Klamath Falls Urban Renewal Feasibility Study

Size: px
Start display at page:

Download "Klamath Falls Urban Renewal Feasibility Study"

Transcription

1 Klamath Falls Urban Renewal Feasibility Study

2 March 17, 2016 Nathan Cherpeski City Manager City of Klamath Falls P.O. Box 237 Klamath Falls, Oregon Dear Nathan, The Urban Renewal Feasibility Study for the industrial/commercial area of Klamath Falls is attached. The study has been completed by Elaine Howard Consulting, LLC and ECONorthwest. It shows that a new urban renewal area could both be adopted and comply with the statutory acreage and assessed value guidelines. It identifies the potential amount of tax increment revenues that could be received in the Urban Renewal Area over three different assessed value growth scenarios for a 30 year duration. The next steps to consider, if the city council decides to proceed, are identified in the study. We have appreciated the opportunity to work with you and Joe Wall on this project. Joe has been an excellent resource for us. Sincerely, Elaine Howard, Principal Elaine Howard Consulting, LLC 4763 SW Admiral Street Portland, Oregon elainehowardconsulting@gmail.com

3 Table of Contents Table of Contents... i Executive Summary...1 Methods...6 Step 1. Define boundary options...6 Step 2. Identify projects and costs...7 Step 3. Determine applicable tax rates...7 Step 4. Forecast growth in assessed value...8 Step 5. Calculate tax increment revenue and revenue sharing...11 Step 6. Create a draft finance plan...15 Impacts on Taxing Districts...16 Impact from Existing Urban Renewal Areas...23 Next Steps...23 BACKGROUND INFORMATION...25 What is Urban Renewal?...25 What is Tax Increment Revenue?...25 What is Maximum Indebtedness?...25 What is Revenue Sharing?...26 How does Oregon Property Tax Work?...26 Property Taxes and School Funding...26 What is Compression?...27 What are Enterprise Zones?...27 What is the Vertical Housing Abatement Program?...30 Elaine Howard Consulting, LLC ECONorthwest i

4 Executive Summary The city of Klamath Falls, Oregon is conducting a feasibility study for an urban renewal area (Area) to serve the industrial and commercial area at the east end of the downtown and adjacent to and west of the rail road from Esplanade Avenue to the north down to South 6 th Street to the south, (Exhibit 3). The Area is largely industrial and general commercial in nature (Exhibit 4, zoning map) with the majority of the buildings in disrepair. The transportation network is in need of improvement and there are minimal storm water facilities in the Area. The road bed is irregular with many pot holes, there are limited sidewalks, and no bike paths. There are also non-conforming uses, most specifically residential uses in an industrial area. The Area will qualify as blighted as defined in ORS A portion of the Area that is zoned commercial is under negotiation for a mixed-use development that could provide momentum in the northern section of the Area. This development will be more fully described in the Forecast Growth in Assessed Value section of the document. Klamath Falls presently has two other urban renewal areas, Lakefront and Town Center. A third urban renewal area was closed in FY2014/15. If an urban renewal area were to be established in this study area, the city would remain in compliance with the acreage and assessed value limitations for urban renewal as stated in ORS 457. The purpose of this feasibility study is to examine the financial feasibility of urban renewal in this area and to examine the impacts on taxing districts as a result of the potential of adding an additional urban renewal area (URA) in Klamath Falls. This report provides the City of Klamath Falls with baseline data to understand the financial capacity of a new URA. The feasibility study examines three financial scenarios: 1. An average 2% annual growth of assessed value that is slightly more than the assessed value growth in Klamath Falls in the past 6 years (1.9%). 2. A 3.2% gain in assessed value plus assumptions on development of Phase I of the Balsiger site. The value above the frozen base and new development assumptions are termed excess value. This is the term defined by the Department of Revenue and used by assessors to capture any additional value in an urban renewal area above the frozen base. 3. A 3.2% gain in assessed value plus assumptions on development of Phase I of the Balsiger site and projected an additional $5 million of assessed value growth in the Area over the 30 year time period. The summaries of the scenarios are listed below. More details on the scenarios are found later in the document. The summaries assume an urban renewal plan is adopted after the FY2016/17 tax roll is certified. This tax roll will show the change of ownership of a number of properties from private ownership to public ownership, identified in Exhibit 10. Elaine Howard Consulting, LLC ECONorthwest 1

5 Scenario 1 The annual average growth rate in the study area over the last six years has been just below 2%. This factor was used to establish a baseline scenario against which to compare the other two scenarios. This timeframe encompasses much of the worst recession in many years. A very conservative scenario might use this growth rate. However, if there is an incentive for development through use of urban renewal, the Area should see a growth rate higher than this very conservative level. Under this scenario of a 2% assessed value growth rate, the Area could support a maximum indebtedness $5,700,000 for a 30 year time period of urban renewal. This scenario does not project any new development beyond the 2% growth nor does it factor in the use of any Enterprise Zone benefits. This scenario is considered by the consulting team to be only a benchmark, not a valid scenario for using in an urban renewal plan. This conservative growth amount and indebtedness translates to a smaller real dollar amount for projects and administration, $3,600,000 of constant 2016 dollars. This amount is less than the nominal maximum indebtedness because the present day estimated costs of projects to be undertaken in the future must account for inflation. It takes an urban renewal plan with a 30-year duration to pay off the debt that is issued after year 16 of the Plan. Scenario 2 The Oregon Constitution limits increases in assessed value of properties to 3% per year. This excludes properties that undergo rehabilitation in excess of $25,000 and new development. Scenario 2 depicts this 3% limitation, adds an additional.2% starting in FYE 2020, and includes projected excess value from the potential new development of Phase I at the Balsiger site, as detailed in the section on tax increment forecasts. Under this scenario, the Area could support a maximum indebtedness of $13,500,000 for a 30 year time period of urban renewal. This translates to a smaller real dollar amount for projects and administration, $8,400,000 for a 30 year period. The amount available for projects is less than the nominal maximum indebtedness because the present day estimated costs of projects to be undertaken in the future must account for inflation. Scenario 3 Scenario 3 uses the assessed value growth rate of 3.2% starting in FYE 2020, uses the same excess value assumptions for the Balsiger site and considers the possibility of additional increased new development or rehabilitation in the Area, which is accounted for by projecting an additional $5 million of assessed value, composed of $2.5 million in FYE 2025 and $2.5 million in FYE Phase II of the Balsiger site alone will account for some assessed value growth. While there is no guarantee that this level of growth can be attained, it does not hurt the urban renewal plan to assume a higher level of growth. If the growth is not attained, either the project list will be reduced in the future or the urban renewal plan will last longer. Under this scenario, the Area could support a maximum indebtedness $15,100,000 for a 30 year time period of urban renewal. Elaine Howard Consulting, LLC ECONorthwest 2

6 This translates to a smaller dollar amount for projects and administration, $9,500,000 for the 30 year period. The amount available for projects is less than the nominal maximum indebtedness because the present day estimated costs of projects to be undertaken in the future must account for inflation. The duration of an urban renewal plan is not a requirement, but it is used as a factor in determining the financial feasibility. The assessed value increase factor to be used in an urban renewal plan can be determined by the Klamath Falls staff and City Council, if they decide to proceed with the development of an urban renewal plan. Exhibit 1 shows the projected tax increment revenues under the three scenarios. These are total revenues and will translate into lower maximum indebtedness amounts as some of these funds will be used to pay interest on long term debt. Exhibit 2 shows the projected maximum indebtedness for the three scenarios, with a 30-year duration. It also shows the total amount of funds for projects, accounting for annual inflation. Exhibit 1. Tax Increment Revenue Summaries Scenario 30 Years 2% $7,997, % plus excess value $18,701, % plus excess value plus $5m additional excess value $21,151,868 Source: ECONorthwest Exhibit 2. Maximum Indebtedness and Amounts for Projects Summaries Assessed Value Growth Scenario 1 Scenario 2 Scenario 3 Projects Completed 23 Years 23 Years 23 Years Term of URA 30 Years 30 Years 30 Years Projected Maximum Indebtedness $5,700,000 $13,500,000 $15,100,000 Total for Projects $3,600,000 $8,400,000 $9,500,000 Source: ECONorthwest Scenario 1 2% AV growth Scenario 2-3.2% of real property AV growth begins in FYE 2020, Phase I Balsiger Site Scenario 3-3.2% of real property AV growth begins in FYE 2020, Phase I Balsiger Site, plus additional is $5M in additional AV real property value growth in FYE 2025 and Elaine Howard Consulting, LLC ECONorthwest 3

7 Exhibit 3. Urban Renewal Feasibility Study Boundary Map Klamath Falls Urban Renewal Feasibility Study Source: ECONorthwest Elaine Howard Consulting, LLC ECONorthwest 4

8 Exhibit 4. Urban Renewal Feasibility Study Zoning Map Source: ECONorthwest Elaine Howard Consulting, LLC ECONorthwest 5

9 Methods The methods used for this feasibility study to establish potential maximum indebtedness and define impacts on the taxing jurisdictions included the following key steps: Step 1. Define boundary options Step 2. Identify projects and costs. Step 3. Determine applicable tax rates. Step 4. Forecast growth in assessed value. Step 5. Calculate tax increment revenue and revenue sharing. Step 6. Create a draft finance plan. Step 7. Present to Klamath Falls City Council Step 1. Define boundary options The City of Klamath Falls defined the boundary option as shown in Exhibit 3. It encompasses 163 acres, and $42,641,172 in assessed value (assumes change in value of publicly owned properties identified in Exhibit 10). The Area is primarily industrial, with some general commercial in the northern and western properties of the Area. There are also a few public/exempt properties in the Area. ORS 457 limits the total amount of assessed value and acreage that can be included in urban renewal districts in a city the size of Klamath Falls to 25% of acreage and 25% of assessed value. The City of Klamath Falls already has two existing URAs, Lakefront and Town Center. This potential urban renewal area does not exceed the assessed value and acreage statutory authority for urban renewal in Klamath Falls, see Exhibit 5. Exhibit 5. Statutory Limitation on Assessed Value and Acreage Urban Renewal Area Acres Frozen Base Lakefront 104 $1,405,520 Town Center 23.5 $3,917,950 Potential Urban Renewal Area $42,641,172 Totals in urban renewal $48,920,192 City 13, $1,339,814,749 Percentage of Total 2.18% 3.65% Source: City of Klamath Falls and Klamath County Assessor Elaine Howard Consulting, LLC ECONorthwest 6

10 Step 2. Identify projects and costs Klamath Falls Urban Renewal Feasibility Study The list of projects and their cost estimates were provided by City of Klamath Falls staff. Potential project allocations are shown below in Exhibit 6. These will be reviewed by City Council and if an urban renewal plan is directed, these will be updated. These project categories are typical categories for projects in an urban renewal area, focusing on infrastructure improvements and developer incentives. The City Council would also direct whether to add an administration category and how much to allocate to that category. Exhibit 6. Estimated project costs, Klamath Falls Feasibility Study Percentage Project Cost of Total Land Acquisition/Parcel Aggregation $2,000, % Developer Assistance/Gap Financing $2,500, % Infrastructure Improvements $2,500, % Demolition $1,000, % Total $8,000, % Source: City of Klamath Falls The total project costs are estimated to be $8 million. Depending on the financial scenario used, these costs will be updated as directed by City Council. The proportional share of total costs could be one method to use for updating the cost estimates. Step 3. Determine applicable tax rates All properties within the boundary options are located within tax code areas 100 and 101, and have the same tax rate. Details of the applicable tax rate are shown below in Exhibit 7. Note that some of these taxing districts, Klamath Falls Police and Klamath Falls Schools, also have rates for general obligation (GO) bonds. However all of these bonds were approved after 2001, and Oregon statutes preclude new urban renewal areas from including GO bond rates for all bonds approved after Tax rate information was obtained from Klamath County Assessor Summary Table 4a and the Klamath County FY 2015/16 Tax Book. The Klamath Falls School District and the Southern Oregon Education Service District are not directly affected by the tax increment financing, but the amounts of their taxes divided for the urban renewal plan are shown in the charts. Under current school funding law, property tax revenues are combined with State School Fund revenues to achieve per-student funding targets. Under this system, property taxes foregone because of the use of Tax Increment Financing are replaced, as determined by a funding formula at the State level with State School Fund revenues. Elaine Howard Consulting, LLC ECONorthwest 7

11 Exhibit 7. Applicable tax rates for Klamath Falls Feasibility Study, FY 2015/16 District Name Permanent Rates Klamath County Klamath Falls City Fire District Library Klamath Vector Klamath County Extension Basin transit General Government Klamath Schools Southern Oregon Education Service District Klamath Community College Education Total Source: Klamath County Assessor Tax Book FY 2015/16 Klamath Falls Urban Renewal Feasibility Study Step 4. Forecast growth in assessed value The Klamath County Assessor provided data on the assessed value of all properties in the city of Klamath Falls for FY The current assessed value of the boundary option is determined from that information. Growth rates for assessed value vary over time, depending on market cycles and new development. In Oregon, appreciation is capped at 3.0% per year, which means any growth above 3.0% per year requires new development to occur. Recent historical trends in the city of Klamath Falls were reviewed to determine a reasonable growth rate to use for the analysis. Exhibit 8 shows historical growth in assessed value in the Area from 2010 to This shows annual growth varying from -1.10% per year to 4.91% per year, with an average annual growth rate (AAGR) of 1.9%. Exhibit 9 shows the growth rates for the city as a whole for the same time period. The growth in the study area in the last two years, when the city has been coming out of the recession, has been much lower in the study area than in the city as a whole. Exhibit 8. Historical Assessed Value Growth for Potential Area FYE Real Property Personal Property Utility Total Assessed Value Growth Rate 2011 $37,076,540 $1,219,939 $2,440,956 $40,737, % 2012 $37,780,130 $1,235,610 $2,487,277 $41,503, % 2013 $37,250,230 $1,343,922 $2,452,391 $41,046, % 2014 $39,221,970 $1,257,973 $2,582,201 $43,062, % 2015 $39,120,160 $1,321,499 $2,575,499 $43,017, % 2016 $39,631,720 $1,355,825 $2,609,177 $43,596, % AAGR 1.9% 1.7% 1.9% 1.9% Source: Klamath County Assessor, City of Klamath Falls AAGR: Average Annual Growth Rate Elaine Howard Consulting, LLC ECONorthwest 8

12 Exhibit 9. Historical Assessed Value Growth for City FYE Real Property Manufactured Property Personal Property Klamath Falls Urban Renewal Feasibility Study Utility Total Assessed Value Growth Rate 2011 $1,167,972,940 $3,937,130 $47,138,294 $44,965,790 $1,264,014, % 2012 $1,179,509,280 $3,455,300 $44,972,566 $46,187,620 $1,274,124, % 2013 $1,183,731,580 $3,560,230 $47,443,726 $51,786,800 $1,286,522, % 2014 $1,179,242,030 $3,266,050 $49,256,909 $52,325,300 $1,284,090, % 2015 $1,219,320,080 $3,074,670 $48,015,872 $56,780,736 $1,327,191, % 2016 $1,243,039,592 $3,444,640 $50,203,798 $65,482,000 $1,362,170, % AAGR 1.25% -2.64% 1.27% 7.81% 1.51% 1.69% Source: Klamath County Assessor, City of Klamath Falls AAGR: Average Annual Growth Rate The period shown in Exhibits 8 and 9 includes the most severe economic recession since the Great Depression, and future growth rates (particularly in the short-term) are estimated to be higher than in recent years, as real market values recover. Indeed, long-term trends statewide demonstrate annual assessed value growth closer to 4.5% per year. Areas with development potential, and areas that receive targeted public investments (like the kinds of investment facilitated by urban renewal) are also more likely to see higher growth in assessed value. For the analysis, annual average growth in assessed value of 2%, 3.2% with some exception value and 3.2% with the baseline exception value and additional assumptions for exception value per year were used. Exception Value is defined as the assessed value of new development that will occur in the Area. This is a planning level analysis to demonstrate the potential of urban renewal to assist with economic development in Klamath Falls. If actual growth is slower than is forecast, that means the Area will need to spend less on projects, or phase those projects over a longer period of time. Additionally, before the Area incurs debt to fund any expenditure on projects, the city will need to conduct another feasibility study, providing a more detailed, short-term forecast of TIF revenues, and confirming that the Area has sufficient financial capacity to pay debt service. The forecasts include the change of ownership of a number of parcels from private ownership to public ownership. This will reduce their assessed value to zero. These properties are shown in Exhibit 10. A number of these properties will return to private ownership once the Balsiger site is developed, and that assumption is included in the financial modelling. Elaine Howard Consulting, LLC ECONorthwest 9

13 Exhibit 10. Properties Moving from Private to Public Ownership Property Assessed Value FY15/16 R CC $74,500 R CC $59,620 R CC $473,860 R CC $27,920 R CC $12,500 R CC $11,230 R CC $9,470 R CC $18,080 R AA $73,160 R AA $47,220 R CC $147,990 Total $955,550 Source: Klamath County FY 2015/16 tax roll Note that for Scenarios 2 and 3, FY , the forecast of assessed value also includes projected development (represented by the incremental 0.2% increase in the growth rate). The process of establishing assessed values results in a lag time between when construction occurs and when the value of that new construction activity hits the tax rolls. This means that any new development in 2017 will not be added to the tax roll until FYE If the timeframe for construction lags, this could be pushed out further. The new assessed value assumptions include the Balsiger site with the following development assumptions: 1. The project will be in two phases. 2. Phase 1 will be approximately residential units over retail, with 3 floors of residential. 3. Phase 1 will start approximately in April of 2017 and take 18 months to construct. 4. The total value of Phase 1 will be between $11-12 million. 5. The developer will apply for the State's Vertical Housing Abatement Program, which will provide a 60% tax credit for the residential improvements (not land) for a 10-year time frame. 6. Phase 2 is not yet defined and therefore assumptions regarding Phase 2 are not included. However, it will add additional value and therefore additional capacity. If the City Council authorizes proceeding with an urban renewal plan, then the development assumptions will be updated at that time. Scenario 3 includes additional new development growth of $2.5 million in 2025 and $2.5 million in This is based on the assumption that the Balsiger site development will provide momentum to spur additional mixed use development in the Area and understanding Phase II of the Balsiger site development will also add increased assessed value. Elaine Howard Consulting, LLC ECONorthwest 10

14 Step 5. Calculate tax increment revenue and revenue sharing Calculating tax increment revenue is done by forecasting assessed value, based on assumed assessed value growth as described in Step 4, and then subtracting the initial assessed value (the frozen base) to determine the excess value. The excess value is that amount of growth in the Area including both new development (exception value) and the annual growth of assessed values within the Area. This excess value is multiplied by the applicable tax rate to determine the total amount of tax increment revenue. Then, the revenue sharing thresholds are applied to determine the portion of tax increment revenue that will be collected by the Area and the portion that will be shared with overlapping taxing districts. The tax increment revenue is forecasted using three different growth scenarios. If it is decided to pursue an urban renewal plan for the area, the city will decide which growth scenario to use in the financial feasibility portion of the urban renewal plan. Exhibits 11 through 13 show the projections of assessed value, tax increment revenues, delinquencies and the portion of TIF projected to be received by the Area. Tax increment revenues would begin in FYE 2018 if an urban renewal area is adopted by the Klamath Falls City Council by December 31, If the urban renewal area is approved after that date, the first year of tax increment is delayed. Scenario 1 - Baseline The Area would receive $7,997,872 in TIF over a 30-year time frame. This translates to $5,700,000 in maximum indebtedness and $3,600,000 in present value dollars available for projects if the area had a 30-year term. No revenue sharing is projected in this scenario. Scenario 2-3.2% Assessed Value (AV) Growth Plus Balsiger Site Phase I The Area would receive $18,701,070 in tax increment over a 30-year time frame. This translates to $13,500,000 in maximum indebtedness and $8,400,000 in present value dollars available for projects for the 30-year time frame. No revenue sharing is projected in this scenario because revenue sharing targets, as established by ORS 457, are not met. Scenario 3-3.2% AV Growth, Balsiger Site Phase I, Plus Additional $5 Million of AV Growth The Area would receive $21,151,868 in tax increment over a 30-year time frame. This translates to $15,100,000 in maximum indebtedness and $9,500,000 in present value dollars available for projects for the 30-year time frame. No revenue sharing is projected in this scenario because revenue sharing targets, as established by ORS 457, are not met. The amounts projected to be available for projects over incremental time periods are shown in Exhibit 14. The charts show a 30 year time period for collecting tax increment revenues, shown in bold in the tables below. Elaine Howard Consulting, LLC ECONorthwest 11

15 Exhibit 11. Scenario 1-2% Assessed Value Growth Baseline Scenario FYE Assessed Value Frozen Base Excess Value Tax Rate Gross Tax Increment Underpayments/ Delinquencies 5% Net Tax Increment Cumulative Tax Increment 2018 $44,361,483 $43,491,650 $869, $13,387 $669 $14,056 $14, $45,248,713 $43,491,650 $1,757, $27,042 $1,352 $28,394 $42, $46,153,687 $43,491,650 $2,662, $40,971 $2,049 $43,020 $85, $47,076,761 $43,491,650 $3,585, $55,177 $2,759 $57,936 $143, $48,018,297 $43,491,650 $4,526, $69,668 $3,483 $73,151 $216, $48,978,663 $43,491,650 $5,487, $84,449 $4,222 $88,671 $305, $49,958,236 $43,491,650 $6,466, $99,525 $4,976 $104,501 $409, $50,957,400 $43,491,650 $7,465, $114,903 $5,745 $120,648 $530, $51,976,548 $43,491,650 $8,484, $130,589 $6,529 $137,118 $667, $53,016,079 $43,491,650 $9,524, $146,588 $7,329 $153,917 $821, $54,076,401 $43,491,650 $10,584, $162,907 $8,145 $171,052 $992, $55,157,928 $43,491,650 $11,666, $179,552 $8,978 $188,530 $1,180, $56,261,086 $43,491,650 $12,769, $196,531 $9,827 $206,358 $1,387, $57,386,308 $43,491,650 $13,894, $213,849 $10,692 $224,541 $1,611, $58,534,034 $43,491,650 $15,042, $231,513 $11,576 $243,089 $1,854, $59,704,715 $43,491,650 $16,213, $249,530 $12,477 $262,007 $2,116, $60,898,810 $43,491,650 $17,407, $267,908 $13,395 $281,303 $2,398, $62,116,786 $43,491,650 $18,625, $286,654 $14,333 $300,987 $2,699, $63,359,123 $43,491,650 $19,867, $305,774 $15,289 $321,063 $3,020, $64,626,306 $43,491,650 $21,134, $325,277 $16,264 $341,541 $3,361, $65,918,833 $43,491,650 $22,427, $345,170 $17,259 $362,429 $3,724, $67,237,210 $43,491,650 $23,745, $365,461 $18,273 $383,734 $4,108, $68,581,954 $43,491,650 $25,090, $386,157 $19,308 $405,465 $4,513, $69,953,593 $43,491,650 $26,461, $407,268 $20,363 $427,631 $4,941, $71,352,666 $43,491,650 $27,861, $428,801 $21,440 $450,241 $5,391, $72,779,719 $43,491,650 $29,288, $450,764 $22,538 $473,302 $5,864, $74,235,313 $43,491,650 $30,743, $473,166 $23,658 $496,824 $6,361, $75,720,020 $43,491,650 $32,228, $496,017 $24,801 $520,818 $6,882, $77,234,421 $43,491,650 $33,742, $519,325 $25,966 $545,291 $7,427, $78,779,109 $43,491,650 $35,287, $543,099 $27,155 $570,254 $7,997,872 Source: ECONorthwest Elaine Howard Consulting, LLC ECONorthwest 12

16 Exhibit 12. Scenario 2-3.2% Assessed Value growth Scenario Phase 1 of Balsiger Development Assessed Gross Tax Underpayments/ Net Tax FYE Value Frozen Base Excess Value Tax Rate Increment Delinquencies Increment Cumulative Tax Increment 2018 $45,083,086 $43,491,650 $1,591, $24,493 $1,225 $25,718 $25, $45,984,748 $43,491,650 $2,493, $38,371 $1,919 $40,290 $66, $50,705,768 $43,491,650 $7,214, $111,030 $5,552 $116,582 $182, $52,276,850 $43,491,650 $8,785, $135,210 $6,761 $141,971 $324, $53,897,177 $43,491,650 $10,405, $160,148 $8,007 $168,155 $492, $55,568,304 $43,491,650 $12,076, $185,868 $9,293 $195,161 $687, $57,291,835 $43,491,650 $13,800, $212,395 $10,620 $223,015 $910, $59,069,425 $43,491,650 $15,577, $239,753 $11,988 $251,741 $1,162, $60,902,784 $43,491,650 $17,411, $267,970 $13,399 $281,369 $1,444, $62,793,673 $43,491,650 $19,302, $297,072 $14,854 $311,926 $1,755, $64,743,911 $43,491,650 $21,252, $327,087 $16,354 $343,441 $2,099, $66,755,372 $43,491,650 $23,263, $358,045 $17,902 $375,947 $2,475, $75,482,380 $43,491,650 $31,990, $492,360 $24,618 $516,978 $2,992, $77,835,036 $43,491,650 $34,343, $528,569 $26,428 $554,997 $3,547, $80,261,720 $43,491,650 $36,770, $565,917 $28,296 $594,213 $4,141, $82,764,778 $43,491,650 $39,273, $604,441 $30,222 $634,663 $4,776, $85,346,628 $43,491,650 $41,854, $644,177 $32,209 $676,386 $5,452, $88,009,764 $43,491,650 $44,518, $685,165 $34,258 $719,423 $6,171, $90,756,762 $43,491,650 $47,265, $727,443 $36,372 $763,815 $6,935, $93,590,277 $43,491,650 $50,098, $771,053 $38,553 $809,606 $7,745, $96,513,051 $43,491,650 $53,021, $816,036 $40,802 $856,838 $8,602, $99,527,912 $43,491,650 $56,036, $862,437 $43,122 $905,559 $9,507, $102,637,776 $43,491,650 $59,146, $910,300 $45,515 $955,815 $10,463, $105,845,655 $43,491,650 $62,354, $959,672 $47,984 $1,007,656 $11,471, $109,154,657 $43,491,650 $65,663, $1,010,600 $50,530 $1,061,130 $12,532, $112,567,984 $43,491,650 $69,076, $1,063,133 $53,157 $1,116,290 $13,648, $116,088,945 $43,491,650 $72,597, $1,117,323 $55,866 $1,173,189 $14,821, $119,720,954 $43,491,650 $76,229, $1,173,222 $58,661 $1,231,883 $16,053, $123,467,530 $43,491,650 $79,975, $1,230,885 $61,544 $1,292,429 $17,346, $127,332,306 $43,491,650 $83,840, $1,290,366 $64,518 $1,354,884 $18,701,070 Source: ECONorthwest 3.2% AV growth on real property starts in FYE 2020 Elaine Howard Consulting, LLC ECONorthwest 13

17 Exhibit 13. Scenario 3-3.2% Assessed Value growth Scenario Phase 1 of Balsiger Development Plus $5M of Additional Excess Value FYE Assessed Value Frozen Base Excess Value Tax Rate Gross Tax Increment Compression Loss Net Tax Increment Cumulative Tax Increment 2018 $45,083,086 $43,491,650 $1,591, $24,493 $1,225 $25,718 $25, $45,984,748 $43,491,650 $2,493, $38,371 $1,919 $40,290 $66, $50,705,768 $43,491,650 $7,214, $111,030 $5,552 $116,582 $182, $52,276,850 $43,491,650 $8,785, $135,210 $6,761 $141,971 $324, $53,897,177 $43,491,650 $10,405, $160,148 $8,007 $168,155 $492, $55,568,304 $43,491,650 $12,076, $185,868 $9,293 $195,161 $687, $57,291,835 $43,491,650 $13,800, $212,395 $10,620 $223,015 $910, $61,569,425 $43,491,650 $18,077, $278,230 $13,912 $292,142 $1,203, $63,482,784 $43,491,650 $19,991, $307,678 $15,384 $323,062 $1,526, $65,456,233 $43,491,650 $21,964, $338,050 $16,903 $354,953 $1,881, $69,991,673 $43,491,650 $26,500, $407,854 $20,393 $428,247 $2,309, $72,171,063 $43,491,650 $28,679, $441,396 $22,070 $463,466 $2,772, $81,071,373 $43,491,650 $37,579, $578,378 $28,919 $607,297 $3,380, $83,602,876 $43,491,650 $40,111, $617,340 $30,867 $648,207 $4,028, $86,214,131 $43,491,650 $42,722, $657,529 $32,876 $690,405 $4,718, $88,907,666 $43,491,650 $45,416, $698,984 $34,949 $733,933 $5,452, $91,686,089 $43,491,650 $48,194, $741,746 $37,087 $778,833 $6,231, $94,552,088 $43,491,650 $51,060, $785,856 $39,293 $825,149 $7,056, $97,508,440 $43,491,650 $54,016, $831,356 $41,568 $872,924 $7,929, $100,558,009 $43,491,650 $57,066, $878,291 $43,915 $922,206 $8,851, $103,703,750 $43,491,650 $60,212, $926,706 $46,335 $973,041 $9,824, $106,948,713 $43,491,650 $63,457, $976,649 $48,832 $1,025,481 $10,850, $110,296,043 $43,491,650 $66,804, $1,028,166 $51,408 $1,079,574 $11,929, $113,748,987 $43,491,650 $70,257, $1,081,310 $54,066 $1,135,376 $13,065, $117,310,895 $43,491,650 $73,819, $1,136,130 $56,807 $1,192,937 $14,258, $120,985,222 $43,491,650 $77,493, $1,192,680 $59,634 $1,252,314 $15,510, $124,775,535 $43,491,650 $81,283, $1,251,016 $62,551 $1,313,567 $16,824, $128,685,515 $43,491,650 $85,193, $1,311,193 $65,560 $1,376,753 $18,200, $132,718,957 $43,491,650 $89,227, $1,373,271 $68,664 $1,441,935 $19,642, $136,879,779 $43,491,650 $93,388, $1,437,309 $71,865 $1,509,174 $21,151,868 Source: ECONorthwest property AV growth 3.2% AV growth on real property starts in FYE 2020, Phase I of Balsiger Development, Additional $5M of real Elaine Howard Consulting, LLC ECONorthwest 14

18 Step 6. Create a draft finance plan Klamath Falls Urban Renewal Feasibility Study The final step in the analysis is to take the annual forecast of tax increment revenue for the Area, and translate it into a financing plan showing the year projects would be funded, the debt incurred, and the timing for retiring the debt. The available funding is in constant 2016 dollars, meaning, for example, the $3,600,000 in available funding under the 2% growth scenario means you could specify $3,600,000 of projects, programs and administration in today s costs for that scenario. The difference between the Maximum Indebtedness and the Available Funding is the cost of inflation increasing the project costs over time. The projects would be completed in a shorter timeframe than the life of the district. The district lasts longer in order to pay off remaining debt. If a shorter term of urban renewal is desired, that can be accomplished by issuing less debt and therefore having less maximum indebtedness and less funding to do projects. The table shows a 30-year duration for all scenarios. Exhibit 14. AV Growth Scenario Finance Plan Year Districts Assessed Value Growth Scenario 1 Scenario 2 Scenario 3 Projects Completed 23 Years 23 Years 23 Years Term of URA 30 Years 30 Years 30 Years Projected Maximum Indebtedness $5,700,000 $13,500,000 $15,100,000 Available Funding (2016 $) Years 1-5 $200,000 $1,000,000 $1,100,000 Years 6-10 $900,000 $1,400,000 $1,300,000 Years $900,000 $1,600,000 $3,400,000 Years 16+ $1,600,000 $4,400,000 $3,700,000 Total for Projects $3,600,000 $8,400,000 $9,500,000 Source: ECONorthwest Scenario 1 2% AV growth Scenario 2-3.2% of real property AV growth begins in FYE 2020, Phase I Balsiger Site Scenario 3-3.2% of real property AV growth begins in FYE 2020, Phase I Balsiger Site additional is $5M in additional AV real property value growth in FYE 2025 and Elaine Howard Consulting, LLC ECONorthwest 15

19 Impacts on Taxing Districts Klamath Falls Urban Renewal Feasibility Study Tax increment financing through urban renewal is not finding new money. These tax revenues are generated from the existing property tax rates of other taxing districts that overlap the urban renewal area. A new urban renewal area would impact these affected taxing districts, by redirecting a portion of these property tax revenues to the urban renewal area. The impact to other taxing districts is measured in terms of foregone revenue. Exhibits 15a through 17b summarize the amount of foregone revenue that would be caused by the proposed new Area given the boundary options. Note that the foregone revenue for the School District and Education Service District does not have a direct impact on school funding, as funding is equalized at the State level. The amount of foregone revenues is roughly equal to the amount of tax increment revenue needed to pay debt service on the maximum indebtedness. In general these impacts start off very small, and grow over time as the assessed value of the Area grows. For example, in Scenario 3 shown in Exhibit 17a, the City of Klamath Falls is estimated to have a total impact of only $2,895 in FY (the first year in which tax increment would be collected), and an impact of $169,894 per year in FY (the 30 th year tax increment would be collected). Detailed tables showing the annual foregone revenues for each taxing district for each scenario are shown in Exhibits 15a through 17b. Recent changes to Oregon Revised Statutes governing urban renewal give urban renewal agencies the ability to under-levy their annual tax increment revenue. That means that a new Area could voluntarily reduce the annual amount of tax increment revenue collections, sharing some of that revenue with overlapping taxing districts. If this were the case, then the amount of annual foregone revenues would be less than what is shown in Exhibits 15a through 17b, though it would have little impact on the total foregone revenues, as the reduced tax increment revenues (TIF) for the Area would result in an extended period of time for the Area to pay off its maximum indebtedness. To the extent that urban renewal investment is successful in stimulating new taxable development, not all of the foregone revenues should truly be categorized as impacts to taxing districts. Successful urban renewal areas cause new development to occur, above and beyond the level that would have occurred without urban renewal. In these situations, the property taxes would not have existed but for the Area s targeted investments, so even though these tax revenues show up as tax increment revenue, and as foregone revenues, they really should not be counted as a negative impact to taxing districts. Note that the analysis was not conducted at the detailed level required to estimate the portion of tax increment revenue in the proposed new Area that would likely be generated by new development dependent upon urban renewal investment. Elaine Howard Consulting, LLC ECONorthwest 16

20 Exhibit 15a. Scenario 1-2% Assessed Value growth Scenario - General Government Klamath Co Library KFalls City Klamath Co Fire Dist #1 Basin Transit Klamath Vector Klamath 911 Klamath Co Ext Serv Dist FYE Subtotal $1,582 -$448 -$4,970 -$2,632 -$440 -$165 -$141 -$137 -$10, $3,196 -$904 -$10,040 -$5,317 -$890 -$333 -$284 -$277 -$21, $4,843 -$1,370 -$15,212 -$8,056 -$1,348 -$505 -$431 -$419 -$32, $6,522 -$1,845 -$20,487 -$10,850 -$1,815 -$679 -$580 -$565 -$43, $8,235 -$2,329 -$25,867 -$13,699 -$2,292 -$858 -$732 -$713 -$54, $9,982 -$2,823 -$31,355 -$16,605 -$2,778 -$1,040 -$888 -$864 -$66, $11,764 -$3,327 -$36,953 -$19,570 -$3,274 -$1,226 -$1,046 -$1,018 -$78, $13,582 -$3,841 -$42,662 -$22,594 -$3,780 -$1,415 -$1,208 -$1,176 -$90, $15,436 -$4,365 -$48,486 -$25,678 -$4,296 -$1,608 -$1,373 -$1,336 -$102, $17,327 -$4,900 -$54,427 -$28,824 -$4,822 -$1,805 -$1,541 -$1,500 -$115, $19,256 -$5,446 -$60,486 -$32,033 -$5,359 -$2,006 -$1,713 -$1,667 -$127, $21,224 -$6,002 -$66,666 -$35,306 -$5,907 -$2,211 -$1,888 -$1,837 -$141, $23,231 -$6,570 -$72,970 -$38,644 -$6,465 -$2,420 -$2,066 -$2,011 -$154, $25,278 -$7,149 -$79,400 -$42,050 -$7,035 -$2,633 -$2,248 -$2,188 -$167, $27,366 -$7,739 -$85,959 -$45,523 -$7,616 -$2,851 -$2,434 -$2,369 -$181, $29,495 -$8,342 -$92,648 -$49,066 -$8,209 -$3,073 -$2,623 -$2,554 -$196, $31,668 -$8,956 -$99,471 -$52,679 -$8,813 -$3,299 -$2,817 -$2,742 -$210, $33,883 -$9,583 -$106,432 -$56,366 -$9,430 -$3,530 -$3,014 -$2,933 -$225, $36,143 -$10,222 -$113,531 -$60,125 -$10,059 -$3,765 -$3,215 -$3,129 -$240, $38,449 -$10,874 -$120,772 -$63,960 -$10,701 -$4,006 -$3,420 -$3,329 -$255, $40,800 -$11,539 -$128,158 -$67,872 -$11,355 -$4,251 -$3,629 -$3,532 -$271, $43,199 -$12,217 -$135,692 -$71,861 -$12,023 -$4,500 -$3,842 -$3,740 -$287, $45,645 -$12,909 -$143,376 -$75,931 -$12,703 -$4,755 -$4,060 -$3,952 -$303, $48,140 -$13,615 -$151,214 -$80,082 -$13,398 -$5,015 -$4,282 -$4,168 -$319, $50,686 -$14,335 -$159,210 -$84,316 -$14,106 -$5,280 -$4,508 -$4,388 -$336, $53,282 -$15,069 -$167,364 -$88,635 -$14,829 -$5,551 -$4,739 -$4,613 -$354, $55,930 -$15,818 -$175,682 -$93,040 -$15,566 -$5,827 -$4,974 -$4,842 -$371, $58,631 -$16,581 -$184,166 -$97,533 -$16,318 -$6,108 -$5,215 -$5,076 -$389, $61,386 -$17,361 -$192,820 -$102,116 -$17,084 -$6,395 -$5,460 -$5,314 -$407, $64,196 -$18,155 -$201,647 -$106,791 -$17,866 -$6,688 -$5,710 -$5,558 -$426, years -$900,357 -$254,634 -$2,828,123 -$1,497,754 -$250,577 -$93,798 -$80,081 -$77,947 -$5,983,271 Source: ECONorthwest Elaine Howard Consulting, LLC ECONorthwest 17

21 Exhibit 15b. Scenario 1-2% Assessed Value growth Scenario - Education Klamath Falls Urban Renewal Feasibility Study KFalls City Schools S Oregon ESD Klamath CC FYE Subtotal Total $2,843 -$322 -$376 -$3,541 -$14, $5,743 -$650 -$760 -$7,153 -$28, $8,701 -$985 -$1,151 -$10,837 -$43, $11,717 -$1,327 -$1,550 -$14,594 -$57, $14,794 -$1,675 -$1,957 -$18,426 -$73, $17,933 -$2,030 -$2,372 -$22,335 -$88, $21,135 -$2,393 -$2,795 -$26,323 -$104, $24,401 -$2,762 -$3,227 -$30,390 -$120, $27,732 -$3,140 -$3,668 -$34,540 -$137, $31,129 -$3,524 -$4,117 -$38,770 -$153, $34,594 -$3,917 -$4,576 -$43,087 -$171, $38,129 -$4,317 -$5,043 -$47,489 -$188, $41,735 -$4,725 -$5,520 -$51,980 -$206, $45,412 -$5,141 -$6,006 -$56,559 -$224, $49,164 -$5,566 -$6,503 -$61,233 -$243, $52,990 -$5,999 -$7,009 -$65,998 -$262, $56,892 -$6,441 -$7,525 -$70,858 -$281, $60,873 -$6,892 -$8,051 -$75,816 -$300, $64,934 -$7,351 -$8,588 -$80,873 -$321, $69,075 -$7,820 -$9,136 -$86,031 -$341, $73,300 -$8,299 -$9,695 -$91,294 -$362, $77,608 -$8,786 -$10,265 -$96,659 -$383, $82,003 -$9,284 -$10,846 -$102,133 -$405, $86,486 -$9,791 -$11,439 -$107,716 -$427, $91,059 -$10,309 -$12,044 -$113,412 -$450, $95,723 -$10,837 -$12,661 -$119,221 -$473, $100,480 -$11,376 -$13,290 -$125,146 -$496, $105,333 -$11,925 -$13,932 -$131,190 -$520, $110,283 -$12,485 -$14,586 -$137,354 -$545, $115,331 -$13,057 -$15,254 -$143,642 -$570, years -$1,617,532 -$183,126 -$213,942 -$2,014,600 -$7,997,871 Source: ECONorthwest Note that the foregone revenue for the School District and Education Service District does not have a direct impact on school funding, as funding is equalized at the State level. Elaine Howard Consulting, LLC ECONorthwest 18

22 Source: ECONorthwest Klamath Falls Urban Renewal Feasibility Study Exhibit 16a. Scenario 2 3.2% Assessed Value growth Scenario including Balsiger Phase 1 Projections - General Government Klamath Co Basin Klamath Klamath Klamath Co Klamath Co Library KFalls City Fire Dist #1 Transit Vector 911 Ext Serv Dist FYE Subtotal $2,895 -$819 -$9,094 -$4,816 -$806 -$302 -$258 -$251 -$19, $4,536 -$1,283 -$14,247 -$7,545 -$1,262 -$473 -$403 -$393 -$30, $13,124 -$3,712 -$41,225 -$21,832 -$3,653 -$1,367 -$1,167 -$1,136 -$87, $15,982 -$4,520 -$50,202 -$26,587 -$4,448 -$1,665 -$1,421 -$1,384 -$106, $18,930 -$5,354 -$59,461 -$31,490 -$5,268 -$1,972 -$1,684 -$1,639 -$125, $21,970 -$6,213 -$69,011 -$36,548 -$6,115 -$2,289 -$1,954 -$1,902 -$146, $25,106 -$7,100 -$78,860 -$41,764 -$6,987 -$2,615 -$2,233 -$2,174 -$166, $28,340 -$8,015 -$89,018 -$47,143 -$7,887 -$2,952 -$2,521 -$2,454 -$188, $31,675 -$8,958 -$99,495 -$52,692 -$8,815 -$3,300 -$2,817 -$2,742 -$210, $35,115 -$9,931 -$110,300 -$58,414 -$9,773 -$3,658 -$3,123 -$3,040 -$233, $38,663 -$10,934 -$121,444 -$64,316 -$10,760 -$4,028 -$3,439 -$3,347 -$256, $42,322 -$11,969 -$132,938 -$70,403 -$11,779 -$4,409 -$3,764 -$3,664 -$281, $58,199 -$16,459 -$182,808 -$96,814 -$16,197 -$6,063 -$5,176 -$5,039 -$386, $62,478 -$17,670 -$196,252 -$103,934 -$17,388 -$6,509 -$5,557 -$5,409 -$415, $66,893 -$18,918 -$210,119 -$111,278 -$18,617 -$6,969 -$5,950 -$5,791 -$444, $71,447 -$20,206 -$224,423 -$118,853 -$19,884 -$7,443 -$6,355 -$6,186 -$474, $76,144 -$21,534 -$239,177 -$126,666 -$21,192 -$7,933 -$6,772 -$6,592 -$506, $80,989 -$22,905 -$254,395 -$134,726 -$22,540 -$8,437 -$7,203 -$7,012 -$538, $85,986 -$24,318 -$270,092 -$143,039 -$23,931 -$8,958 -$7,648 -$7,444 -$571, $91,141 -$25,776 -$286,284 -$151,614 -$25,365 -$9,495 -$8,106 -$7,891 -$605, $96,458 -$27,280 -$302,986 -$160,459 -$26,845 -$10,049 -$8,579 -$8,351 -$641, $101,943 -$28,831 -$320,214 -$169,583 -$28,372 -$10,620 -$9,067 -$8,826 -$677, $107,600 -$30,431 -$337,985 -$178,994 -$29,946 -$11,210 -$9,570 -$9,316 -$715, $113,436 -$32,081 -$356,317 -$188,703 -$31,570 -$11,818 -$10,089 -$9,821 -$753, $119,456 -$33,784 -$375,226 -$198,717 -$33,246 -$12,445 -$10,625 -$10,342 -$793, $125,666 -$35,540 -$394,731 -$209,046 -$34,974 -$13,092 -$11,177 -$10,880 -$835, $132,071 -$37,351 -$414,851 -$219,702 -$36,757 -$13,759 -$11,747 -$11,434 -$877, $138,679 -$39,220 -$435,606 -$230,693 -$38,596 -$14,447 -$12,334 -$12,006 -$921, $145,495 -$41,148 -$457,015 -$242,032 -$40,493 -$15,157 -$12,940 -$12,596 -$966, $152,525 -$43,136 -$479,100 -$253,728 -$42,449 -$15,890 -$13,566 -$13,205 -$1,013, years -$2,105,264 -$595,396 -$6,612,876 -$3,502,131 -$585,915 -$219,324 -$187,245 -$182,267 -$13,990,418 Elaine Howard Consulting, LLC ECONorthwest 19

23 Exhibit 16b. 3.2% Assessed Value growth Scenario including Balsiger Phase 1 Projections - Education KFalls City Schools S Oregon ESD Klamath CC FYE Perm Subtotal Total $5,201 -$589 -$688 -$6,478 -$25, $8,148 -$923 -$1,078 -$10,149 -$40, $23,578 -$2,669 -$3,119 -$29,366 -$116, $28,713 -$3,251 -$3,798 -$35,762 -$141, $34,009 -$3,850 -$4,498 -$42,357 -$168, $39,470 -$4,469 -$5,221 -$49,160 -$195, $45,104 -$5,106 -$5,966 -$56,176 -$223, $50,913 -$5,764 -$6,734 -$63,411 -$251, $56,906 -$6,442 -$7,527 -$70,875 -$281, $63,086 -$7,142 -$8,344 -$78,572 -$311, $69,459 -$7,864 -$9,187 -$86,510 -$343, $76,034 -$8,608 -$10,057 -$94,699 -$375, $104,556 -$11,837 -$13,829 -$130,222 -$516, $112,246 -$12,708 -$14,846 -$139,800 -$554, $120,177 -$13,606 -$15,895 -$149,678 -$594, $128,358 -$14,532 -$16,977 -$159,867 -$634, $136,796 -$15,487 -$18,093 -$170,376 -$676, $145,500 -$16,473 -$19,245 -$181,218 -$719, $154,478 -$17,489 -$20,432 -$192,399 -$763, $163,739 -$18,538 -$21,657 -$203,934 -$809, $173,292 -$19,619 -$22,920 -$215,831 -$856, $183,145 -$20,735 -$24,224 -$228,104 -$905, $193,309 -$21,885 -$25,568 -$240,762 -$955, $203,794 -$23,072 -$26,955 -$253,821 -$1,007, $214,609 -$24,297 -$28,385 -$267,291 -$1,061, $225,765 -$25,560 -$29,861 -$281,186 -$1,116, $237,272 -$26,862 -$31,383 -$295,517 -$1,173, $249,143 -$28,206 -$32,953 -$310,302 -$1,231, $261,388 -$29,593 -$34,572 -$325,553 -$1,292, $274,019 -$31,023 -$36,243 -$341,285 -$1,354, years -$3,782,207 -$428,199 -$500,255 -$4,710,661 -$18,701,079 Source: ECONorthwest Note that the foregone revenue for the School District and Education Service District does not have a direct impact on school funding, as funding is equalized at the State level. Elaine Howard Consulting, LLC ECONorthwest 20

24 Exhibit 17a. Scenario 3-3.2% Assessed Value growth Scenario including Balsiger Phase 1 Projections Plus $5M Additional Excess Value - General Government FYE Klamath Co Library KFalls City Klamath County Basin Transit Klamath Vector Klamath 911 Klamath Co Fire District #1 Source: ECONorthwest 3.2% AV growth for real property starts in FYE 2020 Extension Subtotal $2,895 -$819 -$9,094 -$4,816 -$806 -$302 -$258 -$251 -$19, $4,536 -$1,283 -$14,247 -$7,545 -$1,262 -$473 -$403 -$393 -$30, $13,124 -$3,712 -$41,225 -$21,832 -$3,653 -$1,367 -$1,167 -$1,136 -$87, $15,982 -$4,520 -$50,202 -$26,587 -$4,448 -$1,665 -$1,421 -$1,384 -$106, $18,930 -$5,354 -$59,461 -$31,490 -$5,268 -$1,972 -$1,684 -$1,639 -$125, $21,970 -$6,213 -$69,011 -$36,548 -$6,115 -$2,289 -$1,954 -$1,902 -$146, $25,106 -$7,100 -$78,860 -$41,764 -$6,987 -$2,615 -$2,233 -$2,174 -$166, $32,888 -$9,301 -$103,304 -$54,709 -$9,153 -$3,426 -$2,925 -$2,847 -$218, $36,369 -$10,285 -$114,238 -$60,499 -$10,122 -$3,789 -$3,235 -$3,149 -$241, $39,959 -$11,301 -$125,515 -$66,472 -$11,121 -$4,163 -$3,554 -$3,459 -$265, $48,210 -$13,634 -$151,432 -$80,197 -$13,417 -$5,022 -$4,288 -$4,174 -$320, $52,174 -$14,756 -$163,886 -$86,793 -$14,521 -$5,435 -$4,640 -$4,517 -$346, $68,366 -$19,335 -$214,746 -$113,728 -$19,027 -$7,122 -$6,081 -$5,919 -$454, $72,972 -$20,637 -$229,212 -$121,389 -$20,309 -$7,602 -$6,490 -$6,318 -$484, $77,722 -$21,981 -$244,134 -$129,291 -$21,631 -$8,097 -$6,913 -$6,729 -$516, $82,622 -$23,367 -$259,526 -$137,443 -$22,995 -$8,607 -$7,349 -$7,153 -$549, $87,677 -$24,796 -$275,403 -$145,851 -$24,401 -$9,134 -$7,798 -$7,591 -$582, $92,891 -$26,271 -$291,781 -$154,525 -$25,852 -$9,677 -$8,262 -$8,042 -$617, $98,269 -$27,792 -$308,674 -$163,472 -$27,349 -$10,238 -$8,740 -$8,508 -$653, $103,817 -$29,361 -$326,101 -$172,701 -$28,893 -$10,816 -$9,234 -$8,988 -$689, $109,540 -$30,979 -$344,077 -$182,220 -$30,486 -$11,412 -$9,743 -$9,483 -$727, $115,443 -$32,649 -$362,620 -$192,041 -$32,129 -$12,027 -$10,268 -$9,994 -$767, $121,532 -$34,371 -$381,748 -$202,171 -$33,824 -$12,661 -$10,809 -$10,522 -$807, $127,814 -$36,147 -$401,480 -$212,621 -$35,572 -$13,316 -$11,368 -$11,066 -$849, $134,294 -$37,980 -$421,834 -$223,400 -$37,375 -$13,991 -$11,944 -$11,627 -$892, $140,979 -$39,870 -$442,830 -$234,520 -$39,236 -$14,687 -$12,539 -$12,205 -$936, $147,874 -$41,821 -$464,490 -$245,990 -$41,155 -$15,405 -$13,152 -$12,802 -$982, $154,987 -$43,832 -$486,833 -$257,823 -$43,135 -$16,146 -$13,785 -$13,418 -$1,029, $162,325 -$45,907 -$509,882 -$270,030 -$45,177 -$16,911 -$14,437 -$14,053 -$1,078, $169,894 -$48,048 -$533,658 -$282,621 -$47,283 -$17,699 -$15,111 -$14,709 -$1,129, Years -$2,381,161 -$673,422 -$7,479,504 -$3,961,089 -$662,702 -$248,066 -$211,785 -$206,152 -$15,823,881 Elaine Howard Consulting, LLC ECONorthwest 21

25 Exhibit 17b. Scenario 3-3.2% Assessed Value growth Scenario including Balsiger Phase 1 Projections Plus $5M Additional Excess Value - Education KFalls City Schools S Oregon ESD Klamath CC FYE Subtotal Total $5,201 -$589 -$688 -$6,478 -$25, $8,148 -$923 -$1,078 -$10,149 -$40, $23,578 -$2,669 -$3,119 -$29,366 -$116, $28,713 -$3,251 -$3,798 -$35,762 -$141, $34,009 -$3,850 -$4,498 -$42,357 -$168, $39,470 -$4,469 -$5,221 -$49,160 -$195, $45,104 -$5,106 -$5,966 -$56,176 -$223, $59,084 -$6,689 -$7,815 -$73,588 -$292, $65,338 -$7,397 -$8,642 -$81,377 -$323, $71,788 -$8,127 -$9,495 -$89,410 -$354, $86,611 -$9,806 -$11,456 -$107,873 -$428, $93,734 -$10,612 -$12,398 -$116,744 -$463, $122,823 -$13,905 -$16,245 -$152,973 -$607, $131,097 -$14,842 -$17,339 -$163,278 -$648, $139,631 -$15,808 -$18,468 -$173,907 -$690, $148,435 -$16,805 -$19,633 -$184,873 -$733, $157,515 -$17,833 -$20,834 -$196,182 -$778, $166,883 -$18,893 -$22,073 -$207,849 -$825, $176,545 -$19,987 -$23,351 -$219,883 -$872, $186,512 -$21,116 -$24,669 -$232,297 -$922, $196,793 -$22,280 -$26,029 -$245,102 -$973, $207,399 -$23,480 -$27,432 -$258,311 -$1,025, $218,339 -$24,719 -$28,879 -$271,937 -$1,079, $229,625 -$25,997 -$30,371 -$285,993 -$1,135, $241,266 -$27,315 -$31,911 -$300,492 -$1,192, $253,275 -$28,674 -$33,499 -$315,448 -$1,252, $265,663 -$30,077 -$35,138 -$330,878 -$1,313, $278,442 -$31,523 -$36,828 -$346,793 -$1,376, $291,625 -$33,016 -$38,572 -$363,213 -$1,441, $305,224 -$34,555 -$40,370 -$380,149 -$1,509, Years -$4,277,870 -$484,313 -$565,815 -$5,327,998 -$21,151,879 Source: ECONorthwest 3.2% AV growth for real property starts in FYE 2020 Note that the foregone revenue for the School District and Education Service District does not have a direct impact on school funding, as funding is equalized at the State level. Elaine Howard Consulting, LLC ECONorthwest 22

26 Impact from Existing Urban Renewal Areas It is important to note that the figures shown in Exhibits 15a through 17b are only the impact of the proposed new urban renewal area. The city s two existing urban renewal areas, Lakefront and Town Center are already collecting tax increment revenue, in the amount of $79,139 in FY 2016/17 to Lakefront and $185,257 in FY 2016/17 to Town Center. The impact from these urban renewal areas is in addition to the impact shown in Exhibits 15a through 17b. Next Steps This Urban Renewal Feasibility Study will be presented to the Klamath Falls City Council. If they direct staff to pursue the development of an urban renewal plan, the following steps must be completed: 1. Preparation of an Urban Renewal Plan (Plan) pursuant to ORS including goals and objectives and projects to pursue. This is typically done with the assistance of a consultant. City Council will want to determine if they want additional public input through an advisory committee or to have staff work directly with a consultant. 2. Direction for the projects to be included in the urban renewal plan. This determination should come from the City Council, sometimes with the input of an advisory committee. Initial project categories are presented in the feasibility study. A decision needs to be made on the percentage of allocations to the projects and if administration should also be included as a potential project. 3. Completion of the Report that accompanies the Urban Renewal Plan. This Report must comply with ORS , both identifying existing conditions and establishing financial feasibility. There is generally a large amount of city staff input in this document, as existing conditions must be identified and projects defined. 4. Presentation of the draft Plan to the Urban Renewal Agency for their review, and if desired, passing a motion to start the public review process. 5. Public input that generally takes the form of a Public Open House. 6. Presentation to the Klamath Falls Planning Commission for their finding of conformance with the Klamath Falls Comprehensive Plan. 7. Presentation to the Klamath County Commission. No action on their behalf is required. 8. Consult and confer with affected taxing districts. 9. Public hearing in front of Klamath Falls City Council, advertised to a specific group as identified in Review of a non-emergency ordinance. 10. Publication of notice if the ordinance for the Plan is adopted. 11. Completion of a legal description of the Area that is typically done outside of the urban renewal plan consultant s contract. This legal description must be complete by the final action in front of City Council. 12. Timing of the adoption of a Plan is important. There are two important factors in timing. The first is which tax roll will be used to establish the frozen base. If the Plan is adopted and the 30- day period for a non-emergency ordinance occurs prior to the certification of the FY 16/17 tax roll by the County Assessor (typically in October), the frozen base that is established for the Area uses the FY 15/16 assessed values. This potentially captures increases in assessed value growth as well as any new growth that will come on the tax roll in FY 16/17. However, there are Elaine Howard Consulting, LLC ECONorthwest 23

27 a number of properties that will transfer to public ownership and therefore not have an assessed value, reducing the frozen base. This will occur in the October 2016 tax roll. It is recommended that any adoption of an urban renewal plan for the area occur after the FY 2016/17 tax roll is certified in October of The second important timing factor is when increment will begin. If the Plan is adopted prior to Jan 1, 2017, increment will be distributed in FY 2017/18. If the Plan is adopted after Jan 1, 2017, the first increment is distributed in FY 2018/19. The process of preparing and adopting an urban renewal plan typically takes 4-6 months. Elaine Howard Consulting, LLC ECONorthwest 24

28 BACKGROUND INFORMATION Klamath Falls Urban Renewal Feasibility Study What is Urban Renewal? Urban renewal is a state-sanctioned program used by over 70 cities and counties in Oregon to help them, through partnerships with the private sector, implement adopted plans to revitalize specified areas within their jurisdiction. Urban renewal, through the provision of tax increment financing (TIF), can provide for capital improvements such as parks, water and waste water infrastructure, parking facilities, and transportation improvements that stimulate private investment and attract new businesses, jobs, and residents. It can also be used to assist with development activities that are approved in an urban renewal plan, such as storefront improvement loans, property acquisition, and site preparation. In Oregon, planning and analysis associated with the creation of a new urban renewal area is guided by state statute (ORS Chapter 457). The statutes stipulate that urban renewal area plans must find the proposed urban renewal area is eligible for urban renewal because of existing blight, typified by conditions such as deteriorated buildings and lack of adequate infrastructure. The plan must also contain goals and objectives, authorized urban renewal projects, a limit on the expenditures, specific provisions regarding acquisition and disposition of land, and provisions regarding how the plan may be amended in the future. There are no specific statutory requirements for a feasibility study. What is Tax Increment Revenue? Tax increment financing is the primary funding tool used within urban renewal areas. Tax increment revenue is generated within a URA when the assessed value within that area is frozen (often called the frozen base). Any taxes generated within that area from growth in assessed value ( excess value ) through either appreciation or new investment becomes the increment. Expected new development and substantial rehabilitation is termed exception value and becomes part of the excess value. Taxing jurisdictions continue to collect tax income from the frozen base. Taxes off the assessed value above the frozen base is allocated to the urban renewal area. This is a two-step process. First the assessor determines the increase in value above the frozen base and the taxes that would be generated off that increase in value, then the assessor assigns a portion of that amount to each property tax bill in the city of Klamath Falls. This is called division of taxes. This does not mean individual property tax bills increase, it only means a portion of their tax bill is allocated to the urban renewal agency for use in the urban renewal area. The taxes are distributed in this way due to a legal decision in Shilo Inn Portland/205, LLC v. Multnomah County, City of Portland and the Portland Development Commission (April 18, 2002). The urban renewal area then can obtain loans or issue bonds to pay for identified public improvements and/or investments in private projects that are in the public interest. The tax increment is used to pay debt service on these projects. What is Maximum Indebtedness? Maximum indebtedness (MI) is the amount of the principal of indebtedness included in a plan pursuant to ORS and does not include indebtedness incurred to refund or refinance existing indebtedness. This is the total amount that can be spent from tax increment proceeds for projects, programs and administration during the life of an urban renewal plan. Elaine Howard Consulting, LLC ECONorthwest 25

29 What is Revenue Sharing? Klamath Falls Urban Renewal Feasibility Study In 2009, the Oregon Legislature enacted HB 3056, which, among other things, established a system of revenue sharing for urban renewal areas. These revenue sharing provisions only apply to urban renewal areas approved after 2009 and older urban renewal areas that have been amended to increase maximum indebtedness since When urban renewal areas attain certain thresholds of annual tax revenue, some of this tax revenue is released from the urban renewal area and shared with the other taxing districts. When tax revenues reach 10% of the urban renewal area s maximum indebtedness, then a portion of the TIF above that level is shared with overlapping taxing districts (specifically 25% of the TIF above this threshold remains with the urban renewal area, and the remaining 75% of TIF is returned to taxing districts). Additionally, when TIF revenues for the URA reach 12.5% of the maximum indebtedness, TIF revenues for the URA are capped at the amount, with all TIF revenues above 12.5% of maximum indebtedness being shared with overlapping taxing districts. The analysis for the area studied indicates it would not begin revenue sharing in a projected 30 year lifetime of the Area under any of the three scenarios. How does Oregon Property Tax Work? Citizen initiatives have changed the way that property taxes are raised in Oregon, and have limited the growth of assessed value and property tax revenues for taxing jurisdictions. Measure 5, passed in 1990, introduced tax rate limits. Measure 50 passed in 1996, cut taxes, introduced assessed value growth limits, and replaced most dollar-limited levies (an amount) with permanent tax rate limits. Measure 5 introduced limits on the taxes paid by individual properties. It imposed limits of $5 per $1,000 of real market value for school taxes and $10 per $1,000 of real market value for general government taxes. These limits apply to all property taxes, other than those levied to repay voterapproved general obligation bonds. Under Measure 50, most levies were replaced by permanent limits on tax rates. The permanent rate limit is fixed, and does not change from year to year. In addition to the permanent rate, taxing districts may impose general obligation bond levies and local option levies. The sum of all the tax rates (including permanent rates, local option levy rates, and rates for bonds and other levies) of all taxing districts in a given levy code area is known as the consolidated tax rate. Property Taxes and School Funding Although schools levy property taxes, these local property tax revenues do not have a direct impact on funding for local school districts. This is because the state equalizes school funding using a formula that takes into account property tax revenue generated at the local school district level, and revenue from the state s coffers generated by the statewide income tax, Oregon Lottery, and intergovernmental revenues. Allocation of state revenues to local school districts comes in the form of general purpose grants. The primary driver of the state allocation is the number of students in each district. The state multiplies the number of students by the general purpose grant, with some adjustments for teacher experience and other factors. Regardless of local property tax collections, each school district still receives the same Elaine Howard Consulting, LLC ECONorthwest 26

30 amount of funding per student, with state funding making up the difference between local property tax revenues and the general purpose grant amount. What is Compression? Some jurisdictions in Oregon do not receive the full amount of property taxes that should be levied, due to compression, which occurs as a result of the rate limits enacted by Measure 5. These rate limits apply to the real market value of properties, rather than to the assessed value. If taxes to be raised on an individual property exceed the Measure 5 limits ($5 per $1,000 of real market value for education, or $10 per $1,000 of real market value for general government), and the difference between the real market value and the assessed value is not great enough, then the tax bill for that property is reduced or compressed. Compression loss means some properties pay less in taxes than are calculated by the product of the assessed value and consolidated tax rate. Due to the tax rates in Klamath County relative to the Measure 5 limits, general government taxing districts could experience compression. The general government tax rate shown in Exhibit 7 exceeds the $10 per $1,000 limitation. Note that urban renewal can have an impact on compression losses, because urban renewal changes the effective tax rates of an area. Urban renewal is sometimes referred to as division of taxes. That means that a portion of the taxes that would go to a jurisdiction like the City of Klamath Falls is instead divided off and sent to an urban renewal agency. The process that the County Assessor uses to collect tax increment revenues for urban renewal areas results in a portion of each jurisdictions tax rate being carved off, and turned into a new urban renewal tax rate. A side effect of this process is that education districts that are impacted by urban renewal have their rates reduced a small amount, and that amount is added to the general government side of the compression equation. This means that Klamath Falls existing urban renewal district helps to lower the compression losses that might be experienced by education taxing districts. Similarly, a new urban renewal area in Klamath Falls would also help to reduce compression losses for education districts. However, if there is compression in general government, the creation of a new urban renewal area would add to the compression issue for general government. If the City decides to pursue a new urban renewal area, they will want to do a more thorough analysis of compression in the proposed Area. What are Enterprise Zones? Much of the industrial area in this feasibility study is also in an Enterprise Zone (Exhibit 18). However, at the time of this study, none of the properties were receiving Enterprise Zone benefits. If properties begin using these benefits, it will have an impact on projected tax increment revenues as Enterprise Zone benefits are tax abatements. The following information is from the Business Oregon website. In exchange for locating or expanding into any enterprise zone, eligible (generally non-retail) businesses receive total exemption from the property taxes normally assessed on new plant and equipment. Subject to local authorization, timely filings and criteria the benefits include: Construction-in-Process Enterprise Zone Exemption For up to two years before qualified property is placed in service, it can be exempt from local taxes, which can cover more property than the regular exemption for commercial facilities under construction. Elaine Howard Consulting, LLC ECONorthwest 27

31 Three to five consecutive years of full relief from property taxes on qualified property, after it is in service. Depending on the zone, local incentives also may be available. Criteria for Qualifying Projects For the basic, three-year enterprise zone exemption period, the business needs to: increase full-time, permanent employment of the firm inside the enterprise zone by the greater of one new job or 10% (or less with special-case local sponsor waivers); generally have no concurrent job losses outside the zone boundary inside Oregon; maintain minimum employment level during the exemption period; enter into a first-source agreement with local job training providers; and satisfy any additional local condition that has been established (only) in an urban zone. Criteria for extended tax abatement (for a total of four or five years of exemption) This includes the criteria for the three-year enterprise zone exemption as well as the following: compensation of new workers must be at or above 150% of the county average wage as set at the time of authorization. there needs to be local approval by written agreement with the local zone sponsor (city, port and county, or tribe); and the company also must satisfy additional requirements that the local zone sponsor may reasonably request in the agreement. Elaine Howard Consulting, LLC ECONorthwest 28

32 Exhibit 18. Enterprise Zone Map for Klamath Falls Elaine Howard Consulting, LLC ECONorthwest 29

REPORT ACCOMPANYING THE SECOND AMENDMENT TO THE RIVER DISTRICT URBAN RENEWAL PLAN

REPORT ACCOMPANYING THE SECOND AMENDMENT TO THE RIVER DISTRICT URBAN RENEWAL PLAN Page 1 of 16 REPORT ACCOMPANYING THE SECOND AMENDMENT TO THE RIVER DISTRICT URBAN RENEWAL PLAN Portland Development Commission Page 2 of 16 TABLE OF CONTENTS I. INTRODUCTION... 1 II. A DESCRIPTION OF PHYSICAL,

More information

ANNUAL REPORT FOR FISCAL YEAR ENDING JUNE 30TH, 2017

ANNUAL REPORT FOR FISCAL YEAR ENDING JUNE 30TH, 2017 ANNUAL REPORT FOR FISCAL YEAR ENDING JUNE 30TH, 2017 2016/2017 Sandy Urban Renewal Agency This report fulfills the requirements, prescribed in ORS.457.460, for the filing of an annual report detailing

More information

WHITE OAK PLACE. Brownfield Plan No East Grand River, Tax ID Spartan Ave, Tax ID

WHITE OAK PLACE. Brownfield Plan No East Grand River, Tax ID Spartan Ave, Tax ID WHITE OAK PLACE 1301 East Grand River, Tax ID 33 20 02 18 415 009 1307 East Grand River, Tax ID 33 20 02 18 415 010 116-132 Spartan Ave, Tax ID 33 20 02 18 415 008 East Lansing, Michigan 48823 Brownfield

More information

PALMDALE SCHOOL DISTRICT COMMUNITY FACILITIES DISTRICT NO ANNUAL REPORT FISCAL YEAR 2013/14

PALMDALE SCHOOL DISTRICT COMMUNITY FACILITIES DISTRICT NO ANNUAL REPORT FISCAL YEAR 2013/14 PALMDALE SCHOOL DISTRICT COMMUNITY FACILITIES DISTRICT NO. 90-1 ANNUAL REPORT FISCAL YEAR 2013/14 District Administration Palmdale School District Cathy A. Shepard, Chief Business Officer Trixie Flores,

More information

Related Documents: Guthrie Avenue Business Park Urban Renewal Plan recorded on September 30, 1988, in Book 5958, commencing at Page 44

Related Documents: Guthrie Avenue Business Park Urban Renewal Plan recorded on September 30, 1988, in Book 5958, commencing at Page 44 Prepared by: Rita Conner, Office of Economic Development City of Des Moines, 400 Robert D. Ray Drive, Des Moines, Iowa 50309 515-283-4019 Return to: City Clerk - City of Des Moines, 400 Robert D. Ray Drive,

More information

STATE OF NEW YORK OFFICE OF THE STATE COMPTROLLER 110 STATE STREET ALBANY, NEW YORK April 2018

STATE OF NEW YORK OFFICE OF THE STATE COMPTROLLER 110 STATE STREET ALBANY, NEW YORK April 2018 THOMAS P. DiNAPOLI COMPTROLLER STATE OF NEW YORK OFFICE OF THE STATE COMPTROLLER 110 STATE STREET ALBANY, NEW YORK 12236 GABRIEL F DEYO DEPUTY COMPTROLLER DIVISION OF LOCAL GOVERNMENT AND SCHOOL ACCOUNTABILITY

More information

REPORT TO THE CITY COUNCIL FROM THE CITY MANAGER February 17, 2015

REPORT TO THE CITY COUNCIL FROM THE CITY MANAGER February 17, 2015 REPORT TO THE CITY COUNCIL FROM THE CITY MANAGER February 17, 2015 Subject: Recommendation to Inform Other Taxing Districts of the City s Intent to Apply for an Enterprise Zone Designation. Background.

More information

TAX INCREMENTAL PROJECT PLAN

TAX INCREMENTAL PROJECT PLAN TAX INCREMENTAL PROJECT PLAN TAX INCREMENT DISTRICT #77 RUSHMORE GATEWAY CORRIDOR CITY OF RAPID CITY Prepared by the Rapid City Community Planning and Development Services Department April 2016 INTRODUCTION

More information

EXHIBIT 1. Salt Lake City

EXHIBIT 1. Salt Lake City EXHIBIT 1 Salt Lake City DRAFT Cost-Benefit and Financial Need Analysis Stadler Development March 5, 2018 COST-BENEFIT AND FINANCIAL NEED ANALYSIS STADLER DEVELOPMENT Zions Public Finance, Inc., has conducted

More information

CITY OF MODESTO COMMUNITY FACILITIES DISTRICT NO (HETCH HETCHY) CFD REPORT

CITY OF MODESTO COMMUNITY FACILITIES DISTRICT NO (HETCH HETCHY) CFD REPORT CITY OF MODESTO COMMUNITY FACILITIES DISTRICT NO. 2005-1 (HETCH HETCHY) CFD REPORT September 23, 2005 Goodwin Consulting Group, Inc. 555 University Avenue, Suite 280 Sacramento, California 95825 Phone

More information

CITY OF DETROIT BROWNFIELD REDEVELOPMENT AUTHORITY BROWNFIELD PLAN FOR THE ALBERT KAHN BUILDING REDEVELOPMENT PROJECT

CITY OF DETROIT BROWNFIELD REDEVELOPMENT AUTHORITY BROWNFIELD PLAN FOR THE ALBERT KAHN BUILDING REDEVELOPMENT PROJECT EXHIBIT A CITY OF DETROIT BROWNFIELD REDEVELOPMENT AUTHORITY BROWNFIELD PLAN FOR THE ALBERT KAHN BUILDING REDEVELOPMENT PROJECT Prepared by: Richard A. Barr, Esq. Honigman LLP 660 Woodward Avenue, Ste.

More information

URA Amendment Advisory Committee Meeting #5 October 31, 2014

URA Amendment Advisory Committee Meeting #5 October 31, 2014 URA Amendment Advisory Committee Meeting #5 October 31, 2014 Agenda 9:00 a.m. Welcome & Updates 9:05 a.m. Project & Schedule Update 9:10 a.m. Affordable Housing Discussion 10:00 a.m. Proposed URA Amendments:

More information

STATE OF NEW YORK OFFICE OF THE STATE COMPTROLLER 110 STATE STREET ALBANY, NEW YORK April 2018

STATE OF NEW YORK OFFICE OF THE STATE COMPTROLLER 110 STATE STREET ALBANY, NEW YORK April 2018 THOMAS P. DiNAPOLI COMPTROLLER STATE OF NEW YORK OFFICE OF THE STATE COMPTROLLER 110 STATE STREET ALBANY, NEW YORK 12236 GABRIEL F DEYO DEPUTY COMPTROLLER DIVISION OF LOCAL GOVERNMENT AND SCHOOL ACCOUNTABILITY

More information

Self-Supported Municipal Improvement districts

Self-Supported Municipal Improvement districts Self-Supported Municipal Improvement districts Combined Annual Report Downtown Highland Park Ingersoll Sherman Hill June 30, 2012 FAQ s What is a self-supported municipal improvement district or SSMID?

More information

DRAFT MEMORANDUM -- For Discussion Purposes Only. James R. Musbach and Garrett K. Gray. Subject: Nevada State College Financing Program; EPS #18067

DRAFT MEMORANDUM -- For Discussion Purposes Only. James R. Musbach and Garrett K. Gray. Subject: Nevada State College Financing Program; EPS #18067 DRAFT MEMORANDUM -- D RAFT M EMORANDUM To: From: NSC Committee James R. Musbach and Garrett K. Gray Subject: Nevada State College Financing Program; EPS #18067 Date: April 8, 2009 Introduction Economic

More information

TAUSSIG. & Associates, Inc. SANTA MARGARITA WATER DISTRICT COMMUNITY FACILITIES DISTRICT NO DAVID

TAUSSIG. & Associates, Inc. SANTA MARGARITA WATER DISTRICT COMMUNITY FACILITIES DISTRICT NO DAVID DAVID TAUSSIG & Associates, Inc. SANTA MARGARITA WATER DISTRICT COMMUNITY FACILITIES DISTRICT NO. 2013-1 August 10, 2016 Public Finance Public Private Partnerships Urban Economics Newport Beach Fresno

More information

River Edge Fiscal Impact Analysis

River Edge Fiscal Impact Analysis Final Report Prepared for: Carbondale Investments Prepared by: Economic & Planning Systems, Inc. EPS #20813 App. N-2 Table of Contents 1. INTRODUCTION AND SUMMARY OF FINDINGS... 1 Summary of Findings...

More information

ORDINANCE NUMBER 1174

ORDINANCE NUMBER 1174 ORDINANCE NUMBER 1174 AN ORDINANCE OF THE CITY COUNCIL OF THE CITY OF PERRIS, COUNTY OF RIVERSIDE, STATE OF CALIFORNIA, ACTING IN ITS CAPACITY AS THE LEGISLATIVE BODY OF COMMUNITY FACILITIES DISTRICT NO.

More information

FINAL PROJECT PLAN TAX INCREMENT DISTRICT FOR RED ROCK WATER RESERVOIR CITY OF RAPID CITY. Prepared by the

FINAL PROJECT PLAN TAX INCREMENT DISTRICT FOR RED ROCK WATER RESERVOIR CITY OF RAPID CITY. Prepared by the FINAL PROJECT PLAN TAX INCREMENT DISTRICT FOR RED ROCK WATER RESERVOIR CITY OF RAPID CITY Prepared by the Rapid City Planning Department September 2003 Tax Increment District 43 Project Plan FINAL INTRODUCTION

More information

Tax Computation Manual

Tax Computation Manual Tax Computation Manual 2010 Published by Property Tax Division 150-800-438 (Rev. 10-10) Table of Contents Introduction...ii Key Dates...iii Property Tax Computation Flowchart...iv Chapter 1 Certification

More information

PROPERTY VALUES AND TAXES IN SOUTHEAST WISCONSIN

PROPERTY VALUES AND TAXES IN SOUTHEAST WISCONSIN PROPERTY VALUES AND TAXES IN SOUTHEAST WISCONSIN September 2017 Rob Henken, President Maddie Keyes, Research Intern Jeff Schmidt, Data & Technology Director Sponsored by: T a b l e o f C o n t e n t s

More information

Report Accompanying the Diamond Lake Urban Renewal Plan

Report Accompanying the Diamond Lake Urban Renewal Plan Report Accompanying the Diamond Lake Urban Renewal Plan Adopted by the City of Roseburg July 9, 2018 Ordinance No. 3502 Diamond Lake Urban Renewal Area Consultant Team Elaine Howard Consulting, LLC Elaine

More information

LELAND CONSULTING GROUP

LELAND CONSULTING GROUP Memorandum Date 25 April 2013 To From CC Thomas Puttman, Puttman Infrastructure April Chastain, Leland Consulting Group Chris Zahas, Leland Consulting Group Matt Arnold, SERA Architects Kevin Cronin, Portland

More information

AGENDA. A.) CALL TO ORDER Current SEDA Chair, VanGordon. B.) ROLL CALL Staff 2 minutes. C.) ELECTION OF OFFICERS Chair 3 minutes

AGENDA. A.) CALL TO ORDER Current SEDA Chair, VanGordon. B.) ROLL CALL Staff 2 minutes. C.) ELECTION OF OFFICERS Chair 3 minutes SPRINGFIELD ECONOMIC DEVELOPMENT AGENCY BUDGET COMMITTEE MEETING Tuesday, April 21st, 2015 5:30 p.m. Library Meeting Room, Springfield City Hall 225 Fifth Street Springfield, Oregon AGENDA A.) CALL TO

More information

DRAFT. Prepared for: CBRE CONSULTING CITY OF SAN FRANCISCO MAYOR S OFFICE OF ECONOMIC DEVELOPMENT JANUARY 2011

DRAFT. Prepared for: CBRE CONSULTING CITY OF SAN FRANCISCO MAYOR S OFFICE OF ECONOMIC DEVELOPMENT JANUARY 2011 DRAFT PARKMERCED FISCAL AND ECONOMIC IMPACT ANALYSIS OVERVIEW Prepared for: CITY OF SAN FRANCISCO MAYOR S OFFICE OF ECONOMIC DEVELOPMENT JANUARY 2011 CBRE CONSULTING 101 California Street, 44 th Floor

More information

ORDINANCE NUMBER 1104

ORDINANCE NUMBER 1104 ORDINANCE NUMBER 1104 AN ORDINANCE OF THE CITY COUNCIL OF THE CITY OF PERRIS ACTING IN ITS CAPACITY AS THE LEGISLATIVE BODY OF COMMUNITY FACILITIES DISTRICT NO. 2001-3 (NORTH PERRIS PUBLIC SAFETY) OF THE

More information

Fiscal Analysis November 14, Fiscal Analysis Fiscal Conditions Project Background

Fiscal Analysis November 14, Fiscal Analysis Fiscal Conditions Project Background 3.11 Fiscal Analysis Fiscal Analysis 3.11.1 Fiscal Conditions 3.11.1.1 Project Background The proposed action is a 149 unit residential development, including a private road and appurtenances, on a 29.3

More information

Department of. Assessment & Taxation

Department of. Assessment & Taxation Department of Assessment & Taxation About Your Assessor s Office Your Assessor would like you to know about his role in the Oregon system of local government finance. Many people think assessors work directly

More information

TECHNICAL MEMORANDUM

TECHNICAL MEMORANDUM TECHNICAL MEMORANDUM Date: November 29, 2018 To: From: Cc: RE: Daphne Hooper City Manager, Frederick Steinmann Assistant Research Professor University Center for Economic Research Colleen Unterbrink, Tim

More information

TULSA DEVELOPMENT AUTHORITY BOARD MEETING. MEETING OF: April 6, 2017

TULSA DEVELOPMENT AUTHORITY BOARD MEETING. MEETING OF: April 6, 2017 TULSA DEVELOPMENT AUTHORITY BOARD MEETING MEETING OF: April 6, 2017 TO: FROM: SUBJECT: CHAIRMAN AND BOARD MEMBERS OFFICE OF TULSA DEVELOPMENT AUTHORITY 410 S BOSTON AVE (FIRST PLACE GARAGE) FIRST PLACE

More information

City of Denton, Texas

City of Denton, Texas FEASIBILITY ANALYSIS (EXHIBIT D OF THE FINANCE PLAN) Prepared October 2012 Finalized May 2014 Tax Increment Reinvestment Zone No. 2 City of Denton, Texas George R. Schrader Larry D. Cline 4800 Broadway,

More information

COMMUNITY FACILITIES DISTRICT NO.

COMMUNITY FACILITIES DISTRICT NO. DAVID TAUSSIG & ASSOCIATES, INC. CITY OF ANAHEIM COMMUNITY FACILITIES DISTRICT NO. 1989-1 ADMINISTRATION REPORT FISCAL YEAR 2015-16 AUGUST 10, 2015 Public Finance Urban Economics Newport Beach Riverside

More information

REQUEST FOR COUNCIL ACTION

REQUEST FOR COUNCIL ACTION REQUEST FOR COUNCIL ACTION To: From: RDA Chairperson & Committee Members Bob Wylie, Finance Director Date: November 20, 2018 Subject: Draper City RDA Annual Report 2018 Applicant Presentation: None Staff

More information

Tax Increment Reinvestment Zones/ Tax Increment Financing Best Practices for Cities

Tax Increment Reinvestment Zones/ Tax Increment Financing Best Practices for Cities Tax Increment Reinvestment Zones/ Tax Increment Financing Best Practices for Cities October 5, 2017 TXP, Inc. (512) 328-8300 phone www.txp.com Austin Dallas El Paso Fort Worth Grapevine Irving Laredo McKinney

More information

Property Tax 101. Amy Koethe Dakota County Property Taxation & Records Jeanne Vogt - Ehlers

Property Tax 101. Amy Koethe Dakota County Property Taxation & Records Jeanne Vogt - Ehlers Property Tax 101 Amy Koethe Dakota County Property Taxation & Records Jeanne Vogt - Ehlers 1 Minnesota GFOA Conference Arrowwood Resort September 28, 2017 Overview Minnesota has one of the most complex

More information

CITY OF FLORENCE REPORT ON THE FLORENCE DOWNTOWN PRESERVATION AND RENEWAL PLAN

CITY OF FLORENCE REPORT ON THE FLORENCE DOWNTOWN PRESERVATION AND RENEWAL PLAN CITY OF FLORENCE REPORT ON THE FLORENCE DOWNTOWN PRESERVATION AND RENEWAL PLAN 3rd Draft, Agency Approved August 21, 2006 Referred To Florence Council REPORT ON THE CITY OF FLORENCE DOWNTOWN PRESERVATION

More information

Fiscal Analysis of the City of Palo Alto 2030 Comprehensive Plan

Fiscal Analysis of the City of Palo Alto 2030 Comprehensive Plan Draft Report Fiscal Analysis of the City of Palo Alto 2030 Comprehensive Plan Prepared for: City of Palo Alto Prepared by: Economic & Planning Systems, Inc. February 17, 2017 EPS #151010 Table of Contents

More information

LEVEL OF SERVICE / COST & REVENUE ASSUMPTIONS

LEVEL OF SERVICE / COST & REVENUE ASSUMPTIONS LEVEL OF SERVICE / COST & REVENUE ASSUMPTIONS APPENDIX TO THE FISCAL IMPACT ANALYSIS OF PHASE I OF CAROLINA NORTH University of North Carolina-Chapel Hill Town of Chapel Hill, North Carolina Town of Carrboro,

More information

An introductory guide to creating local budgets

An introductory guide to creating local budgets An introductory guide to creating local budgets 150-504-406 (09-07) 150-504-406 (Rev. 10-01) TOC Table of Contents Introduction...1-4 Phase 1: Preparing the proposed budget...5-26 Phase 2: Approving the

More information

TAX INCREMENTAL DISTRICT PROJECT PLAN

TAX INCREMENTAL DISTRICT PROJECT PLAN TAX INCREMENTAL DISTRICT PROJECT PLAN PROMISE ROAD CITY OF RAPID CITY Prepared by the Rapid City Community Development Department November 2017 INTRODUCTION Tax Increment Financing is a method of financing

More information

D R A F T M E M O R A N D U M

D R A F T M E M O R A N D U M D R A F T M E M O R A N D U M To: From: Joe Speaks, CH2M Darin Smith and Matt Loftis Subject: 4th and King RAB Financing Opportunities; EPS #141018 Date: August 18, 2017 Economic & Planning Systems Inc.

More information

Economic and Fiscal Impact of the Arizona Public University Enterprise

Economic and Fiscal Impact of the Arizona Public University Enterprise Economic and Fiscal Impact of the Arizona Public Enterprise Prepared for: January 2019 Prepared by: and Elliott D. Pollack & Company 7505 East 6 th Avenue, Suite 100 Scottsdale, Arizona 85251 1300 E Missouri

More information

COMMUNITY FACILITIES DISTRICT NO.

COMMUNITY FACILITIES DISTRICT NO. DAVID TAUSSIG & ASSOCIATES, INC. CITY OF ANAHEIM COMMUNITY FACILITIES DISTRICT NO. 1989-2 ADMINISTRATION REPORT FISCAL YEAR 2015-16 AUGUST 10, 2015 Public Finance Urban Economics Newport Beach Riverside

More information

REDEVELOPMENT AGENCY OF SALT LAKE COUNTY. Annual Report. November 1, 2018

REDEVELOPMENT AGENCY OF SALT LAKE COUNTY. Annual Report. November 1, 2018 Annual Report November 1, 2018 Overview of Project Areas Active Project Areas The Agency currently manages these two active project areas: 1. Magna Arbor Park Urban Renewal Area 2. Magna Main Street Community

More information

COMMUNITY FACILITIES DISTRICT NO.

COMMUNITY FACILITIES DISTRICT NO. DAVID TAUSSIG & Associates, Inc. CITY OF ANAHEIM COMMUNITY FACILITIES DISTRICT NO. 06-2 ADMINISTRATION REPORT FISCAL YEAR 2015-2016 AUGUST 3, 2015 Public Finance Facilities Planning Urban Economics Newport

More information

Bonds & TIFs. SDML Finance Officer s School Bonds. Presented by: Tom Grimmond Ray Woody Woodsend Senior Vice President Senior Vice President

Bonds & TIFs. SDML Finance Officer s School Bonds. Presented by: Tom Grimmond Ray Woody Woodsend Senior Vice President Senior Vice President Bonds & TIFs SDML Finance Officer s School 2018 Presented by: Tom Grimmond Ray Woody Woodsend Senior Vice President Senior Vice President 5/30/2018 1 Bonds Definition:--SDCL 6-8B-1(1). Bond any obligation

More information

Urban Analytics FISCAL ANALYSIS FOR THE SUCCESSOR AGENCY TO THE REDEVELOPMENT AGENCY OF THE CITY OF SAN JOSE

Urban Analytics FISCAL ANALYSIS FOR THE SUCCESSOR AGENCY TO THE REDEVELOPMENT AGENCY OF THE CITY OF SAN JOSE FISCAL ANALYSIS FOR THE SUCCESSOR AGENCY TO THE REDEVELOPMENT AGENCY OF THE CITY OF SAN JOSE MERGED AREA REDEVELOPMENT PROJECT FY 2015-1 6 DECEMBER 17, 2015 Urban Analytics INTRODUCTION The Successor Agency

More information

Tax Increment Financing TIF Presented to the Leelanau County Brownfield Redevelopment Authority

Tax Increment Financing TIF Presented to the Leelanau County Brownfield Redevelopment Authority Tax Increment Financing TIF Presented to the Leelanau County Brownfield Redevelopment Authority Presented by Envirologic Technologies, Inc. October 28, 2008 What is Tax Increment Financing? Use of ad valorem

More information

TAX INCREMENT PROJECT PLAN

TAX INCREMENT PROJECT PLAN TAX INCREMENT PROJECT PLAN THE VILLAGE ON MONROE CITY OF RAPID CITY Prepared by the Rapid City Community Planning and Development Services Department May 2017 INTRODUCTION Tax Increment Financing is a

More information

RESOLUTION NUMBER 3415

RESOLUTION NUMBER 3415 RESOLUTION NUMBER 3415 A RESOLUTION OF THE CITY COUNCIL OF THE CITY OF PERRIS, ACTING AS THE LEGISLATIVE BODY OF COMMUNITY FACILITIES DISTRICT NO. 2001-3 (NORTH PERRIS PUBLIC SAFETY) OF THE CITY OF PERRIS,

More information

COMMUNITY FACILITIES DISTRICT NO.

COMMUNITY FACILITIES DISTRICT NO. DAVID TAUSSIG & ASSOCIATES, INC. CITY OF ANAHEIM COMMUNITY FACILITIES DISTRICT NO. 1989-3 ADMINISTRATION REPORT FISCAL YEAR 2015-16 AUGUST 10, 2015 Public Finance Urban Economics Newport Beach Riverside

More information

TRANSFORMATIONAL BROWNFIELD PLAN PROGRAM GUIDELINES

TRANSFORMATIONAL BROWNFIELD PLAN PROGRAM GUIDELINES TRANSFORMATIONAL BROWNFIELD PLAN PROGRAM GUIDELINES PROGRAM OVERVIEW The Brownfield Redevelopment Financing Act, 1996 Public Act (PA) 381, as amended (Act 381), effective July 24, 2017, incorporates Transformational

More information

Property Tax Update with Multi- Residential Property Data

Property Tax Update with Multi- Residential Property Data #IowaLeague2016 Property Tax Update with Multi- Residential Property Data Erin Mullenix Former League Research Director Handouts and presentations are available through the event app and at www.iowaleague.org.

More information

IGA and Tax Incentive Proposal

IGA and Tax Incentive Proposal IGA and Tax Incentive Proposal January 12, 2015 A presentation to the Board of Education An IGA and Tax Incentive Proposal: City of Batavia Geneva CUSD 304 Northern Builders, Inc. AJR Filtration Intergovernmental

More information

ECONorthwest ECONOMICS FINANCE PLANNING

ECONorthwest ECONOMICS FINANCE PLANNING ECONorthwest ECONOMICS FINANCE PLANNING DATE: July 13th, 2015 TO: TriMet Board of Directors FROM: Andrew Dyke, Senior Economist SUBJECT: PORTLAND ECONOMIC RECOVERY ANALYSIS Introduction TriMet contracted

More information

AMENDMENT TO THE MONTCALM COUNTY BROWNFIELD REDEVELOPMENT AUTHORITY BROWNFIELD PLAN FOR THE 107 S LAFAYETTE, LLC REDEVELOPMENT PROJECT

AMENDMENT TO THE MONTCALM COUNTY BROWNFIELD REDEVELOPMENT AUTHORITY BROWNFIELD PLAN FOR THE 107 S LAFAYETTE, LLC REDEVELOPMENT PROJECT AMENDMENT TO THE MONTCALM COUNTY BROWNFIELD REDEVELOPMENT AUTHORITY BROWNFIELD PLAN FOR THE 107 S LAFAYETTE, LLC REDEVELOPMENT PROJECT January 30, 2017 Introduction 107 S Lafayette, LLC ("107 S Lafayette")

More information

WHEREAS, notice of the public hearing was duly given as required by Section of the Act or has been duly waived by the property owner; and

WHEREAS, notice of the public hearing was duly given as required by Section of the Act or has been duly waived by the property owner; and RESOLUTION NUMBER 4983 A RESOLUTION OF THE CITY COUNCIL OF THE CITY OF PERRIS, ACTING AS THE LEGISLATIVE BODY OF COMMUNITY FACILITIES DISTRICT NO. 2001-3 (NORTH PERRIS PUBLIC SAFETY) OF THE CITY OF PERRIS,

More information

Brownfield Plan Former Sawmill Redevelopment Grayling, Crawford County, Michigan. November Approved by Crawford County. Concurrence by Grayling

Brownfield Plan Former Sawmill Redevelopment Grayling, Crawford County, Michigan. November Approved by Crawford County. Concurrence by Grayling Grayling, Crawford County, Michigan November 2017 Approved by Crawford County Brownfield Redevelopment Authority:_ Concurrence by Grayling City Council: November 21, 2017 _ (proposed) December 11, 2017

More information

Salt Lake County. Townships and Unincorporated Islands Fiscal Evaluation

Salt Lake County. Townships and Unincorporated Islands Fiscal Evaluation Salt Lake County Townships and Unincorporated Islands Fiscal Evaluation September 11, 2015 Table of Contents Executive Summary... 4 Background Information... 5 Township Service Provision Options... 5 Remaining

More information

POWAY UNIFIED SCHOOL DISTRICT

POWAY UNIFIED SCHOOL DISTRICT POWAY UNIFIED SCHOOL DISTRICT ADMINISTRATION REPORT FISCAL YEAR 2017/2018 ZONE 2 OF COMMUNITY FACILITIES DISTRICT NO.11 June 29, 2017 PREPARED FOR: Poway Unified School District Planning Department 13626

More information

POWAY UNIFIED SCHOOL DISTRICT

POWAY UNIFIED SCHOOL DISTRICT POWAY UNIFIED SCHOOL DISTRICT ADMINISTRATION REPORT FISCAL YEAR 2017/2018 ZONE 1 OF COMMUNITY FACILITIES DISTRICT NO. 11 June 29, 2017 PREPARED FOR: Poway Unified School District Planning Department 13626

More information

Financial Management Plan for the Palatine Public Library District

Financial Management Plan for the Palatine Public Library District March 2, 2018 Financial Management Plan for the Ehlers Advisors: John Piemonte Municipal Advisor jpiemonte@ehlers-inc.com Jessica Cook Senior Financial Specialist jcook@ehlers-inc.com Anthony Kalina Financial

More information

MAJOR REVENUE SOURCES - GENERAL FUND

MAJOR REVENUE SOURCES - GENERAL FUND Introduction The City of Geneva has developed a diverse base of revenues to fund its operational and capital needs. The purpose of this section is to describe the major revenue sources and trends and how

More information

EXHIBIT A DESCRIPTION OF AUTHORIZED FACILITIES AND SERVICES I. PUBLIC CAPITAL FACILITIES AND RELATED INCIDENTAL EXPENSES

EXHIBIT A DESCRIPTION OF AUTHORIZED FACILITIES AND SERVICES I. PUBLIC CAPITAL FACILITIES AND RELATED INCIDENTAL EXPENSES EXHIBIT A DESCRIPTION OF AUTHORIZED FACILITIES AND SERVICES I. PUBLIC CAPITAL FACILITIES AND RELATED INCIDENTAL EXPENSES A. PUBLIC ROAD IMPROVEMENTS Acquisition, construction, and installation of local

More information

RESOLUTION NO A RESOLUTION OF THE CITY COUNCIL OF THE CITY OF CASTLE PINES, COLORADO, CERTIFYING THE MILL LEVY

RESOLUTION NO A RESOLUTION OF THE CITY COUNCIL OF THE CITY OF CASTLE PINES, COLORADO, CERTIFYING THE MILL LEVY RESOLUTION NO. 12-69 A RESOLUTION OF THE CITY COUNCIL OF THE CITY OF CASTLE PINES, COLORADO, CERTIFYING THE MILL LEVY WHEREAS, the City Manager serving as the City Budget Officer prepared and presented

More information

COUNTY OF CATTARAUGUS INDUSTRIAL DEVELOPMENT AGENCY UNIFORM TAX EXEMPTION POLICY

COUNTY OF CATTARAUGUS INDUSTRIAL DEVELOPMENT AGENCY UNIFORM TAX EXEMPTION POLICY COUNTY OF CATTARAUGUS INDUSTRIAL DEVELOPMENT AGENCY UNIFORM TAX EXEMPTION POLICY SECTION 1. PURPOSE AND AUTHORITY. Pursuant to Section 874(4)(a) of Title One of Article 18-A of the General Municipal Law,

More information

Urban Renewal Work Session. February 24, 2014

Urban Renewal Work Session. February 24, 2014 Urban Renewal Work Session February 24, 2014 Introduction } The purpose of this work session to provide responses to subjects raised by Council regarding a Forest Grove urban renewal program } These subjects

More information

Big Chino Water Ranch Project Impact Analysis Prescott & Prescott Valley, Arizona

Big Chino Water Ranch Project Impact Analysis Prescott & Prescott Valley, Arizona Big Chino Water Ranch Project Impact Analysis Prescott & Prescott Valley, Arizona Prepared for: Central Arizona Partnership August 2008 Prepared by: 7505 East 6 th Avenue, Suite 100 Scottsdale, Arizona

More information

Fisc al Impacts of Annexation. DISCUSSION DRAFT: February 2009

Fisc al Impacts of Annexation. DISCUSSION DRAFT: February 2009 Fisc al Impacts of Annexation : 120 Lakeside Avenue Suite 200 Seattle, Washington 98122 P (206) 324-8760 www.berkandassociates.com Helping Communities and Organizations Create Their Best Futures Project

More information

Financial Information and Operating Data Pursuant to Securities and Exchange Commission Rule 15c2-12 For the Fiscal Year Ended June 30, 2016

Financial Information and Operating Data Pursuant to Securities and Exchange Commission Rule 15c2-12 For the Fiscal Year Ended June 30, 2016 City of Marion, Iowa Annual Report Submitted January 25, 2017 Financial Information and Operating Data Pursuant to Securities and Exchange Commission Rule 15c2-12 For the Fiscal Year Ended June 30, 2016

More information

POWAY UNIFIED SCHOOL DISTRICT

POWAY UNIFIED SCHOOL DISTRICT POWAY UNIFIED SCHOOL DISTRICT ADMINISTRATION REPORT FISCAL YEAR 2017/2018 IMPROVEMENT AREA C OF COMMUNITY FACILITIES DISTRICT NO. 6 June 29, 2017 PREPARED FOR: Poway Unified School District Planning Department

More information

Colorado Legislative Council Staff

Colorado Legislative Council Staff Colorado Legislative Council Staff Room 029 State Capitol, Denver, CO 80203-1784 (303) 866-3521 FAX: 866-3855 TDD: 866-3472 MEMORANDUM February 1, 2012 TO: Joint Budget Committee House and Senate Education

More information

Background & Overview

Background & Overview EXHIBIT C Senate Committee on Revenue and Economic Development Date: 2-14-2017 Total pages: 69 Exhibit begins with: C1 thru: C69 Background & Overview Applied Analysis was retained by the Local Government

More information

PROPERTY VALUES AND TAXES IN SOUTHEAST WISCONSIN

PROPERTY VALUES AND TAXES IN SOUTHEAST WISCONSIN PROPERTY VALUES AND TAXES IN SOUTHEAST WISCONSIN September 2014 Jeff Schmidt, Researcher John Staskunas, Intern Rob Henken, President Sponsored by: TABLE OF CONTENTS INTRODUCTION... 3 Major Findings...

More information

AGENDA JOINT REVIEW BOARD TAX INCREMENTAL DISTRICT NO. 7 PROJECT PLAN AMENDMENT IN ORDER TO SHARE INCREMENT WITH TAX INCREMENTAL DISTRICT NO.

AGENDA JOINT REVIEW BOARD TAX INCREMENTAL DISTRICT NO. 7 PROJECT PLAN AMENDMENT IN ORDER TO SHARE INCREMENT WITH TAX INCREMENTAL DISTRICT NO. AGENDA JOINT REVIEW BOARD TAX INCREMENTAL DISTRICT NO. 7 PROJECT PLAN AMENDMENT IN ORDER TO SHARE INCREMENT WITH TAX INCREMENTAL DISTRICT NO. 6 AND TAX INCREMENTAL DISTRICT NO. 5 PROJECT PLAN AMENDMENT

More information

Plainfield Community Consolidated School District #202 LOCAL PROPERTY TAX TOPICS, INFORMATION, AND THE 2016 TAX

Plainfield Community Consolidated School District #202 LOCAL PROPERTY TAX TOPICS, INFORMATION, AND THE 2016 TAX Plainfield Community Consolidated School District #202 LOCAL PROPERTY TAX TOPICS, INFORMATION, AND THE 2016 TAX LEVY 1 Table of Contents I. Overview of the Tax Levy and Extension Process II. Calculating

More information

EXHIBIT A CITY OF DETROIT BROWNFIELD REDEVELOPMENT AUTHORITY BROWNFIELD PLAN FOR THE JOE LOUIS ARENA REDEVELOPMENT PROJECT.

EXHIBIT A CITY OF DETROIT BROWNFIELD REDEVELOPMENT AUTHORITY BROWNFIELD PLAN FOR THE JOE LOUIS ARENA REDEVELOPMENT PROJECT. EXHIBIT A CITY OF DETROIT BROWNFIELD REDEVELOPMENT AUTHORITY BROWNFIELD PLAN FOR THE JOE LOUIS ARENA REDEVELOPMENT PROJECT Prepared by: Detroit Economic Growth Corporation 500 Griswold, Suite 2200 Detroit,

More information

OLYMPUS HILLS COMMUNITY REINVESTMENT AREA (CRA)

OLYMPUS HILLS COMMUNITY REINVESTMENT AREA (CRA) DRAFT PROJECT AREA BUDGET OLYMPUS HILLS COMMUNITY REINVESTMENT AREA (CRA) MILLCREEK COMMUNITY REINVESTMENT AGENCY, UTAH OCTOBER 2018 Table of Contents TABLE OF CONTENTS... 2 SECTION 1: INTRODUCTION...

More information

K-12 Spending and the Oregon Economy

K-12 Spending and the Oregon Economy K-12 Spending and the Oregon Economy PREPARED FOR THE OREGON EDUCATION ASSOCIATION, OREGON SCHOOL BOARDS ASSOCATION, AND CONFEDERATION OF OREGON SCHOOL ADMINISTRATORS ECONORTHWEST 888 SW FIFTH AVENUE -

More information

TAUSSIG. & Associates, Inc. DAVID. Public Finance Facilities Planning Urban Economics. Newport Beach Fresno Riverside San Francisco Chicago Dallas

TAUSSIG. & Associates, Inc. DAVID. Public Finance Facilities Planning Urban Economics. Newport Beach Fresno Riverside San Francisco Chicago Dallas DAVID TAUSSIG & Associates, Inc. CITY OF ANAHEIM COMMUNITY FACILITIES DISTRICT NO. 06-2 ADMINISTRATION REPORT FISCAL YEAR 2016-2017 AUGUST 1, 2016 Public Finance Facilities Planning Urban Economics Newport

More information

Project Plan for Creation of Tax Incremental District No. 5 (St. Francis Borgia Site)

Project Plan for Creation of Tax Incremental District No. 5 (St. Francis Borgia Site) February 12, 2018 Project Plan for Creation of Tax Incremental District No. 5 (St. Francis Borgia Site) Organizational Joint Review Board Meeting Held: January 25, 2018 Public Hearing Held: January 25,

More information

Fiscal Impact Analysis of Great Pond Village

Fiscal Impact Analysis of Great Pond Village Fiscal Impact Analysis of Great Pond Village Town of Windsor, Connecticut Presentation to: Windsor Town Council Windsor Town Planning & Zoning May 11, 2011 Presentation Overview Introduction Fiscal Impact

More information

THE FISCAL HEALTH OF INDIANA S LARGER MUNICIPALITIES: CITY OF BLOOMINGTON MUNICIPAL PROFILE

THE FISCAL HEALTH OF INDIANA S LARGER MUNICIPALITIES: CITY OF BLOOMINGTON MUNICIPAL PROFILE THE FISCAL HEALTH OF INDIANA S LARGER MUNICIPALITIES: CITY OF BLOOMINGTON MUNICIPAL PROFILE by John Stafford March 2016 1 CITY OF BLOOMINGTON MUNICIPAL PROFILE MARCH 2016 Introduction This document is

More information

CAROLE KEETON STRAYHORN,

CAROLE KEETON STRAYHORN, Truth-In-Taxation A Guide for Setting School District Tax Rates July 2006 CAROLE KEETON STRAYHORN, Texas Comptroller TEXAS PROPERTY TAX Truth-In-Taxation A Guide for Setting School District Tax Rates

More information

Midtown Row. Fiscal Impact Study. BSV Colonial Owner, LLC. Ted Figura Consulting. City of Williamsburg, Virginia. Prepared by. For. Bethesda, Maryland

Midtown Row. Fiscal Impact Study. BSV Colonial Owner, LLC. Ted Figura Consulting. City of Williamsburg, Virginia. Prepared by. For. Bethesda, Maryland Midtown Row Fiscal Impact Study City of Williamsburg, Virginia Prepared by Ted Figura Consulting For BSV Colonial Owner, LLC Bethesda, Maryland August 1 2017 Table of Contents Executive Summary. 4 Background......

More information

Infrastructure Financing Plan. Infrastructure Financing District No. 1 (Rincon Hill Area) DRAFT

Infrastructure Financing Plan. Infrastructure Financing District No. 1 (Rincon Hill Area) DRAFT DRAFT Infrastructure Financing Plan Infrastructure Financing District No. 1 (Rincon Hill Area) Prepared for: City and County of San Francisco Office of Economic Development Prepared by: December 2010 TABLE

More information

CITY COUNCIL STUDY SESSION MEMORANDUM

CITY COUNCIL STUDY SESSION MEMORANDUM City and County of Broomfield, Colorado CITY COUNCIL STUDY SESSION MEMORANDUM To: From: Prepared by: Mayor and City Council Charles Ozaki, City and County Manager David Allen, Deputy Director of Public

More information

BROWNFIELD REDEVELOPMENT PLAN THE VILLAGE MARKETPLACE + LOFTS 147, 159 AND 185 W. MICHIGAN AVENUE

BROWNFIELD REDEVELOPMENT PLAN THE VILLAGE MARKETPLACE + LOFTS 147, 159 AND 185 W. MICHIGAN AVENUE BROWNFIELD REDEVELOPMENT PLAN THE VILLAGE MARKETPLACE + LOFTS 147, 159 AND 185 W. MICHIGAN AVENUE AND 104 HENRY STREET CITY OF SALINE, MICHIGAN for WASHTENAW COUNTY BROWNFIELD REDEVELOPMENT AUTHORITY WASHTENAW

More information

Dr. Laurie Heinz, Superintendent Park Ridge Niles School District 64. Scott Goldstein, AICP & LEED AP, Principal Pete Iosue, AICP, Senior Planner

Dr. Laurie Heinz, Superintendent Park Ridge Niles School District 64. Scott Goldstein, AICP & LEED AP, Principal Pete Iosue, AICP, Senior Planner TO: FROM: Dr. Laurie Heinz, Superintendent Park Ridge Niles School District 64 Scott Goldstein, AICP & LEED AP, Principal Pete Iosue, AICP, Senior Planner DATE: September 5, 2017 RE: 1440 W. Higgins Road

More information

CITY OF DETROIT BROWNFIELD REDEVELOPMENT AUTHORITY BROWNFIELD PLAN FOR THE 640 TEMPLE REDEVELOPMENT PROJECT

CITY OF DETROIT BROWNFIELD REDEVELOPMENT AUTHORITY BROWNFIELD PLAN FOR THE 640 TEMPLE REDEVELOPMENT PROJECT EXHIBIT A CITY OF DETROIT BROWNFIELD REDEVELOPMENT AUTHORITY BROWNFIELD PLAN FOR THE 640 TEMPLE REDEVELOPMENT PROJECT Prepared by: Temple Group Holdings, LLC 1 Kercheval Avenue Grosse Pointe Farms, Michigan

More information

SUPPLEMENT TO THE PROPOSED BUDGET REVENUE OUTLOOK AS PRESENTED BY MAYOR ANTONIO R. VILLARAIGOSA

SUPPLEMENT TO THE PROPOSED BUDGET REVENUE OUTLOOK AS PRESENTED BY MAYOR ANTONIO R. VILLARAIGOSA SUPPLEMENT TO THE PROPOSED BUDGET REVENUE OUTLOOK AS PRESENTED BY MAYOR ANTONIO R. VILLARAIGOSA CITY OF LOS ANGELES Revenue Outlook Supplement to the 201314 Proposed Budget 2 0 1 3 1 4 Prepared by the

More information

ENGINEER S REPORT COUNTY SERVICE AREA NO. 10 BENEFIT ZONE NO. 3 COUNTY OF SACRAMENTO THIRD ADMINISTRATIVE DRAFT NOVEMBER 21, 2005.

ENGINEER S REPORT COUNTY SERVICE AREA NO. 10 BENEFIT ZONE NO. 3 COUNTY OF SACRAMENTO THIRD ADMINISTRATIVE DRAFT NOVEMBER 21, 2005. ENGINEER S REPORT COUNTY SERVICE AREA NO. 10 BENEFIT ZONE NO. 3 COUNTY OF SACRAMENTO THIRD ADMINISTRATIVE DRAFT NOVEMBER 21, 2005 Oakland Office 1700 Broadway Temecula, CA Phoenix, AZ 6 th Floor Sacramento,

More information

2014 ANNUAL REPORT REDEVELOPMENT AGENCY OF RIVERDALE CITY, UTAH. IN COMPLIANCE WITH UTAH CODE SECTION 17C AND 17C-1-402(9)(b)

2014 ANNUAL REPORT REDEVELOPMENT AGENCY OF RIVERDALE CITY, UTAH. IN COMPLIANCE WITH UTAH CODE SECTION 17C AND 17C-1-402(9)(b) 2014 ANNUAL REPORT REDEVELOPMENT AGENCY OF RIVERDALE CITY, UTAH IN COMPLIANCE WITH UTAH CODE SECTION 17C-1-603 AND 17C-1-402(9)(b) Table of Contents EXECUTIVE SUMMARY... 3 INTRODUCTION... 3 OVERVIEW OF

More information

Hopkins Public Schools #270. December 5, 2017 Presented by John Toop Director of Business Services

Hopkins Public Schools #270. December 5, 2017 Presented by John Toop Director of Business Services Hopkins Public Schools #270 Public Hearing for Taxes Payable in 2018 December 5, 2017 Presented by John Toop Director of Business Services Tax Hearing Presentation State Law Requires Public Meeting: Between

More information

TAX INCREMENT FINANCING ACT - OMNIBUS AMENDMENTS Act of Dec. 16, 1992, P.L. 1240, No. 164 Cl. 64 Session of 1992 No

TAX INCREMENT FINANCING ACT - OMNIBUS AMENDMENTS Act of Dec. 16, 1992, P.L. 1240, No. 164 Cl. 64 Session of 1992 No TAX INCREMENT FINANCING ACT - OMNIBUS AMENDMENTS Act of Dec. 16, 1992, P.L. 1240, No. 164 Cl. 64 Session of 1992 No. 1992-164 HB 2439 AN ACT Amending the act of July 11, 1990 (P.L.465, No.113), entitled

More information

Township of Grosse Ile

Township of Grosse Ile Financial Statements March 31, 2016 Table of Contents Independent Auditors Report 1-1 Management s Discussion and Analysis 2-1 Basic Financial Statements Government-wide Financial Statements Statement

More information

4.3 Economic and Fiscal Impacts

4.3 Economic and Fiscal Impacts 4.3 This section evaluates the potential economic, and fiscal impacts that could arise from the construction and long-term operation of the proposed East San Fernando Valley Transit Corridor Project. 4.3.1

More information

FILED 11/29/2017 3:32 PM ARCHIVES DIVISION SECRETARY OF STATE

FILED 11/29/2017 3:32 PM ARCHIVES DIVISION SECRETARY OF STATE OFFICE OF THE SECRETARY OF STATE DENNIS RICHARDSON SECRETARY OF STATE LESLIE CUMMINGS DEPUTY SECRETARY OF STATE PERMANENT ADMINISTRATIVE ORDER OBDD 13-2017 CHAPTER 123 OREGON BUSINESS DEVELOPMENT DEPARTMENT

More information

TAUSSIG. & Associates, Inc. LAGUNA BEACH UNIFIED SCHOOL DISTRICT COMMUNITY FACILITIES DISTRICT No DAVID

TAUSSIG. & Associates, Inc. LAGUNA BEACH UNIFIED SCHOOL DISTRICT COMMUNITY FACILITIES DISTRICT No DAVID DAVID TAUSSIG & Associates, Inc. LAGUNA BEACH UNIFIED SCHOOL DISTRICT COMMUNITY FACILITIES DISTRICT No. 98-1 June 21, 2016 Public Finance Public Private Partnerships Urban Economics Newport Beach Riverside

More information

Portland Community College

Portland Community College Portland Community College Public Hearing $185 million General Obligation Bond Measure No. 26-196 For the November 17, 2017 Special Election Bonds to construct job training space, improve classrooms, safety,

More information