1 Guam Power Authority Revenue Bonds, Series 2014 A, $76,470,000, Dated: September 30, 2014 Guam Power Authority Revenue Bonds, Series 2012 A, $340,620,000, Dated: October 18, 2012 Guam Power Authority Revenue Bonds, 2010 Series A, $150,440,000 and Guam Power Authority Subordinate Revenue Bonds, 2010 Series A, $56,115,000 Dated: July 1, 2010 Principal Existing Resources Description of any material change to the description of the generating units owned or contracted for by the Issuer or the transmission and distribution system of the Issuer There were some material changes to the description of the generating units owned or contracted for by the Guam Power Authority (GPA) during the year. On November 12, 2014, the Consolidated Commission on Utilities (CCU) authorized GPA to proceed with the deactivation of the two Dededo Combustion Turbine units. Unit #1 and Unit #2 had been out of service since December 2010 and May 2004, respectively, for a number of mechanical and environmental compliance issues. Because of the costly expenses needed for repairs and compliance with new EPA regulations, it was determined to be in the best interest of the Authority to deactivate the units which supplied 45MW total at their peak. This process, however, was changed within the year. In addition, on December 29, 2014, the Guam Public Utilities Commission approved the settlement between GPA and Pruvient Energy Guam Investment, Inc. (Pruvient) to terminate the Energy Conversion Agreement between the parties. The termination of this contract would allow for the de activation of the Tanguisson Power Plants and prevent GPA from violating the US Environmental Protection Agency's Electric Generating Utility (EGU) Mercury MACT Rule which carries a penalty of $37,500/day per generating unit. The contract was terminated on January 2, 2015 and the Tanguisson plants were taken offline. This resulted in a reduction of 53 MW of generating capacity. Lastly, on August 31, 2015, there was an incident at the Cabras 3&4 power plants that took down 78.6MW of generating capacity. As of April 30, 2016, the root cause of the incident has not been determined and the amount of insurance recoveries have also not been determined. In light of this incident and of the need to quickly restore generating capacity, on February 16, 2016, GPA entered into a Performance Management Contract to rehabilitate and operate four (4) combustion turbine (CT) units Yigo CT, Macheche CT and Dededo CTs #1 and #2. GPA believes the re commissioning of these units will provide better support to the Department of Defense installations in the northern part of the island during this critical recovery period. Although GPA's generating capacity at the end of the fiscal year was at a critical level, an Interuptible Load Pilot Program was authorized by the CCU and implemented with participating large customers to address this shortfall. During times of peak loads, the participants would go off the grid and run their own generators. In return, GPA would credit their accounts, at a generous rate, for the use of their generators. This action reduced the number and length of outages to other GPA customers. In addition, GPA procured and entered into a one year contract for 40MW of temporary power services which began services in early January 2016.

2 Fuel Supply - Fuel Oil Contracts Description of any material new contracts or material renewals or non-renewals of existing contracts for fuel oil On August 9, 2013, the Guam Power Authority (GPA) entered into a contract with Hyundai Corporation for the purchase of a minimum of 2,000,000 barrels per year of Residual Fuel Oil No. 6 (RFO) for a term of two (2) years with options to extend for three (3) additional one (1) year terms beginning September 1, On February 24, 2015, the Consolidated Commision on Utilities authorized GPA to petition the Guam Public Utilities Commission (PUC) to execute the 3 one year extension options in order to secure a stable premium for the price of RFO No. 6 fuel. The request was granted on March 26, 2015 and the extension of the contract was finalized on August 8, In December 2014, GPA entered into contracts with Mobil Oil Guam Inc. (Mobil) and Isla Petroleum and Energy Holdings, LLC (IP&E) to supply diesel fuel for all the generators in the system. IP&E will supply the units at the Tenjo Vista Power Plant and Mobil will supply all the other units. Both contracts are effective from January 1, 2015 through December 31, 2017 with options to extend the contract for two additional one year terms. Power Sales to the Military; Island Wide Power System - Customer Agreement Description of any renewal, cancellation or material changes in terms of the Issuer's Utility Services Contract with the U.S. Navy and the Department of Defense There were no changes made during the fiscal year to the Utilities Services Contract (USC) between the U.S. Navy and the Guam Power Authority and signed on July 30, 2012.

3 Table 1 Largest Customers Fiscal Year 2015 (Top Ten Customers) Customer Energy Sales (KWh) Energy Sales Revenues 1 Navy 317,393,055 $ 61,586,006 2 Guam Waterworks Authority 52,498,668 13,506,778 3 Department of Education 44,135,377 12,283,797 4 Guam International Airport Authority 22,415,526 5,180,602 5 Goodwin Development Corporation 15,555,304 3,527,424 6 Pacific Islands Club 15,456,662 3,234,983 7 Department of Public Works 12,987,446 6,521,339 8 Hyatt Regency Guam 12,678,630 2,641,644 9 Guam Hilton Hotel 11,610,999 2,555, University of Guam 10,594,140 2,808, ,325,807 $ 113,846,262 Average Monthly Total 42,943,817 9,487,188 % of Authority Total (Annual Basis) 33.47% 31.09% Insurance Table 2 The balance in the self-insurance fund The balance of the Self insurance fund at September 30, 2015 was $20,435, ,500, , ,435, Source: FY2015 Audited Financial Statements Balance Sheet (page 9), 2010A Table 3 Historical Customers, Energy Sales, Peak Demand and Revenues Fiscal Year Ending September 30: Restated Number of Customers (Average): Residential 41,255 41,612 41,708 41,993 42,590 Small Commercial 5,722 5,940 5,966 6,011 6,056 Large Commercial Auxiliary/ Standby/Other Public and Private Outdoor Lighting Navy Total Customers 47,971 48,520 48,598 48,918 49,530 Energy Requirements (MWh): Energy Sales Residential 487, , , , ,569 Small Commercial 367, , , , ,977 Large Commercial 389, , , , ,873 Auxiliary/ Standby/Other 4, Public and Private Outdoor Lighting 12,015 12,009 12,001 11,998 12,165 Total Civilian Energy Sales 1,276,143 1,219,764 1,218,259 1,209,095 1,222,194 Total Navy Energy Sales 358, , , , ,393 Total Energy Sales 1,637,662 1,562,795 1,565,109 1,533,323 1,539,587 System Losses 113, , ,038 86,468 79,267 Total IWPS Energy Requirements 1,750,937 1,731,086 1,668,147 1,619,791 1,618,854 Peak Demand (kw) 263, , , , ,000 Revenues ($000) Residential $ 112,320 $ 122,261 $ 125,932 $ 125,023 $ 105,533 Small Commercial 101, , , ,377 98,437 Large Commercial 98, , , ,089 93,776 Auxiliary/ Standby/Other 1, Public and Private Outdoor Lighting 6,561 7,177 7,469 7,400 6,676 Navy 71,893 86,033 84,899 75,323 61,586 Total Revenues $ 391,875 $ 438,112 $ 449,029 $ 434,463 $ 366,186

4 Table 4 Historical Costs of the Authority's Power Supply ($000) Fiscal Year Ending September 30: Restated Authority Operated Resources $ 243,711 $ 288,602 $ 295,466 $ 271,175 $ 204,136 Fuel Oil Costs $ 138,540 $ 177,628 $ 184,853 $ 159,581 $ 129,028 Other Production Expenses 20,840 24,991 22,009 19,305 20,079 Subtotal $ 159,380 $ 202,619 $ 206,862 $ 178,886 $ 149,107 IPP Operated Resources Fuel Oil Costs $ 105,171 $ 110,974 $ 110,613 $ 111,594 $ 75,108 Lease Payments- Energy Conversion Costs 19,705 19,937 20,264 20,632 18,404 Lease Payments- Debt Service 23,084 23,084 23,084 23,084 26,622 Subtotal $ 147,960 $ 153,995 $ 153,961 $ 155,310 $ 120,134 Total Cost of Power $ 307,340 $ 356,613 $ 360,823 $ 334,196 $ 269,241 Authority Energy Sales (GWh) 1,618 1,563 1,565 1,533 1,540 Average Unit Cost Per kwh of Energy Sold (cents/ kwh) Total Cost of Power Less IPP Debt Service $ 284,256 $ 333,529 $ 337,739 $ 311,112 $ 242,619 Outstanding Indebtedness An update to the balances of the Issuer's outstanding indebtedness Series Senior Revenue Bonds $ 76,470, Series Senior Revenue Bonds 340,055, Series Senior Revenue Bonds 150,440, Series Subordinate Revenue Bonds 14,155, ,120,000 Add premium on 2014 and 2012 bonds 34,543,120 Less discount on bonds (3,612,954) Total bonds $ 612,050,166 Obligations under capital leases 54,429,782 Total indebtedness $ 666,479,948 Working Capital and Liquidity The balance in the Working Capital Fund xx 76,470,000 76,470, ,055, ,510, ,440, ,440,000 14,155,000 27,300, ,120, ,720,000 34,543,120 37,137,418 (3,612,954) (3,713,958) 612,050, ,143,460 39,609,006 54,429,945 14,820,776 18,774,245 54,429,782 73,204, ,479, ,347,650 The Working Capital Fund balance at September 30,2015 was $31,056,786. Cash, Cash Equivalents $26,204,225 Investments 4,855,561 $31,056,786 Fuel Supply Hedges An update to the mark-to-market value of any fuel oil hedges of the Issuer This should be $32,862,800, the rest of the W 26,201,225 4,855,561 31,056,786 32,862,800 (1,806,014) There were no outstanding fuel hedge contracts as of September 30, 2015.

5 , 2010A Table 5 Operating Results and Debt Service Coverage (Cash Basis) ($000) Series 2012A, 2010A Restated Fiscal Year Ending September 30: Operating Revenues Energy Sales Revenues $391,875 $438,111 $449,029 $434,462 $366,185 Additional Future Requirements 0 Other Electric Revenues 2,606 1,916 2,927 2,156 4,775 Total Operating Revenues $394,481 $440,027 $451,956 $436,618 $370,960 Operating Expenses Power Supply Costs $284,256 $333,530 $337,746 $311,112 $242,619 Transmission and Distribution Expenses 12,241 12,717 13,368 12,950 11,170 Customer Accounting 4,454 5,031 5,101 3,999 4,739 Administrative and General 30,432 31,378 31,590 28,393 21,908 Total Operating Expenses $331,383 $382,656 $387,805 $356,454 $280,436 Amounts Available for Debt Service Net Operating Revenues $63,098 $57,371 $64,151 $80,164 $90,524 Interest/ Other Income (Expense) 5,925 1, Balance Available for Debt Service $69,023 $58,484 $64,871 $80,321 $90,780 Senior Lien Debt Service Existing Senior Debt Service $27,484 $27,483 $19,306 $25,454 $25,096 Total Senior Lien Debt Service $27,484 $27,483 $19,306 $25,454 $25,096 Senior Lien Coverage Pursuant to the Senior Indenture IPP Operated Resources-Lease Payments Capital $23,084 $23,084 $23,084 $23,084 $26,662 Balance Available for Debt Service $45,939 $35,400 $41,787 $57,237 $64,118 Coverage of Senior Lien Debt by Balance Available for Debt Service after paying IPP Capital Amount Available After Senior Lien Debt and IPP Capital $18,455 $7,917 $22,481 $31,783 $39,022 Subordinate Lien Debt Service $15,934 $15,163 $15,193 $15,217 Existing Subordinate Debt Service $7,242 $15,934 $15,163 $15,193 $15,217 Subordinate Lien Coverage Pursuant to the Subordinate Indenture Subordinate Lien Coverage after paying IPP Capital Total Debt Service Coverage after paying IPP Capital Interest Income $728 $1,364 $1,209 $974 $592 Amount Available for Capital Improvements $19,184 ($6,653) $8,527 $17,564 $24,397 Capital Improvement Program: Amount Funded from Current Revenues $11,986 $18,587 $17,128 $20,597 $4,563 Amount Funded from Bond or Loan Proceeds 1,843 20,542 23,502 40,764 24,460 Amount Funded from Grants 1,319 7,208 11,142 1,813 3,091 Amount Funded from Self insurance 0 0 4, Total Capital Improvements $15,148 $46,337 $56,399 $63,174 $32,114 Remaining Balance Available $7,198 ($25,240) ($8,601) ($3,033) $19,834 Energy Sales (MWh) 1,637,662 1,562,795 1,565,109 1,533,323 1,539,587 Cost of Power per kwh of Energy Sold (cents/ kwh) Unit Revenue from Energy Sales per kwh (cents/ kwh) Increase in Unit Revenue from Energy Sales Over Previous Year (percent) 7.7% 16.9% 2.6% -1.4% -15.4%

6 , 2010A Any adjustment in rates of the Issuer, the customer class to which the rate adjustment pertains and the effective date of the rate adjustment Series 2012A, 2010A Customer Class Effective Date % Inc/(Dec) (1) 1 Residential 10/1/ % 2 Commercial 10/1/ % 3 Government 10/1/ % 4 Navy 10/1/ % Note (1) Effective October 1, 2014, the start of GPA's fiscal year, there were revenue neutral rate adjustments implemented between the Lifeline Block and Tail block Energy Charges in the Residential rate schedule and the first and second block for Energy Charges of the Commercial and Government rate schedules as well as the demand rates for those customers who are billed for demand. For the Residential rate schedule, the adjustment between the two blocks was part of the five year phase in of adjustments that would ultimately result in the Lifeline Block energy rate being equal to 80% of the Tail Block energy rate. The last adustment for this phase in will take effect on October 1, In May 2012, GPA introduced its new rate structure for Commercial and Government customers whose billings were based on tiers of kwh per kw of billing demand. Under the new rate structure, demand and energy charges were now billed separately. This new rate structure did not please some customers. After assessing the situation, GPA petitioned and received approval from the Guam Public Utilities Commission on September 2013 to modify the rates for these commercial and governmental customers in the interim and, ultimately, a phased implementation of the demand rates would be applied over the next three fiscal years. These "Parity Adjustments" in FY2014, FY2015 and FY2016 should not affect the overall revenue requirements for GPA. They do, however, impact the portion of the overall revenue paid by each customer class. Note (2) On April 2, 2012 a Working Capital Fund Surcharge became effective at a rate of $.00466/kWh for Civilian and $110, 374/month for the Navy to cover a portion of the 2010 Subordinate bond debt service. This surcharge was discontinued for meters read after September 30, The related debt service was paid off on October 1, Note(3) On July 31, 2015, the Self Insurance Fund balance reached the cap set by the PUC of $20M. As a result, the Self Insurance Fund Surcharge was suspended for all meters read after July 31, Once the fund falls below $18M, the surcharge will be reactivated. As of April 30, 2016, the surcharge had not been reactivated.

GUAM POWER AUTHORITY (A COMPONENT UNIT OF THE GOVERNMENT OF GUAM) FINANCIAL STATEMENTS, ADDITIONAL INFORMATION AND INDEPENDENT AUDITORS' REPORT

GUAM POWER AUTHORITY (A COMPONENT UNIT OF THE GOVERNMENT OF GUAM) FINANCIAL STATEMENTS, ADDITIONAL INFORMATION AND INDEPENDENT AUDITORS' REPORT (A COMPONENT UNIT OF THE GOVERNMENT OF GUAM) FINANCIAL STATEMENTS, ADDITIONAL INFORMATION AND INDEPENDENT AUDITORS' REPORT YEARS ENDED SEPTEMBER 30, 2015 AND 2014 (AS RESTATED) Deloitte & Touche LLP 361

More information

Guam Power Authority

Guam Power Authority CREDIT OPINION Guam Power Update to Key Credit Factors Following Assignment of Baa2 Rating to Series 2017 A bonds Summary Contacts Kathrin Heitmann +1.212.553.4694 VP-Senior Analyst kathrin.heitmann@moodys.com

More information

Guam Power Authority

Guam Power Authority Guam Power Authority Presenta)on Par)cipants Guam Power Authority Guam Power Authority John M. Benavente, P.E. General Manager John J. E. Kim, CPA Chief Financial Officer Our Business Guam Power Authority

More information

GUAM POWER AUTHORITY (A COMPONENT UNIT OF THE GOVERNMENT OF GUAM) FINANCIAL STATEMENTS, ADDITIONAL INFORMATION AND INDEPENDENT AUDITORS' REPORT

GUAM POWER AUTHORITY (A COMPONENT UNIT OF THE GOVERNMENT OF GUAM) FINANCIAL STATEMENTS, ADDITIONAL INFORMATION AND INDEPENDENT AUDITORS' REPORT (A COMPONENT UNIT OF THE GOVERNMENT OF GUAM) FINANCIAL STATEMENTS, ADDITIONAL INFORMATION AND INDEPENDENT AUDITORS' REPORT YEARS ENDED SEPTEMBER 30, 2013 AND 2012 (RESTATED) Deloitte & Touche LLP 361 South

More information

GUAM POWER AUTHORITY SCHEDULE "M" Standby, Auxiliary, Supplementary or Breakdown Service for Customers with Demands of 200 Kilowatts or More

GUAM POWER AUTHORITY SCHEDULE M Standby, Auxiliary, Supplementary or Breakdown Service for Customers with Demands of 200 Kilowatts or More GUAM POWER AUTHORITY SCHEDULE "M" Standby, Auxiliary, Supplementary or Breakdown Service for Customers with Demands of 200 Kilowatts or More Applicability: Applicable to Customers of the Guam Power Authority

More information

Rating Update: Moody's upgrades Guam Power Authority's (GPA) Senior Revenue Bonds to Baa2; Outlook revised to stable

Rating Update: Moody's upgrades Guam Power Authority's (GPA) Senior Revenue Bonds to Baa2; Outlook revised to stable Rating Update: Moody's upgrades Guam Power Authority's (GPA) Senior Revenue Bonds to Baa2; Outlook revised to stable Global Credit Research - 15 Sep 2015 Approximately $595 million of debt securities affected

More information

RESPONSES TO PUBLIC UTILITIES COMMISSION Guam Power Authority PUC Docket Set 1 November 9, 2007

RESPONSES TO PUBLIC UTILITIES COMMISSION Guam Power Authority PUC Docket Set 1 November 9, 2007 RESPONSES TO PUBLIC UTILITIES COMMISSION Guam Power Authority PUC Docket 07-10 Set 1 November 9, 2007 Set 1-1 Please provide an update to the spreadsheet depicting the sources and uses of all of the bonds

More information

BEFORE THE GUAM PUBLIC UTILITIES COMMISSION GUAM POWER AUTHORITY LEVELIZED ENERGY ADJUSTMENT GPA DOCKET CLAUSE [LEAC] ORDER

BEFORE THE GUAM PUBLIC UTILITIES COMMISSION GUAM POWER AUTHORITY LEVELIZED ENERGY ADJUSTMENT GPA DOCKET CLAUSE [LEAC] ORDER BEFORE THE GUAM PUBLIC UTILITIES COMMISSION GUAM POWER AUTHORITY LEVELIZED ENERGY ADJUSTMENT GPA DOCKET 12-13 CLAUSE [] ORDER In accordance with the protocol established by Guam Public Utilities Commission

More information

No. 47. An act relating to the Vermont Energy Act of (H.56) It is hereby enacted by the General Assembly of the State of Vermont:

No. 47. An act relating to the Vermont Energy Act of (H.56) It is hereby enacted by the General Assembly of the State of Vermont: No. 47. An act relating to the Vermont Energy Act of 2011. (H.56) It is hereby enacted by the General Assembly of the State of Vermont: * * * Net Metering * * * Sec. 1. 30 V.S.A. 219a is amended to read:

More information

FirstEnergy s Pennsylvania Utilities Rate Plans Will Help Continue Service Reliability Enhancements for Customers

FirstEnergy s Pennsylvania Utilities Rate Plans Will Help Continue Service Reliability Enhancements for Customers FirstEnergy Corp. For Release: April 28, 2016 2800 Pottsville Pike Reading, Pennsylvania 19612 www.firstenergycorp.com FirstEnergy s Pennsylvania Utilities Rate Plans Will Help Continue Service Reliability

More information

Competitive Power Market for Oregon Nonresidential Customers

Competitive Power Market for Oregon Nonresidential Customers Competitive Power Market for Oregon Nonresidential Customers Background The Oregon Legislature passed electric industry restructuring in 1999 (Senate Bill 1149). The law allows all nonresidential customers

More information

GUAM POWER AUTHORITY. Management Discussion and Analysis Year Ended September 30, 2007

GUAM POWER AUTHORITY. Management Discussion and Analysis Year Ended September 30, 2007 GUAM POWER AUTHORITY Management Discussion and Analysis Year Ended September 30, 2007 The major issue in the 2007 financial statements is the allowance of $13.5 million being set up to cover the Department

More information

Hawaiian Electric Industries, Inc Annual Report to Shareholders

Hawaiian Electric Industries, Inc Annual Report to Shareholders Hawaiian Electric Industries, Inc. 2004 Annual Report to Shareholders Appendix A Hawaiian Electric Industries, Inc. 2004 Annual Report to Shareholders Contents 2 Cautionary Statements and Risk Factors

More information

Large Commercial Rate Simplification

Large Commercial Rate Simplification Large Commercial Rate Simplification Presented to: Key Account Luncheon Red Lion Hotel Presented by: Mark Haddad Assistant Director/CFO October 19, 2017 Most Important Information First There is no rate

More information

BOARD OF PUBLIC UTILITIES KANSAS CITY, KANSAS

BOARD OF PUBLIC UTILITIES KANSAS CITY, KANSAS BOARD OF PUBLIC UTILITIES KANSAS CITY, KANSAS Electric Utility Revenues, Revenue Requirements, Cost of Service, And Rates Draft Final Report (As Updated) February 2010 February 1, 2010 Kansas City Board

More information

MARSHALLS ENERGY COMPANY ANALYSIS (Republic of the Marshall Islands: Public Sector Program)

MARSHALLS ENERGY COMPANY ANALYSIS (Republic of the Marshall Islands: Public Sector Program) Public Sector Program (RRP RMI 43321-01) A. Background MARSHALLS ENERGY COMPANY ANALYSIS (Republic of the Marshall Islands: Public Sector Program) 1. Marshalls Energy Company's (MEC) principal lines of

More information

Public Service Company of New Hampshire Comparison of Rates Effective July 1, 2014 and January 1, 2015

Public Service Company of New Hampshire Comparison of Rates Effective July 1, 2014 and January 1, 2015 R Customer charge July 1, 2014 $ 12.39 $ 12.39 $ 12.39 All KWH $ 0.04042 $ 0.01786 $ (0.00225) $ 0.00330 $ 0.00055 $ 0.05988 $ 0.09870 $ 0.15858 R Customer charge January 1, 2015 $ 12.50 $ 12.50 $ 12.50

More information

Power Contracts in Florida. Eduardo Balbis, P.E. Commissioner Florida Public Service Commission

Power Contracts in Florida. Eduardo Balbis, P.E. Commissioner Florida Public Service Commission Power Contracts in Florida Interconnection Rules, Policies and their Impact on Electricity Pricing Eduardo Balbis, P.E. Commissioner Florida Public Service Commission USAID/ARE/ECREEE/ERERA/NARUC Integrating

More information

Southern California Edison Revised Cal. PUC Sheet No E Rosemead, California (U 338-E) Cancelling Revised Cal. PUC Sheet No.

Southern California Edison Revised Cal. PUC Sheet No E Rosemead, California (U 338-E) Cancelling Revised Cal. PUC Sheet No. Southern California Edison Revised Cal. PUC Sheet No. 61411-E Rosemead, California (U 338-E) Cancelling Revised Cal. PUC Sheet No. 53858-E Schedule TOU-BIP Sheet 1 APPLICABILITY This Schedule is optional

More information

Electricity (Net-Metering) THE ELECTRICITY ACT (CAP.131) RULES. (Made under sections 45 and 46) THE ELECTRICITY (NET-METERING) RULES, 2018

Electricity (Net-Metering) THE ELECTRICITY ACT (CAP.131) RULES. (Made under sections 45 and 46) THE ELECTRICITY (NET-METERING) RULES, 2018 GOVERNMENT NOTICE NO. 76 published on 02/03/2018 THE ELECTRICITY ACT (CAP.131) RULES (Made under sections 45 and 46) THE ELECTRICITY (NET-METERING) RULES, 2018 1. Citation 2. Application 3. Interpretation

More information

PART 5 OPERATING PROCEDURES

PART 5 OPERATING PROCEDURES PART 5 OPERATING PROCEDURES LONG ISLAND CHOICE OPERATING PROCEDURES TABLE OF CONTENTS 1.0 INTRODUCTION...1 1.1 Purpose...1 1.2 Incorporation by Reference...1 2.0 DEFINITIONS...3 2.1 Authority...3 2.2 Bundled

More information

No An act relating to the Vermont energy act of (S.214) It is hereby enacted by the General Assembly of the State of Vermont:

No An act relating to the Vermont energy act of (S.214) It is hereby enacted by the General Assembly of the State of Vermont: No. 170. An act relating to the Vermont energy act of 2012. (S.214) It is hereby enacted by the General Assembly of the State of Vermont: * * * Renewable Energy Goals, Definitions * * * Sec. 1. 30 V.S.A.

More information

ELECTRIC UTILITY RATES

ELECTRIC UTILITY RATES ELECTRIC UTILITY RATES Schedule 7 Schedule 20 Schedule 23 Schedule 24 Schedule 25 Schedule 36 Schedule 37 Schedule 38 Schedule 50 Schedule 80 Schedule 81 Schedule 82 Schedule 90 Schedule 200 Schedule 210

More information

ROCKY MOUNTAIN POWER ELECTRIC SERVICE SCHEDULE NO. 94 STATE OF UTAH. Energy Balancing Account (EBA) Pilot Program

ROCKY MOUNTAIN POWER ELECTRIC SERVICE SCHEDULE NO. 94 STATE OF UTAH. Energy Balancing Account (EBA) Pilot Program First Revision of Sheet No. 94.1 P.S.C.U. No. 50 Canceling Original Sheet No. 94.1 ROCKY MOUNTAIN POWER ELECTRIC SERVICE SCHEDULE NO. 94 STATE OF UTAH Energy Balancing Account (EBA) Pilot Program AVAILABILITY:

More information

Financial and Operating Performance Factors

Financial and Operating Performance Factors Management s Discussion and Analysis Management s discussion and analysis reviews the financial and operational results for the fiscal year ended March 31, 2016, relative to the previous year. This section

More information

November 16, Ms. Donna Mitchell, CPA Controller/Treasurer City of Dover 5 East Reed Street Weyandt Hall, Suite 300 Dover, Delaware 19901

November 16, Ms. Donna Mitchell, CPA Controller/Treasurer City of Dover 5 East Reed Street Weyandt Hall, Suite 300 Dover, Delaware 19901 Ms. Donna Mitchell, CPA Controller/Treasurer 5 East Reed Street Weyandt Hall, Suite 300 Dover, Delaware 19901 Re: 2015 Electric Cost-of-Service and Rate Design Study Update Project Number 84122 Dear Ms.

More information

THE NARRAGANSETT ELECTRIC COMPANY RENEWABLE ENERGY GROWTH PROGRAM FOR NON-RESIDENTIAL CUSTOMERS

THE NARRAGANSETT ELECTRIC COMPANY RENEWABLE ENERGY GROWTH PROGRAM FOR NON-RESIDENTIAL CUSTOMERS Sheet 1 1. Introduction This tariff ( Tariff ) describes the terms and conditions under which an Applicant for an eligible distributed generation project ( DG Project ) will receive funding pursuant to

More information

1 st Quarter 2017 Earnings Release Kit

1 st Quarter 2017 Earnings Release Kit 1 st Quarter 2017 Earnings Release Kit Table of Contents IMPORTANT NOTES TO INVESTORS... 3 EARNINGS RELEASE AND ACCOMPANYING SCHEDULES... 4 CONSOLIDATED STATEMENTS OF INCOME (GAAP)... 7 SCHEDULE 1 - SEGMENT

More information

Midwest Investor Roadshow June 23-25, 2009

Midwest Investor Roadshow June 23-25, 2009 Midwest Investor Roadshow June 23-25, 2009 Cautionary Statements And Factors That May Affect Future Results Any statements made in this presentation about future operating results or other future events

More information

Introduced by Representatives Klein of East Montpelier and Cheney 2 of

Introduced by Representatives Klein of East Montpelier and Cheney 2 of 2011 Page 1 of 136 1 H.56 Introduced by Representatives Klein of East Montpelier and Cheney 2 of 3 4 5 Norwich Referred to Committee on Date: Subject: Energy; public service; taxation; air quality; renewable

More information

Public Service Company of New Hampshire dba Eversource Energy Comparison of Rates Effective July 1, 2017 and January 1, 2018

Public Service Company of New Hampshire dba Eversource Energy Comparison of Rates Effective July 1, 2017 and January 1, 2018 R Customer charge July 1, 2017 $ 12.64 $ 12.64 $ 12.64 All KWH $ 0.04125 $ 0.02542 $ (0.00094) $ 0.00356 $ 0.00055 $ 0.06984 $ 0.11660 $ 0.18644 R Customer charge January 1, 2018 $ 12.69 $ 12.69 $ 12.69

More information

Report of Independent Auditors

Report of Independent Auditors Report of Independent Auditors To the Board of Commissioners Public Utility District No. 1 of Clark County Vancouver, Washington Report on the Financial Statements We have audited the accompanying individual

More information

COLLECTION POLICY RECITALS

COLLECTION POLICY RECITALS COLLECTION POLICY RECITALS WHEREAS the Guam Power Authority hereby establishes a Collection Policy whose purpose is to enforce uniform electrical service practices, uniform procedures governing disconnection,

More information

Preliminary 2019 Corporate Operating Plan. Javier Fernandez Vice President & CFO

Preliminary 2019 Corporate Operating Plan. Javier Fernandez Vice President & CFO Preliminary 2019 Corporate Operating Plan Javier Fernandez Vice President & CFO Assumptions Alignment with Board Strategic Directives Revenue Adjustments No General rate increase No change in the fuel

More information

Halifax Electric Membership Corporation

Halifax Electric Membership Corporation Rev. 1/1/18 Halifax Electric Membership Corporation Electric Rate Schedules NORTH CAROLINA 33, MARTIN ENFIELD, NORTH CAROLINA Electric Rate Schedules Table of Contents Schedule Description Page Effective

More information

The Narragansett Electric Company d/b/a National Grid Tariff Advice Filing to Amend R.I.P.U.C. No Docket No.

The Narragansett Electric Company d/b/a National Grid Tariff Advice Filing to Amend R.I.P.U.C. No Docket No. Jennifer Brooks Hutchinson Senior Counsel July 13, 2012 Luly E. Massaro, Commission Clerk Rhode Island Public Utilities Commission 89 Jefferson Boulevard Warwick, RI 02888 RE: The Narragansett Electric

More information

Sponsoring. Hosting. Caribbean Utilities Company, Ltd.

Sponsoring. Hosting. Caribbean Utilities Company, Ltd. Supporting Assisting Sponsoring Hosting Caribbean Utilities Company, Ltd. 2017 Third Quarter Report General Data About the Company Caribbean Utilities Company, Ltd., known locally as CUC, commenced operations

More information

Revised Cal. P.U.C. Sheet No E Cancelling Revised Cal. P.U.C. Sheet No E. ELECTRIC SCHEDULE ET Sheet 1 MOBILEHOME PARK SERVICE

Revised Cal. P.U.C. Sheet No E Cancelling Revised Cal. P.U.C. Sheet No E. ELECTRIC SCHEDULE ET Sheet 1 MOBILEHOME PARK SERVICE Revised Cal. P.U.C. Sheet No. 40088-E Cancelling Revised Cal. P.U.C. Sheet No. 38099-E ELECTRIC SCHEDULE ET Sheet 1 APPLICABILITY: TERRITORY: RATES: This schedule is applicable to single-phase and polyphase

More information

TABLE OF CONTENTS. Tariff Schedule, September 2011 Page 1 of 19

TABLE OF CONTENTS. Tariff Schedule, September 2011 Page 1 of 19 TABLE OF CONTENTS Summary of Electricity Rates Page 2 Schedule A: Month Fixed Charge Page 3 Schedule B: Base Tariff Page 4 Schedule C: Automatic Fuel Price Adjustment Clause Page 5-6 Schedule D: RE Feed-in

More information

CAPITAL POWER INCOME L.P. MD&A. For the Year Ended December 31, 2009

CAPITAL POWER INCOME L.P. MD&A. For the Year Ended December 31, 2009 CAPITAL POWER INCOME L.P. MD&A For the Year Ended December 31, 2009 1 MANAGEMENT S DISCUSSION AND ANALYSIS This management s discussion and analysis (MD&A) is dated March 4, 2010 and should be read in

More information

Southern California Edison Revised Cal. PUC Sheet No E Rosemead, California (U 338-E) Cancelling Revised Cal. PUC Sheet No.

Southern California Edison Revised Cal. PUC Sheet No E Rosemead, California (U 338-E) Cancelling Revised Cal. PUC Sheet No. Southern California Edison Revised Cal. PUC Sheet No. 59107-E Rosemead, California (U 338-E) Cancelling Revised Cal. PUC Sheet No. 57595-E Schedule TOU-GS-3 Sheet 1 APPLICABILITY Applicable to single-

More information

Long Island Power Authority Approved 2002 Operating Budget Approved 2002 and 2003 Capital Budgets

Long Island Power Authority Approved 2002 Operating Budget Approved 2002 and 2003 Capital Budgets Approved 2002 Operating Budget Approved 2002 and 2003 Capital Budgets George E. Pataki Governor Richard M. Kessel Chairman LONG ISLAND POWER AUTHORITY APPROVED 2002 OPERATING BUDGET APPROVED 2002 AND 2003

More information

CITY OF BURLINGTON, VERMONT ELECTRIC DEPARTMENT. Financial Statements and Required Supplementary Information. June 30, 2017 and 2016

CITY OF BURLINGTON, VERMONT ELECTRIC DEPARTMENT. Financial Statements and Required Supplementary Information. June 30, 2017 and 2016 Financial Statements and Required Supplementary Information (With Independent Auditors Report Thereon) Table of Contents Page(s) Independent Auditors Report 1 2 Management s Discussion and Analysis Required

More information

Lehman Brothers CEO Energy/Power Conference September 5, 2007

Lehman Brothers CEO Energy/Power Conference September 5, 2007 Lehman Brothers CEO Energy/Power Conference September 5, 2007 Cautionary Statements Regulation G Statement Ameren has presented certain information in this presentation on a diluted cents per share basis.

More information

Puerto Rico Electric Power Authority ( PREPA ) Juan F. Alicea Flores, PE Executive Director

Puerto Rico Electric Power Authority ( PREPA ) Juan F. Alicea Flores, PE Executive Director Puerto Rico Electric Power Authority ( PREPA ) Juan F. Alicea Flores, PE Executive Director Forward-Looking Statements The information included in this presentation contains certain forward-looking statements.

More information

Advice 4991-E-C Issued by Date Filed July 23, 2018 Decision Robert S. Kenney Effective July 23, 2018 Vice President, Regulatory Affairs Resolution

Advice 4991-E-C Issued by Date Filed July 23, 2018 Decision Robert S. Kenney Effective July 23, 2018 Vice President, Regulatory Affairs Resolution Revised Cal. P.U.C. Sheet No. 42644-E Cancelling Revised Cal. P.U.C. Sheet No. 40233-E ELECTRC SCHEDULE E-BP Sheet 1 BASE NTERRUPTBLE PROGRAM APPLCABLTY: This rate schedule is available until modified

More information

Available In all territory served by the Company in the State of Wyoming.

Available In all territory served by the Company in the State of Wyoming. Available In all territory served by the Company in the State of Wyoming. First Revision of Sheet No. 95-1 Canceling Original Sheet No. 95-1 Applicable This Schedule shall be applicable to all retail tariff

More information

THE NARRAGANSETT ELECTRIC COMPANY QUALIFYING FACILITIES POWER PURCHASE RATE

THE NARRAGANSETT ELECTRIC COMPANY QUALIFYING FACILITIES POWER PURCHASE RATE Sheet 1 THE NARRAGANSETT ELECTRIC COMPANY QUALIFYING FACILITIES POWER PURCHASE RATE I. Applicability The Company will purchase the electrical output from any qualifying facility as defined under the Public

More information

The Potomac Edison Company and Subsidiaries. Quarterly Financial Information. For the three months ended March 31, 2007 and 2006.

The Potomac Edison Company and Subsidiaries. Quarterly Financial Information. For the three months ended March 31, 2007 and 2006. The Potomac Edison Company and Subsidiaries Quarterly Financial Information For the three months ended 2007 and 2006 (Unaudited) GLOSSARY AE...Allegheny Energy, Inc., a diversified utility holding company

More information

Please Refer to Attached Sample Form

Please Refer to Attached Sample Form Revised Cal. P.U.C. Sheet No. 42643-E* Cancelling Revised Cal. P.U.C. Sheet No. 32498-E U 39 San Francisco, California ELECTRIC SAMPLE FORM NO. 79-1080 Sheet 1 BASE INTERRUPTIBLE PROGRAM Please Refer to

More information

Saudi Electricity Company ( SEC ) Financial results for the six months ended 30 June 2017

Saudi Electricity Company ( SEC ) Financial results for the six months ended 30 June 2017 Saudi Electricity Company ( SEC ) Financial results for the six months ended 30 June 2017 Continued growth in customer base drives a 0.6% revenues growth, however net income significantly grows due to

More information

2017 Governor s Energy Summit. Holly Kauffman President, West Virginia Operations

2017 Governor s Energy Summit. Holly Kauffman President, West Virginia Operations 2017 Governor s Energy Summit Holly Kauffman President, West Virginia Operations About FirstEnergy Headquartered in Akron, Ohio 6 million customers served 10 electric utility operating companies in 6 states

More information

Small General Service Demand Time-of-Use

Small General Service Demand Time-of-Use First Revised Sheet No.: 204 Superseding Original Sheet No.: 204 Small General Service Demand Time-of-Use AVAILABILITY Available throughout the Company s entire electric service area where the facilities

More information

Filed with the Iowa Utilities Board on September 22, 2016, TF STATE OF IOWA DEPARTMENT OF COMMERCE BEFORE THE IOWA UTILITIES BOARD

Filed with the Iowa Utilities Board on September 22, 2016, TF STATE OF IOWA DEPARTMENT OF COMMERCE BEFORE THE IOWA UTILITIES BOARD STATE OF IOWA DEPARTMENT OF COMMERCE BEFORE THE IOWA UTILITIES BOARD IN RE: ) DOCKET NO. TF-2016-0290 ) INTERSTATE POWER AND ) RESPONSE LIGHT COMPANY ) ) The Environmental Law & Policy Center and the Iowa

More information

BC Hydro Revenue Requirements Application Evidence #1

BC Hydro Revenue Requirements Application Evidence #1 BC Hydro Revenue Requirements Application Evidence #1 BCUC Project No.: 3698430 By: Ludo Bertsch, Horizon Technologies Inc. For: ESVI Energy Solutions for Vancouver Island Society Date: Oct 6, 2006 Background

More information

CHAPTER 7 CHARGES, FEES, OR DEPOSITS

CHAPTER 7 CHARGES, FEES, OR DEPOSITS Chapter 7 Charges, Fees and Deposits 33 CHAPTER 7 CHARGES, FEES, OR DEPOSITS Charges and fees are collected to support the District s obligation to carry out its statutory duties, including maintenance

More information

Medium General Service Time-of-Use Transition

Medium General Service Time-of-Use Transition Original Sheet No.: 213 Medium General Service Time-of-Use Transition AVAILABILITY Available throughout the Company s entire electric service area where the facilities of the Company are of adequate capacity

More information

SPP s Operating Region

SPP s Operating Region SPP s Operating Region Current 77,366 MW of generating capacity 46,136 MW of peak demand 48,930 miles transmission: 69 kv 12,569 miles 115 kv 10,239 miles 138 kv 9,691 miles 161 kv 5,049 miles 230 kv 3,889

More information

MAHARASHTRA ELECTRICITY REGULATORY COMMISSION MUMBAI

MAHARASHTRA ELECTRICITY REGULATORY COMMISSION MUMBAI MAHARASHTRA ELECTRICITY REGULATORY COMMISSION MUMBAI MAHARASHTRA ELECTRICITY REGULATORY COMMISSION (RENEWABLE PURCHASE OBLIGATION, ITS COMPLIANCE AND IMPLEMENTATION OF RENEWABLE ENERGY CERTIFICATE FRAMEWORK)

More information

Rocky Mountain Power Exhibit RMP (GND-5) Docket No ER-15 Witness: Gregory N. Duvall BEFORE THE WYOMING PUBLIC SERVICE COMMISSION

Rocky Mountain Power Exhibit RMP (GND-5) Docket No ER-15 Witness: Gregory N. Duvall BEFORE THE WYOMING PUBLIC SERVICE COMMISSION Exhibit RMP (GND-5) BEFORE THE WYOMING PUBLIC SERVICE COMMISSION ROCKY MOUNTAIN POWER Exhibit Accompanying Direct Testimony of Gregory N. Duvall Proposed - March 2015 Exhibit RMP (GND-5) Page 1 of 10 Available

More information

MASSACHUSETTS ELECTRIC COMPANY NANTUCKET ELECTRIC COMPANY SMART PROVISION

MASSACHUSETTS ELECTRIC COMPANY NANTUCKET ELECTRIC COMPANY SMART PROVISION Page 1 of 15 1.0 Purpose The operation of the SMART Provision is pursuant to the Solar Massachusetts Renewable Target ( SMART ) Program regulations at 225 CMR 20.00 promulgated pursuant to Chapter 75 of

More information

Cover slide (same as IR cover)

Cover slide (same as IR cover) Integrated results for the year ended 31 March 2016 Cover slide (same as IR cover) 5 July 2016 This presentation is available at www.eskom.co.za/ir2016 Contents Overview of the year Financial review Operating

More information

PG&E Corporation: Strategic Value Creation

PG&E Corporation: Strategic Value Creation PG&E Corporation: Strategic Value Creation Edison Electric Institute International Utility Conference London Hilton on Park Lane, London, UK March 4 March 7, 2007 Cautionary Statement Regarding Forward-Looking

More information

Nova Scotia Utility and Review Board. Section 2

Nova Scotia Utility and Review Board. Section 2 Nova Scotia Utility and Review Board IN THE MATTER OF The Public Utilities Act, R.S.N.S. 1989, c.380, as amended - and - IN THE MATTER OF an Application by Nova Scotia Power Incorporated for Approval of

More information

Twelfth Revised Sheet No FLORIDA POWER & LIGHT COMPANY Cancels Eleventh Revised Sheet No INDEX OF CONTRACTS AND AGREEMENTS

Twelfth Revised Sheet No FLORIDA POWER & LIGHT COMPANY Cancels Eleventh Revised Sheet No INDEX OF CONTRACTS AND AGREEMENTS Twelfth Revised Sheet No. 10.001 FLORIDA POWER & LIGHT COMPANY Cancels Eleventh Revised Sheet No. 10.001 INDEX OF CONTRACTS AND AGREEMENTS Sheet No. Contract Provisions - Various 10.010 Distribution Substation

More information

The following words and terms shall have the following meanings when used in this Tariff:

The following words and terms shall have the following meanings when used in this Tariff: Sheet 1 1. Introduction This tariff ( Tariff ) describes the terms and conditions under which an Applicant for an eligible distributed generation project ( DG Project ) will receive funding pursuant to

More information

Pa. PUC Allows Use of Purchased Receivables in Meeting Gas Supplier Security Requirements

Pa. PUC Allows Use of Purchased Receivables in Meeting Gas Supplier Security Requirements June 17, 2010 Pa. PUC Approves Settlement for Revised PECO Electric POR Program The Pennsylvania PUC has adopted a revised electric Purchase of Receivables program at PECO which will include most, if not

More information

Consolidated Edison, Inc. 6-Year Financials and Operating Statistics

Consolidated Edison, Inc. 6-Year Financials and Operating Statistics Consolidated Edison, Inc. 6-Year Financials and Operating Statistics 2001-2006 Consolidated Edison, Inc. Annual Dividend Growth Dividends Per Share ($)* 2.12 2.14 2.18 2.20 2.22 2.24 2.26 2.28 2.30 2.32

More information

FOR IMMEDIATE RELEASE Media Contact: Scott Reigstad (608) Investor Relations: Susan Gille (608)

FOR IMMEDIATE RELEASE Media Contact: Scott Reigstad (608) Investor Relations: Susan Gille (608) Exhibit 99.1 News Release FOR IMMEDIATE RELEASE Media Contact: Scott Reigstad (608) 458-3145 Investor Relations: Susan Gille (608) 458-3956 Alliant Energy Corporation Corporate Headquarters 4902 North

More information

TVA and HU Rate Actions. September 2018

TVA and HU Rate Actions. September 2018 TVA and HU Rate Actions September 2018 TVA Rate Actions 2 3 TVA Rate Change Key Components TVA implements a fixed grid access charge for local power companies on their monthly power bill based on rolling

More information

Overview of State Highway Fund 0006 Revenues and Allocations, the Texas Mobility Fund, and the Texas Rail Relocation and Improvement Fund

Overview of State Highway Fund 0006 Revenues and Allocations, the Texas Mobility Fund, and the Texas Rail Relocation and Improvement Fund Overview of State Highway Fund 0006 Revenues and Allocations, the Texas Mobility Fund, and the Texas Rail Relocation and Improvement Fund Legislative Budget Board Contents General Overview of State Highway

More information

Independent Auditors Report

Independent Auditors Report GenOn REMA, LLC KPMG LLP 811 Main Street Houston, TX 77002 Independent Auditors Report The Board of Directors and Member GenOn Northeast Generation, Inc., Sole Member of GenOn REMA, LLC: We have audited

More information

CASE 17-M-0178 Draft Discussion Document, November 2017 Session, Publicly Released November 15, 2017 STATE OF NEW YORK PUBLIC SERVICE COMMISSION

CASE 17-M-0178 Draft Discussion Document, November 2017 Session, Publicly Released November 15, 2017 STATE OF NEW YORK PUBLIC SERVICE COMMISSION STATE OF NEW YORK PUBLIC SERVICE COMMISSION At a session of the Public Service Commission held in the City of COMMISSIONERS PRESENT: CASE 17-M-0178 - Petition of Orange and Rockland Utilities, Inc. for

More information

California Municipal Finance Authority Anaheim Public Utilities Department Electric Revenue Bonds New Issue Report

California Municipal Finance Authority Anaheim Public Utilities Department Electric Revenue Bonds New Issue Report California Municipal Finance Authority Anaheim Public Utilities Department Electric Revenue Bonds New Issue Report Public Power / U.S.A. Ratings New Issue $110,110,000 CFMA Qualified Obligation Refunding

More information

Delaware Municipal Electric Corp.; Retail Electric

Delaware Municipal Electric Corp.; Retail Electric Page 1 of 5 RESEARCH Delaware Municipal Electric Corp.; Retail Electric Publication date: 06-Mar-2007 Primary Credit Analyst: Judith Waite, New York (1) 212-438-7677; judith_waite@standardandpoors.com

More information

Revised Cal. P.U.C. Sheet No E Cancelling Revised Cal. P.U.C. Sheet No E

Revised Cal. P.U.C. Sheet No E Cancelling Revised Cal. P.U.C. Sheet No E Revised Cal. P.U.C. Sheet No. 41685-E Cancelling Revised Cal. P.U.C. Sheet No. 40901-E ELECTRIC SCHEDULE ETL Sheet 1 APPLICABILITY: TERRITORY: RATES: This schedule is applicable to residential single-phase

More information

Schedule 19 POWER PURCHASES FROM COGENERATION AND SMALL POWER PRODUCTION QUALIFYING FACILITIES

Schedule 19 POWER PURCHASES FROM COGENERATION AND SMALL POWER PRODUCTION QUALIFYING FACILITIES I. APPLICABILITY & AVAILABILITY This Schedule is applicable to any Cogenerator or Small Power Producer (Qualifying Facility), as defined in the Public Utility Regulatory Policies Act of 1978 (PURPA), which

More information

OREGON STANDARD AVOIDED COST RATES AVOIDED COST PURCHASES FROM ELIGIBLE QUALIFYING FACILITIES Page 1

OREGON STANDARD AVOIDED COST RATES AVOIDED COST PURCHASES FROM ELIGIBLE QUALIFYING FACILITIES Page 1 S ELIGIBLE QUALIFYING FACILITIES Page 1 Available To owners of Qualifying Facilities making sales of electricity to the Company in the State of Oregon. Applicable For power purchased from Base Load and

More information

Superseding REVISED Sheet No. 38 REVISED SHEET NO. 38 Effective March 20, 2008 Effective February 6, 2014 RULE NO. 18. Net Energy Metering

Superseding REVISED Sheet No. 38 REVISED SHEET NO. 38 Effective March 20, 2008 Effective February 6, 2014 RULE NO. 18. Net Energy Metering Superseding REVISED Sheet No. 38 REVISED SHEET NO. 38 Effective March 20, 2008 Effective February 6, 2014 A. ELIGIBLE CUSTOMER-GENERATOR RULE NO. 18 Net Energy Metering Net energy metering is available

More information

CIBC 2014 Institutional Investor Conference Dawn Farrell Chief Executive Officer

CIBC 2014 Institutional Investor Conference Dawn Farrell Chief Executive Officer CIBC 2014 Institutional Investor Conference Dawn Farrell Chief Executive Officer 1 Forward Looking Statements This presentation may contain forward-looking statements pertaining to the following: the timing

More information

Residential Time-of-Use (R-80)

Residential Time-of-Use (R-80) Original Sheet No.: 102 Residential Time-of-Use (R-80) AVAILABILITY Available throughout the Company s entire electric service area where the facilities of the Company are of adequate capacity and are

More information

SCHEDULE C ELECTRICITY PURCHASE AGREEMENT - TERM SHEET SMALL PROJECTS

SCHEDULE C ELECTRICITY PURCHASE AGREEMENT - TERM SHEET SMALL PROJECTS SCHEDULE C ELECTRICITY PURCHASE AGREEMENT - TERM SHEET SMALL PROJECTS The following is a summary of the key terms and conditions of the proposed standard form electricity purchase agreement ( EPA ) for

More information

Tom Chamberlin. Tom Chamberlin. Brian DeBruin Forced Outage Risk Solutions, Managing Director Aon Global Power. Marina Nadirova Product Executive

Tom Chamberlin. Tom Chamberlin. Brian DeBruin Forced Outage Risk Solutions, Managing Director Aon Global Power. Marina Nadirova Product Executive NEW CONTINGENT OUTAGE AND CAPACITY PERFORMANCE COVERAGE Tom Chamberlin Manager of Insurance and Member Financial Services Old Dominion Electric Cooperative Brian DeBruin Forced Outage Risk Solutions, Managing

More information

Half Year Results 6 Months Ended 30 June July 2018

Half Year Results 6 Months Ended 30 June July 2018 Half Year Results 6 Months Ended 30 June 2018 24 July 2018 Agenda Operations and Business Review Will Gardiner, CEO Financial Review Den Jones, Interim CFO Delivering the Strategy Will Gardiner, CEO 2

More information

Management s Discussion and Analysis (Unaudited)

Management s Discussion and Analysis (Unaudited) Management s Discussion and Analysis (Unaudited) USING THIS FINANCIAL REPORT The Financial Report for the Omaha Public Power District (OPPD or Company) includes the Management s Discussion and Analysis,

More information

DEFAULT SERVICE IN PENNSYLVANIA. David B. MacGregor, Esquire Anthony D. Kanagy, Esquire Post & Schell, P.C.

DEFAULT SERVICE IN PENNSYLVANIA. David B. MacGregor, Esquire Anthony D. Kanagy, Esquire Post & Schell, P.C. DEFAULT SERVICE IN PENNSYLVANIA David B. MacGregor, Esquire Anthony D. Kanagy, Esquire Post & Schell, P.C. Synopsis: This presentation provides an overview of default electric service in Pennsylvania beginning

More information

RETAIL ACCESS PROGRAM AUGUST 25, 2011 PRESENTERS: David Keir, Transmission Rates Manager, (david.keir@bchydro.com) Fred James, Rates and Tariff Manager, (fred.james@bchydro.com) Justin Miedema, Regulatory

More information

NEW HAMPSHIRE CODE OF ADMINISTRATIVE RULES NET METERING FOR CUSTOMER-OWNED RENEWABLE ENERGY GENERATION RESOURCES OF 1,000 KILOWATTS OR LESS

NEW HAMPSHIRE CODE OF ADMINISTRATIVE RULES NET METERING FOR CUSTOMER-OWNED RENEWABLE ENERGY GENERATION RESOURCES OF 1,000 KILOWATTS OR LESS CHAPTER Puc 900 NET METERING FOR CUSTOMER-OWNED RENEWABLE ENERGY GENERATION RESOURCES OF 1,000 KILOWATTS OR LESS PART Puc 901 PURPOSE Puc 901.01 Purpose. The purpose of Puc 900, pursuant to the mandate

More information

April 11, 2001 PUBLIC UTILITIES COMMISSION OF THE STATE OF CALIFORNIA ENERGY DIVISION

April 11, 2001 PUBLIC UTILITIES COMMISSION OF THE STATE OF CALIFORNIA ENERGY DIVISION Donald A. Fellows, Jr. Manager of Revenue and Tariffs April 11, 2001 ADVICE 1534-E (U 338-E) PUBLIC UTILITIES COMMISSION OF THE STATE OF CALIFORNIA ENERGY DIVISION SUBJECT: Establishment of Four New Balancing

More information

CUC Announces Second Quarter Results for the Period Ended June 30, 2017

CUC Announces Second Quarter Results for the Period Ended June 30, 2017 Press Release July 31, 2017 CUC Announces Second Quarter Results for the Period 2017 Caribbean Utilities Company, Ltd. is listed for trading in United States dollars on the Toronto Stock Exchange. Grand

More information

Appendix B-2. Term Sheet for Tolling Agreements. for For

Appendix B-2. Term Sheet for Tolling Agreements. for For Appendix B-2 Term Sheet for Tolling Agreements for For 2015 Request For Proposals For Long-Term Developmental Combined-Cycle Gas Turbineand Existing Capacity and Energy Resources in WOTAB DRAFT Entergy

More information

Prepared for the BC Sustainable Energy Association. Expanding Energy Efficiency for BC Hydro: Lessons from Industry Leaders.

Prepared for the BC Sustainable Energy Association. Expanding Energy Efficiency for BC Hydro: Lessons from Industry Leaders. Prepared for the BC Sustainable Energy Association Expanding Energy Efficiency for BC Hydro: Lessons from Industry Leaders June 19, 2012 Overview 1. Key Terms and Concepts 2. BC Hydro s IRP 3. US Data

More information

RATE 833 RATE FOR ELECTRIC SERVICE INDUSTRIAL POWER SERVICE No. 1 of 12 Sheets

RATE 833 RATE FOR ELECTRIC SERVICE INDUSTRIAL POWER SERVICE No. 1 of 12 Sheets Original Sheet No. 12 No. 1 of 12 Sheets TO WHOM AVAILABLE Available to INDUSTRIAL Customers whose plants are located adjacent to existing electric facilities having capacity sufficient to meet the Customer

More information

GREEN MOUNTAIN POWER MULTI-YEAR REGULATION PLAN Filed June 4, 2018

GREEN MOUNTAIN POWER MULTI-YEAR REGULATION PLAN Filed June 4, 2018 GREEN MOUNTAIN POWER MULTI-YEAR REGULATION PLAN Filed This Plan constitutes a form of regulation for Green Mountain Power ( GMP or the Company ) under 30 V.S.A. 218d. The Plan governs the manner in which

More information

Direction to ESB PES on Tariffs to apply from 1 st November 2007 CER/07/191

Direction to ESB PES on Tariffs to apply from 1 st November 2007 CER/07/191 Direction to ESB PES on Tariffs to apply from 1 st November 2007 CER/07/191 22 October 2007 1 Contents 1 Background... 3 1.1 Consultation Background... 3 1.2 Large Energy Users... 4 1.3 Format of the paper...

More information

Old Dominion Power Company 220 West Main Street Louisville, Kentucky ELECTRIC SERVICE VIRGINIA STATE CORPORATION COMMISSION

Old Dominion Power Company 220 West Main Street Louisville, Kentucky ELECTRIC SERVICE VIRGINIA STATE CORPORATION COMMISSION S.C.C. No. 15 Canceling S.C.C. No. 14 Old Dominion Power Company 220 West Main Street Louisville, Kentucky Rates, Terms and Conditions for Furnishing ELECTRIC SERVICE In Dickenson, Lee, Russell, Scott,

More information

Long Island Power Authority

Long Island Power Authority Long Island Power Authority Biennial Report of the Consulting Engineer and Rate Consultant for the Period January 1, 2008 through December 31, 2009 August 31, 2010 NAVIGANT CONSULTING, INC. August 31,

More information

TVA BOARD MEETING AUGUST 22, 2013

TVA BOARD MEETING AUGUST 22, 2013 TVA BOARD MEETING AUGUST 22, 2013 TVA BOARD MEETING 2 CONSENT AGENDA Health Savings Account Contract Pharmacy Benefits Managers Contract Assistant Corporate Secretary Designations 3 CHAIRMAN S REPORT AUGUST

More information

Low Income Utility Working Group Bill Discount Overview. October 17, 2018

Low Income Utility Working Group Bill Discount Overview. October 17, 2018 Low Income Utility Working Group Bill Discount Overview October 17, 2018 PacifiCorp s Bill Discount Programs California Alternate Rates for Energy (CARE) program provides a 20% discount on monthly bills.

More information

Uttar Pradesh Electricity Regulatory Commission

Uttar Pradesh Electricity Regulatory Commission Uttar Pradesh Electricity Regulatory Commission Notification no. UPERC / Secy / CNCE Regulation, 2009/ 696 Dated: 22.3.2010 In exercise of powers conferred under section 181 read with section 9, 61, 86

More information