AFRICAN DEVELOPMENT FUND PROJECT : SBEE SUB-TRANSMISSION AND DISTRIBUTION SYSTEM RESTRUCTURING AND EXTENSIONS PROJECT (PRESREDI)

Size: px
Start display at page:

Download "AFRICAN DEVELOPMENT FUND PROJECT : SBEE SUB-TRANSMISSION AND DISTRIBUTION SYSTEM RESTRUCTURING AND EXTENSIONS PROJECT (PRESREDI)"

Transcription

1 AFRICAN DEVELOPMENT FUND Public Disclosure Authorized Public Disclosure Authorized PROJECT : SBEE SUB-TRANSMISSION AND DISTRIBUTION SYSTEM RESTRUCTURING AND EXTENSIONS PROJECT (PRESREDI) COUNTRY : BENIN PROJECT APPRAISAL REPORT RDGW December 2017 Translated Document

2 TABLE OF CONTENTS CURRENCY EQUIVALENTS... i ACRONYMS AND ABBREVIATIONS... ii PROJECT INFORMATION SHEET... iii PROJECT SUMMARY... iv RESULTS-BASED LOGICAL FRAMEWORK... v PROJECT IMPLEMENTATION SCHEDULE... vii I. STRATEGIC THRUST AND RATIONALE Project Linkages to Country Strategy and Objectives Rationale for Bank Involvement Aid Coordination PROJECT DESCRIPTION Project Description and Components Technical Solution Adopted and Alternative Solutions Considered Project Cost and Financing Mechanisms Project Area and Beneficiaries Participatory Approach to Project Identification, Design and Implementation Bank Group Experience and Lessons Reflected in Project Design Key Performance Indicators PROJECT FEASIBILITY Economic and Financial Performance Environmental and Social Impact PROJECT IMPLEMENTATION Implementation Arrangements Monitoring Governance Sustainability Risk Management Knowledge Development LEGAL FRAMEWORK Legal Instrument Conditions Associated with the Bank s Intervention Compliance with Bank Policies RECOMMENDATIONS Annex I: Comparative Socioeconomic Indicators of Benin... I Annex II: Major Related Ongoing Projects in Benin Financed by the Bank and Other Development Partners as at 30/6/ II Annex III: Map of the Project Area... III

3 CURRENCY EQUIVALENTS October 2017 UA 1 = 1.41 USD UA 1 = 1.20 EUR UA 1 = CFA.F FISCAL YEAR 1st January 31st December WEIGHTS AND MEASURES 1 kilometre (km) = 1,000 m 1 km² = m² 1 hectare (ha) = 10,000 m² 1 ton = 1,000 kg 1 kilojoule (kj) = 1,000 joule (J) 1 kilovolt (kv) = 1,000 volt (V) 1 kilovolt-ampere (kva) = 1,000 volt Ampere (VA) 1 kilowatt (kw) = 1,000 Watt 1 megawatt (MW) = W = kw 1 Gigawatt (GW) = W = kw 1 kilowatt-hour (kwh) = 1,000 Watt/hour = 3,600,000 Joules (J) 1 megawatt-hour (MWh) = 1,000,000 Wh = 1,000 kwh 1 gigawatt-hour (GWh) = 1,000,000 kwh = 1,000 MWh 1 ton of oil equivalent (TOE) = 41,868 Joules = 11,630 kwh 1 million ton of oil equivalent (MTOE) = TOE i

4 ACRONYMS AND ABBREVIATIONS AFD DPD ICB AfDB EBID WB WADB LV CAA BD CSP ESIA ADF HV IEC MV MW ESMP TFP ERR IRR UA EU WAEMU USD NPV ENPV SBEE French Development Agency Detailed Preliminary Design International competitive bidding African Development Bank ECOWAS Bank for Investment and Development World Bank West African Development Bank Low Voltage Autonomous Amortization Fund Bidding documents Country Strategy Paper Environmental and Social Impact Assessment African Development Fund High voltage Information, education and communication Medium voltage Megawatt Environmental and Social Management Plan Technical and financial partners Economic rate of return Internal rate of return Unit of Account European Union West African Economic and Monetary Union United States Dollar Net present value Economic Net Present Value Société béninoise d énergie électrique [Electricity Corporation of Benin] ii

5 PROJECT INFORMATION SHEET BORROWER : Republic of Benin EXECUTING AGENCY : Société béninoise d énergie électrique Financing Plan Sources Amounts (in UA million) Instrument ADF 6.44 Loan ADF 5.17 Grant AFD Loan SBEE 2.61 Counterpart funds TOTAL KEY FINANCIAL INFORMATION ON THE ADF LOAN Loan currency Interest Type Interest rate margin Service commission Commitment fee Other Expenses Maturity Grace period Unit of Account Not applicable Not applicable 0.75% per year of the disbursed loan amount not yet reimbursed 0.50% of the loan amount not disbursed 120 days after signature of the Loan Agreement None 40 years 5 years Time frame Main Milestones (expected) Approval of the concept note February 2016 Project appraisal April 2016 Project re-appraisal October 2017 Project approval December 2017 ADF loan effectiveness April 2018 Completion December 2020 Last disbursement March 2021 iii

6 PROJECT SUMMARY Overview of Project: The SBEE Sub-transmission and Distribution System Restructuring and Extension Project (PRESREDI) is a major investment project to expand electricity grids and connect more subscribers. The goal of the project is to: increase the electricity access rate in Benin and more specifically in the cities of Cotonou, Porto-Novo, Abomey, Bohicon and Lokossa and their environs; and improve electricity supply and reduce overall energy losses (evaluated at 23% in 2015) in the sub-transmission and distribution networks of the SBEE. Specifically, the project seeks to consolidate and expand the medium- and low-voltage distribution networks in the abovementioned localities and connect 10,000 new households. The project will be co-financed by the ADF (43%), the French Development Agency (AFD) (47%) and the SBEE (10%). The implementation period is 36 months from 2018 to Project Impact: The direct beneficiaries of the project are the inhabitants of the municipalities of Cotonou, Porto-Novo, Akpro-Misserete and Seme-Kpodji (in Oueme Department); Lokossa (Department of Mono); Dogbo, Djakotomey, Klouekanme and Toviklin (in Couffo Department); and Abomey, Bohicon and Zogbodomey (in Department of Zou). The project will provide a regular electricity supply to the inhabitants of these towns and their environs, including schools, health centres, as well as commercial and industrial companies. Specifically, the project will provide the SBEE with an additional 40,000 new connections, covering at least 212,000 individuals including at least 109,000 women (51%). The project will benefit SBEE employees through a capacity-building programme. Needs Assessment: Limited investment in electricity infrastructure has undermined the quality of SBEE services and slowed down the electrification of the country. Consequently, the electricity access rate in Benin is only 32%, which is well below the African average of 40% in The unavailability and high cost of electricity has severely harmed national economic prosperity and competitiveness. This project is part of a structured programme that will give project area communities access to reliable, quality, clean and affordable electricity. Value-added of the Bank: The Bank has broad knowledge of and long-standing experience in Benin's electricity sector. It has funded multinational grid interconnection projects between Benin and neighbouring countries including: (i) the 330 kv grid interconnection of CEB (Benin/Togo) with Nigeria (completed in 2010); and (ii) the Ghana-Togo-Benin 330 kv grid interconnection project which is underway. At the national level, the Bank has financed several electricity projects, the most recent being the electrification project for 17 rural localities and the second rural electrification project completed in 2007 and 2011 respectively. The current project comes just after approval by the Bank in April 2017 of the Energy Sector Budget Support Programme of Benin (PASEBE) - Phase I which seeks to support the Government of Benin in its efforts to streamline the energy sector. Knowledge Management: The project has a solid capacity-building component aimed at developing the capacity of the employees of Société béninoise d énergie électrique (SBEE). Building the capacity and skills of SBEE employees will enhance asset management and project sustainability. The attainment of project objectives will be monitored through the Bank's supervision reports, quarterly project reports and auditor's reports. iv

7 RESULTS-BASED LOGICAL FRAMEWORK Country and Project Name: SBEE Sub-Transmission and Distribution System Restructuring and Extension Project (PRESREDI) Project Objective: Consolidate the electricity infrastructure of SBEE in order to improve electricity supply to the following towns and their environs: Cotonou (in Littoral Department), Porto-Novo, Akpro- Misserete and Seme-Kpodji (in Ouémé Department); Lokossa (in Mono Department); and Dogbo, Djakotomey, Klouekanme and Toviklin (in Couffo Department); Abomey, Bohicon and Zogbodomey (in Zou Department). Results Chain Impact The living conditions of project area communities are improved through access to quality energy supply. PERFORMANCE INDICATORS Indicator (including ISCs) Electricity access rate in the project area Baseline situation (2015) 52% (2015) Targets (2021) 60 % (2021) Reports: Means of Verification Ministries of Energy, SBEE RISKS / MITIGATIVE MEASURES Risks Availability of national counterpart contribution Weak operational capacity of SBEE to implement the project OUTCOMES Improved network performance Increase in the number of subscribers connected to the network Job creation Overall energy loss rates of the SBEE Number of new subscribers Number of jobs created Number of internship posts created 23% (2015) 18 % (2021) 40,000 new subscribers Risk mitigation measures The SBEE Board of Directors meeting in June 2017 undertook to make funds available for the compensation of persons affected by the project, which amount to 75% of counterpart funds. The remaining 25% covers project operating costs including the salaries of SBEE staff posted to the project. v

8 OUTPUTS Existing 63/15 kv sub-stations strengthened New 63/20 kv sub-station built 63 kv grid built MV networks built LV networks built MV/LV transformer substations built Connection kits procured and installed 63/15 kv sub-station of Akpakpa extended (new 63 kv bay) and strengthened by installing a new 63/15 kv transformer with an output of 20 MW 63/15 kv sub-station of Gbegamey extended (63 kv bay) and strengthened by installing a new 63/15 kv transformer with an output of 40 MW. CEB 63/20 kv sub-station of Lokossa extended (60 kv bay). New 63/20 kv substation in Hagoume built and equipped with a 63/20 kv transformer with an output of 20 MVA 63 kv line (Lokassa - Hagoume) built MV lines built LV lines built Several MV/LV transformer stations built Several connection kits procured and installed km 105 km 279 km ,000 Reports Ministries of energy SBEE Consultant engineer Bank supervisions Status reports Project completion report. Audit reports Recruitment of a consultant engineer to support the SBEE in works control and supervision Ongoing actions for the benefit of the SBEE to boost its income and improve management. The actions conducted by TFPs will enable the SBEE to reform, cut its losses and supply electricity to more subscribers, thus increasing its revenue. With ADF support, the SBEE is already deploying a new technical and financial model which will enhance the planning of investments while ensuring that they are profitable in the short, medium and long terms. KEY ACTIVITIES COMPONENTS A. Reinforcement of the 63/15 kv sub-stations of Akpaka and Gbégamey (Cotonou) B. 63 kv line and sub-station 63/20 kv of Hagoumè C. Reinforcement and extension of the distribution networks D. Project management RESOURCES Resources (UA million) ADF loan and grant UA million Other donors UA million SBEE UA 2.61 million Expenditure (UA million) Component A: UA 2.70 million Component B: UA 7.09 million Component C: UA million. Component D: UA 5.17 million. vi

9 PROJECT IMPLEMENTATION SCHEDULE SBEE SUB-TRANSMISSION AND DISTRIBUTION SYSTEM RESTRUCTURING AND EXTENSION PROJECT N DESIGNATION A ADB_AFD APPRAISAL MISSION APPROVAL AND EFFECTIVENESS OF THE ADF LOAN Board Approval of the ADF Loan B Signature of the ADF Loan Agreement Effectiveness of the ADF Loan Agreement ELECTRICAL INFRASTRUCTURE Supplementary Technical Studies on the 63 kv Structures Recruitment of a Consulting Firm Conduct of Studies Strengthening of the Akpakpa and Gbegamey Sub-stations Recruitment of Contractors Supply of Equipment, Assembly and Strengthening of the Sub-stations Construction of the Hagoume Station and Extension of the Lokossa CEB Station Recruitment of Contractors C Supply of Equipment and Construction of the Station Construction of the 63 kv Lokossa-Hagoume Line Recruitment of Contractors Supply of Equipment and Construction of the Line Extensions of the HVA/LV Networks Recruitment of Contractors Supply of Equipment, construction and Extension of Networks Connections Procurement of 10,000 Connection Kits Réalisation des branchements TRAINING AND CAPACITY BUILDING D Recruitment of Consultants/Training Institutions PROJECT ADMINISTRATION AND MANAGEMENT Works Inspection and Supervision Recruitment of the Consulting Engineer Inspection and Supervision of the HVB Works Component External Audit of the Project's Financial Statements Recruitment of the External Auditor Conduct of the External Audit of the Project Finances Procurement Audit Recruitment of the External Auditor Conduct of Procurement Audits E Procurement of Computer Equipment and Office Furniture Procurement of 2 Supervision Vehicles Environmental and Social Management of the Project Implementation of the Resettlement Action Plan (RAP) Recruitment of a Firm for Implementation of the RAP Updating of the Environmental-Conformity Certificate Establishment of the Institutional Framework Implementation of the RAP Project Implementation Monitoring by the Implementation Unit Project Completion vii

10 REPORT AND RECOMMENDATIONS OF BANK GROUP MANAGEMENT TO THE BOARD OF DIRECTORS REGARDING A PROPOSAL TO AWARD AN ADF LOAN AND AN ADF GRANT TO FINANCE THE SBEE SUB-TRANSMISSION AND DISTRIBUTION SYSTEM RESTRUCTURING AND EXTENSION PROJECT. Management hereby submits this report and recommendations on a proposal to award an ADF loan of UA 6.44 million and an ADF grant of UA 5.17 million to the Republic of Benin to finance the SBEE Sub-transmission and Distribution System Restructuring and Extension Project (PRESREDI). 1 STRATEGIC THRUST AND RATIONALE 1.1 Project Linkages to Country Strategy and Objectives With a national electricity access rate of 32%, Benin has one of the lowest rates relative to the African average of 40% (2015). The access rate is 54% in urban areas and 8% in rural areas. Hence, a significant proportion of the population in Benin, especially in peri-urban and rural areas, has no access to electricity The project is consistent with: (i) the Government Action Programme ( PAG) approved in October 2016 and focused on improving governance and promoting growth support infrastructure; the PAG which includes energy capacity development among national priorities and under which the Government seeks to endow the country with the means needed to provide sufficient and good quality energy services under optimal cost and safety conditions; (ii) Benin's energy sector policy which seeks to endow the country with the means needed to provide sufficient good quality energy services under optimal cost and safety conditions; the goal of this policy is to increase electricity production, transmission and distribution capacity in order to guarantee 70% energy self-sufficiency by 2025; and (iii) the second pillar of the Bank s country strategy paper (CSP) for Benin which relates to the development of infrastructure that boosts competitiveness and regional integration, and which also targets energy. PRESREDI was selected as one of the Bank's priority interventions in Benin under CSP. 1.2 Rationale for Bank Involvement The Bank's intervention is justified by the obsolescence of SBEE distribution infrastructure and the lack of investment which have a negative impact on SBEE energy supply quality, in terms of saturation of transformers and power lines or even significant energy losses in SBEE networks. In 2015, total energy losses (technical and commercial losses) were assessed at 23% 1 of the total energy injected into the sub-transmission and distribution networks of the SBEE. The current operation supplements the budget support program (PASEBE-I) worth UA million that the Bank approved for Benin in April This program specifically focuses electricity sub-sector support measures to provide Benin with immediate temporary additional capacity of 310 MW while structural actions are undertaken to endow the country with a national installed capacity of at least 335 MW by PASEBE-I also led to the clearance of cross-debts between the SBEE and the State which puts the SBEE in a better position to contribute to the funding of PRESREDI activities. 1 According to the SBEE activity report for

11 1.2.2 AfDB intervention is justified by the fact that the project is included on the indicative programme of operations found in the Bank's CSP for Benin under Pillar 2 which focuses on infrastructure development to boost competitiveness and regional integration. The project will therefore contribute to the achievement of CSP Pillar II objectives by reinforcing infrastructure for electricity supply to urban and peri-urban communities in and around Cotonou. Porto-Novo, Abomey, Bohicon and Lokossa, where demand is rising due to rapid population growth and a boom in economic activities The project is consistent with the Bank's Ten-Year Strategy whose operational pillar focuses on developing sustainable infrastructure that can improve energy security. The project will contribute to the achievement of two of the Bank's new strategic objectives defined in the High-5 priorities in 2015, namely: (i) to light up and power Africa; and (ii) to improve quality of life for the people of Africa. The project contributes to the implementation of the Bank's Energy Sector Policy (approved in 2012) which is geared towards supporting regional member countries in their efforts to improve access to modern, reliable and affordable energy supply. The Bank s participation in project funding is therefore consistent with its strategic objectives since the project seeks to improve access to electricity for urban and semi-urban communities. Lastly, AfDB intervention is also justified by the project's consistency with the Bank's New Deal on Energy for Africa (2016), which seeks to achieve universal access to energy by 2025, with access rates of 100% in urban areas and 95% in rural areas, through on-grid and off-grid solutions, including related technological innovations. 1.3 Aid Coordination The main development partners involved in the electricity sub-sector in Benin are: the Bank, the French Development Agency (AFD), the World Bank (WB), the West African Development Bank (WADB), ECOWAS Bank for Investment and Development (EBID), German International Cooperation (GIZ), KfW, the West African Economic and Monetary Union (WAEMU), the European Union (EU), and the Millennium Challenge Account (MCA). The project is part of a more general programme to consolidate the distribution network in Benin which already receives support from donors like the AFD, EU, MCA-Benin and WB. This demonstrates a synergy between donor interventions in the sector. Development partners are also formed into a coordination group which meets at least once a year with the Minister in charge of energy to update and coordinate sector activities. 2 PROJECT DESCRIPTION 2.1 Project Description and Components PRESPREDI is aimed at reinforcing the SBEE's electricity infrastructure in order to improve the quality of electricity supply in Cotonou, Porto-Novo, Abomey, Bohicon, Lokossa and their environs. Specifically, it seeks to reinforce and expand sub-transmission and distribution networks in these towns and their environs and to connect 10,000 more households to the grid The project stems from a preliminary design study (PDS) and a final design study (FDS) conducted by the SBEE. It focuses on the following four components: 2

12 No. A B C Name of Components Reinforcement of the Existing 63/15 kv Substations 63 kv Lokossa-Hagoume Line and 63/20 kv Substation in Lokossa Reinforcement and Extension of Distribution Networks (MV/LV) Table 2.1 Project Components (amounts in UA million) Cost Description of Components Estimate Cotonou D Project Management 4.88 Baseline Cost Contingencies (physical: 3%; price contingencies: 3%) 1.52 Total Project Cost Installation of a 63kV/20MVA transformer in Akpakpa Installation of a 63kV/40MVA transformer in Gbégamey Mono - Couffo Department Construction of the 63 kv Hagoume-Lokossa line Development of the CEB station in Lokossa (construction of a switch bay with an output voltage of 63 km) Installation of a 63kV/20MVA transformer in Hagoume Cotonou, Porto-Novo, Abomey, Bohicon and Lokossa Extension and restructuring of MV/LV lines Extension and restructuring of LV lines Prefabricated MV/LV 400kVA sub-stations Prefabricated MV/LV 630kVA substations MV/LV overhead substations Procurement of connection kits Establishment of connections and installation of metres in rural areas Establishment of connections and installation of metres in urban areas Public lighting (streets, schools and health centres) Works control and supervision Mitigation of environmental and social impacts (ESMP, RAP) Training Audit of project accounts Procurement audit Procurement of two project supervision vehicles Information, communication and awareness-raising Functioning of the project unit 2.2 Technical Solution Adopted and Alternative Solutions Considered Project works will be integrated into an existing scheme to develop the electricity networks of the SBEE. These include: (i) reinforcing two existing 63/15 kv substations by installing new 63/15 kv 20 MVA transformers in Akpakpa and a new 63/15 kv de 40 MVA transformer in Gbegamey that will ensure safety (N-1) of the sub-stations in case of nonavailability of the sole 63/15 kv transformer currently in service; (ii) installing a 63 kv Lokossa - Hagoumè overhead line (30 km) by extending the 63 kv line supplying power to the 63/20 kv CEB substation in Lokossa and building a new 63/20 kv substation, equipped with a 20 MVA transformer at Hagoumè to improve voltage levels in Mono-Couffo Department and cut technical energy losses; (iii) reinforcing and expanding MV/LV distribution networks (mainly overhead types) in the major towns and environs of the project area In light of the above, the only option considered and adopted is the reinforcement and expansion of existing networks by installing new transformers and new lines adapted to existing technical solutions. 3

13 2.3 Project Cost and Financing Mechanisms The total project cost, net of taxes and customs duties, is estimated at UA million, comprising UA million in foreign exchange (67%) and UA 8.76 million in local currency (33%). It was estimated from the unit costs of similar works and supplies obtained from recent competitive bidding launched by SBEE. This cost includes a 3% provision for physical and technical contingencies and a 3% provision for price increase. Project costs by component, financing source and expenditure category are presented in the tables below. The conversion rates used are indicated on page (i). Table 2.3 Estimated Project Cost by Component (in UA thousand) Components Cost in F.E. Cost in Local Currency Total Cost % Foreign Exchange Reinforcement of the 63/15 kv Sub-stations % (Akpaka and Gbégamey) 63 kv line (Hagoumé-Lokossa) and 63/20 kv % Sub-station (Hagoumè) Reinforcement and Extension of the % Distribution Networks (MV/LV) Project Management % Total Project Cost % The project is co-financed by the Bank, the AFD and the SBEE (counterpart funds). The Bank's financing comprises an ADF loan of UA 6.44 million and an ADF grant of UA 5.17 million. The AFD contribution is EUR million, or approximately UA million. The SBEE contribution is UA 2.61 million which represents 10% of the project cost. Table 2.4 Project Financing Sources (in UA million) Financing Sources F.E. Local Currency Total % Total ADF Loan % ADF Grant % AFD % SBEE % Total Project Cost % Project cost by expenditure category is presented as follows: Table 2.5 Programme Cost by Expenditure Category [in UA million] Expenditure Categories Cost in F.E. Cost in Local Currency Total Cost % Foreign Exchange Works % Goods % Services % Functioning % Total Project Cost % 4

14 The provisional project expenditure schedule by component is as follows: Table 2.6 Expenditure Schedule by Component (in UA million) Components Total Reinforcement of 63/15 kv Substations (Akpaka and Gbégamey) kv line (Lokossa - Hagoume) and 63/20 kv Substation (Hagoume) Reinforcement and Extension of the Distribution Networks Project Management Total Project Cost % Total 8% 50% 42% 100% ADF resources will be used mainly to finance infrastructure components such as works on the 63 kv Lokossa - Hagoume line and project management such as payment of the services of the consultant engineer. The distribution of ADF funding by expenditure category is presented in the table below: Table 2.7.1: FAD Funding- Expenditure Categories (UA million) Expenditure Categories Cost in F.E Cost in local currency Total cost % Foreign exchange Works % Goods % Services % Functioning Total % 2.4 Project Area and Beneficiaries Project Location: The project area covers the following towns and their suburbs as well as neighbouring rural communities: the communes of Cotonou, Porto-Novo, Akpro- Misserete and Seme-Kpodji (in Oueme Department); Lokossa (in Mono Department); Dogbo, Djakotomey, Klouekanme and Toviklin (in Couffo Department); Abomey, Bohicon and Zogbodomey (in Zou Department). They all belong to the territorial area known as South- Benin. According to the 4 th General Population and Housing Census (RGPH) of 2013 conducted in Cotonou and Seme-Kpodji, the Littoral Department has a population of 679,012 inhabitants of which 52% are women. The area thrives in a variety of economic activities predominantly in manufacturing industries, fishing, stockbreeding, market gardening and especially trade. In Porto-Novo and its environs (Oueme Department), there are 1,100,404 inhabitants of which 52% are women. Agriculture is the main livelihood in this area. In Couffo and Lokossa, there are 745,328 inhabitants, with 396,754 being women. The population in Couffo Department mainly engages in agriculture, stockbreeding and fishing (73%). They are also involved in trade (13%), food processing and handicrafts. Lastly, in Zou, there are 851,580 inhabitants, of which 444,550 (55%) are women. The main livelihoods in Zou Department are agriculture (47%), and trade (29%). Retail trade essentially focuses on foodstuff Project Beneficiaries: The project will enable the SBEE to satisfy the electricity demand of its current subscribers and benefit from a potential customer base of at least 40,000 new subscribers. The energy supply capacity of the SBEE will also be boosted in the localities concerned. The project will provide electricity access to at least 212,000 people, including at least 109,000 women. The improvement of network quality will also benefit businesses, companies, factories and industries located in these areas. 5

15 2.5 Participatory Approach to Project Identification, Design and Implementation A participatory approach was adopted to ensure that various stakeholders participate in the project. Hence, participatory plenary sessions were held in town halls and in project area neighbourhoods. These meetings edified the municipal authorities and heads of targeted neighbourhoods on the project and its potential impact on the natural and social environment The meetings also helped to raise the following concerns and expectations of local authorities and leaders about the project: information on the exact route of transmission lines; time frame for studies and project implementation; requests to bypass residential areas; compensation for affected persons; and adapted connection costs for low-income households These meetings revealed the level of support from these stakeholders who are committed to promoting the project in their respective communities. With regard to preparation of the ESIA and resettlement plan, public consultations were also held with regional and local authorities, the population and persons affected by the project to: (i) brief them on the content of the project; (ii) hear their views, concerns and expectations on the project; (iii) acquaint them with the negative impacts of the project and hear their views on mitigative or rehabilitative measures. The minutes of these meetings should be submitted by the SBEE The SBEE will maintain this participatory process throughout the project. For example, information and communication campaigns on the project should be organized prior to the commencement of works. Furthermore, other information campaigns on safety measures when using electricity will be conducted by the SBEE in newly-connected localities prior to powering on the electricity networks constructed under the project. Lastly, information and identification campaigns targeting new customers will be organized as part of a promotional connection drive that benefits households At project commencement, the SBEE should operationalize the system for recording and processing complaints and grievances, as well as the complaints management mechanism, offering all stakeholders or interested parties the possibility to make comments, share their concerns, get information and, if necessary, formally file a complaint and claim damages under the redress mechanism Lastly, the African Development Bank duly posted the summaries of the ESIA and RAP on its website on 07/12/ Bank Group Experience and Lessons Reflected in Project Design The Bank has financed the following multinational projects in the electricity subsector in Benin: (i) the multinational Benin/Togo Communauté Electrique du Bénin (CEB) Energy Production, Dispatching and Transmission Project, completed in November 1999 which produced a completion report in November 1999 and a project performance appraisal project in December 2002; (ii) the multinational 330 kv grid interconnection project between CEB (Benin/Togo) and Nigeria, approved in 2002 and completed in 2010; and (iii) the multinational 330 kv Ghana-Togo-Benin interconnection project approved in April 2009 and currently underway. At the national level, the Bank has financed nine operations in the electricity subsector in Benin, the two most recent being: (i) the electrification project for 17 rural areas (approved in 2000), completed in 2005 and which produced a project completion report in September 2006 and a performance appraisal project in May 2011; and (ii) the second rural electrification project (approved in 2003) completed in 2011 and whose completion report was produced in November

16 2.6.2 The overall portfolio performance in Benin is deemed to be satisfactory. The proportion of risky projects plummeted from 47% in 2010 to 10% in 2015, reflecting a significant improvement in the country's implementation capacity. The main lessons learned from these operations relate to: (i) shortening of the time frame for ratification of loan/grant agreements and procurement; (ii) reduction of delays in the provision of counterpart funds; and (iii) recourse to perennial project implementation structures. The lessons learned were factored into this project as follows: (i) to ensure the availability of resources, the opening and provisioning of an account for counterpart funds will be a condition precedent to first disbursement; (ii) it has been proposed that the project execution unit be hosted within the Directorate for Studies and Development of the SBEE which is a permanent structure responsible for implementing various electricity projects funded by the TFPs for the SBEE. 2.7 Key Performance Indicators Project performance will be measured through the results-based logical framework of the project. The output indicators of the project are: (i) the number of 63/15 kv substations reinforced; (ii) the number of 63/20 kv substations built; (iii) length of 63 kv line built; (iv) total size of overhead the MV network built; (v) total size of LV networks built; (vi) number of MV/LV transformer substations built; (vii) number of connection kits procured; and (v) number of audits completed. The output indicators are: (i) reduction of the loss rate in the network; (ii) the number of new subscribers connected; and (iii) the number of jobs created by the project. The project impact indicators are the average electricity access rates in the project area Data on these project performance indicators will be provided in the periodic reports of the consultant engineer responsible for works control and supervision, the quarterly project progress report to be submitted to the Bank, the SBEE activity reports, reports of the Bank's supervision missions, the project completion reports (of the Borrower and the Bank), and audit reports on project accounts. Analysis of the indicators will make it possible to measure their progress and make the necessary adjustments to achieve set targets. 3 PROJECT FEASIBILITY 3.1 Economic and Financial Performance Baseline Scenario Table 3.1 Key Economic and Financial Data of the Project FIRR 17% NPV EUR 8.4 million EIRR 20% ENPV EUR 15.6 million Financial performance: The financial rate of return (FRR) and net present value (NPV) were calculated using the cost-benefit method for project implementation and operation. The financial benefits considered include proceeds from the sale of electricity to new subscribers which the SBEE can connect to the distribution network of the project. The related costs primarily concern the operation and maintenance of infrastructure. The analysis covers a period of 30 years. The positive NPV of EUR 8.4 million and the FIRR of 17%, which is higher than the 10% opportunity cost, shows that the project is financially sustainable Economic Performance: The economic costs used to calculate the economic internal rate of return (EIRR) and economic net present value (VANE) are project costs, net of taxes. Maintenance costs and other operating expenses are subject to the same process. Apart from proceeds from the sale of electricity to newly-connected subscribers, the economic benefits of the project include the value that will be generated by the jobs created during project execution. The economic costs are net of taxes. The result of the analysis indicates a positive EIRR higher 7

17 than the 10% opportunity cost. It also indicates that the project can effectively use the allocated resources Sensitivity Analysis: Analysis of the sensitivity test results shows that the project can withstand (i) a 10% increase in project costs; (ii) a 10% increase in operating costs; and (iii) a 10% decrease in electricity rates. The FIRR amounts to 15%, 16% and 14%, respectively. 3.2 Environmental and Social Impact Environment: The Project to Restructure and Expand the Sub-transmission and Distribution System of Société Béninoise d Energie Electrique (SBEE) was classified in category 1 in accordance with the Bank s environmental and social assessment procedures. The Environmental and Social Impact Assessment (ESIA) prepared in January 2017 was approved by the Benin Environment Agency (ABE) and an environmental and social compliance certificate was issued in March Beyond March 2018, this certificate should be renewed because it has a validity of one year if project implementation has not started. Although the demarcation of the route for the transmission line is optimal from the environmental and social standpoints relative to the analysed alternatives, the adopted alternative will generate the following major positive and negative impacts during construction and operation: Positive Impacts: The following positive impacts were identified through the ESIA: (i) improved electricity supply (enhanced voltage level) for the population; (ii) improved electricity distribution by the SBEE; (iii) increase in the number of SBEE subscribers; (iv) creation of permanent jobs by SBEE (recruitment of new staff); (v) development of several income-generating activities and creation of permanent jobs thanks to the presence electrification; (vi) improved academic performance; (vii) reduction of rural exodus; (viii) enhancement of real estate value; and (ix) diversification leisure spots for the youth. Negative Impact: The potential negative impact of project implementation on the environment is as follows: (i) impact on flora with the destruction of 900,000 m 2 of vegetation cover or approximately 90 hectares cleared for construction works on the 63/20 kv-20 MVA line; some trees could also be felled during network expansion works in various beneficiary localities; (ii) temporary specific impacts on wildlife due to disruption of wildlife habitat along the route of the 63/20 kv-20 MVA line. The negative social and economic impact of the works are as follows: (i) the project will affect people; its impact on property - mainly agricultural lands with perennial and non-perennial crops, a limestone quarry, a gravel pit and numerous trees; (ii) impact on people s perceptions regarding landscape (encumbrance of the project site by construction machinery, stocks of electricity poles, provisional storage and transportation of excavated material, gas and dust emissions - limited in time and space, noise and vibrations resulting from the operation of machinery, odours, wastewater and garbage from workers camps) etc.; (iii) impact on human health due to increased risk of sexually transmitted infections (STIs) and AIDS with the arrival of workers, the possible presence of workers camps and intermingling of the population; as well as stagnant water on worksites that can promote the development of disease vectors; and (iv) impact on human safety related to risks of accident, traffic disruption on roads during power grid extension works, the presence and movement of construction equipment, non-compliance with the mandatory wearing of personal protective gear (PPG) by workers. 8

18 Mitigative Measures: Provision is made for mitigative measures to address all the negative impacts and identified risks. Mitigation of the negative effects identified during the implementation phase will mainly depend on the organization of work, as recommended in the terms of reference for companies. Such organization is based on binding clauses for companies and the Consultant Engineer, the obligation to have a Health, Safety and Environmental Plan that includes emergency provisions, as well as an environmental protection plan for sensitive environments. The total cost of the ESMP (excluding RAP) is estimated at CFA.F 565,832, Monitoring of ESMP implementation: The Project Management Unit within the SBEE shall have an environmentalist responsible for monitoring ESMP implementation. He shall be assisted in project implementation by a young intern who is a graduate in environmental studies, supported by the environmentalist of the Consultant Engineer and work closely with the Socioeconomist in charge of RAP implementation. Environmental and social compliance in ESMP implementation will be monitored and controlled by the Benin Environment Agency (ABE) competent in this area. This will be the subject of a memorandum of understanding between the EBA and the PMU/SBEE. This protocol will define the actions to be taken as well as the logistical and financial arrangements made Climate change: In terms of climate change, the project was classified in Category 2 (average risk) in accordance with the Bank's climate safeguards system. Its main major climatic challenges are: drought, late and heavy rains, floods and coastal erosion especially in localities that fall more or less within agro-ecological zone 8, the fisheries area. The analysis of wind data in this area indicates average speeds of 4 to 6 m/s or at most 21 km/h. With regard to climate risk adaptation measures, special attention will be paid to: (i) the selection of sites for padmounted transformers to avoid flood-prone and submersible areas; (ii) sizing of platforms for pad-mounted platforms to keep them above water; (iii) sizing of pylons, taking into account the reference speeds of the prevailing winds. The cost of the measurements is included in the works costs. The specifications are provided in the PBQ and will be reflected in the BDs Gender: In the project area, women are responsible for domestic chores (fetching water, collecting firewood, processing and cooking food) and participate in agricultural production (planting, weeding and harvesting) in semi-urban and rural areas. They are generally responsible for post-harvest storage and sale of agricultural products. Access to modern energy for women remains a concern in the community because such access would put an end to the use of fuelwood and hurricane lamps that often cause domestic incidents. The lack of lighting compromises children's education. The project would alleviate the hardship of women's chores through the use of electric grain mills and hulling machines. It would also facilitate the promotion of growth-oriented income-generating activities. To help improve the living conditions of the people, particularly women and children during the electrification of selected localities, the project provides for the following operational social provisions governing households: (i) all households in the project area are eligible for customer subscription; accordingly, the project will cover the area to the extent possible such that the greatest number of potential subscribers do not have to pay for the installation of additional poles; (ii) the project provides for the procurement of 10,000 connection kits for UA 1.62 million from the ADF grant; these kits will be offered at a promotional price in urban areas and at a flat discounted price in rural areas until the expected number of subscribers is reached; (iii) SBEE will establish a schedule of 12 months with a down payment of 10% for new subscribers who cannot pay the full subscription fee; (iv) the project will pay the connection costs for schools, health centres, community water pumping stations and multipurpose public halls in close collaboration with the relevant ministries and management committees of such structures; 9

19 (v) the project provides for an information, awareness-raising and marketing campaign to encourage customers to adopt the prepaid format Jobs: The project will create at least a hundred temporary direct jobs during the construction phase and about 30 direct and indirect permanent jobs. Moreover, to promote the employability of young job-seeking graduates, the project will recruit 15 young graduate interns, with at least 50% being girls. The recruitment will be done in two batches of seven and eight interns for a period of 6 months, renewable once. These interns will be posted to the PMU/SBEE and to the engineering consultant Forced Resettlement: The project will affect 365 property owners, representing 1825 people in total. Accordingly, a resettlement action plan (RAP) was prepared and submitted to the Bank. The summary of the Resettlement Action Plan (RAP) submitted in January 2017 was posted on the Bank's website on 12/07/2017. The overall cost of implementing the RAP is CFA.F 1,734,542,250. The RAP will be updated prior to implementation and will be financed by the SBEE. 4 PROJECT IMPLEMENTATION 4.1 Implementation Arrangements Project Implementation: The SBEE will be the project executing agency to which the ADF resources will be transferred by the Government. The project will be executed by a Project Management Unit (PMU) established within the SBEE Directorate for Studies (DED). Accordingly, SBEE has provided PRESREDI with: (i) an engineer, project manager; (ii) 5 (five) engineers, comprising 1 (one) design engineer, 2 (two) sub-station engineers, and 2 (two) network distribution (MV/LV) engineers; (iii) one technician for the 63 kv facilities (substations and lines); (iv) one procurement expert; (v) one accountant; and (vi) an environmentalist and a socio-economist. The accountant will be posted to the cash-flow and disbursements service to prepare the financial and accounting statements of the project. The socio-economist will support DED to oversee ESMP and RAP implementation. The SBEE has already appointed the staff of the PMU. The curricula vitae of project experts will be submitted to the Bank for approval. PMU staff members will sign performance contracts with SBEE management that will be subject to prior annual review A ministerial order will be issued setting up the project steering committee that will be chaired by the representative of the Minister of Energy and comprise representatives of the ministries in charge of development and finance, the Autonomous Amortization Fund (CAA) and the SBEE. The steering committee shall meet at least once every six months to: (i) review the project implementation plan, periodic progress and financial reports, programmes of activity, the budget and the procurement plan; (ii) ensure implementation of the recommendations of the Steering Committee, supervision and monitoring missions and the various audits; (iii) assess the performance of the Project Coordinator relative to his mission statement; (iv) make recommendations to the Project Coordinator; (v) approve project financial statements; (vi) review any submitted files; and (vii) ensure the lifting of any inter-ministerial bottlenecks facing the project Procurement Arrangements: Goods (including services other than consultancy services) funded by the Bank under the project shall be procured in accordance with the Procurement Framework for Bank Group-funded Operations, October 2015 edition and in accordance with the provisions set out in the loan and grant agreements. Specifically, procurement shall be done according to: 10

20 The Procurement System of the Borrower: The procurement methods and procedures (PMP) of Benin comprising its applicable laws and decrees (Law No of 07/08/2009 to define the public procurement code, as amended by Law No of 19 October 2017 and its various implementing instruments), using standard national competitive bidding documents (SNCBDs) or other bidding documents approved during project negotiations for the procurement of basic, simple, low-cost goods provided for under the project and generally available in Benin. The Bank s Procurement Methods and Procedures (BPM): The Bank's standard procurement methods and procedures, based on the relevant standard bidding documents (SBDs) for works, major and complex goods, and the most suitable consultancy services Assessment of procurement risks and capacity (APRC): An assessment of project risks at the national, sector and project levels and of the procurement capacity of the executing agency (EA) was conducted and the results served as the basis for choosing the procurement system (Borrower s or Bank s) used for given activities or set of similar activities under the project. The appropriate risk mitigation measures have been included in the PERCA action plan indicated in Paragraph. B.5.9. of Annex B The established PMU is finalizing the bidding documents relating to: (i) procurement of MV/LV network consolidation and extension works; and (ii) monitoring and control Financial Arrangements: The financial and accounting management of SBEE is based on the OHADA accounting system of OHADA, which is modelled on SYSCOA. Annual financial statements are produced by the Directorate-General and submitted for verification to two auditors and subsequently to the Board of Directors for approval. The laws in Benin do not provide for a general meeting of shareholders, which normally adopts the budget, approves the accounts, takes strategic decisions and formulates policy. Since such a structure is non-existent among the statutory bodies of companies, these powers are conferred on the Board of Directors With regard to management tools, the SBEE has a procedures manual whose application is concurrently controlled by the internal audit and the management control and procedures services. It also has a financial management and accounting software (GD'OR ) which does not handle analytical project management as recommended by the Bank. Indeed, the software can only generate financial statements and SYSCOA general accounting statements, with the operations of each project managed through a dedicated log that is integrated into SBEE statements. However, non-accounting monitoring makes it possible to establish the status of project revenue and expenditure but does not guarantee the reliability offered by accounting software. Moreover, auditors do not issue a special opinion on project implementation. Adequate configuration of the accounting software is essential for complete and reliable project management support The financial management demands of the project require the SBEE to produce quarterly monitoring reports no later than 45 days after the end of each calendar quarter, and to produce annual financial statements no later than three months after the end of the fiscal year so that an external audit can be conducted. 11

21 4.1.9 Staff of the Studies and Development Department (DED), the Accounts and Finance Department (DFC) and the control bodies is barely sufficient in quality and number to adequately execute the management tasks of the SBEE and projects. Hence, the project has to consolidate its own management by recruiting an accountant who will be posted to the cashflow and disbursements service to prepare its financial and accounting statements Disbursement Arrangements: ADF loan and grant resources will be disbursed in accordance with Bank rules and procedures in two ways, namely: direct payment and reimbursement. The direct payment method will be used for payment of works, goods and services contracts signed with enterprises, suppliers and service providers; and (ii) the reimbursement method will be used to defray expenditure eligible for loan and grant resources and effected by the Borrower on own resources, after prior formal approval from the Bank External Audit Arrangements: In the reports of the last two years, auditors expressed reservations on capital asset inventories and receivables, which is symptomatic of poor monitoring of these key items which are crucial to the SBEE. According to the DCF, recovery measures are being implemented for the accounts concerned. For the external audit of the project, and independent external auditor will be recruited on a competitive basis, on terms of reference approved by the Bank. The audit reports must reach the Bank no later than six months following the end of the fiscal year. The audit contract may not exceed three years according to Bank directives, and may continue in the second and last years only if the Bank approves the audit report of the first year. 4.2 Monitoring During its execution and based on the baseline situation established by the SBEE, regular monitoring will be conducted on all project activities: (i) (ii) (iii) The PMU will regularly monitor the execution of all project activities (contract award; contract management; procurement; coordination between the consultant engineer in charge of works control and supervision and the companies; coordination with all competent public structures and services, the population and other stakeholders; approval of works progress reports; acceptance and commissioning of completed works, etc.) and, where appropriate, make recommendations to the Steering Committee on successful and timely implementation of the project. The PMU shall submit project progress reports to the Bank on a quarterly basis. These reports will detail the physical progress status of the project, its financial performance including approved commitments and disbursements per component and financing source, the main identified problems or constraints that could affect timely performance and recommended solutions. The reports of the Bank's supervision missions, the consultant engineer tasked with works control and supervision and the different audits will be used to ensure proper project implementation; identify the constraints or bottlenecks; and carry out appropriate actions that facilitate timely project implementation and the achievement of project objectives. The Bank will monitor the project through the activities summarized in the table below. These activities will be conducted following the project implementation schedule presented in page (vi). At least two project supervision missions will be conducted annually by the Bank. 12

22 (iv) At completion, the PMU will prepare and submit a completion report to the Bank. The Bank will also prepare its own completion report. A project appraisal report will also be prepared later by the Bank to measure project impact. The main project implementation stages are presented below: Period Stages Monitoring Activities/Feedback Loop - Approval and general procurement notice of the project - Notification to the Government Approval and - Signing of ADF loan and grant agreements December Grant effectiveness effectiveness of the ADF April Loan effectiveness grant/loan - Lifting of conditions precedent to effectiveness and first disbursement of the ADF grant and loan - Launching of project January December 2018 January May 2019 January November 2020 January December 2020 January December 2020 January July 2018 December March Governance Recruitment of the consultant engineer for works monitoring and control Construction of works companies Works control and supervision Construction of electricity infrastructure Implementation of the ESMP and RAP Recruitment of the external auditor Project completion - Publication of the call for expressions of interest - Approval of shortlist and consultancy documents - Approval of the proposals evaluation report - Signature of contract - Conduct of bidding documents - Publication of invitations to tender - Approval of bid evaluation reports - Signing of contracts - Works control and supervision - Provision of electrical equipment and supplies - Construction works - Installation of electricity networks and substations - Establishment of new connections - ESMP Implementation: - Updating of the RAP - Compensation - ESMP Implementation - Publication of the call for expressions of interest - Approval of the shortlist and consultancy documents - Approval of the proposals evaluation report - Signature of contract - Services provision - Borrower s project completion report - The Bank s project completion report In the audit reports of the last two years, auditors expressed reservations on capital asset inventories and receivables, which is symptomatic of poor monitoring of these key items which are crucial to the SBEE. Recovery measures for the accounts involved have been implemented by the DCF. Hence, although there may well be a risk in the economic governance of the project, such risk will be mitigated by the fact that project accounts will be audited and certified by an independent external auditor, hired on terms of reference previously approved by the Bank. The audit reports will be approved by the Bank. The risk is also mitigated by the current project, funded by MCA-Benin and aimed at improving the management performance of the SBEE. Indeed, MCA-Benin is funding the recruitment of a consultant tasked with proposing the most appropriate management scheme for enhancing SBEE performance. The solutions considered include a delegated management contract. 13

23 4.4 Sustainability The project s sustainability is predicated on electricity supply that is regular and sufficient to meet the needs of existing customers and the new subscribers who will be connected to the grid through the project The electricity supply situation in Benin should improve significantly over the next few years thanks to several ongoing operations. These include: (i) the Ghana-Togo-Benin interconnection line financed by the Bank and which will provide the possibility of importing energy from Ghana; (ii) the electricity distribution network reinforcement project in Benin cofinanced by the AFD, EU and EIB; (iii) expansion of the production capacity of the Maria Gleta power plant to 120 MW plant co-financed by the IsDB, WADB, EBID and the Government; (iv) the investment programme of MCA-Benin in the energy sector worth USD 136 million to reinforce the distribution network of the SBEE and increase electricity production in Benin by three solar power plants with a total production capacity of 45 MW; (iv) construction of a 20 MW solar plant (DEFISOL project) financed by the AFD; and (v) the rehabilitation of 15 dieselpowered generators in SBEE plants financed by the Government Project sustainability is based essentially on the SBEE's capacity to repair and maintain the equipment and facilities that will be constructed under the project. SBEE staff has longstanding experience in operating sub-transmission and distribution networks. Furthermore, SBEE engineers and technicians will benefit from the training and capacity-building component of the project, such that the company will be able to ensure sustainable management of the infrastructure financed under PRESREDI. 4.5 Risk Management The potential risks of the project primarily reside in the weak financial capacity of the SBEE to: (i) ensure maintenance of project facilities; and (ii) raise counterpart funding for the project Mitigative Measures: These risks will be mitigated, firstly, through the sectoral budget support actions of the Bank and current initiatives to boost the revenue and improve management of the SBEE. The actions initiated by TFPs and the Government will enable the SBEE to reform, cut its losses and supply electricity to more subscribers, thus increasing its revenue. With ADF support, the SBEE is currently deploying a new technical and financial model that will enhance investment planning while ensuring that such investment is profitable in the short, medium and long terms. Secondly, to enable the company to finance the compensations, the SBEE Board has already approved the allocation of CFAF 1.2 billion under the 2018 budget. The balance of CFAF 300 million will be entered into the 2019 budget. 4.6 Knowledge Development The project provides for capacity-building through training of the SBEE staff responsible for the operation and maintenance of electricity distribution networks Knowledge from the current operation will be disseminated through quarterly and annual project progress reports, financial audit reports and contract audit reports which constitute the information sources for this project. The same applies to reports of the Bank's supervision missions and the Government's monitoring missions. It will be possible to learn and share lessons on project implementation from all the aforementioned reports and the project completion reports. The Bank s project completion report and project performance appraisal report will make it possible to share project implementation knowledge with Bank staff and the public. The lessons learned will enhance the design of similar future projects funded by the Bank in its regional member countries. 14

24 5 LEGAL FRAMEWORK 5.1 Legal Instrument To finance this project, the Bank will award an ADF loan of UA 6.44 million and an ADF grant of UA 5.17 million to the Republic of Benin, for onlending to the SBEE as sole beneficiary. 5.2 Conditions Associated with the Bank s Intervention A) Conditions Precedent to EffectivenessIn addition to its signature by the Bank and the Borrower, the ADF loan agreement shall become effective subject to the Borrower s fulfilment of the conditions provided for in Section of the General Conditions for Loan Agreements and Guarantee Agreements of the African Development Fund Entry into force of the ADF grant memorandum of understanding shall be subject to its signature by the Donee and the Fund. B) Conditions Precedent to First Disbursement of ADF Resources: Apart from entry into force of the loan/grant memorandum of understanding, first disbursement of grant resources shall be subject to fulfilment by the Borrower of the following specific conditions to the satisfaction of the Fund: (i) (ii) (iii) provide the Fund with evidence of the establishment the (a) Project Management Unit, including the appointment of its members and (b) the Steering Committee; provide the Fund with evidence of project-financing closure by the Agence française du développement (AFD - the French Development-finance Agency); and provide the Fund with evidence of the signature of an agreement to on-lend the loan resources to SBEE; the terms and conditions of the agreement should be acceptable to the Fund. C) Conditions Precedent to Disbursement of the Loan Resources relating to Works that Require Expropriation In addition to the entry into force of the present Agreement, and satisfaction of the condition precedent to disbursement of the first tranche of the loan resources and disbursement of the loan resources relating to works requiring expropriation, shall be subject to fulfilment by the Borrower of the following condition: (i) as the works progress and before commencement of works in the area concerned, tender evidence: (a) either of procurement of the lands required for the construction; (b) or of compensation and/or resettlement of project-affected persons in the said area, in keeping with the Environmental and Social Management Plan (ESMP), the Comprehensive Resettlement Plan (CRP) for the populations concerned, and the Bank s relevant rules and procedures, particularly its Involuntary Resettlement Policy and its Integrated Safeguards Systems. It is specified that when such compensation or resettlement is not possible, owing to the impossibility of identifying the beneficiaries or in the event of contestation, dispute or any other duly justified hindrance acceptable to 15

25 D) Other Conditions the Fund (hereinafter referred to as «contentious cases»), the condition precedent could be considered as having been fulfilled if the Borrower tenders evidence that the resources allocated to the compensation and/or resettlement of contentious cases, as defined in the CRP, have been deposited either in a dedicated account opened at the Treasury and earmarked for compensation and/or resettlement, or in another bank account acceptable to the two parties and specially earmarked for the said compensation and/or resettlement, or deposited with a reliable third party acceptable to the two sides Furthermore, the Borrower shall fulfil the following conditions to the satisfaction of the Fund: (i) tender to the Fund, evidence of the opening of an account, in the name of the project, in a bank deemed acceptable by the Fund, for receiving the counterparty contributions; E) Commitments The Borrower undertakes to: (i) (ii) (iii) implement the project, the ESMP and the RAP and have them executed by its contractors in accordance with (a) the rules and procedures of the Fund, (b) domestic legislation and (c) the recommendations, stipulations and procedures contained in the ESMP and the RAP; refrain from commencing works on a given area until such time when the affected persons in that area have been fully compensated; and submit to the Fund half-yearly reports on the ESMP and RAP implementation, including, where applicable, indication of any shortcomings and corrective measures initiated or to be initiated. 5.3 Compliance with Bank Policies The SBEE Sub-transmission and Distribution System Restructuring and Extension Project is consistent with all applicable Bank policies. 6 RECOMMENDATIONS Management recommends that the Board of Directors approve the proposal to award an ADF loan of UA 6.44 million and an ADF grant of UA 5.17 million to the Republic of Benin to finance the SBEE Sub-Transmission and Distribution System Restructuring and Extension Project (PRESREDI), in accordance with the terms and conditions set forth in this report. 16

26 % Annex I: Comparative Socioeconomic Indicators of Benin Benin Selected Macroeconomic Indicators Indicators Unit (e) National Accounts GNI at Current Prices Million US $ GNI per Capita US$ GDP at Current Prices Million US $ GDP at 2000 Constant prices Million US $ Real GDP Growth Rate % 4,9 3,3 5,4 5,6 6,5 5,2 4,0 Real per Capita GDP Growth Rate % 1,7 0,4 2,6 2,9 3,8 2,5 1,3 Gross Domestic Investment % GDP 18,7 23,9 21,7 28,2 24,6 22,1 25,3 Public Investment % GDP 6,4 6,4 5,7 6,1 5,4 7,6 7,6 Private Investment % GDP 12,2 17,5 15,9 22,0 19,1 14,5 17,7 Gross National Savings % GDP 13,6 16,8 15,2 20,5 16,3 16,7 16,3 Prices and Money Inflation (CPI) % 4,2 2,7 6,7 1,0-1,1 0,4 0,2 Exchange Rate (Annual Average) local currency/us$ 712,0 471,9 510,5 494,0 494,4 591,4 588,3 Monetary Growth (M2) % 66,5 9,0 10,8 14,9 17,3 7,7 7,1 Money and Quasi Money as % of GDP % 37,7 56,8 56,5 59,3 66,2 67,4 61,5 Government Finance Total Revenue and Grants % GDP 17,5 18,8 19,0 18,2 19,4 18,5 18,5 Total Expenditure and Net Lending % GDP 19,2 20,5 19,9 21,3 19,5 25,0 24,5 Overall Deficit (-) / Surplus (+) % GDP -1,7-1,5-1,8-1,8-0,9-6,5-6,2 External Sector Exports Volume Growth (Goods) % 43,2-6,4 19,6 102,1 32,4 5,1 14,8 Imports Volume Growth (Goods) % -6,9 7,3 6,6 34,9 22,7 0,7 9,7 Terms of Trade Growth % -28,1 7,4-30,9-14,3-4,4-2,6-3,2 Current Account Balance Million US $ Current Account Balance % GDP -4,4-6,6-7,3-7,4-9,3-6,5-7,1 External Reserves months of imports 8,6 5,2 4,2 3,2 2,9 0,3 0,2 Debt and Financial Flows Debt Service % exports 16,3 4,4 6,5 5,6 5,3 5,5 6,3 External Debt % GDP 55,9 15,8 15,9 17,4 18,8 20,1 19,1 Net Total Financial Flows Million US $ Net Official Development Assistance Million US $ Net Foreign Direct Investment Million US $ ,0 6,0 5,0 4,0 3,0 2,0 1,0 0, Real GDP Growth Rate, Inflation (CPI), ,0-1,0-2,0-3,0-4,0-5,0-6,0-7,0-8,0-9,0-10, Current Account Balance as % of GDP, Source : AfDB Statistics Department; IMF: World Economic Outlook, April 2017 and International Financial Statistics, April 2017; AfDB Statistics Department: Development Data Portal Database, March United Nations: OECD, Reporting System Division. Notes: Data Not Available ( e ) Estimations ( p ) Projections Last Update: June 2017 I

27 Annex II: Major Related Ongoing Projects in Benin Financed by the Bank and Other Development Partners as at 30/6/2017 N o. 1 2 Project Title Donors and Funding Status Reinforcement of the Electricity Distribution Network in Benin; Extension and modernization Dispatching EUR 20 million with financing from the AFD/EIB/EU CFA.F 5,906,766,957 FCFA on IDA financing Approval in December 2015 Physical progress status 50% Financial progress status 36% 3 European Commission (EC): CFA.F 5,050,861,000 Physical progress status > 80% ENERGY FACILITY PROGRAMME: Rural Electrification Project through Connection to the SBEE Grid DGIS, ENDEV/GTZ: CFA.F 1,443,103,000 AFD: CFA.F 5,116,456,000 SBEE: CFA.F 1,574,294,000 Financial progress status > 93% 4 Access to Modern Energy Development Project (DAEM) IDA: USD million or CFA.F billion SBEE: USD 1.5 million or CFA.F 750 million Physical progress status > 25% Financial progress status > 15% 5 Rehabilitation of the Lome-Cotonou- Onigbolo Line CFA.F 5,994,006,143 on EIB financing Physical progress status 18% Financial progress status 20% 6 Construction of the 161 kv Onigbolo/Parakou and Sakete/Porto- Novo Lines CFA.F billion funded by AID CFA.F billion F CFA financed by the EIB CFA.F 1.94 billion with CEB own funds German Cooperation grant to KfW amounting to CFA.F 9.35 billion CFA.F billion with CEB own funds Physical progress status 18% Financial progress status 25% II

28 Annex III: Map of the Project Area III

AFRICAN DEVELOPMENT BANK GROUP

AFRICAN DEVELOPMENT BANK GROUP AFRICAN DEVELOPMENT BANK GROUP Public Disclosure Authorized Public Disclosure Authorized SOUTH SUDAN JUBA POWER DISTRIBUTION SYSTEM REHABILITATION AND EXPANSION PROJECT RDGE/PEVP/PGCL DEPARTMENTS March

More information

AFRICAN DEVELOPMENT FUND NIGERIA-NIGER-BENIN-BURKINA FASO POWER INTERCONNECTION PROJECT

AFRICAN DEVELOPMENT FUND NIGERIA-NIGER-BENIN-BURKINA FASO POWER INTERCONNECTION PROJECT AFRICAN DEVELOPMENT FUND Public Disclosure Authorized Public Disclosure Authorized NIGERIA-NIGER-BENIN-BURKINA FASO POWER INTERCONNECTION PROJECT COUNTRY: APPRAISAL REPORT MULTINATIONAL RDGW November 217

More information

AFRICAN DEVELOPMENT FUND MULTINATIONAL 225 KV GUINEA-MALI ELECTRICITY INTERCONNECTION PROJECT

AFRICAN DEVELOPMENT FUND MULTINATIONAL 225 KV GUINEA-MALI ELECTRICITY INTERCONNECTION PROJECT AFRICAN DEVELOPMENT FUND Public Disclosure Authorized Public Disclosure Authorized MULTINATIONAL 225 KV GUINEA-MALI ELECTRICITY INTERCONNECTION PROJECT RDGW DEPARTMENT November 2017 Translated Document

More information

PROJECT PREPARATORY TECHNICAL ASSISTANCE

PROJECT PREPARATORY TECHNICAL ASSISTANCE Appendix 4 11 A. Justification PROJECT PREPARATORY TECHNICAL ASSISTANCE 1. The government has identified the priority areas to be covered under the ensuing loan project and prepared outline technical studies

More information

AFRICAN DEVELOPMENT FUND

AFRICAN DEVELOPMENT FUND Public Disclosure Authorized Public Disclosure Authorized AFRICAN DEVELOPMENT FUND DJIBOUTI PROPOSAL TO GRANT A UA 10.74 MILLION ADF SUPPLEMENTARY LOAN TO FINANCE THE GEOTHERMAL EXPLORATION PROJECT IN

More information

AFRICAN DEVELOPMENT FUND

AFRICAN DEVELOPMENT FUND AFRICAN DEVELOPMEN FUND Public Disclosure Authorized Public Disclosure Authorized PROJEC: INERCONNECION OF HE ELECRIC GRIDS OF NILE EQUAORIAL LAKES COUNRIES: DRC COMPONEN COUNRY: MULINAIONAL MEMORANDUM

More information

AFRICAN DEVELOPMENT BANK GROUP MULTINATIONAL CAMEROON AND CHAD POWER INTERCONNECTION PROJECT

AFRICAN DEVELOPMENT BANK GROUP MULTINATIONAL CAMEROON AND CHAD POWER INTERCONNECTION PROJECT Public Disclosure Authorized Public Disclosure Authorized AFRICAN DEVELOPMENT BANK GROUP MULTINATIONAL CAMEROON AND CHAD POWER INTERCONNECTION PROJECT RDGC DEPARTMENT November 2017 Translated Document

More information

AFRICAN DEVELOPMENT FUND ETHIOPIA ADDIS ABABA TRANSMISSION AND DISTRIBUTION SYSTEM REHABILITATION AND UPGRADING PROJECT (AATDRUP)

AFRICAN DEVELOPMENT FUND ETHIOPIA ADDIS ABABA TRANSMISSION AND DISTRIBUTION SYSTEM REHABILITATION AND UPGRADING PROJECT (AATDRUP) AFRICAN DEVELOPMENT FUND Public Disclosure Authorized Public Disclosure Authorized ETHIOPIA ADDIS ABABA TRANSMISSION AND DISTRIBUTION SYSTEM REHABILITATION AND UPGRADING PROJECT (AATDRUP) RDGE/PESD DEPARTMENTS

More information

PROJECT APPRAISAL REPORT Date : July 2009

PROJECT APPRAISAL REPORT Date : July 2009 Language: ENGLISH Original: French AFRICAN DEVELOPMENT FUND PROJECT : Electricity Infrastructure Strengthening and Rural Electrification Project COUNTRY : Burkina Faso PROJECT APPRAISAL REPORT Date : July

More information

AFRICAN DEVELOPMENT FUND FEASIBILITY STUDY ON THE EXTENSION OF THE CAMEROON CHAD RAILWAY LINE

AFRICAN DEVELOPMENT FUND FEASIBILITY STUDY ON THE EXTENSION OF THE CAMEROON CHAD RAILWAY LINE AFRICAN DEVELOPMENT FUND Public Disclosure Authorized Public Disclosure Authorized PROJECT : COUNTRY: APPRAISAL REPORT FEASIBILITY STUDY ON THE EXTENSION OF THE CAMEROON CHAD RAILWAY LINE MULTINATIONAL:

More information

PROJECT PREPARATION TECHNICAL ASSISTANCE

PROJECT PREPARATION TECHNICAL ASSISTANCE 12 Appendix 4 A. Justification PROJECT PREPARATION TECHNICAL ASSISTANCE 1. A regional project preparatory technical assistance (R-PPTA) is required to prepare the Pacific Renewable Energy Investment Facility

More information

EAST AFRICAN COMMUNITY LAKE VICTORIA BASIN COMMISSION WATER AND SANITATION INITIATIVE PREPRATION OF INVESTMENT PLAN FOR FIFTEEN CENTRES

EAST AFRICAN COMMUNITY LAKE VICTORIA BASIN COMMISSION WATER AND SANITATION INITIATIVE PREPRATION OF INVESTMENT PLAN FOR FIFTEEN CENTRES EAST AFRICAN COMMUNITY LAKE VICTORIA BASIN COMMISSION WATER AND SANITATION INITIATIVE PREPRATION OF INVESTMENT PLAN FOR FIFTEEN CENTRES APPRAISAL REPORT AND STUDY TERMS OF REFERENCE November 2007 TABLE

More information

AFRICAN DEVELOPMENT FUND TOGO/BENIN COMPLETION REPORT ELECTRIC ENERGY PRODUCTION DISPATCHING AND TRANSMISSION OF THE BENIN ELECTRICITY COMMUNITY

AFRICAN DEVELOPMENT FUND TOGO/BENIN COMPLETION REPORT ELECTRIC ENERGY PRODUCTION DISPATCHING AND TRANSMISSION OF THE BENIN ELECTRICITY COMMUNITY AFRICAN DEVELOPMENT FUND TOGO/BENIN COMPLETION REPORT ELECTRIC ENERGY PRODUCTION DISPATCHING AND TRANSMISSION OF THE BENIN ELECTRICITY COMMUNITY COUNTRY DEPARTMENT WEST REGION AUGUST 1999 SCCD : N D.G.

More information

ASIAN DEVELOPMENT BANK

ASIAN DEVELOPMENT BANK ASIAN DEVELOPMENT BANK TAR: NEP 37196 TECHNICAL ASSISTANCE TO THE KINGDOM OF NEPAL FOR RESTRUCTURING OF NEPAL ELECTRICITY AUTHORITY December 2004 CURRENCY EQUIVALENTS (as of 3 November 2004) Currency Unit

More information

Ebola Recovery and Reconstruction Trust Fund Grant Agreement

Ebola Recovery and Reconstruction Trust Fund Grant Agreement Public Disclosure Authorized OFFICIAL DOCUMENTS GRANT NUMBER: TFOA1023 Public Disclosure Authorized Ebola Recovery and Reconstruction Trust Fund Grant Agreement (LABOR-INTENSIVE PUBLIC WORKS TO MITIGATE

More information

PROJECT PREPARATORY TECHNICAL ASSISTANCE

PROJECT PREPARATORY TECHNICAL ASSISTANCE 8 Appendix 3 A. Justification PROJECT PREPARATORY TECHNICAL ASSISTANCE 1. The Government of the Republic of the Union of Myanmar has requested the Asian Development Bank (ADB) to provide a project preparatory

More information

L/C/TF Number(s) Closing Date (Original) Total Project Cost (USD) IDA Mar ,450,000.00

L/C/TF Number(s) Closing Date (Original) Total Project Cost (USD) IDA Mar ,450,000.00 Public Disclosure Authorized Independent Evaluation Group (IEG) 1. Project Data Report Number : ICRR0021097 Public Disclosure Authorized Public Disclosure Authorized Project ID P111598 Country Tanzania

More information

MADAGASCAR PORTFOLIO REVIEW REPORT

MADAGASCAR PORTFOLIO REVIEW REPORT AFRICAN DEVELOPMENT BANK AFRICAN DEVELOPMENT FUND MADAGASCAR PORTFOLIO REVIEW REPORT SOUTH REGION DEPARTMENT OCTOBER 2007 SCCD :N.A. i CURRENCY EQUIVALENTS (October 2007) UA1 = US$ 1.55665 UA1 = EURO 1.9786

More information

AFRICAN DEVELOPMENT BANK GROUP

AFRICAN DEVELOPMENT BANK GROUP AFRICAN DEVELOPMENT BANK GROUP Public Disclosure Authorized Public Disclosure Authorized PROJECT: LIBERIA ENERGY EFFICIENCY AND ACCESS PROJECT (LEEAP) COUNTRY: LIBERIA PROJECT APPRAISAL REPORT ONEC November

More information

Democratic Socialist Republic of Sri Lanka. Smallholder Agribusiness Partnerships (SAP) Programme. Negotiated financing agreement

Democratic Socialist Republic of Sri Lanka. Smallholder Agribusiness Partnerships (SAP) Programme. Negotiated financing agreement Document: EB 2017/120/R.13/Sup.1 Agenda: 9(b)(iii) Date: 8 April 2017 Distribution: Public Original: English E Democratic Socialist Republic of Sri Lanka Smallholder Agribusiness Partnerships (SAP) Programme

More information

AFRICAN DEVELOPMENT BANK KENYA

AFRICAN DEVELOPMENT BANK KENYA AFRICAN DEVELOPMENT BANK Public Disclosure Authorized Public Disclosure Authorized KENYA LAST MILE CONNECTIVITY PROJECT II APPRAISAL REPORT ONEC DEPARTMENT June 2016 Table of Contents 1. STRATEGIC THRUST

More information

Definitions. Terms of Reference

Definitions. Terms of Reference Terms of Reference National or International consultants: International Description of the assignment (Title of consultancy): Mid-Term Review of the LEPAP project Project Title: Lebanon Environmental Pollution

More information

Evaluation of Budget Support Operations in Morocco. Summary. July Development and Cooperation EuropeAid

Evaluation of Budget Support Operations in Morocco. Summary. July Development and Cooperation EuropeAid Evaluation of Budget Support Operations in Morocco Summary July 2014 Development and Cooperation EuropeAid A Consortium of ADE and COWI Lead Company: ADE s.a. Contact Person: Edwin Clerckx Edwin.Clerck@ade.eu

More information

ANNEX ICELAND NATIONAL PROGRAMME IDENTIFICATION. Iceland CRIS decision number 2012/ Year 2012 EU contribution.

ANNEX ICELAND NATIONAL PROGRAMME IDENTIFICATION. Iceland CRIS decision number 2012/ Year 2012 EU contribution. ANNEX ICELAND NATIONAL PROGRAMME 2012 1 IDENTIFICATION Beneficiary Iceland CRIS decision number 2012/023-648 Year 2012 EU contribution 11,997,400 EUR Implementing Authority European Commission Final date

More information

INTEGRATED SAFEGUARDS DATA SHEET APPRAISAL STAGE

INTEGRATED SAFEGUARDS DATA SHEET APPRAISAL STAGE . Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Date ISDSPrepared/Updated: Date ISDS Approved/Disclosed I. BASIC INFORMATION 1. Basic

More information

Bhutan: Sustainable Rural Electrification Project

Bhutan: Sustainable Rural Electrification Project Validation Report Reference Number: PCV: BHU 2008-23 Project Number: 29242 Loan Number: 1712 July 2008 Bhutan: Sustainable Rural Electrification Project Operations Evaluation Department ABBREVIATIONS ADB

More information

Program-for-Results Financing 1

Program-for-Results Financing 1 Operational Manual BP 9.00 - Program-for-Results Financing These procedures were prepared for use by World Bank staff and are not necessarily a complete treatment of the subject. BP 9.00 February, 2012

More information

Annex 1. Action Fiche for Solomon Islands

Annex 1. Action Fiche for Solomon Islands Annex 1 Action Fiche for Solomon Islands 1. IDENTIFICATION Title/Number FED/2012/023-802 Second Solomon Islands Technical Cooperation Facility (TCF II) Total cost EUR 1,157,000 Aid method / Method of implementation

More information

ONE WASH NATIONAL PROGRAMME (OWNP)

ONE WASH NATIONAL PROGRAMME (OWNP) ONE WASH NATIONAL PROGRAMME (OWNP) ONE Plan ONE Budget ONE Report planning with linked strategic and annual WASH plans at each level budgeting re ecting all WASH-related investments and expenditures financial

More information

EN 1 EN. Annex. Sector Policy Support Programme: Sector budget support (centralised management) DAC-code Sector Trade related adjustments

EN 1 EN. Annex. Sector Policy Support Programme: Sector budget support (centralised management) DAC-code Sector Trade related adjustments Annex 1. Identification Title/Number Trinidad and Tobago Annual Action Programme 2010 on Accompanying Measures on Sugar; CRIS reference: DCI- SUCRE/2009/21900 Total cost EU contribution : EUR 16 551 000

More information

President s report. Proposed loan to the Republic of Mali for the. Rural Microfinance Programme

President s report. Proposed loan to the Republic of Mali for the. Rural Microfinance Programme Document: EB 2009/96/R.15/Rev.1 Agenda: 10(a)(v) Date: 30 April 2009 Distribution: Public Original: English E President s report Proposed loan to the Republic of Mali for the Rural Microfinance Programme

More information

Fiji Agricultural Partnership Project (FAPP) Negotiated financing agreement

Fiji Agricultural Partnership Project (FAPP) Negotiated financing agreement Document: EB 2015/LOT/P.6/Sup.1 Date: 10 April 2015 Distribution: Public Original: English E Republic of Fiji Fiji Agricultural Partnership Project (FAPP) Negotiated financing agreement For: Information

More information

FOR OFFICIAL USE ONLY RESTRUCTURING PAPER ON A PROPOSED PROJECT RESTRUCTURING OF TRANSMISSION GRID STRENGTHENING PROJECT LOAN

FOR OFFICIAL USE ONLY RESTRUCTURING PAPER ON A PROPOSED PROJECT RESTRUCTURING OF TRANSMISSION GRID STRENGTHENING PROJECT LOAN Public Disclosure Authorized Document of The World Bank FOR OFFICIAL USE ONLY Report No: RES22644 Public Disclosure Authorized Public Disclosure Authorized RESTRUCTURING PAPER ON A PROPOSED PROJECT RESTRUCTURING

More information

L/C/TF Number(s) Closing Date (Original) Total Project Cost (USD) IBRD Dec ,040,000.00

L/C/TF Number(s) Closing Date (Original) Total Project Cost (USD) IBRD Dec ,040,000.00 Public Disclosure Authorized Independent Evaluation Group (IEG) 1. Project Data Report Number : ICRR0020616 Public Disclosure Authorized Public Disclosure Authorized Project ID P119939 Country Uzbekistan

More information

Republic of the Maldives: Preparing Business Strategy for Port Development

Republic of the Maldives: Preparing Business Strategy for Port Development Technical Assistance Report Project Number: 47283 Capacity Development Technical Assistance (CDTA) November 2013 Republic of the Maldives: Preparing Business Strategy for Port Development The views expressed

More information

AFRICAN DEVELOPMENT BANK TUNISIA SUPPORT PROJECT FOR THE IMPLEMENTATION OF THE DIGITAL TUNISIA 2020 NATIONAL STRATEGIC PLAN

AFRICAN DEVELOPMENT BANK TUNISIA SUPPORT PROJECT FOR THE IMPLEMENTATION OF THE DIGITAL TUNISIA 2020 NATIONAL STRATEGIC PLAN AFRICAN DEVELOPMENT BANK Public Disclosure Authorized Public Disclosure Authorized TUNISIA SUPPORT PROJECT FOR THE IMPLEMENTATION OF THE DIGITAL TUNISIA 2020 NATIONAL STRATEGIC PLAN PICU/RDGN DEPARTMENTS

More information

AFRICAN DEVELOPMENT FUND

AFRICAN DEVELOPMENT FUND AFRICAN DEVELOPMENT FUND CONGO AGRICULTURAL SECTOR STUDY PROJECT COMPLETION REPORT (PCR) OSAN DEPARTMENT May 201 Translated document PROJECT COMPLETION REPORT (PCR) FOR TECHNICAL ASSISTANCE OPERATIONS

More information

NEPAD/Spanish Fund for African Women s empowerment

NEPAD/Spanish Fund for African Women s empowerment NEPAD/Spanish Fund for African Women s empowerment Project Proposal Format Annex 0 1 P age Proposal Format Proposal Cover Page: PROPOSAL TO THE NEPAD- SPANISH FUND FOR AFRICAN WOMEN s EMPOWERMENT Organization

More information

2.2. Lessons learnt 2.3. Complementary actions 2.4. Donor coordination

2.2. Lessons learnt 2.3. Complementary actions 2.4. Donor coordination 2.2. Lessons learnt EDF projects have been implemented in Sierra Leone for three decades for the rehabilitation of both main and rural roads, providing valuable experience to the SLRA as well as the Commission

More information

L/C/TF Number(s) Closing Date (Original) Total Project Cost (USD) IBRD Jun ,670,000.00

L/C/TF Number(s) Closing Date (Original) Total Project Cost (USD) IBRD Jun ,670,000.00 Public Disclosure Authorized Independent Evaluation Group (IEG) 1. Project Data Report Number : ICRR0020366 Public Disclosure Authorized Public Disclosure Authorized Project ID P107666 Country Peru Project

More information

Executive Summary(in one page)

Executive Summary(in one page) Senegal 2015.10.08 PAGE 1 OF 7 (Please submit completed form to countries@gcfund.org) Executive Summary(in one page) Country (or region) Senegal Submission Date 08/10/2015 NDA or Focal Point Contact Point

More information

GUIDANCE FICHE PERFORMANCE FRAMEWORK REVIEW AND RESERVE IN VERSION 1 9 APRIL 2013 RELEVANT PROVISIONS IN THE DRAFT LEGISLATION

GUIDANCE FICHE PERFORMANCE FRAMEWORK REVIEW AND RESERVE IN VERSION 1 9 APRIL 2013 RELEVANT PROVISIONS IN THE DRAFT LEGISLATION GUIDANCE FICHE PERFORMANCE FRAMEWORK REVIEW AND RESERVE IN 2014-2020 VERSION 1 9 APRIL 2013 RELEVANT PROVISIONS IN THE DRAFT LEGISLATION Regulation Articles Article 18 Performance reserve Article 19 Performance

More information

AFRICAN DEVELOPMENT BANK

AFRICAN DEVELOPMENT BANK AFRICAN DEVELOPMENT BANK Langue: English Original: French REPUBLIC OF TUNISIA RURAL ELECTRIFICATION PROJECT ELECTRICITY VI PROJECT COMPLETION REPORT INFRASTRUCTURE DEPARTMENT (OINF) AUGUST 2006 CONTENTS

More information

FINAL EVALUATION VIE/033. Climate Adapted Local Development and Innovation Project

FINAL EVALUATION VIE/033. Climate Adapted Local Development and Innovation Project FINAL EVALUATION VIE/033 Climate Adapted Local Development and Innovation Project PROJECT SUMMARY DATA Country Long project title Short project title LuxDev Code Vietnam Climate Adapted Local Development

More information

Cambodia: Second Power Transmission and Distribution Project

Cambodia: Second Power Transmission and Distribution Project Validation Report Reference Number: PVR-464 Project Number: 37041-013 Loan Number: 2261 December 2016 Cambodia: Second Power Transmission and Distribution Project Independent Evaluation Department ABBREVIATIONS

More information

L/C/TF Number(s) Closing Date (Original) Total Project Cost (USD) IDA-46950,IDA-46960,IDA-H Sep

L/C/TF Number(s) Closing Date (Original) Total Project Cost (USD) IDA-46950,IDA-46960,IDA-H Sep Public Disclosure Authorized Independent Evaluation Group (IEG) 1. Project Data Report Number : ICRR0021113 Public Disclosure Authorized Public Disclosure Authorized Project ID P096407 Country Western

More information

ASIAN DEVELOPMENT BANK

ASIAN DEVELOPMENT BANK TAR:LAO 29284 ASIAN DEVELOPMENT BANK TECHNICAL ASSISTANCE TO ThE LAO PEOPLE'S DEMOCRATIC REPUBLIC FOR ThE CORPORATE AND FINANCIAL DEVELOPMENT OF ELECTRICIT DU LAO LI LI May 1996 - -I CURRENCY EQUIVALENTS

More information

TERMS OF REFERENCE FOR DRAFTING OF A BUSINESS CONTINUITY PLAN (BCP) FOR EBID

TERMS OF REFERENCE FOR DRAFTING OF A BUSINESS CONTINUITY PLAN (BCP) FOR EBID TERMS OF REFERENCE FOR DRAFTING OF A BUSINESS CONTINUITY PLAN (BCP) FOR EBID April 2018 1 I. BRIEF PRESENTATION OF EBID 1. The ECOWAS Bank for Investment and Development (EBID) is an international financial

More information

FINANCIAL ANALYSIS: PROJECT 1

FINANCIAL ANALYSIS: PROJECT 1 Green Power Development and Energy Efficiency Improvement Investment Program (RRP SRI 47037) A. Background and Rationale FINANCIAL ANALYSIS: PROJECT 1 1. Project 1 of the Green Power Development and Energy

More information

OFFICIAL -1 L(-L DOCUMENTS. Between. and

OFFICIAL -1 L(-L DOCUMENTS. Between. and Public Disclosure Authorized OFFICIAL -1 L(-L DOCUMENTS ADDENDUM No 2 TO ADMINISTRATION AGREEMENT Between Public Disclosure Authorized Public Disclosure Authorized the EUROPEAN UNION (represented by the

More information

Report No.: ISDSA13978

Report No.: ISDSA13978 Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized 0 o Date ISDS Prepared/Updated: 29-Jul-2015 INTEGRATED SAFEGUARDS DATA SHEET APPRAISAL

More information

PROJECT PREPARATORY TECHNICAL ASSISTANCE

PROJECT PREPARATORY TECHNICAL ASSISTANCE Appendix 3 9 A. Justification PROJECT PREPARATORY TECHNICAL ASSISTANCE 1. The PPTA will review and assess the performance of the secondary education subsector in Viet Nam and identify the challenges, which

More information

EXTERNAL END OF PROJECT PERFORMANCE EVALUATION

EXTERNAL END OF PROJECT PERFORMANCE EVALUATION EXTERNAL END OF PROJECT PERFORMANCE EVALUATION 1. Background TERMS OF REFERENCE PT. Rainforest Alliance (RA) is leading a consortium group in implementing the Cocoa Revolution: High-Yielding Climate Smart

More information

Report and Recommendation of the President to the Board of Directors

Report and Recommendation of the President to the Board of Directors Report and Recommendation of the President to the Board of Directors Project Number: 47926 April 2014 Proposed Equity Investment ReNew Power Ventures Private Limited ReNew Power Investment Project (India)

More information

Pacific Islands Regional Oceanscape Program (PROP) Project Number: P151780

Pacific Islands Regional Oceanscape Program (PROP) Project Number: P151780 Pacific Islands Regional Oceanscape Program (PROP) Project Number: P151780 Department of Fisheries Ministry of Natural Resources Teone, Funafuti TUVALU Email: proptuv@gmail.com / proptuv@tuvalufisheries.tv

More information

TERMS OF REFERENCE FOR INDIVIDUAL CONTRACTORS

TERMS OF REFERENCE FOR INDIVIDUAL CONTRACTORS TERMS OF REFERENCE FOR INDIVIDUAL CONTRACTORS ASSIGNMENT TITLE: International Planning/Budgeting Expert Discussion Paper - Integration of the SDGs into Myanmar s Planning and Budgeting Frameworks DURATION:

More information

MFF - Bihar Urban Development Investment Program (Facility Concept)

MFF - Bihar Urban Development Investment Program (Facility Concept) India: MFF - Bihar Urban Development Investment Program (Facility Concept) Project Name Project Number 41603-013 Country Project Status Project Type / Modality of Assistance Source of Funding / Amount

More information

DEVELOPING A LOCAL GOVERNMENT TRANSPORT MASTERPLAN: CASE STUDY

DEVELOPING A LOCAL GOVERNMENT TRANSPORT MASTERPLAN: CASE STUDY DEVELOPING A LOCAL GOVERNMENT TRANSPORT MASTERPLAN: CASE STUDY Objectives of the case study J. Lebo, World Bank (1999) National or state rural planning processes are often top down, technically sophisticated

More information

Cost-benefit analysis in the context of EU Cohesion funding - tools, methodology and available support

Cost-benefit analysis in the context of EU Cohesion funding - tools, methodology and available support Cost-benefit analysis in the context of EU Cohesion funding - tools, methodology and available support Massimo Marra JASPERS Networking and Competence Centre IPA Conference Impact Assessment What can we

More information

AFRICAN DEVELOPMENT BANK GROUP

AFRICAN DEVELOPMENT BANK GROUP AFRICAN DEVELOPMENT BANK GROUP GUINEA SUPPORT PROJECT FOR BUILDING THE ADMINISTRATION S CAPACITY FOR INTEGRATED PROJECT MANAGEMENT (PARCA GPI) APPRAISAL REPORT OSGE/GECL July 2016 Document traduit TABLE

More information

INTEGRATED SAFEGUARDS DATASHEET APPRAISAL STAGE

INTEGRATED SAFEGUARDS DATASHEET APPRAISAL STAGE Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized I. Basic Information Date prepared/updated: 04/15/2010 1. Basic Project Data Original

More information

Electricity (Development of Small Power Projects) GN. No. 77 (contd.) THE ELECTRICITY ACT (CAP.131) RULES. (Made under sections 18(5), 45 and 46))

Electricity (Development of Small Power Projects) GN. No. 77 (contd.) THE ELECTRICITY ACT (CAP.131) RULES. (Made under sections 18(5), 45 and 46)) GOVERNMENT NOTICE NO. 77 published on 02/03/2018 THE ELECTRICITY ACT (CAP.131) RULES (Made under sections 18(5), 45 and 46)) THE ELECTRICITY (DEVELOPMENT OF SMALL POWER PROJECTS) RULES, 2018 1. Citation

More information

The World Bank Land Husbandry, Water Harvesting and Hillside Irrigation (P114931)

The World Bank Land Husbandry, Water Harvesting and Hillside Irrigation (P114931) Public Disclosure Authorized Public Disclosure Authorized The World Bank RESTRUCTURING PAPER ON A PROPOSED PROJECT RESTRUCTURING OF LAND HUSBANDRY, WATER HARVESTING AND HILLSIDE IRRIGATION PROJECT APPROVED

More information

Document of The World Bank FOR OFFICIAL USE ONLY PROJECT COMPLETION NOTE (SCL-4198; WBTF28362) LOAN/GEF GRANT

Document of The World Bank FOR OFFICIAL USE ONLY PROJECT COMPLETION NOTE (SCL-4198; WBTF28362) LOAN/GEF GRANT Public Disclosure Authorized Document of The World Bank FOR OFFICIAL USE ONLY Report No: 30244 Public Disclosure Authorized PROJECT COMPLETION NOTE (SCL-4198; WBTF28362) ON A LOAN/GEF GRANT Public Disclosure

More information

The World Bank Third Secondary and Local Roads Project (P148048)

The World Bank Third Secondary and Local Roads Project (P148048) Public Disclosure Authorized Public Disclosure Authorized RESTRUCTURING PAPER ON A PROPOSED PROJECT RESTRUCTURING OF THIRD SECONDARY AND LOCAL ROADS PROJECT APPROVED ON JULY 3, 2014 TO GEORGIA REPORT NO.:

More information

LOAN AGREEMENT (Special Operations) LOAN AGREEMENT dated 17 January 2013 between KINGDOM OF CAMBODIA ( Borrower ) and ASIAN DEVELOPMENT BANK ( ADB ).

LOAN AGREEMENT (Special Operations) LOAN AGREEMENT dated 17 January 2013 between KINGDOM OF CAMBODIA ( Borrower ) and ASIAN DEVELOPMENT BANK ( ADB ). LOAN AGREEMENT (Special Operations) LOAN AGREEMENT dated 17 January 2013 between KINGDOM OF CAMBODIA ( Borrower ) and ASIAN DEVELOPMENT BANK ( ADB ). WHEREAS (A) the Borrower has applied to ADB for a loan

More information

Benin 27 August 2015

Benin 27 August 2015 Benin 27 August 2015 PAGE 1 OF 6 (Please submit completed form to countries@gcfund.org) Executive Summary(in one page) Country (or region) Benin Submission Date 27/08/2015 NDA or Focal Point Directorate

More information

India: Karnataka Urban Development and Coastal Environmental Management Project

India: Karnataka Urban Development and Coastal Environmental Management Project Validation Report Reference Number: PVR-334 Project Number: 30303 Loan Number: 1704 November 2014 India: Karnataka Urban Development and Coastal Environmental Management Project Independent Evaluation

More information

Having regard to the Treaty on the Functioning of the European Union, and in particular Article 291 thereof,

Having regard to the Treaty on the Functioning of the European Union, and in particular Article 291 thereof, L 244/12 COMMISSION IMPLEMTING REGULATION (EU) No 897/2014 of 18 August 2014 laying down specific provisions for the implementation of cross-border cooperation programmes financed under Regulation (EU)

More information

INSTITUTIONAL SUPPORT

INSTITUTIONAL SUPPORT Danish Ministry of Foreign Affairs Danida Road Sector Programme Support Phase 2, 2007-2012 INSTITUTIONAL SUPPORT Reformulated Component Description Document ZAMBIA This report contains restricted information

More information

Republic of Indonesia: Aligning Asian Development Bank and Country Systems for Improved Project Performance

Republic of Indonesia: Aligning Asian Development Bank and Country Systems for Improved Project Performance Technical Assistance Report Project Number: 47287-001 Capacity Development Technical Assistance (CDTA) December 2013 Republic of Indonesia: Aligning Asian Development Bank and Country Systems for Improved

More information

Global Environment Facility Grant Agreement

Global Environment Facility Grant Agreement Public Disclosure Authorized CONFORMED COPY GEF GRANT NUMBER TF092100 Public Disclosure Authorized Global Environment Facility Grant Agreement (Agricultural Development Program Support Project) Public

More information

PROJECT INFORMATION DOCUMENT (PID) APPRAISAL STAGE. Second Additional Financing to Road Rehabilitation & Maintenance Project Region

PROJECT INFORMATION DOCUMENT (PID) APPRAISAL STAGE. Second Additional Financing to Road Rehabilitation & Maintenance Project Region Project Name PROJECT INFORMATION DOCUMENT (PID) APPRAISAL STAGE Second Additional Financing to Road Rehabilitation & Maintenance Project Region AFRICA Sector Roads and highways (100%) Project ID P120723

More information

United Nations Fund for Recovery Reconstruction and Development in Darfur (UNDF)

United Nations Fund for Recovery Reconstruction and Development in Darfur (UNDF) United Nations Fund for Recovery Reconstruction and Development in Darfur (UNDF) Terms of Reference 29 March 2013 1 Contents I. Introduction... 3 II. Purpose, Scope and Principles of the UNDF... 4 III.

More information

PROJECT PREPARATORY TECHNICAL ASSISTANCE

PROJECT PREPARATORY TECHNICAL ASSISTANCE Appendix 3 13 A. Justification PROJECT PREPARATORY TECHNICAL ASSISTANCE 1. The project preparatory technical assistance (PPTA) is required to help the government of Mongolia design the Regional Road Development

More information

IBERDROLA FRAMEWORK FOR GREEN FINANCING

IBERDROLA FRAMEWORK FOR GREEN FINANCING IBERDROLA FRAMEWORK FOR GREEN FINANCING April 2018 IBERDROLA Framework for Green Financing 1 Index I. INTRODUCTION... 3 1. RATIONAL... 3 2. SCOPE... 3 3. PRINCIPLES AND GENERAL GUIDELINES... 4 II. PROCEDURES...

More information

Multitranche Financing Facility India: Rural Road Sector II Investment Program (Project 1)

Multitranche Financing Facility India: Rural Road Sector II Investment Program (Project 1) Validation Report Reference Number: PVR-326 Project Number: 37066 Loan Number: 2248 October 2014 Multitranche Financing Facility India: Rural Road Sector II Investment Program (Project 1) Independent Evaluation

More information

TECHNICAL ASSISTANCE: HIMACHAL PRADESH POWER SECTOR CAPACITY DEVELOPMENT AND IMPLEMENTATION SUPPORT

TECHNICAL ASSISTANCE: HIMACHAL PRADESH POWER SECTOR CAPACITY DEVELOPMENT AND IMPLEMENTATION SUPPORT Himachal Pradesh Clean Energy Transmission Investment Program (RRP IND 43464) TECHNICAL ASSISTANCE: HIMACHAL PRADESH POWER SECTOR CAPACITY DEVELOPMENT AND IMPLEMENTATION SUPPORT A. INTRODUCTION 1. The

More information

AFRICAN DEVELOPMENT BANK GROUP

AFRICAN DEVELOPMENT BANK GROUP AFRICAN DEVELOPMENT BANK GROUP BENIN COUNTRY STRATEGY PAPER 2017 2021 ECVP/RDGW September 2017 Translated Document TABLE OF CONTENTS ACRONYMS AND ABBREVIATIONS... i EXECUTIVE SUMMARY... iii I. INTRODUCTION...

More information

The Results Measurement (ReM) framework methodology

The Results Measurement (ReM) framework methodology The Results Measurement (ReM) framework methodology The ReM framework methodology European Investment Bank September 2017 1 Introduction EIB lending is results-driven. Outside the EU, we use the Results

More information

REPORT 2015/174 INTERNAL AUDIT DIVISION

REPORT 2015/174 INTERNAL AUDIT DIVISION INTERNAL AUDIT DIVISION REPORT 2015/174 Audit of management of selected subprogrammes and related capacity development projects in the United Nations Economic and Social Commission for Asia and the Pacific

More information

AFRICAN DEVELOPMENT FUND MULTINATIONAL KENYA TANZANIA POWER INTERCONNECTION PROJECT

AFRICAN DEVELOPMENT FUND MULTINATIONAL KENYA TANZANIA POWER INTERCONNECTION PROJECT AFRICAN DEVELOPMENT FUND Public Disclosure Authorized Public Disclosure Authorized MULTINATIONAL KENYA TANZANIA POWER INTERCONNECTION PROJECT APPRAISAL REPORT REVISED VERSION ONEC/EARC February 2015 Table

More information

The World Bank. Key Dates. Project Development Objectives. Components. Overall Ratings. Public Disclosure Authorized

The World Bank. Key Dates. Project Development Objectives. Components. Overall Ratings. Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Copy AFRICA Ethiopia Social Protection & Labor Global Practice IBRD/IDA Sector Investment and Maintenance Loan FY 2013 Seq No: 12 ARCHIVED on 09-Oct-2015

More information

LRTF Quarterly Report March 1, As of February 22, 2012, the LRTF status was as follows: USD million

LRTF Quarterly Report March 1, As of February 22, 2012, the LRTF status was as follows: USD million LRTF Quarterly Report March 1, 2012 I. LRTF Administration As of February 22, 2012, the LRTF status was as follows: USD million Contributions Received Cash Contributions $146,902,156.80 Investment Income

More information

AFRICAN DEVELOPMENT FUND MAURITANIA

AFRICAN DEVELOPMENT FUND MAURITANIA AFRICAN DEVELOPMENT FUND Public Disclosure Authorized Public Disclosure Authorized MAURITANIA PROJECT TO SUPPORT THE PROMOTION OF MICRO-, SMALL AND MEDIUM-SIZED ENTERPRISES, AND YOUTH EMPLOYMENT (PAMPEJ)

More information

Financing Agreement. (Uganda Public Service Performance Enhancement Project) between THE REPUBLIC OF UGANDA. and

Financing Agreement. (Uganda Public Service Performance Enhancement Project) between THE REPUBLIC OF UGANDA. and Public Disclosure Authorized CONFORMED COPY CREDIT NUMBER 4199 UG Public Disclosure Authorized Financing Agreement (Uganda Public Service Performance Enhancement Project) between Public Disclosure Authorized

More information

FOR OFFICIAL USE ONLY RESTRUCTURING PAPER ON A PROPOSED PROJECT RESTRUCTURING THE INFORMAL SETTLEMENTS IMPROVEMENT PROJECT CREDIT 4873-KE

FOR OFFICIAL USE ONLY RESTRUCTURING PAPER ON A PROPOSED PROJECT RESTRUCTURING THE INFORMAL SETTLEMENTS IMPROVEMENT PROJECT CREDIT 4873-KE Public Disclosure Authorized Document of The World Bank FOR OFFICIAL USE ONLY Report No: 104604 Public Disclosure Authorized Public Disclosure Authorized RESTRUCTURING PAPER ON A PROPOSED PROJECT RESTRUCTURING

More information

Annual Implementation Report 2015

Annual Implementation Report 2015 Annual Implementation Report 215 of the INTERREG V-A SLOVAKIA-HUNGARY COOPERATION PROGRAMME Content 1. Identification of the annual implementation report... 4 2. Overview of the implementation... 4 3.

More information

L/C/TF Number(s) Closing Date (Original) Total Project Cost (USD) TF Oct ,000,000.00

L/C/TF Number(s) Closing Date (Original) Total Project Cost (USD) TF Oct ,000,000.00 Public Disclosure Authorized 1. Project Data Report Number : ICRR0021153 Public Disclosure Authorized Public Disclosure Authorized Project ID P126180 Country Sierra Leone Project Name Sierra Leone Energy

More information

ANNEX V. Action Document for Conflict Prevention, Peacebuilding and Crisis Preparedness support measures

ANNEX V. Action Document for Conflict Prevention, Peacebuilding and Crisis Preparedness support measures EN ANNEX V Action Document for Conflict Prevention, Peacebuilding and Crisis Preparedness support measures 1. Title/basic act/ CRIS number 2. Zone benefiting from the action/location CRIS number: 2018/41357

More information

Indonesia: Java-Bali Electricity Distribution Performance Improvement Project

Indonesia: Java-Bali Electricity Distribution Performance Improvement Project Validation Report November 2017 Indonesia: Java-Bali Electricity Distribution Performance Improvement Project Reference Number: PVR-535 Program Number: 40061-013 Loan Number: 2619 and 8245 Grant Number:

More information

Introduction Chapter 1, Page 1 of 9 1. INTRODUCTION

Introduction Chapter 1, Page 1 of 9 1. INTRODUCTION Introduction Chapter 1, Page 1 of 9 1. INTRODUCTION 1.1 OVERVIEW Preamble 1.1.1 The African Development Bank is the premier financial development institution in Africa dedicated to combating poverty and

More information

CE TEXTE N'EST DISPONIBLE QU'EN VERSION ANGLAISE

CE TEXTE N'EST DISPONIBLE QU'EN VERSION ANGLAISE CE TEXTE N'EST DISPONIBLE QU' VERSION ANGLAISE ANNEX 1 1. IDTIFICATION Title/Number Support Services to the National Authorising Officer CRIS NO: FED/2009/021-496 Total cost Total: 315,800 (EC Contribution:

More information

REPORT OF THE AUDITOR GENERAL ON THE FINANCIAL STATEMENTS OF THE UGANDA ELECTRICITY TRANSMISSION COMPANY LIMITED

REPORT OF THE AUDITOR GENERAL ON THE FINANCIAL STATEMENTS OF THE UGANDA ELECTRICITY TRANSMISSION COMPANY LIMITED THE REPUBLIC OF UGANDA REPORT OF THE AUDITOR GENERAL ON THE FINANCIAL STATEMENTS OF THE UGANDA ELECTRICITY TRANSMISSION COMPANY LIMITED KARUMA INTERCONNECTION PROJECT FEASIBILITY STUDY FOR PERIOD 5 TH

More information

L/C/TF Number(s) Closing Date (Original) Total Project Cost (USD) IBRD Dec ,212,149.53

L/C/TF Number(s) Closing Date (Original) Total Project Cost (USD) IBRD Dec ,212,149.53 Public Disclosure Authorized Independent Evaluation Group (IEG) 1. Project Data Report Number : ICRR0021311 Public Disclosure Authorized Public Disclosure Authorized Project ID P110051 Country India Project

More information

Management response to the recommendations deriving from the evaluation of the Mali country portfolio ( )

Management response to the recommendations deriving from the evaluation of the Mali country portfolio ( ) Executive Board Second regular session Rome, 26 29 November 2018 Distribution: General Date: 23 October 2018 Original: English Agenda item 7 WFP/EB.2/2018/7-C/Add.1 Evaluation reports For consideration

More information

IBERDROLA FRAMEWORK FOR GREEN FINANCING (the Framework )

IBERDROLA FRAMEWORK FOR GREEN FINANCING (the Framework ) IBERDROLA FRAMEWORK FOR GREEN FINANCING (the Framework ) February 2018 IBERDROLA Framework for Green Financing 1 Index I. INTRODUCTION... 3 1. RATIONAL... 3 2. SCOPE... 3 3. PRINCIPLES AND GENERAL GUIDELINES...

More information

Philippines: Philippine Energy Efficiency Project

Philippines: Philippine Energy Efficiency Project Validation Report Reference Number: PVR-436 Project Number: 42001-013 Loan/Grant Numbers: 2507 and 0142 December 2015 Philippines: Philippine Energy Efficiency Project Independent Evaluation Department

More information

J. W. Sutherland, K. O. Agadzi and Emmanuel M. K. Amekor Environment and Sustainable Development Department, VRA.

J. W. Sutherland, K. O. Agadzi and Emmanuel M. K. Amekor Environment and Sustainable Development Department, VRA. RATIONALISING THE ENVIRONMENTAL IMPACT ASSESSMENT PROCEDURES IN ECOWAS MEMBER COUNTRIES: AN ESSENTIAL INGREDIENT IN PROMOTING REGIONAL INTEGRATION THROUGH ESTABLISHMENT OF POWER POOLS AND INTERCONNECTIONS

More information

AFRICAN DEVELOPMENT BANK

AFRICAN DEVELOPMENT BANK AFRICAN DEVELOPMENT BANK TUNISIA RURAL ELECTRIFICATION PROJECT ELECTRICITY V PROJECT COMPLETION REPORT COUNTRY PROGRAMMES DEPARTMENT OCDN NORTH REGION JUNE 2001 TABLE OF CONTENTS BASIC DATA EXECUTIVE SUMMARY

More information