Actual Project Name : Tanzania Emergency Power Supply Country: Tanzania. Project Costs (US$M US$M):

Size: px
Start display at page:

Download "Actual Project Name : Tanzania Emergency Power Supply Country: Tanzania. Project Costs (US$M US$M):"

Transcription

1 IEG ICR Review Independent Evaluation Group 1. Project Data: Date Posted : 09/24/2007 Report Number : ICRR12725 PROJ ID : P Appraisal Actual Project Name : Tanzania Emergency Project Costs (US$M Power Supply Country: Tanzania Loan/Credit (US$M Sector Board : EMT Cofinancing (US$M 0 0 Sector(s): Power (100%) Theme(s): Infrastructure services for private sector development (100% - P) L/C Number: C3916 Partners involved : Evaluator : Panel Reviewer : Group Manager : Group: Alvaro J. Covarrubias Kris Hallberg Alain A. Barbu IEGSG 2. Project Objectives and Components: Board Approval Date : 06/08/2004 Closing Date : 08/31/ /31/2006 a. Objectives: Objectives The Memorandum of the President (MOP) states the Project Development Objective (PDO) as: To assist the Government in implementing its emergency measures to avert a prolonged period of severe load shedding which could have crippled economic activities and hindered the delivery of social services. The Development Credit Agreement (DCA) states the PDO as: (i) to assist the Borrower in implementing its emergency measures to avert a prolonged period of severe load-shedding and (ii) address the current power crisis through the financing of electric power purchases and fuel needed to maintain power supply at a level sufficient to prevent a severe contraction of the economy and sustain provision of social services during the Emergency." [numbering added] This review uses the DCA's statement of the PDO since it makes the objective more explicit and amenable to judging efficacy, and also because the discussion in the ICR itself uses this two-part formulation. The project's key performance indicator and target was to reduce the impact of load shedding on GDP by about 6 percent of GDP. The intermediate outcome indicator and target was to minimize or eliminate load shedding by about 27 percent of projected energy requirements in b.were the project objectives/key associated outcome targets revised during implementation? No c. Components (or Key Conditions in the case of DPLs, as appropriate): Part A (US$33.4m at appraisal; US$45.8m at completion): Emergency electric power during the emergency, assisting the Borrower in acquiring emergency electric energy from a private Independent Power Producer (IPP), namely Independent Power Tanzania Ltd (IPTL); and

2 Part B (US$10.4m at appraisal; US$0m at completion): Emergency fuel during the emergency, financing utilization of productive capacity through the purchase of fuel for the state-owned Tanzania Electric Supply Company (TANESCO). Revised components: Part B did not materialize and funds were reallocated to Part A to increase the purchase of emergency electric energy from IPTL. Other significant changes: No d. Comments on Project Cost, Financing, Borrower Contribution, and Dates: The project cost (US$45.8 million) was 4.6 percent higher than the appraisal estimate (US$43.8 million) because of a favorable rate of exchange of the SDR to the US dollar that allowed the Borrower to purchase more emergency electric energy from IPTL than the original estimate. The IDA credit contributed to project financing with US$45.4 million and the Government contributed with the balance of US$0.4 million. The Development Credit Agreement was declared effective on 09/13/2004 or three months after Board approval. The credit was fully disbursed and its closing date was extended 11 months to close on 07/31/ Relevance of Objectives & Design: The project objectives were consistent with the Bank's strategy of supporting Tanzania in developing and using its Songo Songo natural gas resources. They were also consistent with the Government s priority of addressing the severe hydroelectric crisis caused by the 2003 drought through specific emergency measures intended to avert an impending energy and economic crisis, and to ensure generation capacity for future energy requirements at least cost. The project's narrow focus on acquiring emergency electrical power seems to be more appropriate to achieving objective (ii) as set out in the DCA rather than objective (i). For instance, there appears to have been little consideration given to managing demand for power during the crisis. 4. Achievement of Objectives (Efficacy): (i) Assist the Borrower in implementing its emergency measures to avert a prolonged period of severe load-shedding: substantially achieved. Considering that the Emergency Power Supply Project focused on the short-term objective of financing electric power purchases, and that longer-term sector reforms are being addressed in another project (the Songo Songo Project, 3569-TA), the achievement of this objective is the same as for Objective (ii). Load shedding was totally avoided throughout 2005, but was again necessary in (ii) Address the current power crisis through the financing of electric power purchases and fuel needed to maintain power supply at a level sufficient to prevent a severe contraction of the economy and sustain provision of social services during the Emergency. 5. Efficiency (not applicable to DPLs): Because this was an emergency project, no ERR/FRR estimate was required at appraisal. Since the ICA credit was used exclusively to purchase thermal power from IPTL (an Independent Power Producer) which is stated to be expensive, it is likely that the efficiency of the project is modest. a. If available, enter the Economic Rate of Return (ERR ERR)/Financial Rate of Return (FRR FRR) at appraisal and the re-estimated estimated value at evaluation : Rate Available? Point Value Coverage/Scope* Appraisal % % ICR estimate % % * Refers to percent of total project cost for which ERR/FRR was calculated. 6. Outcome: Based on substantial relevance, substantial efficacy, and modest efficiency, the outcome of the project is rated Moderately. a. Outcome Rating : Moderately

3 7. Rationale for Risk to Development Outcome Rating: Although the unusually good rains in late 2006 and early 2007 have restored to full capacity the water of the Mtera reservoir, a reoccurrence of load shedding is the main risk to the development outcome of the project,. This risk remains high because the absence to date of a regional power transmission system makes the country very vulnerable to droughts notwithstanding implementation of new IPPs. Moreover, in the absence of a sustained commitment by the Government to regularly implement cost-reflective tariffs, the financial recovery of TANESCO will remain the biggest issue for the utility. Also, considering that parallel activities (the demand-side management study, the conversion of IPTL to use indigenous gas, and the rehabilitation of TANESCO s transmission and distribution network to reduce losses) under the Songo Songo Project were not implemented by the end of the Emergency Project, it is very clear that the project achievements have not been sustainable as indicated by the fact that load shedding could not be averted in 2006 when the project funding was no longer available. a. Risk to Development Outcome Rating : High 8. Assessment of Bank Performance: a. Ensuring Quality at Entry. Rating: The project was prepared and processed quickly (two months from Appraisal to Board) in view of the emergency nature of the needs of the country. The project objectives met the need to avoid load shedding in the power sector in It had a simple design (injection of cash to TANESCO to finance the purchase of fuel and electricity) with minimal conditionality and flexibility for credit disbursement including 20 percent for retroactive financing. Although the purchase of fuel and electricity was not an investment, it was considered a necessary technical bridge to buy time while the expected investments financed as components of the Songo Songo project were implemented (conversion of Ubungo to domestic natural gas) without load shedding affecting GDP growth. b. Quality of Supervision Rating: Moderately Supervision of the Emergency Power Supply Project took two years from July 2004 to July The credit funds were quickly and fully disbursed by the Bank over the period and as a result load shedding was averted. A mid-term review of the project was undertaken in November 2004 at which time the project team did not revise the project implementation timetable even though the gas conversion of IPTL was not feasible as scheduled. However, the Bank was very flexible in responding quickly to the government s request to amend the DCA to reallocate funding to buy additional emergency generation through leasing arrangements, as part of the contingency plan when purchase of Jet A1 fuel proved impossible, and later to buy additional power generation from IPTL when the leasing arrangements also failed. Form July 2005 to July 2006, project supervision was limited to ensure compliance with financial and performance reporting obligations and, in view of the lack of progress in implementing the emergency program, the project team downgraded implementation progress rating to moderately satisfactory. a. Ensuring Quality -at at-entry Entry: b. Quality of Supervision :Moderately c. Overall Bank Performance : 9. Assessment of Borrower Performance: a. Government Performance. Rating: Moderately The Government drew up a satisfactory emergency plan as an addition to the earlier reform program being implementing. It also approved tariff increases of 4.5 percent in May 2004 and 5 percent in January However, further tariff increases were not sufficient to make TANESCO financially sustainable, because of the costs of power purchased from IPTL. b. Implementing Agency Performance: Rating: Moderately Since TANESCO has no control over tariff increases its finances have been always facing a negative cash flow. Following complex negotiations of a contract with a supplier, TANESCO failed to purchase Jet A1 fuel for Ubungo generators prior to domestic natural gas availability, and its attempt to purchase emergency leased capacity from an IPP did not work out. Finally, an amendment of the Credit Development Agreement permitted TANESCO to purchase all electricity form IPTL. Also, TANESCO was late in submitting its audited accounts for 2005 and the final audit of the project s accounts.

4 c. Overall Borrower Performance. Rating: Moderately. a. Government Performance :Moderately b. Implementing Agency Performance :Moderately c. Overall Borrower Performance :Moderately 10. M&E Design, Implementation, & Utilization: (i) M&E Design: The key performance indicators mentioned in section 4 were inappropriate and inadequate. Since load shedding varies from year to year depending on hydrological conditions and demand, it would be more appropriate to use this indicator only over a long period of time. And measuring the impact of load shedding on GDP seems even more complicated and difficult to estimate (and the methodology is not described anywhere). Moreover, there are no targets, either for the "impact on GDP" or the load shedding itself. (ii) M&E Implementation: It is not clear from the ICR as to how the outcome indicators (as they exist) were estimated. (iii) M&E Utilization: The ICR does not indicate how M&E was utilized. a. M&E Quality Rating : Negligible 11. Other Issues (Safeguards, Fiduciary, Unintended Positive and Negative Impacts): Environment. The project was rated C for environmental assessment purposes. The project did not involve any resettlement or compensation because it made use of existing facilities. The project was executed in compliance with the Bank s Environmental Safeguard Policies and Environment, Health, and Safety Guidelines, mainly in connection with the air quality/emissions and noise abatement of the functioning of Ubungo and IPTL. Procurement. There was one anomaly : the reallocation of US$8.4 million to purchase additional generation output from IPTL in February 2005 was done without seeking no objection by Operations Procurement Review Committee (OPRC). This violated the Bank s procurement guidelines in the sense that any increase in an initial contract amount exceeding 15 percent requires mandatory prior review by the Regional Procurement Manager (RPM) or OPRC. Since the expenditures were in line with the overall project objectives and were disbursed under a category previously approved by OPRC for US$32.2 million, the project team likely felt that it was most important not to create further delays, given the emergency nature of the project. Auditing and Financial statements. The Credit closed on July 31, 2006, but the second external audit on the Project s records and accounts was late and received on March 29, Moreover, TANESCO has been late in submitting its audited financial statements. Its statement for the calendar year 2005 was only submitted in March Unintended outcomes and impacts: None 12. Ratings: ICR IEG Review Reason for Disagreement /Comments Outcome: Moderately Moderately Risk to Development Significant High Broader sector issues and demand Outcome: side management have not been addressed to any significant degree. Bank Performance : Borrower Performance : Moderately Quality of ICR : Moderately Unsatisfactory NOTES: - When insufficient information is provided by the Bank for IEG to

5 arrive at a clear rating, IEG will downgrade the relevant ratings as warranted beginning July 1, The "Reason for Disagreement/Comments" column could cross-reference other sections of the ICR Review, as appropriate. 13. Lessons: An emergency operation should be a part of a wider dialogue or strategy, with clear goals specified for both short term and long terms aspects of the total effort. Demand side management should be a complement to emergency power interventions. 14. Assessment Recommended? Yes No 15. Comments on Quality of ICR: Three major shortcomings are noted: (i) The ICR failed to clearly distinguish the achievements of the Emergency Power Supply Project from those of the Songo Songo project, thus providing a misleading evaluation of the former. (ii) The ICR's treatment of M&E was inadequate (see Section 10). (iii) Although an ERR/IRR was not strictly required due to the emergency nature of the operation, the ICR could have provided other measures of project efficiency. a.quality of ICR Rating : Unsatisfactory

Actual Project Name : Mn - Sustainable Livelihoods Country: Mongolia US$M): Project Costs (US$M

Actual Project Name : Mn - Sustainable Livelihoods Country: Mongolia US$M): Project Costs (US$M IEG ICR Review Independent Evaluation Group 1. Project Data: Date Posted : 10/29/2008 Report Number : ICRR12989 PROJ ID : P067770 Appraisal Actual Project Name : Mn - Sustainable Project Costs (US$M US$M):

More information

US$M): Sector Board : ED Cofinancing (US$M US$M): Loan/Credit (US$M Sector(s): US$M):

US$M): Sector Board : ED Cofinancing (US$M US$M): Loan/Credit (US$M Sector(s): US$M): IEG ICR Review Independent Evaluation Group 1. Project Data: Date Posted : 11/19/2007 Report Number : ICRR12797 PROJ ID : P006204 Project Name : Bo- Education Quality Project Appraisal Actual Project Costs

More information

Actual Project Name : Rwanda Demobilization And Reintegration Project Country: Rwanda US$M): Project Costs (US$M

Actual Project Name : Rwanda Demobilization And Reintegration Project Country: Rwanda US$M): Project Costs (US$M Public Disclosure Authorized IEG ICR Review Independent Evaluation Group 1. Project Data: Date Posted : 02/24/2010 Report Number : ICRR13256 Public Disclosure Authorized Public Disclosure Authorized PROJ

More information

Actual Project Name : Social Insurance. US$9.7 US$9.4 Technical Assistance Project (SITAP) Country: Bosnia and US$M): Project Costs (US$M

Actual Project Name : Social Insurance. US$9.7 US$9.4 Technical Assistance Project (SITAP) Country: Bosnia and US$M): Project Costs (US$M IEG ICR Review Independent Evaluation Group 1. Project Data: Date Posted : 10/22/2008 Report Number : ICRR12969 PROJ ID : P071004 Appraisal Actual Project Name : Social Insurance Project Costs (US$M US$M):

More information

Actual Project Name : Transitional Support Credit Country: Bangladesh US$M): Project Costs (US$M Sector Board : EP Cofinancing (US$M

Actual Project Name : Transitional Support Credit Country: Bangladesh US$M): Project Costs (US$M Sector Board : EP Cofinancing (US$M IEG ICR Review Independent Evaluation Group Report Number : ICRR13360 1. Project Data: Date Posted : 03/30/2010 PROJ ID : P110167 Appraisal Actual Project Name : Transitional Support Project Costs (US$M

More information

US$M): Sector Board : FPD Cofinancing (US$M US$M): (US$M US$M):

US$M): Sector Board : FPD Cofinancing (US$M US$M): (US$M US$M): Public Disclosure Authorized IEG ICR Review Independent Evaluation Group Report Number : ICRR13644 1. Project Data: Date Posted : 07/14/2011 Public Disclosure Authorized Public Disclosure Authorized Public

More information

Actual Project Name : Marmara Earthquake Emergency Reconstruction Project Country: Turkey US$M): Project Costs (US$M

Actual Project Name : Marmara Earthquake Emergency Reconstruction Project Country: Turkey US$M): Project Costs (US$M Public Disclosure Authorized IEG ICR Review Independent Evaluation Group 1. Project Data: Date Posted : 09/06/2007 Report Number : ICRR12684 Public Disclosure Authorized Public Disclosure Authorized Public

More information

US$M): Sector Board : Social Development Cofinancing (US$M (US$M US$M): US$M):

US$M): Sector Board : Social Development Cofinancing (US$M (US$M US$M): US$M): Public Disclosure Authorized IEG ICR Review Independent Evaluation Group Report Number : ICRR14437 1. Project Data: Date Posted : 09/22/2014 Public Disclosure Authorized Public Disclosure Authorized Country:

More information

US$M): Sector Board : Public Sector (US$M US$M): Cofinancing (US$M. ICR Review

US$M): Sector Board : Public Sector (US$M US$M): Cofinancing (US$M. ICR Review Public Disclosure Authorized IEG ICR Review Independent Evaluation Group Report Number : ICRR14400 1. Project Data: Date Posted : 07/24/2014 Public Disclosure Authorized Public Disclosure Authorized Public

More information

L/C/TF Number(s) Closing Date (Original) Total Financing (USD) IBRD Jun ,000,000.00

L/C/TF Number(s) Closing Date (Original) Total Financing (USD) IBRD Jun ,000,000.00 Public Disclosure Authorized 1. Project Data Report Number : ICRR0021272 Public Disclosure Authorized Public Disclosure Authorized Operation ID P159774 Country Fiji Operation Name Fiji Post-Cyclone Winston

More information

US$M): US$M): (US$M. Cofinancing (US$M US$M):

US$M): US$M): (US$M. Cofinancing (US$M US$M): Public Disclosure Authorized IEG ICR Review Independent Evaluation Group Report Number : ICRR14162 1. Project Data: Date Posted : 05/20/2014 Public Disclosure Authorized Public Disclosure Authorized Public

More information

Actual Project Name : Mx Affordable Housing And Urban Poverty Reduction Development Policy Loan III Country: Mexico US$M):

Actual Project Name : Mx Affordable Housing And Urban Poverty Reduction Development Policy Loan III Country: Mexico US$M): Public Disclosure Authorized IEG ICR Review Independent Evaluation Group 1. Project Data: Date Posted : 02/16/2010 Report Number : ICRR13109 Public Disclosure Authorized Public Disclosure Authorized Public

More information

Actual Project Name : Bicol Power Restoration Project Country: Philippines US$M): Project Costs (US$M

Actual Project Name : Bicol Power Restoration Project Country: Philippines US$M): Project Costs (US$M Public Disclosure Authorized IEG ICR Review Independent Evaluation Group 1. Project Data: Date Posted : 11/09/2009 Report Number : ICRR13208 Public Disclosure Authorized PROJ ID : P106262 Appraisal Actual

More information

Actual Project Name : Urban Infrastructure & Project Costs (US$M US$M): Sector Board : Water Cofinancing (US$M US$M): US$M):

Actual Project Name : Urban Infrastructure & Project Costs (US$M US$M): Sector Board : Water Cofinancing (US$M US$M): US$M): Public Disclosure Authorized IEG ICR Review Independent Evaluation Group Report Number : ICRR13817 1. Project Data: Date Posted : 06/27/2013 Public Disclosure Authorized Public Disclosure Authorized Public

More information

Cofinancing (US$M): Monika Huppi Lourdes N. Pagaran IEGPS2

Cofinancing (US$M): Monika Huppi Lourdes N. Pagaran IEGPS2 Public Disclosure Authorized IEG ICR Review Independent Evaluation Group Report Number: ICRR14712 1. Project Data: Date Posted: 06/16/2015 Public Disclosure Authorized Public Disclosure Authorized Public

More information

Country Practice Area(Lead) Additional Financing Croatia Finance & Markets P129220

Country Practice Area(Lead) Additional Financing Croatia Finance & Markets P129220 Public Disclosure Authorized Independent Evaluation Group (IEG) 1. Project Data Report Number : ICRR0020731 Public Disclosure Authorized Public Disclosure Authorized Project ID P116080 Project Name EXPORT

More information

US$M): (US$M. Loan/Credit US$M): US$M): Board Approval Date : 03/04/2004 Closing Date : 07/09/ /30/2010. Group Manager :

US$M): (US$M. Loan/Credit US$M): US$M): Board Approval Date : 03/04/2004 Closing Date : 07/09/ /30/2010. Group Manager : Public Disclosure Authorized IEG ICR Review Independent Evaluation Group 1. Project Data: Date Posted : 05/12/2011 Report Number : ICRR13606 Public Disclosure Authorized Public Disclosure Authorized PROJ

More information

Actual Project Name : Vn-second Payment. Project Costs (US$M US$M): Sector Board : US$M): Cofinancing (US$M US$M):

Actual Project Name : Vn-second Payment. Project Costs (US$M US$M): Sector Board : US$M): Cofinancing (US$M US$M): Public Disclosure Authorized IEG ICR Review Independent Evaluation Group Report Number : ICRR13819 1. Project Data: Date Posted : 06/12/2012 Public Disclosure Authorized Public Disclosure Authorized Public

More information

Actual Project Name : Emergency Water Project Country: West Bank & Gaza US$M): Project Costs (US$M

Actual Project Name : Emergency Water Project Country: West Bank & Gaza US$M): Project Costs (US$M Public Disclosure Authorized IEG ICR Review Independent Evaluation Group 1. Project Data: Date Posted : 04/13/2010 Report Number : ICRR13188 Public Disclosure Authorized Public Disclosure Authorized PROJ

More information

L/C/TF Number(s) Closing Date (Original) Total Project Cost (USD) IBRD Jun ,670,000.00

L/C/TF Number(s) Closing Date (Original) Total Project Cost (USD) IBRD Jun ,670,000.00 Public Disclosure Authorized Independent Evaluation Group (IEG) 1. Project Data Report Number : ICRR0020366 Public Disclosure Authorized Public Disclosure Authorized Project ID P107666 Country Peru Project

More information

Actual Project Name : Tunisia Information. Project Costs (US$M US$M): Sector Board : Global US$M):

Actual Project Name : Tunisia Information. Project Costs (US$M US$M): Sector Board : Global US$M): Public Disclosure Authorized IEG ICR Review Independent Evaluation Group Report Number : ICRR13740 1. Project Data: Date Posted : 05/31/2012 Public Disclosure Authorized Public Disclosure Authorized Public

More information

Actual Project Name : Rural Poverty Alleviation - Paraiba Country: Brazil US$M): Project Costs (US$M

Actual Project Name : Rural Poverty Alleviation - Paraiba Country: Brazil US$M): Project Costs (US$M Public Disclosure Authorized IEG ICR Review Independent Evaluation Group 1. Project Data: Date Posted : 06/28/2007 Report Number : ICRR12652 Public Disclosure Authorized Public Disclosure Authorized PROJ

More information

Cofinancing (US$M): b.were the project objectives/key associated outcome targets revised during implementation? No

Cofinancing (US$M): b.were the project objectives/key associated outcome targets revised during implementation? No Public Disclosure Authorized IEG ICR Review Independent Evaluation Group Report Number: ICRR14890 1. Project Data: Date Posted: 02/16/2016 Public Disclosure Authorized Public Disclosure Authorized Public

More information

to ensure that the urban poor in participating Kelurahans benefit from improved socio -economic and local governance conditions.

to ensure that the urban poor in participating Kelurahans benefit from improved socio -economic and local governance conditions. Public Disclosure Authorized IEG ICR Review Independent Evaluation Group Report Number: ICRR14905 1. Project Data: Date Posted: 06/02/2016 Public Disclosure Authorized Public Disclosure Authorized Public

More information

Country Practice Area(Lead) Additional Financing Indonesia Water P161514

Country Practice Area(Lead) Additional Financing Indonesia Water P161514 Public Disclosure Authorized Independent Evaluation Group (IEG) 1. Project Data Report Number : ICRR0020651 Public Disclosure Authorized Public Disclosure Authorized Project ID P096532 Project Name ID:

More information

Project Costs (US$M):

Project Costs (US$M): Public Disclosure Authorized IEG ICR Review Independent Evaluation Group 1. Project Data: Date Posted: 10/05/2015 Report Number: ICRR14849 Public Disclosure Authorized Public Disclosure Authorized Public

More information

Cofinancing (US$M): c. Policy Areas: The policy areas included into the Program Document of the FIRM DPL were the following:

Cofinancing (US$M): c. Policy Areas: The policy areas included into the Program Document of the FIRM DPL were the following: Public Disclosure Authorized IEG ICR Review Independent Evaluation Group 1. Project Data: Date Posted: 03/25/2015 Report Number: ICRR14675 Public Disclosure Authorized Public Disclosure Authorized Public

More information

Nelson. b.were the project objectives/key associated outcome targets revised during implementation? No

Nelson. b.were the project objectives/key associated outcome targets revised during implementation? No Public Disclosure Authorized IEG ICR Review Independent Evaluation Group Report Number: ICRR14909 1. Project Data: Date Posted: 06/01/2016 Public Disclosure Authorized Public Disclosure Authorized Country:

More information

b.were the project objectives/key associated outcome targets revised during implementation? No

b.were the project objectives/key associated outcome targets revised during implementation? No Public Disclosure Authorized IEG ICR Review Independent Evaluation Group Report Number: ICRR14721 1. Project Data: Date Posted: 06/24/2015 Public Disclosure Authorized Public Disclosure Authorized Public

More information

L/C/TF Number(s) Closing Date (Original) Total Project Cost (USD) IBRD Dec ,000, Original Commitment 400,000,

L/C/TF Number(s) Closing Date (Original) Total Project Cost (USD) IBRD Dec ,000, Original Commitment 400,000, Public Disclosure Authorized Independent Evaluation Group (IEG) 1. Project Data Report Number : ICRR0020001 Public Disclosure Authorized Project ID P100580 Country Ukraine Project Name ROADS & SAFETY IMPROVEMENT

More information

Nelson. The project development objective as stated in the Ozone Projects Trust Fund Grant Agreement (Schedule 2, page 16) was:

Nelson. The project development objective as stated in the Ozone Projects Trust Fund Grant Agreement (Schedule 2, page 16) was: Public Disclosure Authorized IEG ICR Review Independent Evaluation Group Report Number: ICRR14897 1. Project Data: Date Posted: 04/19/2016 Public Disclosure Authorized Public Disclosure Authorized Country:

More information

b.were the project objectives/key associated outcome targets revised during implementation? No

b.were the project objectives/key associated outcome targets revised during implementation? No Public Disclosure Authorized IEG ICR Review Independent Evaluation Group Report Number: ICRR14625 1. Project Data: Date Posted: 06/27/2015 Public Disclosure Authorized Public Disclosure Authorized Public

More information

Actual Project Name : Madagascar Sustainable Health System Development Project Country: Madagascar. Project Costs (US$M US$M):

Actual Project Name : Madagascar Sustainable Health System Development Project Country: Madagascar. Project Costs (US$M US$M): Public Disclosure Authorized IEG ICR Review Independent Evaluation Group 1. Project Data: Date Posted : 03/17/2011 Report Number : ICRR13456 Public Disclosure Authorized PROJ ID : P103606 Appraisal Actual

More information

L/C/TF Number(s) Closing Date (Original) Total Project Cost (USD) IBRD Jul ,330,316.00

L/C/TF Number(s) Closing Date (Original) Total Project Cost (USD) IBRD Jul ,330,316.00 Public Disclosure Authorized 1. Project Data Report Number : ICRR0020321 Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Project ID P107840 Country Macedonia, former

More information

Actual Project Name : Second Community. Project Costs (US$M US$M): Sector Board : Water Cofinancing (US$M US$M): US$M): ICR Review

Actual Project Name : Second Community. Project Costs (US$M US$M): Sector Board : Water Cofinancing (US$M US$M): US$M): ICR Review Public Disclosure Authorized IEG ICR Review Independent Evaluation Group Report Number : ICRR13732 1. Project Data: Date Posted : 11/08/2013 Public Disclosure Authorized Public Disclosure Authorized Public

More information

Actual Project Name : Second Eastern. Project Costs (US$M US$M): Sector Board : Transport Cofinancing (US$M US$M): US$M): ICR Review

Actual Project Name : Second Eastern. Project Costs (US$M US$M): Sector Board : Transport Cofinancing (US$M US$M): US$M): ICR Review Public Disclosure Authorized IEG ICR Review Independent Evaluation Group Report Number : ICRR13933 1. Project Data: Date Posted : 08/03/2012 Public Disclosure Authorized Public Disclosure Authorized Public

More information

L/C/TF Number(s) Closing Date (Original) Total Project Cost (USD) IDA-49320,IDA-H Jun ,274,997.95

L/C/TF Number(s) Closing Date (Original) Total Project Cost (USD) IDA-49320,IDA-H Jun ,274,997.95 Public Disclosure Authorized Independent Evaluation Group (IEG) 1. Project Data Report Number : ICRR0021427 Public Disclosure Authorized Public Disclosure Authorized Project ID P112893 Country Nepal Project

More information

Actual Project Name : My Ozone Depleting Substances Phaseout Project L/C Number: Project Costs (US$M US$M):

Actual Project Name : My Ozone Depleting Substances Phaseout Project L/C Number: Project Costs (US$M US$M): Public Disclosure Authorized IEG ICR Review Independent Evaluation Group Report Number : ICRR13699 1. Project Data: Date Posted : 08/30/2013 Public Disclosure Authorized Public Disclosure Authorized Country:

More information

L/C/TF Number(s) Closing Date (Original) Total Project Cost (USD) TF-17383,TF Jun ,540,000.00

L/C/TF Number(s) Closing Date (Original) Total Project Cost (USD) TF-17383,TF Jun ,540,000.00 Public Disclosure Authorized Independent Evaluation Group (IEG) 1. Project Data Report Number : ICRR0020847 Public Disclosure Authorized Public Disclosure Authorized Project ID P149629 Country Mozambique

More information

US$M): Sector Board : Energy and Mining Cofinancing (US$M (US$M US$M): US$M): Closing Date : 12/31/ /31/2010.

US$M): Sector Board : Energy and Mining Cofinancing (US$M (US$M US$M): US$M): Closing Date : 12/31/ /31/2010. Public Disclosure Authorized IEG ICR Review Independent Evaluation Group Report Number : ICRR13723 1. Project Data: Date Posted : 07/26/2012 Public Disclosure Authorized Public Disclosure Authorized Country:

More information

How many operations were planned for the

How many operations were planned for the Public Disclosure Authorized IEG ICR Review Independent Evaluation Group 1. Project Data: Date Posted: 01/20/2016 Report Number: ICRR14887 Public Disclosure Authorized Public Disclosure Authorized Public

More information

IEG. ICR Review Independent Evaluation Group. Public Disclosure Authorized. Public Disclosure Authorized. Public Disclosure Authorized

IEG. ICR Review Independent Evaluation Group. Public Disclosure Authorized. Public Disclosure Authorized. Public Disclosure Authorized Public Disclosure Authorized IEG ICR Review Independent Evaluation Group Report Number: ICRR14822 1. Project Data: Date Posted: 09/29/2015 Public Disclosure Authorized Public Disclosure Authorized Public

More information

Country Practice Area(Lead) Additional Financing

Country Practice Area(Lead) Additional Financing Public Disclosure Authorized Independent Evaluation Group (IEG) 1. Project Data Report Number : ICRR0021281 Public Disclosure Authorized Public Disclosure Authorized Project ID P149884 Project Name CF-

More information

DRAFT Guidelines for Reviewing World Bank Implementation Completion and Results Reports A Manual for IEG ICR Reviewers

DRAFT Guidelines for Reviewing World Bank Implementation Completion and Results Reports A Manual for IEG ICR Reviewers DRAFT Guidelines for Reviewing World Bank Implementation Completion and Results Reports A Manual for IEG ICR Reviewers Last updated: July 25, 2017 Note: This is a living document under ongoing revision.

More information

L/C/TF Number(s) Closing Date (Original) Total Project Cost (USD) TF Dec ,872,000.00

L/C/TF Number(s) Closing Date (Original) Total Project Cost (USD) TF Dec ,872,000.00 Public Disclosure Authorized Independent Evaluation Group (IEG) 1. Project Data Report Number : ICRR0020840 Public Disclosure Authorized Public Disclosure Authorized Project ID P103470 Country OECS Countries

More information

L/C/TF Number(s) Closing Date (Original) Total Project Cost (USD) IBRD Dec ,000,000.00

L/C/TF Number(s) Closing Date (Original) Total Project Cost (USD) IBRD Dec ,000,000.00 Public Disclosure Authorized Independent Evaluation Group (IEG) 1. Project Data Report Number : ICRR0020665 Public Disclosure Authorized Public Disclosure Authorized Project ID P117440 Country El Salvador

More information

L/C/TF Number(s) Closing Date (Original) Total Project Cost (USD) IDA Mar ,450,000.00

L/C/TF Number(s) Closing Date (Original) Total Project Cost (USD) IDA Mar ,450,000.00 Public Disclosure Authorized Independent Evaluation Group (IEG) 1. Project Data Report Number : ICRR0021097 Public Disclosure Authorized Public Disclosure Authorized Project ID P111598 Country Tanzania

More information

Country Practice Area(Lead) Additional Financing Finance, Competitiveness and

Country Practice Area(Lead) Additional Financing Finance, Competitiveness and Public Disclosure Authorized Independent Evaluation Group (IEG) 1. Project Data Report Number : ICRR0020839 Public Disclosure Authorized Public Disclosure Authorized Project ID P108080 Project Name XK

More information

Actual Project Name : Rural Financial Services Project Country: Ghana US$M): Project Costs (US$M

Actual Project Name : Rural Financial Services Project Country: Ghana US$M): Project Costs (US$M Public Disclosure Authorized IEG ICR Review Independent Evaluation Group 1. Project Data: Date Posted : 07/09/2009 Report Number : ICRR13120 Public Disclosure Authorized Public Disclosure Authorized PROJ

More information

Actual Project Name : Rural Poverty Reduction Project - Pernambuco Country: Brazil. Project Costs (US$M US$M):

Actual Project Name : Rural Poverty Reduction Project - Pernambuco Country: Brazil. Project Costs (US$M US$M): Public Disclosure Authorized IEG ICR Review Independent Evaluation Group 1. Project Data: Date Posted : 04/29/2013 Report Number : ICRR13525 Public Disclosure Authorized Public Disclosure Authorized Public

More information

IEG. ICR Review Independent Evaluation Group. Public Disclosure Authorized. Public Disclosure Authorized. Public Disclosure Authorized

IEG. ICR Review Independent Evaluation Group. Public Disclosure Authorized. Public Disclosure Authorized. Public Disclosure Authorized Public Disclosure Authorized IEG ICR Review Independent Evaluation Group 1. Project Data: Date Posted: 05/26/2015 Report Number: ICRR14633 Public Disclosure Authorized Public Disclosure Authorized Public

More information

Practice Area(Lead) Finance, Competitiveness and Innovation

Practice Area(Lead) Finance, Competitiveness and Innovation Public Disclosure Authorized Independent Evaluation Group (IEG) 1. Project Data Report Number : ICRR0021267 Public Disclosure Authorized Public Disclosure Authorized Project ID P146248 Country Serbia Project

More information

L/C/TF Number(s) Closing Date (Original) Total Project Cost (USD) IDA Jun ,300, Original Commitment 30,400,

L/C/TF Number(s) Closing Date (Original) Total Project Cost (USD) IDA Jun ,300, Original Commitment 30,400, Public Disclosure Authorized Independent Evaluation Group (IEG) 1. Project Data Report Number : ICRR0020110 Public Disclosure Authorized Project ID P107311 Country Mozambique Project Name MZ-Nat'l Dec

More information

L/C/TF Number(s) Closing Date (Original) Total Project Cost (USD) IDA-46260,TF Aug ,000,000.00

L/C/TF Number(s) Closing Date (Original) Total Project Cost (USD) IDA-46260,TF Aug ,000,000.00 Public Disclosure Authorized Independent Evaluation Group (IEG) 1. Project Data Report Number : ICRR0020414 Public Disclosure Authorized Project ID P111633 Country Uganda Project Name UG-SEC N-Uganda SAF

More information

Country Practice Area(Lead) Additional Financing Uzbekistan Energy & Extractives P133633,P165054

Country Practice Area(Lead) Additional Financing Uzbekistan Energy & Extractives P133633,P165054 Public Disclosure Authorized Independent Evaluation Group (IEG) 1. Project Data Report Number : ICRR0021115 Public Disclosure Authorized Public Disclosure Authorized Project ID P118737 Project Name ENERGY

More information

Country Practice Area(Lead) Additional Financing Kyrgyz Republic Water P126390

Country Practice Area(Lead) Additional Financing Kyrgyz Republic Water P126390 Public Disclosure Authorized Independent Evaluation Group (IEG) 1. Project Data Report Number : ICRR0020801 Public Disclosure Authorized Public Disclosure Authorized Project ID P096409 Project Name OIP-2

More information

L/C/TF Number(s) Closing Date (Original) Total Project Cost (USD) TF Oct ,000,000.00

L/C/TF Number(s) Closing Date (Original) Total Project Cost (USD) TF Oct ,000,000.00 Public Disclosure Authorized 1. Project Data Report Number : ICRR0021153 Public Disclosure Authorized Public Disclosure Authorized Project ID P126180 Country Sierra Leone Project Name Sierra Leone Energy

More information

IEG. ICR Review Independent Evaluation Group. Public Disclosure Authorized. Public Disclosure Authorized. Public Disclosure Authorized

IEG. ICR Review Independent Evaluation Group. Public Disclosure Authorized. Public Disclosure Authorized. Public Disclosure Authorized Public Disclosure Authorized IEG ICR Review Independent Evaluation Group Report Number: ICRR14708 1. Project Data: Date Posted: 06/01/2015 Public Disclosure Authorized Public Disclosure Authorized Public

More information

Country Practice Area(Lead) Additional Financing Pakistan Governance P130941,P130941,P152586

Country Practice Area(Lead) Additional Financing Pakistan Governance P130941,P130941,P152586 Public Disclosure Authorized Independent Evaluation Group (IEG) 1. Project Data Report Number : ICRR0020611 Public Disclosure Authorized Public Disclosure Authorized Project ID P126425 Project Name PK:

More information

(US. Loan/Credit. Closing Date : 01/31/ /31/2014

(US. Loan/Credit. Closing Date : 01/31/ /31/2014 Public Disclosure Authorized IEG ICR Review Independent Evaluation Group Report Number : ICRR14935 1. Project Data: Date Posted : 06/23/2016 Public Disclosure Authorized Public Disclosure Authorized Country:

More information

L/C/TF Number(s) Closing Date (Original) Total Project Cost (USD) IBRD Sep ,746,812.05

L/C/TF Number(s) Closing Date (Original) Total Project Cost (USD) IBRD Sep ,746,812.05 Public Disclosure Authorized Independent Evaluation Group (IEG) 1. Project Data Report Number : ICRR0021289 Public Disclosure Authorized Public Disclosure Authorized Project ID P121673 Country Romania

More information

Actual Project Name : Emergency Recovery And Disaster Management (US$M US$M): Project Costs (US$M

Actual Project Name : Emergency Recovery And Disaster Management (US$M US$M): Project Costs (US$M Public Disclosure Authorized IEG ICR Review Independent Evaluation Group Report Number : ICRR14044 1. Project Data: Date Posted : 01/13/2014 Public Disclosure Authorized Public Disclosure Authorized Public

More information

L/C/TF Number(s) Closing Date (Original) Total Project Cost (USD) IBRD Mar ,200,000.00

L/C/TF Number(s) Closing Date (Original) Total Project Cost (USD) IBRD Mar ,200,000.00 Public Disclosure Authorized 1. Project Data Report Number : ICRR0020833 Public Disclosure Authorized Public Disclosure Authorized Project ID Project Name P133226 LB Fiscal Management Reform 2 Country

More information

L/C/TF Number(s) Closing Date (Original) Total Project Cost (USD) IBRD Dec ,212,149.53

L/C/TF Number(s) Closing Date (Original) Total Project Cost (USD) IBRD Dec ,212,149.53 Public Disclosure Authorized Independent Evaluation Group (IEG) 1. Project Data Report Number : ICRR0021311 Public Disclosure Authorized Public Disclosure Authorized Project ID P110051 Country India Project

More information

L/C/TF Number(s) Closing Date (Original) Total Project Cost (USD) COFN-C1280,IDA-H3320,IDA-H6150,IDA-H8860,TF- 30-Nov ,340,000.

L/C/TF Number(s) Closing Date (Original) Total Project Cost (USD) COFN-C1280,IDA-H3320,IDA-H6150,IDA-H8860,TF- 30-Nov ,340,000. Public Disclosure Authorized Independent Evaluation Group (IEG) 1. Project Data Report Number : ICRR0020142 Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Project

More information

b.were the project objectives/key associated outcome targets revised during implementation? No

b.were the project objectives/key associated outcome targets revised during implementation? No Public Disclosure Authorized IEG ICR Review Independent Evaluation Group Report Number: ICRR14760 1. Project Data: Date Posted: 06/30/2015 Public Disclosure Authorized Public Disclosure Authorized Public

More information

L/C/TF Number(s) Closing Date (Original) Total Financing (USD) TF Dec ,580,000.00

L/C/TF Number(s) Closing Date (Original) Total Financing (USD) TF Dec ,580,000.00 Public Disclosure Authorized Independent Evaluation Group (IEG) 1. Project Data Report Number : ICRR0020620 Public Disclosure Authorized Public Disclosure Authorized Operation ID P147166 Country Haiti

More information

Country Practice Area(Lead) Additional Financing Tanzania Health, Nutrition & Population P147991

Country Practice Area(Lead) Additional Financing Tanzania Health, Nutrition & Population P147991 Public Disclosure Authorized Independent Evaluation Group (IEG) 1. Project Data Report Number : ICRR0020727 Public Disclosure Authorized Public Disclosure Authorized Project ID P125740 Project Name TZ-Basic

More information

Actual Project Name : Rural Poverty Reduction Project - Rio Grande Do Norte (US$M. Project Costs (US$M US$M):

Actual Project Name : Rural Poverty Reduction Project - Rio Grande Do Norte (US$M. Project Costs (US$M US$M): Public Disclosure Authorized IEG ICR Review Independent Evaluation Group Report Number : ICRR13678 1. Project Data: Date Posted : 04/29/2013 Public Disclosure Authorized Public Disclosure Authorized Country:

More information

Country Practice Area(Lead) Additional Financing Social, Urban, Rural and Resilience P Indonesia Global Practice

Country Practice Area(Lead) Additional Financing Social, Urban, Rural and Resilience P Indonesia Global Practice Public Disclosure Authorized 1. Project Data Report Number : ICRR0021284 Public Disclosure Authorized Public Disclosure Authorized Project ID P111577 Project Name ID-Local Government and Decentralization

More information

L/C/TF Number(s) Closing Date (Original) Total Project Cost (USD) TF Jun ,660,000.00

L/C/TF Number(s) Closing Date (Original) Total Project Cost (USD) TF Jun ,660,000.00 Public Disclosure Authorized 1. Project Data Report Number : ICRR0020596 Public Disclosure Authorized Public Disclosure Authorized Project ID P116680 Country Armenia Project Name ENERGY EFFICIENCY Practice

More information

L/C/TF Number(s) Closing Date (Original) Total Project Cost (USD) TF-92582,TF Mar ,000,000.00

L/C/TF Number(s) Closing Date (Original) Total Project Cost (USD) TF-92582,TF Mar ,000,000.00 Public Disclosure Authorized Independent Evaluation Group (IEG) 1. Project Data Report Number : ICRR0020815 Public Disclosure Authorized Public Disclosure Authorized Project ID Project Name P111849 LB

More information

L/C/TF Number(s) Closing Date (Original) Total Project Cost (USD) IDA-44890,IDA-H Dec ,300,000.00

L/C/TF Number(s) Closing Date (Original) Total Project Cost (USD) IDA-44890,IDA-H Dec ,300,000.00 Public Disclosure Authorized Independent Evaluation Group (IEG) 1. Project Data Report Number : ICRR0020708 Public Disclosure Authorized Public Disclosure Authorized Project ID P108768 Country Mongolia

More information

L/C/TF Number(s) Closing Date (Original) Total Project Cost (USD) IDA Dec ,000,000.00

L/C/TF Number(s) Closing Date (Original) Total Project Cost (USD) IDA Dec ,000,000.00 Public Disclosure Authorized 1. Project Data Report Number : ICRR0021058 Public Disclosure Authorized Public Disclosure Authorized Project ID P112821 Country Mali Project Name ML-Governance and Budget

More information

L/C/TF Number(s) Closing Date (Original) Total Project Cost (USD) IDA Sep ,600, Original Commitment 26,700,

L/C/TF Number(s) Closing Date (Original) Total Project Cost (USD) IDA Sep ,600, Original Commitment 26,700, Public Disclosure Authorized Independent Evaluation Group (IEG) 1. Project Data Report Number : ICRR0020205 Public Disclosure Authorized Project ID P105116 Country Azerbaijan Project Name SOCIAL PROT DEV

More information

L/C/TF Number(s) Closing Date (Original) Total Project Cost (USD) IDA-48890,IDA-H Jun ,250,000.00

L/C/TF Number(s) Closing Date (Original) Total Project Cost (USD) IDA-48890,IDA-H Jun ,250,000.00 Public Disclosure Authorized Independent Evaluation Group (IEG) 1. Project Data Report Number : ICRR0020165 Public Disclosure Authorized Project ID P113030 Country Chad Project Name TD-Local Dev Prog Sup

More information

Country Practice Area(Lead) Additional Financing Dominican Republic Agriculture P126840,P157377,P157377

Country Practice Area(Lead) Additional Financing Dominican Republic Agriculture P126840,P157377,P157377 Public Disclosure Authorized Independent Evaluation Group (IEG) 1. Project Data Report Number : ICRR0020735 Public Disclosure Authorized Public Disclosure Authorized Project ID P109932 Project Name DO

More information

L/C/TF Number(s) Closing Date (Original) Total Project Cost (USD) IBRD Sep ,000,000.00

L/C/TF Number(s) Closing Date (Original) Total Project Cost (USD) IBRD Sep ,000,000.00 Public Disclosure Authorized Independent Evaluation Group (IEG) 1. Project Data Report Number : ICRR0020612 Public Disclosure Authorized Public Disclosure Authorized Project ID P110752 Country Peru Project

More information

US$M): Sector Board : Agriculture and Rural (US$M US$M): Cofinancing (US$M

US$M): Sector Board : Agriculture and Rural (US$M US$M): Cofinancing (US$M Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized IEG ICR Review Independent Evaluation Group 1. Project Data: Date Posted : 06/30/2014

More information

L/C/TF Number(s) Closing Date (Original) Total Project Cost (USD) TF Jun ,713,300.00

L/C/TF Number(s) Closing Date (Original) Total Project Cost (USD) TF Jun ,713,300.00 Public Disclosure Authorized Independent Evaluation Group (IEG) 1. Project Data Report Number : ICRR0020377 Public Disclosure Authorized Public Disclosure Authorized Project ID P118145 Country Middle East

More information

Practice Area(Lead) Social, Urban, Rural and Resilience Global Practice

Practice Area(Lead) Social, Urban, Rural and Resilience Global Practice Public Disclosure Authorized 1. Project Data Report Number : ICRR0020589 Public Disclosure Authorized Public Disclosure Authorized Project ID P105990 Country India Project Name IN: West Bengal PRI Practice

More information

Practice Area(Lead) Social, Urban, Rural and Resilience Global Practice

Practice Area(Lead) Social, Urban, Rural and Resilience Global Practice Public Disclosure Authorized 1. Project Data Report Number : ICRR0020608 Public Disclosure Authorized Public Disclosure Authorized Project ID P094055 Country Vietnam Project Name VN-Local Development Investment

More information

L/C/TF Number(s) Closing Date (Original) Total Project Cost (USD) IBRD Jun ,719,682.50

L/C/TF Number(s) Closing Date (Original) Total Project Cost (USD) IBRD Jun ,719,682.50 Public Disclosure Authorized Independent Evaluation Group (IEG) 1. Project Data Report Number : ICRR0021067 Public Disclosure Authorized Public Disclosure Authorized Project ID P106768 Country Brazil Project

More information

L/C/TF Number(s) Closing Date (Original) Total Project Cost (USD) IBRD Dec ,000,000.00

L/C/TF Number(s) Closing Date (Original) Total Project Cost (USD) IBRD Dec ,000,000.00 Public Disclosure Authorized Independent Evaluation Group (IEG) 1. Project Data Report Number : ICRR0020654 Public Disclosure Authorized Public Disclosure Authorized Project ID P096023 Country India Project

More information

Actual Project Name : Syr Darya Control & Project Costs (US$M US$M): Sector Board : Agriculture and Rural Development US$M):

Actual Project Name : Syr Darya Control & Project Costs (US$M US$M): Sector Board : Agriculture and Rural Development US$M): Public Disclosure Authorized IEG ICR Review Independent Evaluation Group Report Number : ICRR13726 1. Project Data: Date Posted : 02/10/2012 Public Disclosure Authorized Public Disclosure Authorized Public

More information

Country Practice Area(Lead) Additional Financing Social, Urban, Rural and Resilience P117308,P Bolivia

Country Practice Area(Lead) Additional Financing Social, Urban, Rural and Resilience P117308,P Bolivia Public Disclosure Authorized Independent Evaluation Group (IEG) 1. Project Data Report Number : ICRR0021219 Public Disclosure Authorized Public Disclosure Authorized Project ID P083979 Project Name BO

More information

Country Practice Area(Lead) Additional Financing Niger Transport & Digital Development P131107,P131107

Country Practice Area(Lead) Additional Financing Niger Transport & Digital Development P131107,P131107 Public Disclosure Authorized Independent Evaluation Group (IEG) 1. Project Data Report Number : ICRR0021174 Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Project

More information

L/C/TF Number(s) Closing Date (Original) Total Project Cost (USD) IBRD Jun ,000,000.00

L/C/TF Number(s) Closing Date (Original) Total Project Cost (USD) IBRD Jun ,000,000.00 Public Disclosure Authorized Independent Evaluation Group (IEG) 1. Project Data Report Number : ICRR0020586 Public Disclosure Authorized Public Disclosure Authorized Project ID P118410 Country Brazil Project

More information

L/C/TF Number(s) Closing Date (Original) Total Project Cost (USD) IDA Jun ,251,189.65

L/C/TF Number(s) Closing Date (Original) Total Project Cost (USD) IDA Jun ,251,189.65 Public Disclosure Authorized 1. Project Data Report Number : ICRR0021387 Public Disclosure Authorized Public Disclosure Authorized Project ID P121528 Country Bangladesh Project Name BD: IDEA Project Practice

More information

Actual Project Name : Sustainable. Project Costs (US$M US$M): Sector Board : Energy and Mining Cofinancing (US$M US$M): US$M):

Actual Project Name : Sustainable. Project Costs (US$M US$M): Sector Board : Energy and Mining Cofinancing (US$M US$M): US$M): Public Disclosure Authorized IEG ICR Review Independent Evaluation Group Report Number : ICRR14096 1. Project Data: Date Posted : 02/24/2014 Public Disclosure Authorized Public Disclosure Authorized Public

More information

Country Practice Area(Lead) Additional Financing Bangladesh Environment & Natural Resources P155106

Country Practice Area(Lead) Additional Financing Bangladesh Environment & Natural Resources P155106 Public Disclosure Authorized Independent Evaluation Group (IEG) 1. Project Data Report Number : ICRR0020923 Public Disclosure Authorized Public Disclosure Authorized Project ID P125447 Project Name BD:

More information

L/C/TF Number(s) Closing Date (Original) Total Project Cost (USD) IBRD Sep ,000, Original Commitment 50,000,

L/C/TF Number(s) Closing Date (Original) Total Project Cost (USD) IBRD Sep ,000, Original Commitment 50,000, Public Disclosure Authorized Independent Evaluation Group (IEG) 1. Project Data Report Number : ICRR0020276 Public Disclosure Authorized Project ID P102299 Project Name BW-HIV/AIDS Project SIL (FY09) Country

More information

L/C/TF Number(s) Closing Date (Original) Total Project Cost (USD) IBRD Dec ,040,000.00

L/C/TF Number(s) Closing Date (Original) Total Project Cost (USD) IBRD Dec ,040,000.00 Public Disclosure Authorized Independent Evaluation Group (IEG) 1. Project Data Report Number : ICRR0020616 Public Disclosure Authorized Public Disclosure Authorized Project ID P119939 Country Uzbekistan

More information

Country Practice Area(Lead) Additional Financing Afghanistan Governance P150632,P150632

Country Practice Area(Lead) Additional Financing Afghanistan Governance P150632,P150632 Public Disclosure Authorized 1. Project Data Report Number : ICRR0021292 Public Disclosure Authorized Public Disclosure Authorized Project ID P120427 Project Name AF: ARTF-Public Fin. Mgmt. Reform II Country

More information

L/C/TF Number(s) Closing Date (Original) Total Project Cost (USD) IDA-38870,IDA-46040,TF Dec ,493,000.00

L/C/TF Number(s) Closing Date (Original) Total Project Cost (USD) IDA-38870,IDA-46040,TF Dec ,493,000.00 Public Disclosure Authorized Independent Evaluation Group (IEG) 1. Project Data Report Number : ICRR0020083 Public Disclosure Authorized Project ID P070197 Project Name VN-URBAN UPGRADING Country Practice

More information

L/C/TF Number(s) Closing Date (Original) Total Project Cost (USD) IBRD Dec ,000,000.00

L/C/TF Number(s) Closing Date (Original) Total Project Cost (USD) IBRD Dec ,000,000.00 Public Disclosure Authorized Independent Evaluation Group (IEG) 1. Project Data Report Number : ICRR0020825 Public Disclosure Authorized Public Disclosure Authorized Project ID P100397 Country Morocco

More information

Practice Area(Lead) Social, Urban, Rural and Resilience Global Practice

Practice Area(Lead) Social, Urban, Rural and Resilience Global Practice Public Disclosure Authorized Independent Evaluation Group (IEG) 1. Project Data Report Number : ICRR0020785 Public Disclosure Authorized Public Disclosure Authorized Project ID P099369 Country Brazil Project

More information

L/C/TF Number(s) Closing Date (Original) Total Project Cost (USD) IDA Mar ,906,927.80

L/C/TF Number(s) Closing Date (Original) Total Project Cost (USD) IDA Mar ,906,927.80 Public Disclosure Authorized 1. Project Data Report Number : ICRR0021425 Public Disclosure Authorized Public Disclosure Authorized Project ID P088520 Country India Project Name IN: Biodiver Cons & Rural

More information

L/C/TF Number(s) Closing Date (Original) Total Project Cost (USD) IBRD Jun ,405,000.00

L/C/TF Number(s) Closing Date (Original) Total Project Cost (USD) IBRD Jun ,405,000.00 Public Disclosure Authorized Independent Evaluation Group (IEG) 1. Project Data Report Number : ICRR0020958 Public Disclosure Authorized Public Disclosure Authorized Project ID P092631 Country China Project

More information

How many operations were planned for the. 3 series? How many were approved? 3 Series ID: S First Project ID: P Appraisal Actual

How many operations were planned for the. 3 series? How many were approved? 3 Series ID: S First Project ID: P Appraisal Actual Public Disclosure Authorized IEG ICR Review Independent Evaluation Group 1. Project Data: Date Posted: 09/25/2015 Report Number: ICRR14803 Public Disclosure Authorized Public Disclosure Authorized Public

More information