1 BC HYDRO S APPLICATION FOR 2004/05 AND 2005/06 REVENUE REQUIREMENTS BCOAPO et al. INFORMATION REQUESTS QUESTION 1 Reference: Application, Volume 1, Chapter 1, page 1-7, Tables 1-1 and 1-2 a) Please clarify what is included in low cost Heritage Resources b) Please provide the actual output from low cost Heritage Resources for each year from F1994 to F2003 inclusive and the forecast values for F2004, F2005 and F2006. c) Please explain the basis for the forecast values low cost Heritage Resources for F2004 through F2006. QUESTION 2 Reference: Application, Volume 1, Chapter 1, page 1-10, Table 1-3 Application, Volume 1, Chapter 2, page 2-6, Table 2-6 Application, Volume 2, Appendix F (Load Forecast) a) Please indicate the specific table(s) in the Load Forecast that are the source(s) for the sales forecast set out in Table 1-3. QUESTION 3 Reference: Application, Volume 1, Chapter 1, page 1-10, lines a) Please describe the reliability criteria (energy and capacity) that BC Hydro uses to establish the need for additional resources. b) Please provide a schedule setting out BC Hydro s overall supply/demand balance for F2004, F2005 and F2006 (based on existing and currently committed resource additions) and indicate the degree to which there is a surplus/deficit in each year. QUESTION 4 Reference: Application, Volume 1, Chapter 1, page 1-11, lines 5-6 and 17-18

2 - 2 - a) Please reconcile the claim that BC Hydro has achieved reliability at costs lower than most comparable utilities with the fact that the overall reliability of its distribution system is currently only 3 rd Quartile compared to US and 2 nd Quartile compared to Canadian utilities. b) Please provide the study or reference materials comparing BC Hydro s distribution system reliability with that of US and Canadian utilities. c) What are performance measures does BC Hydro use to monitor distribution system reliability? Please provide the annual results for each measure for the years 1994F to 2003F inclusive. d) For each of the measures identified in (c), has BC Hydro established a target level of performance and, if so, what is it. If not, why not? QUESTION 5 Reference: Application, Volume 1, Chapter 1, page 1-11, lines a) What are performance measures does BC Hydro use to monitor transmission system reliability? Please provide the annual results for each measure for the years 1994F to 2003F inclusive. b) For each of the measures identified in (a), has BC Hydro established a target level of performance and, if so, what is it. If not, why not? c) Please provide any available comparisons of BC Hydro s transmission reliability with that of other US or Canadian utilities. QUESTION 6 Reference: Application, Volume 1, Chapter 1, page 1-13, lines a) Please provide BC Hydro s estimate of the transaction costs associated with a second rate hearing. QUESTION 7 Reference: Application, Volume 1, Chapter 1, page 1-15, lines 7-17

3 - 3 - a) Please provide a schedule that indicates how much of the revenue requirement increase from 1994F to 2005F is due to each of these principal drivers and, in each case, provide an explanation as to why costs have increased. QUESTION 8 Reference: Application, Volume 1, Chapter 1, page 1-18, lines 7-8 and page 1-25 a) Please indicate where in the organizational structure the Materials Management Business Unit is located. QUESTION 9 Reference: Application, Volume 1, Chapter 1, page 1-20, lines 8-12 a) Please provide a schedule setting out the actual revenues under the existing WTS tariffs for 2003F and those forecast for 2004F through 2006F. Please provide a breakdown by the major sources. QUESTION 10 Reference: Application, Volume 1, Chapter 1, page 1-21, lines a) Please provide a schedule setting out the (actual/forecast) net revenues for Powertech Labs Inc. for the years 1999F to 2006F inclusive. b) Why is no reference made here to the BC Hydro Services Asset Corporation? Will BCH SAC have net revenues for 2003F through 2006F? If so please provide the actual/forecast values and indicate how they affect BC Hydro s revenue requirement. If not, why not? QUESTION 11 Reference: Application, Volume 1, Chapter 2, page 2-3

4 - 4 - a) Please indicate, for F2005, the costs associated with BCTC for each expense item shown in Table 2-2. The intent of this question is to obtain an understanding of the costs (by line item) that were removed from the revenue requirement as a result of the establishment of BCTC. QUESTION 12 Reference: Application, Volume 1, Chapter 2, page 2-5 a) If the special dividend is actually paid to the Province in F2004 why aren t the retained earnings and allowed return on equity adjusted accordingly at that time? QUESTION 13 Reference: Application, Volume 1, Chapter 2, page 2-8, Table 2-8 a) Please explain in more detail the basis for determining the values for each of following items and the year over year changes for the F2004 to F2006: Net Sales to Powerex and Point to Point Wheeling Charges to Powerex QUESTION 14 Reference: Application, Volume 1, Chapter 2, page 2-9,lines 9-10 and lines a) Please provide the inflow assumptions used for F2004 through F2006 and compare with the actual values for F2003. b) Please explain more fully why the average cost of market purchases is expected to decline in F2006 from F2005. QUESTION 15 Reference: Application, Volume 1, Chapter 2, page 2-10, Table 2-10 and page 2-11 a) Is the forecasted OM&A expense for BCTC for F2006 $163 M?.

5 - 5 - QUESTION 16 Reference: Application, Volume 1, Chapter 2, page 2-10, Table 2-10 a) Please provide schedule setting and explaining the major contributing factors to the $52 M increase in OM&A from F2003 to F2004. QUESTION 17 Reference: Application, Volume 1, Chapter 2, page 2-13, Table 2-12 a) Please explain the significant increase in finance charges capitalized from F2005 to F2006. QUESTION 18 Reference: Application, Volume 1, Chapter 2, page 2-16 a) Please provide explain the reasons for the increase in depreciation and amortization expense from F2003 to F2004. QUESTION 19 Reference: Application, Volume 1, Chapter 2, page 2-16, lines a) Please explain why there is a $7M increase in depreciation in F2005 for a CIS system that came into service in December 2003 (i.e. F2004). QUESTION 20 Reference: Application, Volume 1, Chapter 2, page 2-18, lines 9-15 a) Please explain why, for ratemaking purposes, the increase in retained earnings attributable to the change in accounting policy should not be amortized over a fixed period and, thereby, reduce the revenue requirement. It seems customers are being asked to pay three times for the same expense: once when the original provisions for

6 - 6 - QUESTION 21 FRSR were made; a second time when the resulting net increase in retained earnings is allowed a return on equity and, a third time, when assets that do not have ARO liabilities are dismantled. Reference: Application, Volume 1, Chapter 2, page 2-16, line 18 a) Please provide a copy of the depreciation study supporting the change in useful life. QUESTION 22 Reference: Application, Volume 1, Chapter 2, page 2-22, lines a) How does BC Hydro s propose to define and determine variable operating costs (line 16 and, also, page 2-23, lines 3-4)? b) Please provide a schedule, based on actual F2003 vs. BC Hydro s approved budget for F2003, setting out the events and their associated costs that would have met the following proposed criteria: Major maintenance expenditures greater than $1 million, related to a single event equipment or infrastructure failure (lines 17-18); Major operating, maintenance or general and administrative expenses greater than $ 1 million related to single weather-related events (lines 19-20); and Major capital expenditures incurred or advanced related to a single event equipment or infrastructure failure or weather-related events with an incremental impact on annual depreciation and finance charges greater than $ 1 million (lines 21-23). c) Why not also capture in the Heritage Deferral Account the impact (e.g. greater than $ 1 million) on depreciation and finance charges of any major delays or postponements in major capital expenditures or maintenance expenditures relative to those included in the revenue requirements application? QUESTION 23 Reference: Application, Volume 1, Chapter 2, page 2-22, lines 8-11

7 - 7 - a) Please outline how the actual Heritage Energy (i.e., the GWh s) will be established for purposes of the deferral account, e.g., will it be set at the forecast value as was done for Illustrative purposes in Appendix E of the April 30, 2003 Proposal? b) Please provide illustrative examples based on the F2006 forecast of how the actual Heritage Energy will be established in cases where: Thermal output from Heritage Resources and/or market purchases to meet load are higher than forecast as a result of either increased domestic load, increased use in lieu of non-heritage Resources, or lower hydraulic generation than forecast Thermal output from Heritage Resources and/or market purchases to meet load are lower than forecast as a result of either lower domestic load, lower use in lieu of non-heritage Resources, or higher hydraulic generation than forecast QUESTION 24 Reference: Application, Volume 1, Chapter 2, page 2-36, lines a) Please explain why it is appropriate to only include sustaining capital expenditures in the allocation base for General Costs as opposed to all Capital Expenditures. QUESTION 25 Reference: Application, Volume 1, Chapter 2, page 2-27, lines a) This allocation assumes that the benefits are split equally between the two units on an absolute dollar basis. Please explain why this approach is more reasonable than a proportional allocation which would assume that the benefits are proportion to the total costs associated with each line of business. QUESTION 26 Reference: Application, Volume 1, Chapter 2, page 2-43 a) Please provide a schedule that reconciles the capital asset expenditures shown here for F2003 to F2006 inclusive with the capital asset expenditures reported in the various Schedule D s.

8 - 8 - QUESTION 27 Reference: Application, Volume 1, Chapter 2, page 2-48 a) Does BC Hydro receive revenues for pole rentals to third parties and, if so, how and where are they recorded? b) Does BC Hydro receive non-tariff revenue from domestic customers such as administration fees, connection/re-connection fees or late payment fees and, if so, how and where are they recorded. Also, if so, please provide the values for F2003 through F2006. QUESTION 28 Reference: Application, Volume 1, Chapter 2, page 2-54 a) Please explain why both the Balance for CIAC and the Accumulated Amortization are adjusted for retirements. QUESTION 29 Reference: Application, Volume 1, Chapter 2, pages a) The cross-references shown for Other (i.e., C-3); Miscellaneous External Revenues (i.e., A-3); and Transmission 3 rd Party Wheeling Revenues (i.e., A-8) don t appear to reconcile with the totals reported in Schedule B for each of the lines. Please provide a reconciliation. b) Please provide a schedule setting out the allocation of total Miscellaneous Revenues, Other Energy Sales (i.e., Long Term Contracts) and Trade Income as per Schedule A.1 to functions for each year F2003 to F2006. QUESTION 30 Reference: Application, Volume 1, Chapter 2, page 2-64 a) Please provide a schedule for each year F2003 to F2006 setting out the OM&A - by function broken down as to:

9 - 9 - QUESTION 31 Direct Support Corporate Allocations (less) Capitalized (less) Recoveries Internal (less) Recoveries External Total Reference: Application, Volume 1, Chapter 2, page 2-81, Schedule D1-3 a) Please provide a schedule that fully reconciles for each year (F2003 F2006), the cost of the Heritage Contract as shown in Schedule B (e.g. $1,052.6 M for F2006) with the cost shown in Schedule D1-3 & Table 5-1 (e.g., $1,138.2 M for F2006). QUESTION 32 Reference: Application, Volume 1, Chapter 2, page 2-92 b) Is there any reduction in Corporate Costs for BC Hydro as a result of the separation of BCTC? If not, why not? If yes, please provide an estimate of the reduction for F2006. QUESTION 33 Reference: Application, Volume 1, Chapter 2, pages a) Please provide schedule setting out BC Hydro s capital expenditures for the years F2003 to F2006, by function and by class of expense (i.e., sustaining vs. growth). b) Please provide a schedule setting out the head count for each function for F1999 to F2006. c) Please provide a definition of what is meant by head count. Does it include just full-time staff and/or just permanent staff? If so, please provide the annual full time equivalent employee values (F1999 to F2006) based on all staffing resources employed.

10 QUESTION 34 Reference: Application, Volume 1, Chapter 3, page 3-35, Table 3-17 and page 3-36, Table 3.18 a) Please explain the significantly higher Allocation from Distribution Corporate in OM&A costs for F2004 and in head count for F2003. QUESTION 35 Reference: Application, Volume 1, Chapter 3, page 3-37, lines and Table 3-20 a) Please indicate how much of the increase in head count and OM&A was due to the transfer of the Environmental Management and Governance Group. Also, please indicate where the Group was transferred from (i.e., which business unit will have experienced a corresponding reduction in OM&A and head count?) QUESTION 36 Reference: Application, Volume 1, Chapter 3, page 3-38, lines 3-6 a) Is the head count (and OM&A) associated with Risk Management new or was it transferred from other lines of business? QUESTION 37 Reference: Application, Volume 1, Chapter 3, page 3-42 a) Please explain the increase in headcount for Treasury for F2004 over F2003. QUESTION 38 Reference: Application, Volume 1, Chapter 3, page 3-49 a) Please explain the increase in head count (F2003 F2005) for Corporate Sustainability.

11 QUESTION 39 Reference: Application, Volume 1, Chapter 3, page 3-59, Table 3-41 a) Please indicate for F2004 through F2006, the changes (increase or decreases) in headcount for each Corporate Group that were the result of staff being transferred in from another line of business or being transferred out to another line business. In each case, please indicate the sending/receiving line of business. QUESTION 40 Reference: Application, Volume 1, Chapter 4, page 4-2, Table 4-1 a) Please provide the values for Table 4-1 for the years F2003 and F2004. QUESTION 41 Reference: Application, Volume 1, Chapter 4, page 4-17, Table 4-6 Application, Volume 1, Chapter 4, page 4-27, Table 4-11 a) Please provide a schedule that reconciles the energy supplied by IPPS and other long-term purchases as shown in Table 4-6 with the energy purchases shown in the Tables 4-4 and 4-5. b) Please reconcile the differences between the Pre-F2001 purchases shown in Tables 4-4 and c) Please reconcile the total purchases volumes as shown in Schedule A-9 (e.g., F2006-7,003 GWh), Tables 4-4 & 4-5 (e.g. F GWh) and Table 4-11 (e.g. F2006 6,995 GWh). QUESTION 42 Reference: Application, Volume 1, Chapter 4, page 4-22, Table 4-8 a) Please provide the specific table reference to the Load Forecast (Appendix F) from which the data was taken. (Note: While the values for Peak Load Requirements

12 QUESTION 43 match those shown in Table 5.1 of the Load Forecast, the values for Electricity Requirements do not) Reference: Application, Volume 1, Chapter 5, page 5-2, lines 13-19; page 4-17, Table 4-6 and page 4-18, Table 4-7 a) Please explain why the forecast energy under the Heritage Contract for F2006 is only 47,616 GWh. In doing so, please outline BC Hydro s inflow and initial reservoir elevation assumptions for F2005 and F2006 and contrast them with those used to develop the Heritage Contract proposal. b) Please explain why the total forecast supply of energy under the Heritage Contract for F2006 is 1,384 GWh (i.e., 49,000 47,616) less that that provided in the original proposal when the hydraulic production forecast from Heritage Resources is only 382 GWh (i.e. 46,635 46,253 {see Table 4-11}) less than that used in the original proposal. c) Please explain how the volumes for thermal production and market purchases associated with the Heritage Contract are established. d) Are the non-heritage Resources shown in Table 4-11 all take or pay? Please discuss the extent to which the production the Heritage Energy is determined as the difference between domestic demand and commitments made for purchases from non-heritage sources. QUESTION 44 Reference: Application, Volume 1, Chapter 5, page 5-3, Table 5-2 a) Please provide the values for F2003 and F2004. b) Please provide a schedule setting out for F2003 through F2006 the volumes (GWh) associated with Heritage Hydro, Thermal Hydro (by station) and Market Purchases. QUESTION 45 Reference: Application, Volume 1, Chapter 5, page 5-15, lines 15-21

13 a) Please explain how trade revenue that could have been produced had all generation needed to meet domestic load and trade opportunities been available is determined. QUESTION 46 Reference: Application, Volume 1, Chapter 5, pages 5-26 to 5-27 a) Pleases outline the extent to which the Reliability Centred Maintenance and Equipment Health Rating initiatives were relied on to development the maintenance and capital programs included in the Application. b) Does BC Hydro expect full implementation of these programs to have a material effect on it resource requirements for capital or maintenance? Please explain. QUESTION 47 Reference: Application, Volume 1, Chapter 6, page 6-7, Table 6-1 a) Please extend Table 6-1 back to F2001. b) For F2005 and F2006, please indicate the split of costs between BC Hydro and BCTC for each line item. c) Please reconcile the F2006 total shown in Table 6-1 ($590.1 M) with the total transmission costs reported in Schedule C3 ($589.8 M) and in Schedule B-3 ($ {i.e., $399.8+$116.7+$61.0}). d) Please provide the head count for each OM&A function for each year F2004 through F2006. QUESTION 48 Reference: Application, Volume 1, Chapter 6, page 6-10, Table 6-4 a) Please provide the head count for each transmission function identified in Table 6-4 for the years F2004 through F2006. QUESTION 49 Reference: Application, Volume 1, Chapter 6, page 6-20, Table 6-6

14 a) Please provide the values for the three categories shown in the Table for F1999 to F2003. QUESTION 50 Reference: Application, Volume 1, Chapter 6, page 6-20, lines a) Please provide copies of the studies/assessments that substantiate the claim that the risk of service outages is increasing due to tree growth at the edge of the transmission lines easement. In addition, please provide the analysis used to determine that $3 M was required to address the issue. QUESTION 51 Reference: Application, Volume 1, Chapter 6, page 6-21, lines 9-14 a) Please provide copies of the studies/assessments that substantiate the claim that BCTC needs to perform additional ongoing maintenance to extend the asset life of ageing transmission infrastructure. b) Why are the activities identified considered incremental to ongoing transmission maintenance requirements? QUESTION 52 Reference: Application, Volume 1, Chapter 6, page 6-21, lines a) Please provide a history of unexpected maintenance expenditures (e.g., F1999 F2003) to substantiate the $2 M / annum value. QUESTION 53 Reference: Application, Volume 1, Chapter 6, page 6-21, lines a) Please provide a copy of the most recent Asset Maintain/Sustain Investment Plan.

15 QUESTION 54 Reference: Application, Volume 1, Chapter 6, page 6-26, Figure 6-1 a) Has BC Hydro established any targets as to % of assets in each category that should be characterized as poor on a long-term basis? If so please provide the targets and their underlying rationale. QUESTION 55 Reference: Application, Volume 1, Chapter 6, page 6-33, lines a) Please provide any supporting information BC Hydro has demonstrating that: On average its transmission equipment is ageing, and Its transmission equipment is older than that of the other utilities used for benchmarking purposes in Table 6-8. QUESTION 56 Reference: Application, Volume 1, Chapter 6, page 6-9, Tables 6-2 and 6-3 a) Please describe the accounting changes leading to the $14.9 M increase for F2004 (Table 6-3) and indicate whether they are one-time costs or will have an ongoing impact beyond F2004. b) Please confirm that in Table 6-2 the one-time BCTC establishment cost for F2004 is reported under General Administration. c) Please provide a schedule that breaks down each of the line items is Table 6-2 for F2005 and F2006 between BC Hydro and BCTC. d) For F2003 through F2006 please provide the head count associated with each of the first four line items shown in Table 6-2. For 2005 and 2006, please separate the head count between BC Hydro and BCTC. e) Please explain the difference between the annual values reported for BC Hydro Rights Management, Properties and Asset Retirement Obligation as reported in Table 6-2 and the annual values for BC Hydro Transmission Costs Rights Management and Property Services as shown in Table 6-9.

16 QUESTION 57 Reference: Application, Volume 1, Chapter 6, page 6-41, lines 8-9 a) Did the establishment of BCTC result in the transfer of any staff from BC Hydro s corporate functions to BCTC s corporate functions? If yes, how many staff were transferred and from what functional areas? b) Did the establishment of BCTC lead to a reduction in head count for BC Hydro s corporate functions? If so, how many and from what functional areas? QUESTION 58 Reference: Application, Volume 1, Chapter 6, page 6-41, line 24 to page 6-42, line 2 a) Has there been a rationalization of BC Hydro office space since the relocation of these 150 employees? If yes, please indicate the annual cost reduction for BC Hydro and where it is reported in the Application. If no, why not? b) The referenced text accounts for 290 of BCTC s staff, is this the same 290 discussed on lines 7-8 of page 6-41? QUESTION 59 Reference: Application, Volume 1, Chapter 6, page 6-43, Table 6-10 a) Is there a difference between the FTE as used in this table versus Head Count, as presented in other tables throughout the Application? If so, please explain. b) Please indicate the allocation of the 36 new positions to the various organization units. QUESTION 60 Reference: Application, Volume 1, Chapter 6, page 6-44, Table 6-12 a) Please confirm whether the $7.5 M funding for additional personnel is the cost of the 36 new positions identified on page 6-41.

17 QUESTION 61 Reference: Application, Volume 1, Chapter 6, page 6-46, Table 6-15 a) Please provide the annual totals for Growth Capital and Sustaining Capital back to F1999. QUESTION 62 Reference: Application, Volume 1, Chapter 6, page 6-48, lines 1-6 a) Please provide any information BC Hydro has on other utilities Capital Replacement Ratios for Transmission. b) Please provide the annual CRR for F1999 through F2006. QUESTION 63 Reference: Application, Volume 1, Chapter 6, page 6-74, Table 6-21 a) Please provide the tables values for F2001 through F2003 b) Please indicate for each year F2001 through F2006, what proportion of ancillary services are purchased from BC Hydro and indicate how this revenue is factored into BC Hydro s revenue requirement. QUESTION 64 Reference: Application, Volume 1, Chapter 6, page 6-79, Table 6-25 and page 6-80, lines 9-17 a) For F2005 and F2006 please indicate for each line in Table whether the cost recoveries and non WTS revenues accrue to BC Hydro or BCTC. b) Does $2.6 M in F2006 represent BC Hydro s complete cost of distribution dispatch or does it also provide part of the distribution dispatch function. If BC Hydro provides part of the distribution dispatch function please indicate: What services are provided by BCTC versus what is self-provided by BC Hydro? Why it more cost-effective for BCTC to provide the services it does? and

18 What are the annual costs for F2005 and F2006 for the BC Hydro s distribution dispatch activities? c) Does $1.1 M in F2006 represent BC Hydro s complete cost of generation dispatch or does it also provide part of the generation dispatch function. If BC Hydro provides part of the generation dispatch function please indicate: What services are provided by BCTC versus what is self-provided by BC Hydro? Why it more cost-effective for BCTC to provide the services it does? and What are the annual costs for F2005 and F2006 for the BC Hydro s generation dispatch activities? QUESTION 65 Reference: Application, Volume 1, Chapter 6, page 6-81, Table 6-26 and page 6-82, Table 6-27 a) Please confirm that the $106.3 M Service Fee to BCTC shown in Table 6-26 is established simply on the basis of BCTC overall net funding requirements for F2005, after allowing for other revenues and cost recoveries. b) Please explain how costs/charges associated with each of the three components of the Asset Management Fee to BCTC for F2006 are determined. QUESTION 66 Reference: Application, Volume 1, Chapter 6, page 6-85, Table 6-29 a) Please confirm that for F2006, the portion of the TRR to be recovered from BC Hydro will be established through the application of the WTS rates. If this is not the case, please explain how the portion of the TRR to be recovered from BC Hydro ( and its customers) will be determined. b) For each of the 5 line items in the bottom half of the Table, please indicate the amount that is expected to be recovered from BC Hydro through application of the WTS rates and describe how each amount was determined. QUESTION 67 Reference: Application, Volume 1, Chapter 7, page 7-3, lines 7-8; page 7-5, lines 5-6 and page7-37, lines 8-11.

19 a) Please provide data for the period F1999 to F2006 to demonstrate that the (average) age of the Distribution infrastructure is increasing and/or increasing proportions of BC Hydro s distribution assets are reaching or exceeding design life. QUESTION 68 Reference: Application, Volume 1, Chapter 7, page 7-11, lines and page 7-15, Table 7-1 a) Please break down the Direct and Support operating expenses shown in Table 7-1 and indicate the costs associated with Field Services. b) Please provide the annual values for Table 7-1 back to F2001. QUESTION 69 Reference: Application, Volume 1, Chapter 7, page 7-15, Table 7-2 a) Please provide the annual values for Table 7-2 back to F2001 b) Does BC Hydro track connection costs per customer for performance or cost management purposes? If so, please provide the history back to F2001. If not, why not? QUESTION 70 Reference: Application, Volume 1, Chapter 7, page 7-16, Table 7-3 a) Does the head count shown include Field Services providing services to Customer Projects? If so, please separate out. b) Please provide the annual values back to F2001. QUESTION 71 Reference: Application, Volume 1, Chapter 7, page 7-17, lines and page 7-21, Table 7-5 a) Please break down the Direct and Support operating expenses shown in Table 7-5 and indicate the cost associated with Field Services and Engineering Services.

20 b) Please provide the annual values for Table 7-5 back to F2001. QUESTION 72 Reference: Application, Volume 1, Chapter 7, page 7-21, Table 7-6 a) Please provide the annual values for Table 7-6 back to F2001. QUESTION 73 Reference: Application, Volume 1, Chapter 7, page 7-22, Table 7-7 a) Please confirm whether Table 7-7 just contains the Distribution Operation s staff or also reflects the head count for support provided by Field Services and Engineering Services. b) Please provide the annual values back to F2001. QUESTION 74 Reference: Application, Volume 1, Chapter 7, page 7-23, lines and page 7-37, Table 7-10 a) Please breakdown the Direct and Support operating expenses in Table 7-10 and indicate the portions associated with Field Services and Asset Management. b) Please provide the annual values for Table 7-10 back to F2001. QUESTION 75 Reference: Application, Volume 1, Chapter 7, page 7-30, Table 7-9 and page 7-31, Figure 7-34 a) Please provide a schedule setting out the calculation of the Electricity Distribution Cost per Customer shown in Table 7-9. b) Please explain the difference between the Electricity Distribution Cost per Customer for BC Hydro shown in Table 7-9 versus that shown in Figure 7-34 for F2005.

21 QUESTION 76 Reference: Application, Volume 1, Chapter 7, page 7-38, Table 7-12 a) Please confirm whether Table 7-12 just contains the Asset Managment s staff or also reflects the head count for support provided by Field Services and Engineering Services. QUESTION 77 Reference: Application, Volume 1, Chapter 7, page 7-39, Tables 7-13, 7-14 and 7-15 a) Please provide the annual values for all three tables back to F2001. QUESTION 78 Reference: Application, Volume 1, Chapter 7, page 7-40 a) Please clarify whether or not BC Hydro s Application includes proposed changes to the rates applicable to Non-Integrated Areas. QUESTION 79 Reference: Application, Volume 1, Chapter 8, page 8-7, Tables 8-1 & 8-2 and Appendix N, page 48 a) Please provide the annual vales for Tables 8-1 and 8-2 back to F2001. b) Please extend the Table on page 48 of Appendix N back to F2001. c) Please indicate, with reference to Appendix N, for which programs the Power Smart Youth Hires were made. QUESTION 80 Reference: Application, Volume 1, Chapter 8, page 8-10, lines 7-10; page 8-16, Table 8-7 and page 8-17, lines 3-7

22 a) What are the critical service level targets ABS is required to meet? b) Please describe the conditions under which ABS would be subject to financial penalties and what the scope of such penalties could entail. c) Does the contract with ABS include any bonuses that are linked to performance? If so, please describe what they are. QUESTION 81 Reference: Application, Volume 1, Chapter 8, page 8-19, Table 8-9 a) Please provide the annual values for Table 8-9 back to F2001. QUESTION 82 Reference: Application, Volume 1, Chapter 8, page 8-20, Table 8-11 a) Are there any performance targets for ABS with respect to bad debt management? If so, what are they? QUESTION 83 Reference: Application, Volume 1, Chapter 8, page 8-22, lines 3-16 a) Please provide the original business case and budget for the Northstar Project. b) Please indicate what the in-service cost of the project is and provide an explanation of any major variances from budget. QUESTION 84 Reference: Application, Volume 1, Chapter 9, page 9-11, Table 9-1 and page 9-12, Table 9-2 a) Please provide the annual values for both tables back to F2001.

23 QUESTION 85 Reference: Application, Volume 1, Chapter 9, page 9-18, Table 9-4 a) Are the costs shown in Table 9-4 charged to internal units as an OM&A expense and then the decision as to whether the costs will be expensed to current operations or capitalized is made by the line business receiving the charge? b) What proportion of Engineering Services were capitalized for each year from F2001 through F2006? QUESTION 86 Reference: Application, Volume 1, Chapter 9, page 9-33, lines 8-10 a) Please provide a copy of the 2003 PA Consulting T&D Best Practices Survey. QUESTION 87 Reference: Application, Volume 1, Chapter 9, page 9-50, Table 9-19 a) Please provide a schedule showing the derivation of Trade Income for F2003 through F2006 using the formula set out in BC Hydro s Heritage Contract Proposal (April 30 th, 2003), Volume 1, page 25. QUESTION 88 Reference: Application, Volume 1, Chapter 9, page 9-56, lines a) Please provide the analyses supporting the gross and net savings estimates associated with the ABS agreement. QUESTION 89 Reference: Volume 2, Appendix I, Power Smart 10-Year Program a) Please list the recipients of the industrial sector power smart partner and load displacement incentives planned for 2004/05 and 2005/06.

24 b) Please provide the specific rate impact evaluations that were undertaken in support of each of the incentives planned for 2004/05 and 2005/06. c) Please provide summaries of life cycle environmental impact assessments associated with the planned initiatives. d) Please provide a summary of the major assumptions used in these evaluations with respect to: -the probability that the measures would otherwise be undertaken, at some point over the planning period (i.e. free rider/persistence assumptions) -project performance -future customer load with and without power smart initiative -the seasonal and daily pattern of the program impact e) Please provide for the Weyerhaeuser/ Kamloops 30 MW turbo generator and Canfor/Prince George 48 MW turbo generator load displacement projects announced this past year: (i) the specific rate impact evaluations that were undertaken in support of the incentives to be provided; (ii) a summary of the major assumptions used in the evaluations; (iii) a summary of the major contract provisions regarding payment schedule, performance, liquidated damages, scheduled and unscheduled maintenance, work stoppages or plant shutdowns; (iv) a summary of any differences in the main contract provisions used in new supply calls and these projects; (v) the reasons why these projects were not bid into or selected in BC Hydro s Customer-Based Generation Call in 2002; (vi) the effect these projects are expected to have on the timing and amount of new supply acquisitions, imports and exports (vii) a summary of the life cycle environmental impact these projects are expected to have. QUESTION 90 Reference: BC Hydro Response to BCUC Information Request 1.55 a) What assurances does BC Hydro have from BCUC or its customers that the effect of industrial power smart initiatives will be matched by a reduction in the recipient customers base load (tier 1 purchases)? b) Please provide any reports or recommendations Power Smart has prepared regarding how stepped rates should be implemented to maximize customers incentive to conserve?

25 c) What is BC Hydro s latest impact of industrial and total conservation potential, as defined in its conservation potential update report, taking stepped rates into account? QUESTION 91 Reference: BC Hydro Response to BCUC Information Request 1.50 a) Does a RIM test result of less than 1 indicate that non-participants are worse off as a result of the initiative? b) What RIM test result would BC Hydro require to acquire a new resource? c) What is the definition of utility benefits and costs used for calculating the utility test benefit-cost ratio? If lost revenues are ignored, why is the utility benefit-cost ratio calculated and used for evaluation purposes?

Revenue Requirement Application 2004/05 and 2005/06. Volume 1. Chapter 2. Consolidated Revenue Requirements and Financial Schedules

Revenue Requirement Application 2004/05 and 2005/06. Volume 1. Chapter 2. Consolidated Revenue Requirements and Financial Schedules Revenue Requirement Application 00/0 and 00/0 Volume 1 Chapter. Consolidated Revenue Requirements and Financial Schedules Table of Contents LIST OF FIGURES... -IV LIST OF TABLES... -IV LIST OF SCHEDULES...-V

More information

British Columbia Hydro and Power Authority

British Columbia Hydro and Power Authority 2017/18 THIRD QUARTER REPORT MANAGEMENT S DISCUSSION AND ANALYSIS This Management s Discussion and Analysis (MD&A) reports on British Columbia Hydro and Power Authority s (BC Hydro or the Company) consolidated

More information

British Columbia Hydro and Power Authority

British Columbia Hydro and Power Authority 2016/17 SECOND QUARTER REPORT MANAGEMENT S DISCUSSION AND ANALYSIS This Management s Discussion and Analysis (MD&A) reports on British Columbia Hydro and Power Authority s (BC Hydro or the Company) consolidated

More information

BC Hydro FIrST QUArTEr report FISCAL 2015

BC Hydro FIrST QUArTEr report FISCAL 2015 BC Hydro FIRST QUARTER REPORT FISCAL 2015 BC Hydro & Power Authority Management S Discussion and Analysis This Management s Discussion and Analysis (MD&A) reports on British Columbia Hydro and Power Authority

More information

2.0 Reference: Application, Volume I, Chapter 2, Consolidated Revenue Requirements and Financial Schedules

2.0 Reference: Application, Volume I, Chapter 2, Consolidated Revenue Requirements and Financial Schedules 1 2.0 Reference: Application, Volume I, Chapter 2, Consolidated Revenue Requirements and Financial Schedules 2.2 2-3, Table 2-2: Please indicate for Columns C and D whether or not an average expected value

More information

BChgdro. lor\js. FOR GEt\JE B-1. September 30,2009

BChgdro. lor\js. FOR GEt\JE B-1. September 30,2009 BChgdro FOR GEt\JE lor\js B-1 Joanna Sofield Chief Regulatory Officer Phone: (0) -0 Fax: (0) -0 bchydroregulatorygroup@bchydro.com September 0,009 Ms. Erica M. Hamilton Commission Secretary British Columbia

More information

Long-Term Rate Forecast

Long-Term Rate Forecast Long-Term Rate Forecast OVERVIEW This brief provides background information on the Long-Term Rate Forecast (LTRF) used in the 2011 Integrated Resource Plan (IRP). It is similar to the report filed as Attachment

More information

Filing Guidelines for Ontario Power Generation Inc.

Filing Guidelines for Ontario Power Generation Inc. Ontario Energy Board Commission de l énergie de l Ontario EB-2009-0331 Filing Guidelines for Ontario Power Generation Inc. Setting Payment Amounts for Prescribed Generation Facilities Issued: July 27,

More information

FIRST QUARTER REPORT. YEAR-TO-DATE RESULTS For the period ended June 30, 2017

FIRST QUARTER REPORT. YEAR-TO-DATE RESULTS For the period ended June 30, 2017 FIRST QUARTER REPORT YEAR-TO-DATE RESULTS For the period ended OPERATIONAL HIGHLIGHTS The CNSC staff assessed NB Power s licence application and confirmed that the safety measures in place at PLNGS meet

More information

Filing Guidelines for Ontario Power Generation Inc.

Filing Guidelines for Ontario Power Generation Inc. Ontario Energy Board Commission de l énergie de l Ontario EB-2011-0286 Filing Guidelines for Ontario Power Generation Inc. Setting Payment Amounts for Prescribed Generation Facilities Issued: July 27,

More information

Ontario Energy Board

Ontario Energy Board Ontario Energy Board Commission de l énergie de l Ontario Ontario Energy Board Filing Requirements For Electricity Transmission Applications Chapter 2 Revenue Requirement Applications February 11, 2016

More information

Filing Guidelines for Ontario Power Generation Inc.

Filing Guidelines for Ontario Power Generation Inc. Ontario Energy Board Commission de l énergie de l Ontario EB-2009-0331 Filing Guidelines for Ontario Power Generation Inc. Setting Payment Amounts for Prescribed Generation Facilities Issued: July 27,

More information

INTERIM MANAGEMENT DISCUSSION AND ANALYSIS For the Three and Six Month Periods Ended June 30, 2017

INTERIM MANAGEMENT DISCUSSION AND ANALYSIS For the Three and Six Month Periods Ended June 30, 2017 Second Quarter 2017 INTERIM MANAGEMENT DISCUSSION AND ANALYSIS For the Three and Six Month Periods Ended June 30, 2017 Dated July 28, 2017 The following interim Management Discussion and Analysis ( MD&A

More information

BC HYDRO S ANNUAL REPORT 2007 REPORTING ON OUR TRIPLE BOTTOM LINE PERFORMANCE MAKE A DIFFERENCE

BC HYDRO S ANNUAL REPORT 2007 REPORTING ON OUR TRIPLE BOTTOM LINE PERFORMANCE MAKE A DIFFERENCE BC HYDRO S ANNUAL REPORT 2007 REPORTING ON OUR TRIPLE BOTTOM LINE PERFORMANCE MAKE A DIFFERENCE c o n t e n t s About BC Hydro and this Report... 4 Message from the Chair and President and CEO... 5 Business

More information

HYDRO-QUÉBEC DISTRIBUTION S RESPONSE TO

HYDRO-QUÉBEC DISTRIBUTION S RESPONSE TO HYDRO-QUÉBEC DISTRIBUTION S RESPONSE TO THE RÉGIE S INFORMATION REQUEST #1 pages 13 to 41 Translation commissioned by Association québécoise des consommateurs industriels d électricité (AQCIE) and Québec

More information

Ontario Energy Board

Ontario Energy Board Ontario Energy Board Commission de l énergie de l Ontario Ontario Energy Board Filing Requirements For Electricity Distribution Rate Applications - 2015 Edition for 2016 Rate Applications - Chapter 2 Cost

More information

Portland General Electric Reports 2017 Financial Results and Initiates 2018 Earnings Guidance

Portland General Electric Reports 2017 Financial Results and Initiates 2018 Earnings Guidance February 16, 2018 Portland General Electric Reports 2017 Financial Results and Initiates 2018 Earnings Guidance Full-year 2017 financial results on target excluding the effects of the Tax Cuts and Jobs

More information

Preliminary 2011 Revenue Requirements. Appendix B. Accounting Changes

Preliminary 2011 Revenue Requirements. Appendix B. Accounting Changes Accounting Changes Accounting Changes This section discusses the developments and implementation of accounting guidance under Canadian Generally Accepted Accounting Principles ( GAAP ) and International

More information

Quarterly Management Report. First Quarter 2010

Quarterly Management Report. First Quarter 2010 Quarterly Management Report First Quarter 2010 INTERIM MANAGEMENT DISCUSSION and ANALYSIS For the Three Months Ended March 31, 2010 This interim Management Discussion and Analysis ( MD&A ) dated April

More information

Nova Scotia Utility and Review Board. Section 2

Nova Scotia Utility and Review Board. Section 2 Nova Scotia Utility and Review Board IN THE MATTER OF The Public Utilities Act, R.S.N.S. 1989, c.380, as amended - and - IN THE MATTER OF an Application by Nova Scotia Power Incorporated for Approval of

More information

PAYMENTS IN LIEU OF CORPORATE INCOME TAXES

PAYMENTS IN LIEU OF CORPORATE INCOME TAXES Filed: September 0, 00 EB-00-0 Tab Page of PAYMENTS IN LIEU OF CORPORATE INCOME TAXES.0 INTRODUCTION Under the Electricity Act,, Hydro One Networks Inc. ( Networks ) is required to make payments in lieu

More information

INFORMATION RELEASE BCUC responds to BC Hydro s comments on the Site C Inquiry Final Report November 28, 2017

INFORMATION RELEASE BCUC responds to BC Hydro s comments on the Site C Inquiry Final Report November 28, 2017 INFORMATION RELEASE BCUC responds to BC Hydro s comments on the Site C Inquiry Final Report November 28, 2017 Vancouver The British Columbia Utilities Commission (BCUC) has responded to the letter from

More information

NOVA SCOTIA UTILITY AND REVIEW BOARD THE PUBLIC UTILITIES ACT REDACTED INFORMATION REQUESTS

NOVA SCOTIA UTILITY AND REVIEW BOARD THE PUBLIC UTILITIES ACT REDACTED INFORMATION REQUESTS M0 NOVA SCOTIA UTILITY AND REVIEW BOARD IN THE MATTER OF: THE PUBLIC UTILITIES ACT IN THE MATTER OF: -anda hearing into Nova Scotia Power Incorporated s 1-1 Fuel Stability Plan and Base Cost of Fuel Reset

More information

BRITISH COLUMBIA HYDRO AND POWER AUTHORITY

BRITISH COLUMBIA HYDRO AND POWER AUTHORITY BRITISH COLUMBIA HYDRO AND POWER AUTHORITY Financial Information Act Return for the Year Ended March 31, 217 Published in accordance with the Financial Information Act, Revised Statutes of British Columbia

More information

FEVI DEFERRAL ACCOUNT PEC EXHIBIT A2-3

FEVI DEFERRAL ACCOUNT PEC EXHIBIT A2-3 ERICA HAMILTON COMMISSION SECRETARY Commission.Secretary@bcuc.com web site: http://www.bcuc.com VIA EMAIL gas.regulatory.affairs@fortisbc.com April 4, 2013 SIXTH FLOOR, 900 HOWE STREET, BOX 250 VANCOUVER,

More information

NB Power Accounting Policy Property Plant & Equipment

NB Power Accounting Policy Property Plant & Equipment Attachment NBEUB IR-40 Accounting_Policy_Property_Plant _and_equipment NB Power Accounting Policy Property Plant & Equipment Scope This accounting policy addresses the following property, plant, and equipment

More information

INFORMATION RELEASE BCUC Receives Comments from BC Hydro on Site C Inquiry Final Report November 24, 2017

INFORMATION RELEASE BCUC Receives Comments from BC Hydro on Site C Inquiry Final Report November 24, 2017 Suite 410, 900 Howe Street Vancouver, BC Canada V6Z 2N3 bcuc.com P: 604.660.4700 TF: 1.800.663.1385 F: 604.660.1102 INFORMATION RELEASE BCUC Receives Comments from BC Hydro on Site C Inquiry Final Report

More information

Revenue Requirement Application 2004/05 and 2005/06. Volume 2

Revenue Requirement Application 2004/05 and 2005/06. Volume 2 Revenue Requirement Application 2004/05 and 2005/06 Volume 2 Appendix K. BC Hydro Transfer Pricing Agreement Fiscal year 2004 TRANSFER PRICING AGREEMENT FOR ELECTRICITY AND GAS This Agreement is dated

More information

Portland General Electric

Portland General Electric Portland General Electric Earnings Conference Call Fourth Quarter and Full-Year 2017 Cautionary Statement Information Current as of February 16, 2018 Except as expressly noted, the information in this

More information

BC Hydro Revenue Requirements Application Evidence #1

BC Hydro Revenue Requirements Application Evidence #1 BC Hydro Revenue Requirements Application Evidence #1 BCUC Project No.: 3698430 By: Ludo Bertsch, Horizon Technologies Inc. For: ESVI Energy Solutions for Vancouver Island Society Date: Oct 6, 2006 Background

More information

STATE OF MINNESOTA BEFORE THE MINNESOTA PUBLIC UTILITIES COMMISSION. LeRoy Koppendrayer

STATE OF MINNESOTA BEFORE THE MINNESOTA PUBLIC UTILITIES COMMISSION. LeRoy Koppendrayer STATE OF MINNESOTA BEFORE THE MINNESOTA PUBLIC UTILITIES COMMISSION LeRoy Koppendrayer Ellen Gavin Marshall Johnson Phyllis Reha Gregory Scott Chair Commissioner Commissioner Commissioner Commissioner

More information

2016 MANAGEMENT DISCUSSION & ANALYSIS & Annual Audited Financial Statements

2016 MANAGEMENT DISCUSSION & ANALYSIS & Annual Audited Financial Statements 2016 MANAGEMENT DISCUSSION & ANALYSIS & Annual Audited Financial Statements MANAGEMENT DISCUSSION AND ANALYSIS// MANAGEMENT DISCUSSION AND ANALYSIS Dated February 16, 2017 The following Management Discussion

More information

Merger Plus. Robert S. Shapard Executive Vice President & CFO UBS Natural Gas & Electric Utilities Conference New York City February 17, 2005

Merger Plus. Robert S. Shapard Executive Vice President & CFO UBS Natural Gas & Electric Utilities Conference New York City February 17, 2005 Merger Plus Robert S. Shapard Executive Vice President & CFO UBS Natural Gas & Electric Utilities Conference New York City February 17, 2005 Safe Harbor Language This presentation includes forward-looking

More information

CRR Auction Analysis Report

CRR Auction Analysis Report Report November 21, 2017 Prepared by: MQRI California Independent System Operator The following ISO staff contributed to this report: Danielle Tavel Abhishek Hundiwale Jie Duan Nongchao Guo Jim McClain

More information

Trung Son Hydropower Project. Financial Analysis

Trung Son Hydropower Project. Financial Analysis Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized The World Bank Trung Son Hydropower Project Financial Analysis Final Report February

More information

SUBMISSION BRITISH COLUMBIA HYDRO AND POWER AUTHORITY F2017 TO F2019 REVENUE REQUIREMENTS APPLICATION

SUBMISSION BRITISH COLUMBIA HYDRO AND POWER AUTHORITY F2017 TO F2019 REVENUE REQUIREMENTS APPLICATION British Columbia Old Age Pensioners Organization, Active Support Against Poverty, Council of Senior Citizens Organizations of BC, Disability Alliance BC, Tenant Resource and Advisory Centre and Together

More information

California Independent System Operator Corporation Fifth Replacement Electronic Tariff

California Independent System Operator Corporation Fifth Replacement Electronic Tariff Table of Contents Appendix F Rate Schedules... 2 Schedule 1... 2 Grid Management Charge... 2 Part A Monthly Calculation of Grid Management Charge (GMC)... 2 Part B Quarterly Adjustment, If Required...

More information

Financial Statements of FESTIVAL HYDRO INC. Year ended December 31, 2014

Financial Statements of FESTIVAL HYDRO INC. Year ended December 31, 2014 Financial Statements of FESTIVAL HYDRO INC. KPMG LLP 140 Fullarton Street Suite 1400 London ON N6A 5P2 Canada Telephone (519) 672-4880 Fax (519)672-5684 Internet w ww.kpmg.ca INDEPENDENT AUDITORS' REPORT

More information

Contact: Gerry Guthrie Kitchener-Wilmot Hydro Inc. Telephone ext 271

Contact: Gerry Guthrie Kitchener-Wilmot Hydro Inc.   Telephone ext 271 Contact: Gerry Guthrie Kitchener-Wilmot Hydro Inc. Email: gerryguthrie@kwhydro.on.ca Telephone 519-745-4771 ext 271 Chair of Group: Iain Clinton Newmarket Hydro Ltd Email: iclinton@nmhydro.on.ca Telephone

More information

Brookfield Renewable Energy Partners L.P. ANNUAL REPORT 2011

Brookfield Renewable Energy Partners L.P. ANNUAL REPORT 2011 Brookfield Renewable Energy Partners L.P. ANNUAL REPORT 2011 OUR OPERATIONS We operate our facilities through three regional operating centers in, the United States, Brazil and Canada which are designed

More information

CITY OF PENTICTON UTILITY RATE REVIEW

CITY OF PENTICTON UTILITY RATE REVIEW PROPOSAL TITLE CITY OF PENTICTON UTILITY RATE REVIEW Submitted to: City of Penticton Prepared by: InterGroup Consultants Ltd. 500-280 Smith Street Winnipeg, MB R3C 1K2 November 2015 Executive Summary

More information

British Columbia Hydro and Power Authority 2016/17 ANNUAL SERVICE PLAN REPORT

British Columbia Hydro and Power Authority 2016/17 ANNUAL SERVICE PLAN REPORT 2016/17 ANNUAL SERVICE PLAN REPORT For more information on BC Hydro contact: 333 Dunsmuir Street Vancouver, BC V6B 5R3 Lower Mainland 604 BCHYDRO (604 224 9376) Outside Lower Mainland 1 800 BCHYDRO (1

More information

ARKANSAS PUBLIC SERVICE COMMISSION

ARKANSAS PUBLIC SERVICE COMMISSION ARKANSAS PUBLIC SERVICE COMMISSION First Revised Sheet No. 4-9.1/34 Replacing: Original Sheet No. CenterPoint Energy Resources Corp. d/b/a CenterPoint Energy Arkansas Gas (Name of Company) Kind of Service:

More information

CH ENERGY GROUP, INC. & CENTRAL HUDSON GAS & ELECTRIC CORP. QUARTERLY FINANCIAL REPORT. for the period ended

CH ENERGY GROUP, INC. & CENTRAL HUDSON GAS & ELECTRIC CORP. QUARTERLY FINANCIAL REPORT. for the period ended CH ENERGY GROUP, INC. & CENTRAL HUDSON GAS & ELECTRIC CORP. QUARTERLY FINANCIAL REPORT for the period ended SEPTEMBER 30, 2017 FINANCIAL STATEMENTS (UNAUDITED) QUARTER ENDED SEPTEMBER 30, 2017 TABLE OF

More information

FortisBC Inc. (FBC) Application for Approval of Demand Side Management (DSM) Expenditures for 2015 and 2016 FBC Final Submission

FortisBC Inc. (FBC) Application for Approval of Demand Side Management (DSM) Expenditures for 2015 and 2016 FBC Final Submission Dennis Swanson Director, Regulatory Affairs FortisBC Inc. Suite 100 1975 Springfield Road Kelowna, BC V1Y 7V7 Tel: (250) 717-0890 Fax: 1-866-335-6295 www.fortisbc.com Regulatory Affairs Correspondence

More information

Combined Financial Statements of NEW BRUNSWICK POWER HOLDING CORPORATION. For the year ended March 31, 2013

Combined Financial Statements of NEW BRUNSWICK POWER HOLDING CORPORATION. For the year ended March 31, 2013 Combined Financial Statements of NEW BRUNSWICK POWER HOLDING CORPORATION Independent Auditor s Report To the Honourable Graydon Nicholas, Lieutenant-Governor of New Brunswick, Fredericton, New Brunswick

More information

FEVI DEFERRAL ACCOUNT PEC EXHIBIT A2-1

FEVI DEFERRAL ACCOUNT PEC EXHIBIT A2-1 ERICA HAMILTON COMMISSION SECRETARY Commission.Secretary@bcuc.com web site: http://www.bcuc.com VIA EMAIL gas.regulatory.affairs@fortisbc.com April 4, 2013 SIXTH FLOOR, 900 HOWE STREET, BOX 250 VANCOUVER,

More information

This report constitutes regulated information as defined in the Royal Decree of 14 November 2007.

This report constitutes regulated information as defined in the Royal Decree of 14 November 2007. This report constitutes regulated information as defined in the Royal Decree of 14 November 2007. 1 Table of Content 1 Overview of Key Figures 4 2 Highlights 6 3 Key events for the third quarter 2013 7

More information

BEFORE THE PENNSYLVANIA PUBLIC UTILITY COMMISSION. PENNSYLVANIA PUBLIC UTILITY COMMISSION v. PECO ENERGY COMPANY ELECTRIC DIVISION

BEFORE THE PENNSYLVANIA PUBLIC UTILITY COMMISSION. PENNSYLVANIA PUBLIC UTILITY COMMISSION v. PECO ENERGY COMPANY ELECTRIC DIVISION PECO ENERGY COMPANY STATEMENT NO. BEFORE THE PENNSYLVANIA PUBLIC UTILITY COMMISSION PENNSYLVANIA PUBLIC UTILITY COMMISSION v. PECO ENERGY COMPANY ELECTRIC DIVISION DOCKET NO. R-01-0001 DIRECT TESTIMONY

More information

Platte River Power Authority

Platte River Power Authority Independent Auditor s Report and Financial Statements Financial Statements Years Ended Contents Independent Auditor s Report...1 Management s Discussion and Analysis (Unaudited)...3 Financial Statements

More information

ITC Midwest 2014 Attachment O True-Up Presentation. Presenter: David Grover Manager, Transmission Pricing July 8, 2015

ITC Midwest 2014 Attachment O True-Up Presentation. Presenter: David Grover Manager, Transmission Pricing July 8, 2015 2014 Attachment O True-Up Presentation Presenter: David Grover Manager, Transmission Pricing July 8, 2015 Presentation Purpose Discuss the 2014 Annual True-Up posting Walk through the timeline and mechanics

More information

COMPENSATION AND BENEFITS

COMPENSATION AND BENEFITS Exhibit F4 Tab 3 Schedule 1 Page 1 of 23 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 COMPENSATION AND BENEFITS 1.0 PURPOSE The purpose of this exhibit is to: Describe

More information

Independent Electricity System Operator Licence EI

Independent Electricity System Operator Licence EI Licence Valid Until September 25, 2033 Original signed by Peter Fraser Vice President, Industry Operations & Performance Ontario Energy Board Date of Issuance: September 26, 2013 Date of Amendment: July

More information

BULGARIA POWER SECTOR: MAKING THE TRANSITION TO FINANCIAL RECOVERY AND MARKET LIBERALIZATION

BULGARIA POWER SECTOR: MAKING THE TRANSITION TO FINANCIAL RECOVERY AND MARKET LIBERALIZATION BULGARIA POWER SECTOR: MAKING THE TRANSITION TO FINANCIAL RECOVERY AND MARKET LIBERALIZATION FINANCIAL STABILIZATION TO RECOVERY: SUMMARY OF WORLD BANK TEAM WORK IN 2016 June 2017 CONTEXT AND SCOPE OF

More information

Spinning Reserve Market Event Report

Spinning Reserve Market Event Report Spinning Reserve Market Event Report 23 January, 2004 TABLE OF CONTENTS PAGE 1. MARKET EVENT... 1 2. BACKGROUND... 2 3. HYDRO GENERATION, THE HYDRO PPA AND THE AS MARKET... 4 4. CHRONOLOGY AND ANALYSIS...

More information

REGULATORY ASSETS. The purpose of this evidence is to provide a description of Hydro One Transmission s Regulatory Assets.

REGULATORY ASSETS. The purpose of this evidence is to provide a description of Hydro One Transmission s Regulatory Assets. Filed: May, 0 EB-0-000 Page of REGULATORY ASSETS.0 INTRODUCTION The purpose of this evidence is to provide a description of Hydro One Transmission s Regulatory Assets. All of the Regulatory Assets reported

More information

Alberta Utilities Commission

Alberta Utilities Commission Alberta Utilities Commission In the Matter of the Need for the Irma Wind Power Project Connection And in the matter of the Electric Utilities Act, S.A. 2003, c. E-5.1, the Alberta Utilities Commission

More information

BC Gas Utility Ltd. Annual Report 2002

BC Gas Utility Ltd. Annual Report 2002 Annual Report 2002 Corporate Profile is the largest distributor of natural gas serving British Columbia, with 774,000 residential, commercial and industrial customers in more than 100 communities., with

More information

OPG REPORTS 2017 THIRD QUARTER FINANCIAL RESULTS. Darlington Refurbishment Project Remains on Time and on Budget at One-Year Mark

OPG REPORTS 2017 THIRD QUARTER FINANCIAL RESULTS. Darlington Refurbishment Project Remains on Time and on Budget at One-Year Mark OPG REPORTS 2017 THIRD QUARTER FINANCIAL RESULTS Nov. 9, 2017 Darlington Refurbishment Project Remains on Time and on Budget at One-Year Mark Toronto: Ontario Power Generation Inc. (OPG or Company) today

More information

20 years operation of the Nordic electricity market

20 years operation of the Nordic electricity market ENERGY 20 years operation of the Nordic electricity market ADB Regional Energy Trade Workshop September 8-9, 2014 Manila Dr. Per Christer Lund 1 SAFER, SMARTER, GREENER Electricity market world wide 2

More information

electric power board of the metropolitan government of nashville & davidson county

electric power board of the metropolitan government of nashville & davidson county 20 15 FINANCIAL REPORT electric power board of the metropolitan government of nashville & davidson county table of contents 19 executive management & board members 20-21 independent auditor s report 22-33

More information

PPAs and Tariff Design

PPAs and Tariff Design RENEWABLE ENERGY TRAINING PROGRAM FINANCING RENEWABLE ENRGY PROJECTS PPAs and Tariff Design Bassem Abou Nehme Energy Finance Consultant TWI - Financial Solutions 1 Outline What is a PPA? Structure of PPA

More information

Guidelines for Other than Private Passenger Rating Program Full Filing for Change in Rates and Rating program

Guidelines for Other than Private Passenger Rating Program Full Filing for Change in Rates and Rating program Guidelines for Other than Private Passenger Rating Program for Change in Rates and Rating program A. GENERAL INFORMATION Section 602 of the Insurance Act and Sections 2, 4 and 5 of the Automobile Insurance

More information

CITY OF BURLINGTON, VERMONT ELECTRIC DEPARTMENT. Financial Statements and Required Supplementary Information. June 30, 2017 and 2016

CITY OF BURLINGTON, VERMONT ELECTRIC DEPARTMENT. Financial Statements and Required Supplementary Information. June 30, 2017 and 2016 Financial Statements and Required Supplementary Information (With Independent Auditors Report Thereon) Table of Contents Page(s) Independent Auditors Report 1 2 Management s Discussion and Analysis Required

More information

TAC FIX IMPACT MODEL DETAILED OVERVIEW

TAC FIX IMPACT MODEL DETAILED OVERVIEW TAC FIX IMPACT MODEL DETAILED OVERVIEW Contents Goal of Spreadsheet... 2 Drivers of transmission investment... 2 Note About Terminology... 3 Core Assumptions... 3 Load served locally for an example IOU,

More information

DECISION and Order E and Letter L-15-16

DECISION and Order E and Letter L-15-16 IN THE MATTER OF FortisBC Energy Inc. 2015 Price Risk Management DECISION and Order E-10-16 and Letter L-15-16 June 17, 2016 Before: D. A. Cote, Commissioner/Panel Chair B. A. Magnan, Commissioner R. D.

More information

2016 Earnings Guidance

2016 Earnings Guidance 2016 Earnings Guidance December 18, 2015 Safe Harbor Statement Statements made in this presentation that relate to future events or PNM Resources ( PNMR ), Public Service Company of New Mexico s ( PNM

More information

Guidelines for Private Passenger Rating Program Full Filing for Change in Rates and Rating Program

Guidelines for Private Passenger Rating Program Full Filing for Change in Rates and Rating Program Guidelines for Private Passenger Rating Program for Change in Rates and Rating Program A. GENERAL INFORMATION Section 602 of the Insurance Act and Sections 2, 4 and 5 of the Automobile Insurance Premiums

More information

Comment on issues raised by Committee members on 21 April 2010

Comment on issues raised by Committee members on 21 April 2010 Electricity Industry Bill Comment on issues raised by Committee members on 21 April 2010 1. This note provides further comment on a number of issues raised by Committee members on Wednesday 21 April. 2.

More information

Public Service Pension Plan Actuarial Valuation as at December 31, Registration number: CRA

Public Service Pension Plan Actuarial Valuation as at December 31, Registration number: CRA Public Service Pension Plan Actuarial Valuation as at December 31, 2016 Registration number: CRA 0208769 Original Date: July 21, 2017 Revised Date: November 10, 2017 Table of Contents 1. Executive Summary

More information

Yukon Energy Corporation

Yukon Energy Corporation Financial Statements December 31, 2016 Management s Responsibility for Financial Reporting Independent Auditor s Report Statement of Financial Position Statement of Operations and Other Comprehensive Income

More information

Public Service Enterprise Group

Public Service Enterprise Group Public Service Enterprise Group PSEG Earnings Conference Call 3 rd Quarter 2017 October 31, 2017 Forward-Looking Statements Certain of the matters discussed in this presentation about our and our subsidiaries

More information

Performance-Based Ratemaking

Performance-Based Ratemaking Performance-Based Ratemaking Rhode Island Utility Business Models Discussion April 24, 2017 Tim Woolf Consultant for the Division of Public Utilities and Carriers Outline Financial incentives under traditional

More information

PPL CORPORATION Poised for growth. Investing in our future.

PPL CORPORATION Poised for growth. Investing in our future. PPL CORPORATION Poised for growth. Investing in our future. 2nd Quarter Earnings Call August 3, 2017 Cautionary Statements and Factors That May Affect Future Results Any statements made in this presentation

More information

Southwestern Public Service Company. Attachment O - Transmission Formula Rate 2014 True-Up. Golden Spread Information Request No. 1.

Southwestern Public Service Company. Attachment O - Transmission Formula Rate 2014 True-Up. Golden Spread Information Request No. 1. The following questions pertain to the spreadsheet file 07-2015---Attachment_O- 2014_SPS_Transmission_Formula_Rate_True-Up_rv1 : GSEC 1-1. Refer to SPS s 2014 FERC Form 1 page 207, line 48 Account 350

More information

COST ALLOCATION. Filed: EB Exhibit G1 Tab 3 Schedule 1 Page 1 of INTRODUCTION

COST ALLOCATION. Filed: EB Exhibit G1 Tab 3 Schedule 1 Page 1 of INTRODUCTION Filed: 0-- EB-0-0 Exhibit G Tab Schedule Page of COST ALLOCATION.0 INTRODUCTION 0 Hydro One Networks Inc s total revenue requirement for each of the five years of the Custom Cost of Service (COS) period,

More information

P-5 STATE OF NEW JERSEY BOARD OF PUBLIC UTILITIES

P-5 STATE OF NEW JERSEY BOARD OF PUBLIC UTILITIES P- STATE OF NEW JERSEY BOARD OF PUBLIC UTILITIES IN THE MATTER OF THE PETITION OF PUBLIC SERVICE ELECTRIC AND GAS COMPANY FOR APPROVAL OF ITS ENERGY EFFICIENCY 01 PROGRAM AND RECOVERY OF ASSOCIATED COSTS

More information

Brookfield Renewable Partners

Brookfield Renewable Partners Brookfield Renewable Partners PRESS RELEASE BROOKFIELD RENEWABLE REPORTS STRONG THIRD QUARTER RESULTS All amounts in US dollars unless otherwise indicated BROOKFIELD, News, November 1, 2017 Brookfield

More information

Municipality of Port Hope. Water Ontario Regulation 453/07 Financial Plan. Financial Plan #

Municipality of Port Hope. Water Ontario Regulation 453/07 Financial Plan. Financial Plan # Municipality of Port Hope Water Ontario Regulation 453/07 Financial Plan Financial Plan # 146-301 February 10, 2015 Contents Page 1. Introduction 1-1 1.1 Study Purpose... 1-1 1.2 Background... 1-1 1.2.1

More information

SPP PLANNING AND COST ALLOCATION OVERVIEW

SPP PLANNING AND COST ALLOCATION OVERVIEW Benefit/Cost Ratio Primer 101 for the Regional Allocation Review Task Force August 4, 2011 1 SPP PLANNING AND COST ALLOCATION OVERVIEW 2 1 Transmission = 10% Retail Electricity Rates Transmission enables

More information

EUGENE WATER & ELECTRIC BOARD INDEPENDENT AUDITOR S REPORTS AND FINANCIAL STATEMENTS DECEMBER 31, 2006 AND 2005

EUGENE WATER & ELECTRIC BOARD INDEPENDENT AUDITOR S REPORTS AND FINANCIAL STATEMENTS DECEMBER 31, 2006 AND 2005 INDEPENDENT AUDITOR S REPORTS AND FINANCIAL STATEMENTS DECEMBER 31, 2006 AND 2005 CONTENTS BOARD OF COMMISSIONERS AND OFFICERS 1 PAGE INDEPENDENT AUDITOR S REPORT 2 MANAGEMENT S DISCUSSION AND ANALYSIS

More information

Guidelines on PD estimation, LGD estimation and the treatment of defaulted exposures

Guidelines on PD estimation, LGD estimation and the treatment of defaulted exposures Guidelines on PD estimation, LGD estimation and the treatment of defaulted exposures European Banking Authority (EBA) www.managementsolutions.com Research and Development December Página 2017 1 List of

More information

MeasureIT Benchmarking Report IT Budgeting Metrics

MeasureIT Benchmarking Report IT Budgeting Metrics MeasureIT Benchmarking Report IT Budgeting Metrics Respondent Name: Sample Health Care Company Name: Info-Tech Email: healthcare@infotech.com Date Completed: Jun 12, 2012 Executive Summary The following

More information

GOVERNMENT OF KERALA

GOVERNMENT OF KERALA 183 GOVERNMENT OF KERALA Kerala Small Hydro Power Policy 2012 1. Order G.O.(P) 25/2012/PD Dated: Thiruvananthapuram, 03.10.2012 2. Title Kerala Small Hydro Power Policy 2012 3. Objective To increase the

More information

Consolidated EIM Initiatives Straw Proposal

Consolidated EIM Initiatives Straw Proposal Consolidated EIM Initiatives Straw Proposal Stakeholder Meeting August 7, 2017 Megan Poage & Don Tretheway Market Design & Policy Agenda Time Topic Presenter 10:00 10:15 Introduction and Purpose Kristina

More information

Provincial Debt Summary (Unaudited)

Provincial Debt Summary (Unaudited) Provincial Debt Summary The following unaudited Provincial Debt Summary information is intended to provide additional information to financial statement readers. The accounting policies applied for this

More information

Alberta Utilities Commission

Alberta Utilities Commission Alberta Utilities Commission In the Matter of the Need for the Al Rothbauer 321S Substation And in the matter of the Electric Utilities Act, S.A. 2003, c. E-5.1, the Alberta Utilities Commission Act, S.A.

More information

BC HYDRO FISCAL 2017 TO FISCAL 2019 REVENUE REQUIREMENTS APPLICATION JUNE 8, RICHARD McCANDLESS

BC HYDRO FISCAL 2017 TO FISCAL 2019 REVENUE REQUIREMENTS APPLICATION JUNE 8, RICHARD McCANDLESS BC HYDRO FISCAL 2017 TO FISCAL 2019 REVENUE REQUIREMENTS APPLICATION JUNE 8, 2017. RICHARD McCANDLESS THE BC UTILITIES COMMISSION SHOULD NOT APPROVE ANY DISCRETIONARY REQUESTS PENDING A NEW APPROACH TO

More information

Decoupling and Utility Demand Side Management

Decoupling and Utility Demand Side Management Decoupling and Utility Demand Side Management Place your chosen image here. The four corners must just cover the arrow tips. For covers, the three pictures should be the same size and in a straight line.

More information

PG&E Corporation. First Quarter Earnings Call. May 2, 2013.

PG&E Corporation. First Quarter Earnings Call. May 2, 2013. PG&E Corporation First Quarter Earnings Call May 2, 2013 This presentation is not complete without the accompanying statements made by management during the webcast conference call held on May 2, 2013.

More information

Applications for Participating Transmission Owner Status Attachment C - Transmission Revenue Requirement

Applications for Participating Transmission Owner Status Attachment C - Transmission Revenue Requirement Applications for Participating Transmission Owner Status Attachment C - Transmission Revenue Requirement The Transmission Revenue Requirement (TRR) for each Participating TO reflects the Participating

More information

XXXXX. Skookum Creek Power Project. Interconnection Facilities Study and Project Plan

XXXXX. Skookum Creek Power Project. Interconnection Facilities Study and Project Plan XXXXX Skookum Creek Power Project Interconnection Facilities Study and Project Plan June 29, 2011 British Columbia Hydro and Power Authority British Columbia Hydro and Power Authority 2011. All rights

More information

MRTU. CRR Settlements. CRR Educational Class #10

MRTU. CRR Settlements. CRR Educational Class #10 MRTU CRR Settlements CRR Educational Class #10 Contents Why is CRR Settlements process important to understand Definition of LMP and CRR Types of CRRs: Obligation vs Option Point to Point and Multi Point

More information

FOR IMMEDIATE DISTRIBUTION May 2, 2013 PG&E CORPORATION REPORTS FIRST-QUARTER 2013 RESULTS

FOR IMMEDIATE DISTRIBUTION May 2, 2013 PG&E CORPORATION REPORTS FIRST-QUARTER 2013 RESULTS Corporate Affairs 77 Beale Street San Francisco, CA 94105 1-415-973-5930 FOR IMMEDIATE DISTRIBUTION May 2, 2013 CONTACT: PG&E External Communications - (415) 973-5930 PG&E CORPORATION REPORTS FIRST-QUARTER

More information

Jazz Air Income Fund and Jazz Air LP Management s Discussion and Analysis of Results of Operations and Financial Condition

Jazz Air Income Fund and Jazz Air LP Management s Discussion and Analysis of Results of Operations and Financial Condition Jazz Air Income Fund and Jazz Air LP 2008 of Results of Operations and Financial Condition February 10, 2009 TABLE OF CONTENTS 1. OVERVIEW... 2 2. RECONCILIATION OF THE JAZZ AIR INCOME FUND CONSOLIDATED

More information

MANAGEMENT S DISCUSSION AND ANALYSIS

MANAGEMENT S DISCUSSION AND ANALYSIS MANAGEMENT S DISCUSSION AND ANALYSIS For the three and nine months ended September 30, 2017 Section 1: Description of the Business... 3 Section 2: Key Performance Indicators... 4 Section 3: Overall Performance...

More information

Alberta Electric System Operator 2018 ISO Tariff Application

Alberta Electric System Operator 2018 ISO Tariff Application Alberta Electric System Operator 2018 ISO Tariff Application Date: September 14, 2017 Table of Contents 1 Application... 6 1.1 Background... 6 1.2 Organization of application... 6 1.3 Relief requested...

More information

APPENDIX B: WHOLESALE AND RETAIL PRICE FORECAST

APPENDIX B: WHOLESALE AND RETAIL PRICE FORECAST Seventh Northwest Conservation and Electric Power Plan APPENDIX B: WHOLESALE AND RETAIL PRICE FORECAST Contents Introduction... 3 Key Findings... 3 Background... 5 Methodology... 7 Inputs and Assumptions...

More information

ONCOR ELECTRIC DELIVERY COMPANY LLC (Exact name of registrant as specified in its charter)

ONCOR ELECTRIC DELIVERY COMPANY LLC (Exact name of registrant as specified in its charter) UNITED STATES SECURITIES AND EXCHANGE COMMISSION Washington, D.C. 20549 Form 8-K Current Report Pursuant to Section 13 or 15(d) of the Securities Exchange Act of 1934 Date of Report (date of earliest event

More information

CH ENERGY GROUP, INC. & CENTRAL HUDSON GAS & ELECTRIC CORP. QUARTERLY FINANCIAL REPORT. for the period ended

CH ENERGY GROUP, INC. & CENTRAL HUDSON GAS & ELECTRIC CORP. QUARTERLY FINANCIAL REPORT. for the period ended CH ENERGY GROUP, INC. & CENTRAL HUDSON GAS & ELECTRIC CORP. QUARTERLY FINANCIAL REPORT for the period ended SEPTEMBER 30, 2016 FINANCIAL STATEMENTS (UNAUDITED) QUARTER ENDED SEPTEMBER 30, 2016 TABLE OF

More information