1 Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized R E S T R I C T E D FILE CopY Report No. P-279 This report was prepared for use within the Bank. It may not be published nor may it be quoted as representing the Bank's views. The Bank accepts no responsibility for the accuracy or completeness of the contents of the report. INTERNATIONAL BANK FOR RECONSTRUCTION AND DEVELOPMENT REPORT AND RECOMMENDATIONS OF THE PRESIDENT TO THE EXECUTIVE DIRECTORS ON A PROPOSED LOAN TO THE EMPRESA DE ENERGIA ELECTRICA DE BOGOTA IN COLOMBIA May 15, 1962

2 INTERNATIONAL BANK FOR RECONSTRUCTION AND DETELOPMENT REPORT AND RECO11AENDATIONS OF THE PRESIDENT TO THE EXECUTIVE DIRECTORS ON A PROPOSED LOAN TO EMPRESA DE ENERGIA ELECTRICA DE BOGOTA IN COLOMBIA 1. I submit the following report and recommendations on a proposed loan, of an amount in various currencies equivalent to $50 million, to Empresa de Energia Electrica de Bogota (EEEB), to assist in financing its second expansion program. PART I - HISTORICAL 2. In January 1960 the Bank made a loan to EEEB of $17.6 million (246 00) to assist in financing additions of 117 MW to its generating facilities (18 MW hydro at Laguneta, 66 MW hydro at Salto II and a 33 MW thermal generating unit at Zipaquira) and related transmission and distribution facilities. The 18 MW addition to the Laguneta hydro plant has been completed; the remaining 99 MW and other facilities are expected to be completed by the end of Engineering studies completed in 1961 indicated that the urgentlyneeded additional power for the Bogota area could most economically be provided by the El Colegio hydroelectric plant downstream from Laguneta on the Bogota River. The plant would have an initial capacity of 150 MW with civil works built to accommodate an ultimate capacity of 300 MW. In addition, the proposed program would include a second thermal unit of about 33 MW for the Zipaquira plant and other related facilities. 4. A Bank mission reviewed the project in mid Subsequently EEEB received an increase in tariffs of 32%, effective February 1, 1962, and made arrangements to borrow funds for its expansion program not covered by internal funds or the proposed loan. Negotiations began on April 16, EEEB was represented by Dr. Manuel Madero Paris, General Manager, Dr. Dario Valencia, Technical Director, and Dr. Ronaldo Alvarez, Auditor General; and the Government, by Dr. Carlos Sanz de Santamaria, Ambassador in Washington, and Dr. Ignacio Mesa, Minister. 5. The proposed loan would be the Bankts twentieth loan in Colombia and would increase the Bank's lending from $220.1 million to $270 million net of cancellations. The status of previous Bank loans is as follows: As of April 30, ($ million) Total loans net of cancellation J of which has been repaid 49 5 Total now outstanding Amount sold 10.1 of which has been repaid Net amount held by Bank / Including $69.6 million not yet disbursed

3 At present the Bank lhas under consideration additional projects in Colombia in the fields of transportation, power, industry and agriculture. PART II - DESCRIPTION OF THE PROPOSED LOAN 7. The main features of the proposed loan are as follows: BORROWER: GUARANTOR: AMOUNT: PURPOSE: Enpresa de Energia Electrica de Bogota (EEEB), an autonomous agency which provides electric power for Bogota and the surrounding area. Republic of Colombia The equivalent in various currencies of $50 million. To assist in financing PER'Is second expansion program, including (i) the El Colegio hydroelectric plant with an initial capacity of 150 MW, (ii) the addition of about 33 MW at the Zipaquira thermal plant, (iii) the second stage of the Guatavita Reservoir, (iv) related transmission and distribution facilities, (v) interest during construction, and (vi) expansion of the transmission and distribution facilities of CAR in the towns near Bogota. INTEREST RATE: 5-3/4h per annum. CCMMITMENT CHARGE: 3/4 of 1% per annum. TERM AND AMORTIZATION: PART III - 25 years, including 4 years of grace. Semi-annual installments from February 1, 1966 to February 1, LEGAL INSTRUMENTS AND LEGAL AUTHORTTY 8. A draft Loan Agreement between EEEB and the Bank (No. 1) and a draft Guarantee Agreement between the Republic of Colombia and the Bank (No. 2) are attached. 9. The draft Guarantee Agreement is in the usual form, and includes a provision of funds covenant (Section 2.02) and a rate covenant (Section 3.07). 10. The draft Loan Agreement follows closely the previous Loan Agreement with EEEB (246 CO). Provisions of special interest are:

4 - 3 - a. Section 2003(b) would permit withdrawals for expenditures in the currency of the Guarantor for engineering services. b. Part 8 of the project would provide for the extension of transmission and distribution facilities in the areas served by CAR, an autonomous corporation set up to develop the resources of the Sabana de Bogota. Withdrawals for this part of the project would be made only after EEEB and the Bank had agreed on the program to be undertaken by CAR and the Bank had approved the financial and administrative arrangements entered into between EEEB and CAR for carrying out part 8 of the project (Section 2.03). 11. Execution of the Loan Agreement has been authorized by EEEB's Board of Directors. In April 1962 the Colombian Congress enacted a law authorizing the Government to incur or guarantee new external debt up to $350 million for economic development and related purposes. Authorization to guarantee the proposed loan would be covered by this law. 12. The report of the Committee provided for under Article III, Section 4(iii) of the Articles of Agreement of the Bank is attached (No. 3). PART IV - APPRAISAL OF THE PROPOSED LOAN Justification of the Project 13. A detailed appraisal of the project (T.0307a) is attached (NOe4). 14. The capital city of Bogota, with about 1.2 million inhabitants, is Colombiats principal manufacturing, administrative and commercial center. For the past several years, electric power supply in Bogota has fallen behind demand, with consequent restrictions on residential and industrial consumption. Restrictions are expected to continue until late 1962, when the Salto II hydroelectric and the Zipaquira thermal plants are put into service. Even so, electric power sales have increased at an average annual rate of about 13% over the pest ten years, and are expected to continue increasing at about the same rate over the next ten years. 15. The project is the second stage of an expansion program which will enable EEEB to satisfy Bogota's growing power demand until The project,expected to be completed at the end of 1965, would increase present generating capacity by 183 knw to 428 VW. The second 33 MW thermal addition at Zipaquira, scheduled for completion in December 1963, will avoid a power shortage before completion of the first 50 MW unit of El Colegio in early 1965, 16. Along with the increase in generating facilities EEEB will need to make the substantial improvements and additions to its transmission and distribution facilities included in the project. The proposed loan would also include up to $1.7 million to be relent by EEEB to CAR (Corporacion Autonoma Regional de la Sabana de Bogota y los Valles de Ubate y Chiquinquira), an autonomous agency recently established to develop the water and agricultural resources of the plateau North and West of Bogota.

5 - 4 - This amount would be used for construction of transmission lines to and distribution facilities in several important towns in the region serviced by CAR. A reliable source of power from EEEB will help in the development of the region. 17. The unit cost of the first stage (150 MW) of the El Co'Legio development is equal to about $265 per kw capacity for firm hydro power. This would be reduced to about $190 per kw when the total 300 MW are installed. No alternative source of thermal power would be as economical. 18. The proposed loan would include $3.0 million to cover part of the local currency costs of engineering on the project. The principal engineering consultant on the project is a Colombian firm, Ingetec, Ltda. Its services are competitive in quality and price with those of competent non-colombian engineering firms whose services are normally financed by the Bank. The encouragement of competent local engineering firms is in the interest of developing countries as well as the Bank. The loan would cover the engineering expenditures incurred for the project in local currency during the period , when EEEB is experiencing a shortage of internally generated funds, and would also cover the foreign exchange costs of engineering during the entire construction period. 19. EEEBts rate of return on net fixed assets (including work in progress) is presently 11% and is expected to average from 9% to 10% over the seven-year period During this period, internal cash generation is expected to cover more than 40% of total construction expenditures. Debt service coverages are also satisfactory. Borrower 20. Empresa de Energia Electrica de Bogota was created in February 1959 with a life of 99 years. It is an autonomous entity, owned by the Municipality of Bogota, with financial and administrative independence. Under a trust agreement between the Municipality and the Colombian banks from which loans had been obtained, four of the seven directors of EEEB are presently appointed by the lending banks. The other directors, including the Chairman, are appointed by the Mlunicipality. In December 1959, the Municipal Council of Bogota adopted a resolution providing that upon the expiration of the trust agreement, now scheduled to take place in 1968, the Board of Directors of EEEB shall consist of the Mayor of Bogota, two members elected by the Council, three members chosen by the Council from lists submitted by associations representative of banks, commerce and industry of Bogota, and one member chosen by the President of the Republic. This resolution continues in effecto Arrangements for financing 21. The total cost of the project is estimated at the equivalent of $74h1 million of which $50 million would be covered by the proposed loan. The local currency costs of the project (exclusive of $3 million for local costs of engineering services to be covered by the proposed loan)

6 amount to $24.1 rmillion and would be met from EEEB's ow'm resources and from foreign and local borrowings of approximately $10 million equivalent. Commitments for these borrowings have been obtained by EEEB and completion of contractual arrangements is a condition of effectiveness of the proposed loan. Procurement 22. All major contracts for the project are to be let through international competitive bidding. Economic Situation 23. A report on the "Current Economic Position and Prospects of Colombia" (R-61-11) was distributed on February 1, A Bank mission was in Colombia in January-March 1962 to appraise Colombia's development program and is now completing its report. 24. A major objective of the development program is to obtain a 5*6% annual increase in Gross Domestic Product during the decade of the 1960's, in comparison with an average increase of less than 4% during The growth of per capita product, which has been relatively small in recent years, would be about 2.5% annually. Investment would rise substantially, increasing from 18% of Gross Domestic Product in to 26% in Nearly two-thirds of the increase would be financed from additional internal public and private savings, supplemented by increased external resources. Import-substitution would be accelerated and non-coffee exports would be expanded. 25. Considerable progress has been made during the past two years in establishing the basis for accelerated development. Both private and public investment has expanded and plans have been developed for further acceleration of public investment in both the economic overhead and the social fields. The Government has not, however, taken the measures in the financial field which the development program requires, and in 1961 most external credit disbursements were for emergency balance of payments purposes instead of for specific projects or specific purposes forming part of an overall program. 26. During 1961 total bank credit expanded rapidly (26%) and there was a current account deficit of more than $100 million in the balanpe ofpayments, leading to a drawing of $65 million from the IVF and a $45 million loan from the U.S. Government through the Export-Import Bank. Additional emergency assistance has been obtained from the U.S. Government and banks in 1962, and Colombia is continuing to draw from the Fund under a $10 million standby arrangement. Some measures are being taken to bring the balance of payments under better control. Advance import requirements have been substantially increased as a means of reducing the current pressure of demand for imports. Reserve requirements have been raised. The Government is now restricting budget expenditures and planning additional tax measures in an effort to reduce the budget deficit.

7 , Much more will have to be done to raise taxation and to reduce pressure on the balance of payments if the development program is to go forward successfully. The prospects for such action being taken are fairly good, now that the continuity of the coalition Government is virtually assured. If the necessary self-help measures are taken, it should be possible for Colombia to secure the external capital which the development program will require. 28. At the end of 1961 Colombia's external public debt amounted to $h26 million. Since then Colombia has contracted $72 million of loans for balance of payments purposes. Service payments on existing debt amount to about $75 million in 1962, or approximately 12% of current foreign exchange earnings, and are scheduled to decline to $45 million in 1966 when amortization of the proposed loan would start. However, Colombia can be expected to wish to incur substantial additions to her external debt to finance her proposed development program. The extent to which she will be able to do so will depend upon her following adequate policies designed to reduce balance of payments pressures and to restrain domestic credit expansion. Prospects of Fulfilment of Obligations 29. The project has been planned and is being supervised by experienced Colombian and foreign consultants, and should be efficiently executed. EEEB has agreed to strengthen its technical staff and appoint an officer for financial planning. The management is qualified to carry out the construction of the project and to operate the expanded power system. 30. The market prospects for the additional power to be produced by the project, the increase of rates already granted, together with the commitments received on local currency financing arrangements, and the tariff and financial covenants contained in the proposed Loan and Guarantee Agreements, afford assurances that funds will be available to complete the project and to service the proposed loan. 31. The transfer of debt service into foreign exchange,together with Colombia's other foreign exchange obligations, should not impose an undue burden on the Colombian economy. PART V - COMPLIANCE WITH ARTICLES OF AGREEMENT 329 I am satisfied that the proposed loan would comply with the Articles of Agreement of the Bank.

8 - 7 - PART VI - RECOf'IMENDi TIONS 33. I recommend that the Bank make a loan to Empresa de Energia Electrica de Bogota, with the guarantee of the Republic of Colombia, in an amount in various currencies equivalent to $50 million, for a term of 25 years, with interest (including commission) at 5-3/4% per annum and on such other terms as are specified in the attached draft Loan and Guarantee Agreements, and that the Executive Directors adopt a Resolution to that effect in the form attached (No. 5). Washington, D.C. May 15, 1962 Eugene R. Black President

FIE, COY INTERNATIONAL BANK FOR RECONSTRUCTION AND DEVELOPMENT REPORT AND RECOMMENDATION OF THE PRESIDENT TO THE EXECUTIVE DIRECTORS ON A

FIE, COY INTERNATIONAL BANK FOR RECONSTRUCTION AND DEVELOPMENT REPORT AND RECOMMENDATION OF THE PRESIDENT TO THE EXECUTIVE DIRECTORS ON A Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized FIE, COY RESTRICTED Report No. P-548 This report was prepared for use within the Bank

More information

R E S T R I C T E D. Report No.P 81

R E S T R I C T E D. Report No.P 81 Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized This document was prepared for internal use in the Bank. In making it available to others,

More information

RESTRICTED. Report No. P-224

RESTRICTED. Report No. P-224 Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized RESTRICTED This report was prepared for use within the Bank. In making it available to others, the Bank assumes no

More information

FILE ttpy. lanuary 27, 1959 R E S T R I C T E D. Report No. P-187

FILE ttpy. lanuary 27, 1959 R E S T R I C T E D. Report No. P-187 FILE ttpy R E S T R I C T E D This report was prepared for use within the Bank. In making it available to others, the Bank assumes no responsibility to them for the accuracy or completeness of the information

More information

FALL REPORT AND RECOMMENDATION OF THE PRESIDENT TO THE EXECUTIVE DIRECTORS ON A PROPOSED LOAN TO THE INSTITUTO NACIONAL DE OBRAS SANITARIAS (INOS)

FALL REPORT AND RECOMMENDATION OF THE PRESIDENT TO THE EXECUTIVE DIRECTORS ON A PROPOSED LOAN TO THE INSTITUTO NACIONAL DE OBRAS SANITARIAS (INOS) Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized FALL PY RESTRICTED Report No. P-474 This report was prepared for use within the Bank

More information

RESTRICTED. Report No. P-241 INTERNATIONAL BANK FOR RECONSTRUCTION AND DEVELOPMENT REPORT AND RECOMMENDATIONS OF THE PRESIDENT TO THE

RESTRICTED. Report No. P-241 INTERNATIONAL BANK FOR RECONSTRUCTION AND DEVELOPMENT REPORT AND RECOMMENDATIONS OF THE PRESIDENT TO THE Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized This report was prepared for use within the Bank. It may not be published nor may it

More information

FILE Copy Report LA- 3G -PD INTERNATIONAL BANK FOR RECONSTRUCTION AND DEVELOPMENT REPORT AND RECOMMENDATIONS OF THE PRESIDENT TO THE

FILE Copy Report LA- 3G -PD INTERNATIONAL BANK FOR RECONSTRUCTION AND DEVELOPMENT REPORT AND RECOMMENDATIONS OF THE PRESIDENT TO THE LA- 3G -PD Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized FILE Copy Report RESTRICTED No. p-347 This report was prepared for use within

More information

of the PRESIDENT to the EXECUTIVE DIRECTORS on the PROPOSED LOAN and to the in the July 9, 1953

of the PRESIDENT to the EXECUTIVE DIRECTORS on the PROPOSED LOAN and to the in the July 9, 1953 Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized P - 49 RESTRICTED This report is restricted to use within the Bank. INTERNATIONAL BANK

More information

F JIE CJtIY 1l Report No. P-605

F JIE CJtIY 1l Report No. P-605 Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized RESTRICTED F JIE CJtIY 1l Report No. P-605 This report was prepared for use within the

More information

FILE COPY FOR OFFICIAL USE ONLY. Document of The World Bank. Report No. P-2525-CO

FILE COPY FOR OFFICIAL USE ONLY. Document of The World Bank. Report No. P-2525-CO Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Document of The World Bank FILE COPY FOR OFFICIAL USE ONLY Report No. P-2525-CO REPORT

More information

FILE COPY. Report. LJ- w R E S T R I C T E D

FILE COPY. Report. LJ- w R E S T R I C T E D Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized LJ- w FILE COPY R E S T R I C T E D Report This report was prepared for use within the

More information

FILE COPY INTERNATIONAL BANK FOR RECONSTRUCTION AND DEVELOPMEINT REPORT AND RECOMMENDATION OF THE PRESIDENT TO THE EXECUTIVE DIRECTORS ON A

FILE COPY INTERNATIONAL BANK FOR RECONSTRUCTION AND DEVELOPMEINT REPORT AND RECOMMENDATION OF THE PRESIDENT TO THE EXECUTIVE DIRECTORS ON A Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized FILE COPY RESTRICTED Report No. P-720 This report was prepared for use within the Bank

More information

FILE COPY Report. No. P-82 INTERNATIONAL BANK FOR RECONSTRUCTION AND DEVELOPMENT REPORT AND RECOMMENDATIONS OF THE PRESIDENT TO THE

FILE COPY Report. No. P-82 INTERNATIONAL BANK FOR RECONSTRUCTION AND DEVELOPMENT REPORT AND RECOMMENDATIONS OF THE PRESIDENT TO THE Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized FILE COPY Report R E ST R ICTE D No. P-82 This report was prepared for use within the

More information

FILE COPY. This report is restricted to use within the Bank. REPORT ANTD RECOMMENDATIONS. Of the PRESIDENT. to the EXECUTIVE DIRECTORS.

FILE COPY. This report is restricted to use within the Bank. REPORT ANTD RECOMMENDATIONS. Of the PRESIDENT. to the EXECUTIVE DIRECTORS. Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized FILE COPY P-60 RESTRICTED This report is restricted to use within the Bank. L.N7ERNATJONAI

More information

FIlE COPY Report INTERNATIONAL BANK FOR RECONSTRUCTION AND DEVELOPMENT REPORT AND RECOMMENDATION OF THE PRESIDENT TO THE EXECUTIVE DIRECTORS ON A

FIlE COPY Report INTERNATIONAL BANK FOR RECONSTRUCTION AND DEVELOPMENT REPORT AND RECOMMENDATION OF THE PRESIDENT TO THE EXECUTIVE DIRECTORS ON A Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized FIlE COPY Report RESTRICTED No. p-479 This report was prepared for use within the Bank

More information

FILE COPY. Document of The World Bank FOR OFFICIAL 165E ONLY. November 2, 1978

FILE COPY. Document of The World Bank FOR OFFICIAL 165E ONLY. November 2, 1978 Public Disclosure Authorized Document of The World Bank FOR OFFICIAL 165E ONLY FILE COPY Report No. 2078a-CO Public Disclosure Authorized STAFF APPRAISAL REPORT COLOMBIA MESITAS HYDROELECTRIC POWER PROJECT

More information

FILE COPY Report No. P-29

FILE COPY Report No. P-29 Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized REST R I.CTE D FILE COPY Report No. P-29 This report was prepared for use within the

More information

FILE COPY Report No. P-769

FILE COPY Report No. P-769 Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized RESTRICTED FILE COPY Report No. P-769 This report was prepared for use within the Bank

More information

PRESIDENT TO THE EXECUTIVE DIRECTORS ON PROPOSED LOANS TO

PRESIDENT TO THE EXECUTIVE DIRECTORS ON PROPOSED LOANS TO Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized FLE Ecopy Report RESTRICTED No. P-937 This report was prepared for use within the Bank

More information

COPY FILE INTERNATIONAL BANK FOR RECONSTRUCTION AND DEVELOPMENT INTERNATIONAL DEVELOPMENT ASSOCIATION. September 23, 1969 REPORT AND RECOMMENDATION

COPY FILE INTERNATIONAL BANK FOR RECONSTRUCTION AND DEVELOPMENT INTERNATIONAL DEVELOPMENT ASSOCIATION. September 23, 1969 REPORT AND RECOMMENDATION Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized FILE COPY RESTRICTED Report No. P-742 This report was prepared for use within the Bank

More information

FLE COPY P-67 RESTRICTED REPORT AND RECOMMENDATIONS OF THE PRESIDENT TO THE EXECUTIVE DIRECTORS A PROPOSED LOAN TO

FLE COPY P-67 RESTRICTED REPORT AND RECOMMENDATIONS OF THE PRESIDENT TO THE EXECUTIVE DIRECTORS A PROPOSED LOAN TO Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized FLE COPY This report is restricted to use within the Bank. P-67 RESTRICTED INTERNATIONAL

More information

Loan Assumption Agreement

Loan Assumption Agreement Public Disclosure Authorized CONFORMED COPY LOAN NUMBER 3936-D-RO Public Disclosure Authorized Loan Assumption Agreement (Power Sector Rehabilitation and Modernization Project) between Public Disclosure

More information

FILE copy INTERNATIONAL BANK FOR RECONSTRUCTION AND DEVELOPMENT REPORT AND RECOMMENDATIONS OF THE PRESIDENT TO THE EXECUTIVE DIRECTORS ON A

FILE copy INTERNATIONAL BANK FOR RECONSTRUCTION AND DEVELOPMENT REPORT AND RECOMMENDATIONS OF THE PRESIDENT TO THE EXECUTIVE DIRECTORS ON A Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized FILE copy R E5RESTRICTED Report No. P-371 This report was prepared for use within the

More information

FILE COPY INTERNATIONAL BANK FOR RECONSTRUCTION AND DEVELOPMENT PRESIDENT. Report No. P-819 REPORT AND RECOMMENDATION OF THE TO THE

FILE COPY INTERNATIONAL BANK FOR RECONSTRUCTION AND DEVELOPMENT PRESIDENT. Report No. P-819 REPORT AND RECOMMENDATION OF THE TO THE Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized FILE COPY RESTRICTED Report No. P-819 This report was prepared for use within the Bank

More information

FILE COPY' cn'clnxrin 'P

FILE COPY' cn'clnxrin 'P Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized FILE COPY' cn'clnxrin 'P ThRNEDT DIVISION ACIVE-S This report was prepared for use within

More information

FILE COPY INTERNATIONAL BANK FOR RECONSTRUCTION AND DEVELOPMENT. Report No. P-721 REPORT AND RECOMMENDATION OF THE PRESIDENT TO THE

FILE COPY INTERNATIONAL BANK FOR RECONSTRUCTION AND DEVELOPMENT. Report No. P-721 REPORT AND RECOMMENDATION OF THE PRESIDENT TO THE Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized FILE COPY RESTRICTED Report No. P-721 This report was prepared for use within the Bank

More information

FILE COPY. FILE CO Y. XReport No. P-743 INTERNATIONAL BANK FOR RECONSTRUCTION AND DEVELOPMENT. September 24, 1969 REPORT AND RECOMMENDATION OF THE

FILE COPY. FILE CO Y. XReport No. P-743 INTERNATIONAL BANK FOR RECONSTRUCTION AND DEVELOPMENT. September 24, 1969 REPORT AND RECOMMENDATION OF THE Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized FILE COPY. FILE CO Y RESTRICTED XReport No. P-743 This report was prepared for use within

More information

INTERNATIONAL BANK FOR RECONSTRUCTION AND DEVELOPMENT

INTERNATIONAL BANK FOR RECONSTRUCTION AND DEVELOPMENT Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized stv RESTRICTED %ti~v~ y5 gty Report No. P-531 This report was prepored for use within

More information

FLE CO Y Report No. E P -7

FLE CO Y Report No. E P -7 Public Disclosure Authorized RESTRICTED FLE CO Y Report No. E P -7 This report was prepared for use within the Bank and its affiliated organizations. They do not accept responsibility for its accuracy

More information

Loan Agreement. Io~CIAL. Dated. Public Disclosure Authorized. DoOCTJMENTSLOAN NUMBER 1911 YU Public Disclosure Authorized

Loan Agreement. Io~CIAL. Dated. Public Disclosure Authorized. DoOCTJMENTSLOAN NUMBER 1911 YU Public Disclosure Authorized Public Disclosure Authorized Io~CIAL DoOCTJMENTSLOAN NUMBER 1911 YU Public Disclosure Authorized Loan Agreement (Fifth Industrial Credit Project) Public Disclosure Authorized between INTERNATIONAL BANK

More information

ASIAN DEVELOPMENT BANK

ASIAN DEVELOPMENT BANK TAR:LAO 29284 ASIAN DEVELOPMENT BANK TECHNICAL ASSISTANCE TO ThE LAO PEOPLE'S DEMOCRATIC REPUBLIC FOR ThE CORPORATE AND FINANCIAL DEVELOPMENT OF ELECTRICIT DU LAO LI LI May 1996 - -I CURRENCY EQUIVALENTS

More information

Global Partnership on Output-based Aid. Colombia Access to Natural Gas Project. Operational Manual. March 30, 2007

Global Partnership on Output-based Aid. Colombia Access to Natural Gas Project. Operational Manual. March 30, 2007 Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized 1. Detailed description of Project 1.1. The Grant Recipients: Global Partnership on Output-based

More information

INTERNATIONAL BANK FOR RECONSTRUCTION AND DEVELOPMENT

INTERNATIONAL BANK FOR RECONSTRUCTION AND DEVELOPMENT Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized FLE c y Report RESTRICTED No. P-808 This report was prepared for use within the Bank

More information

INTERNATIONAL BANK FOR RECONSTRUCTION AND DEVELOPMENT. of the PRESIDENT.. - to the EXECUTIVE DIRECTORS. on the PROPOSED LOAN

INTERNATIONAL BANK FOR RECONSTRUCTION AND DEVELOPMENT. of the PRESIDENT.. - to the EXECUTIVE DIRECTORS. on the PROPOSED LOAN LtV- 3 CO Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized INTERNATIONAL BANK FOR RECONSTRUCTION AND DEVELOPMENT RESTRICTED No. Loan P

More information

IDBI Loan Agreement. Public Disclosure Authorized LOAN NUMBER 3779 IN. Public Disclosure Authorized. (Industrial Pollution Prevention Project)

IDBI Loan Agreement. Public Disclosure Authorized LOAN NUMBER 3779 IN. Public Disclosure Authorized. (Industrial Pollution Prevention Project) Public Disclosure Authorized LOAN NUMBER 3779 IN Public Disclosure Authorized IDBI Loan Agreement Public Disclosure Authorized (Industrial Pollution Prevention Project) between INTERNATIONAL BANK FOR RECONSTRUCTION

More information

FILE CO-PY Report No. P-315

FILE CO-PY Report No. P-315 Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized RESTRICTED FILE CO-PY Report No. P-315 This report was prepared for use within the Bank

More information

INTERNATIONAL BANK FOR RECONSTRUCTION AND DEVELOPMENT

INTERNATIONAL BANK FOR RECONSTRUCTION AND DEVELOPMENT Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized R E S T R I C T E D This report was prepared for use within the Bank. In making it available

More information

FIL COPYrRE FILE COPY INTERNATIONAL BANK FOR RECONSTRUCTION AND DEVELOPMENT REPORT AND RECOMMENDATIONS OF THE PRESIDENT TO THE EXECUTIVE DIRECTORS

FIL COPYrRE FILE COPY INTERNATIONAL BANK FOR RECONSTRUCTION AND DEVELOPMENT REPORT AND RECOMMENDATIONS OF THE PRESIDENT TO THE EXECUTIVE DIRECTORS Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized 7 FIL COPYrRE RESTRICTED -Report RIC No. P-337 FILE COPY This report was prepared for

More information

FIE COPY Report No. P-32

FIE COPY Report No. P-32 Public Disclosure Authorized Public Disclosure Authorized RESTR ICTED FIE COPY Report No. P-32 This report was prepared for use within the Bank and its affiliated organizations. They do not accept responsibility

More information

FILE Copy Report. No. P 87 R E S T R I C T E D

FILE Copy Report. No. P 87 R E S T R I C T E D Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized FILE Copy Report This document was prepared for internal use in the Bank. In making it

More information

Company Overview Market Overview and Business Strategy Financial Overview Development Key Takeaways

Company Overview Market Overview and Business Strategy Financial Overview Development Key Takeaways 1 Company Overview Market Overview and Business Strategy Financial Overview Development Key Takeaways 2 COMPANY OVERVIEW 3 About AES Gener Operations in 4 markets: SIC and SING in Chile, SIN in Colombia

More information

FILE COPY R E S T R I C T E D. Report No. P-132

FILE COPY R E S T R I C T E D. Report No. P-132 Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized FILE COPY R E S T R I C T E D This report was prepared for use within the Bank. In making

More information

FILE COPY Report OF THE PRESIDENT TO THE EXECUTIVE DIRECTORS ON A PROPOSED LOAN ISLAMIC REPUBLIC OF PAKISTAN FOR THE PAKISTAN WESTERN RAILWAY

FILE COPY Report OF THE PRESIDENT TO THE EXECUTIVE DIRECTORS ON A PROPOSED LOAN ISLAMIC REPUBLIC OF PAKISTAN FOR THE PAKISTAN WESTERN RAILWAY Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized FILE COPY Report RESTR ICTED No. p-546 This report was prepared for use within the Bank

More information

ONE WEEK. RP TU DN is i 'y Report No. TO-426a INTERNATIONAL BANK FOR RECONSTRUCTION AND DEVELOPMENT INTERNATIONAL DEVELOPMENT ASSOCIATION

ONE WEEK. RP TU DN is i 'y Report No. TO-426a INTERNATIONAL BANK FOR RECONSTRUCTION AND DEVELOPMENT INTERNATIONAL DEVELOPMENT ASSOCIATION Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized - & - -l,"

More information

Below we present the main impacts on the financial statements as of December 31, 2014 resulting from the change of standards.

Below we present the main impacts on the financial statements as of December 31, 2014 resulting from the change of standards. Empresas Públicas de Medellín E.S.P. (hereinafter, "EPM" or the "company") is the parent company of an economic group consisting of 48 companies with presence in Colombia, Chile, El Salvador, Guatemala,

More information

Public Disclosure Authorized. Public Disclosure Authorized. Public Disclosure Authorized. Public Disclosure Authorized CONFORMED COPY

Public Disclosure Authorized. Public Disclosure Authorized. Public Disclosure Authorized. Public Disclosure Authorized CONFORMED COPY Public Disclosure Authorized CONFORMED COPY LOAN NUMBER 2806-3 MOR Public Disclosure Authorized (Industrial Export Finance Project) between INTERNATIONAL BANK FOR RECONSTRUCTION AND DEVELOPMENT Public

More information

Development Credit Agreement. (Urban Poverty Project) between REPUBLIC OF INDONESIA. and INTERNATIONAL DEVELOPMENT ASSOCIATION. Dated May 28, 1999

Development Credit Agreement. (Urban Poverty Project) between REPUBLIC OF INDONESIA. and INTERNATIONAL DEVELOPMENT ASSOCIATION. Dated May 28, 1999 Public Disclosure Authorized CONFORMED COPY CREDIT NUMBER 3210 IND Public Disclosure Authorized Development Credit Agreement (Urban Poverty Project) between REPUBLIC OF INDONESIA and Public Disclosure

More information

RS Project Agreement. (Second Local Initiatives (Microfinance) Project) between INTERNATIONAL DEVELOPMENT ASSOCIATION. and REPUBLIKA SRPSKA

RS Project Agreement. (Second Local Initiatives (Microfinance) Project) between INTERNATIONAL DEVELOPMENT ASSOCIATION. and REPUBLIKA SRPSKA Public Disclosure Authorized CONFORMED COPY CREDIT NUMBER 3533 BOS Public Disclosure Authorized RS Project Agreement (Second Local Initiatives (Microfinance) Project) between INTERNATIONAL DEVELOPMENT

More information

Development Credit Agreement

Development Credit Agreement Public Disclosure Authorized CREDIT NUMBER 286 EC CONFORMED COPY Public Disclosure Authorized Development Credit Agreement (Third Power Project) Public Disclosure Authorized BETWEEN REPUBLIC OF ECUADOR

More information

Loan Agreement. Public Disclosure Authorized CONFORMED COPY. Public Disclosure Authorized. (Sixth Korea Development Finance Corporation Project)

Loan Agreement. Public Disclosure Authorized CONFORMED COPY. Public Disclosure Authorized. (Sixth Korea Development Finance Corporation Project) Public Disclosure Authorized CONFORMED COPY LOAN NUMBER 1461 KO Public Disclosure Authorized Loan Agreement (Sixth Korea Development Finance Corporation Project) Public Disclosure Authorized between INTERNATIONAL

More information

Loan Agreement. (National Pension Administration Technical Assistance Project) between ARGENTINE REPUBLIC. and

Loan Agreement. (National Pension Administration Technical Assistance Project) between ARGENTINE REPUBLIC. and Public Disclosure Authorized CONFORMED COPY LOAN NUMBER 4131-AR Public Disclosure Authorized Loan Agreement (National Pension Administration Technical Assistance Project) between ARGENTINE REPUBLIC and

More information

LOAN AGREEMENT. (Fourth Rural Credit Project) INTERNATIONAL BANK FOR RECONSTRUCTION AND DEVELOPMENT. and. Dated April 11, 1977

LOAN AGREEMENT. (Fourth Rural Credit Project) INTERNATIONAL BANK FOR RECONSTRUCTION AND DEVELOPMENT. and. Dated April 11, 1977 Public Disclosure Authorized CONFORMED COPY LOAN NUMBER 1399 PH Public Disclosure Authorized LOAN AGREEMENT (Fourth Rural Credit Project) Public Disclosure Authorized between INTERNATIONAL BANK FOR RECONSTRUCTION

More information

Transportadora de Gas del Interior S.A. E.S.P. - TGI S.A. E.S.P. and its Subsidiary

Transportadora de Gas del Interior S.A. E.S.P. - TGI S.A. E.S.P. and its Subsidiary Transportadora de Gas del Interior S.A. E.S.P. - TGI S.A. E.S.P. and its Subsidiary Financial Statements as of December 31, 2007 and for the Period from February 16, 2007 (date of incorporation) to December

More information

INTERNATIONAL BANK FOR RECONSTRUCTION AND DEVELOPMENT

INTERNATIONAL BANK FOR RECONSTRUCTION AND DEVELOPMENT Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized RESTRICTED Report No. P-739 This report was prepared for use within the Bank and its

More information

FILL CP INTERNATIONAL BANK FOR RECONSTRUCTION AND DEVELOPMENT MALAYSIA REPORT AND RECOMMENDATION PRESIDENT TO THE EXECUTIVE DIRECTORS ON A PROPOSED TO

FILL CP INTERNATIONAL BANK FOR RECONSTRUCTION AND DEVELOPMENT MALAYSIA REPORT AND RECOMMENDATION PRESIDENT TO THE EXECUTIVE DIRECTORS ON A PROPOSED TO Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized FILL CP RESTRICTED Report No. P-589 This report was prepared for use within the Bank

More information

Development Credit Agreement

Development Credit Agreement CONFORMED COPY CREDIT NUMBER 3372 CM Development Credit Agreement (Petroleum Environment Capacity Enhancement (CAPECE) Project) between REPUBLIC OF CAMEROON and INTERNATIONAL DEVELOPMENT ASSOCIATION Dated

More information

Loan Agreement. (Power System Improvement Project) between INTERNATIONAL BANK FOR RECONSTRUCTION AND DEVELOPMENT. and ELECTROSTOPANSTVO NA MAKEDONIJA

Loan Agreement. (Power System Improvement Project) between INTERNATIONAL BANK FOR RECONSTRUCTION AND DEVELOPMENT. and ELECTROSTOPANSTVO NA MAKEDONIJA Public Disclosure Authorized LOAN NUMBER 4284 MK CONFORMED COPY Public Disclosure Authorized Loan Agreement (Power System Improvement Project) between INTERNATIONAL BANK FOR RECONSTRUCTION AND DEVELOPMENT

More information

(Electric Power Sector Project) between THE ARGENTINE REPUBLIC. and INTERNATIONAL BANK FOR RECONSTRUCTION AND DEVELOPMENT. Dated November 18, 1988

(Electric Power Sector Project) between THE ARGENTINE REPUBLIC. and INTERNATIONAL BANK FOR RECONSTRUCTION AND DEVELOPMENT. Dated November 18, 1988 Public Disclosure Authorized CONFORMED COPY LOAN NUMBER 2998 AR Public Disclosure Authorized (Electric Power Sector Project) between THE ARGENTINE REPUBLIC Public Disclosure Authorized and INTERNATIONAL

More information

Project Agreement CONFORMED COPY LOAN NUMBER 1130 TU. (Corum-Cankiri Rural Development Project) BETWEEN

Project Agreement CONFORMED COPY LOAN NUMBER 1130 TU. (Corum-Cankiri Rural Development Project) BETWEEN Public Disclosure Authorized LOAN NUMBER 1130 TU CONFORMED COPY Public Disclosure Authorized Project Agreement (Corum-Cankiri Rural Development Project) Public Disclosure Authorized BETWEEN INTERNATIONAL

More information

Loan Agreement _IV. (Fourth KDB Project) between INTERNATIONAL BANK FOR RECONSTRUCTION AND DEVELOPMENT. and KOREA DEVELOPMENT BANK

Loan Agreement _IV. (Fourth KDB Project) between INTERNATIONAL BANK FOR RECONSTRUCTION AND DEVELOPMENT. and KOREA DEVELOPMENT BANK _IV Et)AN NUMBER 1933 KO Loan Agreement (Fourth KDB Project) between INTERNATIONAL BANK FOR RECONSTRUCTION AND DEVELOPMENT and KOREA DEVELOPMENT BANK Dated a 1981 WAN NUMBER 1933 KO LDAN AGREEMENT AGREEMENT,

More information

Loan Agreement. Dated July 26, Public Disclosure Authorized CONFORMED COPY LOAN NUMBER 1611 YU. Public Disclosure Authorized

Loan Agreement. Dated July 26, Public Disclosure Authorized CONFORMED COPY LOAN NUMBER 1611 YU. Public Disclosure Authorized Public Disclosure Authorized CONFORMED COPY LOAN NUMBER 1611 YU Public Disclosure Authorized Loan Agreement (Third Industrial Credit Project) Public Disclosure Authorized between INTERNATIONAL BANK FOR

More information

Development Financing Agreement

Development Financing Agreement Public Disclosure Authorized CONFORMED COPY CREDIT NUMBER 4042 - MAL GRANT NUMBER H148 - MAL Public Disclosure Authorized Development Financing Agreement Public Disclosure Authorized (Post Tsunami Recovery

More information

Project Agreement. Public Disclosure Authorized CONFORMED COPY LOAN NUMBER 2224 BR. Public Disclosure Authorized. (Third Feeder Roads Project)

Project Agreement. Public Disclosure Authorized CONFORMED COPY LOAN NUMBER 2224 BR. Public Disclosure Authorized. (Third Feeder Roads Project) Public Disclosure Authorized CONFORMED COPY LOAN NUMBER 2224 BR Public Disclosure Authorized Project Agreement (Third Feeder Roads Project) Public Disclosure Authorized between INTERNATIONAL BANK FOR RECONSTRUCTION

More information

Loan Agreement. (Industrial Finance Project) between INTERNATIONAL BANK FOR RECONSTRUCTION AND DEVELOPMENT. and

Loan Agreement. (Industrial Finance Project) between INTERNATIONAL BANK FOR RECONSTRUCTION AND DEVELOPMENT. and Public Disclosure Authorized LOAN NUMBER 3136-4 MOR Loan Agreement Public Disclosure Authorized (Industrial Finance Project) between INTERNATIONAL BANK FOR RECONSTRUCTION AND DEVELOPMENT and BANQUE MAROCAINE

More information

Loan Agreement. Public Disclosure Authorized LOAN NUMBER 3771 BUL. Public Disclosure Authorized. (Agricultural Development Project)

Loan Agreement. Public Disclosure Authorized LOAN NUMBER 3771 BUL. Public Disclosure Authorized. (Agricultural Development Project) Public Disclosure Authorized LOAN NUMBER 3771 BUL Public Disclosure Authorized Loan Agreement (Agricultural Development Project) Public Disclosure Authorized between REPUBLIC OF BULGARIA and Public Disclosure

More information

Document of. The World Bank FOR OFFICIAL USE ONLY REPORT AND RECOMMENDATION OF THE PRESIDENT OF THE

Document of. The World Bank FOR OFFICIAL USE ONLY REPORT AND RECOMMENDATION OF THE PRESIDENT OF THE Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized FILE COPY Document of The World Bank FOR OFFICIAL USE ONLY REPORT AND RECOMMENDATION

More information

Loan Agreement. (Xiaolangdi Multipurpose Project: Stage II) between PEOPLE S REPUBLIC OF CHINA. and

Loan Agreement. (Xiaolangdi Multipurpose Project: Stage II) between PEOPLE S REPUBLIC OF CHINA. and Public Disclosure Authorized CONFORMED COPY LOAN NUMBER 4200 CHA Public Disclosure Authorized Loan Agreement (Xiaolangdi Multipurpose Project: Stage II) between PEOPLE S REPUBLIC OF CHINA and Public Disclosure

More information

Public Disclosure Authorized. Public Disclosure Authorized. Public Disclosure Authorized. Public Disclosure Authorized CONFORMED COPY

Public Disclosure Authorized. Public Disclosure Authorized. Public Disclosure Authorized. Public Disclosure Authorized CONFORMED COPY Public Disclosure Authorized CONFORMED COPY CREDIT NUMBER 2785 VN Public Disclosure Authorized Development Credit Agreement (Payment System and Bank Modernization Project) between SOCIALIST REPUBLIC OF

More information

Financing Agreement OFFICIAL OCUMENTS. Public Disclosure Authorized CREDIT NUMBER 5152-UZ. Public Disclosure Authorized

Financing Agreement OFFICIAL OCUMENTS. Public Disclosure Authorized CREDIT NUMBER 5152-UZ. Public Disclosure Authorized Public Disclosure Authorized OFFICIAL OCUMENTS CREDIT NUMBER 5152-UZ Public Disclosure Authorized Financing Agreement (Additional Financing for the Second Rural Enterprise Support Project) between Public

More information

Project Agreement. (Shanghai Urban Environment Project) between INTERNATIONAL BANK FOR RECONSTRUCTION AND DEVELOPMENT. and SHANGHAI MUNICIPALITY

Project Agreement. (Shanghai Urban Environment Project) between INTERNATIONAL BANK FOR RECONSTRUCTION AND DEVELOPMENT. and SHANGHAI MUNICIPALITY Public Disclosure Authorized CONFORMED COPY LOAN NUMBER 4705-CHA Public Disclosure Authorized Public Disclosure Authorized Project Agreement (Shanghai Urban Environment Project) between INTERNATIONAL BANK

More information

The World Bank Guarantees

The World Bank Guarantees The World Bank Guarantees Leveraging Private Finance for Emerging Markets Financial Solutions Unit Finance, Economics and Urban Development Department 1 Sustainable Development Network Vice-Presidency

More information

FOR OFFICIAL USE ONLY REPORT AND RECOMMENDATION OF THE PRESIDENT OF THE TO THE EXECUTIVE DIRECTORS ON A PROPOSED LOAN

FOR OFFICIAL USE ONLY REPORT AND RECOMMENDATION OF THE PRESIDENT OF THE TO THE EXECUTIVE DIRECTORS ON A PROPOSED LOAN Public Disclosure Authorized Document of The World Bank FOR OFFICIAL USE ONLY Report No. P-3799-HO Public Disclosure Authorized Public Disclosure Authorized REPORT AND RECOMMENDATION OF THE PRESIDENT OF

More information

Project Agreement. Public Disclosure Authorized CONFORMED COPY LOAN NUMBER 1583 CO. Public Disclosure Authorized. Interconnection Project)

Project Agreement. Public Disclosure Authorized CONFORMED COPY LOAN NUMBER 1583 CO. Public Disclosure Authorized. Interconnection Project) Public Disclosure Authorized CONFORMED COPY LOAN NUMBER 1583 CO Public Disclosure Authorized Project Agreement (500-kV Interconnection Project) Public Disclosure Authorized between INTERNATIONAL BANK FOR

More information

THE PRESIDENT OF THE REPUBLIC OF INDONESIA REGULATION OF THE GOVERNMENT OF THE REPUBLIC OF INDONESIA

THE PRESIDENT OF THE REPUBLIC OF INDONESIA REGULATION OF THE GOVERNMENT OF THE REPUBLIC OF INDONESIA REGULATION OF THE GOVERNMENT OF THE REPUBLIC OF INDONESIA NUMBER 10 OF 2011 ON PROCEDURES OF FOREIGN LOANS PROCUREMENT AND GRANTS RECEIPT BY THE GRACE OF GOD ALMIGHTY Considering : a. that in order to

More information

R e p o r t N o. P-105

R e p o r t N o. P-105 This document was prepared for internal use in the Bank. In making it available to others, the Bank assumes no responsibility to them for the accuracy or completeness of the information contained herein.

More information

Project Agreement. Public Disclosure Authorized CONFORMED COPY LOAN NUMBER 1674 PA. Public Disclosure Authorized

Project Agreement. Public Disclosure Authorized CONFORMED COPY LOAN NUMBER 1674 PA. Public Disclosure Authorized Public Disclosure Authorized CONFORMED COPY Public Disclosure Authorized Project Agreement LOAN NUMBER 1674 PA Public Disclosure Authorized (Livestock and Agricultural Development Project) between INTERNATIONAL

More information

Financing Agreement CONFORMED COPY CREDIT NUMBER IQ. (Dokan and Derbandikhan Emergency Hydropower Project) between REPUBLIC OF IRAQ.

Financing Agreement CONFORMED COPY CREDIT NUMBER IQ. (Dokan and Derbandikhan Emergency Hydropower Project) between REPUBLIC OF IRAQ. Public Disclosure Authorized CONFORMED COPY CREDIT NUMBER 4249 - IQ Public Disclosure Authorized Financing Agreement (Dokan and Derbandikhan Emergency Hydropower Project) Public Disclosure Authorized between

More information

Loan Agreement. Public Disclosure Authorized CONFORMED COPY LOAN NUMBER 1438 KE. Public Disclosure Authorized

Loan Agreement. Public Disclosure Authorized CONFORMED COPY LOAN NUMBER 1438 KE. Public Disclosure Authorized Public Disclosure Authorized CONFORMED COPY LOAN NUMBER 1438 KE 77-1)7 7 Public Disclosure Authorized Loan Agreement (Third Industrial Development Bank Project) Public Disclosure Authorized between INTERNATIONAL

More information

Loan Agreement. (Central Provinces Electrification Project) INTERNATIONAL BANK FOR RECONSTRUCTION AND DEVELOPMENT

Loan Agreement. (Central Provinces Electrification Project) INTERNATIONAL BANK FOR RECONSTRUCTION AND DEVELOPMENT Public Disclosure Authorized LOAN NUMBER 322 PAN Public Disclosure Authorized Loan Agreement (Central Provinces Electrification Project) BETWEEN Public Disclosure Authorized INTERNATIONAL BANK FOR RECONSTRUCTION

More information

Development Credit Agreement. (Provincial Health Project) between REPUBLIC OF INDONESIA. and INTERNATIONAL DEVELOPMENT ASSOCIATION

Development Credit Agreement. (Provincial Health Project) between REPUBLIC OF INDONESIA. and INTERNATIONAL DEVELOPMENT ASSOCIATION Public Disclosure Authorized CONFORMED COPY CREDIT NUMBER 3381 IND Public Disclosure Authorized Development Credit Agreement (Provincial Health Project) between REPUBLIC OF INDONESIA and Public Disclosure

More information

Development Credit Agreement

Development Credit Agreement Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized CONFORMED COPY CREDIT NUMBER 3993 STP Development Credit Agreement (Governance Capacity Building Technical Assistance

More information

PEOPLE S REPUBLIC OF CHINA

PEOPLE S REPUBLIC OF CHINA Public Disclosure Authorized CONFORMED COPY LOAN NUMBER 7529-CN Public Disclosure Authorized Loan Agreement (Energy Efficiency Financing Project) Public Disclosure Authorized between PEOPLE S REPUBLIC

More information

774- 'I. Public Disclosure Authorized CONFORMED COPY LOAN NUMBER 1369 EGT. Public Disclosure Authorized LOAN AGREEMENT

774- 'I. Public Disclosure Authorized CONFORMED COPY LOAN NUMBER 1369 EGT. Public Disclosure Authorized LOAN AGREEMENT 774- 'I CONFORMED COPY LOAN NUMBER 1369 EGT LOAN AGREEMENT (Alexandria Water Supply Project) between INTERNATIONAL BANK FOR RECONSTRUCTION AND DEVELOPMENT and ALEXANDRIA WATER GENERAL AUTHORITY Public

More information

Loan Agreement. (Eastern Indonesia Region Transport Project) between REPUBLIC OF INDONESIA. and INTERNATIONAL BANK FOR RECONSTRUCTION AND DEVELOPMENT

Loan Agreement. (Eastern Indonesia Region Transport Project) between REPUBLIC OF INDONESIA. and INTERNATIONAL BANK FOR RECONSTRUCTION AND DEVELOPMENT CONFORMED COPY LOAN NUMBER 4643 IND Loan Agreement (Eastern Indonesia Region Transport Project) between REPUBLIC OF INDONESIA and INTERNATIONAL BANK FOR RECONSTRUCTION AND DEVELOPMENT Dated January 22,

More information

LOAN AGREEMENT. (Ialomita-Calmatui Irrigation Project) between INTERNATIONAL BANK FOR RECONSTRUCTION AND DEVELOPMENT. and

LOAN AGREEMENT. (Ialomita-Calmatui Irrigation Project) between INTERNATIONAL BANK FOR RECONSTRUCTION AND DEVELOPMENT. and CONFORMED COPY Public Disclosure Authorized LOAN NUMBER 1368 RO LOAN AGREEMENT (Ialomita-Calmatui Irrigation Project) between INTERNATIONAL BANK FOR RECONSTRUCTION AND DEVELOPMENT and BANCA PENTRU AGRICULTURA

More information

(c) Section 3.07 is deleted and the following is substituted therefor:

(c) Section 3.07 is deleted and the following is substituted therefor: 2 outstanding Loan on which a higher Fixed Spread is applicable. The amount of the Rebate shall be determined by multiplying (i) the difference between the Fixed Spread applicable to the outstanding Loan

More information

First Quarter 2018 Financial Report

First Quarter 2018 Financial Report Medellin, May 8, 2018 EPM Group announces consolidated financial results as of March 31, 2018 Empresas Públicas de Medellin E.S.P. and subsidiaries (hereinafter, "EPM Group") is the holding company of

More information

Loan Agreement CONFORMED COPY LOAN NUMBER 1146 JM INTERNATIONAL BANK FOR RECONSTRUCTION AND DEVELOPMENT THE WATER COMMISSION, KINGSTON, JAMAICA

Loan Agreement CONFORMED COPY LOAN NUMBER 1146 JM INTERNATIONAL BANK FOR RECONSTRUCTION AND DEVELOPMENT THE WATER COMMISSION, KINGSTON, JAMAICA Public Disclosure Authorized LOAN NUMBER 1146 JM CONFORMED COPY Public Disclosure Authorized Loan Agreement (Kingston Sewerage and Water Supply Project) Public Disclosure Authorized BETWEEN INTERNATIONAL

More information

Washington Utilities and Transportation Commission

Washington Utilities and Transportation Commission Mission Statement: The UTC protects consumers by ensuring that utility and transportation services are fairly priced, available, reliable, and safe. Washington Utilities and Transportation Commission Beginning

More information

JUNE

JUNE JUNE 2005 www.endesachile.cl INDEX BUSINESS RESULTS COUNTRY ANALYSIS BUSINESS OUTLOOK CONCLUSIONS BUSINESS Highlights One of the largest private power producers in Latin America, with plants in Argentina,

More information

Loan Agreement CONFORMED COPY LOAN NUMBER 1033 MAS. (Education Project) BETWEEN MAURITIUS AND INTERNATIONAL BANK FOR RECONSTRUCTION AND DEVELOPMENT

Loan Agreement CONFORMED COPY LOAN NUMBER 1033 MAS. (Education Project) BETWEEN MAURITIUS AND INTERNATIONAL BANK FOR RECONSTRUCTION AND DEVELOPMENT Public Disclosure Authorized LOAN NUMBER 1033 MAS CONFORMED COPY Public Disclosure Authorized Loan Agreement (Education Project) Public Disclosure Authorized BETWEEN MAURITIUS AND INTERNATIONAL BANK FOR

More information

Project Agreement LOAN NUMBER 2104 DO. picaal. and. Public Disclosure Authorized. Public Disclosure Authorized

Project Agreement LOAN NUMBER 2104 DO. picaal. and. Public Disclosure Authorized. Public Disclosure Authorized Public Disclosure Authorized picaal LOAN NUMBER 2104 DO Public Disclosure Authorized Project Agreement Public Disclosure Authorized (Sites and Services Project) between INTERNATIONAL BANK FOR RECONSTRUCTION

More information

Public Disclosure Authorized COPY CONFORMED NUMBER 1238 BO. Public Disclosure Authorized. (Fourth Power Project) Public Disclosure Authorized between

Public Disclosure Authorized COPY CONFORMED NUMBER 1238 BO. Public Disclosure Authorized. (Fourth Power Project) Public Disclosure Authorized between Public Disclosure Authorized LOAN CONFORMED NUMBER 1238 BO COPY Public Disclosure Authorized LOAN AGREEMENT (Fourth Power Project) Public Disclosure Authorized between INTERNATIONAL BANK FOR RECONSTRUCTION

More information

Development Credit Agreement. (Management of the Petroleum Economy Project) between REPUBLIC OF CHAD. and INTERNATIONAL DEVELOPMENT ASSOCIATION

Development Credit Agreement. (Management of the Petroleum Economy Project) between REPUBLIC OF CHAD. and INTERNATIONAL DEVELOPMENT ASSOCIATION Public Disclosure Authorized CONFORMED COPY CREDIT NUMBER 3316 CD Public Disclosure Authorized Development Credit Agreement (Management of the Petroleum Economy Project) between REPUBLIC OF CHAD and Public

More information

Loan Agreement INTERNATIONAL BANK FOR RECONSTRUCTION AND DEVELOPMENT CORPORACION DE FOMENTO DE LA PRODUCCION DATED OCTOBER 10, 1951

Loan Agreement INTERNATIONAL BANK FOR RECONSTRUCTION AND DEVELOPMENT CORPORACION DE FOMENTO DE LA PRODUCCION DATED OCTOBER 10, 1951 Public Disclosure Authorized LOAN NUMBER 49 CH Public Disclosure Authorized Loan Agreement (Rio Elqui Project) BETWEEN Public Disclosure Authorized INTERNATIONAL BANK FOR RECONSTRUCTION AND DEVELOPMENT

More information

Development Credit Agreement

Development Credit Agreement Public Disclosure Authorized OFFIC;AL DOCUMENTS CREDIT NUMBER 1948 CE Public Disclosure Authorized Development Credit Agreement (Third Industrial Development Project) Public Disclosure Authorized between

More information

Loan Agreement. (Cameron Highlands Project) INTERNATIONAL BANK FOR RECONSTRUCTION AND DEVELOPMENT

Loan Agreement. (Cameron Highlands Project) INTERNATIONAL BANK FOR RECONSTRUCTION AND DEVELOPMENT Public Disclosure Authorized LOAN NUMBER 210 MA Public Disclosure Authorized Loan Agreement (Cameron Highlands Project) BETWEEN Public Disclosure Authorized INTERNATIONAL BANK FOR RECONSTRUCTION AND DEVELOPMENT

More information

Loan Agreement. Public Disclosure Authorized CONFORMED COPY LOAN NUMBER 1558 CO. Public Disclosure Authorized. (Urban Development Project)

Loan Agreement. Public Disclosure Authorized CONFORMED COPY LOAN NUMBER 1558 CO. Public Disclosure Authorized. (Urban Development Project) Public Disclosure Authorized CONFORMED COPY LOAN NUMBER 1558 CO Public Disclosure Authorized Loan Agreement (Urban Development Project) Public Disclosure Authorized between REPUBLIC OF COLOMBIA and INTERNATIONAL

More information

Financing Agreement. (Uganda Public Service Performance Enhancement Project) between THE REPUBLIC OF UGANDA. and

Financing Agreement. (Uganda Public Service Performance Enhancement Project) between THE REPUBLIC OF UGANDA. and Public Disclosure Authorized CONFORMED COPY CREDIT NUMBER 4199 UG Public Disclosure Authorized Financing Agreement (Uganda Public Service Performance Enhancement Project) between Public Disclosure Authorized

More information

Public Disclosure Authorized. Public Disclosure Authorized. Public Disclosure Authorized. Public Disclosure Authorized CONFORMED COPY

Public Disclosure Authorized. Public Disclosure Authorized. Public Disclosure Authorized. Public Disclosure Authorized CONFORMED COPY Public Disclosure Authorized CONFORMED COPY LOAN NUMBER 3978 IND Loan Agreement Public Disclosure Authorized (Second Power Transmission and Distribution Project) between REPUBLIC OF INDONESIA and INTERNATIONAL

More information