New Positive Pre-Feasibility Study on Horizonte Minerals Enlarged 100% Owned Araguaia Nickel Project, Brazil

Size: px
Start display at page:

Download "New Positive Pre-Feasibility Study on Horizonte Minerals Enlarged 100% Owned Araguaia Nickel Project, Brazil"

Transcription

1 3 rd October 2016 Horizonte Minerals plc / Index: AIM and TSX / Epic: HZM / Sector: Mining New Positive Pre-Feasibility Study on Horizonte Minerals Enlarged 100% Owned Araguaia Nickel Project, Brazil, (AIM: HZM, TSX: HZM) ( Horizonte or the Company ) the London and Canadian listed nickel development company focussed in Brazil, is pleased to announce positive economic results from the its new Pre-Feasibility Study ( PFS ) prepared in accordance National Instrument ( NI ) on its 100%-owned Araguaia project ( Araguaia or the Project ), which includes both the Araguaia Nickel project area ( HZMA ) and the Glencore Araguaia project area ( GAP ). The Project is located south of the Carajás mining district in the State of Pará in northern Brazil. Highlights Robust economics based on a 28 year life of mine ( LOM ) producing ~14,500 tonnes per annum ( TPA ) nickel in ferronickel from a single line Rotary Kiln Electric Furnace Plant ( RKEF ) Post tax NPV8 of US$581 million at a nickel price of US$14,000/t and an NPV8 of US$328 million at US$12,000/t Ni Post tax IRR of 26.4% at US$14,000/t and 19.3% at US$12,000/t Ni Project is expected to generate US$1.3 billion in free cash flow over LOM at US$12,000/t Ni High grade ore with average nickel grade of 1.96% for the first 10 years of production Project on the lower range of the global cost curve with C1 cash costs of US$3.15/Ib Ni (US$6,948/t Ni) Proven and Probable Mineral Reserve Estimate of 24.6 Mt grading 1.77% Ni Commenting, Jeremy Martin, Horizonte s CEO said, We are pleased with the positive results from the PFS delivering a post-tax NPV of U$328M and IRR of 19.3% based on a long term nickel price of U$12,000/t. If we use the bank s consensus mid-term nickel price of US$14,000/t, the NPV increases to US$581M with an IRR of 26.4% showing the significant gearing that is available with any future increase in nickel prices. Importantly the PFS demonstrates that the Project is cash flow positive at

2 today s nickel prices which puts Araguaia within a limited group of global assets that are considered viable in the current low price nickel environment. Our low-cost acquisition of the adjacent nickel project from Glencore was a game-changer for Horizonte. The value is demonstrated in this new PFS which now has an overall grade for the first 10 years of mining averaging 1.96% nickel and the LOM grade over 28 years averaging 1.77% nickel which places the Project firmly in the upper quartile of the global grade curve for this type of deposit. The Project is expected to generate US$1.3 billion in free cash flow over the LOM with the planned operation producing around 14,500 tonnes per year of nickel in ferronickel at a grade of 30% utilising the proven RKEF process. The next major milestone in the development of Araguaia is the Feasibility Study which we anticipate starting in In parallel with this we will be looking at the development funding options available as well as offtake partners. We believe that the timeline for the development of Araguaia is well aligned with the market s expectation of an increase in nickel price over the mid-term. Future demand looks robust with predicted growth running between 2% and 4% this year and demand is anticipated to outpace supply, ensuring that Araguaia is a compelling project to generate value for shareholders. This, combined with strong economic fundamentals, confirms that Araguaia is well positioned to be one of the next major nickel projects to be developed and we look forward to providing updates as we advance the Project through Feasibility. The information communicated in this announcement includes inside information for the purposes of Article 7 of Regulation 596/2014 (MAR). Pre-Feasibility Study Details Summary of Key Results Pre-Feasibility Study key Indicators Value Nickel price $12,000/t $14,000/t NPV8 post tax $328M $581M IRR post tax 19.3% 26.4% Initial mine life Capital costs pre-production $354M $354M C1 costs $3.15/lb $3.15/lb $6,948/t $6,948/t

3 Free cash flow over LOM (after capital $1,259M $1,946M payback) Payback period (After taxation) 4.5 years 3.4 years Breakeven Ni price on NPV8 post tax $9,426/t $9,426/t Average annual production of nickel ~ 14,500tpa ~ 14,500tpa Average Ni grade Year 1 to % 1.96% Product grade quality 30% Ni in FeNi 30% Ni in FeNi The PFS is summarized in a Technical Report ( the Report ) prepared in accordance with NI for the Project titled Prefeasibility Study for the Araguaia Nickel Project, Federative Republic of Brazil and prepared by Snowden Mining Industry Consultants Pty Ltd ( Snowden ) under the guidance of the Qualified Persons. The PFS Report will be filed on SEDAR at later today. The Project, which is 100% owned by Horizonte, is located on the eastern margin of the State of Pará, north-eastern Brazil, to the north of the town of Conceição do Araguaia (population of 46,206), south of the main Carajás Mining District. The Project has good regional infrastructure including a network of Federal highways and roads, with access to low tariff hydro-electric power. The Carajás Mining District, situated approximately 200km northwest of the Project, is host to a number of major iron and copper mines operated by mining major Vale SA. The Report considers open pit mining for the exploitation of nickel laterite to establish the production of run of mine ( ROM ) from eight open pits to supply a targeted 0.9 million tonnes per annum ( Mt/a ) of ore to a processing and smelter facility. This facility will use the proven RKEF process with the product being sold at free on board ( FOB ) at the selected port of export. A Base Case of 0.9 Mt/a production throughput was selected because of the Company s objective to minimise the capital expenditure and overall capital intensity, and to optimise overall cash flow, payback, and the economics of the Project. Opportunity exists to increase production subject to further engineering and there is potential to increase the mineral reserve base.

4 Mineral Resources Mineral Resources reported for the Project deposits, which are included in the PFS, were prepared under the supervision of Mr. Andrew F. Ross BSc (Hons), MSc, FAusIMM, an Independent Qualified Person as defined in NI A total of 46,000 meters (1,786 holes) of core drilling have been completed to date on the HZMA and 28,860 meters (839 holes) of core drilling completed on the Vale dos Sonhos deposit in the GAP. Of this a total of 40,330 meters (1,494 holes) from HZMA and 28,860 meters (839 holes) from GAP were used in the Mineral Resource Estimation reported in the PFS. Updated Mineral Resources for the Araguaia Project effective as at 30 September 2016 by material type (0.90% Ni cut-off grade) Araguaia Category Material Tonnage Bulk density Contained Ni Ni Fe MgO SiO 2 type (kt) (t/m 3 ) metal (kt) (%) (%) (%) (%) Subtotal Measured Limonite 1, Subtotal Measured Transition 6, Subtotal Measured Saprolite 10, Total Measured All 18, Subtotal Indicated Limonite 19, Subtotal Indicated Transition 31, Subtotal Indicated Saprolite 51, Total Indicated All 101, , Total Measured All 120, , Indicated Subtotal Inferred Limonite 2, Subtotal Inferred Transition 4, Subtotal Inferred Saprolite 5, Total Inferred All 13, Note: Totals may not add due to rounding. Mineral Resources are inclusive of Mineral Reserves. Mineral Resources that are not Mineral Reserves do not have demonstrated economic viability. Mineral Reserves Mineral Reserves reported for the Project deposits, which are included in the PFS were established by Snowden in accordance with the CIM Definition Standards using only Indicated and Measured

5 Resources, under the supervision of Mr. Frank Blanchfield B.Eng, FAusIMM, an Independent Qualified Person as defined in NI A Mineral Reserve estimate of 24,646.6 kt (dry) at an average grade of 1.77% Ni was estimated. The detailed breakdown of the Mineral Reserve allocated by deposit is presented in the following table: Mineral Reserves for the Araguaia Project effective as at September 30, 2016 Class Deposit Ore dry mass (kt) Ni Fe Al2O3 (%) (%) (%) SiO2/MgO Probable Baião 2, Probable Pequizeiro 11, Probable Pequizeiro West Probable Jacutinga 1, Probable Vila Oito East 1, Probable Vila Oito 2, Probable Vila Oito West Probable VDS 4, Total Probable 24, Proven Total Proven and Probable 24, A nickel spot price of US$12,000/tonne was used in the Mineral Reserve estimate. The Mineral Reserve estimate resulted in a marginal cut-off grade of 1.28% Ni. Mining Seven shallow open pits were designed for HZMA and one for GAP through a process of pit optimisation using costs and process recoveries. All eight pits are designed using smoothed pit shells with the removal of small satellite pits through a standard process of pit optimisation, waste dump design and pit design. To minimise capital, the Base Case also assumes contractor mining using typical truck and excavator fleet which includes ore haulage to the plant. This fleet is supported by the usual array of support and ancillary equipment. Grade and mineralogy will be closely monitored in the mining process using close spaced grade control drilling ahead of mining. High grade nickel feed is targeted in the early years of production. The average nickel grade of the feed to the plants is as follows: Years 1 to 5 average grade 2.0% Ni

6 Years 6 to 10 average grade 1.9% Ni Years 11 to 28 average grade 1.7% Ni A number of processing constraints were applied to the schedule. These included a 13-month processing feed quantity ramp-up period, and specific process feed grade constraints throughout the life of the Project: Fe grade between 15.0% and 18.0% Al2O3 grade between 4.0% and 5.5% SiO2/MgO ratio between 2.2 and 2.6 Processing The Company completed Laboratory scale test work between 2011 and 2013 which included batch smelting test, slag testing, agglomeration behaviour of the ore, Liquidus measurement of FeNi slag under conditions corresponding to electric furnace smelting, performance of the nickel laterite in rotary kiln processing and evaluation of briquetting behavior. These laboratory tests carried out showed that the ore was suitable for processing using the RKEF process. Pilot plant testing of the drying and agglomeration step and piloting of the full RKEF process flowsheet (excluding refining) to confirm final operating characteristics were recommended in the 2014 PFS report. This pilot testing was carried out in the first and second quarters of Pilot plant A fully integrated pilot test of the RKEF process comprising ore preparation, drying and agglomeration, calcination and electric furnace smelting, including slag and metal granulation, was carried out in April/May The pilot test work facility at the Morro Azul plant in the State of Minas Gerais, Brazil was used for the test. A total of 160 wet tonnes of ore, representative of the planned operational feed, were processed. This ore was collected from selected sites within the Pequizeiro deposit in a bulk sampling exercise in early 2015 using wide diameter auger drilling. Highlights from the pilot plant campaign include: Production of high grade commercial FeNi from representative ore Drying and agglomeration produced excellent feed for calcination Good quality calcine continuously produced with very low dust generation and good prereduction of iron and nickel High quality FeNi produced over the target range of commercial Ni grades No critical flaws were identified in the process flow sheet A full set of technical data was produced and included in the PFS process study

7 Main project features Item Unit Value Ore throughput Year 1 to Year 10 Mt/a (dry) 0.9 Ore grade design (average first 10 years) % Ni 1.96 Overall nickel recovery % 93 Final metal Ni production design capacity t/a Ni 16,400 Furnace power (one furnace) MW 50 Ni grade in the final product metal % 30 Plant configuration One RKEF line Refining system Ladle furnace Final FeNi product Granulated FeNi Capital Cost Estimates The Base Case for the study assumes an ore processing rate of 0.9 Mt/a after a two-year initial ramp up period. A plant construction period of two years has been assumed and the pre-production capital construction costs for the plant have been divided 30%, in Year 1, and 70%, in Year 2. In addition, sustaining capital has been provided for over the LOM and process plant. To minimise capital, the Base Case also assumes contractor mining which includes ore haulage to the plant. Supply chain factors have also been considered for inbound and outbound logistics for key consumables such as coal for smelter requirements. The economic analysis contained in the Report is based on Probable Mineral Reserve estimates. All dollar values are in United States Dollars (US$). Item $ million Plant direct Plant indirect 22.5 Owners costs 21.4 Infrastructure 35.3 Slag storage facility 5.2 Social 1.9 Mining 2.9 Environmental 2.9 Land Acquisition & Resettlement 11.5 Contingency at 15% 46.3

8 Item $ million First fills and spares 1.2 Total pre-production capital costs The capital cost estimates have been complied with an accuracy level of ±25%. Operating Cost Estimates Item $ million $/tonne - ore Mining (contractor) Processing 2, Total operating costs 3, Economic Analysis and Sensitivities Base Case economic model headline results before taxation Item Unit Value - $14,000/t Value - $12,000/t Net Cashflow $M 2, ,482.7 NVP8 $M IRR % Production payback period years Base Case economic model headline results after taxation Item Unit Value - $14,000/t Value - $12,000/t Net Cashflow $M 1, ,258.7 NVP8 $M IRR % Production year payback years Base Case economic model inputs Item Unit Value Pre-Production period Years 2.0 Life of project production Years 27.6

9 Item Unit Value LOM ore mined and processed kt 24,646 LOM waste mined kt 59,061 LOM Average Ni grade % 1.77 LOM Average Fe grade % LOM Average Ni recovery % 93.0 LOM Average Fe recovery % 21.4 LOM Average product Ni grade % 30.0 LOM Average product Fe grade % 70.0 Plant throughput Mtpa 0.9 LOM Ni Price $/t 14,000 & 12,000 LOM Fe price $/t 85 The LOM Ni price of US$12,000 (Base Case) and US$14,000 (Consensus Case) were adopted following a review of multiple information sources including; price forecasts from Consensus Economics together with analysis of average nickel prices over the past 10 years combined with industry benchmarking. Pre Tax Sensitivity table for NPV8 The sensitivity analysis determines how the NPV8 is affected with changes to one variable at a time while holding the other variables constant. The pre-tax results of the Base Case sensitivity analysis are presented in the table below. -20% -10% -5% 0% 5% 10% 20% Grade Ni Grade Fe Mining reserves Recovery Ni Recovery Fe Price Ni Price Fe Pre-production capital

10 -20% -10% -5% 0% 5% 10% 20% Production capital Mining cost Processing cost Overhead cost All figures in the table above are expressed in US$M Social and Environmental The areas within the Project are located 100% within the Pará State, therefore the Project will continue to be permitted by the State Environmental Agency. The Brazilian mine permitting process with environmental agencies has three key stages: 1. The recently obtained preliminary licence ( LP ); 2. The installation licence ( LI ), which permits the start of construction; 3. Finally the licence to operate once construction is complete ( LO ). The granting of the LP is often regarded as the most important licence as it outlines the parameters of the Project as agreed upon by all stakeholders and is the only environmental licensing process that requires approval of the State Government Environmental Council. The LP was awarded to Horizonte Minerals for HZMA earlier in The Company will now focus on obtaining the LI, which once awarded, in parallel with the mining concession, allows construction to start. The Company will also work in partnership with the State Government of Pará to undertake studies identifying possibilities for use of the slag product from Araguaia and potential local industries, which could benefit from the final ferronickel product. The objective of the Company s Sustainability Department in 2016 and 2017 will be to collect new baseline data, particularly for the recently acquired GAP project area, and integrate the environmental and social data for the project, to provide one holistic analysis of combined social and environmental impacts. The Feasibility Study will be conducted to international standards, such as the International Finance Corporations Environmental and Social Performance Standards. Report Filing The Report will be filed on SEDAR at later today. **ENDS**

11 For further information visit or contact: Jeremy Martin Horizonte Minerals plc Tel: +44 (0) David Hall Horizonte Minerals plc Tel: +44 (0) Joanna Scott Christopher Raggett finncap Ltd (Corporate Broking) finncap Ltd (Corporate Finance) Tel: +44 (0) Tel: +44 (0) Lottie Brocklehurst Elisabeth Cowell St Brides Partners Ltd (PR) St Brides Partners Ltd Tel: +44 (0) Tel: +44 (0) About Horizonte Minerals: Horizonte Minerals plc is an AIM and TSX-listed nickel development company focused in Brazil, which wholly owns the advanced Araguaia nickel laterite project located to the south of the Carajás mineral district of northern Brazil. The Company is developing Araguaia as the next major nickel mine in Brazil, with targeted production by Horizonte has a strong shareholder structure including Teck Resources Limited 26.1%, Henderson Global Investors 15.7% and Glencore 10.3%. Qualified Persons Mr Frank Blanchfield, B.Eng, FAusIMM, Mr Andrew Ross, BSc (Hons), MSc, FAusIMM, Mr Francis Roger Billington, BSc (Hons), P.Geo. (APGO), and Mr Nicholas Barcza, BSc (Eng.), MSc (Eng.), PhD, Pr.Eng. (ECSA), HLFSAIMM are the Qualified Persons under NI , and have reviewed, approved and verified the technical content of this press release For readers to fully understand the information in this press release, they should read the Report in its entirety when it is available on SEDAR later today, including all qualifications, assumptions and exclusions that relate to the PFS. The Report is intended to be read as a whole, and sections should not be read or relied upon out of context. CAUTIONARY STATEMENT REGARDING FORWARD LOOKING INFORMATION Except for statements of historical fact relating to the Company, certain information contained in this press release constitutes forward-looking information under Canadian securities legislation. Forward-looking information includes, but is not limited to, statements derived from the PFS, including, without limitation: estimated capital costs, operating costs, and other various other costs,

12 estimated net present value (NPV), initial rate of return (IRR), anticipated construction period, expected life of mine (LOM), production schedule, recoveries, estimated reserves and resources, expected sensitivity to prices, expected production and other economic and operational parameters inherent to a pre-feasibility study for a mineral project; statements with respect to targeted milestones going forward, including, without limitation, the expected timing for a definitive feasibility study, commencement of cons truction, potential to extend LOM and the timing of exploration activities. In addition, this press release includes forward-looking statements with respect to the potential of the Company s current or future property mineral projects; the success of exploration and mining activiti es; and cost and timing of future exploration, production and development. Generally, forward-looking information can be identified by the use of forward-looking terminology such as plans, expects or does not expect, is expected, budget, scheduled, estimates, forecasts, intends, anticipates or does not anticipate, or believes, or variations of such words and phrases or statements that certain actions, events or results may, could, would, might or will be taken, occur or be achieved. Forward-looking information is based on the reasonable assumptions, estimates, analysis and opinions of management made in light of its experience and its perception of trends, current conditions and expected developments, as well as other factors that management believes to be relevant and reasonable in the circumstances at the date that such statements are made, and are inherently subject to known and unknown risks, uncertainties and other factors that may cause the actual results, level of activity, performance or achieveme nts of the Company to be materially different from those expressed or implied by such forward-looking information, including but not limited to risks related to: exploration and mining risks, competition from competitors with greater capital; the Company s lack of expe rience with respect to development-stage mining operations; fluctuations in metal prices; uninsured risks; environmental and other regulatory requirements; exploration, mining and other licences; the Company s future payment obligations; potential disputes with respe ct to the Company s title to, and the area of, its mining concessions; the Company s dependence on its ability to obtain sufficient financing in the future; the Company s dependence on its relationships with third parties; the Company s joint ventures; the potential of currency fluctuations and political or economic instability in countries in which the Company operates; currency exchange fluctuations; the Company s ability to manage its growth effectively; the trading market for the ordinary shares of the Company; uncertainty wi th respect to the Company s plans to continue to develop its operations and new projects; the Company s dependence on key personnel; possible conflicts of interest of directors and officers of the Company, and various risks associated with the legal and regulatory fr amework within which the Company operates. Although management of the Company has attempted to identify important factors that could cause actual results to differ mate rially from those contained in forward-looking information, there may be other factors that cause results not to be as anticipated, estimated or intended. There can be no assurance that such statements will prove to be accurate, as actual results and future events could differ materially from those anticipated in such statements. The Company undertakes no obligation to update forward-looking information except as required by applicable law. Such forwardlooking information represents management's and/or its Qualified Persons best judgment based on information currently available. No forward-looking statement can be guaranteed and actual future results may vary materially. Accordingly, readers are advised not to place undue reliance on forward-looking statements or information. NON-IFRS MEASURES This press release refers to expected cash cost, free cash flow, and certain other non-ifrs measures. These measurements have no standardized meaning under IFRS and may not be comparable to similar measures presented by other companies.

13 These measurements are intended to provide additional information and should not be considered in isolation or as a substitute for measures of performance prepared in accordance with IFRS.

HORIZONTE MINERALS PLC MANAGEMENT S DISCUSSION AND ANALYSIS SIX MONTHS ENDED 30 JUNE 2017

HORIZONTE MINERALS PLC MANAGEMENT S DISCUSSION AND ANALYSIS SIX MONTHS ENDED 30 JUNE 2017 HORIZONTE MINERALS PLC MANAGEMENT S DISCUSSION AND ANALYSIS SIX MONTHS ENDED 30 JUNE 2017 Background This Management s Discussion and Analysis of the financial position and results of operations is prepared

More information

HORIZONTE ANNOUNCES CLOSING OF C$10,060,000 OFFERING AND PRIVATE PLACEMENT

HORIZONTE ANNOUNCES CLOSING OF C$10,060,000 OFFERING AND PRIVATE PLACEMENT NEWS RELEASE HORIZONTE ANNOUNCES CLOSING OF C$10,060,000 OFFERING AND PRIVATE PLACEMENT NOT FOR DISTRIBUTION TO U.S. NEWSWIRE SERVICES OR FOR PUBLICATION, RELEASE OR DISSEMINATION DIRECTLY OR INDIRECTLY,

More information

HORIZONTE MINERALS ANNOUNCES EXCELLENT RESULTS OF PRELIMINARY ECONOMIC ASSESSMENT

HORIZONTE MINERALS ANNOUNCES EXCELLENT RESULTS OF PRELIMINARY ECONOMIC ASSESSMENT NEWS RELEASE 22 August 2012 HORIZONTE MINERALS ANNOUNCES EXCELLENT RESULTS OF PRELIMINARY ECONOMIC ASSESSMENT Horizonte Minerals Plc, (AIM:HZM, TSX:HZM) ( Horizonte or the Company ) the exploration and

More information

Horizonte Minerals Plc 26 Dover Street, London W1S 4LY Tel: +44 (0) Registered in England & Wales no

Horizonte Minerals Plc 26 Dover Street, London W1S 4LY Tel: +44 (0) Registered in England & Wales no Horizonte Minerals plc / Index: AIM and TSX / Epic: HZM / Sector: Mining 14 August INTERIM RESULTS, (AIM: HZM, TSX: HZM) ( Horizonte or the Company ) the exploration and development company focussed in

More information

HORIZONTE ANNOUNCES VERMELHO MINERAL RESOURCE CONFIRMING SIGNIFICANT NICKEL AND COBALT INVENTORY

HORIZONTE ANNOUNCES VERMELHO MINERAL RESOURCE CONFIRMING SIGNIFICANT NICKEL AND COBALT INVENTORY NEWS RELEASE 09 May 2018 HORIZONTE ANNOUNCES VERMELHO MINERAL RESOURCE CONFIRMING SIGNIFICANT NICKEL AND COBALT INVENTORY 09 May 2018, (AIM: HZM, TSX: HZM) ( Horizonte or the Company ) the nickel development

More information

AWARD OF OPTIONS Horizonte Minerals Plc, (AIM: HZM, TSX: HZM) ( Horizonte or the Company )

AWARD OF OPTIONS Horizonte Minerals Plc, (AIM: HZM, TSX: HZM) ( Horizonte or the Company ) NEWS RELEASE AWARD OF OPTIONS Horizonte Minerals Plc, (AIM: HZM, TSX: HZM) ( Horizonte or the Company ) the nickel development company focused in Brazil, has on the basis of the recommendation of its Remuneration

More information

TSX:HZM / AIM:HZM / horizonteminerals.com

TSX:HZM / AIM:HZM / horizonteminerals.com TSX:HZM / AIM:HZM / horizonteminerals.com Forward Looking Information This presentation (the "Presentation") has been prepared by Horizonte Minerals plc (the "Company"). This Presentation does not constitute

More information

ACQUISITION OF VERMELHO NICKEL-COBALT PROJECT FROM VALE AND CONDITIONAL PLACING TO RAISE UP TO 8.5m

ACQUISITION OF VERMELHO NICKEL-COBALT PROJECT FROM VALE AND CONDITIONAL PLACING TO RAISE UP TO 8.5m NEWS RELEASE 19th Dec 2017 ACQUISITION OF VERMELHO NICKEL-COBALT PROJECT FROM VALE AND CONDITIONAL PLACING TO RAISE UP TO 8.5m 19th Dec 2017 Horizonte Minerals Plc, (AIM: HZM, TSX: HZM) ( Horizonte or

More information

HORIZONTE MINERALS PLC MANAGEMENT S DISCUSSION AND ANALYSIS NINE MONTHS ENDED 30th SEPTEMBER 2013

HORIZONTE MINERALS PLC MANAGEMENT S DISCUSSION AND ANALYSIS NINE MONTHS ENDED 30th SEPTEMBER 2013 HORIZONTE MINERALS PLC MANAGEMENT S DISCUSSION AND ANALYSIS NINE MONTHS ENDED 30th SEPTEMBER 2013 BACKGROUND This Management s Discussion and Analysis of the financial position and results of operations

More information

HORIZONTE MINERALS Q SHAREHOLDER UPDATE

HORIZONTE MINERALS Q SHAREHOLDER UPDATE NEWS RELEASE 21 February 2019 HORIZONTE MINERALS Q1 2019 SHAREHOLDER UPDATE Horizonte Minerals Plc, (AIM: HZM, TSX: HZM) ( Horizonte or the Company ), the nickel development company focused in Brazil,

More information

Horizonte Minerals plc / Index: AIM and TSX / Epic: HZM / Sector: Mining INTERIM RESULTS

Horizonte Minerals plc / Index: AIM and TSX / Epic: HZM / Sector: Mining INTERIM RESULTS Horizonte Minerals plc / Index: AIM and TSX / Epic: HZM / Sector: Mining NEWS RELEASE 11 August 2017 INTERIM RESULTS Horizonte Minerals Plc, (AIM: HZM, TSX: HZM) ( Horizonte or the Company ) the nickel

More information

TSX:HZM / AIM:HZM / horizonteminerals.com

TSX:HZM / AIM:HZM / horizonteminerals.com TSX:HZM / AIM:HZM / horizonteminerals.com Forward Looking Information This presentation (the "Presentation") has been prepared by Horizonte Minerals plc (the "Company"). This Presentation does not constitute

More information

HORIZONTE MINERALS PLC MANAGEMENT S DISCUSSION AND ANALYSIS SIX MONTHS ENDED 30 JUNE 2015

HORIZONTE MINERALS PLC MANAGEMENT S DISCUSSION AND ANALYSIS SIX MONTHS ENDED 30 JUNE 2015 HORIZONTE MINERALS PLC MANAGEMENT S DISCUSSION AND ANALYSIS SIX MONTHS ENDED 30 JUNE 2015 Background This Management s Discussion and Analysis of the financial position and results of operations is prepared

More information

Investor Presentation Q2 2018

Investor Presentation Q2 2018 Investor Presentation Q2 2018 TSX:HZM / AIM:HZM horizonteminerals.com @HorizontePLC Cautionary Statements This presentation (the "Presentation") has been prepared by Horizonte Minerals plc (the "Company").

More information

Investor Presentation Q1 2018

Investor Presentation Q1 2018 Investor Presentation Q1 2018 TSX:HZM / AIM:HZM horizonteminerals.com @HorizontePLC Cautionary Statements This presentation (the "Presentation") has been prepared by Horizonte Minerals plc (the "Company").

More information

Vermelho Consolidation December 2017

Vermelho Consolidation December 2017 Vermelho Consolidation December 2017 TSX:HZM / AIM:HZM horizonteminerals.com @HorizontePLC Cautionary Statements This presentation (the "Presentation") has been prepared by Horizonte Minerals plc (the

More information

Investor Presentation February 2018

Investor Presentation February 2018 Investor Presentation February 2018 TSX:HZM / AIM:HZM horizonteminerals.com @HorizontePLC Cautionary Statements This presentation (the "Presentation") has been prepared by Horizonte Minerals plc (the "Company").

More information

Investor Presentation Q2 2018

Investor Presentation Q2 2018 Investor Presentation Q2 2018 TSX:HZM / AIM:HZM horizonteminerals.com @HorizontePLC Cautionary Statements This presentation (the "Presentation") has been prepared by Horizonte Minerals plc (the "Company").

More information

HORIZONTE MINERALS PLC MANAGEMENT S DISCUSSION AND ANALYSIS SIX MONTHS ENDED 30 JUNE 2016

HORIZONTE MINERALS PLC MANAGEMENT S DISCUSSION AND ANALYSIS SIX MONTHS ENDED 30 JUNE 2016 HORIZONTE MINERALS PLC MANAGEMENT S DISCUSSION AND ANALYSIS SIX MONTHS ENDED 30 JUNE 2016 Background This Management s Discussion and Analysis of the financial position and results of operations is prepared

More information

THE ELEMENTS OF VALUE CREATION. Revised Prefeasibility Study Results. Dumont Nickel Project May 14, 2012

THE ELEMENTS OF VALUE CREATION. Revised Prefeasibility Study Results. Dumont Nickel Project May 14, 2012 THE ELEMENTS OF VALUE CREATION Revised Prefeasibility Study Results Dumont Nickel Project May 14, 2012 Disclaimer Cautionary Statements Concerning Forward Looking Statements This presentation contains

More information

Horizonte Minerals plc / Index: AIM and TSX / Epic: HZM / Sector: Mining

Horizonte Minerals plc / Index: AIM and TSX / Epic: HZM / Sector: Mining Horizonte Minerals plc / Index: AIM and TSX / Epic: HZM / Sector: Mining NEWS RELEASE 14 NOVEMBER, 2012 FINANCIAL RESULTS FOR THE THIRD QUARTER 2012 AND MANAGEMENT S DISCUSSION AND ANALYSIS FOR 9 MONTHS

More information

Spanish Mountain Gold Announces Results of New PEA for the First Zone

Spanish Mountain Gold Announces Results of New PEA for the First Zone 1120-1095 West Pender Street Vancouver, British Columbia, V6E 2M6 Tel: 604.601.3651 April 10, 2017 Spanish Mountain Gold Announces Results of New PEA for the First Zone VANCOUVER, B.C. Spanish Mountain

More information

Avnel Gold Reports that Indicated Resources Increased 55% to 2 Million Ounces at the Kalana Main Project

Avnel Gold Reports that Indicated Resources Increased 55% to 2 Million Ounces at the Kalana Main Project Avnel Gold Reports that Indicated Resources Increased 55% to 2 Million Ounces at the Kalana Main Project ST. PETER PORT, GUERNSEY, October 15, 2014 Avnel Gold Mining Limited ( Avnel Gold or the Company

More information

Turquoise Hill files 2016 Oyu Tolgoi Technical Report

Turquoise Hill files 2016 Oyu Tolgoi Technical Report October 21, 2016 Press release Turquoise Hill files 2016 Oyu Tolgoi Technical Report VANCOUVER, CANADA Turquoise Hill Resources today filed an updated compliant independently-prepared technical report

More information

SHAHUINDO GOLD PROJECT DELIVERS POSITIVE ECONOMICS

SHAHUINDO GOLD PROJECT DELIVERS POSITIVE ECONOMICS FOR IMMEDIATE RELEASE December 8th, 2009 TSX: SUE SHAHUINDO GOLD PROJECT DELIVERS POSITIVE ECONOMICS Toronto, Ontario, Canada, December 8 th, 2009 Sulliden Gold Corporation ( Sulliden or the Company )

More information

First Quarter 2018 Results April 26, 2018

First Quarter 2018 Results April 26, 2018 TSX: LUN Nasdaq Stockholm: LUMI First Quarter 2018 Results April 26, 2018 1 Candelaria, Atacama Region, Chile Cautionary Statements Caution Regarding Forward-Looking Information and Non-GAAP Performance

More information

Disclaimer. Developing the next major nickel project in Brazil AIM: HZM TSX: HZM

Disclaimer. Developing the next major nickel project in Brazil AIM: HZM TSX: HZM Investor Presentation Q1 2014 Investor Presentation Q3 2012 Disclaimer This document, and the information contained in this document, is confidential and is being supplied to you solely for your information

More information

NEWS RELEASE GREAT PANTHER SILVER REPORTS POSITIVE PRELIMINARY ECONOMIC ASSESSMENT FOR THE CORICANCHA MINE

NEWS RELEASE GREAT PANTHER SILVER REPORTS POSITIVE PRELIMINARY ECONOMIC ASSESSMENT FOR THE CORICANCHA MINE May 31, 2018 For Immediate Release NEWS RELEASE TSX: GPR NYSE AMERICAN: GPL GREAT PANTHER SILVER REPORTS POSITIVE PRELIMINARY ECONOMIC ASSESSMENT FOR THE CORICANCHA MINE Potential for Average Annual Production

More information

Filo del Sol Pre-Feasibility Study Results Webcast & Conference Call Presentation January 15, 2019

Filo del Sol Pre-Feasibility Study Results Webcast & Conference Call Presentation January 15, 2019 Filo del Sol Pre-Feasibility Study Results Webcast & Conference Call Presentation January 15, 2019 Cautionary Note Regarding Forward-Looking Statements Certain statements made and information contained

More information

ALAMOS GOLD INC. 130 Adelaide Street West, Suite 2200 Toronto, Ontario M5H 3P5 Telephone: (416) or 1 (866)

ALAMOS GOLD INC. 130 Adelaide Street West, Suite 2200 Toronto, Ontario M5H 3P5 Telephone: (416) or 1 (866) FOR IMMEDIATE RELEASE ALAMOS GOLD INC. 130 Adelaide Street West, Suite 2200 Toronto, Ontario M5H 3P5 Telephone: (416) 368-9932 or 1 (866) 788-8801 (All amounts are expressed in United States dollars, unless

More information

SANDSTORM GOLD ROYALTIES RELEASES HOD MADEN PFS AND INCREASES PRODUCTION GUIDANCE

SANDSTORM GOLD ROYALTIES RELEASES HOD MADEN PFS AND INCREASES PRODUCTION GUIDANCE PRESS RELEASE SANDSTORM GOLD ROYALTIES RELEASES HOD MADEN PFS AND INCREASES PRODUCTION GUIDANCE Vancouver, British Columbia June 26, 2018 Sandstorm Gold Ltd. (dba Sandstorm Gold Royalties, Sandstorm or

More information

COPPER SHINES BRIGHTLY FOR MCEWEN MINING - ENHANCED ECONOMICS OF LOS AZULES

COPPER SHINES BRIGHTLY FOR MCEWEN MINING - ENHANCED ECONOMICS OF LOS AZULES COPPER SHINES BRIGHTLY FOR MCEWEN MINING - ENHANCED ECONOMICS OF LOS AZULES $2.2 Billion After-Tax NPV@8 and IRR of 20. 3.6 Year Payback at $3.00/lb. Copper and 36 Year Mine Life 45 Million lbs. Average

More information

Operational Outlook & Update Conference Call November 29, 2018

Operational Outlook & Update Conference Call November 29, 2018 TSX: LUN Nasdaq Stockholm: LUMI Operational Outlook & Update Conference Call November 29, 2018 1 Candelaria, Atacama Region, Chile Cautionary Statements Caution Regarding Forward-Looking Information and

More information

Orezone Announces Positive Preliminary Economic Assessment

Orezone Announces Positive Preliminary Economic Assessment Orezone Announces Positive Preliminary Economic Assessment January 22, 2014 - Orezone Gold Corporation (ORE:TSX) is pleased to announce the results of an independent Preliminary Economic Assessment (the

More information

Joint Venture Arrangement with Waterton to Create and Unlock Value Within the Nickel Industry Mark Selby, President & CEO

Joint Venture Arrangement with Waterton to Create and Unlock Value Within the Nickel Industry Mark Selby, President & CEO TSX : RNX Joint Venture Arrangement with Waterton to Create and Unlock Value Within the Nickel Industry Mark Selby, President & CEO March 22, 2017 1 Disclaimer Cautionary Statements Concerning Forward-Looking

More information

Annual General Meeting May 12, 2017

Annual General Meeting May 12, 2017 TSX: LUN OMX: LUMI Annual General Meeting May 12, 2017 1 Neves-Corvo, Portugal Cautionary Statements Caution Regarding Forward-Looking Information and Non-GAAP Performance Measures All statements, other

More information

WODGINA ORE RESERVE COMMENTARY

WODGINA ORE RESERVE COMMENTARY ASX ANNOUNCEMENT 4 May 2018 WODGINA ORE RESERVE COMMENTARY Mineral Resources Limited (ASX:MIN; MRL) refers to its announcement on 1 May 2018 titled Wodgina Mineral Resource and Ore Reserve Update and its

More information

Developing the next major nickel project in Brazil

Developing the next major nickel project in Brazil Investor Presentation June 2012 Disclaimer This document, and the information contained in this document, is confidential and is being supplied to you solely for your information and may not be reproduced,

More information

TSX.V:ORG Page 1 of 7. Orca Gold Inc West Georgia St. Vancouver, B.C., V6C 3E8, Canada Tel: Fax: HIGHLIGHTS

TSX.V:ORG Page 1 of 7. Orca Gold Inc West Georgia St. Vancouver, B.C., V6C 3E8, Canada Tel: Fax: HIGHLIGHTS Orca Gold Inc. 2000-885 West Georgia St. Vancouver, B.C., V6C 3E8, Canada Tel: +1 604 689 7842 Fax: +1 604 689 4250 NEWS RELEASE Orca Gold Intercepts Broad Mineralization, Including 162m at 2.01 g/t Au

More information

Detour Gold Updates Life of Mine Plan for Detour Lake

Detour Gold Updates Life of Mine Plan for Detour Lake February 4, 2012 NEWS RELEASE Detour Gold Updates Life of Mine Plan for Detour Lake Detour Gold Corporation (TSX: DGC) ( Detour Gold or the Company ) is pleased to announce an updated life of mine plan

More information

NEWS RELEASE. Preliminary Economic Assessment of Block 14 Strong Economics at US$1,200/oz

NEWS RELEASE. Preliminary Economic Assessment of Block 14 Strong Economics at US$1,200/oz Orca Gold Inc., 2000-885 West Georgia St., Vancouver, B.C., V6C 3E8, Canada Tel: +1 604 689 7842 Fax: +1 604 689 4250 NEWS RELEASE Preliminary Economic Assessment of Block 14 Strong Economics at US$1,200/oz

More information

EDV EVR NEWS RELEASE. ENDEAVOUR MINING UPDATES HOUNDÉ PROJECT ECONOMICS FOLLOWING INCREASE IN MINERAL RESERVES TO 2.1Mozs

EDV EVR NEWS RELEASE. ENDEAVOUR MINING UPDATES HOUNDÉ PROJECT ECONOMICS FOLLOWING INCREASE IN MINERAL RESERVES TO 2.1Mozs EDV EVR Toronto Stock Exchange For additional information, contact: Doug Reddy SVP Business Development +1 604 609 6114 dreddy@endeavourmining.com Endeavour Mining Corporation Corporate Office Suite 3123,

More information

HORIZONTE MINERALS INTERIM FINANCIAL RESULTS AND MANAGEMENT DISCUSSION AND ANALYSIS

HORIZONTE MINERALS INTERIM FINANCIAL RESULTS AND MANAGEMENT DISCUSSION AND ANALYSIS NEWS RELEASE 14 August 2012 HORIZONTE MINERALS INTERIM FINANCIAL RESULTS AND MANAGEMENT DISCUSSION AND ANALYSIS 14 August 2012 - Horizonte Minerals Plc, (AIM: HZM, TSX: HZM) ('Horizonte' or 'the Company')

More information

NEWS RELEASE FOR IMMEDIATE RELEASE

NEWS RELEASE FOR IMMEDIATE RELEASE NEWS RELEASE March 26, 2018 FOR IMMEDIATE RELEASE TSX: JAG Jaguar Mining Announces Production Growth Expected at Pilar Over Next 36 Months; Roça Grande Mine Placed On Care and Maintenance to Focus On Growth

More information

MBAC ANNOUNCES POSITIVE DEFINITIVE FEASIBILITY STUDY FOR ITAFÓS PHOSPHATE PROJECT, BRAZIL

MBAC ANNOUNCES POSITIVE DEFINITIVE FEASIBILITY STUDY FOR ITAFÓS PHOSPHATE PROJECT, BRAZIL Symbol: MBC:TSX Shares Outstanding: 72,689,336 Fully Diluted: 79,812,886 FOR IMMEDIATE RELEASE: SEPTEMBER 7, 2010 MBAC ANNOUNCES POSITIVE DEFINITIVE FEASIBILITY STUDY FOR ITAFÓS PHOSPHATE PROJECT, BRAZIL

More information

LEAGOLD FILES UPDATED TECHNICAL REPORT FOR LOS FILOS GOLD MINE, INCREASING RESERVES BY 59% TO 2.7 MILLION OUNCES GOLD

LEAGOLD FILES UPDATED TECHNICAL REPORT FOR LOS FILOS GOLD MINE, INCREASING RESERVES BY 59% TO 2.7 MILLION OUNCES GOLD News Release TSX: LMC March 8, 2018 LEAGOLD FILES UPDATED TECHNICAL REPORT FOR LOS FILOS GOLD MINE, INCREASING RESERVES BY 59% TO 2.7 MILLION OUNCES GOLD Vancouver, March 8, 2018 Leagold Mining Corporation

More information

Horizonte Minerals plc / Index: AIM and TSX / Epic: HZM / Sector: Mining FINAL RESULTS

Horizonte Minerals plc / Index: AIM and TSX / Epic: HZM / Sector: Mining FINAL RESULTS 25 February 2015 Horizonte Minerals plc / Index: AIM and TSX / Epic: HZM / Sector: Mining FINAL RESULTS 25 February 2015 Horizonte Minerals Plc, (AIM: HZM, TSX: HZM) ( Horizonte or the Company ) the exploration

More information

Dalradian Resources Reports Positive Preliminary Economic Assessment for the Curraghinalt Gold Project in Northern Ireland

Dalradian Resources Reports Positive Preliminary Economic Assessment for the Curraghinalt Gold Project in Northern Ireland 2012 No. 12 TSX: DNA Dalradian Resources Reports Positive Preliminary Economic Assessment for the Curraghinalt Gold Project in Northern Ireland TORONTO, ONTARIO - (Marketwire - July 25, 2012) - Dalradian

More information

ThermoPotash Pre-Feasibility Study Confirms Low Capex and Robust Economics

ThermoPotash Pre-Feasibility Study Confirms Low Capex and Robust Economics April 1, 2014 ThermoPotash Pre-Feasibility Study Confirms Low Capex and Robust Economics Plant Capex of US$ 113.6 million and NPV of US$ 145.7 million Verde Potash (TSX: NPK ) ("Verde or the Company )

More information

Horizonte Minerals plc / Index: AIM / Epic: HZM / Sector: Mining 15 August 2011 Horizonte Minerals plc ( Horizonte or the Company ) Interim Results

Horizonte Minerals plc / Index: AIM / Epic: HZM / Sector: Mining 15 August 2011 Horizonte Minerals plc ( Horizonte or the Company ) Interim Results Horizonte Minerals plc / Index: AIM / Epic: HZM / Sector: Mining 15 August Horizonte Minerals plc ( Horizonte or the Company ) Interim Results Horizonte, the AIM and TSX quoted exploration and development

More information

Côté Gold Project Feasibility Study Conference Call

Côté Gold Project Feasibility Study Conference Call Côté Gold Project Feasibility Study Conference Call November 2, 2018 l TSX: IMG l NYSE: IAG l Cautionary Statement All information included in this presentation whether in narrative or chart form, including

More information

PRESS RELEASE. Banro Files NI Technical Report on Namoya Project, Democratic Republic of the Congo

PRESS RELEASE. Banro Files NI Technical Report on Namoya Project, Democratic Republic of the Congo PRESS RELEASE Banro Files NI 43-101 Technical Report on Namoya Project, Democratic Republic of the Congo Toronto, Canada May 13, 2014 Banro Corporation ("Banro" or the "Company") (NYSE MKT - "BAA"; TSX

More information

MEDIA RELEASE OCEANAGOLD UPDATES DIDIPIO NI TECHNICAL REPORT

MEDIA RELEASE OCEANAGOLD UPDATES DIDIPIO NI TECHNICAL REPORT MEDIA RELEASE 30 October 2014 OCEANAGOLD UPDATES DIDIPIO NI 43-101 TECHNICAL REPORT (All figures in US Dollars unless otherwise stated) (MELBOURNE) OceanaGold Corporation (TSX/ASX/NZX: OGC) (the Company

More information

Kişladağ Update March 2018

Kişladağ Update March 2018 Kişladağ Update March 2018 Cautionary Note About Forward Looking Statements and Information Certain of the statements made and information provided in this presentation are forward-looking statements or

More information

For personal use only

For personal use only ASX QUARTERLY REPORT MARCH 216 Quarterly Report March 216 Highlights 29 April 216 Maiden JORC resource of 131.1Mt @7.9% TGC at the Mahenge Project including 37.6Mt @1.2% TGC or 16.7Mt@ 11.1% TGC Largest

More information

MCEWEN MINING ANNOUNCES UPDATED PRELIMINARY ECONOMIC ASSESSMENT FOR THE LOS AZULES COPPER PROJECT (All Dollar Amounts in US Dollars)

MCEWEN MINING ANNOUNCES UPDATED PRELIMINARY ECONOMIC ASSESSMENT FOR THE LOS AZULES COPPER PROJECT (All Dollar Amounts in US Dollars) MCEWEN MINING ANNOUNCES UPDATED PRELIMINARY ECONOMIC ASSESSMENT FOR THE LOS AZULES COPPER PROJECT (All Dollar Amounts in US Dollars) TORONTO, ONTARIO - (September 23, 2013) - McEwen Mining Inc. (NYSE:

More information

FRONTIER LITHIUM INC. ANNOUNCES POSITIVE PRELIMINARY FEASIBILITY STUDY FOR THE PAK LITHIUM PROJECT, NORTHWESTERN ONTARIO

FRONTIER LITHIUM INC. ANNOUNCES POSITIVE PRELIMINARY FEASIBILITY STUDY FOR THE PAK LITHIUM PROJECT, NORTHWESTERN ONTARIO FRONTIER LITHIUM INC. ANNOUNCES POSITIVE PRELIMINARY FEASIBILITY STUDY FOR THE PAK LITHIUM PROJECT, NORTHWESTERN ONTARIO Sudbury, Ontario, March 2, 2018 Frontier Lithium Inc. (TSXV: FL) ( Frontier or the

More information

NPV at 8% discount rate $ 1,698 M IRR 24.6% Projected Years to Payback Total Estimated Capital Cost (excluding sustaining capital and closure

NPV at 8% discount rate $ 1,698 M IRR 24.6% Projected Years to Payback Total Estimated Capital Cost (excluding sustaining capital and closure Alderon Announces Results of its Updated Feasibility Study Demonstrating US$1.7 Billion NPV at 8% discount rate and 24.6% IRR (Pre-Tax) for the Premium-Quality Kami Iron Ore Project September 26, 2018

More information

Nominal NPV 10, 2% escalation applied to operating costs and revenues

Nominal NPV 10, 2% escalation applied to operating costs and revenues Emmerson Plc / Ticker: EML / Index: LSE / Sector: Mining 20 November 2018 Emmerson Plc ( Emmerson or the Company ) Scoping Study Confirms Potential for Low Capex, High Margin Potash Mine Emmerson Plc,

More information

JAMBREIRO IRON ORE PROJECT SET TO DELIVER STRONG CASH FLOWS AND RETURNS: PRE-FEASIBILITY STUDY

JAMBREIRO IRON ORE PROJECT SET TO DELIVER STRONG CASH FLOWS AND RETURNS: PRE-FEASIBILITY STUDY 14 November 2011 JAMBREIRO IRON ORE PROJECT SET TO DELIVER STRONG CASH FLOWS AND RETURNS: PRE-FEASIBILITY STUDY Board approves Commencement of Bankable Feasibility Study Jambreiro Pre-Feasibility Study

More information

Royal Gold Announces Preliminary Economic Assessment for the Peak Gold Project

Royal Gold Announces Preliminary Economic Assessment for the Peak Gold Project Royal Gold Announces Preliminary Economic Assessment for the Peak Gold Project DENVER, COLORADO. SEPTEMBER 24, 2018: ROYAL GOLD, INC. (NASDAQ:RGLD) (together with its subsidiaries, Royal Gold or the Company

More information

US$1.98 Billion NPV & US$3 Million Capex (Phase 1)

US$1.98 Billion NPV & US$3 Million Capex (Phase 1) Nov 27 th, 2017 US$1.98 Billion NPV & US$3 Million Capex (Phase 1) Pre-Feasibility Study for the expansions of Super Greensand production is concluded Verde AgriTech Plc (TSX: NPK ) (OTCQB: AMHPF ) ("Verde

More information

Horizonte Minerals plc / Index: AIM and TSX / Epic: HZM / Sector: Mining 20 February 2014 FINAL RESULTS

Horizonte Minerals plc / Index: AIM and TSX / Epic: HZM / Sector: Mining 20 February 2014 FINAL RESULTS Horizonte Minerals plc / Index: AIM and TSX / Epic: HZM / Sector: Mining 20 February 2014 FINAL RESULTS 20 February 2014 Horizonte Minerals Plc, (AIM: HZM, TSX: HZM) ( Horizonte or the Company ) the exploration

More information

Disclaimer AIM / TSX: HZM

Disclaimer AIM / TSX: HZM Investor Presentation Q1 2012 Disclaimer This document, and the information contained in this document, is confidential and is being supplied to you solely for your information and may not be reproduced,

More information

Skouries Update March 2018

Skouries Update March 2018 Skouries Update March 2018 Cautionary Note About Forward Looking Statements and Information Certain of the statements made and information provided in this presentation are forward-looking statements or

More information

NEWS RELEASE November 30, 2009

NEWS RELEASE November 30, 2009 NEWS RELEASE 09-32 November 30, 2009 www.first-quantum.com FIRST QUANTUM MINERALS ANNOUNCES BOARD APPROVAL FOR DEVELOPMENT OF KEVITSA PROJECT, FINLAND ENHANCED MINERAL RESERVES WITH INCREASED TONNES AND

More information

MCEWEN MINING ANNOUNCES RECORD RESOURCE ESTIMATE AT THE SAN JOSÉ MINE IN ARGENTINA

MCEWEN MINING ANNOUNCES RECORD RESOURCE ESTIMATE AT THE SAN JOSÉ MINE IN ARGENTINA MCEWEN MINING ANNOUNCES RECORD RESOURCE ESTIMATE AT THE SAN JOSÉ MINE IN ARGENTINA TORONTO, ONTARIO - (March 18, 2013) - (NYSE: MUX) (TSX: MUX) is pleased to announce that year-end 2012 mineral resource

More information

Three months ended Twelve months ended December 31, December 31, US$ Millions (except per share amounts)

Three months ended Twelve months ended December 31, December 31, US$ Millions (except per share amounts) NEWS RELEASE Corporate Office 150 King Street West, Suite 1500 P.O. Box 38 Toronto, ON M5H 1J9 Phone: +1 416 342 5560 Fax: +1 416 348 0303 Lundin Mining Fourth Quarter and Full Year Results Toronto, February

More information

Bellhaven Receives Favourable Preliminary Economic Assessment for its 100%- Controlled La Mina Gold-(Copper, Silver) Project, Colombia

Bellhaven Receives Favourable Preliminary Economic Assessment for its 100%- Controlled La Mina Gold-(Copper, Silver) Project, Colombia Bellhaven Receives Favourable Preliminary Economic Assessment for its 100%- Controlled La Mina Gold-(Copper, Silver) Project, Colombia PEA Study Highlights La Mina as One of the Lowest Cost Gold Development

More information

NEWS RELEASE. Centerra Gold Announces Positive Feasibility Study on the Öksüt Project

NEWS RELEASE. Centerra Gold Announces Positive Feasibility Study on the Öksüt Project NEWS RELEASE Centerra Gold Announces Positive Feasibility Study on the Öksüt Project All figures are in United States dollars. This news release contains forward-looking information that is subject to

More information

Horizonte Minerals. Perfectly positioned for the next nickel up-swing

Horizonte Minerals. Perfectly positioned for the next nickel up-swing 6 th February 2017 Sector: Mining (p) 3.0 2.5 2.0 1.5 Market data Source: LSE EPIC HZM Price (p) 2.48 12m High (p) 3.10 12m Low (p) 1.48 Shares (m) 1.17bn Mkt Cap ( m) 29.0m Free Float* 55.1% Market AIM

More information

Corporate Update August 2016 TSX: LUN OMX: LUMI

Corporate Update August 2016 TSX: LUN OMX: LUMI Corporate Update August 2016 TSX: LUN OMX: LUMI Cautionary Statements Caution Regarding Forward-Looking Information and Non-GAAP Performance Measures This presentation contains forward-looking information,

More information

For personal use only

For personal use only ASX Release 29 October 2015 QUARTERLY ACTIVITIES REPORT For the quarter ended 30 September 2015 Highlights: Mt Marion Lithium Project Construction of Mt Marion Lithium concentrate operation commences following

More information

TD Securities 2019 Mining Conference January 16 &17, 2019

TD Securities 2019 Mining Conference January 16 &17, 2019 TSX: LUN Nasdaq Stockholm: LUMI TD Securities 2019 Mining Conference January 16 &17, 2019 1 Candelaria, Atacama Region, Chile Cautionary Statements Caution Regarding Forward-Looking Information and Non-GAAP

More information

Second Quarter 2018 Results July 26, 2018

Second Quarter 2018 Results July 26, 2018 TSX: LUN Nasdaq Stockholm: LUMI Second Quarter 2018 Results July 26, 2018 1 Candelaria, Atacama Region, Chile Cautionary Statements Caution Regarding Forward-Looking Information and Non-GAAP Performance

More information

NEWS RELEASE. Resources at Galat Sufar South ( GSS ), in-pit and outside current design, continue to increase

NEWS RELEASE. Resources at Galat Sufar South ( GSS ), in-pit and outside current design, continue to increase Orca Gold Inc. 2000-885 West Georgia St. Vancouver, B.C., V6C 3E8, Canada Tel: +1 604 689 7842 Fax: +1 604 689 4250 NEWS RELEASE Orca Gold Drills 123 m at 1.96 g/t Au and 12.0 m at 8.36 g/t Au and Proves

More information

MANAGEMENT S DISCUSSION & ANALYSIS QUARTERLY HIGHLIGHTS SEPTEMBER 30, 2017

MANAGEMENT S DISCUSSION & ANALYSIS QUARTERLY HIGHLIGHTS SEPTEMBER 30, 2017 MANAGEMENT S DISCUSSION & ANALYSIS QUARTERLY HIGHLIGHTS SEPTEMBER 30, 2017 1. OVERVIEW Goldsource Mines Inc. (the Company or Goldsource ) is headquartered in Vancouver, BC and its common shares trade on

More information

COLONIAL COAL INTERNATIONAL CORP. Suite Howe Street, Vancouver, British Columbia, Canada, V6C 2T5 Telephone: (604)

COLONIAL COAL INTERNATIONAL CORP. Suite Howe Street, Vancouver, British Columbia, Canada, V6C 2T5 Telephone: (604) COLONIAL COAL INTERNATIONAL CORP. Suite 200-595 Howe Street, Vancouver, British Columbia, Canada, V6C 2T5 Telephone: (604) 568-4962 NEWS RELEASE COLONIAL COAL ANNOUNCES COMBINED RESULTS OF RECENT PRELIMINARY

More information

Definitive Feasibility Study Released 16:23 28-Feb-2017

Definitive Feasibility Study Released 16:23 28-Feb-2017 Regulatory Story Xtract Resources plc - XTR Definitive Feasibility Study Released 16:23 28-Feb-2017 RNS Number : 1114Y Xtract Resources plc 28 February 2017 For immediate release 28 February 2017 Xtract

More information

Stock Symbol: AEM (NYSE and TSX) For further information: Investor Relations (416)

Stock Symbol: AEM (NYSE and TSX) For further information: Investor Relations (416) Stock Symbol: AEM (NYSE and TSX) For further information: Investor Relations (416) 947-1212 (All amounts expressed in U.S. dollars unless otherwise noted) AGNICO-EAGLE FILES NEW TECHNICAL REPORT ON GOLDEX

More information

All amounts are in US dollars, unless otherwise indicated.

All amounts are in US dollars, unless otherwise indicated. TSX: IMG NYSE: IAG NEWS RELEASE IAMGOLD S FEASIBILITY STUDY FOR BOTO GOLD DELIVERS SIGNIFICANTLY IMPROVED PROJECT ECONOMICS 23% After-tax Internal Rate of Return Payback 3.4 years Net Present Value $261

More information

January 18, 2016 Capstone Extends Pinto Valley Mine Life to 2039 (all amounts in US dollars)

January 18, 2016 Capstone Extends Pinto Valley Mine Life to 2039 (all amounts in US dollars) Suite 2100 510 West Georgia Street Vancouver, BC, V6B 0M3, Canada Tel: 604-684-8894 Fax: 604-688-2180 www.capstonemining.com January 18, 2016 Capstone Extends Pinto Valley Mine Life to 2039 (all amounts

More information

For further information: Investor Relations (416)

For further information: Investor Relations (416) For further information: Investor Relations (416) 947-1212 (All amounts expressed in U.S. dollars unless otherwise noted) AGNICO EAGLE COMPLETES UPDATED NI 43-101 TECHNICAL REPORT ON THE MELIADINE GOLD

More information

Detour Gold Reports Fourth Quarter and Full-Year 2014 Results and Year-end 2014 Mineral Reserve and Resource Estimates

Detour Gold Reports Fourth Quarter and Full-Year 2014 Results and Year-end 2014 Mineral Reserve and Resource Estimates March 6, 2015 NEWS RELEASE Detour Gold Reports Fourth Quarter and Full-Year 2014 Results and Year-end 2014 Mineral Reserve and Resource Estimates Detour Gold Corporation (TSX: DGC) ( Detour Gold or the

More information

Aura Minerals Announces Third Quarter 2012 Financial and Operating Results and Corporate Office Relocation in 2013

Aura Minerals Announces Third Quarter 2012 Financial and Operating Results and Corporate Office Relocation in 2013 News Release No. 2012-18 TSX: ORA PO Box 10434 Pacific Centre #1950 777 Dunsmuir Street Vancouver, BC Canada V7Y 1K4 Phone: 604.669.4777 Fax: 604.696.0212 Email: info@auraminerals.com Website: www.auraminerals.com

More information

NOT FOR DISTRIBUTION TO US NEWSWIRE SERVICES OR DISSEMINATION IN THE UNITED STATES

NOT FOR DISTRIBUTION TO US NEWSWIRE SERVICES OR DISSEMINATION IN THE UNITED STATES NEWS RELEASE 09-01 NEW MILLENNIUM CAPITAL CORP. ANNOUNCES UPDATE OF KÉMAG MINERAL RESOURCE ESTIMATE BASED ON THE SPRING DRILLING PROGRAM, AND POSITIVE RESULTS OF KÉMAG PRE-FEASIBILITY STUDY, NOT FOR DISTRIBUTION

More information

NEWS RELEASE 03/2018 Symbol: TSX-V: PRB Shares Issued: 93,914,742

NEWS RELEASE 03/2018 Symbol: TSX-V: PRB Shares Issued: 93,914,742 NEWS RELEASE 03/2018 Symbol: TSX-V: PRB Shares Issued: 93,914,742 Probe Metals Increases Resource to 682,400 ounces Indicated at 2.35 g/t gold and 722,100 ounces Inferred at 2.41 g/t gold at the Val-d

More information

Gold Hawk Resources Inc.

Gold Hawk Resources Inc. Gold Hawk Resources Inc. Gold Hawk updates mineral resources and reserve estimates for the Coricancha Mine Vancouver, British Columbia, March 31, 2009 - Gold Hawk Resources Inc. ( Gold Hawk or the Company

More information

NEWS RELEASE Orca Gold Intersects 13m at 10.19g/t Au and 93.7m at 1.72g/t Au at its Block 14 Gold Project in Sudan

NEWS RELEASE Orca Gold Intersects 13m at 10.19g/t Au and 93.7m at 1.72g/t Au at its Block 14 Gold Project in Sudan Orca Gold Inc. 2000-885 West Georgia St. Vancouver, B.C., V6C 3E8, Canada Tel: +1 604 689 7842 Fax: +1 604 689 4250 NEWS RELEASE Orca Gold Intersects 13m at 10.19g/t Au and 93.7m at 1.72g/t Au at its Block

More information

KINROSS GOLD CORPORATION

KINROSS GOLD CORPORATION April 1 2014 KINROSS GOLD CORPORATION Results of the Tasiast feasibility study 1 1 CAUTIONARY STATEMENT ON FORWARD-LOOKING INFORMATION All statements, other than statements of historical fact, contained

More information

MASON GRAPHITE PRESENTS ITS UPDATED FEASIBILITY STUDY ECONOMIC RESULTS FOR THE LAC GUÉRET GRAPHITE PROJECT

MASON GRAPHITE PRESENTS ITS UPDATED FEASIBILITY STUDY ECONOMIC RESULTS FOR THE LAC GUÉRET GRAPHITE PROJECT MASON GRAPHITE PRESENTS ITS UPDATED FEASIBILITY STUDY ECONOMIC RESULTS FOR THE LAC GUÉRET GRAPHITE PROJECT December 5 th, 2018 Montreal, Quebec, Canada Mason Graphite Inc. ( Mason Graphite or the Company

More information

MEDIA RELEASE. OCEANAGOLD HAILE OPTIMISATION STUDY DELIVERS ENHANCED VALUE (All financial figures in US Dollars unless otherwise stated)

MEDIA RELEASE. OCEANAGOLD HAILE OPTIMISATION STUDY DELIVERS ENHANCED VALUE (All financial figures in US Dollars unless otherwise stated) MEDIA RELEASE 26 June 2017 OCEANAGOLD HAILE OPTIMISATION STUDY DELIVERS ENHANCED VALUE (All financial figures in US Dollars unless otherwise stated) (MELBOURNE) OceanaGold Corporation (TSX/ASX: OGC) (the

More information

For Immediate Release Date: July 4, 2017 # ORVANA PROVIDES UPDATE ON DON MARIO OPERATION; ANNOUNCES US$11.3 MILLION DEBT FINANCING

For Immediate Release Date: July 4, 2017 # ORVANA PROVIDES UPDATE ON DON MARIO OPERATION; ANNOUNCES US$11.3 MILLION DEBT FINANCING For Immediate Release TSX:ORV Date: July 4, 2017 #07-2017 ORVANA PROVIDES UPDATE ON DON MARIO OPERATION; ANNOUNCES US$11.3 MILLION DEBT FINANCING TORONTO, ONTARIO, July 4, 2017 - Orvana Minerals Corp.

More information

Boto Gold Project Feasibility Study Conference Call

Boto Gold Project Feasibility Study Conference Call Boto Gold Project Feasibility Study Conference Call October 23, 2018 l TSX: IMG l NYSE: IAG l Cautionary Statement All information included in this presentation whether in narrative or chart form, including

More information

Detour Gold Reports Third Quarter 2018 Results

Detour Gold Reports Third Quarter 2018 Results NEWS RELEASE Detour Gold Reports Third Quarter 2018 Results October 24, 2018 Detour Gold Corporation (TSX: DGC) ( Detour Gold or the Company ) reports its operational and financial results for the third

More information

PRESS RELEASE FOR IMMEDIATE RELEASE May 13, 2016

PRESS RELEASE FOR IMMEDIATE RELEASE May 13, 2016 CZN-TSX CZICF-OTCQB PRESS RELEASE FOR IMMEDIATE RELEASE May 13, 2016 CANADIAN ZINC FILES TECHNICAL REPORT ON 2016 PREFEASIBILITY STUDY UPDATE FOR THE PRAIRIE CREEK MINE Vancouver, British Columbia, May

More information

Detour Gold Achieves Production and Cost Guidance for 2017 and Provides 2018 Guidance

Detour Gold Achieves Production and Cost Guidance for 2017 and Provides 2018 Guidance January 16, 2018 NEWS RELEASE Detour Gold Achieves Production and Cost Guidance for 2017 and Provides 2018 Guidance Detour Gold Corporation (TSX: DGC) ( Detour Gold or the Company ) today announces fourth

More information

Ann Mason and the Revival of the Yerington District Nevada, USA. Robert Cann Robert Cinits Tom Watkins December 2014

Ann Mason and the Revival of the Yerington District Nevada, USA. Robert Cann Robert Cinits Tom Watkins December 2014 Ann Mason and the Revival of the Yerington District Nevada, USA Robert Cann Robert Cinits Tom Watkins December 2014 1 Cautionary Statement This presentation contains forward-looking statements within the

More information

News Release. B2Gold Corp. Announces Positive Results from the Preliminary Economic Assessment for the Gramalote Project in Colombia

News Release. B2Gold Corp. Announces Positive Results from the Preliminary Economic Assessment for the Gramalote Project in Colombia News Release B2Gold Corp. Announces Positive Results from the Preliminary Economic Assessment for the Gramalote Project in Colombia Vancouver, March 12, 2014 B2Gold Corp. (TSX: BTO, NYSE MKT: BTG, NSX:

More information

McEWEN MINING ANNOUNCES POSITIVE FEASIBILTY STUDY FOR EL GALLO PHASE II, MEXICO

McEWEN MINING ANNOUNCES POSITIVE FEASIBILTY STUDY FOR EL GALLO PHASE II, MEXICO McEWEN MINING ANNOUNCES POSITIVE FEASIBILTY STUDY FOR EL GALLO PHASE II, MEXICO TORONTO, ONTARIO - (September 10, 2012) - McEwen Mining Inc. (NYSE: MUX) (TSX: MUX) is pleased to announce results of the

More information