1 Coordination of interconnected 20 January supply-chains Draft Access Undertaking Return on Capital Response Summary Paper

2 I Introduction Aurizon Network s 2013 Access Undertaking (2013 DAU), also referred to as UT4, proposes the terms upon which access to the Central Queensland Coal Network (CQCN) will be made available to third parties. In developing UT4, Aurizon Network seeks to better promote the long-term competitiveness of the Queensland coal industry, continue to ensure efficient and timely investment in the CQCN, and provide a framework to work in partnership with supply chain participants. The submission detailed Aurizon Network s Maximum Allowable Revenue (MAR), the total revenue Aurizon Network would be able to earn each year for providing access to the CQCN. The Return on Capital derived as a product of the regulatory asset base (RAB) and the Weighted Average Cost of Capital, or WACC forms a key part of both the regulated building blocks methodology and the UT4 submission, particularly due to its importance in ensuring the efficient and timely investment in the CQCN. As outlined within this submission and the attached papers, Aurizon Network stands by its 2013 DAU and is of the view that: It retains a higher relative risk than that associated with energy and water utility businesses; The reasonableness of the UT4 WACC needs to be considered against recent regulatory decisions; and The UT4 WACC efficiently reflects the commercial and regulatory risks borne by Aurizon Network. This paper summarises Aurizon Network s response to a range of matters since the submission of UT4 in April 2013, particularly addressing stakeholder submissions and matters raised during the Queensland Competition Authority s (QCA s) UT4 regulatory consultation process. The paper is structured as follows: Section 2 outlines the role of Aurizon Network within the CQCN and the importance of the Return on Capital requirement; Section 3 summarises the attached papers from SFG Consulting and Aurizon Network; Section 4 discusses the cost of debt; and Section 5 concludes. Volume 1 Overview & Summary 2

3 II Aurizon Network, its role within the CQCN and Return on Capital 1) Aurizon Network and its role within the CQCN Aurizon Network is a subsidiary of Aurizon Holdings Pty Ltd, that owns and operates the rail network within Central Queensland, commonly referred to as the Central Queensland Coal Network (CQCN). As being a separate functional business unit and legal entity within the Aurizon group structure, Aurizon Network provides services other than access including below rail maintenance and rail infrastructure management services. The CQCN is comprised of four major coal systems, totalling approximately 2,670 kilometres of heavy haul rail infrastructure. Constituting the largest coal network in Australia and one of the country s most complex rail freight networks, the CQCN runs more than 100 trains each day, equating to approximately 76,000 coal carrying train services each year. Aurizon Network s 2013 Draft Access Undertaking (2013 DAU) was lodged with the QCA in April 2013, and is a critically important document for both Aurizon Network and the CQCN, as it guides negotiations with its customers, sets out how services must be provided and regulates the revenues that Aurizon Network can earn from providing access. Also, with Aurizon Network being a subsidiary of the Aurizon Group, the 2013 DAU impacts upon the capital structure of the Aurizon Group and how it can be structured, how it must operate, and how it creates value for its shareholders and its customers. As a regulated service, Aurizon Network considers the UT4 revenue proposal reflects the efficient costs of developing, maintaining and operating a highly productive and reliable world class rail network that has safety as its core value. It is essential for Aurizon Network to deliver commercially adequate returns to incentivise its investors and to support funding for expansion as well as continuing to attract private capital to fund future investments in the network, especially at a time of continued financial market instability and capital rationing. Aiming to ensure both prudency and efficiency, these costs have been rigorously benchmarked and are otherwise controlled through the Aurizon Group s corporate governance practices. As such, Aurizon Network is of the view that the UT4 revenue proposal is consistent with the Pricing Principles in the Queensland Competition Authority Act 1997 (the QCA Act), most notably Section 168A(a), which entitles it to charge a price for access that is: at least enough to meet the efficient costs of providing access to the service and include a return on investment commensurate with the regulatory and commercial risks. Volume 1 Overview & Summary 3

4 There are two important aspects (components) of Section 168A(a). The first is that revenue should at least be sufficient to cover the efficient costs of providing the service, including a return on capital, and the second aspect is the scope of the provision where the rate of return must be commensurate with the regulatory and commercial risks involved. Historically, the focus of the review of the return on capital to apply to the CQCN has been on estimating each of the parameters in the Weighted Average Cost of Capital (WACC). This has provided for an expected return on debt that is seen to be based on the prevailing benchmark cost of comparable borrowings in the market. In addition, it has also provided for an expected return on equity that is derived using the Capital Asset Pricing Model (CAPM), where the cost of equity only provides compensation for systematic or non-diversifiable risks. As the WACC is comprised of an expected return on debt based on the prevailing benchmark cost of comparable borrowings in the market, and the expected return on equity compensates equity holders for systematic risks, the question is whether this is (at least) commensurate with the commercial and regulatory risks borne by Aurizon Network and if not, how should these risks be appropriately compensated. 2) Return on Capital and Weighted Average Cost of Capital (WACC) A critical part of Aurizon Network s revenue proposal is the Return on Capital, based upon a post-tax nominal (vanilla) WACC. The WACC is essentially the minimum return a company would need to earn on its existing asset base that would need to satisfy its shareholders. As a weighted average concept, it is usually comprised of a number of sources, categorised as either debt or equity. Within the regulatory framework, WACC forms a key part of the building blocks model utilised by regulators in proving costs that are at least enough in meeting the efficient costs of providing access to a service. For instance, WACC applies to Aurizon Network s capital indicator and the return on the debt and equity proportion s of the regulated asset base (RAB). The WACC therefore forms one of the most significant building blocks that constitutes Aurizon Network s Maximum Allowable Revenue (MAR). Due to the importance of this component, Aurizon Network developed the proposed UT4 WACC having regard to relevant regulatory precedent, prevailing financial market conditions, finance and econometric theory as well as commercial practice. Yet regardless of the prevailing conditions in the financial markets at the time of submission and throughout the UT4 consultation process, Aurizon Network considers it appropriate to specify the values for more uncertain parameters as a range, resulting in a range for the WACC. With this, a decision would then made as to where the point estimate for WACC is selected from within that range, a method that is consistent with the approach adopted by the Independent Pricing and Regulatory Tribunal (IPART). To substantiate the WACC, the UT4 revenue proposal provided extensive detail around the components of Aurizon Network s UT4 Return on Capital and the underlying WACC, where discussion: Outlined the current legislative issues within Queensland and those related to the CQCN; Highlighted Aurizon Network s commercial and regulatory risks; Examined the financial market environment; Volume 1 Overview & Summary 4

5 Analysed the components of the proposed UT4 WACC, the UT3 issues and/or outcomes for these components, and what Aurizon Network believes will be the issues for UT4; and Assessed the reasonableness of the proposed estimates. Ultimately, returns on an investment must reflect the risks investors are asked to bear, and the attached Aurizon Network paper, A comparator analysis of Aurizon Network s commercial and regulatory risks, clearly outlines the risk that Aurizon Network faces in operation of the CQCN. Nonetheless, constituting a large part of the response to the 2013 DAU, the QRC WACC Submission proposed a WACC of 5.65%, compared to Aurizon Network s upper bound WACC of 8.18%. Figure 1 WACC, Return on Capital and the regulated building blocks Cost of Debt + Cost of Equity = Building Blocks Weighted Average Cost of Capital (WACC) X Regulated Asset Base (RAB) = Return on Capital Return of Capital Inflation Maintenance expenditure Operating expenditure Tax Volume 1 Overview & Summary 5

6 Whilst discussed in significant detail within the attached papers, Aurizon Network considers it important to address the reasonableness of such a proposal by asking two basic, yet fundamental issues: Q1 Q2 Can the QCA reasonably expect Aurizon Network investors to invest at substantially lower returns than other similar investments in the Queensland coal supply chain? If the QCA does reasonably expect Aurizon Network investors to invest at substantially lower returns, what recent regulatory and relevant empirical evidence substantiates such a view? In response to the second question and as presented within the QCA WACC Forum held in December 2013, the reasonableness of Aurizon Network s UT4 WACC proposal can be framed most appropriately when compared against a spectrum of relevant industry comparators. As illustrated in Figure 2, the QRC WACC Submission of 5.65% could be considered an extreme outlier when compared to other determinations. Figure 2 Recent Regulatory Decisions (Weighted Average Cost of Capital) 14.00% 12.00% 12.48% 11.11% 10.84% 10.00% 8.00% 9.86% 9.96% 9.65% 8.18% 7.22% 7.31% 7.50% 8.08% 8.28% 8.61% 6.00% 5.65% 4.00% 2.00% 0.00% Relevant Industry Comparators Other Industry Comparators Importantly, as the UT4 WACC will be fixed for four years, implications of an unreasonable fixing need to be carefully considered. For instance, if the regulated WACC is below the expected returns that lenders and shareholders require given the risk profile of Aurizon Network as a below-rail network business, investment in maintenance and capital expenditure could be adversely affected. From October 2013, the QCA began receiving a range responses reflecting the importance of Aurizon Network s UT4 submission. In conjunction, the QCA also began its consultation process into the 2013 DAU, publishing a number of specific papers on Aurizon Network s proposed UT4 cost of capital requirements, as well as holding a WACC Forum later during December The remainder of this paper summarises the Aurizon Network s response to the issues raised in the previous papers and forums. Volume 1 Overview & Summary 6

7 III Cost of Capital Summary of papers In order to progress (and support the regulatory timeline) towards achieving a QCA draft pricing decision by 30 June 2014, Aurizon Network has attached various papers in response to both stakeholders submissions, as well papers commissioned as part of the QCA consultation process, including: 1. Three papers prepared by SFG Consulting, titled: a) An appropriate regulatory estimate of the market risk premium (January 2014); b) An appropriate regulatory estimate of gamma (January 2014); c) Systematic risk of Aurizon Network: Response to reports and submissions to the Queensland Competition Authority (January 2014); and 2. A paper prepared by Aurizon Network titled: a) A comparator analysis of Aurizon Network s commercial and regulatory risks (January 2014). The following sections provide a summary of the content within those papers. a) An appropriate regulatory estimate of the market risk premium 1. Overview The risk-free rate and market risk premium are critical components of the Capital Asset Pricing Model (CAPM) and in turn, derivation of the Aurizon Network s UT4 WACC. The market risk premium (MRP), reflects the rate of return earned on a well-diversified portfolio of assets above the risk-free rate, whilst the risk-free rate (R f ) reflects the rate of return an investor could reasonably expect to earn if funds were invested into a riskless investment, for example a Australian Government 10 year bond. Retained by Aurizon Network to provide views on both the MRP and risk-free rate, SFG Consulting prepared a paper in response to the following reports and submissions: a. Lally (2013a), Response to submissions on the risk-free rate and the MRP, a report commissioned by the QCA; b. McKenzie and Partington (2013), Review of Aurizon Network s draft access undertaking; a report commissioned by the Queensland Resources Council; and c. Queensland Resources Council (2013), WACC submission, submission to the QCA. Volume 1 Overview & Summary 7

8 2. Risk-free rate and the market risk premium The SFG paper undertakes a question and answer format in seeking to identify an appropriate and reasonable risk-free rate. In doing so, the paper seeks QCA consideration of two questions: Q1 Q2 Should a spot rate or some historical average be used? Should the term of the risk-free rate be set to 5 years (or the length of the regulatory control period in question) or 10 years? In consideration of these questions and analysis provided by SFG Consulting, Aurizon Network considers that: Q1 Should a spot rate or some historical average be used? Is of the consensus view that a spot risk-free rate should be utilised and in turn, should also be paired with the spot estimate of the MRP. Such a view is replicated by Lally (2013a), the QRC WACC submission and within the 2013 DAU. Q2 Should the term of the risk-free rate be set to 5 years (or the length of the regulatory control period in question) or 10 years? As is market practice, the rate should be based upon the 10-year government bond yield. This is supported by current and substantial regulatory evidence, with equivalent stances undertaken by the Independent Pricing and Regulatory Tribunal (IPART), the Australian Energy Regulatory (AER) and the Australian Competition Tribunal (ACT). Additionally, in its paper Aurizon Network: Review of benchmark credit rating and cost of debt, Incenta Economic Consulting advised the QCA that a term of 10 years is appropriate when estimating the cost of debt; The adoption of a 10-year risk-free rate for the cost of equity would be consistent with the 10-year risk free rate that the QCA s consultants have recommended for the cost of debt; and Regulators have identified that for longer term equity, the NPV=0 principle would seem to require the utilisation of risk-free rates of longer duration. In regards to the market risk premium (MRP), SFG Consulting undertook a similar approach seeking QCA consideration to six, essential questions: Q1 Q2 Q3 Q4 Q5 Is the Authority comfortable with an approach that implies that the GFC and ensuing European debt crisis resulted in equity capital being cheaper than at any other time in postwar history? Is it time for a revision of the QCA approach to estimating the MRP? Should the QCA have regard to the Wright approach? Should the QCA have regard to evidence from independent expert valuation reports? Should the QCA use the best available data? Volume 1 Overview & Summary 8

9 Q6 What MRP value does the Lally (2013) approach produce? In consideration of these questions and analysis provided by SFG Consulting, Aurizon Network considers that: Q1 Is the Authority comfortable with an approach that implies that the GFC and ensuing European debt crisis resulted in equity capital being cheaper than at any other time in post-war history? Questions the appropriateness of establishing the MRP, especially if the current approach proposes nonsensical equity return outcomes throughout tumultuous periods such as the Global Financial Crisis and the European Debt Crisis. Q2 Is it time for a revision of the QCA approach to estimating the MRP? Recommends the QCA s current approach in estimating the MRP should be augmented. Q3 Should the QCA have regard to the Wright approach? Agrees that the QCA s current approach in estimating the MRP for use in the Sharpe-Lintner CAPM the rounding combination of the Ibbotson, Siegel and Cornell methods in conjunction with survey responses should be augmented with the Wright approach as proposed by Lally (2013a); and Notes that the augmented method inclusive of the Wright approach is consistent with recent regulatory stances such as those witnessed by the AER s recent draft Guideline and extensively within the UK regulatory environment. Q4 Should the QCA have regard to evidence from independent expert valuation reports? Recommends that the QCA have regard to evidence from independent expert valuation reports. Q5 Should the QCA use the best available data? Urges the QCA to continue to follow best practice regulation, especially by means of utilising the most up-to-date and correct data sets available within the approaches of Ibbotson, Siegel, Cornell and Wright, as well as the Fernandez survey data and independent expert valuation reports. Q6 What MRP value does the Lally (2013) approach produce? If making only a singular proposed change of the total six proposed changes to the Lally (2013a) results, the revised Lally (2013a) results would produce a MRP of 7.0%, established during the QCA WACC Forum by Dr Lally when confirming that the most recent estimates were the best, as in survey data from 2013 being superior to that for Summary The Aurizon Network proposed UT4 risk-free rate should be based upon a spot risk-free rate; paired with the spot estimate of the MRP; and based upon the 10-year government bond yield. In addition, the proposed UT4 MRP estimate of 7% continues to remain entirely reasonable. The only way to not derive a 1 QCA, 2013, WACC Forum Minutes,13 th December 2013, available at Volume 1 Overview & Summary 9

10 7% MRP would be to ignore all of the six changes proposed by SFG Consulting, including not updating the QCA/Lally approach with both corrected and updated datasets. For further discussion regarding the reasonableness of Aurizon Network s proposed UT4 MRP and riskfree rate, please refer to the attached SFG Consulting paper, An appropriate regulatory estimate of the market risk premium. b) An appropriate regulatory estimate of gamma 1. Overview Forming another component of the WACC, gamma (ỳ) reflects the value of imputation credits that can used by shareholders. It is calculated as a product of two elements, the distribution rate (F) and the value of distributed credits (theta or Θ). The distribution rate (F) is the ratio of two components, (a) the total amount of franking credits distributed to shareholders in a given year, to (b) the total amount of franking credits created in a given year. Theta (Θ) estimates the value of a dollar of franking credits that has been distributed, or in other words, the extent to which a distributed imputation credit is reflected in the market price of a firm s shares. As example: if theta is 0.35, the share price of an organisation would be higher than it would otherwise be by 35% of the face value of the imputation credits that are expected to be distributed. 2 However, due to Australian Taxation Law and the taxation benefits associated with franking credits the value a resident shareholder places upon franking credits is clearly different to that placed upon franking credits by non-residential shareholders. Specifically, resident shareholders are able to utilise the franking credits so as to reduce tax liabilities whereas non-resident shareholders cannot. As retained by Aurizon Network to provide views on gamma (ỳ), SFG Consulting prepared a paper in response to following reports and submissions: a. Lally (2012), The estimated utilisation rate for imputation credits, report commissioned by the QCA; b. Lally (2013b), Estimating Gamma, a report commissioned by the QCA; c. McKenzie and Partington (2013), Review of Aurizon Network s draft access undertaking; a report commissioned by the Queensland Resources Council; and d. Queensland Resources Council (2013), WACC submission, submission to the QCA 2 SFG 2014, An appropriate regulatory estimate of gamma FINAL Report for Aurizon Ltd, 23 rd December 2013, pg. 34, available at: Volume 1 Overview & Summary 10

11 2. Gamma Similar to the approach used in the previous paper, SFG Consulting undertook a logic-based approach in addressing key elements of a complex issue. In so doing, the paper sought QCA consideration of six questions: Q1 Should gamma be estimated as the product of F and theta (Θ)? Q2 What value should be adopted for the distribution rate, F? Q3 Q4 Q5 Q6 Should theta (Θ) be estimated on the basis on empirical evidence or theoretical assumption? Can redemption (or utilisation ) rates be used to estimate theta (Θ)? What data period should be used to estimate the value of theta (Θ)? What are the current empirical estimates of theta (Θ)? In consideration of these questions and analysis provided by SFG Consulting, Aurizon Network is of the view that: Q1 Should gamma be estimated as the product of F and Θ? As per standard regulatory practice, gamma should be estimated as the product of the distribution rate (F) and the value of distributed franking credits (theta, Θ). Q2 What value should be adopted for the distribution rate, F? The distribution rate (F) should be set at a value of 0.7, in line with the best, currently available empirical evidence, supported by both the AER, the ACT and particularly the QRC in its own UT4 WACC submission. 3 Q3 Should theta (Θ) be estimated on the basis on empirical evidence or theoretical assumption? The alternative approach of estimating gamma (ỳ) as proposed by Lally (2013), should be rejected as no case has been made for rejecting the currently accepted approach; The value of theta (Θ) should be based upon empirical evidence rather than theoretical reasoning as: a. The QCA has previously rejected Lally s theoretical approach stating that such acceptance would be inconsistent with the QCA regulatory model, the Sharpe-Lintner CAPM; b. No other regulator adopts a theta (Θ) value based upon the Lally theoretical approach; c. It is standard regulatory practice to estimate all WACC parameters on the basis of empirical evidence; and d. If theta (Θ) is to be estimated not as is, but in the absence of any foreign investment, then all WACC parameters should be estimated on the same basis. 3 McKenzie and Partington, 2013, Report to Queensland Resources Council Review of Aurizon Network s Draft Access Undertaking, 5 th October 2013, available at: Volume 1 Overview & Summary 11

12 Q4 Can redemption (or utilisation ) rates be used to estimate theta (Θ)? The redemption rate the ratio of redeemed credits to distributed franking credits cannot be used to estimate theta (Θ) as: a. The redemption rate only signifies a franking credit had some positive value, providing no indication of the quantum of that value; b. The ACT has ruled that redemptions rates cannot be used to estimate theta; c. Concerns with data sourced from the Australian Taxation Office infer that reliability and accuracy are prominent and relevant issues that need to be recognised; d. Lally (2013b) indicates that utilisation of redemption rates involves an internal inconsistency as well as implying that the cost of equity rises as markets become more integrated; e. McKenzie and Partington (2013) note that standard practice is to measure the market value of theta; f. Both the National Electricity and National Gas Rules specifically define gamma (ỳ) as the value of imputation credits; and g. Market practice is to make no adjustment in relation to imputation credits to cash flows or discount rates; and Due to clear empirical evidence, the QCA should not assume that: a. All distributed credits are redeemed; and b. The full face value of every imputation credit that is redeemed is reflected in the stock price. Q5 What data period should be used to estimate the value of theta (Θ)? Consistent with standard regulatory approaches, post-2000 data should be used to estimate the value of theta (Θ). Q6 What are the empirical estimates of theta (Θ)? AER empirical evidence estimate a theta (Θ) value between 0 to 0.5, with the SFG theta (Θ) value of 0.35 considered conservative. 3. Summary In summary, by following a logic-based approach in addressing key elements of gamma (ỳ), Aurizon Network considers that: Gamma (ỳ) is a product of the distribution rate (F) and the value of distributed franking credits (theta, Θ), i.e., (ỳ) = F x Θ; There is no basis for the QCA to maintain its current estimate of 0.8 for its distribution rate (F) as 0.7 is now widely accepted and consistent with stakeholder submissions; AER empirical evidence estimates theta (Θ) between 0 to 0.5, with the SFG theta (Θ) value of 0.35 considered conservative; and Consequently, the final estimate of gamma (ỳ) is: (ỳ) = F x Θ = 0.7 x 0.35 = 0.25 Volume 1 Overview & Summary 12

13 For further discussion regarding the reasonableness of Aurizon Network s proposed UT4 gamma, please refer to the attached SFG Consulting paper, An appropriate regulatory estimate of gamma. c) Systematic risk of Aurizon Network: Response to reports and submissions to the Queensland Competition Authority 1. Overview An indication of a firm s systematic risk when compared to the market, the equity beta forms a critical element in deriving the cost of equity and the WACC. Further to its earlier work contained within the 2013 DAU, SFG Consulting has prepared a paper in response to the following reports and submissions regarding estimation of the asset and equity beta: a. Castalia Strategic Advisors (2013), Aurizon Access Undertaking: Risk Allocation Analysis, report commissioned by the Queensland Resources Council; b. Incenta Economic Consulting (2013), Review of Regulatory Capital Structure and Asset/Equity Beta for Aurizon Network, a report commissioned by the QCA; and c. McKenzie and Partington (2013), Review of Aurizon Network s draft access undertaking; a report commissioned by the Queensland Resources Council. 2. Equity beta It is important to highlight that where there is a lack of pure play comparators for an entity, firm beta estimation remains a particularly challenging process. Hence in the absence of such comparators and to undertake accurate beta estimation, a logical and robust methodology requires an assessment of entities that retain similar characteristics to the firm in question. Engaged as part of the UT4 consultation process, Incenta accepted a request by the QCA to review various elements of Aurizon Network s proposed UT4 Return on Capital requirement, including the asset beta, capital structure and equity beta. In relation to the asset beta, Incenta asserted: that a benchmark asset beta of 0.35 to 0.49 is appropriate to apply to Aurizon Network, with: The bottom of this range (0.35) being defined by independent expert Grant Samuel s assessment of the asset beta of the Dalrymple Bay Coal Terminal (DBCT), which is a regulated asset in the same coal chain as, and in our view similar systematic risk characteristics to, Aurizon Network; The middle of this range (0.42) being the estimated asset beta of a large international group of regulated energy and water businesses; and The top of this range (0.49) being the estimated asset beta for tollroads, which share some similar characteristics to Aurizon Network but, in our view, are subject to significantly more volume (revenue risk). 4 4 Incenta, 2013, pg. 4 Volume 1 Overview & Summary 13

14 Yet in arriving at its conclusions, Incenta undertake a distinctly separate, sequential two-step approach in considering whether firms are relevant comparators for Aurizon Network. Firstly, Incenta sought to identify if a firm was regulated in a manner that closely resembles the framework within which Aurizon Network currently operates, particularly focussing upon both the form of regulation and the contractual arrangements. Secondly, if firms did satisfy the criteria in Step 1, Incenta then undertook further filtering by focussing upon industry and business models, for instance, the level of operational financial leverage or gearing that a firm employs. In other words, Incenta s sequential approach asserted that it did not matter if a firm was in the same industry or retained the same operational financial leverage, especially if the firm was not regulated in a similar fashion to that of Aurizon Network. As a result, any such firm was essentially excluded from further consideration. SFG Consulting succinctly summarises this issue and states: This is an extension of the sequential manner in which industries are considered to be either relevant or irrelevant for consideration. Airports are considered irrelevant because of light-handed regulation, and Tollroads are only used to construct an upper bound because regulation is not close enough to the framework applied to Aurizon Network. The gearing of these industries suggests that they should have high stability of operational profits, but they are still not assigned weight in reaching a conclusion on beta because they did not overcome the first hurdle of regulatory comparability. However in undertaking this unusual approach, Aurizon Network considers it questionable as to what firms were considered relevant and what firms were not. For instance, Incenta has relied extensively on the energy and water businesses to estimate a mid-point value of 0.42 for the asset beta, ignoring other businesses within airport, rail and coal industry sectors, altogether because they did not pass the first stage in the filtering approach. In any case, Incenta attempted to frame its mid-point estimate by briefly referring to an independent report prepared by Grant Samuel, where the report previously estimated an asset beta of 0.35 for the Dalrymple Bay Coal Terminal (DBCT). In turn, Incenta used 0.35 as its bottom-of-the-range value. 5 However of curiosity to Aurizon Network is that the Grant Samuel report also contained a beta estimate for WestNet Rail of 1.0 to 1.1 when combined with a gearing level of 20% to 25%, based upon analysis of listed rail operations in North America. 6 When reading the description of the WestNet operations, a number of similar characteristics are clearly similar to those of Aurizon Network, yet Incenta believed: other rail assets regulated by the Economic Regulation Authority (ERA) are not relevant to Aurzion Network, as they refer to assets that have significantly different systematic risks. 7 Incenta make no further referral to WestNet nor allow WestNet any further consideration or weighting within its analysis. Hence, the criteria Incenta employed in estimation of the firm beta seems to obviously place an unjustifiable emphasis upon the nature of the regulated asset, whilst at the expense of other relevant characteristics from completely reasonable and comparable firms. 5 The Aurizon Network paper, A comparator analysis of Aurizon Network s commercial and regulatory risks, discusses the tollroad industry group in greater detail. 6 Grant Samuel & Associates Pty Ltd, 2010, Prime Infrastructure: Financial services guide and independent expert s report in relation to the proposal from Brookfield Infrastructure Partners, 24 th September Incenta, 2013, pg. 67 Volume 1 Overview & Summary 14

15 The SFG Consulting paper also assesses the reports commissioned by the Queensland Resources Council, where in considering the methodology and supporting arguments of the Castalia paper, SFG highlight two important limitations. Firstly, the Castalia paper assesses Aurizon Network s revenue and expenditure risks purely on the basis of regulatory and contractual terms, where if a business retains elements that reduce revenue volatility, then that business s overall risk is also lower than another. Secondly, with no quantitative assessment performed upon historical returns or asset value estimates, the Castalia paper combines a set of possible risk exposures with a qualitative based, relative risk assessment. Overall, the Castalia paper contains no quantitative measurement of revenue or expenditure variations upon beta estimates, nor are its relative risk assessment premises supported by empirical evidence. The Castalia paper is discussed in greater detail by the Aurizon Network paper, A comparator analysis of Aurizon Network s commercial and regulatory risks. In relation to the second paper, SFG comment that Mackenzie and Partington highlight the challenge in finding comparable firms for Aurizon Network, further noting that US Class 1 Railroads are different. However in stating that previous regulators have relied upon energy and water networks also an imperfect comparator Mackenzie and Partington fail to reach any conclusion on whether they agree with this reliance, or how much weight should be assigned to listed rail or transport businesses. 3. Summary The consideration of a range of information in estimate of firm beta is entirely appropriate for decisionmaking purposes, particularly where there is an absence of pure play comparators. However, the reliance upon one criteria, i.e., the form of regulation, as the sole basis to provide a recommendation is questionable. Further, the sequential approach employed by Incenta is of concern to Aurizon Network, as if adopted by the QCA, could quite possibly set a precedent that allows any beta estimate to be engineered for any future regulatory decision. For further discussion regarding the reasonableness of Aurizon Network s proposed UT4 gamma, please refer to the attached SFG Consulting paper, Systematic risk of Aurizon Network: Response to reports and submissions to the Queensland Competition Authority. d) A comparator analysis of Aurizon Network s commercial and regulatory risks 1. Overview Due to the unique nature of the CQCN, the sourcing of relevant comparators has continued to prove an inherently difficult task. Consequently, the process of identifying point estimates for the determination of an appropriate cost of equity becomes an issue of criticality. As a result, three main elements are required within a discretion-based process that: 1. Has regard to all relevant information; 2. Is logical with respect to that relevant information; and Volume 1 Overview & Summary 15

16 3. Exhibits a high degree of confidence that will not underestimate the true cost of equity (even if it was observable). Aurizon Network s 2013 DAU proposal followed this approach in estimation of its cost of equity parameters. Specifically, by identifying that some respects of the provision of coal carrying train services within the CQCN exhibit similar not identical risk characteristics as a US Class 1 Railroad, and via undertaking robust statistically based analysis, issues affecting Aurizon Network can be more accurately defined. The Aurizon Network paper, A comparator analysis of Aurizon Network s commercial and regulatory risks, builds on the 2013 DAU proposal and provides further comments upon Aurizon Networks asset beta, as well as the commercial and regulatory risks to which the organisation is exposed. In conjunction with the SFG Consulting paper, Systematic risk of Aurizon Network, this paper also responds to comments within the following reports and submissions: a. Castalia Strategic Advisors (2013), Aurizon Access Undertaking: Risk Allocation Analysis, report commissioned by the Queensland Resources Council; and b. Incenta Economic Consulting (2013), Review of Regulatory Capital Structure and Asset/Equity Beta for Aurizon Network, a report commissioned by the QCA. 2. Asset beta Asset beta forms a critical part in determination of a firm's cost of equity, where by removing the effect of financial risk or debt, the asset beta indicates how volatile a firm is regardless of its capital structure. However, whilst the cost of debt can be substantiated via comparisons to directly observable market parameters, the components of the cost of equity are substantially more difficult to quantify, particularly due to the short supply of pure play comparators that would allow for statistically robust, empirical estimation. In recognition of these issues, detailed analysis was undertaken by SFG Consulting and supplied as part of the 2013 DAU. Based upon a robust statistical approach that included data from Australian listed energy companies, Australian listed industrial transportation firms (including Aurizon Holdings Limited), and US Class 1 Railroads, the approach applied three main techniques in estimation of an asset beta including: 1. An Ordinary Least Squares (OLS) regression, utilising different starting points of four weekly returns; 2. The incorporation of firm characteristics into the beta estimates (firm size and book to market equity ratios); and 3. Fitting regression-based beta estimates according to firm characteristics (that is, the dependent variable is the regression-based estimate and the independent variables are firm size, book-to-market ratios and debt-equity ratios). Based upon the OLS regression technique and depending upon the weights assigned to the sample of Australian-listed energy network firms, Australian-listed Industrial Transportation firms and US-listed railroads, an asset beta between was estimated. Volume 1 Overview & Summary 16

17 It is important to highlight that the above estimated asset beta same as that proposed in the UT4 submission is substantially below the actual asset betas assigned to the US Class 1 Railroads. Pointedly, at no point throughout the UT4 submission has Aurizon Network sought an asset beta the same as US Class 1 Railroads. This is further proven when reference is made to the United States Surface Transportation Board (U.S. STB), where based upon the U.S. STB s equity beta of 1.153, an asset beta of 0.95 has been estimated. Hence to imply that Aurizon Network has indicated it is a US Class 1 Railroad is materially inaccurate. This is because such an implication would have yielded a relevered equity beta of 1.8, substantially higher than that sought by Aurizon Network within its UT4 submission. As indicated in the 2013 DAU, Aurizon Network continues to be of the view that in some respects, US Class 1 Railroads possess similar risk characteristics to the CQCN. Specifically: analysis shows that Aurizon Network s below-rail business is similar to the US Class 1 railways on a number of systematic risk dimensions. The key difference is that the US Class 1s are more diversified and are also not subject to regulation, although the threat of intrusive regulation would impose some constraints on behaviours. This supports inclusion of these firms in a comparator beta sample, noting that Aurizon Network is not looking to restrict this sample to these firms. 8 Consequently, due to these similar risk characteristics it is not unreasonable to include US Class 1 Railroads within the calculation of Aurizon Network s asset beta. However when focusing upon the Castalia Strategic Advisors (Castalia) paper, Aurizon Access Undertaking: Risk Allocation Analysis Report to Queensland Resources Council, Castalia has excluded US Class 1 Railroads from its comparative analysis. Specifically: There have been attempts to use evidence from international markets to estimate Australian equity betas. For example Aurizon cites an analysis of the betas from listed US railroad companies as part of its claim for a higher beta. Such international evidence should be treated with caution as: The comparators chosen are almost always not directly comparable observed betas for US rail companies relate to vertically integrated businesses with both above rail and below rail activities and thus have a materially different risk profile to a below rail business; and Beta can only be derived by reference to the specific market so betas are only comparable between different markets if the markets have similar characteristics that is the average risk profile of the markets are as comparable as the specific risk profile of the business. A quick comparison of the top 20 stocks in the US and Australia shows that this condition doesn t hold. International betas can only be compared if they were calculated against a counterfactual of a hypothetical weighted average world equity market. 9 8 Aurizon Network, 2013, 2013 Draft Access Undertaking Volume 3: Maximum Allowable Revenue and Reference Tariffs, 30 th April 2013, pg. 143, available at 9 Castalia Strategic Advisors, 2013, Aurizon Access Undertaking: Risk Allocation Analysis Report to Queensland Resources Council, pg. 12, available at Volume 1 Overview & Summary 17

18 It is of note that the Castalia paper does not elaborate further upon these differences, notwithstanding this Aurizon Network acknowledges there are differences between US Class 1 Railroads and the CQCN. However despite the existence of these differences, US Class 1 Railroads do and continue to provide a relevant benchmark and point of reference for equity investors in rail infrastructure. In focusing upon the Incenta Economic Consulting (Incenta) paper, Review of Regulatory Capital Structure and Asset/Equity Beta for Aurizon Network Report to the Queensland Competition Authority, Incenta has included tollroad infrastructure businesses within its asset beta range estimates. Specifically: The 0.49 asset beta estimate for tollroads defines the upper bound of the range. The tolls for tollroads are typically prescribed but not subject to period review (often set as the outcome of an initial tendering process), and as such are more subject to cyclical economic activity than Aurizon Network, and are subject to greater asset stranding risk. 10 Yet the inclusion of tollroads as a suitable comparator industry is questionable. For instance, Incenta asserts that tollroads are not subject to regulation, or, if they are subject to regulation, it is only lighthanded in nature. However in truth, the majority of tollroads across Europe operate under a form of price cap. For instance, Atlantia s annual change in access prices is capped at 70% of CPI for the year plus an x-factor that is compensation for a negotiated investment plan based upon an unlevered IRR. Incenta also assert that tollroads are exposed to greater cyclical economic activity than Aurizon Network, yet little volatility is seen in traffic volumes across the last 7 years, including that covered by the European Debt Crisis. Even when placing aside the wide dispersal of asset beta s across the tollroad industry, it is for these reasons that Aurizon Network does not agree with Incenta in the inclusion of tollroads in the asset beta range analysis, particularly when used as a cap on the asset beta for the CQCN. A number of stakeholder submissions to the 2013 DAU also made point about the de-risking of Aurizon Network s role within the CQCN, including but not limited to the take-or-pay mechanism, capacity reservation charges, annual volume resets and revenue cap adjustment amounts. As a consequence of such changes, reductions to the firm s asset beta should also be undertaken. However, there is no justification for adjusting the asset beta for changes in risk allocation as: Any changes in risk allocation which have been made relate to asymmetric risks; There has been no empirical valuation by stakeholders of the materiality of any change in risk allocation; No empirical evidence has been presented to demonstrate that systematic risk changes as a consequence of the nature of the risk allocation; and Previous regulatory determinations by the QCA have not compensated Aurizon Network for changes in risk allocation. 3. Aurizon Network s commercial and regulatory risks In regards to the commercial and regulatory risks faced by Aurizon Network, Aurizon Network has undertaken a comprehensive appraisal of the papers prepared by Incenta and Castalia. In completion of that review, a range of issues and material errors have been identified. For example, in regards to: 10 Incenta Economic Consulting, 2013a, Review of Regulatory Capital Structure and Asset/Equity Beta for Aurizon Network Report to the Queensland Competition Authority, pg. 16, available at Volume 1 Overview & Summary 18

19 Revenue risks across the short-term (monthly), medium-term (annual) and long-term (regulatory reset) periods, the Castalia paper indicates that take-or-pay arrangements substantially mitigate the cash flow timing differences from volume fluctuations. 11 However significant monthly cash flow timing impacts are associated with volume fluctuations and as a result, the working capital and financing risks associated with cash flow timings are substantially more material than those associated with the direct industry comparators and other regulated utilities; Inflation risks associated with the RAB roll-forward, operating and maintenance cost escalation, as well the electricity supply cost pass-though. Case in point, the Castalia paper states that Aurizon can vary its reference tariffs to compensate for differences between forecast and actual energy costs. 12 Yet such a position is misleading and not relevant to the beta comparison with other regulated utilities as the supply of energy within the CQCN is an undeclared service and therefore not relevant to the WACC on the regulated service; Asset stranding risks. In asserting that Aurizon Network is not subject to such asset stranding risk, Incenta rely upon coal export forecasts produced by the US Energy Information Administration (EIA). 13 Yet there are two material oversights within the utilisation of the EIA data as (1) the forecasts reflect only thermal coal production and exports for energy generation purposes, therefore excluding the metallurgical proportion of the current export market within the CQCN; and (2) coal demand is not disaggregated into relevant coal basins, presuming that all coal produced in central Queensland will be exported via the existing CQCN rail infrastructure; Expenditure risks. For example, the Castalia paper indicates that Aurizon Network bears little expenditure risk, where any such risk is mitigated by the QCA and the ability to obtain pre-approval of the procurement methodology. 14 However the statement essentially overstates the protections associated with pre-approval of the procurement strategy, particularly when such protections are only for major projects that are limited to the procurement model and not the management of the project; and Regulatory risks, where due to the uniqueness of the CQCN, mean that regulatory error is particularly relevant. The Castalia paper notes the partial mitigation that judicial review serves in relation to regulatory error, however the recognition of judicial review confuses the concept of due process with regulatory error. 15 Aurizon Network considers that the key systematic risks regulated business are confronted with revolve around factors that (1) substantially alter the cash-flow beta through EBIT variability; (2) discount beta via inflation and the associated impacts upon real returns; and (3) the medium to long term demand risks due to economic impacts. Based upon these risks, Aurizon Network considers it bears considerably greater risks than regulated energy and water utilities. 11 Castalia, 2013, pg Castalia, 2013, pg Incenta, 2013a, pg Castalia, 2013, pg Castalia, 2013, pg. 16 Volume 1 Overview & Summary 19

20 Equity Margin 4. Summary Aurizon Network recognises that estimation of the cost of equity will often involve a degree of subjectivity, that requires the assessment of available data and information so as to obtain a point estimate that is reasonable when assessed against its comparators. In that light, the reasonableness of Aurizon Network s equity margin and gearing ratio proposal can easily be framed against recent and entirely relevant regulatory decisions. In assessing both direct and indirect comparators across export and rail transportation services, Figure 3 below illustrates that both Aurizon Network s equity margin and gearing ratio sets well within the middle of the comparators. Figure 3 Recent Regulatory Decisions (Equity Margin vs Gearing) 12.00% 10.00% US Class % TPI HVCN UT4 Proposal 6.00% WestNet DBCT 4.00% UT3 Elec SDP GAS 2.00% QRC 0.00% 0% 10% 20% 30% 40% 50% 60% 70% Gearing Of further note is the proposed equity margin by the Queensland Resources Council (QRC). In its WACC submission upon the 2013 DAU, the QRC proposed an equity margin of 2.65%. Aurizon Network considers this unreasonable as: It is only marginally higher than the cost of debt proposed by the QRC; Is based on a very limited set of comparators unrelated to export supply chains or transportation services; It does not address the material and readily apparent disparity between the equity margin of 2.65% and industry agreed equity margins in supply chain infrastructure access arrangements; and The QRC WACC submission provides no evidence of equity return expectations inherent in the pricing of privately owned and unlisted supply chain infrastructure providers, many of which have substantially lower risk profiles than that of Aurizon Network. Volume 1 Overview & Summary 20

21 For further discussion regarding the reasonableness of Aurizon Network s proposed UT4 asset beta, the commercial and regulatory risks associated with the provision of coal carrying services and an augmented comparative risk analysis within the Castalia report, please refer to the attached Aurizon Network paper, A Comparator Analysis of Aurizon Network s Commercial and Regulatory Risks. Volume 1 Overview & Summary 21

QCA WACC Forum. Presentation of the Queensland Resources Council (QRC)

QCA WACC Forum. Presentation of the Queensland Resources Council (QRC) QCA WACC Forum Presentation of the Queensland Resources Council (QRC) 13December 2013 (afternoon session) QRC introductory comments QRC s general approach to the UT4 WACC: identify parameterestimatesestimates

More information

Systematic risk of Aurizon Network

Systematic risk of Aurizon Network Systematic risk of Aurizon Network Response to reports and submissions to the Queensland Competition Authority 20 January 2014 PO Box 29, Stanley Street Plaza South Bank QLD 4101 Telephone +61 7 3844 0684

More information

Estimating gamma for regulatory purposes

Estimating gamma for regulatory purposes Estimating gamma for regulatory purposes REPORT FOR AURIZON NETWORK November 2016 Frontier Economics Pty. Ltd., Australia. November 2016 Frontier Economics i Estimating gamma for regulatory purposes 1

More information

Response to the UT5 draft decision on the term of the risk-free rate

Response to the UT5 draft decision on the term of the risk-free rate Appendix D Response to the UT5 draft decision on the term of the risk-free rate REPORT PREPARED FOR AURIZON NETWORK March 2018 Frontier Economics Pty. Ltd., Australia. i Frontier Economics March 2018

More information

submission To the QCA 9 March 2015 QRC Working together for a shared future ABN Level Mary St Brisbane Queensland 4000

submission To the QCA 9 March 2015 QRC Working together for a shared future ABN Level Mary St Brisbane Queensland 4000 Working together for a shared future To the QCA 9 March 2015 ABN 59 050 486 952 Level 13 133 Mary St Brisbane Queensland 4000 T 07 3295 9560 F 07 3295 9570 E info@qrc.org.au www.qrc.org.au Page 2 response

More information

i Frontier Economics May 2017 Recent evidence on the market risk premium FINAL REPORT PREPARED FOR AURIZON NETWORK

i Frontier Economics May 2017 Recent evidence on the market risk premium FINAL REPORT PREPARED FOR AURIZON NETWORK i Frontier Economics May 2017 Recent evidence on the market risk premium FINAL REPORT PREPARED FOR AURIZON NETWORK May 2017 1 Frontier Economics May 2017 1 Background and context 1 In September 2016,

More information

Review of Regulatory Capital Structure and Asset / Equity Beta for Aurizon Network. Report to the Queensland Competition Authority

Review of Regulatory Capital Structure and Asset / Equity Beta for Aurizon Network. Report to the Queensland Competition Authority Review of Regulatory Capital Structure and Asset / Equity Beta for Aurizon Network Report to the Queensland Competition Authority 9 December 2013 Table of Contents 1. Executive Summary... 3 2. Terms of

More information

Table 6 1: Overview of our response to the preliminary decision on the rate of return

Table 6 1: Overview of our response to the preliminary decision on the rate of return 6. RATE OF RETURN Table 61: Overview of our response to the preliminary decision on the rate of return Components of rate of return Our response to preliminary decision Cost of equity Gamma Cost of debt

More information

Draft Decision on Maximum Allowable Revenue Aurizon Network s 2014 Draft Access Undertaking. 30 September 2014

Draft Decision on Maximum Allowable Revenue Aurizon Network s 2014 Draft Access Undertaking. 30 September 2014 Draft Decision on Maximum Allowable Revenue Aurizon Network s 2014 Draft Access Undertaking 30 September 2014 Contents Background to Draft Decision Maximum Allowable Revenue Building Blocks for MAR Operating

More information

Response to the UT5 draft decision on the value of dividend imputation tax credits (gamma)

Response to the UT5 draft decision on the value of dividend imputation tax credits (gamma) Appendix H Response to the UT5 draft decision on the value of dividend imputation tax credits (gamma) REPORT PREPARED FOR AURIZON NETWORK March 2018 Frontier Economics Pty. Ltd., Australia. i Frontier

More information

Draft Gas Rate of Return Guidelines

Draft Gas Rate of Return Guidelines Draft Gas Rate of Return Guidelines Stakeholder Forum 3 September 2018 Agenda 01 Introduction and progress 02 High level overview of Draft Guidelines Matters that remain unchanged 03 High level overview

More information

Port of Melbourne tariff compliance statement

Port of Melbourne tariff compliance statement 2017-18 Port of Melbourne tariff compliance statement Interim commentary 9 November 2017 An appropriate citation for this paper is: Essential Services Commission 2017, 2017-18 Port of Melbourne tariff

More information

A regulatory estimate of gamma under the National Gas Rules

A regulatory estimate of gamma under the National Gas Rules A regulatory estimate of gamma under the National Gas Rules Report prepared for DBP 31 March 2010 PO Box 29, Stanley Street Plaza South Bank QLD 4101 Telephone +61 7 3844 0684 Email s.gray@sfgconsulting.com.au

More information

TCI Fund Management Limited

TCI Fund Management Limited The Queensland Competition Authority 145 Ann St Brisbane Queensland Australia 8 March 2018 Dear Sirs, TCI is a global investor in infrastructure and has been an equity investor in Aurizon since the Initial

More information

SEQ Retail Water Long Term Regulatory Framework weighted average cost of

SEQ Retail Water Long Term Regulatory Framework weighted average cost of APPENDIX B Final Report SEQ Retail Water Long Term Regulatory Framework weighted average cost of capital (WACC) September 2014 We wish to acknowledge the contribution of the following staff to this report:

More information

9. PROPOSED RATE OF RETURN

9. PROPOSED RATE OF RETURN PROPOSED RATE OF RETURN 9 9. PROPOSED RATE OF RETURN Key messages We need to be able to earn a fair rate of return on capital to continue investing in our network in a manner that best promotes our customers

More information

Attachment 9. Rate of return and forecast inflation Water and Sewerage Price Proposal. 30 June 2017

Attachment 9. Rate of return and forecast inflation Water and Sewerage Price Proposal. 30 June 2017 Attachment 9 Rate of return and forecast inflation 30 June 2017 2018 23 Water and Sewerage Price Proposal Icon Water Page 2017 Icon Water Limited (ABN 86 069 381 960) This publication is copyright and

More information

Final decision. Cost of capital: market parameters

Final decision. Cost of capital: market parameters Final decision Cost of capital: market parameters August 2014 We wish to acknowledge the contribution of the following staff to this report: Michael S Blake, Daniel Kelley, Darren Page and Zach Zhang We

More information

Regulatory estimates of gamma in light of recent decisions of the Australian Competition Tribunal

Regulatory estimates of gamma in light of recent decisions of the Australian Competition Tribunal Regulatory estimates of gamma in light of recent decisions of the Australian Competition Tribunal Report prepared for DBP 20 July 2011 PO Box 29, Stanley Street Plaza South Bank QLD 4101 Telephone +61

More information

An updated estimate of the market risk premium

An updated estimate of the market risk premium An updated estimate of the market risk premium REPORT PREPARED FOR AURIZON NETWORK September 2017 Frontier Economics Pty. Ltd., Australia. i Frontier Economics September 2017 An updated estimate of the

More information

Appendix C: Rate of Return

Appendix C: Rate of Return Appendix C: Rate of Return Introduction The capital already invested in the network and the financing and costs associated with that capital, has by far the greatest impact on prices. The cost of funding

More information

Response to the QCA Discussion Paper on risk-free rate and market risk premium

Response to the QCA Discussion Paper on risk-free rate and market risk premium Response to the QCA Discussion Paper on risk-free rate and market risk premium Report for Aurizon Ltd 19 March 2013 Level 1, South Bank House Cnr. Ernest and Little Stanley St South Bank, QLD 4101 PO Box

More information

Better equity: submission to the AER s Equity beta issues paper

Better equity: submission to the AER s Equity beta issues paper Better equity: submission to the AER s Equity beta issues paper 28 October 2013 Bev Hughson, Darach Energy Consulting Services Carolyn Hodge, Senior Policy Officer, Energy+Water Consumers Advocacy Program

More information

Review of Weighted Average Cost of Capital estimate proposed by Goldfields Gas Transmission

Review of Weighted Average Cost of Capital estimate proposed by Goldfields Gas Transmission Review of Weighted Average Cost of Capital estimate proposed by Goldfields Gas Transmission FINAL DRAFT REPORT PREPARED FOR THE ECONOMIC REGULATION AUTHORITY 6 August 2009 Frontier Economics Pty Ltd. August

More information

Re: Weighted Average Cost of Capital for Rail Infrastructure Draft Consultant Report to ORAR

Re: Weighted Average Cost of Capital for Rail Infrastructure Draft Consultant Report to ORAR Alcoa World Alumina Australia A global alliance between Alcoa and WMC Ltd W495J23R1 9 May 2003 Corporate Office PO Box 252 Applecross, WA 6153 Australia Tel: 618 9316 5111 Fax: 618 9316 5228 Dr. Ken Michael

More information

Assessing the reliability of regression-based estimates of risk

Assessing the reliability of regression-based estimates of risk Assessing the reliability of regression-based estimates of risk 17 June 2013 Stephen Gray and Jason Hall, SFG Consulting Contents 1. PREPARATION OF THIS REPORT... 1 2. EXECUTIVE SUMMARY... 2 3. INTRODUCTION...

More information

A Comparison between the WACC Proposed for Aurizon Network and Normalised Comparators Aurizon Network DAU

A Comparison between the WACC Proposed for Aurizon Network and Normalised Comparators Aurizon Network DAU A Comparison between the WACC Proposed for Aurizon Network and Normalised Comparators 2017 Aurizon Network DAU August 2018 Disclaimer Nine-Squared Pty Ltd (NineSquared) has prepared this report taking

More information

AER Draft Rate of Return Guideline Initial network sector perspectives

AER Draft Rate of Return Guideline Initial network sector perspectives AER Draft Rate of Return Guideline Initial network sector perspectives AER Public Forum, 2 August 2018 Andrew Dillon, CEO, Energy Networks Australia Craig de Laine, Chair, ENA Rate of Return Working Group/ENA-CRG

More information

Response to the UT5 Draft Decision on the market risk premium

Response to the UT5 Draft Decision on the market risk premium Appendix E Response to the UT5 Draft Decision on the market risk premium REPORT PREPARED FOR AURIZON NETWORK March 2018 Frontier Economics Pty. Ltd., Australia. i Frontier Economics March 2018 Response

More information

Weighted Average Cost of Capital for WestNet Rail

Weighted Average Cost of Capital for WestNet Rail Weighted Average Cost of Capital for WestNet Rail April 2008 Synergies Economic Consulting Pty Ltd www.synergies.com.au Disclaimer Synergies Economic Consulting (Synergies) has prepared this advice exclusively

More information

Input Methodologies review - Cost of Capital

Input Methodologies review - Cost of Capital 9 February 2016 *weliington electricity Keston Ruxton Manager, Market Assessment and Dairy Regulation Branch Commerce Commission By email: regulation.branch(5)comcom.govt.nz Wellington Electricity Lines

More information

Jemena Gas Networks (NSW) Ltd

Jemena Gas Networks (NSW) Ltd Jemena Gas Networks (NSW) Ltd 2015-20 Access Arrangement Response to the AER's draft decision and revised proposal Appendix 7.5 - The required return on equity for the benchmark efficient entity Public

More information

SEQ Interim Price Monitoring. Guideline for Templates for 2010/11

SEQ Interim Price Monitoring. Guideline for Templates for 2010/11 SEQ Interim Price Monitoring Guideline for Templates for 2010/11 Version 1.0 May 2010 Level 19, 12 Creek Street Brisbane Queensland 4000 GPO Box 2257 Brisbane Qld 4001 Telephone (07) 3222 0555 Facsimile

More information

Response to the QCA approach to setting the risk-free rate

Response to the QCA approach to setting the risk-free rate Response to the QCA approach to setting the risk-free rate Report for Aurizon Ltd. 25 March 2013 Level 1, South Bank House Cnr. Ernest and Little Stanley St South Bank, QLD 4101 PO Box 29 South Bank, QLD

More information

Queensland Competition Authority Pricing Papers Anglo American Metallurgical Coal Pty Ltd

Queensland Competition Authority Pricing Papers Anglo American Metallurgical Coal Pty Ltd Submission to Queensland Competition Authority Queensland Competition Authority Pricing Papers Anglo American Metallurgical Coal Pty Ltd July 2013 Contents 1 Executive Summary 2 2 Risk Fee Rate and the

More information

Market evidence on the cost of equity

Market evidence on the cost of equity Market evidence on the cost of equity Aurizon Network Pty Ltd 22 November 2016 NOTICE Ernst & Young ( EY or we ) was engaged on the instructions of Aurizon Network Pty Ltd ( Aurizon ) to undertake an assessment

More information

Jemena Gas Networks (NSW) Ltd

Jemena Gas Networks (NSW) Ltd Jemena Gas Networks (NSW) Ltd 2015-20 Access Arrangement Response to the AER's draft decision and revised proposal Appendix 7.3 - Dividend discount model Public 27 February 2015 APPENDIX M M 2 Public 30

More information

IN D EC. consulting. A Review of the Regulatory Framework for Development of Costing Principles for Rail Access in WA

IN D EC. consulting. A Review of the Regulatory Framework for Development of Costing Principles for Rail Access in WA Discussion Paper A Review of the Regulatory Framework for Development of Costing Principles for Rail Access in WA IN D EC consulting Prepared for: Mr Jock Irvine Alcoa World Alumina Australia Booragoon

More information

Jemena Electricity Networks (Vic) Ltd

Jemena Electricity Networks (Vic) Ltd Jemena Electricity Networks (Vic) Ltd 2016-20 Electricity Distribution Price Review Regulatory Proposal Attachment 9-14 SFG - Report on return on debt transition Public 30 April 2015 Return on debt transition

More information

SUBMISSION TO REVISED DRAFT DECISION OF WEIGHTED AVERAGE COST OF CAPITAL METHODOLOGY FOR REGULATED RAILWAY NETWORKS

SUBMISSION TO REVISED DRAFT DECISION OF WEIGHTED AVERAGE COST OF CAPITAL METHODOLOGY FOR REGULATED RAILWAY NETWORKS The Pilbara Infrastructure Pty Ltd ACN: 103 096 340 87 Adelaide Terrace East Perth Western Australia 6004 PO Box 6915, East Perth, Western Australia 6892 Telephone: + 61 8 6218 8888 Facsimile: + 61 8 6218

More information

Aurizon Network Debt investor presentation. October 2013

Aurizon Network Debt investor presentation. October 2013 Aurizon Network Debt investor presentation October 2013 Disclaimer No Reliance on this document This document was prepared by Aurizon Holdings Limited (ACN 146 335 622) (referred to as Aurizon which includes

More information

Final decision. Aurizon Network's revenue adjustment amounts for

Final decision. Aurizon Network's revenue adjustment amounts for Final decision Aurizon Network's revenue adjustment amounts for 2014 15 February 2016 Table of Contents Table of Contents THE ROLE OF THE QCA TASK, TIMING AND CONTACTS II 1 BACKGROUND 1 1.1 Process to

More information

Jemena Electricity Networks (Vic) Ltd

Jemena Electricity Networks (Vic) Ltd Jemena Electricity Networks (Vic) Ltd 2016-20 Electricity Distribution Price Review Regulatory Proposal Revocation and substitution submission Attachment 6-4 Frontier Economics - The required return on

More information

QCA declarations review Anglo American s submission in response to initial submissions

QCA declarations review Anglo American s submission in response to initial submissions QCA declarations review Anglo American s submission in response to initial submissions Anglo American Coal Australia 17 July 2018 APAC-#71641439-v3 1 1 Executive Summary Anglo American Metallurgical Coal

More information

Beta estimation: Considerations for the Economic Regulation Authority

Beta estimation: Considerations for the Economic Regulation Authority Beta estimation: Considerations for the Economic Regulation Authority 23 September 2013 PO Box 29, Stanley Street Plaza South Bank QLD 4101 Telephone +61 7 3844 0684 Email s.gray@sfgconsulting.com.au Internet

More information

Economic Regulation Workshop

Economic Regulation Workshop Economic Regulation Workshop Role of IPART Setting prices for water utilities 8 October 2018 Contents 1. Why and how does IPART regulate prices? 2. Form of regulation 3. Building block approach 4. Expenditure

More information

Executive Summary. Regulation

Executive Summary. Regulation Executive Summary 1. Transformation is one of our core values Good momentum on safety, cost and operational performance For UT5 we have focused on improved engagement with stakeholders to increase transparency

More information

Cost of equity issues related to Input Methodologies review

Cost of equity issues related to Input Methodologies review Cost of equity issues related to Input Methodologies review A REPORT PREPARED FOR TRANSPOWER NEW ZEALAND February 2016 Frontier Economics Pty. Ltd., Australia. i Frontier Economics February 2016 Cost

More information

Standard User Funding Agreement (SUFA) Regulatory Notes (Volume 3)

Standard User Funding Agreement (SUFA) Regulatory Notes (Volume 3) December 2012 Standard User Funding Agreement (SUFA) Regulatory Notes (Volume 3) Standard User Funding Agreement (SUFA) - Regulatory notes (Volume 3) 1 Contents Contents Executive Summary 2 3 1 Introduction

More information

The impact of inadequate recognition of these risks on such a nationally important asset as the CQCN cannot be overstated.

The impact of inadequate recognition of these risks on such a nationally important asset as the CQCN cannot be overstated. Professor Roy Green Queensland Competition Authority Level 27 145 Ann Street Brisbane Queensland 4001 12 March 2018 Dear Professor Green This letter and the attached detailed documents form Aurizon Network

More information

DIRECT INFRASTRUCTURE VALUATIONS AND BOND RATE INCREASES:

DIRECT INFRASTRUCTURE VALUATIONS AND BOND RATE INCREASES: insightpaper DIRECT INFRASTRUCTURE VALUATIONS AND BOND RATE INCREASES: it s not what you expect April 2017 AMP CAPITAL INFRASTRUCTURE 1 Key points Future bond rate increases are likely to be moderate.

More information

A Framework for Quantifying Estimation Error in Regulatory WACC

A Framework for Quantifying Estimation Error in Regulatory WACC A Framework for Quantifying Estimation Error in Regulatory WACC Report for Western Power in relation to the Economic Regulation Authority s 2005 Network Access Review 19 May 2005 STRATEGIC FINANCE GROUP

More information

AER Rate of Return Guidelines. Response to Issues Paper

AER Rate of Return Guidelines. Response to Issues Paper AER Rate of Return Guidelines Response to Issues Paper 12 December 2017 Contents 1 Overview 3 2 Context for Guideline review 5 3 Overall allowed rate of return 10 4 Return on debt 19 5 Return on equity

More information

Debt risk premium estimate for Aurizon

Debt risk premium estimate for Aurizon Appendix G Debt risk premium estimate for Aurizon Dr. Tom Hird March 2018 Table of Contents 1 Executive summary 1 1.1 Best estimate of Aurizon s DRP 1 1.2 3 rd party cross checks 2 1.3 Conclusion 2 2 Introduction

More information

Independent Pricing and Regulatory Tribunal. Comparison of financial models - IPART and Australian Energy Regulator

Independent Pricing and Regulatory Tribunal. Comparison of financial models - IPART and Australian Energy Regulator Independent Pricing and Regulatory Tribunal Comparison of financial models - IPART and Australian Energy Regulator Research Research Paper November 2009 Comparison of financial models IPART and Australian

More information

REVIEW OF ARGUMENTS ON THE TERM OF THE RISK FREE RATE. Dr Martin Lally Capital Financial Consultants Ltd. 20 November 2015

REVIEW OF ARGUMENTS ON THE TERM OF THE RISK FREE RATE. Dr Martin Lally Capital Financial Consultants Ltd. 20 November 2015 REVIEW OF ARGUMENTS ON THE TERM OF THE RISK FREE RATE Dr Martin Lally Capital Financial Consultants Ltd 20 November 2015 1 CONTENTS Executive Summary 3 1. Introduction 4 2. Review of ERAWA Arguments 4

More information

Independent Pricing and Regulatory Tribunal. Review of imputation credits (gamma)

Independent Pricing and Regulatory Tribunal. Review of imputation credits (gamma) Independent Pricing and Regulatory Tribunal Review of imputation credits (gamma) Analysis and Policy Development Discussion Paper December 2011 Review of imputation credits (gamma) Analysis and Policy

More information

The Vasicek adjustment to beta estimates in the Capital Asset Pricing Model

The Vasicek adjustment to beta estimates in the Capital Asset Pricing Model The Vasicek adjustment to beta estimates in the Capital Asset Pricing Model 17 June 2013 Contents 1. Preparation of this report... 1 2. Executive summary... 2 3. Issue and evaluation approach... 4 3.1.

More information

Dalrymple Bay Coal Terminal User Group

Dalrymple Bay Coal Terminal User Group DBCT User Group Submission in response to Draft Decision DBCT 2015 Draft Access Undertaking Dalrymple Bay Coal Terminal User Group 2015 Draft Amending Access Undertaking Submission to the Queensland Competition

More information

Dalrymple Bay Coal Terminal: Corporate Costs. Report prepared by Stephen J Meyrick

Dalrymple Bay Coal Terminal: Corporate Costs. Report prepared by Stephen J Meyrick Dalrymple Bay Coal Terminal: Corporate Costs Report prepared by Stephen J Meyrick August 2015 Disclaimer My name is Stephen Meyrick. I have prepared this report exclusively for use of Dalrymple Bay Coal

More information

Determining the cost of capital for the UCLL and UBA price reviews

Determining the cost of capital for the UCLL and UBA price reviews ISBN no. 978-1-869453-57-2 Project no. 13.01/14544 Public version Determining the cost of capital for the UCLL and UBA price reviews Technical consultation paper Date: 7 March 2014 2 CONTENTS LIST OF DEFINED

More information

Information Paper. The Split Cost of Capital Concept

Information Paper. The Split Cost of Capital Concept Information Paper The Split Cost of Capital Concept February 2014 We wish to acknowledge the contribution of the following staff to this report: Michael S. Blake, Ralph Donnet, John Fallon, Dan Kelley

More information

23 May Mr Charles Millsteed Chief Executive Officer Queensland Competition Authority. Dear Mr Millsteed. DBCT Incremental Expansion Study

23 May Mr Charles Millsteed Chief Executive Officer Queensland Competition Authority. Dear Mr Millsteed. DBCT Incremental Expansion Study 23 May 2017 Mr Charles Millsteed Chief Executive Officer Queensland Competition Authority Dear Mr Millsteed DBCT Incremental Expansion Study DBCT Management (DBCTM) is obligated under the Port Services

More information

Valuation of the Regulatory Asset Base: Submission on the Commerce Commission s Decision Paper

Valuation of the Regulatory Asset Base: Submission on the Commerce Commission s Decision Paper Valuation of the Regulatory Asset Base: Submission on the Commerce Commission s Decision Paper 10 November 2005 051104-powerco submission on valuation of rab.doc Table of Contents 1 Introduction... 1 2

More information

Telecom Corporation of New Zealand Limited

Telecom Corporation of New Zealand Limited pwc.co.nz Telecom Corporation of New Zealand Limited Submission 21 July 2014 Submission on Commerce Commission Expert s paper: Review of the beta and gearing for UCLL and UBA services Contents Introduction

More information

Ergon Energy s Building Block Components

Ergon Energy s Building Block Components 03.01.01 Ergon Energy s Building Block Components Contents 1 Introduction... 3 1.1 Overview... 3 1.2 Purpose of this document... 3 1.3 NER requirements... 4 1.4 Structure of this document... 5 2 Regulatory

More information

Default price quality path reset

Default price quality path reset Default price quality path reset October 2012 Project team: Dr Tom Hird Daniel Young CEG Asia Pacific Suite 201, 111 Harrington Street Sydney NSW 2000 Australia T +61 3 9095 7570 F +61 2 9252 6685 www.ceg-ap.com

More information

Partners Group Global Real Estate Fund (AUD) ARSN Annual report For the period 30 March 2016 to 30 June 2017

Partners Group Global Real Estate Fund (AUD) ARSN Annual report For the period 30 March 2016 to 30 June 2017 Partners Group Global Real Estate Fund (AUD) ARSN 611 351 627 Annual report ARSN 611 351 627 Annual report Contents Directors' report Auditor's independence declaration Statement of comprehensive income

More information

Expected inflation estimate for Aurizon

Expected inflation estimate for Aurizon Appendix C Expected inflation estimate for Aurizon Dr. Tom Hird March 2018 Table of Contents 1 Executive summary 1 1.1 QCA draft decision to target nominal returns 1 1.2 Implications for the estimate of

More information

National Electricity Law And National Gas Law Amendment Package: Creating a binding rate of return instrument

National Electricity Law And National Gas Law Amendment Package: Creating a binding rate of return instrument National Electricity Law And National Gas Law Amendment Package: Creating a binding rate of return instrument Response to COAG Energy Council Senior Committee of Officials 13 April 2018 Contents 1 Executive

More information

Review of Floor and Ceiling Cost Proposal of the Pilbara Infrastructure Pty Ltd

Review of Floor and Ceiling Cost Proposal of the Pilbara Infrastructure Pty Ltd In association with AECOM Economic Regulation Authority Review of Floor and Ceiling Cost Proposal of the Pilbara Infrastructure Pty Ltd Draft Report February 2011 Disclaimer This draft report has been

More information

Mechanistic cost of debt extrapolation from 7 to 10 years

Mechanistic cost of debt extrapolation from 7 to 10 years Mechanistic cost of debt extrapolation from 7 to 10 years Dr. Tom Hird Annabel Wilton October 2013 i Table of Contents 1 Introduction 1 2 AER approach 2 3 Simple, mechanistic extrapolation 4 3.1 Mechanistic

More information

TRAILING AVERAGE COST OF DEBT AND EFFICIENT DEBT MANAGEMENT

TRAILING AVERAGE COST OF DEBT AND EFFICIENT DEBT MANAGEMENT TRAILING AVERAGE COST OF DEBT AND EFFICIENT DEBT MANAGEMENT A REPORT BY TRANSPOWER NZ LTD February 2016 1 TRAILING AVERAGE COST OF DEBT AND EFFICIENT DEBT MANAGEMENT Transpower New Zealand Limited 2016.

More information

For personal use only

For personal use only Dominic D Smith Senior Vice President & Company Secretary Aurizon Holdings Limited ABN 14 146 335 622 T +61 7 3019 9000 F +61 7 3019 2188 E CompanySecretary@aurizon.com.au W aurizon.com.au Level 17, 175

More information

THE TRAILING AVERAGE COST OF DEBT. Martin Lally School of Economics and Finance Victoria University of Wellington. 19 March 2014

THE TRAILING AVERAGE COST OF DEBT. Martin Lally School of Economics and Finance Victoria University of Wellington. 19 March 2014 THE TRAILING AVERAGE COST OF DEBT Martin Lally School of Economics and Finance Victoria University of Wellington 19 March 2014 The helpful comments of John Fallon, Michael Blake, and Darren Page of the

More information

Comparison of OLS and LAD regression techniques for estimating beta

Comparison of OLS and LAD regression techniques for estimating beta Comparison of OLS and LAD regression techniques for estimating beta 26 June 2013 Contents 1. Preparation of this report... 1 2. Executive summary... 2 3. Issue and evaluation approach... 4 4. Data... 6

More information

Transnet National Ports Authority Tariff Methodology: Position Paper Ports Regulator: Road Shows March delivering freight reliably

Transnet National Ports Authority Tariff Methodology: Position Paper Ports Regulator: Road Shows March delivering freight reliably Transnet National Ports Authority Tariff Methodology: Position Paper Ports Regulator: Road Shows March 2013 delivering freight reliably Vision for South African Ports A system of ports, seamlessly integrated

More information

The Pilbara Infrastructure Pty Ltd (TPI) Final Determination on TPI s Costing Principles

The Pilbara Infrastructure Pty Ltd (TPI) Final Determination on TPI s Costing Principles The Pilbara Infrastructure Pty Ltd (TPI) Final Determination on TPI s Costing Principles 11 March 2010 A full copy of this document is available from the website at www.era.wa.gov.au. For further information,

More information

The Debt Maturity Issue in Access Pricing. Kevin Davis *

The Debt Maturity Issue in Access Pricing. Kevin Davis * Kevin Davis * Professor of Finance, University of Melbourne and Research Director, Australian Centre for Financial Studies Professor of Finance, Monash University Abstract: Draft 2: December 11, 2013 kevin.davis@unimelb.edu.au

More information

Information Paper. Financial Capital Maintenance and Price Smoothing

Information Paper. Financial Capital Maintenance and Price Smoothing Information Paper Financial Capital Maintenance and Price Smoothing February 2014 The QCA wishes to acknowledge the contribution of the following staff to this report: Ralph Donnet, John Fallon and Kian

More information

Revenue model. Instructions Water and Sewerage Price Proposal. 30 June 2017

Revenue model. Instructions Water and Sewerage Price Proposal. 30 June 2017 Revenue model Instructions 30 June 2017 2018 23 Water and Sewerage Price Proposal Icon Water Page 2017 Icon Water Limited (ABN 86 069 381 960) This publication is copyright and is the property of Icon

More information

AER Review of the Rate of Return Guideline. Response to Discussion Papers and Concurrent Expert Evidence Sessions

AER Review of the Rate of Return Guideline. Response to Discussion Papers and Concurrent Expert Evidence Sessions AER Review of the Rate of Return Guideline Response to Discussion Papers and Concurrent Expert Evidence Sessions 4 May 2018 Contents 1 Overview 3 2 Reaching a Guideline capable of acceptance 15 3 The effects

More information

Open Country Dairy Response to the Commerce Commission s Draft Review of Fonterra s 2016/17 Base Milk Price Calculation: The Asset Beta

Open Country Dairy Response to the Commerce Commission s Draft Review of Fonterra s 2016/17 Base Milk Price Calculation: The Asset Beta Dear Keston Open Country Dairy Response to the Commerce Commission s Draft Review of Fonterra s 2016/17 Base Milk Price Calculation: The Asset Beta Open Country Dairy s (Open Country) submission responds

More information

AustralianSuper. Financial Statements. For the year ended 30 June 2015

AustralianSuper. Financial Statements. For the year ended 30 June 2015 Financial Statements For the year ended 1 Financial Statements For the year ended Table of contents Page Statement of financial position 3 Operating statement 4 Statement of cash flows 5 6 Trustee statement

More information

Submission to the Australian Energy Regulator

Submission to the Australian Energy Regulator Submission to the Australian Energy Regulator Qld Electricity Distribution Regulatory Proposals 2015-16 to 2019-20 January, 2015 Cotton Australia Cotton Australia is the key representative body for the

More information

INDEC. consulting. Estimation of CPI-X in the WA Rail Industry

INDEC. consulting. Estimation of CPI-X in the WA Rail Industry Public Submission Estimation of CPI-X in the WA Rail Industry INDEC consulting Prepared for: Chairman Economic Regulation Authority Level 27 197 St Georges Tce PERTH WA 6000 W531 April 2004 Public Submission

More information

Determination: Allowable Revenue and Forecast Capital Expenditure for System Management 2013/14 to 2015/16

Determination: Allowable Revenue and Forecast Capital Expenditure for System Management 2013/14 to 2015/16 Determination: Allowable Revenue and Forecast Capital Expenditure for System Management 2013/14 to 2015/16 March 2013 31 March 2013 This document is available from the s website at www.erawa.com.au. For

More information

Summary and analysis of Wellington Airport s third price setting event

Summary and analysis of Wellington Airport s third price setting event ISBN no. 978-1-869454-49-4 Project no. 18.08/15078 Public version Summary and analysis of Wellington Airport s third price setting event Date: 30 June 2015 2 [BLANK PAGE] 3 Contents 1. INTRODUCTION...5

More information

ASIC s Regulatory Guide 247 Effective Disclosure in an Operating and Financial Review and the International Integrated Reporting Framework

ASIC s Regulatory Guide 247 Effective Disclosure in an Operating and Financial Review and the International Integrated Reporting Framework companydirectors.com.au Comparison guide July 2014 ASIC s Regulatory Guide 247 Effective Disclosure in an Operating and and the International Integrated Reporting Framework Important Notices The Material

More information

AustralianSuper. Financial Statements. For the year ended 30 June 2014

AustralianSuper. Financial Statements. For the year ended 30 June 2014 Financial Statements For the year ended 1 Statement of financial position As at Note Assets Cash and cash equivalents 8 4,375,370 3,290,003 Listed equity securities 40,906,219 29,381,169 Fixed interest

More information

SUBMISSION TO THE AUSTRALIAN ENERGY REGULATOR ON ERGON ENERGY S REGULATORY PROPOSAL FOR THE REVENUE DETERMINATION

SUBMISSION TO THE AUSTRALIAN ENERGY REGULATOR ON ERGON ENERGY S REGULATORY PROPOSAL FOR THE REVENUE DETERMINATION SUBMISSION TO THE AUSTRALIAN ENERGY REGULATOR ON ERGON ENERGY S REGULATORY PROPOSAL FOR THE 2015-2020 REVENUE DETERMINATION CHAMBER OF COMMERCE AND INDUSTRY QUEENSLAND SUBMISSION 30 January 2015 1 Chamber

More information

WACC parameters for GAWB Price Monitoring Investigation Final Report

WACC parameters for GAWB Price Monitoring Investigation Final Report WACC parameters for GAWB Price Monitoring Investigation 2015-20 Final Report Queensland Competition Authority May, 2015 Table of Contents 1. Executive Summary... 1 1.1 Cost of equity... 1 1.2 Cost of debt...

More information

1. INFORMATION NOTE STATUS 2 2. BACKGROUND 2 3. SUMMARY OF CONCLUSIONS 3 4. CONSIDERATIONS 3 5. STARTING POINT 4 6. SHALLOW MARKET ADJUSTMENT 4

1. INFORMATION NOTE STATUS 2 2. BACKGROUND 2 3. SUMMARY OF CONCLUSIONS 3 4. CONSIDERATIONS 3 5. STARTING POINT 4 6. SHALLOW MARKET ADJUSTMENT 4 Contents 1. INFORMATION NOTE STATUS 2 2. BACKGROUND 2 3. SUMMARY OF CONCLUSIONS 3 4. CONSIDERATIONS 3 5. STARTING POINT 4 6. SHALLOW MARKET ADJUSTMENT 4 7. CREDIT RISK ADJUSTMENT 5 8. LIQUIDITY OF LIABILITIES

More information

Estimating the Market Risk Premium: The Difficulty with Historical Evidence and an Alternative Approach

Estimating the Market Risk Premium: The Difficulty with Historical Evidence and an Alternative Approach Estimating the Market Risk Premium: The Difficulty with Historical Evidence and an Alternative Approach (published in JASSA, issue 3, Spring 2001, pp 10-13) Professor Robert G. Bowman Department of Accounting

More information

Aurizon Network Pty Ltd ABN Interim Financial Report for the six months ended 31 December 2017

Aurizon Network Pty Ltd ABN Interim Financial Report for the six months ended 31 December 2017 Aurizon Network Pty Ltd ABN 78 132 181 116 Interim Financial Report for the six months ended Aurizon Network Pty Ltd ABN 78 132 181 116 Interim Financial Report - CONTENTS Consolidated income statement...

More information

Economic Regulation Authority

Economic Regulation Authority Western Australia Response to Submissions made on: Final Report Review of Rate of Return Methodologies and Practices (Institute for Research into International Competitiveness - September 2003) Economic

More information

Forum. Russell s Multi-Asset Model Portfolio Framework. A meeting place for views and ideas. Manager research. Portfolio implementation

Forum. Russell s Multi-Asset Model Portfolio Framework. A meeting place for views and ideas. Manager research. Portfolio implementation Forum A meeting place for views and ideas Russell s Multi-Asset Model Portfolio Framework and the 2012 Model Portfolio for Australian Superannuation Funds Portfolio implementation Manager research Indexes

More information

2018 WACC methodology review for WA railway networks

2018 WACC methodology review for WA railway networks 2018 WACC methodology review for WA railway networks Response on behalf of Arc Infrastructure to the Economic Regulation Authority's Consultation Paper June 2018 Synergies Economic Consulting Pty Ltd www.synergies.com.au

More information

Financial Management (FM) Syllabus and study guide

Financial Management (FM) Syllabus and study guide September 2018 to June 2019 Financial Management (FM) Syllabus and study guide Guide to structure of the syllabus and study guide Overall aim of the syllabus This explains briefly the overall objective

More information

January Cost of Capital for PR09 A Final Report for Water UK

January Cost of Capital for PR09 A Final Report for Water UK January 2009 Cost of Capital for PR09 A Final Report for Water UK Project Team Dr Richard Hern Tomas Haug Anthony Legg Mark Robinson Contact Dr Richard Hern Ph: +44 (0)20 7659 8582 Fax: +44 (0)20 7659

More information