWSC meetings held on COWASH issues have signed Minutes of Meetings? 1 SNNPR Activities accomplished by RSU in 2007 EFY: Assisted the project woredas and zones in preparing reports 32 P a g e

COMMUNITY-LED ACCELERATED WASH (COWASH) PROJECT Phase I (Jun 2011-Sep 2014)

COMMUNITY-LED ACCELERATED WASH (COWASH) PROJECT Phase I (Jun 2011-Sep 2014) COMMUNITY-LED ACCELERATED WASH (COWASH) PROJECT Phase I (Jun 2011-Sep 2014) Phase I Completion report of Component 1 (June, 2011 September 7, 2014) Date and location: January20, 2014, Addis Ababa by the

More information

SEMI-ANNUAL PERFORMANCE REPORT

SEMI-ANNUAL PERFORMANCE REPORT COMMUNITY-LED ACCELERATED WASH (COWASH) PROJECT SEMI-ANNUAL PERFORMANCE REPORT 2008 EFY (08/07/2015-31/12/2015) MARCH 2016 Table of contents 1 EXECUTIVE SUMMARY... 1 2 OVERALL OBJECTIVE ACHIEVEMENT...

More information

ANNUAL PROGRESS REPORT

ANNUAL PROGRESS REPORT COMMUNITY-LED ACCELERATED WASH (COWASH) ANNUAL PROGRESS REPORT 2004 EFY (7/2011-6/2012) AUGUST 2012 i Table of contents 1 EXECUTIVE SUMMARY... 1 2 OVERALL OBJECTIVE ACHIEVEMENT... 3 3 PROJECT PURPOSE ACHIEVEMENT...

More information

COMMUNITY-LED ACCELERATED WASH (COWASH) MONTHLY PROGRESS REPORT

COMMUNITY-LED ACCELERATED WASH (COWASH) MONTHLY PROGRESS REPORT COMMUNITY-LED ACCELERATED WASH (COWASH) MONTHLY PROGRESS REPORT JULY 2012 1 MAJOR OUTPUTS ACHIEVED 1.1 PROJECT RELATED OUTPUTS (COMPONENT 1) a) The Ph.D, the two M.Sc and the B.Sc level CMP researches

More information

Inception report to Community Managed WASH Project (CMP) Implementation Manual Development -Final- 12 th March 2014, Addis Ababa, Ethiopia

Inception report to Community Managed WASH Project (CMP) Implementation Manual Development -Final- 12 th March 2014, Addis Ababa, Ethiopia Inception report to Community Managed WASH Project (CMP) Implementation Manual Development -Final- 12 th March 2014, Addis Ababa, Ethiopia Table of Content 1. Introduction... 1 2. Objective, scope and

More information

BASELINE SURVEY REPORT OF TIGRAY REGION ON WASH

BASELINE SURVEY REPORT OF TIGRAY REGION ON WASH BASELINE SURVEY REPORT OF TIGRAY REGION ON WASH Authors: Ayenew Admasu, Meresa Kiros, Abdulkadir Memhur Date: January 4, 2011 1 2 Contents 1. ACRONYMS... 5 2 INTRODUCTION... 6 2.1 BACKGROUND... 6 2.2 OBJECTIVE

More information

Financing the One WASH program ETHIOPIA. By Abiy Girma National WASH Program Coordinator

Financing the One WASH program ETHIOPIA. By Abiy Girma National WASH Program Coordinator Financing the One WASH program ETHIOPIA By Abiy Girma National WASH Program Coordinator OWNP:- Road to sector wide approach Government led Instrument for achieving the goals set in achieving middle income

More information

FEDERAL DEMOCRATIC REPUBLIC OF ETHIOPIA THE WASH IMPLEMENTATION FRAMEWORK (WIF)

FEDERAL DEMOCRATIC REPUBLIC OF ETHIOPIA THE WASH IMPLEMENTATION FRAMEWORK (WIF) FEDERAL DEMOCRATIC REPUBLIC OF ETHIOPIA THE WASH IMPLEMENTATION FRAMEWORK (WIF) March, 2013 WIF PLEDGE AND SIGNATURE PAGE We, the undersigned actors in the Ethiopian WASH sector, recognize the importance

More information

COMMUNITY-LED ACCELERATED WASH (COWASH) UN-OFFICIAL MONTHLY PROGRESS REPORT

COMMUNITY-LED ACCELERATED WASH (COWASH) UN-OFFICIAL MONTHLY PROGRESS REPORT COMMUNITY-LED ACCELERATED WASH (COWASH) UN-OFFICIAL MONTHLY PROGRESS REPORT NOVEMBER 2014 1 FOREWORD The purpose of this Monthly Report is to record the major actions and issues taken place during the

More information

ONE WASH NATIONAL PROGRAMME (OWNP)

ONE WASH NATIONAL PROGRAMME (OWNP) ONE WASH NATIONAL PROGRAMME (OWNP) ONE Plan ONE Budget ONE Report planning with linked strategic and annual WASH plans at each level budgeting re ecting all WASH-related investments and expenditures financial

More information

Financial absorption in the water, sanitation and hygiene sector

Financial absorption in the water, sanitation and hygiene sector Financial absorption in the water, sanitation and hygiene sector Ethiopia case study 1 WaterAid/Anna Kari 1 WaterAid commissioned DFI to carry out analysis, through five country case studies, of financial

More information

Value for Money and Sustainability in WASH Programmes

Value for Money and Sustainability in WASH Programmes Value for Money and Sustainability in WASH Programmes Assessing the VFM of DFID s contribution to the Water Supply and Sanitation Programme (WSSP) in Ethiopia Final report, short version Marie-Alix Prat,

More information

FEDERAL DEMOCRATIC REPUBLIC OF ETHIOPIA ONE WASH NATIONAL PROGRAM CONSOLIDATED WASH ACCOUNTS FINANCIAL MANAGEMENT MANUAL

FEDERAL DEMOCRATIC REPUBLIC OF ETHIOPIA ONE WASH NATIONAL PROGRAM CONSOLIDATED WASH ACCOUNTS FINANCIAL MANAGEMENT MANUAL FEDERAL DEMOCRATIC REPUBLIC OF ETHIOPIA ONE WASH NATIONAL PROGRAM CONSOLIDATED WASH ACCOUNTS FINANCIAL MANAGEMENT MANUAL July 21, 2015 FINANCIAL MANAGEMENT (FM) MANUAL FOR OWNP- CONSOLIDATED ACRONYMS AWP

More information

The Bottom line. A monthly newsletter on EMCP reform activities in the Federal and Regional Governments

The Bottom line. A monthly newsletter on EMCP reform activities in the Federal and Regional Governments The Bottom line Vol. I No. 6 Nov. /Dec. 2004 A monthly newsletter on EMCP reform activities in the Federal and Regional Governments Dear Readers, It s now been a year since the first issue of this newsletter.

More information

1. Background General information on the initiative... 3

1. Background General information on the initiative... 3 Contents 1. Background... 3 1.1 General information on the initiative... 3 1.2 Implementation modalities... 4 2. Project Budget and funds utilization... 4 2.1 Budget components and utilization... 4 2.2

More information

EASY-TO-USE GUIDELINES TO APPLY THE WASH SDG COSTING TOOL.

EASY-TO-USE GUIDELINES TO APPLY THE WASH SDG COSTING TOOL. EASY-TO-USE GUIDELINES TO APPLY THE WASH SDG COSTING TOOL www.sanitationandwaterforall.org 2 Acknowledgments The WASH SDG costing tool was developed for country application by UNICEF and the World Bank

More information

Ethio-Italian Cooperation Framework

Ethio-Italian Cooperation Framework Ethio-Italian Cooperation Framework 2009-2011 I. CONTEXT AND RATIONALE 1. Ethiopia and Italy have long lasted political, economic and cultural relations. During the last 25 years the development cooperation,

More information

Ethiopian Civil Service University Training and Consultancy Division Training Schedule for the Year 2017/18(2010 E.C)

Ethiopian Civil Service University Training and Consultancy Division Training Schedule for the Year 2017/18(2010 E.C) Creating Impact Ethiopian Civil Service University Training and Consultancy Division Training Schedule for the Year 2017/18(2010 E.C) 1 P age 1. Introduction The establishment of Training and Consultancy

More information

COMMUNITY BASED OPERATION AND MAINTENANCE MANAGEMENT GUIDELINE HAS 8 PARTS

COMMUNITY BASED OPERATION AND MAINTENANCE MANAGEMENT GUIDELINE HAS 8 PARTS COMMUNITY BASED OPERATION AND MAINTENANCE MANAGEMENT GUIDELINE HAS 8 PARTS PART - A INTRODUCTION TO O&M MANAGMENT PART- B PART - C PART - D PART - E PART - F PART - G PART - H DESCRIPTION OF WATER SOURCES

More information

The World Bank. Key Dates. Project Development Objectives. Components. Overall Ratings. Public Disclosure Authorized

The World Bank. Key Dates. Project Development Objectives. Components. Overall Ratings. Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Copy AFRICA Ethiopia Social Protection & Labor Global Practice IBRD/IDA Sector Investment and Maintenance Loan FY 2013 Seq No: 12 ARCHIVED on 09-Oct-2015

More information

177. PROFILE ON THE PRODUCTION OF METALLIC CONTAINERS

177. PROFILE ON THE PRODUCTION OF METALLIC CONTAINERS 177. PROFILE ON THE PRODUCTION OF METALLIC CONTAINERS 177-1 TABLE OF CONTENTS PAGE I. SUMMARY 177-2 II. PRODUCT DESCRIPTION & APPLICATION 177-3 III. MARKET STUDY AND PLANT CAPACITY 177-3 A. MARKET STUDY

More information

103. PROFILE ON THE PRODUCTION OF GRINDING WHEEL

103. PROFILE ON THE PRODUCTION OF GRINDING WHEEL 103. PROFILE ON THE PRODUCTION OF GRINDING WHEEL 103-1 TABLE OF CONTENTS PAGE I. SUMMARY 103-2 II. PRODUCT DESCRIPTION & APPLICATION 103-3 III. MARKET STUDY AND PLANT CAPACITY 103-3 A. MARKET STUDY 103-3

More information

Bilateral Guideline. EEA and Norwegian Financial Mechanisms

Bilateral Guideline. EEA and Norwegian Financial Mechanisms Bilateral Guideline EEA and Norwegian Financial Mechanisms 2014 2021 Adopted by the Financial Mechanism Committee on 9 February 2017 09 February 2017 Contents 1 Introduction... 4 1.1 Definition of strengthened

More information

Community Participatory Monitoring

Community Participatory Monitoring Islamic Republic of Afghanistan Ministry for Rural Rehabilitation and Development National Solidarity Programme Monitoring and Evaluation Department Community Participatory Monitoring Implementation of

More information

Science and Information Resources Division

Science and Information Resources Division MINISTRY OF NATURAL RESOURCES Science and Information Resources Division The mandate of the Ministry of Natural Resources is to achieve the sustainable development of the province s natural resources,

More information

156. PROFILE ON THE PRODUCTION OF BOILER

156. PROFILE ON THE PRODUCTION OF BOILER 156. PROFILE ON THE PRODUCTION OF BOILER 156-1 TABLE OF CONTENTS PAGE I. SUMMARY 156-2 II. PRODUCT DESCRIPTION & APPLICATION 156-2 III. MARKET STUDY AND PLANT CAPACITY 156-3 A. MARKET STUDY 156-3 B. PLANT

More information

One WASH National Program (OWNP) Ethiopia: A SWAp with a comprehensive management structure

One WASH National Program (OWNP) Ethiopia: A SWAp with a comprehensive management structure 38th WEDC International Conference, Loughborough University, UK, 2015 WATER, SANITATION AND HYGIENE SERVICES BEYOND 2015: IMPROVING ACCESS AND SUSTAINABILITY One WASH National Program (OWNP) Ethiopia:

More information

Fund for Gender Equality Monitoring and Evaluation Framework Executive Summary

Fund for Gender Equality Monitoring and Evaluation Framework Executive Summary Fund for Gender Equality Monitoring and Framework Executive Summary Primary Goal of the Monitoring and Framework The overall aim of this Monitoring and (M&E) Framework is to ensure that the Fund for Gender

More information

101. PROFILE ON THE PRODUCTION OF GLASS BOTTLES AND TUMBLERS

101. PROFILE ON THE PRODUCTION OF GLASS BOTTLES AND TUMBLERS 101. PROFILE ON THE PRODUCTION OF GLASS BOTTLES AND TUMBLERS 101-1 TABLE OF CONTENTS PAGE I. SUMMARY 101-2 II. PRODUCT DESCRIPTION & APPLICATION 101-3 III. MARKET STUDY AND PLANT CAPACITY 101-3 A. MARKET

More information

126. PROFILE ON THE PRODUCTION OF DECORATION (WALL) PAPER

126. PROFILE ON THE PRODUCTION OF DECORATION (WALL) PAPER 126. PROFILE ON THE PRODUCTION OF DECORATION (WALL) PAPER 126-1 TABLE OF CONTENTS PAGE I. SUMMARY 126-2 II. PRODUCT DESCRIPTION & APPLICATION 126-2 III. MARKET STUDY AND PLANT CAPACITY 126-3 A. MARKET

More information

Ethiopia Protection of Basic Services Social Accountability Program Social Accountability Guide First edition

Ethiopia Protection of Basic Services Social Accountability Program Social Accountability Guide First edition Ethiopia Protection of Basic Services Social Accountability Program Social Accountability Guide First edition Chapter 0 of 13 Ethiopia Social Accountability Program Phase 2 MANAGEMENT AGENCY Multi Donor

More information

157. PROFILE ON THE PRODUCTION OF BOLTS AND NUTS

157. PROFILE ON THE PRODUCTION OF BOLTS AND NUTS 157. PROFILE ON THE PRODUCTION OF BOLTS AND NUTS 157-1 TABLE OF CONTENTS PAGE I. SUMMARY 157-2 II. PRODUCT DESCRIPTION & APPLICATION 157-2 III. MARKET STUDY AND PLANT CAPACITY 157-3 A. MARKET STUDY 157-3

More information

ANNEX. Support to the Productive Safety Net Programme (PSNP) CRIS 2008/ Total cost EC contribution : EUR 20,230,000

ANNEX. Support to the Productive Safety Net Programme (PSNP) CRIS 2008/ Total cost EC contribution : EUR 20,230,000 ANNEX 1. IDTIFICATION Title/Number Support to the Productive Safety Net Programme (PSNP) CRIS 2008/020-930 Total cost EC contribution : EUR 20,230,000 Aid method / Management mode Contribution of the beneficiary

More information

ANNEX ICELAND NATIONAL PROGRAMME IDENTIFICATION. Iceland CRIS decision number 2012/ Year 2012 EU contribution.

ANNEX ICELAND NATIONAL PROGRAMME IDENTIFICATION. Iceland CRIS decision number 2012/ Year 2012 EU contribution. ANNEX ICELAND NATIONAL PROGRAMME 2012 1 IDENTIFICATION Beneficiary Iceland CRIS decision number 2012/023-648 Year 2012 EU contribution 11,997,400 EUR Implementing Authority European Commission Final date

More information

Tracking Government Investments for Nutrition at Country Level Patrizia Fracassi, Clara Picanyol, 03 rd July 2014

Tracking Government Investments for Nutrition at Country Level Patrizia Fracassi, Clara Picanyol, 03 rd July 2014 Tracking Government Investments for Nutrition at Country Level Patrizia Fracassi, Clara Picanyol, 03 rd July 2014 1. Introduction Having reliable data is essential to policy makers to prioritise, to plan,

More information

Case Study on Ethiopia s Productive Safety Net Programme

Case Study on Ethiopia s Productive Safety Net Programme Case Study on Ethiopia s Productive Safety Net Programme Workshop on Fraud & Error Control in Social Protection Programs May 17 th, 2007 Presentation Outline 1. Background to the PSNP 2. Experiences with

More information

94. PROFILE ON THE PRODUCTION OF LEATHER GLOVES

94. PROFILE ON THE PRODUCTION OF LEATHER GLOVES 94. PROFILE ON THE PRODUCTION OF LEATHER GLOVES 94-1 TABLE OF CONTENTS PAGE I. SUMMARY 94-2 II. PRODUCT DESCRIPTION & APPLICATION 94-3 III. MARKET STUDY AND PLANT CAPACITY 94-3 A. MARKET STUDY 94-3 B.

More information

Scaling up sanitation and hygiene in Uganda. Poonam Pillai, Sr. Environmental Specialist, ENV & Sam Mutono, Sr. Water and Sanitation Specialist, WSP

Scaling up sanitation and hygiene in Uganda. Poonam Pillai, Sr. Environmental Specialist, ENV & Sam Mutono, Sr. Water and Sanitation Specialist, WSP Scaling up sanitation and hygiene in Uganda Poonam Pillai, Sr. Environmental Specialist, ENV & Sam Mutono, Sr. Water and Sanitation Specialist, WSP Background Institutional and governance issues and financing

More information

116. PROFILE ON THE PRODUCTION OF CHIP BOARD

116. PROFILE ON THE PRODUCTION OF CHIP BOARD 116. PROFILE ON THE PRODUCTION OF CHIP BOARD 116-1 TABLE OF CONTENTS PAGE I. SUMMARY 116-2 II. PRODUCT DESCRIPTION & APPLICATION 116-2 III. MARKET STUDY AND PLANT CAPACITY 116-3 A. MARKET STUDY 116-3 B.

More information

Report of the DSA Project Activities: October 1 st to December 31 st, Project Report: Q - 23 April 18, 2003

Report of the DSA Project Activities: October 1 st to December 31 st, Project Report: Q - 23 April 18, 2003 Report of the DSA Project Activities: October 1 st to December 31 st, 2002 Project Report: Q - 23 April 18, 2003 Decentralization Support Activity Project The DSA Project is implemented by Harvard University

More information

112. PROFILE ON THE PRODUCTION OF GRINDING STONE

112. PROFILE ON THE PRODUCTION OF GRINDING STONE 112. PROFILE ON THE PRODUCTION OF GRINDING STONE 112-1 TABLE OF CONTENTS PAGE I. SUMMARY 112-2 II. PRODUCT DESCRIPTION & APPLICATION 112-2 III. MARKET STUDY AND PLANT CAPACITY 112-3 A. MARKET STUDY 112-3

More information

182. PROFILE ON THE PRODUCTION OF PRINTED CIRCUIT BOARD

182. PROFILE ON THE PRODUCTION OF PRINTED CIRCUIT BOARD 182. PROFILE ON THE PRODUCTION OF PRINTED CIRCUIT BOARD 182-1 TABLE OF CONTENTS PAGE I. SUMMARY 182-2 II. PRODUCT DESCRIPTION & APPLICATION 182-3 III. MARKET STUDY AND PLANT CAPACITY 182-3 A. MARKET STUDY

More information

TARGETING MECHANISMS OF THE SOCIAL SAFETY NET SYSTEMS IN THE COMCEC REGION COUNTRY EXPERIENCE: CAMEROUN

TARGETING MECHANISMS OF THE SOCIAL SAFETY NET SYSTEMS IN THE COMCEC REGION COUNTRY EXPERIENCE: CAMEROUN TARGETING MECHANISMS OF THE SOCIAL SAFETY NET SYSTEMS IN THE COMCEC REGION COUNTRY EXPERIENCE: CAMEROUN I- INTRODUCTION With a surface area of 475,000 km2 and a population of around 22 million people,

More information

Programme Advisory Committee Programme Implementation Manual Pro-poor rewards for Environmental Services in Africa v PROGRAMME FOR RURAL OUTREACH OF FINANCIAL INNOVATIONS & TECHNOLOGIES (PROFIT) 1.1 Risk

More information

Decentralization Support Activity Project

Decentralization Support Activity Project Report of the DSA Project Activities: January 1 st to March 31 st, Project Report: Q 36 May 23 rd, Decentralization Support Activity Project THE NETHERLANDS MINISTER FOR DEVELOPMENT COOPERATION The DSA

More information

Restoring confidence in South Africa to oil wheels for growth Dimanche, 05 Août :10 - Mis à jour Dimanche, 05 Août :12

Restoring confidence in South Africa to oil wheels for growth Dimanche, 05 Août :10 - Mis à jour Dimanche, 05 Août :12 Johannesburg, South Africa, August 5 (Infosplusgabon) - Post-apartheid years have brought about remarkable progress in South Africa in terms of poverty reduction, access to education, and reducing unemployment.

More information

153. PROFILE ON THE PRODUCTION OF AUTO- RADIATOR, FUEL TANK AND SILENCERS

153. PROFILE ON THE PRODUCTION OF AUTO- RADIATOR, FUEL TANK AND SILENCERS 153. PROFILE ON THE PRODUCTION OF AUTO- RADIATOR, FUEL TANK AND SILENCERS 153-1 TABLE OF CONTENTS PAGE I. SUMMARY 153-2 II. PRODUCT DESCRIPTION & APPLICATION 153-2 III. MARKET STUDY AND PLANT CAPACITY

More information

Steps In Implimentation of Water and Sanitation Software Activities

Steps In Implimentation of Water and Sanitation Software Activities MINISTRY OF WATER AND ENVIRONMENT DIRECTORATE OF WATER DEVELOPMENT Steps In Implimentation of Water and Sanitation Software Activities A Guide to District Local Governments July 2012 Contents FOREWORD...3

More information

National Health and Nutrition Sector Budget Brief:

National Health and Nutrition Sector Budget Brief: Budget Brief Ethiopia UNICEF Ethiopia/2017/ Ayene National Health and Nutrition Sector Budget Brief: 2006-2016 Key Messages National on-budget health expenditure has increased 10 fold in nominal terms

More information

151. PROFILE ON THE PRODUCTION OF AGRICULTURAL IMPLEMENTS HAND, ANIMAL AND TRACTOR DRAWN

151. PROFILE ON THE PRODUCTION OF AGRICULTURAL IMPLEMENTS HAND, ANIMAL AND TRACTOR DRAWN 151. PROFILE ON THE PRODUCTION OF AGRICULTURAL IMPLEMENTS HAND, ANIMAL AND TRACTOR DRAWN 151-1 TABLE OF CONTENTS PAGE I. SUMMARY 151-2 II. PRODUCT DESCRIPTION & APPLICATION 151-3 III. MARKET STUDY AND

More information

GLOSSARY Programming EUROPEAN SOCIAL FUND AND EMPLOYMENT STRATEGY. Community Support Framework (CSF)

GLOSSARY Programming EUROPEAN SOCIAL FUND AND EMPLOYMENT STRATEGY. Community Support Framework (CSF) CARDS 2004 Local Partnerships for Employment Phase 2 This project is funded by the European Union GLOSSARY 2000-2006 EUROPEAN SOCIAL FUND AND EMPLOYMENT STRATEGY Community Support Framework (CSF) The CSF,

More information

New Multidimensional Poverty Measurements and Economic Performance in Ethiopia

New Multidimensional Poverty Measurements and Economic Performance in Ethiopia New Multidimensional Poverty Measurements and Economic Performance in Ethiopia 1. Introduction By Teshome Adugna(PhD) 1 September 1, 2010 During the last five decades, different approaches have been used

More information

111. PROFILE ON THE PRODUCTION OF AGGREGATES

111. PROFILE ON THE PRODUCTION OF AGGREGATES 111. PROFILE ON THE PRODUCTION OF AGGREGATES 111-1 TABLE OF CONTENTS PAGE I. SUMMARY 111-2 II. PRODUCT DESCRIPTION & APPLICATION 111-2 III. MARKET STUDY AND PLANT CAPACITY 111-3 A. MARKET STUDY 111-3 B.

More information

155. PROFILE ON ASSEMBLY OF BICYCLE

155. PROFILE ON ASSEMBLY OF BICYCLE 155. PROFILE ON ASSEMBLY OF BICYCLE 155-1 TABLE OF CONTENTS PAGE I. SUMMARY 155-2 II. PRODUCT DESCRIPTION & APPLICATION 155-3 III. MARKET STUDY AND PLANT CAPACITY 155-3 A. MARKET STUDY 155-3 B. PLANT CAPACITY

More information

BASELINE SURVEY ON REVENUE COLLECTION & STRATEGIES FOR IMPROVING LOCAL REVENUE IN PUNTLAND May- June 2013

BASELINE SURVEY ON REVENUE COLLECTION & STRATEGIES FOR IMPROVING LOCAL REVENUE IN PUNTLAND May- June 2013 BASELINE SURVEY ON REVENUE COLLECTION & STRATEGIES FOR IMPROVING LOCAL REVENUE IN PUNTLAND May- June 2013 Jointly Conducted by: Puntland Ministries of Interior and Finance Garowe 1 Acknowledgement The

More information

200. PROFILE ON THE PRODUCTION OF WOOD SCREW & RIVETS

200. PROFILE ON THE PRODUCTION OF WOOD SCREW & RIVETS 200. PROFILE ON THE PRODUCTION OF WOOD SCREW & RIVETS 200-1 TABLE OF CONTENTS PAGE I. SUMMARY 200-2 II. PRODUCT DESCRIPTION & APPLICATION 200-2 III. MARKET STUDY AND PLANT CAPACITY 200-3 A. MARKET STUDY

More information

Assessing the Impact of the Ethiopian Productive Safety Net Programme (PSNP)

Assessing the Impact of the Ethiopian Productive Safety Net Programme (PSNP) Assessing the Impact of the Ethiopian Productive Safety Net Programme (PSNP) Alemayehu Seyoum Taffesse International Food Policy Research Institute Fifth Transfer Project Research Workshop: Evaluating

More information

Ethiopia Water Supply Sector Resource Flows Assessment

Ethiopia Water Supply Sector Resource Flows Assessment Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Ethiopia Water Supply Sector Resource Flows Assessment Sector Finance Working Papers:

More information

Community Hygiene and Water Women-led Output based Aid Project (WOBA) in Vietnam. Introduction & Overview

Community Hygiene and Water Women-led Output based Aid Project (WOBA) in Vietnam. Introduction & Overview Community Hygiene and Water Women-led Output based Aid Project (WOBA) in Vietnam Introduction & Overview What is the difference between Equity and Equality? What is GESI? Gender equality is about transforming

More information

Irish Aid. Evaluation of the Irish Aid/ Tigray Regional Support Programme (TRSP)

Irish Aid. Evaluation of the Irish Aid/ Tigray Regional Support Programme (TRSP) DAI Europe Ltd. 2nd Floor, Strand Bridge House 138/142 Strand London WC2R 1HH Tel: +44 207 420 8600 Fax: +44 207 420 8601 www.dai-europe.com Irish Aid Evaluation of the Irish Aid/ Tigray Regional Support

More information

150. PROFILE ON THE PRODUCTION OF AC MOTORS

150. PROFILE ON THE PRODUCTION OF AC MOTORS 150. PROFILE ON THE PRODUCTION OF AC MOTORS 150-1 TABLE OF CONTENTS PAGE I. SUMMARY 150-2 II. PRODUCT DESCRIPTION & APPLICATION 150-3 III. MARKET STUDY AND PLANT CAPACITY 150-3 A. MARKET STUDY 150-3 B.

More information

PROJECT PREPARATORY TECHNICAL ASSISTANCE

PROJECT PREPARATORY TECHNICAL ASSISTANCE Appendix 4 11 A. Justification PROJECT PREPARATORY TECHNICAL ASSISTANCE 1. The government has identified the priority areas to be covered under the ensuing loan project and prepared outline technical studies

More information

192. PROFILE ON THE PRODUCTION OF SPRINGS AND COILS

192. PROFILE ON THE PRODUCTION OF SPRINGS AND COILS 192. PROFILE ON THE PRODUCTION OF SPRINGS AND COILS 192-1 TABLE OF CONTENTS PAGE I. SUMMARY 192-2 II. PRODUCT DESCRIPTION & APPLICATION 192-2 III. MARKET STUDY AND PLANT CAPACITY 192-3 A. MARKET STUDY

More information

Public Disclosure Copy

Public Disclosure Copy Public Disclosure Authorized EUROPE AND CENTRAL ASIA Uzbekistan Water Global Practice IBRD/IDA Investment Project Financing FY 2013 Seq No: 11 ARCHIVED on 12-Jan-2018 ISR30620 Implementing Agencies: Republic

More information

2018 NATIONAL PLATFORM ON ROMA INTEGRATION MONTENEGRO

2018 NATIONAL PLATFORM ON ROMA INTEGRATION MONTENEGRO European Union Roma Integration 2020 is co-funded by: 2018 NATIONAL PLATFORM ON ROMA INTEGRATION MONTENEGRO 30 May 2018, Podgorica :: POLICY RECOMMENDATIONS :: INTRODUCTION The third National Platform

More information

Assessment Report of Harari People National Regional State. Project Report: September Decentralization Support Activity Project

Assessment Report of Harari People National Regional State. Project Report: September Decentralization Support Activity Project Assessment Report of Harari People National Regional State Project Report: September 2004 Decentralization Support Activity Project The DSA Project is implemented by Harvard University and funded by USAID,

More information

PROJECT PREPARATORY TECHNICAL ASSISTANCE

PROJECT PREPARATORY TECHNICAL ASSISTANCE Appendix 3 9 A. Justification PROJECT PREPARATORY TECHNICAL ASSISTANCE 1. The PPTA will review and assess the performance of the secondary education subsector in Viet Nam and identify the challenges, which

More information

EAST AFRICAN COMMUNITY LAKE VICTORIA BASIN COMMISSION WATER AND SANITATION INITIATIVE PREPRATION OF INVESTMENT PLAN FOR FIFTEEN CENTRES

EAST AFRICAN COMMUNITY LAKE VICTORIA BASIN COMMISSION WATER AND SANITATION INITIATIVE PREPRATION OF INVESTMENT PLAN FOR FIFTEEN CENTRES EAST AFRICAN COMMUNITY LAKE VICTORIA BASIN COMMISSION WATER AND SANITATION INITIATIVE PREPRATION OF INVESTMENT PLAN FOR FIFTEEN CENTRES APPRAISAL REPORT AND STUDY TERMS OF REFERENCE November 2007 TABLE

More information

Implementation of the EAC Common Market Protocol:

Implementation of the EAC Common Market Protocol: Policy Brief, 2017 Implementation of the EAC Common Market Protocol: Proposals for Review of Investment Related Policies, Laws and Regulations This publication was produced for review by the East Africa

More information

183. PROFILE ON ASSEMBLY OF REFRIGERATOR

183. PROFILE ON ASSEMBLY OF REFRIGERATOR 183. PROFILE ON ASSEMBLY OF REFRIGERATOR 183-1 TABLE OF CONTENTS PAGE I. SUMMARY 183-2 II. PRODUCT DESCRIPTION & APPLICATION 183-2 III. MARKET STUDY AND PLANT CAPACITY 183-3 A. MARKET STUDY 183-3 B. PLANT

More information

2 SCOPE OF WORK, RESPONSIBILITIES AND DESCRIPTION OF THE PROPOSED ANALYTICAL WORK

2 SCOPE OF WORK, RESPONSIBILITIES AND DESCRIPTION OF THE PROPOSED ANALYTICAL WORK UNITED NATIONS COUNTRY TEAM in TURKEY INDIVIDUAL CONSULTANT PROCUREMENT NOTICE 09.09.2016 Country Description of the Assignment Contracting Office Type of Contract Period of Assignment/Services Turkey

More information

MFF - Bihar Urban Development Investment Program (Facility Concept)

MFF - Bihar Urban Development Investment Program (Facility Concept) India: MFF - Bihar Urban Development Investment Program (Facility Concept) Project Name Project Number 41603-013 Country Project Status Project Type / Modality of Assistance Source of Funding / Amount

More information

Internal Audit of the Lesotho Country Office

Internal Audit of the Lesotho Country Office Internal Audit of the Lesotho Country Office October 2017 Office of Internal Audit and Investigations (OIAI) Report 2017/15 Internal Audit of the Lesotho Country Office (2017/15) 2 Summary The Office of

More information

Research notes Basic Information on Recent Elderly Employment Trends in Japan

Research notes Basic Information on Recent Elderly Employment Trends in Japan Research notes Basic Information on Recent Elderly Employment Trends in Japan Yutaka Asao The aim of this paper is to provide basic information on the employment of older people in Japan over the last

More information

Summary of Terminal Evaluation

Summary of Terminal Evaluation Summary of Terminal Evaluation I. Outline of the Project Country: Republic of Zambia Issue/Sector: Water Resource and Disaster management Rural water supply Division in charge: Global Environment Department

More information

WSSCC, Global Sanitation Fund (GSF)

WSSCC, Global Sanitation Fund (GSF) Annex I WSSCC, Global Sanitation Fund (GSF) Terms of Reference Country Programme Monitor (CPM) BURKINA FASO 1 Background The Water Supply and Sanitation Collaborative Council (WSSCC) was established in

More information

Case study on value for money assessment of a UNICEF assisted WASH programme in Nepal

Case study on value for money assessment of a UNICEF assisted WASH programme in Nepal 40 th WEDC International Conference, Loughborough, UK, 2017 LOCAL ACTION WITH INTERNATIONAL COOPERATION TO IMPROVE AND SUSTAIN WATER, SANITATION AND HYGIENE SERVICES Case study on value for money assessment

More information

US$M): Sector Board : Social Development Cofinancing (US$M (US$M US$M): US$M):

US$M): Sector Board : Social Development Cofinancing (US$M (US$M US$M): US$M): Public Disclosure Authorized IEG ICR Review Independent Evaluation Group Report Number : ICRR14437 1. Project Data: Date Posted : 09/22/2014 Public Disclosure Authorized Public Disclosure Authorized Country:

More information

ToR for the National Experience Sharing Forum (NESF II) Facilitation

ToR for the National Experience Sharing Forum (NESF II) Facilitation EC SHARE - ETHIOPIA PROGRAMME Accelerating Resilience Capacity in Southern and Eastern Ethiopia (ARCE) STRENGTHENING INSTITUTIONALIZED SUBNATIONAL COORDINATION STRUCTURES AND HARMONIZATION MECHANISMS Project

More information

Water Supply and Sanitation in Ethiopia. Turning Finance into Services for 2015 and Beyond. An AMCOW Country Status Overview

Water Supply and Sanitation in Ethiopia. Turning Finance into Services for 2015 and Beyond. An AMCOW Country Status Overview An AMCOW Country Status Overview Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Water Supply and Sanitation in Ethiopia Turning Finance

More information

77. PROFILE ON THE PRODUCTION OF CONVEYOR AND TRANSMISSION BELT OF RUBBER

77. PROFILE ON THE PRODUCTION OF CONVEYOR AND TRANSMISSION BELT OF RUBBER 77. PROFILE ON THE PRODUCTION OF CONVEYOR AND TRANSMISSION BELT OF RUBBER 77-1 TABLE OF CONTENTS PAGE I. SUMMARY 77-2 II. PRODUCT DESCRIPTION & APPLICATION 77-2 III. MARKET STUDY AND PLANT CAPACITY 77-3

More information

The Bottom line. A monthly newsletter on EMCP reform activities in the Federal and Regional Governments

The Bottom line. A monthly newsletter on EMCP reform activities in the Federal and Regional Governments The Bottom line Vol. I No. 5 Sept. /Oct. 2004 A monthly newsletter on EMCP reform activities in the Federal and Regional Governments Dear readers, The first quarter of the FY 1997 has just ended. The project

More information

General public survey after the introduction of the euro in Slovenia. Analytical Report

General public survey after the introduction of the euro in Slovenia. Analytical Report 1 Flash EB N o 20 Euro Introduction in Slovenia, Citizen Survey Flash Eurobarometer European Commission General public survey after the introduction of the euro in Slovenia Analytical Report Fieldwork:

More information

Implementing Gender Budgeting Three Year Plan. The Steering Committee's Proposals

Implementing Gender Budgeting Three Year Plan. The Steering Committee's Proposals Implementing Gender Budgeting Three Year Plan The Steering Committee's Proposals Ministry of Finance March 2011 Contents Introduction... 3 International Conventions and Legislation... 4 Premises and Obstacles...

More information

Vulnerability of Older People in Ethiopia

Vulnerability of Older People in Ethiopia The Case of Oromia, Amhara and SNNP Regional States European Commission The Case of Oromia, Amhara and SNNP Regional States HelpAge International in Ethiopia Addis Ababa HelpAge International helps older

More information

Instructions on Completion of the Application Form for the Grant Assistance for Cultural Grassroots Projects of Japan

Instructions on Completion of the Application Form for the Grant Assistance for Cultural Grassroots Projects of Japan Instructions on Completion of the Application Form for the Grant Assistance for Cultural Grassroots Projects of Japan To Whom It May Concern in Applicant Organizations Please refer to the following instructions

More information

PRESS RELEASE 2012 LABOUR FORCE SURVEY 10 APRIL 2012

PRESS RELEASE 2012 LABOUR FORCE SURVEY 10 APRIL 2012 PRESS RELEASE 2012 LABOUR FORCE SURVEY 10 APRIL 2012 =========================================================== 1. The Namibia Statistics Agency is pleased to release the results of the 2012 Labour Force

More information

Making every drop count

Making every drop count Making every drop count Financing water, sanitation and hygiene in Ethiopia Water, Sanitation and Hygiene for all Acknowledgements The Water Supply and Sanitation Collaborative Council is a leading international

More information

Briefing Note for the DAG-DPPA Meeting

Briefing Note for the DAG-DPPA Meeting Briefing Note for the DAG-DPPA Meeting (January 12, 2007) Discussion Areas: The Recent Flood Hazard And The Existing Needs Assessment Process Presenter : Director General Simon Mechale 1 I. About 2006

More information

UNDP Pakistan Monitoring Policy STRATEGIC MANAGEMENT UNIT UNITED NATIONS DEVELOPMENT PROGRAMME, PAKISTAN

UNDP Pakistan Monitoring Policy STRATEGIC MANAGEMENT UNIT UNITED NATIONS DEVELOPMENT PROGRAMME, PAKISTAN UNDP Pakistan Monitoring Policy STRATEGIC MANAGEMENT UNIT UNITED NATIONS DEVELOPMENT PROGRAMME, PAKISTAN Approved Version April 2014 Contents Contents... 2 1. Key Elements of Results Based Management in

More information

National Education Sector Budget Brief:

National Education Sector Budget Brief: Budget Brief Ethiopia UNICEF Ethiopia/216/Tesfaye National Education Sector Budget Brief: 26-216 Key Messages The sector received 24.2 per cent of on-budget total national expenditure and 4.4 per cent

More information

Ex-Ante Evaluation (for Japanese ODA Loan)

Ex-Ante Evaluation (for Japanese ODA Loan) Japanese ODA Loan Ex-Ante Evaluation (for Japanese ODA Loan) 1. Name of the Program Country: India Project: Tamil Nadu Investment Promotion Program Loan Agreement: November 12, 2013 Loan Amount: 13,000

More information

78. PROFILE ON THE PRODUCTION OF FIBERGLASS REINFORCED PLASTICS

78. PROFILE ON THE PRODUCTION OF FIBERGLASS REINFORCED PLASTICS 78. PROFILE ON THE PRODUCTION OF FIBERGLASS REINFORCED PLASTICS 78-1 TABLE OF CONTENTS PAGE I. SUMMARY 78-2 II. PRODUCT DESCRIPTION & APPLICATION 78-2 III. MARKET STUDY AND PLANT CAPACITY 78-3 A. MARKET

More information

FOR OFFICIAL USE ONLY GOVERNMENT OF THE FEDERAL DEMOCRATIC REPUBLIC OF ETHIOPIA PROMOTING BASIC SERVICES PROGRAM - PHASE III

FOR OFFICIAL USE ONLY GOVERNMENT OF THE FEDERAL DEMOCRATIC REPUBLIC OF ETHIOPIA PROMOTING BASIC SERVICES PROGRAM - PHASE III FOR OFFICIAL USE ONLY GOVERNMENT OF THE FEDERAL DEMOCRATIC REPUBLIC OF ETHIOPIA PROMOTING BASIC SERVICES PROGRAM - PHASE III PROGRAM OPERATIONAL MANUAL (POM) December, 2012 TABLE OF CONTENTS Page ABBREVIATIONS

More information

THE WORLD BAN IBRD IDA I WORLD BANKGROUP

THE WORLD BAN IBRD IDA I WORLD BANKGROUP Public Disclosure Authorized THE WORLD BAN IBRD IDA I WORLD BANKGROUP Ethiopia Country Office Africa Avenue, Bole Road Tel (251-11) 5176000 Addis Abeba, Ethiopia Fax: (251-11) 6627717 December 4, 2015

More information

Common challenges raised by the three Ministries in their collaboration with UNICEF in 2014 were: - Delays in processing of payments by UNICEF -

Common challenges raised by the three Ministries in their collaboration with UNICEF in 2014 were: - Delays in processing of payments by UNICEF - Islamic Republic of Afghanistan Ministry of Rural Rehabilitation & Development (MRRD) National Rural Water Supply, Sanitation & Irrigation Programme (Ru-WatSIP) UNICEF WASH Annual Review Meeting (ARM)

More information

Budget Brief Water and Sanitation

Budget Brief Water and Sanitation Budget Brief Water and Sanitation KEY MESSAGES AND RECOMMENDATIONS The 2015/16 budget allocation to Water and Sanitation was MK19.2 billion, down from MK36.3 billion in 2014/15, representing a 47% decline

More information

not, ii) actions to be undertaken

not, ii) actions to be undertaken Recommendations, Final report Recommendation 1: Political commitment a) The European Commission should formally remind accession countries of the obligations of future member states to comply with the

More information

National Plan Commission April 2018 Addis Ababa

National Plan Commission April 2018 Addis Ababa National Plan Commission April 2018 Addis Ababa Overview of the Session 1. Introduction 2. Contribution of Ethiopia to the preparation of SDGs and Owning the 2030 Sustainable development Agenda 3. Policy

More information

Research Brief. Sultan Hafeez Rahman, Md. Shanawez Hossain, Mohammed Misbah Uddin

Research Brief. Sultan Hafeez Rahman, Md. Shanawez Hossain, Mohammed Misbah Uddin Research Brief Public Finance and Revenue Mobilization in Union Parishads Abstract Sultan Hafeez Rahman, Md. Shanawez Hossain, Mohammed Misbah Uddin July 2016 Despite the long history of local government

More information