A review of DECC s Impact Assessment of Feed-in-Tariff rates for small-scale renewables

Size: px
Start display at page:

Download "A review of DECC s Impact Assessment of Feed-in-Tariff rates for small-scale renewables"

Transcription

1 A review of DECC s Impact Assessment of Feed-in-Tariff rates for small-scale renewables A report for the British Photovoltaic Association 22 October 2015 Cambridge Econometrics Covent Garden Cambridge CB1 2HT UK alb@camecon.com

2 Cambridge Econometrics mission is to provide rigorous, accessible and relevant independent economic analysis to support strategic planners and policy-makers in business and government, doing work that we are interested in and can be proud of. Cambridge Econometrics Limited is owned by a charitable body, the Cambridge Trust for New Thinking in Economics. 2

3 Authorisation and Version History Version Date Authorised for release by /10/15 Philip Summerton Final Report. Description 3

4 Contents Page Executive Summary 5 1 Scope 7 2 Review of Evidence 8 3 Alternative options 16 Appendix A Data table 21 4

5 Executive Summary Higher Bands The British Photovoltaic Association (BPVA) commissioned Cambridge Econometrics (CE) to review the data and assumptions applied in DECC s Impact Assessment of proposed revisions to the Feed-in-Tariffs for small scale renewables (2015). The review focussed on small scale (domestic) solar PV. The analysis suggests that some of the assumptions and data used in the Impact Assessment of solar PV are either not suitable or not robust: As a result of proposed changes to the banding classifications, the OPEX for a representative household 3kWp system are significantly underestimated. An electricity price has been applied to calculate the bill saving that includes not only the variable unit cost, but also the fixed standing charge. The calculations do not include the impact of long term system degradation. The load factor used for the impact assessment calculation was for a household with the optimal possible set of characteristics in the UK; that of a household based on the south coast with ideal conditions for solar panels. The targeted rate of a return for this well-sited installation on the south coast was given at a 4% real return per annum compared to 8% in the 2012 Impact Assessment of Feed-in-Tariffs. The Parsons Brinkerhoff report upon which the estimate was based reports a central estimate of 6.2% hurdle rate for a potential domestic installer. The implications for the Feed-in-Tariff of the assumptions selected was significant: The result of the DECC impact assessment was for a Feed-in Tariff rate of 1.64p/kWh for small scale solar PV. Our calculations, which are based on the alternative assumptions suggested in this report, show that this would provide an annual real rate of return of just 1.5% for the best sited locations in the country, and a negligible 0.4% for the average household. In order to provide potential investors with a rate of return in line with the previous literature, the FIT rates would need to be increased above those proposed in the impact assessment. A FIT rate of 7.92p/kWh would provide a 4.8% return to the average investor, and a 6.2% return to the best sites, whereas a FIT rate of 9.11p/kWh would provide a 6.2% return to the average investor, and a 7.1% return to the best sites under our revised assumptions. Similar analysis was also carried out for the higher tariff bands, with the minimum FiT rates required to give a 4% rate of return calculated. A rate of 6.06p/kWh is required in the 4-50kWp band, 4.43p/kWh rate is required in the kWp and kWp bands, and 2.80p/kWh for the 1000kWp+ band. These calculations were based on values taken at face value from DECC Impact Assessment, and may therefore be subject to revision. 5

6 Degression Rates and Expenditure Projections Grants for electricity storage Two scenarios were analysed for the degression projections based on a starting 7.92 FiT rate. Scenario A featured a 10% quarterly regression and scenario B featured a 5% quarterly regression. These projections were then used to calculate expected total expenditure under different take-up assumptions. Expenditure projections for DECC s own proposed tariff rates and current tariff rates are also presented for comparison purposes. It was found that both scenario A and B reduced projected expenditure from current levels by over 40%. The BPVA has proposed that finance is used from the DECC innovation support scheme for energy storage towards supporting the installation of energy storage systems in the form of a one off grant payment, applicable only to new installations and when used in combination with a new PV installation. This would be an alternative method of providing a more realistic rate of return to potential investors, however significantly improved FiT rates would still be necessary. 6

7 1 Scope 1.1 Scope Cambridge Econometrics (CE) was commissioned by the British Photovoltaic Association (BPVA) to review the data and modelling approach applied by DECC in its Impact Assessment 1 of feed-in-tariff options, and in the underlying work carried out by Parsons Brinkerhoff in the publication Small-scale Generation Cost Update 2. In particular, the BPVA was particularly concerned about the choice of input assumptions that resulted in a proposal to reduce the Feed-in-Tariff for smallscale domestic (0-10kWp) to 1.63p/kWh. After an initial assessment of the data and the modelling approach, it was agreed that the review would focus on five aspects: degradation OPEX and size banding electricity prices load factors hurdle rates (real internal rates of return) A second stage of the analysis assesses the implications of alternative proposals for feed-in-tariffs on internal real rates of return for households in different parts of the country. We also consider the implications of the different options for take-up of solar PV and the number of installations that can be supported under different options for caps. 1.2 Layout The layout of this report follows the scope: Chapter 2 presents our review of the assumptions and calculations used in the Impact Assessment, and Chapter 3 sets out our assessment of the alternative options put forward by the BPVA /supporting_documents/IA%20for%20FITs%20consultation%20August%202015%20%20FINAL%20do cx%20esignature%20included%20corrected.pdf /supporting_documents/SmallScale%20Generation%20Costs%20Update.PDF 7

8 2 Review of Evidence It is noted that the CAPEX costs, which represents the most significant part of the system cost, presented in the Impact Assessment for small scale (<10kWp) solar PV are broadly reasonable. However, many of the supporting assumptions used in the calculation of the revised Feed-in-Tariffs are reviewed and critiqued below. 2.1 Degradation Degradation of the performance of the PV system is not considered DECC does not address the issue of solar panel degradation in the Impact Assessment, despite assuming a long lifespan of 30 years, and neither is it addressed in the Parsons Brinkerhoff study. Standard estimates put degradation at 1% during the first year, followed by around 0.5% degradation thereafter. Indeed, DECC acknowledge the importance in modelling panel degradation in their 2012 Renewables Obligation banding review 3 : The degradation of solar PV panels over time was not something that was included within our original modelling. The load factor assumptions for both large-scale ground-mounted and building-mounted solar PV now include an annual 0.5% rate of panel degradation which is consistent with the warranties available from manufacturers. Accounting for degradation has a significant effect on the modelling of total costs over the full lifetime of the PV system. After including degradation in our model, we found that the present value of the total revenue over the lifetime of the system is reduced by 348 and this implies that the feed-in-tariff required to meet DECC s target IRR would be an additional 0.86p/kWh (see Table 2.1). Table 2.1. Effect of including degradation rate Required FiT to give Rate of degradation Total revenue over 4% real internal rate pa lifetime of system of return DECC IA assumption 0% p/kWh Revised assumption 0.5% p/kWh 2.2 Operating costs (OPEX) and banding An incorrect value for OPEX cost is used In DECC s Impact Assessment it is asserted that the OPEX costs used in the DECC FIT calculation model are based on the estimates presented in the Parsons Brinckerhoff independent report. Based on five survey responses and a literature review, PB assumes that domestic OPEX is the cost of replacing the inverter, which PB assumes need replacing every 10 years. PB assumes inverter costs of 1000 for the 0-4kWp band, and 1200 for the 4-10kWp band. All system cost estimates are based on average system size of 3.06kWp for the 0-4kWp band and 8.21kWp for the 4-10kWp band (see Table 2.2)

9 Table 2.2. OPEX calculation for different bands Band Inverter cost Average system OPEX/kWp/year size 0-4kWp ( ) 3.06 = kWp ( ) 8.21 = 14.6 The OPEX estimates from the PB report are also reported in DECC s impact assessment (inflated to 2016 prices), with low and high cases calculated using a 20% difference each way: Table 2.3. OPEX estimates at different bands DECC has proposed in its Impact Assessment to merge the banding for <4kWp systems and 4-10kWp systems to a single category of 0-10kWp systems. One implication of doing this is that the fixed OPEX for replacing an inverter is proportionately less of the total cost of the larger (6kWp) average system that represents the new banding category - for which the applied assumption of 20/kWp/year is valid. However, it is not a valid assumption when applied to a 3kWp system which is the typical household installation and the OPEX should have been recalculated in line with the stated methodology presented by DECC in the IA Where tariff bands have changed, the underpinning assumptions are broken down by installation size and have then been re-calculated from the raw data gathered by PB. The result is that 3kWp systems would not be a viable financial proposition because the OPEX cost, which reflects the cost of a replacement inverter, is much higher than estimated in the DECC calculation of the proposed FIT. Had the OPEX been recalculated correctly for the 3kWp system, PB s method would give a cost estimate of 102/year (or 34/kWp/year as stated, but not applied, in the Impact Assessment) for a 3kWp system. The difference in the present value (discounted at 4% over 30 years) of the corrected total annual OPEX estimation is 501. This would require the Feed-in-Tariff to be revised to 2.89p/kWh, an increase of 1.25p/kWh (see table 2.4). Table 2.4. Effect of including alternate OPEX assumptions Annual OPEX Total Opex Cost over lifetime of system Required FiT to give 4% return DECC IA Assumption p/kWh Corrected assumption p/kWh 9

10 2.3 Electricity prices DECC applies an electricity bill saving which includes an implicit saving in fixed standard charges DECC overestimates the bill savings to the householder by factoring the total price of electricity in the Impact Assessment analysis. Instead of using the (average) variable unit cost of electricity to calculate the total bill savings, DECC applies the average cost (including both standing charges and variable unit costs). DECC also reports the following in the Impact Assessment: Bill savings are valued using the central retail electricity prices in the Green Book supplementary guidance. These are set out in table 13 below. We have taken an average of the services and industrial prices for the relevant bands in the absence of information about the sector of the installations in those bands. More information about which installation group faces which electricity price is set out in paragraph 5.28 below. The medium electricity prices have been used within this analysis. These are due to be revised and republished by DECC during the period of the consultation. This will be taken into account in the analysis for the Government response to the consultation. Since the publication of DECC s retail prices, declines in fossil fuel price have led to falls in the electricity wholesale price. Other things being equal, this would result in a decrease in the bill savings for a FITs installation and therefore an increase in the generation tariff to reach a particular point on the supply curve for FITs installations. While in the short term electricity prices may be lower, this may not be true over the longer term. Given that FITs installations may continue to generate for up to 35 years, DECC has decided to continue using central electricity price projections for this analysis. Table 2.5. Electricity Prices used in DECC Impact Assessment (p/kwh, 2016 prices) Sector Wholesale Residential Service/ Industrial However the data shown in Table 2.5 represents average electricity costs, not average variable electricity costs. Hence it is not the correct data to use in such an assessment because the standing charge will not be reduced in line with the reduction in electricity demand. The use of solar panels to generate electricity for domestic consumption will not affect the householder s obligation to pay a standing charge, therefore only the variable unit price should be included in an analysis of any cost savings that are made. A table of average variable unit prices across the UK was produced by DECC in 2014 and is shown below. The average variable unit price for the UK is given as 0.14 /kwh. This therefore, is the most appropriate number to use when calculating the expected revenues from domestic solar panel installation. 10

11 Table 2.6. Average variable unit costs and standing charges for standard electricity in Region Average variable unit price ( /kwh) (5) East Midlands 0.13 Eastern 0.13 London 0.14 Merseyside & North Wales 0.15 North East 0.14 North Scotland 0.15 North West 0.14 Northern Ireland 0.17 South East 0.14 South Scotland 0.13 South Wales 0.15 South West 0.15 Southern 0.14 West Midlands 0.14 Yorkshire 0.14 United Kingdom 0.14 Using the variable unit cost of 14p/kWh in the impact calculation instead of 16p/kWh price leads to a significant difference in the resultant FIT rate required to provide a real rate of return of 4% pa, even assuming the same above inflation real electricity price rises from that point on. The reduction in the amount of bill savings given by using a more accurate estimate of electricity prices is 528 and the corresponding increase in FiT required to give a rate of return of 4% is 1.31p/kWh. Table 2.7. Effect of alternate electricity price assumptions Variable unit electricity Price Bill Savings over lifetime of system Required FiT to give 4% return DECC IA Assumption 16p/kWh 4, p/kWh Alternative Assumption 14p/kWh 3, p/kWh

12 2.4 Load factors The load factor assumption has a significant impact on the calculation of the return of a solar PV investment Load factors affect the FIT calculation in that an over-estimation of the load factor leads to a significant underestimation in the size of the FIT required to provide a realistically attractive rate of return. The DECC impact assessment does not use the central case assumption of 10.3% for the Midlands as previous studies and the previous FIT rate Impact Assessment (2012) have done. Instead, it uses the 11.3% high scenario for the South West (Exeter). The proposed justification for this is the intention of targeting well-sited installations. Regarding the choice of load factor, DECC reports the following: The load factor is the proportion of time for which an installation is expecting to generate electricity. The 2015 PB analysis shows that average load factors have increased for solar PV, Hydro, Wind and AD, compared to assumptions from the 2012 Review.18 It is assumed that the load factors are constant over time. Table 2.8: PV Load factors (DECC Impact Assessment Table 5) Low Central High Central Scotland 8.4% 8.9% 9.5% 9.0% Midlands 9.7% 10.3% 10.9% 9.5% South East 9.9% 10.5% 11.1% 9.7% South West 10.1% 10.7% 11.3% 10.0% Load factors are taken from the higher range of PB data. This reflects the intention of targeting well-sited installations. For PV, the 11.3% estimate is representative of installations located in the South West with high load factors. The load factor estimates are based on the report from Parsons Brinkerhoff (PB). However PB issue a warning about the quality and validity of their data: The load factor analysis above is based on a limited number of data points and on PVGIS irradiance data which has limitations. Both of these variables are applied at a regional level and as such, load factors at specific project locations may vary. Parsons Brinckerhoff acknowledges that load factors for PV installations could be refined further using other analytical methodologies should additional robust data be sourced. The difference in FiT rate required to accommodate the central case in the midlands instead of only the most optimally sited areas of the South West is significant: an extra 1.50p/kWh (see Table 2.9) Table 2.9. Effect of alternative load factor assumption on required FiT rate Load Factor Electricity Generated pa Required FiT to give 4% return DECC IA Assumption 11.3% 2972kWh 1.64p/kWh Alternative assumption 10.3% 2709kWh 3.14p/kWh 12

13 2.5 Hurdle rates DECC sets out the hurdle rates for domestic solar PV (0-10kWp) in Table 7 of the Impact Assessment on p13 (see Table 2.10 below). Table 2.10: Hurdle rates for domestic investors (DECC Impact Assessment, Table 7) Minimum 2.5% 3.5% Average 6.2% 8.0% Maximum 10.0% 12.5% The hurdle rates chosen are below the ones recommended in the consultation report These rates are sourced from the analysis by Parsons Brinkerhoff and Ricardo-AEA. That study states that the domestic hurdle rates were gathered from only seven survey responses from households considering or having recently installed solar PV. The consultants did not receive data from commercial installers to derive the commercial hurdle rates and it is not particularly clear what this data is based on. Despite presenting these hurdle rates, DECC has used a domestic hurdle rate of 4% rather than the central rate of 6.2% presented in the supporting analysis. In the Impact Assessment DECC argues the following The target rates of return have been set as the maximum of the low end of hurdle rate ranges for domestic and commercial investors (please refer to table 7 in section 4 for a reminder of the full range of hurdle rates). For example the low end of the hurdle rate ranges for domestic and commercial investors in PV are respectively 2.5% and 4%. The maximum of these two values (4%) is therefore identified as the target rate of return for solar PV. The focus on domestic and commercial hurdle rates reflects the scheme s objective to support primarily non-energy professionals (as per our State aid approval); and the choice of level corresponds to targeting a level that is high enough to allow deployment to come forward, but low enough to avoid overcompensation. In summary, DECC has selected a hurdle rate for the domestic sector which is based on no survey responses, is for the commercial sector and is not fully explained in the supporting documentation. The supporting evidence report by PB notes Suitable hurdle rates for commercial and developer/utility-scale installations were subsequently calculated based on the assumption that commercial investors may also invest for reasons apart from financial return, although rates higher than domestic investors are proposed. Developers will focus on returns, but with competitively priced finance (e.g. debt for 70% of the project at 6% interest and equity returns at 8.5%) real hurdle rates as low as 4% could arise. In other words, the supporting evidence suggests that if investors have other incentives or reasons for installing solar PV that are not financial it is possible to assume a very low real hurdle rate. The selection of a minimum rate will severely limit take-up because only perspective installers that have a return lower than (or equal to) the minimum 13

14 rate will go ahead with the project. The analysis suggests that the minimum and maximum are defined as the range falling within one standard deviation of the mean after removing outliers, but as there were only seven household respondents and no commercial respondents (upon which the selected rate is based), the ability to justify the reduction in hurdle rates from 2012 based on the sample size presented seems extremely limited. Moreover, the 2012 Impact Assessment on Feed-in-Tariffs suggested a real hurdle rate of 8% for small scale domestic installations, with 95% of perspective investors requiring a rate between 3.5% and 12.5%. This has the implication that only 2.5% of perspective investors would consider PV if the real return on investment was less than or equal to 3.5%. Given the lack of data, it would be more appropriate to use the average (mean) real hurdle rate of the domestic survey respondents (6.2%) given that the distribution cannot be statistically determined from such a small sample and that no survey response were received for commercial rates (on which the domestic estimates were based). Another alternative would be to determine the desired take up based on the distribution of hurdle rates presented in the 2012 Impact Assessment as it is unlikely that the required hurdle rate would substantially change over time. The selection of the hurdle rate has substantial consequences for the calculation of the feed-in-tariff that delivers an internal (real) rate of return equivalent to the real hurdle rate. The difference between DECC selecting a 4.0% real hurdle rate and the average domestic real hurdle rate of 6.2% adds 3.26p/kWh to the solar feed-in-tariff rate (see Table 2.11). Table 2.11 Effect of alternative hurdle rate on required FiT rates Real Hurdle Rate Required FiT to give return in line with real hurdle rate DECC IA assumption 4% 1.64p/kWh Alternative assumption 6.2% 4.90p/kWh 2.6 Summary The combined effects of the omission of a treatment of degradation, the incorrect treatment of electricity prices and Opex results in a significant difference in the real rates of return available at the proposed FiT rate of 1.63p/kWh. Figure 2.1 shows the necessary steps required to bridge the gap between the DECC proposal rate of 1.63p/kWh and proposed tariffs of 7.92p/kWh and 9.11p/kWh. Correcting for the three technical errors in the Impact assessment (detailed in sections 2.1 to 2.3 above), requires an increase in FiT rate to 5.05%. However this still only provides a rate of return of 4% in even the best located sites in the UK, and a significantly lower return for the majority of UK households. In order to raise the rate of return to the PB recommended required hurdle rate of 6.2%, an additional increase to 7.92p/kWh is required. To achieve this level of return for projects sited in the Midlands the rate would need to be increased to 9.11p/kWh. 14

15 Figure 2.1. Required Adjustments to correct Feed in Tariff 15

16 3 Alternative options 3.1 Analysis of alternative options The BPVA has suggested a number of alternative FiTs for both small scale domestic PV and commercial scale PV. Table 3.1 shows the resultant rates of return for different sites in the UK for three different FiT rates in the 0-4kWh band (which the BPVA recommend maintaining) for corrected assumptions on degradation, variable unit electricity prices and operating costs. Table 3.1: Rates of returns corresponding for different load factors and FiT rates for 0-4kWh band FiT Rate Rate of Return South West High Scenario Rate of Return Midlands Average Scenario Rate of Return Scotland Low Scenario 1.63p/kWh 1.5% 0.4% -1.8% 6.58p/kWh 5.2% 4.0% 1.4% 7.92p/kWh 6.2% 4.8% 2.2% 9.11p/kWh 7.1% 6.2% 3.0% Higher Bands In Table 3.2, we present the assumptions used in the DECC impact assessment that provide a 4% rate of return for the representative UK household (Midlands average scenario) for the intermediate bands (4-50kWp, kWp and kWp), and for the higher 1000kWp+ band. These bands correspond to the preferred bands recommended by the BPVA, and as such, these are the bands we have focused on for this analysis. We assume that the stand alone band will be designated the same tariff as the 1000kWp+ band for competitive reasons as outlined in DECC s impact assessment. The only significant correction to these figures from the DECC impact assessment calculation has been the inclusion of the omitted 0.5% annual degradation rate. All other assumption have been taken from the DECC Impact Assessment at face value and CE has not assessed the accuracy and validity of these assumptions. Further research, including insight from industry sources, could highlight errors or inconsistencies in these figures. We use the reference size installation used in the Impact Assessment, along with the CAPEX and OPEX costs stated and the lower electricity price for services/industry. Using these assumptions, we find that a rate of 6.06p/kWh is required in the 4-50kWp band, whereas a 4.43p/kWh rate is required in the kWp and kWp bands, and 2.80p/kWh for the 1000kWp+ band. 16

17 Table 3.2: Assumptions and resultant FiT rates to provide a 4% return for centrally representative UK location 4-50kWp kWp kWp 1000kWp+ Reference Size 30kWp 140kWp 455kWp 2840kWh CAPEX 1700/kWp 1500/kWp 1500/kWp 1300/kWp OPEX 10/kWp 10/kWp 10/kWp 10/kWp Annual Degradation 0.5% 0.5% 0.5% 0.5% Electricity Prices 10p/kWh 10p/kWh 10p/kWh 10p/kWh Required FiT Rate 6.06p/kWh 4.43p/kWh 4.43p/kWh 2.80p/kWh Rate of Return at Midlands Average Scenario Rate of Return at South West High Scenario 4% 4% 4% 4% 5% 5% 5% 5% Degression Rates Feed in Tariffs are slowly reduced over time so that the same rate of return is available in each quarter both as an incentive for, and a response to, the gradual reduction of costs of PV systems. The appropriate degression rate depends therefore upon the anticipated rate of reduction of CAPEX and/or OPEX costs. Here we make no predictions as to the likely rate of reduction of CAPEX or OPEX, we simply show the degressed tariff rates that would provide the same rate of return for two different rates of CAPEX reduction. In scenario A, a 10% quarterly degression rate would correspond to a 4.85% quarterly (20.9% annual) reduction in CAPEX costs. As an example, this would require CAPEX costs of 936/kWp for a 0-4kWp system by 2019 Q1, if there were no other changes in the costs or performance of the technology. Table 3.3: Suggested tariff rates with 10% degression q1 q2 q3 q4 q1 q2 q3 q4 q1 q2 q3 q4 q1 0-4kWp kWp kWp kWp kWp Stand Alone

18 In scenario B, a 5% quarterly degression rate would correspond to a 2.42% quarterly (10.0% annual) reduction in CAPEX costs. As an example, this would require CAPEX costs of 1267/kWp for a 0-4kWp system by 2019 Q1, if there were no other changes in the costs or performance of the technology. Table 3.4: Suggested tariff rates with 5% degression q1 q2 q3 q4 q1 q2 q3 q4 q1 q2 q3 q4 q1 0-4kWp kWp kWp kWp kWp Stand Alone Cap analysis In Table 3.5 below, we present the total expenditure implications over the period January 2016 to March 31 st 2019, for a number of combinations of proposed tariff rates and caps. We compare three different sets of generation tariff levels, one for each row of Table 3.5. DECC proposals show the effects of using the proposed generation tariffs from the Impact Assessment. CE Scenario A refers to the suggested tariff levels shown above in Table 3.3 with 10% quarterly degression and CE Scenario B refers to the suggested tariff levels in Table 3.4, with 5% quarterly degression applied. DECC Do Nothing Scenario uses current generation tariff levels and degression rates. For each set of generation tariffs we use three quarterly deployment scenarios to calculate forecasted expenditure for The first deployment scenario based on the caps proposed by DECC in the Impact Assessment. The second deployment scenario is based on the higher caps recently proposed by the Solar Trade Alliance as part of their response to the FiT Consultation process. The third deployment scenario adopts the average quarterly deployment in 2014/2015 across the period. 18

19 Table 3.5: Total expenditure under different deployment assumptions and Feed-in-Tariff assumptions Total Take-up FiT rate and 2019 (MW) degression proposals: Deployment Assumptions DECC caps STA caps 2014/15 take-up rate extrapolated Capped total expenditure ( ) DECC m 42m 42m BPVA Scenario A 37m 131m 156m BPVA Scenario B 44m 167m 187m DECC Do Nothing Scenario 79m 302m 324m As can be seen, both BPVA tariff scenarios would reduce expenditure by over 40% in comparison to the do nothing scenario. However, this relies on the assumption that deployment rates are maintained, but this is likely to be heavily influenced by the FiT rate on offer, rather than independent of it. 3.2 Analysis of the BPVA proposal for support scheme for energy storage The BPVA have proposed that finance is used from the DECC innovation support scheme for energy storage towards supporting the installation of energy storage systems in the form of a one off grant payment, applicable only to new installations and when used in combination with a new PV installation. This proposal would appear to be a good fit for the specifications of the scheme. The potential benefit to the consumer of this scheme and the required FiT rates required to give a selection of hurdle rates are shown in Table 3.6 below. The calculation below assumes a storage system cost of 500/kWh, an average increase in self-provision ratio of 23 percentage points, and a lifetime of 17 years or longer SMA, photovoltaik 2015 geschäftsmodelle für private und gewerbliche anlagen. 6 Deutsche Bank, 19

20 Table 3.6: FiT rates required to give various hurdle rates for different storage funding options No storage system 50% discount on kWh storage system 100% discount on kWh storage system Cost to government per consumer 6.2% rate of return for Midlands average 4.8% rate of return for Midlands average 4.0% rate of return for Midlands average p/kWh 7.45p/kWh 5.82p/kWh 7.92p/kWh 6.97p/kWh 3.99p/kWh 6.58p/kWh 5.09p/kWh 2.38p/kWh 20

21 Appendix A Data table Table A.1 shows a comparison between a recreation of the calculation used in DECC s impact assessment to produce the proposed figure of 1.63p/kWh for the residential sector, and an alternative calculation in which we propose a number of improvements to the assumptions used in the analysis. Note that due to precision errors (differences in rounding) we calculate a FiT rate of 1.64 p/kwh. Code Variable CE re-creation More DECC Calculation of DECC Source appropriate (table 21, IA) calculation figure 1 Size (kwp) 3kWp DECC IA table 10 2 Lifetime 30yrs DECC IA table 11 Does not correspond to any 3 Annual OpEx 73 value in the 102 assessment 4 Capex Cost per Undisclosed 1650 kwp calculation 5 Export Payments 4.85p DECC IA, para 4.22 DECC table 13, residential price 6 Electricity Bill projections. Does 16 p/kwh Initial Rate not distinguish 14 p/kwh between fixed and variable cost Real Electric Price 7 Rises 0.7% Implied from 6. 8 Degradation Rate 0% No justification 0.5% pa Minimum Scenario 9 Real Hurdle Rate 4% Commercial 6.2% Developer 10 CPI 2% DECC IA para Load Factor 11.3% High scenario, South West 10.3% DECC IA, table 12, 13 Export Fraction 0.53 all building mounted category Source DECC IA table 9, <4kWp category average scenario Average variable unit costs and fixed costs for electricity for selected towns and cities in the UK (QEP 2.2.4) 7 Taken from publically available industry estimates DECC IA table 7, average scenario, Domestic user Average scenario, Midlands 14 Initial Capex Implied from 1, Implied from 1, 4 15 Total Opex Implied from 1, Implied from 1, 2 16 kwh/kwp 991 Implied from Implied from kwh in the year 2980 kwh 2972 kwh Implied from 1, kwh Implied from 1,

22 18 kwh exported 1575 kwh Implied from 17, kwh Implied from 17, kwh used 1397 kwh Implied from 17, kwh Implied from 17, Export Income pa 76 Implied from 18, 5 70 Implied from 18, 5 21 Bill Savings pa 223 Implied from 19, 6, Implied from 19, 6, 7 22 Total Cost Implied from 14, Implied from 14, Total Revenues Implied from 20, Implied from 20, Short Fall Implied from 22, Implied from 22, Equivalent Annual Figure Implied from Implied from FiT Rate Required 1.63p 1.64p Implied from 25, p Implied from 25, 17 22

Feed-in Tariff Review workshop. BIS Conference Centre, London, 5 October 2015

Feed-in Tariff Review workshop. BIS Conference Centre, London, 5 October 2015 Feed-in Tariff Review workshop BIS Conference Centre, London, 5 October 2015 Agenda 10.00 10.15 Presentation on FIT Review consultation Gareth Redmond, Head of Renewables Programme Team, DECC Sarah Lowe,

More information

Checklist for PV Installations Feb 2012

Checklist for PV Installations Feb 2012 Checklist for PV Installations Feb 2012 Installation of Solar Photovoltaic systems (PV) can generate an income in the form of the Feed In Tariff, which is paid for every kwh generated, plus a separate

More information

Solar PV where the sun doesn t shine: Estimating the economic impacts of support schemes for residential PV with detailed net demand profiling

Solar PV where the sun doesn t shine: Estimating the economic impacts of support schemes for residential PV with detailed net demand profiling Sources: www.engineersjournal.ie; www.investopedia.com; www.theguardian.com Solar PV where the sun doesn t shine: Estimating the economic impacts of support schemes for residential PV with detailed net

More information

D2.6 Business Model Report

D2.6 Business Model Report D2.6 Business Model Report United Kingdom An analysis of future viable business models in a lower-subsidy world This project has received funding from the European Union s Horizon 2020 research and innovation

More information

What next for UK auctions of renewable Contracts for Difference?

What next for UK auctions of renewable Contracts for Difference? What next for UK auctions of renewable Contracts for Difference? In February we saw the results of the first competitive auction for Contracts for Difference (CfDs), the primary support mechanism for incentivising

More information

The Energiesprong concept is based on the assumption that the capital investment required to deliver net-zero-energy refurbishments is covered by:

The Energiesprong concept is based on the assumption that the capital investment required to deliver net-zero-energy refurbishments is covered by: Energiesprong UK Limited National Energy Centre Davy Avenue, Knowlhill Milton Keynes MK5 8NG 30 November 2015 Energiesprong UK finance model London Introduction The purpose of the financial model is to

More information

GREEK RENEWABLES SUPPORT SCHEME PROPOSALS

GREEK RENEWABLES SUPPORT SCHEME PROPOSALS BRIEFING GREEK RENEWABLES SUPPORT SCHEME PROPOSALS MARCH 2016 BRIEF OUTLINE OF THE SCHEME PHOTOVOLTAIC PROJECTS TRANSITIONAL PROVISIONS NON-INTERCONNECTED ISLANDS COMPETITIVE BIDDING PROCESS FROM 2017

More information

Feed-in tariff determination Best practice and cross-country coordination

Feed-in tariff determination Best practice and cross-country coordination Feed-in tariff determination Best practice and cross-country coordination Dr. Corinna Klessmann, Ecofys 26 January 2012 9 th Workshop of the International Feed-in Cooperation (IFIC) Content I. Best practice

More information

UK Solar Investment. 8% return per annum. Defined exit strategy at the end of year 3 with option to extend. Pension Compatible.

UK Solar Investment. 8% return per annum. Defined exit strategy at the end of year 3 with option to extend. Pension Compatible. UK Solar Investment 8% return per annum. Defined exit strategy at the end of year 3 with option to extend. Pension Compatible. Sovereign backed income. All investments presently generating projected real

More information

D2.6 Business Model Report

D2.6 Business Model Report D2.6 Business Model Report Austria This project has received funding from the European Union s Horizon 2020 research and innovation programme under grant agreement No 646554 1 Index 1. Residential Single

More information

Joint venture for a PV project in Honduras. January 2015

Joint venture for a PV project in Honduras. January 2015 Joint venture for a PV project in Honduras January 2015 1. The project: The goal is to carry out several PV and wind projects in Honduras. The first PV project is a 48 Mw (up to 55 Mwp installed) facility

More information

Contract length analysis for Feed-in Tariff with Contracts for Difference. Summary of onshore and offshore wind analysis

Contract length analysis for Feed-in Tariff with Contracts for Difference. Summary of onshore and offshore wind analysis Contract length analysis for Feed-in Tariff with Contracts for Difference Summary of onshore and offshore wind analysis August 2013 Contract length analysis for Feed-in Tariff with Contracts for Difference

More information

Pay in Advance Energy A Discounted Deal

Pay in Advance Energy A Discounted Deal Pay in Advance Energy A Discounted Deal Pay in Advance Energy Offer Prices effective from 6th December 2013 How to find your electricity supply area See what supply area you are in by using the map below.

More information

Unsubsidised rooftop PV markets in Singapore: when do we get grid parity back?

Unsubsidised rooftop PV markets in Singapore: when do we get grid parity back? Unsubsidised rooftop PV markets in Singapore: when do we get grid parity back? Monika BIERI Solar Energy Research Institute of Singapore (SERIS) National University of Singapore (NUS) IEA-PVPS Workshop

More information

SMA Solar Technology AG 3. WestLB Energy Forum

SMA Solar Technology AG 3. WestLB Energy Forum SMA Solar Technology AG 3. WestLB Energy Forum Pierre-Pascal Urbon, CFO, September 1, 2010 1 Disclaimer IMPORTANT LEGAL NOTICE This presentation does not constitute or form part of, and should not be construed

More information

The Levy Control Framework

The Levy Control Framework Report by the Comptroller and Auditor General Department of Energy & Climate Change The Levy Control Framework HC 815 SESSION 2013-14 27 NOVEMBER 2013 Our vision is to help the nation spend wisely. Our

More information

Optimal support for renewable deployment: A case study in German photovoltaic

Optimal support for renewable deployment: A case study in German photovoltaic Optimal support for renewable deployment: A case study in German photovoltaic Rutger-Jan Lange r.lange@jbs.cam.ac.uk University of Cambridge Cambridge, 14.05.10 Outline 1. Solar energy is an option 2.

More information

Updated Financial Analysis Final Draft

Updated Financial Analysis Final Draft Solar Market Pathways: San Francisco Solar and Storage for Resilience Project December 2017 Final Draft Important Notice This report was prepared by Arup North America Ltd. ( Arup ) in its capacity as

More information

Investing in Climate Change

Investing in Climate Change Investing in Climate Change Mark Fulton Global Head of Climate Change Investment Research DB Climate Change Advisors April 10, 2010 http://www.dbcca.com/research DB Climate Change Advisors (DBCCA) DBCCA

More information

Domestic Feed in Tariff (FIT) Terms and Conditions

Domestic Feed in Tariff (FIT) Terms and Conditions Domestic Feed in Tariff (FIT) Terms and Conditions 1. Definitions The following definitions shall apply: Accreditation means the process of accreditation via either the MCS or ROO-FIT route and Accredited

More information

Community and Renewable Energy Scheme Project Development Project Toolkit Project Finance Module

Community and Renewable Energy Scheme Project Development Project Toolkit Project Finance Module Community and Renewable Energy Scheme Project Development Project Toolkit Module Structure In the past, it was the case that the high costs involved with setting up loan finance for energy projects tended

More information

THAMESWEY SOLAR LIMITED

THAMESWEY SOLAR LIMITED THAMESWEY SOLAR LIMITED BUSINESS PLAN 2017-19 Address: 2 nd Floor, Gloucester Chambers, Jubilee Square, Woking, Surrey GU21 6GA Registered Address: The St Botolph Building, 138 Houndsditch, London, EC3A

More information

Steps to Success. Energy Efficiency Loans in Wales Applicant Supporting Information. Updated May 2018

Steps to Success. Energy Efficiency Loans in Wales Applicant Supporting Information. Updated May 2018 Steps to Success Energy Efficiency Loans in Wales Applicant Supporting Information Updated May 2018 Energy Efficiency Loans in Wales Congratulations! You re taking the first step towards saving your business

More information

UNAUDITED INTERIM FINANCIAL REPORT TRIPLE POINT VCT 2011 PLC FOR THE SIX MONTHS ENDED 31 AUGUST TP VCT PLC 1

UNAUDITED INTERIM FINANCIAL REPORT TRIPLE POINT VCT 2011 PLC FOR THE SIX MONTHS ENDED 31 AUGUST TP VCT PLC 1 UNAUDITED INTERIM FINANCIAL REPORT TRIPLE POINT VCT 2011 PLC FOR THE SIX MONTHS ENDED 31 AUGUST 2012 TP70 2010 VCT PLC 1 Unaudited Interim Financial Report / General Information Directors Jane Owen Chad

More information

Approval levels fall back in February

Approval levels fall back in February Approval levels fall back in February - Mortgage approvals decline slightly between January and February - Growth in number of first-time buyers and small deposit mortgages - Northern Ireland has highest

More information

SSE FEED IN TARIFF (FIT) STATEMENT OF TERMS

SSE FEED IN TARIFF (FIT) STATEMENT OF TERMS SSE FEED IN TARIFF (FIT) STATEMENT OF TERMS This FIT Statement of Terms for the provision of Generation and Export (where applicable) Feed-in-Tariffs by SSE Energy Supply Limited (trading as Southern Electric,

More information

Economic and financial feasibility of PV projects

Economic and financial feasibility of PV projects Economic and financial feasibility of PV projects Monika BIERI Research Associate Solar Energy Research Institute of Singapore (SERIS) National University of Singapore (NUS) SERIS INDUSTRY DAY on PV Quality

More information

Feed in Tariff (FIT) Terms and Conditions

Feed in Tariff (FIT) Terms and Conditions Feed in Tariff (FIT) Terms and Conditions 1. Definitions The following definitions shall apply: Accreditation means the process of accreditation via either the MCS or ROO-FIT route and Accredited shall

More information

SMEs and UK growth: the opportunity for regional economies. November 2018

SMEs and UK growth: the opportunity for regional economies. November 2018 1 SMEs and UK growth: the opportunity for regional economies November 2018 2 Table of contents FOREWORD 3 1: INTRODUCTION 4 2: EXECUTIVE SUMMARY 5 3: SMES AND UK REGIONAL GROWTH 7 Contribution of SMEs

More information

How multi-technology PPA structures could help companies reduce risk

How multi-technology PPA structures could help companies reduce risk How multi-technology PPA structures could help companies reduce risk 1 How multi-technology PPA structures could help companies reduce risk Table of contents Introduction... 3 Key PPA risks related to

More information

First Utility Feed-in Tariffs v3

First Utility Feed-in Tariffs v3 Feed-In Tariff Statement of Terms Please read these terms carefully 1 Definitions Accreditation MCS Microgeneration Certification Scheme, which certifies Microgeneration products and installers in accordance

More information

The economic impact of the UK Maritime Services Sector

The economic impact of the UK Maritime Services Sector The economic impact of the UK Maritime Services Sector A Report for Maritime UK (including regional breakdown) February 2013 Contents 1 Executive summary...2 2 Introduction...5 2.1 The channels of economic

More information

BBPA. Local impact of the beer and pub sector. A report for the British Beer and Pub Association

BBPA. Local impact of the beer and pub sector. A report for the British Beer and Pub Association Local impact of the beer and pub sector A report for the British Beer and Pub Association Contents Executive summary... 1 Beer and pub activity provides significant benefits... 1 Estimated impact of each

More information

Solar Bond Case Study

Solar Bond Case Study Solar Bond Case Study Andy Heald, Co-Founder, Generation Community www.apse.org.uk Social finance for solar energy Gen Community 30 th October 2014 Oxford Andy Heald Director Gen Community Generating community

More information

RESTRICTED: STATISTICS

RESTRICTED: STATISTICS Households Below Average Income 2008/09 Peter Matejic (DWP) HBAI Publication Private households in United Kingdom Main source DWP Family Resources Survey Measurement of living standards as determined by

More information

Impact Assessment (IA)

Impact Assessment (IA) Title: : AMENDMENTS TO PART 3, CHAPTER 1 OF THE ENERGY ACT 2008 (as amended): NUCLEAR SITES: DECOMMISSIONING AND COST RECOVERY IA No: DECC0089 Lead department or agency: DECC Other departments or agencies:

More information

Detailed calculation of out of London Living wage: method, rationale, data sources and figures for the 2010/11 calculation.

Detailed calculation of out of London Living wage: method, rationale, data sources and figures for the 2010/11 calculation. Detailed calculation of out of London Living wage: method, rationale, data sources and figures for the 2010/11 calculation. by Donald Hirsch The following account of the process involved in setting the

More information

Power Trading in the Coupled European Markets

Power Trading in the Coupled European Markets Power Trading in the Coupled European Markets Challenges for policy-makers February 2016-1 - Europe Economics is registered in England No. 3477100. Registered offices at Chancery House, 53-64 Chancery

More information

Renewable Energy Fund

Renewable Energy Fund For discussion purposes only not suitable for retail clients Renewable Energy Fund Trusted Alternatives Summary Document March 2013 Under The Enterprise Investment Scheme Summary Document The following

More information

Appendix 8.1.A Economic Insight report on input cost and frontier shift assumptions. Wessex Water

Appendix 8.1.A Economic Insight report on input cost and frontier shift assumptions. Wessex Water Appendix 8.1.A Economic Insight report on input cost and frontier shift assumptions Wessex Water September 2018 Business plan section Supporting document Board vision and executive summary 1 Engaging customers

More information

BBPA Local impact of the beer and pub sector 2010/11

BBPA Local impact of the beer and pub sector 2010/11 Local impact of the beer and pub sector 2010/11 A report for the British Beer and Pub Association () Contents Executive summary... 1 The beer and pub sector provides significant benefits to the UK economy......

More information

Tax Reform and Renewable Energy: The Implications for Project Developers and Renewable Energy Costs

Tax Reform and Renewable Energy: The Implications for Project Developers and Renewable Energy Costs UTILITIES AND RENEWABLE ENERGY December 29, 2017 Tax Reform and Renewable Energy: The Implications for Project Developers and Renewable Energy Costs What real impact will the adoption of the Tax Cuts and

More information

FSB MEMBERSHIP PROFILE

FSB MEMBERSHIP PROFILE FSB MEMBERSHIP PROFILE Published: January 2016 @fsb_policy fsb.org.uk FSB Membership Profile CONTENTS 1. Summary...3 2. Background and Methodology...4 3. Demographic Profile...6 4. Business Profile...8

More information

Pennsylvania s Energy Efficiency Uncapped

Pennsylvania s Energy Efficiency Uncapped Pennsylvania s Energy Efficiency Uncapped Assessing the Potential Impact of Expanding the State s Energy Efficiency Program Beyond the Current Budget Cap Prepared for Keystone Energy Efficiency Alliance

More information

APPENDIX B: WHOLESALE AND RETAIL PRICE FORECAST

APPENDIX B: WHOLESALE AND RETAIL PRICE FORECAST Seventh Northwest Conservation and Electric Power Plan APPENDIX B: WHOLESALE AND RETAIL PRICE FORECAST Contents Introduction... 3 Key Findings... 3 Background... 5 Methodology... 7 Inputs and Assumptions...

More information

Whereas, solar energy is an abundant, domestic, renewable, and non-polluting energy resource.

Whereas, solar energy is an abundant, domestic, renewable, and non-polluting energy resource. An Act Relating to the Establishment of a Community Solar Program For Vertically-Integrated States Whereas, solar energy is an abundant, domestic, renewable, and non-polluting energy resource. Whereas,

More information

Online Energy Saver. Online Energy Saver 21 Offer Prices effective from 31st January A Discounted Deal

Online Energy Saver. Online Energy Saver 21 Offer Prices effective from 31st January A Discounted Deal Online Energy Saver A Discounted Deal Online Energy Saver 21 Offer Prices effective from 31st January 2014 Limited Offer subject to availability and may be withdrawn from sale at any time. Online Energy

More information

Collaborations and Shared Ownership Breakout Session

Collaborations and Shared Ownership Breakout Session Collaborations and Shared Ownership Breakout Session John Malone Energy4All Location 8 sites, South of England Installed capacity 842kW Annual output 750 MWh Number of members - 326 Share raise total

More information

Gas, oil and coal prices were subsidised by 3.63bn in 2010 Or were they? Wind power still gets lower public subsidies than fossil fuel tax breaks

Gas, oil and coal prices were subsidised by 3.63bn in 2010 Or were they? Wind power still gets lower public subsidies than fossil fuel tax breaks INTRODUCTION On 27 th February 2012, the UK national daily newspaper The Guardian published an article 1 headed Wind power still gets lower public subsidies than fossil fuel tax breaks Financial support

More information

The Economics and Financing of Distributed Generation Investment. Budapest, Hungary November 17, 2016

The Economics and Financing of Distributed Generation Investment. Budapest, Hungary November 17, 2016 The Economics and Financing of Distributed Generation Investment Budapest, Hungary November 17, 2016 Topics to Cover How to Finance Distributed Generation Investments 1 Importance of financial aspects

More information

Solutions for Financing Local Government PV Projects September Nick Hylla, Executive Director Midwest Renewable Energy Association

Solutions for Financing Local Government PV Projects September Nick Hylla, Executive Director Midwest Renewable Energy Association Solutions for Financing Local Government PV Projects September 2017 Nick Hylla, Executive Director Midwest Renewable Energy Association MREA Overview Founded in 1990 501c3 non-profit RE education and demonstration

More information

The impact of using the retail price index in the tobacco duty escalator

The impact of using the retail price index in the tobacco duty escalator The impact of using the retail price index in the tobacco duty escalator Introduction October 2017 The impact of using the RPI in the tobacco duty escalator The reintroduction of the tobacco duty escalator

More information

Iona EnvIronmEntal vct PlC

Iona EnvIronmEntal vct PlC Iona EnvIronmEntal vct PlC HALF YEARLY REPORT & ACCOUNTS 31 MARCH 2012 Half Year Report Contents Half Yearly Review 2 3 4 5 6 8 Investment Objectives and Strategy Financial Highlights Chairman s Statement

More information

Current Issues in Pensions

Current Issues in Pensions a true partnership approach Financial Reporting - 30 September 2014 Current Issues in Pensions The key financial assumptions required for determining pension liabilities under the Accounting Standards

More information

Change of Ownership for Feed in Tariffs (FIT) Form Change of Responsibility Form First Utility accepts no liability for the accuracy for this form.

Change of Ownership for Feed in Tariffs (FIT) Form Change of Responsibility Form First Utility accepts no liability for the accuracy for this form. This form should be used to notify First Utility of transfer of responsibility from the FIT Generator to another party. Examples might be where a FIT Generator no longer resides at the installation address

More information

STANDARD FEED IN TARIFF (FIT) STATEMENT OF TERMS for Green Energy (UK) plc

STANDARD FEED IN TARIFF (FIT) STATEMENT OF TERMS for Green Energy (UK) plc STANDARD FEED IN TARIFF (FIT) STATEMENT OF TERMS for Green Energy (UK) plc These general statement of terms for the generation and export (where applicable) feed-in-tariff by Green Energy (UK) plc (the

More information

Whereas, solar energy is an abundant, domestic, renewable, and non-polluting energy resource.

Whereas, solar energy is an abundant, domestic, renewable, and non-polluting energy resource. An Act Relating to the Establishment of a Community Solar Program For Restructured States Whereas, solar energy is an abundant, domestic, renewable, and non-polluting energy resource. Whereas, local solar

More information

D2.6 Business Model Report

D2.6 Business Model Report D2.6 Business Model Report Germany This project has received funding from the European Union s Horizon 2020 research and innovation programme under grant agreement No 646554 Index Introduction... 4 1.

More information

Market trend analysis. Issue 2 March 2018

Market trend analysis. Issue 2 March 2018 Market trend analysis Link Asset Services Welcome to the second issue of the Market Trend Analysis from Link Asset Services. This year we analyse the visible market trends through our datasets across the

More information

Online Fixed Energy A Guaranteed Deal

Online Fixed Energy A Guaranteed Deal Online Fixed Energy A Guaranteed Deal Online Fixed Price Energy February 2016 Prices effective from 20th January 2015 Subject to availability and may be withdrawn from sale at any time. Online Fixed Price

More information

FP FORESIGHT UK INFRASTRUCTURE INCOME FUND

FP FORESIGHT UK INFRASTRUCTURE INCOME FUND FP FORESIGHT UK INFRASTRUCTURE INCOME FUND Targeting annual income of 5% through active management of UK listed renewable energy and infrastructure investment companies. INVESTOR GUIDE This Investor Guide

More information

Research and Development Tax Credits Statistics

Research and Development Tax Credits Statistics Coverage: United Kingdom Theme: The Economy Research and Development Tax Credits Statistics Released: 15 August 2014 Next Release: August 2015 Frequency of release: Annual Media contact: HMRC Press Office

More information

A Summary of Changes to the HS2 Economic Case

A Summary of Changes to the HS2 Economic Case A Summary of Changes to the HS2 Economic Case April 2011 Contents 1 Introduction 4 2 Cost Changes 6 3 Appraisal Changes 7 4 Summary of Changes 9 Annex 1: Capital Costs 10 Annex 2: Operating Costs 13 Annex

More information

Proposed Scaling Weights for GSP Group Correction

Proposed Scaling Weights for GSP Group Correction Proposed Scaling Weights for GSP Group Correction Section A Document Overview Executive Summary: We have been reviewing the BSC Profiling and Settlement arrangements in light of the recent advances in

More information

Solving India s Renewable Energy Financing Challenge: Which Federal Policies can be Most Effective?

Solving India s Renewable Energy Financing Challenge: Which Federal Policies can be Most Effective? Solving India s Renewable Energy Financing Challenge: Which Federal Policies can be Most Effective? 1 Which federal policy would be the most cost-effective? India aims to double existing renewable energy

More information

lifetime mortgages - An essential ingredient in DB de-risking transactions

lifetime mortgages - An essential ingredient in DB de-risking transactions lifetime mortgages - An essential ingredient in DB de-risking transactions 18 April 2018 2018 Bulk Annuities seminar Introduction & agenda Lifetime mortgage ("LTMs") market and key drivers Why invest in

More information

Ulster Bank Northern Ireland PMI

Ulster Bank Northern Ireland PMI Embargoed until 0101 UK (0001 UTC) 13 August 2018 Ulster Bank Northern Ireland PMI Fastest rise in output since January Key Findings Sharper increases in both output and new orders Slowest rise in employment

More information

20th February 2015 ScottishPower Standard Domestic Tariff. Prices. Your domestic gas and electricity pricing information

20th February 2015 ScottishPower Standard Domestic Tariff. Prices. Your domestic gas and electricity pricing information 20th February 2015 ScottishPower Standard Domestic Tariff Prices Your domestic gas and electricity pricing information How to find your electricity supply area See what supply area you are in by using

More information

Diane Roy Vice President, Regulatory Affairs

Diane Roy Vice President, Regulatory Affairs Diane Roy Vice President, Regulatory Affairs Gas Regulatory Affairs Correspondence Email: gas.regulatory.affairs@fortisbc.com Electric Regulatory Affairs Correspondence Email: electricity.regulatory.affairs@fortisbc.com

More information

AHK Business Trip - Tunisia

AHK Business Trip - Tunisia AHK Business Trip - Tunisia Inverter Reliability and Investment Return Ahmad Rahme Special Sales Projects November 1 st, 2016 Disclaimer IMPORTANT LEGAL NOTICE This presentation does not constitute or

More information

Modelling of UUK s proposed USS benefit changes

Modelling of UUK s proposed USS benefit changes UUK Date: 12 December 2017 Prepared for: Mary Lambe - UUK Prepared by: Steven Leigh John Coulthard Modelling of UUK s proposed USS benefit changes Introduction This paper sets out the results of our initial

More information

Housing market recovery pushes stamp duty revenues to record high

Housing market recovery pushes stamp duty revenues to record high FOR IMMEDIATE RELEASE Housing market recovery pushes stamp duty revenues to record high Stamp duty revenues raised on residential properties are projected to have risen by over 20% in 2014/15 to a record

More information

Ulster Bank Northern Ireland PMI

Ulster Bank Northern Ireland PMI 11 February 2019 Employment falls for first time in four years Key Findings Output growth at 28-month low Employment falls for first time in four years Business sentiment remains muted Northern Ireland

More information

EUROZONE MYC EXPLANATION AND FAQS

EUROZONE MYC EXPLANATION AND FAQS EUROZONE MYC EXPLANATION AND FAQS This paper is addressed to users of the Eurozone Mercer Yield Curve ( Eurozone MYC ) and their auditors. It explains the methodology used to derive the Eurozone MYC which

More information

Case No COMP/M IBERDROLA / SCOTTISH POWER. REGULATION (EC) No 139/2004 MERGER PROCEDURE. Article 6(1)(b) NON-OPPOSITION Date: 26/03/2007

Case No COMP/M IBERDROLA / SCOTTISH POWER. REGULATION (EC) No 139/2004 MERGER PROCEDURE. Article 6(1)(b) NON-OPPOSITION Date: 26/03/2007 EN Case No COMP/M.4517 - IBERDROLA / SCOTTISH POWER Only the English text is available and authentic. REGULATION (EC) No 139/2004 MERGER PROCEDURE Article 6(1)(b) NON-OPPOSITION Date: 26/03/2007 In electronic

More information

Evaluation of influential factors in the choice of micro-generation solar devices: a case study in Cyprus

Evaluation of influential factors in the choice of micro-generation solar devices: a case study in Cyprus Evaluation of influential factors in the choice of micro-generation solar devices: a case study in Cyprus Mehrshad Radmehr, PhD, Newcastle University 33 rd USAEE/IAEE Conference, Pittsburgh, Pennsylvania

More information

Introduction. Background to the Breyer Case

Introduction. Background to the Breyer Case Breyer Group Plc & Others ( Claimants ) v Department of Energy and Climate Change ( DECC ): A Cautionary Tale for Policy Makers and Regulators and Possible Implications for Irish I-SEM Design Introduction

More information

CMA Report and Summer Budget Implications for the UK energy sector July 2015

CMA Report and Summer Budget Implications for the UK energy sector July 2015 CMA Report and Summer Budget 2015 Implications for the UK energy sector July 2015 Two announcements this week are likely to have big implications for the way the UK energy market evolves over the next

More information

2010 No. 678 ELECTRICITY. The Feed-in Tariffs (Specified Maximum Capacity and Functions) Order 2010

2010 No. 678 ELECTRICITY. The Feed-in Tariffs (Specified Maximum Capacity and Functions) Order 2010 STATUTORY INSTRUMENTS 2010 No. 678 ELECTRICITY The Feed-in Tariffs (Specified Maximum Capacity and Functions) Order 2010 Made - - - - 8th March 2010 Laid before Parliament 9th March 2010 Coming into force

More information

Current Issues in Pensions

Current Issues in Pensions 30 September Current Issues in Pensions Financial Reporting The key financial assumptions required for determining pension liabilities under the Accounting Standards FRS102 (UK non-listed), IAS19 (EU listed)

More information

The Enterprise Solar EIS Fund. Promoted by Enterprise Investment Partners LLP

The Enterprise Solar EIS Fund. Promoted by Enterprise Investment Partners LLP The Enterprise Solar EIS Fund Promoted by Enterprise Investment Partners LLP Warning The value of this investment may go down as well as up and an investor may not get back the amount he or she invests.

More information

NOLANS RARE EARTHS A MAJOR PROJECT FOR THE TERRITORY

NOLANS RARE EARTHS A MAJOR PROJECT FOR THE TERRITORY NOLANS RARE EARTHS A MAJOR PROJECT FOR THE TERRITORY October 2014 Gavin Lockyer Managing Director DISCLAIMER Important Notice This presentation contains certain statements which may constitute forward-looking

More information

Evaluation of the dispersion of profitability within the comparator sets used in Annex 9 of Ofcom s pay TV phase three document

Evaluation of the dispersion of profitability within the comparator sets used in Annex 9 of Ofcom s pay TV phase three document within the comparator sets used in Annex 9 of Ofcom s pay TV phase three document A report for British Sky Broadcasting Limited 16 September 2009 Final report [date] 1 Important Notice This report has

More information

Solving India s Renewable Energy Financing Challenge: Which Federal Policies can be Most Effective?

Solving India s Renewable Energy Financing Challenge: Which Federal Policies can be Most Effective? Solving India s Renewable Energy Financing Challenge: Which Federal Policies can be Most Effective? BRAZIL CHINA EUROPE INDIA INDONESIA UNITED STATES 235 Montgomery St. 13th Floor San Francisco, CA 94104,

More information

Meridian Energy Cross-Submission. Transmission Pricing Methodology: Second issues paper Supplementary Refinements Consultation

Meridian Energy Cross-Submission. Transmission Pricing Methodology: Second issues paper Supplementary Refinements Consultation Meridian Energy Cross-Submission Transmission Pricing Methodology: Second issues paper Supplementary Refinements Consultation 24 March 2017 INTRODUCTION The Electricity Authority seeks cross-submissions

More information

Solving India s Renewable Energy Financing Challenge: Which Federal Policies can be Most Effective?

Solving India s Renewable Energy Financing Challenge: Which Federal Policies can be Most Effective? Solving India s Renewable Energy Financing Challenge: Which Federal Policies can be Most Effective? Gireesh Shrimali Shobhit Goel Sandhya Srinivasan David Nelson March 2014 Acknowledgements The authors

More information

HEALTH AND COMMUNITIES AND LOCAL GOVERNMENT SELECT COMMITTEES JOINT INQUIRY INTO LONG-TERM FUNDING OF SOCIAL CARE Written Evidence submitted by

HEALTH AND COMMUNITIES AND LOCAL GOVERNMENT SELECT COMMITTEES JOINT INQUIRY INTO LONG-TERM FUNDING OF SOCIAL CARE Written Evidence submitted by HEALTH AND COMMUNITIES AND LOCAL GOVERNMENT SELECT COMMITTEES JOINT INQUIRY INTO LONG-TERM FUNDING OF SOCIAL CARE Written Evidence submitted by Ruth Hancock 1, Ferran Espuny Pujol, Marcello Morciano Health

More information

EUROPEAN COMMISSION Background and objectives of the notified project

EUROPEAN COMMISSION Background and objectives of the notified project EUROPEAN COMMISSION Brussels, 27.9.2016 C(2016) 6326 final PUBLIC VERSION This document is made available for information purposes only. Subject: State Aid SA.44626 (2016/N) Denmark Pilot tender for aid

More information

Current Issues in Pensions

Current Issues in Pensions RISK PENSIONS INVESTMENT INSURANCE 31 December 2017 Current Issues in Pensions Financial Reporting The key financial assumptions required for determining pension liabilities under the Accounting Standards

More information

Economic Impact on Riverside County of the Proposed Palen PV Solar Project

Economic Impact on Riverside County of the Proposed Palen PV Solar Project Final Report Economic Impact on Riverside County of the Proposed Palen PV Solar Project Prepared for: EDF Renewable Development, Inc. Prepared by: Economic & Planning Systems, Inc. October 10, 2017 EPS

More information

Employer Covenant Working Group

Employer Covenant Working Group Employer Covenant Working Group TYPE A Contingent Asset Guarantee Certification A practical guide for advisors, trustees and sponsors November 2018 1 Contents 1. Objectives 2. Introduction 3. Guidance

More information

Relative regional consumer price levels of goods and services, UK: 2016

Relative regional consumer price levels of goods and services, UK: 2016 Article Relative regional consumer price levels of goods and services, UK: 2016 UK relative regional consumer price levels (RRCPLs) of goods and services for 2016. They provide an indication of a region's

More information

California ISO. Flexible Ramping Product Uncertainty Calculation and Implementation Issues. April 18, 2018

California ISO. Flexible Ramping Product Uncertainty Calculation and Implementation Issues. April 18, 2018 California Independent System Operator Corporation California ISO Flexible Ramping Product Uncertainty Calculation and Implementation Issues April 18, 2018 Prepared by: Kyle Westendorf, Department of Market

More information

Banks approved eight in 10 small business loan and overdraft applications and nine in 10 loan and overdraft applications from medium sized business

Banks approved eight in 10 small business loan and overdraft applications and nine in 10 loan and overdraft applications from medium sized business Release Date : 28 February 218 UK Finance: SME Finance Update - Quarter 4, 217 Q4, 217: SME MANUFACTURERS BORROW MORE WHILE SERVICE BUSINESSES RETRENCH Key highlights: The quarterly value of new loans

More information

Current Issues in Pensions

Current Issues in Pensions 31 March 2016 Current Issues in Pensions Financial Reporting The key financial assumptions required for determining pension liabilities under the Accounting Standards FRS102 (UK non-listed), IAS19 (EU

More information

REVIEW OF PENSION SCHEME WIND-UP PRIORITIES A REPORT FOR THE DEPARTMENT OF SOCIAL PROTECTION 4 TH JANUARY 2013

REVIEW OF PENSION SCHEME WIND-UP PRIORITIES A REPORT FOR THE DEPARTMENT OF SOCIAL PROTECTION 4 TH JANUARY 2013 REVIEW OF PENSION SCHEME WIND-UP PRIORITIES A REPORT FOR THE DEPARTMENT OF SOCIAL PROTECTION 4 TH JANUARY 2013 CONTENTS 1. Introduction... 1 2. Approach and methodology... 8 3. Current priority order...

More information

Improving the Financeability and Attractiveness of Sustainable Energy Investments in Photovoltaics

Improving the Financeability and Attractiveness of Sustainable Energy Investments in Photovoltaics Solar Bankability Energy Efficiency Finance Market Place, Brussels, 19 January 2017 Improving the Financeability and Attractiveness of Sustainable Energy Investments in Photovoltaics David Moser, EURAC

More information

ANALYSIS OF RESPONSES TO REVIEW OF RAILTRACK EFFICIENCY

ANALYSIS OF RESPONSES TO REVIEW OF RAILTRACK EFFICIENCY ANALYSIS OF RESPONSES TO REVIEW OF RAILTRACK EFFICIENCY A Report for the Office of the Rail Regulator by Europe Economics Europe Economics Chancery House 53-64 Chancery Lane London WC2A 1QU Tel: 020 7831

More information

Thrive Renewables Plc

Thrive Renewables Plc ALL STREET. TRANSFORMING RESEARCH THE SOCIAL STOCK EXCHANGE ANNUAL RESEARCH BOOK JANUARY 2017 ALL RIGHTS RESERVED ALL STREET RESEARCH WWW.ALLSTREET.ORG Business Overview Established: 1994 Location: Bristol,

More information

The policy and regulatory aspects of a bankable solar power project. Uzbekistan Energy Forum, London 18 April 2018 Louis Skyner Partner

The policy and regulatory aspects of a bankable solar power project. Uzbekistan Energy Forum, London 18 April 2018 Louis Skyner Partner The policy and regulatory aspects of a bankable solar power project Uzbekistan Energy Forum, London 18 April 2018 Louis Skyner Partner Contents 1. The restriction of subsidies and policy priorities. 2.

More information