JOINT PUBLIC NOTICE November 19, 2018

Size: px
Start display at page:

Download "JOINT PUBLIC NOTICE November 19, 2018"

Transcription

1 JI PUI I ovember 9, 08 United tates rmy tate of ouisiana orps of ngineers epartment of nvironmental Quality ew rleans istrict ater Permits ivision egulatory ranch Post ffice ox eake venue aton ouge, ouisiana ew rleans, ouisiana 708 (504) 86-7 (5) 9-5 Project Manager Project Manager Kenny lanke Ms. lizabeth ill Kenneth.G.lanke@usace.army.mil Q pplication umber MV Q Q 80-0 Interested parties are hereby notified that a permit application has been received by the ew rleans istrict of the U.. rmy orps of ngineers pursuant to: [ ] ection 0 of the ivers and arbors ct of March, 899 ( tat. 5; U 40); and/or [X] ection 404 of the lean ater ct (86 tat. 86; U 44). pplication has also been made to the ouisiana epartment of nvironmental Quality, ffice of nvironmental ervices, for a ater Quality ertification (Q) in accordance with statutory authority contained in :074 (), and provisions of ection 40 of the lean ater ct (P..95-7). F- F II UIVII I IVIG PI M F PI: 6844,, c/o ydrik etlands onsultants, ttn: Michael enry, ighway 90 ast, uite, ammond, ouisiana I F K: ocated on an approximate.65-acre site, in ections 0 &, ownship 7 outh, ange ast, along and south of uddy llis oad, approximately.65 miles west of ouisiana ighway 447, near enham prings, ouisiana, located in ivingston Parish, as shown on the enclosed drawings (atitude.45 ongitude ). his project is located in the Pontchartrain asin (mite iver U ). he work described below was partially completed prior to obtaining a epartment of the rmy permit and was in violation of ection of the lean ater ct. ll legal issues concerning the unauthorized work have been deferred. F K: he applicant is requesting an after-the-fact epartment of the rmy permit authorization to clear, grade, excavate, place and maintain fill material for the construction of an approximate 56-lot residential subdivision (llis states), near enham prings, ouisiana, within ivingston Parish. he proposed development would include residential homesites, 4 detention ponds, utility and drainage infrastructure and appurtenances, green space areas, and ingress/egress. pproximately 46,58 cubic yards of native material would be excavated as a result of pond construction and placed as fill in jurisdictional areas during project construction. pproximately 0.66 acre of jurisdictional wetlands have been impacted prior to the applicant obtaining a epartment of the rmy permit. pproximately 4. acres of jurisdictional forested wetlands (including after-the-fact portion) would be directly impacted as a result of project implementation. pproximately.5 acres of jurisdictional ther

2 aters of the United tates (U) would be excavated and.0 acres U would be avoided and not directly impacted. he applicant has claimed that the project has been designed to avoid and minimize direct and secondary adverse wetland impacts to the maximum extent practicable. he applicant is proposing to utilize best management practices during and after the construction phase of the project. he applicant is proposing to compensate for the unavoidable impact by purchasing mitigation credits from an approved mitigation bank. he applicant may be required to fully or partially restore the project site to pre-project conditions, if issuance of a permit is determined to be contrary to the overall public interest he comment period for the epartment of rmy Permit and the ouisiana epartment of nvironmental Quality will close in 0 days from the date of this joint public notice. ritten comments, including suggestions for modifications or objections to the proposed work, stating reasons thereof, are being solicited from anyone having interest in this permit and/or this Q request and must be mailed so as to be received before or by the last day of the comment period. etters concerning the orps of ngineers permit application must reference the applicants name and the Permit pplication umber, and be mailed to the orps of ngineers at the address above, I: GU. imilar letters concerning the ater Quality ertification must reference the applicants name and the Q application number and be mailed to the ouisiana epartment of nvironmental Quality at the address above. Individuals or parties may request an extension of time in which to comment on the proposed work by writing or ing the orps of ngineers Project Manager listed above. ny request must be specific and substantively supportive of the requested extension, and received by this office prior to the end of the initial comment period. he ection hief will review the request and the requestor will be promptly notified of the decision to grant or deny the request. If granted, the time extension will be continuous to the initial comment period and, inclusive of the initial comment period, will not exceed a total of calendar days. he application for this proposed project is on file with the ouisiana epartment of nvironmental Quality and may be examined during weekdays between 8:00 a.m. and 4: p.m. opies may be obtained upon payment of costs of reproduction. orps of ngineers Permit riteria he decision whether to issue a permit will be based on an evaluation of the probable impacts, including cumulative impacts of the proposed activity on the public interest. hat decision will reflect the national concern for both protection and utilization of important resources. he benefit which reasonably may be expected to accrue from the proposal must be balanced against its reasonably foreseeable detriments. ll factors which may be relevant to the proposal will be considered including the cumulative effects thereof; among those are conservation, economics, aesthetics, general environmental concerns, wetlands, historic properties, fish and wildlife values, flood hazards, floodplain values, land use, navigation, shoreline erosion and accretion, recreation, water supply and conservation, water quality, energy needs, safety, food and fiber production, mineral needs, considerations of property ownership and, in general, the needs and welfare of the people. he U rmy orps of ngineers is soliciting comments from the public, federal, state, and local agencies and officials, Indian ribes, and other interested parties in order to consider and evaluate the impacts of this proposed activity. ny comments received will be considered by the U rmy orps of ngineers to determine whether to make, modify, condition, or deny a permit for this proposal. o make this decision, comments are used to assess impacts on endangered species, historic properties, water quality, general environmental effects, and other public interest factors listed above. omments are used in the preparation of an nvironmental ssessment and/or an nvironmental Impact tatement pursuant to the ational nvironmental Policy ct. omments are also used to determine the need for a public hearing and to determine the overall public interest of the proposed activity.

3 he ew rleans istrict is unaware of properties listed on the ational egister of istoric Places near the proposed work. he possibility exists that the proposed work may damage or destroy presently unknown archeological, scientific, prehistorical, historical sites, or data. opies of this notice are being sent to the tate rcheologist and tate istoric Preservation fficer. ur initial finding is that the proposed work would neither affect any species listed as endangered by the U.. epartments of Interior or ommerce, nor affect any habitat designated as critical to the survival and recovery of any endangered species. Utilizing tandard ocal perating Procedure for ndangered pecies in ouisiana (P), dated ctober, 04, between the U.. rmy orps of ngineers, ew rleans and U.. Fish and ildlife ervice, cological ervices ffice, the orps has determined that the proposed activity would have no effect on any listed species. his notice initiates the ssential Fish abitat (F) consultation requirements of the Magnuson-tevens Fishery onservation and Management ct. he applicants proposal would result in the destruction or alteration of 0 acres of F utilized by various life stages of red drum and penaeid shrimp. ur initial determination is that the proposed action would not have a substantial adverse impact on F or federally managed fisheries in the Gulf of Mexico. ur final determination relative to project impacts and the need for mitigation measures is subject to review by and coordination with the ational Marine Fisheries ervice. If the proposed work involves deposits of dredged or fill material into navigable waters, the evaluation of the probable impacts will include the application of guidelines established by the dministrator of the nvironmental Protection gency. lso, a certification that the proposed activity will not violate applicable water quality standards will be required from the epartment of nvironmental Quality, ffice of nvironmental ervices, before a permit is issued. ny person may request, in writing, within the comment period specified in this notice, that a public hearing be held to consider this application. equests for public hearings shall state, with particularity, the reasons for holding a public hearing. ou are requested to communicate the information contained in this notice to any other parties whom you deem likely to have interest in the matter. nclosure J M. M hief, entral valuation ection egulatory ranch

4 VIG PI MM J M r ee k FI IG M I G K M. 4 G VIG MK P VIG UX VUV MGU X PUJ MK K K IK etlands - GI - Flood ontrol.ik.m., (985) K FI M F U I K I I JI I M I F I I I KVI I KVI PI ll F lye IVIG J s GI o Gray I M IM IG I G IK IG F PI I GF U G J es t reek PI I PPI I I G 4 IG M U P V I G K I P I M 447 U JU M V I U- G I I G P K F P M U U I K K P P UMM K JU I G I FI PI I. 4 I. 9 5 JI U P I IIG VI MM.K. I I GI IG U UKIGM I PI V P I J J M PIG IK PI PIUM JI U PIIP 447 J I- I F Proposed chool ite I F K V V UKIGM I I I MIG VI I G I G I I U G G G I 6 G I I U Q I I G I K PK I I U I 6 V P I M MP ek U V K re K IK P P M IM K I P VI U IG IM 0 M GI V V 0 II U MP ll lye o 9 X I JU U J./. IG I st e U I UMI V J I IG PI K MGI MP 4 PI U I 0 IG K M I K G P I FI PI I. 5, I JU IG J.. U. VI P P M U G IM M K MP I I U PK X. GMI G V I I I IG IM IVI. PI PI K I VI M. M UMI eham prings MI K MPGU PI G PI V JFF Z UI JUI IG KF P.. IMI P. P U I G I IG P M MG K J M MM U MIP PI GI I IM MMUI P M U F JU K P. IMI F P M U Proposed M UIG M PIG PK Z G G UIG M G M PIG FI I G P JKI 976 PIG VG MMI PK M. IVVI MMI PK

5 P P P PP Z PP P 9 9 P- waters F MIFI / IMPV,57 I. F / IG PVI : MI-, IVIG, IK etlands - GI - Flood ontrol.ik.m (985) , 6--08, 8--08, XIIG P I II 60.8 I I F G = XIIG P --P 0 I XI F MI II I V F I P J Z ntergy Powerline II IG --P K / IMP K I. F IU P V , U ,58 U. X & IU I. I I I I F Z & X P FM F IU MP UM: 06 00, 4-0-0;.F.. = MI P UKIGM - (off-site) IG U.. F UUIZ IVI = 0.66 (U..) - - P 00 I IMG X =,95 I. F. / 0.7 FI / MIFI =,57 I. F. / P J... MV Q - FI =,65 I. F. / X = 66 I. F. / 0. - MIFI / IMPV = 57 I. F. / 0. PP I P XIIG P ( = 0.58 II PJ) U VI / U 78 P IG F: P VPM IG F: P VPM F F IG P K II U U X F P VGI II F I P J V. I U.. 7 VPM U.65 PJ PJ =.65 II = 56 MI. 4.0 I = MM (5) = GP () = P () = P- F IG II F Z / II I IMP VI XI -.8 IMP VI FI / GIG U X - MIFI / G G: 7 5 M 48 VI 5 I. V. Z Z II P = Z M PP XIIG P I U (off site) FI U P I. V Z X U.. 7.

6 5 IG PP I P F* =.5 PP G PP IV 4. (yp.) FIGU 4 F I VI -.G.V. X P- IMP XI FI IMP FIIG / GIG XIIG G VI -.G.V. I - PFI VI KIG U FIGU 4 F I FIGU 4 F I VI -.G.V. F* =.5 5 IV UV PP IV 4. (yp.) FI PP G P P IMP FIIG / GIG FI PP IV 4. (yp.) XIIG G IV UV VI -.G.V. G: XIIG G PP G I - PFI VI KIG PP X IMP VI XI FI IMP VI FIIG / GIG (*) : F F I I I FM.5 F.5 F IK etlands - GI - Flood ontrol.ik.m (985) ,

7 P P M FUI PI I I PP G I - PP I * I * IV PI U * * : MII VI IK etlands - GI - Flood ontrol.ik.m (985) ,

8 VI -.G.V UJ I IG VGI (I) VI -.G.V. K I - PFI VI KIG : I I IMP G: XIIG G IK etlands - GI - Flood ontrol.ik.m (985)4-0 65

Public Notice. Proposed anchor structures, dredging, and discharge at the Enbridge Line 5 pipeline in the Straits of Mackinac, Michigan

Public Notice. Proposed anchor structures, dredging, and discharge at the Enbridge Line 5 pipeline in the Straits of Mackinac, Michigan US Army Corps of Engineers Detroit District Public Notice Applicant: Enbridge Pipelines (Lakehead), LLC In Reply Refer To: Corps File No. LRE-2010-00463-56-N18 Date: January 29, 2019 Expires: February

More information

AGENDA OF THE BOARD OF BUILDING AND SAFETY COMMISSIONERS (BBSC) 201 NORTH FIGUEROA STREET - ROOM 900 TUESDAY, JANUARY 9, MEETING NO.

AGENDA OF THE BOARD OF BUILDING AND SAFETY COMMISSIONERS (BBSC) 201 NORTH FIGUEROA STREET - ROOM 900 TUESDAY, JANUARY 9, MEETING NO. F UIIG FY II IFI P F UIIG FY 01 FIGU G 9001 I PI. FII I PI JY GG- GG GUII JI UZ I GI Y FK U G G UPI F UIIG YU P.. XUI FFI G F F UIIG FY II ) 01 FIGU - 900 UY JUY 9 018 - IG. 860 9:30 a.m. GUII F IY U IG

More information

AGENDA OF THE BOARD OF BUILDING AND SAFETY COMMISSIONERS (BBSC) 201 NORTH FIGUEROA STREET - ROOM 900 TUESDAY, DECEMBER 12, MEETING NO.

AGENDA OF THE BOARD OF BUILDING AND SAFETY COMMISSIONERS (BBSC) 201 NORTH FIGUEROA STREET - ROOM 900 TUESDAY, DECEMBER 12, MEETING NO. F UIIG FY II IFI P F UIIG FY 01 FIGU G 9001 I PI. FII I PI JY GG- GG GUII JI UZ I GI Y FK U G G UPI F UIIG YU P.. XUI FFI G F F UIIG FY II ) 01 FIGU - 900 UY 1 017 - IG. 8604 9:30 a.m. GUII F IY U IG Pursuant

More information

Federal Emergency Management Agency

Federal Emergency Management Agency age 1 of 5 ssue ate: ay 26 216 ffective ate: eptember 14 216 ase o.: 15--288 - ederal mergency anagement gency ashington.. 2472 V V J Q istrict of olumbia ashington V V.: 1 17h treet evee otomac ederal

More information

Regional Division Directors Regions I - X. Doug Bellomo, P.E. Director, Risk Analysis Division

Regional Division Directors Regions I - X. Doug Bellomo, P.E. Director, Risk Analysis Division August 18, 2010 U.S. Department of Homeland Security 500 C Street SW Washington, DC 20472 FEMA MEMORANDUM FOR: Regional Division Directors Regions I - X FROM: SUBJECT: EFFECTIVE DATE: Doug Bellomo, P.E.

More information

Public Notice. Engineering Department 1410 West 5 th Street Owensboro, Kentucky 42302

Public Notice. Engineering Department 1410 West 5 th Street Owensboro, Kentucky 42302 Regulatory Division South Branch Public Notice No. LRL-2017-768-cat Public Notice US Army Corps of Engineers Louisville District Public Notice No. Open Date: Closing Date: LRL-2017-768-cat Sep 05, 2017

More information

ADMINISTRA TIVE APPEAL DECISION RUDOLPH AND ROSEANN KRAUSE FILE NUMBER (LP-CR) JACKSONVILLE DISTRICT

ADMINISTRA TIVE APPEAL DECISION RUDOLPH AND ROSEANN KRAUSE FILE NUMBER (LP-CR) JACKSONVILLE DISTRICT ADMINISTRA TIVE APPEAL DECISION RUDOLPH AND ROSEANN KRAUSE FILE NUMBER 2002 8023 (LP-CR) JACKSONVILLE DISTRICT Review Officer: Arthur L. Middleton, US Army Corps of Engineers (USACE), South Atlantic Division

More information

Article 23-6 FLOODPLAIN DISTRICT

Article 23-6 FLOODPLAIN DISTRICT AMENDING THE CODE OF THE CITY OF PITTSFIELD CHAPTER 23, ZONING ORDINANCE SECTION I That the Code of the City of Pittsfield, Chapter 23, Article 23-6 Floodplain District, shall be replaced with the following:

More information

AGENDA OF THE BOARD OF BUILDING AND SAFETY COMMISSIONERS (BBSC) 201 NORTH FIGUEROA STREET - ROOM 900 TUESDAY, NOVEMBER 28, MEETING NO.

AGENDA OF THE BOARD OF BUILDING AND SAFETY COMMISSIONERS (BBSC) 201 NORTH FIGUEROA STREET - ROOM 900 TUESDAY, NOVEMBER 28, MEETING NO. F II F II IFI P F II F 01 FI 9001 I PI FII I PI J - II JI Z I I FK PI F II P.. XI FFI F F II F II ) 01 FI - 900 8 017 - I. 8603 9:30 a.m. II F I I Pursuant to the oard's esolution o. 901-90 the oard must

More information

Permit Coordination and Evaluation

Permit Coordination and Evaluation Permit Coordination and Evaluation Presented by USACE Detroit District Regulatory Office and MDEQ Water Resources Division October 10, 2017 US Army Corps of Engineers BUILDING STRONG Permit Coordination

More information

AGENDA OF THE BOARD OF BUILDING AND SAFETY COMMISSIONERS (BBSC) 201 NORTH FIGUEROA STREET - ROOM 900 TUESDAY, JUNE 26, MEETING NO.

AGENDA OF THE BOARD OF BUILDING AND SAFETY COMMISSIONERS (BBSC) 201 NORTH FIGUEROA STREET - ROOM 900 TUESDAY, JUNE 26, MEETING NO. F UIIG FY II IFI P F UIIG FY 01 FIGU G 9001 I PI. FII I PI JY GG- GG GUII JI UZ I GI Y FK U G G UPI F UIIG YU P.. XUI FFI G F F UIIG FY II ) 01 FIGU - 900 UY JU 6 018 - IG. 8614 9:30 a.m. GUII F IY U IG

More information

Kentwood Neighborhood Conservation Ordinance

Kentwood Neighborhood Conservation Ordinance GG entwood eighborhood Conservation rdinance City Planning Cases: CPC 2016 2112 ZC nvironmental Case: V 2016 2111 he City of os ngeles, epartment of City Planning will hold a series of pen Houses/Public

More information

Title. Community Open House

Title. Community Open House itle Community pen ouse itle eeting Format & chedule > pen ouse format > Visit stations on focused topic areas Japanese merican ational useum searching for new director - latimes.com > taff available to

More information

Zone Change to Remove the Studio City Residential Floor Area (RFA) Supplemental Use District

Zone Change to Remove the Studio City Residential Floor Area (RFA) Supplemental Use District epartment of City Planning Zone Change to emove the tudio City esidential Floor rea (F) upplemental Use istrict Zone Change Frequently sked Questions CPC 2017-2342-ZC -2015-4197--C1 hat is the purpose

More information

ADMINISTRATIVE APPEAL DECISION JAMES JOHNSON, PERMIT NUMBER (IP-MN) JACKSONVILLE DISTRICT

ADMINISTRATIVE APPEAL DECISION JAMES JOHNSON, PERMIT NUMBER (IP-MN) JACKSONVILLE DISTRICT ADMINISTRATIVE APPEAL DECISION JAMES JOHNSON, PERMIT NUMBER 199601445(IP-MN) JACKSONVILLE DISTRICT Review Officer: Arthur L. Middleton, U.S. Army Corps of Engineers (USACE), South Atlantic Division, Atlanta

More information

JACKSONVILLE DISTRICT. DATE: September 13, Appellant's Representative: Douglas Rillstone, Attorney, Broad and Cassel

JACKSONVILLE DISTRICT. DATE: September 13, Appellant's Representative: Douglas Rillstone, Attorney, Broad and Cassel AD~INISTRA TIVE APPEAL DECISION A~DREW CONLYN, FILE NO. 200001477 (IP-TWM) JACKSONVILLE DISTRICT DATE: September 13, 2005 Review Officer: Mores Bergman, US Army Corps of Engineers Appellant: Andrew Conlyn

More information

INTERAGENCY COORDINATION AGREEMENT ON WETLAND MITIGATION BANKING WITHIN THE REGULATORY BOUNDARIES OF CHICAGO DISTRICT, CORPS OF ENGINEERS January 1997

INTERAGENCY COORDINATION AGREEMENT ON WETLAND MITIGATION BANKING WITHIN THE REGULATORY BOUNDARIES OF CHICAGO DISTRICT, CORPS OF ENGINEERS January 1997 INTERAGENCY COORDINATION AGREEMENT ON WETLAND MITIGATION BANKING WITHIN THE REGULATORY BOUNDARIES OF CHICAGO DISTRICT, CORPS OF ENGINEERS January 1997 SECTION 1, PURPOSE The Chicago District of the U.S.

More information

COUNTY LINE GOLF COURSE BARTLETT CITY LIMITS 95 S GRANGER CR 1 WEIR C R C R C R1 HUTTO R D FM RED BUD LA F M6 ROW E LN TO LL

COUNTY LINE GOLF COURSE BARTLETT CITY LIMITS 95 S GRANGER CR 1 WEIR C R C R C R1 HUTTO R D FM RED BUD LA F M6 ROW E LN TO LL I U 3 3 7 I U U ll information (Information) provided or depicted on this map and or aerial photograph has been obtained from third par sources deemed reliable. owever, neither ustin nor any of its brokers,

More information

Laurel Public Schools Demographic Study

Laurel Public Schools Demographic Study aurel Public chools emographic tudy K- onsultants aurel Public chools emographic tudy Forward n January, K- onsultants of Billings, Montana was asked to prepare a emographics tudy to determine the number

More information

AGENDA OF THE BOARD OF BUILDING AND SAFETY COMMISSIONERS (BBSC) 201 NORTH FIGUEROA STREET - ROOM 900 TUESDAY, AUGUST 29, MEETING NO.

AGENDA OF THE BOARD OF BUILDING AND SAFETY COMMISSIONERS (BBSC) 201 NORTH FIGUEROA STREET - ROOM 900 TUESDAY, AUGUST 29, MEETING NO. F UII F II IFI P F UII F 01 FIU 9001 I PI FII I PI J - UII JI UZ I I FK U UPI F UII U P.. XUI FFI F F UII F II ) 01 FIU - 900 U UU 9 017 - I. 898 9:30 a.m. UII F I U I Pursuant to the oard's esolution

More information

AGENDA OF THE BOARD OF BUILDING AND SAFETY COMMISSIONERS (BBSC) 201 NORTH FIGUEROA STREET - ROOM 900 TUESDAY, OCTOBER 16, MEETING NO.

AGENDA OF THE BOARD OF BUILDING AND SAFETY COMMISSIONERS (BBSC) 201 NORTH FIGUEROA STREET - ROOM 900 TUESDAY, OCTOBER 16, MEETING NO. F UIIG FY II IFI P F UIIG FY 01 FIGU G 9001 I PI. FII I PI JY GG- GG GUII JI UZ I GI Y FK U G G UPI F UIIG YU P.. XUI FFI G F F UIIG FY II ) 01 FIGU - 900 UY 16 018 - IG. 8618 9:30 a.m. GUII F IY U IG

More information

CIP PROJECT STATUS - DECEMBER 2014

CIP PROJECT STATUS - DECEMBER 2014 FFI PG 37 hi s page i nt ent i onal l yl ef tbl ank 38 PG: IP PJ B 2014 FFI PJ : raffic ystem Improvements (1101) F2013 Projects: (1) raffic signal lights at F518 and estover and F518 and aple eaf r (2)

More information

Town of Sellersburg EMPLOYMENT APPLICATION. Applicant Name

Town of Sellersburg EMPLOYMENT APPLICATION. Applicant Name wn of ellersburg Y II pplicant ame he wn of ellersburg considers applicants for all positions without regards to race, color, religion, sex, national origin, age, marital or veteran status, the presence

More information

Public Notice. LOCATION: On the left bank of the Ohio River at Mile 596.2, in Jefferson County, Kentucky

Public Notice. LOCATION: On the left bank of the Ohio River at Mile 596.2, in Jefferson County, Kentucky Public Notice US Army Corps of Engineers Louisville District Public Notice No. Open Date: Close Date: LRL-1981-00042-mck 27 Nov 2015 28 Dec 2015 Please address all comments and inquiries to: U.S. Army

More information

ADMINISTRATIVE APPEAL DECISION BARBARA MOORE FILE NUMBER (LP-VA) JACKSONVILLE DISTRICT

ADMINISTRATIVE APPEAL DECISION BARBARA MOORE FILE NUMBER (LP-VA) JACKSONVILLE DISTRICT " I, ADMINISTRATIVE APPEAL DECISION BARBARA MOORE FILE NUMBER 200004449 (LP-VA) JACKSONVILLE DISTRICT Review Officer: Arthur L. Middleton, US Anny Corps of Engineers (USACE), South Atlantic Division, Atlanta,

More information

a) Ensure public safety through reducing the threats to life and personal injury.

a) Ensure public safety through reducing the threats to life and personal injury. SECTION VII: FLOODPLAIN DISTRICT 7-1 Statement Of Purpose The purposes of the Floodplain District are to: a) Ensure public safety through reducing the threats to life and personal injury. b) Eliminate

More information

FINAL INTEGRATED GENERAL REEVALUATION REPORT AND SUPPLEMENTAL ENVIRONMENTAL IMPACT STATEMENT ADDENDUM

FINAL INTEGRATED GENERAL REEVALUATION REPORT AND SUPPLEMENTAL ENVIRONMENTAL IMPACT STATEMENT ADDENDUM FINAL INTEGRATED GENERAL REEVALUATION REPORT AND SUPPLEMENTAL ENVIRONMENTAL IMPACT STATEMENT BREVARD COUNTY, FLORIDA HURRICANE AND STORM DAMAGE REDUCTION PROJECT MARCH 2014 U.S. Army Corps of Engineers

More information

ENBRIDGE ENERGY LIMITED PARTNERSHIP SPECIAL USE PERMIT

ENBRIDGE ENERGY LIMITED PARTNERSHIP SPECIAL USE PERMIT Page 1 of 6 Chequamegon- Nicolet National Forest ENBRIDGE ENERGY LIMITED PARTNERSHIP SPECIAL USE PERMIT Fact Sheet July 5, 2017 Situation: Enbridge Energy Limited Partnership (Enbridge) has requested to

More information

Puyallup Shoreline Master Program FINAL, JAN

Puyallup Shoreline Master Program FINAL, JAN CHAPTER 1 INTRODUCTION A. PURPOSE AND INTENT 1. The purposes of this Shoreline Master Program are: a. To guide the future development of shorelines in the City of Puyallup in a positive, effective, and

More information

National Flood Insurance Program Final Nationwide Programmatic Environmental Impact Statement

National Flood Insurance Program Final Nationwide Programmatic Environmental Impact Statement Final Nationwide Programmatic Environmental Impact Statement EXECUTIVE SUMMARY Action Agency: Federal Emergency Management Agency Cooperating Agency: U.S. Environmental Protection Agency September 2017

More information

TOWN OF NORTHBRIDGE, MASSACHUSETTS

TOWN OF NORTHBRIDGE, MASSACHUSETTS F BIG, MU C B BIG ocation: It is in outhern Massachusetts, bordered by Grafton on the north, Upton and Mendon on the east, Uxbridge on the south, and utton on the west. orthbridge is 3 miles southeast

More information

TOWN OF CHARLTON, MASSACHUSETTS

TOWN OF CHARLTON, MASSACHUSETTS W F C, C WC B C ocation: outh central assachusetts, bordered by pencer on the north, eicester on the northeast, xford on the east, udley and outhbridge on the south, turbridge on the west, and ast Brookfield

More information

Disclaimer for Review of Plans

Disclaimer for Review of Plans isclaimer for eview of lans he an Francisco lanning ode requires that the plans of certain proposed projects be provided to members of the public prior to the ityʹs approval action on the project. ccordingly,

More information

COMMUNITY CERTIFICATIONS

COMMUNITY CERTIFICATIONS OMB No. xxxxxxxx Expires: xxxxxxxx National Flood Insurance Program Community Rating System COMMUNITY CERTIFICATIONS D R A F T CRS COMMUNITY CERTIFICATIONS The following community certifications are part

More information

DEPARTMENT OF TH E ARMY U.S. ARMY CORPS OF ENGINEERS 441 G STREET, NW WASHINGTON, DC MAY

DEPARTMENT OF TH E ARMY U.S. ARMY CORPS OF ENGINEERS 441 G STREET, NW WASHINGTON, DC MAY DEPARTMENT OF TH E ARMY U.S. ARMY CORPS OF ENGINEERS 441 G STREET, NW WASHINGTON, DC 20314-1000 MAY 11 2018 The Honorable Bill Shuster Chairman, Committee on Transportation and Infrastructure United States

More information

TITLE 16 - CONSERVATION CHAPTER 71 - ATLANTIC COASTAL FISHERIES COOPERATIVE MANAGEMENT ACT

TITLE 16 - CONSERVATION CHAPTER 71 - ATLANTIC COASTAL FISHERIES COOPERATIVE MANAGEMENT ACT TITLE 16 - CONSERVATION CHAPTER 71 - ATLANTIC COASTAL FISHERIES COOPERATIVE MANAGEMENT ACT Sec. 5101. - Findings and purpose (a) Findings The Congress finds the following: Coastal fishery resources that

More information

COMPLIANCE WITH EXECUTIVE ORDER FLOOD PLAIN MANAGEMENT 8 step project plan for September 2017 proposed demo s 11 in Floodplain

COMPLIANCE WITH EXECUTIVE ORDER FLOOD PLAIN MANAGEMENT 8 step project plan for September 2017 proposed demo s 11 in Floodplain CPLIAC I XCUT 988 FL PI AAGT 8 step project plan for eptember 207 proposed demo s in Floodplain Proposed Activity / Action: Cmv has seventeen (7) properties scheduled for demolition in eptember 207 that

More information

Introduction. 1.1 Project Background

Introduction. 1.1 Project Background 1 Introduction 1.1 Project ackground he aine epartment of ransportation (aine, in partnership with the ffice of the Governor, the aine ffice of edevelopment and e-mployment, the owns of runswick and opsham,

More information

Benefits and Challenges of Port-Sponsored Mitigation Banks

Benefits and Challenges of Port-Sponsored Mitigation Banks Benefits and Challenges of Port-Sponsored Mitigation Banks Presented by Dan Berlin, PWS October 10, 2018 1 Presentation Outline Mitigation Overview Mitigation Banking Process Port-Led Mitigation Banking

More information

Community Incentives for Nature-Based Flood Solutions

Community Incentives for Nature-Based Flood Solutions Community Incentives for Nature-Based Flood Solutions A GUIDE TO FEMA S COMMUNITY RATING SYSTEM FOR CONSERVATION PRACTITIONERS The Federal Emergency Management Agency (FEMA) uses a Community Rating System

More information

HELPING OUR COMMUNITY REBUILD

HELPING OUR COMMUNITY REBUILD I F II I ZIG GUI VI 1 HPIG U UI BUI BUIIG GH dditional information regarding the anta osa rebuilding effort available online: ity.org/rebuild onomaountyecovers.org IG F U V Planning & conomic evelopment

More information

Working to Protect and Preserve the Gulf of Mexico

Working to Protect and Preserve the Gulf of Mexico Working to Protect and Preserve the Gulf of Mexico 839 St. Charles Ave., Suite 309, New Orleans, LA 70130 Mailing Address: P.O. Box 2245, New Orleans, LA 70176 Phone: (504) 525-1528 Fax: (504) 525-0833

More information

Environmental Review and Disaster Recovery

Environmental Review and Disaster Recovery Environmental Review and Disaster Recovery Welcome and Speakers Welcome to HUD s webinar series on CDBG-DR basics Webinars will focus on key rules and requirements for managing DR grants Webinars will

More information

MITIGATION BANK ENABLING INSTRUMENT Table of Contents

MITIGATION BANK ENABLING INSTRUMENT Table of Contents MITIGATION BANK ENABLING INSTRUMENT Table of Contents RECITALS... 1 AGREEMENT... 3 Section I: Purpose and Authorities... 3 A. Purpose... 3 B. Authorities... 3 Section II: Definitions... 5 Section III:

More information

PURPOSE AND NEED VDOT

PURPOSE AND NEED VDOT PUPO A nhance the future movement of people, passenger services and air cargo traffic to and around ulles Airport and AA etro ilver ine by providing a limited access roadway facility to the west of the

More information

RESTORE ACT Direct Component Multiyear Plan Matrix Department of the Treasury OMB Approval No Applicant Name:

RESTORE ACT Direct Component Multiyear Plan Matrix Department of the Treasury OMB Approval No Applicant Name: RESTORE ACT Direct Component Multiyear Plan Matrix Department of the Treasury OMB Approval No. 1505-0250 Applicant Name: Manatee County 1. MULTIYEAR PLAN VERSION (INITIAL OR AMENDMENT NUMBER): Initial

More information

TABLE OF CONTENTS. Table of Contents 3 List of Drawings 1. Procurement Requirements Advertisement for Bids 2

TABLE OF CONTENTS. Table of Contents 3 List of Drawings 1. Procurement Requirements Advertisement for Bids 2 TABLE OF CONTENTS General Requirements Total Pages Table of Contents 3 List of Drawings 1 Procurement Requirements Advertisement for Bids 2 Instruction for Procurement Instructions to Bidders 8 Procurement

More information

ARTICLE 2 ADMINISTRATIVE PROVISIONS

ARTICLE 2 ADMINISTRATIVE PROVISIONS WHATCOM COUNTY CRITICAL AREAS ORDINANCE 16.16.200 Authority ARTICLE 2 ADMINISTRATIVE PROVISIONS This Chapter is adopted under the authority of Chapters 36.70 and 36.70A, RCW and Article 11 of the Washington

More information

CHAPTER 15: FLOODPLAIN OVERLAY DISTRICT "FP"

CHAPTER 15: FLOODPLAIN OVERLAY DISTRICT FP CHAPTER 15: FLOODPLAIN OVERLAY DISTRICT "FP" SECTION 15.1 STATUTORY AUTHORIZATION The legislature of the State of Minnesota in Minnesota Statutes, Chapter 103F and Chapter 394 has delegated the responsibility

More information

CWPPs, HMPs, NFIP, FIRM: MAKING SENSE OF THE HAZARD PLANNING ALPHABET SOUP

CWPPs, HMPs, NFIP, FIRM: MAKING SENSE OF THE HAZARD PLANNING ALPHABET SOUP CWPPs, HMPs, NFIP, FIRM: MAKING SENSE OF THE HAZARD PLANNING ALPHABET SOUP Presented By: Christopher Duerksen cduerksen@clarionassociates.com 303-830-2890 ROCKY MOUNTAIN LAND USE INSTITUTE MARCH 2015 OVERVIEW

More information

TOWN OF HOPEDALE, MASSACHUSETTS

TOWN OF HOPEDALE, MASSACHUSETTS F, U B ocation: It is in astern assachusetts, bordered by ilford on the northeast, Bellingham on the east, endon on the south and west, and Upton on the northwest. is 2 miles southeast of orcester and

More information

Funding Coastal Protection & Restoration

Funding Coastal Protection & Restoration Funding Coastal Protection & Restoration Chip Kline Office of the Governor- Coastal committed to our coast committed to our coast Funding Stream State Mineral Revenues GOMESA NRDA RESTORE Pot 1 Summary

More information

2019 EXECUTIVE SUMMARY / 1

2019 EXECUTIVE SUMMARY / 1 I VI Introduction he 2019 Business lan outlines how the ity of plans to allocate resources to deliver the programs and services residents and businesses rely on every day It is developed using a service-based

More information

[FWS R6 ES 2013 N018; C2] Endangered and Threatened Wildlife and Plants; Draft Revised Supplement to the

[FWS R6 ES 2013 N018; C2] Endangered and Threatened Wildlife and Plants; Draft Revised Supplement to the This document is scheduled to be published in the Federal Register on 03/22/2013 and available online at http://federalregister.gov/a/2013-06612, and on FDsys.gov Billing Code 4310-55 DEPARTMENT OF THE

More information

WELCOME! Southeast Hicksville Brownfield Opportunity Area (BOA) Public Open House. June 9th, :00pm - 9:00pm

WELCOME! Southeast Hicksville Brownfield Opportunity Area (BOA) Public Open House. June 9th, :00pm - 9:00pm M! outheast icksville Brownfield pportunity rea (B) Public pen ouse June 9th, 2014 7:00pm - 9:00pm illiam P. Bennett ommunity enter 28. arl treet icksville 11801 hank you for coming! e know your time is

More information

NATIONAL WETLAND MITIGATION BANKING STUDY Model Banking Instrument

NATIONAL WETLAND MITIGATION BANKING STUDY Model Banking Instrument NATIONAL WETLAND MITIGATION BANKING STUDY Model Banking Instrument Institute for Water Resources Water Resources Support Center U.S. Army Corps of Engineers Alexandria, Virginia 22315 May 1996 IWR Technical

More information

HUD s Environmental Review Process. Disaster Assistance Training 2012 Jerimiah Sanders, Environmental Specialist

HUD s Environmental Review Process. Disaster Assistance Training 2012 Jerimiah Sanders, Environmental Specialist HUD s Environmental Review Process Disaster Assistance Training 2012 Jerimiah Sanders, Environmental Specialist Goals: Understand NEPA Overview of levels of environmental review Spot red flags New Tools

More information

BRITISH COLUMBIA DAM SAFETY REGULATION 44/2000

BRITISH COLUMBIA DAM SAFETY REGULATION 44/2000 PDF Version [Printer friendly ideal for printing entire document] BRITISH COLUMBIA DAM SAFETY REGULATION 44/2000 Published by Important: Quickscribe offers a convenient and economical updating service

More information

Proposed Report 1 DEPARTMENT OF THE ARMY CHIEF OF ENGINEERS 2600 ARMY PENTAGON WASHINGTON, DC

Proposed Report 1 DEPARTMENT OF THE ARMY CHIEF OF ENGINEERS 2600 ARMY PENTAGON WASHINGTON, DC Proposed Report 1 REPLY TO ATTENTION OF DEPARTMENT OF THE ARMY CHIEF OF ENGINEERS 2600 ARMY PENTAGON WASHINGTON, DC 20310-2600 DAEN THE SECRETARY OF THE ARMY 1. I submit for transmission to Congress my

More information

HOOD CANAL COORDINATING COUNCIL IN LIEU FEE PROGRAM INSTRUMENT

HOOD CANAL COORDINATING COUNCIL IN LIEU FEE PROGRAM INSTRUMENT HOOD CANAL COORDINATING COUNCIL IN LIEU FEE PROGRAM INSTRUMENT Basic Agreement Final Submitted by: Hood Canal Coordinating Council With Technical Assistance from: Environmental Science Associates June,

More information

Modernization, FEMA is Recognizing the connection between damage reduction and

Modernization, FEMA is Recognizing the connection between damage reduction and EXECUTIVE SUMMARY Every year, devastating floods impact the Nation by taking lives and damaging homes, businesses, public infrastructure, and other property. This damage could be reduced significantly

More information

Crediting Adaptation Strategies through the National Flood Insurance Program s Community Rating System Coordinator s Manual

Crediting Adaptation Strategies through the National Flood Insurance Program s Community Rating System Coordinator s Manual Crediting Adaptation Strategies through the National Flood Insurance Program s Community Rating System Coordinator s Manual W. Thomas Hawkins, Adjunct Faculty, University of Florida, Levin College of Law

More information

[Bank Name] Mitigation Bank CA BEI template_pdt FINAL Draft dot

[Bank Name] Mitigation Bank CA BEI template_pdt FINAL Draft dot MITIGATION BANK ENABLING INSTRUMENT Table of Contents RECITALS... 1 AGREEMENT...2 Section I: Purpose and Authorities... 2 A. Purpose...2 B. Authorities... 2 Section II: Definitions... 4 Section III: Stipulations...

More information

CHAPTER 1 INTRODUCTION

CHAPTER 1 INTRODUCTION CHAPTER 1 INTRODUCTION 1.1 PROJECT BACKGROUND This Environmental Impact Report (EIR) examines the potentially significant effects on the environment resulting from the proposed City of Citrus Heights City

More information

SUBJECT: Amite River and Tributaries, Louisiana, East Baton Rouge Parish Watershed

SUBJECT: Amite River and Tributaries, Louisiana, East Baton Rouge Parish Watershed DEPARTMENi OF THE ARMY OFFICE OF 'rhe CHIEF OF ENGINEERS WASHINGTON. D.C. 20314-1000 REPLY TO AT1'~NTIQN OF: (lo-1-7a) THE SECRETARY OF THE ARMY 1. I submit for transmission to Congress my report on East

More information

[FWS R1 ES 2016 N013; FXES FF01E00000] Proposed Weyerhaeuser Company Safe Harbor Agreement for the Northern

[FWS R1 ES 2016 N013; FXES FF01E00000] Proposed Weyerhaeuser Company Safe Harbor Agreement for the Northern This document is scheduled to be published in the Federal Register on 02/22/2016 and available online at http://federalregister.gov/a/2016-03559, and on FDsys.gov Billing Code 4333 15 DEPARTMENT OF THE

More information

DAEN SUBJECT: Lower San Joaquin River Feasibility Study Report, California

DAEN SUBJECT: Lower San Joaquin River Feasibility Study Report, California 1.33 miles of new setback levee along the Delta Front to eliminate the eastern portions of the Fourteenmile Slough levee in North Stockton. 0.59 miles of height improvements between 1.8 and 2.7 feet on

More information

Decision Memo Lake Ocoee Inn and Marina Permit Renewal

Decision Memo Lake Ocoee Inn and Marina Permit Renewal Decision Memo Lake Ocoee Inn and Marina Permit Renewal USDA Forest Service Ocoee/ Hiwassee Ranger District, Cherokee National Forest Polk County, Tennessee Approximately 8.03 acres of USA Tract K-986;

More information

Deduct Pond Trail Link Categorical Exclusion Appeal Issues and Responses Walla Walla Ranger District Umatilla National Forest April 2010

Deduct Pond Trail Link Categorical Exclusion Appeal Issues and Responses Walla Walla Ranger District Umatilla National Forest April 2010 Deduct Pond Trail Link Categorical Exclusion Appeal Issues and Responses Walla Walla Ranger District Umatilla National Forest April 2010 Appellant Appeal Number Hells Canyon Preservation Council (HCPC)

More information

DEPARTMENT OF THE ARMY OFFICE OF THE CHIEF OF ENGINEERS WASHINGTON, D.C

DEPARTMENT OF THE ARMY OFFICE OF THE CHIEF OF ENGINEERS WASHINGTON, D.C .t DEPARTMENT OF THE ARMY OFFICE OF THE CHIEF OF ENGINEERS WASHINGTON, D.C. 20314-1000 REPLY TO A TTENTION OF: CECW-PE (l0-1-7a) 1 3 OCT 199B SUBJECT: Tampa Harbor, Big Bend Channel, Florida THE SECRETARY

More information

Floodplain Development Permit Application

Floodplain Development Permit Application Floodplain Development Permit Application **All construction will also require a building permit** This is an application packet for a Floodplain Development Permit. Certain sections are to be completed

More information

IN THE UNITED STATES DISTRICT COURT FOR THE DISTRICT OF NEW MEXICO

IN THE UNITED STATES DISTRICT COURT FOR THE DISTRICT OF NEW MEXICO FOREST GUARDIANS, a non-profit New Mexico corporation; SOUTHWEST ENVIRONMENTAL CENTER, a nonprofit New Mexico corporation; and SIERRA CLUB, a non-profit California corporation, v. Plaintiffs, FEDERAL EMERGENCY

More information

National Flood Insurance Program (NFIP)

National Flood Insurance Program (NFIP) National Flood Insurance Program (NFIP) Programmatic EIS (PEIS) Informing our Understanding of the NFIP and the Environment ASFPM June 12, 2013 Overview/Outline After this Seminar you should know: Who

More information

City of Monte Sereno

City of Monte Sereno MASTER FEE SCHEDULE Services / Activities / Subject Matter Effective Date Page Planning s July 1, 2018 1-2 Public Works s July 1, 2018 3-4 Building s July 1, 2018 5-6 Administrative Services July 1, 2018

More information

Alexandria City Public Schools Redistricting: Draft Options October 2016

Alexandria City Public Schools Redistricting: Draft Options October 2016 lexandria ity ublic chools edistricting: raft ptions ctober 6 reface he following document contains F ptions for the edistricting eview ommittee to review and analyze. hese options only serve as the starting

More information

SUBJECT: Flagler County, Florida, Hurricane and Storm Damage Reduction Project

SUBJECT: Flagler County, Florida, Hurricane and Storm Damage Reduction Project DEPARTMENT OF THE ARMY CHIEF OF ENGINEERS 2600 ARMY PENTAGON WASHINGTON, DC 20310-2600 REPLY TO ATTENTION OF DAEN B3 DEC 2014 THE SECRETARY OF THE ARMY 1. I submit for transmission to Congress my report

More information

Wetzel County Floodplain Ordinance

Wetzel County Floodplain Ordinance Wetzel County Floodplain Ordinance AUTHORITY AND PURPOSE: THE PROVISIONS OF THIS ORDINANCE HAVE BEEN PREPARED WITH THE INTENTION OF MEETING THE REQUIREMENTS OF SECTION 60.3 (D) OF THE NATIONAL FLOOD INSURANCE

More information

United States Department of the Interior

United States Department of the Interior United States Department of the Interior IN «CPLY utrt* TO NATIONAL PARK SERVICE P.O. BOX 37 127 WASHINGTON, D.C 20013-7127 ENVIRONMENTAL QUALITY DIVISION EIS/RELATED DOCUMENT REVIEW ER-97/0135 ENVIRONMENTAL

More information

Conservation Commission Procedures Standard Flow Chart - NOT

Conservation Commission Procedures Standard Flow Chart - NOT Conservation Commission Procedures Standard Flow Chart - NOT Mark s Rule of Three Rule 1 - Hearings, site visits, acquire information, close the hearing Rule 2 - Paperwork Issue a great Order of Conditions

More information

Interagency Regulatory Guide

Interagency Regulatory Guide Interagency Regulatory Guide Advance Permittee-Responsible Mitigation U.S. Army Corps of Engineers Washington State Department of Ecology Washington State Department of Fish and Wildlife US Army Corps

More information

CEQA ENVIRONMENTAL REVIEW GUIDELINES

CEQA ENVIRONMENTAL REVIEW GUIDELINES CEQA ENVIRONMENTAL REVIEW GUIDELINES Adopted by City Council on September 18, 2007 by Resolution No. 07-113 Revised by City Council on June 3, 2014 by Resolution No. 14-49 CITY OF BENICIA CEQA ENVIRONMENTAL

More information

TURTLE ISLAND RESTORATION NETWORK. Independent Auditor s Report and Financial Statements. Year Ended June 30, 2016

TURTLE ISLAND RESTORATION NETWORK. Independent Auditor s Report and Financial Statements. Year Ended June 30, 2016 TURTLE ISLAND RESTORATION NETWORK Independent Auditor s Report and Financial Statements Year Ended June 30, 2016 FOR THE FISCAL TABLE OF CONTENTS PAGE(S) Independent Auditor's Report... 1-2 FINANCIAL STATEMENTS:

More information

TOWN OF KENT, CT PLANNING AND ZONING COMMISSION

TOWN OF KENT, CT PLANNING AND ZONING COMMISSION TOWN OF KENT, CT PLANNING AND ZONING COMMISSION FLOOD PLAIN MANAGEMENT REGULATIONS Whereas, Congress has determined that a National Flood Insurance Program would alleviate personal hardships and economic

More information

DEPARTMENT OF THE ARMY U.S. ARMY CORPS OF ENGINEERS 441 G STREET NW WASHINGTON, D.C AUG 2339

DEPARTMENT OF THE ARMY U.S. ARMY CORPS OF ENGINEERS 441 G STREET NW WASHINGTON, D.C AUG 2339 DEPARTMENT OF THE ARMY U.S. ARMY CORPS OF ENGINEERS 441 G STREET NW WASHINGTON, D.C. 20314-1000 8 1 AUG 2339 CECW-PC MEMORANDUM FOR COMMANDERS, MAJOR SUBORDINATE COMMANDS SUBJECT: Implementation Guidance

More information

Marin County Flood Control and Water Conservation District FLOOD CONTROL ZONE 5 ADVISORY BOARD MAY 15, 2014 STAFF REPORT

Marin County Flood Control and Water Conservation District FLOOD CONTROL ZONE 5 ADVISORY BOARD MAY 15, 2014 STAFF REPORT FLOOD CONTROL ZONE 5 ADVISORY BOARD MAY 15, 2014 STAFF REPORT Item 1. Approval of Meeting Minutes for February 10, 2014 Recommended Action: Approve minutes. Item 2. Open Time for Items not on the Agenda

More information

Environmental Review and Disaster Recovery

Environmental Review and Disaster Recovery Environmental Review and Disaster Recovery Welcome & Speakers Session Objectives Identify the importance of Environmental Reviews Identify tips for understanding post disaster Environmental Laws Determine

More information

CHAPTER 17 NON-RECREATION OUTGRANT POLICY

CHAPTER 17 NON-RECREATION OUTGRANT POLICY CHAPTER 17 NON-RECREATION OUTGRANT POLICY 17-1. Purpose. The purpose of this guidance is to establish a consistent, nationwide policy that will be applied to evaluate non-recreational real estate outgrant

More information

Oregon Department of State Lands

Oregon Department of State Lands Oregon Department of State Lands Mission: To ensure a legacy for Oregonians and their public schools through sound stewardship of lands, wetlands, waterways, unclaimed property, estates and the Common

More information

DAEN SUBJECT: South San Francisco Bay Shoreline, Santa Clara County, California

DAEN SUBJECT: South San Francisco Bay Shoreline, Santa Clara County, California opportunities would be significant with the restoration of the tidal marsh areas. Recreational features in the recommended plan include two pedestrian bridges, viewing platforms, and benches. The new levees

More information

Offsetting Impacts to Wetlands and Waters in the United States. Palmer Hough U.S. Environmental Protection Agency November 2013

Offsetting Impacts to Wetlands and Waters in the United States. Palmer Hough U.S. Environmental Protection Agency November 2013 Offsetting Impacts to Wetlands and Waters in the United States Palmer Hough U.S. Environmental Protection Agency November 2013 1 Problem: Wetlands Loss Approximately 221 million acres in 1700 (lower 48)

More information

Chapter 5 Floodplain Management

Chapter 5 Floodplain Management Chapter 5 Floodplain Management Contents 1.0 Introduction... 1 2.0 Floodplain Management and Regulation... 1 2.1 City Code... 1 2.2 Floodplain Management... 1 2.3 Level of Flood Protection... 2 2.3.1 Standard

More information

UPDATE ON DALLAS FLOODWAY

UPDATE ON DALLAS FLOODWAY UPDATE ON DALLAS FLOODWAY ENVIRONMENTAL IMPACT STATEMENT [ EIS ] Transportation and Trinity River Project Committee Rob Newman Director, Trinity River Corridor Project, Fort Worth District 28 April 2014

More information

BOCA RATON INLET MANAGEMENT STUDY IMPLEMENTATION PLAN CERTIFICATE OF ADOPTION

BOCA RATON INLET MANAGEMENT STUDY IMPLEMENTATION PLAN CERTIFICATE OF ADOPTION BOCA RATON INLET MANAGEMENT STUDY IMPLEMENTATION PLAN CERTIFICATE OF ADOPTION WHEREAS the Department of Environmental Protection, in partnership with the City of Boca Raton. has sponsored a study of the

More information

Changes in Criteria and Scoring for CRS Outreach Projects

Changes in Criteria and Scoring for CRS Outreach Projects Changes in Criteria and Scoring for CRS Outreach Projects A Handout for the National Flood Insurance Program Community Rating System Many communities want to keep disseminating and obtaining CRS credit

More information

Docket No. CP

Docket No. CP MEMORANDUM OF AGREEMENT AMONG THE FEDERAL ENERGY REGULATORY COMMISSION THE ADVISORY COUNCIL ON HISTORIC PRESERVATION THE OHIO STATE HISTORIC PRESERVATION OFFICE AND ROVER PIPELINE LLC REGARDING THE ROVER

More information

Floodplain Management 101. Mississippi Emergency Management Agency Floodplain Management Bureau

Floodplain Management 101. Mississippi Emergency Management Agency Floodplain Management Bureau Floodplain Management 101 Mississippi Emergency Management Agency Floodplain Management Bureau Stafford Act The Stafford Disaster Relief and Emergency Assistance Act (Stafford Act) (Public Law 100-707)

More information

TURTLE ISLAND RESTORATION NETWORK. Independent Auditor s Report and Financial Statements. Year Ended June 30, 2017

TURTLE ISLAND RESTORATION NETWORK. Independent Auditor s Report and Financial Statements. Year Ended June 30, 2017 TURTLE ISLAND RESTORATION NETWORK Independent Auditor s Report and Financial Statements Year Ended June 30, 2017 FOR THE FISCAL TABLE OF CONTENTS PAGE(S) Independent Auditor's Report... 1-2 FINANCIAL STATEMENTS:

More information

Trust Fund 2009 Work Program

Trust Fund 2009 Work Program Trust Fund 2009 Work Program Date of Report: May 8, 2009 Date of Next Progress Report: Dec. 1, 2009 Date of Work Program Approval: Project Completion Date: June 30, 2011 I. PROJECT TITLE: Minnesota s Habitat

More information

DIVISION OF REVENUE AND TAXATION

DIVISION OF REVENUE AND TAXATION WLH H H SLS VS VU WLH H H L SL SLS Business License pplication equirements License pplication Worker s ompensation pplication -Status (on-us) nnual orporate eport rticles & By-Laws (orporation) artnership

More information

Analysis of Revenue from U.S. Natural Resources BPC STA FF

Analysis of Revenue from U.S. Natural Resources BPC STA FF Analysis of Revenue from U.S. Natural Resources BPC STA FF JULY 2013 ANALYSIS OF REVENUE FROM U.S. NATURAL RESOURCES 2 Presentation Outline I. Executive Summary II. Revenue Mix III. Disbursement Mix Sections

More information