1 Public-Private Partnerships and Contract Regulation Jorge G. Montecinos and Flavio M. Menezes The University of Queensland, School of Economics April, 2012 Abstract: This paper explores some underlying incentive issues associated with the Least-Present Value of Revenue (LPVR) auction proposed by Engel, Fischer and Galetovic (2001) to allocate public-private partnership contracts. We also explore the implications for the cost of capital faced by the concessionaire when there is a risk of default. The extent of this risk also depends on the nature of the tender and associated contract. While the LPVR auction variable-term contract addresses the adverse selection issues associated with ensuring that the lowest cost firm wins the tender, it fails to consider ex-post (moral hazard) distortions that might emerge when the firm faces a guaranteed rate of return under a zero net present value auction. We then consider a fixed-term contract, which provides the firm with an incentive to exert an effort to boost demand (thus increasing expected revenues at the least cost). Under a fixed-term contract the firm faces a bankruptcy risk and, therefore, potentially higher cost of capital than under a variable-term contract. In particular, we show that when renegotiation is not possible, a variable term contract can be welfare dominated by a fixed term contract if the extent of moral hazard is sufficiently high to offset any increase in the cost of capital. We extend our analysis to consider the impact of renegotiation. We show that the positive incentives for cost reduction that exist under a fixed term contract may disappear when renegotiation is feasible. In this case, whether a fixed-term contract welfaredominates a variable term contract will no longer depend only on the trade-off pointed out above but also on the effect generated by the disutility cost that arises from the firm being subsidized by the government to avoid default. Key-words: public-private partnerships, infrastructure regulation, concessions.

2 1

3 1. INTRODUCTION Public-Private Partnerships (PPPs) have been employed in several countries as an alternative mechanism for the financing and provision of public goods in areas such as transport, education and health. They have been used as both a privatization vehicle, as construction is often bundled with operation by a private concessionaire, and as a tool to remove debt from the government's balance sheet. There are several dimensions of PPPs that have attracted attention from economists. In particular, focus is directed towards the design of the tender used to allocate the project and the choice of contract duration. In an influential paper, Engel, Fischer and Galetovic (2001), henceforth EFG, propose a tender mechanism to address two important issues: to provide better demand-side risk management and to mitigate the need to renegotiate contracts. EFG introduced the notion of a variable term concession contract implemented via a Least-Present Value of Revenue (LPVR) auction. Under this mechanism, the tender allocates the contract to the bidder with the lowest bid expressed as the present value of the expected revenue. Moreover, the duration of the contract is endogenous; the concession contract will remain in place until the firm recovers its full bid. EFG argued that, unlike fixed term contracts, the LPVR mechanism results in an optimal allocation of risk. The term of the contract varies endogenously to ensure that the firm recovers the full value of its bid. Thus, under a LPVR-related contract, the firm is fully insured against demand risk. 1 Arguably, the government is the best placed party to deal with demand risk and this risk is priced competitively through the tender process. This endogenous adjustment mechanism also mitigates the need for costly renegotiation. The UK government was an early adopter of a variable term contract. These include, for example, the Second Severn Bridge over the Severn River between England and Wales and the Queen Elizabeth II Bridge across the Thames River. In both cases, the duration of the concession contract was contingent upon achieving a particular revenue target (Foice, 1998). This approach was also 1 Nombela and De Rus (2004) propose a variation of the LPVR mechanism that includes operation and maintenance costs: the Least Present Value of Net Revenues (LPVNR) mechanism. 2

4 adopted by the Chilean government for the concession of the Santiago-Valparaiso-Viña del Mar Highway (Route 68). 2 In addition to setting a variable term, the Chilean government went further still by considering the level of revenues to be the main variable used to decide the winner of the tender, awarding the concession to the bidder who proposed the least present value of the expected revenues. The introduction of the LPVR has had mixed results with some tenders cancelled due to lack of interest by industry. As is clear from the above discussion, the LPVR mechanism involves both the allocation of the contract via a tender and an endogenous duration of the contract. In this paper we abstract from the design of the tender and assume that the tender selects the concessionary with the least expected operational cost and that the construction costs are fixed and known to all. 3 This allows us to focus on the effects on incentives of both fixed and variable-term contracts. Engel et al (2008) extend the analysis of the LPVR mechanism by proposing a two-threshold auction. These thresholds refer to the levels of output that define high and low demand states, such that, under this mechanism, the concessionary is fully insured across the three different demand states. Under this contract, if the high demand state occurs (above the high threshold), then user fees are sufficient to cover the investment, if the low demand state realises (below the low threshold), then user fees are not sufficient to cover the investment and the government provides a subsidy to cover the losses, while if intermediate demand occurs (between the high and low thresholds), the optimal contract awards a minimum revenue guarantee. This guarantee is part of a revenue sharing agreement, so that is isomorphic to a revenue cap in the case of high demand. The authors show that, in the absence of moral hazard, a variable term contract based on the present value of revenues not only achieves an optimal risk-sharing agreement but also generates a higher expected welfare than a fixed term contract in all states of demand. In addition to this, Engel et al (2008) consider the presence of moral hazard by allowing the owner/manager of the firm to exert a positive effort to boost demand. In this new scenario, the optimal contract is still implemented using a double threshold auction. However, since the concessionaire is able to positively affect demand, the revenues collected by the concessionaire will 2 The Lusoponte Concession in Portugal was also awarded under a variable term scheme but unlike the UK the duration of the contract was contingent on achieving an accumulated traffic target (De Lemos et al., 2004). 3 We assume throughout the paper that construction is bundled with operation in the tender process. Iossa and Martimort (2008) and Martimort and Pouyet (2008) examine whether such bundling is optimal and the resulting implications for contract design. 3

5 be unequal across the states of demand and thus, the subsidy and the revenue cap in the optimal contract will be state-dependent. As with EFG, Engel et al (2008) assumes that is possible to find a mechanism that would avoid further renegotiations (by solving the adverse selection problem). However, both EFG and Engel et al (2008) do not allow the firm to default if the revenues are not sufficient to service debt. Moreover, the optimal contract will implement a mechanism in which the investment (representing the cost of the project) is primarily covered with fees revenues and/or a government subsidy (representing the sources of income). In consequence, a solution like this suffers from the fact that the government may not effectively committ to this transfers. As argued in Laffont and Tirole (1993) incentive based regulation has been effectively used without the government need for committing to these transfers. We, instead, take the viewpoint that renegotiations are often inevitable. One main reason for the occurrence of renegotiations is the possibility of default which not only affects the firm but also the welfare-efficiency of the contract 4, so that the introduction of a disutility cost that accounts for this efficiency loss would introduce the incentives to the government to regenotiate the contract to avoid the firm default. We explore this possibility by assuming that the firm funds investment with a mix of debt and equity and allowing for a setting in which the firm may default if the revenues collected are not sufficient to cover debt repayments. This contrasts with the analysis of Engel et al (2008), in which it is assumed that the government subsidizes the project in the low demand state. Moreover, unlike EFG and Engel et al (2008), we do not impose any assumptions on the degree of risk aversion of the firm. In our view, relaxing this assumption allows us to focus our study on the two types of contracts without introducing any biases that may result if the government faces a risk averse versus a risk seeker firm. Another potential downside of the endogenous variable-term mechanism is that, while they limit the firm's upside profitability risk, the firm might still face a downside risk of going bankrupt if it cannot pay debt holders during the duration of the contract. 5 Although this type of contract does allow the firm to recover the full estimated revenue at the end of the contract, short-run fluctuations in demand or costs might lead to a period in which debt is not serviced in a timely manner. In this paper, we do not allow for this possibility by assuming that the firm only pays debt at the end of 4 Since we follow Demsetz idea for the competitive tender, any other firm taking over the project will be less efficient than the incumbent. 5 See, for example, Vassallo (2006), Gomez-Ibanez (2003), and Brealey, Cooper, and Habib (1997). 4

6 the contract and, therefore, a variable-term contract will effectively eliminate both downside risk and upside profitability. Here we focus on a previously ignored perverse incentive associated with a variable-term contract. While the EFG mechanism addresses the adverse selection ex-ante incentive issues to ensure that the lowest cost firm wins the tender, it fails to consider ex-post moral hazard distortions that might emerge when the concessionary faces a guaranteed rate of return under a Zero Net Present Value auction. In contrast, under a fixed-term contract the concessionary has an incentive to boost demand but it faces a bankruptcy risk and, potentially, a higher cost of capital than under a variable-term contract. In particular, we show that a variable-term contract can be welfare dominated by a fixed contract if the extent of moral hazard is sufficiently high such that it offsets any increase in the cost of capital. This is one of the main insights of this paper. The above result, however, assumes that the government can commit not to renegotiate with the concessionaire when the latter becomes bankrupt under a fixed-term contract. When renegotiation is feasible, however, we show that the positive incentives that exist under a fixed term contract to increase the expected revenues may disappear. This result adds to the theoretical and empirical literature on the negative effects of renegotiation on the performance of concession contracts. 6 The paper is organized as follows. Section 2 introduces the benchmark model where an unregulated monopoly chooses its effort level and the level of debt it must take on in order to maximize profits. Section 3 introduces regulation in the form of both a fixed-term contract with duration chosen to maximize total surplus and a variable-term contract. We show that a variable term contract is akin to a regulatory scheme where the concessionary is guaranteed a particular rate of return. In contrast, under a fixed term contract, the concessionary's rate of return will depend on the realization of demand and cost uncertainty. This distinction allows us to fully explore the costs,- including the incidence of moral hazard, of the two types of contract. Section 4 investigates the implications of introducing renegotiations. Section 5 concludes. 2. THE MODEL The government wants to contract a firm to build a facility and provide a service using the facility. The firm is selected via a competitive tender and we assume that the most efficient firm wins the 6 See, for example, Guasch (2004), Guasch, Laffont and Straub (2003, 2005, 2006, 2008). 5

7 tender with a price of. The government can either offer a fixed duration contract or a variable term contract (also referred to as a NPV contract). We assume for simplicity that time is measured continuously. As in Camacho and Menezes (2010) 7, the firm has to outlay $ for the construction of the facility which is completed in one period and lasts for years. This up-front investment is funded using an appropriate combination of debt and equity. Therefore, there is a risk of default if not enough revenue is generated throughout the life of the project to cover the repayment of debt. Of course, by definition, there is no risk of default under a NPV contract, which will have implications for the cost of capital under this type of contract. It is assumed that investment does not depreciate. Additionally, we assume that the firm is owneroperated so that there are no agency issues inside the firm. We assume the marginal cost to operate the infrastructure project is equal to zero which allows us to concentrate on moral hazard on the demand side. The inverse demand function is uncertain and inelastic with a choke price equal to ; at any price below or equal to, the demand is either equal to or depending on the level of effort. Effort can take one of two values,, and the cost of the effort is equal to. Let denote the probability of high demand,, and be the probability of low demand,. We assume. Realized demand is observable by the government but the choice of effort is not. At a price above demand is always equal to zero. Expected demand for and any effort level,, is then given by: We assume that the firm holds cash on hand the firm must borrow an amount. This implies that, in order to fund the project, We assume that lenders are risk neutral and behave competitively so that they are subject to a zero profit constraint. This implies the rate of return expected by lenders is the risk free rate. We further assume that the cost of equity is also equal to. From this definition the risk free rate is referred to a period equivalent to the duration of the contract. 7 Camacho and Menezes (2010) compare price cap and cost of service regulation in a similar model with a wealth-constrained entrepreneur who faces cost uncertainty. 6

8 At, the government determines the type of contract that it will offer the firm. Under a fixed term contract, the government announces a fixed term for the duration of the contract. Alternatively, under a variable term contract, the government announces a maximum term for the duration of the contract and the contract terminates endogenously once the firm recovers all the costs associated with the project, including the initial outlay. The firm then builds the infrastructure and chooses the level of effort and the level of debt to maximize profit given the price and taking into account the cost of debt, determined in the debt market and referred to a period equivalent to the duration of the contract. At, the facility starts operating, the level of demand is realized and will remain known for the entire duration of the contract. The firm collects revenue from the users of the facility (e.g. if the facility is a highway, revenue collection will be in the form of tolls). This revenue is then used to cover expenditures in the same order of priority as defined in basic financial statements, namely (i) the operational cost, which is assumed to be equal to zero for simplicity; (ii) bondholders; and (iii) the firm. The contract expires at some,, which is determined either exogenously or endogenously. We assume that when the contract expires, price reverts to realized marginal cost (i.e., zero), so that profits are zero for. If the firm defaults, debt-holders take over the contract and absorb the losses (given by the difference between net operating revenues and debt payments) with no change in price and costs. We assume no discounting. The expected total welfare for the duration of the contract is is equal to, where is the expected consumer surplus, is the firm s expected profit and is the weight assigned to the firm s profit. Lemma 1: Given the choke price, the price being charged to users ( ), the life of the project ( ) and the duration of the contract ( ), the Consumer Surplus valued at for the entire life of the project is given by The first term in (2) represents the consumer surplus generated while the contract is outstanding, whereas the second term in (2) corresponds to that surplus generated after the contract terminates up until the end of the asset s life. 7

9 The firm's expected profits for the duration of the contract when the effort written as: is exerted can be The firm's expected profits under zero effort are equal to: The participation constraint requires that. It is incentive compatible for the firm to choose positive effort when or, equivalently, if Condition (3) establishes that it is incentive compatible for the firm to choose the positive level of effort when the resource cost of the effort is less than or equal to the sum of the increase in expected demand and the difference in the total debt payment if the firm exerts high versus low effort. Accordingly, the firm chooses to undertake only if both the participation and the incentive constraints are satisfied. If the incentive constraint (IC) is not satisfied, then the firm undertakes as long as. We turn to the firm's optimal choice of debt and the associated cost of debt assuming a contract period equal to. Given limited liability, we can calculate the firm's profits conditional on their choice of effort and demand as follows: Limited liability means that, if accumulated revenue at is not sufficient to cover debt payments the firm will default, but it loses at most the equity invested, as well as the cost of effort exerted. Similarly, lenders' profits conditional on the choice of effort and demand are given by: 8

10 If the revenue collected by the firm is insufficient to cover debt payments, the firm defaults and lenders will take over the project which continues to operate for periods which allows the lender to collect the net revenue from the project. We assume default is only possible when realized demand is low; that is. Note that, when the price is sufficiently high that revenue can cover debt payments in all states of nature (i.e., when ), there is no default risk and, therefore, the cost of debt is equal to the risk-free rate. In contrast, when the firm s revenue is insufficient to pay debt plus interest in all states of nature (i.e., when ), the cost of debt is determined by using expression (5) as follows: This expression shows that the firm (borrower) cannot commit to repay debt for a period longer than the duration of the contract, or in other words that the lender will be willing to lend an amount of money up until the equivalent revenues that the firm can accumulate for a given duration of the contract. Rearranging this expression yields: We can conclude, therefore, that the cost of debt is larger than or equal to the cost of equity. When the cost of debt is equal to the risk-free rate, the firm is indifferent between choosing any level of debt in the interval. In this instance, we assume that the firm chooses Alternatively, when the cost of debt is greater than the risk-free rate, then it will always be optimal for the firm to choose This yields the following result. Lemma 2: For a contract period equal to T (either endogenously or exogenously fixed), and since the strategy set is restricted to those that satisfy weak dominance, the firm will weakly choose. 9

11 Having determined the cost of debt, we can now rewrite the incentive constraint. When is such that the risk of default is zero (i.e., when ), the cost of debt is equal to the risk-free rate under both levels of effort and therefore (3) reduces to: (7) Condition (7) states that, when there is no risk of default, the positive level of effort will be chosen if the resource cost of effort ( ) is less than the increase in the expected demand that happens under positive effort. Meanwhile if the risk of default is positive regardless of the level of effort chosen by the firm (i.e., ), the cost of debt is given by (6) and (3) can be rewritten as: (8) Where, i.e.,. Note that represents the difference in the cost of debt under positive effort and under zero effort. This difference is greater than zero since a positive effort increases the probability of a high demand scenario ( ) and decreases the risk of default. The result below characterizes the optimal choice of effort for the firm. Lemma 3: Table 1 below summarizes the threshold levels that must satisfy in order for the firm to undertake. Table 1: Threshold levels for where 10

12 3. FIXED VERSUS VARIABLE TERM CONTRACTS In this section we determine the socially optimal duration of a fixed term contract, and equilibrium welfare outcomes under both fixed and variable term contracts. 3.1 FIXED-TERM CONTRACTS We note first that, under a fixed-term contract, the firm's expected gross revenue is fixed as has been set by the tender. Therefore, there is a natural analogy between a fixed-term contract and a price-cap regime in a standard regulatory economics framework. This insight allows us to rewrite Lemma 3 in terms of the duration of the contract rather than the price. Lemma 4: Table 2 below summarizes the threshold levels that must satisfy in order for the firm to undertake. Table 2: Threshold levels for where Recall that for,, there is no risk of default whereas, if, there is a risk that the firm defaults on its debt and loses its effort, net revenue and equity in the project. This risk is priced in terms of a higher cost of debt. The government's problem when choosing the optimal duration for a fixed-term contract can be written as: 11

13 where is the contract duration set by the government during the tender, (PR) stands for the participation constraint and (IC) for the incentive compatibility constraint. Given limited liability, expected profits is given by, ;. Then, can be rewritten as: ; The proposition below determines the optimal fixed-term contract duration and the associated choice of effort by the firm. The proof is in the appendix. Proposition 1: Table 3 below characterizes the optimal fixed-term contract duration ( ) for all combinations of the IC and PR conditions. 12

14 Table 3: Optimal Term Cap Constraints Effort Proposition 1 has important implications for the relationship between the duration of the contract, the firm s cost of capital and optimal effort induction. The nature of this relationship will depend on parameter values. When there is no risk of default (rows one and three of Table 3), the firm s cost of capital is equal to the risk-free rate and, thus, does not depend on the level of effort. Thus, the regulator will set the lowest duration of the contract possible (i.e. set duration such that the firm s participation constraint is binding) to extract all expected rent. In this instance there is no trade-off between rent extraction, optimal effort choice and the cost of capital. The firm s expected profit is zero which allows us to obtain total welfare by replacing the duration in rows one and three of Table 3 in as follows: The optimal choice of effort in equation (9) will depend on parameter values as described in rows one ( ) and three ( ) of Table 3. 13

15 Alternatively, for other parameter values (rows two and four of Table 3), by reducing the duration of the contract to extract rents, the government may affect the optimal choice of effort and the firm s cost of capital. In this case, it is optimal for the regulator to set the minimum duration such that the participation constraint is satisfied with equality and, therefore, the firm s cost of capital is given by equation (6), reflecting a higher cost of capital than the risk-free rate. The firm s expected profit is zero and we obtain total welfare by substituting the duration expressions from rows two and four of Table 3 into : If ; and, If The optimal choice of effort in equations (10a) and (10b) will depend on parameter values as described in rows two ( ) and four ( ) of Table VARIABLE TERM CONTRACTS A variable term contract has the property that the duration of the contract is endogenous. Under this type of contract the firm is fully insulated against cost and demand uncertainty; profits will be zero, ex-post, regardless of the realization of demand. Under these circumstances, there are no incentives for cost reduction. There is, therefore, a natural analogy between a variable-term contract and a cost-plus regime in a standard regulatory economics framework. This insight allows us to characterise the optimal choice of effort by the firm. At the firm determines the level of effort,, that it is going to exert. At, demand is realized. Since the regulated term for the contract adjusts endogenously depending on the observed 14

16 demand, it will be the case that operational and capital costs are always being covered. Hence, there is no risk of default and the firm s cost of capital is always equal to the risk-free rate, setting then, it holds that the firm is indifferent between any levels of debt discussed in the previous section, we assume that the firm chooses.. In this. As The following proposition characterizes the choice of effort by the firm and the ex-post durations, contingent on the realisation of demand, under a variable term contract. The proof of this proposition is offered in the appendix. Proposition 2: Under a Variable Term Contract the firm always chooses. The ex-post contract duration terms are given by, when ; and, when. Proposition 2 establishes that society bears the full extent of moral hazard under a variable term contract. This proposition also allows us to compute the expected overall welfare for the variable term contract evaluated at, as the level of welfare that is obtained at the expected duration of the contract for each state of cost/demand described in Proposition 2, as follows: 3.3. WELFARE COMPARISON In this section we compare the welfare generated by a fixed term contract against that generated by a variable term contract. Proposition 3 below provides this comparison for all potential model parameterizations. The proof is in the appendix. Proposition 3: Table 4 below compares the welfare generated by fixed and variable term contracts for all feasible parameter values expressed in terms of the incentive constraint (IC) and participation constraint (PR) faced by the firm under a fixed term contract. Table 4: Optimal Regulation Constraints Optimal type of contract 15

17 , if, otherwise. Proposition 3 establishes that whether a fixed term or a variable term contract is welfare superior depends on the trade-off between higher revenues (which result from increased demand) under a fixed term contract and a lower cost of capital under a variable term contract. When there is no risk of default, such that the cost of capital is the minimized, then if the firm chooses to exert a positive effort,, a fixed term contract will be welfare superior as it boosts demand at no extra cost in terms of an increase in the cost of capital. In contrast, if the firm chooses to exert effort then both types of contract generate the same level of welfare. If the model is parameterized such that there exist default risk, there will be a trade-off between the higher cost of capital the firm faces under a fixed term contract and lower demand under the variable term contract. More specifically, if the firm undertakes under a fixed term contract, whether the fixed term contract is welfare superior to the variable term contract will depend on parameter values as given in the second row of Table 4. Further, if the firm undertakes under a fixed term contract, then a fixed term contract yields the same expected demand as a variable term contract but still leads to a higher cost of capital. Therefore, in this case, the fixed term contract is welfare dominated by a variable term contract. This potential trade-off between higher expected demand/revenues and a lower cost of capital has yet to be explored in the PPP literature. This trade-off it is likely to be more significant in concession contracts where the increase in revenues in response to the increased demand is larger than the increase in capital costs. It should be noted, however, that this trade-off has been studied in other contexts. Camacho and Menezes (2010) show that the question of whether price-cap regulation welfare dominates cost-of-service regulation depends precisely on the trade-off between a higher cost efficiency under price cap and a lower cost of capital (or a lower entrepreneur s rent) under cost of service regulation. 16

18 4. ALLOWING FOR RENEGOTIATION As discussed above, the firm might only default when low demand eventuates. In contrast to the previous section, we now assume that there is scope for renegotiation in the event the firm defaults. We explore the impact of such renegotiations on equilibrium behavior and the impact this may have on the resulting welfare realized under fixed term versus variable term contracts. First, recall that the firm defaults when low demand eventuates only when, or equivalently, in terms of the duration, when For any contract duration that is at least as large as the right hand side of equation (12), the firm never defaults, even when demand is low. If a default occurs at the end of the duration of the contract, the shortfall in revenue required to fully cover the debt repayment at the end of the contract is given by: Notice that equation (13) simply represents the gap between debt payments, given that the firm chooses, and net operational revenue. To avoid default, the government needs to transfer an amount equal to to the firm when low demand eventuates and the original contract duration satisfies equation (12). In this model, we suppose that this transfer occurs at time. As indicated above, demand is observable which implies that there is no scope for a second round of moral hazard arising from contract renegotiation. However, full observability also means that, if default does occur, it will happen at when demand is realized. We maintain the assumption that, if the firm defaults, the contract reverts to debt holders who forego part of their wealth but continue to manage the project in the same fashion in order to recover net operating revenue. We also assume that the government faces a disutility cost given by 17

19 . This cost is meant to capture the negative future impact of the firm s default on its cost of capital and how this will affect the government who has then, the incentives to avoid the firm default preventing the loss of welfare. Default is avoided by extending the original contract duration from to. We assume henceforth that,. When renegotiation is possible, the limited liability constraint becomes: To sum up, when the firm renegotiates the contract with the government to avoid default, it receives a transfer which is implemented through an extension of the contract term from to. The firm continues to operate the project but profits are zero (ex-post). It follows then that debt holders payoff is equal to Thus, under the above assumptions, the risk of default disappears such that. This result is summarized in the following Lemma. Lemma 5: In the case of default, if renegotiation involving a transfer of L to the firm, then. Furthermore, ex-post profits under default are equal to zero. Lemma 5 has some important implications for the optimal choice of effort for the firm under a fixed term contract. This is established in the next proposition with proof provided in the appendix. Proposition 4: Table 5 below characterizes optimal contract duration ( ) given the IC and PR conditions and the optimal choice of effort if renegotiation is allowed for. Table 5: Optimal Term Cap under renegotiation Constraints Effort 18

20 Or Or The optimal choice of effort for the firm given above is factored in by the government when choosing the optimal duration for a fixed-term contract, which is given by the solution to the following optimization problem: where is set by the government prior to the realization of demand. From Lemma 5, we know that debt is paid under all states of nature such that the firm s cost of capital does not depend on the level of effort and is equal to the risk-free rate. Moreover, the regulator sets the lowest duration of the contract possible (again, at the point in which the participation constraint is binding), so that the expected profit is zero, and, there is no trade-off between rent extraction, optimal effort choice and the cost of capital. Total welfare is then given by: Equation (16) allows us to compare the welfare generated by both types of contracts when renegotiation is possible. Proposition 5 below provides such comparison. The proof is in the appendix. Proposition 5: Table 6 below compares the welfare generated by fixed and variable term contracts for all parameter values when renegotiation is allowed for, expressed in terms of the incentive constraint (IC) and participation constraint (PR) faced by the firm under a fixed term contract. 19

21 Table 6: Optimal Regulation under Non-Commitment Constraints if if Or Or Proposition 5 shows that under renegotiation, whether a fixed-term contract welfare dominates a variable term contract will no longer depend entirely upon the trade-off between higher revenues under a fixed term contract and a lower capital cost under a variable term contract as was the case in section 3. Instead, when there is no risk of default and the effect of the disutility cost ( ) is small, then we have the same result that was found in section 3: if the firm chooses to exert a positive effort, then a fixed term contract is welfare superior as it still drives higher revenues at no extra cost in terms of an increase in the cost of capital. However, if the disutility cost is larger than the advantage of the fixed term contract with respect to the variable term contract under fullcommitment, then the variable term contract generates more welfare. If the firm chooses to exert effort, then both types of contracts generate the same level of welfare. When there is a risk of default, the particular form of renegotiation studied above implies that the cost of capital remains minimized. Moreover, Proposition 4 shows that the optimal duration for the fixed term contract is identical to that of a variable term contract when renegotiation is feasible. In this instance, the firm has no incentives to exert a positive effort to avoid default and, as a result, the 20

22 fixed term contract is dominated by the variable term contract (both generate the same cost of capital and expected marginal cost but the former entails a disutility cost ). 5. CONCLUSION This paper investigates a perverse incentive associated with the Least-Present Value of Revenue (LPVR) auction proposed by Engel, Fischer and Galetovic (2001) to allocate public-private partnerships contracts. While the LPVR auction variable-term contract addresses the adverse selection issues associated with ensuring that the lowest cost firm wins the tender, it fails to consider ex-post (moral hazard) distortions that might emerge when the firm faces a guaranteed rate of return under a zero net present value auction. We consider a fixed-term contract, which provides the firm with an incentive to provide the service at the least cost. However, under a fixedterm contract the firm faces a bankruptcy risk and, therefore, potentially higher cost of capital than under a variable-term contract. We have established that, when renegotiation is not possible, a variable term contract can be welfare dominated by a fixed term contract if the extent of moral hazard is sufficiently high such that it offsets any increase in the cost of capital. We extend our analysis to consider the impact of renegotiation and find that the positive incentives for cost reduction that exist under a fixed term contract may disappear when renegotiation is feasible. In this case, whether a fixed-term contract welfare-dominates a variable term contract will no longer depend only on the trade-off pointed out above but also on the effect generated by the disutility cost that arises from the firm being subsidized by the government to avoid default. REFERENCES Brealey, R. A., Cooper, I. A., & Habib, M. A. (1997). Investment Appraisal in the Public Sector. Oxford Review of Economic Policy, 13, Camacho, F., & Menezes, F. (2010). Price Regulation and the Cost of Capital. School of Economics, University of Queensland, Discussion Paper No De Lemos, T., Eaton, D., Betts, M., & De Almeyda, L. T. (2004). Risk Management in the Lusoponte Concession - A Case Study of the Two Bridges in Lisbon, Portugal. International Journal of Project Management, 22,

23 Engel, E., Fischer, R., & Galetovic, A. (2001). Least-Present-Value-of-Revenue Auction and Highway Franchising. Journal of Political Economy, 109, Engel, E., Fischer, R., & Galetovic, A. (2008). The Basic Public Finance of Public-Private Partnerships. Forthcoming in the Journal of the European Economics Association. Center discussion Paper No. 957, Economic Growth Center, Yale University, New Haven, CT (USA) Foice, D. (1998). Second Severn Crossing. Paper presented at the Seminar in PPP Risk Management for Big Transport Projects, Ministerio de Fomento, Spain. Gomez-Ibanez, J. A. (2003). Regulating Infrastructure: Monopoly, Contracts and Discretion. Cambridge, MA: Harvard University Press. Guasch, J. L. (2004). Granting and Renegotiating Infrastructure Concessions: Doing it Right. Washington, DC: World Bank Institute. Guasch, J. L., Laffont, J. J., & Straub, S. (2003). Renegotiations of Concession Contracts in Latin America. The World Bank. Guasch, J. L., Laffont, J. J., & Straub, S. (2005). Concessions of Infrastructure in Latin America: Government-led Renegotiation. The World Bank. Guasch, J. L., Laffont, J. J., & Straub, S. (2006). Renegotiation of Concessions Contracts: A Theoretical Approach. Review of Industrial Organization, 29, Guasch, J. L., Laffont, J. J., & Straub, S. (2008). Renegotiation of Concessions Contracts in Latin America. Evidence from the Water and Transport Sectors. International Journal of Industrial Organization, 26, Iossa, E., & Martimort, D. (2008). The Simple Micro-Economic of Public-Private Partnerships. Center for Economic and International Studies. Laffont, J. J., & Tirole, J. (1993). A Theory of Incentives in Procurement and Regulation, MIT Press. Cambridge, MA (USA) Martimort, D., & Pouyet, J. (2008). To Build or not to Build: Normative and Positive Theories of Public-Private Partnerships. International Journal of Industrial Organization, 26, Nombela, G., & De Rus, G. (2004). Flexible-Term Contracts for Road Franchising. Transportation Research Part A, 38, Vassallo, J. M. (2006). Traffic Risk Mitigation in Highway Concession Projects, The Experience of Chile. Journal of Transport Economics and Policy, 40,

24 APPENDIX Proof of Proposition 1 We begin by identifying all the cases that need to be examined. From Lemma 2 we know that the concessionaire chooses only one level of effort within the range of possible durations. In fact, the decision of whether or not to undertake a positive effort will depend only on the cost of undertaking that level of effort ( ) being less than or equal to the expected benefit in terms of higher expected demand. First, assume that the minimum duration for the contract that satisfies the participation constraint is greater than or equal to. In this situation, the government can set the minimum duration of the contract to extract all rents from the firm. Thus, to find this duration, we substitute in and set. The optimal duration cap is then given by, Where the firm chooses when,, and when,. Secondly, assume that the minimum duration that satisfies the participation constraint is lower than. It continues to hold that the government will set the minimum feasible duration for the contract to extract maximum rents. Therefore, we find the optimal duration cap by substituting in and setting. If we calculate, we get: 23

25 If no default: If default: Since,, then Therefore, the previous condition is analogous to: Then, the optimal duration will depend on the condition between and. If we have that rearranging for yields 24

26 where the firm chooses when,., and when, In the other hand, when we have that the minimum duration for the contract will be given by equals to: Proof of Proposition 2 Under a variable term contract, the duration is endogenous and will depend on the realisation of demand. The firm s state contingent net) revenues, which depend on whether or low or high demand state realised, are given by: Since the regulated term for the contract adjusts endogenously depending on the observed costs and realized demand, it holds that operational and capital costs are always able to be covered. Hence, there is no risk of default and the firm s cost of capital is always equal to. Then, the expression for profits reduces to 25

27 Fix, and at any level such that, the ex-ante expected revenues for the high and low demand scenarios are the same, regardless of the level of effort, i.e.,. Then, from the expression above, the firm never chooses, as it can always guarantee higher profits by choosing. It follows that the welfare maximizing regulated ex-post durations for the contract (the ones that guarantee zero profits and maximize consumer surplus) are equal to ; and. Notice that since in all cases, then ; where, and, is given by, Rearranging this expression, we have that, Proof of Proposition 3 We proceed to prove Proposition 3 using the cases outlined in Proposition 1 and comparing each result with what we obtained in Proposition 2. Case 1: and We know from Proposition 1 that under these market conditions the optimal duration cap is given by,, while the welfare generated is given by equation (9) ( ). It is then possible to compare this welfare against the welfare obtained under a variable term contract. By taking the difference between equation (9) ( ) and equation (11) we find that the fixed term contract always generates at least the same welfare as the variable term contract. 26

28 Rearranging, Since, Therefore, Case 2: and We know from Proposition 1 that, under these market conditions, the optimal duration cap is we find that:. By taking the difference between equation (10) ( ) and equation (11) Rearranging, If we define Z as, Consequently,, if 27

29 But,, therefore the above condition is equivalent to, Which can be written as, Rearranging, So, if this condition is met, then, Case 3: and We know from Proposition 1 that, under this model parameterisation, the optimal term cap is. By taking the difference between equation (9) ( ) and equation (11) we find that the fixed term contract generates the same welfare as the variable term contract. Case 4: and We know from Proposition 1 that, under these market conditions, the optimal term cap is find that:. By taking the difference between equation (10) ( ) and equation (11) we 28

30 Rearranging, After rearranging this expression we get: According to this, whether the fixed term contract welfare dominates the variable term contract will depend on the difference. Since, we have that: If, then, and the fixed term contract will generate a higher welfare than the variable term contract. But if,, then, and we conclude that the variable term contract generates a higher welfare than the fixed term contract. Proof of Proposition 4 From Lemma 2 we know that the concessionaire chooses only one level of effort within the range of possible durations. We must also consider Lemma 6, which states the choice of effort for the firm when there is no risk of default, since it is possible to renegotiate the contract. As in Proposition 1, assume initially that the minimum duration for the contract that satisfies the participation constraint is greater than or equal to. In this situation, the government sets the minimum duration of the contract to extract all rents from the firm, and the optimal duration cap is given by 29

31 where the firm chooses when,, and when,. On the other hand, when the minimum duration that satisfies the participation constraint is lower than, the government can still set the minimum duration of the contract such that it extracts all rents. According to Lemma 6, the optimal duration cap can be found by substituting in and setting, such that the participation constraint is binding. Solving for in this manner yields where the firm chooses. This follows from the fact that, since the risk of default is covered by the government allowing for the possibility of renegotiation, the firm has no incentives to exert a positive effort. Proof of Proposition 5 To prove Proposition 5 we use the cases obtained in Proposition 4 and we compare each result with the results obtained in Proposition 2. Note that Proposition 4 provides only two distinct cases to analyze: Case 1: and We know from Proposition 4 that, under these market conditions, the optimal duration cap is given by,. Moreover, from equation (16) we know that,. Since under a variable term contract there is no risk of default, it holds that. Therefore, 30

32 We know from Proposition 3 that, for this case,. Then, the question of whether the fixed term contract will dominate the variable term contract will depend on parameter values. If, then. Finally, if, then. Case 2: and ; and ; and We know from Proposition 4 that, under these market conditions, the optimal term cap is. From equation (16) we know that,. Since under a variable term contract there is no risk of default,. Therefore,. Replacing, we have that, which implies that 31

Online Appendix. Bankruptcy Law and Bank Financing

Online Appendix. Bankruptcy Law and Bank Financing Online Appendix for Bankruptcy Law and Bank Financing Giacomo Rodano Bank of Italy Nicolas Serrano-Velarde Bocconi University December 23, 2014 Emanuele Tarantino University of Mannheim 1 1 Reorganization,

More information

Is there a PPP interest rate premium?

Is there a PPP interest rate premium? Is there a PPP interest rate premium? Eduardo Engel, Ronald Fischer, Alexander Galetovic Yale and U. de Chile, U. de Chile, U. de los Andes U. de Montevideo April 1, 2014 1 Motivation Exogenous Risk Endogenous

More information

Public-private Partnerships in Micro-finance: Should NGO Involvement be Restricted?

Public-private Partnerships in Micro-finance: Should NGO Involvement be Restricted? MPRA Munich Personal RePEc Archive Public-private Partnerships in Micro-finance: Should NGO Involvement be Restricted? Prabal Roy Chowdhury and Jaideep Roy Indian Statistical Institute, Delhi Center and

More information

Game Theory. Lecture Notes By Y. Narahari. Department of Computer Science and Automation Indian Institute of Science Bangalore, India July 2012

Game Theory. Lecture Notes By Y. Narahari. Department of Computer Science and Automation Indian Institute of Science Bangalore, India July 2012 Game Theory Lecture Notes By Y. Narahari Department of Computer Science and Automation Indian Institute of Science Bangalore, India July 2012 The Revenue Equivalence Theorem Note: This is a only a draft

More information

1 Appendix A: Definition of equilibrium

1 Appendix A: Definition of equilibrium Online Appendix to Partnerships versus Corporations: Moral Hazard, Sorting and Ownership Structure Ayca Kaya and Galina Vereshchagina Appendix A formally defines an equilibrium in our model, Appendix B

More information

Partial privatization as a source of trade gains

Partial privatization as a source of trade gains Partial privatization as a source of trade gains Kenji Fujiwara School of Economics, Kwansei Gakuin University April 12, 2008 Abstract A model of mixed oligopoly is constructed in which a Home public firm

More information

Auditing in the Presence of Outside Sources of Information

Auditing in the Presence of Outside Sources of Information Journal of Accounting Research Vol. 39 No. 3 December 2001 Printed in U.S.A. Auditing in the Presence of Outside Sources of Information MARK BAGNOLI, MARK PENNO, AND SUSAN G. WATTS Received 29 December

More information

Topics in Contract Theory Lecture 6. Separation of Ownership and Control

Topics in Contract Theory Lecture 6. Separation of Ownership and Control Leonardo Felli 16 January, 2002 Topics in Contract Theory Lecture 6 Separation of Ownership and Control The definition of ownership considered is limited to an environment in which the whole ownership

More information

On the use of leverage caps in bank regulation

On the use of leverage caps in bank regulation On the use of leverage caps in bank regulation Afrasiab Mirza Department of Economics University of Birmingham a.mirza@bham.ac.uk Frank Strobel Department of Economics University of Birmingham f.strobel@bham.ac.uk

More information

Rural Financial Intermediaries

Rural Financial Intermediaries Rural Financial Intermediaries 1. Limited Liability, Collateral and Its Substitutes 1 A striking empirical fact about the operation of rural financial markets is how markedly the conditions of access can

More information

Basic Assumptions (1)

Basic Assumptions (1) Basic Assumptions (1) An entrepreneur (borrower). An investment project requiring fixed investment I. The entrepreneur has cash on hand (or liquid securities) A < I. To implement the project the entrepreneur

More information

Game-Theoretic Approach to Bank Loan Repayment. Andrzej Paliński

Game-Theoretic Approach to Bank Loan Repayment. Andrzej Paliński Decision Making in Manufacturing and Services Vol. 9 2015 No. 1 pp. 79 88 Game-Theoretic Approach to Bank Loan Repayment Andrzej Paliński Abstract. This paper presents a model of bank-loan repayment as

More information

Default and Renegotiation in PPP Auctions

Default and Renegotiation in PPP Auctions Default and Renegotiation in PPP Auctions Flávio Menezes The University of Queensland Matthew Ryan The University of Auckland June 25, 2013 Abstract The winners of auctions for PPP contracts, especially

More information

Auctions. Agenda. Definition. Syllabus: Mansfield, chapter 15 Jehle, chapter 9

Auctions. Agenda. Definition. Syllabus: Mansfield, chapter 15 Jehle, chapter 9 Auctions Syllabus: Mansfield, chapter 15 Jehle, chapter 9 1 Agenda Types of auctions Bidding behavior Buyer s maximization problem Seller s maximization problem Introducing risk aversion Winner s curse

More information

Backward Integration and Risk Sharing in a Bilateral Monopoly

Backward Integration and Risk Sharing in a Bilateral Monopoly Backward Integration and Risk Sharing in a Bilateral Monopoly Dr. Lee, Yao-Hsien, ssociate Professor, Finance Department, Chung-Hua University, Taiwan Lin, Yi-Shin, Ph. D. Candidate, Institute of Technology

More information

(Some theoretical aspects of) Corporate Finance

(Some theoretical aspects of) Corporate Finance (Some theoretical aspects of) Corporate Finance V. Filipe Martins-da-Rocha Department of Economics UC Davis Chapter 2. Outside financing: Private benefit and moral hazard V. F. Martins-da-Rocha (UC Davis)

More information

ADVERSE SELECTION PAPER 8: CREDIT AND MICROFINANCE. 1. Introduction

ADVERSE SELECTION PAPER 8: CREDIT AND MICROFINANCE. 1. Introduction PAPER 8: CREDIT AND MICROFINANCE LECTURE 2 LECTURER: DR. KUMAR ANIKET Abstract. We explore adverse selection models in the microfinance literature. The traditional market failure of under and over investment

More information

Technical Appendix to Long-Term Contracts under the Threat of Supplier Default

Technical Appendix to Long-Term Contracts under the Threat of Supplier Default 0.287/MSOM.070.099ec Technical Appendix to Long-Term Contracts under the Threat of Supplier Default Robert Swinney Serguei Netessine The Wharton School, University of Pennsylvania, Philadelphia, PA, 904

More information

Discussion of Liquidity, Moral Hazard, and Interbank Market Collapse

Discussion of Liquidity, Moral Hazard, and Interbank Market Collapse Discussion of Liquidity, Moral Hazard, and Interbank Market Collapse Tano Santos Columbia University Financial intermediaries, such as banks, perform many roles: they screen risks, evaluate and fund worthy

More information

(Some theoretical aspects of) Corporate Finance

(Some theoretical aspects of) Corporate Finance (Some theoretical aspects of) Corporate Finance V. Filipe Martins-da-Rocha Department of Economics UC Davis Part 6. Lending Relationships and Investor Activism V. F. Martins-da-Rocha (UC Davis) Corporate

More information

Dynamic Lending under Adverse Selection and Limited Borrower Commitment: Can it Outperform Group Lending?

Dynamic Lending under Adverse Selection and Limited Borrower Commitment: Can it Outperform Group Lending? Dynamic Lending under Adverse Selection and Limited Borrower Commitment: Can it Outperform Group Lending? Christian Ahlin Michigan State University Brian Waters UCLA Anderson Minn Fed/BREAD, October 2012

More information

Financial Intermediation, Loanable Funds and The Real Sector

Financial Intermediation, Loanable Funds and The Real Sector Financial Intermediation, Loanable Funds and The Real Sector Bengt Holmstrom and Jean Tirole April 3, 2017 Holmstrom and Tirole Financial Intermediation, Loanable Funds and The Real Sector April 3, 2017

More information

Econ 101A Final exam May 14, 2013.

Econ 101A Final exam May 14, 2013. Econ 101A Final exam May 14, 2013. Do not turn the page until instructed to. Do not forget to write Problems 1 in the first Blue Book and Problems 2, 3 and 4 in the second Blue Book. 1 Econ 101A Final

More information

University of Konstanz Department of Economics. Maria Breitwieser.

University of Konstanz Department of Economics. Maria Breitwieser. University of Konstanz Department of Economics Optimal Contracting with Reciprocal Agents in a Competitive Search Model Maria Breitwieser Working Paper Series 2015-16 http://www.wiwi.uni-konstanz.de/econdoc/working-paper-series/

More information

1 Theory of Auctions. 1.1 Independent Private Value Auctions

1 Theory of Auctions. 1.1 Independent Private Value Auctions 1 Theory of Auctions 1.1 Independent Private Value Auctions for the moment consider an environment in which there is a single seller who wants to sell one indivisible unit of output to one of n buyers

More information

TOWARD A SYNTHESIS OF MODELS OF REGULATORY POLICY DESIGN

TOWARD A SYNTHESIS OF MODELS OF REGULATORY POLICY DESIGN TOWARD A SYNTHESIS OF MODELS OF REGULATORY POLICY DESIGN WITH LIMITED INFORMATION MARK ARMSTRONG University College London Gower Street London WC1E 6BT E-mail: mark.armstrong@ucl.ac.uk DAVID E. M. SAPPINGTON

More information

Auctions in the wild: Bidding with securities. Abhay Aneja & Laura Boudreau PHDBA 279B 1/30/14

Auctions in the wild: Bidding with securities. Abhay Aneja & Laura Boudreau PHDBA 279B 1/30/14 Auctions in the wild: Bidding with securities Abhay Aneja & Laura Boudreau PHDBA 279B 1/30/14 Structure of presentation Brief introduction to auction theory First- and second-price auctions Revenue Equivalence

More information

THE BASIC PUBLIC FINANCE OF PUBLIC-PRIVATE PARTNERSHIPS

THE BASIC PUBLIC FINANCE OF PUBLIC-PRIVATE PARTNERSHIPS THE BASIC PUBLIC FINANCE OF PUBLIC-PRIVATE PARTNERSHIPS EDUARDO M.R.A. ENGEL, RONALD D. FISCHER AND ALEXANDER GALETOVIC 1 PRELIMINARY AND INCOMPLETE March 29, 2007 Abstract When should public-private partnerships

More information

PRINCETON UNIVERSITY Economics Department Bendheim Center for Finance. FINANCIAL CRISES ECO 575 (Part II) Spring Semester 2003

PRINCETON UNIVERSITY Economics Department Bendheim Center for Finance. FINANCIAL CRISES ECO 575 (Part II) Spring Semester 2003 PRINCETON UNIVERSITY Economics Department Bendheim Center for Finance FINANCIAL CRISES ECO 575 (Part II) Spring Semester 2003 Section 5: Bubbles and Crises April 18, 2003 and April 21, 2003 Franklin Allen

More information

Monetary Economics. Lecture 23a: inside and outside liquidity, part one. Chris Edmond. 2nd Semester 2014 (not examinable)

Monetary Economics. Lecture 23a: inside and outside liquidity, part one. Chris Edmond. 2nd Semester 2014 (not examinable) Monetary Economics Lecture 23a: inside and outside liquidity, part one Chris Edmond 2nd Semester 2014 (not examinable) 1 This lecture Main reading: Holmström and Tirole, Inside and outside liquidity, MIT

More information

Microeconomic Theory II Preliminary Examination Solutions Exam date: August 7, 2017

Microeconomic Theory II Preliminary Examination Solutions Exam date: August 7, 2017 Microeconomic Theory II Preliminary Examination Solutions Exam date: August 7, 017 1. Sheila moves first and chooses either H or L. Bruce receives a signal, h or l, about Sheila s behavior. The distribution

More information

Econ 101A Final exam May 14, 2013.

Econ 101A Final exam May 14, 2013. Econ 101A Final exam May 14, 2013. Do not turn the page until instructed to. Do not forget to write Problems 1 in the first Blue Book and Problems 2, 3 and 4 in the second Blue Book. 1 Econ 101A Final

More information

Revenue Equivalence and Income Taxation

Revenue Equivalence and Income Taxation Journal of Economics and Finance Volume 24 Number 1 Spring 2000 Pages 56-63 Revenue Equivalence and Income Taxation Veronika Grimm and Ulrich Schmidt* Abstract This paper considers the classical independent

More information

Relational Contracts and the Value of Loyalty

Relational Contracts and the Value of Loyalty Relational Contracts and the Value of Loyalty Simon Board Department of Economics, UCLA November 20, 2009 Motivation Holdup problem is pervasive Developing economies (McMillan and Woodruff, 99) Developed

More information

An Examination of the Efficiency of Resource Allocation Auctions Within Firms 1

An Examination of the Efficiency of Resource Allocation Auctions Within Firms 1 An Examination of the Efficiency of Resource Allocation Auctions Within Firms 1 Stanley Baiman 2 Paul Fischer 3 Madhav V. Rajan 4 Richard Saouma 5 December 1, 2006 1 We are indebted to Stefan Reichelstein,

More information

Unraveling versus Unraveling: A Memo on Competitive Equilibriums and Trade in Insurance Markets

Unraveling versus Unraveling: A Memo on Competitive Equilibriums and Trade in Insurance Markets Unraveling versus Unraveling: A Memo on Competitive Equilibriums and Trade in Insurance Markets Nathaniel Hendren October, 2013 Abstract Both Akerlof (1970) and Rothschild and Stiglitz (1976) show that

More information

Online Appendix for Military Mobilization and Commitment Problems

Online Appendix for Military Mobilization and Commitment Problems Online Appendix for Military Mobilization and Commitment Problems Ahmer Tarar Department of Political Science Texas A&M University 4348 TAMU College Station, TX 77843-4348 email: ahmertarar@pols.tamu.edu

More information

Financial Economics Field Exam August 2011

Financial Economics Field Exam August 2011 Financial Economics Field Exam August 2011 There are two questions on the exam, representing Macroeconomic Finance (234A) and Corporate Finance (234C). Please answer both questions to the best of your

More information

Using Trade Policy to Influence Firm Location. This Version: 9 May 2006 PRELIMINARY AND INCOMPLETE DO NOT CITE

Using Trade Policy to Influence Firm Location. This Version: 9 May 2006 PRELIMINARY AND INCOMPLETE DO NOT CITE Using Trade Policy to Influence Firm Location This Version: 9 May 006 PRELIMINARY AND INCOMPLETE DO NOT CITE Using Trade Policy to Influence Firm Location Nathaniel P.S. Cook Abstract This paper examines

More information

Training the Doubtful and Timid

Training the Doubtful and Timid Training the Doubtful and Timid Miguel Palacios and Alex Stomper August 21, 2014 Abstract We analyze the effect of human capital on insurance within the firm. In our model human capital creates rents that

More information

Columbia University. Department of Economics Discussion Paper Series. Bidding With Securities: Comment. Yeon-Koo Che Jinwoo Kim

Columbia University. Department of Economics Discussion Paper Series. Bidding With Securities: Comment. Yeon-Koo Che Jinwoo Kim Columbia University Department of Economics Discussion Paper Series Bidding With Securities: Comment Yeon-Koo Che Jinwoo Kim Discussion Paper No.: 0809-10 Department of Economics Columbia University New

More information

Exploring the Effect of Wealth Distribution on Efficiency Using a Model of Land Tenancy with Limited Liability. Nicholas Reynolds

Exploring the Effect of Wealth Distribution on Efficiency Using a Model of Land Tenancy with Limited Liability. Nicholas Reynolds Exploring the Effect of Wealth Distribution on Efficiency Using a Model of Land Tenancy with Limited Liability Nicholas Reynolds Senior Thesis in Economics Haverford College Advisor Richard Ball Spring

More information

March 30, Why do economists (and increasingly, engineers and computer scientists) study auctions?

March 30, Why do economists (and increasingly, engineers and computer scientists) study auctions? March 3, 215 Steven A. Matthews, A Technical Primer on Auction Theory I: Independent Private Values, Northwestern University CMSEMS Discussion Paper No. 196, May, 1995. This paper is posted on the course

More information

Answers to Microeconomics Prelim of August 24, In practice, firms often price their products by marking up a fixed percentage over (average)

Answers to Microeconomics Prelim of August 24, In practice, firms often price their products by marking up a fixed percentage over (average) Answers to Microeconomics Prelim of August 24, 2016 1. In practice, firms often price their products by marking up a fixed percentage over (average) cost. To investigate the consequences of markup pricing,

More information

Practice Problems 2: Asymmetric Information

Practice Problems 2: Asymmetric Information Practice Problems 2: Asymmetric Information November 25, 2013 1 Single-Agent Problems 1. Nonlinear Pricing with Two Types Suppose a seller of wine faces two types of customers, θ 1 and θ 2, where θ 2 >

More information

1 Ricardian Neutrality of Fiscal Policy

1 Ricardian Neutrality of Fiscal Policy 1 Ricardian Neutrality of Fiscal Policy We start our analysis of fiscal policy by stating a neutrality result for fiscal policy which is due to David Ricardo (1817), and whose formal illustration is due

More information

Auctions That Implement Efficient Investments

Auctions That Implement Efficient Investments Auctions That Implement Efficient Investments Kentaro Tomoeda October 31, 215 Abstract This article analyzes the implementability of efficient investments for two commonly used mechanisms in single-item

More information

Bailouts, Time Inconsistency and Optimal Regulation

Bailouts, Time Inconsistency and Optimal Regulation Federal Reserve Bank of Minneapolis Research Department Sta Report November 2009 Bailouts, Time Inconsistency and Optimal Regulation V. V. Chari University of Minnesota and Federal Reserve Bank of Minneapolis

More information

Reciprocity in Teams

Reciprocity in Teams Reciprocity in Teams Richard Fairchild School of Management, University of Bath Hanke Wickhorst Münster School of Business and Economics This Version: February 3, 011 Abstract. In this paper, we show that

More information

Resource Allocation Auctions Within Firms

Resource Allocation Auctions Within Firms University of Pennsylvania ScholarlyCommons Accounting Papers Wharton Faculty Research 12-2007 Resource Allocation Auctions Within Firms Stanley Baiman University of Pennsylvania Paul E. Fischer University

More information

Liability, Insurance and the Incentive to Obtain Information About Risk. Vickie Bajtelsmit * Colorado State University

Liability, Insurance and the Incentive to Obtain Information About Risk. Vickie Bajtelsmit * Colorado State University \ins\liab\liabinfo.v3d 12-05-08 Liability, Insurance and the Incentive to Obtain Information About Risk Vickie Bajtelsmit * Colorado State University Paul Thistle University of Nevada Las Vegas December

More information

Sequential Investment, Hold-up, and Strategic Delay

Sequential Investment, Hold-up, and Strategic Delay Sequential Investment, Hold-up, and Strategic Delay Juyan Zhang and Yi Zhang February 20, 2011 Abstract We investigate hold-up in the case of both simultaneous and sequential investment. We show that if

More information

Principles of Banking (II): Microeconomics of Banking (3) Bank Capital

Principles of Banking (II): Microeconomics of Banking (3) Bank Capital Principles of Banking (II): Microeconomics of Banking (3) Bank Capital Jin Cao (Norges Bank Research, Oslo & CESifo, München) Outline 1 2 3 Disclaimer (If they care about what I say,) the views expressed

More information

Haiyang Feng College of Management and Economics, Tianjin University, Tianjin , CHINA

Haiyang Feng College of Management and Economics, Tianjin University, Tianjin , CHINA RESEARCH ARTICLE QUALITY, PRICING, AND RELEASE TIME: OPTIMAL MARKET ENTRY STRATEGY FOR SOFTWARE-AS-A-SERVICE VENDORS Haiyang Feng College of Management and Economics, Tianjin University, Tianjin 300072,

More information

research paper series

research paper series research paper series Research Paper 00/9 Foreign direct investment and export under imperfectly competitive host-country input market by A. Mukherjee The Centre acknowledges financial support from The

More information

FDI with Reverse Imports and Hollowing Out

FDI with Reverse Imports and Hollowing Out FDI with Reverse Imports and Hollowing Out Kiyoshi Matsubara August 2005 Abstract This article addresses the decision of plant location by a home firm and its impact on the home economy, especially through

More information

The Basic Public Finance of Public-Private Partnerships

The Basic Public Finance of Public-Private Partnerships ECONOMIC GROWTH CENTER YALE UNIVERSITY P.O. Box 208629 New Haven, CT 06520-8269 http://www.econ.yale.edu/~egcenter/ CENTER DISCUSSION PAPER NO. 957 The Basic Public Finance of Public-Private Partnerships

More information

BACKGROUND RISK IN THE PRINCIPAL-AGENT MODEL. James A. Ligon * University of Alabama. and. Paul D. Thistle University of Nevada Las Vegas

BACKGROUND RISK IN THE PRINCIPAL-AGENT MODEL. James A. Ligon * University of Alabama. and. Paul D. Thistle University of Nevada Las Vegas mhbr\brpam.v10d 7-17-07 BACKGROUND RISK IN THE PRINCIPAL-AGENT MODEL James A. Ligon * University of Alabama and Paul D. Thistle University of Nevada Las Vegas Thistle s research was supported by a grant

More information

KIER DISCUSSION PAPER SERIES

KIER DISCUSSION PAPER SERIES KIER DISCUSSION PAPER SERIES KYOTO INSTITUTE OF ECONOMIC RESEARCH http://www.kier.kyoto-u.ac.jp/index.html Discussion Paper No. 657 The Buy Price in Auctions with Discrete Type Distributions Yusuke Inami

More information

Definition of Incomplete Contracts

Definition of Incomplete Contracts Definition of Incomplete Contracts Susheng Wang 1 2 nd edition 2 July 2016 This note defines incomplete contracts and explains simple contracts. Although widely used in practice, incomplete contracts have

More information

IS TAX SHARING OPTIMAL? AN ANALYSIS IN A PRINCIPAL-AGENT FRAMEWORK

IS TAX SHARING OPTIMAL? AN ANALYSIS IN A PRINCIPAL-AGENT FRAMEWORK IS TAX SHARING OPTIMAL? AN ANALYSIS IN A PRINCIPAL-AGENT FRAMEWORK BARNALI GUPTA AND CHRISTELLE VIAUROUX ABSTRACT. We study the effects of a statutory wage tax sharing rule in a principal - agent framework

More information

Optimal auctions with endogenous budgets

Optimal auctions with endogenous budgets Optimal auctions with endogenous budgets Brian Baisa and Stanisla Rabinoich September 14, 2015 Abstract We study the benchmark independent priate alue auction setting when bidders hae endogenously determined

More information

Soft Budget Constraints in Public Hospitals. Donald J. Wright

Soft Budget Constraints in Public Hospitals. Donald J. Wright Soft Budget Constraints in Public Hospitals Donald J. Wright January 2014 VERY PRELIMINARY DRAFT School of Economics, Faculty of Arts and Social Sciences, University of Sydney, NSW, 2006, Australia, Ph:

More information

Antino Kim Kelley School of Business, Indiana University, Bloomington Bloomington, IN 47405, U.S.A.

Antino Kim Kelley School of Business, Indiana University, Bloomington Bloomington, IN 47405, U.S.A. THE INVISIBLE HAND OF PIRACY: AN ECONOMIC ANALYSIS OF THE INFORMATION-GOODS SUPPLY CHAIN Antino Kim Kelley School of Business, Indiana University, Bloomington Bloomington, IN 47405, U.S.A. {antino@iu.edu}

More information

Sequential Investment, Hold-up, and Strategic Delay

Sequential Investment, Hold-up, and Strategic Delay Sequential Investment, Hold-up, and Strategic Delay Juyan Zhang and Yi Zhang December 20, 2010 Abstract We investigate hold-up with simultaneous and sequential investment. We show that if the encouragement

More information

Revision Lecture Microeconomics of Banking MSc Finance: Theory of Finance I MSc Economics: Financial Economics I

Revision Lecture Microeconomics of Banking MSc Finance: Theory of Finance I MSc Economics: Financial Economics I Revision Lecture Microeconomics of Banking MSc Finance: Theory of Finance I MSc Economics: Financial Economics I April 2005 PREPARING FOR THE EXAM What models do you need to study? All the models we studied

More information

Multi-agent contracts with positive externalities

Multi-agent contracts with positive externalities Multi-agent contracts with positive externalities Isabelle Brocas University of Southern California and CEPR Preliminary and incomplete Abstract I consider a model where a principal decides whether to

More information

Interest on Reserves, Interbank Lending, and Monetary Policy: Work in Progress

Interest on Reserves, Interbank Lending, and Monetary Policy: Work in Progress Interest on Reserves, Interbank Lending, and Monetary Policy: Work in Progress Stephen D. Williamson Federal Reserve Bank of St. Louis May 14, 015 1 Introduction When a central bank operates under a floor

More information

SCREENING BY THE COMPANY YOU KEEP: JOINT LIABILITY LENDING AND THE PEER SELECTION EFFECT

SCREENING BY THE COMPANY YOU KEEP: JOINT LIABILITY LENDING AND THE PEER SELECTION EFFECT SCREENING BY THE COMPANY YOU KEEP: JOINT LIABILITY LENDING AND THE PEER SELECTION EFFECT Author: Maitreesh Ghatak Presented by: Kosha Modi February 16, 2017 Introduction In an economic environment where

More information

Fee versus royalty licensing in a Cournot duopoly model

Fee versus royalty licensing in a Cournot duopoly model Economics Letters 60 (998) 55 6 Fee versus royalty licensing in a Cournot duopoly model X. Henry Wang* Department of Economics, University of Missouri, Columbia, MO 65, USA Received 6 February 997; accepted

More information

2. Aggregate Demand and Output in the Short Run: The Model of the Keynesian Cross

2. Aggregate Demand and Output in the Short Run: The Model of the Keynesian Cross Fletcher School of Law and Diplomacy, Tufts University 2. Aggregate Demand and Output in the Short Run: The Model of the Keynesian Cross E212 Macroeconomics Prof. George Alogoskoufis Consumer Spending

More information

Gathering Information before Signing a Contract: a New Perspective

Gathering Information before Signing a Contract: a New Perspective Gathering Information before Signing a Contract: a New Perspective Olivier Compte and Philippe Jehiel November 2003 Abstract A principal has to choose among several agents to fulfill a task and then provide

More information

Robust Trading Mechanisms with Budget Surplus and Partial Trade

Robust Trading Mechanisms with Budget Surplus and Partial Trade Robust Trading Mechanisms with Budget Surplus and Partial Trade Jesse A. Schwartz Kennesaw State University Quan Wen Vanderbilt University May 2012 Abstract In a bilateral bargaining problem with private

More information

Microeconomic Theory (501b) Comprehensive Exam

Microeconomic Theory (501b) Comprehensive Exam Dirk Bergemann Department of Economics Yale University Microeconomic Theory (50b) Comprehensive Exam. (5) Consider a moral hazard model where a worker chooses an e ort level e [0; ]; and as a result, either

More information

6.254 : Game Theory with Engineering Applications Lecture 3: Strategic Form Games - Solution Concepts

6.254 : Game Theory with Engineering Applications Lecture 3: Strategic Form Games - Solution Concepts 6.254 : Game Theory with Engineering Applications Lecture 3: Strategic Form Games - Solution Concepts Asu Ozdaglar MIT February 9, 2010 1 Introduction Outline Review Examples of Pure Strategy Nash Equilibria

More information

An Economic Analysis of Compulsory and Voluntary Insurance

An Economic Analysis of Compulsory and Voluntary Insurance Volume, Issue (0) ISSN: 5-839 An Economic Analysis of Compulsory and Voluntary Insurance Kazuhiko SAKAI Mahito OKURA (Corresponding author) Faculty of Economics Kurume University E-mail: sakai_kazuhiko@kurume-uacjp

More information

G604 Midterm, March 301, 2003 ANSWERS

G604 Midterm, March 301, 2003 ANSWERS G604 Midterm, March 301, 2003 ANSWERS Scores: 75, 74, 69, 68, 58, 57, 54, 43. This is a close-book test, except that you may use one double-sided page of notes. Answer each question as best you can. If

More information

Foreign direct investment and export under imperfectly competitive host-country input market

Foreign direct investment and export under imperfectly competitive host-country input market Foreign direct investment and export under imperfectly competitive host-country input market Arijit Mukherjee University of Nottingham and The Leverhulme Centre for Research in Globalisation and Economic

More information

Optimal Labor Contracts with Asymmetric Information and More than Two Types of Agent

Optimal Labor Contracts with Asymmetric Information and More than Two Types of Agent Theoretical and Applied Economics Volume XIX (2012), No. 5(570), pp. 5-18 Optimal Labor Contracts with Asymmetric Information and ore than Two Types of Agent Daniela Elena ARINESCU ucharest Academy of

More information

Does Encourage Inward FDI Always Be a Dominant Strategy for Domestic Government? A Theoretical Analysis of Vertically Differentiated Industry

Does Encourage Inward FDI Always Be a Dominant Strategy for Domestic Government? A Theoretical Analysis of Vertically Differentiated Industry Lin, Journal of International and Global Economic Studies, 7(2), December 2014, 17-31 17 Does Encourage Inward FDI Always Be a Dominant Strategy for Domestic Government? A Theoretical Analysis of Vertically

More information

Indirect Taxation of Monopolists: A Tax on Price

Indirect Taxation of Monopolists: A Tax on Price Vol. 7, 2013-6 February 20, 2013 http://dx.doi.org/10.5018/economics-ejournal.ja.2013-6 Indirect Taxation of Monopolists: A Tax on Price Henrik Vetter Abstract A digressive tax such as a variable rate

More information

Firm-Specific Human Capital as a Shared Investment: Comment

Firm-Specific Human Capital as a Shared Investment: Comment Firm-Specific Human Capital as a Shared Investment: Comment By EDWIN LEUVEN AND HESSEL OOSTERBEEK* Employment relationships typically involve the division of surplus. Surplus can be the result of a good

More information

Foreign Bidders Going Once, Going Twice... Government Procurement Auctions with Tariffs

Foreign Bidders Going Once, Going Twice... Government Procurement Auctions with Tariffs Foreign Bidders Going Once, Going Twice... Government Procurement Auctions with Tariffs Matthew T. Cole (Florida International University) Ronald B. Davies (University College Dublin) Working Paper: Comments

More information

Risk Sharing in the New Public Works Concession Law in Spain

Risk Sharing in the New Public Works Concession Law in Spain Risk Sharing in the New Public Works Concession Law in Spain José M. Vassallo and Juan Gallego Budgetary constraints are forcing transport infrastructure authorities to raise private funds to finance the

More information

Practice Problems 1: Moral Hazard

Practice Problems 1: Moral Hazard Practice Problems 1: Moral Hazard December 5, 2012 Question 1 (Comparative Performance Evaluation) Consider the same normal linear model as in Question 1 of Homework 1. This time the principal employs

More information

Zhiling Guo and Dan Ma

Zhiling Guo and Dan Ma RESEARCH ARTICLE A MODEL OF COMPETITION BETWEEN PERPETUAL SOFTWARE AND SOFTWARE AS A SERVICE Zhiling Guo and Dan Ma School of Information Systems, Singapore Management University, 80 Stanford Road, Singapore

More information

Group-lending with sequential financing, contingent renewal and social capital. Prabal Roy Chowdhury

Group-lending with sequential financing, contingent renewal and social capital. Prabal Roy Chowdhury Group-lending with sequential financing, contingent renewal and social capital Prabal Roy Chowdhury Introduction: The focus of this paper is dynamic aspects of micro-lending, namely sequential lending

More information

Trading Company and Indirect Exports

Trading Company and Indirect Exports Trading Company and Indirect Exports Kiyoshi Matsubara June 015 Abstract This article develops an oligopoly model of trade intermediation. In the model, manufacturing firm(s) wanting to export their products

More information

Trade Agreements as Endogenously Incomplete Contracts

Trade Agreements as Endogenously Incomplete Contracts Trade Agreements as Endogenously Incomplete Contracts Henrik Horn (Research Institute of Industrial Economics, Stockholm) Giovanni Maggi (Princeton University) Robert W. Staiger (Stanford University and

More information

Omar O. Chisari (UADE and CONICET)

Omar O. Chisari (UADE and CONICET) Comment on International Trade and Domestic Regulation under Asymmetric Information: A Simple General Equilibrium Approach by D.Martimort and T.Verdier. Omar O. Chisari (UADE and CONICET) 1. The paper

More information

We examine the impact of risk aversion on bidding behavior in first-price auctions.

We examine the impact of risk aversion on bidding behavior in first-price auctions. Risk Aversion We examine the impact of risk aversion on bidding behavior in first-price auctions. Assume there is no entry fee or reserve. Note: Risk aversion does not affect bidding in SPA because there,

More information

Prof. Bryan Caplan Econ 812

Prof. Bryan Caplan   Econ 812 Prof. Bryan Caplan bcaplan@gmu.edu http://www.bcaplan.com Econ 812 Week 9: Asymmetric Information I. Moral Hazard A. In the real world, everyone is not equally in the dark. In every situation, some people

More information

Standard Risk Aversion and Efficient Risk Sharing

Standard Risk Aversion and Efficient Risk Sharing MPRA Munich Personal RePEc Archive Standard Risk Aversion and Efficient Risk Sharing Richard M. H. Suen University of Leicester 29 March 2018 Online at https://mpra.ub.uni-muenchen.de/86499/ MPRA Paper

More information

Lecture 3: Information in Sequential Screening

Lecture 3: Information in Sequential Screening Lecture 3: Information in Sequential Screening NMI Workshop, ISI Delhi August 3, 2015 Motivation A seller wants to sell an object to a prospective buyer(s). Buyer has imperfect private information θ about

More information

Mechanism Design: Single Agent, Discrete Types

Mechanism Design: Single Agent, Discrete Types Mechanism Design: Single Agent, Discrete Types Dilip Mookherjee Boston University Ec 703b Lecture 1 (text: FT Ch 7, 243-257) DM (BU) Mech Design 703b.1 2019 1 / 1 Introduction Introduction to Mechanism

More information

USO cost allocation rules and welfare

USO cost allocation rules and welfare USO cost allocation rules and welfare Andreas Haller Christian Jaag Urs Trinkner Swiss Economics Working Paper 0049 August 2014 ISSN 1664-333X Presented at the 22 nd Conference on Postal and Delivery Economics,

More information

Risk Mitigation Strategy for Infrastructure Projects

Risk Mitigation Strategy for Infrastructure Projects 2008/SOM3/IEG/SEM2/012 Risk Mitigation Strategy for Infrastructure Projects Submitted by: Peru Seminar on Recent Trends on Investment Liberalization and Facilitation in Transport and Telecommunication

More information

Bounding the bene ts of stochastic auditing: The case of risk-neutral agents w

Bounding the bene ts of stochastic auditing: The case of risk-neutral agents w Economic Theory 14, 247±253 (1999) Bounding the bene ts of stochastic auditing: The case of risk-neutral agents w Christopher M. Snyder Department of Economics, George Washington University, 2201 G Street

More information

Auction Theory Lecture Note, David McAdams, Fall Bilateral Trade

Auction Theory Lecture Note, David McAdams, Fall Bilateral Trade Auction Theory Lecture Note, Daid McAdams, Fall 2008 1 Bilateral Trade ** Reised 10-17-08: An error in the discussion after Theorem 4 has been corrected. We shall use the example of bilateral trade to

More information

Directed Search and the Futility of Cheap Talk

Directed Search and the Futility of Cheap Talk Directed Search and the Futility of Cheap Talk Kenneth Mirkin and Marek Pycia June 2015. Preliminary Draft. Abstract We study directed search in a frictional two-sided matching market in which each seller

More information