1 Social Monitoring Report 2 nd Quarterly Report June 2017 VIE: Power Transmission Investment Program Tranche 3 Installation of a second transformer bank for 220 kv Duc Hoa substation Installation of a second transformer bank for 220 kv Tra Vinh substation Installation of a second transformer bank for 220 kv Uyen Hung substation Installation of a second transformer bank for 500 kv Cau Bong substation Prepared by the Southern Power Projects Management Board for the National Power Transmission Corporation and the Asian Development Bank.

2 This social monitoring report is a document of the borrower. The views expressed herein do not necessarily represent those of ADB's Board of Directors, Management, or staff, and may be preliminary in nature. In preparing any country program or strategy, financing any project, or by making any designation of or reference to a particular territory or geographic area in this document, the Asian Development Bank does not intend to make any judgments as to the legal or other status of any territory or area.

3 Project Number: Period: March - June, 2017 POWER TRANSMISSION INVESTMENT PROGRAM, TRANCHE 3 Loan: 3374-VIE CORRECTIVE ACTION PLAN PERFORMANCE MONITORING REPORT Subprojects: 1. Installation of a second transformer bank for 220 kv Duc Hoa substation 2. Installation of a second transformer bank for 220 kv Tra Vinh substation 3. Installation of a second transformer bank for 220 kv Uyen Hung substation 4. Installation of a second transformer bank for 500 kv Cau Bong substation JUNE 2017

4 POWER TRANSMISSION INVESTMENT PROGRAM TRANCHE 3 National Safeguard Specialist for Resettlement CORRECTIVE ACTION PLAN PERFORMANCE MONITORING REPORT Subprojects: 1. Installation of a second transformer bank for 220 kv Duc Hoa substation 2. Installation of a second transformer bank for 220 kv Tra Vinh substation 3. Installation of a second transformer bank for 220 kv Uyen Hung substation 4. Installation of a second transformer bank for 500 kv Cau Bong substation Full name Designation Signature Prepared by Nguyễn Công Hiệp National safeguard specialist for resettlement JUNE 2017

5 LIST OF ABBREVIATIONS ADB : Asian Development Bank CARB : Compensation, Assistance and Resettlement Board DDR : Due diligence report DMS : Detailed Measurement Survey LURC : Land use rights certificate TB : Transformer bank NPT : National Power Transmission Corporation PTIP : Power Transmission Investment Program RP : Resettlement plan SPMB : Southern Viet Nam Power Projects Management Board TOR : Term of Reference UBND : Provincial People's Committee Power Transmission Investment Program Tranche 3 i

6 LIST OF TABLES Table 1. Summary of Shortcomings and Proposed Corrective Actions... 5 Table 2. HH losing more than 10% of total productive land area and the assistance allowance is not yet received... 9 Table 3. Complaints and grievance redress status Table 4. Summary of shortcomings and corrective action implementation status Table 5. Summary of shortcomings and recommendations Power Transmission Investment Program Tranche 3 ii

7 LIST OF ABBREVIATIONS LIST OF TABLES TABLE OF CONTENTS TABLE OF CONTENTS I. INTRODUCTION Power transmission investment program, Tranche Subprojects under Power Transmission Investment Program, Tranche 3 managed by SPMB Corrective action plan performance monitoring report... 8 II. METHODOLOGY 8 III. MAIN FINDINGS Identification of vulnerable affected households Identification of households losing more than 10% of productive land but not yet received the life stabilization assistance Complaint and grievance redress status Summary of shortcomings and corrective action implementation status IV. RECOMMENDATION 20 V. ANNEXES Decision issued by PC of Long An Province for land rental of National Power Transmission Corporation Decision issued by PC of HCMC for land rental of National Power Transmission Corporation LURC issued by PC of Tra Vinh Province to the National Power Transmission Corporation List of households who are acquired agricultural land by 220 kv Ba Ria Vung Tau transmission line List of households who received compensation payment late by 220 kv Ba Ria Vung Tau transmission line i ii iii Power Transmission Investment Program Tranche 3 iii

8 I. INTRODUCTION 1.1 Power transmission investment program, Tranche 3 1. The Asian Development Bank (ADB) on 16 December 2011 approved a multi-tranche financing facility (MFF) in the amount of $730 million for the Power Transmission Investment Program (PTIP). The Vietnam Electricity National Power Transmission Corporation (NPT) is the executing agency (EA), while the Southern Viet Nam Power Projects Management Board (SPMB) is the implementing agency (IA). ADB approved Tranche 1 in December 2011, Tranche 2 in November 2012 and Tranche 3 in October Nine subprojects are proposed for inclusion in Tranche 3, namely, the installation of a second transformer bank each for the (i) 220 kv Duc Hoa substation (SS), (ii) 500 kv Cau Bong SS, (iii) 220 kv Tra Vinh SS, (iv) 220 kv Uyen Hung SS, and (v) 220 kv Vung Tau SS; construction of new transmission lines that include the 220 kv Binh Long - Tay Ninh Transmission Line (TL) and the 500 kv My Tho - Duc Hoa TL; and construction of new substations that include the 500 kv Chon Thanh SS and the 500 kv Duc Hoa SS and Connections 1.2 Subprojects under Power Transmission Investment Program, Tranche 3 managed by SPMB 2. SPMB is managing seven subprojects, namely, the installation of a second transformer bank each for the (i) 220 kv Duc Hoa substation (SS), (ii) 500 kv Cau Bong SS, (iii) 220 kv Tra Vinh SS, (iv) 220 kv Uyen Hung SS, and (v) 220 kv Vung Tau SS; new constructions of 500 kv My Tho - Duc Hoa TL; and the 500 kv Duc Hoa SS and Connection 3. Of these 7 subprojects there are 4 subprojects, namely, the installation of second transformer bank for: (i) 220 kv Duc Hoa substation (SS), (ii) 500 kv Cau Bong SS, (iii) 220 kv Tra Vinh SS, (iv) 220 kv Uyen Hung (SS). The second transformer bank shall be installed in the existing compound of the substation. No land acquisition will occur; therefore, a resettlement plan (RP) is not required. Notwithstanding, ADB safeguards policy considers the existing substations as an associated facility of the proposed subproject. Thus, a due diligence report (DDR) is required. Due diligence report for these subprojects had been prepared in March In addition to this requirement, a due diligence review of how land acquisition was carried out in during the construction of the 220 kv Ba Ria - Vung Tau TL is required. Per ADB safeguards policy, the 220 kv Ba Ria - Vung Tau TL is an associated facility of the Second Transformer Bank for the 220 kv Vung Tàu SS because the main reason for the transmission line is to connect the substation to the Ba Ria Gas-Power-Fertilizer Plant. DDR for 220 kv Ba Ria Vung Tau TL was also prepared in March

9 5. According to the DDR, there are some corrective actions as followings: Table 1. Summary of Shortcomings and Proposed Corrective Actions Areas of Concerns Gaps in the 2013 implementation of land acquisition vis-à-vis PTIP resettlement policy Corrective actions Responsible Entities Timeline I. INSTALLATION OF A SECOND TRANSFORMER BANK FOR THE 220KV DUC HOA SUBSTATION Missing signatures in the DMS The DMS records lacked the signature of the DMS group leader (4 forms), representative of the AHs (2 forms) and representative of Duc Hoa District DONRE (11 forms). (i) Review the cited DMS forms to ensure that details of affected assets and entitlements in said forms are consistent with the approved compensation plans and compensation payment vouchers. SPMB CARB and Prior to the implementation of PTIP3 (ii)ensure that the compensation plans and compensation payment vouchers of the 2 AHs that did not sign the DMS forms included the signatures of the household heads Identification of vulnerable AHs The DMS did not determine who among the AHs belonged to one or more of the following vulnerable groups (i.e., womenheaded AH with dependents, landless and poor AH, AH headed by a disabled person or by an elderly, ethnic minority AH). Per PTIP resettlement policy, a vulnerable AH is entitled to additional assistance to help improve the social and economic condition of the household (i) Determine who among the 12 AHs were vulnerable (ii) Prepare supplementary payment vouchers or plans for the vulnerable AH for approval by the PPC (iii) Pay supplementary allowance to the vulnerable AHs SPMB, CARB and PPC Prior to the implementation of PTIP3 Payment of life stabilization assistance Losing 30% of one s total agricultural (productive) land was used in determining who were severely affected. Only 1 AH was deemed severely affected and for which it was provided life stabilization assistance (i) Review all DMs forms to find out which among the remaining 11 AHs lost 10%-29% of their total agricultural (productive) land (ii) Prepare payment vouchers or plans for AHs that lost 10%-29% of their total agricultural (productive) land for approval by the PPC. SPMB, CARB & PPC Prior to the implementation of PTIP3 (iii) Pay life stabilization assistance to the eligible 5

10 AHs. II. INSTALLATION OF A SECOND TRANSFORMER BANK FOR THE 500 KV CAU BONG SUBSTATION Identification of vulnerable affected households The DMS did not determine who among the AHs belonged to one or more of the following vulnerable groups (i.e., womenheaded AH with dependents, landless and poor AH, AH headed by a disabled person or by an elderly, ethnic minority AH). Per PTIP resettlement policy, a vulnerable AH is entitled to additional assistance to help improve the social and economic condition of the household (i)determine who among the 158 AHs (i.e., 120 permanent loss of land, and 38 affected by land use restrictions) were vulnerable (ii) Prepare supplementary payment vouchers or plans for the vulnerable AH for approval by HCMCPC (iii) Provide supplementary assistance to the vulnerable AHs SPMB, CARB &HCMC PC Prior to the implementation of PTIP3 Payment for life stabilization assistance Losing 30% or more of one s total agricultural (productive) land was used for determining who were severely affected. 33 AHs (i.e., 13 lost 30% - 70%, and 20 lost more than 70% of productive lands) were deemed severely affected and for which they were provided life stabilization assistance. (i) Review all DMS forms to find out which among the remaining 87 AHs lost 10%-29% of their total agricultural (productive) land (ii) Prepare payment vouchers or plans for AHs that lost 10%-29% of their total agricultural (productive) land for approval by HCMCPC SPMB, CARB & HCMC PC Prior to the implementation of PTIP3 (iii) Pay life stabilization assistance to the eligible AHs III. INSTALLATION OF A SECOND TRANSFORMER BANK FOR THE 220 KV TRA VINH SUBSTATION Payment for life stabilization assistance Losing 30% or more of one s total agricultural (productive) land was used for determining who were severely impacted and thus eligible to get life stabilization assistance. Six AHs (i.e., lost 30% or more of productive lands) were deemed severely affected. PTIP resettlement policy sets the benchmark for determining who are severely impacted at 10% loss of an AH s total productive assets (i)review the DMS forms of the remaining 5 AHs to find out who among them lost 10%-29% of their total agricultural (productive) land. (ii) Prepare payment vouchers or plans for AHs that lost 10%-29% of their total agricultural (productive) landholdings for approval by the PPC. (iii) Pay life stabilization assistance to the eligible AHs SPMB, CARB & PPC Prior to the implementation of PTIP3 IV. INSTALLATION OF A SECOND TRANSFORMER BANK FOR THE 220 KV UYEN HUNG SUBSTATION 6

11 Un-resolved complaint of the AH The extended delay in the resolution of the complaint of the AP is not consistent with the intent and spirit of the grievance redress process that calls for the speedy resolution of complaints (i) Elevate the complaint of the AP to the PPC for resolution. (ii) If the complaint is not resolved at the PPC level, bring the matter to the People s Court for adjudication SPMB, CARB Prior to the implementation of PTIP3 V. 220 KV BA RIA VUNG TAU TRANSMISSION LINE Identification of vulnerable AHs The DMS did not determine who among the AHs belonged to one or more of the vulnerable groups (i.e., women-headed AH with dependents, landless and poor AH, AH headed by a disabled person or by an elderly, ethnic minority AH). Per PTIP resettlement policy, a vulnerable AH is entitled to additional assistance to help improve the social and economic condition of the household. (i) Determine who among the 140 AHs were vulnerable. (ii) Prepare supplementary payment vouchers or plans for the vulnerable AH for approval by the PPC. (iii) Pay supplementary allowance to the vulnerable AHs. SPPMB, LFDC, DCARB, and PPC Prior to the implementation of PTIP3 Payment of life stabilization assistance Losing 30% or more of one s total agricultural (productive) land was used for determining who were severely affected. Eight AHs (i.e., lost 30% or more of productive lands) were deemed severely affected and for which they were provided life stabilization assistance. (i) Review all DMs forms to find out which among the other 132 AHs lost 10%-29% of their total agricultural (productive) land. (ii) Prepare payment vouchers or plans for AHs that lost 10%-29% of their total agricultural (productive) land for approval by the PPC. SPPMB, LFDC, DCARB, and PPC Prior to the implementation of PTIP3 (iii) Pay life stabilization assistance to the eligible AHs. Compensation given to AHs The DMS was completed in 2008, but preparation of compensation plans and payment of compensation was carried out over an extended period of time, from 2009 to 2014, depending on the availability of government funds. The CPs of AHs might not have been updated to reflect changes in fixed assets found on the affected lands (subsequent to the 2008 DMS) and the unit rates used to calculate compensation for affected assets might not have been adjusted to reflect prevailing (i) Review each CP of the 140 AHs and find when it was approved and when was compensation actually paid. (ii) Regarding the matter of accuracy of affected assets found on the recovered land, check if the AH signed the CP in agreement (ii) Regarding the unit rates used, if the period of approval of the CP and actual payment of compensation was more SPPMB, LFDC, DCARB, and PPC Prior to the implementation of PTIP3 7

12 market rates at the time of payment of compensation. than 1 year, compute compensation deficits for project-acquired assets (i.e., land, trees, crops, structures) due to inflation using consumer price index (CPI) at the time compensation was actually paid. (iii) Prepare payment vouchers for approval by the PPC. (iii) Pay compensation deficits to eligible AHs. Incomplete land acquisition process 7 AHs with agricultural lands in the TL ROW were belatedly located in The DMS forms of these AHs have since been forwarded to authorities in their respective wards for the preparation of their CPs. (i) Finalize the CPs of the 7 AHs for approval by the PPC (ii) Pay compensation (assistance) to the 7 AHs. SPPMB, LFDC, DCARB, and PPC Prior to the implementation of PTIP3 Incomplete DMS forms The DMS forms of 6 AHs lacked the signatures of the affected households. (i) Compare the amounts indicated in the respective DMS forms of the 6 AHs vis-à-vis the amounts indicated in their respective CPs and payment vouchers. SPPMB, DCARB Prior to the implementation of PTIP3 (ii) If there was a deficit in the amounts paid to the AHs vis-à-vis what were paid the AHs, confirm that the AHs were aware of and agree to the shortfall. 1.3 Corrective action plan performance monitoring report 6. According to ToR, the safeguard policy stated clearly the tasks and responsibility of Consultant, including: prepare due diligence report and corrective action plan as required by ADB 7. Hence this report is prepared to monitor the status of corrective action plan implementation for subprojects named the installation of a second transformer bank for: (1) 220 kv Duc Hoa SS; (ii) 550 kv Cau Bong SS; (iii) 220 kv Tra Vinh SS and 220 kv Uyen Hung SS. II. METHODOLOGY 8. In order to prepare the corrective action plan performance monitoring report, the Consultant has carried out following activities: Work with SPMB, CARB to disseminate the non-compliance issues ; 8

13 Review all documents regarding preparation of compensation plan including: DMS record, breakdown sheet for compensation cost, certificate of land loss rate, certificate of household member, complaints and responses... The purpose of this review is to: (i) identify whether houshold belongs to vunerable affected housholds or not and if yes check for the assistance policy has been applied or not ; (ii) check the percentage of acquired land area and whether the life stabilization assistance policy has been applied as per project policy framework or not; (iii) adequacy of signature of HH in compensation documents; (iv) what is the complaint for and whether grievance redress process is applied as per the project grievance mechanism or notm III. MAIN FINDINGS 3.1 Identification of vulnerable affected households 9. According to review of compensation documents, particularly in certificate of household member, there is no household who belongs to vulnerable household (women=headed AH with dependents, AH headed by a disabled person or by an elderly, landles and poor AH, ethnic minority AH). 3.2 Identification of households losing more than 10% of productive land but not yet received the life stabilization assistance 10. Based on review of documents, Consultant identified the following households 1 losing more than 10% total of productive land area and the life stabilization assistance has not been applied. TT Table 2. HH losing more than 10% of total productive land area and the assistance allowance is not yet received Full name Total area of productive land (m 2 ) Acquired land area (m 2 ) I INSTALLATION OF A SECOND TRANSFORMER BANK FOR 220KV DUC HOA SS Land acquisition rate 1 [This information has been 11,396 2,849 25% 2 removed as it falls within exceptions to disclosure 15,999 2, % 3 specified in paragraph 97, 34, , % 4 (exception (x) Information that, if disclosed, would or would be 11, , % 5 likely to endanger the life, 12,568 2, % health, safety, or security of any individual, or safety or 16.5% 6 security of ADB assets, or to prejudice the defense or national security of a member) 10,214 1,683 1 For further confirmation. 9

14 TT Full name of ADB s Public Communications Policy (2011). Total area of productive land (m 2 ) Acquired land area (m 2 ) Land acquisition rate II INSTALLATION OF A SECOND TRANSFORMER BANK FOR 500KV CAU BONG SS 1 8, , % 2 6, % 3 2, % 4 1, % 5 12,790 2, % 6 4, % 7 3, % 8 3, % 9 11,289 1, % 10 3, % 11 5, % [This information has been removed as it falls within exceptions to disclosure specified in paragraph 97, 4, , , , % 12% 12.5% 15 (exception (x) Information that, 7, % if disclosed, would or would be 16 likely to endanger the life, 10, , % 17 health, safety, or security of 4, % any individual, or safety or 18 security of ADB assets, or to 3, % prejudice the defense or national security of a member) of ADB s Public Communications Policy (2011). 3, ,678 5, , , % 18% 27% 22 3, % 23 2, % 24 8,146 1, % 25 25,428 3, % 26 3, % 27 4, % 28 5,330 1, % 29 7, % 30 4, % 31 2, % 32 8,340 1, % III INSTALLATION OF A SECOND TRANSFORMER BANK FOR 220KV TRA VINH SS 1 [This information has been 14,242 2, % 10

15 TT 2 Full name removed as it falls within exceptions to disclosure specified in paragraph 97, (exception (x) Information that, if disclosed, would or would be likely to endanger the life, health, safety, or security of any individual, or safety or security of ADB assets, or to prejudice the defense or national security of a member) of ADB s Public Communications Policy (2011). Total area of productive land (m 2 ) Acquired land area (m 2 ) 9,570 1,780 Land acquisition rate 18.6% 3.3 Complaint and grievance redress status 11. Among subprojects said above, there is only complaint case, specified as below: 11

16 Table 3. Complaints and grievance redress status No. Full name Complaint Grievance redress status Remark I INSTALLATION OF A SECOND TRANSFORMER BANK FOR 220KV UYEN HUNG SS 1 Household [This information has been removed as it falls within exceptions to disclosure specified in paragraph 97, (exception (x) Information that, if disclosed, would or would be likely to endanger the life, health, safety, or security of any individual, or safety or security of ADB assets, or to prejudice the defense or national security of a member) of ADB s Public Communications Policy (2011). Compensation rate for tree and land attached assets are required to be adjusted Compensation for affected land including: agricultural land; assistance allowance for interrupted business and production, assistance allowance for life stabilization. The meeting for review of compensation rate has been organized by CARB and accordingly finalized that the compensation rate shall be updated and applied based on the newest unit rate issued by PPC at the compensation time (Decision No. 58/2011/QĐ-UBND dated 29/12/2011 by Binh Duong PPC regarding issuance of unit rate for compensation and housing assistance, structure works, fruit tree and crops where the State acquires land in Binh Duong Province). Accordingly the CARB has advised Tan Uyen District PC to issue the Decision no. 9222/QĐ-UBND dated 07 th September 2012 for approving the supplementary assistance and compensation cost as VND. After this decision has been issued the households has greed and satisfied with compensation received and no any relevant doubts found. In 1998, Mr. [This information has been removed as it falls within exceptions to disclosure specified in paragraph 97, (exception (x) Information that, if disclosed, would or would be likely to endanger the life, health, safety, or security of any individual, or safety or security of ADB assets, or to prejudice the defense or national security of a member) of ADB s Public Communications Policy (2011). along with some people (where [This information has been removed as it falls within exceptions to disclosure specified in paragraph 97, (exception (x) Information that, if disclosed, would or would be likely to endanger the life, health, safety, or security of any individual, or safety or security of ADB assets, or to prejudice the defense or national security of a member) of ADB s Public Communications Policy (2011). acted as representative) bought the land plot with area of m 2 owned by [This information has been removed as it falls within exceptions to disclosure specified in paragraph 97, (exception (x) Information that, if disclosed, would or would be likely to Solved Currently the compensation cost has been transferred to the Bank account However the household has not yet received. SPMB has not received any information stated that the household bring the complaints to PPC or to the Court. 12

17 No. Full name Complaint Grievance redress status Remark endanger the life, health, safety, or security of any individual, or safety or security of ADB assets, or to prejudice the defense or national security of a member) of ADB s Public Communications Policy (2011). (which white book is issued by Tan Uyen PPC). On 01 st April 1999 and 29 th June 1999, the Tan Uyen District People s commune has issued the Decion no. 235/QĐ-UB and 484/QĐ-UB relating withdrawal of the issued land certificate with reason of mistake (the land issued the land use right certificate is productive land). On 22th October 2001, the representative of Tan Uyen Forest Management Division has signed the lump sum contract with the household. Accordingly the land area of 8,03 hectare has been fully transferred to the household with land use period of 50 years; and the household was entitled to cultivate agricultural and industrial crops in the planned area and rotation with short term crops in the forestry land site. When estimation of the assistance and compensation cost CARB has calculated based on regulation of Binh Duong PPC stated For land belongs to forest part, land based on lump sum contract with the State shall be supported with site clearance, conservation and its assistance cost is VND as per m 2. The household has not agreed with this assistance cost and requested that the compensation cost shall be calculated as agricultural land and entitlement of suspended production as well as life stabilization assistance allowance. The CARB has organized many discussion meetings with the household along with attendance of concerned agencies: Tan Uyen Town People committee, Forest Management County, DONRE, Justice Department. During the meetings, the representatives from concerned agencies have explained and confirmed clearly that the land portion cultivated by the houseohld is the forest land. Hence the compensation and assistance policy applied for this said household is consistent with regulation of PPC. However currently the household still 13

18 No. Full name Complaint Grievance redress status Remark requests for compensation for acquired land as agricultural land with unit rate of VND /m Summary of shortcomings and corrective action implementation status Table 4. Summary of shortcomings and corrective action implementation status Areas of Concerns Gaps in the 2013 implementation of land acquisition vis-à-vis PTIP resettlement policy Corrective actions Implementation status Remark I. INSTALLATION OF A SECOND TRANSFORMER BANK FOR 220 KB DUC HOA SUBSTATION Missing signatures in the DMS records The DMS records lacked the signature of the DMS group leader (4 forms), representative of the AHs (2 forms) and representative of Duc Hoa District DONRE (11 forms) (i) Review the cited DMS forms to ensure that details of affected assets and entitlements in said forms are consistent with the approved compensation plans and compensation payment vouchers. (ii) Ensure that the compensation plans and compensation payment vouchers of the 2 AHs that did not sign the DMS forms included the signatures of the household heads - By comparison, it stated that the number of DMS assets which has been taken into calculation are adequate. - The signature of affected households are available in DMS records Identification of vulnerable households The DMS did not determine who among the AHs belonged to one or more of the following vulnerable groups (i.e., women-headed AH with dependents, landless and poor AH, AH headed by a disabled person or by an elderly, ethnic minority AH). Per PTIP resettlement policy, a vulnerable AH is entitled to additional assistance to help improve the social and economic condition of the household i) Determine who among the 12 AHs were vulnerable. (ii) Prepare supplementary payment vouchers or plans for the vulnerable AH for approval by the PPC. (iii) Pay supplementary allowance to the vulnerable AHs No vulnerable households found Payment for life stabilization assistance Losing 30% of one s total agricultural (productive) land was used in determining who (i) Review all DMs forms to find out which among the remaining 11 AHs lost 10%-29% of their total agricultural (productive) Among 11 households, 6 households are losing more than 10% total of productive land On 18 th November 2016, Long An PPC has issued the Decision No. 4906/QD- 14

19 Areas of Concerns Gaps in the 2013 implementation of land acquisition vis-à-vis PTIP resettlement policy Corrective actions Implementation status Remark were severely affected. Only 1 AH was deemed severely affected and for which it was provided life stabilization assistance land. (ii) Prepare payment vouchers or plans for AHs that lost 10%- 29% of their total agricultural (productive) land for approval by the PPC. (iii) Pay life stabilization assistance to the eligible AHs area and not yet received the life stabilization assistance UBND approval for land rental of National Power Transmission Corporation (see decision attached in appendix) It means that compensation, resettlement for this subproject have been completed prior to implementation of PTIP3; all households has agreed and satisfied with compensation received. Till now, there is no doubt or complaints from households informed. II. INSTALLATION OF A SECOND TRANSFORMER BANK FOR 500 KB CAU BONG SUBSTATION Identification of vulnerable affected households The DMS did not determine who among the AHs belonged to one or more of the following vulnerable groups (i.e., women-headed AH with dependents, landless and poor AH, AH headed by a disabled person or by an elderly, ethnic minority AH). Per PTIP resettlement policy, a vulnerable AH is entitled to additional assistance to help improve the social and economic condition of the household. (i) Determine who among the 158 AHs (i.e., 120 permanent loss of land, and 38 affected by land use restrictions) were vulnerable. (ii) Prepare supplementary payment vouchers or plans for the vulnerable AH for approval by HCMCPC. (iii) Provide supplementary assistance to the vulnerable AHs No vulnerable affected households found Payment for life stabilization assistance Losing 30% or more of one s total agricultural (productive) land was used for determining who were severely affected. 33 AHs (i.e., 13 lost 30% - 70%, and 20 lost more than 70% of productive lands) were (i) Review all DMS forms to find out which among the remaining 87 AHs lost 10%-29% of their total agricultural (productive) land. (ii) Prepare payment vouchers or plans for AHs that lost 10%- 29% of their total agricultural (productive) land for approval by There are 32 household losing more than 10% total of productive land area but not yet received life stabilization assistance On 26 th August 2014, HCMC PP has issued Decision no. 4254/QD- UBND for renting land located Cu Chi district for construction investment of power works (transformer stations and 15

20 Areas of Concerns Gaps in the 2013 implementation of land acquisition vis-à-vis PTIP resettlement policy Corrective actions Implementation status Remark deemed severely affected and for which they were provided life stabilization assistance HCMCPC. (iii) Pay life stabilization assistance to the eligible AHs connections). (refer to decision attached in appendix) It means that compensation, resettlement for this subproject have been completed prior to implementation of PTIP3; all households has agreed and satisfied with compensation received. Till now there is no doubts or complaints of AHs informed III. INSTALLATION OF A SECOND TRANSFORMER BANK FOR 220 KV TRA VINH SUBSTATION Payment for life stabilization assistance Losing 30% or more of one s total agricultural (productive) land was used for determining who were severely impacted and thus eligible to get life stabilization assistance. Six AHs (i.e., lost 30% or more of productive lands) were deemed severely affected. PTIP resettlement policy sets the benchmark for determining who are severely impacted at 10% loss of an AH s total productive assets (i) Review the DMS forms of the remaining 5 AHs to find out who among them lost 10%-29% of their total agricultural (productive) land. (ii) Prepare payment vouchers or plans for AHs that lost 10%- 29% of their total agricultural (productive) landholdings for approval by the PPC. (iii) Pay life stabilization assistance to the eligible AHs There are 2 AHs losing more than 10% total of productive land area but not yet received life stabilization assistance On 30 th October 2012, Tra Vinh PPC has issued land use right certificate No. BI for the National power transmission Corporation. It means that compensation and resettlement activities have been conducted and completed prior to PTIP 3 commenced; all HH have agreed and satisfied with compensation received. Till now, no doubts or complaints from AH informed IV. INSTALLATION OF A SECOND TRANSFORMER BANK FOR 220 KV UYEN HUNG SUBSTATION Un-resolved complaint of the AH The extended delay in the resolution of the complaint of the AP is not consistent with the intent and spirit of the grievance redress process that calls for the speedy resolution of (i) Elevate the complaint of the AP to the PPC for resolution. (ii) If the complaint is not resolved at the PPC level, bring the matter to the People s Court for adjudication - Consultation meetings with HH have been organized on 12/09/2012, 15/11/2012; 21/11/2012 but they were absent - On 29 th November Till now, the SPMB has not yet received any information stated that Mr Nguyen Chau submits complaint to PPC or brings the matter the Court for adjudication 16

21 Areas of Concerns Gaps in the 2013 implementation of land acquisition vis-à-vis PTIP resettlement policy Corrective actions Implementation status complaints 2012, HH has submitted complaints to the SPMB, the compliant stated If our land in use acquired is still the perennial agricultural land, it is kindly requested to conduct compensation as per unit rate of agricultural land and reproductive assistance as well as life stabilization allowance based on new decision of PPC in On 17 th December 2012, SPMB has issued official letter no. 7548/AMN-DB to response to complaints of Mr Nguyen Chau Tri HH - On 26 th March 2013, direct discussion meeting with mr Nguyen Chau Tri has been conducted at headquarter of Tan Uyen District People s Committee. Currently compensation cost has been transferred to the Bank account Remark V. 220 KV BA RIA VUNG TAU TRANSMISSION LINE Identification of vulnerable AHs The DMS did not determine who among the AHs belonged to one or more of the vulnerable groups (i.e., womenheaded AH with dependents, landless and poor AH, AH headed by a disabled person or by an elderly, ethnic minority AH). Per PTIP resettlement policy, a vulnerable AH is (i) Determine who among the 140 AHs were vulnerable. (ii) Prepare supplementary payment vouchers or plans for the vulnerable AH for approval by the PPC. (iii) Pay supplementary allowance to the vulnerable AHs. No vulnerable affected households found 17

22 Areas of Concerns Gaps in the 2013 implementation of land acquisition vis-à-vis PTIP resettlement policy Corrective actions Implementation status Remark entitled to additional assistance to help improve the social and economic condition of the household. Payment of life stabilization assistance Losing 30% or more of one s total agricultural (productive) land was used for determining who were severely affected. Eight AHs (i.e., lost 30% or more of productive lands) were deemed severely affected and for which they were provided life stabilization assistance. (i) Review all DMs forms to find out which among the other 132 AHs lost 10%-29% of their total agricultural (productive) land. (ii) Prepare payment vouchers or plans for AHs that lost 10%- 29% of their total agricultural (productive) land for approval by the PPC. (iii) Pay life stabilization assistance to the eligible AHs. There are not any households who acquired more than 10% of total agricultural land (see the annex) Compensation given to AHs The DMS was completed in 2008, but preparation of compensation plans and payment of compensation was carried out over an extended period of time, from 2009 to 2014, depending on the availability of government funds. The CPs of AHs might not have been updated to reflect changes in fixed assets found on the affected lands (subsequent to the 2008 DMS) and the unit rates used to calculate compensation for affected assets might not have been adjusted to reflect prevailing market rates at the time of payment of compensation. (i) Review each CP of the 140 AHs and find when it was approved and when was compensation actually paid. (ii) Regarding the matter of accuracy of affected assets found on the recovered land, check if the AH signed the CP in agreement (ii) Regarding the unit rates used, if the period of approval of the CP and actual payment of compensation was more than 1 year, compute compensation deficits for project-acquired assets (i.e., land, trees, crops, structures) due to inflation using consumer price index (CPI) at the time compensation was actually paid. (iii) Prepare payment vouchers for approval by the PPC. (iii) Pay compensation deficits to eligible AHs. (i) 140 AHs were fully received compensation; (ii) Checking compensation documents, it was known that all AHs signed the CP. (iii) 11 households were compensated more than one year after the compensation plan was approved (see the annex). However, this is not the fault of the employer but rather the households. Therefore, there is no need to consider additional prices for these households. The reasons for late payment are: - Waiting to receive payment for affected ROW: 4 AHs (AHs are affected by both foundation and ROW. The compensation plan was prepared for the foundation first; then 18

23 Areas of Concerns Gaps in the 2013 implementation of land acquisition vis-à-vis PTIP resettlement policy Corrective actions Implementation status Remark prepared for ROW); - Provide legal document late (LURC mortgaged in the bank): 4 AHs; - compensation is not a big amount so the households are slow to receive: 2 AHs; - Waiting to adjust the compensation plan, due to wrong information initially provided 1 AHs. All AHs signed in the compensation documents (DMS, compensation plan, payment slip. Incomplete land acquisition process 7 AHs with agricultural lands in the TL ROW were belatedly located in The DMS forms of these AHs have since been forwarded to authorities in their respective wards for the preparation of their CPs. (i) Finalize the CPs of the 7 AHs for approval by the PPC (ii) Pay compensation (assistance) to the 7 AHs. The compensation plan was prepared and paid to 1 AH. The compensation plans for 6 AHs are under preparation because CARB is collecting legal documents (land was sold many owners) Follow-up status of preparing the compensation plans for 6 AHs Incomplete DMS forms The DMS forms of 6 AHs lacked the signatures of the affected households. (i) Compare the amounts indicated in the respective DMS forms of the 6 AHs vis-à-vis the amounts indicated in their respective CPs and payment vouchers. The signature of affected households are available in DMS records. (ii) If there was a deficit in the amounts paid to the AHs vis-àvis what were paid the AHs, confirm that the AHs were aware of and agree to the shortfall. 19

24 IV. RECOMMENDATION 12. Based on examination, review the status of corrective action plan implementation, the following recommendations are provided by consultant: Table 5. Summary of shortcomings and recommendations No. Content Recommendation Timeline Responsible agency 1 Life stabilization assistance policy for households losing more than 10% of total productive land (table 2). Although the delayed application of life stabilization assistance policy for households losing more than 10% of total productive land is indicated as non-compliance with the project policy framework, the Consultant has not recommended to consider retroactive amount for assistance allowance due to following reasons: - The rate of land loss is only calculated on the affected land plots and households also have many other agricultural land plots. Therefore, the land loss rate of households will be less than 10% on the total area of agricultural land owned by the household. The consultant will work with the local authorities to check the total area of agricultural land owned by the household. - Addition to compensation for land loss, HH have also received vocational change assistance and job creation. These assistance allowance is relatively high and hence HHs can purchase new productive land area to restore living standard. - The compensation has been completed, all HH has received compensation without any complaints. - The Local authority has provided Minutes of land handover for Power corporation. Currently the CARB for these subprojects has dissolved and it will meet difficulties in implementation of retroactive approach if raised. September SPMB; - Local authorities; - Consultant 2 Prepare the - The CARB will prepare and pay July CARB; 20

25 compensation plans and pay for 6 AHs by 220 kv Ba Ria Vung Tau transmission line for the households soon; - Consultant will monitor the implementation status. - SPMB; - Consultant. 21

26 V. ANNEXES 5.1 Decision issued by PC of Long An Province for land rental of National Power Transmission Corporation 22

27 23

28 24

29 5.2 Decision issued by PC of HCMC for land rental of National Power Transmission Corporation 25

30 26

31 5.3 LURC issued by PC of Tra Vinh Province to the National Power Transmission Corporation 27

32 28

33 5.4 List of households who are acquired agricultural land by 220 kv Ba Ria Vung Tau transmission line [This information has been removed as it falls within exceptions to disclosure specified in paragraph 97, (exception (x) Information that, if disclosed, would or would be likely to endanger the life, health, safety, or security of any individual, or safety or security of ADB assets, or to prejudice the defense or national security of a member) of ADB s Public Communications Policy (2011). 29

34 5.5 List of households who received compensation payment late by 220 kv Ba Ria Vung Tau transmission line [This information has been removed as it falls within exceptions to disclosure specified in paragraph 97, (exception (x) Information that, if disclosed, would or would be likely to endanger the life, health, safety, or security of any individual, or safety or security of ADB assets, or to prejudice the defense or national security of a member) of ADB s Public Communications Policy (2011). 30

35 31

VIE: Power Transmission Investment Program, Tranche 3

VIE: Power Transmission Investment Program, Tranche 3 Social Monitoring Report 1st Semi-annual Report July 2017 VIE: Power Transmission Investment Program, Tranche 3 Prepared by Le Duc Huy for the National Power Transmission Corporation and the Asian Development

More information

VIE: Power Transmission Investment Program, Tranche 1 220kV Phu My Industrial Zone Substation and 220kV Song May-Uyen Hung Transmission Line

VIE: Power Transmission Investment Program, Tranche 1 220kV Phu My Industrial Zone Substation and 220kV Song May-Uyen Hung Transmission Line Social Monitoring Report Semestral Report July to December 2014 VIE: Power Transmission Investment Program, Tranche 1 220kV Phu My Industrial Zone Substation and 220kV Song May-Uyen Hung Transmission Line

More information

VIE: Power Transmission Investment Program, Tranche 2 Cau Bong-Duc Hoa Transmission Line

VIE: Power Transmission Investment Program, Tranche 2 Cau Bong-Duc Hoa Transmission Line Social Monitoring Report Quarterly Report July September 2015 VIE: Power Transmission Investment Program, Tranche 2 Cau Bong-Duc Hoa Transmission Line Prepared by the Southern Vietnam Power Projects Management

More information

VIE: Power Transmission Investment Program, Tranche 2 220kV Cau Bong-Hoc Mon-Binh Tan Transmission Line

VIE: Power Transmission Investment Program, Tranche 2 220kV Cau Bong-Hoc Mon-Binh Tan Transmission Line Social Monitoring Report Semi Annual Report January June 2016 VIE: Power Transmission Investment Program, Tranche 2 220kV Cau Bong-Hoc Mon-Binh Tan Transmission Line Prepared by the Southern Vietnam Power

More information

VIE: Power Transmission Investment Program, Tranche 2 Cau Bong-Duc Hoa Transmission Line

VIE: Power Transmission Investment Program, Tranche 2 Cau Bong-Duc Hoa Transmission Line Social Monitoring Report Semi-Annual Monitoring Report July December 2015 VIE: Power Transmission Investment Program, Tranche 2 Cau Bong-Duc Hoa Transmission Line Prepared by the Southern Vietnam Power

More information

VIE: Power Transmission Investment Program, Tranche 1 Song May-Uyen Hung Transmission Line

VIE: Power Transmission Investment Program, Tranche 1 Song May-Uyen Hung Transmission Line Social Monitoring Report 5 th Independent Monitoring Report January April 2016 VIE: Power Transmission Investment Program, Tranche 1 Song May-Uyen Hung Transmission Line Prepared by the Southern Vietnam

More information

VIE: Power Transmission Investment Program, Tranche 2 Cau Bong-Duc Hoa Transmission Line

VIE: Power Transmission Investment Program, Tranche 2 Cau Bong-Duc Hoa Transmission Line Social Monitoring Report Quarterly Report April June 2015 VIE: Power Transmission Investment Program, Tranche 2 Cau Bong-Duc Hoa Transmission Line Prepared by the Southern Vietnam Power Projects Management

More information

VIE: Power Transmission Investment Program, Tranche 2 Cau Bong-Duc Hoa Transmission Line

VIE: Power Transmission Investment Program, Tranche 2 Cau Bong-Duc Hoa Transmission Line Social Monitoring Report Semi-Annual Monitoring Report January June 2015 VIE: Power Transmission Investment Program, Tranche 2 Cau Bong-Duc Hoa Transmission Line Prepared by the Southern Vietnam Power

More information

VIE: Power Transmission Investment Program, Tranche 2 220kV Cau Bong-Hoc Mon-Binh Tan Transmission Line

VIE: Power Transmission Investment Program, Tranche 2 220kV Cau Bong-Hoc Mon-Binh Tan Transmission Line Social Monitoring Report Quarterly Report April June 2016 VIE: Power Transmission Investment Program, Tranche 2 220kV Cau Bong-Hoc Mon-Binh Tan Transmission Line Prepared by the Southern Vietnam Power

More information

VIE: Power Transmission Investment Program, Tranche 1 220kV Phu My 2 Industrial Zone Substation and Connection Lines Subproject

VIE: Power Transmission Investment Program, Tranche 1 220kV Phu My 2 Industrial Zone Substation and Connection Lines Subproject Social Monitoring Report Final Report December 2016 VIE: Power Transmission Investment Program, Tranche 1 220kV Phu My 2 Industrial Zone Substation and Connection Lines Subproject Prepared by the Southern

More information

VIE: Power Transmission Investment Program, Tranche 2 500kV Pleiku-My Phuoc-Cau Bong Transmission Line (Binh Duong Province)

VIE: Power Transmission Investment Program, Tranche 2 500kV Pleiku-My Phuoc-Cau Bong Transmission Line (Binh Duong Province) Social Monitoring Report July 2014 VIE: Power Transmission Investment Program, Tranche 2 500kV Pleiku-My Phuoc-Cau Bong Transmission Line (Binh Duong Province) Prepared by Central Vietnam Power Projects

More information

VIE: Power Transmission Investment Program, Tranche 2 220kV Cau Bong-Duc Hoa Transmission Line

VIE: Power Transmission Investment Program, Tranche 2 220kV Cau Bong-Duc Hoa Transmission Line Social Monitoring Report Semi-Annual Report Jun-Dec 2014 VIE: Power Transmission Investment Program, Tranche 2 220kV Cau Bong-Duc Hoa Transmission Line Prepared by the Southern Power Projects Management

More information

VIE: Power Transmission Investment Program, Tranche 2 220kV Cau Bong-Hoc Mon-Binh Tan Transmission Line

VIE: Power Transmission Investment Program, Tranche 2 220kV Cau Bong-Hoc Mon-Binh Tan Transmission Line Social Monitoring Report 3 rd Independent Monitoring Report June 2016 VIE: Power Transmission Investment Program, Tranche 2 220kV Cau Bong-Hoc Mon-Binh Tan Transmission Line Prepared by the Southern Vietnam

More information

VIE: Power Transmission Investment Program, Tranche 2 220kV Cau Bong-Hoc Mon-Binh Tan Transmission Line

VIE: Power Transmission Investment Program, Tranche 2 220kV Cau Bong-Hoc Mon-Binh Tan Transmission Line Social Monitoring Report Semi-Annual Report Jun-Dec 2014 VIE: Power Transmission Investment Program, Tranche 2 220kV Cau Bong-Hoc Mon-Binh Tan Transmission Line Prepared by the Southern Power Projects

More information

COMPENSATION, ASSISTANCE AND RESETTLEMENT POLICY PROPOSED FOR

COMPENSATION, ASSISTANCE AND RESETTLEMENT POLICY PROPOSED FOR Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized DIRECTORATE FOR ROADS OF VIETNAM PROJECT MANAGEMENT UNIT 3 ================= COMPENSATION,

More information

Safeguards Monitoring Report

Safeguards Monitoring Report Safeguards Monitoring Report Semiannual Report Covering July-Dec 2016 period February 2017 (ESDIP) Tranche-2 Chimtala- Arghandi 220 kv DC Transmission Line Subproject (DABS - 006/ICB) Prepared by Da Afghanistan

More information

VIE: Renewable Energy Development and Network Expansion and Rehabilitation for Remote Communes Sector Project. Sub-project: So Vin Hydropower Project

VIE: Renewable Energy Development and Network Expansion and Rehabilitation for Remote Communes Sector Project. Sub-project: So Vin Hydropower Project Final Resettlement Monitoring Report Document stage: Final Project number: Loan 2517 May, 2017 VIE: Renewable Energy Development and Network Expansion and Rehabilitation for Remote s Sector Project Sub-project:

More information

Da Nang - Quang Ngai Expressway Development Project

Da Nang - Quang Ngai Expressway Development Project Public Disclosure Authorized Public Disclosure Authorized DA NANG-QUANG NGAI EXPRESSWAY PROJECT Due Dilligence report, Phu Ninh district, Quang Nam province MINISTRY OF TRANSPORT VIETNAM EXPRESSWAY CORPORATION

More information

Combined Resettlement Plan and Ethnic Minority Development Plan. VIE: GMS Kunming-Haiphong Transport Corridor Noi Bai-Lao Cai Highway Project

Combined Resettlement Plan and Ethnic Minority Development Plan. VIE: GMS Kunming-Haiphong Transport Corridor Noi Bai-Lao Cai Highway Project Combined Resettlement Plan and Ethnic Minority Development Plan December 2017 VIE: GMS Kunming-Haiphong Transport Corridor Noi Bai-Lao Cai Highway Project Prepared by Vietnam Expressway Corporation for

More information

NORTH POWER CORPORATION Electric Network Project Management Board RESETTLEMENT PLAN (RP) SUBPROJECT:

NORTH POWER CORPORATION Electric Network Project Management Board RESETTLEMENT PLAN (RP) SUBPROJECT: Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Subproject : Rural Energy - Additional Financing (Phase 4) Subproject in Ha Nam NORTH

More information

VIE: Ben Luc Long Thanh Expressway Project

VIE: Ben Luc Long Thanh Expressway Project Resettlement Plan TA 7155-VIE 19 July 2010 VIE: Ben Luc Long Thanh Expressway Project Vietnam Expressway Corporation ABBREVIATIONS ADB DP CPC DPC DCSCC DARD DOC DOF DONRE DPI DOT DMS EMA FS GoV HCMC HH

More information

Viet Nam: Secondary Cities Development Project - Ha Tinh Subproject

Viet Nam: Secondary Cities Development Project - Ha Tinh Subproject Resettlement Monitoring Report # First Periodic Report September 2016 Viet Nam: Secondary Cities Development Project - Ha Tinh Subproject Prepared by Nguyen Van Trung, External Resettlement Monitoring

More information

VIETNAM INDUSTRIAL POLLUTION MANAGEMENT PROJECT (P113151)

VIETNAM INDUSTRIAL POLLUTION MANAGEMENT PROJECT (P113151) Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized VIETNAM INDUSTRIAL POLLUTION MANAGEMENT PROJECT (P113151) Due Diligence Review of Involuntary

More information

Internal Resettlement Monitoring Report

Internal Resettlement Monitoring Report Internal Resettlement Monitoring Report Stage of document: Quarterly (Q4 2015) Project/Loan number: Loan 2789 Date: March 2016 VIE: TRANSPORT CONNECTIONS IN NORTHERN MOUNTAINOUSPROVINCES PROJECT Prepared

More information

Cam My and Thong Nhat Districts DONG NAI PROVINCE Stage 3

Cam My and Thong Nhat Districts DONG NAI PROVINCE Stage 3 THE SOCIALIST REPUBLIC OF VIETNAM MINISTRY OF TRANSPORT VIETNAM EXPRESSWAY CORPORATION (VEC) SOUTHERN EXPRESSWAY PROJECT MANAGEMENT UNIT (SEPMU) The Updated Resettlement Plan Cam My and Thong Nhat Districts

More information

NATIONAL POWER TRANMISSION CORPORATION Northern Power Projects Management Board RESETTLEMENT PLAN (RP)

NATIONAL POWER TRANMISSION CORPORATION Northern Power Projects Management Board RESETTLEMENT PLAN (RP) Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized NATIONAL POWER TRANMISSION CORPORATION Northern Power Projects Management Board -------------------------------

More information

PEOCS QUALITY MANAGEMENT SYSTEM ISO C6NG TY Ttl VAN XAY D/NG DION 3 R'P82 VO L t' RESETTLEMENT ACTION PLAN

PEOCS QUALITY MANAGEMENT SYSTEM ISO C6NG TY Ttl VAN XAY D/NG DION 3 R'P82 VO L t' RESETTLEMENT ACTION PLAN Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized ELECTRICITY OF VIET NAM SOUTHERN POWER PROJECT MANAGEMENT BOARD R'P82 VO L. 14 LONG AN

More information

Socialist Republic of Viet Nam: Water Sector Investment Program Multitranche Financing Facility (MFF) Periodic Financing Request 3

Socialist Republic of Viet Nam: Water Sector Investment Program Multitranche Financing Facility (MFF) Periodic Financing Request 3 Appendix 3: Water Sector Investment Program (MFF0054-VIE) PFR3 Report VIE 41456-043 Project Administration Manual Project Number: 41456-043 Loan Number: XXXX March 2015 Socialist Republic of Viet Nam:

More information

FACTSHEET ON MINIMUM WAGE LEGISLATION AROUND THE WORLD

FACTSHEET ON MINIMUM WAGE LEGISLATION AROUND THE WORLD FACTSHEET ON MINIMUM WAGE LEGISLATION AROUND THE WORLD According to the International Labour Office in Geneva in Switzerland, about 90% of the countries in the world have legislation in favour of minimum

More information

PAK: MFF Power Distribution Enhancement Investment Program (Tranche 2)

PAK: MFF Power Distribution Enhancement Investment Program (Tranche 2) Social Monitoring Report Bi-annual Social Monitoring Report July 2014 PAK: MFF Power Distribution Enhancement Investment Program (Tranche 2) Prepared by Lahore Electric Supply Company, Punjab for the Asian

More information

VIE: O Mon IV Combined Cycle Power Plant

VIE: O Mon IV Combined Cycle Power Plant Resettlement Due Diligence Report February 2011 VIE: O Mon IV Combined Cycle Power Plant Prepared by Can Tho Thermal Power Company for the Asian Development Bank. 1 O MON IV THERMAL POWER PLANT RESETTLEMENT

More information

Viet Nam: Northern Power Transmission Expansion Sector Project

Viet Nam: Northern Power Transmission Expansion Sector Project Validation Report Reference Number: PVR-485 Project Number: 38196-013 Loan Number: 2225 December 2016 Viet Nam: Northern Power Transmission Expansion Sector Project Independent Evaluation Department ABBREVIATIONS

More information

Vertical Accountability PAPI Chapter 3. Map 3.3: Provincial Performance in Vertical Accountability by Quartiles

Vertical Accountability PAPI Chapter 3. Map 3.3: Provincial Performance in Vertical Accountability by Quartiles Dimension 3: Vertical Accountability Map 3.3: Provincial Performance in Vertical Accountability by Quartiles Vertical Accountability Best Performers High Average Low Average Poor Performers 46 THE VIET

More information

Nepal: Decentralized Rural Infrastructure and Livelihood Project- Additional Financing

Nepal: Decentralized Rural Infrastructure and Livelihood Project- Additional Financing Resettlement Planning Document Due Diligence Report Loan Number: 2796 and Grant Number: 0267 NEP June 2012 Nepal: Decentralized Rural Infrastructure and Livelihood Project- Additional Financing Ghupa-Sanghu

More information

REPORT ON Independent Resettlement Monitoring (Mission I)

REPORT ON Independent Resettlement Monitoring (Mission I) ELECTRICITY OF VIETNAM TRUNG SON HYDROPOWER PROJECT CONSTRUCTION OPERATION ROAD TRUNG SON HYDROPOWER PLANT REPORT ON Independent Resettlement Monitoring (Mission I) Monitored and reported by: Centre for

More information

The Provincial People s Committees of Thanh Hóa, Quảng Bình, Thừa Thiên - Huế, Quảng Nam, and Quảng Ngãi Province. To:

The Provincial People s Committees of Thanh Hóa, Quảng Bình, Thừa Thiên - Huế, Quảng Nam, and Quảng Ngãi Province. To: MINISTRY OF CONSTRUCTION THE SOCIALIST REPUBLIC OF VIETNAM Independence Freedom Happiness No: /BXD-QLN Subject: Guidelines on the implementation of Project s Component 1 funded by Green Climate Fund (GCF):

More information

Outlook for Central Vietnam, including Tax Incentives

Outlook for Central Vietnam, including Tax Incentives Outlook for Central Vietnam, including Tax Incentives Presentation by Nguyen Quang Phuc, Director, Tax and Advisory Services ECV Business Forum, 24 November 2017 Outlook for Central Vietnam, including

More information

VIE: Central Mekong Delta Region Connectivity Project

VIE: Central Mekong Delta Region Connectivity Project Social Monitoring Report Fifth Report August 2016 VIE: Central Mekong Delta Region Connectivity Project Prepared by Romeo Cleto, External Monitor, for the Ministry of Transport, Cuu Long Corporation for

More information

PAK: MFF Power Distribution Enhancement Investment Program (Tranche 4)

PAK: MFF Power Distribution Enhancement Investment Program (Tranche 4) Social Monitoring Report Bi-annual Social Monitoring Report November 2015 PAK: MFF Power Distribution Enhancement Investment Program (Tranche 4) Prepared by Lahore Electric Supply Company, Punjab for the

More information

Thanh Thanh Cong Tay Ninh Joint Stock Company

Thanh Thanh Cong Tay Ninh Joint Stock Company Interim separate financial statements 31 December 2016 GENERAL INFORMATION CONTENTS Pages General information 1-2 Report of management 3 Report on review of interim separate financial information 4-5 Interim

More information

Initial Environmental Examination

Initial Environmental Examination Initial Environmental Examination June 2017 IND: Green Energy Corridor and Grid Strengthening Project (320 kv VSC-HVDC power transmission lines between Pugalur, Tamil Nadu and North Trichur, Kerala) Annexures

More information

COUNTRY REPORT (VIETNAM)

COUNTRY REPORT (VIETNAM) COUNTRY REPORT (VIETNAM) ------------------------------------------------------------------------------------- I. Current situation of Rail Links in Viet Nam: 1. Singapore Kunming Railways Project: - Section:

More information

Press Release. Press Release SAVILLS VIETNAM REPORT ON INDUSTRIAL SECTOR NATIONWIDE 1. OVERVIEW 24/09/2015

Press Release. Press Release SAVILLS VIETNAM REPORT ON INDUSTRIAL SECTOR NATIONWIDE 1. OVERVIEW 24/09/2015 24/09/2015 SAVILLS VIETNAM REPORT ON INDUSTRIAL SECTOR NATIONWIDE 1. OVERVIEW Co.,Ltd 18 th Floor, Continental Tower 81-85 Ham Nghi Street District 1, HCMC T: +84 8 3823 9205 savills.com.vn Large-scale

More information

INFORMATION FOR STRATEGIC INVESTORS

INFORMATION FOR STRATEGIC INVESTORS 1. General information INFORMATION FOR STRATEGIC INVESTORS 1.1. General information of the equitized corporation Vietnamese name : CONG TY TNHH MTV - TONG CONG TY PHAT DIEN 3 English name : POWER GENERATION

More information

Thanh Thanh Cong Tay Ninh Joint Stock Company

Thanh Thanh Cong Tay Ninh Joint Stock Company Interim consolidated financial statements 31 December 2016 CONTENTS Pages General information 1-2 Report of management 3 Report on review of interim consolidated financial statements 4-5 Interim consolidated

More information

Socialist Republic of Viet Nam: Viet Nam Water Sector Investment Program Multitranche Financing Facility (MFF) - Periodic Financing Request 2

Socialist Republic of Viet Nam: Viet Nam Water Sector Investment Program Multitranche Financing Facility (MFF) - Periodic Financing Request 2 Project Administration Manual Project Number: 41456 Loan Number: 2961 December 2012 Socialist Republic of Viet Nam: Viet Nam Water Sector Investment Program Multitranche Financing Facility (MFF) - Periodic

More information

LOAN AGREEMENT (Ordinary Operations) (Ho Chi Minh City Urban Mass Rapid Transit Line 2 Investment Program Loan 2) between

LOAN AGREEMENT (Ordinary Operations) (Ho Chi Minh City Urban Mass Rapid Transit Line 2 Investment Program Loan 2) between LOAN NUMBER 2956-VIE LOAN AGREEMENT (Ordinary Operations) (Ho Chi Minh City Urban Mass Rapid Transit Line 2 Investment Program Loan 2) between SOCIALIST REPUBLIC OF VIET NAM and ASIAN DEVELOPMENT BANK

More information

VIE: Central Mekong Delta Connectivity Project Can Tho City

VIE: Central Mekong Delta Connectivity Project Can Tho City Income Restoration Program February 2015 VIE: Central Mekong Delta Connectivity Project Can Tho City Prepared by Ministry of Transport, Cuu Long Corporation for Investment, Development and Project Management

More information

THANH CONG SECURITIES COMPANY Floor 3&5, Centec Tower, Nguyen Thi Minh Khai, Dis.3, HCMC Phone : + 84 (08) Website:

THANH CONG SECURITIES COMPANY Floor 3&5, Centec Tower, Nguyen Thi Minh Khai, Dis.3, HCMC Phone : + 84 (08) Website: THANH CONG SECURITIES COMPANY Floor 3&5, Centec Tower, 72-74 Nguyen Thi Minh Khai, Dis.3, HCMC Phone : + 84 (08) 3 827 0527 Website: www.tcsc.vn MONTHLY REPORT AUGUST 2012 Research Department research@tcsc.vn

More information

Viet Nam: Renewable Energy Development and Network Expansion and Rehabilitation for Remote Communes Sector Project

Viet Nam: Renewable Energy Development and Network Expansion and Rehabilitation for Remote Communes Sector Project Project Administration Memorandum Project Number: 42182 Loan Number: 2517 November 2009 Version: (Inception) 2009-02 Viet Nam: Renewable Energy Development and Network Expansion and Rehabilitation for

More information

GEO: Sustainable Urban Transport Investment Program, Tranche 2 Tbilisi-Rustavi Urban Road Link (Section-1: km 0 to 4 Tbilisi Phonichala) (Addendum)

GEO: Sustainable Urban Transport Investment Program, Tranche 2 Tbilisi-Rustavi Urban Road Link (Section-1: km 0 to 4 Tbilisi Phonichala) (Addendum) Resettlement Plan December 2014 GEO: Sustainable Urban Transport Investment Program, Tranche 2 Tbilisi-Rustavi Urban Road Link (Section-1: km 0 to 4 Tbilisi Phonichala) (Addendum) Prepared by the Municipal

More information

Asian Development Bank Accountability Mechanism Compliance Review Panel

Asian Development Bank Accountability Mechanism Compliance Review Panel Asian Development Bank Accountability Mechanism Compliance Review Panel Terms of Reference for Monitoring under the Chashma Right Bank Irrigation Project (Stage III) Inspection Request I. Introduction

More information

Subproject: Cau Khai drainage system Yen Dinh district, Thanh Hoa province

Subproject: Cau Khai drainage system Yen Dinh district, Thanh Hoa province Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized RP299 vol. 3 Ministry of Agriculture and Rural Development The World Bank Natural Disaster

More information

PROSPECTUS INITIAL PUBLIC OFFERING POWER GENERATION CORPORATION 3 THE PARENT COMPANY

PROSPECTUS INITIAL PUBLIC OFFERING POWER GENERATION CORPORATION 3 THE PARENT COMPANY THE EQUITIZATION STEERING COMMITTEE OF EVNGENCO 3 RECOMMENDS THAT INVESTORS SHOULD CAREFULLY STUDY THIS PROSPECTUS AND THE AUCTION REGULATION BEFORE MAKING DECISION TO INVEST. THE AUCTIONEER PROSPECTUS

More information

.~~~IO O12O RP82 OF VIT NAM ~~~ELECTRICITY. RESETTLIEMENT ACTION PlAsN (RAP) (FINAL REVISION) \} \ PECC4 POWER ENGINEERING CONSULTING COMPANY 4

.~~~IO O12O RP82 OF VIT NAM ~~~ELECTRICITY. RESETTLIEMENT ACTION PlAsN (RAP) (FINAL REVISION) \} \ PECC4 POWER ENGINEERING CONSULTING COMPANY 4 Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized X RP82 VOL. 20 ~~~~~SOCIALIST REPUBLIC OF VIET NAM OF VIT NAM \} \ ~~~ELECTRICITY PECC4

More information

VIETNAM BRIEF ABOUT THE COUNTRY AND OPPORTUNITIES IN DOING BUSINESS

VIETNAM BRIEF ABOUT THE COUNTRY AND OPPORTUNITIES IN DOING BUSINESS VIETNAM BRIEF ABOUT THE COUNTRY AND OPPORTUNITIES IN DOING BUSINESS 1 CONTENTS: I. OVERVIEW OF ECONOMY IN VIETNAM II. III. IV. OVERVIEW OF FDI IN VIETNAM PROCEDURES FOR INVESTMENT TIPS FOR DOING BUSINESS

More information

PROJECT AGREEMENT. (Viet Nam Water Sector Investment Program Project 2) between ASIAN DEVELOPMENT BANK. and

PROJECT AGREEMENT. (Viet Nam Water Sector Investment Program Project 2) between ASIAN DEVELOPMENT BANK. and LOAN NUMBER 2961-VIE PROJECT AGREEMENT (Viet Nam Water Sector Investment Program Project 2) between ASIAN DEVELOPMENT BANK and BAC GIANG WATER SUPPLY AND SEWERAGE ONE MEMBER LIMITED COMPANY BINH DUONG

More information

CONSOLIDATED INCOME STATEMENT Quarter IV/2011

CONSOLIDATED INCOME STATEMENT Quarter IV/2011 CONSOLIDATED INCOME STATEMENT Quarter IV/2011 Item Quarter IV Accumulated amount Current year Previous year Current year Previous year 1 Sales 664.125.062.838 671.185.380.822 2.374.962.709.626 2.148.850.890.455

More information

Compulsory versus voluntary social insurance schemes. October 2017

Compulsory versus voluntary social insurance schemes. October 2017 Compulsory versus voluntary social insurance schemes October 2017 Overview of the Social Insurance system in Vietnam The Insurance policy administered by Social Insurance authorities is a major policy

More information

Updated Facility Administration Manual. Socialist Republic of Viet Nam: Greater Mekong Subregion Ben Luc Long Thanh Expressway Project

Updated Facility Administration Manual. Socialist Republic of Viet Nam: Greater Mekong Subregion Ben Luc Long Thanh Expressway Project Updated Facility Administration Manual Project Number: 41414 Loan Number: MFF 0053-VIE 23 March 2016 Socialist Republic of Viet Nam: Greater Mekong Subregion Ben Luc Long Thanh Expressway Project 1 Contents

More information

Viet Nam: Ho Chi Minh City Long Thanh Dau Giay Expressway Technical Assistance Project

Viet Nam: Ho Chi Minh City Long Thanh Dau Giay Expressway Technical Assistance Project Completion Report Project Number: 40198 Loan Number: 2374 October 2012 Viet Nam: Ho Chi Minh City Long Thanh Dau Giay Expressway Technical Assistance Project Asian Development Bank CURRENCY EQUIVALENTS

More information

TECHNICAL ASSISTANCE: HIMACHAL PRADESH POWER SECTOR CAPACITY DEVELOPMENT AND IMPLEMENTATION SUPPORT

TECHNICAL ASSISTANCE: HIMACHAL PRADESH POWER SECTOR CAPACITY DEVELOPMENT AND IMPLEMENTATION SUPPORT Himachal Pradesh Clean Energy Transmission Investment Program (RRP IND 43464) TECHNICAL ASSISTANCE: HIMACHAL PRADESH POWER SECTOR CAPACITY DEVELOPMENT AND IMPLEMENTATION SUPPORT A. INTRODUCTION 1. The

More information

PETROVIETNAM FERTILIZER AND CHEMICALS CORPORATION. New CHALLENGES OPPORTUNITIES ANNUAL REPORT.

PETROVIETNAM FERTILIZER AND CHEMICALS CORPORATION. New CHALLENGES OPPORTUNITIES ANNUAL REPORT. PETROVIETNAM FERTILIZER AND CHEMICALS CORPORATION New CHALLENGES OPPORTUNITIES ANNUAL REPORT www.dpm.vn CONTENTS 04 Vision - Mission 06 Leader's message Pioneering with FIRM STEPS Enhancing Internal STRENGTH

More information

Tax Environment Landscape and Incentives to New Investment Projects in Nghe An. 08 September 2017 Phan Xuan Qui

Tax Environment Landscape and Incentives to New Investment Projects in Nghe An. 08 September 2017 Phan Xuan Qui Tax Environment Landscape and Incentives to New Investment Projects in Nghe An 08 September 2017 Phan Xuan Qui Table of Contents 1 Current tax environment landscape in Vietnam [03] 2 Tax incentives - Overview

More information

Implementation Status & Results Vietnam Central North Region Health Support Project (P095275)

Implementation Status & Results Vietnam Central North Region Health Support Project (P095275) losure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Implementation Status & Results Vietnam Central North Region Health Support Project (P095275) Operation

More information

EVALUATION REPORT OF 2008

EVALUATION REPORT OF 2008 SAIGON BEER ALCOHOL BEVERAGE JS CORPORATION (SABECO) No. 6 Hai Ba Trưng Street, Ben Nghe Ward, District 1, Ho Chi Minh City Tel: (08) 3829 4081 Fax: (08) 3829 6856 Website: www.sabeco.com.vn Email: sabeco@sabeco.com.vn

More information

CONSOLIDATED BALANCE SHEET

CONSOLIDATED BALANCE SHEET For the first quarter of year 2011 ended 31 March 2011 CONSOLIDATED BALANCE SHEET The first quarter of year 2011 Unit: VND ASSETS Code Note A - CURRENT ASSETS 100 2.212.505.287.114 2.249.134.755.209 I.

More information

THANH CONG SECURITIES COMPANY Floor 3&5, Centec Tower, Nguyen Thi Minh Khai, Dis.3, HCMC Phone : + 84 (08) Website:

THANH CONG SECURITIES COMPANY Floor 3&5, Centec Tower, Nguyen Thi Minh Khai, Dis.3, HCMC Phone : + 84 (08) Website: THANH CONG SECURITIES COMPANY Floor 3&5, Centec Tower, 72-74 Nguyen Thi Minh Khai, Dis.3, HCMC Phone : + 84 (08) 3 827 0527 Website: www.tcsc.vn MONTHLY REPORT MAY 2012 Research Department research@tcsc.vn

More information

OFFICIAL -1 L(-L DOCUMENTS. Between. and

OFFICIAL -1 L(-L DOCUMENTS. Between. and Public Disclosure Authorized OFFICIAL -1 L(-L DOCUMENTS ADDENDUM No 2 TO ADMINISTRATION AGREEMENT Between Public Disclosure Authorized Public Disclosure Authorized the EUROPEAN UNION (represented by the

More information

Socialist Republic of Viet Nam: Sustainable Rural Infrastructure Development Project in Northern Mountain Provinces

Socialist Republic of Viet Nam: Sustainable Rural Infrastructure Development Project in Northern Mountain Provinces Sustainable Rural Infrastructure Development Project in Northern Mountain Provinces (RRP VIE 41461) Project Administration Manual Project Number: 41461 Loan and/or Grant Number(s): 30 September 2010 Socialist

More information

TABLE OF CONTENTS CORPORATE INFORMATION 2 STATEMENT OF THE BOARD OF MANAGEMENT 3 INTERIM FINANCIAL STATEMENTS REVIEW REPORT 4-5

TABLE OF CONTENTS CORPORATE INFORMATION 2 STATEMENT OF THE BOARD OF MANAGEMENT 3 INTERIM FINANCIAL STATEMENTS REVIEW REPORT 4-5 TABLE OF CONTENTS PAGE CORPORATE INFORMATION 2 STATEMENT OF THE BOARD OF MANAGEMENT 3 INTERIM FINANCIAL STATEMENTS REVIEW REPORT 4-5 SEPARATE STATEMENT OF FINANCIAL POSITION 6-8 SEPARATE STATEMENT OF INCOME

More information

TABLE OF CONTENTS CORPORATE INFORMATION 2 STATEMENT OF THE BOARD OF DIRECTORS 3 SEPARATE STATEMENT OF FINANCIAL POSITION 4-6

TABLE OF CONTENTS CORPORATE INFORMATION 2 STATEMENT OF THE BOARD OF DIRECTORS 3 SEPARATE STATEMENT OF FINANCIAL POSITION 4-6 TABLE OF CONTENTS PAGE CORPORATE INFORMATION 2 STATEMENT OF THE BOARD OF DIRECTORS 3 SEPARATE STATEMENT OF FINANCIAL POSITION 4-6 SEPARATE STATEMENT OF INCOME 7-8 SEPARATE STATEMENT OF CASH FLOWS 9-11

More information

Kazakhstan: Countercyclical Support

Kazakhstan: Countercyclical Support Validation Report August 2018 Kazakhstan: Countercyclical Support Reference Number: PVR-567 Project Number: 49083-001 Loan Number: 3272 ABBREVIATIONS ADB CPS - - Asian Development Bank country partnership

More information

THANH CONG TEXTILE GARMENT INVESTMENT TRADING JOINT STOCK COMPANY AND ITS SUBSIDIARIES (Incorporated in the Socialist Republic of Vietnam)

THANH CONG TEXTILE GARMENT INVESTMENT TRADING JOINT STOCK COMPANY AND ITS SUBSIDIARIES (Incorporated in the Socialist Republic of Vietnam) THANH CONG TEXTILE GARMENT INVESTMENT TRADING JOINT STOCK COMPANY (Incorporated in the Socialist Republic of Vietnam) AUDITED CONSOLIDATED FINANCIAL STATEMENTS For the year ended 31 December 2015 March

More information

TABLE OF CONTENTS CORPORATE INFORMATION 2 STATEMENT OF THE BOARD OF DIRECTORS 3 INTERIM FINANCIAL STATEMENTS REVIEW REPORT 4-5

TABLE OF CONTENTS CORPORATE INFORMATION 2 STATEMENT OF THE BOARD OF DIRECTORS 3 INTERIM FINANCIAL STATEMENTS REVIEW REPORT 4-5 TABLE OF CONTENTS PAGE CORPORATE INFORMATION 2 STATEMENT OF THE BOARD OF DIRECTORS 3 INTERIM FINANCIAL STATEMENTS REVIEW REPORT 4-5 SEPARATE STATEMENT OF FINANCIAL POSITION 6-8 SEPARATE STATEMENT OF INCOME

More information

PROJECT PREPARATORY TECHNICAL ASSISTANCE

PROJECT PREPARATORY TECHNICAL ASSISTANCE Appendix 4 11 A. Justification PROJECT PREPARATORY TECHNICAL ASSISTANCE 1. The government has identified the priority areas to be covered under the ensuing loan project and prepared outline technical studies

More information

Avoidance of double taxation agreement between Vietnam and Japan Concept of Permanent Establishment

Avoidance of double taxation agreement between Vietnam and Japan Concept of Permanent Establishment Avoidance of double taxation agreement between Vietnam and Japan Concept of Permanent Establishment Lac Boi Tho Senior Manager Tax and Corporate services CONTENT General introduction on the avoidance of

More information

TATA COFFEE VIETNAM COMPANY LIMITED (Incorporated in the Socialist Republic of Vietnam)

TATA COFFEE VIETNAM COMPANY LIMITED (Incorporated in the Socialist Republic of Vietnam) (Incorporated in the Socialist Republic of Vietnam) AUDITED FINANCIAL STATEMENTS FOR THE PERIOD FROM 28 MARCH 2017 (DATE OF INCORPORATION) TO 31 MARCH 2018 No.12 VSIP II-A, Street No.32, Vietnam Singapore

More information

REPORT OF THE DIRECTORS

REPORT OF THE DIRECTORS REPORT OF THE DIRECTORS The Directors of Gemadept Corporation ( the company ) present this report together with the reviewed financial statements for the first 6 months of the fiscal year ending 31 December

More information

Note: The given business registration No is not correct. The correct one is as above

Note: The given business registration No is not correct. The correct one is as above COMPANY CREDIT REPORT GENERAL INFORMATION VietnamCredit s Ref CR0023260 Company Search Date 1 Aug 2016 QUICK CREDIT RATING OVERVIEW Company status Operating Total Score 51 Credit rating BB Logo SUBJECT

More information

OFFICIAL DOCUMENTS. The World Bank. Public Disclosure Authorized. Public Disclosure Authorized

OFFICIAL DOCUMENTS. The World Bank. Public Disclosure Authorized. Public Disclosure Authorized Public Disclosure Authorized OFFICIAL DOCUMENTS The World Bank 1818 H Street N.W. (202) 473-1000 INTERNATIONAL BANK FOR RECONSTRUCTION AND DEVELOPMENT Washington, D.C. 20433 Cable Address: INTBAFRAD INTERNATIONAL

More information

THANH CONG TEXTILE GARMENT INVESTMENT TRADING JOINT STOCK COMPANY AND ITS SUBSIDIARIES (Incorporated in the Socialist Republic of Vietnam)

THANH CONG TEXTILE GARMENT INVESTMENT TRADING JOINT STOCK COMPANY AND ITS SUBSIDIARIES (Incorporated in the Socialist Republic of Vietnam) THANH CONG TEXTILE GARMENT INVESTMENT TRADING JOINT STOCK COMPANY (Incorporated in the Socialist Republic of Vietnam) REVIEWED CONSOLIDATED FINANCIAL STATEMENTS For the period from 01 January 2015 to 30

More information

The PCI-Foreign Invested Enterprises 2011 Survey American Chamber of Commerce June 6, 2012, New Saigon World Hotel, HCMC

The PCI-Foreign Invested Enterprises 2011 Survey American Chamber of Commerce June 6, 2012, New Saigon World Hotel, HCMC The PCI-Foreign Invested Enterprises 2011 Survey American Chamber of Commerce June 6, 2012, New Saigon World Hotel, HCMC Jim Winkler, Ph.D. USAID/VNCI Director Findings taken from the PCI 2011 report,

More information

Report and Recommendation of the President to the Board of Directors

Report and Recommendation of the President to the Board of Directors Report and Recommendation of the President to the Board of Directors Lanka Project Number: 46265 September 2013 Proposed Administration of Grant Socialist Republic of Viet Nam: Energy Efficiency for Ho

More information

Company s Overview. Market data on 19 th Feb, PPC Ownership breakdown by 6 th Feb, 2013

Company s Overview. Market data on 19 th Feb, PPC Ownership breakdown by 6 th Feb, 2013 19 th February 213 SONG DA URBAN & INDUSTRIAL ZONE INVESTMENT AND DEVELOPMENT JSC. (HOSE: SJS) Industry: Real estate Establishment date: 8 th July 23 Website: http://www.sudicosd.com.vn Listing date: 6

More information

Socialist Republic of Viet Nam: GMS Corridor Connectivity Enhancement Project

Socialist Republic of Viet Nam: GMS Corridor Connectivity Enhancement Project Technical Assistance Project Number: 50098 Project Preparatory Technical Assistance (PPTA) November 2016 Socialist Republic of Viet Nam: GMS Corridor Connectivity Enhancement Project This document is being

More information

In this issue: L atest News T enant News W orkshop U pcoming Event L egal Update

In this issue: L atest News T enant News W orkshop U pcoming Event L egal Update In this issue: 1 LATEST NEWS VSIP Binh Duong received nearly US$600 million in FDI February 20, 2014 marked the inauguration of the Binh Duong Province Integrated Administration Centre at the Binh Duong

More information

TABLE OF CONTENTS CORPORATE INFORMATION 2 STATEMENT OF THE BOARD OF DIRECTORS 3 INTERIM FINANCIAL STATEMENTS REVIEW REPORT 4

TABLE OF CONTENTS CORPORATE INFORMATION 2 STATEMENT OF THE BOARD OF DIRECTORS 3 INTERIM FINANCIAL STATEMENTS REVIEW REPORT 4 TABLE OF CONTENTS PAGE CORPORATE INFORMATION 2 STATEMENT OF THE BOARD OF DIRECTORS 3 INTERIM FINANCIAL STATEMENTS REVIEW REPORT 4 SEPARATE STATEMENT OF FINANCIAL POSITION 6 SEPARATE STATEMENT OF INCOME

More information

THE MINISTRY OF FINANCE

THE MINISTRY OF FINANCE THE MINISTRY OF FINANCE Circular No. 28/2011/TT-BTC of February 28, 2011, guiding a number of articles of the Law on Tax Administration and the Government s Decree No. 85/2007/ND-CP of May 25, 2007, and

More information

COUNTRY REPORT ON IMPLEMENTED SNA IN VIETNAM

COUNTRY REPORT ON IMPLEMENTED SNA IN VIETNAM August 15, 2015 COUNTRY REPORT ON IMPLEMENTED SNA IN VIETNAM Name: Nguyen Thi Mai Hanh National Account Department GSO Viet Nam 1. Introduction Since 1989, the System of National Account have been studied

More information

(i) Loan Disbursement Handbook means ADB s Loan Disbursement Handbook (2012, as amended from time to time);

(i) Loan Disbursement Handbook means ADB s Loan Disbursement Handbook (2012, as amended from time to time); 2 (f) GAP or Gender Action Plan means the gender action plan for the Project, including any update thereto, prepared and agreed between the Borrower and ADB and further set out in the PAM; (g) Goods means

More information

PAK: Power Distribution Enhancement Investment Program, Tranche 2

PAK: Power Distribution Enhancement Investment Program, Tranche 2 Social Monitoring Report Bi-annual Social Monitoring Report July 2012 PAK: Power Distribution Enhancement Investment Program, Tranche 2 Prepared by Quetta Electric Supply Company (QESCO), Balochistan for

More information

IMPLEMENTATION COMPLETION AND RESULTS REPORT (IDA TF-94257) ON A CREDIT IN THE AMOUNT OF SDR 91.1 MILLION (US$ 150 MILLION EQUIVALENT) TO THE

IMPLEMENTATION COMPLETION AND RESULTS REPORT (IDA TF-94257) ON A CREDIT IN THE AMOUNT OF SDR 91.1 MILLION (US$ 150 MILLION EQUIVALENT) TO THE Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Document of The World Bank Report No: ICR00002312 IMPLEMENTATION COMPLETION AND RESULTS

More information

FINANCIAL STATEMENTS FOR THE FISCAL YEAR ENDED 31 DECEMBER 2010 VNDIRECT SECURITIES JOINT STOCK COMPANY

FINANCIAL STATEMENTS FOR THE FISCAL YEAR ENDED 31 DECEMBER 2010 VNDIRECT SECURITIES JOINT STOCK COMPANY FOR THE FISCAL YEAR ENDED 31 DECEMBER 2010 VNDIRECT SECURITIES JOINT STOCK COMPANY CONTENTS Page 1. Contents 1 2. Report of the General Directors 2-4 3. Auditor s report 5-6 4. Balance sheet as of 31 December

More information

Community Hygiene and Water Women-led Output based Aid Project (WOBA) in Vietnam. Introduction & Overview

Community Hygiene and Water Women-led Output based Aid Project (WOBA) in Vietnam. Introduction & Overview Community Hygiene and Water Women-led Output based Aid Project (WOBA) in Vietnam Introduction & Overview What is the difference between Equity and Equality? What is GESI? Gender equality is about transforming

More information

Agreement Amending Project Agreement

Agreement Amending Project Agreement Public Disclosure Authorized.:DUMENTS CREDIT NUMBER 2724 VN Public Disclosure Authorized Agreement Amending Project Agreement (Power Sector Rehabilitation and Expansion Project) among INTERNATIONAL DEVELOPMENT

More information

CONSOLIDATED BALANCE SHEET

CONSOLIDATED BALANCE SHEET CONSOLIDATED FINANCIAL STATEMENT For quarter IV 2013 CONSOLIDATED BALANCE SHEET As of 31 December 2013 Unit: VND ASSETS Code Note A - CURRENT ASSETS 100 2,458,477,109,246 2,512,342,753,055 I. Cash and

More information

EXECUTIVE SUMMARY - A STUDY ON "FORMALIZATION" OF HOUSEHOLD BUSINESS IN VIETNAM

EXECUTIVE SUMMARY - A STUDY ON FORMALIZATION OF HOUSEHOLD BUSINESS IN VIETNAM EXECUTIVE SUMMARY - A STUDY ON "FORMALIZATION" OF HOUSEHOLD BUSINESS IN VIETNAM Central Institute for Economic Management would like to thank the Mekong Business Initiative for supporting the preparation

More information

PROJECT PREPARATORY TECHNICAL ASSISTANCE

PROJECT PREPARATORY TECHNICAL ASSISTANCE 8 Appendix 3 A. Justification PROJECT PREPARATORY TECHNICAL ASSISTANCE 1. The Government of the Republic of the Union of Myanmar has requested the Asian Development Bank (ADB) to provide a project preparatory

More information

INTEGRATED SAFEGUARDS DATA SHEET APPRAISAL STAGE

INTEGRATED SAFEGUARDS DATA SHEET APPRAISAL STAGE . Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Date ISDSPrepared/Updated: Date ISDS Approved/Disclosed I. BASIC INFORMATION 1. Basic