This document can be shared by CB participants with Centers for input in advance of Board deliberations. Document Category Standard Document

Size: px
Start display at page:

Download "This document can be shared by CB participants with Centers for input in advance of Board deliberations. Document Category Standard Document"

Transcription

1 Version: 28 June 2016 For Information CGIAR Consortium CRP2 Value for Money (V4M) Analysis Purpose: This paper provides, as a companion document to the Consortium Office prepared paper titled Developing the Rationale for Investing in the CRP2 Portfolio (document CB26-08, a draft set of materials for broad stakeholder review and input), an explanation of the value for money analysis carried out by the Consortium, include the methodology used and the functionality of the online tool used for the submission process. It considers its role in contributing to the overall analysis of the submissions of full proposals as part of the portfolio of CGIAR Research Programs. This document can be shared by CB participants with Centers for input in advance of Board deliberations. Document Category Standard Document Montpellier, France, June 2016 Page 1 of 8

2 What Value for Money is and is not, in the context of the CRP2 Portfolio: In this document, we start by describing what this analysis is composed of, then lay out the methodologies and visualization tools, and lastly present the data collection effort to support the analysis. The term value-for-money can mean different things to different people. We lay out in this document what value-for-money means in the context of the CRP2 portfolio analysis. Value for Money, in the context of the CGIAR CRP2 portfolio, is an attempt to link the results (preferably outcomes or milestones towards targets) to the investments required to produce such results. No attempt is made to standardize a methodology to calculate returns on investment using standard economics tools such as Internal Rate of Return, Net Present Value or Benefit Cost Ratios. Instead, the focus is on standardizing a set of results (outcomes) against two evaluation frameworks defined in CGIAR s Strategy and Results Framework ( SRF ): respectively, the ten CGIAR targets, and the Results Framework (a quantitative and qualitative evaluation framework). The time frame is constant for all proposals (6 years; ) and no efforts have been made to discount either investments or results produced at different points during this period. Rather, all investments are assumed to be more or less evenly spread over the 6 years, and the results are assumed to be produced at the end of the period, in 2022, as milestones of progress towards achieving 2030 targets, where relevant. All CRP proposals have been asked to specify results in terms of standardized targets, and to specify investments against these targets and against the IDOs and sub-idos in the Results Framework. Results and investments are specified at component / flagship level, and aggregated at program level. It is clear that they are interdependent, i.e. some activities produce multiple results (e.g. increased productivity as well as reduced poverty), and some activities are linked, and are jointly required to produce a single result. While there are clear limitations to the approach, as a minimum it enables the following types of analysis and inquiry: 1. Transparently and explicitly linking results to activities and investments, thereby facilitating ISPC to query and validate the assumptions underpinning either the results and/or the proposed budgets. 2. The same data support an analysis on the coherence of budgets and results across flagships and programs. It also supports an analysis of the portfolio interactions between CRPs, within geographies and with the platforms. 3. The same data also supports an analysis of the projected results (outcomes, eventually leading to impacts) based on proposed investment at the level of the portfolio. Thus, it addresses the important question of whether in principle, the Montpellier, France, June 2016 Page 2 of 8

3 targets set in the SRF can be achieved and thereby giving credibility to the proposals and the overall portfolio. 4. The data analysis also supports prioritization of investments. Visualizing proposed investments against targets, against IDOs and sub-idos of the results framework, and by geographies (both site integration and other countries) allows a more transparent interpretation of proposed or planned investments, bringing more rigor and confidence to the choices made by investors. The CRP2 Portfolio [presented by the Centers] is a complex set of 12 programs and 3 platforms, about 70 flagships and modules, 20 site integration geographies, more than 40 participating partners and numerous collaborations. The value-for-money analysis provides a crisp and synthetic overview of how all these component pieces are combined to make a powerful portfolio of investments with ambitious goals. Ultimately the approach outlined in this document provides a strategic framework to assist donors with their investment decisions for CRP2. Description of the value-for-money package The value-for-money analysis combines the CRPs aspirational results and anticipated needs for financial resources over the next six years into a set of visuals. These visuals provide strategic insight into the overall portfolio s expected results, investment needs, geographic coverage, and role clarity and coordination amongst the different players. The analysis produced two main outputs: 1. The detailed value-for-money data package provided to the ISPC provides reviewers with tools to drill up and down between flagships, outcomes, and sub-idos investments, to assess the coherence and consistency between the description of the research, the cluster of activities, the flagships and the overall CRP aspirational results. The CO provided this material to assist ISPC in its review. 2. The aggregated value for money overview at portfolio level that is contained in Chapter 5 of the Consortium s Investment Case for the CRP2 Portfolio document, and shared with other interested stakeholders ultimately a tool for resource mobilization (as a more comprehensive source for derived, target specific, shorter products to be used for resource mobilization efforts). Montpellier, France, June 2016 Page 3 of 8

4 Methodology and visualization techniques The V4M analysis is organized against two results frameworks, both adopted as part of the Strategy and Results Framework (SRF) in 2015: a. CGIAR 2022 intermediary targets These targets have been written in the context of the SDGs with 2030 quantitative goals, as well as 2022 intermediary goals. b. Results Framework (IDOs and sub-idos) This framework was designed to help describe and categorize the types of results that each flagship projects aims to accomplish. The analysis presents results and investments against these frameworks to visualize how the various parts of the CRPs combine to make a coherent and synergistic portfolio. For this to be possible, a number of steps were undertaken: 1) We first needed to harmonize as much as reasonably possible how the CRPs would describe the combined results and investments of their programs. We defined guidelines and provided standard forms and tables for the CRPs to submit with their proposals in the Guidance document. There was still a fair amount of gray areas particularly around harmonizing the methodologies for quantifying contributions to the targets. An area of future improvement is to further increase the alignment between the CRPs on these methodologies. For example, some CRPs counted the entire investment amount of their program against the CGIAR quantitative targets. Others decided to only count those investments that directly contributed to the targets, and exclude some or all of the supporting investments (for example crosscutting investments in capacity building). Despite these differences, still over 80% of the CRP2 total investment is counted towards accomplishing the CGIAR targets. 2) We then needed to design powerful visuals that would distill the large amount of quantitative information into single synthetic views. Montpellier, France, June 2016 Page 4 of 8

5 Here are some examples of the visualization techniques we used: Thumbnail Description Heatmaps: To visualize the funding intensity of each CRPs to the targets, IDOs or sub-idos. IDO or sub-idos levels of investment: To visualize the top and bottom IDOs or sub-idos in terms of investments received. Synergies: To visualize the handshakes for collaborations between CRPs by targets. Portfolio s total contribution to targets: To estimate the total contribution from the individual CRPs contribution by correcting for double counting. Contribution to target vs Investment quadrant: To identify the positioning of individual CRPs by target. Geographic footprint of the portfolio: To visualize on a map where the CRPs are integrated together by target. Top geographies: To visualize the top geographies in terms of impact while distinguishing between site integration and other countries. Financial analysis: To visualize the budgetary information such as cost structure, funding gap, mapping between sources and uses of funds, etc. Montpellier, France, June 2016 Page 5 of 8

6 Avoiding double counting: A Conservative approach Note that to add up each CRP s contribution to an overall portfolio contribution to each of the targets, we made a simple assumption to avoid double counting the impact of multiple CRPs. We assumed that when multiple CRPs contribute to a given target in the same country, they all reach the same farmers, the same people, the same land or forest area and therefore we would only keep the maximum of all these CRPs contribution. For example, if Maize and Wheat aspire to reach 10 and 5 million farmers respectively in India for adopting new varieties, then we assumed that together they would reach 10 million farmers, not 15 million. Avoiding this double counting is a complex problem and our approach is simplistic and conservative. We believe however that it gives us an order of magnitude to get a picture of the overall portfolio that can be refined over time. Supporting analysis: Detailed financial review The value-for-money analysis is underpinned by a detailed financial review of the flagships budgets. The financial analysis provides information on the total financial resources needed, the timing of the funding needed, the funding gap and needs for fund raising of W3 and Bilateral. It also provides information on the uses of funds towards internal resources (such as personnel, travel, etc.) and external collaborations, and the total management and support cost of the overall program. Last, it provides information on how individual flagships have prioritized the uses of W1+2 funding. This analysis will be used to provide feedback to the CRPs on the final budgets to be submitted for approval. Data collection The table below describes the data and level of detail that had to be submitted by the CRPs as part of their proposal, for each results framework: Level of program hierarchy CRP Flagship CGIAR 2022 Intermediary targets Overall Contribution to targets Contribution to targets by countries Investment amount by target, differentiated by windows of funding Synergies between CRPs by target SRF Investment amount by sub- IDOs, differentiated by windows of funding (Base budget only) Description of outcomes (Base budget and uplift budget) Montpellier, France, June 2016 Page 6 of 8

7 In addition, CRPs were provided one standard budget template in excel and asked to submit a detailed budget by participating partners and flagship projects, including a list of expenses by natural categories (personnel, travel, collaborations, etc.) Online Submission Tool To collect this data, an online submission tool was developed to ensure standardization of the proposal submissions from all CRPs and Platforms, and facilitate the value-for-money (V4M) analysis across the portfolio. While the online tool had some technical issues with data entry and printing for the narrative sections, the databases exported from the tool for the V4M analysis, actually proved to be very useful. It produced an aggregated database of the CRPs and Platforms Budget roll-ups, detailed flagship budgets, contribution to the targets by geographies, contributions to the SRF and detailed flagship outcomes. For the budget roll-up, the online tool read and consolidated almost 70 Flagship / Module budget excel files. This database was key for the Budget analysis across the various windows of funding. The database of the PIM tables was also key for the SRF and Intermediary targets analysis. Following submission, the databases from the online tool were connected to Tableau, a powerful data visualization tool. This tool provided an initial visual overview of the data, which made us quickly realize that an extra step of data validation was required to ensure data accuracy of the budgets and/ or PIM tables submitted and consistency across databases. In fact, this data validation exercise proved to be a significant effort in the end. To highlight some examples, when analyzing the data, we noticed that: some CRP s submitted W1+W2 funding that was higher or lower than originally assigned some CRPs included the Management and Support costs in the outcomes (PIM B) analysis and sub-ido (PIM C) tables, which was not required. In some cases, too, the total amounts requested in these tables were not in-line with their budgets. some CRP s submitted numbers in a different format, which we had to fix manually to be able to analyze the data accurately across all CRP s, i.e. 1,000,000 to 1, and some CRP s had a different understanding of what we required in the Contribution to 2022 CGIAR Targets (PIM A) table. As part of this data validation phase, we communicated with the individual CRPs to highlight inconsistencies, and clarify misconceptions or misunderstandings of what was required. Seven CRP s ultimately re-submitted their budgets and / or PIM tables through the online tool in April The final consolidated databases were then shared with the ISPC on 24 April 2016, to ensure the latest information submitted was available to be considered in their proposal reviews. Montpellier, France, June 2016 Page 7 of 8

8 Conclusions The value-for-money analysis was initially designed to answer four key questions, ultimately informing the donors investment decisions for the CRP2 Portfolio: 1) What share of the CGIAR 2022 intermediary targets is the portfolio positioned to deliver? 2) Are there gaps in the portfolio? What are the complementarities or redundancies? 3) How is W1/W2 proposed to be used and prioritized? How much are the outcomes reliant on different sources of funding? How much needs to be fundraised/secured? 4) What are the major risks to the CRP2 portfolio s success? Which risks are we willing to take? For some risks do we need mitigation strategies? We think that the value-for-money analysis and tools successfully answer questions 1 and 2. For question 3, as the Centers and CRPs decided in their Rome meeting in November 2015 not to prioritize W1-2, but to allocate an equal amount of W1 to each CRP and CRPs appear to use the W1-2 by and large as spread out base funding, rather than to prioritize specific this question does not have a useful answer yet. The donors have indicated that they do want to see a prioritization of W1-2 at FC15 but that is homework still to be carried out by the Centers/CRPs. To answer Question 4, we need to create a risk framework or register that can be operationalized and tracked on a regular basis, that identifies key learnings, progress and failures and allows on-going reprioritization of resources to avoid throwing good money after bad, while preserving a strong spirit of calculated risk taking to support innovation. Refinement of the targets would be a distinct plus, e.g. the need to provide baselines for target 6; but also the translation of the targets into lower level indicators (as per the MEL Task Force or CoP) with which we might monitor progress. Such refinement should precede the risk analysis. We hope that this analysis will help donors and reviewers draw out new insights and conclusions when considering the CRP2 portfolio and help strategically position the proposals and clarify the roles of the individual players. The challenge and opportunity for the value-for-money analysis and tools is to remain relevant and useful into the future. To achieve this, the current V4M analysis needs to be converted into robust project management tools that are owned by the CRP leaders, practitioners and investors to enhance the overall success of individual CRPs and the portfolio. Montpellier, France, June 2016 Page 8 of 8

Big Data Addendum: response to the Full proposal ISPC Commentary and other adjustments

Big Data Addendum: response to the Full proposal ISPC Commentary and other adjustments Big Data Addendum: response to the Full proposal ISPC Commentary and other adjustments The CGIAR Big Data in Agriculture Platform thanks the ISPC for insightful and valuable comments on the 2017-2022 proposal.

More information

SUMMARY OF MAJOR DECISIONS. Fifty Seventh Meeting, Accra, Ghana. 30 April to 1 May 2015 Chair: Don Blackmore

SUMMARY OF MAJOR DECISIONS. Fifty Seventh Meeting, Accra, Ghana. 30 April to 1 May 2015 Chair: Don Blackmore SUMMARY OF MAJOR DECISIONS Fifty Seventh Meeting, Accra, Ghana 30 April to 1 May 2015 Chair: Don Blackmore CGIAR MATTERS CGIAR Governance Reforms, Strategy Results Framework (SRF) and Second Round of CRPs

More information

ISPC Assessment of the Platform on Big Data revised proposal ( )

ISPC Assessment of the Platform on Big Data revised proposal ( ) 14 September 2016 ISPC Assessment of the Platform on Big Data revised proposal (2017-2022) ISPC PLATFORM RATING 1 : A 1. Summary The social value of the data and knowledge products generated by CGIAR is

More information

INDIVIDUAL CONSULTANT PROCUREMENT NOTICE TOR - CONSULTANCY IC/2012/026. Date: 16 April 2012

INDIVIDUAL CONSULTANT PROCUREMENT NOTICE TOR - CONSULTANCY IC/2012/026. Date: 16 April 2012 INDIVIDUAL CONSULTANT PROCUREMENT NOTICE IC/2012/026 TOR - CONSULTANCY Date: 16 April 2012 Position: Consultant - RESOURCE MOBILISATION STRATEGY 2012-2015 for UNCT ETHIOPIA Duty Station: Addis Ababa, Ethiopia

More information

INTEGRATED MEDIUM TERM PLAN Director of Planning and Performance. To present the thb s Draft Integrated Medium Term Plan

INTEGRATED MEDIUM TERM PLAN Director of Planning and Performance. To present the thb s Draft Integrated Medium Term Plan INTEGRATED MEDIUM TERM PLAN 2015-18 BOARD MEETING 29 JANUARY 2015 AGENDA ITEM 2.1 Report of Director of Planning and Performance Paper prepared by Director of Planning and Performance Purpose of Paper

More information

2016 Consortium Program of Work and Budget

2016 Consortium Program of Work and Budget Version: 30 October 2015 Revision 1 2016 Consortium Program of Work and Budget Background The paper presents the proposed 2016 Program of Work and Budget of the CGIAR Consortium 1 ( 2016 PoWB ), approved

More information

CGIAR Research Programs Second Call for Proposals

CGIAR Research Programs Second Call for Proposals CGIAR Research Programs Second Call for Proposals 18 December 2014, version 3 Prepared by the CGIAR Consortium Office Health Warning: This draft of the Guidance for the CRP 2nd Call for Proposals is a

More information

Terms of Reference for consultancy to carry out Project Base line study in the Malawi, Mozambique, Tanzania, Zambia and SADC region

Terms of Reference for consultancy to carry out Project Base line study in the Malawi, Mozambique, Tanzania, Zambia and SADC region Terms of Reference for consultancy to carry out Project Base line study in the Malawi, Mozambique, Tanzania, Zambia and SADC region STRENGTHENING THE SOCIAL ACCOUNTABILITY AND OVERSIGHT CAPACITY OF PARLIAMENTARY

More information

Proposed Working Mechanisms for Joint UN Teams on AIDS at Country Level

Proposed Working Mechanisms for Joint UN Teams on AIDS at Country Level Proposed Working Mechanisms for Joint UN Teams on AIDS at Country Level Guidance Paper United Nations Development Group 19 MAY 2006 TABLE OF CONTENTS Introduction A. Purpose of this paper... 1 B. Context...

More information

2011 SURVEY ON MONITORING THE PARIS DECLARATION

2011 SURVEY ON MONITORING THE PARIS DECLARATION TASK TEAM ON MONITORING THE PARIS DECLARATION 2011 SURVEY ON MONITORING THE PARIS DECLARATION Revised Survey Materials Initial Annotated Draft 3 May 2010 FOR COMMENT This initial text with annotations

More information

Fund Council. April 25-26, Fund Office Financial and Scorecard Report. (Approved)

Fund Council. April 25-26, Fund Office Financial and Scorecard Report. (Approved) Fund Council 9 th Meeting (FC9) New Delhi, India April 25-26, 2013 2012 Fund Office Financial and Scorecard Report (Approved) Document presented for Agenda Item 3: 2012 Scorecards and Financial Reports

More information

Round-table discussion on the process to identify information to be provided under Article 9, paragraph 5, of the Paris Agreement

Round-table discussion on the process to identify information to be provided under Article 9, paragraph 5, of the Paris Agreement United Nations FCCC/CP/2017/INF.2 Distr.: General 19 October 2017 English Only Conference of the Parties Twenty-third session Bonn, 6 17 November 2017 Item 10(f) of the provisional agenda Matters relating

More information

WHO reform: programmes and priority setting

WHO reform: programmes and priority setting WHO REFORM: MEETING OF MEMBER STATES ON PROGRAMMES AND PRIORITY SETTING Document 1 27 28 February 2012 20 February 2012 WHO reform: programmes and priority setting Programmes and priority setting in WHO

More information

Version 2.0- Project. Q: What is the current status of your project? A: Completed

Version 2.0- Project. Q: What is the current status of your project? A: Completed Baker College, MI Project: Develop an institutional quality assurance framework to measure institutional effectiveness and drive continuous quality improvement efforts Version 2.0- Project What is the

More information

NEPAD/Spanish Fund for African Women s empowerment

NEPAD/Spanish Fund for African Women s empowerment NEPAD/Spanish Fund for African Women s empowerment Project Proposal Format Annex 0 1 P age Proposal Format Proposal Cover Page: PROPOSAL TO THE NEPAD- SPANISH FUND FOR AFRICAN WOMEN s EMPOWERMENT Organization

More information

INTERNAL AUDIT DIVISION REPORT 2016/155. Audit of the United Nations Human Settlements Programme project management process

INTERNAL AUDIT DIVISION REPORT 2016/155. Audit of the United Nations Human Settlements Programme project management process INTERNAL AUDIT DIVISION REPORT 2016/155 Audit of the United Nations Human Settlements Programme project management process Established policies and procedures need to be further strengthened, particularly

More information

Annex 1: The One UN Programme in Ethiopia

Annex 1: The One UN Programme in Ethiopia Annex 1: The One UN Programme in Ethiopia Introduction. 1. This One Programme document sets out how the UN in Ethiopia will use a One UN Fund to support coordinated efforts in the second half of the current

More information

ZIMBABWE_Reporting format for final scoring (Ref. 4)

ZIMBABWE_Reporting format for final scoring (Ref. 4) Process 1: Bringing people in the same space Score each step: 0 (not applicable); 1 (started); 2 (on-going); 3 (nearly completed); 4 (completed) STEP 1. Select/develop coordinating mechanisms at country

More information

Summary and Recommendations by the Standing Committee on Finance on the 2016 Biennial Assessment and Overview of Climate Finance Flows

Summary and Recommendations by the Standing Committee on Finance on the 2016 Biennial Assessment and Overview of Climate Finance Flows Summary and Recommendations by the Standing Committee on Finance on the 2016 Biennial Assessment and Overview of Climate Finance Flows Seyni Nafo and Outi Honkatukia 7 November, 2016 Functions and the

More information

TERMS OF REFERENCE FOR INTERNATIONAL CONSULTANT

TERMS OF REFERENCE FOR INTERNATIONAL CONSULTANT TERMS OF REFERENCE FOR INTERNATIONAL CONSULTANT Title: Countries: Duration: Analysis and Advocacy for Child-Centred Budgeting Botswana, Lesotho, Namibia, South Africa and Swaziland 40 working days, spread

More information

NCF Glossary 1. November 2017

NCF Glossary 1. November 2017 NCF Glossary 1 November 2017 1 This glossary in developed specifically for NCF projects and thus the definitions only relate to NCF projects. Please note that the Glossary is subject to revisions by NDF.

More information

EBA/Rec/2017/02. 1 November Final Report on. Recommendation on the coverage of entities in a group recovery plan

EBA/Rec/2017/02. 1 November Final Report on. Recommendation on the coverage of entities in a group recovery plan EBA/Rec/2017/02 1 November 2017 Final Report on Recommendation on the coverage of entities in a group recovery plan Contents Executive summary 3 Background and rationale 5 1. Compliance and reporting obligations

More information

INTERNATIONAL ASSOCIATION OF INSURANCE SUPERVISORS

INTERNATIONAL ASSOCIATION OF INSURANCE SUPERVISORS Guidance Paper No. 2.2.x INTERNATIONAL ASSOCIATION OF INSURANCE SUPERVISORS GUIDANCE PAPER ON ENTERPRISE RISK MANAGEMENT FOR CAPITAL ADEQUACY AND SOLVENCY PURPOSES DRAFT, MARCH 2008 This document was prepared

More information

CGIAR Research Program Portfolio (CRP2) Final Guidance for Full Proposals

CGIAR Research Program Portfolio (CRP2) Final Guidance for Full Proposals 2017-2022 CGIAR Research Program Portfolio (CRP2) Final Guidance for Full Proposals 19 December 2015 PREFACE The CGIAR Consortium is issuing this 2 nd call full proposals guidance document (Guidance) 1

More information

Linking Country Level Monitoring and Evaluation to FCPF Progress Reporting

Linking Country Level Monitoring and Evaluation to FCPF Progress Reporting 1 Forest Carbon Partnership Facility Linking Country Level Monitoring and Evaluation to FCPF Progress Reporting September 26, 2013 Aim of this presentation Explain how the various monitoring and evaluation

More information

The Global Fund. Financial Management Handbook for Grant Implementers. December 2017 Geneva, Switzerland

The Global Fund. Financial Management Handbook for Grant Implementers. December 2017 Geneva, Switzerland The Global Fund Financial Management Handbook for Grant Implementers Geneva, Switzerland This page has been intentionally left blank Table of Contents 1 Executive Summary... 4 1.1 Introduction... 4 1.2

More information

Development Impact Bond Working Group Summary Document: Consultation Draft

Development Impact Bond Working Group Summary Document: Consultation Draft Development Impact Bond Working Group Summary Document: Consultation Draft FULL REPORT CONTENTS 2 Working Group Membership 4 Foreword 6 Summary 8 Development Impact Bond Working Group Recommendations 17

More information

NEW ZEALAND. Submission to the Ad Hoc Working Group on the Durban Platform for Enhanced Action. Work Stream 1 October 2014

NEW ZEALAND. Submission to the Ad Hoc Working Group on the Durban Platform for Enhanced Action. Work Stream 1 October 2014 NEW ZEALAND Submission to the Ad Hoc Working Group on the Durban Platform for Enhanced Action Work Stream 1 October 2014 Nationally Determined Contributions Context This submission responds to the invitation

More information

Strategic Orientation for the Future of the PMR Proposal on Modality for Funding Additional Activities under the PMR

Strategic Orientation for the Future of the PMR Proposal on Modality for Funding Additional Activities under the PMR Strategic Orientation for the Future of the PMR Proposal on Modality for Funding Additional Activities under the PMR Mr. Adrien de Bassompierre PMR Secretariat Thirteenth Meeting of the Partnership Assembly

More information

WHITE PAPER. Solvency II Compliance and beyond: Title The essential steps for insurance firms

WHITE PAPER. Solvency II Compliance and beyond: Title The essential steps for insurance firms WHITE PAPER Solvency II Compliance and beyond: Title The essential steps for insurance firms ii Contents Introduction... 1 Step 1 Data Management... 1 Step 2 Risk Calculations... 3 Solvency Capital Requirement

More information

Budgeting by Priorities Results Team Kickoff. January 3, 2014

Budgeting by Priorities Results Team Kickoff. January 3, 2014 Budgeting by Priorities Results Team Kickoff January 3, 2014 Aligning to the Strategic Plan What does it mean? Ability to identify how much money you spend by strategic plan priority. Ability to show that

More information

PEFA Training. Dakar, Senegal January & February 1, #PEFA. PEFA Secretariat

PEFA Training. Dakar, Senegal January & February 1, #PEFA. PEFA Secretariat www.pefa.org #PEFA PEFA Training Dakar, Senegal January 30-31 & February 1, 2019 PEFA Secretariat Improving public financial management. Supporting sustainable development. INTRODUCTION Introductions Participant

More information

LFA Spot check Terms of Reference Guidance Note for LFAs

LFA Spot check Terms of Reference Guidance Note for LFAs Guidance Note LFA Spot check Terms of Reference Guidance Note for LFAs 01 Background The LFA spot check Terms of Reference (ToR) outline the work to be undertaken by the LFA across several programmatic

More information

RICE CRP Proposal Budget Narrative

RICE CRP Proposal Budget Narrative RICE CRP Proposal Budget Narrative The purpose of the CRP budget narrative is to summarize the information provided in the Flagship budget narratives and participating partners excel-based budget templates

More information

CRP Proposal Budget Narrative

CRP Proposal Budget Narrative CRP Proposal Budget Narrative The purpose of the CRP budget narrative is to summarize the information provided in the Flagship budget narratives and participating partners excel-based budget templates

More information

PEFA Handbook. Volume I: The PEFA Assessment Process Planning, Managing and Using PEFA

PEFA Handbook. Volume I: The PEFA Assessment Process Planning, Managing and Using PEFA PEFA Handbook Volume I: The PEFA Assessment Process Planning, Managing and Using PEFA October 18, 2016 PEFA Secretariat Washington DC USA 1 Table of Contents PEFA ASSESSMENT HANDBOOK... 5 Preface... 5

More information

MODALITY FOR FUNDING ADDITIONAL ACTIVITIES UNDER THE PMR: DRAFT PROPOSAL FOR DISCUSSION. PMR Note PA

MODALITY FOR FUNDING ADDITIONAL ACTIVITIES UNDER THE PMR: DRAFT PROPOSAL FOR DISCUSSION. PMR Note PA MODALITY FOR FUNDING ADDITIONAL ACTIVITIES UNDER THE PMR: DRAFT PROPOSAL FOR DISCUSSION PMR Note PA13 2015-4 October 14, 2015 I. INTRODUCTION 1. In an effort to further facilitate discussions on the PMR

More information

South Sudan Common Humanitarian Fund Allocation Process Guidelines

South Sudan Common Humanitarian Fund Allocation Process Guidelines South Sudan Common Humanitarian Fund Allocation Process Guidelines 27 January 2012 ACRONYMS AB CAP CERF CHF HC HCT HFU ISWG NCE NGO OCHA OPS PPA PRT PUNO TOR UN UNDP Advisory Board Consolidated Appeal

More information

Joint Venture on Managing for Development Results

Joint Venture on Managing for Development Results Joint Venture on Managing for Development Results Managing for Development Results - Draft Policy Brief - I. Introduction Managing for Development Results (MfDR) Draft Policy Brief 1 Managing for Development

More information

IMI2 PROPOSAL TEMPLATE

IMI2 PROPOSAL TEMPLATE IMI2 PROPOSAL TEMPLATE (TECHNICAL ANNEX) RESEARCH AND INNOVATION ACTIONS & INNOVATION ACTIONS Note: This is for information only. The definitive template for your call will be available in the submission

More information

INSIGHT REPORT RECONCILIATION INDIVIDUAL CLIENT SEGREGATION IN PRACTICE MANAGING THE OPERATIONAL IMPACT OF EMIR

INSIGHT REPORT RECONCILIATION INDIVIDUAL CLIENT SEGREGATION IN PRACTICE MANAGING THE OPERATIONAL IMPACT OF EMIR INSIGHT REPORT RECONCILIATION INDIVIDUAL CLIENT SEGREGATION IN PRACTICE MANAGING THE OPERATIONAL IMPACT OF EMIR Contents 1 A new era for derivatives operations 1 EMIR comes into effect 2 Client segregation

More information

DRAFT TEXT on. Version 08/12/ :20. Draft text produced under the APA Co-Chairs responsibility

DRAFT TEXT on. Version 08/12/ :20. Draft text produced under the APA Co-Chairs responsibility DRAFT TEXT on APA 1.7 agenda item 3 Further guidance in relation to the mitigation section of decision 1/CP.21 on: (a) Features of nationally determined contributions, as specified in paragraph 26; (b)

More information

Administrative Classification of the Budget: Practical Experience of Reform in Tajikistan

Administrative Classification of the Budget: Practical Experience of Reform in Tajikistan Administrative Classification of the Budget: Practical Experience of Reform in Tajikistan Michael Parry, Principal, Michael Parry Consulting LLP George Gridilian, Managing Partner, ECORYS-Tajikistan LLC

More information

CGIAR System 3-Year Business Plan ( ) Companion Document

CGIAR System 3-Year Business Plan ( ) Companion Document SC7 Meeting Agenda Item 10 Issued: 2 November 2018 CGIAR System 3-Year Business Plan (2019-2021) Companion Document 2019-2021 Advisory Bodies Work Plans and Budgets Business Plan Actions: 8.1 - Implement

More information

PEFA Handbook. Volume I: The PEFA Assessment Process Planning, Managing and Using PEFA

PEFA Handbook. Volume I: The PEFA Assessment Process Planning, Managing and Using PEFA PEFA Handbook Volume I: The PEFA Assessment Process Planning, Managing and Using PEFA Second edition November 20, 2018 PEFA Secretariat Washington DC, USA Table of Contents PEFA ASSESSMENT HANDBOOK...

More information

Fund for Gender Equality Monitoring and Evaluation Framework Executive Summary

Fund for Gender Equality Monitoring and Evaluation Framework Executive Summary Fund for Gender Equality Monitoring and Framework Executive Summary Primary Goal of the Monitoring and Framework The overall aim of this Monitoring and (M&E) Framework is to ensure that the Fund for Gender

More information

UNEP/OzL.Pro.30/4/Add.1/Rev.1. United Nations Environment Programme

UNEP/OzL.Pro.30/4/Add.1/Rev.1. United Nations Environment Programme UNITED NATIONS EP UNEP/OzL.Pro.30/4/Add.1/Rev.1 Distr.: General 15 October 2018 Original: English United Nations Environment Programme Thirtieth Meeting of the Parties to the Montreal Protocol on Substances

More information

IATI Country Pilot Synthesis Report May June 2010

IATI Country Pilot Synthesis Report May June 2010 IATI Country Pilot Synthesis Report May June 2010 Executive Summary Overall goal of pilots The country pilots have successfully proved the IATI concept that it is possible get data from multiple donor

More information

NYISO Capital Budgeting Process. Draft 01/13/03

NYISO Capital Budgeting Process. Draft 01/13/03 NYISO Capital Budgeting Process Draft 01/13/03 1 1.0 INTRODUCTION An effective, capital budgeting process is essential to ensure sound capital investment decisions. This report details a recommended approach

More information

Improving System Financing Modalities

Improving System Financing Modalities Agenda Item 7 For Decision Issued: 24 October 2017 Improving System Financing Modalities Purpose a. Building on the System Council May 2017 discussions on improving financing modalities, this document

More information

10 th October Dear Sir/Madam:

10 th October Dear Sir/Madam: Pinners Hall 105-108 Old Broad Street London EC2N 1EX tel: + 44 (0)20 7216 8947 fax: + 44 (0)20 7216 8928 web: www.ibfed.org 10 th October 2014 Secretariat of the Basel Committee on Banking Supervision

More information

INTERNATIONAL MONETARY FUND. The G-20 Mutual Assessment Process and the Role of the Fund. (In consultation with Research and Other Departments)

INTERNATIONAL MONETARY FUND. The G-20 Mutual Assessment Process and the Role of the Fund. (In consultation with Research and Other Departments) INTERNATIONAL MONETARY FUND The G-20 Mutual Assessment Process and the Role of the Fund Prepared by the Strategy, Policy, and Review Department and the Legal Department (In consultation with Research and

More information

Relationship with UNFCCC and External Bodies

Relationship with UNFCCC and External Bodies Relationship with UNFCCC and External Bodies 19 June 2013 Meeting of the Board 26-28 June 2013 Songdo, Republic of Korea Agenda item 9 Page b Recommended action by the Board It is recommended that the

More information

Fourth Report of the Green Climate Fund to the Conference of the Parties to the United Nations Framework Convention on Climate Change

Fourth Report of the Green Climate Fund to the Conference of the Parties to the United Nations Framework Convention on Climate Change Fourth Report of the Green Climate Fund to the Conference of the Parties to the United Nations Framework Convention on Climate Change GCF/B.10/08 26 June 2015 Meeting of the Board 6 9 July 2015 Songdo,

More information

Project Selection Risk

Project Selection Risk Project Selection Risk As explained above, the types of risk addressed by project planning and project execution are primarily cost risks, schedule risks, and risks related to achieving the deliverables

More information

Armenia: Infrastructure Sustainability Support Program

Armenia: Infrastructure Sustainability Support Program Technical Assistance Report Project Number: 46220 Policy and Advisory Technical Assistance (PATA) December 2012 Armenia: Infrastructure Sustainability Support Program The views expressed herein are those

More information

(Re)insurance Fast Forward. Régis DELAYAT Senior Digital Advisor to the Chairman February 28 th, 2018

(Re)insurance Fast Forward. Régis DELAYAT Senior Digital Advisor to the Chairman February 28 th, 2018 (Re)insurance Fast Forward Régis DELAYAT Senior Digital Advisor to the Chairman February 28 th, 2018 Agenda 1 The value of standards (ACORD source) 2 2 3 The global Ruschlikon initiative With B3i, less

More information

Business Plan

Business Plan Business Plan 2017-2019 Contents Executive Summary 3 Introduction 4 1. Market trends 5 2. Member survey 6 3. Strategy 2017-2019 9 Key Priorities 2017-2019 1. Professional 11 2. Research 12 3. Market Information

More information

Study of relationship between Ministry of Health and Ministry of Finance in Ghana

Study of relationship between Ministry of Health and Ministry of Finance in Ghana Study of relationship between Ministry of Health and Ministry of Finance in Ghana Presentation at the Global Health Initiative, Woodrow Wilson International Center for Scholars June 24, 2009 Content of

More information

REQUEST FOR EXPRESSIONS OF INTEREST AFRICAN DEVELOPMENT BANK 01 B.P.

REQUEST FOR EXPRESSIONS OF INTEREST AFRICAN DEVELOPMENT BANK 01 B.P. REQUEST FOR EXPRESSIONS OF INTEREST AFRICAN DEVELOPMENT BANK Avenue Joseph Anoma, 01 B.P. 1387, Abidjan, CÔTE D'IVOIRE Programming and Budget Department (SNPB) E-mail: a.maquengo@afdb.org / b.mugova@afdb.org

More information

75 working days spread over 4 months with possibility of extension 1. BACKGROUND

75 working days spread over 4 months with possibility of extension 1. BACKGROUND TERMS OF REFERENCE 1. Environmental Finance Expert Contracting Agency: Coordinating Agency: Place: Expected duration: United Nations Development Programme (UNDP) Bhutan UNDP Country Office Thimphu, Bhutan.

More information

TERMS OF REFERENCE FOR INDIVIDUAL CONTRACTORS

TERMS OF REFERENCE FOR INDIVIDUAL CONTRACTORS TERMS OF REFERENCE FOR INDIVIDUAL CONTRACTORS ASSIGNMENT TITLE: International Planning/Budgeting Expert Discussion Paper - Integration of the SDGs into Myanmar s Planning and Budgeting Frameworks DURATION:

More information

Summary report. Technical workshop on principles guiding new investments in agriculture: Screening of prospective investors and investment proposals

Summary report. Technical workshop on principles guiding new investments in agriculture: Screening of prospective investors and investment proposals Summary report Technical workshop on principles guiding new investments in agriculture: Screening of prospective investors and investment proposals Lilongwe, Malawi, 26-27 September 2017 1 1. Introduction

More information

Reforms to Victoria s native vegetation permitted clearing regulations

Reforms to Victoria s native vegetation permitted clearing regulations Reforms to Victoria s native vegetation permitted clearing regulations Outline 1. Background to native vegetation regulation 2. Reforms to Victoria s native vegetation permitted clearing regulations 3.

More information

JORDAN. Terms of Reference

JORDAN. Terms of Reference JORDAN Terms of Reference Jordan: Strengthening municipal financial management systems to sustain service delivery in municipalities affected by the refugee crisis Assessment of Municipal Public Financial

More information

REPORT FROM THE COMMISSION TO THE EUROPEAN PARLIAMENT AND THE COUNCIL

REPORT FROM THE COMMISSION TO THE EUROPEAN PARLIAMENT AND THE COUNCIL EUROPEAN COMMISSION Brussels, 30.1.2018 COM(2018) 48 final REPORT FROM THE COMMISSION TO THE EUROPEAN PARLIAMENT AND THE COUNCIL on the implementation of the Common Monitoring and Evaluation System for

More information

Performance Management in Whitehall. DSO Review Guidance

Performance Management in Whitehall. DSO Review Guidance Performance Management in Whitehall DSO Review Guidance April 2008 Table of Contents 1 Introduction... 1 1.1 Aims of Guidance... 1 1.2 Departmental Strategic Objectives and Performance Management... 1

More information

Methodology and Inputs for the 2017 Valuation: Initial assessment. Technical discussion document for sponsoring employers

Methodology and Inputs for the 2017 Valuation: Initial assessment. Technical discussion document for sponsoring employers NOTE: This document was first circulated to stakeholders in February 2017 as part of the Trustee's preparations for the 2017 valuation. In December 2017, a formal actuarial report was submitted to the

More information

INTERNAL AUDIT DIVISION REPORT 2018/058. Audit of the management of the regular programme of technical cooperation

INTERNAL AUDIT DIVISION REPORT 2018/058. Audit of the management of the regular programme of technical cooperation INTERNAL AUDIT DIVISION REPORT 2018/058 Audit of the management of the regular programme of technical cooperation There was a need to enhance complementarity of activities related to the regular programme

More information

DECISIONS TAKEN WITH RESPECT TO THE REVIEW OF IPCC PROCESSES AND PROCEDURES COMMUNICATIONS STRATEGY

DECISIONS TAKEN WITH RESPECT TO THE REVIEW OF IPCC PROCESSES AND PROCEDURES COMMUNICATIONS STRATEGY IPCC 33 rd SESSION, 10-13 May 2011, ABU DHABI, UAE DECISIONS TAKEN WITH RESPECT TO THE REVIEW OF IPCC PROCESSES AND PROCEDURES COMMUNICATIONS STRATEGY Decision Recalling the recommendation of the InterAcademy

More information

Programmatic approach to funding proposals

Programmatic approach to funding proposals Meeting of the Board 28 30 June 2016 Songdo, Incheon, Republic of Korea Provisional agenda Item 12(g) GCF/B.13/18 20 June 2016 Programmatic approach to funding proposals Summary This document builds on

More information

NEXT STEPS FOR CONVERTING INTENDED NATIONALLY DETERMINED CONTRIBUTIONS INTO ACTION

NEXT STEPS FOR CONVERTING INTENDED NATIONALLY DETERMINED CONTRIBUTIONS INTO ACTION POLICY REPORT: NEXT STEPS FOR CONVERTING INTENDED NATIONALLY DETERMINED CONTRIBUTIONS INTO ACTION WRITTEN BY: Hannah Pitt, Paolo Cozzi and Laurence Blandford CONTRIBUTIONS FROM: Leila Surratt MARCH 2016

More information

Project management guidelines. November 2013

Project management guidelines. November 2013 p r o j e c t m a n a g e m e n t g u i d e l i n e s N O V E M B E R 2 0 1 3 T e l e c o m m u n i c a t i o n D e v e l o p m e n t S e c t o r Project management guidelines November 2013 Please consider

More information

Private Fundraising: 2013 workplan and proposed budget

Private Fundraising: 2013 workplan and proposed budget Distr.: General E/ICEF/2013/AB/L.1 3 December 2012 Original: English For action United Nations Children s Fund Executive Board First regular session 2013 5-8 February 2013 Item 12 of the provisional agenda*

More information

October Review of the Asian Development Bank s Service Charges for the Administration of Grant Cofinancing from External Sources

October Review of the Asian Development Bank s Service Charges for the Administration of Grant Cofinancing from External Sources October 2009 Review of the Asian Development Bank s Service Charges for the Administration of Grant Cofinancing from External Sources i ABBREVIATIONS ADB Asian Development Bank AfDB African Development

More information

Final Preliminary Survey Report Audit of Budgeting and Forecasting. June 19, Office of Audit and Evaluation

Final Preliminary Survey Report Audit of Budgeting and Forecasting. June 19, Office of Audit and Evaluation 2013-705 Audit of Budgeting and Forecasting June 19, 2014 Office of Audit and Evaluation TABLE OF CONTENTS INTRODUCTION... 1 BACKGROUND... 1 OBJECTIVE, SCOPE AND APPROACH... 3 RISK ASSESSMENT... 4 PRELIMINARY

More information

Sections of the ORSA Report

Sections of the ORSA Report Lessons Learned From Orsa Reviews Impact on Risk Focused Examination NAIC Insurance Summit INS Companies Joe Fritsch, Director INS Companies Don Carbone, Exam Manager INS Companies Sections of the ORSA

More information

Scope of Work For Conducting Baseline Assessment on Investment for Flood Resilience (including Disaster Risk Reduction and Climate Change Adaptation)

Scope of Work For Conducting Baseline Assessment on Investment for Flood Resilience (including Disaster Risk Reduction and Climate Change Adaptation) Scope of Work For Conducting Baseline Assessment on Investment for Flood Resilience (including Disaster Risk Reduction and Climate Change Adaptation) 1. Introduction Mercy Corps is an international, non-governmental

More information

Informal note by the co-facilitators

Informal note by the co-facilitators SBI agenda item 15 Matters related to climate finance: Identification of the information to be provided by Parties in accordance with Article 9, paragraph 5, of the Paris Agreement Informal note by the

More information

Management response to the recommendations deriving from the evaluation of the Mali country portfolio ( )

Management response to the recommendations deriving from the evaluation of the Mali country portfolio ( ) Executive Board Second regular session Rome, 26 29 November 2018 Distribution: General Date: 23 October 2018 Original: English Agenda item 7 WFP/EB.2/2018/7-C/Add.1 Evaluation reports For consideration

More information

Solvency II Detailed guidance notes for dry run process. March 2010

Solvency II Detailed guidance notes for dry run process. March 2010 Solvency II Detailed guidance notes for dry run process March 2010 Introduction The successful implementation of Solvency II at Lloyd s is critical to maintain the competitive position and capital advantages

More information

Shared Business Plan and Budget Assumptions NERC and the Regional Entities Planning Period

Shared Business Plan and Budget Assumptions NERC and the Regional Entities Planning Period NERC and the Regional Entities 2013-2015 Planning Period Commencing in December 2011, NERC and the eight Regional Entities have been collaborating in the development of a common set of business planning

More information

Q&A on A.M. Best s Updated Credit Rating Methodology

Q&A on A.M. Best s Updated Credit Rating Methodology BEST S BRIEFING Our Insight, Your Advantage. October 13, 2017 A.M. Best anticipates that fewer than 5% of its current credit ratings will change owing to the adoption of the updated BCRM Q&A on A.M. Best

More information

Basic Introduction to Project Cycle. Management Using the. Logical Framework Approach

Basic Introduction to Project Cycle. Management Using the. Logical Framework Approach Basic Introduction to Project Cycle Management Using the Logical Framework Approach Developed and Presented by: Umhlaba Development Services Umhlaba Development Services Noswal Hall, Braamfontein, Johannesburg,

More information

The Treasury December 2005

The Treasury December 2005 The Treasury December 2005 For specific questions on any aspect of the Budget process, please contact your Treasury Vote Team. Feel free to email any general comments and suggestions for improvements to

More information

THE WORLD BANK TERMS OF REFERENCE Impact of carbon pricing instruments on national economy and contribution to NDC

THE WORLD BANK TERMS OF REFERENCE Impact of carbon pricing instruments on national economy and contribution to NDC THE WORLD BANK TERMS OF REFERENCE Impact of carbon pricing instruments on national economy and contribution to NDC A. Project Background and Objectives Partnership for Market Readiness The Partnership

More information

B.29[17d] Medium-term planning in government departments: Four-year plans

B.29[17d] Medium-term planning in government departments: Four-year plans B.29[17d] Medium-term planning in government departments: Four-year plans Photo acknowledgement: mychillybin.co.nz Phil Armitage B.29[17d] Medium-term planning in government departments: Four-year plans

More information

Working Towards a Harmonized Framework for Impact Reporting for Social Bonds

Working Towards a Harmonized Framework for Impact Reporting for Social Bonds Working Towards a Harmonized Framework for Impact Reporting for Social Bonds June 2018 Contents Introduction...2 Core Principles...4 Recommendations...5 Sample Summary Template for Reporting on Social

More information

Term. Explanation. Benefit Sharing

Term. Explanation. Benefit Sharing Note on Benefit Sharing for Emission Reductions Programs Under the Forest Carbon Partnership Facility and BioCarbon Fund Initiative for Sustainable Forest Landscapes January 2019 Version Introduction Benefit

More information

ATI Work Plan 2017 / 2018 facilitated by funded by

ATI Work Plan 2017 / 2018 facilitated by funded by ATI Work Plan 2017 / 2018 facilitated by funded by Imprint The International Tax Compact (ITC) is an informal platform that aims to enhance domestic revenue mobilisation in partner countries, and to promote

More information

GFOA AWARD FOR BEST PRACTICES IN SCHOOL BUDGETING. Applicant and Judge's Guide

GFOA AWARD FOR BEST PRACTICES IN SCHOOL BUDGETING. Applicant and Judge's Guide GFOA AWARD FOR BEST PRACTICES IN SCHOOL BUDGETING Applicant and Judge's Guide GFOA Award for Best Practices in School Budgeting Applicant and Judges Guide Introduction... 2 Definitions... 2 About the Award...

More information

DECISION ADOPTED BY THE CONFERENCE OF THE PARTIES TO THE CONVENTION ON BIOLOGICAL DIVERSITY AT ITS ELEVENTH MEETING

DECISION ADOPTED BY THE CONFERENCE OF THE PARTIES TO THE CONVENTION ON BIOLOGICAL DIVERSITY AT ITS ELEVENTH MEETING CBD Distr. GENERAL UNEP/CBD/COP/DEC/XI/5 5 December 2012 ORIGINAL: ENGLISH CONFERENCE OF THE PARTIES TO THE CONVENTION ON BIOLOGICAL DIVERSITY Eleventh meeting Hyderabad, India, 8-19 October 2012 Agenda

More information

COMMISSION DELEGATED REGULATION (EU) No /.. of

COMMISSION DELEGATED REGULATION (EU) No /.. of EUROPEAN COMMISSION Brussels, 13.3.2014 C(2014) 1557 final COMMISSION DELEGATED REGULATION (EU) No /.. of 13.3.2014 supplementing Regulation (EU) No 575/2013 of the European Parliament and of the Council

More information

HLCM Procurement Network Procurement Process and Practice Harmonization in Support of Field Operations, Phase II

HLCM Procurement Network Procurement Process and Practice Harmonization in Support of Field Operations, Phase II HLCM Procurement Network Procurement Process and Practice Harmonization in Support of Field Operations, Phase II Introduction This Project proposal has been prepared by the HLCM Procurement Network (PN)

More information

Introduction Chapter 1, Page 1 of 9 1. INTRODUCTION

Introduction Chapter 1, Page 1 of 9 1. INTRODUCTION Introduction Chapter 1, Page 1 of 9 1. INTRODUCTION 1.1 OVERVIEW Preamble 1.1.1 The African Development Bank is the premier financial development institution in Africa dedicated to combating poverty and

More information

EU- WHO Universal Health Coverage Partnership: Supporting policy dialogue on national health policies, strategies and plans and universal coverage

EU- WHO Universal Health Coverage Partnership: Supporting policy dialogue on national health policies, strategies and plans and universal coverage EU- WHO Universal Health Coverage Partnership: Supporting policy dialogue on national health policies, strategies and plans and universal coverage Year 1 Report Oct. 2011 Dec. 2012 Abbreviations AFRO/IST

More information

Vietnam: IMF-World Bank Relations *

Vietnam: IMF-World Bank Relations * -1- Vietnam: IMF-World Bank Relations * Partnership in Vietnam s Development Strategy The government of Vietnam s development strategy is set forth in its Comprehensive Poverty Reduction and Growth Strategy

More information

Internal Audit of the Republic of Albania Country Office January Office of Internal Audit and Investigations (OIAI) Report 2017/24

Internal Audit of the Republic of Albania Country Office January Office of Internal Audit and Investigations (OIAI) Report 2017/24 Internal Audit of the Republic of Albania Country Office January 2018 Office of Internal Audit and Investigations (OIAI) Report 2017/24 Internal Audit of the Albania Country Office (2017/24) 2 Summary

More information

2. Introduction of a carve-in mechanism in the endorsement process of IFRS. 3. Revision of the endorsement criteria in the IAS Regulation

2. Introduction of a carve-in mechanism in the endorsement process of IFRS. 3. Revision of the endorsement criteria in the IAS Regulation European Commission Attn. Valdis Dombrovskis Financial Stability, Financial Services and Capital Markets Union 1049 Bruxelles/Brussels Belgium Our ref : RJ-XXX Direct dial : (+31) 20 301 0391 Date : 19

More information

Office of Inspector General

Office of Inspector General Audit Report OIG-14-036 Treasury Made Progress to Stand Up the Federal Insurance Office, But Missed Reporting Deadlines May 14, 2014 Office of Inspector General Department of the Treasury Contents Audit

More information